Volume 2 - Bill of Quantities

Summary - 1

Summary of Bill of Quantities


General Summary

Page

Bill No. 1: GENERAL ITEMS


Bill No. 2: TRACKWORKS
Bill No. 3: STATIONS
Bill No. 4: LEVEL CROSSINGS
Bill No. 5: BRIDGES
Bill No. 6: CULVERTS
Bill No. 7: TELECOMMUNICATION
Bill No. 8: SIGNALLING
Bill No. 9: POWER SUPPLY

Subtotal of Bills

(A)

Total for Daywork (Provisional Sum)

(B)

Specified Provisional Sum included in Subtotal of Bills (C)

Amount (USD)

Total equivelent to
VND

Amount (VND)

85,613

23,559,874,052

25,229,333,944

5,456,265

369,847,486,102

476,244,657,254

696,704

91,756,782,474

105,342,501,851

41,584

10,969,546,702

11,780,441,354

2,654,038

156,559,710,259

208,313,446,980

85,173

23,439,736,869

25,100,617,066

1,924

529,463,114

566,982,221

27,185

7,481,283,145

8,011,391,138

3,379

929,875,562

995,761,828

9,051,865

685,073,758,279

861,585,133,636
372,217,481
Not applicable

Total of Bills plus Provisional Sum (A+B)

(D)

861,957,351,117

Add Provisional Sum for Contingency (10%)

(E)

86,195,735,112

Bid Price (D+E) carried forward to Letter of Bid

(F)

948,153,086,229
US$ 48,623,235.19

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

General Items - 2

Bill No. 1: GENERAL ITEMS


Rate
Item No. Ref.Spec

Particular & Description

Unit

Amount

Total equivelent to VND

Quantity
USD

VND

USD

VND

Rate

Amount

53,665.68290

############

53,665.68290

14,768,833,524

15,815,314,341

15,815,314,341

27.91421

7,682,015

111.65684

30,728,060

8,226,342

32,905,368

GENERAL ITEMS

1.1

01111 Mobilisation and Demobilisation

LS

1.2

01112 Construction Photographs

LS

1.3

01113 Project Information Signs (2m x 3m)

each

1.4

01115 Provision of Monthly Report

Month

36

340

4.13511

1,137,987

1,405.93740

386,915,701

1,218,622

414,331,480

LS

9,942.28811

2,735,150,143

9,942.28811

2,735,150,143

2,929,024,761

2,929,024,761

SURVEY WORK

1.5

01201 Geological drilling

1.6

01202

Topographic Survey (Ref Topo-Survey


Breakdown)

ENGINEERS FACILITIES
ACCOMMODATION

1.7

01300.1

Provision, Maintenance and Operation of


Engineers Office

1.8

01300.2

Provision of Resident Engineers Office and


Sub-site Office

1.9

01300.3

Maintenance and Operation of Resident


Engineers Office and Sub-site Office

1.10

01300.4

Provision equipment and furnishing for the


Engineers office

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Month

LS

Month

LS

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

1.11

01300.8 Provision Engineers Vehicles

1.12

01300.9 Maintenance Engineers Vehicles

General Items - 3

LS
Month

OTHERS

1.13

01350.1 Drawings and Submittals

1.14

01500.1

1.15

01600.1 Environmental Management

HIV-AIDS/ Human Trafficking Prevention


Programme

Item 1 Carried forward to Summary

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

LS

20,213.44825

5,562,755,124

20,213.44825

5,562,755,124

5,956,917,365

5,956,917,365

LS

274.31432

75,491,500

274.31432

75,491,500

80,840,629

80,840,629

LS

Total VND :

85,613.32782

23,559,874,052

25,229,333,944

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Trackworks - 4

Bill No. 2: TRACKWORKS


Rate
Item No. Ref.Spec

Particular & Description

Unit

USD
2.1

Trackworks

ROAD BED

Amount

Total equivelent to VND

Quantity
VND

USD

VND

Rate

Amount

02301.1 Soil Excavation

m3

149091.6

0.75287

207,197

112,246.59289

30,891,337,464

221,878

33,080,146,025

02301.3 Soil Excavation for Benching

m3

4191.5

0.57114

157,177

2,393.93331

658,806,431

168,314

705,488,131

02301.4 Soil Excavation for Organic

m3

21698.1

0.72057

198,299

15,634.99992

4,302,709,037

212,350

4,607,591,535

02301.5 Soil Excavation for Ditch

19680.0

1.08128

297,571

21,279.59040

5,856,198,067

318,656

6,271,150,080

02400.1 Embankment , K=90

m3

1854.6

0.44239

121,740

820.45649

225,779,736

130,367

241,778,638

02400.2 Sand Embankment, K=95

18804.6

1.33457

367,279

25,096.05502

6,906,532,521

393,303

7,395,905,594

02400.4 Embankment for Extention, K=95

m3

49188.2

0.47779

131,483

23,501.63008

6,467,416,773

140,800

6,925,698,560

02400.5 Embankment, K=98

7999.5

0.50118

137,929

4,009.18941

1,103,362,956

147,702

1,181,542,149

02501 Turf

m2

12524.1

0.11365

31,271

1,423.36397

391,638,940

33,487

419,394,537

10

02600 Road Formation for Reused Ballast

8300.3

0.46002

126,594

3,818.30401

1,050,764,941

135,564

1,125,221,869

11

02701 Rubble Gabion 0.3x1x2m

unit

690.0

3.48810

959,923

2,406.78900

662,346,904

1,027,941

709,279,290

12

02702 Rubble Gabion 0.5x1x2m

unit

278.0

4.59264

1,263,904

1,276.75392

351,365,179

1,353,460

376,261,880

13

04150 Concrete M150

m3

80.1

4.62887

1,273,866

370.77249

102,036,669

1,364,129

109,266,733

14

04801 Sheet Pile

490.0

0.97541

268,429

477.95090

131,529,967

287,449

140,850,010

15

04803 Pile Bamboo, D=80

82706.2

0.02516

6,922

2,080.88799

572,523,745

7,413

613,101,061

16

06021.1 Supply and Installation of Sub-Ballast

m3

7216.2

1.71341

471,533

12,364.30924

3,402,672,863

504,944

3,643,776,893

17

06022.1 Supply and Installation of Geo-Textile Type 2

m2

45903.8

0.21093

58,049

9,682.48853

2,664,663,490

62,162

2,853,472,016

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

Trackworks - 5

18

08105 Masonry Ditch

64.1

3.92108

1,079,077

251.34123

69,168,832

1,155,538

74,069,986

19

10201 Corrugated Iron Fence

120.0

2.92868

805,969

351.44160

96,716,249

863,078

103,569,360

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

Trackworks - 6

Drainage System

20

03401 RC Ditch Installation R40 (Type 1)

2025.0

3.04803

838,818

6,172.26075

1,698,607,290

898,255

1,818,966,375

21

03403 RC Ditch Installation R60 (Type 1)

300.0

3.72447

1,024,975

1,117.34100

307,492,450

1,097,602

329,280,600

22

03414 RC Ditch Installation R70 (Type 2)

150.0

4.83665

1,331,052

725.49750

199,657,849

1,425,367

213,805,050

23

03415 RC Ditch Installation R85 (Type 2)

950.0

4.89340

1,346,660

4,648.73000

1,279,326,715

1,442,081

1,369,976,950

m2

2648.6

0.00824

2,263

21.82446

5,994,629

2,424

6,420,206

C
24

Retaining Wall
02200 Site Clearing

25

02301.1 Soil Excavation

m3

4656.3

1.03586

285,065

4,823.27492

1,327,346,902

305,264

1,421,400,763

26

02400.2 Sand Embankment, K=95

m3

690.8

1.33452

367,260

921.88642

253,703,111

393,283

271,679,896

27

02400.3 Embankment, K=95

m3

240.4

0.37093

102,082

89.17157

24,540,480

109,315

26,279,326

28

02701 Rubble Gabion 0.3x1x2m

unit

1067.0

3.48810

959,923

3,721.80270

1,024,237,894

1,027,941

1,096,813,047

29

02702 Rubble Gabion 0.5x1x2m

unit

221.0

4.59264

1,263,904

1,014.97344

279,322,678

1,353,460

299,114,660

30

02704 Crushed Stone cushion(4x6cm)

m3

37.8

2.58839

712,323

97.84114

26,925,825

762,797

28,833,727

31

03407 PVC Drainage Pipe D=100

181.0

0.25352

69,773

45.88712

12,628,978

74,717

13,523,777

32

04140 Concrete M200

m3

1210.9

5.76368

1,586,173

6,979.24011

1,920,697,177

1,698,565

2,056,792,359

33

04806 Anchor L=80x80x8mm Steel

1600.5

1.13525

312,422

1,816.96763

500,030,811

334,559

535,461,680

34

06022.1 Supply and Installation of Geo-Textile Type 2

3103.7

0.21088

58,039

654.50826

180,135,148

62,151

192,898,059

35

06022.2 Supply and Installation of Geo-Textile Type 3

m2

258.5

0.23427

64,470

60.55880

16,665,426

69,038

17,846,323

m3

54.7

3.54186

974,727

193.73974

53,317,552

1,043,793

57,095,477

36

08102

Rubble Stone Reveted with Cement Mortar


M100

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

37

08103 Place Rubble (without Mortar)

Trackworks - 7

430.1

1.84487

507,715

793.47859

218,368,236

543,690

233,841,069

Slope Protection Structure

38

02301.1 Soil Excavation

m3

22,842.3

0.80645

221,945

18,421.17284

5,069,739,413

237,671

5,428,952,283

39

02301.3 Soil Excavation for Benching

498.5

0.29732

81,822

148.21402

40,788,397

87,620

43,678,570

40

02301.4 Soil Excavation for Organic

m3

1,827.7

0.72760

200,233

1,329.83452

365,965,489

214,421

391,897,262

41

02301.5 Soil Excavation for Ditch

m3

1,827.7

1.50302

413,631

2,747.06965

755,993,580

442,940

809,561,438

42

02400.2 Sand Embankment, K=95

m3

578.6

1.32018

363,320

763.85615

210,217,235

389,064

225,112,430

43

02400.3 Embankment, K=95

m3

11,787.4

0.40903

112,574

4,821.40022

1,326,953,766

120,550

1,420,971,070

44

02701 Rubble gabion 0.3x1x2m

unit

5,306.0

3.49578

962,034

18,548.60868

5,104,553,943

1,030,202

5,466,251,812

45

02702 Rubble gabion 0.5x1x2m

unit

1,710.0

4.59264

1,263,904

7,853.41440

2,161,275,019

1,353,460

2,314,416,600

46

02703 Crushed Stone cushion(1x2cm)

m3

257.3

2.58856

712,367

666.03649

183,292,049

762,844

196,279,761

47

02704 Crushed Stone cushion(4x6cm)

m3

435.0

2.18461

601,208

950.30535

261,525,526

643,808

280,056,480

48

03407 PVC Drainage Pipe D=100

1,476.4

0.23554

64,828

347.75126

95,712,014

69,421

102,493,164

49

04130 Concrete M250

310.7

6.70060

1,844,010

2,081.87642

572,934,000

1,974,672

613,530,590

50

04140 Concrete M200

m3

6,056.0

5.42024

1,491,656

32,824.97344

9,033,470,674

1,597,351

9,673,557,656

51

04201 Reinforcement Bar(D 10mm)

Ton

4.2

75.91701

20,892,409

320.44905

88,187,781

22,372,791

94,436,537

52

04202 Reinforcement Bar(10D18 mm)

Ton

11.7

75.53856

20,788,271

884.98100

243,547,467

22,261,273

260,804,597

53

04203 Reinforcement Bar( D>18 mm)

Ton

8.0

116.94966

32,184,635

938.76339

258,348,392

34,465,153

276,654,278

54

04802 Rail Pile

30.0

5.12568

1,410,597

153.77040

42,317,917

1,510,548

45,316,440

55

04806 Anchor L=80x80x8mm Steel

12,933.1

1.13741

313,018

14,710.23727

4,048,286,694

335,197

4,335,136,321

56

04807 Consolidation Pile

2,632.0

0.02516

6,922

66.22112

18,219,704

7,413

19,511,016

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

Trackworks - 8

57

06021.1 Supply and Installation of Sub-Ballast

1,081.2

1.89160

520,576

2,045.19792

562,846,555

557,462

602,727,914

58

06022.1 Supply and Installation of Geo-Textile Type 2

17,008.5

0.21115

58,113

3,591.34478

988,407,732

62,230

1,058,438,955

59

06022.2 Supply and Installation of Geo-Textile Type 3

m2

1,619.0

0.23471

64,594

379.99549

104,577,937

69,171

111,987,849

60

06030.1 Removal of Ballast

5,866.8

0.91120

250,764

5,345.82816

1,471,179,889

268,532

1,575,423,538

61

06030.5

Evacuation of Ballast That Cannot be Reused up to 30Km

m3

4,106.7

0.44277

121,849

1,818.32356

500,397,227

130,483

535,854,536

62

08102

Rubble Stone Reveted with Cement Mortar


M100

m3

1,249.1

3.62050

996,366

4,522.36655

1,244,561,083

1,066,966

1,332,747,231

63

08103 Place Rubble (without Mortar)

1,895.0

1.84901

508,854

3,503.87395

964,278,908

544,910

1,032,604,450

64

08104 Place Rubble (with Mortar)

m3

667.5

6.31086

1,736,756

4,212.49905

1,159,284,784

1,859,818

1,241,428,515

65

08220 Cement Mortar M100

16.2

3.45304

950,278

55.93925

15,394,499

1,017,612

16,485,314

66

10501 Water Proofing system

m2

96.2

5.96975

1,642,875

574.28995

158,044,563

1,759,285

169,243,217

LS

1.0

42,162.60226

11,603,177,677

42,162.60226

11,603,177,677

12,425,348,421

12,425,348,421

67

09102.02

Temporary Facility and Work for Construction


of Retaining Wall and Slope Protection

Track Work

68

06030.1 Removal of Ballast

m3

64024.3

0.77610

213,580

49,689.25923

13,674,313,195

228,714

14,643,253,750

69

06030.2 Supply of Ballast

106979.2

1.34923

371,311

144,339.54602

39,722,555,336

397,621

42,537,176,483

70

06030.3 Screening and Washing of Ballast

m3

61462.6

0.40422

111,241

24,844.41217

6,837,143,263

119,123

7,321,609,300

71

06030.4 Installation of Ballast

123617.8

0.84794

233,352

104,820.47733

28,846,481,881

249,887

30,890,481,189

72

06030.5

m3

61462.6

0.44455

122,336

27,323.19883

7,519,105,536

131,005

8,051,907,913

73

06041.1 Installation of P50 rails and joints materials

152421.0

0.21060

57,958

32,099.86260

8,834,062,044

62,065

9,460,009,365

Evacuation of Ballast That Cannot be Reused up to 30Km

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

74

06042.1

Removal of the P43 rails and joints materials


from main line

75

06042.2

Evacuation of the not re-usable steel


materials

76

Trackworks - 9

150325.0

0.06936

19,088

10,426.54200

2,869,475,756

20,441

3,072,793,325

7577.2

0.24058

66,212

1,822.92278

501,699,218

70,903

537,246,212

06071.1 Supply of standard PC sleepers

sleeper 94380.0

18.71553

625,327

1,766,371.72140

59,018,377,833

990,280

93,462,626,400

77

06071.2 Installation of standard PC sleepers

sleeper 94380.0

0.29705

81,741

28,035.57900

7,714,670,749

87,533

8,261,364,540

78

06072.1 Supply of special PC sleeper for check rails

sleeper 31772.0

22.45615

749,710

713,476.79780

23,819,788,503

1,187,605

37,732,586,060

79

06072.2

Installation of special PC sleepers for check


rails

sleeper 31772.0

0.43824

120,608

13,923.76128

3,831,967,543

129,154

4,103,480,888

80

06073.1 Supply of special PC sleeper for guard rails

sleeper

2567.0

24.32838

812,425

62,450.95146

2,085,493,923

1,286,828

3,303,287,476

81

06073.2

Installation of special PC sleepers for guard


rails

sleeper

2567.0

0.52745

145,147

1,353.96415

372,591,643

155,432

398,993,944

82

06074.1

Removal of the existing sleepers from main


line

sleeper 116338.0

0.18168

50,001

21,136.28784

5,817,044,259

53,544

6,229,201,872

83

06074.2

Evacuation of the not re-usable concrete and


various materials up to 30Km

84

Ton

Ton

7577.2

0.24058

66,212

1,822.92278

501,699,218

70,903

537,246,212

06081.1 Supply of fastening system for PC sleeper

set

225666.0

6.46180

20,188

1,458,208.55880

4,555,722,641

146,193

32,990,789,538

85

06082.1 Supply of the check rail fastening system

set

31772.0

12.92350

40,359

410,605.44200

1,282,278,205

292,367

9,289,084,324

86

06083.1

Supply of the guard rail fastening system for


PC sleeper

set

2567.0

12.08937

31,033.41279

3,299

235,744

605,154,848

87

06085.1

Supply of fastening system for wooden


timbers

set

332.0

6.37325

1,753,920

2,115.91900

582,301,315

1,878,198

623,561,736

88

06085.2

Supply of the guard rail fastening system for


wooden timbers

set

332.0

2.73451

752,533

907.85732

249,840,974

805,856

267,544,192

89

06090.1 Supply of the wooden timbers

timber

166.0

3.22180

886,646

534.81880

147,183,219

949,471

157,612,186

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

90

06090.2 Renewal of the wooden timbers

91

Trackworks - 10

timber

350.0

3.56862

982,086

1,249.01700

343,730,068

1,051,674

368,085,900

06101.1 Removal of the guard rails

3473.6

0.06936

19,088

240.92890

66,305,744

20,441

71,003,858

92

06101.2 Installation of the guard rails

3303.6

0.17609

48,453

581.73092

160,070,140

51,887

171,413,893

93

06102.1 Removal of the check rails

18175.5

0.06936

19,088

1,260.65268

346,942,669

20,441

371,525,396

94

06102.2 Installation of the check rails

20366.5

0.17609

48,453

3,586.33699

986,823,015

51,887

1,056,756,586

95

06130.1 Supply and installation of kilometer board

board

85.0

1.38374

380,811

117.61790

32,368,941

407,794

34,662,490

96

06130.2 Supply and installation of hectometer board

board

767.0

1.24193

341,779

952.56031

262,144,773

365,997

280,719,699

97

06130.3 Supply and installation of gradient board

board

302.0

1.59163

438,011

480.67226

132,279,387

469,048

141,652,496

98

06130.5 Supply and installation of curve board

board

375.0

1.96444

540,621

736.66500

202,733,032

578,928

217,098,000

99

06130.6 Supply and installation of curve post

post

1500.0

1.98147

545,304

2,972.20500

817,956,502

583,943

875,914,500

100

06151.1

Lifting of the track up to its final level using


heavy tamPing machine

80987.5

0.45290

124,635

36,679.23875

10,093,913,507

133,467

10,809,158,663

101

06151.2

Lifting of the track up to its final level using


hand tamPing tools for the first lifting

4262.5

0.45290

124,635

1,930.48625

531,258,606

133,467

568,903,088

102

06151.3 Final leveling and lining of the track

85250.0

0.08235

22,670

7,020.33750

1,932,632,419

24,276

2,069,529,000

103

06151.4

Shifting works using a heavy tamping


machine

500.0

0.13323

36,671

66.61500

18,335,507

39,269

19,634,500

104

09102.01

Temporary Facility and Work for Construction


of Trackworks

LS

1.0

40,868.87621

11,246,142,410

40,868.87621

11,246,142,410

12,043,085,496

12,043,085,496

5,456,265.18719

369,847,486,102

Item 2 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD loan No. CVN 6006 01

Total VND :

476,244,657,254

Package CP2
Contract YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 11

Bill No. 3: STATIONS


Rate
Item No. Ref.Spec

Particular & Description

Unit

USD
3.1
A

Amount

Total equivelent to VND

Quantity

VND

USD

VND

Rate

Amount

VAN PHU STATION


Road Bed

02301.1 Soil Excavation

m3

9,653.0

0.48619

133,794

4,693.19207

1,291,516,330

143,275

1,383,033,575

02301.4 Soil excavation for Organic

m3

828.0

0.74402

204,754

616.04856

169,535,989

219,262

181,548,936

02301.5 Soil excavation for ditch

m3

933.0

0.70608

194,315

658.77264

181,296,306

208,084

194,142,372

02400.3 Embankment , K=95

4,552.0

0.12703

34,967

578.24056

159,169,397

37,444

170,445,088

79.0

2.55780

703,915

202.06620

55,609,277

753,792

59,549,568

3.28347

903,605

1,631.88459

449,091,851

967,633

480,913,601

3.72281

1,024,512

1,917.24715

527,623,786

1,097,107

565,010,105

3.92938

1,081,370

471.52560

129,764,411

1,157,993

138,959,160

4.16763

1,146,930

416.76300

114,693,021

1,228,199

122,819,900

4.83655

1,331,024

483.65500

133,102,427

1,425,337

142,533,700

5.36709

1,477,030

912.40530

251,095,057

1,581,688

268,886,960

02704 Crushed Stone cushion(4x6cm)

m3

03401 RC Ditch Installation R40 (Type 1)

03402 RC Ditch Installation R50 (Type 1)

03403 RC Ditch Installation R60 (Type 1)

03413 RC Ditch Installation R60 (Type 2)

10

03414 RC Ditch Installation R70 (Type 2)

11

03415 RC Ditch Installation R85 (Type 2)

12

08105 Masonry Ditch

497.0
515.0
120.0
100.0
100.0
170.0

116.0

3.90864

1,075,654

453.40224

124,775,808

1,151,872

133,617,152

Special Railway Bed

13

02301.1 Soil Excavation

m3

21,608.0

0.48038

132,209

10,380.05104

2,856,763,213

141,576

3,059,174,208

14

02400.2 Sand Embankment ,K=95

16,525.0

0.87941

242,014

14,532.25025

3,999,273,170

259,162

4,282,652,050

15

02400.3 Embankment , K=95

m3

12,399.0

0.16304

44,876

2,021.53296

556,414,052

48,055

595,833,945

16

02400.5 Embankment , K=98

m3

9,406.0

0.34019

93,624

3,199.82714

880,630,119

100,258

943,026,748

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 12

Tracks

17

06030.1 Removal of ballast

m3

3,200.0

0.50112

137,910

1,603.58400

441,312,512

147,682

472,582,400

18

06030.2 Supply of ballast

m3

4,947.0

1.37837

379,325

6,818.79639

1,876,519,711

406,203

2,009,486,241

19

06030.3 Screening and washing of ballast

m3

3,200.0

0.25059

68,954

801.88800

220,654,384

73,841

236,291,200

20

06030.4 Installation of ballast

m3

5,907.0

0.85281

234,690

5,037.54867

1,386,315,041

251,320

1,484,547,240

21

06030.5

m3

2,240.0

0.45113

124,149

1,010.53120

278,093,682

132,946

297,799,040

22

06041.1 Installation of P50 rails and joints materials

1,900.0

0.21000

57,793

399.00000

109,806,700

61,888

117,587,200

23

06042.1

4,787.5

0.07869

21,656

376.72838

103,675,922

23,190

111,022,125

24

06071.1 Supply of standard PC sleepers

sleeper 1,440.0

18.56626

584,254

26,735.41440

841,325,659

946,296

1,362,666,240

25

06071.2 Installation of standard PC sleepers

sleeper 1,440.0

0.29970

82,470

431.56800

118,756,584

88,314

127,172,160

26

06074.1

sleeper 3,983.0

0.20800

57,245

828.46400

228,006,835

61,301

244,161,883

27

06081.1 Supply of fastening system for PC sleeper

set

2,880.0

6.44515

15,615

18,562.03200

44,969,976

141,295

406,929,600

28

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,805.0

0.07162

19,716

129.27410

35,588,120

21,113

38,108,965

29

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

95.0

0.07162

19,716

6.80390

1,873,059

21,113

2,005,735

30

06151.3 Final leveling and lining of the track

9,675.0

0.00238

654

23.02650

6,323,483

700

6,772,500

31

06161.2

3,862.1

6.32862

1,741,634

24,441.76330

6,726,364,324

1,865,042

7,202,978,708

Evacuation of Ballast That Cannot be Reused up to 30Km

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Installation of new track (new siding / track


extension)

Turnouts

32

06030.1 Removal of ballast

m3

233.3

0.70310

193,495

164.03323

45,142,279

207,205

48,340,927

33

06030.2 Supply of ballast

m3

707.0

1.37837

379,325

974.50759

268,182,623

406,203

287,185,521

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 13

34

06030.3 Screening and washing of ballast

m3

233.3

0.35157

96,747

82.02128

22,571,165

103,603

24,170,580

35

06030.4 Installation of ballast

m3

777.0

0.85281

234,690

662.63337

182,354,289

251,320

195,275,640

36

06030.5

m3

163.3

0.45113

124,149

73.66953

20,273,526

132,946

21,710,082

37

06152.1 Removal of the turnout from main line

turnout

7.0

9.52526

2,621,353

66.67682

18,349,474

2,807,096

19,649,672

38

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

5.0

77.55588

21,343,424

387.77940

106,717,122

22,855,764

114,278,820

39

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

5.0

17.14542

4,718,434

85.72710

23,592,172

5,052,770

25,263,850

40

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

5.0

17.14542

4,718,434

85.72710

23,592,172

5,052,770

25,263,850

41

06162.1

Installation of P43 turnout on loops and


sidings

turnout

13.0

170.18472

46,834,959

2,212.40136

608,854,466

50,153,561

651,996,293

42

06162.2

Lifting of a P43 turnout up to its final level


(with wooden timbers)

set

13.0

17.14542

4,718,434

222.89046

61,339,646

5,052,770

65,686,010

43

06162.3

Final leveling and lining of a P43 turnout (with


wooden timbers)

set

13.0

17.14542

4,718,434

222.89046

61,339,646

5,052,770

65,686,010

587.9

0.45787

126,001

269.18177

74,075,714

134,929

79,324,759

E
E-1
44

Evacuation of Ballast That Cannot be Reused up to 30Km

Station Buildings
Van Phu station (S=473m2)
02301.1 Soil Excavation

45

02306 Soil backfill for foundation

m3

70.6

0.33232

91,456

23.46179

6,456,777

97,936

6,914,282

46

02307 Sand backfill for floor

242.1

0.52435

144,297

126.94514

34,934,346

154,522

37,409,776

47

03112 Transport Soil to 5km by Truck

m3

141.0

0.07914

21,780

11.15874

3,070,948

23,323

3,288,543

48

04140 Concrete M200

m3

101.4

15.21251

4,186,487

1,542.54851

424,509,787

4,483,131

454,589,483

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 14

49

04170 Broken-Brick Concrete M50

151.4

1.79249

493,292

271.38299

74,684,476

528,246

79,976,444

50

04180 Solid-Brick Concrete M50

78.8

4.57263

1,258,383

360.32324

99,160,558

1,347,549

106,186,861

51

04201 Reinforcement Bar(D 10mm)

Ton

0.2

84.89619

23,363,493

13.58339

3,738,159

25,018,969

4,003,035

52

04202 Reinforcement Bar(10D18 mm)

Ton

2.8

80.18260

22,066,311

226.91676

62,447,661

23,629,872

66,872,538

53

07251 Mortaring and Painting of Walls

1,714.2

0.22990

63,273

394.09458

108,462,491

67,756

116,147,335

54

07256 Tiling for Floor 300x300

m2

221.2

0.89456

246,180

197.87667

54,455,034

263,624

58,313,629

55

07262 Manufacture of Glass Panel Door

m2

59.8

11.02148

3,033,117

659.08450

181,380,405

3,248,036

194,232,553

56

07272 Manufacture of Glass Window

m2

31.7

11.14824

3,068,000

353.39921

97,255,610

3,285,391

104,146,895

57

07281 Metal-Sheet Roofing

m2

623.2

1.22241

336,406

761.80591

209,648,223

360,243

224,503,438

58

07291 Power Supply for Van Phu Station

Ls

1.0

583.47851

160,573,700

583.47851

160,573,700

171,951,531

171,951,531

59

07292 Water Supply for Van Phu Station

Ls

1.0

109.28857

30,076,286

109.28857

30,076,286

32,207,413

32,207,413

m3

423.0

0.17642

48,548

74.62566

20,535,724

51,988

21,990,924

E-2
60

Staff's seven-room
sccommodations(S=156.7m2)
02301.1 Soil Excavation

61

02306 Soil backfill for foundation

m3

136.9

0.47280

130,114

64.72632

17,812,662

139,334

19,074,825

62

03112 Transport Soil to 5km by Truck

m3

141.0

0.07914

21,780

11.15874

3,070,948

23,323

3,288,543

63

04140 Concrete M200

101.4

9.71346

2,673,147

984.94484

271,057,059

2,862,559

290,263,483

64

04170 Broken-Brick Concrete M50

m3

48.3

2.23483

615,031

107.94229

29,705,988

658,610

31,810,863

65

04180 Solid-Brick Concrete M50

181.9

4.93631

1,358,484

897.91479

247,108,232

1,454,742

264,617,570

66

04201 Reinforcement Bar(D 10mm)

Ton

2.1

85.50848

23,531,990

182.98815

50,358,458

25,199,405

53,926,727

67

04202 Reinforcement Bar(10D18 mm)

Ton

0.7

80.60806

22,183,390

58.03780

15,972,041

23,755,247

17,103,778

68

07251 Mortaring and Painting of Walls

1,644.3

0.20800

57,244

342.01440

94,126,309

61,300

100,795,590

69

07258 Tiling of Ceramic 400x400

m2

221.2

0.85353

234,883

188.80084

51,956,156

251,527

55,637,772

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 15

70

07263 Manufacture of Wooden Door, Glass Panel

39.9

14.09854

3,879,927

562.53175

154,809,106

4,154,849

165,778,475

71

07273 Manufacture of Moulded Glass Window

31.7

14.90103

4,100,774

472.36265

129,994,533

4,391,344

139,205,605

72

07276 Coating with Natural Granite for Walls

m2

16.8

4.54183

1,249,913

76.30274

20,998,544

1,338,479

22,486,447

73

07277 Coating with Glazed Brick, 20x25cm for Walls

m2

95.1

0.73517

202,322

69.91467

19,240,840

216,658

20,604,176

74

07280 Roof

623.2

1.11218

306,068

693.11058

190,741,883

327,756

204,257,539

75

07293 Power Supply for Accommodation

Ls

1.0

273.79379

75,348,243

273.79379

75,348,243

80,687,222

80,687,222

76

07294 Water Supply for Accommodation

Ls

1.0

184.02024

50,642,499

184.02024

50,642,499

54,230,894

54,230,894

each

1.0

232.97467

64,114,794

232.97467

64,114,794

68,657,800

68,657,800

2,141.0

5.39513

1,484,747

11,550.97333

3,178,843,252

1,589,952

3,404,087,232

m2

3,200.0

0.59154

162,789

1,892.92800

520,924,704

174,324

557,836,800

90.0

7.91284

2,177,612

712.15560

195,985,046

2,331,912

209,872,080

each

1.0

203.58841

56,027,674

203.58841

56,027,674

59,997,648

59,997,648

LS

1.0

2,853.61680

785,317,350

2,853.61680

785,317,350

840,962,878

840,962,878

480.0

2.54276

699,763

1,220.52480

335,886,326

749,347

359,686,560

E-3
77

House for combustion engine


07209 House for combustion engine (S=7.2m2)

E-4
78

Brick fence
07219 Brick Fence (L=2141m)

E-5
79

Station yard
07214

Station yard (S=3200m2)

E-6

Patterned iron Fence

80

07220 Patterned Iron Fence (L=90m)

E-7
81

Water Tank
07213 Water Tank (V=30m3)
Side Platform + Drainage Ditch at Platform
Foundation

E-8

82
E-9
83

07216

Side Platform + Drainage Ditch at Platform


Foundation (V=1200m2)
Drainage ditch

07215 Drainage Ditch (L=480m)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

E-10
84

F
F-1
85
85-1
F-2
86

Stations - 16

Miscellaneous Work
07301

Miscellaneous Facility and Work for


Construction of Van Phu Station buildings

LS

1.0

294.41718

81,023,821

294.41718

81,023,821

86,764,956

86,764,956

07205 Duty Room(S=15.36m2)

each

1.00

514.19954

141,508,072

514.19954

141,508,072

151,534,963

151,534,963

07304 Pump House(S=9m2)

each

1.00

514.19954

141,508,072

514.19954

141,508,072

151,534,963

151,534,963

m3

242.7

0.09894

27,231

24.01274

6,608,884

29,160

7,077,132

Locomotive Depot
Duty Room

Commissioning workshop
02301.1 Soil Excavation

87

02306 Soil backfill for foundation

m3

126.5

0.24522

67,492

31.02033

8,537,765

72,274

9,142,661

88

03112 Transport Soil to 5km by Truck

m3

116.3

0.07445

20,487

8.65854

2,382,664

21,939

2,551,506

89

04140 Concrete M200

m3

121.3

5.68808

1,565,358

689.96410

189,877,979

1,676,276

203,332,279

90

04170 Broken-Brick Concrete M50

m3

74.6

2.04928

563,960

152.87629

42,071,419

603,921

45,052,507

91

04180 Solid-Brick Concrete M50

m3

63.0

4.53757

1,248,743

285.86691

78,670,833

1,337,226

84,245,238

92

04201 Reinforcement Bar(D 10mm)

Ton

2.2

85.00957

23,394,694

187.87115

51,702,275

25,052,381

55,365,762

93

04202 Reinforcement Bar(10D18 mm)

Ton

2.1

80.01662

22,020,633

168.83507

46,463,535

23,580,957

49,755,819

94

04203 Reinforcement Bar( D>18 mm)

Ton

1.6

80.06075

22,032,773

128.89781

35,472,765

23,593,958

37,986,272

95

07217 Installation of Iron Gate

46.30

1.73149

476,514

80.16799

22,062,595

510,278

23,625,871

96

07251 Mortaring and Painting of Walls

m2

491.20

0.30191

83,093

148.29819

40,815,161

88,980

43,706,976

97

07257 Tiling for Floor 400x400

m2

147.30

0.60289

165,921

88.80570

24,440,111

177,677

26,171,822

98

07264 Manufacture of Wooden Door, Safe Glass Panel

23.00

9.83734

2,707,246

226.25882

62,266,655

2,899,074

66,678,702

99

07265 Ventilation Door

m2

31.20

6.39283

1,759,316

199.45630

54,890,653

1,883,976

58,780,051

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

100

07274 Manufacture of Wooden Window, Safe Glass Panel

101

07282 Working Pit

102

07295 Lighting System for Commissioning Workshop

F-3
103

07214

Station yard (S=35m2)

07210 Toilet Rooms (S=30.2m2)

07212 Fire Prevention Water Tank (S=30m3)

07302

Miscellaneous Facility and Work for


Construction of Locomotive depot

Wagon Depot

G-1

Guard House

G-2
108
109

387.77357

106,715,778

2,975,973

114,277,363

each

1.00

1,565.18286

430,739,417

1,565.18286

430,739,417

461,260,483

461,260,483

Ls

1.00

487.60269

134,188,607

487.60269

134,188,607

143,696,859

143,696,859

m2

35.00

0.77599

213,554

27.15965

7,474,397

228,686

8,004,010

each

1.00

399.85636

110,040,753

399.85636

110,040,753

117,837,952

117,837,952

each

1.00

203.55982

56,019,804

203.55982

56,019,804

59,989,220

59,989,220

LS

1.0

64.53556

17,760,234

64.53556

17,760,234

19,018,677

19,018,677

each

1.00

240.18763

66,099,796

240.18763

66,099,796

70,783,455

70,783,455

163.6

0.46976

129,278

76.85274

21,149,829

138,438

22,648,457

m3

57.5

0.39289

108,127

22.59118

6,217,282

115,788

6,657,810

Miscellaneous Work

107

2,779,057

Fire Prevention Water Tank

F-6
106

10.09827

Toilet Rooms

F-5
105

38.40

Station yard

F-4
104

Stations - 17

07211

Guard House (S=15.84m2)

Wagon dispatcher (S=124.8m2)


02301.1 Soil Excavation
02306 Soil backfill for foundation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 18

110

03112 Transport Soil to 5km by Truck

104.0

0.07445

20,487

7.74280

2,130,671

21,939

2,281,656

111

04140 Concrete M200

34.0

6.77189

1,863,635

230.51514

63,438,140

1,995,687

67,933,185

112

04170 Broken-Brick Concrete M50

m3

28.8

1.31753

362,592

37.94486

10,442,654

388,284

11,182,579

113

04180 Solid-Brick Concrete M50

m3

128.1

4.39433

1,209,322

562.91367

154,914,092

1,295,011

165,890,909

114

04201 Reinforcement Bar(D 10mm)

Ton

0.7

63.49991

17,475,217

46.98993

12,931,660

18,713,465

13,847,964

115

04202 Reinforcement Bar(10D18 mm)

Ton

1.2

61.73955

16,990,767

72.85267

20,049,105

18,194,688

21,469,732

116

07252 Mortaring of Walls, Cement Mortar M50

m2

787.70

0.19274

53,045

151.82130

41,783,208

56,803

44,743,723

117

07253 Painting of Walls

m2

831.70

0.13440

36,986

111.78048

30,761,423

39,607

32,941,142

118

07259 Tiling of Foundation

m2

162.80

0.77936

214,487

126.87981

34,918,562

229,685

37,392,718

119

07261 Manufacture of Door, Glass Panel

m2

119.30

10.77780

2,966,067

1,285.79154

353,851,781

3,176,234

378,924,716

120

07271 Manufacture of window, glass panel

m2

22.80

10.41434

2,866,027

237.44695

65,345,424

3,069,107

69,975,640

121

07278 Installation of Vitrailed Panel

m2

9.10

9.89381

2,722,788

90.03367

24,777,368

2,915,717

26,533,025

122

07280 Roof

m2

163.30

0.93378

256,974

152.48627

41,963,902

275,183

44,937,384

123

07296 Lighting System for Wagon Dispatcher

LS

1.00

110.24724

30,340,121

110.24724

30,340,121

32,489,942

32,489,942

124

07297 Water Supply for Wagon Dispatcher

LS

1.00

84.13287

23,153,431

84.13287

23,153,431

24,794,022

24,794,022

70.1

0.38929

107,137

27.28923

7,510,293

114,728

8,042,433

G-2
125

Wagon repair workshop(S=140.4m2)


02301.1 Soil Excavation

126

02306 Soil Backfill for Foundation

m3

23.4

0.33232

91,456

7.77629

2,140,064

97,936

2,291,702

127

02307 Sand Backfill for Floor

m3

14.0

0.54896

151,075

7.68544

2,115,054

161,780

2,264,920

128

03112 Transport Soil to 5km by Truck

m3

46.0

0.08041

22,123

3.69886

1,017,658

23,691

1,089,786

129

04140 Concrete M200

m3

24.8

6.35091

1,747,770

157.50257

43,344,702

1,871,613

46,416,002

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 19

130

04170 Broken-Brick Concrete M50

87.1

1.86964

514,525

162.84564

44,815,129

550,983

47,990,619

131

04180 Solid-Brick Concrete M50

23.6

4.21121

1,158,930

99.38456

27,350,757

1,241,049

29,288,756

132

04201 Reinforcement Bar(D 10mm)

Ton

0.7

70.90284

19,512,505

49.63199

13,658,753

20,895,110

14,626,577

133

07252 Mortaring of Walls, Cement Mortar M50

584.50

0.15098

41,544

88.24781

24,282,404

44,488

26,003,236

134

07253 Painting of Walls

m2

584.50

0.16083

44,267

94.00514

25,873,954

47,403

27,707,054

135

07261 Manufacture of Door, Glass Panel

11.50

7.11733

1,958,694

81.84930

22,524,982

2,097,482

24,121,043

136

07271 Manufacture of window, glass panel

25.50

7.77700

2,140,233

198.31350

54,575,955

2,291,885

58,443,068

137

07280 Roof

m2

212.40

1.67911

462,098

356.64296

98,149,690

494,841

105,104,228

138

07283

ton

0.5

97.36020

26,793,596

48.68010

13,396,798

28,692,120

14,346,060

139

07299 Water Supply for Wagon Repair Workshop

Ls

1.00

453.53363

124,812,776

453.53363

124,812,776

133,656,682

133,656,682

each

1.00

399.85636

110,040,753

399.85636

110,040,753

117,837,952

117,837,952

LS

1.00

533.99867

146,956,800

533.99867

146,956,800

157,369,774

157,369,774

LS

1.0

63.55046

17,489,125

63.55046

17,489,125

18,728,359

18,728,359

G-3
140

Outdoor toilets
07210 Toilet Rooms (S=30.2m2)

G-4
141

Repair yard
07208 Repair Yard (S=250m2)

G-5
142

Manufacture of Iron Patterns by Solid Square


Iron 12x12

Miscellaneous Work
07303

Miscellaneous Facility and Work for


Construction of Wangon depot

Level Crossing - Km 148+003.64

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

H-1
143

Stations - 20

Rail way
03102 Removal of RC slab

unit

28.0

0.25524

70,241

7.14672

1,966,743

75,218

2,106,104

144

06030.2 Supply of ballast

m3

1.0

1.42532

392,249

1.42532

392,249

420,043

420,043

145

06030.4 Installation of ballast

m3

1.0

0.85281

234,690

0.85281

234,690

251,320

251,320

146

06071.1 Supply of standard PC sleepers

sleeper

2.0

18.61221

596,893

37.22442

1,193,786

959,831

1,919,662

147

06071.2 Installation of standard PC sleepers

sleeper

2.0

0.29970

82,470

0.59940

164,940

88,314

176,628

148

06074.1

sleeper

29.0

0.12068

33,205

3.49972

962,937

35,558

1,031,182

149

06081.1 Supply of fastening system for PC sleeper

set

4.0

6.44515

15,615

25.78060

62,458

141,295

565,180

150

06130.4 Supply and installation of whistle board

board

1.0

3.59500

989,350

3.59500

989,350

1,059,453

1,059,453

151

06140.1 Supply of T1A blocks for RC slab

block

8.0

8.94505

2,461,689

71.56040

19,693,508

2,636,117

21,088,936

152

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.76011

2,961,188

21.52022

5,922,376

3,171,010

6,342,020

153

06140.3 Supply of T2A blocks for RC slab

block

20.0

15.26709

4,201,517

305.34180

84,030,335

4,499,225

89,984,500

154

06140.4

block

13.0

0.25524

70,241

3.31812

913,131

75,218

977,834

155

06140.5 Removal of T2 blocks of the RC slab

block

15.0

0.25524

70,241

3.82860

1,053,612

75,218

1,128,270

156

06140.6

block

10.0

1.61934

445,644

16.19340

4,456,439

477,221

4,772,210

157

06140.7 Installation of T2 blocks of the RC slab

block

20.0

5.87623

1,617,140

117.52460

32,342,790

1,731,726

34,634,520

m3

9.4

0.07952

21,889

0.74749

205,760

23,440

220,336

H-2
158

Removal of the existing sleepers from main


line

Removal of T1A and T1B blocks of the RC


slab

Installation of T1A and T1B blocks of the RC


slab

Road way
02301.3 Soil excavation for Benching

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

159

02400.5 Embankment , K=98

160

03105 Removal of existing pavement

161

03302

Medium grained asphalt overlay-7cm


thickness

Stations - 21

28.1

1.81627

499,837

51.03719

14,045,412

535,254

15,040,637

108.2

0.34206

94,137

37.01089

10,185,605

100,807

10,907,317

m2

171.5

0.81304

223,755

139.43636

38,373,935

239,609

41,092,944

162

Supply (when required) and installation /


06140.09 modification of trolleys and barriers at the
level crossing km 148.003

set

1.0

5.75671

1,584,249

5.75671

1,584,249

1,696,505

1,696,505

163

06140.19 Supply and installation of road signs (boards)

sign

2.0

3.99983

1,100,762

7.99966

2,201,525

1,178,759

2,357,518

164

06140.20

sign

2.0

3.50696

965,114

7.01392

1,930,229

1,033,500

2,067,000

12.0

3.05583

840,971

36.66996

10,091,656

900,560

10,806,720

LS

1.0

14.09363

3,878,575

14.09363

3,878,575

4,153,401

4,153,401

each

2.0

268.87042

73,993,330

537.74084

147,986,660

79,236,303

158,472,606

60.0

60.97434

16,780,177

3,658.46040

1,006,810,642

17,969,177

1,078,150,620

165

10201 Corrugated Iron Fence

H-3
166

Supply and installation of road signs (side


posts)

Other work
09104.01

Temporary Facility and Work for Construction


of Level Crossing - Km 148+003.64

Installation of Culvert

167

07203 Turnout control house

168

07286 Installation of Culvert, D=1.0m

Miscellaneous

169

06042.2 Evacuation of the not re-usable steel materials

Ton

180.0

0.36772

101,202

66.18960

18,216,443

108,373

19,507,140

170

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

180.0

0.36772

101,202

66.18960

18,216,443

108,373

19,507,140

171

06120.1 Supply and installation of buffer stop (BS)

BS

7.0

85.35191

23,488,905

597.46337

164,422,333

25,153,267

176,072,869

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

172

06130.8 Supply and installation of fouling point

173

09103.01

Temporary Facility and Work for Construction


of Van Phu Station

Stations - 22

sign

10.0

0.27598

75,954

2.75980

759,544

81,336

813,360

LS

1.0

1,340.07859

368,790,567

1,340.07859

368,790,567

394,922,100

394,922,100

Total VND :

Item 3.1 Carried forward to Collection


3

STATIONS (Cont'd)

3.2

MAU DONG STATION

Road Bed

02301.1 Soil Excavation

m3

4,782.0

0.44333

122,001

2,120.00406

583,409,093

130,646

624,749,172

02301.4 Soil excavation for Organic

m3

1,544.0

0.27089

74,544

418.25416

115,095,388

79,826

123,251,344

02400.1 Embankment , K=90

268.0

0.34825

95,842

93.33100

25,685,689

102,633

27,505,644

02400.2 Sand Embankment ,K=95

m3

1,042.0

1.28767

354,360

1,341.75214

369,243,573

379,470

395,407,740

02400.3 Embankment , K=95

1,778.0

0.07256

19,970

129.01168

35,506,802

21,385

38,022,530

02400.4 Embankment for Extention, K=95

407.0

0.37730

103,828

153.56110

42,257,854

111,185

45,252,295

02704 Crushed Stone cushion(4x6cm)

m3

118.0

2.49730

687,256

294.68140

81,096,167

735,953

86,842,454

02600 Road Formation for Reused Ballast

m3

75.0

0.43387

119,402

32.54025

8,955,115

127,862

9,589,650

03401 RC ditch installation R40

153.0

2.81149

773,721

430.15797

118,379,305

828,545

126,767,385

10

03402 RC ditch installation R50

50.0

3.20266

881,376

160.13300

44,068,806

943,828

47,191,400

11

03407 PVC drainage Pipe D100

158.0

0.00244

672

0.38552

106,242

720

113,760

12

04140 Concrete M200

m3

1,279.0

4.90175

1,348,962

6,269.33825

1,725,322,238

1,444,546

1,847,574,334

13

04150 Concrete M150

m3

19.0

4.71709

1,298,141

89.62471

24,664,674

1,390,124

26,412,356

14

04601

Unit

812.0

0.25092

69,051

203.74704

56,069,461

73,944

60,042,528

Supply and installation of platform concrete


slab,L=1m

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

15

06022.1 Supply and Installation of Geo-Textile Type 2

Stations - 23

337.5

0.00205

560

0.69188

189,008

600

202,500

285.0

3.78608

1,041,931

1,079.03280

296,950,460

1,115,760

317,991,600

m3

136.0

3.78608

1,041,931

514.90688

141,702,676

1,115,760

151,743,360

16

08101 Rubble stone with cement mortar M100

17

08102

18

08104 Place Rubble (with Mortar)

m3

116.0

3.78608

1,041,931

439.18528

120,864,047

1,115,760

129,428,160

19

08220 Cement Mortar M100

m3

85.0

2.85148

784,722

242.37580

66,701,382

840,326

71,427,710

Rubble Stone Reveted with Cement Mortar


M100

Special Railway Bed

20

02301.1 Soil Excavation

m3

1,525.0

0.57672

158,719

879.49800

242,046,414

169,965

259,196,625

21

02400.2 Sand Embankment ,K=95

m3

218.0

1.28767

354,360

280.71206

77,250,575

379,470

82,724,460

22

02400.3 Embankment , K=95

m3

1,307.0

0.09446

25,996

123.45922

33,976,811

27,838

36,384,266

Tracks

23

06030.1 Removal of ballast

m3

1,326.7

0.58114

159,936

770.99844

212,186,786

171,268

227,221,256

24

06030.2 Supply of ballast

m3

1,578.0

1.28673

354,102

2,030.45994

558,772,585

379,193

598,366,554

25

06030.3 Screening and washing of ballast

m3

1,326.7

0.29058

79,967

385.51249

106,091,807

85,633

113,609,301

26

06030.4 Installation of ballast

m3

1,976.0

0.78727

216,657

1,555.64552

428,114,696

232,009

458,449,784

27

06030.5

m3

928.7

0.30589

84,176

284.08004

78,174,386

90,141

83,713,947

28

06041.1 Installation of P50 rails and joints materials

1,525.0

0.20363

56,047

310.53575

85,472,003

60,018

91,527,450

29

06042.1

2,512.5

0.06349

17,474

159.51863

43,903,287

18,712

47,013,900

30

06071.1 Supply of standard PC sleepers

sleeper 1,163.0

18.60143

593,921

21,633.46309

690,730,257

956,649

1,112,582,787

Evacuation of Ballast That Cannot be Reused up to 30Km

Removal of the P43 rails and joints materials


from main line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

31

06071.2 Installation of standard PC sleepers

32

06074.1

33

06081.1 Supply of fastening system for PC sleeper

34

06151.1

35

06151.2

36

06151.3 Final leveling and lining of the track

37

06161.2

Stations - 24

sleeper 1,163.0

0.27564

75,854

320.56932

88,218,225

81,229

94,469,327

sleeper 2,099.0

0.19075

52,494

400.38425

110,185,693

56,214

117,993,186

set

1,163.0

6.92255

146,987

8,050.92565

170,946,201

281,977

327,939,251

Lifting of the track up to its final level using


heavy tamping machine

2,371.0

0.34926

96,115

828.09546

227,889,685

102,926

244,037,546

Lifting of the track up to its final level using


hand tamping tools for the first lifting

124.8

0.34926

96,115

43.58765

11,995,206

102,926

12,845,165

2,495.7

0.05199

14,312

129.75144

35,718,945

15,326

38,249,098

970.7

3.19713

879,852

3,103.45409

854,072,302

942,196

914,589,657

Removal of the existing sleepers from main


line

Installation of new track (new siding / track


extension)

Turnouts

38-1

06030.1 Removal of ballast

m3

184.0

0.35163

96,765

64.69992

17,804,800

103,622

19,066,448

38

06030.2 Supply of ballast

m3

184.0

1.28673

354,102

236.75832

65,154,725

379,193

69,771,512

39

06030.4 Installation of ballast

m3

184.0

0.78727

216,657

144.85768

39,864,931

232,009

42,689,656

m3

184.0

0.30589

84,176

56.28376

15,488,411

90,141

16,585,944

turnout

2.0

8.78776

2,418,395

17.57552

4,836,789

2,589,756

5,179,512

turnout

4.0

72.64710

19,992,536

290.58840

79,970,142

21,409,154

85,636,616

39-1

06030.5

Evacuation of Ballast That Cannot be Reused up to 30km

40

06152.1 Removal of the turnout from main line

41

06152.2

Installation of new P50 turnout with concrete


bearers

42

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

8.83118

2,430,345

35.32472

9,721,380

2,602,553

10,410,212

43

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

4.41556

1,215,173

17.66224

4,860,690

1,301,276

5,205,104

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 25

Buildings

44

07203 Turnout control house

Miscellaneous

each

2.0

268.87042

73,993,330

537.74084

147,986,660

79,236,303

158,472,606

45

06042.2 Evacuation of the not re-usable steel materials

Ton

94.2

0.34355

94,546

32.36241

8,906,212

101,245

9,537,279

46

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

94.2

0.34355

94,546

32.36241

8,906,212

101,245

9,537,279

47

06130.8 Supply and installation of fouling point

sign

4.0

0.26829

73,828

1.07316

295,313

79,060

316,240

48

09103.02

LS

1.0

493.10544

135,702,959

493.10544

135,702,959

145,318,515

145,318,515

Temporary Facility and Work for Construction


of Mau Dong Station

Total VND :

Item 3.2 Carried forward to Collection


3
3.3
A

STATIONS (Cont'd)
LANG THIP STATION
Road Bed

02301.1 Soil Excavation

3,170.0

0.31148

85,720

987.39160

271,732,844

91,794

290,986,980

02301.4 Soil excavation for Organic

m3

141.0

0.59226

162,998

83.50866

22,982,708

174,547

24,611,127

02301.5 Soil excavation for ditch

579.0

0.98471

270,992

570.14709

156,904,458

290,194

168,022,326

02400.1 Embankment , K=90

268.0

0.35766

98,426

95.85288

26,378,069

105,400

28,247,200

02400.2 Sand Embankment ,K=95

m3

57.0

1.29354

355,975

73.73178

20,290,573

381,199

21,728,343

02400.3 Embankment , K=95

719.0

0.08235

22,666

59.20965

16,296,980

24,272

17,451,568

02400.4 Embankment for Extention, K=95

m3

204.0

0.38747

106,627

79.04388

21,751,976

114,183

23,293,332

02704 Crushed Stone cushion(4x6cm)

m3

20.0

2.51937

693,333

50.38740

13,866,666

742,461

14,849,220

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 26

02600 Road Formation for Reused Ballast

31.0

0.44559

122,621

13.81329

3,801,251

131,310

4,070,610

10

02501 Turf

470.0

0.06609

18,187

31.06230

8,548,005

19,476

9,153,720

11

02705 Mortar for Ditch Bed - 2cm thickness

m2

420.0

0.24771

68,169

104.03820

28,630,835

72,999

30,659,580

12

03101 Removal of existing masonry

m3

47.0

2.69402

741,399

126.61894

34,845,735

793,932

37,314,804

13

03401 RC ditch installation R40

100.0

3.09095

850,629

309.09500

85,062,947

910,903

91,090,300

14

03402 RC ditch installation R50

54.0

3.48539

959,177

188.21106

51,795,552

1,027,142

55,465,668

15

04150 Concrete M150

m3

105.0

4.93400

1,357,841

518.07000

142,573,305

1,454,054

152,675,670

16

04601

Unit

600.0

0.25556

70,338

153.33600

42,202,548

75,321

45,192,600

block

8.0

3.68388

1,013,800

29.47104

8,110,403

1,085,636

8,685,088

set

16.0

3.13502

862,760

50.16032

13,804,162

923,893

14,782,288

Supply and installation of platform concrete


slab,L=1m

17

06140.5 Removal of T2 blocks of the RC slab

18

06140.8 Supply of the fastening system for RC slab

19

08101 Rubble stone with cement mortar M100

m3

147.0

3.82103

1,051,551

561.69141

154,577,985

1,126,061

165,530,967

20

08104 Place Rubble (with Mortar)

m3

94.0

3.82103

1,051,551

359.17682

98,845,786

1,126,061

105,849,734

Tracks

21

06030.1 Removal of ballast

m3

1,973.3

0.21990

60,515

433.92867

119,414,151

64,803

127,875,760

22

06030.2 Supply of ballast

m3

1,316.0

1.28673

354,102

1,693.33668

465,997,923

379,193

499,017,988

23

06030.3 Screening and washing of ballast

m3

1,973.3

0.10995

30,257

216.96434

59,706,088

32,401

63,936,893

24

06030.4 Installation of ballast

m3

1,908.0

0.80850

222,499

1,542.61800

424,528,569

238,265

454,609,620

25

06030.5

m3

928.7

0.31413

86,445

291.73253

80,281,904

92,571

85,970,688

26

06041.1 Installation of P50 rails and joints materials

1,375.0

0.20280

55,805

278.85000

76,732,425

59,760

82,170,000

Evacuation of Ballast That Cannot be Reused up to 30Km

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

27

06042.1

28

Removal of the P43 rails and joints materials


from main line

Stations - 27

1,600.0

0.06548

18,014

104.76800

28,822,624

19,291

30,865,600

06071.1 Supply of standard PC sleepers

sleeper 1,007.0

18.60143

593,921

18,731.64001

598,078,563

956,649

963,345,543

29

06071.2 Installation of standard PC sleepers

sleeper 1,007.0

0.28305

77,899

285.03135

78,443,815

83,418

84,001,926

30

06074.1

sleeper 1,600.0

0.19799

54,491

316.78400

87,185,912

58,352

93,363,200

31

06081.1 Supply of fastening system for PC sleeper

set

2,014.0

6.44411

15,328

12,978.43754

30,870,300

140,988

283,949,832

32

06151.1

Lifting of the track up to its final level using


heavy tamping machine

2,095.3

0.15779

43,420

330.61739

90,978,125

46,497

97,425,164

33

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

110.3

0.15779

43,420

17.40424

4,789,236

46,497

5,128,619

34

06151.3 Final leveling and lining of the track

2,205.6

0.02687

7,400

59.26447

16,321,517

7,924

17,477,174

35

06161.2

830.6

3.21698

885,318

2,672.02359

735,345,039

948,049

787,449,499

Removal of the existing sleepers from main


line

Installation of new track (new siding / track


extension)

Turnouts

36

06030.1 Removal of ballast

m3

31.3

2.12272

584,177

66.44114

18,284,739

625,570

19,580,341

37

06030.2 Supply of ballast

m3

163.2

1.28684

354,145

210.01229

57,796,402

379,238

61,891,642

38

06030.3 Screening and washing of ballast

m3

31.3

1.06136

292,088

33.22057

9,142,370

312,785

9,790,171

39

06030.4 Installation of ballast

m3

172.6

0.80850

222,499

139.54710

38,403,371

238,265

41,124,539

40

06030.5

m3

21.9

0.31413

86,445

6.87945

1,893,156

92,571

2,027,305

41

06152.1 Removal of the turnout from main line

turnout

2.0

9.02470

2,483,596

18.04940

4,967,193

2,659,578

5,319,156

Evacuation of Ballast That Cannot be Reused up to 30Km

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

42

06152.2

Installation of new P50 turnout with concrete


bearers

43

06152.3

44

06152.4

Stations - 28

turnout

4.0

74.05163

20,379,061

296.20652

81,516,245

21,823,068

87,292,272

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

13.60390

3,743,804

54.41560

14,975,216

4,009,080

16,036,320

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

6.80198

1,871,902

27.20792

7,487,610

2,004,541

8,018,164

each

1.0

268.87042

73,993,330

268.87042

73,993,330

79,236,303

79,236,303

Buildings

45

07203 Turnout control house

Miscellaneous

46

06042.2 Evacuation of the not re-usable steel materials

Ton

82.3

0.35279

97,095

29.03462

7,990,885

103,974

8,557,060

47

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

82.3

0.35279

97,095

29.03462

7,990,885

103,974

8,557,060

48

06130.8 Supply of fouling point

sign

4.0

0.27066

74,491

1.08264

297,965

79,769

319,076

49

09103.03

LS

1.0

71.13755

19,577,103

71.13755

19,577,103

20,964,285

20,964,285

Temporary Facility and Work for Construction


of Lang Thip Station

Item 3.3 Carried forward to Collection


3

STATIONS (Cont'd)

3.4

CO PHUC STATION

Total VND :

Road Bed

02301.1 Soil Excavation

m3

1,954.0

0.51937

142,933

1,014.84898

279,291,639

153,061

299,081,194

02301.4 Soil excavation for Organic

m3

188.0

0.57672

158,719

108.42336

29,839,164

169,965

31,953,420

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

02301.5 Soil excavation for ditch

Stations - 29

567.0

0.95888

263,877

543.68496

149,618,168

282,575

160,220,025

02704 Crushed Stone cushion(4x6cm)

31.0

2.49730

687,256

77.41630

21,304,925

735,953

22,814,543

02600 Road Formation for Reused Ballast

m3

640.0

0.43387

119,402

277.67680

76,416,982

127,862

81,831,680

02400.2 Sand Embankment ,K=95

m3

14.0

1.28767

354,360

18.02738

4,961,046

379,470

5,312,580

02400.4 Embankment for Extention, K=95

48.0

0.37730

103,828

18.11040

4,983,727

111,185

5,336,880

02501 Turf

m2

290.0

0.06499

17,881

18.84710

5,185,402

19,148

5,552,920

02705 Mortar for Ditch Bed - 2cm thickness

m2

325.0

0.24295

66,854

78.95875

21,727,704

71,592

23,267,400

10

04140 Concrete M200

m3

151.0

5.32937

1,466,640

804.73487

221,462,683

1,570,563

237,155,013

11

04150 Concrete M150

m3

89.0

4.54017

1,249,451

404.07513

111,201,111

1,337,984

119,080,576

12

08101 Rubble stone with cement mortar M100

m3

101.0

3.78608

1,041,931

382.39408

105,235,075

1,115,760

112,691,760

Tracks

13

06030.1 Removal of ballast

m3

1,780.0

0.60565

166,670

1,078.05700

296,672,288

178,480

317,694,400

14

06030.2 Supply of ballast

m3

1,895.0

1.28673

354,102

2,438.35335

671,022,845

379,193

718,570,735

15

06030.3 Screening and washing of ballast

m3

1,780.0

0.30280

83,335

538.98400

148,337,012

89,240

158,847,200

16

06030.4 Installation of ballast

m3

2,429.0

0.78727

216,657

1,912.27883

526,260,424

232,009

563,549,861

17

06030.5

m3

1,246.0

0.30589

84,176

381.13894

104,883,477

90,141

112,315,686

18

06041.1 Installation of P50 rails and joints materials

1,775.0

0.19639

54,039

348.59225

95,919,926

57,869

102,717,475

19

06042.1

2,762.5

0.06188

17,036

170.94350

47,062,890

18,243

50,396,288

20

06071.1 Supply of standard PC sleepers

sleeper 1,287.0

18.60143

593,921

23,940.04041

764,376,475

956,649

1,231,207,263

21

06071.2 Installation of standard PC sleepers

sleeper 1,287.0

0.27564

75,854

354.74868

97,624,124

81,229

104,541,723

Evacuation of Ballast That Cannot be Reused up to 30Km

Removal of the P43 rails and joints materials


from main line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Removal of the existing sleepers from main


line

22

06074.1

23

06081.1 Supply of fastening system for PC sleeper

24

06151.1

25

06151.2

26

06151.3 Final leveling and lining of the track

27

06161.2

28

06161.3 Replacement of isolated rails

29

06161.4 Replacement of isolated sleepers

Stations - 30

sleeper 2,814.0

0.18362

50,529

516.70668

142,189,760

54,110

152,265,540

set

2,574.0

6.44411

15,328

16,587.13914

39,453,899

140,988

362,903,112

Lifting of the track up to its final level using


heavy tamping machine

1,910.3

0.43055

118,492

822.47967

226,355,792

126,888

242,394,146

Lifting of the track up to its final level using


hand tamping tools for the first lifting

100.5

0.43055

118,492

43.27028

11,908,474

126,888

12,752,244

2,785.8

0.05293

14,568

147.45239

40,583,158

15,600

43,458,480

235.8

3.19713

879,854

753.88325

207,469,565

942,198

222,170,288

775.0

0.17908

49,286

138.78700

38,196,603

52,778

40,902,950

sleeper 1,139.0

2.18118

600,262

2,484.36402

683,698,407

642,795

732,143,505

Installation of new track (new siding / track


extension)

Turnouts

30

06030.1 Removal of ballast

m3

31.3

1.37798

379,227

43.13077

11,869,817

406,098

12,710,867

31

06030.2 Supply of ballast

m3

199.0

1.28640

354,013

255.99360

70,448,627

379,098

75,440,502

32

06030.3 Screening and washing of ballast

m3

31.3

0.68899

189,614

21.56539

5,934,909

203,049

6,355,434

33

06030.4 Installation of ballast

m3

208.4

0.78727

216,657

164.06707

45,151,368

232,009

48,350,676

34

06030.5

m3

21.9

0.30589

84,176

6.69899

1,843,458

90,141

1,974,088

35

06152.1 Removal of the turnout from main line

turnout

6.0

8.78776

2,418,395

52.72656

14,510,368

2,589,756

15,538,536

36

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

4.0

72.64710

19,992,536

290.58840

79,970,142

21,409,154

85,636,616

37

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

8.83118

2,430,345

35.32472

9,721,380

2,602,553

10,410,212

Evacuation of Ballast That Cannot be Reused up to 30Km

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

38

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

39

06162.1

Installation of P43 turnout on loops and


sidings

Stations - 31

set

4.0

4.41556

1,215,173

17.66224

4,860,690

1,301,276

5,205,104

turnout

1.0

43.41248

11,947,150

43.41248

11,947,150

12,793,693

12,793,693

each

1.0

268.87042

73,993,330

268.87042

73,993,330

79,236,303

79,236,303

Buildings

40

07203 Turnout control house

Miscellaneous

41

06042.2 Evacuation of the not re-usable steel materials

Ton

152.6

0.34355

94,546

52.42573

14,427,685

101,245

15,449,987

42

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

152.6

0.34355

94,546

52.42573

14,427,685

101,245

15,449,987

43

06130.8 Supply and installation of fouling point

sign

4.0

0.26829

73,828

1.07316

295,313

79,060

316,240

44

09103.04

LS

1.0

179.71395

49,457,407

179.71395

49,457,407

52,961,829

52,961,829

Temporary Facility and Work for Construction


of Co Phuc Station

Total VND :

Item 3.4 Carried forward to Collection


3
3.5
A

STATIONS (Cont'd)
LAM GIANG STATION
Road Bed

02301.1 Soil Excavation

1,321.0

0.40168

110,541

530.61928

146,024,978

118,374

156,372,054

02301.4 Soil excavation for Organic

m3

473.0

0.50726

139,604

239.93398

66,032,895

149,496

70,711,608

02301.5 Soil excavation for ditch

m3

242.0

0.67057

184,547

162.27794

44,660,346

197,623

47,824,766

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

02600 Road Formation for Reused Ballast

Stations - 32

m3

298.0

0.44559

122,621

132.78582

36,541,057

131,310

39,130,380

02400.2 Sand Embankment ,K=95

m3

59.0

0.88549

243,683

52.24391

14,377,294

260,950

15,396,050

02400.3 Embankment , K=95

m3

1,270.2

0.06780

18,663

86.11956

23,705,616

19,985

25,384,947

02400.4 Embankment for Extention, K=95

m3

293.8

0.38747

106,627

113.83869

31,327,111

114,183

33,546,965

02501 Turf

402.0

0.06609

18,187

26.56818

7,311,272

19,476

7,829,352

03101 Removal of existing masonry

m3

23.0

2.69402

741,399

61.96246

17,052,168

793,932

18,260,436

10

04140 Concrete M200

m3

64.0

5.39308

1,484,174

345.15712

94,987,132

1,589,339

101,717,696

11

04150 Concrete M150

m3

20.0

4.69596

1,292,335

93.91920

25,846,696

1,383,906

27,678,120

12

08104 Place Rubble (with Mortar)

m3

142.0

3.82103

1,051,551

542.58626

149,320,230

1,126,061

159,900,662

Tracks

13

06030.1 Removal of ballast

m3

1,256.7

0.72145

198,549

906.64622

249,516,183

212,617

267,195,784

14

06030.2 Supply of ballast

m3

1,947.0

1.28673

354,102

2,505.26331

689,436,136

379,193

738,288,771

15

06030.3 Screening and washing of ballast

m3

1,256.7

0.36075

99,274

453.35453

124,758,107

106,309

133,598,520

16

06030.4 Installation of ballast

m3

2,324.0

0.80850

222,499

1,878.95400

517,088,257

238,265

553,727,860

17

06030.5

m3

879.7

0.31413

86,445

276.34016

76,046,076

92,571

81,434,709

18

06041.1 Installation of P50 rails and joints materials

1,800.0

0.20020

55,089

360.36000

99,160,380

58,993

106,187,400

19

06042.1

2,887.5

0.06819

18,772

196.89863

54,205,002

20,102

58,044,525

20

06071.1 Supply of standard PC sleepers

sleeper 1,353.0

18.60143

593,921

25,167.73479

803,575,269

956,649

1,294,346,097

21

06071.2 Installation of standard PC sleepers

sleeper 1,353.0

0.28305

77,899

382.96665

105,396,704

83,418

112,864,554

22

06074.1

sleeper 2,452.0

0.20082

55,269

492.41064

135,519,613

59,185

145,121,620

Evacuation of Ballast That Cannot be Reused up to 30Km

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 33

23

06081.1 Supply of fastening system for PC sleeper

set

2,706.0

6.44411

15,328

17,437.76166

41,477,176

140,988

381,513,528

24

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,943.6

0.35251

97,008

685.13844

188,544,855

103,882

201,905,055

25

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

102.3

0.35251

97,008

36.06177

9,923,924

103,882

10,627,129

26

06151.3 Final leveling and lining of the track

3,033.4

0.03241

8,917

98.31249

27,048,843

9,549

28,965,937

27

06161.2

245.9

3.21710

885,354

791.08489

217,708,438

948,087

233,134,593

28

06161.3 Replacement of isolated rails

987.5

0.18350

50,500

181.20625

49,868,503

54,078

53,402,025

29

06161.4 Replacement of isolated sleepers

sleeper 1,077.0

2.18858

602,307

2,357.10066

648,684,305

644,984

694,647,768

Installation of new track (new siding / track


extension)

Turnouts

30

06030.1 Removal of ballast

m3

15.7

1.41067

388,211

22.14752

6,094,911

415,719

6,526,788

31

06030.2 Supply of ballast

m3

167.5

1.28673

354,102

215.52728

59,312,046

379,193

63,514,828

32

06030.3 Screening and washing of ballast

m3

15.7

0.70531

194,105

11.07337

3,047,455

207,859

3,263,386

33

06030.4 Installation of ballast

m3

172.2

0.80850

222,499

139.22370

38,314,371

238,265

41,029,233

34

06030.5

m3

11.0

0.31413

86,445

3.45543

950,900

92,571

1,018,281

35

06152.1 Removal of the turnout from main line

turnout

4.0

9.02470

2,483,596

36.09880

9,934,385

2,659,578

10,638,312

36

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

4.0

74.05163

20,379,061

296.20652

81,516,245

21,823,068

87,292,272

37

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

4.53463

1,247,935

18.13852

4,991,739

1,336,360

5,345,440

38

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

2.26734

623,968

9.06936

2,495,871

668,181

2,672,724

Evacuation of Ballast That Cannot be Reused up to 30Km

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 34

Buildings

39

07203 Turnout control house

Miscellaneous

each

1.0

268.87042

73,993,330

268.87042

73,993,330

79,236,303

79,236,303

40

06042.2 Evacuation of the not re-usable steel materials

Ton

93.9

0.35279

97,095

33.12698

9,117,183

103,974

9,763,159

41

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

93.9

0.35279

97,095

33.12698

9,117,183

103,974

9,763,159

42

06120.1 Supply and installation of buffer stop (BS)

BS

1.0

84.10865

23,146,758

84.10865

23,146,758

24,786,877

24,786,877

43

06130.8 Supply and installation of fouling point

sign

3.0

0.27066

74,491

0.81198

223,473

79,769

239,307

44

09103.05

LS

1.0

156.00034

42,931,399

156.00034

42,931,399

45,973,406

45,973,406

Temporary Facility and Work for Construction


of Lam Giang Station

Total VND :

Item 3.5 Carried forward to Collection


3
3.6
A

STATIONS (Cont'd)
MAU A STATION
Road Bed

02301.1 Soil Excavation

m3

1,185.5

0.55139

151,742

653.67285

179,890,016

162,494

192,636,637

02301.5 Soil excavation for ditch

2.1

0.27089

74,544

0.56887

156,542

79,826

167,635

m3

382.2

0.43387

119,402

165.82511

45,635,266

127,862

48,868,856

02600 Road Formation for Reused Ballast

02400.2 Sand Embankment ,K=95

159.3

1.28756

354,338

205.10831

56,445,977

379,445

60,445,589

02400.4 Embankment for Extention, K=95

m3

159.6

0.65299

179,702

104.21720

28,680,391

192,435

30,712,626

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

04150 Concrete M150

Tracks

Stations - 35

m3

113.2

4.44940

1,224,484

503.67208

138,611,554

1,311,247

148,433,160

06030.1 Removal of ballast

m3

1,870.0

0.54127

148,961

1,012.17490

278,557,509

159,516

298,294,920

06030.2 Supply of ballast

m3

1,606.0

1.28673

354,102

2,066.48838

568,687,435

379,193

608,983,958

06030.3 Screening and washing of ballast

m3

1,870.0

0.27066

74,480

506.13420

139,277,843

79,758

149,147,460

10

06030.4 Installation of ballast

m3

2,167.0

0.78727

216,657

1,706.01409

469,496,228

232,009

502,763,503

11

06030.5

m3

1,309.0

0.30589

84,176

400.41001

110,186,574

90,141

117,994,569

12

06041.1 Installation of P50 rails and joints materials

1,500.0

0.18705

51,479

280.57500

77,217,787

55,126

82,689,000

13

06042.1

1,662.5

0.06200

17,063

103.07500

28,367,237

18,272

30,377,200

14

06071.1 Supply of standard PC sleepers

sleeper 1,029.0

18.60143

593,921

19,140.87147

611,144,827

956,649

984,391,821

15

06071.2 Installation of standard PC sleepers

sleeper 1,029.0

0.27564

75,854

283.63356

78,053,787

81,229

83,584,641

16

06074.1

sleeper 2,312.0

0.18848

51,865

435.76576

119,911,048

55,540

128,408,480

17

06081.1 Supply of fastening system for PC sleeper

set

2,058.0

6.44411

15,328

13,261.97838

31,544,726

140,988

290,153,304

18

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,549.8

0.49962

137,497

774.31108

213,093,486

147,240

228,192,552

19

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

81.6

0.49962

137,497

40.76899

11,219,789

147,240

12,014,784

20

06151.3 Final leveling and lining of the track

1,631.4

0.08490

23,363

138.50586

38,115,133

25,019

40,815,997

21

06161.2

131.4

3.19702

879,816

420.08843

115,607,837

942,158

123,799,561

22

06161.4 Replacement of isolated sleepers

sleeper 1,156.0

2.76044

759,674

3,191.06864

878,183,630

813,503

940,409,468

Evacuation of Ballast That Cannot be Reused up to 30Km

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Installation of new track (new siding / track


extension)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 36

Turnouts

23

06030.1 Removal of ballast

m3

91.0

0.47397

130,438

43.13127

11,869,820

139,680

12,710,880

24

06030.2 Supply of ballast

m3

217.0

1.28673

354,102

279.22041

76,840,083

379,193

82,284,881

25

06030.3 Screening and washing of ballast

m3

91.0

0.23698

65,219

21.56518

5,934,919

69,840

6,355,440

26

06030.4 Installation of ballast

m3

244.3

0.78727

216,657

192.33006

52,929,363

232,009

56,679,799

27

06030.5

m3

63.7

0.30589

84,176

19.48519

5,362,021

90,141

5,741,982

28

06152.1 Removal of the turnout from main line

turnout

4.0

8.78776

2,418,395

35.15104

9,673,579

2,589,756

10,359,024

29

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

4.0

72.64710

19,992,536

290.58840

79,970,142

21,409,154

85,636,616

30

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

8.83118

2,430,345

35.32472

9,721,380

2,602,553

10,410,212

31

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

4.41556

1,215,173

17.66224

4,860,690

1,301,276

5,205,104

Evacuation of Ballast That Cannot be Reused up to 30Km

Miscellaneous

32

06042.2 Evacuation of the not re-usable steel materials

Ton

127.5

0.34355

94,546

43.80263

12,054,587

101,245

12,908,738

33

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

127.5

0.34355

94,546

43.80263

12,054,587

101,245

12,908,738

34

06130.8 Supply and installation of fouling point

sign

4.0

0.26829

73,828

1.07316

295,313

79,060

316,240

35

09103.06

LS

1.0

150.17560

41,328,427

150.17560

41,328,427

44,256,851

44,256,851

Temporary Facility and Work for Construction


of Mau A Station

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 37

Total VND :

Item 3.6 Carried forward to Collection


3

STATIONS (Cont'd)

3.7

YEN BAI STATION

Road Bed

02301.1 Soil Excavation

m3

2,139.0

0.63535

174,850

1,359.01365

374,003,455

187,239

400,504,221

02301.5 Soil excavation for ditch

m3

468.0

0.70608

194,315

330.44544

90,939,626

208,084

97,383,312

m3

128.0

0.46916

129,110

60.05248

16,526,129

138,259

17,697,152

06030.1 Removal of Ballast

m3

3,721.0

0.97531

268,406

3,629.12851

998,740,419

287,425

1,069,508,425

06030.2 Supply of ballast

m3

3,721.0

1.37837

379,325

5,128.91477

1,411,467,525

406,203

1,511,481,363

06030.4 Installation of ballast

m3

3,721.0

0.85281

234,690

3,173.30601

873,282,253

251,320

935,161,720

5-1

Evacuation of Ballast That Cannot be Re06030.5


used up to 30km

m3

3,721.0

0.32298

88,885

1,201.80858

330,740,676

95,183

354,175,943

06041.1 Installation of P50 rails and joints materials

2,900.0

0.20374

56,072

590.84600

162,609,003

60,045

174,130,500

06042.1

3,912.5

0.06907

19,014

270.23638

74,392,804

20,361

79,662,413

06071.1 Supply of standard PC sleepers

sleeper 2,107.0

18.56626

584,254

39,119.10982

1,231,023,031

946,296

1,993,845,672

06071.2 Installation of standard PC sleepers

sleeper 2,107.0

0.29970

82,470

631.46790

173,763,974

88,314

186,077,598

10

06074.1

sleeper 5,203.0

0.18339

50,471

954.17817

262,600,067

54,047

281,206,541

11

06081.1 Supply of fastening system for PC sleeper

set

4,214.0

6.44515

15,615

27,159.86210

65,799,819

141,295

595,417,130

12

06151.1

Lifting of the track up to its final level using


heavy tamping machine

2,755.0

0.68275

187,893

1,880.97625

517,646,248

201,207

554,325,285

02600 Road Formation for Reused Ballast

B
4-1

Tracks

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

13

06151.2

14

Lifting of the track up to its final level using


hand tamping tools for the first lifting

Stations - 38

145.0

0.68275

187,893

98.99875

27,244,539

201,207

29,175,015

06151.3 Final leveling and lining of the track

3,775.0

0.08866

24,395

334.69150

92,091,616

26,124

98,618,100

15

06161.3 Replacement of isolated rails

875.0

0.19334

53,212

169.17250

46,560,386

56,982

49,859,250

16

06161.4 Replacement of isolated sleepers

sleeper 3,324.0

4.02234

1,106,948

13,370.25816

3,679,496,382

1,185,384

3,940,216,416

Turnouts

17-1

06030.1 Removal of ballast

m3

609.0

1.09664

301,796

667.85376

183,793,472

323,180

196,816,620

17

06030.2 Supply of ballast

m3

609.0

1.37837

379,325

839.42733

231,008,794

406,203

247,377,627

18

06030.4 Installation of ballast

m3

609.0

0.85281

234,690

519.36129

142,926,335

251,320

153,053,880

Evacuation of Ballast That Cannot be Re06030.5


used up to 30km

m3

609.0

0.32298

88,885

196.69482

54,130,898

95,183

57,966,447

18-1
19

06090.2 Renewal of the wooden timbers

timber

193.0

5.40496

1,487,454

1,043.15728

287,078,676

1,592,851

307,420,243

20

06152.1 Removal of the turnout from main line

turnout

7.0

9.52526

2,621,353

66.67682

18,349,474

2,807,096

19,649,672

21

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

7.0

77.55588

21,343,424

542.89116

149,403,970

22,855,764

159,990,348

22

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

7.0

48.98696

13,481,241

342.90872

94,368,689

14,436,487

101,055,409

23

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

7.0

24.49348

6,740,621

171.45436

47,184,348

7,218,244

50,527,708

24

06162.4 Replacement of isolated switch parts

set

5.0

81.58220

22,451,476

407.91100

112,257,380

24,042,329

120,211,645

Ton

247.8

0.36772

101,202

91.12102

25,077,969

108,373

26,854,829

D
25

Miscellaneous
06042.2 Evacuation of the not re-usable steel materials

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Evacuation of the not re-usable concrete and


various materials

26

06074.2

27

06130.8 Supply and installation of fouling point

28

06140.21 Repair level crossing

29

09103.07

Temporary Facility and Work for Construction


of Yen Bai Station

Stations - 39

Ton

247.8

0.36772

101,202

91.12102

25,077,969

108,373

26,854,829

sign

1.0

0.27598

75,954

0.27598

75,954

81,336

81,336

15.2

2.17078

597,399

32.99586

9,080,462

639,729

9,723,881

LS

1.0

399.82731

110,032,761

399.82731

110,032,761

117,829,394

117,829,394

Total VND :

Item 3.7 Carried forward to Collection


3

STATIONS (Cont'd)

3.8

NGOI HOP STATION

Road Bed

02301.1 Soil Excavation

m3

576.7

0.63446

174,605

365.89308

100,694,721

186,977

107,829,636

02301.5 Soil excavation for ditch

181.7

0.95860

263,805

174.17762

47,933,423

282,498

51,329,887

02400.2 Sand Embankment ,K=95

m3

32.1

1.28601

353,918

41.28092

11,360,762

378,995

12,165,740

02400.3 Embankment , K=95

73.3

0.42137

115,963

30.88642

8,500,109

124,180

9,102,394

02600 Road Formation for Reused Ballast

m3

342.3

0.43387

119,402

148.51370

40,871,146

127,862

43,767,163

03101 Removal of existing masonry

15.1

2.66742

734,079

40.27804

11,084,597

786,094

11,870,019

04150 Concrete M150

m3

28.0

4.44940

1,224,484

124.58320

34,285,544

1,311,247

36,714,916

04601

Unit

785.0

0.25092

69,051

196.97220

54,205,082

73,944

58,046,040

block

8.0

2.99759

824,939

23.98072

6,599,512

883,392

7,067,136

set

16.0

2.99759

824,939

47.96144

13,199,024

883,392

14,134,272

Supply and installation of platform concrete


slab,L=1m

06140.5 Removal of T2 blocks of the RC slab

10

06140.8 Supply of the fastening system for RC slab

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

11

08104 Place Rubble (with Mortar)

Stations - 40

99.7

3.78757

1,042,350

377.62073

103,922,334

1,116,208

111,285,938

Tracks

12

06030.1 Removal of ballast

m3

765.6

1.87291

515,424

1,433.89990

394,608,810

551,946

422,569,858

13

06030.2 Supply of ballast

m3

765.6

1.28673

354,102

985.12049

271,100,311

379,193

290,310,161

14

06030.4 Installation of ballast

m3

765.6

0.78727

216,657

602.73391

165,872,779

232,009

177,626,090

m3

765.6

0.30589

84,176

234.18938

64,445,257

90,141

69,011,950

1,625.0

0.19279

53,057

313.28375

86,216,967

56,816

92,326,000

2,587.5

0.06117

16,829

158.27738

43,545,516

18,022

46,631,925

14-1

06030.5

Evacution of Ballast That Cannot be Re-used


up to 30km

15

06041.1 Installation of P50 rails and joints materials

16

06042.1

17

06071.1 Supply of standard PC sleepers

sleeper

991.0

18.60143

593,921

18,434.01713

588,575,825

956,649

948,039,159

18

06071.2 Installation of standard PC sleepers

sleeper

991.0

0.27564

75,854

273.15924

75,171,334

81,229

80,497,939

19

06074.1

sleeper 2,481.0

0.18527

50,991

459.65487

126,509,254

54,604

135,472,524

20

06081.1 Supply of fastening system for PC sleeper

1,982.0

6.44411

15,328

12,772.22602

30,379,809

140,988

279,438,216

21

06090.2 Renewal of the wooden timbers

152.0

3.44308

947,541

523.34816

144,026,223

1,014,681

154,231,512

22

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,543.8

0.46241

127,256

713.86856

196,457,820

136,273

210,378,257

23

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

81.3

0.46241

127,256

37.59393

10,345,913

136,273

11,078,995

24

06151.3 Final leveling and lining of the track

2,487.5

0.05265

14,490

130.96688

36,044,684

15,517

38,598,538

25

06161.3 Replacement of isolated rails

862.5

0.17908

49,286

154.45650

42,509,123

52,778

45,521,025

26

06161.4 Replacement of isolated sleepers

sleeper 1,191.0

2.18118

600,262

2,597.78538

714,912,030

642,795

765,568,845

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set
timber

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 41

Turnouts

27-1

06030.1 Removal of ballast

m3

172.6

0.74966

206,312

129.39132

35,609,387

220,930

38,132,518

27

06030.2 Supply of ballast

m3

172.6

1.28673

354,102

222.08960

61,117,965

379,193

65,448,712

28

06030.4 Installation of ballast

m3

172.6

0.78727

216,657

135.88280

37,395,038

232,009

40,044,753

Evacuation of Ballast That Cannot be Re06030.5


used up to 30km

m3

172.6

0.30589

84,176

52.79661

14,528,803

90,141

15,558,337

turnout

4.0

8.78776

2,418,395

35.15104

9,673,579

2,589,756

10,359,024

turnout

4.0

72.64710

19,992,536

290.58840

79,970,142

21,409,154

85,636,616

28-1
29

06152.1 Removal of the turnout from main line

30

06152.2

Installation of new P50 turnout with concrete


bearers

31

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

17.66236

4,860,691

70.64944

19,442,764

5,205,107

20,820,428

32

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

8.83118

2,430,345

35.32472

9,721,380

2,602,553

10,410,212

Miscellaneous

33

06042.2 Evacuation of the not re-usable steel materials

Ton

123.8

0.34355

94,546

42.53149

11,704,767

101,245

12,534,131

34

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

123.8

0.34355

94,546

42.53149

11,704,767

101,245

12,534,131

35

06130.8 Supply and installation of fouling point

sign

4.0

0.26829

73,828

1.07316

295,313

79,060

316,240

36

09103.08

LS

1.0

173.33296

47,701,347

173.33296

47,701,347

51,081,340

51,081,340

Temporary Facility and Work for Construction


of Ngoi Hop Station

Item 3.8 Carried forward to Collection


3

STATIONS (Cont'd)

3.9

TRAI HUT STATION

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 42

Road Bed

02301.1 Soil Excavation

944.0

0.65287

179,666

616.30928

169,604,737

192,397

181,622,768

02301.5 Soil excavation for ditch

m3

18.9

0.95888

263,877

18.12283

4,987,273

282,575

5,340,668

m3

195.3

0.43387

119,402

84.73481

23,319,120

127,862

24,971,449

02600 Road Formation for Reused Ballast

02400.2 Sand Embankment ,K=95

10.9

1.29237

355,661

14.08683

3,876,703

380,862

4,151,396

02400.4 Embankment for Extention, K=95

m3

25.2

0.43387

119,402

10.93352

3,008,918

127,862

3,222,122

m3

43.1

4.45151

1,225,053

191.86008

52,799,765

1,311,857

56,541,037

06030.1 Removal of ballast

m3

1,514.1

1.05837

291,271

1,602.47802

441,013,096

311,909

472,261,417

06030.2 Supply of ballast

m3

1,514.1

1.28673

354,102

1,948.23789

536,145,482

379,193

574,136,121

06030.4 Installation of ballast

m3

1,514.1

0.78727

216,657

1,192.00551

328,040,720

232,009

351,284,827

m3

1,514.1

0.30589

84,176

463.14805

127,451,101

90,141

136,482,488

1,575.0

0.19827

54,564

312.27525

85,937,883

58,430

92,027,250

1,800.0

0.06183

17,010

111.29400

30,618,567

18,216

32,788,800

04150 Concrete M150

Tracks

7-1

8-1

06030.5

Evacuation of Ballast That Cannot be Reusrd up to 30km

06041.1 Installation of P50 rails and joints materials

10

06042.1

11

06071.1 Supply of standard PC sleepers

sleeper 1,191.0

18.60143

593,921

22,154.30313

707,360,048

956,649

1,139,368,959

12

06071.2 Installation of standard PC sleepers

sleeper 1,191.0

0.27564

75,854

328.28724

90,342,138

81,229

96,743,739

13

06074.1

sleeper 2,630.0

0.18151

49,946

477.37130

131,356,810

53,485

140,665,550

14

06081.1 Supply of fastening system for PC sleeper

2,382.0

6.44411

15,328

15,349.87002

36,510,951

140,988

335,833,416

15

06090.2 Renewal of the wooden timbers

29.0

3.44308

947,541

99.84932

27,478,687

1,014,681

29,425,749

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set
timber

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 43

16

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,496.3

0.48884

134,526

731.45129

201,290,685

144,058

215,553,985

17

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

78.8

0.48884

134,526

38.52059

10,600,618

144,058

11,351,770

18

06151.3 Final leveling and lining of the track

1,712.5

0.08058

22,176

137.99325

37,975,870

23,747

40,666,738

19

06161.3 Replacement of isolated rails

137.5

0.17908

49,286

24.62350

6,776,817

52,778

7,256,975

20

06161.4 Replacement of isolated sleepers

sleeper 1,434.0

2.18118

600,262

3,127.81212

860,775,694

642,795

921,768,030

Turnouts

21-1

06030.1 Removal of ballast

m3

153.8

0.84130

231,532

129.39194

35,609,568

247,937

38,132,711

21

06030.2 Supply of ballast

m3

153.8

1.28673

354,102

197.89907

54,460,851

379,193

58,319,883

22

06030.4 Installation of ballast

m3

153.8

0.78727

216,657

121.08213

33,321,882

232,009

35,682,984

Evacuation of Ballast That Cannot be Re06030.5


used up to 30km

m3

153.8

0.30589

84,176

47.04588

12,946,291

90,141

13,863,686

22-1
23

06090.2 Renewal of the wooden timbers

timber

184.0

4.86757

1,339,552

895.63288

246,477,639

1,434,470

263,942,480

24

06152.1 Removal of the turnout from main line

turnout

4.0

8.78776

2,418,395

35.15104

9,673,579

2,589,756

10,359,024

25

06152.2

Installation of new P50 turnout with concrete


bearers

turnout

4.0

72.64710

19,992,536

290.58840

79,970,142

21,409,154

85,636,616

26

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

17.66236

4,860,691

70.64944

19,442,764

5,205,107

20,820,428

27

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

8.83118

2,430,345

35.32472

9,721,380

2,602,553

10,410,212

Ton

146.0

0.34355

94,546

50.15830

13,803,683

101,245

14,781,770

D
28

Miscellaneous
06042.2 Evacuation of the not re-usable steel materials

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 44

29

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

146.0

0.34355

94,546

50.15830

13,803,683

101,245

14,781,770

30

09103.09

Temporary Facility and Work for Construction


of Trai Hut Station

LS

1.0

141.54883

38,954,340

141.54883

38,954,340

41,714,542

41,714,542

Total VND :

Item 3.9 Carried forward to Collection


3

STATIONS (Cont'd)

10

LANG KHAY STATION

Road Bed

02301.1 Soil Excavation

m3

633.0

0.56627

155,840

358.44891

98,646,552

166,882

105,636,306

02301.4 Soil excavation for Organic

m3

178.9

0.27808

76,531

49.74851

13,691,475

81,954

14,661,571

02301.5 Soil excavation for ditch

m3

63.2

0.67080

184,604

42.39456

11,666,998

197,685

12,493,692

m3

587.0

0.44554

122,610

261.53198

71,972,052

131,298

77,071,926

02600 Road Formation for Reused Ballast

02400.2 Sand Embankment ,K=95

101.1

1.29315

355,869

130.73747

35,978,313

381,085

38,527,694

02400.4 Embankment for Extention, K=95

m3

859.0

0.44554

122,618

382.71886

105,328,836

131,306

112,791,854

02501 Turf

m2

35.2

0.06609

18,187

2.32637

640,191

19,476

685,555

04150 Concrete M150

m3

105.5

4.47827

1,232,427

472.45749

130,021,021

1,319,753

139,233,942

Tracks
06030.1 Removal of ballast

m3

1,482.1

1.06484

293,046

1,578.19936

434,322,913

313,810

465,097,801

06030.2 Supply of ballast

m3

1,482.1

1.28673

354,102

1,907.06253

524,814,226

379,193

562,001,945

10

06030.4 Installation of ballast

m3

1,482.1

0.80850

222,499

1,198.27785

329,766,139

238,265

353,132,557

9-1

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

10-1

06030.5

Evacuation of Ballast That Cannot be Reused up to 30km

Stations - 45

m3

1,482.1

0.31413

86,445

465.57207

128,120,824

92,571

137,199,479

1,500.0

0.20065

55,218

300.97500

82,827,487

59,131

88,696,500

1,475.0

0.06404

17,617

94.45900

25,985,399

18,866

27,827,350

11

06041.1 Installation of P50 rails and joints materials

12

06042.1

13

06071.1 Supply of standard PC sleepers

sleeper 1,117.0

18.60143

593,921

20,777.79731

663,409,885

956,649

1,068,576,933

14

06071.2 Installation of standard PC sleepers

sleeper 1,117.0

0.28305

77,899

316.16685

87,012,652

83,418

93,177,906

15

06074.1

sleeper 1,796.0

0.19041

52,406

341.97636

94,121,185

56,119

100,789,724

16

06081.1 Supply of fastening system for PC sleeper

set

2,234.0

6.44411

15,328

14,396.14174

34,242,428

140,988

314,967,192

17

06151.1

Lifting of the track up to its final level using


heavy tamping machine

1,425.0

0.55112

151,663

785.34600

216,120,003

162,410

231,434,250

18

06151.2

Lifting of the track up to its final level using


hand tamping tools for the first lifting

75.0

0.55112

151,663

41.33400

11,374,737

162,410

12,180,750

19

06151.3 Final leveling and lining of the track

1,500.0

0.09480

26,080

142.20000

39,120,600

27,929

41,893,500

20

06161.4 Replacement of isolated sleepers

sleeper

716.0

2.18858

602,307

1,567.02328

431,251,590

644,984

461,808,544

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Turnouts

21-1

06030.1 Removal of ballast

m3

153.8

0.86398

237,773

132.88012

36,569,548

254,621

39,160,710

21

06030.2 Supply of ballast

m3

153.8

1.28673

354,102

197.89907

54,460,851

379,193

58,319,883

22

06030.4 Installation of ballast

m3

153.8

0.80850

222,499

124.34730

34,220,385

238,265

36,645,157

m3

153.8

0.31413

86,445

48.31319

13,295,313

92,571

14,237,420

turnout

4.0

9.02470

2,483,596

36.09880

9,934,385

2,659,578

10,638,312

turnout

4.0

74.05163

20,379,061

296.20652

81,516,245

21,823,068

87,292,272

22-1

06030.5

Evacuation of Ballast That Cannot be Reused up to 30km

23

06152.1 Removal of the turnout from main line

24

06152.2

Installation of new P50 turnout with concrete


bearers

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Stations - 46

25

06152.3

Lifting of a P50 turnout up to its final level


(with concrete bearers)

set

4.0

18.13854

4,991,737

72.55416

19,966,950

5,345,439

21,381,756

26

06152.4

Final leveling and lining of a P50 turnout (with


concrete bearers)

set

4.0

9.06927

2,495,868

36.27708

9,983,473

2,672,719

10,690,876

Miscellaneous

27

06042.2 Evacuation of the not re-usable steel materials

Ton

109.2

0.35279

97,095

38.52467

10,602,730

103,974

11,353,961

28

06074.2

Evacuation of the not re-usable concrete and


various materials

Ton

109.2

0.35279

97,095

38.52467

10,602,730

103,974

11,353,961

29

06130.8 Supply and installation of fouling point

sign

4.0

0.27066

74,491

1.08264

297,965

79,769

319,076

30

09103.10

LS

1.0

186.32259

51,276,106

186.32259

51,276,106

54,909,397

54,909,397

696,703.55794

91,756,782,474

Temporary Facility and Work for Construction


of Lang Khay Station

Item 3.10 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

105,342,501,851

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 47

Bill No. 4: LEVEL CROSSINGS


Rate
Particular & Description

Item No. Ref.Spec

Unit

USD
1

Level Crossing - Km 154+450

Rail way

03102 Removal of RC slab

Amount

Total equivelent to VND

Quantity

VND

USD

VND

Rate

Amount

unit

28.0

0.26314

72,421

7.36792

2,027,782

77,552

2,171,456

06030.2 Supply of ballast

m3

4.9

1.47859

406,901

7.24509

1,993,818

435,734

2,135,097

06030.4 Installation of ballast

m3

4.9

0.88466

243,457

4.33483

1,192,940

260,708

1,277,469

06042.1

34.8

0.08539

23,496

2.97157

817,657

25,161

875,603

06071.1 Supply of standard PC sleepers

sleeper

11.0

18.71331

624,717

205.84641

6,871,892

989,627

10,885,897

06071.2 Installation of standard PC sleepers

sleeper

11.0

0.30899

85,030

3.39889

935,327

91,055

1,001,605

06074.1

sleeper

36.0

0.12438

34,236

4.47768

1,232,481

36,661

1,319,796

06081.1 Supply of fastening system for PC sleeper

set

22.0

6.46003

19,709

142.12066

433,607

145,680

3,204,960

06130.4 Supply and installation of whistle board

board

2.0

3.70660

1,020,061

7.41320

2,040,123

1,092,340

2,184,680

10

06140.1 Supply of T1A blocks for RC slab

block

20.0

8.94505

2,461,689

178.90100

49,233,770

2,636,117

52,722,340

11

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.76011

2,961,188

21.52022

5,922,376

3,171,010

6,342,020

12

06140.3 Supply of T2A blocks for RC slab

block

43.0

15.26709

4,201,517

656.48487

180,665,220

4,499,225

193,466,675

13

06140.4

block

14.0

0.26314

72,421

3.68396

1,013,891

77,552

1,085,728

14

06140.5 Removal of T2 blocks of the RC slab

block

14.0

0.26314

72,421

3.68396

1,013,891

77,552

1,085,728

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Removal of T1A and T1B blocks of the RC


slab

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Installation of T1A and T1B blocks of the RC


slab

15

06140.6

16

06140.7 Installation of T2 blocks of the RC slab

Road way

17

02400.3 Embankment , K=95

Level Crossings - 48

block

22.0

1.61934

445,644

35.62548

9,804,165

477,221

10,498,862

block

43.0

5.87623

1,617,140

252.67789

69,536,999

1,731,726

74,464,218

m3

2.0

0.65122

179,218

1.30244

358,436

191,917

383,834

18

03105 Removal of existing pavement

m2

483.6

0.08926

24,572

43.16614

11,883,227

26,313

12,724,967

19

03301 Concrete pavement M200,25cm thickness

m2

60.6

5.81030

1,598,996

352.10418

96,899,166

1,712,297

103,765,198

20

Supply (when required) and installation /


06140.10 modification of trolleys and barriers at the
level crossing km 154.450

set

1.0

1,047.77390

288,348,110

1,047.77390

288,348,110

308,779,701

308,779,701

21

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.12399

1,134,932

8.24798

2,269,864

1,215,350

2,430,700

22

06140.20

sign

2.0

3.61579

995,073

7.23158

1,990,146

1,065,581

2,131,162

7.5

3.15068

867,076

23.63010

6,503,068

928,514

6,963,855

23

10201 Corrugated Iron Fence

C
24

Supply and installation of road signs (side


posts)

Other work
09104.02

Temporary Facility and Work for Construction


of Level Crossing - Km 154+450

Item 4.1 Carried forward to Collection

LS

1.0

Total VND :

10.94229

3,011,326

10.94229

3,011,326

3,224,701

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

3,224,701

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 49

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 155+550

Rail way

03102 Removal of RC slab

unit

26.0

0.26314

72,421

6.84164

1,882,940

77,552

2,016,352

06030.2 Supply of ballast

m3

1.5

1.47859

406,901

2.21789

610,352

435,734

653,601

06030.4 Installation of ballast

m3

1.5

0.88466

243,457

1.32699

365,186

260,708

391,062

06042.1

4.9

0.08539

23,496

0.41841

115,130

25,161

123,289

06071.1 Supply of standard PC sleepers

sleeper

4.0

18.71331

624,717

74.85324

2,498,870

989,627

3,958,508

06071.2 Installation of standard PC sleepers

sleeper

4.0

0.30899

85,030

1.23596

340,119

91,055

364,220

06074.1

sleeper

34.0

0.12438

34,236

4.22892

1,164,010

36,661

1,246,474

06081.1 Supply of fastening system for PC sleeper

set

8.0

6.46003

19,709

51.68024

157,675

145,680

1,165,440

06140.1 Supply of T1A blocks for RC slab

block

4.0

8.94505

2,461,689

35.78020

9,846,754

2,636,117

10,544,468

10

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.76011

2,961,188

21.52022

5,922,376

3,171,010

6,342,020

11

06140.3 Supply of T2A blocks for RC slab

block

12.0

15.26709

4,201,517

183.20508

50,418,201

4,499,225

53,990,700

12

06140.6

block

6.0

1.75970

484,272

10.55820

2,905,631

518,586

3,111,516

13

06140.7 Installation of T2 blocks of the RC slab

block

12.0

6.18279

1,701,502

74.19348

20,418,019

1,822,066

21,864,792

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Installation of T1A and T1B blocks of the RC


slab

Road way

14

02301.5 Soil excavation for ditch

m3

1.6

0.64668

177,975

1.03469

284,760

190,585

304,936

15

02400.3 Embankment , K=95

m3

2.9

0.66024

181,689

1.91470

526,899

194,564

564,236

16

02400.5 Embankment , K=98

m3

6.9

1.86992

514,606

12.90245

3,550,778

551,069

3,802,376

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 50

17

03105 Removal of existing pavement

m2

36.2

0.27884

76,742

10.09401

2,778,047

82,179

2,974,880

18

03303 Fine grained asphalt overlay-5cm thickness

m2

91.0

1.53649

422,849

139.82059

38,479,299

452,811

41,205,801

19

Supply (when required) and installation /


06140.11 modification of trolleys and barriers at the
level crossing km 155.550

set

1.0

384.18376

105,727,641

384.18376

105,727,641

113,219,224

113,219,224

20

06140.19 Supply and installation of road signs (boards)

sign

1.0

4.12399

1,134,932

4.12399

1,134,932

1,215,350

1,215,350

21

06140.20

sign

1.0

3.61579

995,073

3.61579

995,073

1,065,581

1,065,581

Supply and installation of road signs (side


posts)

Other work

22

02400.3 Embankment , K=95

23
24

07202 Guard Hut


09104.03

Temporary Facility and Work for Construction


of Level Crossing - Km 155+550

Item 4.2 Carried forward to Collection

m3

2.5

0.65122

179,218

1.62805

448,046

191,917

479,793

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

1.76517

485,782

1.76517

485,782

520,203

520,203

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 51

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 156+960

Rail way

03102 Removal of RC slab

unit

38.0

0.26314

72,421

9.99932

2,751,989

77,552

2,946,976

06030.2 Supply of ballast

m3

2.8

1.47859

406,901

4.14005

1,139,324

435,734

1,220,055

06030.4 Installation of ballast

m3

2.8

0.88466

243,457

2.47705

681,680

260,708

729,982

06071.1 Supply of standard PC sleepers

sleeper

8.0

18.71331

624,717

149.70648

4,997,740

989,627

7,917,016

06071.2 Installation of standard PC sleepers

sleeper

8.0

0.30899

85,030

2.47192

680,238

91,055

728,440

06074.1

sleeper

27.0

0.08539

23,496

2.30553

634,389

25,161

679,347

06081.1 Supply of fastening system for PC sleeper

set

16.0

6.46003

19,709

103.36048

315,351

145,680

2,330,880

06130.4 Supply and installation of whistle board

board

2.0

3.70660

1,020,061

7.41320

2,040,123

1,092,340

2,184,680

06140.1 Supply of T1A blocks for RC slab

block

11.0

8.94505

2,461,689

98.39555

27,078,574

2,636,117

28,997,287

10

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.76011

2,961,188

21.52022

5,922,376

3,171,010

6,342,020

11

06140.3 Supply of T2A blocks for RC slab

block

26.0

15.26709

4,201,517

396.94434

109,239,435

4,499,225

116,979,850

12

06140.4

block

12.0

0.26314

72,421

3.15768

869,049

77,552

930,624

13

06140.5 Removal of T2 blocks of the RC slab

block

26.0

0.26314

72,421

6.84164

1,882,940

77,552

2,016,352

14

06140.6

block

13.0

1.65578

455,672

21.52514

5,923,740

487,960

6,343,480

15

06140.7 Installation of T2 blocks of the RC slab

block

26.0

5.87623

1,617,140

152.78198

42,045,627

1,731,726

45,024,876

Removal of the existing sleepers from main


line

Removal of T1A and T1B blocks of the RC


slab

Installation of T1A and T1B blocks of the RC


slab

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 52

Road way

16

03105 Removal of existing pavement

17

03302

Medium grained asphalt overlay-7cm


thickness

m2

562.3

1.30326

358,664

732.82310

201,677,009

384,078

215,967,059

m2

317.4

0.89976

247,608

285.58382

78,590,678

265,153

84,159,562

18

Supply (when required) and installation /


06140.12 modification of trolleys and barriers at the
level crossing km 156.960

set

1.0

873.14492

240,290,092

873.14492

240,290,092

257,316,418

257,316,418

19

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.12399

1,134,932

8.24798

2,269,864

1,215,350

2,430,700

20

06140.20

sign

2.0

3.61579

995,073

7.23158

1,990,146

1,065,581

2,131,162

6.0

3.15068

867,076

18.90408

5,202,454

928,514

5,571,084

21

Supply and installation of road signs (side


posts)

10201 Corrugated Iron Fence

Other work

22

02400.3 Embankment , K=95

23
24

07202 Guard Hut


09104.04

Temporary Facility and Work for Construction


of Level Crossing - Km 156+960

Item 4.3 Carried forward to Collection

m3

2.5

0.65122

179,218

1.62805

448,046

191,917

479,793

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

10.63169

2,925,848

10.63169

2,925,848

3,133,166

3,133,166

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 53

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 163+810

Rail way

03102 Removal of RC slab

unit

28.0

0.24256

66,754

6.79168

1,869,114

71,484

2,001,552

06030.2 Supply of ballast

m3

3.4

0.57595

158,499

1.95823

538,897

169,730

577,082

06030.4 Installation of ballast

m3

3.4

0.81172

223,382

2.75985

759,500

239,211

813,317

06042.1

25.0

0.07876

21,677

1.96900

541,929

23,213

580,325

06071.1 Supply of standard PC sleepers

sleeper

8.0

18.70418

622,207

149.63344

4,977,660

986,939

7,895,512

06071.2 Installation of standard PC sleepers

sleeper

8.0

0.28421

78,208

2.27368

625,663

83,750

670,000

06074.1

sleeper

25.0

0.11476

31,584

2.86900

789,604

33,822

845,550

06081.1 Supply of fastening system for PC sleeper

set

16.0

6.45765

19,053

103.32240

304,845

144,977

2,319,632

06130.4 Supply and installation of whistle board

board

2.0

3.69062

1,015,667

7.38124

2,031,334

1,087,634

2,175,268

10

06140.1 Supply of T1A blocks for RC slab

block

16.0

8.87686

2,442,922

142.02976

39,086,756

2,616,021

41,856,336

11

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

12

06140.3 Supply of T2A blocks for RC slab

block

36.0

15.76423

4,338,321

567.51228

156,179,539

4,645,723

167,246,028

13

06140.4

block

10.0

0.24256

66,754

2.42560

667,541

71,484

714,840

14

06140.5 Removal of T2 blocks of the RC slab

block

18.0

0.24256

66,754

4.36608

1,201,573

71,484

1,286,712

15

06140.6

block

18.0

1.56425

430,475

28.15650

7,748,552

460,978

8,297,604

16

06140.7 Installation of T2 blocks of the RC slab

block

36.0

5.85383

1,610,977

210.73788

57,995,183

1,725,127

62,104,572

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Removal of T1A and T1B blocks of the RC


slab

Installation of T1A and T1B blocks of the RC


slab

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Road way

17

02400.5 Embankment , K=98

Level Crossings - 54

m3

70.6

1.74649

480,627

123.30219

33,932,297

514,684

36,336,690

18

03105 Removal of existing pavement

m2

16.7

1.20239

330,903

20.07991

5,526,087

354,350

5,917,645

19

03303 Fine grained asphalt overlay-5cm thickness

m2

655.6

1.53732

423,067

1,007.86699

277,362,896

453,045

297,016,302

20

Supply (when required) and installation /


06140.13 modification of trolleys and barriers at the
level crossing km 163.810

set

1.0

908.07072

249,901,695

908.07072

249,901,695

267,609,074

267,609,074

21

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

22

06140.20

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

6.0

2.91337

801,757

17.48022

4,810,544

858,568

5,151,408

23

Supply and installation of road signs (side


posts)

10201 Corrugated Iron Fence

Other work

24

02400.3 Embankment , K=95

25

09104.05

Temporary Facility and Work for Construction


of Level Crossing - Km 163+810

Item 4.4 Carried forward to Collection

m3

11.0

0.61129

168,232

6.72419

1,850,550

180,152

1,981,672

LS

1.0

5.55147

1,527,776

5.55147

1,527,776

1,636,030

1,636,030

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 55

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 164+530

Rail way

4.5.1

03102 Removal of RC slab

unit

24.0

0.24256

66,754

5.82144

1,602,098

71,484

1,715,616

4.5.2

06030.2 Supply of ballast

m3

3.2

0.57595

158,499

1.84304

507,197

169,730

543,136

4.5.3

06030.4 Installation of ballast

m3

3.2

0.81172

223,382

2.59750

714,824

239,211

765,475

4.5.4

06042.1

25.0

0.07876

21,677

1.96900

541,929

23,213

580,325

4.5.5

06071.1 Supply of standard PC sleepers

sleeper

7.0

18.70418

622,207

130.92926

4,355,452

986,939

6,908,573

4.5.6

06071.2 Installation of standard PC sleepers

sleeper

7.0

0.28421

78,208

1.98947

547,455

83,750

586,250

4.5.7

06074.1

sleeper

25.0

0.11476

31,584

2.86900

789,604

33,822

845,550

4.5.8

06081.1 Supply of fastening system for PC sleeper

set

14.0

6.45765

19,053

90.40710

266,740

144,977

2,029,678

4.5.9

06130.4 Supply and installation of whistle board

board

2.0

3.69062

1,015,667

7.38124

2,031,334

1,087,634

2,175,268

4.5.10 06140.1 Supply of T1A blocks for RC slab

block

13.0

8.87686

2,442,922

115.39918

31,757,989

2,616,021

34,008,273

4.5.11 06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

4.5.12 06140.3 Supply of T2A blocks for RC slab

block

30.0

15.76423

4,338,321

472.92690

130,149,615

4,645,723

139,371,690

block

8.0

0.24256

66,754

1.94048

534,033

71,484

571,872

block

16.0

0.24256

66,754

3.88096

1,068,065

71,484

1,143,744

block

15.0

1.57675

433,923

23.65125

6,508,851

464,670

6,970,050

block

30.0

5.85383

1,610,977

175.61490

48,329,319

1,725,127

51,753,810

4.5.13 06140.4

Removal of the P43 rails and joints materials


from main line

Removal of the existing sleepers from main


line

Removal of T1A and T1B blocks of the RC


slab

4.5.14 06140.5 Removal of T2 blocks of the RC slab


4.5.15 06140.6

Installation of T1A and T1B blocks of the RC


slab

4.5.16 06140.7 Installation of T2 blocks of the RC slab

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 56

Road way

4.5.17 02301.3 Soil excavation for Benching

m3

7.3

0.07754

21,341

0.56604

155,789

22,853

166,827

4.5.18 02301.5 Soil excavation for ditch

m3

15.1

0.58270

160,363

8.79877

2,421,487

171,726

2,593,063

4.5.19 02400.3 Embankment , K=95

m3

11.9

1.75566

483,166

20.89235

5,749,671

517,401

6,157,072

4.5.20 02400.5 Embankment , K=98

m3

93.8

0.74473

204,951

69.85567

19,224,381

219,473

20,586,567

4.5.21

02501 Turf

m2

58.8

0.08113

22,332

4.77044

1,313,119

23,914

1,406,143

4.5.22

03303 Fine grained asphalt overlay-5cm thickness

m2

414.1

1.53732

423,072

636.60421

175,194,223

453,050

187,608,005

Supply (when required) and installation /


4.5.23 06140.14 modification of trolleys and barriers at the
level crossing km 164.530

set

1.0

255.83477

70,405,910

255.83477

70,405,910

75,394,688

75,394,688

4.5.24 06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

30.0

2.91337

801,757

87.40110

24,052,719

858,568

25,757,040

4.5.25 06140.20
4.5.26

10201 Corrugated Iron Fence

C
4.5.27

Supply and installation of road signs (side


posts)

Other work
07202 Guard Hut

4.5.28 09104.06

Temporary Facility and Work for Construction


of Level Crossing - Km 164+530

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

20.43171

5,622,817

20.43171

5,622,817

6,021,235

6,021,235

Item 4.5 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 57

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 171+182

Rail way

06030.2 Supply of ballast

m3

2.6

0.57595

158,499

1.49747

412,097

169,730

441,298

06030.4 Installation of ballast

m3

2.6

0.81172

223,382

2.11047

580,795

239,211

621,949

06071.1 Supply of standard PC sleepers

sleeper

6.0

18.70418

622,207

112.22508

3,733,245

986,939

5,921,634

06071.2 Installation of standard PC sleepers

sleeper

6.0

0.28421

78,208

1.70526

469,247

83,750

502,500

06081.1 Supply of fastening system for PC sleeper

set

12.0

6.45765

19,053

77.49180

228,634

144,977

1,739,724

06130.4 Supply and installation of whistle board

board

2.0

3.69062

1,015,667

7.38124

2,031,334

1,087,634

2,175,268

06140.1 Supply of T1A blocks for RC slab

block

10.0

8.87686

2,442,922

88.76860

24,429,222

2,616,021

26,160,210

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

06140.3 Supply of T2A blocks for RC slab

block

24.0

15.76423

4,338,321

378.34152

104,119,692

4,645,723

111,497,352

10

06140.6

block

12.0

1.59556

439,097

19.14672

5,269,159

470,210

5,642,520

11

06140.7 Installation of T2 blocks of the RC slab

block

24.0

5.85383

1,610,977

140.49192

38,663,456

1,725,127

41,403,048

Installation of T1A and T1B blocks of the RC


slab

Road way

12

02301.3 Soil excavation for Benching

m3

511.8

0.07809

21,489

39.96646

10,998,196

23,012

11,777,542

13

02301.5 Soil excavation for ditch

m3

179.5

0.58336

160,540

104.71312

28,817,016

171,916

30,858,922

14

02400.2 Sand Embankment ,K=95

m3

61.3

0.85723

235,903

52.54820

14,460,855

252,619

15,485,545

15

02400.3 Embankment , K=95

m3

180.5

0.61118

168,204

110.31799

30,360,820

180,122

32,512,021

m2

119.1

3.51409

967,072

418.52812

115,178,305

1,035,597

123,339,603

16

02501 Turf

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 58

17

03105 Removal of existing pavement

m2

57.0

1.88220

517,988

107.28540

29,525,322

554,691

31,617,387

18

03301 Concrete pavement M200,25cm thickness

m2

140.9

6.20208

1,706,817

873.87307

240,490,577

1,827,758

257,531,102

19

Supply (when required) and installation /


06140.15 modification of trolleys and barriers at the
level crossing km 171.182

set

1.0

768.36753

211,455,280

768.36753

211,455,280

226,438,447

226,438,447

20

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

21

06140.20

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

9.0

2.91337

801,757

26.22033

7,215,816

858,568

7,727,112

22

Supply and installation of road signs (side


posts)

10201 Corrugated Iron Fence

Other work

23

04606 Installation of Box Culvert, BxH=0.75x0.8m

24

07202 Guard Hut

25

09104.07

Temporary Facility and Work for Construction


of Level Crossing - Km 171+182

Item 4.6 Carried forward to Collection

13.5

34.63329

9,531,106

467.54942

128,669,929

10,206,455

137,787,143

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

108.68674

29,910,675

108.68674

29,910,675

32,030,066

32,030,066

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 59

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 176+150

Rail way

03102 Removal of RC slab

unit

26.0

0.24256

66,754

6.30656

1,735,606

71,484

1,858,584

06030.2 Supply of ballast

m3

1.6

0.57595

158,499

0.92152

253,598

169,730

271,568

06030.4 Installation of ballast

m3

1.6

0.81172

223,382

1.29875

357,412

239,211

382,738

06071.1 Supply of standard PC sleepers

sleeper

1.0

18.70418

622,207

18.70418

622,207

986,939

986,939

06071.2 Installation of standard PC sleepers

sleeper

1.0

0.28421

78,208

0.28421

78,208

83,750

83,750

Removal of the existing sleepers from main


06074.1
line

sleeper

20.0

0.21143

58,181

4.22860

1,163,622

62,304

1,246,080

06081.1 Supply of fastening system for PC sleeper

set

2.0

6.45765

19,053

12.91530

38,106

144,977

289,954

06140.1 Supply of T1A blocks for RC slab

block

6.0

8.87686

2,442,922

53.26116

14,657,533

2,616,021

15,696,126

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

10

06140.3 Supply of T2A blocks for RC slab

block

17.0

15.76423

4,338,321

267.99191

73,751,449

4,645,723

78,977,291

11

06140.4

block

10.0

0.24256

66,754

2.42560

667,541

71,484

714,840

12

06140.5 Removal of T2 blocks of the RC slab

block

16.0

0.24256

66,754

3.88096

1,068,065

71,484

1,143,744

13

06140.6

block

8.0

1.64257

452,028

13.14056

3,616,223

484,058

3,872,464

14

06140.7 Installation of T2 blocks of the RC slab

block

17.0

5.85383

1,610,977

99.51511

27,386,614

1,725,127

29,327,159

Removal of T1A and T1B blocks of the RC


slab

Installation of T1A and T1B blocks of the RC


slab

Road way

15

02301.3 Soil excavation for Benching

m3

9.5

0.07372

20,290

0.70034

192,759

21,728

206,416

16

02301.5 Soil excavation for ditch

m3

65.4

0.52761

145,206

34.50569

9,496,447

155,494

10,169,308

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 60

17

02400.3 Embankment , K=95

m3

147.5

0.90325

248,570

133.22938

36,664,020

266,183

39,261,993

18

02400.5 Embankment , K=98

m3

39.0

1.74527

480,300

68.06553

18,731,709

514,333

20,058,987

19

02501 Turf

m2

108.4

0.08456

23,268

9.16630

2,522,260

24,917

2,701,003

20

03105 Removal of existing pavement

m2

6.9

0.51262

141,079

3.53708

973,445

151,075

1,042,418

21

03303 Fine grained asphalt overlay-5cm thickness

m2

437.0

1.53704

422,994

671.68648

184,848,256

452,966

197,946,142

22

Supply (when required) and installation /


06140.16 modification of trolleys and barriers at the
level crossing km 176.150

set

1.0

768.36753

211,455,280

768.36753

211,455,280

226,438,447

226,438,447

23

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

24

06140.20

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

18.0

2.91337

801,757

52.44066

14,431,631

858,568

15,454,224

25

10201 Corrugated Iron Fence

C
26

Supply and installation of road signs (side


posts)

Other work
09104.08

Temporary Facility and Work for Construction


of Level Crossing - Km 176+150

Item 4.7 Carried forward to Collection

LS

1.0

Total VND :

24.37352

6,707,618

24.37352

6,707,618

7,182,902

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

7,182,902

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 61

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 184+122

Rail way

03102 Removal of RC slab

unit

27.0

0.24256

66,754

6.54912

1,802,360

71,484

1,930,068

06030.2 Supply of ballast

m3

2.2

0.57595

158,499

1.26709

348,698

169,730

373,406

06030.4 Installation of ballast

m3

2.2

0.81172

223,382

1.78578

491,441

239,211

526,264

06071.1 Supply of standard PC sleepers

sleeper

7.0

18.70418

622,207

130.92926

4,355,452

986,939

6,908,573

06071.2 Installation of standard PC sleepers

sleeper

7.0

0.28421

78,208

1.98947

547,455

83,750

586,250

Removal of the existing sleepers from main


06074.1
line

sleeper

22.0

0.21143

58,181

4.65146

1,279,985

62,304

1,370,688

06081.1 Supply of fastening system for PC sleeper

set

14.0

6.45765

19,053

90.40710

266,740

144,977

2,029,678

06130.4 Supply and installation of whistle board

board

2.0

3.69062

1,015,667

7.38124

2,031,334

1,087,634

2,175,268

06140.1 Supply of T1A blocks for RC slab

block

9.0

8.87686

2,442,922

79.89174

21,986,300

2,616,021

23,544,189

10

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

11

06140.3 Supply of T2A blocks for RC slab

block

24.0

15.76423

4,338,321

378.34152

104,119,692

4,645,723

111,497,352

12

06140.4

block

9.0

0.24256

66,754

2.18304

600,787

71,484

643,356

13

06140.5 Removal of T2 blocks of the RC slab

block

18.0

0.24256

66,754

4.36608

1,201,573

71,484

1,286,712

14

06140.6

block

11.0

1.60406

441,448

17.64466

4,855,926

472,727

5,199,997

15

06140.7 Installation of T2 blocks of the RC slab

block

24.0

5.85383

1,610,977

140.49192

38,663,456

1,725,127

41,403,048

B
16

Removal of T1A and T1B blocks of the RC


slab

Installation of T1A and T1B blocks of the RC


slab

Road way
02301.1 Soil Excavation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

4.0

0.21148

58,207

0.84592

232,829

62,331

249,324

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 62

17

02301.3 Soil excavation for Benching

m3

51.2

0.07804

21,480

3.99565

1,099,787

23,002

1,177,702

18

02301.5 Soil excavation for ditch

m3

50.4

0.58303

160,449

29.38471

8,086,625

171,818

8,659,627

19

02400.3 Embankment , K=95

m3

61.6

1.04493

287,564

64.36769

17,713,934

307,940

18,969,104

20

02400.5 Embankment , K=98

m3

122.7

1.74571

480,424

214.19862

58,947,983

514,465

63,124,856

m2

392.3

1.53715

423,020

603.02395

165,950,579

452,994

177,709,546

21

03303 Fine grained asphalt overlay-5cm thickness

22

Supply (when required) and installation /


06140.17 modification of trolleys and barriers at the
level crossing km 184.120

set

1.0

768.36753

211,455,280

768.36753

211,455,280

226,438,447

226,438,447

23

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

24

06140.20

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

16.5

2.91337

801,757

48.07061

13,228,995

858,568

14,166,372

25

Supply and installation of road signs (side


posts)

10201 Corrugated Iron Fence

Other work

26

07202 Guard Hut

27

09104.09

Temporary Facility and Work for Construction


of Level Crossing - Km 184+122

Item 4.8 Carried forward to Collection

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

136.03286

37,436,335

136.03286

37,436,335

40,088,976

40,088,976

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 63

LEVEL CROSSINGS(Cont'd)

Level Crossing - Km 186+550

Rail way

06030.2 Supply of ballast

m3

2.4

0.57595

158,499

1.38228

380,398

169,730

407,352

06030.4 Installation of ballast

m3

2.4

0.81172

223,382

1.94813

536,117

239,211

574,106

06042.1

25.0

0.07876

21,677

1.96900

541,929

23,213

580,325

06071.1 Supply of standard PC sleepers

sleeper

7.0

18.70418

622,207

130.92926

4,355,452

986,939

6,908,573

06071.2 Installation of standard PC sleepers

sleeper

7.0

0.28421

78,208

1.98947

547,455

83,750

586,250

Removal of the existing sleepers from main


06074.1
line

sleeper

25.0

0.11476

31,584

2.86900

789,604

33,822

845,550

06081.1 Supply of fastening system for PC sleeper

set

14.0

6.45765

19,053

90.40710

266,740

144,977

2,029,678

06130.4 Supply and installation of whistle board

board

1.0

3.69062

1,015,667

3.69062

1,015,667

1,087,634

1,087,634

06140.1 Supply of T1A blocks for RC slab

block

9.0

8.87686

2,442,922

79.89174

21,986,300

2,616,021

23,544,189

10

06140.2 Supply of T1B blocks for RC slab

block

2.0

10.73152

2,953,326

21.46304

5,906,653

3,162,591

6,325,182

11

06140.3 Supply of T2A blocks for RC slab

block

22.0

15.76423

4,338,321

346.81306

95,443,051

4,645,723

102,205,906

12

06140.6

block

11.0

1.60406

441,448

17.64466

4,855,926

472,727

5,199,997

13

06140.7 Installation of T2 blocks of the RC slab

block

22.0

5.80217

1,596,756

127.64774

35,128,625

1,709,898

37,617,756

Removal of the P43 rails and joints materials


from main line

Installation of T1A and T1B blocks of the RC


slab

Road way

14

02301.3 Soil excavation for Benching

m3

1.3

0.08047

22,150

0.10461

28,795

23,719

30,835

15

02400.3 Embankment , K=95

m3

24.6

1.74980

481,547

43.04508

11,846,054

515,668

12,685,433

16

02400.5 Embankment , K=98

m3

28.5

1.59112

437,880

45.34692

12,479,585

468,907

13,363,850

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 64

17

03105 Removal of existing pavement

m2

1,230.3

0.06991

19,235

86.01027

23,664,519

20,598

25,341,719

18

03303 Fine grained asphalt overlay-5cm thickness

m2

722.9

0.85374

234,959

617.16865

169,851,911

251,607

181,886,700

19

Supply (when required) and installation /


06140.18 modification of trolleys and barriers at the
level crossing km 186.550

set

1.0

803.29333

221,066,884

803.29333

221,066,884

236,731,104

236,731,104

20

06140.19 Supply and installation of road signs (boards)

sign

2.0

4.10613

1,130,011

8.21226

2,260,023

1,210,081

2,420,162

21

06140.20

sign

2.0

3.59527

989,421

7.19054

1,978,842

1,059,529

2,119,058

12.0

2.91337

801,757

34.96044

9,621,087

858,568

10,302,816

22

Supply and installation of road signs (side


posts)

10201 Corrugated Iron Fence

Other work

23

02400.3 Embankment , K=95

24
25

07202 Guard Hut


09104.10

Temporary Facility and Work for Construction


of Level Crossing - Km 186+550

Item 4.9Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

6.0

0.61129

168,231

3.66774

1,009,385

180,151

1,080,906

each

1.0

519.34153

142,923,152

519.34153

142,923,152

153,050,312

153,050,312

LS

1.0

13.18557

3,628,683

13.18557

3,628,683

3,885,802

3,885,802

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Level Crossings - 65

LEVEL CROSSINGS(Cont'd)

10

Repair Level Crossing

Rail way

4.10.1

03102 Removal of RC Slab

unit

219.0

0.24915

68,565

54.56385

15,015,642

73,423

16,079,637

4.10.2

03105 Removal of Existing Pavement

m2

336.0

0.12344

33,971

41.47584

11,414,229

36,378

12,223,008

4.10.3

03301 Concrete Pavement M200,25cm Thickness

m2

900.0

0.97177

267,428

874.59300

240,685,636

286,378

257,740,200

4.10.4

03302

Medium Grained Asphalt Overlay-7cm


Thickness

m2

9,200.0

0.93593

257,563

8,610.55600

2,369,582,958

275,814

2,537,488,800

4.10.5 06140.1 Supply of T1A blocks for RC slab

block

77.0

8.74711

2,407,208

673.52747

185,355,043

2,577,777

198,488,829

4.10.6 06140.2 Supply of T1B blocks for RC slab

block

24.0

10.53513

2,899,272

252.84312

69,582,527

3,104,707

74,512,968

block

101.0

1.64511

452,727

166.15611

45,725,463

484,807

48,965,507

4.10.8 06140.3 Supply of T2A blocks for RC slab

block

202.0

15.15111

4,169,596

3,060.52422

842,258,464

4,465,043

901,938,686

4.10.9 06140.7 Installation of T2 blocks of the RC slab

block

202.0

2.13058

586,337

430.37716

118,440,011

627,883

126,832,366

1.0

284.01467

78,161,045

284.01467

78,161,045

83,699,331

83,699,331

41,584.34054

10,969,546,702

4.10.7 06140.6

4.10.10 09104.11

Installation of T1A and T1B blocks of the RC


slab

Temporary Facility and Work for Construction


of Level Crossing - Repair Level Crossing

Item 4.10 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

LS

Total VND :

11,780,441,354

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 66

Bill No. 5: BRIDGES


Rate
Item No. Ref.Spec

Particular & Description

Unit

USD
1

Lan Mau Bridge (Km 145+250)

Superstructure (RC Girder L=5.0m)

Amount

Total equivelent to VND

Quantity
VND

USD

VND

Rate

Amount

03406

Drainage System on Bridge

ls

1.0

16.38099

4,508,068

16.38099

4,508,068

4,827,497

4,827,497

04120

Concrete M300

m3

6.1

16.40395

4,514,381

100.06410

27,537,724

4,834,258

29,488,974

04202

Reinforcement bar(10D18 mm)

Ton

0.3

71.58253

19,699,566

24.18273

6,655,104

21,095,425

7,126,667

04203

Reinforcement bar( D>18 mm)

Ton

0.5

70.52554

19,408,680

38.20651

10,514,458

20,783,928

11,259,485

10501

Water proofing system

m2

16.7

1.28601

353,913

21.47637

5,910,344

378,990

6,329,133

B
6
7
8

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

222.5

0.77931

214,465

173.39648

47,718,564

229,662

51,099,795

m3

74.1

2.46014

677,029

182.29637

50,167,869

725,002

53,722,648

283.5

0.77848

214,238

220.69908

60,736,371

229,418

65,040,003

03103

Removal of Reinforced Concrete

m3

7.7

3.08840

849,928

23.78068

6,544,447

910,152

7,008,170

10

04120

Concrete M300

0.7

7.56890

2,082,966

5.29823

1,458,077

2,230,560

1,561,392

11

04130

Concrete M250

m3

9.1

6.82919

1,879,396

62.14563

17,102,502

2,012,565

18,314,342

12

04140

Concrete M200

m3

0.1

6.50366

1,789,811

0.65037

178,981

1,916,632

191,663

13

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.59226

20,252,643

6.62772

1,823,953

21,687,692

1,953,194

14

04202

Reinforcement Bar(10D18 mm)

Ton

0.5

73.21680

20,149,313

33.14232

9,120,788

21,577,041

9,767,063

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.2

71.80658

19,761,215

11.68724

3,216,335

21,161,443

3,444,236

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 67

16

08101

Rubble Stone with Cement Mortar M100

67.5

3.54617

975,905

239.36648

65,873,567

1,045,055

70,541,213

17

08102

Rubble Stone Reveted with Cement Mortar


M100

m3

161.2

2.57750

709,330

415.49300

114,343,955

759,591

122,446,069

18

08220

Cement Mortar M100

m3

0.3

5.51901

1,518,838

1.65570

455,652

1,626,459

487,938

19

10502

2 Layer Bitumen for Water Protection

m2

14.6

0.32171

88,528

4.69697

1,292,504

94,801

1,384,095

Apporach Track

20

02301.1 Soil excavation

m3

66.4

0.78295

215,464

51.98788

14,306,841

230,732

15,320,605

21

02301.5 Soil excavation for ditch

3.6

0.95031

261,524

3.42112

941,486

280,055

1,008,198

22

02400.1 Embankment , K=90

m3

4.6

0.77848

214,238

3.58101

985,493

229,418

1,055,323

23

02400.3 Embankment , K=95

m3

5.8

0.77848

214,238

4.51518

1,242,578

229,418

1,330,624

D
24
25
26

Miscellaneous

03106

28

09105.01

0.97016

266,992

46.17962

12,708,813

285,910

13,609,316

m3

87.4

3.31250

911,602

289.51250

79,674,036

976,196

85,319,530

m3

57.1

0.77848

214,238

44.45121

12,232,969

229,418

13,099,768

Dismantle Existing Steel Structure

Ton

12.5

29.87722

8,222,232

373.46525

102,777,903

8,804,838

110,060,475

Temporary Facility and Work for Construction


of Lan Mau Bridge

LS

1.0

2,565.53505

706,037,039

2,565.53505

706,037,039

756,064,972

756,064,972

Filling with aggregate

Item 5.1 Carried forward to Collection


5

47.6

02400.3 Embankment , K=95

27

m3

02301.1 Soil excavation


02302

BRIDGES (Cont'd)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 68

Ngoi Sen Bridge (Km 145+950)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.67784

5,415,351

19.67784

5,415,351

5,799,069

5,799,069

04110

Concrete M400

m3

40.7

36.82039

10,132,992

1,498.58987

412,412,791

10,850,990

441,635,293

04201

Reinforcement bar(D 10mm)

Ton

0.2

70.71170

19,459,909

12.86953

3,541,703

20,838,787

3,792,659

04202

Reinforcement bar(10D18 mm)

