You are on page 1of 16

B.O.

Q
for

Construction of a Bungalow

7-C Sunset Lane-4, Phase II Extn. DHA Karachi 75500, Pakistan Tel: +92-21-35397171-74 (4-Lines) | Fax: +92-21-35388551
younus@sheltergroup.com.pk | www.sheltergroup.com.pk

[CONSTRUCTION DIVISION]

SHELTER GROUP

CONSTRUCTION OF BUNGALOW FOR


____________________________________________ ____________________________________________

APPENDIX

SUBJECT

PROVISION

1.

Time for completion of project

One Year (12 Months) (Time will be started with effect from the approval of Map) 02 Months from the completion date of project. 10% (Ten Percent) of the Contract Price Rs 300,000.00 _______________________________

2.

Maintenance Period

3.

Deviation Limit

4. 5 6

Mobilization Advance Sponsors Address:-

_______________________________ _______________________________

Bill Of Quantities (B.O.Q)

Page 2

[CONSTRUCTION DIVISION]

SHELTER GROUP

CONSTRUCTION OF BUNGALOW FOR


____________________________________________ ____________________________________________ FORM OF TENDER
I/We have carefully examined the instructions. Specifications and Tender Drawings:I/We the undersigned, offer to construct Bungalow at ___________________________________ ________________________, in conformity with the Drawings, Instructions and specifications etc. The offer/quotation is submitted herewith amounting to Rs 2100 (Rupees). Calculated at the rate of Rs__________________ per sq.ft for built-up area of ______________Sq.ft. 1 2. 3. 4. 5 Civil Electrical Plumbing/Sanitary External Development Other then covered area Grand Total Rs Rs Rs Rs Rs Rs ________________Total ________________Total ________________Total ________________Total ________________Total ________________Total

(In Words: ________________________________________________________) I/We undertake that if I/We are declared successful tendered. I/we shall when called upon by the Architect or the owner, to do so enter into and execute a contract agreement for the works with such modifications as may be necessary I/We hereby agree to abide by this offer/quotation for a period of sixty days from the date fixed for receiving the same and it shall remain binding on us at all times till the expiry of total period. Contractor:Name of Person Signing (On behalf of Company) Identity Card No Companys Address Muhammad Younus Rizvi

################# 7-C Sunset Lane-4, Phase II (Ext) DHA Karachi-75500

Companys Seal
Bill Of Quantities (B.O.Q)

________________________________
Page 3

[CONSTRUCTION DIVISION]

SHELTER GROUP

CONSTRUCTION OF BUNGALOW FOR


____________________________________________ ____________________________________________

SPECIFICATIONS OF A CLASS CONSTRUCTION


1. STRUCTURE
Foundation Superstructure R.C.C Foundation R.C.C Frame Structure beam slab construction R.C.C R.C.C

Roof Under Ground Tank (Fresh Water) Overhead Tank Roof Treatment

R.C.C

2.

R.C.C Material
Sulphate resistance Cement for work Pakland / Lucky upto plinth level & Portland Cement Cement / Dada Bhoy / for structural Masonry and finishing Pakland work Mild or Tor Sand fine Sand Coarse Crush Razaq / Amerali Malir/Hub Malir/Nooriabad Malir/Nooriabad

Cement

Steel Aggregate

3. Masonry
Masonry As Per Drawing Best blocks available

Bill Of Quantities (B.O.Q)

Page 4

[CONSTRUCTION DIVISION]

SHELTER GROUP

4. Plaster
Internal Plaster External Plaster Stucco Base Plaster As Per Drawing As Per Drawing As Per Drawing As Per Drawing O.P.C O.P.C O.P.C O.P.C

5 Joinery 5.1 Wooden


Main Door Frame: Steel frame 2x7 Panel: Malaysian Ply wood Frame: Deodar Wooden frame 2x7 Panel: Teak Wooden panel Shutter 11/2 thick With wooden lapping. Frame: Steel frame 2x7 Panel: Malaysian Ply wood Frame: Deodar Wooden 2x7 Panel: Teak ply flush panel Shutter solid core 1-1/2 Thick with wooden lipping. Frame: Steel Manufactured Manufactured Not Applicable Not Applicable Manufactured Manufactured Not Applicable Not Applicable

Internal Doors

Drawing & Dinning Room

Manufactured

Panel: Glass panels in Malaysian Ply Not Applicable wood All doors shall have following fittings :Magnetic doors stopper 6 Nos, Iron hold Fast 4 Nos Iron butt hinges 1 No 9 Tower bolts 1 No Lock Curtain Rail 1x2 deodar or equivalent

Best Quality Locally Available

Manufactured on Site

6.

