From Fault Recording to Disturbance Recording

Sakis Meliopoulos Georgia Power Distinguished Professor School of Electrical and Computer Engineering Georgia Institute of Technology Atlanta, Georgia 30332

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Outline Why FR DR Requirements/data processing Historian for Disturbance Play Back

Conclusions
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Why FR DR Following the 2003 blackout, numerous engineers worked for months to align and synthesize fault recorded data for the purpose of recreating the disturbance and the evolution of the blackout

There must be a BETTER WAY


Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

FR DR: How For Disturbance Recording and playback: Recording system requirements Storage schemes (what to store data processing - model) Playback and system synthesizing
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

What to Store The SuperCalibrator Concept as a Data Compressor


Fact: A plethora of data is available at the substation level

The SuperCalibrator is conceptually very simple:


Utilizes all available data (Relays, DFRs, PMUs, Meters, etc.). Utilizes a detailed substation model (three-phase, breaker-oriented model, instrumentation channel inclusive and data acquisition model inclusive). At least one GPS synchronized device (PMU, Relay with PMU, etc.) Results on UTC time enabling a truly decentralized State Estimator. Extracts the Real Time Model of the System form all available measurements mentioned above.

Recently this approach has been extended to dynamic state estimation with build in fault locating: PMU data of phasors, frequency and rate of frequency change are used to provide the dynamic state of the system in a reliable and robust way
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Distributed Dynamic State Estimation Implementation

System is Represented with a Set of Differential Equations (DE) The Dynamic State Estimator Fits the Streaming Data to the Dynamic Model (DE) of the System
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

SuperCalibrator Measurement Set


Conversion of Non-Synchronized Measurements into Phasors

~ ~ j Async Amease
is a synchronizing unknown variable
cos() and sin() are unknown variables in the state
estimation algorithm. There is one variable for each non-synchronized relay

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Dynamic State Estimation Block diagram


YES

z
Measurements

zm
Power System Dynamic Model x,y,z

e
-

Dynamic State Estimator

Bad Data Detection

NO

e, y e, z e Application x

(Stability Monitoring)

Dynamic State Estimation Problem is Converted to Static by Integration Least Squares Solution

e x

Bad Data Detection Bad Data Identification and Removal

Pseudomeasurements

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Dynamic State Estimation: Numerical Experiments

Test System: 3 generating substations and an infinite bus connected through overhead transmission lines Substation 1: Substation of interest where DSE is performed Simulated 3 phase fault near Substation 3 DSE uses PMU and other relay measurements in the first substation DSE algorithm estimates local and neighboring substation states
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Numerical Experiments: Post Fault DSE Performance


Simulated and Estimated Voltage Magnitude at Substation 3 (neighboring substation) for post fault condition

Simulated and Estimated Voltage Phase angle at Substation 3 (neighboring substation) for post fault condition

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

10

Distributed Dynamic State Estimation Implementation 1


Measurement Layer
Phase Conductor
v(t) i(t)

IED Vendor D

Physical Arrangement
Relay Vendor C Attenuator
Data Processing

LAN

Current Transformer

FireWall

Potential Transformer

Instrumentation Cables

i1(t) i2(t)

Burden

PMU Vendor A
SuperCalibrator

Data Flow

Attenuator

v1(t)

v2(t)

PMU Vendor C Burden

Data/Measurements from all PMUs, Relays, IEDs, Meters, FDRs, etc are collected via a Local Area Network in a data concentrator. The data is used in a dynamic state estimator which provides the validated and high fidelity dynamic model of the system. Bad data detection and rejection is achieved because of high level of redundant measurements at this level.
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Encoding/Decoding Cryptography

Anti-Aliasing Filters

LAN

11

Distributed Dynamic State Estimation: Implementation 2

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

12

The USVI WAPA System Provides an Excellent Testbed for the Distributed Dynamic State Estimator
Program XfmHms - Page 1 of 1