Ton

2.7

71.13954

19,577,656

191.92736

52,818,558

20,964,877

56,561,142

05100

Steel Structure

Ton

41.5

1,443.87019

24,429,158

59,975.95643

1,014,746,439

52,584,627

2,184,277,589

05520

Bearing for composite girder

unit

4.0

1,621.75525

6,487.02100

-2

31,624,227

126,496,908

10501

Water proofing system

m2

108.2

1.27495

137.94959

37,963,753

375,728

40,653,770

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

350,866

m3

146.0

0.63125

173,724

92.16250

25,363,649

186,033

27,160,818

m3

47.9

2.46014

677,029

117.84071

32,429,702

725,002

34,727,596

m3

258.1

0.72030

198,225

185.90943

51,161,911

212,271

54,787,145

11

03101

Removal of Existing Masonry

m3

52.9

1.07723

296,449

56.98547

15,682,153

317,455

16,793,370

12

04120

Concrete M300

44.1

7.54733

2,077,034

332.83725

91,597,203

2,224,207

98,087,529

13

04202

Reinforcement Bar(10D18 mm)

Ton

2.3

73.21680

20,149,313

170.07018

46,803,429

21,577,041

50,119,798

14

05100

Steel Structure

Ton

3.4

1,320.78994

22,346,737

4,503.89370

76,202,374

48,102,141

164,028,301

15

08101

Rubble Stone with Cement Mortar M100

m3

138.2

3.54617

975,905

490.08069

134,870,028

1,045,055

144,426,601

61,605

164,925

65,970

C
16

Apporach Track
02301.1 Soil excavation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

0.4

0.55963

154,012

0.22385

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 69

17

02301.5 Soil excavation for ditch

18.5

0.72698

200,072

13.44913

3,701,330

214,248

3,963,588

18

02400.1 Embankment , K=90

58.5

0.40799

112,271

23.86742

6,567,865

120,227

7,033,280

19

02400.3 Embankment , K=95

m3

103.5

0.40799

112,271

42.22697

11,620,069

120,227

12,443,495

D
20
21
22

Miscellaneous

03106

24

09105.02

66.2

0.77931

214,465

51.59032

14,197,613

229,662

15,203,624

m3

95.4

3.11053

856,026

296.74456

81,664,848

916,681

87,451,367

m3

44.2

0.40799

112,271

18.03316

4,962,386

120,227

5,314,033

Dismantle Existing Steel Structure

Ton

17.6

29.87722

8,222,232

525.83907

144,711,287

8,804,838

154,965,149

Temporary Facility and Work for Construction


of Ngoi Sen Bridge

LS

1.0

6,304.89047

1,735,110,267

6,304.89047

1,735,110,267

1,858,055,631

1,858,055,631

Filling with aggregate

02400.3 Embankment , K=95

23

m3

02301.1 Soil excavation


02302

Item 5.2 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

Van Phu Bridge (Km 148+920)

Superstructure (Com. Deck Girder L=21.5m)

03406

Drainage System on Bridge

ls

2.0

21.82185

6,005,395

43.64370

12,010,790

6,430,921

12,861,842

04110

Concrete M400

m3

100.0

39.50467

10,871,708

3,950.46700

1,087,170,793

11,642,049

1,164,204,900

04201

Reinforcement bar(D 10mm)

Ton

0.5

70.71170

19,459,909

35.35585

9,729,955

20,838,787

10,419,394

04202

Reinforcement bar(10D18 mm)

Ton

5.8

71.13954

19,577,656

409.76375

112,767,299

20,964,877

120,757,692

05100

Steel Structure

Ton

107.1

1,591.42500

26,925,670

170,384.03974

2,882,765,140

57,958,458

6,205,253,915

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 70

05520

Bearing for composite girder

unit

10501

Water proofing system

B
8
9
10

8.0

1,621.75525

265.7

1.27495

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

350,866

12,974.04200

-3

31,624,227

252,993,816

338.75422

93,225,223

375,728

99,830,930

73.6

0.97564

268,501

71.80710

19,761,676

287,526

21,161,914

m3

74.1

2.47402

680,857

183.32488

50,451,475

729,100

54,026,310

m3

108.1

0.73998

203,651

79.99184

22,014,715

218,081

23,574,556

11

03103

Removal of Reinforced Concrete

m3

76.2

3.07325

845,758

234.18165

64,446,731

905,686

69,013,273

12

04120

Concrete M300

m3

515.2

7.10898

1,956,402

3,662.54650

1,007,938,253

2,095,027

1,079,357,910

13

04202

Reinforcement Bar(10D18 mm)

Ton

16.5

73.63065

20,263,208

1,214.78423

334,309,504

21,699,006

357,997,796

14

04203

Reinforcement Bar( D>18 mm)

Ton

5.3

72.21246

19,872,915

382.00969

105,129,310

21,281,058

112,578,499

15

04402

Concrete Pile, D=1.0m

208.0

37.25647

10,252,999

7,749.34576

2,132,623,758

10,979,500

2,283,736,000

16

05100

Steel Structure

Ton

0.4

1,301.80880

22,025,590

504.78938

8,540,643

47,410,862

18,384,036

17

08101

Rubble Stone with Cement Mortar M100

m3

247.4

3.56619

981,421

882.27541

242,803,629

1,050,962

260,007,999

18

10502

2 Layer Bitumen for Water Protection

175.0

0.32348

89,028

56.60900

15,579,924

95,336

16,683,800

Apporach Track

19

02301.1 Soil excavation

35.6

0.70188

193,161

24.98693

6,876,544

206,848

7,363,789

20

02301.5 Soil excavation for ditch

m3

8.1

0.91182

250,930

7.38574

2,032,529

268,710

2,176,551

21

02400.3 Embankment , K=95

m3

416.5

0.92287

253,983

384.37536

105,783,934

271,979

113,279,254

22

02400.5 Embankment , K=98

m3

261.1

0.47391

130,418

123.73790

34,052,076

139,659

36,464,965

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

D
23
24
25

Bridges - 71

Miscellaneous
3

123.3

1.00262

275,918

123.62305

34,020,679

295,469

36,431,328

m3

12.6

2.46014

677,030

30.99776

8,530,582

725,003

9,135,038

m3

123.3

0.73584

202,507

90.72907

24,969,128

216,856

26,738,345

Dismantle Existing Steel Structure

Ton

31.2

29.87722

8,222,232

931.57172

256,369,200

8,804,838

274,534,849

Temporary Facility and Work for Construction


of Van Phu Bridge

LS

1.0

4,761.63660

1,310,405,726

4,761.63660

1,310,405,726

1,403,257,640

1,403,257,640

02301.1 Soil excavation


02302

Filling with aggregate

02400.3 Embankment , K=95

26

03106

27

09105.03

Item 5.3 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

Gia Da Bridge (Km 152+494)

Superstructure (RC Girder L=11m)

03406

Drainage System on Bridge

ls

1.0

17.06279

4,695,690

17.06279

4,695,690

5,028,414

5,028,414

04120

Concrete M300

m3

20.7

14.81939

4,078,302

306.76137

84,420,849

4,367,280

90,402,696

04202

Reinforcement bar(10D18 mm)

Ton

2.4228

68.84809

18,947,042

166.80722

45,905,462

20,289,580

49,158,203

04203

Reinforcement bar( D>18 mm)

Ton

3.6885

67.83146

18,667,269

250.19905

68,854,967

19,989,982

73,733,848

05100

Steel Structure

Ton

1.4320

1,059.48550

17,925,669

1,517.14086

25,668,840

38,585,636

55,253,087

05510

Bearing for reinforced concrete

unit

4.0

1,237.77584

24,136,629

96,546,516

10501

Water proofing system

m2

31.7

1.23961

365,312

11,580,390

Substructure

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

4,951.10336
341,140

39.29564

10,814,125

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 72

02302

Filling with Aggregate

46.4

2.46014

677,029

114.15050

31,414,158

725,002

33,640,093

03103

Removal of Reinforced Concrete

5.2

2.86509

788,478

14.89847

4,100,084

844,347

4,390,604

10

04120

Concrete M300

m3

0.8

7.68392

2,114,629

6.14714

1,691,703

2,264,465

1,811,572

11

04130

Concrete M250

m3

14.4

6.94423

1,911,057

99.99691

27,519,214

2,046,469

29,469,154

12

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.59226

20,252,643

10.30439

2,835,775

21,687,692

3,036,711

13

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

73.21680

20,149,313

41.58129

11,443,198

21,577,041

12,254,033

14

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.80658

19,761,215

5.94989

1,637,414

21,161,443

1,753,437

15

08101

Rubble Stone with Cement Mortar M100

m3

175.2

3.54617

975,905

621.28898

170,978,501

1,045,055

183,093,636

16

08220

Cement Mortar M100

m3

0.2

5.51901

1,518,838

1.10380

303,768

1,626,459

325,292

Apporach Track

17

02301.1 Soil excavation

m3

33.0

0.78295

215,464

25.83735

7,110,328

230,732

7,614,156

18

02301.3 Soil excavation for Benching

m3

43.9

0.49167

135,300

21.58431

5,939,689

144,888

6,360,583

19

02301.5 Soil excavation for ditch

m3

8.1

0.95031

261,524

7.69751

2,118,345

280,055

2,268,446

20

02400.1 Embankment , K=90

15.6

0.40799

112,271

6.36464

1,751,431

120,227

1,875,541

21

02400.3 Embankment , K=95

m3

121.5

0.40799

112,271

49.57079

13,640,951

120,227

14,607,581

D
22
23
24
25

Miscellaneous
02301.1 Soil excavation
02302

Filling with aggregate

02400.3 Embankment , K=95


03106

Dismantle Existing Steel Structure

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

2,310.0

0.77931

214,465

1,800.20610

495,415,201

229,662

530,519,220

m3

59.1

2.46014

677,029

145.39427

40,012,430

725,002

42,847,618

m3

200.0

0.40799

112,271

81.59800

22,454,239

120,227

24,045,400

Ton

3.1

29.87722

8,222,232

92.61938

25,488,920

8,804,838

27,294,998

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

26

09105.04

Temporary Facility and Work for Construction


of Gia Da Bridge

Item 5.4 Carried forward to Collection

Bridges - 73

LS

Total VND :

1.0

Total VND :

1,883.26311

518,275,327

1,883.26311

518,275,327

554,998,958

554,998,958

1,954,748,448

93,389,423

4,207,665,123

38,444,091

153,776,364

BRIDGES (Cont'd)

Tuan Quan Bridge (Km 152+550)

Superstructure (Truss Girder L=28.3m)

05100

Steel Structure

Ton

45.1

2,564.28943

05530

Bearing for truss girder

unit

4.0

1,971.49184

06085.1

Supply of fastening system for wooden


timbers

set

166.0

3.28054

902,808

544.56964

149,866,206

966,779

160,485,314

06085.2

Supply of the guard rail fastening system for


wooden timbers

set

166.0

1.28684

354,142

213.61544

58,787,509

379,235

62,953,010

06090.1 Supply of the wooden timbers

timber

83.0

7.00179

1,926,897

581.14857

159,932,459

2,063,432

171,264,856

B
6
7
8

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

43,385,779

115,534.18848
7,885.96736

m3

250.3

3.64438

1,002,943

912.18831

251,036,530

1,074,008

268,824,202

m3

44.6

2.46014

677,029

109.72224

30,195,505

725,002

32,335,089

266.7

0.40799

112,271

108.81093

29,942,728

120,227

32,064,541

03103

Removal of Reinforced Concrete

m3

56.7

2.86509

788,478

162.45060

44,706,688

844,347

47,874,475

10

04120

Concrete M300

2.0

8.32530

2,291,124

16.65060

4,582,247

2,453,467

4,906,934

11

04130

Concrete M250

m3

103.6

7.58554

2,087,552

785.86194

216,270,384

2,235,470

231,594,692

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 74

12

04140

Concrete M200

13

04202

Reinforcement Bar(10D18 mm)

14

04203

Reinforcement Bar( D>18 mm)

15

04401

16

35.0

7.26002

1,997,968

254.10070

69,928,866

2,139,538

74,883,830

Ton

2.8

73.21680

20,149,313

207.61502

57,135,796

21,577,041

61,184,289

Ton

1.9

71.80658

19,761,215

138.86603

38,216,015

21,161,443

40,923,903

Concrete Pile, D=1.5m

40.0

54.91069

15,111,458

2,196.42760

604,458,302

16,182,216

647,288,640

08101

Rubble Stone with Cement Mortar M100

164.1

3.54617

975,905

581.92650

160,145,959

1,045,055

171,493,526

17

08220

Cement Mortar M100

m3

6.0

5.51901

1,518,838

33.11406

9,113,030

1,626,459

9,758,754

18

10502

2 Layer Bitumen for Water Protection

m2

85.1

0.32171

88,528

27.37752

7,533,703

94,801

8,067,565

Apporach Track

19

02301.1 Soil excavation

m3

106.4

0.78295

215,464

83.30588

22,925,420

230,732

24,549,885

20

02301.5 Soil excavation for ditch

m3

11.8

0.72698

200,072

8.57836

2,360,848

214,248

2,528,126

21

02400.1 Embankment , K=90

m3

1.4

0.40799

112,271

0.57119

157,180

120,227

168,318

22

02400.3 Embankment , K=95

m3

4.3

0.40799

112,271

1.75436

482,766

120,227

516,976

D
23
24
25

Miscellaneous
02301.1 Soil excavation
02302

Filling with aggregate

02400.3 Embankment , K=95

26

03106

27

09105.05

m3

57.0

1.00262

275,918

57.14934

15,727,321

295,469

16,841,733

m3

109.7

3.10892

855,572

341.04852

93,856,255

916,196

100,506,701

49.0

0.40799

112,271

19.99151

5,501,289

120,227

5,891,123

Dismantle Existing Steel Structure

Ton

54.0

29.87722

8,222,232

1,613.36988

444,000,539

8,804,838

475,461,252

Temporary Facility and Work for Construction


of Tuan Quan Bridge

LS

1.0

8,476.93583

2,332,858,673

8,476.93583

2,332,858,673

2,498,158,922

2,498,158,922

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Item 5.5 Carried forward to Collection

Bridges - 75

Total VND :

Total VND :

BRIDGES (Cont'd)

Tram Bridge (Km 153+450)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

17.06279

4,695,690

17.06279

4,695,690

5,028,414

5,028,414

04120

Concrete M300

m3

15.6

16.10900

4,433,201

251.30040

69,157,943

4,747,327

74,058,301

04202

Reinforcement bar(10D18 mm)

Ton

1.6

68.84809

18,947,042

108.89909

29,969,105

20,289,580

32,092,637

04203

Reinforcement bar( D>18 mm)

Ton

2.4

67.83146

18,667,269

160.79176

44,250,014

19,989,982

47,385,453

05510

Bearing for reinforced concrete

unit

4.0

1,237.77584

24,136,629

96,546,516

10501

Water proofing system

m2

31.7

1.23961

10,814,125

365,312

11,580,390

B
7
8
9

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

4,951.10336
341,140

39.29564

m3

109.8

1.00262

275,918

110.08768

30,295,786

295,469

32,442,496

m3

10.4

2.46014

677,029

25.58546

7,041,105

725,002

7,540,021

65.8

0.40799

112,271

26.84574

7,387,445

120,227

7,910,937

10

03103

Removal of Reinforced Concrete

m3

6.3

2.19097

602,953

13.80311

3,798,604

645,677

4,067,765

11

04120

Concrete M300

0.7

8.96330

2,466,703

6.27431

1,726,692

2,641,487

1,849,041

12

04130

Concrete M250

11.7

8.22359

2,263,133

96.21600

26,478,656

2,423,493

28,354,868

13

04140

Concrete M200

m3

0.1

7.26002

1,997,968

0.72600

199,797

2,139,538

213,954

14

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.59226

20,252,643

5.98747

1,647,755

21,687,692

1,764,511

15

04202

Reinforcement Bar(10D18 mm)

Ton

0.3

73.21680

20,149,313

20.28252

5,581,763

21,577,041

5,977,272

16

08101

Rubble Stone with Cement Mortar M100

m3

36.6

3.54617

975,905

129.78982

35,718,112

1,045,055

38,249,013

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 76

17

08220

Cement Mortar M100

0.3

5.51901

1,518,838

1.65570

455,652

1,626,459

487,938

18

10502

2 Layer Bitumen for Water Protection

15.0

0.32171

88,528

4.82565

1,327,915

94,801

1,422,015

Apporach Track

19

02301.1 Soil excavation

3.1

0.78295

215,464

2.42715

667,940

230,732

715,269

20

02301.5 Soil excavation for ditch

m3

17.3

0.72698

200,072

12.57675

3,461,243

214,248

3,706,490

21

02400.1 Embankment , K=90

m3

30.3

0.40799

112,271

12.36210

3,401,817

120,227

3,642,878

22

02400.3 Embankment , K=95

m3

15.6

0.40799

112,271

6.36464

1,751,431

120,227

1,875,541

D
23
24
25

Miscellaneous

03106

27

09105.06

135.0

1.00262

275,918

135.35370

37,248,918

295,469

39,888,315

m3

40.5

2.46014

677,029

99.63567

27,419,685

725,002

29,362,581

m3

54.0

0.40799

112,271

22.03146

6,062,645

120,227

6,492,258

Dismantle Existing Steel Structure

Ton

22.5

29.87722

8,222,232

672.23745

185,000,225

8,804,838

198,108,855

Temporary Facility and Work for Construction


of Tram Bridge

LS

1.0

2,737.20283

753,280,133

2,737.20283

753,280,133

806,655,588

806,655,588

Filling with aggregate

02400.3 Embankment , K=95

26

m3

02301.1 Soil excavation


02302

Item 5.6 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

Thuy Loi Bridge (Km 157+341)

Superstructure (Com. Deck Girder L=17.5m)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 77

03406

Drainage System on Bridge

ls

1.0

19.67784

5,415,351

19.67784

5,415,351

5,799,069

5,799,069

04110

Concrete M400

40.7

54.88381

15,104,064

2,233.77107

614,735,393

16,174,298

658,293,929

04201

Reinforcement Bar(D 10mm)

Ton

0.2

70.71170

19,459,909

12.86953

3,541,703

20,838,787

3,792,659

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

71.13954

19,577,656

191.92736

52,818,558

20,964,877

56,561,142

05100

Steel Structure

Ton

38.1

1,534.15994

25,956,790

58,393.80930

987,977,731

55,872,909

2,126,657,012

05520

Bearing for Composite Girder

unit

4.0

1,621.75525

6,487.02100

-2

31,624,227

126,496,908

10501

Water Proofing system

m2

108.2

1.99331

215.67614

59,353,700

587,425

63,559,385

Substructure

548,555

02302

Filling with Aggregate

m3

11.7

2.46014

677,029

28.78364

7,921,242

725,002

8,482,523

03101

Removal of Existing Masonry

m3

4.9

0.85391

234,998

4.18416

1,151,489

251,649

1,233,080

10

03103

Removal of Reinforced Concrete

m3

31.0

2.86509

788,478

88.81779

24,442,810

844,347

26,174,757

11

04120

Concrete M300

m3

1.2

8.96330

2,466,703

10.75596

2,960,043

2,641,487

3,169,784

12

04130

Concrete M250

m3

45.8

8.22359

2,263,133

376.64042

103,651,491

2,423,493

110,995,979

13

04201

Reinforcement Bar(D 10mm)

Ton

0.2

73.59226

20,252,643

14.19963

3,907,747

21,687,692

4,184,640

14

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

73.21680

20,149,313

155.30674

42,740,523

21,577,041

45,769,004

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.80658

19,761,215

8.78338

2,417,192

21,161,443

2,588,468

16

08101

Rubble Stone with Cement Mortar M100

35.0

3.54617

975,905

124.11595

34,156,664

1,045,055

36,576,925

17

08220

Cement Mortar M100

m3

0.1

5.51901

1,518,838

0.55190

151,884

1,626,459

162,646

20,533,765

230,732

21,988,760

C
18

Apporach Track
02301.1 Soil excavation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

95.3

0.78295

215,464

74.61514

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 78

19

02301.5 Soil excavation for ditch

16.4

0.95031

261,524

15.58508

4,288,993

280,055

4,592,902

20

02400.1 Embankment , K=90

11.6

0.40799

112,271

4.73268

1,302,346

120,227

1,394,633

21

02400.3 Embankment , K=95

m3

5.3

0.40799

112,271

2.16235

595,037

120,227

637,203

D
22
23
24

Miscellaneous

03106

26

09105.07

1,600.0

1.00262

275,918

1,604.19200

441,468,656

295,469

472,750,400

m3

84.6

3.08442

848,837

260.94193

71,811,594

908,983

76,899,962

m3

200.0

0.40799

112,271

81.59800

22,454,239

120,227

24,045,400

Dismantle Existing Steel Structure

Ton

8.8

29.87722

8,222,232

262.91954

72,355,643

8,804,838

77,482,574

Temporary Facility and Work for Construction


of Thuy Loi Bridge

LS

1.0

3,354.28080

923,100,425

3,354.28080

923,100,425

988,508,901

988,508,901

Filling with Aggregate

02400.3 Embankment, K=95

25

m3

02301.1 Soil Excavation


02302

Item 5.7 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

Nghia Phuonng Bridge (Km 166+550)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

40.7

38.23238

10,521,575

1,556.05787

428,228,086

11,267,106

458,571,214

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50838

52,428,065

20,809,881

56,142,978

05100

Steel Structure

Ton

41.5

1,521.73463

25,746,564

63,210.31523

1,069,469,260

55,420,389

2,302,070,407

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 79

05520

Bearing for Composite Girder

unit

10501

Water Proofing system

B
8
9
10

4.0

1,617.84929

108.2

1.26969

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

6,471.39716

-1

31,548,061

126,192,244

137.38046

37,807,573

374,182

40,486,492

146.0

0.72068

198,337

105.21928

28,957,164

212,390

31,008,940

m3

47.9

2.31214

636,308

110.75151

30,479,167

681,395

32,638,821

m3

258.1

0.37730

103,828

97.38113

26,797,917

111,185

28,696,849

11

03103

Removal of Reinforced Concrete

m3

67.7

2.64496

727,896

179.06379

49,278,578

779,473

52,770,322

12

04120

Concrete M300

m3

1.1

8.62511

2,373,641

9.48762

2,611,005

2,541,831

2,796,014

13

04130

Concrete M250

m3

61.6

7.88585

2,170,195

485.76836

133,684,007

2,323,969

143,156,490

14

04202

Reinforcement Bar(10D18 mm)

Ton

2.4

72.57459

19,972,575

176.28150

48,512,787

21,387,780

51,950,276

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.2

71.25823

19,610,316

16.30816

4,488,017

20,999,851

4,806,026

16

05100

Steel Structure

Ton

3.4

1,038.77514

17,575,266

3,542.22323

59,931,656

37,831,381

129,005,009

17

08101

Rubble Stone with Cement Mortar M100

m3

138.2

3.36653

926,471

465.25445

128,038,246

992,118

137,110,708

18

08220

Cement Mortar M100

2.0

5.34596

1,471,209

10.69192

2,942,418

1,575,455

3,150,910

Apporach Track

19

02301.1 Soil excavation

36.1

0.73103

201,173

26.39018

7,262,342

215,428

7,776,951

20

02301.5 Soil excavation for ditch

m3

7.2

0.88576

243,769

6.37747

1,755,134

261,041

1,879,495

21

02400.1 Embankment , K=90

m3

82.2

0.74065

203,824

60.88143

16,754,359

218,267

17,941,547

22

02400.3 Embankment , K=95

m3

53.7

0.74065

203,824

39.77291

10,945,366

218,267

11,720,938

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

D
23
24
25

Bridges - 80

Miscellaneous
3

86.1

0.93416

257,080

80.43118

22,134,578

275,296

23,702,986

m3

128.8

2.94666

810,917

379.52981

104,446,127

868,377

111,846,958

m3

44.2

0.74065

203,824

32.73673

9,009,035

218,267

9,647,401

Dismantle Existing Steel Structure

Ton

17.6

28.63074

7,879,195

503.90102

138,673,824

8,437,494

148,499,894

Temporary Facility and Work for Construction


of Nghia Phuonng Bridge

LS

1.0

5,879.42287

1,618,021,287

5,879.42287

1,618,021,287

1,732,670,033

1,732,670,033

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

26

03106

27

09105.08

Item 5.8 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

Tu Mau Bridge (Km 168+850)

Substructure (Box Culvert BxH=6.8x8.5m


L=11.3m)

1
2
3

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

m3

89.0

0.93416

257,080

83.14024

22,880,109

275,296

24,501,344

233.1

2.31214

636,308

538.95983

148,323,458

681,395

158,833,175

m3

119.3

0.74065

203,824

88.35955

24,316,242

218,267

26,039,253

03103

Removal of Reinforced Concrete

180.2

2.64496

727,896

476.62179

131,166,910

779,473

140,461,035

04120

Concrete M300

m3

404.6

8.69590

2,393,114

3,518.36114

968,253,904

2,562,684

1,036,861,946

04140

Concrete M200

m3

9.0

3.93286

1,082,332

35.39574

9,740,990

1,159,023

10,431,207

04202

Reinforcement Bar(10D18 mm)

Ton

32.6

74.76180

20,574,498

2,436.02354

670,395,325

22,032,353

717,897,784

04203

Reinforcement Bar( D>18 mm)

Ton

12.9

73.98355

20,360,318

957.81027

263,589,968

21,802,997

282,267,268

04204

High-Strength Bar D=36 mm

Ton

1.8

87.81205

24,165,933

158.06520

43,499,647

25,878,268

46,581,918

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 81

10

05100

Steel Structure

Ton

11

08101

Rubble Stone with Cement Mortar M100

3.1

988.73990

16,728,709

3,073.59685

52,002,864

36,009,137

111,938,003

709.8

3.36653

926,471

2,389.56299

657,608,878

992,118

704,205,356

Apporach Track

12

02301.1 Soil excavation

2.4

0.73103

201,173

1.75447

482,815

215,428

517,027

13

02301.5 Soil excavation for ditch

m3

34.3

0.88576

243,769

30.38157

8,361,265

261,041

8,953,706

14

02400.1 Embankment , K=90

m3

17.6

0.74065

203,824

13.03544

3,587,308

218,267

3,841,499

15

02400.3 Embankment , K=95

m3

138.0

0.74065

203,824

102.20970

28,127,757

218,267

30,120,846

Miscellaneous

16

02301.1 Soil Excavation

17

09105.09

Temporary Facility and Work for Construction


of Tu Mau Bridge

Item 5.9 Carried forward to Collection

m3

745.8

0.93416

257,080

696.69653

191,730,175

275,296

205,315,757

LS

1.0

2,172.09310

597,761,536

2,172.09310

597,761,536

640,117,351

640,117,351

Total VND :

Total VND :

BRIDGES (Cont'd)

10

Dao Thinh Bridge (Km 171+414)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

m3

31.4

53.53315

14,732,367

1,680.94091

462,596,310

15,776,263

495,374,658

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 82

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43588

41,400,079

20,809,881

44,333,579

05100

Steel Structure

Ton

27.8

1,490.19634

25,212,960

41,476.57512

701,751,317

54,271,789

1,510,544,532

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

Substructure

349,423

02302

Filling with Aggregate

m3

29.0

2.31214

636,308

67.05206

18,452,940

681,395

19,760,455

02303

Compacted Clay

m3

12.2

0.93947

258,540

11.46153

3,154,192

276,860

3,377,692

10

03103

Removal of Reinforced Concrete

m3

93.5

2.64496

727,896

247.30376

68,058,303

779,473

72,880,726

11

04120

Concrete M300

m3

1.4

6.46622

1,779,504

9.05271

2,491,305

1,905,595

2,667,833

12

04130

Concrete M250

m3

111.9

5.72696

1,576,057

640.84682

176,360,810

1,687,733

188,857,323

13

04202

Reinforcement Bar(10D18 mm)

Ton

2.5

72.57459

19,972,575

183.34374

50,456,318

21,387,780

54,031,521

14

04203

Reinforcement Bar( D>18 mm)

Ton

3.9

71.25823

19,610,316

278.53631

76,653,390

20,999,851

82,084,848

15

04302

RC Pile 40x40

84.0

5.48853

1,510,457

461.03652

126,878,360

1,617,483

135,868,572

16

08101

Rubble Stone with Cement Mortar M100

62.3

3.36653

926,471

209.73482

57,719,122

992,118

61,808,951

17

08103

Place Rubble (without Mortar)

m3

3.2

1.74134

479,220

5.57229

1,533,503

513,176

1,642,163

18

08220

Cement Mortar M100

m3

0.4

5.34596

1,471,209

2.13838

588,484

1,575,455

630,182

19

10502

2 Layer Bitumen for Water Protection

51.1

0.31563

86,855

16.12869

4,438,302

93,010

4,752,811

Apporach Track

20

02301.1 Soil excavation

m3

7.3

0.73103

201,173

5.33652

1,468,562

215,428

1,572,624

21

02301.5 Soil excavation for ditch

m3

13.5

0.88576

243,769

11.95776

3,290,878

261,041

3,524,054

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 83

22

02400.1 Embankment , K=90

34.4

0.74065

203,824

25.47836

7,011,557

218,267

7,508,385

23

02400.3 Embankment , K=95

39.6

0.74065

203,824

29.32974

8,071,443

218,267

8,643,373

D
24
25
26

Miscellaneous

03106

28

09105.10

359.7

0.93416

257,080

336.01735

92,471,633

275,296

99,023,971

m3

60.0

2.90960

800,732

174.57600

48,043,908

857,469

51,448,140

m3

119.9

0.74065

203,824

88.80394

24,438,536

218,267

26,170,213

Dismantle Existing Steel Structure

Ton

6.2

28.63074

7,879,195

177.51059

48,851,006

8,437,494

52,312,463

Temporary Facility and Work for Construction


of Dao Thinh Bridge

LS

1.0

6,662.78499

1,833,603,105

6,662.78499

1,833,603,105

1,963,527,412

1,963,527,412

Filling with Aggregate

02400.3 Embankment, K=95

27

02301.1 Soil Excavation


02302

Item 5.10 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

11

Thac Thu Bridge (Km 173+330)

Substructure (Box Culvert BxH=3.5x3.5m


L=7.5m)

02302

Filling with Aggregate

15.7

2.31214

636,308

36.30060

9,990,040

681,395

10,697,902

04120

Concrete M300

m3

68.9

8.51217

2,342,559

586.48851

161,402,293

2,508,546

172,838,819

04140

Concrete M200

m3

77.9

7.33855

2,019,570

571.67305

157,324,525

2,162,672

168,472,149

04160

Concrete M100

7.0

3.36825

926,939

23.57775

6,488,574

992,620

6,948,340

04201

Reinforcement Bar(D 10mm)

Ton

0.2

94.99159

26,141,748

19.22250

5,290,044

27,994,084

5,664,883

04202

Reinforcement Bar(10D18 mm)

Ton

1.7

94.99159

26,141,748

165.85912

45,644,537

27,994,084

48,878,790

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

04203

Reinforcement Bar( D>18 mm)

04301

RC Pile 35x35

04803

10
11

Bridges - 84

5.6

94.00274

25,869,613

525.83723

144,710,732

27,702,666

154,964,558

160.0

5.39812

1,485,564

863.69920

237,690,186

1,590,827

254,532,320

Pile Bamboo, D=80

2,300.0

0.02395

6,595

55.08500

15,168,442

7,062

16,242,600

08101

Rubble Stone with Cement Mortar M100

m3

62.9

3.82540

1,052,752

240.61766

66,218,082

1,127,347

70,910,126

10502

2 Layer Bitumen for Water Protection

66.7

0.31563

86,855

21.05252

5,793,243

93,010

6,203,767

Ton

Miscellaneous

12

02301.1 Soil Excavation

m3

26.0

0.72068

198,337

18.73768

5,156,755

212,390

5,522,140

13

02400.3 Embankment, K=95

m3

8.7

0.74065

203,824

6.44366

1,773,272

218,267

1,898,923

14

09105.11

LS

1.0

165.91423

45,659,704

165.91423

45,659,704

48,895,031

48,895,031

Temporary Facility and Work for Construction


of Thac Thu Bridge

Item 5.11 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

12

Con tran Bridge (Km 173+960)

Superstructure (RC Girder L=7m)

03406

Drainage System on Bridge

ls

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

04120

Concrete M300

8.7

15.45468

4,253,145

134.45572

37,002,359

4,554,511

39,624,246

04202

Reinforcement Bar(10D18 mm)

Ton

0.8

68.42168

18,829,699

54.79140

15,078,635

20,163,922

16,147,067

04203

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

10501

Water Proofing system

m2

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

B
6

Bridges - 85

Substructure
02301.1 Soil Excavation

m3

302.2

0.72068

198,337

217.78950

59,937,363

212,390

64,184,258

02302

Filling with Aggregate

m3

104.2

2.64160

726,972

275.25472

75,750,462

778,483

81,117,929

02303

Compacted Clay

30.0

0.93947

258,540

28.18410

7,756,210

276,860

8,305,800

m3

214.3

0.74065

203,824

158.72130

43,679,553

218,267

46,774,618

02400.3 Embankment, K=95

10

03103

Removal of Reinforced Concrete

m3

170.0

2.85844

786,639

485.93480

133,728,701

842,379

143,204,430

11

04120

Concrete M300

m3

1.7

7.57332

2,084,187

12.87464

3,543,119

2,231,867

3,794,174

12

04130

Concrete M250

m3

161.7

6.40228

1,761,918

1,035.24868

284,902,066

1,886,762

305,089,415

13

04150

Concrete M150

m3

5.9

3.64665

1,003,564

21.51524

5,921,030

1,074,674

6,340,577

14

04202

Reinforcement Bar(10D18 mm)

Ton

5.6

74.53301

20,511,542

413.96677

113,923,978

21,964,936

121,996,330

15

04203

Reinforcement Bar( D>18 mm)

Ton

3.3

71.25823

19,610,316

231.80587

63,793,141

20,999,851

68,313,355

16

04302

RC Pile 40x40

208.0

4.06487

1,118,650

845.49296

232,679,207

1,197,915

249,166,320

17

08101

Rubble Stone with Cement Mortar M100

m3

295.0

3.82540

1,052,752

1,128.49300

310,561,751

1,127,347

332,567,365

18

08102

Rubble Stone Reveted with Cement Mortar


M100

m3

9.0

2.79335

768,737

25.14015

6,918,630

823,207

7,408,863

19

08220

Cement Mortar M100

0.7

5.62166

1,547,077

3.93516

1,082,953

1,656,699

1,159,689

20

10502

2 Layer Bitumen for Water Protection

m2

250.9

0.32205

88,627

80.80235

22,236,520

94,907

23,812,166

Apporach Track

21

02301.5 Soil excavation for ditch

m3

45.4

0.67235

185,025

30.52469

8,400,143

198,136

8,995,374

22

02400.1 Embankment , K=90

68.9

0.74065

203,824

51.03079

14,043,496

218,267

15,038,596

23

02400.3 Embankment , K=95

m3

123.7

0.74065

203,824

91.61841

25,213,069

218,267

26,999,628

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

D
24
25
26

Bridges - 86

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

27

03106

28

09105.12

m3

921.6

0.72068

198,337

664.17869

182,787,140

212,390

195,738,624

m3

59.8

2.91685

802,713

174.42763

48,002,263

859,592

51,403,602

691.2

0.74065

203,824

511.93728

140,883,373

218,267

150,866,150

Dismantle Existing Steel Structure

Ton

17.6

28.63074

7,879,195

504.75995

138,910,200

8,437,494

148,753,019

Temporary Facility and Work for Construction


of Con tran Bridge

LS

1.0

3,927.60965

1,080,880,933

3,927.60965

1,080,880,933

1,157,469,321

1,157,469,321

Item 5.12 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

13

Moc Tom Bridge (Km 174+184)

Superstructure (RC Girder L=7.0m)

5.13.1

03406

Drainage System on Bridge

ls

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

5.13.2

04120

Concrete M300

m3

8.7

7.70920

2,121,579

67.07004

18,457,734

2,271,908

19,765,600

5.13.3

04202

Reinforcement Bar(10D18 mm)

Ton

0.8

68.42168

18,829,699

54.79140

15,078,635

20,163,922

16,147,067

5.13.4

04203

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

5.13.5

10501

Water Proofing system

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

Substructure

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

5.13.6
5.13.7
5.13.8

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

Bridges - 87

203.0

0.93416

257,080

189.63448

52,187,216

275,296

55,885,088

33.1

2.31214

636,308

76.53183

21,061,804

681,395

22,554,175

m3

124.1

0.74065

203,824

91.91467

25,294,599

218,267

27,086,935

5.13.9

03103

Removal of Reinforced Concrete

m3

9.8

2.64496

727,896

25.92061

7,133,383

779,473

7,638,835

5.13.10

04120

Concrete M300

0.7

8.27332

2,276,819

5.79132

1,593,773

2,438,149

1,706,704

5.13.11

04130

Concrete M250

m3

9.0

7.10228

1,954,550

63.92052

17,590,946

2,093,044

18,837,396

5.13.12

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

7.00618

1,928,104

21,733,949

2,064,725

5.13.13

04202

Reinforcement Bar(10D18 mm)

Ton

0.4

72.57459

19,972,575

32.01047

8,809,304

21,387,780

9,433,508

5.13.14

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

4.21777

1,160,734

20,999,851

1,242,981

5.13.15

08101

Rubble Stone with Cement Mortar M100

m3

143.6

3.36653

926,471

483.43371

133,041,188

992,118

142,468,145

5.13.16

08220

Cement Mortar M100

m3

0.6

5.34596

1,471,209

3.20758

882,725

1,575,455

945,273

5.13.17

10502

2 Layer Bitumen for Water Protection

m2

16.0

0.31563

86,855

5.05008

1,389,683

93,010

1,488,160

Apporach Track

5.13.18

02301.1 Soil excavation

21.4

0.73103

201,173

15.64404

4,305,100

215,428

4,610,159

5.13.19

02301.5 Soil excavation for ditch

m3

23.2

0.88576

243,769

20.54963

5,655,433

261,041

6,056,151

5.13.20

02400.3 Embankment , K=95

m3

105.1

0.74065

203,824

77.84232

21,421,937

218,267

22,939,862

D
5.13.21
5.13.22
5.13.23

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

49.0

0.93416

257,080

45.77384

12,596,914

275,296

13,489,504

m3

45.5

2.92669

805,430

133.16440

36,647,044

862,500

39,243,750

m3

94.0

0.74065

203,824

69.62110

19,159,487

218,267

20,517,098

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

5.13.24

03106

5.13.25 09105.13

Bridges - 88

Dismantle Existing Steel Structure

Ton

8.5

28.63074

7,879,195

243.36129

66,973,154

8,437,494

71,718,699

Temporary Facility and Work for Construction


of Moc Tom Bridge

LS

1.0

2,862.33007

787,715,241

2,862.33007

787,715,241

843,530,677

843,530,677

Item 5.13 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

14

Sung Bridge (Km 177+165)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

40.7

43.16471

11,878,955

1,756.80370

483,473,475

12,720,667

517,731,147

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50838

52,428,065

20,809,881

56,142,978

05100

Steel Structure

Ton

27.8

1,505.43226

25,470,741

41,900.63588

708,926,113

54,826,670

1,525,988,513

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

108.2

1.26969

137.38046

37,807,573

374,182

40,486,492

Substructure

349,423

02302

Filling with Aggregate

5.0

2.31214

636,308

11.56070

3,181,541

681,395

3,406,975

03103

Removal of Reinforced Concrete

m3

36.0

2.85844

786,639

102.90384

28,319,019

842,379

30,325,644

10

04120

Concrete M300

m3

1.2

7.35835

2,025,015

8.83002

2,430,019

2,168,503

2,602,204

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 89

11

04130

Concrete M250

12

04201

Reinforcement Bar(D 10mm)

13

04202

14

55.9

6.61903

1,821,568

370.00378

101,825,646

1,950,639

109,040,720

Ton

0.3

73.74922

20,295,839

21.87254

6,019,340

21,733,949

6,445,855

Reinforcement Bar(10D18 mm)

Ton

2.9

72.57459

19,972,575

207.66566

57,149,728

21,387,780

61,199,208

04203

Reinforcement Bar( D>18 mm)

Ton

0.2

71.25823

19,610,316

11.10631

3,056,464

20,999,851

3,273,037

15

08101

Rubble Stone with Cement Mortar M100

15.0

3.36653

926,471

50.49795

13,897,060

992,118

14,881,770

16

08220

Cement Mortar M100

m3

0.1

5.34596

1,471,209

0.53460

147,121

1,575,455

157,546

Apporach Track

17

02301.1 Soil excavation

m3

24.7

0.73103

201,173

18.05644

4,968,971

215,428

5,321,072

18

02301.5 Soil excavation for ditch

m3

38.4

0.88576

243,769

34.01318

9,360,717

261,041

10,023,974

19

02400.1 Embankment , K=90

m3

12.7

0.74065

203,824

9.40626

2,588,569

218,267

2,771,991

20

02400.3 Embankment , K=95

m3

86.7

0.74065

203,824

64.21436

17,671,569

218,267

18,923,749

Miscellaneous

21

02302

Filling with Aggregate

22

03106

Dismantle Existing Steel Structure

23

09105.14

Temporary Facility and Work for Construction


of Sung Bridge

Item 5.14 Carried forward to Collection


5

BRIDGES (Cont'd)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

46.2

2.96397

815,680

136.93541

37,684,397

873,477

40,354,637

Ton

7.5

28.63074

7,879,195

214.73055

59,093,959

8,437,494

63,281,205

LS

1.0

2,413.88756

664,303,547

2,413.88756

664,303,547

711,374,354

711,374,354

Total VND :

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 90

15

Dieu Bridge (Km 179+304)

Superstructure (Com. Deck Girder L=18.4m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

42.8

53.19674

14,639,783

2,276.82047

626,582,694

15,677,119

670,980,693

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

13.95820

3,841,305

20,941,249

4,113,490

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

193.70223

53,307,016

20,809,881

57,084,209

05100

Steel Structure

Ton

43.2

1,600.33750

27,076,463

69,179.77353

1,170,467,830

58,283,044

2,519,473,414

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

114.3

1.26969

145.12557

39,939,054

374,182

42,769,003

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

88.4

0.72068

198,337

63.70811

17,532,968

212,390

18,775,276

m3

145.1

2.31214

636,308

335.49151

92,328,331

681,395

98,870,415

m3

126.0

0.74065

203,824

93.32190

25,681,865

218,267

27,501,642

11

03103

Removal of Reinforced Concrete

m3

4.0

2.85844

786,639

11.43376

3,146,558

842,379

3,369,516

12

04120

Concrete M300

40.0

8.61190

2,369,994

344.47600

94,799,758

2,537,926

101,517,040

13

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

72.57459

19,972,575

196.47248

54,069,357

21,387,780

57,900,570

14

04203

Reinforcement Bar( D>18 mm)

Ton

0.2

71.25823

19,610,316

17.74187

4,882,577

20,999,851

5,228,543

15

05100

Steel Structure

Ton

0.7

1,204.06968

20,371,920

889.24158

15,045,274

43,851,279

32,385,485

16

08101

Rubble Stone with Cement Mortar M100

m3

435.9

3.36653

926,471

1,467.47043

403,848,563

992,118

432,464,236

17

10502

2 Layer Bitumen for Water Protection

20.4

0.31563

86,855

6.43885

1,771,846

93,010

1,897,404

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 91

Apporach Track

18

02301.1 Soil excavation

558.9

0.51755

142,430

289.25870

79,604,001

152,522

85,244,546

19

02301.5 Soil excavation for ditch

m3

230.6

0.67235

185,025

155.04391

42,666,806

198,136

45,690,162

20

02400.1 Embankment , K=90

m3

59.8

0.74065

203,824

44.29087

12,188,695

218,267

13,052,367

21

02400.3 Embankment , K=95

1,476.0

0.75094

206,665

1,108.38744

305,037,053

221,308

326,650,608

D
22
23
24

Miscellaneous

03106

26

09105.15

252.1

0.72068

198,337

181.68343

50,000,692

212,390

53,543,519

m3

121.3

2.93698

808,264

356.25567

98,042,410

865,535

104,989,396

m3

146.4

0.74065

203,824

108.43116

29,839,881

218,267

31,954,289

Dismantle Existing Steel Structure

Ton

27.0

28.63074

7,879,195

773.02998

212,738,253

8,437,494

227,812,338

Temporary Facility and Work for Construction


of Dieu Bridge

LS

1.0

7,876.62776

2,167,653,474

7,876.62776

2,167,653,474

2,321,247,715

2,321,247,715

Filling with Aggregate

02400.3 Embankment, K=95

25

m3

02301.1 Soil Excavation


02302

Item 5.15 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

16

Tay Bridge (Km 181+190)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

m3

31.4

55.12074

15,169,270

1,730.79124

476,315,065

16,244,124

510,065,494

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 92

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43658

41,400,274

20,809,881

44,333,787

05100

Steel Structure

Ton

27.8

1,540.55059

26,064,915

42,878.08295

725,463,750

56,105,652

1,561,586,368

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

280.2

0.72068

198,337

201.93454

55,573,954

212,390

59,511,678

m3

88.0

2.31214

636,308

203.46832

55,995,128

681,395

59,962,760

m3

231.7

0.37730

103,828

87.42041

24,056,867

111,185

25,761,565

11

03103

Removal of Reinforced Concrete

m3

20.5

2.85844

786,639

58.59802

16,126,109

842,379

17,268,770

12

04120

Concrete M300

m3

1.8

6.96120

1,915,729

12.53016

3,448,312

2,051,472

3,692,650

13

04130

Concrete M250

m3

21.1

6.22193

1,712,282

131.28272

36,129,158

1,833,610

38,689,171

14

04140

Concrete M200

m3

21.4

5.89636

1,622,682

126.18210

34,725,394

1,737,661

37,185,945

15

04201

Reinforcement Bar(D 10mm)

