Annual Plan Document For Financial Year 2012-13 (Revised) & 2013-14 (Proposed) 1.

0 Introduction of sector

1.1 Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPN) a company under the Companies Act, 1956 and registered with Registrar of Companies as "RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED" vide No. 17016485 of 2000-2001 with its Registered Office at VIDYUT BHAWAN, JYOTI NAGAR, JAIPUR-302005 has been established on 19 July, 2000 by Govt. of Rajasthan under the provisions of the Rajasthan Power Sector Reforms Act, 1999 as the successor company of RSEB. The Rajasthan Electricity Regulatory Commission (RERC) has granted a license to RVPN for transmission and bulk supply vide RERC Transmission and Bulk Supply License 4/2001 dated 30.4.2001 to function as Transmission and Bulk Supply Licensee in the State. 1.2 Under the provision of the Electricity Act, 2003, RVPN has been declared as State Transmission Utility (STU) by Govt. of Rajasthan. 1.3 RVPN Provides the pathway for power within whole of Rajasthan. RVPN owns, builds, maintains and operates the high-voltage electric transmission system that helps to keep the power supply in the State. RVPN also owns the shared generating projects as representative of erstwhile RSEB. 1.4 RVPN is an "ISO 9001:2008 Certified Company" and also RVPN's Meter Testing Laboratories at Jaipur and Udaipur are Now "ISO/IEC 17025:2005 Certified" . 2.0 2.1 Vision, Mission and Objectives & Functions of RVPN Vision: Reliable, adequate and quality power for all.

2.2 Mission: To achieve its vision by providing necessary support and enabling policy framework for integrated development of transmission infrastructure in the State to meet the requirements of the growing economy and to meet the requirements and aspirations of the people for quality power. 2.3 Objectives:

(I). Improving the Power availability through i. Fresh Capacity addition (Private Sector) (II). Expanding the Transmission Network and reduction in Transmission losses through i. ii. Transmission lines addition Transformation capacity addition
1

2.4 o

Functions : The main work items dealt by the RVPN include following : Intra state Transmission transmission System of electricity through Intra-State

Planning and co-ordination relating to intra-state transmission with all concerned agencies such as Central Transmission Utility (CTU), State Govt., generating companies, licensees, Regional Power Committees etc. Ensuring development of an efficient, co-ordinated and economical system of intra-state transmission of electricity from generating stations to Load Centres. Non-discriminatory Open Access to its transmission system on payment of transmission charges. Complying with the directions of RLDC and SLDC, operating SLDC until any other authority is established by the State Govt. General Policy in the transmission sector and issues relating to energy policy and coordination thereof. Research, Development relating to Transmission System Network. Administration and compliance of the Electricity Act, 2003 & Bhakra Beas Management Board as provided in the Punjab Reorganisation Act, 1966. Schemes and issues relating to Power Transmission in Rajasthan and matters relating thereof with Rajasthan Electricity Regulatory Commission. Cooperation / Coordination among Power Sector Companies & with Central Agencies XII FIVE YEAR PLAN (2012-13 TO 2016-17)

o o

o 3.0

3.1 The working Group on Power & energy for preparation of 12th Five Year Plan, in its report has proposed a plan outlay of `1260000 lacs for Capital Works of RVPN for 12th Five Year Plan. The details of requirement of allocation of ` 1260000 lacs have been sent to Planning Department separately also. The Year wise break up of `1260000 lacs is as follows:
2

Table 3.1 Details of plan outlay for Capital Works for 12th Five Year Plan Particulars RVPN Transmission Generation (Shared Projects) Total 2012-13 278000 2000 280000 2013-14 2014-15 2015-16 2016-17 Total 253000 2000 255000 243000 2000 245000 238000 2000 240000 238000 2000 240000 1250000 10000 1260000

3.2 Above outlay has been proposed mainly for execution of EHV Transmission schemes related to evacuation systems for forthcoming generation projects in the State, system strengthening schemes and Augmentation works required to meet the peak demand and requirement of Distribution Companies. Besides this the above outlay will be utilized for installation of capacitor banks, RMU schemes, IT works, SCADA and other Capital works. Outlay for Generation head is proposed for RMU and miscellaneous capital works in shared projects and new interstate shared projects. 3.3 The Planning Department, Govt of Rajasthan vide letter no. F.1(32) Plan/Gr.IV/TFYP/2011 dated 2.1.2012 have informed about the tentative outlays for 12th Five Year Plan and Annual Plan 2012-13. As proposed by RVPN and working Group an allocation of Rs. 1260000 lacs has been made for RVPN for capital works during 12th Five Year Plan 3.4 Resources for XII Five Year Plan.

For above outlays the assessment of resources likely to be available for funding XII Five Year Plan are as under: Table 3.2 Resources likely to be available for XII Five Year Plan S. No. A 1 2 3 4 B 1 Source Direct Bonds LIC REC PFC/NCRPB/Comml. Banks Total A Through State Govt. State Govt. Equity Total (B) Grand Total (` in lacs) Amount 277000.00 150000.00 488000.00 93000.00 1008000.00 252000.00 252000.00 1260000.00
3

3.5

Transmission Works

3.5.1. Looking to the Generation capacity likely to be added during XII Five Year Plan, the main emphasis of RVPN will be on construction of Evacuation System of Generating Projects. The work on evacuation system for Chhabra Super Critical TPS (Unit 5 &6), Kalisindh TPS (Unit1&2), Suratgarh Super Critical TPS (Unit7&8), Kawai Super Critical TPS, and Ramgarh GTPS is under progress and the work for developing transmission system for New Solar and Wind Power projects is also under progress. Commissioning of these works will be matching with the commissioning of Generating Projects. The evacuation schemes of other generation projects envisaged in 12th Plan shall also be identified and approved on finalization of commissioning dates by RVUN. 3.5.2 Besides above, the construction of 220kV & 132kV Sub-Stations and their associated lines and augmentation of capacity of existing GSSs on the basis of load growth and requirement of Discoms shall also be carried out during 12th Plan. RVPN have adopted new technology i.e. use of EHV cables, Construction of GIS/ Hybrid GSS and Automation/ SCADA system in construction of Grid Sub-Stations in XI Plan, which will continue in 12th Plan. In XII Plan, installation of capacitor banks, expansion in IT activities, R&M of existing Grid Sub-Stations will also be carried out by replacing obsolete/ old equipments. 3.5.3. With the above works in sight, the following physical targets for transmission works have been proposed for XII Five Year Plan: Table 3.3 XII Plan Physical Targets (Proposed) S. No. Head/ schemes A Transmission : - 765kV Lines - 765kV S/S Transmission : - 400kV Lines - 400kV S/S - 220 kV Lines - 220 kV S/S - 132 kV Lines - 132 kV S/S Augmentation : Unit kMs MVA Nos. kMs MVA Nos. kMs MVA Nos. kM MVA Nos. MVA Target XII Plan 426 7500 2 5800 5040 8 3650 4600 40 2150 2875 100 7500

C D E

For all above works a provision of `1250000 lacs has been proposed for transmission works during XII Plan.
4

3.6

Generation (Shared Projects)

(i) BBMB works - During XII Five Year Plan, the RM&U of shared project in BBMB will continue. Rajasthan has to keep provision for Rajasthan share in Modernization work. During XII Plan, uprating of five units of Bhakra Left Bank earlier scheduled in XI Plan are proposed to be uprated from 108 MW (existing) to 126 MW. Rajasthan will get its 15.22 per cent share i.e. total 13.698 MW in XII Plan. (ii) Chambal Development Plan Phase-II (Rahu Ghat Hydro Electric Project) - In the 12th meeting of MP-Rajasthan inter State Control Board held on 3rd June 1999 at Jaipur, the proposal regarding construction of Rahu Ghat Hydro Electric Project downstream of Kota Barrage was discussed and it was decided to take up the survey and investigation of the following four Hydel Projects: S. No. 1 2 3 4 Table 3.4 Name of the Dam Site FRLs (Meter) Devipura (Rahu ka Gaon) (Rajasthan) Gujjapura (MP) Jiatpura (MP) Barsala (MP) Total
* Firm power subject to change after detailed survey and investigation

Firm Power (MW*) 31 10 10 16 67

182.5 143.0 131.0 119.0

Ministry of Environment & Forest (MOE&F) accorded Site clearance for carrying out S&I works and conducting EIA studies for preparation of comprehensive EIA report and management plans etc. for obtaining environment clearance. MPPGCL was designated deputed as nodal authority for conducting S& I works and EIA studies. Subsequently MPPGCL after consultation with RVPNL, awarded work of S&I AND EIA studies to CWC and WAPCOS respectively, with Rajasthan / RVPNL sharing 50% of the estimated expenditure on these works. National Wild Life Board, MOE&F had accorded approval for conduction OF EIA studies and S&I works. Approval of Honble Supreme Court is to be obtained prior to initiate S&I works and EIA studies. For above works and other miscellaneous work in BBMB a provision of Rs.10000 lacs is proposed during XII Plan.
5

4. 4.1

Annual Plan 2012-13 (Revised) Introduction

4.1.1 The Planning Department, Government of Rajasthan vide letter no. F.1 (32) Plan/Gr.-IV/TFYP/2011 dated 2.1.12 have intimated the outlays for 2012-13 for RVPN as under: in lacs (i) Outlay 2012-13 56000.00 (ii) IEBR 224000.00 ----------------Total 280000.00 ----------------The Plan proposals for above outlay were prepared as per directions of the State Government and submitted to Planning Department. 4.1.2 On the basis of above allocation by State Government a petition for approval of Investment Plan for Rs. 280000 lacs was submitted in RERC by RVPN. However, the RERC after going through the details of schemes under execution have approved investment plan for Rs. 224400 lacs only against proposal for Rs.280000 lacs. 4.1.3 Recently the Planning Department, Govt. of Rajasthan vide letter no.F.10(21) Plan/Gr.V/12 dated 13.12.2012 have circulated the revised outlays of Rs. 280000 lacs for Annual Plan 2012-13. However, considering allowing an investment plan of Rs. 224400 lacs by the Regulatory Commission, Annual Plan 2012-13 of Rs. 224400 lacs has been prepared by RVPN. 4.1.4 The breakup of Outlay of ` 224400 lacs for capital works viz.a viz expenditure upto Nov., 2012 are as under: Table Outlay for capital works viz.a viz expenditure incurred ( ` in lacs) S. Head Plan Outlay Expenditure No 2012-13 upto Nov., 12 (Revised) I. Generation (Shared Generating Projects) 1. S&I Preliminary Exps. (New works) 43.00 0.00 2. Renovation & Modernization/ Uprating of shared generating stations. (Ongoing works) a. Uprating of Bhakra Left Bank b. Other Capital works of BBMB 3457.00 92.61 c. Purchase of equipments for RPS/JS Total (I) 3500.00 92.61 II Transmission: On going works & new works including 137460.42 220900.00 SCADA Total (II) 220900.00 137460.42 Total ( I + II) 224400.00 137553.03
6

4.2

Resources

The details of revised resources for financing the above outlay of Rs.224400 lacs are as under: (A) (i) (ii) (iii) (iv) (B) (i) Direct Bonds LIC REC PFC/Commercial Banks/NCRPB etc. Total (A) Through State Govt. State Govt. Equity Total (B) Total (A+B) Works Position The detailed works position for RVPN is given as follows: 4.3.1 Generation (Shared Generating Projects) (i) Survey, Investigation and Preliminary Expenses of New Projects 44900.00 44900.00 224400.00 (`. in lacs) 100000.00 0.00 69500.00 10000.00 179500.00

4.3

A provision of ` 43.00 lacs has been kept during the year 2012-13 for making payment for S&I Works and for preliminary expenses for interstate new projects. (ii) Bhakhra Beas Complex & Other shared projects

A total provision of ` 3457.00 lacs for up rating of Bhakhra Left Bank, other shared projects and for other Capital Works of BBMB is kept during the year 2012-13. This provision is for the Rajasthans Share in Modernization works. 4.3.2. Transmission

(i) A total provision of ` 220900.00 lacs is proposed for Transmission works during the year 2012-13. During 2012-13 the work on evacuation schemes of Chhabra Super Critical TPS, Kalisind TPS, Suratgarh Super Critical TPS, Kawai Super Critical TPS & Solar and Wind Power is under progress. The work on evacuation scheme of Ramgargh GTPS (160 MW) is likely to be completed during 2012-13. More transmission schemes related to forthcoming Generation stations and for expansion of transmission system are approved in 2012-13. which has been included in Annual Plan 2012-13. (ii) During 2012-13 major expenditure are on construction of evacuation schemes which includes 765 kV and 400 kV transmission systems covered under various evacuation schemes.
7

(iii) Besides above looking to the load growth the expansion in transmission system and augmentation of capacity of existing EHV GSS is required. During 2012-13 RVPN has planned to commission 8 Nos. of 220kV and 20 Nos. of 132kV GSS alongwith their associated lines. An addition of 1500MVA transformer capacity under augmentation programme is also proposed during 2012-13. (iv) The details of physical targets proposed during 2012-13 viz-a-viz their achievement up to Nov.2012 are as under: S. No. Works i. Lines & S/S - 400 kV Lines - 220 kV Lines -220kV Substations - 132 kV Lines -132kV Substations Augmentation Capacitor Banks Unit Target 2012-13 (Proposed) 20 700 920/8 425 550/20 1500 150 Achievement up to Nov.2012 97.848 277.80 400/3 278.083 400/10 1347.50 282.36

ii iii.

ckt.kM ckt.kM MVA/ Nos. ckt.kM MVA/ Nos. MVA MVAR

(v) The scheme wise provisions & working targets of transmission works during 2012-13 are shown in Annexure -A. 4.4. Government Support during 2012-13