The USVI WAPA system is a small 270 MW, Five Substations, 35 kV/13 kV System. 17 relay/PMUs. Faults create large swings of the generators as manifested by the frequency oscillations in the Feb 20, 2008 event. In addition events are more frequent in the USVI system than mainland systems.

c:\agc-projects\virginislands_ii\viwapa_events\february20_2008\d-303 disturb - Feb 20, 2008, 12:18:11.980001 - 200 27.67 k 16.53 k VA (V) VB (V) VC (V)

5.399 k

-5.735 k

-16.87 k

-28.00 k 3.079 k 1.827 k IA (A) IB (A) IC (A)

574.8

-677.0

-1.929 k

-3.181 k 63.81 62.01 Frequency (Hertz)

60.21

58.41

56.61

54.81 12.48 12.53 12.58

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

13

Distributed Dynamic State Estimation During a Fault


The Dynamic State Estimator Operates at 10 times per second What happens when a fault occurs?

Introduce the Fault Location (F) as another State to be Estimated


Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

14

Historian for Disturbance Play-Back Substation Storage Scheme


Full Model + Model Changes + Data
System FULL MODEL stored once a day in WinIGS format time of day can be arbitrarily selected, for example at 2 am. (example storage follows) Report system changes by exception UTC time (example storage follows) Storage of state data: at each occurrence of the state estimator, the estimated states are stored in COMTRADElike format. (example storage follows)
15

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Substation Storage Scheme


FULL MODEL + Model Changes + Data
System FULL MODEL stored once a day in WinIGS format. Time of day can be arbitrarily selected, for example at 2 am. Example storage:
MODEL 3 DEV_TITLE Long Bay Substation NUMERIC_ID 77 NET_LAYER 3 GEO_COORDINATES 18.339260000 -64.920927000 COORDINATES -137 2 -144 -1 -137 4 -138 -1 -145 0 -145 7 -145 4 -141 6 COORDINATES -141 -2 -142 2 INTERFACES FDR-9B 3-0A0B2 FDR-8B FDR10B FDR-YH1 3-0B0D 3-0A0B1 FDR-7B INTERFACES FDR-YH2 PARAMETERS LONGBAY VIWAPA VIWAPA END_MODEL

Substation Model

MODEL 123 DEV_TITLE Feeder #11, Long Bay to East End Substation - Section 1 NUMERIC_ID 246 COORDINATES -145 7 -145 10 -141 13 -132 13 -126 10 -120 6 -114 4 -109 3 COORDINATES -107 1 -105 -2 CIRCUITS 1 INTERFACES 3-0B0D_N 3-0B0D_A 3-0B0D_N 3-0B0D_B 3-0B0D_N 3-0B0D_C 3-0B0D_N UG350_N INTERFACES UG350_A UG350_N UG350_B UG350_N UG350_C UG350_N PARAMETERS 5 7 14.40 3868.0 0.0 0.0 0.0 CABLE PARAMETERS VI34KV750KCM-CU-TS -0.10802 -3.09671 CKT1 CABLE VI34KV750KCM-CU-TS 0.00119 -2.92351 PARAMETERS CKT1 CABLE VI34KV750KCM-CU-TS 0.11108 -3.09234 CKT1 CABLE CONDUIT8 PARAMETERS -0.00656 -2.93099 CKT1 COPPER 4/0 0.00667 -3.18108 CKT1 PARAMETERS 1 CKT1 5499.0 25.0000 34.5000 END_MODEL MODEL 123

Transmission Line Model

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

16

Substation Storage Scheme


Full Model + MODEL CHANGES + Data
Report system changes by exception UTC time

MODEL_CHANGE TIME 1267771497 450123 TYPE XFMR_TAP DEVICE_ID 1265 VALUE R12 END_MODEL_CHANGE MODEL_CHANGE TIME 1267771791 609355 TYPE BREAKER_OPERATION DEVICE_ID 3409 VALUE CLOSE END_MODEL_CHANGE . . . . . . . . .

