Professional Documents
Culture Documents
Date :
Chd :
Date :
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
Office : DI
Strip no 4
S23' panel
Input data:
Support condition(simply or continuous) :
continuous
Type of the panel=
2)One short edge discontinuous
Grade of concrete M-.
30
N/mm2
Grade of steel =Fe-..
415
N/mm2
1)c/c span of larger panel 3600 mm
2)width of support :
350 mm
Calculation:
Clear span:
3250 mm
Approximate depth of slab:
deff.=span/(h1*h2*h3)
Span=
c/c span
or clear span+deff.
which ever
less
26
1
1.7
3600 mm
3376 mm
IS 456:2000
cl-23.2.1
whichever
is less
0 kn.m
13.68 kn.m
Hence
Ast=Mu/(0.87*fy*j*d)
(for mid span moment)
j=lever arm factor=0.5+sqrt(0.25-Mu/(0.87*fck*b*d^2))
= 1.000
Calculation of steel:
a) Steel in short direction (at mid span):
1) Steel at midspan=
0 sq.mm
Ast min.= 0.12% of cross section
180
sq.mm
{S max=300 or
3d, whichever less }
S max.=
300 mm
By :ANUP SHEE
Date :
Chd :
Date :
Bar dia
Midspan
Office : DI
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
Spacing
S reqd.
S pro.
8 279.253
275
moment
S REQD
279.253
S PRO
275
Y8 @ 275mm c/c
B DIA
8
IS 456:2000
cl-23.2.1
By :ANUP SHEE
Date :
Chd :
Date :
Position
from left
Strip 1
Grid
Grid
Grid
Grid
Grid
Grid
Strip 2
Grid
Grid
Grid
Grid
Grid
Grid
Office : DI
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
1
Span
2
Span
3
Span
4
Span
5
Span
6
0
-8.06
11.63
-7.55
11.43
-7.89
11.18
-7.47
13.68
-11.47
5.62
279.3
278.1
190.9
279.3
194.4
279.3
198.9
279.3
161.4
193.7
279.3
150
150
150
150
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c
Y8 @ 195mm c/c
Y8 @ 275mm c/c
Y8 @ 160mm c/c
Y8 @ 190mm c/c
Y8 @ 275mm c/c
1
Span
2
Span
3
Span
4
Span
5
Span
6
0
-1.81
2.1
-0.91
1.45
-1.11
1.77
-1.39
1.74
-1.32
5.62
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
279.3
150
150
150
150
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
By :ANUP SHEE
Date :
Chd :
Date :
Strip 3
Grid
1
Span
Grid
2
Span
Grid
3
Span
Grid
4
Span
Grid
4Z
Span
Grid
5
Span
Grid
6
Strip 4
Grid
Grid
Grid
Grid
Strip 5
Grid
Grid
Grid
Grid
Strip 6
Grid
Grid
Grid
Grid
Office : DI
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
5.63
-16.67
23.96
-15.96
23.67
-14.59
16.43
-3.51
3.88
-4.46
6.71
-4.79
5.62
279.3
131.4
138.7
137.5
140.5
151
133.4
279.3
279.3
279.3
279.3
279.3
279.3
150
150
150
150
150
150
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 130mm c/c
Y10 @ 135mm c/c
Y8 @ 135mm c/c
Y10 @ 140mm c/c
Y8 @ 150mm c/c
Y8 @ 130mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
C
Span
AY
Span
2B2
Span
A
5.63
-5.81
7.58
-3.5
11.7
-10.03
5.63
279.3
279.3
279.3
279.3
189.8
222.3
279.3
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 185mm c/c
Y8 @ 220mm c/c
Y8 @ 275mm c/c
C
Span
AY
Span
2B2
Span
A
5.63
0
0.83
-4.61
11.02
-8.38
5.63
279.3
279.3
279.3
279.3
201.8
267.2
279.3
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 200mm c/c
Y8 @ 265mm c/c
Y8 @ 275mm c/c
2B12
Span
Ay
Span
2B2
Span
A
0
-5.82
7.87
-5.09
11.34
-8.76
5.62
279.3
279.3
279.3
279.3
196
255.4
279.3
150
150
150
150
150
150
150
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 275mm c/c
Y8 @ 195mm c/c
Y8 @ 255mm c/c
Y8 @ 275mm c/c
By :ANUP SHEE
Date :
Chd :
Date :
Office : DI
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
By :ANUP SHEE
Date :
Chd :
Date :
Office : DI
Client :HPCL
Project :110KV GIS FOR HPCL
Subject: First floor slab design
Sh. No.
