You are on page 1of 3

BHATT NIRAVKUMAR SURESHCHANDRA

At. & Po.-Sajod, Zaverkhadki, Ta.-Ankleshwar, Di.- Bharuch.Pin-393020


(P) 9904068456, (R) 02646 265597.
bhattnirav2009@yahoo.com,bhattnirav2009@gmail.com.

-------------------------------------------------------------
-

Education qualification:-
1. Diploma Mechanical Engg. With 68% for N.I.E.
2. A.T.I. (State Transfer Co.) with 73% (Regional First).
3. I.T.I. (Diesel Mechanic) with 71% (Trade first) from N.C.V.T.
4. H.S.C. (comm.) with 40% from G.H.S.E.B.
____________________________________________________________
Personal Profile:-
• Passport No :- G 9069860
• Material Status: - Married.
• Date Of Birth :- 11/June/1984
• Nationality :- Indian
• Language Know: - English, Hindi, Gujarati.
• Current Location: - Ankleshwar, Gujarat.
--------------------------------------------------------------------------------------
Hobby:-
Thinking, Reading, Hear Cool Music, Playing Games Indoor & Outdoor, Self Drive
Traveling, Bike Riding,

Space time activities:-


To meet relatives, friends, and family member, Reading technically data & technically
book,

Ambition:-
My ambition is drive towards the excellence work ethic and work culture, hard
working and honesty. My ambition is outlined hear under.
Industrial Experience:-

1. Presently Employ: - Oasis ceramic (P) Ltd.


Date of Joining: - 01/05/2007
Position: - Power Plant In charge.
Objective: -Presently I am working in Oasis ceramic (P) Ltd. As a Power Plant In charge,

My Responsibility
o Make a 1 M.W. Project Work,
o Making planning of all types Preventives & Routing Maintenance of P.C.C, M.C.C, & Gas bas
Power Plant,
o Maintain Synchronizing System,
o Maintain & Maintenance of Cooling System,
o Making Dailey, Weekly, Monthly, Production,Comption & Attendance Report,
o Making all types of Routing & Preventives Maintenance Report,
o Making All types of Troubleshooting & Reporting,
o All types document file Recording & Reporting.
o And Also handling Work shop,

2. Name of Employer: - Green Power Int. (P) Ltd.


Date of Joining:-16/10/2005
Date of Relive: - 17/06/2007

 Site:-Ginni Filament Ltd.


Date of Joining:-10/10/2006
Date of Relive: - 17/06/2007
Position:-Power Plant Supervisor.
Objective:-I was worked in Ginni Filament Ltd. Under O. & M. Contract of Green Power Int.
(P) Ltd. Capacity of Power Plant [8.1 M.W., {6 X 1365kw}]
My Responsibility
• Attend all types of Routing Maintenances & Preventives Maintenance of Gas base Power
Plant.
• Ventilation System.
• Synchronizing System.
• H.R.U.System.
• V.A.M.System.
• Cooling System.
• Maintains %Ge Humidity in Engine Room.
• Preventive & Routing Maintains of P.C.C. & M.C.C.
• All types document file Recording & Reporting, Work.
• Making Dailey, Weekly, Monthly, Consumptions & Production Report,
• Making P.M. & Routing Maintenance Planning,
• Making Preventive Maintenance & Routing Maintenance Report. & etc.
 Site: - Sun Pharmaceuticals (P) Ltd.
Date of Joining:-16/10/2005
Date of Relive: - 10/10/2006
Position: - Power Plant Operator.
Objective: - I was worked in Sun Pharmaceuticals (P) Ltd. Under O. &M. Contract. Green
Power Int. (P) Ltd. Capacity of Power Plant (1.7 M.W.) Gas base Power Plant. As a Power Plant
Operator.

3. Name of Employer: - State Transport Corporation.


Date of Joining : - 14/10/2003
Date of Relive : - 13/10/2005
Position: - Apprentice Trainee, in Work shop. Utility & Tyre plant.
Objective: - I was worked as an Apprentice Trainee in Work shop, Utility & Tyre
Plant (hot & cold remold).
I worked as Apprentice Trainee of Engine Section, Head Section, Gearbox Section, Flore
(Cheeses) Section, Engineering Section, Joint Section, Clutch Section, Air assembly Section,
Differentials Section, Seat Section, F.I.Pump Section, Injector Section, Radiator Section,
Spring Section, Scrape yard, Hot Remold Tyre Section, Cold Remold Tyre Section, Boiler
Section, & Utility Section,

4. Name of Employer: - - Green Power Int. (P) Ltd.


Date of Joining: - 01/06/2002
Date of Relive: - 13/10/2003

 Site: - Sun Pharmaceuticals (P) Ltd.


Position: - Power plant Operator,
Objective: - I was worked in Sun Pharmaceuticals (P) Ltd. Under O. & M. Contract.
Green Power Int. (P) Ltd. Capacity of Power Plant (2 M.W.) Gas base Power Plant. As a
Power Plant Operator.

Yours faithfully,