April 2007 Successfully provided Mud Services in Drilling/ Production testing of

wells SKFH, KLOY, KLCC

KLOY

DI L

CW-IV

4/4/2007 26/4/2007 30/4/2007

0 1643 1643

Spudded the Well, Kicked off the Well at 200m drilled to 305m.. Lowered & cemented 9 Casing. Further drilled down to 1640m. Made a S/T of 35 stands. HDIL-SPGR logging tool did not go beyond 1582m.Recorded from 1582 to 300m. Made R/T and conditioned the hole but Logging tool did not go beyond 1538m. R/I bit and observed held up at 1538m. While reaming, String got stuck at 1623m and released the same with circulation, and reamed to bottom. Further, recorded CDL-CNT-Cal-GR and HRI-SP-GR Logs from 1643 to 1300m. Conditioned the hole and lowered 5 Prodn. Csg. to 1633.49m(F/C, 610.71m). WOC. Scrapped the Well, recorded CBLVDL-CCL-GR Log (1603 to 1175m). Found good Cement Bondage with Cement rise up to 1210m. HT at 250 ksc in water ok. Perforated the object I. Applied Compressor to 120ksc. Only Water flowed. Carried out Reverse wash with Water. 300 Liters Oil surfaced. Found Injectivity 260lpm @ 120ksc. Applied N2 to 140 ksc. 0 to 100 ksc, initially 50itres of Oil followed by

Rig: CW- IV
Well :KLOY, Type/ Profile: DI L, Drilled Interval: 0 1643m, Meterage Drilled : 1643m Activity: Spudded the Well with 12 bit. Kicked off the Well at 200m drilled to 305m. Conditioned the hole. Lowered & cemented 9 Casing. IWH, IBOP and drilled F/C, Cement, Csg Shoe and formation to 1640m. Made a S/T of 35 stands. HDIL-SP-GR logging tool did not go beyond 1582m.Recorded from 1582 to 300m. Made R/T and conditioned the hole but Logging tool did not go beyond 1538m. R/I bit and observed held up at 1538m. While reaming, String got stuck at 1623m and released the same with circulation, and reamed to bottom. Further, recorded CDL-CNT-Cal-GR and HRI-SP-GR Logs from 1643 to 1300m. Conditioned the hole and lowered 5 Prodn. Csg. to 1633.49m(F/C, 610.71m). WOC. Scrapped the Well, recorded CBL-VDLCCL-GR Log (1603 to 1175m).HT at 250 ksc in water ok. Perforated the object I in 1.05 NaCl brine.Applied Compressor to 120ksc. Only Water flowed.Reverse wash with Water. 300 Liters Oil surfaced. Found Injectivity 260lpm @ 120ksc. Applied N2 to 140 ksc. 0 to 100 ksc, initially 50itres of Oil followed by water and 100 to 140ksc Water along with traces of Oil flowed. Carried out BHS and Rig released. Mud Parameters:
Drilled Interval
m 0-300 300-1050 1050-1300

Sp.Gr

Visco sity
Sec, API 37-42 37-40 37-42 37-42 38-45 38-42

Gel10
sec 47-52 46-48 47-52 46-52 48-55 46-48

Fluid Loss
Cc, API NC NC 12-8 NC8 8-6 6.6-5

San d
%, v/v <2 <1 <1 <1 <1 <1

pH

PV
CPS

YP
Lbs/ 100 sq.ft

Gel 0/10
Lbs/ 100 sq.ft

Solid
%, v/v

1350-TD

GTO Actual GTO Actual GTO Actual GTO Actual

1.05-1.10 1.05-1.09 1.10-1.15 1.10-1.16 1.15-1.20* 1.16-1.22

9.0 9.0-9.5 9.0-9.5 9.0-9.5 9.0-9.5 9.5 9-15 12-14 12-22 9-14 12-14 10-20 3-6/50-30 3-5/35-18 2-3/12-19 15-16 13

1.20-1.25*
1.22-1.30

38-45
39-44

48-55
48-52

6-4
5.6-4.6

<1 <1

9.0-9.5
9.5

DEVIATION DATA
Well KLOY : Inclined LProfile (KOP: 200m, Hole 12 - 0 - 305m & 8 -305 -1643m MD) DD(m) Angle, o Azimuth, o 0 0 0.00 200 0 0.00 206 1.50 16.00 215 3.00 24.00 225 4.00 17.00 234 6.00 9.00 271 8.50 3.00 316 9.50 358.00 364 10.00 355.00 412 10.50 355.00 470 11.50 355.00 560 13.5 357.00 600 17.00 358.00 640 17.00 359.00 670 15.75 1.00 698 15.00 1.00 745 13.50 1.00 773 13.00 1.00 802 1300 5.00 830 13.75 7.00 869 13.50 10.00 913 13.25 10.00 953 13.00 11.00 991 12.50 13.00

