You are on page 1of 25

By :ANUP SHEE

Date :
Chd :
Date :

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

Office : DI

Strip no 4
S23' panel
Input data:
Support condition(simply or continuous) :
continuous
Type of the panel=
2)One short edge discontinuous
Grade of concrete M-.
30
N/mm2
Grade of steel =Fe-..
415
N/mm2
1)c/c span of larger panel 3600 mm
2)width of support :
350 mm
Calculation:
Clear span:
3250 mm
Approximate depth of slab:
deff.=span/(h1*h2*h3)
Span=

c/c span
or clear span+deff.

which ever
less

At first take span of panel=c/c span=.


3600 mm
where,
h1= basic value of eff. Span to eff. Depth ratio=
h2= factor for span more than 10 m=
h3= modification factor depending upon steel=
(consider pt=0.12%& fs=240n/mm2)
deff req.= 81.447964
Over all depth=D=deff.+clear cover+0.5*dia. Of bar=
105.448
(clear cover=
20 mm
dia of bar=
8 mm
)
Over all depth provided=
150 mm
safe
deff pro.=
126 mm
span=
=

c/c larger span=


or clear larger span+deff.=
3376 mm

B.M from staad out put


a) Moment along the strip:
1) Max midspan moment=
2)Max moment for the strip
Check for strength criteria:
dreqd.=sqrt(Mu/(0.138*fck*b)
dreqd.=
57.483457 mm
deff. pro.=
126 mm

26
1
1.7

3600 mm
3376 mm

IS 456:2000
cl-23.2.1

whichever
is less

0 kn.m
13.68 kn.m

Hence

Safe for strength criteria.

Ast=Mu/(0.87*fy*j*d)
(for mid span moment)
j=lever arm factor=0.5+sqrt(0.25-Mu/(0.87*fck*b*d^2))
= 1.000
Calculation of steel:
a) Steel in short direction (at mid span):
1) Steel at midspan=
0 sq.mm
Ast min.= 0.12% of cross section
180
sq.mm
{S max=300 or
3d, whichever less }
S max.=

300 mm

By :ANUP SHEE
Date :
Chd :
Date :
Bar dia
Midspan

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Office : DI

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

Spacing
S reqd.
S pro.
8 279.253
275

Check for deflection(at mid span):


Ast reqd=
0 sq.mm , Ast pro.=
182.8 sq.mm
fs = 0.58*fy*(Ast reqd/Ast pro) =
0 N/sq.mm
pt pro. =
0.1450663 % (percentage of tension reinforcement)
Value of modification factor =h3=
1.4 (from fig. 4 of IS 456:2000)
(For limited deflection )
dreqd.= 92.747253 mm
dpro=
126 mm
Overall comment =
safe
Hence, provide Y8 bar @ 275mm c/c

moment

S REQD
279.253

S PRO
275

Y8 @ 275mm c/c

B DIA
8

IS 456:2000
cl-23.2.1

By :ANUP SHEE
Date :
Chd :
Date :

Position
from left
Strip 1
Grid
Grid
Grid
Grid
Grid
Grid
Strip 2
Grid
Grid
Grid
Grid
Grid
Grid

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Office : DI

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

Moment(max) S,reqd Thickness Bar provided


(KN-m)
(mm) of slab(mm)

1
Span
2
Span
3
Span
4
Span
5
Span
6

0
-8.06
11.63
-7.55
11.43
-7.89
11.18
-7.47
13.68
-11.47
5.62

279.3
278.1
190.9
279.3
194.4
279.3
198.9
279.3
161.4
193.7
279.3

150
150
150
150
150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c
Y8 @ 195mm c/c
Y8 @ 275mm c/c
Y8 @ 160mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c

1
Span
2
Span
3
Span
4
Span
5
Span
6

0
-1.81
2.1
-0.91
1.45
-1.11
1.77
-1.39
1.74
-1.32
5.62

279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3

150
150
150
150
150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c

By :ANUP SHEE
Date :
Chd :
Date :
Strip 3
Grid
1
Span
Grid
2
Span
Grid
3
Span
Grid
4
Span
Grid
4Z
Span
Grid
5
Span
Grid
6
Strip 4
Grid
Grid
Grid
Grid
Strip 5
Grid
Grid
Grid
Grid
Strip 6
Grid
Grid
Grid
Grid