4.4.1 To expedite the work and for timely completion of work for various evacuation schemes and system strengthening schemes, the funds are being arranged by RVPN form various Financial Institutions viz. PFC, REC, NCRPB, Commercial Bank etc. The new approved schemes shall also be posed to these institutions for loan assistance. The counter-part fund for such loan assistance is required to be met from plan fund and assistance from State Government is required to meet such demand. For all these works an equity support of Rs.44900 lacs shall be required from the State Govt., which has been shown in tentative resources for Annual Plan 20122013. 5. 5.1 Annual Plan 2013-14 Plan Outlays

5.1.1. On the basis of RVPN request and report of Working Group the Planning Deparment, Govt. of Rajasthan vide letter F.10(20) Plan/Gr. V/2012 dated 10.12.12 have intimated the proposed outlays for 2013-14 for RVPN as under: ` in lacs (i) Proposed outlay 2013-14 51000.00 (ii) IEBR 204000.00 ----------------Total 255000.00 ----------------8

5.1.2. Accordingly, the breakup of tentative Outlay of ` 255000 lacs capital works is proposed as under : S. No I. Head Generation (Shared Generating Projects) 1. S&I Preliminary Exps. (New works) 2. Renovation & Modernization/ Uprating of shared generating stations. (Ongoing works) a. Uprating of Bhakra Left Bank b. Other Capital works of BBMB Total (I) Transmission: On going works & New works including SCADA Total (II) Total ( I + II) 5.2. Resources The details of tentative resources proposed for financing the above outlay of Rs.255000 lacs are as under: (A) (i) (ii) (iii) (iv) Direct Bonds LIC REC PFC/Commercial Banks/NCRPB etc. Total (A) (B) (i) Through State Govt. State Govt. Equity Total (B) Total (A+B) 5.3. Works Position The detailed works position for RVPN is given as follows: 51000.00 51000.00 255000.00 (` in lacs) 75000.00 00.00 105500.00 23500.00 204000.00 ` in lacs Plan Outlay 2013-14 (Revised) 100.00

for

1900.00 2000.00 253000.00 253000.00 255000.00

II

5.3.1 Generation (Shared Generating Projects) (i) Survey, Investigation and Preliminary Expenses of New Projects

A provision of ` 100.00 lacs has been kept during the year 2013-14 for making payment for S&I Works and for preliminary expenses for interstate new projects. (ii) Bhakhra Beas Complex & Other shared projects

A total provision of ` 1900.00 lacs for up rating of Bhakhra Left Bank, other shared projects and for other Capital Works of BBMB is kept during the year 2013-14. This provision is for the Rajasthans Share in Modernization works. 5.3.2. Transmission

(i) A total provision of ` 253000.00 lacs is proposed for Transmission works during the year 2013-14. During 2013-14 the work on evacuation schemes of Chhabra Super Critical TPS, Kalisind TPS, Suratgarh Super Critical TPS, Kawai Super Critical TPS & Solar and Wind Power will be in full swing. More transmission schemes related to forthcoming Generation stations and for expansion of transmission system are likely to be approved in 2013-14, which will be included in Annual Plan at the time of revision. (ii) During 2013-14 major expenditure will be on construction of evacuation schemes which includes 765 kV and 400 kV transmission systems covered under various evacuation schemes. (iii) Besides above looking to the load growth the expansion in transmission system and augmentation of capacity of existing EHV GSS is required. During 2013-14 RVPN has planned to commission 3 Nos. of 400kV and 8 Nos. of 220 kV GSS and 20 Nos. of 132 kV GSS alongwith their associated lines. An addition of 1500MVA transformer capacity under augmentation programme is also proposed during 2013-14. (iv) The following physical targets are proposed for the transmission works to be under taken during 2013-14: S. No. i. Works Lines & S/S - 765 kV Lines - 400 kV Lines - 400 kV Substations - 220 kV Lines - 220 kV Substations - 132 kV Lines - 132kV Substations Augmentation Capacitor Banks Unit ckt.kM ckt.kM MVA/ Nos. ckt.kM MVA/ Nos. ckt.Km MVA/ Nos. MVA MVAR Target 2013-14 (Proposed) 426 1050 1890/3 700 920/8 425 550/20 1500 150

ii iii.

(v) The scheme wise provisions & working targets of transmission works during 2013-14 are shown in Annexure -A.
10

5.4. Government Support during 2013-14 5.4.1 To expedite the work and for timely completion of work for various evacuation schemes and system strengthening schemes, the funds are being arranged by RVPN form various Financial Institutions viz. PFC, REC, NCRPB, Commercial Bank etc. The new approved schemes shall also be posed to these institutions for loan assistance. The counter-part fund for such loan assistance is required also to be met from plan fund and assistance from State Government is required to meet such demand. For all these works an equity support of ` 51000 lacs shall be required from State Govt., which has been shown in tentative resources for Annual Plan 201314. 6. 6.1 Private Sector Projects : Generation Projects

6.1.1 Jalipa kapurdi lignite Mining cum power Generation project (Raj West) Under private sector 8x135 MW TPS is under construction by M/s Raj West Power Limited. As per information provided by M/s Raj West Power Limited COD of First four units is as under: (i) (ii) (iii) (iv) Unit - 1 Unit - 2 Unit - 3 Unit - 4 26.11.2009 4.10.2010 7.11.2011 4.12.2011

Subsequent units as intimated by M/s Raj West Power Ltd. are expected as under. Unit-5 Unit-6 Unit-7 Unit-8 Synchronized on 30.3.12 Synchronized on 26.6.12 Synchronization expected in Dec.12 Synchronized on 29.10.12

RERC have determined provisional tariff for Unit-1 to 8. 6.1.2 Case-1 (i) Procurement of 1200 MW power from Kawai Super Critical TPS in Dist Baran. For procurement of 1200 MW power LOI placed to L-1 firm M/S Adani power Rajasthan Ltd on 17.12.2009. PPA for 1200 MW signed with M/s. Adani Power Rajasthan Ltd. and three Discoms on 28.1.2010. Tariff got adopted from RERC on 31.5.10 through competitive Bidding process @ Rs 3.2383 per unit (levelised). Commencement of supply of power (as per schedule 4.1 of PPA) is from 31.8.2013.

11

6.1.3 Case-1 (ii) Procurement of 1000 MW Power under Case-I For procurement of 1000 MW power under Case-I, RFP issued on 28.5.12. The non-financial bids opened on 18.9.12. The bid evaluation is under process. 6.1.4 Case-2 (i) Gurha Thermal Power Plant (70 MW)

The GoR approved the Project in December 2008 and SPV in the name of Gurha Thermal Power Company Ltd. Incorporated on 16.4.2009. RFP was issued on 7.4.2010. EC granted by State Environmental Impact Appraisal Authority (SEIAA) on 29.12.2011. RFP (non-financial bids) opened on 27.6.2011. Evaluation report (non-financial bids) approved by BoD on 26.3.2010. Financial bids opened on 23.8.2011. The evaluation committee finalized the financial report in consultation with M/s PFCCL on 26.08.2011. The report approved by BoD of RVPN in its meeting held on 2.12.2011. LoI issued to L-1 bidder M/s SPML consortium on 15.12.2011. GoR (Mines) Department vide letter no. F.10(5) mines/Gr.1 /2006/Pt. dt.20.9.12approved the transfer rights of 50 hect. Land in favour of Gurha Thermal Power Company Ltd. The PPA and handing over of SPV to SPML consortium is to be taken place shortly. The power availability is expected within 36 months of signing of PPA (between successful bidder and three Discoms). 6.1.5 Case-2 (ii) Giral Unit 3 & 4 Power Plant (2x125 MW)

The GoR approved the Project on 15.1.2010 and SPV in the name of Barmer Thermal Power Co. Ltd. was got registered with the RoC, Rajasthan, Jaipur on 5.7.2010. Land for power plant has been acquired. Additional land for ash dyke (56.48 hectare) got allotted by GoR to RVPN. EC issued by SPCB, Jaipur on 19.9.12. Model FSA finalized by RSMML on 16.8.12. For selection of developer RFQ stage has been completed and RFP has been issued to qualified bidders on 10.5.2011. RFP bids are to be opened on 28.12.12. The power availability is expected within 36 months of signing of PPA (between successful bidder and three Discoms). 6.1.6 Case-2 (iii) 1000 MW Gas based Thermal Power Plant at Keshoraipaton The GoR approved the Project on 19.7.2010 and SPV in the name of Keshoraipatan Gas Thermal Power Company Ltd. has been incorporated on 17.9.2010. Cooperative Department, GoR allotted 458 Bigha(70.44 Hactare) land of Sugar Mill for the project and payment for this land has been made. Possession of the same has been taken. Nagar Palika, Keshoraipatan has issued demand note for allotment of 150 Bigha land and Case for payment is under process. Form No. 1 submitted to MoE&F, GoI on 25.10.10 for issuing ToR for EC. ToR issued on 20.4.2011. For allotment of gas on administered price, application submitted to CEA on 26.10.10. Term Sheet for supply of gas at market driven price has been signed with M/s GAIL on 7-6-11.

12

RERC vide order dt. 23.3.2011approved procurement of 1000 MW power through Case-1 or Case-2. Co-ordination committee in its 150th meeting held on 15.9.2011 decided to initiate process for procurement of 1000 MW power under Case-1 and also advised that efforts may be continued for setting up of 1000 MW gas based power project under Case-2. Accordingly process for procurement of 1000 MW power under case-1 has been initiated for which appointment of consultant is underway. 6.1.7 Case-2 (iv) Banswara power project (2x660 MW)

The GoR approved the Project on 13.1.2009. SPV in the name of Banswara Thermal Power Company Ltd. has been incorporated on 13.4.2009. Water allotment (2000MCFT/63 cusec) committed by GoR from Mahi Project on 1.9.09. Possession of 444.50 acre Govt. land and 862.56 acre private land has been taken. For EC final report submitted to MoE& F on 5.10.2010. MoP, GoI vide their office memorandum dt. 20.8.10 has recommended the case of allotment of coal linkage to MoC, GoI. CEA and MoC, GoI have requested for allotment of coal linkage and coal block respectively on 29.12.2011. The state Govt has given its consent on 7.12.2010 to Ministry of Railway for sharing 50% (Approx.120000 lacs) of the Final project cost (Excluding the cost of land acquisition) for construction of broad gauge rail link from Ratlam to Dungarpur via Banswara. Out of this, 50% cost is to be recovered from the developer and rest is to be borne by RVUN. MoU between Ministry of Rail, GoI and GoR signed on dt. 31.5.2011. For construction of railway line a meeting was held on 19.12.2011 under the chairmanship of CS, GoR wherein a decision was taken to expedite the above work through CMD RVUN, Collector Banswara and Railway authorities. The power generation from this project is expected within 48 months from signing of PPA (between successful bidder and three Discoms). 6.2 Transmission Projects

6.2.1 The Govt. of Rajasthan constituted a State Level Empowered Committee (SLEC) with a view to encourage competition in private sector participation for development of transmission projects in State. The SLEC on dt.16.1.2009 decided three transmission projects (two 400 kV and one 220 kV) to be implemented through competitive bidding process and authorized Rajasthan Rajya Vidyut Prasaran Nigam Limited to act as Bid Process Coordinator (BPC) for the purpose of selection of Bidder as Transmission Service Provider (TSP). (i) Orders have been placed in favour of M/s. GMR Energy Ltd. for following two projects and SPVs (M/S Maru Transmission Service Co. Ltd. (MTSCL)) and Aravali Transmission Services Company Limited (ATSCL) have been handed over to successful bidder. 1. 2. 400 kV S/C Bikaner- Deedwana Ajmer line with 400 kV/220 kV GSS at Deedwana and Associated schemes/work 400 kV S/C Hindaun- Alwar line with 400 kV/220 kV GSS at Alwar and Associated schemes/work.

13

Tariff for aforesaid two projects have been adopted and transmission licences have been granted by RERC. (ii) Order for third scheme i.e. for220 kV S/C Nawalgarh Deedwana line with 220 kV Sub-station and associated scheme work has been placed on M/S EMCO Ltd. 6.2.2 The State Level Empowered Committee on 10.9.2010 have identified two more projects to be developed through tariff based competitive bidding under private sector detailed as under: (i) 400kV D/C Babai (Jhunjhunu) - Jaipur (North) line alongwith 400kV/220kV GSS at Jaipur (North). RFP (Financial bids) has been opened on dt.5.12.2012 and case is under decision for placement of order. (ii) 400kV D/C Jodhpur (New) - Udaipur line alongwith 400kV/220kV GSS at Udaipur. RFP (Financial bids) has been opened on 23.11.12 and the case is under decision for placement of order. *******

14

Transmission - Details of Plan Provisions & Physical Targets for Annual Plan 2012-13 (Revised) and 2013-14 (Proposed)
S.No. Scheme Category

ANNEXURE-A

` in lakhs Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan Ckt Km. MVA

I A

1 2 3 4 5

765kV SCHEMES ON GOING SCHEMES Composite Power Evacuation System {Chhabra Super Critical TPS (2x660MW) & Kalisindh TPS (2x600 MW)} 765/400 kV GSS at Phagi(Jaipur South) alongwith 2 sets of 765kV, 3x80 MVAR (single phase) Line Reactors and 400kV, 1x125 MVAR Bus Reactor at Phagi (Jaipur South) 400/765 kV GSS at Anta(Baran) Pooling Station alongwith 2 sets of 765kV, 3x80 MVAR (single phase) Line Reactors. 765 kV, 1X S/C Anta- Phagi(Jaipur South) ckt - I (RFD 2013-14)

ES ES ES 214 212

2x1500 2x1500

83285.06 50463.53 68161.38

2014-15 2014-15 2013-14 2013-14

15000 9000 9500 14000

17000 25000 5500 4800 Incl in I.2 214 212

II A. 1 2

3 4 5 6 7 8 9 10

11

ES 765 kV, 1 X S/C Phagi(Jaipur South)- Anta ckt -II (RFD 2013-14) Evacuation system for Kawai Super Critical TPS (2x660MW) Additional 1x1500 MVA, 765/400 kV transformer (3rd transformer) at 765/400 kV pooling ES station Anta (Baran) I. TOTAL (765kV ) TARGET 220 kV - WORKING - ACHIVEABLE 400kV SCHEMES ON GOING SCHEMES Normal Development Works 400 kV S/C Jodhpur - Merta line (Second ckt.) BPTS,LR WIND POWER Evacuation in Jaisalmer/Barmer area (Phase - I) 400 kV S/C Akal (Jaisalmer) - Jodhpur line (charged on 220 kV) ES Composite Evacuation System [Chhabra Super Critical TPS (2x660MW) and Kalisindh TPS (2x600 MW)] ES 400/220 kV GSS at Ajmer (RFD 2013-14) Terminal 400 kV Bays at existing 400 kV Substation at Heerapura ES 400 kV D/C (Quad Moose) Kalisindh TPS -Anta(Baran) Pooling Station Line (For Kalisingdh ES TPS ) (RFD 2013-14) 400 kV D/C (Quad Moose) Chhabra SCTPS - Anta(Baran) Pooling Station Line (For Chhabra ES TPSkV ) D/C (Twin Moose) Phagi (Jaipur 765 kV)-Ajmer Line (RFD 2013-14) ES 400 400 kV D/C Phagi (Jaipur ) - Heerapura line ES Power Evacuation of Banswara Super Critical TPS 400/220 kV GSS at Jodhpur (New) alongwith 400kV, 1x80 MVAR Bus Reactor and ES 2x50MVAR Line Reactors at Jodhpur end of 400kV D/C Udaipur -Jodhpur (New) line. (Under normal development) 400/220 kV GSS at Chittorgarh alongwith 400kV, 1x80 MVAR Bus Reactor, and 2x50MVAR ES Line Reactors at Chittorgarh end of 400kV D/C Banswara TPS-Chittorgarh line. (Under normal development) Terminal 400 kV Bays at existing 400kV Substation Bhilwara ES

1x1500

16161.12

2014-15 47500 -

52300

426 426 426

98 245

8332.12 20156.15

27.10.12 26.11.11

50 0

98

500

2x315 159 179 213 89 2x315 2x315

12334.01 996.09 18948.83 24632.16 11603.74 3716.19 14790.96 13834.05

2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2014-15 2013-14

1800 10000 10000 6500

2900 2800 4800 5700 159 179 213 89

630

500 4000

2600 2600 630

2440.86

2013-14

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan 3000 3500 1000 3900 500 Ckt Km. MVA

12 13 14 15 16 17 18 19 20 21 22 23 24

400kV Interconnecting Lines (Banswara Evacuation) : 400 kV D/C Banswara TPS- Udaipur (Quad Moose) Line 400 kV D/C Banswara TPS- Chittorgarh (Quad Moose) Line 400 kV D/C Chittorgarh-Bhilwara (Twin Moose) Line (Under normal development)(RFD 2013-14) 400 kV D/C Bhilwara-Ajmer (Twin Moose) Line LILO of 400kV Jodhpur -Merta line at 400 kV GSS Jodhpur(New) Power Evacuation Scheme of Suratgarh Super Critical TPS 400/220 kV GSS at Babai (Jhunjhunu) alongwith 400kV, 1x80 MVAR Bus Reactor and 2x80MVAR Line Reactors at Babai end of 400kV D/C Suratgarh TPS-Babai (Jhunjhunu) line. (RFD 2013-14) Terminal 400 kV Bays at existing 400 kV Substation Bikaner (with 400kV, 1x50 MVAR Shunt Line Reactor at Bikaner end of 400kV S/C Bikaner-Merta line.) Terminal 400 kV Bay at existing 400 kV Substation Mertacity with 400kV, 1x50 MVAR Shunt Line Reactor at Merta end of 400kV S/C Bikaner-Merta line. 400kV Interconnecting Lines (Suratgarh Super Critical TPS Evacuation) : 400 kV D/C Suratgarh TPS- Babai (Jhunjhunu)(Quad Moose) Line (RFD 2013-14) 400 kV D/C Suratgarh TPS- Bikaner (Twin Moose) Line 400 kV S/C Bikaner- Merta (Twin Moose) Line Evacuation system for Kawai Super Critical TPS (2x660MW) (i) 400 kV D/C (Quad Moose) Kawai SCTPS-765/400 kV Anta (Baran) line (RFD 2013-14) (ii) 3 nos. 400 kV bays at 765/400 kV Anta(Baran) Pooling Station

ES ES ES ES ES ES ES ES

320 360 100 300 110 2x315

30315.48 34104.37 4644.14 13923.6 3716.19 14388.31 2760.19 1387.99

12th Plan 12th Plan 2013-14 2014-15 2014-15 2013-14

600 500 100 2700 1300

100

630

ES ES ES ES ES

480 340 200 101

43576.58 15779.49 11899.74 14944.75 Incl. in I.A.5

2013-14 12th Plan 2014-15 2013-14 2014-15

15200 600 2800 Incl. in 765kV Anta

21200 100 3000 500 Incl. in 765kV Anta

480

101

25

26

27

28

29

Transmission System for New Solar and Wind Power Plants in Jaisalmer, Barmer & Jodhpur Districts 400/220 kV, 3 X 500 MVA and 220/132kV, 3x160 MVA with 132/33kV, 2x40/50 MVA Pooling Sub-Station GSS at Ramgarh (Jaisalmer) alongwith 400kV, 1x125 MVAR, 400kV Shunt Reactor (Bus type) and 2x50 MVAR Shunt Reactor (line type) for 400kV D/C RamgarhBhadla line 400/220 kV, 3 X 315 MVA and 220/132kV, 3x160 MVA with 132/33kV, 2x40/50 MVA Pooling Sub-Station GSS at Bhadla (Jodhpur) alongwith 400kV, 1x125 MVAR Shunt Reactor (Bus type) and 4x50 MVAR, 400kV Shunt Reactors (Line type) for Bhadla ends of 400kV D/C Bhadla-Bikaner line, 400kV LILO Jodhpur-Merta at Bhadla line and 400kV D/C Ramgarh-Bhadla line. GSS Akal by installation of 400/220 kV, 1 X500 MVA Transformer Augmentation of 400kV alongwith 400kV, 1x125 MVAR Bus Reactor and 400kV, 2x50 MVAR Shunt Reactor (line type) for proposed 400kV Akal-Jodhpur (New) line. Augmentation of 400kV GSS Jodhpur (New) (i) 2x50 MVAR, 400kV Shunt Reactor (line type) at 400kV GSS Jodhpur (New) for 400kV D/C Akal-Jodhpur(New) line (ii) 400kV bays at Jodhpur (New) for LILO of one ckt. of 400kV D/C Raj West LTPSJodhpur line. at 400kV GSS Barmer Augmentation (i) 1x125 MVAR, 400kV Shunt Reactor (Bus type) at 400kV GSS Barmer (ii) 400kV bays for 400kV D/C Barmer-Bhinmal (PG) line

ES

3x500

30820.43

12th Plan

100

800

ES

3x315

33616.41

12th Plan

100

1000

ES

1x500

8832.48

3701.39 ES ES ES ES 3177.51

Incl in 400kV GSS Ramgarh 12th Plan Incl in 400 kV GSS 12th Plan 12th Plan 12th Plan 100 12th Plan

2013-14

Incl in 400kV GSS Ramgarh Incl in 400 kV GSS Jodhpur 300

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan Incl in 400kV GSS 2000 4000 12000 4000 3600 1000 1400 100 100 1200 Ckt Km. MVA

30

31

Augmentation at 400kV GSS Bikaner (i) 1x125 MVAR, 400kV Bus Reactor at 400kV GSS Bikaner GSS (ii) 400kV Bays for 400kV D/C Bhadla-Bikaner line and 400kV D/C Bikaner-Sikar (PGCIL) line at Bikaner end of the lines 400kV Interconnecting Lines ( New Solar & Wind Plants) : (i) 400 kV D/C Ramgarh(Jaisalmer)-Akal (Jaisalmer) line (Twin Moose) (ii) 400 kV D/C Ramgarh-Bhadla line (Twin Moose) (iii) 400 kV D/C Bhadla-Bikaner line (Quad Moose) (iv) 400 kV D/C line from 400/220kV Pooling Station Bhadla to LILO point at 400kV S/C Jodhpur-Merta line (Twin Moose) (v) 400 kV D/C Barmer-Bhinmal (PGCIL) line (Twin Moose) (vi) LILO of one circuit of 400kV D/C Raj West-Jodhpur line at 400kV GSS Jodhpur (New) (Twin Moose) (vii) 400 kV D/C Bikaner-Sikar (PGCIL) line (Twin Moose) (viii) 400kV D/C Akal-Jodhpur (New) line (Quad Moose) Inter- connect RVPNs 765/400 kV Anta GSS to PGCILs 400/220 kV Kota GSS (i) LILO of 2nd circuit of 400 kV D/C Chhabra TPS-Dahra section at 765/400 kV Anta GSS (ii) 400kV bay equipments work at 765/400kV Anta GSS (iii) 400 kV S/C line extension from 765/400 kV Anta GSS to PGCILs 400/220 kV Kota GSS Construction of 400kV S/C line between 400kV Chhabra TPS and Kawai SCTPS to provide start up power to M/s Adani Power Rajasthan Limited for its Ist unit at Kawai TPP Supplementary Transmission System for Power Evacuation Scheme of Solar Power Projects in Jaisalmer, Barmer, Jodhpur and Bikaner Districts (i) 400/220 kV, 2 X 500 MVA GSS at Jaisalmer-2 alongwith 1x125 MVAR , 400kV Bus Type Reactor (ii) 400 kV D/C Jaisalmer-2 -Barmer line (iii) 400 kV S/C Akal(1)- Jaisalmer-2 line (iv) 400kV Terminal Bay Equipment at 400/220kV GSS Barmer (for termination of 400 kV D/C Jaisalmer 2 - Barmer line at Barmer end) (v) 400kV Terminal Bay Equipment at 400/220kV GSS Akal 1 (for termination of 400 kV S/C Akal 1 - Jaisalmer 2 line at Akal 1 end) TOTAL (400kV ) (Spill over work) Target 400 kV - WORKING - ACHIVEABLE 220kV SCHEMES ON GOING WORKS Normal development works LILO of one ckt. of existing 220 kV D/C Bhiwadi - Alwar line at proposed 220 kV GSS Kishangarh Bas with 220 kV GSS at Kishangarh Bas i) LILO of existing 220 kV S/C Badarpur - Alwar line at proposed 220 kV GSS MIA Alwar ii) 220 kV S/C Mandawar -Alwar MIA line (Turnkey)

ES ES

4968.21

12th Plan 12th Plan

Incl in 400kV GSS 100

ES ES ES ES ES ES ES ES ES ES ES ES

200 360 360 320 280 100 420 480 2 45 16

9931.72 17873.13 42589.27 15887.78 13902.43 4968.34 20851.16 56784.04 92.65 1811.54 2686.80 1053.00

12th Plan 12th Plan 12th Plan 12th Plan 12th Plan 12th Plan 12th Plan 12th Plan 2014-15 2014-15 2014-15 19.12.12

32

33 34

800

16

200

ES ES ES ES ES

2 X 500 260 50

19379.76 13498.12 3518.61 3619.21 1820.11

12th Plan 12th Plan 12th Plan 12th Plan 12th Plan

100

200

59350

114 98 114 20

89100

1321 1321 1050

1890 1890/3 1890/3

III A. 1 2

LC,LR LC,LR LC,LR

6 5 58

100 100

2123.25 2889.63 899.91

22.2.12 8.2.11 2012-13

100 300 58

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan Ckt Km. MVA

3 (a) i. ii. iii. iv.

v. vi. ( b) i. ii. iii. ( c) i.