Ton

0.0

73.74922

20,295,839

0.76994

211,888

21,733,949

226,902

16

04202

Reinforcement Bar(10D18 mm)

Ton

1.2

72.57459

19,972,575

87.64180

24,119,082

21,387,780

25,828,097

17

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

10.20845

2,809,374

20,999,851

3,008,439

18

05100

Steel Structure

Ton

1.8

1,400.02604

23,687,349

2,496.03643

42,230,991

50,987,857

90,903,701

19

08101

Rubble Stone with Cement Mortar M100

298.7

3.36653

926,471

1,005.58251

276,736,788

992,118

296,345,647

20

08220

Cement Mortar M100

m3

2.0

5.34596

1,471,209

10.69192

2,942,418

1,575,455

3,150,910

21

10502

2 Layer Bitumen for Water Protection

m2

24.0

0.31563

86,855

7.57512

2,084,525

93,010

2,232,240

Apporach Track

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 93

22

02301.1 Soil excavation

27.9

0.51755

142,430

14.43965

3,973,791

152,522

4,255,364

23

02301.5 Soil excavation for ditch

220.4

0.67235

185,025

148.18594

40,779,548

198,136

43,669,174

24

02400.1 Embankment , K=90

m3

33.4

0.74065

203,824

24.73771

6,807,733

218,267

7,290,118

25

02400.3 Embankment , K=95

m3

313.1

0.74065

203,824

231.89752

63,817,396

218,267

68,339,398

D
26
27
28

Miscellaneous

03106

30

09105.16

49.8

0.72068

198,337

35.88986

9,877,170

212,390

10,577,022

m3

51.6

2.90960

800,732

150.13536

41,317,760

857,469

44,245,400

m3

24.0

0.74065

203,824

17.77560

4,891,784

218,267

5,238,408

Dismantle Existing Steel Structure

Ton

19.5

28.63074

7,879,195

558.29943

153,644,294

8,437,494

164,531,133

Temporary Facility and Work for Construction


of Tay Bridge

LS

1.0

3,535.62953

973,007,722

3,535.62953

973,007,722

1,041,952,498

1,041,952,498

Filling with Aggregate

02400.3 Embankment, K=95

29

m3

02301.1 Soil Excavation


02302

Item 5.16 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

17

Trang Bridge (Km 183+150)

Superstructure (Com. Deck Girder L=21.5m)

5.17.1

03406

Drainage System on Bridge

ls

5.17.2

04110

Concrete M400

5.17.3

04201

Reinforcement Bar(D 10mm)

5.17.4

04202

Reinforcement Bar(10D18 mm)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

50.0

38.41876

10,572,864

1,920.93800

528,643,209

11,322,030

566,101,500

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

Ton

2.9

80.02403

22,022,674

230.20033

63,351,306

23,583,143

67,840,212

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 94

5.17.5

05100

Steel Structure

Ton

54.1

1,501.58155

5.17.6

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

5.17.7

10501

Water Proofing system

m2

132.9

1.26969

B
5.17.8

Substructure
02301.1 Soil Excavation

25,405,590

349,423

81,227.46833

1,374,305,471

54,686,430

2,958,241,103

6,471.39716

-1

31,548,061

126,192,244

168.74180

46,438,323

374,182

49,728,788

m3

188.7

0.72068

198,337

135.99232

37,426,143

212,390

40,077,993

5.17.9

02302

Filling with Aggregate

m3

32.8

2.31214

636,308

75.83819

20,870,911

681,395

22,349,756

5.17.10

02303

Compacted Clay

m3

15.2

0.93947

258,540

14.27994

3,929,813

276,860

4,208,272

m3

207.3

0.74065

203,824

153.53675

42,252,782

218,267

45,246,749

5.17.11

02400.3 Embankment, K=95

5.17.12

03103

Removal of Reinforced Concrete

m3

90.1

2.85844

786,639

257.54544

70,876,212

842,379

75,898,348

5.17.13

04120

Concrete M300

m3

1.8

7.33933

2,019,788

13.21079

3,635,619

2,162,905

3,893,229

5.17.14

04130

Concrete M250

m3

94.6

6.60006

1,816,342

624.36568

171,825,937

1,945,043

184,001,068

5.17.15

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

8.75182

2,408,508

21,733,949

2,579,168

5.17.16

04202

Reinforcement Bar(10D18 mm)

Ton

2.3

72.57459

19,972,575

165.19065

45,460,577

21,387,780

48,681,795

5.17.17

04203

Reinforcement Bar( D>18 mm)

Ton

3.8

71.25823

19,610,316

271.44825

74,702,751

20,999,851

79,995,992

5.17.18

08101

Rubble Stone with Cement Mortar M100

m3

96.2

3.36653

926,471

323.86019

89,126,478

992,118

95,441,752

5.17.19

08103

Place Rubble (without Mortar)

m3

3.3

1.74134

479,220

5.74642

1,581,426

513,176

1,693,481

5.17.20

08220

Cement Mortar M100

6.0

5.34596

1,471,209

32.07576

8,827,253

1,575,455

9,452,730

5.17.21

10502

2 Layer Bitumen for Water Protection

m2

142.4

0.31563

86,855

44.94571

12,368,183

93,010

13,244,624

9,015,805

152,522

9,654,643

C
5.17.22

Apporach Track
02301.1 Soil excavation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

63.3

0.51755

142,430

32.76092

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 95

5.17.23

02301.5 Soil excavation for ditch

46.8

0.67235

185,025

31.46598

8,659,178

198,136

9,272,765

5.17.24

02400.1 Embankment , K=90

24.8

0.74065

203,824

18.36812

5,054,844

218,267

5,413,022

5.17.25

02400.3 Embankment , K=95

m3

78.4

0.74065

203,824

58.06696

15,979,827

218,267

17,112,133

D
5.17.26
5.17.27
5.17.28
5.17.29

Miscellaneous

5.17.30 09105.17

577.5

0.72068

198,337

416.19270

114,539,467

212,390

122,655,225

m3

113.0

2.94666

810,917

332.97258

91,633,636

868,377

98,126,601

m3

554.5

0.74065

203,824

410.69043

113,020,589

218,267

121,029,052

Dismantle Existing Steel Structure

Ton

46.0

28.63074

7,879,195

1,317.01404

362,442,950

8,437,494

388,124,724

Temporary Facility and Work for Construction


of Trang Bridge

LS

1.0

6,856.83614

1,887,006,118

6,856.83614

1,887,006,118

2,020,714,423

2,020,714,423

Filling with Aggregate

02400.3 Embankment, K=95


03106

m3

02301.1 Soil Excavation


02302

Item 5.17 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

18

Mang Bridge (Km 183+960)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

40.7

37.90497

10,431,473

1,542.73228

424,560,955

11,170,620

454,644,234

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50908

52,428,259

20,809,881

56,143,186

05100

Steel Structure

Ton

41.5

1,497.57774

25,337,849

62,149.61099

1,051,523,017

54,540,615

2,263,440,431

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 96

05520

Bearing for Composite Girder

unit

10501

Water Proofing system

B
8
9
10

4.0

1,617.84929

108.2

1.26969

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

6,471.39716

-1

31,548,061

126,192,244

137.38046

37,807,573

374,182

40,486,492

80.4

0.93416

257,080

75.10646

20,669,222

275,296

22,133,798

m3

123.4

2.31214

636,308

285.31808

78,520,440

681,395

84,084,143

m3

116.8

0.74065

203,824

86.50792

23,806,682

218,267

25,493,586

11

03103

Removal of Reinforced Concrete

m3

3.4

2.64496

727,896

8.99286

2,474,847

779,473

2,650,208

12

04120

Concrete M300

m3

2.5

10.15408

2,794,410

25.38520

6,986,027

2,992,415

7,481,038

13

04140

Concrete M200

m3

2.1

8.65746

2,382,541

18.18067

5,003,335

2,551,361

5,357,858

14

04202

Reinforcement Bar(10D18 mm)

Ton

0.5

72.57459

19,972,575

33.52148

9,225,133

21,387,780

9,878,802

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

5.91443

1,627,657

20,999,851

1,742,988

16

05100

Steel Structure

Ton

3.7

1,038.77514

17,575,266

3,864.55515

65,385,262

37,831,381

140,744,087

17

08101

Rubble Stone with Cement Mortar M100

m3

377.5

3.36653

926,471

1,270.86508

349,742,676

992,118

374,524,545

Apporach Track

18

02301.1 Soil excavation

m3

37.3

0.73103

201,173

27.26742

7,503,749

215,428

8,035,464

19

02301.5 Soil excavation for ditch

29.1

0.88576

243,769

25.77562

7,093,668

261,041

7,596,293

20

02400.1 Embankment , K=90

m3

13.5

0.74065

203,824

9.99878

2,751,629

218,267

2,946,605

21

02400.3 Embankment , K=95

m3

4.8

0.74065

203,824

3.55512

978,357

218,267

1,047,682

Miscellaneous

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

22
23
24

229.1

0.93416

257,080

214.01606

58,897,001

275,296

63,070,314

51.6

2.94638

810,850

152.03321

41,839,838

868,304

44,804,486

m3

229.1

0.74065

203,824

169.68292

46,696,153

218,267

50,004,970

Dismantle Existing Steel Structure

Ton

9.9

28.63074

7,879,195

283.15802

77,925,235

8,437,494

83,446,816

Temporary Facility and Work for Construction


of Mang Bridge

LS

1.0

5,416.06439

1,490,504,718

5,416.06439

1,490,504,718

1,596,117,974

1,596,117,974

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

25

03106

26

09105.18

Bridges - 97

Item 5.18 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

19

Khe Nham Bridge (Km 185+262)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

16.51029

4,543,648

16.51029

4,543,648

4,865,599

4,865,599

04120

Concrete M300

m3

15.6

15.36150

4,227,495

239.63940

65,948,918

4,527,044

70,621,886

04202

Reinforcement Bar(10D18 mm)

Ton

1.6

68.42168

18,829,699

108.22462

29,783,500

20,163,922

31,893,880

04203

Reinforcement Bar( D>18 mm)

Ton

2.4

67.55941

18,592,397

160.14688

44,072,532

19,909,805

47,195,396

05510

Bearing for Reinforced Concrete

unit

4.0

1,333.49163

5,333.96652

26,003,087

104,012,348

10501

Water Proofing system

m2

31.7

1.26969

40.24917

11,076,710

374,182

11,861,569

B
7
8

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

m3

414.1

0.93416

257,080

386.83566

106,456,779

275,296

114,000,074

m3

79.7

2.31214

636,308

184.27756

50,713,770

681,395

54,307,182

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

02400.3 Embankment, K=95

Bridges - 98

246.6

0.74065

203,824

182.64429

50,263,078

218,267

53,824,642

10

03103

Removal of Reinforced Concrete

81.1

2.85844

786,639

231.81948

63,796,457

842,379

68,316,937

11

04120

Concrete M300

m3

0.7

9.05688

2,492,465

6.33982

1,744,726

2,669,074

1,868,352

12

04130

Concrete M250

m3

49.5

7.88585

2,170,195

390.34958

107,424,649

2,323,969

115,036,466

13

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

5.50022

1,513,664

21,733,949

1,620,918

14

04202

Reinforcement Bar(10D18 mm)

Ton

1.8

72.57459

19,972,575

133.44435

36,723,974

21,387,780

39,326,139

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.7

71.25823

19,610,316

49.57435

13,642,896

20,999,851

14,609,596

16

08101

Rubble Stone with Cement Mortar M100

m3

276.1

3.36653

926,471

929.49893

255,798,551

992,118

273,923,780

17

08220

Cement Mortar M100

m3

0.4

5.34596

1,471,209

2.13838

588,484

1,575,455

630,182

18

10502

2 Layer Bitumen for Water Protection

m2

90.4

0.31563

86,855

28.53295

7,851,711

93,010

8,408,104

Apporach Track

19

02301.1 Soil excavation

m3

20.1

0.73103

201,173

14.69370

4,043,576

215,428

4,330,103

20

02301.5 Soil excavation for ditch

m3

25.5

0.88576

243,769

22.58688

6,216,102

261,041

6,656,546

21

02400.1 Embankment , K=90

12.6

0.37730

103,827

4.75398

1,308,215

111,184

1,400,918

22

02400.3 Embankment , K=95

m3

104.2

0.37730

103,828

39.31466

10,818,841

111,185

11,585,477

D
23
24
25
26

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95


03106

Dismantle Existing Steel Structure

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

373.8

0.72068

198,337

269.39018

74,138,273

212,390

79,391,382

m3

48.0

2.91956

803,461

140.13888

38,566,108

860,392

41,298,816

m3

242.9

0.74065

203,824

179.90389

49,508,928

218,267

53,017,054

Ton

6.0

28.63074

7,879,195

171.78444

47,275,167

8,437,494

50,624,964

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

27

09105.19

Temporary Facility and Work for Construction


of Khe Nham Bridge

Item 5.19 Carried forward to Collection

Bridges - 99

LS

Total VND :

1.0

Total VND :

4,291.46967

1,181,015,463

4,291.46967

1,181,015,463

1,264,699,122

1,264,699,122

BRIDGES (Cont'd)

20

Mau A Bridge (Km 188+050)

Superstructure (Com. Deck Girder L=21.5m)

5.20.1

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

5.20.2

04110

Concrete M400

m3

50.0

8.71266

2,397,726

435.63300

119,886,306

2,567,623

128,381,150

5.20.3

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

5.20.4

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

70.61358

19,432,916

203.12985

55,901,504

20,809,881

59,862,536

5.20.5

05100

Steel Structure

Ton

61.3

1,505.53418

25,472,464

92,259.33027

1,560,955,936

54,830,381

3,360,012,876

5.20.6

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

5.20.7

10501

Water Proofing system

132.9

1.26969

168.74180

46,438,323

374,182

49,728,788

B
5.20.8
5.20.9
5.20.10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

212.0

0.93416

257,080

198.04192

54,500,935

275,296

58,362,752

m3

60.6

2.31214

636,308

140.11568

38,560,281

681,395

41,292,537

75.7

0.74065

203,824

56.06721

15,429,501

218,267

16,522,812

5.20.11

03103

Removal of Reinforced Concrete

m3

3.0

2.85844

786,639

8.57532

2,359,918

842,379

2,527,137

5.20.12

04120

Concrete M300

m3

1.8

8.62511

2,373,641

15.52520

4,272,555

2,541,831

4,575,296

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 100

5.20.13

04130

Concrete M250

5.20.14

04202

Reinforcement Bar(10D18 mm)

5.20.15

04203

5.20.16

22.0

7.88585

2,170,195

173.48870

47,744,288

2,323,969

51,127,318

Ton

1.5

72.57459

19,972,575

108.33862

29,814,861

21,387,780

31,927,464

Reinforcement Bar( D>18 mm)

Ton

0.2

71.25823

19,610,316

11.44051

3,148,436

20,999,851

3,371,526

05100

Steel Structure

Ton

0.1

571.39829

9,667,614

83.94412

1,420,270

20,809,881

3,057,180

5.20.17

08101

Rubble Stone with Cement Mortar M100

236.6

3.36653

926,471

796.52100

219,202,959

992,118

234,735,119

5.20.18

08220

Cement Mortar M100

m3

1.0

5.34596

1,471,209

5.34596

1,471,209

1,575,455

1,575,455

Apporach Track

5.20.19

02301.5 Soil excavation for ditch

m3

75.9

0.88576

243,769

67.22918

18,502,043

261,041

19,813,012

5.20.20

02400.1 Embankment , K=90

m3

44.3

0.74065

203,824

32.81080

9,029,417

218,267

9,669,228

5.20.21

02400.3 Embankment , K=95

m3

245.3

0.74065

203,824

181.68145

49,998,107

218,267

53,540,895

D
5.20.22
5.20.23
5.20.24
5.20.25

Miscellaneous

5.20.26 09105.20

43.6

0.93416

257,080

40.72938

11,208,683

275,296

12,002,906

130.8

2.92161

804,033

382.14659

105,167,464

861,004

112,619,323

m3

114.0

0.74065

203,824

84.43410

23,235,973

218,267

24,882,438

Dismantle Existing Steel Structure

Ton

22.0

28.63074

7,879,195

629.87628

173,342,281

8,437,494

185,624,868

Temporary Facility and Work for Construction


of Mau A Bridge

LS

1.0

8,370.88631

2,303,673,773

8,370.88631

2,303,673,773

2,466,906,056

2,466,906,056

Filling with Aggregate

02400.3 Embankment, K=95


03106

m3

02301.1 Soil Excavation


02302

Item 5.20 Carried forward to Collection

Total VND :

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 101

BRIDGES (Cont'd)

21

Khe hoi Bridge (Km 189+207)

Superstructure (RC Girder L=7.0m)

03406

Drainage System on Bridge

ls

04120

Concrete M300

04202

Reinforcement Bar(10D18 mm)

04203

10501

B
6

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

8.7

14.04529

3,865,279

122.19402

33,627,926

4,139,162

36,010,709

Ton

0.8

68.42168

18,829,699

54.96450

15,126,274

20,163,922

16,198,082

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

Water Proofing system

m2

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

Substructure
02301.1 Soil Excavation

m3

274.5

0.99566

274,008

273.30867

75,215,095

293,423

80,544,614

02302

Filling with Aggregate

m3

90.3

2.46440

678,207

222.53532

61,242,110

726,263

65,581,549

02303

Compacted Clay

m3

30.0

1.00130

275,565

30.03900

8,266,939

295,090

8,852,700

m3

214.3

0.78943

217,246

169.17485

46,555,842

232,640

49,854,752

02400.3 Embankment, K=95

10

03103

Removal of Reinforced Concrete

153.0

3.04665

838,436

466.13745

128,280,758

897,846

137,370,438

11

04120

Concrete M300

m3

1.7

8.16066

2,245,817

13.87312

3,817,889

2,404,950

4,088,415

12

04130

Concrete M250

m3

148.3

6.91253

1,902,327

1,025.12820

282,115,044

2,037,121

302,105,044

13

04140

Concrete M200

0.1

6.56550

1,806,827

0.65655

180,682

1,934,854

193,485

14

04150

Concrete M150

m3

5.9

3.88679

1,069,647

22.93206

6,310,915

1,145,439

6,758,090

15

04202

Reinforcement Bar(10D18 mm)

Ton

2.5

77.35335

21,287,697

192.81019

53,061,499

22,796,087

56,821,298

16

04203

Reinforcement Bar( D>18 mm)

Ton

1.6

75.95032

20,901,583

119.14479

32,788,731

22,382,614

35,112,054

17

04302

RC Pile 40x40

304.0

4.33249

1,192,309

1,317.07696

362,462,071

1,276,793

388,145,072

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 102

18

08101

Rubble Stone with Cement Mortar M100

253.3

3.58820

987,475

908.89106

250,127,443

1,057,445

267,850,819

19

08103

Place Rubble (without Mortar)

9.0

1.85598

510,775

16.70382

4,596,979

546,967

4,922,703

20

08220

Cement Mortar M100

m3

0.7

5.69798

1,568,082

3.98859

1,097,657

1,679,193

1,175,435

21

10502

2 Layer Bitumen for Water Protection

m2

209.1

0.33637

92,574

70.33497

19,357,178

99,133

20,728,710

Apporach Track

22

02301.1 Soil excavation

m3

29.4

0.86641

238,433

25.47245

7,009,930

255,328

7,506,643

23

02301.5 Soil excavation for ditch

m3

52.8

1.04986

288,919

55.43261

15,254,909

309,391

16,335,845

24

02400.1 Embankment , K=90

m3

0.3

0.87780

241,577

0.26334

72,473

258,694

77,608

25

02400.3 Embankment , K=95

m3

127.8

0.87780

241,577

112.18284

30,873,528

258,694

33,061,093

D
26
27
28

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

29

03106

30

09105.21

m3

567.6

0.93416

257,080

530.22922

145,918,540

275,296

156,258,010

m3

51.1

2.91806

803,048

149.11287

41,035,744

859,950

43,943,445

425.7

0.74065

203,824

315.29471

86,768,015

218,267

92,916,262

Dismantle Existing Steel Structure

Ton

7.1

28.63074

7,879,195

203.27825

55,942,281

8,437,494

59,906,207

Temporary Facility and Work for Construction


of Khe hoi Bridge

LS

1.0

2,560.77012

704,725,732

2,560.77012

704,725,732

754,660,749

754,660,749

Item 5.21 Carried forward to Collection


5

BRIDGES (Cont'd)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 103

22

Muong Bridge (Km 194+470)

Superstructure (RC Girder L=7m)

03406

Drainage System on Bridge

ls

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

04120

Concrete M300

m3

8.7

15.45468

4,253,145

134.45572

37,002,359

4,554,511

39,624,246

04202

Reinforcement Bar(10D18 mm)

Ton

0.8

68.42168

18,829,699

54.96450

15,126,274

20,163,922

16,198,082

04203

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

10501

Water Proofing system

m2

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

Substructure

02302

Filling with Aggregate

m3

1.3

2.31214

636,308

3.00578

827,201

681,395

885,814

03103

Removal of Reinforced Concrete

m3

0.4

2.85844

786,639

1.14338

314,656

842,379

336,952

04120

Concrete M300

m3

0.8

8.33725

2,294,416

6.66980

1,835,533

2,456,992

1,965,594

04130

Concrete M250

m3

8.4

7.16621

1,972,144

60.19616

16,566,009

2,111,885

17,739,834

10

04140

Concrete M200

m3

0.1

6.84064

1,882,545

0.68406

188,255

2,015,937

201,594

11

04201

Reinforcement Bar(D 10mm)

Ton

0.2

73.74922

20,295,839

12.61333

3,471,197

21,733,949

3,717,157

12

04202

Reinforcement Bar(10D18 mm)

Ton

0.1

72.57459

19,972,575

7.25746

1,997,258

21,387,780

2,138,778

13

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

7.12582

1,961,032

20,999,851

2,099,985

14

08101

Rubble Stone with Cement Mortar M100

4.0

3.36653

926,471

13.46612

3,705,883

992,118

3,968,472

15

08220

Cement Mortar M100

m3

0.2

5.34596

1,471,209

1.06919

294,242

1,575,455

315,091

301,759

215,428

323,142

C
16

Apporach Track
02301.1 Soil excavation

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

1.5

0.73103

201,173

1.09655

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 104

17

02301.5 Soil excavation for ditch

44.3

0.88576

243,769

39.23917

10,798,952

261,041

11,564,116

18

02400.1 Embankment , K=90

19.2

0.74065

203,824

14.22048

3,913,427

218,267

4,190,726

19

02400.3 Embankment , K=95

m3

155.2

0.74065

203,824

114.94888

31,633,535

218,267

33,875,038

D
20
21
22

Miscellaneous

03106

24

09105.22

18.0

0.93416

257,080

16.81488

4,627,438

275,296

4,955,328

m3

54.0

2.90960

800,732

157.11840

43,239,517

857,469

46,303,326

m3

90.0

0.74065

203,824

66.65850

18,344,189

218,267

19,644,030

Dismantle Existing Steel Structure

Ton

8.5

28.63074

7,879,195

243.36129

66,973,154

8,437,494

71,718,699

Temporary Facility and Work for Construction


of Muong Bridge

LS

1.0

4,710.38390

1,296,300,945

4,710.38390

1,296,300,945

1,388,153,431

1,388,153,431

Filling with Aggregate

02400.3 Embankment, K=95

23

m3

02301.1 Soil Excavation


02302

Item 5.22 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

23

Khai Bridge (Km 195+394)

Superstructure (RC Girder L=21.5m)

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

04110

Concrete M400

50.0

28.58540

7,866,727

1,429.27000

393,336,335

8,424,142

421,207,100

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

80.02403

22,022,674

230.20033

63,351,306

23,583,143

67,840,212

05100

Steel Structure

Ton

55.9

1,505.53418

25,472,464

84,217.45923

1,424,893,747

54,830,381

3,067,134,202

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 105

05520

Bearing for Composite Girder

unit

10501

Water Proofing system

B
8
9
10

4.0

1,617.84929

132.9

1.26969

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

6,471.39716

-1

31,548,061

126,192,244

168.74180

46,438,323

374,182

49,728,788

79.2

0.94124

259,034

74.54621

20,515,479

277,388

21,969,130

m3

80.3

2.32973

641,147

187.07732

51,484,125

686,577

55,132,133

m3

106.7

0.74629

205,375

79.62914

21,913,550

219,928

23,466,318

11

03103

Removal of Reinforced Concrete

m3

1.0

2.88018

792,620

2.88018

792,620

848,784

848,784

12

04120

Concrete M300

m3

7.8

8.67129

2,386,339

67.63606

18,613,443

2,555,429

19,932,346

13

04140

Concrete M200

m3

0.1

7.59832

2,091,065

0.75983

209,106

2,239,232

223,923

14

04202

Reinforcement Bar(10D18 mm)

Ton

0.7

73.12643

20,124,452

53.83129

14,814,414

21,550,417

15,864,124

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.80011

19,759,436

6.06567

1,669,277

21,159,538

1,787,558

16

05100

Steel Structure

Ton

2.6

1,046.67416

17,708,912

2,721.93895

46,053,087

38,119,058

99,130,897

17

08101

Rubble Stone with Cement Mortar M100

m3

260.4

3.39214

933,515

883.31326

243,087,376

999,662

260,311,985

Apporach Track

18

02301.1 Soil excavation

m3

45.3

0.73103

201,173

33.11566

9,113,133

215,428

9,758,888

19

02301.5 Soil excavation for ditch

42.7

0.88576

243,769

37.82195

10,408,923

261,041

11,146,451

20

02400.1 Embankment , K=90

m3

12.4

0.74065

203,824

9.18406

2,527,422

218,267

2,706,511

21

02400.3 Embankment , K=95

m3

104.5

0.74065

203,824

77.39793

21,299,642

218,267

22,808,902

Miscellaneous

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

22
23
24

664.8

0.93416

257,080

621.02957

170,906,704

275,296

183,016,781

51.6

2.94578

810,673

152.00225

41,830,742

868,116

44,794,786

m3

664.8

0.74065

203,824

492.38412

135,502,412

218,267

145,103,902

Dismantle Existing Steel Structure

Ton

17.0

28.63074

7,879,195

485.57735

133,631,140

8,437,494

143,099,898

Temporary Facility and Work for Construction


of Khai Bridge

LS

1.0

6,652.57246

1,830,792,599

6,652.57246

1,830,792,599

1,960,517,762

1,960,517,762

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

25

03106

26

09105.23

Bridges - 106

Item 5.23 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

24

Muoi Bridge (Km 197+850)

Superstructure (Com. Deck Girder L=21.5m)

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

04110

Concrete M400

m3

50.0

6.62971

1,824,497

331.48550

91,224,833

1,953,776

97,688,800

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

80.02403

22,022,674

230.20033

63,351,306

23,583,143

67,840,212

05100

Steel Structure

Ton

64.9

1,505.53418

25,472,464

97,697.80150

1,652,970,629

54,830,381

3,558,077,758

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

132.9

1.26969

168.74180

46,438,323

374,182

49,728,788

Substructure

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8
9
10

02301.1 Soil Excavation


02302

Filling with Aggregate

02400.3 Embankment, K=95

Bridges - 107

88.0

0.72068

198,337

63.41984

17,453,633

212,390

18,690,320

37.7

2.31214

636,308

87.16768

23,988,822

681,395

25,688,592

m3

28.8

0.37730

103,828

10.86624

2,990,236

111,185

3,202,128

11

04120

Concrete M300

m3

3.5

8.62511

2,373,641

30.18789

8,307,745

2,541,831

8,896,409

12

04202

Reinforcement Bar(10D18 mm)

Ton

0.4

72.57459

19,972,575

26.02888

7,163,164

21,387,780

7,670,727

13

08101

Rubble Stone with Cement Mortar M100

m3

125.0

3.36653

926,471

420.81625

115,808,833

992,118

124,014,750

Apporach Track

14

02301.1 Soil excavation

m3

19.7

0.51755

142,430

10.19574

2,805,866

152,522

3,004,683

15

02301.5 Soil excavation for ditch

m3

32.3

0.67235

185,025

21.71691

5,976,313

198,136

6,399,793

16

02400.1 Embankment , K=90

m3

10.8

0.37730

103,827

4.07484

1,121,328

111,184

1,200,787

17

02400.3 Embankment , K=95

m3

37.8

0.37730

103,828

14.26194

3,924,685

111,185

4,202,793

D
18
19
20

Miscellaneous

03106

22

09105.24

78.5

0.72068

198,337

56.57338

15,569,434

212,390

16,672,615

m3

149.4

2.92161

804,033

436.48853

120,122,472

861,004

128,633,998

m3

78.5

0.37730

103,828

29.61805

8,150,471

111,185

8,728,023

Dismantle Existing Steel Structure

Ton

21.7

28.63074

7,879,195

620.14183

170,663,354

8,437,494

182,756,120

Temporary Facility and Work for Construction


of Muoi Bridge

LS

1.0

6,965.87673

1,917,014,153

6,965.87673

1,917,014,153

2,052,848,749

2,052,848,749

Filling with Aggregate

02400.3 Embankment, K=95

21

02301.1 Soil Excavation


02302

Item 5.24 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 108

BRIDGES (Cont'd)

25

Bom nuoc Bridge (Km 201+635)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

16.51029

4,543,648

16.51029

4,543,648

4,865,599

4,865,599

04120

Concrete M300

15.6

15.36150

4,227,495

239.63940

65,948,918

4,527,044

70,621,886

04202

Reinforcement Bar(10D18 mm)

Ton

1.6

68.42168

18,829,699

108.48463

29,855,053

20,163,922

31,970,503

04203

Reinforcement Bar( D>18 mm)

Ton

2.4

67.55941

18,592,397

160.14688

44,072,532

19,909,805

47,195,396

05510

Bearing for Reinforced Concrete

unit

4.0

1,333.49163

5,333.96652

26,003,087

104,012,348

10501

Water Proofing system

m2

31.7

1.26969

40.24917

11,076,710

374,182

11,861,569

Substructure

349,423

02302

Filling with Aggregate

2.0

2.31214

636,308

4.62428

1,272,617

681,395

1,362,790

03103

Removal of Reinforced Concrete

m3

8.0

2.85844

786,639

22.86752

6,293,115

842,379

6,739,032

04120

Concrete M300

m3

0.7

8.18931

2,253,697

5.73252

1,577,588

2,413,389

1,689,372

10

04130

Concrete M250

10.4

7.01827

1,931,428

72.99001

20,086,849

2,068,284

21,510,154

11

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

6.22738

1,713,781

21,733,949

1,835,215

12

04202

Reinforcement Bar(10D18 mm)

Ton

0.5

72.57459

19,972,575

34.45624

9,482,379

21,387,780

10,154,276

13

08101

Rubble Stone with Cement Mortar M100

6.0

3.36653

926,471

20.19918

5,558,824

992,118

5,952,708

14

08220

Cement Mortar M100

m3

0.4

5.34596

1,471,209

2.13838

588,484

1,575,455

630,182

15

10502

2 Layer Bitumen for Water Protection

16.7

0.31563

86,855

5.27102

1,450,482

93,010

1,553,267

Apporach Track

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 109

16

02301.1 Soil excavation

27.3

0.73103

201,173

19.95712

5,492,020

215,428

5,881,184

17

02301.5 Soil excavation for ditch

26.4

0.88576

243,769

23.38406

6,435,493

261,041

6,891,482

18

02400.1 Embankment , K=90

m3

25.6

0.74065

203,824

18.96064

5,217,903

218,267

5,587,635

19

02400.3 Embankment , K=95

m3

49.4

0.74065

203,824

36.58811

10,068,922

218,267

10,782,390

D
20
21
22

Miscellaneous

03106

24

09105.25

49.8

0.93416

257,080

46.52117

12,802,578

275,296

13,709,741

m3

51.6

2.90960

800,732

150.13536

41,317,760

857,469

44,245,400

m3

144.0

0.74065

203,824

106.65360

29,350,703

218,267

31,430,448

Dismantle Existing Steel Structure

Ton

11.4

28.63074

7,879,195

326.39044

89,822,818

8,437,494

96,187,432

Temporary Facility and Work for Construction


of Bom nuoc Bridge

LS

1.0

3,401.45791

936,083,598

3,401.45791

936,083,598

1,002,412,027

1,002,412,027

Filling with Aggregate

02400.3 Embankment, K=95

23

m3

02301.1 Soil Excavation


02302

Item 5.25 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

26

Tran Bridge (Km 203+150)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

16.51029

4,543,648

16.51029

4,543,648

4,865,599

4,865,599

04120

Concrete M300

m3

15.6

15.36150

4,227,495

239.63940

65,948,918

4,527,044

70,621,886

04202

Reinforcement Bar(10D18 mm)

Ton

1.6

68.42168

18,829,699

106.18497

29,222,187

20,163,922

31,292,794

04203

Reinforcement Bar( D>18 mm)

Ton

2.4

67.55941

18,592,397

160.14688

44,072,532

19,909,805

47,195,396

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 110

05510

Bearing for Reinforced Concrete

unit

10501

Water Proofing system

4.0

1,333.49163

31.7

1.26969

Substructure

349,423

5,333.96652

26,003,087

104,012,348

40.24917

11,076,710

374,182

11,861,569

02302

Filling with Aggregate

54.0

2.31214

636,308

124.85556

34,360,647

681,395

36,795,330

03103

Removal of Reinforced Concrete

m3

11.5

2.85844

786,639

32.87206

9,046,354

842,379

9,687,359

04120

Concrete M300

m3

0.8

7.99142

2,199,239

6.39314

1,759,392

2,355,072

1,884,058

10

04130

Concrete M250

m3

13.4

6.82034

1,876,969

91.39256

25,151,389

2,009,966

26,933,544

11

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

9.55421

2,629,326

21,733,949

2,815,633

12

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

72.57459

19,972,575

42.05625

11,573,908

21,387,780

12,394,005

13

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

5.90446

1,624,911

20,999,851

1,740,048

14

08101

Rubble Stone with Cement Mortar M100

m3

160.0

3.36653

926,471

538.64480

148,235,306

992,118

158,738,880

15

08220

Cement Mortar M100

m3

0.2

5.34596

1,471,209

1.06919

294,242

1,575,455

315,091

Apporach Track

16

02301.1 Soil excavation

m3

23.8

0.51755

142,430

12.31769

3,389,829

152,522

3,630,024

17

02400.1 Embankment , K=90

m3

23.2

0.37730

103,827

8.75336

2,408,778

111,184

2,579,469

18

02400.3 Embankment , K=95

4.2

0.37730

103,828

1.58466

436,076

111,185

466,977

D
19
20

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

165.0

0.72068

198,337

118.91220

32,725,562

212,390

35,044,350

m3

72.6

1.79321

493,501

130.18705

35,828,202

528,469

38,366,849

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

21

02400.3 Embankment, K=95

22

03106

23

09105.26

Bridges - 111

33.0

0.37730

103,828

12.45090

3,426,312

111,185

3,669,105

Dismantle Existing Steel Structure

Ton

4.2

28.63074

7,879,195

120.24911

33,092,617

8,437,494

35,437,475

Temporary Facility and Work for Construction


of Tran Bridge

LS

1.0

2,035.50104

560,171,312

2,035.50104

560,171,312

599,863,582

599,863,582

Item 5.26 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

27

Den Bridge (Km 204+064)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

16.51029

4,543,648

16.51029

4,543,648

4,865,599

4,865,599

04120

Concrete M300

m3

15.6

15.36150

4,227,495

239.63940

65,948,918

4,527,044

70,621,886

04202

Reinforcement Bar(10D18 mm)

Ton

1.6

68.42168

18,829,699

108.22531

29,783,688

20,163,922

31,894,082

04203

Reinforcement Bar( D>18 mm)

Ton

2.4

67.55941

18,592,397

160.14688

44,072,532

19,909,805

47,195,396

05510

Bearing for Reinforced Concrete

unit

4.0

1,333.49163

5,333.96652

26,003,087

104,012,348

10501

Water Proofing system

m2

31.7

1.26969

40.24917

11,076,710

374,182

11,861,569

Substructure

349,423

02302

Filling with Aggregate

m3

54.0

2.31214

636,308

124.85556

34,360,647

681,395

36,795,330

03103

Removal of Reinforced Concrete

m3

11.5

2.85844

786,639

32.87206

9,046,354

842,379

9,687,359

04120

Concrete M300

m3

0.8

7.96372

2,191,616

6.37098

1,753,293

2,346,909

1,877,527

10

04130

Concrete M250

m3

13.1

6.79268

1,869,347

88.98411

24,488,442

2,001,804

26,223,632

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 112

11

04201

Reinforcement Bar(D 10mm)

Ton

0.2

73.74922

20,295,839

14.06398

3,870,416

21,733,949

4,144,664

12

04202

Reinforcement Bar(10D18 mm)

Ton

0.5

72.57459

19,972,575

35.88160

9,874,641

21,387,780

10,574,332

13

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

5.90446

1,624,911

20,999,851

1,740,048

14

08101

Rubble Stone with Cement Mortar M100

m3

160.0

3.36653

926,471

538.64480

148,235,306

992,118

158,738,880

15

08220

Cement Mortar M100

0.2

5.34596

1,471,209

1.06919

294,242

1,575,455

315,091

Apporach Track

16

02301.1 Soil excavation

m3

10.9

0.73103

201,173

7.96823

2,192,785

215,428

2,348,165

17

02301.5 Soil excavation for ditch

m3

541.9

0.88576

243,769

479.99334

132,098,248

261,041

141,458,118

18

02400.1 Embankment , K=90

m3

41.1

0.37730

103,827

15.50703

4,267,275

111,184

4,569,662

19

02400.3 Embankment , K=95

m3

77.4

0.37730

103,828

29.20302

8,036,260

111,185

8,605,719

D
20
21
22

Miscellaneous

03106

24

09105.27

165.0

0.93416

257,080

154.13640

42,418,180

275,296

45,423,840

72.6

1.79321

493,501

130.18705

35,828,202

528,469

38,366,849

m3

33.0

0.37730

103,828

12.45090

3,426,312

111,185

3,669,105

Dismantle Existing Steel Structure

Ton

4.2

28.63074

7,879,195

120.24911

33,092,617

8,437,494

35,437,475

Temporary Facility and Work for Construction


of Den Bridge

LS

1.0

1,869.90996

514,600,538

1,869.90996

514,600,538

551,063,782

551,063,782

Filling with Aggregate

02400.3 Embankment, K=95

23

m3

02301.1 Soil Excavation


02302

Item 5.27 Carried forward to Collection

Total VND :

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 113

BRIDGES (Cont'd)

28

Tro Bridge (Km 204+815)

Superstructure (Com. Deck Girder L=21.5m)

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

04110

Concrete M400

m3

50.0

6.62971

1,824,497

331.48550

91,224,833

1,953,776

97,688,800

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

80.02403

22,022,674

230.20033

63,351,306

23,583,143

67,840,212

05100

Steel Structure

Ton

65.7

1,505.53418

25,472,464

98,905.36035

1,673,401,583

54,830,381

3,602,056,110

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

132.9

1.26969

168.74180

46,438,323

374,182

49,728,788

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

430.2

0.93416

257,080

401.87563

110,595,764

275,296

118,432,339

m3

97.1

2.31214

636,308

224.50879

61,785,534

681,395

66,163,455

m3

981.2

0.74065

203,824

726.72578

199,992,427

218,267

214,163,580

11

03103

Removal of Reinforced Concrete

4.0

2.85844

786,639

11.43376

3,146,558

842,379

3,369,516

12

04120

Concrete M300

m3

1.8

8.62511

2,373,641

15.52520

4,272,555

2,541,831

4,575,296

13

04130

Concrete M250

8.1

7.88585

2,170,195

63.87539

17,578,579

2,323,969

18,824,149

14

04140

Concrete M200

m3

97.0

7.56027

2,080,596

733.34619

201,817,786

2,228,021

216,118,037

15

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

72.57459

19,972,575

45.34896

12,480,063

21,387,780

13,364,368

16

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

5.28023

1,453,125

20,999,851

1,556,089

17

05100

Steel Structure

Ton

0.1

845.33710

14,302,446

47.76155

808,088

30,786,519

1,739,438

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 114

18

08101

Rubble Stone with Cement Mortar M100

324.6

3.36653

926,471

1,092.77564

300,732,378

992,118

322,041,503

19

08220

Cement Mortar M100

4.7

5.34596

1,471,209

25.12601

6,914,682

1,575,455

7,404,639

Apporach Track

20

02301.1 Soil excavation

m3

28.1

0.73103

201,173

20.54194

5,652,959

215,428

6,053,527

21

02301.5 Soil excavation for ditch

m3

100.4

0.88576

243,769

88.93030

24,474,375

261,041

26,208,516

22

02400.1 Embankment , K=90

m3

28.1

0.74065

203,824

20.81227

5,727,464

218,267

6,133,303

23

02400.3 Embankment , K=95

m3

306.2

0.74065

203,824

226.78703

62,411,008

218,267

66,833,355

D
24
25
26

Miscellaneous

03106

28

09105.28

59.6

0.93416

257,080

55.67594

15,321,961

275,296

16,407,642

m3

178.8

2.90960

800,732

520.23648

143,170,846

857,469

153,315,457

m3

114.0

0.74065

203,824

84.43410

23,235,973

218,267

24,882,438

Dismantle Existing Steel Structure

Ton

21.0

28.63074

7,879,195

601.24554

165,463,086

8,437,494

177,187,374

Temporary Facility and Work for Construction


of Tro Bridge

LS

1.0

2,766,529,158

10,052.76929

2,766,529,158

2,962,558,159

2,962,558,159

Filling with Aggregate

02400.3 Embankment, K=95

27

m3

02301.1 Soil Excavation


02302

Item 5.28 Carried forward to Collection

Total VND :

Total VND :

###########
-

BRIDGES (Cont'd)

29

Sau Bridge (Km 206+243)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 115

Superstructure (RC Girder L=7m)

03406

Drainage System on Bridge

ls

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

04120

Concrete M300

m3

8.7

15.45468

4,253,145

134.45572

37,002,359

4,554,511

39,624,246

04202

Reinforcement Bar(10D18 mm)

Ton

0.8

68.42168

18,829,699

54.96450

15,126,274

20,163,922

16,198,082

04203

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

10501

Water Proofing system

m2

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

B
6
7
8

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

m3

44.2

0.93416

257,080

41.28987

11,362,931

275,296

12,168,083

m3

22.0

2.31214

636,308

50.86708

13,998,782

681,395

14,990,690

m3

22.0

0.74065

203,824

16.29430

4,484,135

218,267

4,801,874

03103

Removal of Reinforced Concrete

m3

5.2

2.85844

786,639

14.86389

4,090,525

842,379

4,380,371

10

04120

Concrete M300

m3

0.8

6.89793

1,898,314

5.51834

1,518,651

2,032,824

1,626,259

11

04130

Concrete M250

m3

3.4

5.72690

1,576,044

19.47146

5,358,552

1,687,719

5,738,245

12

04140

Concrete M200

0.1

5.40132

1,486,445

0.54013

148,644

1,591,771

159,177

13

04201

Reinforcement Bar(D 10mm)

Ton

0.2

73.74922

20,295,839

12.61333

3,471,197

21,733,949

3,717,157

14

04202

Reinforcement Bar(10D18 mm)

