EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-155 6 June 2013 5 June 2013 08.00-12.00


21.00 22.00 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 C 9.00 C 10.00 C Symbols Yesterday = 11.00 C 12.00 R 13.00 R Cloudy (C), 14.00 R 15.00 R 16.00 R 17.00 R 18.00

Working Date Working Time


19.00 20.00

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Chipping Box Out For Install Damper Installation Pump For 03P030A Loot Bolt Reactor 03R003 Area Shop Shop Shop Shop Shop Shop Shop Shop OSBL 03B 03B Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Joint Set Set Set Set Set Set Set Set Set Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 1 4 1 24 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 11 12 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Loot Bolt Reactor 03R003 Chipping Box Out For Install Damper Area Shop Shop Shop Shop Shop Shop Shop Shop 03B 03B 03B OSBL Unit Set Joint Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 1 1 24 4 No. 1 2 3 4 5 6 7 8 9 10 11 12 Activities (Tomorrow) Fit-up and welding Hopper Reactor Fit-up and welding Pipe 36" 800HT Fit-Up Pipe 66" 304H For Hydrotest Fit-Up Pipe 28" 800HT For Hydrotest Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Reactor Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Loot Bolt Reactor 03R003 Chipping Box Out For Install Damper Area Shop Shop Shop Shop Shop Shop Shop 03B 03B 03B OSBL Unit Set Joint Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 1 1 1 24 4 2 3 8 4 2 5 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 8 13 42 19 8 2 32 52 168 76 32 8 20 8 12 32 16 8 8 13 42 19 8 2 5 2 3 8 4 2 135 32 52 168 76 32 8 20 8 12 32 16 8 540 Description 1 3 2 4 Indirect 1 1 4 1 1 1 4 4 16 4 4 4 4 12 8 16 1 1 4 1 1 1 1 3 2 4 4 4 16 4 4 4 4 12 8 16 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 13 36 22 8 2 6 5 5 1 3 7 3 3 72 104 288 176 64 16 48 40 40 8 24 56 24 24 9 13 36 22 8 2 6 5 5 1 3 7 3 3 142 Unit ea ea ea 72 104 288 176 64 16 48 40 40 8 24 56 24 24 1,136 Q'ty 1 3 2 4 Indirect 1 1 4 1 1 1 8 8 32 8 8 8 8 24 16 32 1 1 4 1 1 1 1 3 2 4 8 8 32 8 8 8 8 24 16 32

EQUIPMENT AND MACHINERY REPORT

Welding Plug Handrail For Trim Cooler Shop

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /