Sl Major Sector no
Sector
Project Name
Location
Owner
Structure (BOOT/BOT)
2 Transport
Road
Highways
Four Laning and Belgaum streghtening of Km. 515 district of to Km 592 Belgaum Karnataka Maharashtra Border NH4 in the State
Ministry of Highways
NHAI
599.49 PPP
BOT-Annuity
3 Transport
Road
Road
KRDCL
KRDCL
188.00 PPP
BOT-Annuity
MSW
BBMP
BBMP
30.00 PPP
BOT
Commercial Development
Bangalore
BBMP
BBMP
35.00 PPP
BOOT
28 Transport
Airport
Airport
Devenhalli, Bangalore
IDD
KSIIDC
BIAL
2470.29 PPP
DBOOT
KUWSDB
Apr-05 Works under eight Priority Investme nt Packages (PI Works) are complete
237.00
Management Contract
Value
Total
3599.78
0
Airport
3490.29
Bio-technology
422.82
12 Cultural Centres
1050 Entertainment
50 MRTS
3716 MSW
236.83 Port
2950 Power
14503.7
Rail
0 Road
0 Township Development
357
Others
1.65
Total
108868.71
No. of Projecs
0.8
0.6
0.4
0.2
Stages
0 1
Mode of Award
ICB
Type of Funding
VGF Flag
Amount of Amount of Govt Govt Support Support (GoK) provided (Rs. in Cr.)
ADB / WB Any other support in agency form of (Rs. in Cr.) Grant or Loan (Rs. in Cr.)
Remarks
Domestic Tender
Jun-03
Jan-04
Apr-06
M/s North 17 yrs & 6 Karnataka months Expressway Ltd., Belgaum and the main sponser is ILFS. Ms: 10 Years Brindavan Infrastructur e Co Ltd., Ramky 15 years Infrastructur e Ltd., Hyderabad
ICB
Mar/03
May/04
Dec/05 NIL
0.00
Domestic Tender
Apr/05
Jun/05
NIL
0.00
30 years
ICB
6/28/1999
1/17/2002
39540
350.00
350
30 years as UZA & L&T) Siemens Consortium (SPV per CA with MOCA
40155.00
#R
Land Details
Expension Plan
Additional Investment
Issue s
The project invovled wideing and strenghtening of exsiting 2 lanes to 4 lanes with divided carriageway & median plantation from Km 515 to 592 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus and services roads on either side
The work is completed in June, 06. Entire amount will be paid on Annuity basis.
Completed As per the Municipal Solid Waste (Management & Handling) Rules 1999. It is the responsibility of the Municipal authority to dispose municipal solid waste in a scientific manner. iDeCK has assisted in carrying out the project development activities includi
Due to this project, the travel comfort has increased and the travel time has come down. Fuel consumption and vehicle maintenance is reduced. Avalibility of good transportation facilities for agriculture produce and overall economic development.
The Concession Agreement between BMP and the Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed.
BMP has developed a commercial plaza (300,000 sq.ft.) at Madivala in Bangalore. Subsequently, in order to leverage the commercial potential of the complex, BMP has requested iDeCK to provide assistance in identification of a suitable private developer (th
3884 acres
6 lane road already exists.elevated road planned by NHAI. Electricity66KVA from BESCOM Water- 30 lakh
2nd runway & With private terminal sector expansion will investment handle 25 mn pax.
A committee has been set up by GOK to look into the costs incurred
Cost revised due to enhancement in the capacity of the airport. The project is operational.
Airport designed to handle an annual passenger traffic of 11mm & cargo of 350000 tones annually.
Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli
Availble Completed with PPP Cell / KRDCL Availabl Completed e with PPP Cell
S t a g e O P E R A T I O O P E R A
O P E R A T I O N
O P E R A T I O N
O P E R A T I O N
Completed
Sl no.
Sector
Project Name
Location
Stage
Airport
Bijapur, Karnataka
IDD
110.00 BOT
Financial bid opening- Sep 2008 Date of signing- 2010, April April 2008
The project cost excludes land cost. The bid process Underway. Awaiting administrative approval.
Awarded
Airport
Gulbarga
IDD
110.00 DBOT
Awarded
Airport
Shimoga
IDD
110.00 BOT
Awarded
Airport
Hassan
IDD
690.00 BOT
1. Approval from the Union govt. is awaited. Awarded 2. About 514 Acre of land is handed over to concessioner, balance 446 acre of land notified by KIIDB, final award is pending. 3. CA signed on Sept,07, 4. Site survey completed on March 08. 5. Project DPR submited feb 08. 6. Topographical & Geo technical survey completed. 7. Enviormentel approval application submitted on Feb 08, approvel expected by Dec 08. To be commissioned in Nov 2009.
Commercial Development
Mysore
16.00 BOOT
2 Years
The bid process has been completed. The Concession Awarded Agreement has been signed and project has been awarded.
Bangalore
BBMP
12.00 BOOT
Awarded
MSW
BBMP
70.33 BOTAnnuity
Construction
Awarded
MSW
Shimoga
4.00 BOT
Awarded
MSW
Modern abattoir
Bangalore
BBMP
30.00 BOOT
Awarded
10
Road
Design, Engineering, Financing, karnataka / Bangalore Construction, Operation and Rural and Urban maintence of Access Controlled highway Project of Bangalore Nelamangala of NH-4 from Km10/0 to Km 29/5 in the State of karnataka on BOT basis.
445.00 BOT
04.09.2009
Awarded
11
Road
1) Karnataka/ Ministry of Design,Construction,Development, Chickballpur/Chickballp Highways Finance,operation and maintence of ur/ AP/Karnatka border-Avathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing
402.87 BOTAnnuity
28.09.2006
Awarded
12
Road
Construction of Elevated Highway Project of Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis.
450.00 BOT
Awarded
13
Road
Construction of Access Controlled Bangalore Rural and Highways from Km. 10/0 to Km. 29/5 Urban of Bangolore - Nelamangala section of NH-4 in the state of Karnataka on BOT basis
Ministry of Highways
445.00 BOT
Awarded
14
Road
Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Bangalore Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State
441.00 BOT
Awarded
15
Road
Design, Engineering, Financing, Kolar, Bangalore urban Construction, Development, and Rural Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section from Km 237 Km to Km 318 NH-4 in Widening and strengthening of Wadi Wadi - Raichur -Raichur Road
565.00 BOT
Jul-10 4.80% of physical progress achieved. The project is being developed under NHDP Phase IIIA, NH - 4.
Awarded
16
Road
KRDCL
Feb-04
Feb-06 Work on 69 out of 84 km completed. Cost of the project has increased from 60.48 to 82.38 cr. (Rs. 25.00 Cr. contributed by Cement Factories & balance by Govt)
Awarded
17
Road
PWD
18.60 BOT
Jun-06 18 months
Concessionaire agreement executed on 18/11/05, Ms: Awarded SOWIL was appointed as Independent Engineer and Tripartite Agreement was concluded on 29/08/06. The Concessionaire has commenced the work during last week of August 06.
Sl no
Sector
Project Name
Location
Sponser Dept
Stage
Road
BOT
1. PD, KSHIP to provided TOR Pipeline to the PPP Cell, IDD for appointment of TA and further action 2. TA to be appointed Apr/09 PPPA committee approval is awaited. Pipeline
Road
4/6 laning of NH-4A Belgaum district from Belgaum - KNT / of Karnataka GOA border (84Kms) in the state of Karnataka under NHDP phase - III
BOT
Road
4/6 lanning of Kundapur Karnataka/Mang Dept. of road to Suratkal of NH-17 in alore,/Dakshin Transport & the state of karnataka Kannada Highway / under NHDP phase -III Ministry of programme(Package no. Highways BHDP-III DL5/11) Bangalore-KanakpuraTamilnadu (203KM)
500.00 BOT
March, 2009
Pipeline
Road
BOT
Pipeline
Road
Pipeline
Road
Construction of Expressway (State highway, Special) from Outer Ring Road to International Airport in Devanahalli Taluk
Devanhalli, Bangalore
1000.00 BOT
Pipeline
Road
BDA
5000.00 BOT
BDA land acquisition work at Rs. 702.00 coroes. DPR is being prepared & Preparation of bidding documents are in Progress. .
Pipeline
Road
Road
Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Devilalli Hassan Section of NH48 from Km 110 to Km 191 in the state of Karnataka Design, Engineering, Financing, Procurement, Construction, Operation and maintence of 4 & 6 laning from Km 202 to Km 299 of Hungund Hospet Section of NH13 in the state of Karnata under NHDP phase III on BOT
Hassan, Karnataka
440.00 BOT
1112.00 BOT
Pipeline
10
Road
Design, Engineering, Bijapur and Financing, Procurement, Bagalkot Construction, Operation and maintence of Bijapur - Hungund section of NH-13 from existing Km 102.00 to 202.00 in the state of Karntaka under NHDP phase III on BOT Devanhalli-Vijipura-HCross-Kolar (60 Km)
Ministry of Highways
917.00 BOT
Pipeline
11
Road
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed 1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
12
Road
BOT
13
Road
Development of bypass Belekeri port, PWD road for Belekeri Port near NH17 on karnataka costal area
25.00 BOT
1. DPR for technical feasibility has been submitted to GoK 2. Writ petition filed has been dismissed. 3. Bidding process to be initiated.
Pipeline
14
Road
Bellary, Karnataka
PWD
30.00 BOT
The project handed over to NH Pipeline by PWD, GOK. DPR prepared by IDecK will be used to prepared new DPR for NH
15
Airport
Bijapur, Karnataka
IDD
110.00 BOT
Financial bid The project cost excludes land Awrded opening- Sep cost. The bid process 2008 Underway. Awaiting administrative approval.
15
Road
PWD
230.00 BOT
1.Final DPR submitted to PWD, Pipeline Waiting for approval, 2. Bidding process to be initiated.
16
Road
ShimogaHavere
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
17
Road
TumkurChikkaballapurKolar
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
18
Road
Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu Development BelgaumofvNippanai-BagalkotBakalkot Badami-KudalsangamaTailkote Road(240 Km)
PWD
144.00 BOT
Pipeline
19
Road
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
20
Road
Four laning of Kundapur Mangalore, to Suratkal section ( Km Dakshin 284 to 358) and Kannada Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis Ilakal-Gadag-Bankpura Cross (200Km)
Ministry of Highways
616.00 No Info
RFQ invited
Pipeline
21
Road
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
22
Road
BOT
Pipeline
23
Road
BOT
Pipeline
24
Road
Improvement of Hunabad-Bijapura-Hubli (420Km) Improvement of SH Chikkanayakanahalli to Hasssan (74 KM) Hassan PWD
Annuity
Pipeline
25
Road
100.00 BOT
26
Rail
Hassan Bangalore
IDD
The gauge conversion is over OPERATI and the operation of goods ON train has begun since May 2006. After the completion of statutory inspection and certification by the Railway Safety Commissioner, this line will be opened for passenger services.
27
Airport
Devenhalli, Bangalore
IDD
2470.29 DBOOT
1/17/2002 Cost revised due to OPERATI enhancement in the capacity of ON the airport. The project is operational.
28
Road
Four Laning and Belgaum district Ministry of streghtening of Km. 515 of Karnataka Highways to Km 592 Belgaum Maharashtra Border NH4 in the State
599.49 BOTAnnuity
Completed on Jul-04 and toll is OPERATI being collected since March, ON 2005
29
Road
KRDCL
188.00 BOTAnnuity
Jan-04 The work is completed in June, OPERATI 06. Entire amount will be paid ON on Annuity basis.
30
MSW
Bangalore
BBMP
30.00 BOT
May/04 Completed
OPERATI ON
31
Commercial Development
Bangalore
BBMP
35.00 BOOT
Jun/05 The Concession Agreement OPERATI between BMP and the ON Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed.
26
Road
Improvement of SH Uttara Kannada PWD Dhawrad to Ramnagara (60 KM) Improvement of TumkurHonnavara(370Km)
190.00 BOT
27
Road
Annuity
Pipeline
28
Road
Improvement to District Tumkur Chikkanayakanahalliand Hasan Tiptur-Hassan Road (Partly MDR and partly SH) for a length of 74.00 Km
203.00 BOT
Jan-09 The revised bid documents as Pipeline per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008
29
Road
Improvement to State Gulbargha Highway (SH-10) from District Maharashtra Border to Andhra Pradesh Border via Aland, Gulbarga, Malkhed, Sedam, Ribbanpally,
197.21 BOT
Jan-09 The revised bid documents as Pipeline per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008
30
Road
District Dharwad PWD, Ports and & Belgaum Inland Water Transport Department, GoK
193.10 BOT
Jan-09 The revised bid documents as Pipeline per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008
31
Road
32
Road
Tumkur-Mandya
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
33
Road
Proposed to develop six Bellary lane road (76Km) from Bellary to Hospet and Four lane upto Gutti on NH-63 (370Km) from Hospet to Bellary .