Of
Strip 6
Position
from left
support 1
span 1
support 2
span 2
support 3
span 3
support 4
Strip 5
Position
from left
support 1
span 1
support 2
span 2 (top and bottom)
support 3
span 3 (top and bottom)
support 4
Strip 4
279.3
150 Y8 @ 275mm c/c
Moment(max) S,reqd Thickness Bar provided
(KN-m)
(mm) of slab(mm)
5.63
279.3
150 Y8 @ 275mm c/c
-10.28
215.6
150 Y8 @ 215mm c/c
11.63
189.8
150 Y8 @ 185mm c/c
5.39/-3.34
279.3
150 Y8 @ 275mm c/c
10.79
205.1
150 Y8 @ 205mm c/c
-8.49
262.5
150 Y8 @ 260mm c/c
5.63
279.3
150 Y8 @ 275mm c/c
Position
from left
support 1
span 1
support 2
span 2 (top & bottom)
support 3
span 3
support 4
By :ANUP SHEE
TCE CONSULTING ENGINEERS LIMITED
Client :HPCL
Date :
Project :110KV GIS FOR HPCL
Chd :
Job No.TCE-4786A
Office : DI
Subject: First floor slab design
Date :
Sh. No.
Of
Strip 3
279.3
150 Y8 @ 275mm c/c
Position
Moment(max) S,reqd Thickness Bar provided
from left
(KN-m)
(mm) of slab(mm)
support 1
5.91
279.3
150 Y8 @ 275mm c/c
span 1
1.02/-17.24
125.6
150 Y8 @ 125mm c/c
support 2
23.42
90.49
150 Y8 @ 90mm c/c
span 2 (top steel reqd)
2.57/-14.66
149.1
150 Y8 @ 145mm c/c
support 3
23.15
91.64
150 Y8 @ 90mm c/c
span 3
-15.1
144.5
150 Y8 @ 140mm c/c
support 4
16.94
128
150 Y8 @ 125mm c/c
span 4 (top & bottom)
5.05/-3
279.3
150 Y8 @ 275mm c/c
support 5
4.26/-0.47
279.3
150 Y8 @ 275mm c/c
span 5
-5.11
279.3
150 Y8 @ 275mm c/c
support 6
4.28
279.3
150 Y8 @ 275mm c/c
span 6
0.83/-2.25
279.3
150 Y8 @ 275mm c/c
support 7
5.91
279.3
150 Y8 @ 275mm c/c
Strip 2
Position
from left
span no 1
support 2 ( top)
span no 2
support 3 ( top)
span no 3
support 4 ( top)
span no 4
support 5 ( top)
span no 5 (top steel reqd)
support 6 ( top)
Strip 1
Position
from left
span no 1
support 2 ( top)
span no 2
support 3 ( top)
span no 3
support 4 ( top)
span no 4 (top steel reqd)
support 5 ( top)
span no 5
support 6 ( top)
kn/m2
mm
4600
mm
mm
mm
4100
steel=
1.7
(considering pt.=0.12% & fs=240N/mm2 )
Clear cover =
15 mm
Dia of bar=
10 mm
300
Dreqd
112.76 mm
Dpro.130 mm
Check for deflection:
fs = 0.58*fy*(Ast reqd/Ast pro) =
290.00 N/sq.mm
pt pro. =
0.38 % (percentage of tension reinforcement)
Value of modification factor =h3=
1.7 (from fig. 4 of IS 456:2000)
Overall comment =
safe
Results:
Hence, at bottom of mid span in x-direction provide Y10 bar @
at top of the support in x-direction provide Y10 bar @
at bottom of midspan in y-direction provide Y 10 bar @
at top of the support in y-direction provide Y10 bar @
Overall depth provided =
130 mm
185
135
200
140
c/c
c/c
c/c.
c/c
1
1
1
1
Support condition :
Type of the panel=
continuous
4)Two adjacent edges discontinuous
25 N/mm2
500 N/mm2
4600
4600 mm
4100 mm
300 mm
4100
4300 mm
3800 mm
300
which ever
less
3910 mm
c/c longer span=
or clear longer span+deff.=
=
4410 mm
Now,
ly lx=
1.13
So, the panel of the slab is a
two way slab
longer span=ly=
4600 mm
4410 mm
whichever
is less
Load calculation:
Total factored load for limit state design w=
(Factor used 1.5)
Calculation of B.M
(+ve ax)=
0.0414
(-ve ax)=
0.0550
(+ve ay)=
0.0350
(-ve ay)=
0.0470
(w*a*lx2)
a) Moment in shorter direction:
2
1) Midspan moment=w*(+ax)*lx =
18.605
2
2) Support moment=w*(-ax)*lx =
24.699
b) Moment in longer direction:
1) Midspan moment=w*(+ay)*lx2=
15.731
2
2) Support moment=w*(-ay)*lx =
21.125
Maximum moment=
24.70
29.40 kn/m2
IS 456:2000
table 26
kn.m
kn.m
kn.m
kn.m
kn.m
85.23 mm
110 mm
Hence Safe
for strength criteria.