4 5 6 7 8 9 10

Jaipur City EHV network strengthening scheme-1 220/132kV, 2x160 MVA capacity GIS Substation at Mansarovar (Jaipur) alongwith associated lines and allied works 220 kV GIS Substation at existing 132 kV Substation at Mansarovar (Jaipur) Up-gradation of existing 132 kV D/C Line to 220 kV D/C Lines Between 220 kV Sanganer to 220 kV Mansarovar (Proposed) 2 Nos. 220 kV Terminal Bays at 220 kV Substation at Sanganer (a) 220 kV S/C Tapping Line on Tubular Pole/Narrow base Tower (1.5 Km), 220 kV D/C Composite Portion on Tubular Pole/ Narrow base Tower (2 Km) by conversion of existing 132 kV S/C Heerapura-Sanganer Line & 220 kV XLPE Cable S/C (2.5 Km) from Tapping Point. (LILO of Sanganer- Heerapura line for Mansarovar) (b) 220 kV XLPE Cable S/C from Tapping Point. 1 Nos. 220 kV Terminal Bays at 400 or 220 kV Substation at Heerapura 132 kV Terminal Bay at existing 132 kV Substation at Chambal 220kV GIS Substation at Nallah Power House (Jaipur) alongwith associated lines and allied works 220 kV GIS substation at existing 132 kV Nallah Power House, Jaipur (RFD 2013-14) Up-gradation of existing 132 kV (S/C & D/C Sections) Line to 220 kV D/C Line Between 220 kV Heerapura to 220 kV Nallah Power House (Proposed) 2 Nos. 220 kV Terminal Bays at 400 kV Heerapura/ 220 kV Substation at Heerapura Up-gradation of existing 132 kV Line Up-gradation of existing 132 kV D/C Line to 220 kV D/C Lines (to be charged on 132 kV for present) between 132 kV Kunda-Ki- Dhani to 132 kV Purana Ghat Power Evacuation System of Ramgarh GTPS (Stage-III) : 220/132kV GSS at Dechu (New location) 220 kV D/C Ramgarh GTPP-Dechu line 220kV D/C Dechu -Phalodi line Normal development works LILO of 220 kV Debari - Banswara line for 220 kV Madri with 220 kV GSS at Madri (Udaipur) 220 kV S/C Khushkhera - Neemrana line ( Turnkey) 220 kV D/C line to connect the LILO of 220 kV S/C Heerapura-Khetri line(second ckt.) to LILO of one ckt. of 220 kV D/C Neemrana- Kotputli line (i) 220 kV GSS at Bundi (New location) (Distt. Bundi) (ii) LILO of one ckt of 220kV D/C KTPS- Gulabpura at proposed 220 kV GSS Bundi (i) (ii) (i) (ii) 220 kV GSS at Gajner (New location) (Distt. Bikaner) 220 kV D/C Bikaner (400kV GSS)-Gajner line 220 kV GSS at Manoharpur (Upgradation) (Distt. Jaipur) 220 kV D/C Kotputli-Manoharpur line

SS SS SS SS

2x160 14

7476.20 723.52 236.83 4387.28

2012-13 2012-13 2012-13 31.5.12

1800 14

160

200

8 SS SS SS SS SS SS 14 2x160 10 118.41 59.54 6933.93 854.81 236.83 789.51

2012-13 2012-13 2012-13 2013-14 2013-14 2013-14 2013-14 100 3200

1500 10

160

400

14

ES ES ES LC,LR SS SS SS,LC SS SS,LC SS SS,LC SS SS,LC SS SS SS

2x100 420 71 33 51 125 2X100

4307.69 8655.07 967.05 3412.72 1651.87 2004.65 3143.42 202.11 3430.74 1668.10 2758.31 2001.28 2535.60 1096.24 797.87 1228.75

29.3.12 2013-14 8.9.12 2012-13 9.6.12 2012-13 6.11.12 30.6.12 2012-13 2012-13 2013-14 2012-13 26.3.12 27.8.12 22.2.12 2.9.12

100 2000 500 400 200 700 800

420 71 33 51 125 100

1000 50 300 150

420

1x100, 8 1x100 117 1x100 102 1x100 57 43 49

100 8

11 12

1000 117 1200 102 1500 57 49

100

150 600 100

13

(i) 220 GSS at Padampur (Upgradation) (Distt. Sri Ganganager) (ii) 220 kV S/C Suratgarh-Padampur line. (iii) 220 kV S/C Padampur-Udyogvihar line (iv) 220 kV S/C Udyogvihar-Hanumangarh line

50

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 1x100 108 1x100 11 1x100 33 1x100 42 35 1x100 19 100 15 100 21 25 100 14 10 3610.37 1668.10 2107.49 202.11 2246.70 996.79 2388.21 1001.74 797.87 1976.41 335.39 2335.92 342.65 2430.96 342.65 736.38 3273.50 242.06 173.53 2013-14 2012-13 25.11.12 25.11.12 2013-14 2013-14 2013-14 2013-14 2013-14 16.10.12 12.9.12 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 Plan 1200 800 11 700 700 900 33 900 42 35 600 19 1000 1200 21 300 500 200 1200 14 10 25 100 100 800 15 200 100 100 100 100 100 Ckt Km. MVA 108 100 150 Plan 600 Ckt Km. MVA 100

14 15 16 17

(i) 220 GSS at Gangapurcity (New location) (Distt. Sawai Madhopur) (ii) 220 kV D/C Hindaun (400 kV GSS) - Gangapurcity line (i) 220/132kV GSS at Nadbai (Upgradation) (Distt. Bhartpur) (ii) LILO of existing 220kV S/C Mandawar-Bharatpur line at 220kV GSS Nadbai (i) 220/132kV GSS at Tehandesar (Upgradation) (Distt. Churu) (RFD 2013-14) (ii) 220 kV S/C Sujangarh-Tehandesar line. (i) 220/132kV GSS at Badnu (Upgradation) (Distt. Bikaner) (ii) LILO of existing 220 kV Ratangarh(400kV)-Bikaner(220kV) line at proposed 220 kV GSS Badnu. (iii) 220kV S/C Tehandesar -Badnu line (RFD 2013-14) (i) 220/132kV, 1x100 MVA GSS at Sikrai (Upgradation) (Distt. Dausa) (ii) LILO of 220kV S/C Hindaun-Dausa line at 220kV GSS Sikrai (i) 220/132kV GSS at Hamirgarh (Distt. Bhilwara) (ii) LILO of 220 kV S/C Bhilwara-Chittorgarh line at 220 kV GSS Hamirgarh (i) 220/132kV GSS at Lalsot (Distt. Dausa) with 1 No bay at 132kV GSS Toonga & 2 Nos bay at 220kV GSS Bhadoti (RFD 2013-14) (ii) LILO of 220 kV S/C Dausa-Anta line at proposed 220 kV GSS Lalsot (RFD 2013-14) 220 kV S/C Sirohi- Pindwara with 1 no.bays at 220kV GSS Sirohi &1 no.bays at 220kV GSS Pindwara (i) 220kV GSS at Bamantukda (Distt. Rajsamand) (RFD 2013-14) (ii) LILO of existing 220 kV S/C Bhilwara (400 kV GSS)-Bali line at proposed 220 kV GSS Bamantukda (RFD 2013-14) (iii) LILO of existing 220 kV S/C Kankroli (220 kV GSS)-Bali line at proposed 220 kV GSS Bamantukda (RFD 2013-14) Composite Power Evacuation System [Chhabra Super Critical TPS(2x660MW) and Kalisindh TPS (2x600 MW)] LILO 220kV Ajmer-Beawer Line at 400kV Ajmer GSS LILO 220kV Ajmer-Kishangarh Line at 400kV Ajmer GSS (RFD 2013-14) Power Evacuation System of Banswara Super Critical TPS (2x660 MW) 220kV Interconnecting Lines at Udaipur: (i) LILO of Amberi(Prop 220 kV GSS)-Debari line at proposed 400 kV GSS Udaipur. (ii) LILO of Chittorgarh-Debari line at proposed 400 kV GSS Udaipur. 220kV Interconnecting Lines at Chhitorgarh : (i) 220 kV D/C from 400kV Chittorgarh to 220kV GSS Sawa (ii) LILO of 220kV S/C Chittorgarh - Debari line at 400kV GSS Chittorgarh (RFD 2013-14) 220kV Interconnecting Lines at 400kV GSS Jodhpur (New) : (i) 220 kV LILO of existing 220 kV GSS Jodhpur (220kV GSS) -Pali line at 400kV Jodhpur (New) (ii) 220 kV D/C Jodhpur (New) - Jhalamand (U/C 220 Kv GSS) (iii) 220 kV D/C Jodhpur (New) - Barli (U/C 220 Kv GSS) 220 kV D/C Banswara TPS- Banswara (220 kV GSS) Line Power Evacuation System of Suratgarh Super Critical TPS 220kV Interconnecting Lines : 220 kV Interconnections at 400/ 220 kV GSS Babai(Jhunjhunu) (i) LILO of existing 220 kV S/C Khetri-Reengus line at 400kV GSS Babai (Jhunjhunu) (RFD 2013-14)

SS,LC SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS

18 19 20

21 22

23 24 25

ES ES

20 9

408.5 408.5

2013-14 2013-14

400

350

20 9

ES ES ES ES ES

10 10 50 10 16 40 90 20

2043.68

2014-15 2014-15 2013-14 2013-14 2014-15 2014-15 2014-15 12th plan

100

300

26

2043.68

200

800

50 10

27

2043.68

100

500

28

ES

409.62

29

ES

40.85 2013-14

20

50

S.No.

Scheme

Category

(ii) LILO of existing 220 kV S/C Khetri-Heerapura line at 400kV GSS Babai (Jhunjhunu)(RFD 2013-14) 30 220 kV Terminal Bays at various 400/220 kV Substations (6 No.) 31 220 kV Interconnections at 400/ 220 kV GSS at Jaipur (North) (i) LILO of 220 kV S/C VKIA- Kukas at 400kV GSS jaipur (North) (ii) 220 kV D/C line from 400kV GSS jaipur (North) to under contruction GSS Manoharpur (iii) 2 No. bays at 220kV GSS Manoharpur. 32 JAIPUR CITY EHV NETWORK STRENTHENING SCHEME-III [JENSS-III] (a.) 220 kV GSS at Sitapura (New) and associated lines. (i) 220 kV Substation at Sitapura (Jaipur) (ii) Up-gradation of existing 132 kV S/C Line to 220 kV D/C Lines Between 220 kV Sanganer to 220 kV Sitapura (Proposed) ) (RFD 2013-14) (iii) 1 No. 220 kV Terminal Bays at 220 kV Substation at Sanganer (iv) Up-gradation of existing 132 kV S/C Line to 220 kV D/C Lines Between 220 kV Indira Gandhi Nagar to 132 kV Sitapura (Charged on 132 kV) (v) 2 Nos. 132kV Terminal Bays at 132 kV S/S Sitapura. (vi) 220 kV D/C Interconnection between 220 kV Sitapura (Proposed) and 132 kV Sitapura (Existing) [Charged on 132 kV] (vii) Up-gradation of existing 132 kV S/C Line Sanganer-Chaksu Line to 220 kV D/C Line [for future connectivity to 400 kV Jaipur South (PG) (approx. 34kM)] 20 kM line on 220 kV D/C narrow base towers and balance 14 kM on 220 kV D/C conventional towers.(RFD 201314) kV GSS at Kunda Ki Dhani (up-gradation) and associated lines (b.) 220 (i) 220 kV substation at Kunda ki Dhani at existing 132 kV Kunda Ki Dhani, Jaipur (ii) LILO 220 kV D/C Bassi (PG)-Kukas Line at KKD (iii) Up-gradation of existing 132 kV S/C Line to 220 kV D/C Lines Between 132 kV Purana Ghat to 132 kV Bassi (Charged on 132 kV) (c.) 220 kV S/C XLPE Cable System from 400 kV Heerapura to 220 kV Nala Power House (RFD 33 JODHPUR 2013-14) CITY EHV NETWORK STRENTHENING SCHEME-I [JDENSS-I] (a.) (i) 220 kV GSS at Barli (Distt. Jodhpur) (RFD 2013-14) (ii) LILO of 220kV Jodhpur (400kV GSS)-Jodhpur (220kV GSS) interconnector-II at Barli (RFD 2013-14) (i) 220 kV GSS at Jhalamand (Distt. Jodhpur) (ii) LILO of 220kV Jodhpur (400kV GSS)-Jodhpur (220kV GSS) interconnector-I at Jhalamand (i) 220 kV GSS at Karwad/Bhawad (Distt. Jodhpur) (ii)220kV D/C Jodhpur (400kV GSS)-Karwad/Bhawad-Bhopalgarh line( balance 85ckm in RFD 2013-14) (i) 220 GSS at Bhadwasia (Distt. Jodhpur) (ii) 220kV D/C Jodhpur (400kV GSS)-Bhadwasia line (on Narrow base towers with one ckt. on 220kV & other on 132kV) Strengthning scheme of existing 132kV Chopasani Housing Board (CHB) GSS (i) Upgradation of existing 132 kV S/C Jodhpur-CHB-Soorsagar Line to 220 kV D/C Narrowbase Towers (to be charged on 132 kV) (i) 220 GSS at Kuchera (New location) (Distt. Nagaur) (ii) LILO of 220 kV Nagaur - Merta line at proposed 220 kV GSS Kuchera (i) 220 GSS at Aspur (New location) (Distt. Dungarpur ) (ii) Stringing of IInd circuit of 220kV D/C Banswara-Debari line from Debari to Salumber (RFD 2013-14)

ES

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 2013-14 50 Plan Ckt Km. MVA Plan Ckt Km. MVA 7 102.13 7 1078.12 2013-14 2014-15 100 500 200

ES ES ES SS,LC SS,LC

19 62

2453.3

160 SS SS SS SS SS SS 11

2769.07 704.72 118.37 741.72 123.50 85.73 2321.22

2014-15 2013-14 2014-15 2014-15 2014-15 2014-15 2013-14

300

600

18

1 84

SS,LC SS SS SS SS SS,LC SS SS SS,LC SS SS,LC SS SS,LC SS SS SS SS,LC SS SS,LC SS

+ 160 8 40 10 2x100 6 2x100 2 2x100 163 2x100 22

3126.45 353.48 1594.08 8554.36 5098.42 102.15 4351.64 35.52 4887.92 2534.36 4324.37 915.3

24.3.12 24.3.12 2013-14 2013-14 2013-14 2013-14 2014-15 2014-15 2012-13 2012-13/ 2013-14 2014-15 2014-15

200

500 40

3300 600

500 1300

10 100 6

(b.) (c.)

200 2000 163 200 100

700 600

(d.)

1400

(e.)

