SECTION 01017 CONTRACTOR USE OF PREMISES
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

SUBSECTION INDEX PART 1 - GENERAL

DESCRIPTION

1.01 1.02 1.03 1.04

Requirements Included Work Permits Contractor Facilities Site Approval Protection of Property

PART 1 - GENERAL
DATE JOB/EWO

1.01 A.

Requirements Included The Contractor, during the performance of this Contract, will be restricted to the use of the Work site, haul roads, housing and messing, and storage and laydown areas assigned by Saudi Aramco. The Contractor shall comply with applicable criteria and standards for construction and use of field offices, work sites and laydown areas. Work Permits Saudi Aramco approval is required prior to any excavation, temporary construction or connection to existing utilities systems for field offices. The Contractor shall request Saudi Aramco approval as follows: 1. The request for utilities connections shall include a design and installation package showing type of materials, methods, test procedures and work specifications. The Contractor may not interrupt any service without prior written approval of Saudi Aramco. Contractor shall request inspection of the Work by Saudi Aramco prior to final connection and backfilling. The Contractor shall perform all testing of HV/LV cables, transformers, meters and piping in accordance with manufacturers specification and witnessed by Saudi Aramco. The Contractor shall obtain excavation approval from Saudi Aramco prior to initiating any subsurface work. Unless otherwise approved by Saudi Aramco, road crossings must be completed within 7 days and must include repair of road. A copy of Saudi Aramco excavation approval must be in the possession of the person in charge at the excavation site.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

1.02 A.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

B.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

2.

3.

Date:

4.

Section 01017
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

1 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

CERT

5.

The Contractor shall, in accordance with the requirements of Saudi Aramco Representative, afford access to the site for other contractors to complete their work as and when necessary as directed by Saudi Aramco Representative.

1.03
DESCRIPTION

Contractor Facilities Site Approval Contractor shall obtain Saudi Aramco approval of the construction of temporary facilities and all such construction shall be in accordance with applicable regulations for construction and use of field offices, worksites and laydown areas. Contractor's request for temporary facilities shall include three copies of a site plan showing size, location and use of desired area and location, size and construction details of temporary building, installation, facilities, utilities and access roads. The request shall include the requested occupancy date, period of occupancy and special requirements if any. No approval will be granted by Saudi Aramco to the Contractor for the establishment of plants on Saudi Aramco property for manufacture of goods available from Saudi Arabian manufacturers. Protection of Property Requirements hereinafter specified are in addition to Special Condition "Protection of Property".

A.

B.

DATE JOB/EWO

C.

REV. NO.

1.04
DISCIPLINE ENGINEER

__ ________ _ DATE: ________

A.

PROJECT ENGINEER
____________ DATE

B.

Existing Surfaces and Facilities: 1. Take positive action to protect all existing surfaces and facilities from any damage resulting from construction operations unless modifications to the surfaces or facilities are required as a part of the Contract. Protect all paving, landscaping, and utility facilities from damage caused by mobile and stationery equipment, including vehicles delivering materials to the site. Provide and maintain adequate protection of all adjacent structures. When required by law, or for the safety of the Work, shore, brace, underpin or otherwise protect those portions of adjacent structures which may be affected by the work. The Contractor, before commencement of any part of the Work, shall give any notices required to be given to an adjoining landowner or other parties.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

3.

Date:

C.

Utilities: 1. Utilities as known to Saudi Aramco are shown on the Drawings. The locations of these utilities are not guaranteed, nor is there any guarantee
DWG. TYPE PLANT NO. INDEX DRAWING NO.

Section 01017
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

2 OF 3

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


that other utilities do not exist. Unless otherwise specifically directed, protect utilities from damage and prevent any interruption of service. 2. Before commencing construction, verify the location of all utilities in the vicinity of the Work area. Prior to beginning construction affecting any utility submit a plan for performing the Work to Saudi Aramco for review and obtain an excavation permit.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

DESCRIPTION

D.

New Work: 1. All finished surfaces of items shall be clean and not marred upon acceptance of the structure. Refinish all such surfaces that have been inadequately protected and are damaged. The Contractor shall at all times provide and maintain adequate protection against weather so as to preserve all work, materials, equipment, apparatus and fixtures free from injury or damage. Do not use items of equipment that are intended to form a part of the completed work as construction equipment without specific approval from Saudi Aramco in each instance.

2.
DATE JOB/EWO

3.

REV. NO.

E.
DISCIPLINE ENGINEER

Detection of Movement and Damage to Adjacent Existing Facilities: 1. Conduct a pre-construction inspection of existing facilities and structures in the vicinity of the Work site. Document the inspection by photographs, sketches and narratives assembled into an inspection report. The inspection shall be signed and dated by the owner/lessee of the facility or structure, indicating agreement that the report represents an accurate description of the existing condition. Submit a copy of the inspection report to Saudi Aramco.

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

F.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Repair of Damage: As soon as possible after discovery of any damage to surfaces or facilities which are to remain in place, the Contractor shall notify Saudi Aramco as to the damage. Saudi Aramco will charge the Contractor for any repairs or direct the Contractor to repair such damage. All repairs shall result in conditions equal in strength to the previous conditions. All damaged surfaces shall be repaired in a manner and to a quality acceptable to Saudi Aramco.

- END OF SECTION Date:

Section 01017

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

3 OF 3

00

You might also like