Pipeline
34
Road
Six Laning of NH-4 from Belgaum & NHAI,Ministry of Belgaum to Dharwad Dharwad district Shipping,RoadTr from Km 515 to Km 433 of Karnataka asport and (80 Kms) in the state of Highway. Karnataka under NHDP Phase V STRR and ITRR roads in Bangalore Metropolitan Region Bangalore Metropolitan Region (State Highway Special- 2) BMRDA
NA BOT
Mar/09 Feasibility Report i.e. DPR is being finalised. Tender called. Prequalifi
Pipeline
35
Road
5250.00 BOTAnnuity
NA
1. Compensation R&R packages to be approved. Mode of execution Annuity or BOOT with VGF needs to be approved. 2. Cabinet approval required. 3. Land to be acquired.
Pipeline
36
Road
Two diversion from Bannihatti to NH-63 at BPTCL(19Km) and Bannihatti to Gadiganur(9Km) on StateHighway (SH-40) from Sandur to Torangallu, Yelahanka-Hindupura (73Km)
Bellary
KRDCL ?
56.00 BOT
IDECK has submitted DPR to GOK as part of SH-40 development on BOT basis
Pipeline
37
Road
BOT
1. PD, KSHIP to provide project Pipeline details with relevant maps. 2. TA to be appointed
SUB TOTAL
19832.62
38
Port
2nd Stage Development Costline at of Modern Sea at Karwar Karwar on the costline of Karnataka
500.00 BOOST
Mar/08 The RFQ has been invited and Pipeline shortlisting is under process.
39
Port
Development of Modern Malpe, Costline Direcotor of Ports Deep Sea Port at Ist of Karnataka & Inland Water Stage Malpe on the Transport Costline of Karnataka Maritime State Development of Honavar Port in Uttar Kannada District of Karnataka Maritime State Honavar Direcotor of Ports & Inland Water Transport
1350.00 BOOST
The project proposal is submitted for the approval of Public Private Partnership (PPP) Committee. The project proposal is submitted for the approval of Public Private Partnership (PPP) Committee.
Pipeline
40
Port
1100.00 BOOST
Pipeline
SUB TOTAL
2950.00
41
Urban Infrastructure
Located on NH- KSIIDC 7, adjoining the Northern Boundary BIAL Devanahalli Bangalore
9000.00 BOT
Jan-09 Invitation of EOI from Pipeline prospetive developers to be issued. -States recommendation to GoI for approval -Provision of Power and Water to the project -Assistance for obtaining statutory clearances to the extent possible.
SUB TOTAL
9000.00
42
Power
Chamalpura, Mysore
4500.00 BOO
Pipeline
43
Power
5000.00 BOO
Pipeline
44
Power
Jewargi, Gulbarga
5000.00 BOO
Pipeline
45
Power
ADB assisted Karnataka Mysore Urban Infrastructure Development Project (KUIDP) SUB TOTAL
3.70 BOO
Jul-99
Pipeline
14503.70
46
Airport
Bellary
IDD
BOT
1. AAI to conduct technical Pipeline feasibility study and approve site for new airport. 2. An amount of Rs. 3.50 Lac has been trasnfered to AAI for inspection. 3. Bescom, PCB and Airforce are constulted for n/c clearances 4. KSHIP / PWD to devleop apprach road 5. Traffic assessment work has been started by IdecK 6. PIM would be developed after site is identified
SUB TOTAL
47
The bid process for selection of Pipeline management partner under way. 522.00 BOT Yet to be commenced, inking of Pipeline the agreement with PPP partner is not finalised
48
Bio-technology
IT & BT / KBITS
49
Commercial Development
Bangalore
300.00 BOT
Detailed feasibilty reports Pipeline completed . Awaiting approval of land use conversion after which Bidding will be done.
50
Commercial Development
Bangalore
106.82 BOT
Detailed feasibilty reports Pipeline completed . Awaiting approval of land use conversion after which Bidding will be done.
51
Devenhalli, Bangalore
Deptt of Tourism
1050.00 BOOT
Draft cabinet note has been prepared .For bening taken up in the next cabenet metting
The process of finalization of Pipeline bidding process is placed before the steering committee constituted for the purpose.Decision of the committee is awaited. The steering committee headed by Chief secretary to Government is planned for site inspection.
52
Adoption of PHC through scheme for involving private medicla colleges and other agencies in the management of primary health centres
NA Manageme nt Contract
Pipeline
53
Heritage Park
35.00 DBOOT
Project concept note prepared. Pipeline Remarks- Funding, Guidence and suggestions are required for finalising the project. Tenders to be invited Pipeline
54
Information Technology
Bangalore
Transport Department
50.00
55
Information Technology
Development of Facility Bangalore for smart card based driving licence and registratio certificates for vehicles for all RTOS in karnataka Development of Express Bangalore Rail Link to BIAL
Transport Department
The bid process for selection of Pipeline management partner under way.
56
MRTS
IDD
3716.00 BOT 1. Geo surveys undertaken 2. Traffic studies completed 3. DPR submitted to GOK 4. Bid process underway. 5. RFQ to be issued.
Pipeline
57
Others
Transport Department
Pipeline
58
Theme Park
20.49 BOT
Pipeline
59
Township Development
UDD
Aug-08 Land Acqusition notification to be issued. Agreement to be executed with DLF tld.
Pipeline
60
Township Development
BDA
1425.16 BLMT
Agencies have been qualified Pipeline by the process of RFQ. RFQwill be issued after change of land use is obtained. From Govt. of Karnataka.. Change of use from Agriculture to residential zone & industrial to residential zone is under progress
61
Warehousing infrastructure
Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port
119.66 No Info
Pipeline
62
Bijapur city
DMA, CMC
120.00 PBDPS
1. DPR of technical feasibility and has been prepared and approved. 2. Project has been cancelled and moved to ADB.
Pipeline
SUB TOTAL
47466.78
63
Entertainment
Aquamarine park
Magalore
Deptt of Tourism
No Info
Pipeline
64
Entertainment
Development of Various Pilikula Nissarga Pilikula Nisarga Tourism Facilities in Dhama at Dhama, NGO Pilikula, Nisarga Dhama Dakshin Kannada, Mangalore
80.00 BOT
1. Under bidding
Pipeline
65
Entertainment
Mangalore
Deptt of Tourism
40.00 No Info
Pipeline
66
Entertainment
Bangalore
KSTDC
The bid process for selection of Pipeline management partner under way.
SUB TOTAL
152.00
67
Hotels/ Resorts
3 Star Category Jog Falls, hotel,Theme Uttarkannda park,Restaurant,Organis District ed Retail,Civic amenities
Deptt of Tourism
17.50 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
68
Hotels/ Resorts
Deptt of Tourism
29.60 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
69
Hotels/ Resorts
Deptt of Tourism
8.90 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
70
Hotels/ Resorts
Development of 5 Stat Dlx Hotel, Multi cusine Restaurant, Theme park, Multiplex, Retail shops, Civic Amenties
Gokarna
Deptt of Tourism
272.90 BOT
Pipeline
71
Hotels/ Resorts
Deptt of Tourism
4.20 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
72
Hotels/ Resorts
4.30 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
73
Hotels/ Resorts
2.00 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
74
Hotels/ Resorts
4.20 BOT
1. Preparation of bid documents is in progress. 2. EOI Published and good response received 1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Pipeline
75
Hotels/ Resorts
Deptt of Tourism
20.00 BOT
Pipeline
SUB TOTAL
363.60
76
MSW
Under approval (Detailed DPR Pipeline of technical study has been submitted to MCC). The approval of funding under JNNURM is awaited from GOI. Bidding process is underway in Pipeline Shimoga town, Identification of landfill sites and technical studies at the other towns are underway.
77
MSW
Setting up of Municipal Solid Waste (MSW) treatment and landfill facilities in 8 towns in Karnataka
78
MSW
BBMP
25.00 BOOT
Jun/04 The bidder has been selected. The process of awarding is underway.
Pipeline
SUB TOTAL
62.50
79
Rail
10957.00 DBFOT/B OT
02.05.2009
Expression of interest was Pipeline notified on 06.08.08. Preapplication conference was held on 15.09.2008. Represetatives from 27 interested firms attended the conference. Response to queries & proceedings of pre application conference to be released. Railway clearance for project is Pipeline alredy approved. Land from hulikunte, Laxmipur & Bhujung Nagar of Sandur Taluk already have 66% farmer consent
80
Rail
Bellary
IDD
81
Rail
Bellary
IDD
Railway clearance for project is Pipeline alredy approved. Land from Krishnanagar, Daulatpur, Sushilnagar of Sandur Taluk (Revenue Land identification process is completed.
82
Rail
Bellary
IDD
Railway clearance for project is Pipeline alredy approved. Land from Torangallu & Daroji of Sandur Taluk (Revenue land identificatopm process is completed)
83
Rail
Proposed New railway Station for Passengers between ToaangalluGadiganur of Hospet to Bellary-Double Lane
Feasibility Report-completed by Pipeline M/s. URRC and submited to railway board. JSW is ready to invest under PPP as per Railways guidelines.
SUB TOTAL
84
Transport terminal
Bellary
30.00
Pipeline
85
Transport terminal
Pipeline
Davanagere, Karnataka
KSRTC
Yet to be tendered
Pipeline
87
Transport terminal
Commcercial development with transport Infrastructure facilites to Jayanagar 9th block, Bangalore
Yet to be tendered
Pipeline
88
Transport terminal
70.00 BOOT
Yet to be tendered
Pipeline
89
Transport terminal
BOOT
March, 2009
Yet to be tendered
Pipeline
90
Transport terminal
Construction of Inter Kempgowda Modal Transit Center at Bus stand Kempgowda Bus Station (main) at Bangalore
KSRTC
900.00 BOOT
3/1/2009 Require approval form GoK for Pipeline Zone change from Traffic / Transport to Commercial. The approval is pending with GoK - UDD . Yet to be tenderd
91
Transport terminal
Construction of mobality Bangalore, Karnataka KSRTC hub at Trumpet interchange, near Bangalore International Airport, Bangalore
53.00 BOOT
Yet to be tendered
Pipeline
92
Transport terminal
Development of Modern Bus Station and Commercial Building on NWKTRC site at Belgaum
Belgaum Central KSRTC Bus Stand and NWKRTC Central Workshop Area located on Old Pune Highway, Link Road and Fort Road
40.00 DBOT
Jan-09 Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. To obtain Project approval from Belgaum Cantonment Board. Application submited by NWKRTC 2 months back. Once these are done and once SLWA clears the project, it can be out.
93
Transport terminal
Development of Modern Bus Station and Commercial Building on NWKTRC site at Dharwad
Dhaward Old KSRTC Bus Stand Area NWKRTC lcoated at the Junction on Subhash Road, Dharwad District.
25.00 DBOT
Jan-09 Project Structuring is underway Pipeline and studies are going on. The apporx. Project cost is taken under consideration as per the similar projects undertaken in this sector. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. Yet to be tendered Pipeline
94
Transport terminal
BOOT
95
Transport terminal
Development of Bidar Old Bus Commercial Complex on Stand, near NEKRTC site at Bidar Bidar Railway Station
KSRTC NEKRTC
28.00 DBOT
Jan-09 Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NEKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. Ready for bidding Awaiting approval of project and Land use change to commercial Pipeline
96
Transport terminal
Development of KSRTC Midway Plaza Facility Centre between Hiriyur & Chitradurga
KSRTC site at Bus Depot on NH-4, 10 Km from Hiriyur & 33 Km from Chitradurga in Chitradurga District
KSRTC
3.00 BOOT
97
Transport terminal
Development of Modern Hubli Bus Stand, KSRTC Bus Station & Hubli NWKRTC Commercial building on NWKRTC at Hubli Bus Stand
40.00 DBOT
Jan-09 Ready for bidding Pipeline Awaiting approval for Project Structure presnetation and Land use change Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed
98
Transport terminal
Development of Modern KSRTC site at KSRTC Bus Station & Puttur, Dakshin Commercial Complex on Kannada District KSRTC site and vacant land parcels at Puttur
30.00 BOOT
Mar-09 Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.
99
Transport terminal
Development of Modern NEKRTC site at KSRTC Bus Station & Gulbarga Main NEKRTC Commercial Complex on Road, Gulbarga NEKRTC at Gulbarga Bus Stand
30.75 DBOT
Dec-08 Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NEKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. 1. DPR for technical feasibility has been submitted to DC & AC, Hospet. 2. - Land acquisition to commence. 3. Bidding process to be initiated subsequently Pipeline
100
Transport terminal
HUDA
27.00 BOT
101
Transport terminal
Torangallu, Bellary
IDD
22.50 BOT
1. DPR and Project structuring Pipeline completed. 2. Existing site found to be inadequate. 3. Additional land to be identified. 4. Bidding process to be initiated subsequently
102
Transport terminal
Project development of Mangalore, KSRTC Bus stand and vaccant South Kannada land parcels for KSRTC at Mangalore.
