TO CC.
1.00 2.00
Report No : Date :
Rev. 2
K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 C 9.00 C 10.00 C Symbols Yesterday = 11.00 C 12.00 C 13.00 C Cloudy (C), 14.00 C 15.00 S 16.00 S 17.00 S 18.00
24.00
Sunshine (S),
MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours
No.
Description
Total M/D
Total MH
No.
Description
Total M/D
Total MH
ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Area Shop Shop Shop Shop Shop Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Joint Set Set Set Set Set Set Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 1 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Installation Pump For 03P030A Area Shop Shop Shop Shop Shop Shop Shop Shop 03B Unit Set Joint Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 1 No. 1 2 3 4 5 6 7 8 9 10 11 Activities (Tomorrow) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Reactor Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Loot Bolt Reactor 03R003 Area Shop Shop Shop Shop Shop Shop Shop 03B 03B 03B Unit Set Joint Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 1 1 24 3 3 8 4 2 5 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 40 20 8 2 80 88 320 160 64 16 40 24 24 64 32 16 10 11 40 20 8 2 5 3 3 8 4 2 135 80 88 320 160 64 16 40 24 24 64 32 16 1,080 Description 2 2 2 4 Indirect 1 1 3 2 1 1 8 8 24 16 8 8 16 16 16 32 1 1 3 2 1 1 2 2 2 4 8 8 24 16 8 8 16 16 16 32 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description 3 3 8 4 2 5 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 41 22 7 2 80 88 328 176 56 16 40 24 24 64 32 16 10 11 41 22 7 2 5 3 3 8 4 2 137 Unit ea ea ea 80 88 328 176 56 16 40 24 24 64 32 16 1,096 Q'ty 2 2 2 4 Indirect 1 1 3 2 1 1 8 8 24 16 8 8 16 16 16 32 1 1 3 2 1 1 2 2 2 4 8 8 24 16 8 8 16 16 16 32