24 1x100 24 1x100 77

969.47 3145.95 400.56 3374.78 755.30

2014-15 2014-15 2014-15 20.3.12 2013-14

100 400 600 77

500 1200 100

34 35

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan Ckt Km. MVA

36

Transmission System for New Solar and Wind Power Plants in Jaisalmer, Barmer & Jodhpur Districts 220/132kV, Transformer at Pooling Sub-Station GSS at Ramgarh (Jaisalmer)

ES ES 3x160 Incl. in 400kV scheme 2013-14 Incl. in 400kV scheme

37

220/132kV, Transformer at Pooling Sub-Station GSS at Bhadla (Jodhpur)

ES

3x160

Incl. in 400kV scheme

2013-14

Incl. in 400kV scheme

38

(i) 220/132kV GSS at Bap (Distt. Jodhpur) (ii) LILO of 220kV Barsingsar LTPS-Phalodi line at at Bap (RFD 2013-14) (iii) 220kV D/C Bap-Bhadla line (i) 220/132kV GSS at Kanasar (Distt. Jodhpur) (ii) 220kV D/C Bhadla - Kanasar line Normal Development Works (i) 220/132kV GSS at Mandalgarh(New) (Distt. Bhilwara) (TK) (ii) LILO of 220kV Kota (PG) -Bhilwara line at proposed 220 kV GSS Mandalgarh (i) 220/132kV GSS at Chonkarwada (Distt. Bharatpur)

ES ES ES ES ES LR,SS LR,SS LR,SS 41 120

2x160

6583.53 955.14 3438.51 6450.30 955.14

2012-13 2013-14 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

2000 41 400

160

1200

39

2x160 50 1x100 36 100

1000

40 41

3105.93 601.93 3697.31

400 400

1200 1200

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 400 Plan Ckt Km. MVA 1200 Plan Ckt Km. MVA 110 6 100 80 100 20 100 4 5 40 12 40 1X100 30 100 2199.65 90.58 90.58 564.06 705.07 1886.79 105.00 3654.89 1372.81 3377.74 344.85 3041.24 70.73 212.09 945.79 246.35 945.79 4391.47 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 23.7.12 2014-15 2013-14 2013-14 2014-15 2014-15 2013-14 2013-14 2013-14 2013-14 2013-14

42 43 44 45

(ii) 220 kV D/C Hindaun (400kV GSS)-Chonkarwada line (iii) LILO of 220kV S/C Mandawar-Nadbai-Bharatpur line at 220kV Chonkarwada (i) 220/132kV GSS at Baithwasia (Distt. Jodhpur) (ii) 220kV D/C Bhawad-Baithwasia line (i) 220/132kV GSS at Behror (Distt. Alwar)(TK) (ii) LILO of one circuit of 220 kV D/C Neemrana-Kotputli line at proposed 220kV GSS Behror (i) 220/132kV GSS at Bansur (Distt. Alwar)(TK) (ii) LILO of 220 kV S/C Alwar-Kotputli line at proposed 220 kV GSS at Bansur 220 kV interconnections at 400/220 kV GSS at Neemrana(PG) (i) LILO of one circuit of 220 kV 2xS/C Khushkhera(220 kV GSS)-Neemrana( 220 kV GSS) line at PGCILs 400/220 kV Neemrana(PG) (ii) 220 kV D/C line from PGCILs 400/220 kV Neemrana (PG) to Behror(proposed 220 kV GSS) 220 kV interconnections at 400/220 kV GSS at Kotputli (PG) (i) LILO of one circuit of approved 220 kV D/C Kotputli-Manoharpur line at PGCILs 400/220 kV Kotputli(PG) (ii) 220 kV D/C line from PGCILs 400/220 kV Kotputli(PG) to Bansur (i) 220/132kV GSS at Amberi (Distt. Udaipur) (ii) LILO of 220 kV S/C Kankroli(PG)-Debari line at proposed 220 kV GSS Amberi (i) 220/132kV GSS at Danta Ramgarh (Distt. Sikar) (RFD 2013-14) (ii) 2 Nos bay at 220kV GSS Renwal (iii) 2 Nos bay at 220kV GSS Dhod (iv) 220 kV S/C Renwal-Danta Ramgarh line (RFD 2013-14) (v) 220 kV S/C Dhod -Danta Ramgarh line (RFD 2013-14)

LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS

400 400 400

1200 1200 1200

100 100 100 100 400 700

5 500 100 700 1000 1400 12 40

46

47 48

100

28 35

28 35

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed Plan Ckt Km. MVA Plan 50 200 Ckt Km. MVA

49

Interconnections for 400 kV GSS Deedwana (RVPN Scope) (i) LILO of proposed 220 kV S/C Kuchamancity - Dhod line at proposed 400 kV GSS Deedwana 50 Interconnections for 400 kV GSS Alwar (RVPN Scope) (i) LILO of existing 220 kV S/C Dausa-Alwar line at proposed 400 kV GSS Alwar (ii) LILO of 220 kV S/C Mandawar - Alwar (MIA) line at proposed 400 kV Alwar GSS 51 Jaipur City EHV Network Strengthening Scheme-IV (Phase-I) (a) (i) 220 kV GIS Substation at Chambal (Jaipur) (ii) 2 Nos. 220 kV Terminal Bays at 400/ 220 kV Substation at Heerpaura (iii) 1 No. 220 kV Terminal GIS Bay at 220 kV Substation at Mansarovar (iv) 220 kV D/C Cable System between 400 kV Heerapura and 220 kV Chambal (v) 220 kV S/C Cable System between 220 kV Mansarovar and 220 kV Chambal (b) (i) 220/132kV,1x160MVA &220/33kV ,1X50MVA GIS Substation at PWD Bungalow (Jaipur) (ii) 1 No. 220 kV Terminal Bay at 220 kV Substation at VKIA (iii) 220 kV S/C Cable System between 220 kV Chambal and 220 kV PWD Bungalow (iv) 220 kV S/C Cable System between 220 kV VKIA and 220 kV PWD Bungalow Supplementary Transmission System for Power Evacuation Scheme of Solar Power Projects in Jaisalmer, Barmer, Jodhpur and Bikaner Districts 52 220kV GSS at Badisid (near Bap) (Jodhpur Distt.) : (i) (a) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Badisid (b) 2 Nos. 220kV bays at 220kV GSS Bap (ii) LILO of one circuit of 220 KV D/C Bap - Bhadla line at Badisid (12kM) (iii) 220 KV D/C Badisid-Aau (Proposed 220 KV GSS) line 220kV GSS at Aau (New loc.) (Jodhpur Distt.): (i) (a) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Aau (b) 2 Nos. 220kV bays at 220kV GSS Baithwasia (ii) 220 KV D/C Aau-Baithwasia (U/C 220 KV GSS) line 220 KV GSS at PS_1(New location other than PHED s/s) / Bajju (New location) (Bikaner Distt.): (i) (a) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at PS_1(New location) / Bajju (New location) (b) 2 Nos. 220kV bays at 400/220kV GSS Bhadla (ii) 220 KV D/C PS_1 / Bajju -Bhadla (U/C 400 KV GSS) line 220 KV GSS at Ramdev Nagar (Near Phalodi) (Jodhpur Distt.): (i) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Ramdev Nagar (Phalodi) (ii) LILO of one circuit of U/C 220 KV D/C Dechu-Phalodi line at proposed 220 KV GSS Ramdev Nagar 220 KV GSS at Chatrail (Jaisalmer Distt.): (i) (a) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Chatrail (Jaisalmer) (b) 2 Nos. 220kV bays at 220kV GSS Ramgarh (400kV GSS)

SS SS SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS

80 20 20 2X160

1849.58 673.31 673.31 10859.74 231.51 471.44 8681.82 3177.88 4795.95 114.22 3761.12 9163.47

2014-15 2014-15

50 -

14 5 1x160 1x50 6 15

2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

50

1000

ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES

1 X 160

4953.69 224.14 698.37 2327.91

2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

100

300

24 100 1 X 160 80

53

5087.87 224.14 1862.33

100

300

54

1 X 160

4921.26 224.14 931.16

2014-15 2014-15 2014-15

100

300

40

55

1 X 160 10

4696.80 232.79

2014-15 2014-15

100

300

56

1 X 160

4741.94 224.14

2014-15 2014-15

100

300

S.No.

Scheme

Category

57

58

(ii) 220 KV D/C Chatrail-Ramgarh (U/C 400 KV GSS) line 220 KV GSS at Pokaran (New loc.) (Jaisalmer Distt.): (i) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Pokran (New loc.) (ii) LILO of both circuits of U/C 220 KV D/C Ramgarh GTPP Dechu line at Pokaran 220 KV GSS at Kolayat (New loc.) (Bikaner Distt.): (i) (a) 220/132 KV, 1x160 MVA and 132/33kV, 1x20/25 MVA GSS at Kolayat (New loc.) (b) 2 Nos. 220kV bays at 220kV GSS Gajner (ii) 220 KV D/C Gajner (U/C 220 KV GSS)-Kolayat line LILO of both circuits of 220kV D/C Ramgarh GTPS- Dechu line at 400kV Ramgarh (1kM D/C each for both circuits i.e. total 2kM D/C) Optical Fibre Cable System for 220kV & 132kV Schemes already approved under Main Transmission System for New Solar & Wind Power Plants & Smart Grid Applications. (i) 220kV Transmission Lines already approved under Main Transmission System for Solar & Wind Power Plants (Total Route length 140kM) (ii) Software Development for Integration/Innovation, Smart Grid Applications etc. Power Evacuation System for Proposed Wind Project in Banswara and Pratapgarh area. (i) 220kV Switching Station at Banswara (ii) 2 Nos bays at 220kV GSS Banswara (iii) 220 kV D/C line between 220 kV Switching Station at Banswara & 220 kV GSS Banswara (iv) Termination of approved 220 kV D/C Banswara SCTPS-Banswara (220 kV GSS) line at 220 kV Switching Station Banswara. (i) 220/132kV GSS at Pratapgarh (Up-gradatation) with 2 Nos bays at 220kV GSS Chittorgarh & 2 Nos bays at 220kV GSS Nimbahera (ii) 220 kV D/C Banswara(switching station)-Pratapgarh line (iii) 220 kV D/C Pratapgarh-Chittorgarh (400 kV GSS) line with one circuit via 220 kV GSS Nimbhahera 220kV New starts 2012-13 (i) 220/132kV, 2x160 MVA GSS at NPH Jodhpur (Up-gradation) (ii) 220 kV D/C 1000 SQ. MM XLPE Cable between Jodhpur(220 kV GSS) & proposed 220 kV GSS NPH (iii) 2 Nos. 220kV bays at 220kV GSS Jodhpur (i) 220/132kV, 1x100 MVA GSS at Sayla (Distt. Jalore) (ii) 1 No. 220kV extension bay at 220kV GSS Jalore (iii) 220 kV D/C Bhinmal(400 kV GSS-PG)-Sayla (proposed 220 kV GSS) line (iv) 220 kV S/C Jalore -Sayla(proposed 220 kV GSS) line

ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES LR,SS LR,SS LR,SS

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 100 300 Plan Ckt Km. MVA Plan Ckt Km. MVA 120 2793.49 2014-15 1 X 160 20 5133.01 465.58 2014-15 2014-15 100 300

1 X 160 30 4

59 60

4921.26 224.14 698.37 641.81

2014-15 2014-15 2014-15 2014-15

100

300

50

200

140

902.54 128.93 2575.74 181.16 343.53 100 2635.20 2398.56 4111.82

2014-15

50

100

61

20 -

2013-14 2013-14 2013-14 2014-15 2014-15 2014-15 2014-15

200

1200

62

200

1000

140 240

63

LR,SS LR,SS 12

2x160

3213.46 7110.06 227.22 3417.40 92.14 1744.99 1129.29

2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

150 -

1000 2000

64

LR,LC LR,LC LR,LC LR,LC LR,LC LR,LC LR,LC LR,LC LR,LC

1x100 100 55 1x100

200

1000

65

(i) 220/132kV, 1x100 MVA GSS at Jethana (Distt. Ajmer) (ii) 2 Nos. 220kV bays at 400/220kV GSS Ajmer (2x82.24) (iii) 1 No. 132kV extension bay at 132kV GSS Saradhana (iv) LILO of 220 kV S/C Ras-Merta line at proposed 220 kV GSS Jethana (v) 220kV D/C Ajmer (400 kV GSS)-Jethana (proposed 220 kV GSS) line

40 70

4264.77 184.28 60.72 699.34 719.45

300

1000

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 1x160 70 1x160 60 16 1x160 20 56 2x160 28 1 1x100 8 82 40 4890.26 1209.73 4641.44 1036.91 276.51 2317.25 345.64 1011.83 5856.50 815.68 901.32 2143.84 140.50 1319.42 926.48 2014-15 2014-15 2014-15 2014-15 2014-15 2013-14 2013-14 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 400 0 700 40370 1563 1563 700 500 1020 1020/ 9 920/8 2000 1000 700 49300 887 887 700 500 960 960/9 920/8 100 200 200 400 400 700 400 700 Plan 400 Ckt Km. MVA Plan 700 Ckt Km. MVA

66

(i)

220/132kV, 1x160 MVA GSS at Goner (Distt. Jaipur )

SS,LC,LR SS,LC,LR SS,LC,LR SS,LC,LR SS,LC,LR SS,LC,LR

67

(ii LILO of one circuit of proposed 220kV D/C Jaipur (South) - Chaksu line at proposed 220kV GSS Goner. (i) 220/132kV, 1x160 MVA GSS at Vatika (Distt. Jaipur ) (ii) 220 kV D/C Jaipur ( South-PG) - Vatika line. (iii) LILO of 220kV S/C KTPS- Sanganer line at proposed 220kV Vatika. Conectivity with PGCIL's under construction 400/220kV GSS Jaipur ( South-PG) (a) (i) 220/132kV, 1x160 MVA GSS at Chaksu (Distt. Jaipur ) (Upgradation) ( RFD 201314) (ii) 220 kV D/C Jaipur ( South-PG) - Chaksu ( Proposed 220kV GSS) line. (RFD 2013-

68

69

70

SS,LC,LR 14) LILO of 220 kV S/C Duni - SEZ (220kV GSS ) line at PGCIL's 400/220kV GSS (b) SS,LC,LR Jaipur (South) (i) 220kV GIS Substation at Banar (Up-gradation) (District- Jodhpur) LC,LR (ii) 220 kV D/C line on Narrow Base/conventional towers from Jodhpur(400 kV GSS) to LC,LR proposed 220 kV GIS sub-station Banar (14kM D/C) (iii) 220 kV D/C XLPE Cable for termination of proposed 220 kV D/C Jodhpur(400 kV GSS)- LC,LR Banar line at proposed 220 kV GIS sub-station Banar(0.5kM D/C) (i) 220/132kV, 1x100 MVA GSS at Laxmangarh (Up-gradation) (Distt. Sikar) SS,LR (ii) LILO of 220 kV S/C Ratangarh-Reengus line at proposed 220 kV GSS Laxmangarh SS,LR (iii) Upgradation of existing 132 kV S/C Sikar-Laxmangarh-Fatehpur- Ratangarh line (presently with Wolf conductor on H-Pole towers) to ACSR Panther conductor on Lattice type towers (i) LILO of one ckt. Of under construction 220kV D/C Ramgarh GTPS - Dechu line at 220kV GSS Amarsagar. (ii) 2 No. bays at 220kV GSS Amarsagar. SS,LR SS SS