30.00 DBOT
Jan-09 Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.
103
Transport terminal
Project development of terminals and vacant parcels for Transport Infrastructure and Commcercial development
100.00 BOOT
March, 2009
Ready for bidding Pipeline Awaiting approval for Land use change to Commecia. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. Bid process to commence upon Pipeline approval from the GoK.
104
Transport terminal
Hebbal, Bangalore
350.00 DBOT
105
Transport terminal
BMTC
151.13 DBOT
106
Transport terminal
Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development
BMTC
153.00 DBOT
107
Transport terminal
CA Site No. 38 , BMTC Sector IV, Hosur - Sarjapura Road layout, Bangalore
153.00 DBOT
108
Transport terminal
196.90 DBOT
109
Transport terminal
197.00 DBOT
110
Transport terminal
218.75 DBOT
111
Transport terminal
Nagarbhavi 2nd BMTC Stagem, 10th Block C A site No. 6/12, Bangalore
109.40 DBOT
112
Transport terminal
Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development
109.40 DBOT
113
Transport terminal
Sy. No 36(P), BMTC KIADB Industrial Area, Electronic City, Phase-2, Bangalore Sy. No. 69, Puttenhalli, Yelahanka, Bangalore BMTC
86.00 DBOT
114
Transport terminal
263.00 DBOT
115
Transport terminal
Anjanpura, 10th BMTC Block, BDA layout, C A Site no. 14, Bangalore Bidadi, KIADB BMTC Industrial Area, Plot No. 38,39 ,40 at Bangalore
87.50 DBOT
116
Transport terminal
219.00 DBOT
117
Transport terminal
131.00 DBOT
118
Transport terminal
Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development
250.00 DBOT
119
Transport terminal
Peenya 4th Stage, KIADB Industrial Area, Plot No. 479, Bangalore
BMTC
350.00 DBOT
120
Transport terminal
219.00 DBOT
121
Transport terminal
BMTC
262.00 DBOT
122
Transport terminal
BMTC
130.00 DBOT
123
Transport terminal
Kogilu, Adjacent BMTC to proposed Peripheral Ring Road on Yelahanka Road, Bangalore Dodda Gubbi, BMTC Adjacent to proposed Peripheral Ring Road on Hennur Road, Bangalore
250.00 DBOT
124
Transport terminal
250.00 DBOT
125
Transport terminal
Herandhalli, adjacent to proposed peripheral ring road on Old Madras Road Chikka Banahalli, adjacent to proposed peripheral ring road on Kadugodi, Bangalore
BMTC
250.00 DBOT
126
Transport terminal
BMTC
250.00 DBOT
127
Transport terminal
Kachamaranaha BMTC lli, adjacent to proposed peripheral ring road on Sarjapura road, Bangalore
250.00 DBOT
128
Transport terminal
Huskur adjacent BMTC to proposed peripheral ring road on Hosur Road, Bangalore
250.00 DBOT
129
Transport terminal
BMTC
250.00 DBOT
130
Transport terminal
Kaggalipura, BMTC adjacent to proposed peripheral ring road on Kanakpura road, Bangalore
250.00 DBOT
131
Road
Design, Engineering, karnataka / Dept. of road Financing, Construction, Bangalore Rural Transport & Operation and and Urban Highway / maintence of Access Ministry of Controlled highway Highways Project of Bangalore Nelamangala of NH-4 from Km10/0 to Km 29/5 in the State of karnataka on BOT basis.
445.00 BOT
IMPLEME NTATION
131
Transport terminal
Traffic & TransitManagement Centre (TTMC) along with commercial development Traffic & TransitManagement Centre (TTMC) along with commercial development
132
Transport terminal
Challaghatta BMTC adjacent to proposed peripheral ring road on Mysore Road, Bangalore Sulikere BMTC adjacent to proposed peripheral ring road in between Mysore road and Magadi road, Bangalore
250.00 DBOT
250.00 DBOT
133
Road
1) Karnataka/ Ministry of Design,Construction,De Chickballpur/Chi Highways velopment, ckballpur/ Finance,operation and maintence of AP/Karnatka borderAvathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing an
402.87 BOTAnnuity
28.09.2006
IMPLEME NTATION
133
Transport terminal
Machahalli BMTC adjacent to proposed peripheral ring road on Magadi road, Bangalore
250.00 DBOT
134
WB assisted Karnataka Belgaum, Urban Water Sector Gulbarga & Improvement Project Hubli-Dharwad (KUWASIP)
KUWSDB
Apr-05 Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli
OPERATI ON
149
Airport
Gulbarga
IDD
110.00 DBOT
150
Airport
IDD
110.00 BOT
151
Airport
Hassan
IDD
690.00 BOT
1. Approval from the Union Awrded govt. is awaited. 2. About 514 Acre of land is handed over to concessioner, balance 446 acre of land notified by KIIDB, final award is pending. 3. CA signed on Sept,07, 4. Site survey completed on March 08. 5. Project DPR submited feb 08. 6. Topographical & Geo technical survey completed. 7. Enviormentel approval application submitted on Feb 08, approvel expected by Dec 08. To be commissioned in Nov 2009.
152
Road
Construction of Elevated Bangalore Rural Highway Project of and Urban Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis.
450.00 BOT
IMPLEME NTATION
153
Road
Construction of Access Bangalore Rural Ministry of Controlled Highways and Urban Highways from Km. 10/0 to Km. 29/5 of Bangolore Nelamangala section of NH-4 in the state of Karnataka on BOT basis
445.00 BOT
IMPLEME NTATION
154
Road
Design, Engineering, Tumku, Mandya, Financing, Construction, Hassan, Operation and Bangalore maintence of Four Laning of Bangalore Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State
441.00 BOT
IMPLEME NTATION
155
Road
Design, Engineering, Kolar, Bangalore Financing, Construction, urban and Rural Development, Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate Mulbagal section from Km 237 Km to Km 318 NH-4 in
565.00 BOT
4.80% of physical progress IMPLEME achieved. The project is being NTATION developed under NHDP Phase IIIA, NH - 4.
156
Road
KRDCL
Feb-04 Work on 69 out of 84 km IMPLEME completed. Cost of the project NTATION has increased from 60.48 to 82.38 cr. (Rs. 25.00 Cr. contributed by Cement Factories & balance by Govt)
157
Road
Construction of Sandur Sandur By pass PWD Bye-Pass Road, Bellary road, Bellary, District. karnataka
18.60 BOT
158
MSW
BBMP
70.33 BOTAnnuity
Jun-06 Concessionaire agreement executed on 18/11/05, Ms: SOWIL was appointed as Independent Engineer and Tripartite Agreement was concluded on 29/08/06. The Concessionaire has commenced the work during last week of August 06. Construction
IMPLEME NTATION
IMPLEME NTATION
134
Transport terminal
Kudaregere BMTC adjacent to proposed peripheral ring road on Dasanpura Hobli, Bangalore North Taluk Shimoga DMA / Shimoga CMC
250.00 DBOT
135
MSW
4.00 BOT
Bidding process completed. IMPLEME The project has been awarded. NTATION
136
MSW
Kannahalli
BBMP
40.00 BOOT
OPERATI ON
135
Transport terminal
Horohalli BMTC adjacent to proposed peripheral ring road on Doddaballapura road, Yelahanka Hobbli, Bangalore Bangalore BBMP
250.00 DBOT
136
MSW
Modern abattoir
30.00 BOOT
137
Bangalore
BBMP
12.00 BOOT
138
Commercial Development
16.00 BOOT
The bid process has been IMPLEME completed. The Concession NTATION Agreement has been signed and project has been awarded.
136
Transport terminal
Kalatammanhalli BMTC , adjacent to proposed peripheral ring road on Hesargathha Hobli, Bangalore North Taluk
250.00 DBOT
137
Transport terminal
Kambipura BMTC adjacent to proposed peripheral ring road in between Mysore Road and Kanakpura Road, Magadi Road at Bangalore Bayappanhalli NGEF, Old Madras Road, Bangalore BMTC
250.00 DBOT
138
Transport terminal
395.00 DBOT
139
Transport terminal
100.00 BOT
140
Transport terminal
Transport Infrastructure In front of KSRTC and Commcercial Channarayapatn development a Bus stand on NH-48 at Channaryapatna , Hassan District
100.00 BOOT
March, 2009
Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.
141
Transport terminal
KSRTC
Require approval from GoK for Pipeline Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities. Yet to be tenderd,
142
Transport terminal
KSRTC
Require approval from GoK for Pipeline Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.
143
Transport terminal
Require approval from GoK for Pipeline Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.
144
Transport terminal
KSRTC
Require approval from GoK for Pipeline Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.
145
Transport terminal
KSRTC
40.00 BOOT
Ready for bidding Pipeline Awaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.
SUB TOTAL
14069.51
GRAND TOTAL
111754.91
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
79
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
80
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
81
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
82
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
83
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
119 Transport
Road
Road
Torrangallu, bellary
PWD
PWD
120 Transport
Road
Road
Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu Improvement to State Gulbargha District Highway (SH-10) from Maharashtra Border to Andhra Pradesh Border via Aland, Gulbarga, Malkhed, Sedam, Ribbanpally,
PWD
PWD
122 Transport
Road
Road
PWD
KRDCL
124 Transport
Road
Road
Development of bypass Belekeri port, near NH17 road for Belekeri Port on karnataka costal area
PWD
PWD
129 Transport
Road
State highway
Uttara Kannada
PWD
KSHIP
130 Transport
Road
State highway
Improvement of SH Hassan Chikkanayakanahalli to Hasssan (74 KM) Connectivity to Belikere Belikere Port
PWD
KSHIP
145 Transport
Road
Road
PWD
152 Transport
Road
Road
Construction of Sandur Sandur By pass road, Bye-Pass Road, Bellary Bellary, karnataka District.