Calculation of steel:
a) Steel in short direction:
1) Steel at midspan=
421.06 sq.mm
Ast min. =
156 sq.mm
2) Steel at support=
576.63 sq.mm
b) Steel in longer direction:
{S max=300 or
1) Steel at midspan=
392.45 sq.mm
3d, whichever less }
2) Steel at support=
545.05 sq.mm
S max.=
300 mm
spacing of distribution reinf =5d or 450mm whichever is less
Bar dia
X direction
Y direction
S reqd.
S pro.
S reqd.
S pro.
Midspan
10
186.53
187
200.13
200
Support
10
136.20
136
144.10
144
IS 456:2000
cl-23.2.1
c/c
c/c
c/c.
c/c
IS 456:2000
CL-D-1.8
4
1.1279
0.032 0.037
0.024 0.028
(-ve ax)=
0
1
0 0.039
0 0.029
0.043
0.032
0
0
0
0
0.047
0.036
0.037 0.043
0.028 0.032
(-ve ax)=
0.048
0.036
0
0.051
0.039
0.044
0.033
0
0
0
0
0.037 0.044
0.028 0.033
(-ve ax)=
0.052
0.039
0
0.057
0.044
0.046
0.035
0
0
0
0
0.047 0.053
0.035
0.04
(-ve ax)=
0.06
0.045
0.055
0.065
0.049
0.055
0.041
0
0
0
0
0.045 0.049
0.035 0.037
(-ve ax)=
0.052
0.04
0
0.056
0.043
0.05
0.038
0
0
0
0
0.035 0.043
(-ve ax)=
0.051
0
0.057
0
0.045
0
0
0
0
0.057 0.064
0.043 0.048
(-ve ax)=
0.071
0.053
0
0.076
0.057
0
0
3 one long edge disnontinuous
negative moment at continuous edge
positive moment at mid-span
0
0
0
4 two adjacent edges discontinuous
negative moment at continuous edge
positive moment at mid-span
1
0
0
5 two short edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0
0
0
6 two long edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0
0
0
three edges discontinuous(one long
7 edge continuous)
negative moment at continuous edge
positive moment at mid-span
0
0
0
0
0.051 0.053
0.039 0.041
(+ve ax)=
0
0
0
0
0
0
0.055 0.057
0.041 0.044
(+ve ax)=
0
0
0
0
0.063 0.067
0.047 0.051
(+ve ax)=
0
0
0
0
0.071 0.075
0.053 0.056
(+ve ax)=
0
0
0
0
0.059
0.06
0.044 0.045
(+ve ax)=
0
0
0
0
0.063 0.068
(+ve ax)=
0
0
0
0
0.08 0.084
0.06 0.064
(+ve ax)=
0
0
three edges discontinuous (one short
8 edge continuous)
negative moment at continuous edge
positive moment at mid-span
0
0.066
0.049
0
0
0
0
0.043 0.051
(-ve ax)=
0.059
0
0.065
0
0.053
0
0
0
0
0.056 0.064
(-ve ax)=
0.072
0
0.079
0
0
0
0
0
0
9 four edges discontinuous
negative moment at continuous edge
positive moment at mid-span
0
0
0
0.055
0.0414
0.047
0.035
0
0.066
0
0
0
0
0.071 0.076
(+ve ax)=
0
0
0
0
0.085 0.089
(+ve ax)=
0
0
0
0
0.06
0.045
0
0
0
0
0.065
0.049
0.032
0.024
0
0
0
0
0
0.064
0.048
0
0.068
0.052
0.037
0.028
0
0
0
0
0
0
0.077
0.059
0
0.085
0.065
0.037
0.028
0
0
0
0
0
0
0.084
0.063
0.0414
0.091
0.069
0.047
0.035
0
0
0
0
0.047
0.035
0.065
0.049
0
0.069
0.052
0.035
0
0
0
0
0
0
0.08
0
0.088
0.045
0.035
0
0
0
0
0
0
0.091
0.069
0
0.097
0.073
0.043
0
0
0
0
0
0
0.087
0
0.096
0.057
0.043
0
0
0
0
0
0
0.1
0
0.107
0.056
0
0
0
0
0
0