200

600

71

B. C D

New 400 kV & 220 kV Schemes (to be identified) 220 kV Bus Bar Protection Scheme Carried Over Liabilities (Civil works & Bal.Elect. Works - 220kV & 400kV)of Sub Stations & Lines Commissioned in last 3 years only III. TOTAL (220kV ) TARGET 220 kV - WORKING

- ACHIVEABLE IV 132kV SCHEMES A. Carried Over Liabilities (Civil works & Bal.Elect. Works - 132kV) of Sub Stations & Lines Commissioned in last 3 years only B. ON GOING SCHEMES Normal Development Schemes 1 LILO 132kV Hingonia-Heerapura line for 132 kV Champapura with 132 kV GSS at LC,LR Champapura, Kalwar Road, Jaipur (Jaipur) (Line comm. In 2010-11) 2 LILO 132 kV Bundi-Kota line for 132 kV Talera with 132 kV GSS at Talera (Bundi)(Line LC,LR,VR comm. In 2010-11) 3 132 kV S/C Deoli-Jahajpur line with 132 kV GSS at Jahajpur (Bhilwara) LC,LR,VR

5 4 18

25 25 25

1229.46 1300.8 1642.71

7.5.11 9.6.11 30.6.11

50 50 50

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 13 4 6 41 13 10 3 1 38 39 2 15 34 32 21 1 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 1569.96 1426.49 1364.19 1317.46 1540.86 1300.8 1426.49 1158.12 1519.00 1530.64 1401.57 1300.8 1980.67 1613.64 1551.12 1322.77 9.7.11 13.7.11 20.7.11 28.7.11 11.8.11 6.9.11 12.9.11 1.10.11 13.10.11 1.12.11 19.1.12 27.1.12 22.1.12 2012-13 11.4.12 9.5.12 17.10.11 14.10.11 17.10.11 24.9.11 4.9.12 2012-13 Plan 50 50 50 50 50 50 50 50 50 50 100 100 100 150 150 150 200 Ckt Km. MVA Plan 25 25 Ckt Km. MVA

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22

132 kV S/C Momasar-Patlisar Fanta line with 132 kV GSS Patlisar Fanta (Churu) LILO of 132 kV Todabhim-Sikandra line with 132 kV GSS at Sikrai (Dausa) LILO of 132 kV Hindaun-Todabhim line with 132 kV GSS at Daula Kunwa (Bada Khora) (Dausa) 132 kV S/C line from 220 kV GSS Hanumangarh - Rawatsar with S/S at Rawatsar (Hanumangarh) 132 kV S/C Riri-Upani line with 132 kV GSS at Upani (Bikaner) LILO 132kV Kota-Modak line for 132 kV Mandana Town with 132 kV GSS at Mandana Town (Kota) (Line comm. In 2010-11) LILO of 132 kV Jamwa Ramgarh-Rajgarh line with 132 kV GSS at Andhi (Jaipur) LILO 132kV Khetri-Gudha Gorji for132 kV Nangli with 132 kV GSS at Nangli (Jhunjhunu) 132kV S/C line from 220kV Phalodi-Bap line with 132 kV GSS at Bap (Jodhpur) (LineTurnkey) LILO 132kV Chittor-Hamirgarh line for 132 kV Rashmi with 132kV GSS at Rashmi (Chittorgarh) (Line- Turnkey) LILO of 132 kV Mandawar-Todabhim line with 132 kV GSS at Mahuwa (Dausa) LILO 132kV Hindaun-Gangapur line for 132 kV Baroli with 132 kV GSS at Baroli (Sawaimadhopur) 132 kV Jhunjhunu (220kV GSS) - Malsisar line with 132 kV GSS at Malsisar (Jhunjhunu) 132kV Saradhna-Pushkar Road- MDS University with 132kV GSS at Pushkar Road (Ajmer) ( GSS comm. 23.8.11)(20ckM Saradhna-Pushkar road line completed in 2011-12) LILO of 132 kV MDSU-Bherunda line with 132 kV GSS at Pushkar (Ajmer) Line comm. In 2011-12 132 kV S/C Senthi (Chittorgarh) - Nimbehera line with 132 kV GSS at Rasoolpur (Chittorgarh) line comm.30.11.11 132kV GIS Substation at PWD Bunglow, Station Road, Jaipur (i) underground cable from 132kV GSS Nallah Power House - PWD Bunglow (ii) 132/33kV conventional type transformer with 132kV & 33kV Gas Insulated Modules & 2 Nos 132kV extension bays at 132kV GSS Nallah Power House (i) LILO of 132kV Reengus-Govindgarh line with 132kV GSS at RIICO, Reengus (Disst.Sikar) (ii) 132 kV S/C line for RIICO, Reengus from lacation no 60B Jaipur City EHV network strengthening scheme-1 (i) Up-grading and Up-rating of existing 132 kV S/C Line to 132 kV D/C on Tubular Poles between existing 132 kV GSS Mansarovar and 132 kV GSS Chambal and associated terminal bays and strengthening (allied work for GIS Mansarovar) (ii) Up-rating & Refurbishment of 132 kV S/C Line between existing 220 kV Heerapura to 132 kV Chambal and associated strengthening of terminal bays. (allied work for GIS NPH ) Normal Development Schemes LILO of 132kV VKI - Vaishali Nagar line to New Jhotwara with 132kV GIS S/S at New Jhotwara (Jaipur) (Turnkey) LILO 132kV Kota-Sangod line at Shivpura with 132kV GSS at Shivpura (Kota) Extension of Existing 132 kV S/C VKIA - Pratap Steel line upto 220 kV GSS VKIA 132 kV D/C line from 220 kV SEZ-I to 132 kV SEZ-I with 132 kV GSS at SEZ-I 132kV S/C Madri-Dakan Kotda (Transport Nagar) line with 132kV GSS at Dakan Kotda (Transport Nagar), Udaipur

LC,LR,VR LC,LR LC,LR,VR VR,LR, LC LC,LR,VR LC,LR,VR LR,VR LC,LR VR,LR LC,LR LC VR,LC LR,VR LC,LR LC,VR LC,LR,VR

12

LC,LR LC,LR LC,LR,VR LC,LR,VR SS

8 2x50 4 2 6 25

11682.70

1745.03

100 2 incl. in 220kV scheme incl. in 220kV scheme 50 100 40 50 400 6

427.22

SS

263.8

2013-14

incl. in 220kV scheme incl. in 220kV scheme 100 300 200 600

23 24 25 26 27

LC,LR LC,LR LC,SS LC LC

5 1 4 4 6

2x50 25 25 25

3973.80 1261.71 43.84 1175.82 1200.79

2014-15 2014-15 2012-13 2014-15 2013-14

25

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 4 16 26 4 28 34 30 3 15 2 22 45 10 12 4 29 17 25 10 24 19 17 22 1 19 22 25 25 25 25 25 1078.83 1423.7 1450.92 1181.9 1587.07 671.02 1725.59 1426.49 1642.71 1401.57 1642.71 2006.46 1476.34 1501.27 1401.57 2117.09 1569.96 1715.46 1476.34 1686.36 1625.89 1642.71 1657.26 1576.04 1642.71 1613.61 3751.11 4442.67 2014-15 2013-14 27.7.12 26.9.12 31.8.12 23.11.12 2013-14 2014-15 2013-14 2012-13 30.6.12 2013-14 2014-15 2014-15 2012-13 2012-13 2012-13 30.12.12 2013-14 2012-13 5.12.12 2012-13 3.9.12 30.6.12 2012-13 2012-13 2013-14 2013-14 2013-14 Plan 100 200 350 400 700 150 250 100 500 250 500 350 100 800 800 800 800 150 800 600 700 400 500 800 800 2500 3000 Incl. in 220kV Scheme 100 28 34 Ckt Km. MVA Plan 200 700 50 100 100 700 700 600 100 50 750 100 250 100 100 100 150 500 150 100 150 100 50 100 150 1300 8 Incl. in 220kV Scheme 400 50 10 25 30 15 25 25 Ckt Km. MVA

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

LILO 132kV Jodhpur-Baori line for 132 kV Jhalamand with 132kV GSS at Jalamand (Jodhpur) 132kV S/C Buhana-Mahpalwas with 132 kV GSS at Mahpalwas (Jhunjhunu) (Line- Turnkey) 132kV S/C Hanumangarh (220kV GSS)- Guluwala line with 132 kV GSS at Guluwala (Hanumangarh) Line comm. 25.1.12 LILO 132kV Alwar-Mandawar line for 132 kV Pinan with 132 kV GSS Pinan (Alwar) (Line comm. on 2.4.11) 132kV S/C Baseri -Sarmathura line with 132 kV GSS at Sarmathura (Dholpur) 132kV S/C Zawarmines - Rishabdeo line Normal Development Works LILO of 132 kV Kishangarh Bas-Khushkhera line with 132 kV GSS at PUR, Kotkasim(Alwar) LILO of 132 kV Alwar-Bansur line with 132 kV GSS at Vijay Mandir, Alwar City(Alwar) 132 kV S/C Shri Mahaveerji GSS-Nangal Sherpur line with 132 kV GSS at Nangal Sherpur (Karauli) LILO of 132kV Heerapura-VKIA-Rampura Dabri line with 132 kV GSS at RIICO, Sarna Doongar (Jaipur) 132 kV S/C Sapotra -Kaila Devi line with 132 kV GSS Kaila Devi (Karauli) Line comm. On 27.4.12 132 kV S/C Karauli -Mandrayal line with 132 kV GSS Mandrayal (Karauli) LILO of 132 kV Jodhpur-Bilara line with 132 kV GSS at SEZ, Kaparda (Jodhpur) LILO of 132 kV Padampur-Sri Ganganagar line with 132 kV GSS at Telewala (Sri Ganganagar) LILO of Sawa-Sata line with 132 kV GSS at Sedwa (Barmer) Line comm.26.9.12 132 kV Padroo-Junameetha Khera-Sindhari line with 132 kV GSS at Junameetha Khera (Barmer) (Line commissioned on 23.7.12 & 15.8.12) 132 kV S/C Sanchore ( 220kVGSS )- Paladar line with 132 kV GSS at Paladar (Jalore) 132 kV S/C Sri Karanpur - Kaminpura line with 132 kV GSS at Kaminpura (Sri Ganganagar) Line comm. 7.8.12 LILO of 132 kV Beawar-Nasirabad line with 132 kV GSS at Kharwa (Ajmer) 132 kV S/C Kankroli (220kV) -Sapol line with 132 kV GSS at Sapol (Rajsamand)Line comm.6.11.12 LILO of 132 kV Banswara-Sagwara line with 132 kV GSS at Partapur(Banswara) Line comm. In 2011-12 132 kV S/C Mavli - Sanwad line with 132 kV GSS at Sanwad (Udaipur) 132 kV S/C Shri Madhopur - Thoi line with 132 kV GSS at Thoi (Sikar) LILO of 132 kV Bhilwara-Hamirgarh line with 132 kV GSS at RIICO, Bhilwara (Bhilwara) Line comm.2011-12 132 kV S/C Beegod- Kachola line with 132 kV GSS at Kachola (Bhilwara) 132 kV S/C Ajoliya-ka-khera-Bassi line with 132 kV GSS at Bassi (Chittorgarh) JAIPUR CITY EHV NETWORK STRENTHENING SCHEME-III [JENSS-III] (i) 132 kV GIS Substation at MNIT (Jaipur) (ii) 132 kV S/C Cable system between 220 kV IGN and 132 kV MNIT JODHPUR CITY EHV NETWORK STRENTHENING SCHEME-I [JDENSS-I] (a) 132/33 kV Transformer at 220 kV GSS Barli.

LC,LR LC,LR LC,LR LC,LR VR,LR SS LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LR,VR LC LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LR,VR LC,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR LC,LR,VR LC,LR,VR SS,LC SS,LC SS,LC SS,LC

16

25

25 25 25

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 2x50

2 22

25 25

45

25

4 29 17 25

25 25 25 25

24

25 25 25 25 25 25 25

17 22

20 22

8 2x50

55

(b) Lines associated with 220 kV GSS Barli.

SS,LC

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 100 Plan Ckt Km. MVA 400 Plan 4 14 50 2x50 42.20 144.97 514.91 Incl. in 220kV Scheme 103.86 2x50 2013-14 2013-14 2013-14 2014-15 Ckt Km. 4 14 50 MVA

56

(i) LILO of existing 132 kV S/C Jodhpur-PS8 line at Barli (ii) LILO of existing 132 kV CHB-Soorsagar line at Barli (iii) LILO of existing 132 kV S/C Tinwari-Soorsagar line at 400kV GSS Jodhpur. (a) 132/33 kV Transformer at 220 kV GSS Jhalamand.

SS,LC SS,LC SS,LC SS,LC

Incl. in 220kV Scheme

Incl. in 220kV Scheme

57

(b) Lines associated with 220 kV GSS Jhalamand. (i) LILO of existing 132 kV S/C Jodhpur(220kV GSS)- Bilara line at Jhalamand (a) 132/33 kV Transformer at 220 kV GSS Karwad/Bhawad.