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Office : DI

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

5.63
-16.67
23.96
-15.96
23.67
-14.59
16.43
-3.51
3.88
-4.46
6.71
-4.79
5.62

279.3
131.4
138.7
137.5
140.5
151
133.4
279.3
279.3
279.3
279.3
279.3
279.3

150
150
150
150
150
150
150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 130mm c/c
Y10 @ 135mm c/c
Y8 @ 135mm c/c
Y10 @ 140mm c/c
Y8 @ 150mm c/c
Y8 @ 130mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c

C
Span
AY
Span
2B2
Span
A

5.63
-5.81
7.58
-3.5
11.7
-10.03
5.63

279.3
279.3
279.3
279.3
189.8
222.3
279.3

150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 185mm c/c
Y8 @ 220mm c/c
Y8 @ 275mm c/c

C
Span
AY
Span
2B2
Span
A

5.63
0
0.83
-4.61
11.02
-8.38
5.63

279.3
279.3
279.3
279.3
201.8
267.2
279.3

150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 200mm c/c
Y8 @ 265mm c/c
Y8 @ 275mm c/c

2B12
Span
Ay
Span
2B2
Span
A

0
-5.82
7.87
-5.09
11.34
-8.76
5.62

279.3
279.3
279.3
279.3
196
255.4
279.3

150
150
150
150
150
150
150

Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 195mm c/c
Y8 @ 255mm c/c
Y8 @ 275mm c/c

By :ANUP SHEE
Date :
Chd :
Date :

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Office : DI

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

By :ANUP SHEE
Date :
Chd :
Date :

TCE CONSULTING ENGINEERS LIMITED


Job No.TCE-4786A

Office : DI

Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of

Strip 6
Position
from left
support 1
span 1
support 2
span 2
support 3
span 3
support 4

Moment(max) S,reqd Thickness Bar provided


(KN-m)
(mm) of slab(mm)
5.63
436.3
150 Y10 @ 300mm c/c
-10.83
316.5
150 Y10 @ 300mm c/c
9.34
368.8
150 Y10 @ 300mm c/c
12.42/-0.64
274.6
150 Y10 @ 270mm c/c
29.5
108.6
150 Y10 @ 105mm c/c
-23.89
137.1
150 Y10 @ 135mm c/c
0
436.3
150 Y10 @ 300mm c/c

Strip 5
Position
from left
support 1
span 1
support 2
span 2 (top and bottom)
support 3
span 3 (top and bottom)
support 4

Moment(max) S,reqd Thickness Bar provided


(KN-m)
(mm) of slab(mm)
5.63
279.3
150 Y8 @ 275mm c/c
-8.35
267.1
150 Y8 @ 265mm c/c
11.05
200.1
150 Y8 @ 200mm c/c
1.01/-4.68
279.3
150 Y8 @ 275mm c/c
0.55/-1.36
279.3
150 Y8 @ 275mm c/c
2.15/0.39
279.3
150 Y8 @ 275mm c/c
5.63
279.3
150 Y8 @ 275mm c/c

Strip 4

279.3
150 Y8 @ 275mm c/c
Moment(max) S,reqd Thickness Bar provided
(KN-m)
(mm) of slab(mm)
5.63
279.3
150 Y8 @ 275mm c/c
-10.28
215.6
150 Y8 @ 215mm c/c
11.63
189.8
150 Y8 @ 185mm c/c
5.39/-3.34
279.3
150 Y8 @ 275mm c/c
10.79
205.1
150 Y8 @ 205mm c/c
-8.49
262.5
150 Y8 @ 260mm c/c
5.63
279.3
150 Y8 @ 275mm c/c

Position
from left
support 1
span 1
support 2
span 2 (top & bottom)
support 3
span 3
support 4