PWD
PWD
84
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
85
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
86
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
87
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
88
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
89
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
90
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
91
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
92
Government of Karnataka
Category
93
Government of Karnataka
Category
94
Government of Karnataka
Category
95
Government of Karnataka
Category
96
Government of Karnataka
Category
97
Government of Karnataka
Category
yes
yes
Duplicate
yes Duplicate
Duplicate
Duplicate
Duplicate
98
Government of Karnataka
Category
99
Government of Karnataka
Category
100
Government of Karnataka
Category
101
Government of Karnataka
Category
102
Government of Karnataka
Category
103
Government of Karnataka
Category
104
Government of Karnataka
Category
105
Government of Karnataka
Category
106
Government of Karnataka
107
Government of Karnataka
108
Government of Karnataka
109
Government of Karnataka
110
Government of Karnataka
111
Government of Karnataka
112
Government of Karnataka
113
Government of Karnataka
114
Government of Karnataka
115
Government of Karnataka
116
Government of Karnataka
117
Government of Karnataka
118
Government of Karnataka
119
Government of Karnataka
120
Government of Karnataka
121
Government of Karnataka
122
Government of Karnataka
123
Government of Karnataka
124
Government of Karnataka
125
Government of Karnataka
126
Government of Karnataka
127
Government of Karnataka
128
Government of Karnataka
129
Government of Karnataka
130
Government of Karnataka
131
Government of Karnataka
132
Government of Karnataka
133
Government of Karnataka
134
Government of Karnataka
135
Government of Karnataka
136
Government of Karnataka
137
Government of Karnataka
138
Government of Karnataka
139
Government of Karnataka
140
Government of Karnataka
141
Government of Karnataka
142
Government of Karnataka
143
Government of Karnataka
144
Government of Karnataka
145
Government of Karnataka
146
Government of Karnataka
147
Government of Karnataka
148
Government of Karnataka
149
Government of Karnataka
150
Government of Karnataka
151
Government of Karnataka
152
Government of Karnataka
153
Government of Karnataka
154
Government of Karnataka
155
Government of Karnataka
156
Government of Karnataka
157
Government of Karnataka
158
Government of Karnataka
159
Government of Karnataka
160
Government of Karnataka
161
Government of Karnataka
162
Government of Karnataka
163
Government of Karnataka
164
Government of Karnataka
165
Government of Karnataka
166
Government of Karnataka
167
Government of Karnataka
168
Government of Karnataka
169
Government of Karnataka
170
Government of Karnataka
171
Government of Karnataka
172
Government of Karnataka
173
Government of Karnataka
174
Government of Karnataka
175
Government of Karnataka
176
Government of Karnataka
177
Government of Karnataka
178
Government of Karnataka
179
Government of Karnataka
180
Government of Karnataka
181
Government of Karnataka
182
Government of Karnataka
183
Government of Karnataka
184
Government of Karnataka
185
Government of Karnataka
186
Government of Karnataka
187
Government of Karnataka
188
Government of Karnataka
189
Government of Karnataka
190
Government of Karnataka
191
Government of Karnataka
192
Government of Karnataka
193
Government of Karnataka
194
Government of Karnataka
195
Government of Karnataka
196
Government of Karnataka
197
Government of Karnataka
198
Government of Karnataka
199
Government of Karnataka
200
Government of Karnataka
201
Government of Karnataka
202
Government of Karnataka
203
Government of Karnataka
204
Government of Karnataka
205
Government of Karnataka
206
Government of Karnataka
207
Government of Karnataka
208
Government of Karnataka
209
Government of Karnataka
210
Government of Karnataka
211
Government of Karnataka
212
Government of Karnataka
213
Government of Karnataka
214
Government of Karnataka
215
Government of Karnataka
216
Government of Karnataka
217
Government of Karnataka
218
Government of Karnataka
219
Government of Karnataka
220
Government of Karnataka
221
Government of Karnataka
222
Government of Karnataka
223
Government of Karnataka
224
Government of Karnataka
225
Government of Karnataka
226
Government of Karnataka
227
Government of Karnataka
228
Government of Karnataka
229
Government of Karnataka
230
Government of Karnataka
231
Government of Karnataka
232
Government of Karnataka
233
Government of Karnataka
234
Government of Karnataka
235
Government of Karnataka
236
Government of Karnataka
237
Government of Karnataka
238
Government of Karnataka
239
Government of Karnataka
240
Government of Karnataka
241
Government of Karnataka
242
Government of Karnataka
243
Government of Karnataka
244
Government of Karnataka
245
Government of Karnataka
246
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
Energy
Power
Chamalpura, Mysore
Energy Department / ESCOMS / PCKL Energy Department / ESCOMS / PCKL Energy Department / ESCOMS / PCKL KSIIDC Deptt of Tourism
4500.00 PPP
BOO
Energy
Power
5000.00 PPP
BOO
Energy
Power
Jewargi, Gulbarga
5000.00 PPP
BOO
Tourism
Hotels/ Resorts
Hotels/ Resorts
Development of 5 Stat Dlx Hotel, Multi cusine Restaurant, Theme park, Multiplex, Retail shops, Civic Amenties Banihatti to Nandihalli Railway line
Gokarna
Deptt of Tourism
272.90 PPP
DBOT
Transport
Rail
Rail
Bellary
IDD
PPP
Transport
Rail
Rail
Bellary
IDD
PPP
Transport
Rail
Rail
Bellary
IDD
PPP
Transport
Rail
Rail
Proposed New railway Station for Passengers between ToaangalluGadiganur of Hospet to Bellary-Double Lane
IDD
PPP
247
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
Transport
Transport terminal
Bus Terminal
Development of Modern Bus Station and Commercial Building on NWKTRC site at Dharwad
Dhaward Old Bus Stand Area lcoated at the Junction on Subhash Road, Dharwad District.
KSRTC - NWKRTC
KSIIDC
25 PPP
DBOT
10 Transport
Transport terminal
Bus Terminal
Bangalore, Karnataka
KSRTC
KSRTC
70 PPP
BOOT
11 Transport
Transport terminal
Bus Terminal
Construction of inter model transit center at Peenya Bangalore Development of commcercial space above bus ststion at Shimoga
Bangalore, Karnataka
KSRTC
KIPDC
PPP
BOOT
12 Transport
Transport terminal
Bus Terminal
Shimoga, Karnataka
KSRTC
KSRTC
PPP
BOOT
248
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
BDA
BDA
1425.16 PPP
BLMT
249
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
250
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
251
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
252
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
253
Government of Karnataka
Mode of Award
ICB
Aug-07
Pvt. Contribution
ICB
Aug-07
Pvt. Contribution
ICB
Aug-07
Pvt. Contribution
Jul-99
Aug-02
One year
One year
One year
254
Government of Karnataka
Mode of Award
ICB
39722
39814
39995
Domestic
VGF
GOI-20%
Domestic
March, 2009
40603 VGF
GOI-20%
Domestic
VGF
GOI-20%
255
Government of Karnataka
Mode of Award
NCB
To be invited
Pvt. Contribution
256
Government of Karnataka
Mode of Award
Stage Bidding completed Opearatio nal Identificati on Under Constructi on Developm ent
Nos 0 0 0 0
0 0
Total
257
Government of Karnataka
Mode of Award
258
Government of Karnataka
Mode of Award
259
Government of Karnataka
Mode of Award
260
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
25 years
25 years
25 years
Total Land requried-236 acres including 50acres yard in Nandihalli and width of land required 3050mtrs Total Land requried-160 acres and width of land required30-50mtrs
75acres of land required for Station, Railway sidings and foe future expensions
261
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
Land
Land use conversion 45% FAR for commercial development has to be approved. Once this this is done and onces SLWA approves, the project can be bid out.
Yet to be finalised
NILL
Yet to be finalised
Yet to be finalised
KSIIDC-IL&FS Project Development Company Limited (KIPDC) 1st floor, Yet to be finalised Land is in possession of KSRTC
Land is in possession of KSRTC Power & Water supply Road widening by Muncipality
262
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
263
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
264
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
265
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
266
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
267
Government of Karnataka
Additional Investment
Issues
Brief Description
It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe The land extend is 45 acres. The land owenership is private - recoemmended for acquisition. DoT approved the project and would seek the land cost report from the concerned DC. The land acquisition being higher, DOT
Railway clearance for project is alredy approved. Land from hulikunte, Laxmipur & Bhujung Nagar of Sandur Taluk already have 66% farmer consent Railway clearance for project is alredy approved. Land from Krishnanagar, Daulatpur, Sushilnagar of Sandur Taluk (Revenue Land identification process is completed. Railway clearance for project is alredy approved. Land from Torangallu & Daroji of Sandur Taluk (Revenue land identificatopm process is completed) Feasibility Reportcompleted by M/s. URRC and submited to railway board. JSW is ready to invest under PPP as per Railways guidelines.
268
Government of Karnataka
Additional Investment
Issues
Brief Description
PDF funding sought PDF funding approved (Rs. in Lacks) Project Benefits: - Modern Bus Station with 22 Bus bays, passenger amenities, NWKRTC station office, 200 two wheeler parking and 5 car parking, worth Rs.5.0 Cr. - Commercial Building of 61,970 Sqft after 30 years - Half early lease rental for lease pe 1
Financially not viable without Viablity Gap Funding. We'll provide the Advertisement are completed.
Project Structuring is underway and studies are going on. The apporx. Project cost is taken under consideration as per the similar projects undertaken in this sector. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conc Yet to be tendered
Project Components: - Modern Bus Station (1.81 acres): consisting of 22 bus bays, Passenger Amenities, NWKRTC station office, 200 two wheeler parking and 5 car parking lots . - Commercial Building (0.30 acres): with a built-up area of 61,970 sqft and a
Conversion from Yet to be tendered Transport Zone to Commercial zonechange of land use Yet to be tendered
269
Government of Karnataka
Additional Investment
Issues
Brief Description
Agencies have been qualified by the process of RFQ. RFQwill be issued after change of land use is obtained. From Govt. of Karnataka..
Construction of 45000 tenements It will enable economic weaker (units) for urban poor in 3 years span section around bangalore to own Area of each tenement =325 Sq. ft. at a house as their basic need 15000 per year 8 numbers of package.
Around Bangalore City : Viz 1. Gunjur Sy No. 138 Change of use of land 2. Doddabanahalli Sy No. 3 from Agriculture to 3. Tippasandra Sy No. 1 residential zone & industrial to residential zone is under progress
270
Government of Karnataka
Additional Investment
Issues
Brief Description
271
Government of Karnataka
Additional Investment
Issues
Brief Description
272
Government of Karnataka
Additional Investment
Issues
Brief Description
273
Government of Karnataka
Additional Investment
Issues
Brief Description
274
Government of Karnataka
Stage
Contact Details
Energy Deptt
BIDDING
Energy Deptt
Bidding
BIDDING
Energy Deptt
Bidding
BIDDING
Department of Tourism
Initial
Project Identification
JSW proposal
Concept
Project Identification
JSW proposal
Concept
Project Identification
JSW proposal
Concept
Project Identification
JSW proposal
Concept
Project Development
275
Government of Karnataka
Stage
Contact Details
KSRTC
Initial
Project Development
Project Identification
Project Identification
Project Identification
276
Government of Karnataka
Stage
Contact Details
BDA
Bidding
RFP/Stage
277
Government of Karnataka
Stage
Contact Details
278
Government of Karnataka
Stage
Contact Details
279
Government of Karnataka
Stage
Contact Details
280
Government of Karnataka
Stage
Contact Details
281
Government of Karnataka
Category
This project is droped from PPP mode as said by the Exec.Engg. Energy dept. Dropped This project is droped from PPP mode as said by the Exec.Engg. Energy dept. Dropped This project is droped from PPP mode as said by the Exec.Engg. Energy dept. Dropped
No
Dropped
Dropped
Dropped
Dropped
282
Government of Karnataka
Category
No
Dropped
Dropped
Dropped
Dropped
283
Government of Karnataka
Category
No
BDA is informed that this project is dropped from the PPP mode
Dropped
284
Government of Karnataka
Category
285
Government of Karnataka
Category
286
Government of Karnataka
Category
287
Government of Karnataka
Category
288
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
Agri-Infrastructure
Agriculture and horticulture markets Agriculture and horticulture markets Agriculture and horticulture markets
Devleopme Development of Whole Bytarayna- pura, Yelenkha Agriculture Marketing nt of Veg sale vegetable market Market Devleopme Developmant of APMC Mangalore / south nt of Veg yard Nellikay road, canara/Karnataka Market Mangalore Agriculture Marketing
550.00 PPP
BOT
Agri-Infrastructure
BOT
Secretary,APMC Mangalore Devleopme Developmant of Mysore/karnataka nt of Veg Commercial complex at Market veg. market yard, Mysore Rural areas of Karnataka (All PHCs) at all districts Agriculture Marketing APMC Mysore
Agri-Infrastructure
Healthcare
Health Health and Arogya Bandhu Infrastructure Famility and facility welfare
NGO
NA
PPP PPP
Manageme nt Contract
Healthcare
Health Health and Mobile health clinics Infrastructure Famility and facility welfare
Under served areas in the Health and Familiy state Welfare / DH and FWO
NGO
Govt. of karnataka
4.56 PPP
Manageme nt Contract
Healthcare
Health Health and Thayi Bhagya Infrastructure Famility and facility welfare
Govt. of karnataka
1.20 PPP
Manageme nt Contract
Industrial Infrastructure
Biotechnology
Setting up of sector specific Special Economic Zone for Biotechnology sector at Electronic city , Phase III, Bangalore
IT , BT ,S&T
KBITS
IT , BT ,S&T
522.00 PPP
BOT
Industrial Infrastructure
Information Technology
Business Park
KSIIDC
KIPDC
KSIIDC
9000.00 PPP
DBOT
Tourism
Theme Park
Heritage Park
20.49 PPP
BOT
10 Tourism
Hotels/ Resorts
Hotels/ Resorts
3 Star Category hotel,Theme park,Restaurant,Organi sed Retail,Civic amenities Development of Tourism Infrastructure Projects at Badami, Pattadakal & Aihole
Dept of Tourism
KSIIDC
Deptt of Tourism
18.00 PPP
DBOT
11 Tourism
Hotels/ Resorts
Hotels/ Resorts
Dept of Tourism
KSIIDC
Deptt of Tourism
21.00 PPP
DBOT
12 Tourism
Hotels/ Resorts
Hotels/ Resorts
Dept of Tourism
KSIIDC
Deptt of Tourism
28.00 PPP
DBOT
289
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
13 Tourism
Hotels/ Resorts
Hotels/ Resorts
Dept of Tourism
KSIIDC
Deptt of Tourism
21.00 PPP
DBOT
14 Tourism
Development of Various Pilikula Nissarga Dhama Tourism Facilities in at Dakshin Kannada, Pilikula, Nisarga Dhama Mangalore
80.00 PPP
BOT
15 Tourism
Mangalore
Dept of Tourism
KSIIDC
Deptt of Tourism
40.00 PPP
DBOT
16 Tourism
Mangalore
Dept of Tourism
KSIIDC
Deptt of Tourism
PPP
No Info
17 Tourism
Cultural Centres
Cultural Centres
Devenhalli, Bangalore
Dept of Tourism
Ideck
1050.00 PPP
BOOT
18 Tourism
Bangalore
KSTDC
Ideck
32.00 PPP
Manageme nt Contract
19 Tourism
Belgaum/ Karnataka
BUDA
35.00 PPP
DBOOT
20 Transport
Airport
Airport
Bijapur, Karnataka
IDD
IDD
Private
110.00 PPP
BOT
21 Transport
Airport
Airport
IDD
KSIIDC
BIAL
2470.29 PPP
DBOOT
22 Transport
Airport
Airport
Bellary
IDD
IDD
PPP
BOT
23 Transport
Airport
Minor Airport
Gulbarga
IDD
IDD
110.00 PPP
DBOT
290
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
24 Transport
Airport
Minor Airport
IDD
IDD
110.00 PPP
BOT
25 Transport
Airport
Airport
Hassan
IDD
IDD
Jupitar Aviation
690.00 PPP
BOT
26 Transport
Port
Minor port
2nd Stage Coastline at Karwar Development of Modern Sea at Karwar on the costline of Karnataka
788.00 PPP
BOOST
27 Transport
Port
Minor port
Development of Modern Malpe, Costline of Deep Sea Port at Ist Karnataka Stage Malpe on the Costline of Karnataka Maritime State
1350 PPP
BOOST
28 Transport
Port
Minor port
1100 PPP
BOOST
29 Transport
Rail
Rail
Hassan Bangalore
IDD
PPP
No Info
30 Transport
Rail
Bangalore
IDD
KSIIDC
3716.00 PPP
BOT
31 Transport
Transport terminal
Bus Terminal
Development of Modern NEKRTC site at Gulbarga KSRTC - NEKRTC Bus Station & Main Road, Gulbarga Commercial Complex on NEKRTC at Gulbarga Bus Stand
KIPDC
NEKRTC
29.60 PPP
DBOT
291
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
32 Transport
Transport terminal
Bus Terminal
33 Transport
Transport terminal
Bus Terminal
Development of Modern Bus Station & Commercial Complex on KSRTC site and vacant land parcels at Puttur Project development of Bus stand and vaccant land parcels for KSRTC at Mangalore.