1039 1120 1255 1350 1500 1577 1579.2

13.00 13.00 13.00 13.50 13.00 13.00 13.00

15.00 18.00 26.00 32.00 37.00 37.00 37.00

Rig: R-II
Well: SKFH, Type / Profile:D , Drilled Interval ; 0-1777 mts Meterage Drilled :1777 mts Activity: During lowering of 9 5/8 casing at the depth of 1248 m approx. ,observed no mud return ,decieded to establish circulation but in vain. Lowered three more singles of casing pipe & try to establish circulation ,no success. P/O the casing up to the depth 1100m approx.& resumed circulation. Circulation established, resumed lowering of casing after gel breaking at the interval of 200m till bottom. Mud Parameters: Drilled Interval Sp.Gr Viscosity Gel10 Fluid Sand pH Pv Yp Solid Loss 0-302 GTO 1.0537-42 47-52 N/C 9.01.15 < 2% 9.5 Actual 1.0537-40 47-50 N/C 1 9.0 1.08 300GTO 1.1035-40 45-50 N/C-12 1 9.0700 1.15 9.5 Actual 1.0638-40 48-50 N/C 1 9.01.09 9.5 700GTO 1.1537-42 47-52 12-6 1 9.01200 1.20 9.5

Actual 12001775 GTO Actual

1.101.20 1.201.40 1.201.45

39-42 40-45 40-45

49-52 50-55 50-55

12-7.6 6-5 6-4.8 1

<1

<1

9.09.5 9.09.5 9.09.5

1216

1216

12-14

1625

1220

16-20

SKFH

DS

R-II

22/2/2007 31/3/2007

0 1077 1077

During lowering of 9 5/8 casing at the depth of 1248 m approx. Observed no mud return ,decieded to establish circulation but in vain. Lowered three more singles of casing pipe & try to establish circulation ,no success. P/O the casing up to the depth 1100m approx.& resumed circulation. Circulation established, resumed lowering of casing after gel breaking at the interval of 200m till bottom.

CL-CLS System

May2007 Successfully provided Mud Services in Drilling/ Production testing of wells SKFH,
KLXC EV CW-IV 06.05.07 25.05.07 0 1491 1491 Spudded the well.D/D 306 m.Lowered & Cemented 9 5/8 casing.Further drilled down to 1382 m. Cut core of 1382-1390 m .Further drilled down to 1487 m. Recorded logs.Lowered & cemented 5 casing. Recorded CBL-VDL logs.Tested casing harmatically. Placed brine cushion of 200 m & perforated Obj.I 1435-1425 m. Displaced well fluid with water. Applied nitrogen twice. Observed flow of water with traces of oil. Carried out HF job. Applied compressor obs. Little flow. PA PT nil.

Rig : CW-IV
Well: KLXC , Type / Profile: EV, Drilled Interval : 00-1491 , Meterage drilled: 1491 m

Activity: Spudded in the well.D/D to 306 m. Lowered and cemented 9 5/8 casing. After IWH and IBOP D/D with 8 1/2 bit to 315 m. Carried out LOT. LOT value 1.71 MWE. D/D to 1382 m. Cut core from 1382 to 1390 m , D/D to 1396 m. Cut a core from 1396 to 1403 m. D/D to 1487 m. Recorded logs. Lowered and cemented 5 casing. After IWH and IBOP scrapped the well. Recorded CBL-VDL-GR logs. Recorded zero effect survey from 1440 to 100 m by VSP party. Tested casing hermetically at 250 KSC. Placed a brine cushion of 200 m Perforated Object I (1435-1425 m , K-X ). Applied Nitrogen up to 100 KSC. Observed 0-60 KSC flow of water, 60-100 KSC flow of water with oil traces.Released nitrogen. WUO. PA,PT- Nil. Applied nitrogen up to 130 KSC. 0-100 KSC no flow, 100 liter oil surfaced, 100-130KSC flow of water with oil traces. Nitrogen cut at 130 KSC. Released nitrogen. WUO. No flow. PA,PT nil. Carried out BHS. Injectivity 130 lpm at 130 KSC. Carried out HF job. Observed flow of chemical water with oil traces. PA,PT nil. Applied compressor up to 110 KSC. Observed flow of water + oil traces + little gas. WUO.PA,PT- nil. Mud Parameters:
Drilled Interval m 00GTO 300 Actual 3001050 10501300 1300TD GTO Actual GTO Actual GTO Actual Sp.Gr 1.05-1.10 1.05-1.09 1.10-1.18 1.09-1.18 1.18-1.22 1.18-1.22 1.221.25* 1.22Viscosity 38-42 36-41 38-42 38-40 40-42 38-42 40-42 38-42 Gel10 48-52 46-51 48-52 48-50 50-52 48-52 50-52 48-52 Fluid Loss NC NC NC-10 NC-9.5 10-7 9.5-7.0 7-5 7.0-5.0 Sand <2 <2 <1 <1 <1 <1 <1 <1 pH 9.0 9.0 9.0-9.5 9.0-9.5 9.0-9.5 9.5 9.0-9.5 9.5 1410121016 1016 1112 Pv 8-14 1014 8-11 Yp Solid

1.25+

17

18

14

SKFH

DS

R-II

06-04-2007 12-05-07 15-05-2007

1777 2090 313

Drilled successfully to it s target depth without any problem .