Paneling

Bill Of Quantities (B.O.Q)

Page 5

[CONSTRUCTION DIVISION]

SHELTER GROUP

7.

False Ceiling
Bath Rooms Proper & Aluminum grid, Powder Best Quality Locally coated Available Plaster of Paris Best Quality Locally Available

Skirting at Ceiling level

8.

Wrought Iron Work


Best Quality Locally Available -do-

Railing

Wooden hand rail 3x1 Mild Steel 3/8x3/8 sq. Bar enamel painted as Per Architectural drawings

Grill

Gate Louvered Door

Mild Steel with wooden panel As per -doarchitectural drawings. Louvered Mild Steel Gate/Door -do-

9.

Paint Work
Ceiling Bath Room Ceiling Walls Wrought Iron Wood work External Paint Marble Distemper Distemper Plastic emulsion with Premier Burger/I.C.I -doI.C.I/Burger

Enamel paint with Premier/powder Buxly/Burger coated Enamel paint with premier Weather resistance paint Cement Base/Cement Stuco Plain Wax polish I.C.I/Burger I.C.I/Burger -

Bill Of Quantities (B.O.Q)

Page 6

[CONSTRUCTION DIVISION]

SHELTER GROUP

10.

Flooring Walls and Counter Tops

10.1 Tiles
Floor Tiles (Matt) 12x12 Transfer tiles (Glazed) on Walls & in Shabbir Tiles between counters. Floor Tiles (Matt) or Glazed 12x10 Walls tiles (Glazed) 6x6 On walls upto 7 high (Glazed)

Kitchen

Bath Room Ceiling

Shabbir Tiles

Master Baths

Floor Tiles (Matt) 12x10 Walls tiles (Glazed) 12x10 On wall Shabbir Tiles tiles upto 7 high There will be double plaster In the bath rooms & kitchen Provision for tiles fixing will be that no portion of cut tiles will Be fixed on wall or floor & Plumbing accessories will be Cut in the centre of tiles & Not at the corner.

Terrace There will be minimum grouting in tile fixing & the grouting will match the color of tile. Tiles will not be cut, full size tiles will be used with line matching. The vertical and horizontal surface.

10.2 Marble
Kitchen Bathroom Entrance Lobby, Botaseena China Verona thick as per Best quality locally architectural drawings available Botaseena China Verona 48x24x1 -do-

Colored marble 24x224x1 with inlay Natural Marble as per architectural drawings

Bill Of Quantities (B.O.Q)

Page 7

[CONSTRUCTION DIVISION]

SHELTER GROUP

Drawing room

White marble 12x12x1 with Brass Inlays Coloured marble 48x12x1 Full length top beveled section Botisina marble 12121 With brass inlay 4x12 marble matching in 5/8 section with beveled with beveled edges.

Natural Marble Botaseena China Verona -do-

Stairs

Lounge

-do-

Skirting

-do-

Note: Marble to be finished in chemical polish.

10.3 Stone
Walkway Stone Natural stone

10.4 P.C.C Flooring


Drive Way Parking P.C.C Flooring with stone inlay. Cast in situ

11.

Sanitary
1 Wash basin with vanity counter in AGM master bath 1 Shower -do1 W.C in master Bath. -do1 Bath tub in master bath -do1 Wash basin with counter -do1 Water closet -do1 Shower tray (Room Shower) -do1 Large Mirror 4x8 with light 1 Towel rail 1 Soap dish 1 Toilet Paper Holder 1 Large Mirror with aluminum frame. 1 Flexible shower in each bath room. Premium local quality -do-do-do-do-doPage 8

Bath Room Fixture

Fittings

Bill Of Quantities (B.O.Q)

[CONSTRUCTION DIVISION] 1 Sunk medicine cabinet sunk Near shower tray/bath. Tee Cock. Bib Cock if required. Concealed stop cock Kitchen Sink mixers, single drain and single bowls sink. Bottle trap. Floor trap at Kurah. Geyser 30 gallons. Cooking range (4 Burners)

SHELTER GROUP

-do-

Stainless Steel Imported Best quality available -do-do-do-

12.

