Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Purpose Use this procedure to analyze material costs by cost elements. Trigger Perform this transaction when you need to analyze material costs by cost elements. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Transaction code via Command edit field.

Transaction Code CK84_99_COST_ELEMENT

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

1/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Screen Flow

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

2/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Procedure 1. In SAP, start the transaction using the menu path or transaction code. SAP Easy Access

2. As required, complete/review the following fields: Sequence R/O/C of character s entered from the Description

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

3/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

keyboard. . The key code enables you to select menu options using the keyboard. To do this, you use character s derived from the menu options. Field Example: CK84_99_C OST_ELEM ENT R Command

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

4/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

3. Click the Enter button

Analyze Itemization: Cost Elements (Grouped)

4. As required, complete/review the following fields: The goods R/O/C that are the subject of business Description

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

5/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

activity. The material can be traded, used in manufact ure, consumed , or produced. Field Example: 66810949 R Material

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

6/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

R Date R/O/C from which a costing run is valid. R Method of distinguis hing two or more cost estimates for the same material. R Contains all control paramete rs for costing, including paramete rs that control how cost estimates are executed and which material prices or activity prices are used to
Wednesday, July 15, 2009

Description

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

7/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

valuate the costing items. A plant is an organizati onal unit for dividing an enterprise according to productio n, procurem ent, maintena nce, and materials planning. It is a place where materials are produced, or goods and services are provided. Field Example:
Wednesday, July 15, 2009 CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc 8/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

23.01.2009 Costing Date Example: 1 Costing version Example: PPC1 Costing variant Example: 7U11 R Plant

5.

Click the Cost Comp. View drop-down list

6. Click the Cost of Goods Manufactured list item . 7. Click the Execute button .

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

9/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Cost Elements (Grouped)

8. Click the Exit button

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

10/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Analyze Itemization: Cost Elements (Grouped)

9. Click the Exit button

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

11/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Result You have successfully analyzed material costs by cost elements.

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

12/13

Work Instruction

CK84_99_COST_ELEMENT - JPN - Cost Element Itemization

Scenario Instructions In this simulation you are required to: Analyze Material Costs by Cost Elements in SAP ECC 6.0.

Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. 23.01.2009 1 PPC1 7U11 Field Costing Date Costing version Costing variant Plant 66810949 Material Value

Wednesday, July 15, 2009

CO_CK84_99_COST_ELEMENT_JPN_Co st Element Itemization.udc

13/13