SS,LC SS,LC SS,LC

10

2014-15 2012-13

Incl. in 220kV Scheme 120 130 Incl. in 220kV Scheme 2000 1900 500 2 300 200 2500 13 15

Incl. in 220kV Scheme 50 Incl. in 220kV Scheme 1200 100 50 150 4 9

58

(b) Lines associated with 220 kV GSS Karwad/Bhawad. (i) LILO of existing 132 kV S/C Jodhpur (220kV GSS)-Jhalamand-Baori line at Karwad/Bhawad (ii) 132 kV S/C Karwad/Bhawad-Mathania line (a) 132/33 kV Transformer at 220 kV GSS Bhadwasia.

SS,LC SS,LC SS,LC

13 15 2x50

59

(i) 132 kV GIS Substation at Engineering College (ii) 132 kV S/C Cable system between 132 kV OPH and 132 kV Engineering College (iii) 132 kV D/C Cable system between 132 kV NPH and 132 kV Engineering College (i) 132 kV Hybrid GIS Substation at Kuri Bhagtasani (ii) LILO of 132 kV S/C Jodhpur (220 kV GSS)- Banar Line at Kuri Bhagtasani (i)132 kV Hybrid GIS Substation at Pratap Nagar (ii)132 kV D/C Cable system between 132 kV CHB and 132 kV Pratap Nagar (Proposed) (i) 132 kV GIS Substation at OPH (ii) 132 kV D/C Cable system between 132 kV Banar and 132 kV OPH (Proposed) (iii) 3 No. Terminal 132 kV Hybrid GIS Bays at 132 kV GSS Banar Strengthning scheme of existing 132kV Chopasani Housing Board (CHB) GSS (i) 132 kV D/C Cable system for LILO of existing 132 kV S/C PS8-Jodhpur Line at CHB (ii) 132 kV Terminal Hybrid GIS Bays (4 Incomer/ Outgoing & 1 Bus Coupler) (iii) 132 kV S/C Line along Bypass Road, to interconnect 132kV lines emanating from 220kV Jodhpur GSS towards Pali and PS-8 Works associated with 220kV GRID-SUBSTATIONS (i) 132/33 kV Transformer at 220 kV Bundi

SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC SS,LC 4 9

2x50

165.52 184.00 Incl. in 220kV Scheme 3947.07 1925.10 3938.30 3405.61 150.07 3394.61 3965.82 4058.32 4570.60 819.20 3585.80 1338.28 36.78

2012-13 2012-13 2014-15

2013-14 2013-14 2013-14 31.10.12 31.10.12 2013-14 2013-14 2013-14 2013-14 2013-14 2012-13 2012-13 2013-14

50 4 9

50

60

2x50 2 2x50 10 2x50 14

61

100 400 200 10

50

62

50 14

63

10 3

1200

10

300 3

64

SS,LC

1X25

Incl. in 220kV Bundi 144.87 110.84

2012-13

Incl. in 220kV Scheme 200 13 8

Incl. in 220kV Scheme -

(ii) LILO of existing 132 kV S/C Talera-Bundi line at proposed 220 kV GSS Bundi (iii) 132 kV S/C Bundi (220 kV GSS)-Bundi (132 kV GSS) line

SS,LC SS,LC

13 8

10.7.12 2012-13

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 1X25 Incl. in 220kV Gajner 206.62 206.62 184.00 366.90 incl. in 220kV Gangapurci ty (New location) 103.87 305.92 427.85 incl. in 220kV scheme 62.76 21.64 incl. in 220kV scheme 206.62 206.62 2012-13 Plan Incl. in 220kV Gajner 250 300 incl. in 220kV scheme Ckt Km. MVA Plan Incl. in 220kV Gajner 50 50 incl. in 220kV scheme Ckt Km. MVA

65

(i) 132/33 kV Transformer at 220 kV Gajner

SS,LC

66 67

(ii) LILO of existing 132 kV S/C Pugal Road-Gajner (PS-4) line at proposed 220 kV GSS Gajner. (iii) LILO of existing 132 kV S/C Bhinasar-Kolayat line at proposed 220 kV GSS Gajner. (i) 132 kV S/C Manoharpur- Shahpura line (Second circuit) (ii) 132 kV S/C Manoharpur- Ajeetgarh line. (i) 132/33 kV Transformer at 220 GSS Gangapurcity (New location) (Distt. Sawai Madhopur)

SS,LC SS,LC SS,LC SS,LC SS,LC

34 28 12 30 1x25

2012-13 9.7.12 2012-13 2012-13 2012-13

34 28 12 30

(ii) 132 kV D/C Gangapurcity (220 kV GSS)-Gangapurcity(132 kV GSS) line (iii) 132 kV S/C Gangapurcity (220 kV GSS)-Sapotra line (iv) 132 kV S/C Gangapurcity (220 kV GSS)- Shrimahavir ji line (i) 132/33 kV Transformer at 220 GSS at Kuchera (New location) (Distt. Nagaur)

SS,LC SS,LC SS,LC SS,LC

7 28 33 1x25

31.7.12 7.6.12 2012-13 2014-15

500

7 28 33

50

68

incl. in 220kV scheme

incl. in 220kV scheme

(ii) LILO of existing 132 kV Merta-Kuchera line at proposed 220 kV GSS Kuchera (iii) LILO of existing 132 kV Kuchera - Sanjoo line at proposed 220 kV GSS Kuchera (i) 132/33 kV Transformer at 220 GSS at Aspur (New location) (Distt. Dungarpur )

SS,LC SS,LC SS,LC

6 2 1x25

2014-15 2014-15 2012-13

69

70 71 72 73

(ii) LILO of existing 132 kV Salumber - Sagwara line at proposed 220 kV GSS Aspur (iii) LILO of existing 132 kV Salumber - Dhariyawad line at proposed 220 kV GSS Aspur Transmission System for New Solar and Wind Power Plants in Jaisalmer, Barmer & Jodhpur Districts (i) Up-gradation of PS No. 2 to 132kV Grid Substation with 132/33kV, 2x20/25 MVA Transformers with associated 132kV line Up-gradation of PS No. 3 to 132kV Grid Substation with 132/33kV, 1x20/25 ,1x50MVA Transformers Charging of 132 kV line from PS_No.5 to PS_No.1 on 132 kV voltage level via 132 kV PS_No.2 GSS and 132 kV PS_No.3 GSS Up-gradation of PS No. 4 to 132kV Grid Substation with 132/33kV, 2x20/25 MVA Transformers

SS,LC SS,LC ES ES ES ES ES

24 23

2012-13 2012-13

incl. in 220kV scheme 300

24 23

incl. in 220kV scheme 50

2x25 1x25, 1x50

1993.12 2110.39 718.88

2012-13 11.1.13 2012-13 9.1.13

950 950 500 950

25 25

100 100 50

2x25

1993.12

25

100

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 2X50 incl. in 220kV scheme 2012-13 Plan incl. in 220kV scheme Ckt Km. MVA Plan incl. in 220kV scheme Ckt Km. MVA

74

132/33kV, Transformer at 220kV GSS Bap (Distt. Jodhpur)

ES

75

(i) 132/33kV, Transformer at Kanasar (Distt. Jodhpur)

ES

2X50

incl. in 220kV scheme

2014-15

incl. in 220kV scheme

incl. in 220kV scheme

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 24 20 277.85 231.54 1X25 incl. in 220kV scheme 2014-15 2014-15 2014-15 Plan 60 Ckt Km. MVA Plan 200 Ckt Km. MVA

76

(ii) LILO of 132 kV PS1 - PS2 line at proposed 220kV GSS at Kanasar (iii) LILO of 132 kV PS2 - PS3 line at proposed 220kV GSS at Kanasar Normal Development Works (i) 132/33kV, Transformer at 220kV GSS Mandalgarh(New) (Distt. Bhilwara)

LR,SS

incl. in 220kV scheme

incl. in 220kV scheme

77

(ii) LILO of existing 132 kV S/C Mandalgarh- Begun line at proposed 220 kV GSS Mandalgarh (iii) LILO of existing 132 kV Bijolia-Beegod line at proposed 220 kV GSS Mandalgarh (i) 132/33kV Tranformer at Chonkarwada (Distt. Bharatpur)

LR,SS LR,SS LR,SS

1 1 1X25

78

(ii) 132kV D/C line from proposed 220kV Chonkarwada to 132kV GSS Bhusawar (iii) 132kV D/C line from proposed 220kV Chonkarwada to proposed 132kV GSS Mahuwa 132 kV S/C Tehandesar-Parewara line Work associated with 220kV GSS

LR,SS LR,SS LR,SS

29 52 15

11.38 11.38 Incl.in 220kV Chonkarwa da 303.42 543.20 183.99

2014-15 2014-15 2014-15

2014-15 2014-15 2013-14

incl. in 220kV scheme 50 50

incl. in 220kV scheme 100 200 100

15

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 2x25 incl.in 2014-15 220kV Baithwasia Plan incl. in 220kV scheme Ckt Km. MVA Plan incl. in 220kV scheme Ckt Km. MVA

79

(i) 132/33kV Transformer at GSS Baithwasia (Distt. Jodhpur)

80

(ii) 132kV D/C Baithwasia-Osian line (iii) 132kV S/C Baithwasia-Matora line (i) 132/33kV, Transformer at GSS Behror (Distt. Alwar) (ii) LILO of 132kV S/C Behror-Jakhrana line at proposed 220kV GSS Behror (iii) LILO of 132kV S/C Keshwana-Behror line at proposed 220kV GSS Behror (iv) 132kV S/C Jakhrana-Mandan line (i) 132/33kV, Transformer at GSS Bansur (Distt. Alwar)

LR,SS LR,SS

30 30 1x25

LR,SS LR,SS LR,SS

4 20 20 1x25

81

82 83

(ii) LILO of 132 kV S/C Kotputli-Bansur line at proposed 220 kV GSS Bansur (iii) 132 kV S/C Bansur(Proposed 220 kV GSS)-Mundawar line (i) 132 kV S/C from proposed 220 kV GSS Lalsot to existing 132 kV GSS Toonga (ii) 132 kV S/C from proposed 220 kV GSS Lalsot to existing 132 kV GSS Bhadoti 132 /33kV, 2X80MVA & 33 /11 kV , 3X20MVA Transformer at 220kV GSS Chambal

LR,SS LR,SS LR,SS LR,SS LR,SS

4 34 30 50 2x80 3x20

313.85 368.20 incl.in 220kV Behror 42.80 209.60 245.84 incl.in 220kV Bansur 42.80 429.39 367.10 611.84 Incl in 220kV Chambal

2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

200 incl.in 220kV Behror incl.in 220kV Behror

incl.in 220kV Bansur

2014-15 2014-15 2013-14 2013-14 2014-15

incl.in 220kV Bansur 100 550 Incl in 220kV Chambal 30 50

150 Incl in 220kV Chambal

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 1X25 Incl in 220kV Amberi 2014-15 Plan Incl in 220kV Amberi Ckt Km. MVA Plan Incl in 220kV Amberi Ckt Km. MVA

84

(i) 132/33kV Transformer at GSS at Amberi (Distt. Udaipur)

LR,SS

(ii) LILO of 132 kV S/C Debari-Sukher line at proposed 220 kV GSS Amberi

LR,SS

10

105.35

2014-15

(iii) LILO of 132 kV S/C Sukher-Seesarma line at proposed 220 kV GSS Amberi

LR,SS

10

105.35

2014-15

85

(i) 132/33kV Transformer at Bamantukda (Distt. Rajsamand)

1X25

86 87 88 89 90 91 92 93 94 95 96

(ii) LILO of existing 132 kV S/C Mokhampura Amet line at proposed 220 kV GSS Bamantukda 10ckm (iii) LILO of under construction 132 kV S/C Kankroli(220 kV GSS)Sapol line at proposed 220 kV GSS Bamantukda 14ckm LILO of 132 kV Asind-Beawer line with 132kV GSS at Partappura ( Disst. Bhilwara) 132 kV S/C Ganganagar- Raipur line with 132kV GSS at Raipur ( Disst. Bhilwara) 132 kV S/C Dhod- Dayalpura line with 132kV GSS at Dayalpura ( Disst. Nagaur) LILO of 132 kV Reodar-Aburoad line with 132kV GSS at RIICO Growth Centre, Aburoad ( Disst. Sirohi) LILO of 132 kV Badnu-Jasrasar line with 132kV GSS at Lalamdesar Bada ( Disst. Bikaner) LILO of 132 kV Napasar-Badnu line with 132kV GSS at Moondsar ( Disst. Bikaner) LILO of 132 kV Sangod-Kawai line with 132kV GSS at Bapawar ( Disst. Kota) LILO of 132 kV Mandawa-Bandikui line with 132kV GSS at Dhigaria Bhim ( Disst. Dausa) (i) 132kV GSS at Sultanpur(Kota) (TK) (ii) 132kV S/C Dahara-Sultanpur line (TK) (i) 132kV GSS at Mangrol (Baran) (ii) 132kV S/C Baran-Mangrol line (i) 132kV GSS at Khetusar (Jodhpur) (ii) 132kV S/C Bap-Khetusar line (i) 132kV GSS at Hatundi(Jodhpur) (ii) 132kV S/C Soyla-Hatundi line

10 14 LC,LR,VR LR,VR LC,VR LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR LR,LC LR,LC LC LC LR,LC LR,LC LR,LC LR,LC 22 25 28 1 6 4 6 28 25 30 25 45 25 25 25 25 25 25 25 25 50 25

Incl in 2013-14 220kV Bamantukd a 105.35 2013-14 147.05 2013-14 1572.35 1630.54 1667.12 1366.83 1387.38 1366.83 1387.38 1434.41 1250.18 343.73 1250.18 368.2 1250.18 551.75 1250.18 307.02 2012-13 2013-14 2013-14 2012-13 2012-13 2013-14 5.11.12 2012-13 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14

Incl in 220kV Amberi Incl in 220kV Amberi Incl in 220kV Bamantuk da Incl in 220kV Bamantuk 700 100 400 750 700 300 700 650 200 150 100