KSRTC
KIPDC
KSRTC
15.00 PPP
DBOT
KSRTC
KIPDC
KSRTC
20.70 PPP
DBOT
34 Transport
Transport terminal
Bus Terminal
Project development of Hassan new bus station at KSRTC vacant parcels for Hassan District Transport Infrastructure and Commcercial development Project development of KSRTC site at Bus Depot KSRTC vacant parcels for on old NH-4 at Chitradurga Transport Infrastructure District and Commcercial development Development of Commercial Complex on NEKRTC site at Bidar Bidar Old Bus Stand, near KSRTC - NEKRTC Bidar Railway Station
KIPDC
KSRTC
91.00 PPP
DBOT
35 Transport
Transport terminal
Bus Terminal
KIPDC
KSRTC
37.00 PPP
DBOT
36 Transport
Transport terminal
Bus Terminal
KSIIDC
28 PPP
DBOT
37 Transport
Transport terminal
Bus Terminal
Development of Modern Bus Station and Commercial Building on NWKTRC site at Belgaum
Belgaum Central Bus KSRTC - NWKRTC Stand and Central Workshop Area located on Old Pune Highway, Link Road and Fort Road
KSIIDC
NWKRTC
30.00 PPP
DBOT
38 Transport
Transport terminal
Bus Terminal
Hebbal, Bangalore
BMTC
BMTC
350 PPP
DBOT
39 Transport
Transport terminal
Truck Terminal
HUDA
Ideck
26.00 PPP
BOT
40 Transport
Transport terminal
Truck Terminal
Torangallu, Bellary
IDD
Ideck
29.00 PPP
BOT
41 Transport
Transport terminal
Bus Terminal
No Info
PPP
No Info
292
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
42 Transport
Tuck terminal between Bellary JSWSL and BTPCL Development of Modern Hubli Bus Stand, Hubli Bus Station & Commercial building on NWKRTC at Hubli Bus Stand
No Info
30.00 PPP
No Info
43 Transport
KSRTC - NWKRTC
KIPDC
NWKRTC
40.00 PPP
DBOT
44 Transport
Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port Computerisation of Regional Transport Offices (RTOs) in Karnataka under PPP framework
Dept of Shipping
Dept of Shipping
119.66 PPP
No Info
45 Transport
Information Technology
Karnataka
Transport Department
Transport Department
50.00 PPP
BOMT
46 Transport
Road
Highways
47 Transport
Road
Highways
Design, Engineering, Bagalkot, Koppal & Bellary NHAI Financing, District. Procurement, Construction, Operation and maintence of 4 & 6 laning from Km 202 to Km 299 of Hungund Hospet Section of NH13 in the state of Karnata under NHDP phase III on BOT Design, Engineering, Hassan, Karnataka NHAI Financing, Construction, Operation and maintence of Four Laning of Devilalli Hassan Section of NH48 from Km 110 to Km 191 in the state of Karnataka Four laning of Kundapur Mangalore, Dakshin NHAI to Suratkal section ( Km Kannada 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis Improvement to District Tumkur and Hasan KRDCL ChikkanayakanahalliTiptur-Hassan Road (Partly MDR and partly SH) for a length of 74.00 Km
NHAI
1112.00 PPP
BOT
NHAI
440.00 PPP
BOT
48 Transport
Road
Highways
NHAI
616.00 PPP
No Info
49 Transport
Road
Road
KRDCL
203.00 PPP
BOT
50 Transport
Road
Road
KRDCL
KRDCL
193.10 PPP
BOT
51 Transport
Road
Highways
Four Laning and Belgaum district of streghtening of Km. 515 Karnataka to Km 592 Belgaum Maharashtra Border NH4 in the State Four laning of Bangalore -Mysore Road (Bangalore Maddur) Bangalore-Maddur
NHAI
NHAI
599.49 PPP
BOTAnnuity
52 Transport
Road
Road
KRDCL
KRDCL
188.00 PPP
BOTAnnuity
53 Transport
Road
Highways
4/6 laning of NH-4A Belgaum district of from Belgaum - KNT / Karnataka GOA border (84Kms) in the state of Karnataka under NHDP phase - III
NHAI
NHAI
PPP
BOT
293
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
54 Transport
Road
Highways
Six Laning of NH-4 from Belgaum & Dharwad Belgaum to Dharwad district of Karnataka from Km 515 to Km 433 (80 Kms) in the state of Karnataka under NHDP Phase V Construction of Bangalore Peripheral Ring Road around Bangalore City..
NHAI
NHAI
NA PPP
BOT
55 Transport
Road
Road
BDA
BDA
5000 PPP
BOT
56 Transport
Road
Road
Torrangallu, bellary
PWD
PWD
230.00 PPP
BOT
57 Transport
Road
Road
Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu Improvements to Wagdhari-Ribbanapally Road Development of Bellary, Karnataka Linkages to NH-13 and NH 63 at Hospet from Sandur-Hospet road in Bellary Development of bypass Belekeri port, near NH17 road for Belekeri Port on karnataka costal area
PWD
PWD
144.00 PPP
BOT
58 Transport
Road
Road
KRDCL
KRDCL
196.53 PPP
BOTAnnuity
59 Transport
Road
Road
NHAI
PWD
30.00 PPP
BOT
60 Transport
Road
Road
PWD
PWD
25.00 PPP
BOT
61 Transport
Road
Express way
Construction of Expressway (State highway, Special) from Outer Ring Road to International Airport in Devanahalli Taluk Two diversion from Bannihatti to NH-63 at BPTCL(19Km) and Bannihatti to Gadiganur(9Km) on StateHighway (SH-40) from Sandur to Torangallu,
Devanhalli, Bangalore
No Info
1000.00 PPP
BOT
62 Transport
Road
State highway
Bellary
KRDCL
KRDCL
56.00 PPP
BOT
63 Transport
Road
National Highway
Proposed to develop six Bellary lane road (76Km) from Bellary to Hospet and Four lane upto Gutti on NH-63 (370Km) from Hospet to Bellary . Improvement of Hospete-Hubli-Ankola NH (271Km) North Canara - Hubli Koppal - Bellary District
NHAI
NHAI
PPP
No Info
64 Transport
Road
National Highway
IDD
PPP
BOT
65 Transport
Road
National Highway
No Info
PPP
Annuity
294
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
66 Transport
Road
National Highway
No Info
PPP
BOT
67 Transport
Road
National Highway
Bangalore-KanakpuraTamilnadu (203KM)
No Info
PPP
BOT
68 Transport
Road
State highway
Shimoga-Havere
KSHIP
PPP
BOT
69 Transport
Road
State highway
Tumkur-ChikkaballapurKolar
KSHIP
PPP
BOT
70 Transport
Road
State highway
KSHIP
PPP
BOT
71 Transport
Road
State highway
Chitradurga-TumkurMandya
KSHIP
PPP
BOT
72 Transport
Road
National Highway
PPP
BOT
73 Transport
Road
74 Transport
Road
Highways( 4/6 lanning of Karnataka/Mangalore,/Dak NHAI NHDP Kundapur to Suratkal shin Kannada Phase) of NH-17 in the state of karnataka under NHDP phase -III programme(Package no. BHDP-III DL5/11) Highways 1) Karnataka/ Chikkaballapur NHAI Design,Construction,De velopment, Finance,operation and maintence of AP/Karnatka borderAvathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing an Highways Construction of Bangalore Rural and Elevated Highway Urban Project of Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis. Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore Nelamangala section of NH-4 in the state of Karnataka on BOT basis Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Bangalore Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State Bangalore Rural and Urban NHAI
NHAI
500.00 PPP
BOT
NHAI
402.87 PPP
BOTAnnuity
75 Transport
Road
NHAI
450.00 PPP
BOT
76 Transport
Road
Highways
NHAI
NHAI
445.00 PPP
BOT
77 Transport
Road
Highways
NHAI
441.00 PPP
BOT
295
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
78 Transport
Road
Highways
NHAI
NHAI
565.00 PPP
BOT
Construction, Development, Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate Mulbagal section from Km 237 Km to Km 318 NH-4 in
79 Transport
Road State Development of Highways, existing 4-lane road Major from Bangalore to District Hunsur via Mysore and Roads & other Connecting roads Rural into 6-lane roads. Roads (Package 1)
DBOT
Karnataka State
Government of Karnataka
603.36
PPP
80 Transport
Road State Development of road Highways, Shimoga-HonnalliMajor Harapanahalli-KudligiDistrict Sandur-Thoranagal and Roads & other connecting roads. Rural (Package 2) Roads
DBOT
Karnataka State
Government of Karnataka
867.4
PPP
81 Transport
Road Development of road State Thamilnadu border to Highways, Attibele-SarjapurMajor Hoskote-JangamakoteDistrict Shidlgatta join SH-58 Roads & and other connecting Rural roads. Roads ( Package 3)
KRDCL
DBOT
Karnataka State
Government of Karnataka
356.48
PPP
82 Transport
Road
Development of road from SH-17 State SrirangapatanaHighways, PadavapuraMajor NagamandalaDistrict ChikkanayakanahalliRoads & Hiriyuru-ChallakereRural Bellary-A.P.Border (SHRoads 19). ( Package 4) State Highways, Development of road Major from Bangalore-MagadiDistrict Huliyuru Durga and Roads & other connecting roads. Rural ( Package 5) Roads State Highways, Major District Roads & Rural Roads Development of road Hassan-ArakalgudRamnathpuraPiriyapatna and other connecting roads. ( Package 6)
KRDCL
DBOT
Karnataka State
Government of Karnataka
1381.8
PPP
83 Transport
Road
KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. Government of Karnataka
DBOT
Karnataka State
710.16
PPP
84 Transport
Road
DBOT
Karnataka State
Government of Karnataka
366.52
PPP
85 Transport
Road
State Highways, Development of road Major Yelahanka to A.P District Border via Gowribidanur Roads & (SH-09). Rural ( Package 7) Roads Development of road State Sira-MadugiriHighways, GowribidanurMajor ChikkaballapuraDistrict Shidalgatta-ChithamaniRoads & Srinivasapur-Mulbagal Rural (SH-58) and other Roads connecting roads. ( Package 8)
DBOT
Karnataka State
299.6
PPP
86 Transport
Road
DBOT
Karnataka State
Government of Karnataka
1432.4
PPP
296
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
87 Transport
Road
Development of road from Hoskote-MallurTekal-BangarpetBaythmangal-AP Border (SH-95) and connecting roads. ( Package 9)
DBOT
Karnataka State
Government of Karnataka
572.4
PPP
88 Transport
Road
State NelamangalaHighways, Taverekere-KengeriMajor Kanakapura road District Jigani-Anekal and other Roads & connecting roads. Rural ( Package 10) Roads State Highways, Development of road Major from Bangarpet-KolarDistrict Chithamani-Bagepalli Roads & joining NH-7 (SH-05). ( Rural Package 14) Roads State Development of road Highways, from Chikkaballapur Major (NH-7) Vijipur-VemagalDistrict Kolar-Nandi cross and Roads & other connecting roads. Rural ( Package 15) Roads Development of road State from Mandya-DuddaHighways, MelukoteMajor SanthebachalliDistrict SravanabelagolaRoads & Channarayapatha (SHRural 47) and other Roads connecting roads. ( Package 16) Development of road State from Mandya-DuddaHighways, MelukoteMajor SanthebachalliDistrict SravanabelagolaRoads & Channarayapatha (SHRural 47) and other Roads connecting roads. ( Package 17) State Development of road Highways, from KushalnagaraMajor Madikere-SampajiDistrict Sulya-Puttur joining NHRoads & 48 (SH-88) and other Rural connecting roads. Roads ( Package 18)
DBOT
Karnataka State
Government of Karnataka
388.46
PPP
89 Transport
Road
KRDCL Karnataka State Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. Government of Karnataka 216.8 PPP
DBOT
90 Transport
Road
DBOT
Karnataka State
Government of Karnataka
305.82
PPP
91 Transport
Road
KRDCL
DBOT
Karnataka State
Government of Karnataka
569.74
PPP
92 Transport
Road
KRDCL
DBOT
Karnataka State
Government of Karnataka
319.44
PPP
93 Transport
Road
DBOT
Karnataka State
Government of Karnataka
349.34
PPP
94 Transport
Road
KRDCL Development of road from Hunsur-Verajpet, Madakeri-Somavarpet road and other connecting roads. ( Package 19) Karnataka Road Development Corporation Limited.