By :ANUP SHEE
TCE CONSULTING ENGINEERS LIMITED
Client :HPCL
Date :
Project :110KV GIS FOR HPCL
Chd :
Job No.TCE-4786A
Office : DI
Subject: First floor slab design
Date :
Sh. No.
Of
Strip 3
279.3
150 Y8 @ 275mm c/c
Position
Moment(max) S,reqd Thickness Bar provided
from left
(KN-m)
(mm) of slab(mm)
support 1
5.91
279.3
150 Y8 @ 275mm c/c
span 1
1.02/-17.24
125.6
150 Y8 @ 125mm c/c
support 2
23.42
90.49
150 Y8 @ 90mm c/c
span 2 (top steel reqd)
2.57/-14.66
149.1
150 Y8 @ 145mm c/c
support 3
23.15
91.64
150 Y8 @ 90mm c/c
span 3
-15.1
144.5
150 Y8 @ 140mm c/c
support 4
16.94
128
150 Y8 @ 125mm c/c
span 4 (top & bottom)
5.05/-3
279.3
150 Y8 @ 275mm c/c
support 5
4.26/-0.47
279.3
150 Y8 @ 275mm c/c
span 5
-5.11
279.3
150 Y8 @ 275mm c/c
support 6
4.28
279.3
150 Y8 @ 275mm c/c
span 6
0.83/-2.25
279.3
150 Y8 @ 275mm c/c
support 7
5.91
279.3
150 Y8 @ 275mm c/c
Strip 2
Position
from left
span no 1
support 2 ( top)
span no 2
support 3 ( top)
span no 3
support 4 ( top)
span no 4
support 5 ( top)
span no 5 (top steel reqd)
support 6 ( top)

Moment(max) S,reqd Thickness Bar provided


(KN-m)
(mm) of slab(mm)
-1.48
279.3
150 Y8 @ 275mm c/c
2.27
279.3
150 Y8 @ 275mm c/c
-1.28
279.3
150 Y8 @ 275mm c/c
2.11
279.3
150 Y8 @ 275mm c/c
-1.37
279.3
150 Y8 @ 275mm c/c
2.36
279.3
150 Y8 @ 275mm c/c
-1.7
279.3
150 Y8 @ 275mm c/c
2.35
279.3
150 Y8 @ 275mm c/c
1.2/-1.61
279.3
150 Y8 @ 275mm c/c
5.91
279.3
150 Y8 @ 275mm c/c

Strip 1
Position
from left
span no 1
support 2 ( top)
span no 2
support 3 ( top)
span no 3
support 4 ( top)
span no 4 (top steel reqd)
support 5 ( top)
span no 5
support 6 ( top)

Moment(max) S,reqd Thickness Bar provided


(KN-m)
(mm) of slab(mm)
-8.46
263.5
150 Y8 @ 260mm c/c
12.31
178.9
150 Y8 @ 175mm c/c
0.39/-7.83
279.3
150 Y8 @ 275mm c/c
12.02
183.4
150 Y8 @ 180mm c/c
0.53/-8.2
272.1
150 Y8 @ 270mm c/c
11.8
186.9
150 Y8 @ 185mm c/c
1.45/-7.77
279.3
150 Y8 @ 275mm c/c
14.28
153.2
150 Y8 @ 150mm c/c
-11.77
187.4
150 Y8 @ 185mm c/c
5.91
279.3
150 Y8 @ 275mm c/c

INPUT DATA SHEET


Design of a slab
Input data:
(Red data are input data )
Support condition(simply or continuous) :
Type of the panel=
Live load =
5 kn/m2
Dead load for floor finishing =
0.6
Thickness of celing plastering=
0
Grade of concrete M25 N/mm2
Grade of steel =Fe500 N/mm2
Panel ..All floor slabs
1)c/c span of slab panel
a)longer span:
4600
b)shorter span:
4100
2)width of support :
300
h3=modification factor depending upon

kn/m2
mm

4600
mm
mm
mm
4100

steel=
1.7
(considering pt.=0.12% & fs=240N/mm2 )
Clear cover =
15 mm
Dia of bar=
10 mm

300

Dreqd
112.76 mm
Dpro.130 mm
Check for deflection:
fs = 0.58*fy*(Ast reqd/Ast pro) =
290.00 N/sq.mm
pt pro. =
0.38 % (percentage of tension reinforcement)
Value of modification factor =h3=
1.7 (from fig. 4 of IS 456:2000)

Overall comment =

safe

Results:
Hence, at bottom of mid span in x-direction provide Y10 bar @
at top of the support in x-direction provide Y10 bar @
at bottom of midspan in y-direction provide Y 10 bar @
at top of the support in y-direction provide Y10 bar @
Overall depth provided =
130 mm