Plumbing
Cold water supply system Hot water supply Sewerage Pipe External Sewerage Pipe (Internal) Pressure Pump

PPRC/PVC Pipes PPRC/PVC Pipes R.C.C Pipe

AGM AGM Best Quality

UPVC

AGM Imported quality

Note: The system for supply and disposal of water will be pressure tested.

13.

Water Supply

Under Ground Water Tank (UGWT) Over Ground Water Tank (OGWT) Under Ground Water Tank (For Gardening Purpose) Centrifugal Pump
Bill Of Quantities (B.O.Q)

As Per Drawing

R.C.C

As Per Drawing

R.C.C

Not Applicable

R.C.C

Overhead Tank 2.HP

Best Quality
Page 9

[CONSTRUCTION DIVISION]

SHELTER GROUP

14

GAS
1 Gas Point for Geyser 2 Gas Point for Cooking Range Under Ground Water Tank (For Gardening Purpose) G.I Pipe G.I Pipe Best quality available -do-

Not Applicable

R.C.C

Note: All fixtures & fittings will be pressure tested to maximum prescribed load as per codes mentioned in specifications.

15

Electrical
Electric Meter PVC Conduits KESC PVC Galco, Shavyl 1. Pakistan Cables Ltd 2. A.G.E Cables Ltd 3. Pioneer Cable Ltd 1. Pakistan Cables Ltd 2. A.G.E Cables Ltd

Wiring Cables

Power Cables Music Points Fancy Lights Dimmers Earthling System Wiring Accessories, Outlet, Switches Switch Boxes

Philips system/Sony System

China/Local Japanese or best imported quality Made by any reputable manufacturer


Page 10

Japanese/Taiwanese with Aluminum covers.

Steel Box

Bill Of Quantities (B.O.Q)

[CONSTRUCTION DIVISION]

SHELTER GROUP

Switches/Sockets Surveillance Camera With Monitor - To have phase selector switch - To have phase indicator lights - To have auto generator provision. (Made with brown boveri MCCBs from either)

China/Local Imported

Distribution Boards

Distribution Equipment Fans Energy Saver Telephone Outlets

Faizi Industries or Chinese Royal/Millat/Pak Philips/Di-achie Best quality available

16.

Kitchen Cabinet
Kitchen cabinet Frame: Golden Teak Panel: Lasani Lamination Frame: Deodar Wooden Panel: Formica or chipboard, Either sides with wooden lapping or edges. Locally Manufactured -doNot Applicable -do-

Top counter

Frame: Deodar Wooden / Golden Locally Manufactured Teak Panel: Lasani Lamination -doR.C.C shelves with Marble tiles Inside the shelves with lasani Lamination panel. Frame: Deodar wood frame Panel: Paneled finish in mirror And teak partex with Wooden lipping. Deodar with ply base, on channel 3- Locks 2- Big handle Locally Manufactured -doLocally Manufactured Best quality available -doPage 11

Bottom Counters

Wardrobes

Drawers Fittings

Bill Of Quantities (B.O.Q)

[CONSTRUCTION DIVISION] 2- Small Handles 2- Piano hinges full length Architrave

SHELTER GROUP

-doBrass

Doors: 1 to 2 Locally Manufactured Maranti Ornamental Wardrobes: 1 x -do1-1/2 Maranti Ornamental Cabinets : 1x1 -doDeodar Plain/paneled

17.

Aluminum
Anodized black deluxe section sliding/fixed panel windows with 5mm & 7mm tinted glass & fly proof screening. Anodized black aluminum open able shutter with 3mm glass and fly proof screening. Tinted glass 3mm & 7mm 3 Phase 1 HP. with Siemens Motor phase 1 HP.

Doors, Windows

Alcop deluxe

Ventilators

-do-

Glass Water Pump

-doJawad Pump

Note: All Electrical system will b e finally tested for maximum load.

Bill Of Quantities (B.O.Q)

Page 12

[CONSTRUCTION DIVISION]

SHELTER GROUP

CONSTRUCTION OF BUNGALOW FOR


____________________________________________ ____________________________________________

LABOURS RATES WITH SANDMIX, CRUSH & SHUTTERING ON COVERED AREA BASIS
1.
1. 2.

Commercial Bungalows
Building/Plinth, Ground Floor & Mezzanine 1st Floor, 2nd Floor & 3rd Floor Rs. ___________________ Rs. ___________________

2.

Residential Bungalows
Terms & Conditions:

1.