22

25

Incl in 220kV Amberi Incl in 220kV Amberi Incl in 220kV Bamantuk da Incl in 220kV Bamantuk 100 650 600 100 150 650 100 150 650 650

10 14

25 28

25 25

1 6 4 6

25 25 25 25

25

25 28 25 30 25 45

650

97

100

650 25

25

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 25 25 25 17 25 1 1250.18 307.02 1250.18 209.12 1250.18 11.53 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 Plan 100 100 100 Ckt Km. MVA Plan 650 650 17 650 1 25 Ckt Km. 25 25 MVA 25

(i) (ii) 99 (i) (ii) 100 (i) (ii)

98

132kV GSS at Kirmarsariya(Jodhpur) 132kV S/C Tinwari-Kirmarsariya line 132kV GSS at Anandpur Kaloo (Pali) 132kV S/C Jaitaran-Anandpur Kaloo line 132kV GSS at Subhash Nagar, Ajmer(Pali) LILO 132kV Ajmer-Saradhna line at Subhash Nagar, Ajmer

LR,LC LR,LC LR,LC LR,LC LC LC

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 25 20 1250.18 245.83 2013-14 2013-14 Plan 300 Ckt Km. MVA Plan 650 Ckt Km. 20 MVA 25

101 (i) 132kV GSS at Sawalpura Tanwaran (Sikar) (ii) 132kV S/C Ajeetgarh -Sawalpura Tanwaran line 102 Jaipur City EHV Network Strengthening Scheme-IV (Phase-I) 132kV Interconnection (i) 132 kV Hybrid GIS Bay at Jawahar Nagar (Jaipur) (ii) 132 kV S/C Cable system between 132 kV MNIT and 132 kV Substation Jawahar Nagar(6kM S/C)at Bijaipur (Chittorgarh) 103 (i) 132kV GSS (ii) 1 No. 132kV bay at 220kV GSS Nimbahera (iii) 132 kV S/C Nimbahera - Bijaipur line 104 (i) 132kV GSS at Kushalgarh (Banswara) (ii) 1 No. 132kV bay at 132kV GSS Bagidora (iii) 132 kV S/C Bagidora-Kushalgarh 105 (i) 132 kV GSS at Sawar (Distt.Ajmer) (ii) LILO of 132kV Kekri-Deoli line 106 (i) 132 kV GSS at Mehara (Distt.Jhunjhunu) (ii) LILO of 132kV Khetri Nagar-Babai line 107 (i) 132 kV GSS at Bilwadi (Virat Nagar) (Distt.Jaipur) (ii) LILO of 132kV Paota-Shahpura line 108 (i) 132 kV GSS at at Jatawali (Distt.Jaipur) (ii) 1 No. 132kV bay at 220kV GSS Chomu (iii) 132kV S/C Chomu-Jatawali line from 220kVGSS Choumu 109 (i) 132 kV GSS at Maniya (Distt.Dholpur) (ii) LILO of 132kV Dholpur-Rajakhera line (12kM D/C) Interconnections for 400 kV GSS Deedwana (RVPN Scope) 110 132 kV D/C interconnecting line between proposed 400 kV Deedwana GSS and existing 132 kV Deedwana GSS Interconnections for 220 kV GSS Nawalgarh (RVPN Scope) 111 LILO of existing 132 kV S/C Koodan - Nawalgarh line to proposed 220 kV Nawalgarh GSS 112 132 kV S/C Nawalgarh(220 kV) - Kumawas line 113 132 kV S/C Nawalgarh(220 kV) - Gudagorji line 114 132 kV S/C Nawalgarh(220 kV) - Udaipurwati line Supplementary Transmission System for Power Evacuation Scheme of Solar Power Projects in Jaisalmer, Barmer, Jodhpur and Bikaner Districts (132kV schemes associated with 220kV GSS's) 115 LILO of existing 132 KV S/C Aau(132 KV GSS)-Phalodi line at proposed 220 KV GSS Aau 116 117 118 119 LILO of existing 132 KV S/C PS1-Bajju line at proposed 220 KV GSS PS_1 / Bajju LILO of existing 132 KV S/C Chandan-Pokaran line at proposed 220 KV GSS Pokaran LILO of existing 132 KV S/C Kolayat-Bajju line at proposed 220 KV GSS Kolayat 20 Nos., 132/33kV, 1x20/25 MVA Capacity Grid Sub-Stations alongwith approx. 25kM long 132kV D/C line (for each of 132kV GSS) in the periphery of 30kM around various proposed 220kV GSSs as mentioned in project repot{ location of 132kV GSS to be identified later on in consultation with field officers of RVPN/RREC}.

LC LC

LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS LR,SS VR,LR VR,LR VR,LC,LR VR,LC,LR VR,LC VR,LC VR,LC,LR VR,LC,LR VR,LC,LR VR,LC,LR VR,LC,LR SS

6 25 50 25 45 25 16 25 10 25 24 25 12 25 27 20

269.84 2251.67 1190.48 59.70 490.57 1190.48 59.70 551.75 1271.70 170.79 1271.70 107.16 1271.70 255.63 1210.97 60.72 150.49 1271.70 255.63 734.64

2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2013-14 2014-15

150

900 6 300 40 25

200

200 45

25

100 100 100 100

200 16 200 10 200 24 200 12

25 25 25 25

150

200 27

25

100

SS SS SS SS

8 22 34 30

283.87 489.43 653.58 598.86

2014-15 2014-15 2014-15 2014-15

100

250

ES ES ES ES

10 20 20 20

154.27 308.54 308.54 308.54

2014-15 2014-15 2014-15 2014-15

100

50 100 100 100

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 20X25 1000 15426.97 42803.82 2014-15 2014-15 Plan 200 200 Ckt Km. MVA Plan 1200 1500 Ckt Km. MVA

(i) 20 nos.132/33kV, 1x20/25 MVA Capacity Grid Sub-Stations (ii) 500kM long 132kV D/C lines for 20 Nos. 132kV GSS 120 Optical Fibre Cable System for 132kV Schemes already approved under Main Transmission System for New Solar & Wind Power Plants (as per Appendix-IIB) & Smart Grid Applications. (i) 132kV Transmission Lines already approved under Main Transmission System for Solar & Wind Power Plants (Total Route length 22kM) 121 (i) Transformer at 220 GSS Sayla (Distt. Jalore) (ii) LILO of existing 132 kV S/C Sayla-Daspan line at proposed 220 kV GSS Sayla (iii) LILO of existing 132 kV S/C Sayla-Jeewana line at proposed 220 kV GSS Sayla 122 (i) LILO of 132 kV S/C Beawar-Mertacity line at proposed 220 kV GSS Jethana (ii) LILO of 132 kV S/C Beawar-Nasirabad line at proposed 220 kV GSS Jethana (iii) 132 kV S/C line from proposed 220 kV GSS Jethana to 132 kV GSS Saradhana 123 (i) Transformer at 220 GSS Goner (Distt. Jaipur)

ES ES ES ES

22

141.83

LR,LC LR,LC LR,LC LR,LC LR,LC LR,LC

1x25 24 10 30 20 30 1x50 255.63 107.16 255.63 107.16 2026.59 Incl. in 220kV Goner 272.95 Incl. in 220kV GSS Vatika 167.97

(ii) LILO of 132kV S/C Bassi- Puranaghat line at proposed 220kV GSS Goner. 124 (i) Transformer at 220 GSS Vatika (Distt. Jaipur) (ii) LILO of 132kV S/C Balawala- Phagi line at proposed 220kV Vatika.

SS,LC,LR

26 1x50 16

2014-15 Incl. in 220kV 2014-15 2014-15 GSS Sayla 2014-15 Incl. in 220kV 2014-15 GSS 2014-15 2014-15 Incl. in 220kV Goner 2014-15 2014-15 Incl. in 220kV GSS 2014-15 Incl. in 220kV GSS Vatika 100

Incl. in 220kV GSS Sayla Incl. in 220kV GSS Incl. in 220kV Goner Incl. in 220kV GSS Incl. in 220kV GSS Vatika 200

125 (i) 132/33kV, 20/25MVA GSS at Masuda (Ajmer) (ii) LILO 132kV Beawar-Gulabpura line 126 (i) 132/33kV, 20/25MVA GSS at Ghatol (Banswara) (ii) 132kV S/C Paloda -Ghatol line (iii) 1 No. 132kV bay at 132kV GSS Paloda 127 (i) 132/33kV, 20/25MVA GSS at Kanera (Chittorgarh) (ii) 132kV Nimbahera - Kanera line (iii) 1 No. 132kV bay at 132kV GSS Bijaipur 128 (i) 132/33kV, 20/25MVA GSS at Parbatsar (Nagaur) (ii) 132kV S/C Roopangarh-Parbatsar line (iii) 1 No. 132kV bay at 132kV GSS Roopangarh 129 (i) 132/33kV, 20/25MVA GSS at Sherera (Bikaner) (ii) LILO 132kV Bikaner-Dulchasar line

LR,VR LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LR,VR LR,VR LR,VR LC,LR,VR LC,LR,VR 30 20 50 40 24

25

1283.11 253.07

2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15

25

1223.28 493.63 59.83

100

200

25

1223.28 345.88 59.83

100

200

25

1223.28 247.37 59.83

100

200

25

1283.11 316.05

100

200

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 25 14 1223.28 173.50 59.83 25 2 25 6 25 2 25 28 1283.11 22.12 1283.11 64.10 1283.11 22.12 1223.28 345.88 59.83 75 955.99 59.85 59.85 25 23 1567.42 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 2014-15 500 43000 622 622 425 750 750 / 28 550/2 0 1000 30850 792 792 425 1000 800 800/28 550/20 100 150 50 150 100 200 100 200 100 200 100 200 Plan 100 Ckt Km. MVA Plan 200 Ckt Km. MVA

130 (i) 132/33kV, 20/25MVA GSS at Tibbi (Hanumangarh) (ii) 132kV S/C Amarpura Theri(Hanumangarh)-Tibbi line (iii) 1 No. 132kV bay at 132kV GSS Amarpura Their 131 (i) 132/33kV, 20/25MVA GSS at Ajasar (Jaisalmer) (ii) LILO 132kV Pokran-Askandra line 132 (i) 132/33kV, 20/25MVA GSS at Narainpur PS Thanagazi (Alwar) (ii) LILO 132kV Bansur-Thanagazi 133 (i) 132/33kV, 20/25MVA GSS at Bhanwargarh (Kishanganj) (Baran) (ii) LILO 132kV Baran-Kelwara line 134 (i) 132/33kV, 20/25MVA GSS at Batoda (Sawaimadhopur) (ii) 132kV S/C line from 220kV Gangapurcity (U/C) GSS to Batoda (iii) 1 No. 132kV bay at 220kV GSS Gangapurcity (U/C) 135 (i) Construction of 132kV S/C Nokha Daiya - Khajuwala line (ii) 1 No. 132kV bay at 132kV GSS Nokha Daiya (iii) 1 No. 132kV bay at 132kV GSS Khajuwala 136 (i) 132/33kV, 20/25MVA GSS at Kolukheri P.S.Chhabra (Distt. Baran) (ii) 132kV S/C Chhipabarod - Kolukheri line (iii) 1 No. 132kV bay at 132kV GSS Chhipabarod C 132 kV New Schemes (To be identified ) IV. TOTAL (132KV) TARGET 132 kV - WORKING - ACHIEVEABLE Capacitor banks (MVAR) Augmentation (EAP & Plan)/(Upgradation) i. Transformers capacity (MVA) ii. 400/220/132/33kV Feeder bays, Transformer bays, Bus-coupler bays etc. iii. 33kV line bays as per requirement of Discoms iv. Other works approved under Augnentation (A) Jaipur Zone (B) Jodhpur Zone (C) Ajmer Zone VII Automation/ SCADA solutions, RTU's/ BCU's, related primary equipments upgradations, communication interfaces/ channels (under ULDC, up gradation of existing S/S) & setting up of Sub control centre at CDCC Jaipur VIII Utility Software, IT Software, Other Allied Software, Hardware Equipments (Upgradation / New) cost on IT/non-IT goods for 'Integrated MIS & Computerisation in RVPN Capital IX Purchase of IT hardwares, custom software, non IT items, computer furniture, net working X items and broad band connectivity required under IMIS Project. RMU of equipments & protection schemes of RVPN (Scheme -II & III) XI V VI

LC,LR,VR LC,LR,VR LC,LR,VR LR,VR LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR LC,LR,VR SS,LC SS,LC SS,LC LC,LR,VR LC,LR,VR LC,LR,VR

Cap. Aug.

1500

SCADA / SLDC

7200 7000 7000 3000

7700 7500 7500 5000

30 30 300 2000

30 41 400 2000

S.No.

Scheme

Category

Line Capacity Estimated Working Annual Plan 2012-13 Annual Plan 2013-14 (Proposed) Length (in MVA) Cost Target / (Revised) (Ckt. Dt. of Provision Physical Targets Provision Physical Targets kM) Comm. Proposed Proposed 878.88 Plan 800 200 1500 120 30680 220900 Ckt Km. MVA Plan 79 200 31450 253000 Ckt Km. MVA

XII XIII XIV XV

RMU- PLCC Stage -I Scheme Air Conditioning of Control Rooms of 220kV GSS Allocation by CCOA Roof Top Solar Power Plant at Vidyut Bhawam,Jaipur. TOTAL (V TO XIV) TOTAL OF TRANSMISSION WORKS (I TO XIII) Abbreviation Used :VR : Voltage Regulation Improvement Scheme. LC : Load Catering Scheme. SS : System Strengthening Scheme.

210.00 1488090.67

BPTS : Bulk Power Transfer Scheme. Mtg. : Metering Aug. : Augmentation

ES : Evacuation Sysstem Scheme. LR : Loss Reduction.