JOB SAFETY ANALYSIS FOR EARTHWORK AT RECEIVING BASIN

COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS 1.0 Excavation POTENTIAL HAZARDS 1.1 Under ground services HAZARDS CONTROL 1.1.1 Appropriate consolidated permit to wprk must be obtained prior to start of excavation RESPONSIBLE Dodsal Site Supervisor

1.1.2 Under groundservices must be identified prior to start of work and work shall be start with trial pit method, no mechanical excavation with Dodsal Site Supervisor in a proximity of 6 meters from any services 1.2 Movement of machinery 1.2.1 All equipments to be inspected and certified prior to their induction to site 1.2.2 Experienced, trained and certified operators with relevant license shall be deployed 1.2.3 Equipment must be equiped with reverse alarm and revolving warning lights 1.2.4 Banks Man wearing with reflective jackets to be provided for every heavy equipments 1.3.1 Procedures like sloping, benching and shoring to be applied considering soil condtion. 1.3.2 Excavated materials to be kept away from a minimum 2 meters from the edge of excavation Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

1.3 Collapse of Edge of Excavation

1 of Pages 4

JOB SAFETY ANALYSIS FOR EARTHWORK AT RECEIVING BASIN

COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE

1.4 Deep fall and Injury

1.3.3 Equipments and heavy machinery must keep a safety margin of 3 Dodsal Site Supervisor meters from the edge of excavation 1.4.1 Excavated area must be barricaded with hard barrier by means of Dodsal Site Supervisor scaffolding and deep excavation sign board to be displayed 1.4.2 Adequate access and egress to be kept avialble and the same to be Dodsal Site Supervisor ensured in every 25 feet of latteral length 1.4.3 Alluminium ladder or ladder with guard to be provided at regular Dodsal Site Supervisor interval incase of lengthy excavation 1.5.1 Dumping and disposal of excavated area must be carried out only Dodsal Site Supervisor at designated area by QP 1.5.2 Waste, spills generated by the activity to be contained and disposed at designated area as per applicable pfocedures. Dodsal Site Supervisor

1.5 Enviornmental

2.0 Filling

2.1 Dust allergy

2.1.1 During offloading of filling material workers shall wear dust mask Dodsal Site Supervisor 2.1.2 Care shall be taken to control dust, not to cause a nuisance to public by pouring and spraying water Dodsal Site Supervisor

2 of Pages 4

JOB SAFETY ANALYSIS FOR EARTHWORK AT RECEIVING BASIN

COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS 3.0 Compaction POTENTIAL HAZARDS 3.1 Equipment failure 3.2 Injury 3.3 Exposure to Vibration HAZARDS CONTROL 3.1.1 Equipments shall be inspected and certified prior to its induction to site and care shall be taken to ensure proper maintanace 3.2.1 Experienced and trained workers shall be deployed 3.3.1 Workers shall be rotated to avoid prolonged vibration RESPONSIBLE Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

3.3.2 Equipments to be maintained properly, if defective the same to be Dodsal Site Supervisor discarded from the service 3.4 Noise 4.0 Material handling and Storage 4.1 Slip,trip, fall and injury 3.4.1 Ear plugs/ Ear muffs shall be used to avoid exposure to noise 4.1.1 Material will be stored in their designated area 4.1.2 Barricading will be provided for open and storage area 4.1.3 Minimise the manual handling and used equipment. 5.0 Weather 5.1 Sun Burn 5.2 Heat stress and dehydration 5.1.1 Adequate shelter to be provided for workers to take rest 5.2.1 Sufficient quantity of cool drinking water will be made 5.2.2 Rotation of workers will be made suitably Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

3 of Pages 4

JOB SAFETY ANALYSIS FOR EARTHWORK AT RECEIVING BASIN

COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS 5.3 Dust HAZARDS CONTROL 5.3.1 Water will be sprayed to suppress the dust and dust mask to be provided to workers Remarks: 1- Prior to start any work it will be made sure that personnel are safety inducted. 2- Prior to start any work Tool Box Talk will be carried out. 3- Personnel will wear all applicable PPE. 4- Adequate first aid facility will be provided. 5- Adequate fire extinguishers shall be provided with every equipments. Prepared By: M P Gupta ( Civil Engineer ) Reviewed By: Solayappan ( HSE Officer ) RESPONSIBLE Dodsal Site Supervisor Dodsal Site Supervisor

4 of Pages 4