Sandmix, Rati, Crush, solling stone, shuttering and skilled labour will be provided by contractor. Installation of Electricity, Gas, Water, Telephone and other charges before and during construction is owners responsibility. All drawings and specifications of work should be provided by the owner or the Architect. Any work other than drawings will be charged extra. Water, Electricity, Watchman and Curing will be managed by the owner. Mixture Machine and lift for the pouring of columns and slabs will be arranged at owners cost. All taxes and Fines during construction will be paid by the owner. Every item which is not shown in the drawing and not under the covered area will be charged extra. Steel, Cement, Blocks will be provided at owners cost at site.

2.

3. 4. 5. 6.

7. 8.

9.

10. Work will be finished in time as per drawings and specifications to the entire satisfaction of the owner or the Architect.
Bill Of Quantities (B.O.Q) Page 13

[CONSTRUCTION DIVISION]

SHELTER GROUP

DETAILS OF EXTRA WORK:


1. Excavation in ordinary soil more than 5 Ft in depth, furthermore will be charged extra Rs._______ per CFT. Hard Stone excavation will be charged extra Rs.______ per CFT. R.C.C Chajjas on Windows and Roof Projections will be charged extra at 50% of covered rates. Under Ground Water Tank Excavation, Lean Concrete. Water, Electricity, Watchman and Curing will be managed by the owner. Mixture Machine and lift for the pouring of columns and slabs will be arranged at owners cost. All taxes and Fines during construction will be paid by the owner. Every item which is not shown in the drawing and not under the covered area will be charged extra. Steel, Cement, Blocks will be provided at owners cost at site.

2. 3.

4. 5. 6.

7. 8.

9.

10. Work will be finished in time as per drawings and specifications to the entire satisfaction of the owner or the Architect.

Contractor:Name of Person Signing (On behalf of Company) Identity Card No Companys Address Muhammad Younus Rizvi

################# 7-C Sunset Lane-4, Phase II (Ext) DHA Karachi-75500

Companys Seal

________________________________

Bill Of Quantities (B.O.Q)

Page 14

[CONSTRUCTION DIVISION]

SHELTER GROUP

CONSTRUCTION OF BUNGALOW FOR


____________________________________________ ____________________________________________

SCHEDULE OF PAYMENT (A)


1. DHA Membership and Registration Chargers : Rs 100,000/-

2.

Plot Price within 20 Days

Rs 10,00,000/(OR actual Price)

CONSTRUCTION PAYMENT SCHEDULE (B)


S/No a b c d e f g h j k l a b c a b c Job/Items Excavation Foundation Masonry & Columns Plinth beam Ground Floor Masonry & Columns Ground Floor Beam & Slab Ist Floor Masonry & Columns Ist Floor Beam & Slab Stair case tower & H.O tank Under Ground Tank Compound Wall & Gate Percentage Amount

STRUCTURE
3% 5% 3% 6% 4% 7% 3% 7% 3% 2% 7% 3% 3% 1% 3% 4% 1%

ELECTRICAL
Electrical, Communication Conduits & Boxes Electrical Fittings, Fixtures and Cable Testing Plumbing lines & Manholes Plumbing Fitting & Fixture Testing

PLUMBING AND GAS SUPPLY

Bill Of Quantities (B.O.Q)

Page 15

[CONSTRUCTION DIVISION]

SHELTER GROUP

PLASTER
a b c d e D.P.C Ground Floor First Floor Stair Case tower, & O.H Tank External Plaster, cornices and A/C & Planter Drain Pipes & Finishes 1% 3% 3% 2% 3%

WOODEN JOINRY
a b Chowkeths, AC Boxes, Exhaust Fan Boxes Panel Fixing (After Fixing) 3% 3%

ALUMINIUM JOINRY
a Frames of Aluminum Windows, Doors & Glass Fixing (After Fixing) 3%

STEEL MONGRY
a a b c d e a b c d e Grills & Railings (After Fixing) 1% 2% 1% 1% 1% 1% 1.5%

FLOORING & TILES


Marble Laying Tiles Laying Hard Standing & Drive Way Roof Insulation, water proofing and Screening Marble Finishing Site Cleaning

EXTERNAL DEVELOPMENT COLOURS


Internal surface preparation & First Coat Distemper & Emulsion Finishing Coats Enamel Surface Preparation & III coats of paint External Surface Preparation & III Coats of Paints or Rockwall Finishes 1% 1.5% 1% 2%

TOTAL

100%

------- END OF THE DOCUMENT -------