JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING

AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS 1.0 Weather POTENTIAL HAZARDS 1.1 Sun Burn 1.2 Heat stress and dehydration 1.3 Dust 2.0 Excavation 2.1 Collapse of Excavation 2.2 Fall and hit 2.3 Movement of Machinery HAZARDS CONTROL 1.1.1 Adequate shelter will be provided for workers to take rest 1.2.1 Sufficient quantity cool drinking water will be made 1.2.2 Rotation of workers will be made suitably 1.3.1 Water will be sprayed to suppress the dust and dust mask will be provided to workers 2.1.1 Sloping,shoring benching will be applied as applicable. 2.2.1 Excavated materials to be kept away from the edge of excavation. 2.3.1 Equipment will be equiped with Reverse alarm and revolving warning light Banks Man will be provided for heavy equipments 2.4.1 Excavated area must be barricaded with crash barrier and deep excation board will be displayed. proper access and egress will be kept available 2.5 Undergroud services 2.5.1 Undergroud services shall be identified if any by using electronic detector or by trial pit and checking through
concerned drawing

RESPONSIBLE Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

2.4 Deep Fall

Dodsal Site Supervisor

Dodsal Site Supervisor

3.0 Form work

3.1 Collapse of structure, damage and injury

3.1.1 Skilled and competent workers to be depolyed 2.1.2 Form work shall be constructed as per approved drawing

Dodsal Site Supervisor Dodsal Site Supervisor


Page 1 of Pages 6

JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL and design with adequate strength. 3.1.3 Only approved materials to be used and also ensured the application of Tie rod, standard wooden support and universal jack 3.1.4 Removal of form shall be done only after specified time Dodsal Site Supervisor Dodsal Site Supervisor RESPONSIBLE

duration to set concrete to gain sufficient strength 3.2 Fall of personel, material and 3.2.1 Adequate working platform with sufficient board ,toe board Dodsal Site Supervisor and guard rail to be provided injury 3.2.2 Adequate, clear access and egress shall be maintained Dodsal Site Supervisor always. 3.2.3 Personnesl working at elevated position shall wear full body Dodsal Site Supervisor harness with fall arrestor system 3.3.1 Deffect free tools, denailing and application of Dodsal Site Supervisor sharp edge protection and appropriate PPEs 3.4.1 Good housekeeping shall be maintained all the time and Dodsal Site Supervisor materials shall be stored at designated places only 3.4.2 Work area shall be illuminated with adequated lightrs during work at neight or when visibility is poor 3.4.3 Area shall be barricaded with relevant sign board
4.0 Working at height and 4.1 Fall of personnel, material, 4.1.1 Competent and experienced workers shall be depolyed

3.3 Nails, tools and sharp edge injury 3.4 Slip, trip and fall

Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

Page 2 of Pages 6

JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS provision of scaffolding POTENTIAL HAZARDS collapse and injury HAZARDS CONTROL and personnel working at height shall wear full body harness with fall aresstor system 4.1.2 Inspected and certified scaffold and access ladder shall be erected and working platform shall be provided with adequate number of wooden planks,guard rail and toe board 4.1.3 Materials left at elevated places shall be properly secured 4.1.4 Area shall be barricaded with relavent sign board to prevent unauthorized entry 4.2 Slip, trip and fall 4.2.1 No loose material shall be left at elavated work area and all tools and material shall be secured and stored properly 4.2.2 Adequate access and egress shall be maintained always 5.0 Steel bar bending, fixing and storage / Reinforcement 5.1 Equipment failure, cut and injury due to splashing of metal parts 5.1.1 Equipment shall be inspected and certified for its competency 5.1.2 Experienced and competent workers shall be deployed with adequate and appropriate tools 5.1.3 Store the steel in segregation at the designated places with Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor RESPONSIBLE