DBOT
Karnataka State
Government of Karnataka
546.48
PPP
95 Transport
Road
Development of road State from HassanHighways, Holenarasipura road, Major HolenarasipuraDistrict Channarayapatna road Roads & and other connecting Rural roads. Roads ( Package 20)
DBOT
Karnataka State
Government of Karnataka
283.32
PPP
297
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
96 Transport
Road State Development of road Highways, from Huliyur-TipturMajor NuggenahalliDistrict Shravanabelagola road Roads & (SH-47) and other Rural connecting roads. Roads ( Package 21)
DBOT
Karnataka State
Government of Karnataka
214.72
PPP
97 Transport
Road State Highways, Major District Roads & Rural Roads Development of road from KadurChikkamangalurMudigere-BelthangadiBantwal road (SH-64). ( Package 22)
KRDCL
DBOT
Karnataka State
Government of Karnataka
323.88
PPP
98 Transport
Road State Development of road Highways, from MangaloreMajor Shimoga(NH-13 to NHDistrict 48) via BelthangadiRoads & Kokkada (SH-37) and Rural other connecting roads. Roads ( Package 23)
KRDCL
DBOT
Karnataka State
Government of Karnataka
350.44
PPP
99 Transport
Road
State Highways, Development of road Major from NH-17 KundapuraDistrict Thirthhalli road (SH-52). Roads & ( Package 24) Rural Roads State Development of road Highways, from ChannagiriMajor Davanagere-Jaglur (SHDistrict 65) and other Roads & connecting road (SHRural 45). Roads ( Package25)
KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. Government of Karnataka
DBOT
Karnataka State
163.62
PPP
100 Transport
Road
DBOT
Karnataka State
Government of Karnataka
309.6
PPP
101 Transport
Road State Highways, Major District Roads & Rural Roads Development of road from BadravathiShimoga-HonalliShikaripura (SH-57) and other connecting roads. ( Package 26)
DBOT
Karnataka State
Government of Karnataka
625.22
PPP
102 Transport
Road State Development of road Highways, from Haveri-HirekeruruMajor Thalagundi-SorabaDistrict Sagar road and other Roads & connecting road. Rural ( Package 27) Roads
DBOT
Karnataka State
Government of Karnataka
370.1
PPP
103 Transport
Road
State Highways, Major District Roads & Rural Roads State Highways, Major District Roads & Rural Roads
KRDCL Development of road from Tadas-MundgodSirsi-SampakhandKumta road (SH-69). ( Package 28) Karnataka Road Development Corporation Limited.
DBOT
Karnataka State
Government of Karnataka
273.48
PPP
104 Transport
Road
Development of road from MysoreManadwadi (SH-33) road and other connecting roads. ( Package 29)
KRDCL Karnataka Road Development Corporation Limited. KRDCL Government of Karnataka PPP
DBOT
Karnataka State
228.2
105 Transport
Road Development of road from Katak-ChincholiState Jalasangi near SH-105 Highways, (SH-75), from Major Maharastra border District nerar KamlanagarRoads & Sangam-AP Border Rural near Goonalli and other Roads connecting roads. (Package 30)
DBOT
Karnataka State
Government of Karnataka
428.3
PPP
298
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
106 Transport
Road
Development of road from Bidar to Humnabad (SH-105) and other connecting roads. (Package 31)
DBOT
Karnataka State
225.48
PPP
107 Transport
Road State Development of road Highways, from AfzalpurMajor Ghattarga, Sarasamba District with Ribbanapalli and Roads & other connecting roads. Rural (Package 32) Roads
Karnataka State
Government of Karnataka
507.38
PPP
108 Transport
Road
State Highways, Development of road Major from Devangaon bridgeDistrict Afzalpur-Gulbarga and Roads & other connecting roads. Rural (Package 33) Roads Development of road State from TN BorderHighways, Kodihalli-KanakpuraMajor Ramnagar-MagadiDistrict Solur-DavaspetRoads & Kottigere (SH-03) and Rural other connecting roads. Roads ( Package 11)
DBOT
Karnataka State
Government of Karnataka
492.16
PPP
109 Transport
Road
KRDCL
DBOT
Karnataka State
Government of Karnataka
447.46
PPP
110 Transport
Road State Highways, Development of road Major from NanjangudDistrict Chamarajnagar, and Roads & other connecting roads. Rural ( Package 12) Roads
DBOT
Karnataka State
Government of Karnataka
500.2
PPP
111 Transport
Road Development of road State from Mysore-BannurHighways, Mallavali-MaddurMajor Huliyuru durga-KunigalDistrict Tumkur-Koratagere (SHRoads & 33) and other Rural connecting roads. Roads ( Package 33)
KRDCL
DBOT
Karnataka State
Government of Karnataka
627.84
PPP
112 Transport
Road State Development of road Highways, from AP border near Major Kothadoddi-YaragaraDistrict Purthipalli to join SH-23 Roads & near Kapgal and other Rural connecting roads. Roads (Package 34)
DBOT
Karnataka State
Government of Karnataka
468.68
PPP
113 Transport
Road State Development of road Highways, from Tawargere Major Hulihyder-KanakgeriDistrict Gonal-Chikka Jantakal Roads & Kuditheni (SH-29). Rural (Package 35) Roads
DBOT
Karnataka State
Government of Karnataka
585.04
PPP
114 Transport
Road
115 Transport
Road
116 Transport
Road
State Development of road Highways, from GangavathiMajor Karatgi-SindanoorDistrict Kalmali joining SH-20 Roads & (SH-23), and other Rural connecting roads. Roads (Package 36) State Development of road Highways, from Gorabal on SH-23Major Dhadesugur-DesanurDistrict Sindegeri-Bellary and Roads & other connecting roads . Rural (Package 37) Roads State Development of road Highways, from Gangavathi -NHMajor 63 at Koppal-Mundargi District and other connecting Roads & roads. Rural (Package 38) Roads
KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. Government of Karnataka Government of Karnataka Government of Karnataka
DBOT
Karnataka State
458.98
PPP
DBOT
Karnataka State
685.76
PPP
DBOT
Karnataka State
721.24
PPP
299
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
117 Transport
Road
Development of road from LokapuraVarchagal-Govanakop and other connecting roads. (Package 39)
KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. Government of Karnataka
DBOT
Karnataka State
566.2
PPP
118 Transport
Road
119 Transport
Road
120 Transport
Road
Development of road State from RamdurgaHighways, Chunchur-Manoli-SogalMajor BailhongalDistrict ChikkabagewadiRoads & Bagewai and other Rural connecting roads. Roads (Package 40) State Development of road Highways, from AnnigereMajor Navalgund-Datnal-Ron District and other connecting Roads & roads. Rural (Package 41) Roads State Highways, Development of road from Raichur to Bachi Major (Bachi to Hungund SHDistrict 20). Roads & (Package 42) Rural Roads Development of road State from Yaragatti Highways, Thavalgeri - Maldinni Major near SH-31, Nesargi to District AP Border near Roads & Ananthapur (SH-31) Rural and other connecting Roads roads. (Package 43) State Highways, Major District Roads & Rural Roads Development of road from Lokapura-HalkiMallapur to join NH-4 near Gotur and other connecting roads. (Package 44)
DBOT
Karnataka State
Government of Karnataka
423.56
PPP
KRDCL Karnataka Road Development Corporation Limited. KRDCL Karnataka Road Development Corporation Limited. KRDCL Government of Karnataka Government of Karnataka
DBOT
Karnataka State
483.9
PPP
DBOT
Karnataka State
398.74
PPP
121 Transport
Road
DBOT
Karnataka State
Government of Karnataka
850.2
PPP
122 Transport
Road
DBOT
Karnataka State
Government of Karnataka
328.22
PPP
123 Transport
Road State Development of road Highways, from Lokapur to Mudhol Major (SH-34), MudholDistrict Sidapur-KanakawadiRoads & Nipani (SH-18) and Rural other connecting roads. Roads (Package 45)
DBOT
Karnataka State
Government of Karnataka
363.6
PPP
124 Transport
Road
Development of road from ShiraguppiMolwad-Ainapur (SH72) and other connecting roads. (Package 46)
DBOT
Karnataka State
402
PPP
125 Transport
Road State Development of road Highways, from Maharastra border Major to Sankeshwara District Navalihal (SH-12) and Roads & other connecting roads. Rural (Package 47) Roads
Karnataka State
Government of Karnataka
323
PPP
126 Transport
Road
State Development of road Highways, from NH-218 to Major Mulawad- BabaleshwarDistrict Mudhol and other Roads & connecting roads. Rural (Package 48) Roads State Highways, Major District Roads & Rural Roads Development of road from SH-53 near Kudachi-RaibagBagewadi-Zangathaal (SH-73) and other connecting roads. (Package 49)
DBOT
Karnataka State
444.82
PPP
127 Transport
Road
DBOT
Government of Karnataka
261.04
PPP
300
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
128 Transport
Road State Development of road Highways, from DevangaonMajor Vibuthihal-Indi-AthargaDistrict Bijapur (SH-34) and Roads & other connecting roads. Rural (Package 50) Roads
DBOT
Karnataka State
Government of Karnataka
290
PPP
129 Transport
Road Development of road State from NH-13 near Highways, Hungund-Mudagal (SHMajor 20), SindhanurDistrict Lingasugur-MaskiRoads & Chikmudbal to NH-218 Rural at Jewargi and other Roads connecting roads. (Package 51)
KRDCL
DBOT
Karnataka State
Government of Karnataka
448.92
PPP
130 Urban and Municipal Urban Urban local ADB assisted Infrastructure bodies Karnataka Urban Infrastructure Infrastructure Development Project (KUIDP) 131 Urban and Municipal MSW Infrastructure MSW Setting up of Municipal Solid Waste (MSW) treatment and landfill facilities in 8 towns in Karnataka
Mysore
KUIDFC
3.70 PPP
BOO
PWD
No Info
Bangalore
BBMP
BBMP
30.00 PPP
BOT
133 Urban and Municipal Commercial Commerci Madivala Commercial Development al Complex Plaza Infrastructure
Bangalore
BBMP
BBMP
35.00 PPP
BOOT
134 Urban and Municipal Commercial Hospitality Development of 1.60 Bangalore Development and retail acres land along Hosur Infrastructure space road
KSIIDC
106.82 PPP
DBOT
MSW
Mysore
37.50 PPP
Manageme nt Contract
136 Urban and Municipal Water Supply Water & Sewerage Supply Infrastructure
Bijapur city
DMA, CMC
KUIDFC
120.00 PPP
PBDPS
137 Urban and Municipal Water Supply Water & Sewerage Supply Infrastructure
WB assisted Karnataka Belgaum, Gulbarga & Urban Water Sector Hubli-Dharwad Improvement Project (KUWASIP)
KUIDFC
KUWSDB
237.00 PPP
Manageme nt Contract
MSW
BBMP
BBMP
70.33 PPP
BOTAnnuity
301
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
139 Urban and Municipal Township Township Bidadi Integradted Development Developme Township Infrastructure nt
BMRDA
40000.00 PPP
Manageme nt Contract
Urban local Inertisation and land fill Shimoga bodies facility Shimoga
Shimoga CMC
3.64 PPP
BOOT
MSW
Kannahalli
BBMP
BBMP
40.00 PPP
BOOT
MSW
Bangalore
BBMP
BBMP
25.00 PPP
BOOT
MSW
Modern abattoir
Bangalore
BBMP
BBMP
30.00 PPP
BOOT
144 Urban and Municipal Common Public User facilities Utilies Infrastructure
Bangalore
BBMP
BBMP
12.00 PPP
BOOT
145 Urban and Municipal Commercial Commerci Development of Mysore Development al Complex Commercial Complex at Infrastructure Makkaji Chowk, Mysore
BBMP
16.00 PPP
BOOT
146 Urban and Municipal Commercial Commerci Development of Makkaji Mysore Development al complex Chowka Commercial Infrastructure complex
75.00 PPP
BOOT
Urban local Inertisation and land fill Belguam bodies facility Belgaum
5.12 PPP
BOOT
148 Agri-Infrastructure
Commercial Hospitality Development of Land Development and retail for Animal Husbandry space
Bangalore
KSIIDC
300.00 PPP
DBOT
302
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
303
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
304
Government of Karnataka
Sub Sector
Project Name
Location
Sponsor Dept
Exec. Agency
Owner
305
Government of Karnataka
Mode of Award
Global Tender
NA
Other
NA
NA
NA
NA
Global Tender
To be invited
Other
NA
NA
NA
NA
Other NA NA NA NA
24 months
Pvt. Contribution
2012 Government
100%
2012 Government
100%
14.45
NCB
Debt : Equit 60 % : 40 %
NCB
NCB
NCB
NCB
306
Government of Karnataka
Mode of Award
NCB
NCB
Pvt. Sector
NCB
NCB
29-05-2007
Successful bidder
Domestic Tender
Negotiate d
Govt. funds
Domestic Tender
ICB
6/28/1999
Domestic Tender
307
Government of Karnataka
Mode of Award
Domestic Tender
ICB
Nov-07
ICB
Apr/09
ICB
---
ICB
---
The entire funding for the project will have to be borne by the concessionair.The GoK will hand over the available The entire funding for the project will have to be borne by the concessionaire. The Government of Karnataka will hand over the The entire funding for the project will have to be borne by the concessionaire. The Government of Karnataka will hand over the available port land and waterfront area required for the development of Honnavar port in Uttara Kannda District of
ICB
NCB
Debt : Equit 50 % : 50 %
308
Government of Karnataka
Mode of Award
NCB
Feb-09
Debt : Equit 50 % : 50 %
NCB
Dec-08
Debt : Equit 50 % : 50 %
NCB
Feb-09
NCB
Feb-09
ICB
39722
Debt : Equit 50 % : 50 %
NCB
Feb-09
Debt : Equit 50 % : 50 %
ICB
Domestic Tender
Domestic Tender
309
Government of Karnataka
Mode of Award
NCB
Debt : Equit 50 % : 50 %
Global tender
Nov/07
8/25/2009 Fully funded by Nil PPP partner M/s Rosmerta Technologies Pvt. Ltd
Nil
Nil
Nil
Nil
ICB
Dec/08
Equit and Debt VGF will be known after RFP is received from the bidder.