Ton

0.2

72.57459

19,972,575

13.62370

3,749,252

21,387,780

4,014,914

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

4.57620

1,259,374

20,999,851

1,348,610

16

08101

Rubble Stone with Cement Mortar M100

m3

59.6

3.36653

926,471

200.64519

55,217,652

992,118

59,130,233

17

08220

Cement Mortar M100

m3

0.6

5.34596

1,471,209

3.20758

882,725

1,575,455

945,273

Apporach Track

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 116

18

02301.1 Soil excavation

16.5

0.73103

201,173

12.06200

3,319,353

215,428

3,554,562

19

02301.5 Soil excavation for ditch

32.1

0.88576

243,769

28.43290

7,824,974

261,041

8,379,416

20

02400.1 Embankment , K=90

m3

4.0

0.74065

203,824

2.96260

815,297

218,267

873,068

21

02400.3 Embankment , K=95

m3

45.6

0.74065

203,824

33.77364

9,294,389

218,267

9,952,975

D
22
23
24

Miscellaneous

03106

26

09105.29

16.0

0.93416

257,080

14.94656

4,113,278

275,296

4,404,736

m3

48.0

2.90960

800,732

139.66080

38,435,126

857,469

41,158,512

m3

90.0

0.74065

203,824

66.65850

18,344,189

218,267

19,644,030

Dismantle Existing Steel Structure

Ton

8.5

28.63074

7,879,195

243.36129

66,973,154

8,437,494

71,718,699

Temporary Facility and Work for Construction


of Sau Bridge

LS

1.0

1,776.58687

488,917,952

1,776.58687

488,917,952

523,561,396

523,561,396

Filling with Aggregate

02400.3 Embankment, K=95

25

m3

02301.1 Soil Excavation


02302

Item 5.29 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

30

Nuoc Chay Bridge (Km 206+630)

Superstructure (RC Girder L=7m)

03406

Drainage System on Bridge

ls

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

04120

Concrete M300

m3

8.7

15.45468

4,253,145

134.45572

37,002,359

4,554,511

39,624,246

04202

Reinforcement Bar(10D18 mm)

Ton

0.8

68.42168

18,829,699

54.79140

15,078,635

20,163,922

16,147,067

04203

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

10501

B
6
7
8

Water Proofing system

Bridges - 117

24.0

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

62.0

0.93416

257,080

57.91792

15,938,953

275,296

17,068,352

m3

20.8

2.31214

636,308

48.09251

13,235,212

681,395

14,173,016

m3

40.5

0.37730

103,828

15.28065

4,205,020

111,185

4,502,993

03103

Removal of Reinforced Concrete

m3

10.5

1.00174

275,685

10.51827

2,894,694

295,219

3,099,800

10

04120

Concrete M300

m3

9.6

8.36739

2,302,710

80.32694

22,106,015

2,465,874

23,672,390

11

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

78.11457

21,497,179

48.82239

13,435,951

23,020,413

14,387,988

12

08101

Rubble Stone with Cement Mortar M100

m3

42.4

3.36653

926,471

142.74087

39,282,356

992,118

42,065,803

Apporach Track

13

02301.1 Soil excavation

65.9

0.73103

201,173

48.17488

13,257,295

215,428

14,196,705

14

02301.5 Soil excavation for ditch

m3

22.5

0.88576

243,769

19.92960

5,484,796

261,041

5,873,423

15

02400.1 Embankment , K=90

m3

4.8

0.37730

103,827

1.81104

498,368

111,184

533,683

16

02400.3 Embankment , K=95

2.5

0.37730

103,828

0.94325

259,570

111,185

277,963

D
17
18

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

180.0

0.93416

257,080

168.14880

46,274,378

275,296

49,553,280

m3

6.3

2.31214

636,308

14.56648

4,008,743

681,395

4,292,789

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

19

03106

20

09105.30

Bridges - 118

Dismantle Existing Steel Structure

Ton

7.1

28.63074

7,879,195

203.27825

55,942,281

8,437,494

59,906,207

Temporary Facility and Work for Construction


of Nuoc Chay Bridge

LS

1.0

2,307.35185

634,984,845

2,307.35185

634,984,845

679,978,206

679,978,206

Item 5.30 Carried forward to Collection

Total VND :

Total VND :

BRIDGES (Cont'd)

31

Bay Bridge (Km 206+960)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

m3

31.4

26.02516

7,162,138

817.19002

224,891,146

7,669,629

240,826,351

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43658

41,400,274

20,809,881

44,333,787

05100

Steel Structure

Ton

32.5

1,470.91463

24,886,729

47,775.05713

808,316,718

53,569,564

1,739,930,332

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

B
8
9
10
11

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95


03103

Removal of Reinforced Concrete

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

258.7

0.93416

257,080

241.66719

66,506,565

275,296

71,219,075

m3

90.8

2.31214

636,308

209.94231

57,776,791

681,395

61,870,666

m3

300.9

0.74065

203,824

222.86159

61,330,739

218,267

65,676,540

m3

20.5

2.85844

786,639

58.59802

16,126,109

842,379

17,268,770

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 119

12

04120

Concrete M300

1.8

6.87056

1,890,775

12.36701

3,403,395

2,024,751

3,644,552

13

04130

Concrete M250

21.1

6.13129

1,687,329

129.37022

35,602,639

1,806,889

38,125,358

14

04140

Concrete M200

m3

51.4

5.80571

1,597,729

298.41349

82,123,253

1,710,940

87,942,316

15

04202

Reinforcement Bar(10D18 mm)

Ton

1.2

72.57459

19,972,575

87.64180

24,119,082

21,387,780

25,828,097

16

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

10.20845

2,809,374

20,999,851

3,008,439

17

05100

Steel Structure

Ton

2.8

1,274.26807

21,559,624

3,566.92481

60,349,590

46,407,851

129,904,624

18

08101

Rubble Stone with Cement Mortar M100

m3

296.3

3.36653

926,471

997.50284

274,513,258

992,118

293,964,563

19

08220

Cement Mortar M100

m3

2.0

5.34596

1,471,209

10.69192

2,942,418

1,575,455

3,150,910

20

10502

2 Layer Bitumen for Water Protection

m2

24.0

0.31563

86,855

7.57512

2,084,525

93,010

2,232,240

Apporach Track

21

02301.1 Soil excavation

m3

18.5

0.73103

201,173

13.52406

3,721,699

215,428

3,985,418

22

02301.5 Soil excavation for ditch

m3

89.5

0.88576

243,769

79.27552

21,817,297

261,041

23,363,170

23

02400.1 Embankment , K=90

m3

69.0

0.37730

103,827

26.03370

7,164,039

111,184

7,671,696

24

02400.3 Embankment , K=95

408.4

0.37730

103,828

154.08932

42,403,212

111,185

45,407,954

D
25
26
27

Miscellaneous

03106

29

09105.31

165.6

0.93416

257,080

154.69690

42,572,428

275,296

45,589,018

m3

151.8

2.96397

815,680

449.93065

123,820,161

873,477

132,593,809

m3

150.6

0.74065

203,824

111.54189

30,695,943

218,267

32,871,010

Dismantle Existing Steel Structure

Ton

13.7

28.63074

7,879,195

392.24114

107,944,966

8,437,494

115,593,668

Temporary Facility and Work for Construction


of Bay Bridge

LS

1.0

7,070.43041

1,945,787,403

7,070.43041

1,945,787,403

2,083,660,796

2,083,660,796

Filling with Aggregate

02400.3 Embankment, K=95

28

02301.1 Soil Excavation


02302

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 120

Item 5.31 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

32

Trac Bridge (Km 207+572)

Superstructure (RC Girder L=9.5m)

03406

Drainage System on Bridge

ls

1.0

16.51029

4,543,648

16.51029

4,543,648

4,865,599

4,865,599

04120

Concrete M300

15.6

15.36150

4,227,495

239.63940

65,948,918

4,527,044

70,621,886

04202

Reinforcement Bar(10D18 mm)

Ton

1.6

68.42168

18,829,699

108.48531

29,855,241

20,163,922

31,970,705

04203

Reinforcement Bar( D>18 mm)

Ton

2.3

67.55941

18,592,397

158.67273

43,666,846

19,909,805

46,760,964

05510

Bearing for Reinforced Concrete

unit

4.0

1,333.49163

5,333.96652

26,003,087

104,012,348

10501

Water Proofing system

31.7

1.26969

40.24917

11,076,710

374,182

11,861,569

Substructure

349,423

02302

Filling with Aggregate

m3

2.0

2.31214

636,308

4.62428

1,272,617

681,395

1,362,790

03103

Removal of Reinforced Concrete

8.0

2.85844

786,639

22.86752

6,293,115

842,379

6,739,032

04120

Concrete M300

0.7

8.08351

2,224,585

5.65846

1,557,209

2,382,213

1,667,549

10

04130

Concrete M250

m3

10.4

7.57083

2,083,494

78.73663

21,668,336

2,231,125

23,203,700

11

04140

Concrete M200

0.1

6.91248

1,902,315

0.69125

190,232

2,037,108

203,711

12

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

6.27311

1,726,364

21,733,949

1,848,690

13

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

75.66665

20,823,517

42.81900

11,783,820

22,299,017

12,618,791

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 121

14

08101

Rubble Stone with Cement Mortar M100

6.0

3.36653

926,471

20.19918

5,558,824

992,118

5,952,708

15

08220

Cement Mortar M100

0.4

5.34596

1,471,209

2.13838

588,484

1,575,455

630,182

16

10502

2 Layer Bitumen for Water Protection

m2

16.7

0.31563

86,855

5.27102

1,450,482

93,010

1,553,267

Apporach Track

17

02301.1 Soil excavation

m3

20.8

0.73103

201,173

15.20542

4,184,396

215,428

4,480,902

18

02301.5 Soil excavation for ditch

m3

10.4

0.88576

243,769

9.21190

2,535,194

261,041

2,714,826

19

02400.1 Embankment , K=90

m3

9.0

0.89318

245,807

8.03862

2,212,263

263,224

2,369,016

20

02400.3 Embankment , K=95

m3

8.3

0.74065

203,824

6.14740

1,691,742

218,267

1,811,616

D
21
22
23

Miscellaneous

03106

25

09105.32

55.0

0.93416

257,080

51.37880

14,139,393

275,296

15,141,280

m3

47.1

2.90916

800,607

137.02144

37,708,608

857,336

40,380,526

m3

18.3

0.74065

203,824

13.55390

3,729,985

218,267

3,994,286

Dismantle Existing Steel Structure

Ton

6.0

28.63074

7,879,195

171.49813

47,196,375

8,437,494

50,540,589

Temporary Facility and Work for Construction


of Trac Bridge

LS

1.0

4,193.80999

1,154,139,444

4,193.80999

1,154,139,444

1,235,918,739

1,235,918,739

Filling with Aggregate

02400.3 Embankment, K=95

24

m3

02301.1 Soil Excavation


02302

Item 5.32 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

33

Mang Bridge (Km 208+210)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 122

Superstructure (Com. Deck Girder


L=21.95m)

5.33.1

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

5.33.2

04110

Concrete M400

m3

51.1

25.63780

7,055,546

1,310.09158

360,538,395

7,555,483

386,085,181

5.33.3

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

5.33.4

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

78.57122

21,622,861

230.20032

63,351,308

23,155,000

67,840,214

5.33.5

05100

Steel Structure

Ton

56.6

1,505.53418

25,472,464

85,249.26202

1,442,351,047

54,830,381

3,104,711,656

5.33.6

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

5.33.7

10501

Water Proofing system

135.7

1.26969

172.29693

47,416,707

374,182

50,776,497

B
5.33.8
5.33.9
5.33.10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

82.3

0.93416

257,080

76.88137

21,157,674

275,296

22,656,861

m3

0.3

2.31214

636,308

0.69364

190,893

681,395

204,419

m3

119.7

0.74065

203,824

88.65581

24,397,772

218,267

26,126,560

5.33.11

03103

Removal of Reinforced Concrete

m3

0.8

2.85844

786,639

2.28675

629,311

842,379

673,903

5.33.12

04120

Concrete M300

m3

3.5

8.62511

2,373,641

30.18789

8,307,745

2,541,831

8,896,409

5.33.13

04140

Concrete M200

2.1

7.56027

2,080,596

15.87657

4,369,251

2,228,021

4,678,844

5.33.14

04202

Reinforcement Bar(10D18 mm)

Ton

0.4

72.57459

19,972,575

31.32827

8,621,562

21,387,780

9,232,463

5.33.15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

5.54460

1,525,878

20,999,851

1,633,998

5.33.16

05100

Steel Structure

Ton

2.9

1,301.50557

22,020,460

3,734.38390

63,182,867

47,399,819

136,003,353

5.33.17

08101

Rubble Stone with Cement Mortar M100

m3

468.9

3.36653

926,471

1,578.56592

434,422,095

992,118

465,204,130

Apporach Track

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 123

5.33.18

02301.1 Soil excavation

15.9

0.73103

201,173

11.62338

3,198,649

215,428

3,425,305

5.33.19

02301.5 Soil excavation for ditch

399.6

0.88576

243,769

353.94970

97,409,965

261,041

104,311,984

5.33.20

02400.1 Embankment , K=90

m3

26.0

0.74065

203,824

19.25690

5,299,432

218,267

5,674,942

5.33.21

02400.3 Embankment , K=95

m3

1,442.7

0.74065

203,824

1,068.53576

294,057,354

218,267

314,893,801

D
5.33.22
5.33.23
5.33.24
5.33.25

Miscellaneous

5.33.26 09105.33

108.3

0.93416

257,080

101.16953

27,841,751

275,296

29,814,557

m3

78.0

2.97398

818,439

231.97044

63,838,272

876,432

68,361,696

m3

108.3

0.74065

203,824

80.21240

22,074,174

218,267

23,638,316

Dismantle Existing Steel Structure

Ton

29.7

28.63074

7,879,195

851.47821

234,327,247

8,437,494

250,931,072

Temporary Facility and Work for Construction


of Mang Bridge

LS

1.0

5,666.91474

1,559,538,902

5,666.91474

1,559,538,902

1,670,043,739

1,670,043,739

Filling with Aggregate

02400.3 Embankment, K=95


03106

m3

02301.1 Soil Excavation


02302

Item 5.33 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

34

2 M Bridge (Km 208+977)

Superstructure (RC Girder L=3m)

5.34.1

03406

Drainage System on Bridge

ls

1.0

12.96104

3,566,882

12.96104

3,566,882

3,819,622

3,819,622

5.34.2

04120

Concrete M300

m3

3.8

15.07966

4,149,936

57.30271

15,769,755

4,443,989

16,887,158

5.34.3

04202

Reinforcement Bar(10D18 mm)

Ton

0.3

68.42168

18,829,699

18.96238

5,218,463

20,163,922

5,588,229

5.34.4

04203

Reinforcement Bar( D>18 mm)

Ton

0.3

67.55941

18,592,397

19.78883

5,445,899

19,909,805

5,831,781

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

5.34.5

10501

B
5.34.6
5.34.7
5.34.8

Water Proofing system

Bridges - 124

11.6

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

1.26969

349,423

14.72840

4,053,307

374,182

4,340,511

44.9

0.93416

257,080

41.94378

11,542,886

275,296

12,360,790

m3

3.9

2.31214

636,308

9.01735

2,481,603

681,395

2,657,441

m3

9.1

0.74065

203,824

6.73992

1,854,802

218,267

1,986,230

5.34.9

03101

Removal of Existing Masonry

m3

12.2

0.78831

216,942

9.61738

2,646,692

232,314

2,834,231

5.34.10

04120

Concrete M300

m3

11.1

8.03473

2,211,167

89.18550

24,543,951

2,367,844

26,283,068

5.34.11

04202

Reinforcement Bar(10D18 mm)

Ton

0.6

72.57459

19,972,575

45.51007

12,524,403

21,387,780

13,411,849

5.34.12

08101

Rubble Stone with Cement Mortar M100

m3

11.6

3.36653

926,471

39.05175

10,747,060

992,118

11,508,569

Apporach Track

5.34.13

02301.1 Soil excavation

7.3

0.73103

201,173

5.33652

1,468,562

215,428

1,572,624

5.34.14

02301.5 Soil excavation for ditch

m3

26.6

0.88576

243,769

23.56122

6,484,247

261,041

6,943,691

5.34.15

02400.1 Embankment , K=90

m3

9.7

0.74065

203,824

7.18431

1,977,096

218,267

2,117,190

5.34.16

02400.3 Embankment , K=95

44.1

0.74065

203,824

32.66267

8,988,653

218,267

9,625,575

D
5.34.17
5.34.18

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

68.4

0.93416

257,080

63.89654

17,584,263

275,296

18,830,246

m3

82.8

2.90960

800,732

240.91488

66,300,593

857,469

70,998,433

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

5.34.19
5.34.20

02400.3 Embankment, K=95


03106

5.34.21 09105.34

Bridges - 125

27.0

0.74065

203,824

19.99755

5,503,257

218,267

5,893,209

Dismantle Existing Steel Structure

Ton

3.1

28.63074

7,879,195

88.75529

24,425,503

8,437,494

26,156,231

Temporary Facility and Work for Construction


of 2 M Bridge (Km 208+977)

LS

1.0

1,717.50712

472,659,155

1,717.50712

472,659,155

506,150,544

506,150,544

Item 5.34 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

35

Khe Se Bridge (Km 209+705)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

40.7

38.55498

10,610,356

1,569.18769

431,841,485

11,362,178

462,440,645

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50838

52,428,065

20,809,881

56,142,978

05100

Steel Structure

Ton

41.5

1,537.20062

26,008,237

63,852.19477

1,080,329,391

55,983,649

2,325,447,189

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

108.2

1.26969

137.38046

37,807,573

374,182

40,486,492

Substructure

349,423

02302

Filling with Aggregate

m3

5.0

2.31214

636,308

11.56070

3,181,541

681,395

3,406,975

03103

Removal of Reinforced Concrete

m3

32.0

2.85844

786,639

91.47008

25,172,461

842,379

26,956,128

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 126

10

04120

Concrete M300

1.2

8.62511

2,373,641

10.35013

2,848,369

2,541,831

3,050,197

11

04130

Concrete M250

50.1

7.88585

2,170,195

395.08109

108,726,766

2,323,969

116,430,847

12

04201

Reinforcement Bar(D 10mm)

Ton

0.2

73.74922

20,295,839

16.96158

4,667,840

21,733,949

4,998,591

13

04202

Reinforcement Bar(10D18 mm)

Ton

2.2

72.57459

19,972,575

159.58935

43,919,095

21,387,780

47,031,087

14

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

9.13816

2,514,827

20,999,851

2,693,021

15

08101

Rubble Stone with Cement Mortar M100

m3

15.0

3.36653

926,471

50.49795

13,897,060

992,118

14,881,770

16

08220

Cement Mortar M100

m3

0.1

5.34596

1,471,209

0.53460

147,121

1,575,455

157,546

Apporach Track

17

02301.1 Soil excavation

m3

638.5

0.73103

201,173

466.76266

128,448,906

215,428

137,550,778

18

02301.5 Soil excavation for ditch

m3

29.0

0.88576

243,769

25.68704

7,069,292

261,041

7,570,189

19

02400.1 Embankment , K=90

m3

13.1

0.74065

203,824

9.70252

2,670,099

218,267

2,859,298

20

02400.3 Embankment , K=95

m3

57.0

0.74065

203,824

42.21705

11,617,987

218,267

12,441,219

D
21
22
23

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

24

03106

25

09105.35

m3

115.0

0.93416

257,080

107.42840

29,564,186

275,296

31,659,040

m3

72.6

2.96397

815,680

215.18422

59,218,338

873,477

63,414,430

28.8

0.64442

177,351

18.55930

5,107,704

189,917

5,469,610

Dismantle Existing Steel Structure

Ton

9.2

28.63074

7,879,195

263.40281

72,488,590

8,437,494

77,624,945

Temporary Facility and Work for Construction


of Khe Se Bridge

LS

1.0

4,126.06967

1,135,497,271

4,126.06967

1,135,497,271

1,215,955,630

1,215,955,630

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 127

Item 5.35 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

36

Cai Bridge (Km 212+540)

Superstructure (Truss Girder L=28.3m)

05100

Steel Structure

Ton

45.1

2,447.64796

41,412,297

110,277.92216

1,865,816,537

89,141,432

4,016,236,019

05530

Bearing for Truss Girder

unit

4.0

1,815.97957

-1

7,263.91828

-2

35,411,601

141,646,404

06085.1

Supply of fastening system for wooden


timbers

set

166.0

3.28054

902,808

544.56964

149,866,206

966,779

160,485,314

06085.2

Supply of the guard rail fastening system for


wooden timbers

set

166.0

1.28684

354,142

213.61544

58,787,509

379,235

62,953,010

06090.1 Supply of the wooden timbers

timber

83.0

6.46334

1,778,720

536.45722

147,633,749

1,904,755

158,094,665

Substructure

03103

Removal of Reinforced Concrete

35.0

2.85844

786,639

100.04540

27,532,380

842,379

29,483,265

04120

Concrete M300

m3

1.6

8.63755

2,377,058

13.82008

3,803,292

2,545,490

4,072,784

04130

Concrete M250

36.7

7.89829

2,173,611

289.86724

79,771,537

2,327,628

85,423,948

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

9.06378

2,494,358

21,733,949

2,671,102

10

04202

Reinforcement Bar(10D18 mm)

Ton

1.5

72.57459

19,972,575

108.46272

29,849,014

21,387,780

31,964,037

11

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

9.50442

2,615,624

20,999,851

2,800,960

Apporach Track

12

02301.1 Soil excavation

m3

618.9

0.73103

201,173

452.43447

124,505,917

215,428

133,328,389

13

02301.3 Soil excavation for Benching

m3

20.6

0.45466

125,125

9.36600

2,577,578

133,991

2,760,215

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 128

14

02301.5 Soil excavation for ditch

14.4

0.88576

243,769

12.75494

3,510,269

261,041

3,758,990

15

02400.1 Embankment , K=90

2.6

0.74065

203,824

1.92569

529,943

218,267

567,494

16

02400.3 Embankment , K=95

m3

38.3

0.74065

203,824

28.36690

7,806,471

218,267

8,359,626

D
17
18
19

Miscellaneous

03106

21

09105.36

257,080

326.95600

89,977,958

275,296

96,353,600

m3

195.0

2.95556

813,379

576.33420

158,608,823

871,012

169,847,340

m3

87.5

0.74065

203,824

64.80688

17,834,629

218,267

19,098,363

Dismantle Existing Steel Structure

Ton

56.0

28.63074

7,879,195

1,603.32144

441,234,896

8,437,494

472,499,664

Temporary Facility and Work for Construction


of Cai Bridge

LS

1.0

6,463.99989

1,778,897,301

6,463.99989

1,778,897,301

1,904,945,299

1,904,945,299

Filling with Aggregate

Retaining Wall

20

02301.1 Soil excavation

22

02302

0.93416

21

350.0

02400.3 Embankment, K=95

20

m3

02301.1 Soil Excavation


02302

Filling with aggregate

02400.3 Embankment , K=95

m3

105.0

0.93416

257,080

98.08680

26,993,387

275,296

28,906,080

m3

10.2

2.31214

636,308

23.58383

6,490,344

681,395

6,950,229

m3

65.0

0.74065

203,824

48.14225

13,248,581

218,267

14,187,355

158.5

8.63695

2,376,887

1,368.95658

376,736,665

2,545,308

403,431,318

5.6

85.61095

23,560,195

482.95192

132,908,717

25,229,609

142,326,279

768.0

1.74134

479,220

1,337.34912

368,040,860

513,176

394,119,168

23

04130

Concrete M250

24

04202

Reinforcement bar(10D18 mm)

Ton

25

08103

Place rubble (without Mortar)

Item 5.36 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 129

BRIDGES (Cont'd)

37

Phuc Minh Bridge (Km 214+742)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

40.7

37.73109

10,383,625

1,535.65536

422,613,527

11,119,381

452,558,807

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50838

52,428,065

20,809,881

56,142,978

05100

Steel Structure

Ton

41.5

1,497.57774

25,337,849

62,206.87836

1,052,491,936

54,540,615

2,265,526,064

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

108.2

1.26969

137.38046

37,807,573

374,182

40,486,492

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

223.1

0.93416

257,080

208.41110

57,354,522

275,296

61,418,538

m3

73.2

2.31214

636,308

169.24865

46,577,765

681,395

49,878,114

m3

252.8

0.74065

203,824

187.23632

51,526,790

218,267

55,177,898

11

03103

Removal of Reinforced Concrete

85.1

2.85844

786,639

243.25324

66,943,015

842,379

71,686,453

12

04120

Concrete M300

m3

1.1

9.05688

2,492,465

9.96257

2,741,711

2,669,074

2,935,981

13

04130

Concrete M250

77.4

7.88585

2,170,195

610.36479

167,973,088

2,323,969

179,875,201

14

04202

Reinforcement Bar(10D18 mm)

Ton

2.8

72.57459

19,972,575

204.14652

56,181,257

21,387,780

60,162,114

15

05100

Steel Structure

Ton

3.4

1,301.50557

22,020,460

4,438.13399

75,089,770

47,399,819

161,633,383

16

08101

Rubble Stone with Cement Mortar M100

238.1

3.36653

926,471

801.57079

220,592,666

992,118

236,223,296

17

08220

Cement Mortar M100

m3

2.0

5.34596

1,471,209

10.69192

2,942,418

1,575,455

3,150,910

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 130

Apporach Track

18

02301.1 Soil excavation

m3

70.6

0.73103

201,173

51.61072

14,202,808

215,428

15,209,217

19

02301.5 Soil excavation for ditch

m3

79.7

0.88576

243,769

70.59507

19,428,364

261,041

20,804,968

20

02400.1 Embankment , K=90

17.7

0.74065

203,824

13.10951

3,607,691

218,267

3,863,326

21

02400.3 Embankment , K=95

m3

318.9

0.74065

203,824

236.19329

64,999,577

218,267

69,605,346

D
22
23
24

Miscellaneous

03106

26

09105.37

107.1

0.93416

257,080

100.04854

27,533,255

275,296

29,484,202

m3

98.2

2.96391

815,670

291.05596

80,098,770

873,466

85,774,361

m3

97.4

0.74065

203,824

72.13931

19,852,489

218,267

21,259,206

Dismantle Existing Steel Structure

Ton

17.7

28.63074

7,879,195

506.76410

139,461,744

8,437,494

149,343,644

Temporary Facility and Work for Construction


of Phuc Minh Bridge

LS

1.0

7,770.71656

2,138,506,638

7,770.71656

2,138,506,638

2,290,035,611

2,290,035,611

7,419,628

273,978

7,945,362

Filling with Aggregate

02400.3 Embankment, K=95

25

m3

02301.1 Soil Excavation


02302

Item 5.37 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

38

4M Bridge (Km 217+050)

Superstructure ( Box culvert


2xBxH=2x3.0x1.5m L=5m)

5.38.1

10501

Water Proofing system

m2

29.0

0.92968
-

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

255,849

26.96072
-

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

B
5.38.2
5.38.3
5.38.4

Bridges - 131

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

2,150.0

0.93416

257,080

2,008.44400

552,721,742

275,296

591,886,400

m3

17.5

2.31214

636,308

40.46245

11,135,395

681,395

11,924,413

m3

850.0

0.37730

103,828

320.70500

88,253,502

111,185

94,507,250

5.38.5

04120

Concrete M300

72.5

8.26010

2,273,183

598.85725

164,805,772

2,434,255

176,483,488

5.38.6

04130

Concrete M250

m3

8.9

7.41669

2,041,080

66.00854

18,165,608

2,185,705

19,452,775

5.38.7

04150

Concrete M150

m3

6.1

3.69931

1,018,053

22.56579

6,210,126

1,090,190

6,650,159

5.38.8

04201

Reinforcement Bar(D 10mm)

Ton

0.2

74.76180

20,574,498

15.04806

4,141,235

22,032,353

4,434,672

5.38.9

04202

Reinforcement Bar(10D18 mm)

Ton

2.8

84.03376

23,126,156

231.29872

63,653,587

24,764,814

68,163,912

5.38.10

04203

Reinforcement Bar( D>18 mm)

Ton

5.1

73.98355

20,360,318

375.86603

103,438,558

21,802,997

110,767,946

5.38.11

04302

RC Pile 40x40

48.0

5.89293

1,621,733

282.86064

77,843,178

1,736,645

83,358,960

5.38.12

08101

Rubble Stone with Cement Mortar M100

m3

52.5

3.36653

926,471

176.74283

48,639,710

992,118

52,086,195

C
5.38.13
5.38.14
5.38.15
5.38.16

Miscellaneous

5.38.17 09105.38

55.0

0.72068

198,337

39.63740

10,908,521

212,390

11,681,450

m3

18.0

1.80478

496,675

32.48604

8,940,146

531,868

9,573,624

m3

35.0

0.37730

103,828

13.20550

3,633,968

111,185

3,891,475

Dismantle Existing Steel Structure

Ton

3.0

28.63074

7,879,195

85.89222

23,637,584

8,437,494

25,312,482

Temporary Facility and Work for Construction


of 4M Bridge (Km 217+050)

LS

1.0

1,434.42035

394,753,479

1,434.42035

394,753,479

422,724,676

422,724,676

Filling with Aggregate

02400.3 Embankment, K=95


03106

02301.1 Soil Excavation


02302

Item 5.38 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 132

BRIDGES (Cont'd)

39

Khe But Bridge (Km 218+486)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

m3

31.4

58.51178

16,102,486

1,837.26989

505,618,069

17,243,466

541,444,832

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43588

41,400,079

20,809,881

44,333,579

05100

Steel Structure

Ton

27.8

1,648.10624

27,884,673

45,871.67505

776,112,998

60,022,745

1,670,610,661

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

990.0

0.93416

257,080

924.81840

254,509,081

275,296

272,543,040

m3

53.8

2.31214

636,308

124.39313

34,233,385

681,395

36,659,051

m3

772.2

0.74065

203,824

571.92993

157,393,143

218,267

168,545,777

11

03103

Removal of Reinforced Concrete

219.8

2.85844

786,639

628.28511

172,903,344

842,379

185,154,904

12

04120

Concrete M300

1.4

8.69131

2,391,858

12.16783

3,348,602

2,561,339

3,585,875

13

04130

Concrete M250

188.4

7.95205

2,188,411

1,498.16622

412,296,637

2,343,476

441,510,878

14

04150

Concrete M150

m3

5.8

3.64665

1,003,564

21.15057

5,820,673

1,074,674

6,233,109

15

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

4.74945

1,307,052

21,733,949

1,399,666

16

04202

Reinforcement Bar(10D18 mm)

Ton

4.9

72.57459

19,972,575

353.90418

97,394,666

21,387,780

104,295,798

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 133

17

04203

Reinforcement Bar( D>18 mm)

Ton

18

08101

Rubble Stone with Cement Mortar M100

19

08220

20

10502

7.5

71.25823

19,610,316

534.21297

147,015,790

20,999,851

157,432,943

190.2

3.36653

926,471

640.31401

176,214,721

992,118

188,700,844

Cement Mortar M100

m3

0.8

5.34596

1,471,209

4.27677

1,176,967

1,575,455

1,260,364

2 Layer Bitumen for Water Protection

m2

239.4

0.31563

86,855

75.56182

20,793,139

93,010

22,266,594

Apporach Track

21

02301.1 Soil excavation

m3

136.2

0.73103

201,173

99.56629

27,399,751

215,428

29,341,294

22

02301.5 Soil excavation for ditch

m3

53.9

0.88576

243,769

47.74246

13,139,132

261,041

14,070,110

23

02400.1 Embankment , K=90

m3

11.2

0.74065

203,824

8.29528

2,282,832

218,267

2,444,590

24

02400.3 Embankment , K=95

m3

262.3

0.74065

203,824

194.27250

53,463,120

218,267

57,251,434

D
25
26
27

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

28

03106

29

09105.39

m3

183.6

0.93416

257,080

171.51178

47,199,866

275,296

50,544,346

m3

139.2

2.94876

811,504

410.46739

112,961,382

869,005

120,965,496

137.7

0.74065

203,824

101.98751

28,066,610

218,267

30,055,366

Dismantle Existing Steel Structure

Ton

33.8

28.63074

7,879,195

966.28748

265,922,817

8,437,494

284,765,423

Temporary Facility and Work for Construction


of Khe But Bridge

LS

1.0

6,126.14380

1,685,919,060

6,126.14380

1,685,919,060

1,805,378,864

1,805,378,864

Item 5.39 Carried forward to Collection


5

BRIDGES (Cont'd)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 134

40

Lang Khay Bridge (Km 220+139)

Superstructure (Com. Deck Girder L=21.8m)

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

04110

Concrete M400

m3

50.0

32.11601

8,838,354

1,605.80050

441,917,690

9,464,616

473,230,800

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

79.93068

21,996,982

230.20036

63,351,307

23,555,630

67,840,214

05100

Steel Structure

Ton

55.0

1,505.53418

25,472,464

82,788.52663

1,400,717,322

54,830,381

3,015,093,591

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

132.9

1.26969

168.74180

46,438,323

374,182

49,728,788

B
8
9

Substructure
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

38.5

2.31214

636,308

89.01739

24,497,869

681,395

26,233,708

m3

29.2

0.74065

203,824

21.62698

5,951,670

218,267

6,373,396

10

03103

Removal of Reinforced Concrete

m3

36.0

2.85844

786,639

102.90384

28,319,019

842,379

30,325,644

11

04120

Concrete M300

m3

1.2

8.62511

2,373,641

10.35013

2,848,369

2,541,831

3,050,197

12

04130

Concrete M250

39.9

7.88585

2,170,195

314.64542

86,590,777

2,323,969

92,726,363

13

04202

Reinforcement Bar(10D18 mm)

Ton

1.8

72.57459

19,972,575

131.80562

36,272,993

21,387,780

38,843,203

14

04203

Reinforcement Bar( D>18 mm)

Ton

1.1

82.39381

22,674,832

89.92790

24,748,218

24,281,511

26,501,812

15

08101

Rubble Stone with Cement Mortar M100

m3

160.9

3.36653

926,471

541.67468

149,069,130

992,118

159,631,786

16

08220

Cement Mortar M100

m3

0.9

5.34596

1,471,209

4.81136

1,324,088

1,575,455

1,417,910

17

10502

2 Layer Bitumen for Water Protection

43.4

0.31563

86,855

13.69834

3,769,516

93,010

4,036,634

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 135

Apporach Track

18

02301.1 Soil excavation

4.5

0.78102

214,944

3.51459

967,248

230,174

1,035,783

19

02301.5 Soil excavation for ditch

m3

50.2

0.94644

260,455

47.51129

13,074,862

278,911

14,001,332

20

02400.1 Embankment , K=90

m3

77.9

0.79136

217,777

61.64694

16,964,866

233,209

18,166,981

21

02400.3 Embankment , K=95

220.4

0.79136

217,777

174.41574

47,998,157

233,209

51,399,264

D
22
23
24

Miscellaneous

03106

26

09105.40

75.0

0.93416

257,080

70.06200

19,280,991

275,296

20,647,200

m3

81.0

2.90960

800,732

235.67760

64,859,276

857,469

69,454,989

m3

25.0

0.74065

203,824

18.51625

5,095,608

218,267

5,456,675

Dismantle Existing Steel Structure

Ton

17.2

28.63074

7,879,195

491.87611

135,364,563

8,437,494

144,956,147

Temporary Facility and Work for Construction


of Lang Khay Bridge

LS

1.0

5,958.04912

1,639,659,283

5,958.04912

1,639,659,283

1,755,841,241

1,755,841,241

Filling with Aggregate

02400.3 Embankment, K=95

25

m3

02301.1 Soil Excavation


02302

Item 5.40 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

41

Bau Bridge (Km 221+953)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

m3

31.4

39.21603

10,792,284

1,231.38334

338,877,731

11,556,997

362,889,706

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.57273

3,184,824

20,941,249

3,410,492

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 136

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.13577

41,317,489

20,809,881

44,245,137

05100

Steel Structure

Ton

30.2

1,471.55827

24,897,619

44,446.40151

751,998,465

53,593,005

1,618,703,294

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

B
8
9
10

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

35.0

0.93416

257,080

32.69560

8,997,796

275,296

9,635,360

m3

23.1

2.31214

636,308

53.41043

14,698,722

681,395

15,740,225

m3

49.1

0.74065

203,824

36.36592

10,007,775

218,267

10,716,910

11

03103

Removal of Reinforced Concrete

m3

1.6

2.85844

786,639

4.57350

1,258,623

842,379

1,347,806

12

04120

Concrete M300

m3

6.2

8.62511

2,373,641

53.47568

14,716,576

2,541,831

15,759,352

13

04140

Concrete M200

m3

2.2

7.56027

2,080,596

16.63259

4,577,310

2,228,021

4,901,646

14

04202

Reinforcement Bar(10D18 mm)

Ton

0.7

72.57459

19,972,575

49.62505

13,656,848

21,387,780

14,624,536

15

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

71.25823

19,610,316

6.65267

1,830,819

20,999,851

1,960,546

16

05100

Steel Structure

Ton

2.7

1,301.50557

22,020,460

3,453.24568

58,426,227

47,399,819

125,764,518

17

08101

Rubble Stone with Cement Mortar M100

m3

81.7

3.36653

926,471

275.04550

75,692,654

992,118

81,056,041

Apporach Track

18

02301.1 Soil excavation

m3

273.4

0.73103

201,173

199.86360

55,000,675

215,428

58,898,015

19

02301.5 Soil excavation for ditch

m3

37.6

0.88576

243,769

33.30458

9,165,703

261,041

9,815,142

20

02400.1 Embankment , K=90

m3

19.5

0.74065

203,824

14.44268

3,974,575

218,267

4,256,207

21

02400.3 Embankment , K=95

m3

33.2

0.74065

203,824

24.58958

6,766,967

218,267

7,246,464

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

D
22
23
24

Bridges - 137

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

25

03106

26

09105.41

m3

70.1

0.93416

257,080

65.48462

18,021,300

275,296

19,298,250

m3

42.0

2.92669

805,430

122.92098

33,828,041

862,500

36,225,000

70.1

0.74065

203,824

51.91957

14,288,085

218,267

15,300,517

Dismantle Existing Steel Structure

Ton

14.8

28.63074

7,879,195

424.88018

116,927,247

8,437,494

125,212,411

Temporary Facility and Work for Construction


of Bau Bridge

LS

1.0

4,155.35678

1,143,557,093

4,155.35678

1,143,557,093

1,224,586,550

1,224,586,550

Item 5.41 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

42

Cop Vo Bridge (Km 222+287)

Superstructure (Com. Deck Girder L=13.5m)

5.42.1

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

5.42.2

04110

Concrete M400

m3

31.4

52.92524

14,565,067

1,661.85254

457,343,098

15,597,109

489,749,223

5.42.3

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

5.42.4

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43658

41,400,274

20,809,881

44,333,787

5.42.5

05100

Steel Structure

Ton

27.8

1,470.91463

24,886,729

40,939.90806

692,671,325

53,569,564

1,490,999,532

5.42.6

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

5.42.7

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 138

Substructure

5.42.8

02302

Filling with Aggregate

m3

18.3

2.31214

636,308

42.31216

11,644,442

681,395

12,469,529

5.42.9

03103

Removal of Reinforced Concrete

m3

31.0

2.85844

786,639

88.61164

24,385,822

842,379

26,113,749

5.42.10

04120

Concrete M300

1.2

8.62511

2,373,641

10.35013

2,848,369

2,541,831

3,050,197

5.42.11

04130

Concrete M250

m3

38.5

7.88585

2,170,195

303.60523

83,552,505

2,323,969

89,472,807

5.42.12

04201

Reinforcement Bar(D 10mm)

Ton

0.2

95.24472

26,211,416

19.32230

5,317,510

28,068,688

5,694,295

5.42.13

04202

Reinforcement Bar(10D18 mm)

Ton

2.4

73.08157

20,112,104

174.17896

47,934,184

21,537,195

51,330,674

5.42.14

04203

Reinforcement Bar( D>18 mm)

Ton

0.1

90.96228

25,032,879

9.69112

2,667,003

26,806,643

2,855,980

5.42.15

08101

Rubble Stone with Cement Mortar M100

m3

55.0

3.36653

926,471

185.15915

50,955,887

992,118

54,566,490

5.42.16

08220

Cement Mortar M100

m3

0.1

5.34596

1,471,209

0.53460

147,121

1,575,455

157,546

Apporach Track

5.42.17

02301.1 Soil excavation

m3

35.2

0.73103

201,173

25.73226

7,081,287

215,428

7,583,066

5.42.18

02301.5 Soil excavation for ditch

123.9

0.88576

243,769

109.74566

30,202,940

261,041

32,342,980

5.42.19

02400.1 Embankment , K=90

m3

10.8

0.74065

203,824

7.99902

2,201,303

218,267

2,357,284

5.42.20

02400.3 Embankment , K=95

m3

77.0

0.74065

203,824

57.03005

15,694,473

218,267

16,806,559

D
5.42.21
5.42.22
5.42.23

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

215.0

0.93416

257,080

200.84440

55,272,174

275,296

59,188,640

m3

72.6

2.96397

815,680

215.18422

59,218,338

873,477

63,414,430

m3

53.8

0.74065

203,824

39.84697

10,965,749

218,267

11,742,765

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

5.42.24

03106

5.42.25 09105.42

Bridges - 139

Dismantle Existing Steel Structure

Ton

7.8

28.63074

7,879,195

223.31977

61,457,717

8,437,494

65,812,453

Temporary Facility and Work for Construction


of Cop Vo Bridge

LS

1.0

4,016.72640

1,105,405,914

4,016.72640

1,105,405,914

1,183,732,079

1,183,732,079

Item 5.42 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

43

Bo Bridge (Km 223+220)

Superstructure (Com. Deck Girder L=13.5m)

03406

Drainage System on Bridge

ls

1.0

18.04125

4,964,973

18.04125

4,964,973

5,316,777

5,316,777

04110

Concrete M400

31.4

50.44436

13,882,323

1,583.95290

435,904,941

14,865,988

466,792,023

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

11.27002

3,101,517

20,941,249

3,321,282

04202

Reinforcement Bar(10D18 mm)

Ton

2.1

70.61358

19,432,916

150.43658

41,400,274

20,809,881

44,333,787

05100

Steel Structure

Ton

28.7

1,557.00490

26,343,309

44,656.11500

755,546,662

56,704,905

1,626,340,905

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

83.4

1.26969

105.89215

29,141,882

374,182

31,206,779

B
8
9
10
11

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95


03103

Removal of Reinforced Concrete

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

m3

91.4

0.96784

266,347

88.46058

24,344,127

285,220

26,069,108

203.3

2.39549

659,247

487.00312

134,024,904

705,959

143,521,465

m3

129.3

0.76736

211,173

99.21965

27,304,731

226,137

29,239,514

m3

18.0

2.96148

814,997

53.30664

14,669,949

872,746

15,709,428

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 140

12

04120

Concrete M300

13

04202

Reinforcement Bar(10D18 mm)

14

04203

15

50.7

7.77711

2,140,268

394.29948

108,511,605

2,291,922

116,200,445

Ton

3.3

75.19086

20,692,572

245.45304

67,548,833

22,158,794

72,335,167

Reinforcement Bar( D>18 mm)

Ton

0.2

73.82704

20,317,252

12.47308

3,432,600

21,756,879

3,675,825

05100

Steel Structure

Ton

0.8

1,348.42383

22,814,280

1,143.22069

19,342,404

49,108,545

41,635,207

16

08101

Rubble Stone with Cement Mortar M100

602.2

3.48787

959,870

2,100.39531

578,033,434

1,027,883

618,991,143

17

10502

2 Layer Bitumen for Water Protection

m2

4.6

0.32696

89,986

1.50402

413,937

96,362

443,265

Apporach Track

18

02301.1 Soil excavation

m3

2.6

0.73103

201,173

1.90068

523,050

215,428

560,113

19

02301.5 Soil excavation for ditch

m3

364.1

0.88576

243,769

322.50522

88,756,176

261,041

95,045,028

20

02400.1 Embankment , K=90

m3

56.5

0.74065

203,824

41.84673

11,516,075

218,267

12,332,086

21

02400.3 Embankment , K=95

m3

1,149.0

0.74065

203,824

851.00685

234,194,149

218,267

250,788,783

D
22
23
24

Miscellaneous

03106

26

09105.43

51.4

0.72068

198,337

37.04295

10,194,508

212,390

10,916,846

m3

104.5

2.96397

815,680

309.73487

85,238,517

873,477

91,278,347

m3

51.4

0.74065

203,824

38.06941

10,476,571

218,267

11,218,924

Dismantle Existing Steel Structure

Ton

14.8

28.63074

7,879,195

424.88018

116,927,247

8,437,494

125,212,411

Temporary Facility and Work for Construction


of Bo Bridge

LS

1.0

7,014.82620

1,930,485,086

7,014.82620

1,930,485,086

2,067,274,197

2,067,274,197

Filling with Aggregate

02400.3 Embankment, K=95

25

02301.1 Soil Excavation


02302

Item 5.43 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 141

BRIDGES (Cont'd)

44

4M Bridge (Km 224+050)