185
135
200
140

c/c
c/c
c/c.
c/c

1
1
1
1

DESIGN OF TWO WAY SLAB

Support condition :
Type of the panel=

(Panel no. 11 is considered for the design of two way slab)

continuous
4)Two adjacent edges discontinuous

Grade of concrete MGrade of steel =Fe-

25 N/mm2
500 N/mm2
4600

1)c/c span of slab panel


a)longer span:
b)shorter span:
2)width of support :
Calculation:
Clear span:
a)longer span:
b)shorter span:

4600 mm
4100 mm
300 mm
4100
4300 mm
3800 mm
300

Approximate depth of slab:


deff.=span/(h1*h2*h3)
Span=

c/c shorter span


or clear shorter span+deff.

which ever
less

At first take span of panel=c/c shorter span=


4100 mm
where,
h1=
basic value of eff. Span to eff. Depth ratio=
26
h2=
factor for span more than 10 m=
1
h3=
modification factor depending upon steel=
1.7
IS 456:2000
(consider pt=0.12%& fs=240n/mm2)
cl-23.2.1
deff.=
92.76
Over all depth=D=deff.+clear cover+0.5*dia. Of bar=
112.76
(clear cover=
15 mm
dia of bar=
10 mm
)
Over all depth provided=
130 mm
safe
deff x pro.=
110 mm
deff.y pro.=
100 mm
shorter span=lx=
c/c shorter span=
4100 mm
whichever
or clear shorter span+deff.=
3910 mm
is less
=

3910 mm
c/c longer span=
or clear longer span+deff.=
=
4410 mm
Now,
ly lx=
1.13
So, the panel of the slab is a
two way slab
longer span=ly=

4600 mm
4410 mm

whichever
is less

Load calculation:
Total factored load for limit state design w=
(Factor used 1.5)
Calculation of B.M
(+ve ax)=
0.0414
(-ve ax)=
0.0550
(+ve ay)=
0.0350
(-ve ay)=
0.0470
(w*a*lx2)
a) Moment in shorter direction:
2
1) Midspan moment=w*(+ax)*lx =
18.605
2
2) Support moment=w*(-ax)*lx =
24.699
b) Moment in longer direction:
1) Midspan moment=w*(+ay)*lx2=
15.731
2
2) Support moment=w*(-ay)*lx =
21.125
Maximum moment=

24.70

29.40 kn/m2

IS 456:2000
table 26

kn.m
kn.m
kn.m
kn.m

kn.m

Check for strength criteria:


dreqd.=
deff x. pro.=

85.23 mm
110 mm

Hence Safe
for strength criteria.

Calculation of steel:
a) Steel in short direction:
1) Steel at midspan=
421.06 sq.mm
Ast min. =
156 sq.mm
2) Steel at support=
576.63 sq.mm
b) Steel in longer direction:
{S max=300 or
1) Steel at midspan=
392.45 sq.mm
3d, whichever less }
2) Steel at support=
545.05 sq.mm
S max.=
300 mm
spacing of distribution reinf =5d or 450mm whichever is less
Bar dia
X direction
Y direction
S reqd.
S pro.
S reqd.
S pro.
Midspan
10
186.53
187
200.13
200
Support
10
136.20
136
144.10
144

Check for deflection:


Ast reqd=
421.06 sq.mm ,
Ast pro.=
421.06 sq.mm
fs = 0.58*fy*(Ast reqd/Ast pro) =
290.00 N/sq.mm
pt pro. =
0.38278227 % (percentage of tension reinforcement)
Value of modification factor =h3=
1.7 (from fig. 4 of IS 456:2000)
(For limited deflection )
dreqd.=
88.46 mm
dpro=
110 mm
Overall comment =
safe
Hence, at bottom of mid span in x-direction provide Y10 bar @
185
at top of the support in x-direction provide Y10 bar @
135
at bottom of midspan in y-direction provide Y10 bar @
200
at top of the support in y-direction provide Y10 bar @
140
Torsion reinforcement
Torsion reinforcement shall be provided at any corner where the slab is simply
supported on both the edges meeting at the corner and it shall be consist of four
layer two at top and two at bottom .
Area of each layer =3/4 of area reqd for max mid span moment
=
315.80 sq.mm
Size of torsion reinf. mesh=1/5 of lx
=
782 mm
Spacing of torsion reinforcement=
194.49 mm c/c
Provide Y10 @ 150 mm c/c