ICB
Dec-08
VGF
domestic
Pre-qualification complleted and bids are yet to be invited from Prequalified agency
VGF
domestic
Pre-qualification complleted and bids are yet to be invited from Prequalified agency
VGF
ICB
Debt : Equit 82 % : 18 %
Domestic Tender
Jun-03
ICB
Dec/08
VGF
310
Government of Karnataka
Mode of Award
ICB
RFQ invited
VGF
ICB
To be invited
Pvt. Contribution
Pvt. Contribution
ICB
Domestic Tender
Pvt. (2500)
311
Government of Karnataka
Mode of Award
2/16/2009
2/16/2009
2/16/2009
2/16/2009
ICB
RFQ invited
VGF
ICB
ICB
VGF
ICB
VGF
ICB
VGF
312
Government of Karnataka
Mode of Award
ICB
VGF
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
313
Government of Karnataka
Mode of Award
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
314
Government of Karnataka
Mode of Award
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
315
Government of Karnataka
Mode of Award
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
316
Government of Karnataka
Mode of Award
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
317
Government of Karnataka
Mode of Award
Competati ve Bidding
28-01-2009
Private
Competati ve Bidding
28-01-2009
Private
Domestic Tender
Dec-98
ICB
Mar/03
NIL
Domestic Tender
Apr/05
NIL
NCB
Domestic Tender
Pvt. Contribution
ICB
Sep-04
318
Government of Karnataka
Mode of Award
ICB
Aug/06
Pvt. Contribution
NCB
Sep/05
Service provider
Domestic Tender
NIL
Domestic Tender
NIL
Domestic Tender
Mar/05
NIL
Domestic Tender
Jan/05
NIL
Domestic Tender
Jun/05
NIL
ICB
6/25/2005
Private contribution
NCB
38974
NCB
319
Government of Karnataka
Mode of Award
320
Government of Karnataka
Mode of Award
321
Government of Karnataka
Mode of Award
322
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
NA
NA
30 iDecK
NA
NA
NA
NA NA NA
25
About 9 Acre
upto 2012
upto 2012
60 years
iDecK
KSIIDC-IL&FS Land area of Project around 408 acres Development Company Limited (KIPDC) 1st floor, AUM plaza. Near hotel ballal residency, No. 73, 3rd cross, residency road, Banbalore-560025
323
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
324
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
325
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
326
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
Nil
Nil
Nil
Nil
15 M/s iDecK
Nil
Paperless office
327
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
328
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
329
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
330
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
331
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
332
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
333
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
334
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
335
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
336
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
337
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
338
Government of Karnataka
ADB / WB support Any other agency Type of financial in form of Grant or (Rs. in Cr.) support details/ Loan (Rs. in Cr.)
Remarks
Period of Contract Consultant / Land Details Concession (Yr) TA for the project.
Expansion Plan
339
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
RFP to be invited 1
RFP to be invited 41 PHC are under agreement and are working - management contract
Implementation of National Health Programe, Primary curatives services within designated PHC area. 43 PHC's handed over throught the state. The Salary of staff upto 75% will be reiumbsered by the Govt.
90 mobile units are working in tribal and under served areas in different districts of the state
The NGO will provide staff vehicle and medicine and will serve the area as per mutually agreed program cost reambursement 100% done by the Govt.
40 private nursing Recognised private medical service homes and govt. have providers will be rreambursed at Rs. 3 entered into a contract Laks/100 deliveries service being free to the SC/ST and BPL families in the region including surgeries. Tenders are invited, Last date for submission of Bids is on 25th March 2009 Part B - Biotechnology incubation centre and common instrumentation facility Part C - Development of Bio cluster units. Effluent treatment plant Convention centre Total Site Area: Around 408 acres Site for Govt. Organisations:104 acres Site for Development on PPP: Around 304 acres Project Components: IT-ITES Parks/SEZs, Multi-specialty Hospitals,5-Star Hotels, Financial District, Office Complexes, Retail& Development of World Class BioTech park in the state and also Government will receive annual payments from the PPP partner.
Invitation of EOI from prospetive developers was issued, 8 PROSPECTIVE DEVELOPERS HAVE EXPRESSED INTEREST, EVALUATION OF EOI UNDER PROCESS. -States recommendation to GoI for approval -Provision of Power and Water to the project -Assistance for obtaining s DPR prepared, Awaiting approval from JNNURM
Project Benefits: - Lease Premium of more than Rs.1100 Cr to the State Exchequer - Development of 30 million sqft of built-up space would revert to the State Government at the end of 60 years lease period - Employment generation for around 6 lakh person
Process of Rebidding
The Mysore City has been granted the status of heritage city under Jawaharlal Nehru National Urban National Mission (JNNUNM). The Mysore City Corp. intends to develop a amusement park on the lines of NTR garden the The existing structure withinin the site cannot be demosihed as per DOT. The same can however be redesigned and re-furbished to be an integrated part of the proposed project. The land of 3.0 acre would be used. The land extent is 2.00 acres. The Land ownership is private recommended for acquisition. DoT approved to acquire the required land parcel.
The heirtage Park is being developed with an intention to : 1. To harness Mysore Reputation as a tourism city 2. To provide a entertainment facility for the tourists KSIIDC -Nodal Agency and project Development done through Joint venture of KSIIDC & ILFS Infrastructure Develoment Corporation
1. Preparation of bid documents is in progress. 2. EOI Published and good response received
Invitation for Bids Near Yagachi Dam and Behind the published on 26th Feb Temple : 2009 DoT has planned an International category hotel (3 star) on a portion of 10 acre Land parcel available. The balance availabe land around 7 acres would be made available to KSIIDC for
340
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
Invitation for Bids Land extent is 5.00 acres. It was published on 26th Feb suggested by DoT to consider 2009 developing a 3 star hotel and devleopment of the lake front within the land parcel as part of the project. 1. Under bidding The Pilikula Nisarga Dhama is an NGO with an objective to facilitating and enhancing the experiences of visitor by crreating rope ways, Lake, Aquarium, restaurant, Ayurvedic spa and resort etc. Approval obtained from The proposed development is 18 hole KSCZMA and link golf course in 135 acres land submitted for arroval parcel between Arabian sea and for NCZMA Gurupur river
The proposed development is Aquamarine park in 20 acres land parcel between Arabian sea and Gurupur river Bid process is The project will be having a main completed and the Convention hall of 6000 seating Private developer has capacity, 20 conference rooms with a been identified. seating capacity ranging 50 to Agrrement between 25,banquet hall,exhibition halls, five Dept and the selected star category hotel with 300 rooms, bidder yet to be signed food court, parking complexes, enterainment zo The bid process for KSTDC has proposed to introduce a selection of luxury tourist train to showcase unique management partner tourist attractions in Karnataka. completed and the agrrement b/w KSTDC and Management partner was entered into. Project concept note FACILITIES prepared. 1. Constuction of compound wall for Remarks- Funding, surrounding park area. Guidence and 2. Walkers pathway suggestions are 3.Joggers pathway required for finalising 4.Swimming pool the project. 5.Children amusement park and zoo 6. Musical fountain and water falls About 650 acres of Airport is being developed for ATR 72 land has been acquired type of aircraft. and additional 100 acres of land is being acquired. Rs. 950 lakhs has been paid as part compensation. Remaining compensation is yet to be released to KIADB. FD has sought clarification on the acquition of Govt. la Cost revised due to enhancement in the capacity of the airport. The project is operational. KIADB has identified about 1713 acres of land near SaganakalMoka road. AAI has also approved the loaction. Due to the recent development and agitation of the land loosers, it has felt to limit the land requirement to 1250 acres. Joint measurement survey 567 acres of land has been acquired for Gulbarga airport. Project developer M/s Maytas consortia were identified. Priliminary clearances and NoCs have been obtained. Construction work yet to start. Meanwhile, a decision has been taken by the cabinet Extent of Land and Location : 567 acres 10 guntas of land has been acquired near Sreenivasa Saradagi village in Gulbarga. Develop this airport on PPP basis and seek approvals/clearances from GOI and other statutory authorities. Expression of Interest(EO Airport designed to handle an annual passenger traffic of 11mm & cargo of 350000 tones annually.
Improved linkages between the state capital and other districts, easy access to tourism centers and promotion of balanced regional development across the state.
341
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
660 acres of land has been acquired for shimoga airport. Project developer M/s Maytas consortia were identified. Priliminary clearances and NoCs have been obtained. Construction work yet to start. Meanwhile, a decision has been taken by the cabinet About 960 acres of land is identified. 536.24 acres acquired and handed over to the developer. Remaining 423.15 acres is also under acquition by KIADB for which Rs. 3588 lakhs has been sought for the same is being clarified. M/s Jupiter Aviation & Logisti The RFQ process has been completed. Bidding process is under progress
Location: 660 acres of land has been identified in Shimoga and Badravathi Taluk . Rs 5.83 crores released for acquisition and development Develop this airport on PPP basis and seek approvals/clearances from GOI and other statutory authorities. Express
1. Location and Extent of Land : 514 acres of land in Bhuvanahalli village near Hassan abutting the BangaloreMangalore National Highway. 2. Public Works Department of Government of Karnataka to develop this airport on PPP basis and to seek approvals/cl
No land acquisition is envisaged. The selected developer has to carryout the rehabilitation of Baithkol and Aligadda village which have already been acquired by GOK. But not vacated. The approximate area is 54-12-00 acres and needs. The project proposal is The Government of Karnataka has submitted for the decided to develop the Malpe Port in approval of Public Udupi District of Karnataka Maritime Private Partnership State on Build Own Operate Shasre (PPP) Committee. and Transfer (BOOST) basis on the Project is cleared in lines of Karwar Port (2nd stage) 15th SHLCC through open Bid route on the Gujarat and Mahara The Government The Government of Karnataka has approval is sought for decided to develop the Honnavar Port issue of Request For in Uttara Kannada District of Proposals (RFP) for Karnataka Maritime State on Build appointment of Own Operate Shasre and Transfer consultants for the (BOOST) basis on the lines of Karwar preparation of the Port (2nd stage) through open Bid Detailed project report. route on the Gujara In the circumstances explained above the approval of the Government is sought for issue of Notifi The gauge conversion is over and the operation of goods train has begun since May 2006. After the completion of statutory inspection and certification by the Railway Safety Commissioner, this line will be opened for passenger services. Gauge conversion of HassanMangalore railway line is one of the first PPP railway project in India. A Special Purpose Vehicle: Hassan Mangalore Railway Development Company has been set up by GoK and GoI for this project.
