You are on page 1of 5

OCEANUS

DOCUMENTARY ROOM
OMAR MAUCO

11

INTRODUCTION The Documentary Room is the designated room for the storage of the Final Diagram of the FSO KhalifE.Fairs. The D.R. is at the B deck inside the accommodation area and permanently locked for security reasons. There are three (3) Final Drawing Inventory Lists to introduce the seafarer to an easy way to find its interest.

Documentary Room port view

Documentary Room Stbd View

INDEX All diagrams are placed at their respective equipment folder. A basic distribution is shown below: BA HU PD ME HO AC HV EL Basic Steel Structure Piping System Machinery Hull Outfiffing Accommodation HVAC Electric

RESULTS After checking all folders (Blue boxes not included) the following observations were noted: Check of Folder 1 Basic Lines Plan Draft mark arrangement Dangerous zone plan Freeboard mark arrangement Damage control plan Damage control plan Docking Plan Freeboard Provisional Trim & Stability Booklet Provisional Trim & Stability Booklet Final General Arrangement Sounding Table manual Final Trim & Stability Booklet Result of I/E & Dwt Meas Final capacity plan with Dwt scale Final Damage Stability Calculation Cargo Tank Calibration Provisional Damage Stability calculation SOPEP Manual Type of document (final) (final) (final) (final) (final) (For Approval) (final) (final) (final) (For approval) (final) (final) Requires 2 additional stes. Missing (note 1) (final) (final) Missing (note 1) (final) Requires 2 additional sets. (final) (For Approval) Requires 2 additional sets. Qty 01 01 01 01 01 01 01 01 01 01 01 01

01 01 01 01 01

Note 1: This drawing will be provided after finish DNV approval. Check of Folder 2-1 HU Steel Structure All in good order Check of Folder 2-2 HU Steel Structure All in good order Check of Folder 3-1 PD Piping System All in good order Cargo Operating Manual Requires 2 additional for the CCR uses. (final) Type of document Qty 01 Type of document Qty Type of document Qty

Check of Folder 3-2 PD Piping System All in good order Check of Folder 3-4 PD Piping System All in good order Check of Folder 3-5 PD Piping System All in good order Check of Folder 3-6 PD Piping System All in good order Check of Folder 3-7 PD Piping System All in good order Check of Folder 3-8 PD Piping System All in good order Check of Folder 4-1 ME Machinery All in good order Check of Folder 4-2 ME Machinery All in good order Check of Folder 4-3 ME Machinery All in good order Check of Folder 5-1 HO Hull Outfitting All in good order Check of Folder 5-2 HO Hull Outfitting All in good order Check of Folder 5-3 HO Hull Outfitting All in good order Check of Folder 6-1 AC Accommodation All in good order

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Check of Folder 6-2 AC Accommodation All in good order Check of Folder 6-1 AC Accommodation All in good order Check of Folder 7-1 HV-HVAC Checked by First Eng. Check of Folder 7-2 HV-HVAC Checked by First Eng. Check of Folder 8-1 EL-Electric Checked by First Eng. Check of Folder 8-2 EL-Electric Checked by First Eng. Check of Folder 8-3 EL-Electric Checked by First Eng. Check of Folder 8-4 EL-Electric Checked by First Eng. Check of Folder 8-5 EL-Electric Checked by First Eng. Check of Folder 8-6 EL-Electric Checked by First Eng.

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

Type of document

Qty

You might also like