Superstructure (RC Girder L=5m)

03406

Drainage System on Bridge

ls

04120

Concrete M300

04202

Reinforcement Bar(10D18 mm)

04203

10501

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

6.1

15.08973

4,152,707

92.04735

25,331,515

4,446,957

27,126,438

Ton

0.3

88.77021

24,429,616

29.98924

8,253,057

26,160,635

8,837,847

Reinforcement Bar( D>18 mm)

Ton

0.5

67.55941

18,592,397

36.59963

10,072,245

19,909,805

10,785,938

Water Proofing system

16.7

1.26969

349,423

21.20382

5,835,365

374,182

6,248,839

Substructure

02301.1 Soil Excavation

170.0

0.93416

257,080

158.80720

43,703,580

275,296

46,800,320

02400.3 Embankment, K=95

m3

110.0

0.74065

203,824

81.47150

22,420,676

218,267

24,009,370

03103

Removal of Reinforced Concrete

m3

10.2

2.85844

786,639

29.15609

8,023,722

842,379

8,592,266

04120

Concrete M300

0.7

6.89793

1,898,314

4.82855

1,328,820

2,032,824

1,422,977

10

04130

Concrete M250

m3

9.1

5.76589

1,586,782

52.46960

14,439,718

1,699,217

15,462,875

11

04140

Concrete M200

0.1

5.72690

1,576,044

0.57269

157,605

1,687,719

168,772

12

04201

Reinforcement Bar(D 10mm)

Ton

0.1

73.74922

20,295,839

6.64185

1,827,843

21,733,949

1,957,359

13

04202

Reinforcement Bar(10D18 mm)

Ton

0.5

72.57459

19,972,575

32.85307

9,041,185

21,387,780

9,681,820

14

08220

Cement Mortar M100

0.3

5.34596

1,471,209

1.60379

441,363

1,575,455

472,637

15

10502

2 Layer Bitumen for Water Protection

m2

14.6

0.31563

86,855

4.60820

1,268,086

93,010

1,357,946

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 142

Apporach Track

16

02301.1 Soil excavation

m3

28.5

0.73103

201,173

20.83436

5,733,428

215,428

6,139,698

17

02301.5 Soil excavation for ditch

m3

9.7

0.88576

243,769

8.59187

2,364,557

261,041

2,532,098

18

02400.1 Embankment , K=90

81.1

0.74065

203,824

60.06672

16,530,153

218,267

17,701,454

19

02400.3 Embankment , K=95

m3

272.7

0.74065

203,824

201.97526

55,582,893

218,267

59,521,411

D
20
21
22

Miscellaneous

03106

24

09105.44

55.0

0.93416

257,080

51.37880

14,139,393

275,296

15,141,280

m3

18.0

1.83646

505,402

33.05628

9,097,237

541,213

9,741,834

m3

35.0

0.74065

203,824

25.92275

7,133,851

218,267

7,639,345

Dismantle Existing Steel Structure

Ton

1.8

28.63074

7,879,195

51.53533

14,182,550

8,437,494

15,187,489

Temporary Facility and Work for Construction


of 4M Bridge (Km 224+050)

LS

1.0

1,155.11342

317,888,020

1,155.11342

317,888,020

340,412,732

340,412,732

Filling with Aggregate

02400.3 Embankment, K=95

23

m3

02301.1 Soil Excavation


02302

Item 5.44 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

45

Ly Bridge (Km 225+170)

Superstructure (Com. Deck Girder L=17.5m)

03406

Drainage System on Bridge

ls

1.0

19.57226

5,386,297

19.57226

5,386,297

5,767,956

5,767,956

04110

Concrete M400

m3

40.7

50.50238

13,898,296

2,055.44687

565,660,630

14,883,092

605,741,844

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 143

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

12.93281

3,559,117

20,941,249

3,811,307

04202

Reinforcement Bar(10D18 mm)

Ton

2.7

70.61358

19,432,916

190.50908

52,428,259

20,809,881

56,143,186

05100

Steel Structure

Ton

38.7

1,497.57774

25,337,849

58,000.25737

981,319,185

54,540,615

2,112,324,204

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

108.2

1.26969

137.38046

37,807,573

374,182

40,486,492

B
8
9

Substructure
02302

Filling with Aggregate

02400.3 Embankment, K=95

349,423

m3

146.9

2.31214

636,308

339.65337

93,473,685

681,395

100,096,926

m3

166.7

0.74065

203,824

123.46636

33,977,515

218,267

36,385,109

10

03103

Removal of Reinforced Concrete

m3

33.6

2.85844

786,639

96.04358

26,431,084

842,379

28,303,934

11

04120

Concrete M300

m3

1.2

8.62511

2,373,641

10.35013

2,848,369

2,541,831

3,050,197

12

04130

Concrete M250

m3

36.3

7.88585

2,170,195

286.25636

78,778,076

2,323,969

84,360,075

13

04140

Concrete M200

m3

64.5

9.31372

2,563,141

600.73494

165,322,625

2,744,759

177,036,956

14

04202

Reinforcement Bar(10D18 mm)

Ton

1.8

72.57459

19,972,575

129.03036

35,509,242

21,387,780

38,025,334

15

08101

Rubble Stone with Cement Mortar M100

476.4

3.36653

926,471

1,603.81489

441,370,625

992,118

472,645,015

16

08220

Cement Mortar M100

m3

0.8

5.34596

1,471,209

4.27677

1,176,967

1,575,455

1,260,364

17

10502

2 Layer Bitumen for Water Protection

m2

34.9

0.31563

86,855

11.01549

3,031,247

93,010

3,246,049

Apporach Track

18

02301.1 Soil excavation

m3

42.7

0.73103

201,173

31.21498

8,590,084

215,428

9,198,776

19

02301.5 Soil excavation for ditch

m3

175.4

0.88576

243,769

155.36230

42,757,026

261,041

45,786,591

20

02400.1 Embankment , K=90

m3

15.5

0.74065

203,824

11.48008

3,159,277

218,267

3,383,139

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

21

02400.3 Embankment , K=95

D
22
23
24

Bridges - 144

619.0

Miscellaneous

03106

26

09105.45

458.46235

126,167,257

218,267

135,107,273

75.0

0.93416

257,080

70.06200

19,280,991

275,296

20,647,200

81.0

2.90960

800,732

235.67760

64,859,276

857,469

69,454,989

m3

25.0

0.74065

203,824

18.51625

5,095,608

218,267

5,456,675

Dismantle Existing Steel Structure

Ton

19.4

28.63074

7,879,195

556.00897

153,013,958

8,437,494

163,856,133

Temporary Facility and Work for Construction


of Ly Bridge

LS

1.0

9,058.74750

2,492,973,658

9,058.74750

2,492,973,658

2,669,619,234

2,669,619,234

Filling with Aggregate

02400.3 Embankment, K=95

25

203,824

m3

02301.1 Soil Excavation


02302

0.74065

Item 5.45 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

46

Lang Thip Bridge (Km 228+030)

Superstructure (Com. Deck Girder L=21.5m)

03406

Drainage System on Bridge

ls

1.0

21.71627

5,976,342

21.71627

5,976,342

6,399,809

6,399,809

04110

Concrete M400

50.0

35.44102

9,753,393

1,772.05100

487,669,655

10,444,493

522,224,650

04201

Reinforcement Bar(D 10mm)

Ton

0.2

71.05940

19,555,591

17.61207

4,846,854

20,941,249

5,190,289

04202

Reinforcement Bar(10D18 mm)

Ton

2.9

70.61358

19,432,916

203.12985

55,901,504

20,809,881

59,862,536

05100

Steel Structure

Ton

54.1

1,505.53418

25,472,464

81,442.98556

1,377,951,817

54,830,381

2,966,090,035

05520

Bearing for Composite Girder

unit

4.0

1,617.84929

6,471.39716

-1

31,548,061

126,192,244

10501

Water Proofing system

m2

132.9

1.26969

168.74180

46,438,323

374,182

49,728,788

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

349,423

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

B
8
9
10

Bridges - 145

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95

m3

78.9

0.95252

262,127

75.15383

20,681,809

280,701

22,147,309

135.1

2.35755

648,802

318.50501

87,653,119

694,774

93,863,967

m3

114.7

0.75520

207,827

86.62144

23,837,711

222,553

25,526,829

11

03103

Removal of Reinforced Concrete

m3

2.8

2.91452

802,084

8.16066

2,245,835

858,917

2,404,968

12

04120

Concrete M300

m3

14.3

6.59309

1,814,431

94.28119

25,946,360

1,942,996

27,784,843

13

04202

Reinforcement Bar(10D18 mm)

Ton

1.3

73.99953

20,364,728

96.32889

26,509,785

21,807,719

28,388,198

14

04203

Reinforcement Bar( D>18 mm)

Ton

0.2

72.65733

19,995,355

16.95895

4,667,115

21,412,173

4,997,815

15

05100

Steel Structure

Ton

0.8

1,059.17099

17,920,348

802.54445

13,578,426

38,574,182

29,228,043

16

08101

Rubble Stone with Cement Mortar M100

m3

420.4

3.43262

944,661

1,443.07345

397,135,447

1,011,597

425,275,379

Apporach Track

17

02301.1 Soil excavation

4.0

0.73103

201,173

2.92412

804,692

215,428

861,712

18

02301.5 Soil excavation for ditch

m3

93.8

0.88576

243,769

83.08429

22,865,502

261,041

24,485,646

19

02400.1 Embankment , K=90

m3

46.1

0.74065

203,824

34.14397

9,396,302

218,267

10,062,109

20

02400.3 Embankment , K=95

270.2

0.74065

203,824

200.12363

55,073,332

218,267

58,975,743

D
21
22

Miscellaneous
02301.1 Soil Excavation
02302

Filling with Aggregate

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

m3

91.6

0.93416

257,080

85.56906

23,548,517

275,296

25,217,114

m3

84.0

2.97790

819,523

250.14360

68,839,928

877,592

73,717,728

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

23

02400.3 Embankment, K=95

24

03106

25

09105.46

Bridges - 146

91.6

0.74065

203,824

67.84354

18,670,308

218,267

19,993,257

Dismantle Existing Steel Structure

Ton

28.6

28.63074

7,879,195

818.55286

225,266,172

8,437,494

241,227,953

Temporary Facility and Work for Construction


of Lang Thip Bridge

LS

1.0

4,629.04985

1,273,917,761

4,629.04985

1,273,917,761

1,364,184,233

1,364,184,233

Item 5.46 Carried forward to Collection

Total VND :

BRIDGES (Cont'd)

47

Ba Muoi Bridge (Km 229+980)

Superstructure (RC Girder L=7m)

03406

Drainage System on Bridge

ls

04120

Concrete M300

04202

Reinforcement Bar(10D18 mm)

04203

10501

B
6
7
8
9

1.0

14.97934

4,122,323

14.97934

4,122,323

4,414,420

4,414,420

8.7

15.45468

4,253,145

134.45572

37,002,359

4,554,511

39,624,246

Ton

0.8

68.42168

18,829,699

54.79140

15,078,635

20,163,922

16,147,067

Reinforcement Bar( D>18 mm)

Ton

1.7

67.55941

18,592,397

114.18891

31,424,868

19,909,805

33,651,552

Water Proofing system

m2

24.0

1.26969

349,423

30.47256

8,386,153

374,182

8,980,368

Substructure
02301.1 Soil Excavation
02302

Filling with Aggregate

02400.3 Embankment, K=95


03101

Removal of Existing Masonry

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

277.5

0.93416

257,080

259.22940

71,339,667

275,296

76,394,640

m3

124.6

2.31214

636,308

288.09264

79,284,011

681,395

84,901,817

m3

900.5

0.74065

203,824

666.95533

183,543,805

218,267

196,549,434

m3

10.5

1.00174

275,685

10.51827

2,894,694

295,219

3,099,800

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Bridges - 147

10

04120

Concrete M300

11

04202

Reinforcement Bar(10D18 mm)

12

08101

Rubble Stone with Cement Mortar M100

9.6

6.89793

1,898,314

66.22013

18,223,817

2,032,824

19,515,110

Ton

0.6

78.11457

21,497,179

48.82239

13,435,951

23,020,413

14,387,988

m3

380.1

3.36653

926,471

1,279.61805

352,151,500

992,118

377,104,052

Apporach Track

13

02301.1 Soil excavation

m3

32.2

0.73103

201,173

23.53917

6,477,768

215,428

6,936,782

14

02301.3 Soil excavation for Benching

m3

61.1

0.45466

125,125

27.77973

7,645,145

133,991

8,186,850

15

02301.5 Soil excavation for ditch

m3

12.3

0.88576

243,769

10.89485

2,998,354

261,041

3,210,804

16

02400.1 Embankment , K=90

m3

43.2

0.74065

203,824

31.99608

8,805,210

218,267

9,429,134

17

02400.3 Embankment , K=95

m3

379.0

0.74065

203,824

280.70635

77,249,419

218,267

82,723,193

D
18

Miscellaneous
02301.1 Soil Excavation

540.0

0.93416

257,080

504.44640

138,823,135

275,296

148,659,840

6.3

2.31214

636,308

14.56648

4,008,743

681,395

4,292,789

19

02302

Filling with Aggregate

20

03106

Dismantle Existing Steel Structure

Ton

7.0

28.63074

7,879,195

200.41518

55,154,362

8,437,494

59,062,458

21

09105.47

Temporary Facility and Work for Construction


of Ba Muoi Bridge

LS

1.0

4,640.92601

1,277,186,097

4,640.92601

1,277,186,097

1,367,684,154

1,367,684,154

Item 5.47 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

2,654,037.78071

156,559,710,259

208,313,446,980

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 148

Bill No. 6: CULVERTS


Rate
Item No. Ref.Spec

Particular & Description

Unit

USD
1

Amount

Total equivelent to VND

Quantity
VND

USD

VND

Rate

Amount

Pipe Culverts D=1.0m (Upgrading Section)

02301.1 Soil Excavation

m3

5,007.9

0.61228

168,499

3,066.23701

843,823,838

180,438

903,615,460

02400.3 Embankment , K=95

m3

4,218.5

0.33084

91,044

1,395.64854

384,067,511

97,495

411,282,658

02704 Crushed Stone cushion(4x6cm)

m3

172.2

2.44138

671,865

420.40564

115,695,168

719,472

123,893,078

04130 Concrete M250

m3

9.3

4.74463

1,305,724

44.12506

12,143,230

1,398,244

13,003,669

04140 Concrete M200

m3

1,306.6

7.52907

2,072,010

9,837.48286

2,707,288,442

2,218,827

2,899,119,358

04150 Concrete M150

m3

292.6

5.13558

1,413,320

1,502.67071

413,537,487

1,513,464

442,839,566

04604 Supply and installation of pipe,D=1m

308.0

10.51533

2,893,822

3,238.72164

891,297,196

3,098,871

954,452,268

08101 Rubble stone with cement mortar M100

m3

459.1

3.55535

978,428

1,632.26119

449,196,146

1,047,757

481,025,239

LS

1.0

24,334.29485

6,696,814,983

24,334.29485

6,696,814,983

7,171,333,733

7,171,333,733

09106.01

Temporary Facility and Work for Construction


of Pipe Culverts D=1.0m (Upgrading Section)

Item 6.1 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 149

CULVERTS (Cont'd)

Pipe Culverts D=1.0m (Realignment Section)

02301.1 Soil Excavation

m3

1,357.6

0.61228

168,499

831.23133

228,753,618

180,438

244,962,629

02400.3 Embankment , K=95

m3

1,289.7

0.33084

91,044

426.68435

117,418,957

97,495

125,739,302

02704 Crushed Stone cushion(4x6cm)

m3

31.1

2.44526

672,944

76.04759

20,928,572

720,627

22,411,500

04140 Concrete M200

m3

269.5

7.52935

2,072,087

2,029.15983

558,427,359

2,218,909

597,995,976

04150 Concrete M150

m3

62.7

5.13558

1,413,320

322.00087

88,615,176

1,513,464

94,894,193

04604 Supply and installation of pipe,D=1m

66.0

10.54652

2,902,407

696.07032

191,558,853

3,108,064

205,132,224

08101 Rubble stone with cement mortar M100

m3

75.4

3.50176

963,680

264.03270

72,661,448

1,031,964

77,810,086

LS

1.0

3,692.24851

1,016,109,370

3,692.24851

1,016,109,370

1,088,108,216

1,088,108,216

Temporary Facility and Work for Construction


8

09106.02 of Pipe Culverts D=1.0m (Realignment

Section)
Item 6.2 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 150

CULVERTS (Cont'd)

Pipe Culverts D=1.5m (Upgrading Section)

6.3.1

02301.1 Soil Excavation

m3

2,413.5

0.61228

168,498

1,477.73778

406,668,813

180,437

435,484,700

6.3.2

02400.3 Embankment , K=95

m3

2,292.8

0.33084

91,044

758.54995

208,744,812

97,495

223,536,536

6.3.3

02704 Crushed Stone cushion(4x6cm)

m3

63.8

2.44138

671,865

155.76004

42,864,993

719,472

45,902,314

6.3.4

04140 Concrete M200

m3

528.0

7.52907

2,072,010

3,975.34896

1,094,021,351

2,218,827

1,171,540,656

6.3.5

04150 Concrete M150

m3

175.0

5.13558

1,413,320

898.72650

247,331,033

1,513,464

264,856,200

6.3.6

04605 Supply and Installation of Pipe, D=1.5m

100.0

17.46896

4,807,463

1,746.89600

480,746,328

5,148,108

514,810,800

6.3.7

08101 Rubble stone with cement mortar M100

m3

117.6

3.50176

963,680

411.80698

113,328,730

1,031,964

121,358,966

LS

1.0

5,155.00090

1,418,659,852

5,155.00090

1,418,659,852

1,519,182,370

1,519,182,370

6.3.8

09106.03

Temporary Facility and Work for Construction


of Pipe Culverts D=1.5m (Upgrading Section)

Item 6.3 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 151

CULVERTS (Cont'd)

Pipe Culverts D=1.5m (Realignment Section)

02301.1 Soil Excavation

m3

663.3

0.61228

168,498

406.12532

111,764,418

180,437

119,683,862

02400.3 Embankment , K=95

m3

630.1

0.33084

91,044

208.46228

57,366,586

97,495

61,431,600

02704 Crushed Stone cushion(4x6cm)

m3

17.5

2.44138

671,865

42.72415

11,757,639

719,472

12,590,760

04140 Concrete M200

m3

111.2

7.52907

2,072,010

837.23258

230,407,527

2,218,827

246,733,562

04150 Concrete M150

m3

43.8

5.13558

1,413,320

224.93840

61,903,424

1,513,464

66,289,723

04605 Supply and Installation of Pipe, D=1.5m

25.0

17.70235

4,871,699

442.55875

121,792,479

5,216,895

130,422,375

08101 Rubble stone with cement mortar M100

m3

33.6

3.50176

963,680

117.65914

32,379,637

1,031,964

34,673,990

LS

1.0

912.55547

251,135,897

912.55547

251,135,897

268,930,729

268,930,729

Temporary Facility and Work for Construction


8

09106.04 of Pipe Culverts D=1.5m (Realignment

Section)
Item 6.4 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 152

CULVERTS (Cont'd)

Box Culverts (Upgrading Section)

6.5.1

02301.1 Soil Excavation

m3

73.4

0.61228

168,499

44.94135

12,367,793

180,438

13,244,149

6.5.2

02400.3 Embankment , K=95

m3

69.7

0.33084

91,044

23.05955

6,345,741

97,495

6,795,402

6.5.3

02704 Crushed Stone cushion(4x6cm)

m3

3.7

2.44138

671,865

9.03311

2,485,900

719,472

2,662,046

6.5.4

04130 Concrete M250

m3

1.0

6.51085

1,791,796

6.51085

1,791,796

1,918,758

1,918,758

6.5.5

04140 Concrete M200

m3

1.0

7.37847

2,030,570

7.37847

2,030,570

2,174,450

2,174,450

6.5.6

04150 Concrete M150

m3

12.2

5.13558

1,413,320

62.65408

17,242,506

1,513,464

18,464,261

6.5.7

04607 Installation of Box Culvert, BxH=1.0x1.5m

14.4

16.20208

4,458,824

233.30995

64,207,072

4,774,765

68,756,616

6.5.8

08101 Rubble stone with cement mortar M100

m3

17.2

3.77270

1,038,250

64.89044

17,857,906

1,111,818

19,123,270

LS

1.0

305.34072

84,029,981

305.34072

84,029,981

89,984,125

89,984,125

6.5.9

09106.05

Temporary Facility and Work for Construction


of Box Culverts (Upgrading Section)

Item 6.5 Carried forward to Collection

Total VND :

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Culverts - 153

CULVERTS (Cont'd)

Box Culverts (Realignment Section)

02301.1 Soil Excavation

m3

102

0.33084

91,044

33.58026

9,240,928

97,495

9,895,743

02400.2 Sand Embankment ,K=95

m3

239

1.31449

361,742

313.63731

86,311,747

387,375

92,427,675

04803 Pile Bamboo, D=80

6,690

0.02827

7,783

189.12630

52,066,497

8,334

55,754,460

04130 Concrete M250

m3

363

6.58104

1,811,101

2,386.28510

656,705,122

1,939,431

703,237,681

04150 Concrete M150

m3

45

5.66043

1,557,750

253.58726

69,787,182

1,668,128

74,732,134

04201 Reinforcement bar(D 10mm)

Ton

0.2

75.92819

20,895,488

13.92295

3,831,605

22,376,088

4,103,103

04202 Reinforcement bar(10D18 mm)

Ton

15

75.92819

20,895,488

1,138.69886

313,370,683

22,376,088

335,575,311

04203 Reinforcement bar( D>18 mm)

Ton

16

75.92819

20,895,488

1,179.47610

324,592,605

22,376,088

347,592,389

04302 RC pile 40x40

96

4.08091

1,123,065

391.76736

107,814,264

1,202,643

115,453,728

10

04607 Installation of Box Culvert, BxH=1.0x1.5m

30.0

2.49498

686,619

74.84940

20,598,567

735,271

22,058,130

11

08101 Rubble stone with cement mortar M100

m3

42.4

3.50176

963,680

148.47462

40,860,019

1,031,964

43,755,274

12

08220 Cement Mortar M100

m3

8.5

5.24613

1,443,737

44.59211

12,271,769

1,546,037

13,141,315

13

10502

2 Layer Bitumen for Water Protection

m2

99.9

1.39463

383,807

139.32354

38,342,291

411,002

41,059,100

14

09106.06

Temporary Facility and Work for Construction


of Box Culverts (Realignment Section)

LS

1.0

4,988.26622

1,372,774,357

4,988.26622

1,372,774,357

1,470,045,548

1,470,045,548

300

5.13077

1,411,997

1,539.23100

423,599,095

1,512,047

453,614,100

85,173.34311

23,439,736,869

15

04303 RC pile 30x30

Item 6.6 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302=VIE and AFD Loan No. CVN 6006 01

Total VND :

25,100,617,066

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 154

Bill No. 7: TELECOMMUNICATION


Item
No.
7.1
A

Ref.ID

Particular & Description

Unit

Quantit
y

Rate
USD

Amount
VND

USD

Total equivelent to VND


VND

Rate

Amount

Van Phu Station


Permanent Woks (Phase 1)

7.1.1

11101 Concrete Pole H=7.3m

set

16

9.13962

2,515,223

146.23392

40,243,575

2,693,446

43,095,136

7.1.2

11102 Ligament 3Fe4

set

2.58297

710,840

18.08079

4,975,881

761,208

5,328,456

7.1.3

11103 Ligament 5Fe4

set

2.87609

791,496

11.50436

3,165,985

847,580

3,390,320

7.1.4

11104 Concrete Protection Pole H=7.3m

set

9.85548

2,712,241

19.71096

5,424,482

2,904,423

5,808,846

7.1.5

11105 Stringer 2.5m

ea

30

1.49850

412,383

44.95500

12,371,497

441,604

13,248,120

7.1.6

11106 Angle Iron 757583150 mm

ea

7.44666

2,049,331

29.78664

8,197,325

2,194,541

8,778,164

7.1.7

11107 Angle Iron 100100102550 mm

ea

4.53054

1,246,805

4.53054

1,246,805

1,335,151

1,335,151

7.1.8

11108 Angle Iron 100100101950 mm

ea

3.61341

994,412

7.22682

1,988,823

1,064,873

2,129,746

7.1.9

11109 Angle Iron 100100101350 mm

ea

2.66006

732,048

7.98018

2,196,143

783,919

2,351,757

7.1.10

11110 Protection Slat 600

ea

22

0.21889

60,244

4.81558

1,325,360

64,512

1,419,264

7.1.11

11111 Protection Slat 900

ea

22

0.31215

85,896

6.86730

1,889,714

91,983

2,023,626

7.1.12

11112 Ceramics A18

ea

220

0.09252

25,458

20.35440

5,600,729

27,262

5,997,640

7.1.13

11113 Line Support Porcelain A18

ea

20

0.09054

24,912

1.81080

498,249

26,678

533,560

7.1.14

11114 Direct Porcelain Nut

ea

220

0.08295

22,836

18.24900

5,024,024

24,454

5,379,880

7.1.15

11115 Support Porcelain Tie

set

20

0.17520

48,212

3.50400

964,232

51,628

1,032,560

7.1.16

11116 Concrete Placement for Signal Pole Base

set

7.77020

2,138,367

31.08080

8,553,468

2,289,886

9,159,544

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Concrete Placement for Three-Column Pole


Base

Telecommunication - 155

set

20.94825

5,764,972

20.94825

5,764,972

6,173,463

6,173,463

11118 Bimetallic Wire Cs 3mm

4,400

0.03899

10,723

171.55600

47,179,858

11,483

50,525,200

7.1.19

11119 Galvanized Iron Wire 4mm

1,100

0.01095

3,011

12.04500

3,312,622

3,225

3,547,500

7.1.20

11120 Hang Telecommunication Cable 420.65

600

0.10525

28,965

63.15000

17,378,775

31,017

18,610,200

7.1.21

11121 Arrester for Poles

set

3.65915

1,006,995

14.63660

4,027,978

1,078,348

4,313,392

7.1.22

11122 Wire Test Chair of H Pole

set

6.82703

1,878,800

6.82703

1,878,800

2,011,927

2,011,927

7.1.23

11123 Wire Test Ladder

set

3.05716

841,328

3.05716

841,328

900,943

900,943

7.1.24

11203 Dismount, Revoke Transmission Line

550

0.14916

41,042

82.03800

22,573,309

43,951

24,173,050

7.1.25

11204 Dismount, Revoke Copper Hang Cable

600

0.00431

1,191

2.58600

714,573

1,275

765,000

7.1.17

11117

7.1.18

Temporary Works

7.1.26

11124 Hang Telecommunication Cable 1020.9

160

0.29124

80,149

46.59840

12,823,811

85,828

13,732,480

7.1.27

11125 Telephone Subscriber Wire (20.75 mm2)

100

0.02217

6,099

2.21700

609,868

6,531

653,100

7.1.28

11126 Relocation of AF Dispatch Telephone

set

12.31982

3,390,430

12.31982

3,390,430

3,630,666

3,630,666

7.1.29

11127 Relocation of AF Station Telephone

set

12.31982

3,390,430

24.63964

6,780,859

3,630,666

7,261,332

7.1.30

11128 Relocation of Magnetic Telephone

set

5.53256

1,522,570

16.59768

4,567,710

1,630,455

4,891,365

7.1.31

11129 Angle Iron 505052500 mm

ea

5.13441

1,412,997

41.07528

11,303,976

1,513,118

12,104,944

7.1.32

11130 Flat Iron 40x4x35000 mm

ea

4.06763

1,119,417

4.06763

1,119,417

1,198,736

1,198,736

7.1.33

11131 Earthing Cable M50

30

0.39781

109,472

11.93430

3,284,151

117,229

3,516,870

7.1.34

11132 Soil-upgrading Chemicals

kg

275

0.25025

68,875

68.81875

18,940,659

73,755

20,282,625

7.1.35

11205 Earth Connection Plate

set

2.02721

557,895

2.02721

557,895

597,426

597,426

Permanent Woks (Phase 2)

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 156

7.1.36

11101 Concrete Pole H=7.3m

set

9.03702

2,487,003

27.11106

7,461,009

2,663,225

7,989,675

7.1.37

11133 Angle Iron 100100103150 mm

ea

7.36311

2,026,338

29.45244

8,105,353

2,169,919

8,679,676

7.1.38

11102 Ligament 3Fe4

set

2.55400

702,865

7.66200

2,108,595

752,668

2,258,004

7.1.39

11120 Hang Telecommunication Cable 420.65

100

0.10408

28,640

10.40800

2,864,044

30,670

3,067,000

7.1.40

11125 Telephone Subscriber Wire (20.75 mm2)

300

0.02217

6,099

6.65100

1,829,605

6,531

1,959,300

7.1.41

11126 Relocation of AF Dispatch Telephone

set

12.31982

3,390,430

12.31982

3,390,430

3,630,666

3,630,666

7.1.42

11127 Relocation of AF Station Telephone

set

12.31982

3,390,430

24.63964

6,780,859

3,630,666

7,261,332

7.1.43

11128 Relocation of Magnetic Telephone

set

5.53256

1,522,570

33.19536

9,135,420

1,630,455

9,782,730

7.1.44

11129 Angle Iron 505052500 mm

ea

7.54179

2,075,505

60.33432

16,604,041

2,222,570

17,780,560

7.1.45

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

2.32436

639,671

171,249

684,996

7.1.46

11135 Earthing cable M16

20

0.12731

35,030

2.54620

700,609

37,513

750,260

7.1.47

11151 Hang Telecommunication Cable 1020.5

480

0.21436

58,987

102.89280

28,313,750

63,167

30,320,160

7.1.48

11152 Indoor Cable Box 102

ea

2.75514

758,211

5.51028

1,516,422

811,936

1,623,872

Item 7.1 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 157

TELECOMMUNICATION (Cont'd)
7

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

7.2

Co Phuc Station

7.2.1

11101 Concrete Pole H=7.3m

set

10.36147

2,851,481

20.72294

5,702,963

3,053,530

6,107,060

7.2.2

11133 Angle Iron 100100103150 mm

ea

5.32096

1,464,335

10.64192

2,928,671

1,568,094

3,136,188

7.2.3

11102 Ligament 3Fe4

set

2.48735

684,522

4.97470

1,369,043

733,025

1,466,050

7.2.4

11120 Hang Telecommunication Cable 420.65

100

0.10381

28,564

10.38100

2,856,370

30,588

3,058,800

7.2.5

11128 Relocation of Magnetic Telephone

set

5.17866

1,425,169

5.17866

1,425,169

1,526,153

1,526,153

7.2.6

11129 Angle Iron 505052500 mm

ea

7.44313

2,048,359

14.88626

4,096,718

2,193,500

4,387,000

7.2.7

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

0.58109

159,918

171,249

171,249

7.2.8

11135 Earthing Cable M16

0.12731

35,030

0.63655

175,152

37,513

187,565

Item 7.2 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 158

TELECOMMUNICATION (Cont'd)
7

7.3

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Mau Dong Station

7.3.1

11101 Concrete Pole H=7.3m

set

10.36147

2,851,481

20.72294

5,702,963

3,053,530

6,107,060

7.3.2

11133 Angle Iron 100100103150 mm

ea

5.32096

1,464,335

10.64192

2,928,671

1,568,094

3,136,188

7.3.3

11102 Ligament 3Fe4

set

2.48735

684,522

4.97470

1,369,043

733,025

1,466,050

7.3.4

11120 Hang Telecommunication Cable 420.65

60

0.10381

28,564

6.22860

1,713,822

30,588

1,835,280

7.3.5

11128 Relocation of Magnetic Telephone

set

5.17866

1,425,169

5.17866

1,425,169

1,526,153

1,526,153

7.3.6

11129 Angle Iron 505052500 mm

ea

7.44313

2,048,359

14.88626

4,096,718

2,193,500

4,387,000

7.3.7

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

0.58109

159,918

171,249

171,249

7.3.8

11135 Earthing cable M16

0.12731

35,030

0.63655

175,152

37,513

187,565

Item 7.3 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 159

TELECOMMUNICATION (Cont'd)
7

7.4

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Lam Giang Station

7.4.1

11101 Concrete Pole H=7.3m

set

10.36147

2,851,481

20.72294

5,702,963

3,053,530

6,107,060

7.4.2

11133 Angle Iron 100100103150 mm

ea

5.32096

1,464,335

10.64192

2,928,671

1,568,094

3,136,188

7.4.3

11102 Ligament 3Fe4

set

2.48735

684,522

4.97470

1,369,043

733,025

1,466,050

7.4.4

11120 Hang Telecommunication Cable 420.65

110

0.10381

28,564

11.41910

3,142,008

30,588

3,364,680

7.4.5

11128 Relocation of Magnetic Telephone

set

5.17866

1,425,169

5.17866

1,425,169

1,526,153

1,526,153

7.4.6

11129 Angle Iron 505052500 mm

ea

7.44313

2,048,359

14.88626

4,096,718

2,193,500

4,387,000

7.4.7

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

0.58109

159,918

171,249

171,249

7.4.8

11135 Earthing cable M16

0.12731

35,030

0.63655

175,152

37,513

187,565

Item 7.4 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 160

TELECOMMUNICATION (Cont'd)
7

7.5

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Lang Thip Station

7.5.1

11101 Concrete Pole H=7.3m

set

10.36147

2,851,481

20.72294

5,702,963

3,053,530

6,107,060

7.5.2

11133 Angle Iron 100100103150 mm

ea

5.32096

1,464,335

10.64192

2,928,671

1,568,094

3,136,188

7.5.3

11102 Ligament 3Fe4

set

2.48735

684,522

4.97470

1,369,043

733,025

1,466,050

7.5.4

11120 Hang Telecommunication Cable 420.65

110

0.10381

28,564

11.41910

3,142,008

30,588

3,364,680

7.5.5

11128 Relocation of Magnetic Telephone

set

5.17866

1,425,169

5.17866

1,425,169

1,526,153

1,526,153

7.5.6

11129 Angle Iron 505052500 mm

ea

7.44313

2,048,359

14.88626

4,096,718

2,193,500

4,387,000

7.5.7

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

0.58109

159,918

171,249

171,249

7.5.8

11135 Earthing cable M16

0.12731

35,030

0.63655

175,152

37,513

187,565

Item 7.5 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 161

TELECOMMUNICATION (Cont'd)
7

7.6

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Level Crossing Km 155+550

7.6.1

11136 Buried Telecommunication cable 520.5

230

0.62462

171,893

143.66260

39,535,369

184,073

42,336,790

7.6.2

11137 Indoor Cable Box 52

ea

2.42807

668,205

2.42807

668,205

715,552

715,552

7.6.3

11128 Relocation of Magnetic Telephone

set

5.45834

1,502,142

5.45834

1,502,142

1,608,580

1,608,580

7.6.4

11129 Angle Iron 505052500 mm

ea

8.20230

2,257,276

16.40460

4,514,552

2,417,221

4,834,442

7.6.5

11134 Flat Iron 4045000 mm

ea

0.29058

79,959

0.29058

79,959

85,625

85,625

7.6.6

11135 Earthing cable M16

0.06366

17,515

0.31830

87,573

18,756

93,780

Item 7.6 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 162

TELECOMMUNICATION (Cont'd)
7

7.7

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Level Crossing Km 171+183

7.7.1

11101 Concrete Pole H=7.3m

set

8.79147

2,419,422

8.79147

2,419,422

2,590,856

2,590,856

7.7.2

11133 Angle Iron 100100103150 mm

ea

5.23037

1,439,399

10.46074

2,878,798

1,541,391

3,082,782

7.7.3

11102 Ligament 3Fe4

set

2.48735

684,522

4.97470

1,369,043

733,025

1,466,050

7.7.4

11120 Hang Telecommunication Cable 420.65

100

0.10369

28,545

10.36900

2,854,504

30,567

3,056,700

7.7.5

11128 Relocation of Magnetic Telephone

set

5.17866

1,425,169

5.17866

1,425,169

1,526,153

1,526,153

7.7.6

11129 Angle Iron 505052500 mm

ea

7.80571

2,148,140

15.61142

4,296,279

2,300,351

4,600,702

7.7.7

11134 Flat Iron 4045000 mm

ea

0.58109

159,918

0.58109

159,918

171,249

171,249

7.7.8

11135 Earthing cable M16

0.12731

35,030

0.63655

175,152

37,513

187,565

7.7.9

11135 Dismount, Revoke Current Cable

30

0.00403

1,108

0.12090

33,252

1,187

35,610

Item 7.7 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Telecommunication - 163

TELECOMMUNICATION (Cont'd)
7

7.8

Supply, installation and wiring all signaling equipment


to complete all specified works include, but not limited
to, the following:

Level Crossing Km 186+550

7.8.1

11101 Concrete Pole H=7.3m

set

8.99588

2,475,675

8.99588

2,475,675

2,651,095

2,651,095

7.8.2

11133 Angle Iron 100100103150 mm

ea

5.35199

1,472,866

10.70398

2,945,732

1,577,230

3,154,460

7.8.3

11102 Ligament 3Fe4

set

2.54520

700,437

5.09040

1,400,873

750,068

1,500,136

7.8.4

11120 Hang Telecommunication Cable 420.65

550

0.10613

29,207

58.37150

16,064,106

31,277

17,202,350

7.8.5

11201 New Installation of Magnetic telephone

set

9.78652

2,693,263

19.57304

5,386,526

2,884,100

5,768,200

7.8.6

11129 Angle Iron 505052500 mm

ea

7.98723

2,198,086

15.97446

4,396,172

2,353,837

4,707,674

7.8.7

11134 Flat Iron 4045000 mm

ea

0.59458

163,636

0.59458

163,636

175,230

175,230

7.8.8

11135 Earthing cable M16

0.13024

35,844

0.65120

179,222

38,384

191,920

1,924.05646

529,463,114

Item 7.8 Carried Forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

566,982,221

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 164

Bill No. 8: SIGNALING


Item
No.

Ref.Spec

Particular & Description

8.1

Van Phu Station

Temporary Step

Unit

Quantit
y

Rate
USD

Amount
VND

USD

Total equivelent to VND


VND

Rate

Amount

11201

Dismantlement, Relocation and Installation of


Control Desk

set

59.04475

16,249,163

59.04475

16,249,163

17,400,536

17,400,536

11202

Dismantlement, Relocation and Installation of


Relay Rack

set

46.58030

12,818,933

46.58030

12,818,933

13,727,249

13,727,249

11203

Dismantlement, Relocation and Installation of


Control Power Supply Panel

set

16.22459

4,465,020

16.22459

4,465,020

4,781,400

4,781,400

11204

Excavation and Burying Works for Cable


Protection Pipes DSF 110

40

0.37723

103,821

15.08920

4,152,841

111,177

4,447,080

11205

Buried Signalling Cable 24x1, with Digging and


Burying Works

240

0.57274

157,616

137.45760

37,827,737

168,784

40,508,160

11206

Buried Signalling Cable 19x1, with Digging and


Burying Works

140

0.46506

127,983

65.10840

17,917,666

137,052

19,187,280

11207

Buried Electric Power Cable Cu 2x6, with


Digging and Burying Works

140

0.30556

84,097

42.77840

11,773,521

90,055

12,607,700

11208

Cable Protection Pipes DSF 110, with Digging


and Burying Works

80

0.37723

103,821

30.17840

8,305,681

111,177

8,894,160

11209

Signalling Cable Boxes (HF-7) and Installation


Work

ea

18.26263

5,025,885

36.52526

10,051,769

5,382,006

10,764,012

10

11210

Arrester Earthing, Earthing Iron Piles and


Related Installation Works

set

2.05199

564,706

4.10398

1,129,412

604,720

1,209,440

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

11

11211

Replacement of the Board, Upgrading and


Wiring of Type D-92 Push Button Control Desk

Signaling - 165

set

Standard Step

23.41464

6,443,722

23.41464

6,443,722

6,900,307

6,900,307

12

11212

Dismantlement, Relocation and Installation of


Colour Light Home Signal "L"

set

44.61272

12,277,453

44.61272

12,277,453

13,147,401

13,147,401

13

11213

Dismantlement, Relocation and Installation of


High Pole Colour Light Starting Signal "L2, C2"

set

29.28197

8,058,414

58.56394

16,116,827

8,629,412

17,258,824

14

Dismantlement, Relocation and Installation of


11214 Low Pole Colour Light Starting Signal "L1, L3,
C1, C3"

set

12.92906

3,558,094

51.71624

14,232,377

3,810,211

15,240,844

15

11215

New Installation and Wiring of Low Pole Colour


Light Starting Signal "L4, C4"

set

76.72093

21,113,656

153.44186

42,227,312

22,609,714

45,219,428

16

11216 Installation of Track Circuit Devices and Wiring

set

98.70450

27,163,553

197.40900

54,327,106

29,088,291

58,176,582

17

11217 Construction of Signal Concrete base

set

4.63198

1,274,726

41.68782

11,472,538

1,365,050

12,285,450

18

Electric Locked Switch Lever, Iron Frame,


11218 Switch Point Lock Set and Components, with
Related Installation

set

217.30607

59,802,788

869.22428

239,211,151

64,040,256

256,161,024

19

Electric Locked Switch Lever, Iron Frame,


11219 Switch Point Lock Sets (for next point) and
Components, with Related Installation

set

579.37940

159,445,613

1,158.75880

318,891,225

170,743,511

341,487,022

20

Electric Locked Switch Lever, Iron Frame,


11259 Switch Link Elbow Set and Components, with
Related Installation

set

177.89409

48,956,583

355.78818

97,913,166

52,425,518

104,851,036

21

Fish-Tail Switch Lever, Iron Frame and


11220 Mechanical Components, with Related
Installation (No.11, 12, 14, 16,18, 20, 22, 24)

set

74.10877

20,394,788

592.87016

163,158,304

21,839,909

174,719,272

22

11221

Insulated Joint and Fish Plate for track (P50)


circuit

set

98.70450

27,163,553

789.63600

217,308,426

29,088,291

232,706,328

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 166

23

11222

Type D-92 Push Button Control Desk and


Wiring

set

204.03505

56,150,585

204.03505

56,150,585

60,129,268

60,129,268

24

11223

8 Layer Relay Rack with Relay, Socket,


Terminal block and Wiring

set

237.89518

65,468,924

237.89518

65,468,924

70,107,880

70,107,880

25

11224

Two Aspects Colour Light Starting Signalling


Pole and Whole Set of Components

set

32.03201

8,815,233

64.06402

17,630,466

9,439,857

18,879,714

26

Transformer Box (HB2) with Relay and


11225 Transformer (for two aspects colour light starting
signalling pole)

box

55.35374

15,233,392

110.70748

30,466,784

16,312,790

32,625,580

27

11226 Signalling Cable Boxes and Installation Works

ea

12

12.58623

3,463,736

151.03476

41,564,826

3,709,167

44,510,004

28

11205

Buried Signalling Cable 24x1, with Digging and


Burying Works

120

0.33455

92,068

40.14600

11,048,193

98,592

11,831,040

29

11206

Buried Signalling Cable 19x1, with Digging and


Burying Works

1,077

0.33455

92,068

360.31035

99,157,532

98,592

106,183,584

30

11255

Buried Signalling Cable 14x1, with Digging and


Burying Works

1,614

0.33455

92,068

539.96370

148,598,196

98,592

159,127,488

31

11227

Buried Signalling Cable 7x1, with Digging and


Burying Works

736

0.33455

92,068

246.22880

67,762,250

98,592

72,563,712

32

11207

Buried Electric Power Cable Cu 2x6, with


Digging and Burying Works

150

0.33455

92,068

50.18250

13,810,241

98,592

14,788,800

33

11228

Buried Electric Power Cable Cu 2x4, with


Burying Works

730

0.33455

92,068

244.22150

67,209,841

98,592

71,972,160

34

11229

Buried Electric Power Cable Cu 2x2.5, with


Burying Works

728

0.33455

92,068

243.55240

67,025,704

98,592

71,774,976

35

11230 Switch point lamp

set

18

5.89470

1,622,220

106.10460

29,199,966

1,737,167

31,269,006

36

11231

set

6.15595

1,694,122

12.31190

3,388,244

1,814,163

3,628,326

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

37

11232 Switch Adjuster

38

11258

Concrete Conduit (dimension: 200x200) and


Related Installation Works

Item 8.1 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Signaling - 167

set

14.58961

4,015,066

72.94805

20,075,328

4,299,563

21,497,815

760

1.58670

436,654

1,205.89200

331,857,306

467,595

355,372,200

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 168

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.2

Yen Bai Station

Dismantlement and Re-Installation of Electric


11233 Locked Switch Lever,with Iron Frame and Point
Adjuster Set (for track P50)

11234

set

70.00307

19,264,889

490.02149

134,854,224

20,629,949

144,409,643

Dismantlement and Re-Installation of Electric


Locked Switch Lever

set

35.17119

9,679,128

140.68476

38,716,511

10,364,966

41,459,864

11235

Dismantlement and Re-Installation of


Mechanical Lock Set and Switch Lever

set

19

12.90517

3,551,514

245.19823

67,478,770

3,803,165

72,260,135

11236

Dismantlement and Re-Installation of Track


Circuit Devices and Wiring

set

25.90746

7,129,748

103.62984

28,518,990

7,634,943

30,539,772

Item 8.2 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 169

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.3

Co Phuc Station

11233

Dismantlement, Relocation and Installation of


Semaphore Home Signal (C)

set

53.63397

14,760,115

53.63397

14,760,115

15,805,977

15,805,977

11234

Dismantlement, Relocation and Installation of


Electric Distant Signal (CT)

set

53.63397

14,760,115

53.63397

14,760,115

15,805,977

15,805,977

11235

Dismantlement, Relocation and Installation of


Distant Signal Lever (CTK)

set

29.33108

8,071,938

29.33108

8,071,938

8,643,894

8,643,894

11236 New Installation of Signal Pull Wire

set

111.89737

30,794,236

111.89737

30,794,236

32,976,235

32,976,235

11237

set

47.86880

13,173,525

191.47520

52,694,102

14,106,967

56,427,868

11238 Construction of Signalling Pole Concrete Base

base

6.54481

1,801,135

13.08962

3,602,270

1,928,759

3,857,518

11239

set

3.85454

1,060,768

3.85454

1,060,768

1,135,932

1,135,932

11240 Iron Frame of Fish-Tail Switch Point Indicator

set

3.96670

1,091,633

15.86680

4,366,533

1,168,984

4,675,936

11241

set

10.62611

2,924,315

42.50444

11,697,259

3,131,524

12,526,096

10

11242 Turnout Control Lockset

set

5.49048

1,510,980

43.92384

12,087,837

1,618,044

12,944,352

11

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

306

0.49968

137,519

152.90208

42,080,887

147,263

45,062,478

12

11244

Signalling Cable Boxes (HZ) and Installation


Works

ea

9.31128

2,562,477

18.62256

5,124,954

2,744,047

5,488,094

13

11303 Execute Signalling Hang Cable Line

108

0.17687

48,672

19.10196

5,256,580

52,121

5,629,068

Dismantlement, Relocation and Installation of


Fish-Tail Switch Point Indicator and Lever

Construction of Concrete base for Distant Signal


Lever (CTK), 800x800x500mm

Turnout Control Lock Device and Installation


Work

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 170

14

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

0.21215

58,387

1.27290

350,322

62,524

375,144

15

11303

Cable Protection Pipes PVC 34, with Digging


and Burying Works

14

0.26746

73,604

3.74444

1,030,449

78,819

1,103,466

Item 8.3 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.4

Signaling - 171

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:
Ngoi Hop Station
Dismantlement and Re-Installation of
11237 Mechanical Lock Set and Switch Lever,with Iron
Frame, Point Locks and Sliding Plate