Dodsal Site Supervisor

Page 3 of Pages 6

JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL proper barrication and sign board 5.1.4 Equipments shall be fitted with apporpriate machine guard Dodsal Site Supervisor to protect from moving parts 5.2 Manual lifting of steel structures 5.3 Enviornmental pollution 6.0 Cleaning of form work prior to concreting 6.1 Compressor air, Dust and nuisance to public 5.2.1 Manual lifting shall be avoided, use equipments to lift heavyDodsal Site Supervisor steel structures 5.3.1 Steel scraps shall be accumulated and disposed as per the approved procedure at designated area 6.1.1 Use only low pressure compressor air to avoid emission of Dodsal Site Supervisor dust. 6.1.2 Compressor air shall not be used to clean dirt and dust on cloth 7.0 Concreting / masonary work 7.1 Fall of personel, material and 7.1.1 Use certified working platform, approved form work injury and collapse and follow scaff tag System for scaffolding. 7.1.2 Material handling and storage shall be done as per standard procedure and complay good house keeping 7.1.3 Experienced and competent person shall be deployed more than 1.5 mts to avoid displacement of reinforcement or Dodsal Site Supervisor 7.1.4 Concrete shall not be allowed to fall freely from a height of Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor RESPONSIBLE

Page 4 of Pages 6

JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS form work 7.1.5 Concreting shall not be done when adverse weather condition prevails 7.1.6 House keeping to be maintained always Dodsal Site Supervisor Dodsal Site Supervisor HAZARDS CONTROL RESPONSIBLE

7.2 Equipments failure, collapse 7.2.1 Equipments shall be inspected and certified by QP approved Dodsal Site Supervisor and injury third party 7.2.2 Operators of mixers, pumps and other equipments involved Dodsal Site Supervisor shall be approved with relevant licence by QP approved third Dodsal Site Supervisor party All access road leading to site shall be safe for traffic Dodsal Site Supervisor movements No infringing activity shall be permitted when concreting Dodsal Site Supervisor is going on Dumping, cleaning and disposal of concrete waste Dodsal Site Supervisor to be done at designated area only Equipment shall be maintained and inspected for its suitablity Dodsal Site Supervisor Experienced workers shall be deployed to man such Dodsal Site Supervisor equipment Workers shall be rotated suitably to avoid prolonged Dodsal Site Supervisor exposure to viberation Inspect the form work prior to concreting and compaction Dodsal Site Supervisor Viberators shall not be used along the forms to avoid damageDodsal Site Supervisor
Page 5 of Pages 6

7.2.3 7.2.4 7.3 Enviornmental pollution 8.0 Compaction of concrete 7.3.1

8.1 Equipment failure and injury 8.1.1 8.1.2 8.2 Exposure to viberation 8.2.1

8.3 Collapse of form work and 8.3.1 displacement of reinforcement 8.3.2

JOB SAFETY ANALYSIS FOR EARTHWORKS, BLINDING, SCREEDING, WATER PROOFING, FORM WORK, REINFORCEMENT, CONCRETING AND CURING AT RECEIVING BASIN AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE

9.0 Curing of concrete

8.4 Noise 9.1 Equipment failure

9.2 Fall of personel and injury 10.0 Water proofing 10.1 Corrosive material

11.0 Material handling and Storage

11.1 Slip,trip, fall and injury

and displacement of reinforcement 8.4.1 Ear plugs/Ear muffs shall be used to avoid exposure to noiseDodsal Site Supervisor 9.1.1 Equipment shall be certified by QP approved third party Dodsal Site Supervisor 9.1.2 Operators shall be certified with licence by QP approved Dodsal Site Supervisor third party 9.2.1 Clear access shall be maintained all the time and working Dodsal Site Supervisor platform shall be provided 10.1.1 Workers shall be trained for application and safe handling Dodsal Site Supervisor of the material. 10.1.2 Water proofing material shall be stored in designated area Dodsal Site Supervisor 11.1.1 Material will be stored in their designated area Dodsal Site Supervisor 11.1.2 Barricading will be provided for open the storage area Dodsal Site Supervisor 11.1.3 As far as possible mechanical handling will be done to Dodsal Site Supervisor to avoid manual handling

Remarks: 1- Prior to start any work it will be made sure that personnel are safety inducted. 2- Prior to start any work Tool Box Talk will be crried out. 3- Personnel will wear applicable PPE. 4- Adequate first aid facility will be provided. 5- Adequate fire extinguishers shall be provided with every equipments to meet any eventuality Prepared By: M P Gupta ( Civil Engineer ) Reviewed By: Solayappan ( HSE Officer )