Aim of presentation

The aim of our presentation is to appraise t he Management what we have learned from the Dynagro as well as from Mr. Patrick. Those thing we are going to implement in the Texereurop (BD) Ltd. Sequence of Presentation: o What is productivity? o Problem you may face. o Productivity tools. o What is industrial engineering? o What is method study. o Basic elements of method study. o what is method study procedure? o What is work measurement? o Purpose of work measurement. o Work measurement techniques. o What is time study? o Time study procedure. o What is production study? o What is potential study? o Potential study procedure. o Bar chart. o What is GSD? o What GSD gives?

o A simple operation o Work analysis t techniques. o Out commitment. o Question and answer season. What is productivity? In general ratio of output to input Productivity = Out pur/Input 100 Problem you may ace in productivity : * Productivity Low output, low labour utilisation Targets not met, poor efficiency Inefficient style change Low moral, high labour turnover and excessive training costs Low return on capital investment o Industrial Engineering o 5S System o PDCA Cycle o KAIZAN o Total Quality Management o Six Sigma o Just in Time o Lean Manufacturing What is I.E-? Compete with globalization Face the up-coming challenges Setting the standard procedures. Set the accuracy and accountability Transparency of reporting Understanding the value of time.

Productivity tools:

Communication buildup between dept. Meet the buyer requirements. Meet the buyer requirements. Function of I.E Analysis of the work. Develop the method Measure the work Set the SMV & Target Cost per minute Develop system & Procedure Continuous follow-up What is method study? o Is the dystemic recoding & critical examination of existing of proposed of way doing work, as a means of developing and applying easier & more effective methods and reducing cost. Basic element of method study? o o o o E-Eliminate C-Combined R-Re arrange S-Simplify

Procedure of method study SREDDIM Select, Record, Examine, Define, Develop, Install and Maintain . Work Measurement No Measurement ..................!!! No Management ...................!!! What is work measurement? o Work measurement is an application of techniques.

o Designed to establish the time for a qualified worker. o Carry out a specified job at a defined level of performance.

Purpose of work measurement: o Work measurement is concerned with investigating, redacting and subsequently elimination ineffective time. Work measurement techniques: Time Study. Production Study Potential Study PMTS MTM1 MTM2/GSD

What is time study? Time study is a work measurement technique to set the SMV Time study procedure:

What is production study? o To prove the capacity. o To find out non-productive time o To clear the bottle neck What is potential study? o To see current picture of the line quickly o Take the immediate decision about the line o To balance the line smoothly o Finally achieve the line target. Potential study procedure:

Shoulder ioint Sleeve attach Neck attach Side seam Bottom hem
50 100 150 200 250 300

146

91

Shoulder joint Sleeve attach Neck attach Side seam Bottom hem
50 100 150 200 250

260

146
315

91
300

300

Shoulder joint Sleeve attach Neck attach


140

185

Side seam Bottom hem


50 100 150 200 250
300

300

WHAT IS GSD?
GSD is a technique for METHODS ANAL YSIS
and the setting of TIME

STANDARDS

GSD Give you ...


Method Time Cost Production Capacity

A SIMPLE OPERATION
ACODE MG2T DESCRIPTION Match & Get 2 Parts Together TMU 76 38 17 61 79 50 23 FOOT Position To Needle MS1A Sew To Hold AM2P Align Edges S34LA Sew 34cm IN 1 Burst TCUT Cut Threads with Scissors AS1H Put Aside with 1 Hand

Total SMV

344 TMU 0.189

Note smv = TMU/ 2000+Allow%

Work Study / E.E

Work measurement

Method Study

Higher Productivity

Our Commitment
Implementing the method Increase the productivity Reduce the helper Set the line target Achieve the target with quality Ship the goods on time with full qty Ensure the maximum utilization of existing resources. Ensure discipline at Texeurop (BD) Ltd.