Item 8.4 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set

67.40417

18,549,681

269.61668

74,198,723

19,864,062

79,456,248

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.5

Signaling - 172

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:
MauA Station
Dismantlement and Re-Installation of
11237 Mechanical Lock Set and Switch Lever,with Iron
Frame, Point Locks and Sliding Plate

Item 8.5 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set

48.54639

13,360,007

291.27834

80,160,044

14,306,662

85,839,972

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 173

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

Mau Dong Station

8.6
8.6.1

11246

Dismantlement, Relocation and Installation of


distant Signal Lever (LTK, CTK)

set

29.33108

8,071,938

58.66216

16,143,876

8,643,894

17,287,788

8.6.2

11247

Dismantlement, Relocation and Installation of


Automatic Control for Signal Pull Wire (LTK)

set

34.92065

9,610,195

34.92065

9,610,195

10,291,148

10,291,148

8.6.3

11236 New Installation of Signal Pull Wire

set

111.89737

30,794,236

223.79474

61,588,473

32,976,235

65,952,470

8.6.4

11237

Dismantlement, Relocation and Installation of


Fish-Tail Switch Point Indicator and Lever

set

11.90006

3,274,900

47.60024

13,099,599

3,506,951

14,027,804

8.6.5

11248

Installation Work of Concrete Electric Pole


H=7.5m

set

2.37890

654,667

4.75780

1,309,335

701,056

1,402,112

8.6.6

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

100

0.17687

48,672

17.68700

4,867,203

52,121

5,212,100

8.6.7

11249

Construction of Concrete Base for Signal Lever


(LTK), 800x800x500mm

set

3.85454

1,060,768

3.85454

1,060,768

1,135,932

1,135,932

8.6.8

11250

Construction of Concrete Base for Signal


Pulling Wire Adjuster (LTD), 1000x500x500mm

set

17.05134

4,692,548

17.05134

4,692,548

5,025,049

5,025,049

8.6.9

11251

Fish-Tail Switch (Stood and Installed with Frame


and Mechanical Components)

set

42.47451

11,689,014

84.94902

23,378,028

12,517,267

25,034,534

set

39.93545

10,990,257

159.74180

43,961,027

11,768,998

47,075,992

set

10.62611

2,924,315

42.50444

11,697,259

3,131,524

12,526,096

8.6.12 11242 Turnout Control Lockset

set

5.49048

1,510,980

43.92384

12,087,837

1,618,044

12,944,352

8.6.13 11252 Concrete Electric Pole H=7.5m

set

2.63955

726,413

2.63955

726,413

777,884

777,884

8.6.10 11240 Iron Frame of Fish-Tail Switch Point Indicator


8.6.11 11241

Turnout Control Lock Device and Installation


Work

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.6.14 11253 Oil Turnout Lamp


8.6.15 11301

Cable Protection Pipes PVC 34, with Digging


and Burying Works

Item 8.6 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Signaling - 174

set

1.12624

309,942

2.25248

619,885

331,904

663,808

12

0.26746

73,604

3.20952

883,242

78,819

945,828

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.7

8.7.1

Signaling - 175

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:
Trai Hut Station
Dismantlement and Re-Installation of
11237 Mechanical Lock Set and Switch Lever,with Iron
Frame, Point Locks and Sliding Plate

Item 8.7 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set

67.40417

18,549,681

269.61668

74,198,723

19,864,062

79,456,248

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 176

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.8

Lam Giang Station

11233

Dismantlement, Relocation and Installation of


Semaphore Home Signal (C)

set

54.84797

15,094,199

54.84797

15,094,199

16,163,734

16,163,734

11234

Dismantlement, Relocation and Installation of


Electric Distant Signal (CT)

set

54.84797

15,094,199

54.84797

15,094,199

16,163,734

16,163,734

11235

Dismantlement, Relocation and Installation of


Distant Signal Lever (CTK)

set

29.99496

8,254,639

29.99496

8,254,639

8,839,541

8,839,541

11236 New Installation of Signal Pull Wire

set

102.78159

28,285,562

102.78159

28,285,562

30,289,803

30,289,803

11237

set

4.05646

1,116,341

16.22584

4,465,364

1,195,442

4,781,768

11238 Construction of Signalling pole Concrete Base

set

8.60028

2,366,798

17.20056

4,733,595

2,534,503

5,069,006

11239

set

3.90941

1,075,877

3.90941

1,075,877

1,152,110

1,152,110

11240 Iron Frame of Fish-Tail Switch Point Indicator

set

48.12420

13,243,820

192.49680

52,975,280

14,182,242

56,728,968

11256

set

10.64508

2,929,538

42.58032

11,718,152

3,137,117

12,548,468

10

11242 Turnout Control Lockset

set

5.50945

1,516,203

44.07560

12,129,622

1,623,637

12,989,096

11

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

270

0.50693

139,508

136.87110

37,667,124

149,393

40,336,110

12

11244

Signalling Cable Boxes (HZ) and Installation


Works

ea

10.33249

2,843,512

30.99747

8,530,537

3,044,996

9,134,988

13

###### Oil Turnout Lamp

set

1.12624

309,942

2.25248

619,885

331,904

663,808

Dismantlement, Relocation and Installation of


Fish-Tail Switch Point Indicator and Lever

Construction of Concrete base for Distant Signal


Lever (CTK), 800x800x500mm

Turnout Control Lock Device and Installation


Work

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

14

######

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

Item 8.8 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Signaling - 177

0.21314

58,659

0.63942

175,976

62,815

188,445

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.9

8.9.1

Signaling - 178

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:
Lang Khay
Dismantlement and Re-Installation of
11237 Mechanical Lock Set and Switch Lever,with Iron
Frame, Point Locks and Sliding Plate

Item 8.9 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

set

67.67357

18,623,805

270.69428

74,495,222

19,943,440

79,773,760

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 179

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.10

Lang Thip Station

8.10.1 11233

Dismantlement, Relocation and Installation of


Semaphore Home Signal (C)

set

54.84797

15,094,199

54.84797

15,094,199

16,163,734

16,163,734

8.10.2 11235

Dismantlement, Relocation and Installation of


Distant Signal Lever (CTK)

set

29.99496

8,254,639

29.99496

8,254,639

8,839,541

8,839,541

set

93.66040

25,775,401

93.66040

25,775,401

27,601,779

27,601,779

8.10.3 11236 New Installation of Signal Pull Wire


8.10.4 11237

Dismantlement, Relocation and Installation of


Fish-Tail Switch Point Indicator and Lever

set

52.18066

14,360,161

208.72264

57,440,645

15,377,684

61,510,736

8.10.5 11248

Installation Work of Concrete Electric Pole


H=7.5m

set

2.43901

671,211

2.43901

671,211

718,772

718,772

set

6.59541

1,815,062

6.59541

1,815,062

1,943,672

1,943,672

8.10.6 11238 Construction of Signalling Pole Concrete Base


8.10.7 11239

Construction of Concrete base for Distant Signal


Lever (CTK), 800x800x500mm

set

3.90941

1,075,877

3.90941

1,075,877

1,152,110

1,152,110

8.10.8 11259

Fish-Tail Switch (Stood and Installed with Frame


and Mechanical Components)

set

42.65408

11,738,430

85.30816

23,476,861

12,570,185

25,140,370

set

40.01133

11,011,137

160.04532

44,044,548

11,791,358

47,165,432

set

10.64508

2,929,538

42.58032

11,718,152

3,137,117

12,548,468

8.10.11 11242 Turnout Control Lockset

set

5.50945

1,516,203

44.07560

12,129,622

1,623,637

12,989,096

8.10.12 11253 Oil Turnout Lamp

set

1.12624

309,942

2.25248

619,885

331,904

663,808

25

0.37044

101,949

9.26100

2,548,735

109,173

2,729,325

8.10.9 11240 Iron Frame of Fish-Tail Switch Point Indicator


8.10.10 11241

8.10.13 11243

Turnout Control Lock Device and Installation


Work

Buried Signalling Cable 5x1, with Digging and


Burying Works

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 180

8.10.14 11226 Signalling Cable Boxes and Installation Works

ea

10.78494

2,968,017

21.56988

5,936,033

3,178,323

6,356,646

8.10.15 11303 Execute Signalling Hang Cable Line

75

0.05122

14,086

3.84150

1,056,466

15,085

1,131,375

14

0.19910

54,796

2.78740

767,138

58,678

821,492

8.10.16 11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

Item 8.10 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 181

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.11

Level Crossing Km 148+017

Replacement of Control Panel and Additional


11261 wire Connection for Level Crossing Control
Cabinet

set

7.39385

2,034,790

7.39385

2,034,790

2,178,970

2,178,970

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

9.10825

2,506,592

9.10825

2,506,592

2,684,203

2,684,203

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.39620

109,042

3.96200

1,090,421

116,768

1,167,680

11271

Level Crossing Signalling Pole H=3.2m 2


Lamps, and Related Installation Works

set

18.68650

5,142,529

37.37300

10,285,058

5,506,916

11,013,832

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

60

0.40633

111,824

24.37980

6,709,414

119,747

7,184,820

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

10

0.39576

108,908

3.95760

1,089,077

116,625

1,166,250

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

0.23372

64,320

0.70116

192,961

68,878

206,634

11231

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

set

17.60605

4,845,203

17.60605

4,845,203

5,188,521

5,188,521

Item 8.11 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 182

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.12

Level Crossing Km 154+450

Replacement of Control Panel and Additional


11261 wire Connection for Level Crossing Control
Cabinet

set

7.39385

2,034,790

7.39385

2,034,790

2,178,970

2,178,970

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

7.06749

1,944,976

7.06749

1,944,976

2,082,792

2,082,792

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.39620

109,042

3.96200

1,090,421

116,768

1,167,680

11273

3,230

0.50383

138,647

1,627.37090

447,830,827

148,472

479,564,560

11274 Train Detected Sensors and Installation Works

set

19.07617

5,249,780

38.15234

10,499,559

5,621,765

11,243,530

11226 Signalling Cable Boxes and Installation Works

ea

10.27077

2,826,527

20.54154

5,653,054

3,026,807

6,053,614

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

0.39576

108,908

3.16608

871,261

116,625

933,000

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

40

0.23372

64,320

9.34880

2,572,818

68,878

2,755,120

10

11278

Level Crossing Control Box and Related


Installation Works

ea

4.03097

1,109,324

4.03097

1,109,324

1,187,928

1,187,928

Buried Signalling Cable 4x1, with Digging and


Burying Works

Item 8.12 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 183

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.13

Level Crossing Km 155+550

11263 Control Software Programming (PLC)

set

14.40151

3,963,304

14.40151

3,963,304

4,244,133

4,244,133

11264 Reimbursement of Road Pavement

m2

10

0.39620

109,042

3.96200

1,090,421

116,768

1,167,680

Manipulated Control Panel and Level Crossing


11265 Control Cabinet, with PLC Technology and New
Instalation

set

157.68040

43,393,761

157.68040

43,393,761

46,468,529

46,468,529

11271

Level Crossing Signalling Pole H=3.2m 2


Lamps, and Related Installation Works

set

75.00261

20,640,762

150.00522

41,281,524

22,103,313

44,206,626

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

70

0.29411

80,939

20.58770

5,665,720

86,674

6,067,180

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

12

0.39576

108,908

4.74912

1,306,892

116,625

1,399,500

11231

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

set

17.60368

4,844,547

17.60368

4,844,547

5,187,819

5,187,819

Item 8.13 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 184

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.14

Level Crossing Km 156+960

Replacement of Control Panel and Additional


11261 wire Connection for Level Crossing Control
Cabinet

set

7.39385

2,034,790

7.39385

2,034,790

2,178,970

2,178,970

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

14.68158

4,040,375

14.68158

4,040,375

4,326,666

4,326,666

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.39620

109,042

3.96200

1,090,421

116,768

1,167,680

11273

3,950

0.50355

138,579

1,989.02250

547,386,161

148,398

586,172,100

11274 Train Detected Sensors and Installation Works

set

19.07617

5,249,780

38.15234

10,499,559

5,621,765

11,243,530

11226 Signalling Cable Boxes and Installation Works

ea

10.27077

2,826,527

20.54154

5,653,054

3,026,807

6,053,614

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

14

0.39576

108,908

5.54064

1,524,708

116,625

1,632,750

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

40

0.23372

64,320

9.34880

2,572,818

68,878

2,755,120

10

11278

Level Crossing Control Box and Related


Installation Works

ea

3.37411

928,565

3.37411

928,565

994,360

994,360

Buried Signalling Cable 4x1, with Digging and


Burying Works

Item 8.14 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 185

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.15

Level Crossing Km 163+810

Replacement of Control Panel and Additional


11261 wire Connection for Level Crossing Control
Cabinet

set

6.93643

1,908,910

6.93643

1,908,910

2,044,170

2,044,170

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

16.58076

4,563,029

16.58076

4,563,029

4,886,354

4,886,354

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.37823

104,088

3.78230

1,040,875

111,463

1,114,630

11227

Buried Signalling Cable 7x1, with Digging and


Burying Works

2,400

0.49929

137,403

1,198.29600

329,766,828

147,139

353,133,600

11273

Buried Signalling Cable 4x1, with Digging and


Burying Works

700

0.49929

137,403

349.50300

96,181,991

147,139

102,997,300

11274 Train Detected Sensors and Installation Works

set

18.98183

5,223,808

37.96366

10,447,617

5,593,954

11,187,908

11226 Signalling Cable Boxes and Installation Works

ea

10.08821

2,776,284

30.26463

8,328,852

2,973,004

8,919,012

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

0.39128

107,679

3.13024

861,432

115,309

922,472

10

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

12

0.22924

63,093

2.75088

757,114

67,563

810,756

Item 8.15 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 186

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.16

Level Crossing Km 164+530

Replacement of Control Panel and Additional


8.16.1 11261 wire Connection for Level Crossing Control
Cabinet

set

6.93643

1,908,910

6.93643

1,908,910

2,044,170

2,044,170

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
8.16.2 11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

16.58076

4,563,029

16.58076

4,563,029

4,886,354

4,886,354

8.16.3 11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

8.16.4 11264 Reimbursement of Road Pavement

m2

10

0.37823

104,088

3.78230

1,040,875

111,463

1,114,630

620

0.43260

119,054

268.21200

73,813,666

127,490

79,043,800

8.16.6 11274 Train Detected Sensors and Installation Works

set

18.98183

5,223,808

37.96366

10,447,617

5,593,954

11,187,908

8.16.7 11226 Signalling Cable Boxes and Installation Works

ea

9.79807

2,696,432

19.59614

5,392,863

2,887,494

5,774,988

8.16.5 11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

8.16.8 11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

0.39128

107,679

3.13024

861,432

115,309

922,472

8.16.9 11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

12

0.22924

63,093

2.75088

757,114

67,563

810,756

8.16.10 11278

Level Crossing Control Box and Related


Installation Works

ea

3.93657

1,083,349

3.93657

1,083,349

1,160,112

1,160,112

Item 8.16 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 187

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.17

Level Crossing Km 171+182

Replacement of Control Panel and Additional


8.17.1 11261 wire Connection for Level Crossing Control
Cabinet

set

6.93643

1,908,910

6.93643

1,908,910

2,044,170

2,044,170

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
8.17.2 11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

16.58076

4,563,029

16.58076

4,563,029

4,886,354

4,886,354

8.17.3 11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

8.17.4 11264 Reimbursement of Road Pavement

m2

0.37823

104,088

3.02584

832,700

111,463

891,704

8.17.5 11271

Level Crossing Signalling Pole H=3.2m 2


Lamps, and Related Installation Works

set

15.05162

4,142,217

30.10324

8,284,435

4,435,724

8,871,448

8.17.6 11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

70

0.47402

130,448

33.18140

9,131,333

139,691

9,778,370

8.17.7 11273

Buried Signalling Cable 4x1, with Digging and


Burying Works

4,600

0.47402

130,448

2,180.49200

600,059,006

139,691

642,578,600

8.17.8 11274 Train Detected Sensors and Installation Works

set

18.98183

5,223,808

75.92732

20,895,233

5,593,954

22,375,816

8.17.9 11226 Signalling Cable Boxes and Installation Works

ea

9.79807

2,696,432

39.19228

10,785,727

2,887,494

11,549,976

8.17.10 11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

0.39128

107,679

3.52152

969,111

115,309

1,037,781

8.17.11 11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

10

0.22924

63,093

2.29240

630,928

67,563

675,630

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

8.17.12 11231

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

Item 8.17 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Signaling - 188

set

16.77001

4,615,116

16.77001

4,615,116

4,942,131

4,942,131

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 189

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.18

Level Crossing Km 176+150

Replacement of Control Panel and Additional


11261 wire Connection for Level Crossing Control
Cabinet

set

6.93643

1,908,910

6.93643

1,908,910

2,044,170

2,044,170

Additional Equipments ( Signal Interface Block


with Arrester, Communication Ring Receiver,
11262 Whistle, Push Button, Flashing Lights) for
Control Panel and Controller, with Installation
Work

LS

16.58076

4,563,029

16.58076

4,563,029

4,886,354

4,886,354

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.37823

104,088

3.78230

1,040,875

111,463

1,114,630

11273

3,200

0.47657

131,146

1,525.02400

419,666,832

140,439

449,404,800

11274 Train Detected Sensors and Installation Works

set

18.98183

5,223,808

37.96366

10,447,617

5,593,954

11,187,908

11226 Signalling Cable Boxes and Installation Works

ea

9.79807

2,696,432

19.59614

5,392,863

2,887,494

5,774,988

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

0.39128

107,679

3.13024

861,432

115,309

922,472

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

18

0.22924

63,093

4.12632

1,135,671

67,563

1,216,134

10

11278

Level Crossing Control Box and Related


Installation Works

ea

3.93657

1,083,349

3.93657

1,083,349

1,160,112

1,160,112

Buried Signalling Cable 4x1, with Digging and


Burying Works

Item 8.18 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 190

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.19

Level Crossing Km 184+122

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.37823

104,088

3.78230

1,040,875

111,463

1,114,630

Manipulated Control Panel and Level Crossing


11265 Control Cabinet, with PLC Technology and New
Instalation

set

167.65722

46,139,387

167.65722

46,139,387

49,408,703

49,408,703

11271

Level Crossing Signalling Pole H=3.2m 2


Lamps, and Related Installation Works

set

73.61920

20,260,062

147.23840

40,520,123

21,695,636

43,391,272

11243

Buried Signalling Cable 5x1, with Digging and


Burying Works

76

0.49968

137,519

37.97568

10,451,462

147,263

11,191,988

11273

Buried Signalling Cable 4x1, with Digging and


Burying Works

4,700

0.46628

128,322

2,191.51600

603,111,238

137,414

645,845,800

11274 Train Detected Sensors and Installation Works

set

18.98183

5,223,808

37.96366

10,447,617

5,593,954

11,187,908

11226 Signalling Cable Boxes and Installation Works

ea

9.79807

2,696,432

19.59614

5,392,863

2,887,494

5,774,988

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

10

0.39128

107,679

3.91280

1,076,790

115,309

1,153,090

10

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

100

0.22924

63,093

22.92400

6,309,282

67,563

6,756,300

11

11278

Level Crossing Control Box and Related


Installation Works

ea

3.93657

1,083,349

3.93657

1,083,349

1,160,112

1,160,112

12

11231

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

set

16.77001

4,615,116

16.77001

4,615,116

4,942,131

4,942,131

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Item 8.19 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Signaling - 191

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Signaling - 192

SIGNALING (Cont'd)
Supply, installation and wiring all signaling
equipment to complete all specified works
include, but not limited to, the following:

8.20

Level Crossing Km 186+550

11263 Control Software Programming (PLC)

set

6.75746

1,859,654

6.75746

1,859,654

1,991,424

1,991,424

11264 Reimbursement of Road Pavement

m2

10

0.37823

104,088

3.78230

1,040,875

111,463

1,114,630

Manipulated Control Panel and Level Crossing


11265 Control Cabinet, with PLC Technology and New
Instalation

set

164.72450

45,332,297

164.72450

45,332,297

48,544,425

48,544,425

11271

Level Crossing Signalling Pole H=3.2m 2


Lamps, and Related Installation Works

set

73.61920

20,260,062

73.61920

20,260,062

21,695,636

21,695,636

11272

Level Crossing Signalling Pole H=3.6m 2


Lamps, and Related Installation Works

set

88.79703

24,437,005

88.79703

24,437,005

26,168,547

26,168,547

11227

Buried Signalling Cable 7x1, with Digging and


Burying Works

59

0.39360

108,323

23.22240

6,391,045

115,998

6,843,882

11276

Cable Protection Pipes DSF 110, with Digging


and Burying Works

18

0.39128

107,679

7.04304

1,938,223

115,309

2,075,562

11277

Cable Protection Pipes Galvanize Steel 34,


with Digging and Burying Works

0.22924

63,093

0.68772

189,278

67,563

202,689

11231

Arrester Earthing, Earthing Iron Pile and


Related Installation Works

set

16.77001

4,615,116

16.77001

4,615,116

4,942,131

4,942,131

27,185.02524

7,481,283,145

Item 8.20 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

8,011,391,138

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 193

Bill No. 9: POWER SUPPLY


Item
No.

Ref.Spec

Particular & Description

High Voltage and Transformer Station 180KVA

High-Voltage Line

Unit

Quantit
y

Rate
USD

Amount
VND

USD

Total equivelent to VND


VND

Rate

Amount

9.1.1

11301

Power Line Stringer X2-35

set

8.88637

2,445,541

17.77274

4,891,082

2,618,825

5,237,650

9.1.2

11302

Auxiliary Power Line Stringer XL2-35

set

7.69974

2,118,971

7.69974

2,118,971

2,269,116

2,269,116

9.1.3

11303

Ceramic Insulator 35kV and Accessories

ea

18

0.73020

200,945

13.14360

3,617,012

215,184

3,873,312

9.1.4

11304

Clamp (aluminium) A50 - 3 Bolts

ea

12

0.17050

46,930

2.04600

563,163

50,255

603,060

9.1.5

11305

Overhead Wire AC50

190

0.05520

15,197

10.48800

2,887,354

16,273

3,091,870

9.1.6

11343

Spin-cast Concrete Pole H=12m

set

18.14567

4,993,707

18.14567

4,993,707

5,347,548

5,347,548

Transformer substation

9.1.6

11306

Transformer 180kVA - 35/0.4kV

set

495.86827

136,463,290

495.86827

136,463,290

146,132,721

146,132,721

9.1.7

11307

Distribution Cabinet 400V-300A

set

92.55269

25,470,562

92.55269

25,470,562

27,275,339

27,275,339

9.1.8

11308

Lightning Arrest MPM LGA 35KV

set

21.29060

5,859,185

21.29060

5,859,185

6,274,352

6,274,352

9.1.9

11309

Automatic Fuse 35 KV

set

24.91225

6,855,864

24.91225

6,855,864

7,341,653

7,341,653

9.1.10

11310

Spin-cast Concrete Pole LT-10C

set

15.91212

4,379,026

31.82424

8,758,051

4,689,312

9,378,624

9.1.11

11311

Concrete Pole Base LT-10C at Transformer


Station

ea

9.22960

2,539,991

18.45920

5,079,982

2,719,968

5,439,936

9.1.12

11312

Substations Power Line Carrier

set

7.39960

2,036,377

7.39960

2,036,377

2,180,669

2,180,669

9.1.13

11313

Fuse Cutout Supporter

set

3.78967

1,042,925

3.78967

1,042,925

1,116,824

1,116,824

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 194

9.1.14

11314

Surge Arrester and Neutral Insulator

set

7.49523

2,062,688

7.49523

2,062,688

2,208,845

2,208,845

9.1.15

11315

Insulated Chair

set

17.55888

4,832,214

17.55888

4,832,214

5,174,612

5,174,612

9.1.16

11316

Supporter and Accessories of Low Voltage


Cabinet

set

3.02298

831,924

3.02298

831,924

890,872

890,872

9.1.17

11317

Transformer Girder and Accessories

set

21.63498

5,953,956

21.63498

5,953,956

6,375,838

6,375,838

9.1.18

11318

Steel Ladder

set

3.77822

1,039,772

3.77822

1,039,772

1,113,447

1,113,447

9.1.19

11319

Earthing Sytstem for Transformer

LS

14.06912

3,871,840

14.06912

3,871,840

4,146,188

4,146,188

9.1.20

11320

Low Voltage Cable Carrier

set

1.26532

348,215

1.26532

348,215

372,889

372,889

9.1.21

11321

Copper Bar F8

15

1.15106

316,768

17.26590

4,751,525

339,214

5,088,210

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 195

9.1.22

11322

Low Voltage Cable Cu/XLPE/PVC 1x185 mm2

24

2.77886

764,742

66.69264

18,353,814

818,930

19,654,320

9.1.23

11323

Substation Name Plaque

ea

0.86437

237,868

0.86437

237,868

254,723

254,723

9.1.24

11324

Substation Warning Board

ea

0.72030

198,223

2.16090

594,669

212,269

636,807

9.1.25

11325

Ceramic Insulator 35kV

ea

0.89506

246,315

6.26542

1,724,207

263,769

1,846,383

9.1.26

11326

Polime Insulator 35 KV

ea

1.34695

370,679

4.04085

1,112,038

396,945

1,190,835

9.1.27

11327

Insulator-Lining Lead

kg

3.2

0.26198

72,103

0.83834

230,730

77,212

247,078

9.1.28

11328

Wire Connecting Terminal (Copper) M185

ea

0.31330

86,221

2.50640

689,765

92,330

738,640

9.1.29

11329

Wire Connecting Terminal (Copper) M70

ea

0.16680

45,896

1.00080

275,378

49,149

294,894

9.1.30

11330

Wire Connecting Terminal (Copper) M50

ea

0.10535

28,999

0.94815

260,988

31,053

279,477

9.1.31

11331

Wire Connecting Terminal (Aluminium) M50

ea

0.15342

42,213

0.46026

126,640

45,205

135,615

9.1.32

11332

Clamp 50 mm2 (Aluminium)

ea

0.11736

32,301

0.70416

193,809

34,590

207,540

9.1.33

11333

Copper Line M50

0.58961

162,259

3.53766

973,552

173,756

1,042,536

9.1.34

11334

Copper Line M70

10

0.75353

207,377

7.53530

2,073,772

222,071

2,220,710

Item 9.1 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

POWER SUPPLY (Cont'd)


Supply, installation and wiring all power supply
equipment to complete all specified works
include, but not limited to, the following:

Diesel Generator, Low Voltage and Light


system

Diesel Generator Part

Power - 196

9.2.1

11356

Diesel Generator 10kVA-230V-50Hz

set

586.48008

161,399,731

586.48008

161,399,731

172,836,093

172,836,093

9.2.2

11357

Change-Over Switchboard 3P-30A

set

26.83111

7,383,950

26.83111

7,383,950

7,907,157

7,907,157

9.2.3

11358

Power Supply Panel 30A (for Signal


Equipments Room)

set

68.75186

18,920,553

68.75186

18,920,553

20,261,214

20,261,214

9.2.4

11359

Single Pole Switch 10A-220V

ea

0.32315

88,929

0.64630

177,857

95,230

190,460

9.2.5

11360

Single Socket 16A-220V

ea

0.24926

68,591

0.24926

68,591

73,452

73,452

9.2.6

11361

Neon Lamp 2x36W

set

1.15410

317,608

1.15410

317,608

340,113

340,113

9.2.7

11362

Electric Wire Cu/PVC 2x2.5 mm2

15

0.15171

41,753

2.27565

626,290

44,711

670,665

9.2.8

11363

Signal Wire XLPE/Cu 10x1.5 mm2

15

0.33537

92,300

5.03055

1,384,504

98,840

1,482,600

9.2.9

11364

Earthing Device for Diesel Generator

LS

7.45944

2,052,849

7.45944

2,052,849

2,198,308

2,198,308

Low Voltage Part

9.2.10

11344

Low Voltage Cable 0.6/1kV


2
Cu/XLPE/DSTA/PVC 4x10 mm

75

0.34240

94,225

25.68000

7,066,890

100,902

7,567,650

9.2.11

11345

Low Voltage Cable 0.6/1kV


Cu/XLPE/DSTA/PVC 3x35+1x25 mm2

60

1.03963

286,112

62.37780

17,166,733

306,385

18,383,100

9.2.12

11346

Low Voltage Cable 0.6/1kV


2
Cu/XLPE/DSTA/PVC 3x25+1x16 mm

650

0.86105

236,963

559.68250

154,025,641

253,753

164,939,450

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 197

9.2.13

11347

Low Voltage Cable 0.6/1kV


Cu/XLPE/DSTA/PVC 3x10+1x6 mm2

190

0.40394

111,162

76.74860

21,120,812

119,039

22,617,410

9.2.14

11371

Cable Ditch Excavation and Filling

380

0.53171

146,323

202.04980

55,602,609

156,691

59,542,580

9.2.15

11342

Plastic Pipes HDPE D65/50

1,000

0.13019

35,832

130.19000

35,832,295

38,371

38,371,000

9.2.16

11372

Warning Belt

610

0.04629

12,733

28.23690

7,767,340

13,636

8,317,960

9.2.17

11373

Brick M75

ea

5,490

0.00631

1,742

34.64190

9,563,333

1,865

10,238,850

9.2.18

11374

Back Filling Black Sand

m3

64.1

0.31579

86,913

20.24214

5,571,129

93,071

5,965,851

9.2.19

11348

Cable Marking Stake

ea

30

0.11670

32,111

3.50100

963,340

34,387

1,031,610

9.2.20

11349

Wire Connecting Terminal (Copper) M10

ea

16

0.07903

21,747

1.26448

347,951

23,288

372,608

9.2.23

11352

Wire Connecting Terminal (Copper) M16

ea

0.10115

27,843

0.80920

222,741

29,815

238,520

9.2.22

11351

Wire Connecting Terminal (Copper) M25

ea

26

0.09114

25,075

2.36964

651,944

26,852

698,152

9.2.21

11350

Wire Connecting Terminal (Copper) M35

ea

0.16370

45,052

0.98220

270,311

48,244

289,464

Light System at Station Platform

9.2.24

11335

Switchboard 500V-32A

set

44.91424

12,360,433

44.91424

12,360,433

13,236,261

13,236,261

9.2.25

11336

Galvanized Lamp Pole with Arm H=10m

set

24.99891

6,879,715

174.99237

48,158,007

7,367,194

51,570,358

9.2.26

11337

High-Pressure Lamp with Component Bulb


SON 250W-220V

set

11.83801

3,257,827

82.86607

22,804,788

3,488,668

24,420,676

9.2.27

11338

Low Voltage Cable 0.6/1kV/XLPE/DSTA/PVC


2
4x6 mm

150

0.33686

92,709

50.52900

13,906,384

99,278

14,891,700

9.2.28

11339

Electric Wire Cu/ PVC 2x2.5 mm

85

0.09961

27,413

8.46685

2,330,071

29,355

2,495,175

9.2.29

11340

Earthing Device for Lamp Pole

set

1.23369

339,519

8.63583

2,376,633

363,576

2,545,032

9.2.30

11341

Base for Lighting Switchboard Cabinet

m3

5.65467

1,556,165

5.65467

1,556,165

1,666,431

1,666,431

9.2.31

11371

Cable Ditch Excavation and Filling

m3

191

0.56129

154,467

107.20639

29,503,167

165,412

31,593,692

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 198

9.2.32

11372

Warning Belt

425

0.04308

11,854

18.30900

5,037,924

12,694

5,394,950

9.2.33

11373

Brick M75

ea

3,825

0.00580

1,597

22.18500

6,108,142

1,710

6,540,750

9.2.34

11374

Back Filling Black Sand

46.8

0.39632

109,074

18.54778

5,104,651

116,802

5,466,333

9.2.35

11342

Plastic Pipes HDPE D65/50

200

0.15347

42,232

30.69400

8,446,467

45,225

9,045,000

Item 9.2 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Power - 199

POWER SUPPLY (Cont'd)


Supply, installation and wiring all power supply
equipment to complete all specified works
include, but not limited to, the following:

9.3

Power Supply for Level Crossing

9.3.1

11353

Low Voltage Cable 0.6/1kV Cu/XLPE/PVC 2x4


2
mm

35

0.10541

29,004

3.68935

1,015,123

31,059

1,087,065

9.3.2

11354

Steel Wire 3

30

0.01803

4,955

0.54090

148,662

5,307

159,210

9.3.3

11355

Watt-Hour Meter Box

set

1.61950

445,685

4.85850

1,337,054

477,265

1,431,795

3,378.78261

929,875,562

Item 9.3 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

995,761,828

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-200

Total for TOPO-SURVEY


Rate
Item no. Ref.Spec

Description

Unit

USD
C.1

Amount

Total equivelent to VND

Quantity
VND

USD

VND

Rate

Amount

Bridge Survey

C.1.1

Additional topo-mapping of bridges on land at


1/500 scale

ha

72.2

7.63930

2,102,337

551.55746

151,788,707

2,251,303

162,544,077

C.1.2

Additional topo-mapping of bridges in water at


1/500 scale

ha

12.4

9.85040

2,710,830

122.14496

33,614,294

2,902,913

35,996,121

C.1.3

Inspection of bridge piles

pile

37.6

8.18908

2,253,637

307.90941

84,736,749

2,413,324

90,740,982

C.1.4

Cross-section of approach road at both sides

33,840.0

0.03258

8,963

1,102.50720

303,297,430

9,598

324,796,320

C.1.5

Surveying of the longitudinal profile of stream


bed

4,000.0

0.02655

7,303

106.20000

29,213,100

7,821

31,284,000

C.1.6

Surveying of the cross-section of river bed

3,700.0

0.04800

13,215

177.60000

48,895,500

14,151

52,358,700

C.1.7

Current status of medium bridges for


inspection

bridge

8.4

22.43790

6,174,922

188.47836

51,869,344

6,612,461

55,544,672

C.1.8

Current status of small bridges for inspection

bridge

10.4

14.47607

3,983,821

150.55113

41,431,735

4,266,104

44,367,482

Item C.1 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-201

Total for TOPO-SURVEY


Item No. Ref.Spec
C
C.2

Particular & Description

Unit

Quantity

TOPO-SURVEY (Cont'd)
Station Survey

C.2.1

Additional station plane at 1/1000 scale

ha

27.6

3.40895

938,139

94.08702

25,892,649

1,004,614

27,727,346

C.2.2

Additional topo-mapping of station at 1/1000


scale

ha

39.2

3.40895

938,139

133.63084

36,775,068

1,004,614

39,380,869

C.2.3

Surveying of the longitudinal profle

18,516.0

0.01897

5,216

351.24852

96,581,030

5,586

103,430,376

C.2.4

Surveying of the cross-section

18,694.0

0.03258

8,963

609.05052

167,548,527

9,598

179,425,012

C.2.5

Longitudinal profile of roadway

400.0

0.01897

5,216

7.58800

2,086,434

5,586

2,234,400

C.2.6

Cross-section of roadway

720.0

0.03258

8,963

23.45760

6,453,137

9,598

6,910,560

Item C.2 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-202

Total for TOPO-SURVEY


Item No. Ref.Spec
C
C.3

Particular & Description

Unit

Quantity

TOPO-SURVEY (Cont'd)
Alignment Survey

C.3.1

Additional topo-mapping of alignment at


1/1000 scale

ha

8.9

7.63930

2,102,337

67.98977

18,710,796

2,251,303

20,036,597

C.3.2

Longitudinal profile of realignment section

2,977.0

0.02505

6,892

74.57385

20,516,070

7,380

21,970,260

C.3.3

Cross-section of realignment section

19,648.0

0.03258

8,963

640.13184

176,098,933

9,598

188,581,504

C.3.4

Longitudinal profile of upgraded section

82,273.0

0.01897

5,216

1,560.71881

429,142,961

5,586

459,576,978

C.3.5

Cross-section of upgraded section

43,023.0

0.03258

8,963

1,401.68934

385,601,812

9,598

412,934,754

C.3.6

Cross-section of slide

28,815.0

0.03258

8,963

938.79270

258,259,912

9,598

276,566,370

Item C.3 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-203

Total for TOPO-SURVEY


Item No. Ref.Spec
C
C.4

Particular & Description

Unit

Quantity

TOPO-SURVEY (Cont'd)
Level Crossing Survey

C.4.1

Topo-mapping of level crossing at 1/200 scale

ha

3.2

28.77382

7,918,582

92.07622

25,339,461

8,479,671

27,134,947

C.4.2

Longitudinal profile of road

1,800.0

0.01897

5,216

34.14600

9,388,953

5,586

10,054,800

C.4.3

Cross-section of road

4,320.0

0.03258

8,963

140.74560

38,718,821

9,598

41,463,360

Item C.4 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-204

Total for TOPO-SURVEY


Item No. Ref.Spec
C
C.5

Particular & Description

Unit

Quantity

TOPO-SURVEY (Cont'd)
Culvert Survey

C.5.1

Additional topo-mapping of culvert at 1/200


scale

ha

0.9

28.77382

7,918,582

25.89644

7,126,723

8,479,671

7,631,704

C.5.2

Longitudinal profile of culvert

3,000.0

0.01897

5,216

56.91000

15,648,255

5,586

16,758,000

C.5.3

Current status of culverts for inspection

24.0

2.46092

677,249

59.06208

16,253,977

725,237

17,405,688

Item C.5 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

culvert

Total VND :

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Topo-Survey-205

Total for TOPO-SURVEY


Item No. Ref.Spec
C
C.6

Particular & Description

Unit

Quantity

TOPO-SURVEY (Cont'd)
Setting of Control Network (x 0.2)

C.6.1

Inspection and recovery of control network of


triangular plan grade 4 (GPS)

point

1.8

56.65872

15,592,522

101.98570

28,066,540

16,697,367

30,055,261

C.6.2

Inspection of leveling control survey grade 4

km

19.0

7.24591

1,994,082

137.67229

37,887,553

2,135,377

40,572,163

C.6.3

Inspection and recovery of control network of


secondary control points

point

76.0

8.18908

2,253,637

622.37008

171,276,407

2,413,324

183,412,624

C.6.4

Inspection of technical leveling control survey


work

km

17.0

3.61861

995,839

61.51637

16,929,265

1,066,402

18,128,834

9,942.28811

2,735,150,143

Item C.6 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

2,929,024,761

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Daywork-206

Total for DAYWORK


Item No.
B

Particular & Description

Page

Amount (VND)

DAYWORK
COLLECTION
69,384,800

B.1

Daywork Labor

B.2

Daywork Materials

150,064,933

B.3

Daywork Contractor's Equipment

152,767,748

US$ 19,088
Item B Carried Forward to Summary

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

372,217,481

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Daywork-207

Total for DAYWORK


Item No.
B
B.1

Particular & Description

Unit

Quantity

Rate

Amount

DAYWORK (Cont'd)
Daywork Labor

B.1.1

Forman

hr

160.0

31,731

5,076,960

B.1.2

Equipment Operator

hr

640.0

23,798

15,230,720

B.1.3

Skilled Labour

hr

640.0

23,798

15,230,720

B.1.4

Common Labour

hr

1,600.0

21,154

33,846,400

Item B.1 Carried forward to Collection

69,384,800

Total VND :

Total for DAYWORK


Item No.

Particular & Description

DAYWORK (Cont'd)

B.2

Daywork Materials

Unit

Quantity

Rate

Amount

B.2.1

Concrete M200

m3

15.0

735,563

11,033,445

B.2.2

Concrete M300

m3

30.0

893,312

26,799,360

B.2.3

Reinforcement bar

ton

3.0 12,265,000

36,795,000

B.2.4

Stone material as rubble stone

m3

10.0

214,769

2,147,690

B.2.5

Stone material as crushed stone

m3

51.0

266,538

13,593,438

B.2.6

Steel Materials as plate, pipe, wire and others

Ton

4.0 14,924,000

59,696,000

Item B.2 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

150,064,933

Package CP2
Contract No. YVLC-002-CP2

Volume 2 - Bill of Quantities

Daywork-208

Total for DAYWORK


Item no.
B
B.3

Description

Unit

Quantity

Rate

Amount

DAYWORK (Cont'd)
Daywork Contractor's Equipment

B.3.1

Rental of Wheel Loader (0.8m3)

hr

48.0

214,294

10,286,112

B.3.2

Rental of Excavator (0.3m3)

hr

48.0

193,337

9,280,176

B.3.3

Rental of Bulldozer (100 HP)

hr

48.0

200,417

9,620,016

B.3.4

Rental of Dump Truck (10 ton)

hr

120.0

221,154

26,538,480

B.3.5

Rental of Vibration Roller (15 ton)

hr

40.0

240,560

9,622,400

B.3.6

Rental of Truck Crane (20 ton)

hr

60.0

413,748

24,824,880

B.3.7

Truck Crane (35 ton)

hr

16.0

655,676

10,490,816

B.3.8

Rental of Vibrator Hammer

hr

32.0

125,000

4,000,000

B.3.9

Rental of Clamshell (0.65 m3)

hr

56.0

272,727

15,272,712

B.3.10

Rental of Air Compressor (9 m3/min)

hr

56.0

144,823

8,110,088

B.3.11

Rental of Generator (100 KVA)

hr

56.0

181,818

10,181,808

B.3.12

Rental of Concrete Pump Truck (60 m3/hr)

hr

32.0

330,057

10,561,824

B.3.13

Rental of Agitator Truck (5 m3)

hr

28.0

142,087

3,978,436

Item B.3 Carried forward to Collection

Yen Vien - Lao Cai Railway Upgrading Project


ADB Loan No. 2302-VIE and AFD Loan No. CVN 6006 01

Total VND :

152,767,748

Package CP2
Contract No. YVLC-002-CP2