SOC + Fractional Second March 05, 01:44:57.450123

File Format Each line begins with a keyword optionally followed by one or more arguments.
17

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

Substation Storage Scheme


Full Model + MODEL CHANGES + Data
Storage of state data: at each occurrence of the state estimator, the estimated states are stored in COMTRADE-like format. The following File Types Are Used:

Configuration Files: Description of State Names Types and Locations

State Data Files: State Values plus Model Change Information

Triggered Event Files: Waveform data recorded for each triggering event in COMTRADE format.

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

18

Substation Storage Scheme


Full Model + MODEL CHANGES + Data
Storage of state data: at each occurrence of the state estimator, the estimated states are stored in COMTRADE-like format.

Configuration File One for Each Day


File Naming Standard: CompanyName_SubstationName_SOC.scf File Content: <Title or Brief Description> <SOC> <uSec>
<Number of States> <State Name>, <State Type>, <Bus Name>, <Phase>, <Power Device ID> <State Name>, <State Type>, <Bus Name>, <Phase>, <Power Device ID> ... ...

Where:
SOC: is the Second of Century Time Code defined as the number of seconds elapsed since midnight of January 1, 1970 (in UTC time)

uSec is a fractional second value in microseconds.


Above structure repeated each time the set of states changes

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

19

Substation Storage Scheme


Full Model + MODEL CHANGES + Data
Storage of state data: at each occurrence of the state estimator, the estimated states are stored in COMTRADE-like format.

State Data File One for Each Day


File Naming Standard: CompanyName_SubstationName_SOC.sdf File Content: STATE_VECTOR <SOC> <uSec> <State Value> <State Value> <State Value>. . . STATE_VECTOR <SOC> <uSec> <State Value> <State Value> <State Value>. . . ... ... STATE_VECTOR <SOC> <uSec> <State Value> <State Value> <State Value>. . . MODEL_CHANGE TIME 1267771791 609355 TYPE BREAKER_OPERATION DEVICE_ID 3409 VALUE CLOSE END_MODEL_CHANGE STATE_VECTOR <SOC> <uSec> <State Value> <State Value> <State Value>. . . STATE_VECTOR <SOC> <uSec> <State Value> <State Value> <State Value>. . . ...
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

20

Substation Storage Scheme


Full Model + MODEL CHANGES + Data
Storage of state data: at each occurrence of the state estimator, the estimated states are stored in COMTRADE-like format.

Triggered Event Files One for Each Event


File Naming Standard: CompanyName_SubstationName_SOC.cfg CompanyName_SubstationName_SOC.dat

File Content: Standard COMTRADE Waveform File Format

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

21

Re-Construction of System State


System Operation Play Back over a user specified time interval (t1 to t2) Reconstructed state is presented via graphical visualization Techniques, ( 3-D rendering, animation etc) with multiple user options.

Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

22

Wide Area Monitoring and Disturbance Play-Back

The SuperCalibrator at each substation stores the streaming data with (a) time tags, (b) network status, and (c) substation real time model at the time. This data can be played back for any user specified past time interval. Various visualizations allow the user to observe specific performance parameters of the system. Examples are: (a) voltage profile evolution, (b) transient swings of the system, (c) electric current flow, etc.
Georgia Tech Fault and Disturbance Analysis Conference Atlanta, Georgia, May 3-4, 2010

23

Conclusions
The Dynamic State Estimator fits PMU data to the Dynamic Model of the System: Enables a powerful method to study system dynamics and predict performance. Fault Location Estimation has been integrated into the Dynamic State Estimator. Substation storage scheme (historian) that enables automated Disturbance Play Back. The implemented historian of (full model) + (model changes) + (data) has been presented. Comments and suggestions are welcome.

Need for standards for disturbance+model storage and playback that include coincident system models.
24