PRAVEEN P GEORGE mob no: +91 8826724171 : +91 8813083894

Mail To: prvnpg@gmail.com : prvn_pg@yahoo.com : george31087@rediffmail.com

-----------------------------------------------------------------------------------------------------------------------More than 4 years experience in piping projects,planning,construction & design in field of oil & gas, petrochemical & fertilizers.
EXPERTISE:

Well verse with piping commodities, National & International Codes & Standards, Piping specifications, Pipe Wall thickness Calculation (as per ASME B 31.3). Hand on experience of erection, precommissioning , layout, p&id, design , stress. Well Aware with the software such as PDMS 11.6, AUTOCAD 2008, CAESAR II 5.10.

PROFESSIONAL EXPERIENCE

1) Toyo Engineering India Ltd Duration April 2012 to present Designation Piping Engineer . Role Piping Execution. 2) Thermax Ltd Duration December 2010 to April 2012 Designation Project Engineer Role Projects and Execution 3) Onshore Construction Pvt Ltd Duration April 2009 to December 2010 Designation Piping Engineer Role Iso Drafting , piping execution and planning .
1). JOB RESPONSIBILITIES AT TOYO ENGINEERING INDIA LTD.

Piping fabrication , erection , allignment, mechanical clearance , Pressure test , Punch killing ( punch from both mechanical and process side) Format clearance , Billing approvals. Material reconcilation. Raise material constraints , co-ordinate with other departments. Assisting in System turnover. Timely job completion. Handling a team including junior piping engineers & subcontractors. Getting all reports attested by client regarding my unit. Loop identification and completion as per front availability. Schedule planning and frequent reporting to GSI and RCM. Assuring that all QA/QC requirements are fullfilled. Abiding and implementing all steps required for a safe and healthy job completion. Well versed with all type of drawings. Command over ASME B31.3.

2) . JOB RESPONSIBILITIES AT THERMAX LTD

Assist the construction manager in project co-ordination at various sites. Inspects fabrication/ construction for conformance with project equipment and piping requirements and applicable codes, as assigned Communicates with project manager on a regular basis regarding progress, changes, budget & schedule. Steps-in to interface with Customer and others upon Project Managers request. Regular visit at various sites, constant follow up with site engineers, sub-contractors regarding job completion on time. Attend to any kind of constraints at site regarding engineering, materials, manpower, cranes, tools and tackles etc. Site mobilisation and demobilisation. Boilers erection , power piping , allignment,pressure test, IBR procedures and approvals. See through precommissioning and commissioning activities. Kick off meetings with client and subcontractor to make sure smooth job completion on time. Co-ordination with vendors, transportation departments , material procurement depts regarding material delivery on time. Make sure HSC policies and proper worhing environment is maintained at site. Make sure invoices are submitted and bills are cleared monthly. Co-ordinate with sites and prepare WCC by every project month end. Make sure labour pyments and other statutory regulations are maintained at site. Make sure all QA/QC requirements are fullfilled at site. Perform performance test and then receive job completion certificate from client. Regular followup with IBR inspectors and facilitate all their site visits. Well acquainted with Equipment erections, rotary and static equipment allignments, Pressure parts, power piping. Well acquainted with B31.1 procedures. Job planning in MS projects, preperations of erection protocols. Safe fabrication and errection of structure, piping & plant equipments; its documentation and keep record. Inspection of all piping material / piping work /piping errection. Inspection of insulation material as per specification and proper fixing on equipments and pipings. To Manage Pre-commissioning & commissioning activities of new plants. Bills checking & verification Co-ordination with other departments for effective project execution. Responsible for safety of Work man & Machine in the plant and to develop safety culture in deptt. Coordination with various department involved in project execution.

3) . JOB RESPONSIBILITIES AT ONSHORE CONST CO PVT LTD

Iso Drafting Piping Erection, precommissioning and commissioning.

QA/QC procedures followed, pressure testing performed. Working experience on power piping, process piping and utility piping. Cost comparison, vendor selection, material procurement. Labour management, maintaining clear discipline at site among work force. Cost effective usage of tools, tackles and consumables. Bill preparation and monthly job completion certificates getting attested by client. Job planning in MS Projects. Prepaing equipment erection protocols and Autocad presentations of heavy equipment erections.Safe fabrication and errection of piping & plant equipments; its documentation and keep record. Inspection of all piping material / piping work /piping errection. Inspection of insulation material as per specification and proper fixing on equipments and pipings. To assist Pre-commissioning & commissioning activities of new plants. Bills checking & verification Co-ordination with other departments for effective project execution. Responsible for safety of Work man & Machinery , tools and tackles in the plant and to develop safety culture in deptt. Coordination with various department involved in project execution.

ACHIEVEMENTS IN CAREER

Awarded as best engineer for the year 2011 by Thermax Ltd. Successfully has accomplished 4 shutdowns in oil and gas sector on time.
ACADEMIC QUALIFICATION
MECHANICAL ENGINEER (BTECH) PASSED OUT WITH 71% FROM CUSAT UNIVERSITY. 12TH PASSED OUT WITH 91% FROM KERALA HSC BOARD. 10TH PASSED OUT WITH 77% FROM ICSE BOARD. COMPLETED PIPING DIPLOMA COURSE FROM SMART BRAINS ENGINEERS AND TECHNOLOGISTS PRIVATE LTD.

SKILL SET
CAESAR II STRESS ANALYSIS DYNAMIC & STATIC ANALYSIS SYSTEM MODELLING PDMS Operating System: Windows 9X/2000/XP/windows 7 Programming Languages Auto cad 2008 MICROSOFT WORD. MICROSOFT EXCEL. MS PROJECTS ASNT LEVEL2 IN RT,VT,PT,UT,MT,RT. PV ELITE :C,C++ .

PROJECT DETAILS

SERIAL NO: 1

DESIGNATION PIPING ENGINEER

PROJECT DETAILS HALDIA PETROCHEMICALS LTD (HPL) SUPERMAX PROJECT LLDPE MRPL ONGC (REFINERY) CDU/VDU UNIT REVAMP PROJECT GNFC (FERTILIZERS) 109TPH FM BOILER HRSG 12 TPH BI DRUM BOILER. RAYMOND TEXTILE MILLS DFCPL (FERTILIZERS) 90 TPH HRSG BOILER 80 TPH FM BOILER 2 UNITS THERMAX LTD MUNDRA SEZ ASSEMBLY SHOP (EXPORT JOB) 80TPH DIESEL FIRED FM BOILER FOR JIFCO PROJECT. (EXPORT JOB) IOCL SBR PROJECT. (REFINERY)

PROJECT PERIOD APRIL 2009 TO FEB 2010

WORKED WITH OCCPL

PIPING ENGINEER

FEB 2010 TO DEC 2010

OCCPL

3 4

PROJECT ENGINEER PROJECT ENGINEER PROJECT ENGINEER PROJECT ER

DEC 2010 TO MARCH 2011 MARCH 2011 TO AUGUST 2011 AUG 2011 TO SEPT 2011 OCT 2011 TO FEBRUARY2012

THERMAX LTD THERMAX LTD

5 6

THERMAX LTD THERMAX LTD

PROJECT ER

MARCH 2012 TO APRIL 2012. APRIL 2012 TO TILL DATE.

THERMAX LTD

PIPING ENGINEER

TOYO ENGINEERING INDIA LTD

PERSONAL DATA Date of Birth: 17/3/1987 Sex: Male Nationality: Indian Marital Status: Single Fathers Name: GEORGE PHILIP

Religion : Christian
DECLARATION I consider myself familiar with mechanical engineering aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge. PRAVEEN P GEORGE