CL-CLS System

Rig: Rum-II Well: SKFH Type/ Profile:D , Drilled Interval :1777-2090m Meterage Drilled :313m Activity: Drilled successfully to its target depth without any problem and saved 7 drilling days. Mud Parameters:
Drilled Interval 17772090 GTO Actual Sp.Gr 1.651.70* 1.651.75 Viscosity 42-47 39-46 Gel10 52-57 49-56 Fluid Loss 6-5 6-5 Sand < 1% <1% pH 9.0-9.5 9.0-9.5 Pv 1626 Yp 16-30 Solid 21-28

June2007
WDAQ EV R-II 22/5/2007 1277 2616 1339 Drilling CL-CLS System

Rig: Rum-II
Well: WDAQ, Type/ Profile:EV, Drilled Interval :1277-2618 m, Meterage Drilled : 1339 m Activity: Drilling.

Mud Parameters:
Drilled Interval 100-1500 GTO ACTUA L GTO ACTUA L GTO ACTUA L ACTUA L Sp.Gr 1.20-1.30 1.14-1.34 1.30-1.40 1.40-1.37 1.55-1.57 1.55-1.57 1.57-1.64 Viscosity 40-42 40-41 42-44 40-42 42-45 40-46 43-44 Gel10 50-52 50-51 52-54 50-52 52-55 50-56 53-54 Fluid Loss 10-7 8.0-5.2 7-6 5.2-5.0 6.0 5-4.8 4.8-4.0 Sand 1 1 1 1 1 1 1 pH 9.09.5 9.09.5 9.09.5 9.5 9.09.5 9.5 9.5 Pv Yp Soli d

18

16

1218 18

15001750 17502800 17552125 21252616

1516 1715 1724

1618 1316 1628

1922 2224

July2007

HIGHLIHGTS: WDAQ-First deepest well in Wadu area drilled with target depth 2800m without any problem .After logging tested Object-I ( 18011899m - Wadu sand ) .A 100m cement plug (2020-1920m ) was placed to isolate the zone before lowering 5 casing with 1801-1899m slotted casing. For testing of Object-I conventionally 200m water cushion was placed & displaced with 5.5m3 mud of sp.gr1.65.During p/o 2 7/8 singles well became active , SIDPP & SICPP was recorded 1000 psi with mud wt. 1.65.Well was circulated with 6mm bean at 15spm in absence of adjustable choke & thus lost approx. 35m3 mud. Later on well was circulated through adjustable choke using mud wt. 1.63 & recorded shut in pressure 600 psi. Well was killed with 1.75 mud wt. On observation shut in pressure recorded 100 psi , hence decided to kill the well with mud wt. 1.78.Well was killed with mud wt. 1.78 & further testing carried on smoothly.

WDA Q

EV

R-II

22/5/2007 21/7/2007

2616 2801 185

Drilling

CL-CLS System

Well: WDAQ, TYPE / Profile :EV, Drilled Interval : 2616- 2801 m, Meterage Drilled :185 m Activity: Drilled down from 2616 m to 2801 m without any problem .After logging tested Object-I interval 1801-1899m ( Wadu sand ) .A 100m cement plug (2020-1920m ) was placed to isolate the zone before lowering 5 casing with 1801-1899m slotted casing. For testing of Object-I conventionally 200m water cushion was placed & displaced with 5.5m3 mud of sp.gr1.65.During p/o 2 7/8 singles well became active, SIDPP & SICPP was recorded 1000 psi with mud wt. 1.65.Well was circulated with 6mm bean at 15 spm in absence of adjustable choke & thus lost approx. 35m3 mud. Well was circulated through adjustable choke using mud wt. 1.63 & recorded shut in pressure 600 psi. Well was killed with 1.75 mud wt. On observation shut in pressure recorded 100 psi , hence decieded to kill the well with mud wt. 1.78.Well was killed with mud wt. 1.78 Further testing carried on smoothly. Drilled Interval 21252616 26162800 26162801 ACTU AL GTO ACTU AL Sp.Gr 1.57-1.64 1.55-1.57 1.64+-1.70 Viscosit y 43-44 42-45 42-45 Gel10 53-54 52-55 52-55 Fluid Loss 4.84.0 6 4.04.8 Sand 1 1 <1 pH 9.5 9.5 9.5 Soli d 17- 16- 2224 28 24 16- 1826 26 24 Pv Yp