IS 456:2000
cl-23.2.1

c/c
c/c
c/c.
c/c

IS 456:2000
CL-D-1.8

type of panel =case no


ly lx=

4
1.1279

Bending moment coefficient for rectangular panels supported on four sides


case no. Type of panel and moment considered
1
1 interior panel
negative moment at continuous edge
positive moment at mid-span
0
ly lx

2 one short edge discontinuous


negative moment at continuous edge
positive moment at mid-span
0

0.032 0.037
0.024 0.028
(-ve ax)=
0
1
0 0.039
0 0.029

0.043
0.032
0
0
0
0

0.047
0.036

0.037 0.043
0.028 0.032
(-ve ax)=

0.048
0.036
0

0.051
0.039

0.044
0.033

0
0

0
0

0.037 0.044
0.028 0.033
(-ve ax)=

0.052
0.039
0

0.057
0.044

0.046
0.035

0
0

0
0

0.047 0.053
0.035
0.04
(-ve ax)=

0.06
0.045
0.055

0.065
0.049

0.055
0.041

0
0

0
0

0.045 0.049
0.035 0.037
(-ve ax)=

0.052
0.04
0

0.056
0.043

0.05
0.038

0
0

0
0

0.035 0.043
(-ve ax)=

0.051
0

0.057

0
0.045

0
0

0
0

0.057 0.064
0.043 0.048
(-ve ax)=

0.071
0.053
0

0.076
0.057

0
0
3 one long edge disnontinuous
negative moment at continuous edge
positive moment at mid-span
0

0
0
4 two adjacent edges discontinuous
negative moment at continuous edge
positive moment at mid-span
1

0
0
5 two short edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0

0
0
6 two long edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0

0
0
three edges discontinuous(one long
7 edge continuous)
negative moment at continuous edge
positive moment at mid-span
0

short span coefficient ax (value of ly lx)


1.1
1.2
1.3
1.4
1.5

0
0
0

0.051 0.053
0.039 0.041
(+ve ax)=
0
0
0
0
0
0
0.055 0.057
0.041 0.044
(+ve ax)=
0
0

0
0

0.063 0.067
0.047 0.051
(+ve ax)=
0
0

0
0

0.071 0.075
0.053 0.056
(+ve ax)=
0
0

0
0

0.059
0.06
0.044 0.045
(+ve ax)=
0
0

0
0

0.063 0.068
(+ve ax)=
0
0

0
0

0.08 0.084
0.06 0.064
(+ve ax)=

0
0
three edges discontinuous (one short
8 edge continuous)
negative moment at continuous edge
positive moment at mid-span
0

0.066
0.049

0
0

0
0

0.043 0.051
(-ve ax)=

0.059
0

0.065

0
0.053

0
0

0
0

0.056 0.064
(-ve ax)=

0.072
0

0.079

0
0

0
0

0
0
9 four edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0

0
0

FINAL VALUE OF BM COEFFICIENT


(-ve ax)=
(+ve ax)=
(-ve ay)=
(+ve ay)=

0.055
0.0414
0.047
0.035

0
0.066

0
0

0
0

0.071 0.076
(+ve ax)=
0
0

0
0

0.085 0.089
(+ve ax)=
0
0

0
0

cient ax (value of ly lx)


1.75

long span coeff.ay for


2 all value of ly lx

0.06
0.045
0
0
0
0

0.065
0.049

0.032
0.024

0
0
0

0
0

0.064
0.048
0

0.068
0.052

0.037
0.028

0
0

0
0

0
0

0.077
0.059
0

0.085
0.065

0.037
0.028

0
0

0
0

0
0

0.084
0.063
0.0414

0.091
0.069

0.047
0.035

0
0

0
0

0.047
0.035

0.065
0.049
0

0.069
0.052

0.035

0
0

0
0

0
0

0.08
0

0.088

0.045
0.035

0
0

0
0

0
0

0.091
0.069
0

0.097
0.073

0.043

0
0

0
0

0
0

0.087
0

0.096

0.057
0.043

0
0

0
0

0
0

0.1
0

0.107

0.056

0
0

0
0

0
0

You might also like