The bidder has to offer the highest amount of revenue per annum with an esclation of 10% per year. It is expected that it will be to the tune 10 cr. Approx.
The bidder has to offer the highest amount of revenue per annum with an esclation of 10% per year. It is expected that it will be to the tune 10 cr. Approx.
The bidder has to offer the highest amout of revenue per annum with an escalation 10% per year.
1. Geo surveys undertaken 2. Traffic studies completed 3. DPR submitted to GOK 4. Bid process underway. 5. RFQ to be issued.
Tp provide fast access to the new BIAL airport a dedicated rail link facility (35KM) for airport users is being planned. It will be developed on International standard and would offer services at par with other airports in the world. Rs 148 Crore Contrib
1. Faster and cheaper mode of tranport 2. Ensure multiple transport linkages to Airport 3. Reduce traffic congestion on highway linkgin to airport
Invitation for Bids was Project Components: published on 25th Feb Modern Intracity Bus Station on project 2009 site-I around (1.27 acres): Bus Station with 3 Platforms to accomodate 12 bus bays, bus circulation and two wheeler parking
Proposed Built-up area: 1, 31,000 sq. ft. Project Benefits: - Modern Bus Station worth~ 1.75 Cr. - Commercial Building of
342
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
Invitation for Bids was Project Components: published on 25th Feb - New Bus Station on Project Site-I of 2009 around 3 acres with commercial complex. Bus Station with 27 bus bays, bus circulation & parking areas, autoInvitation for Bids was Site Area: Around 1.063 acres published on 25th Feb Project Components: 2009 - KSRTC Premises: consisting of KSRTC offices, KSRTC guest house and associated infrastructure and Invitation for Bids was Project Components: published on 25th Feb Hassan: 2009 - Retail Block Cleared by SLSWA Retail & office spaces, restaurants, and reconmended to Multiplex with 3 screens & associated SHLC for approval facilities - Hospitality Block: Invitation for Bids was Project Components (Phase I): published on 25th Feb - KSRTC Premises: reservation 2009 counters and office, guest house and associated infrastructure, including parking. - Suggested Product Mix: Ready for bidding Project Components: Awaiting approval of - Suggested commercial development project and Land use on Project Site of around 1.86 acres: change to commercial Retail shops, office space, banks, Conceptualization, restaurants, 60 rooms Business Hotel Market study, Demand and 2 screen air-conditioned movie Assessment, Topo theatre and associated facilities. Survey & Soil Testing, Conceptual architectural designs, 3D moves of proposed & comml. Development, Financial Model Invitation for Bids was Project Components: published on 25th Feb - Modern Bus Station (3.76 acres): 2009 consisting of 41 bus bays, Passenger RFP Documents drafts Amenities, NWKRTC station office, are prepared and 450 two wheeler parking and 40 car under scrutiny, parking lots . permission from the - Commercial Building (2 acres): with a chief election built-up area of 92000 sqft and a sug commissioner is expected to publish in the State tender bulletin. Probably date are to be postponned after Bid process to BMTC has appointed M/s Ernst & commence upon Young as its financial advisor per the approval from the GoK. KTPP for assisting BMTC. BMTC requested UDD that a suitable amendment may be issued allowing ancillary land use of Trafrfic & Transportation category upto 45% of total built up area instead of 45% of the 1. DPR for technical Hospet is key loading point of iron ore. feasibility has been The rapid growth in export of iron ore submitted to DC & AC, has resulted in volume of trucks traffic Hospet. through Hospet. In order to address 2. - Land acquisition to the problem of traffic congestion on commence. the roads and to faciliate smooth traffic 3. Bidding process to truch operation Hos be initiated subsequently 1. DPR and Project structuring completed. 2. Existing site found to be inadequate. 3. Additional land to be identified. 4. Bidding process to be initiated subsequently Torangullu is fast developing as major industrial area and is likely to witness exponential growth with Jindal Vijaynagar Steel plans to expand steels production level 1.6mpta to 10mpta, setting up of KPCL power plan and increasing export of iron ore from
Project Benefits: - New Bus Station for the town - Total Benefits to KSRTC: ~Rs. 7.2 Cr. - Employment generation - First of its kind development will Proposed Built-up area: ~ 1.3 lakh sq. ft. Project Benefits: - Total Benefits to KSRTC: ~Rs.13.3 Cr. Proposed Built-up area: (i) Hassan: 411,427 sq. ft. Project Benefits: - Employment generation - First of its kind development will boost economic activity in both the towns Project Benefits: - Total Benefits to KSRTC: Rs. 20.27 Cr. - Employment generation - First of its kind development will boost economic activity in the Project Benefits: - Commercial Building of 1,45,000 sqft after 30 years - Total Minimum Benefit to NEKRTC: ~Rs. 0.9 Cr. - Employment generation - First of its kind development in Bidar & expected to boost economic activity in the town
Project Benefits: - Modern Bus Station with 41 Bus bays, passenger amenities, NWKRTC station office, 450 two wheeler parking and 40 car parking, worth Rs.10.2 Cr. - Commercial Building of 92000 Sqft after 30 years - Half early lease rental for lease p
World Class Bus Terminal and maintenance facility for 150 buses, passenger amenity, parking facility for 250 cars, transit facility, park and ride facility, besides being nodes providing interchnage between various mode of transport, viz. 2 wheelers, car
1. reduction in congestion on roads network in the area. 2. Better facilities for truckers, such as wash room/ dormitory / secure space for parking etc. 3. generation of local employment through service repair shops / petrol pumps / shops / offices area 1. reduction in congestion on roads network in the area. 2. Better facilities for truckers, such as wash room/ dormitory / secure space for parking etc. 3. generation of local employment through service repair shops / petrol pumps / shops / offices area New Tourist entry point for Hampi-World Heritage site
343
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
Parking space for 1000 regular and trailer trucks catering to JSW, BTPCL and other industries. Facilities like service centers, dormitories, dhaba, Invitation for Bids was Project Components: published on 25th Feb - Modern Bus Station (2.66 acres): 2009 consisting of 38 bus bays, Passenger RFP Documents drafts Amenities, NWKRTC station office, are prepared and 445 two wheeler parking and 9 car under scrutiny, parking lots . permission from the - Commercial Building (1.37 acres): chief election with a built-up area of 179,958 sqft and commissioner is as expected to publish in the State tender bulletin. Probably date are to be postponned after election The proposal approved on 29-08-2006.
Project Benefits: - Modern Bus Station with 38 Bus bays, passenger amenities, NWKRTC station office, 445 two wheeler parking and 9 car parking, worth Rs. 7.6 Cr. - Commercial Building of 179,958 Sqft after 30 years - Half early lease rental for leas
Agreement signed on 25th Feb 2009 Completion of bid process , management partner has been idenfied and agrrement entered between transport Dept. and management partner Draft DPR ongoing
Project Involves supply of computer and peripherals and maintenance of these facilities for a period of agreement . It also involves converting the existing database into electronic form as well as training the personnel in using these facilties and prov
Ideck 4 laning from Km 202 to Km 286.925 & 6 laning from Km 286.925 to Km 299.00 minimizing accidents, free movement of NH trafffic, decreased vehcile operating costs. 1
4 lane length 77 Km Channaraypatna Bybass - 9 KM 4 lane main carriageway with 5.5 m bituminous cart track on both sides 5 nos. of VUP & one ROB Service Road 46.2 KM Vehicular under passes 10 nos. Pedestrian under passes 4 nos. ROB cum interchnage - 2 no. The proposal approved on 30-04-2008
RFQ invited
The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document issued & date of submission 27/02/09 The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval.
The project road "ChikkanyakanahalliTitpur Hassan Road' lies in the southern part of Karnataka and provides vital connectivity between SH19 (Srirangpattana - Biddar Road) at Chikkanyakanhalli with NH-48 (Neelmangala - Mangalore Road) at Hassan. The impr
The project invloves widening and improvement of existing DharwardRamnagar section of SH-34 in the karnataka State to two lane road with paved shoulders.. The project road is importent link between Hubli-Dharwad and Goa.Total projects length is 60.4 Kms Completed on Jul-04 The project invovled wideing and and toll is being strenghtening of exsiting 2 lanes to 4 collected since March, lanes with divided carriageway & 2005 median plantation from Km 515 to 592 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus The work is completed in June, 06. Entire amount will be paid on Annuity basis. PPPA committee approval is awaited. The project invovled wideing and strenghtening of exsiting 2 lanes to 6 lanes divided carriageway from Belgaum-KNT / GOA border with with facilities like drinking water & toilets, Bus bays, truck lay bus and services
The improvent envisaged include widening to 2 lane road, reconstruction of road and CD structure, junciton inprovement, drainage and enhancement of rad safety. The proposal also includes construction also includes of bypass, ROB across railway crossing,, The Road will also cater for heavy truck traffic carrying manganese and iron ore to Goa port from Hospet regions.
Due to this project, the travel comfort has increased and the travel time has come down. Fuel consumption and vehicle maintenance is reduced. Avalibility of good transportation
344
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The project invovled wideing and strenghtening of exsiting 4 lanes to 6 lanes from Km 515 to Km 433 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus and services roads on either side for local, traffic. Phase I - Rs.3000 Crore (Including LA) Phase II - Rs. 2000 Crore ( Including LA)
DPR is being prepared & Preparation of 1. Total length 116 Kms, bidding documents are 2. Proposed to be taken up in two in Progress. . phases Phase 1 Tumkur Road to Housur RFQ from the eligible Road via Ballary Road. Old Madras contractors is invited in Road, Sarjapur Road two packages each package Rs.1400.00 Crores. Last date for submission of applica 1.Final DPR submitted to PWD, Waiting for approval, 2. Bidding process to be initiated. Bids are to be invited The projects envisges road linkages which necessary to provide key linkages in the area and to insulate the residential cluster from heavy truck movement Diversion road from State Highway to TRF Road (atTorangallu Station). Bypass road to Taranagar Link road to Toranagallu Railway Station to JVSL plant. Sandur-Hospet Road(added 1 PDF funding 75% from GOI of Rs. 22.5 lacks
Bids invited & bidding date of submission 27/02/09 The project handed over to NH by PWD, GOK. DPR prepared by IDecK will be used to prepared new DPR for NH 1. DPR for technical feasibility has been submitted to GoK 2. Writ petition filed has been dismissed. 3.At the instance of IDD the DPR and draft bid documents submitted to KRDCL by iDecK 4. Bidding process to be initiated by KRDCL. The Sandur-Hospet roads (28Km) is major distric road (MDR) which provides a vital link for movement of iron ore traffic (50% of total traffics) from sandur mines towards Hospet. PWD has come up with development of this bypass road which would connect direcelty from bilekeri minor port to NH-17. To reduce the commercial traffic movement through the village
IDECK has submitted DPR to GOK as part of SH-40 development on BOT basis
This road will reduce the distance between Sandur And Bellary/Hospet by 4-5Kms and trip by 15-20 minutes. And will remove the traffic conjestion at Torangallu.
Present traffic density 16500 PCU. Present lane width 7.00mt twolane in very bad condition subgrade condition. Major villages to bypassed -Kariganur, Papinayaan halli, Gadiiganur, Kudadhini. 1. CE, NHAI to provide project details with relevant maps. 2. TA to be appointed 1. CE, NHAI to provide project details with relevant maps. 2. TA to be appointed GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI. GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI.
345
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI. GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI. GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI. GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI. GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI.
GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI. 1. PD, KSHIP to GoK has been working for Road provided TOR to the Network imporvment in Karnataka. As PPP Cell, IDD for decided by Hon'able CM the above appointment of TA and National Highway has been identifed further action for improvement BOT project. 2. TA to be appointed RFQ under evalution Widenig of existing 2- lane carriageway to 4-lanes.
Project starts from AP - KNT border to Avathi village conncting Chickballapur town thru a bypass. 2 toll plaza are proposed in the project limit and this project will cater to the traffic plying from Bangalore to Hyderbad.
Construction of 9 Km long 4 lane Elevated Highway. Construction of interchange at Electronic city junction. Widening of existing 4- lane carriageway to 6 lanes. Construction of missing length (about 10 Km) of 2 lane service road Construction of 4 pedestri Elevated Highway : 4.25 Kms of 4 Lanes Ground Level 4 lane from Km 10/150 to 14/500 6 lane from Km 14/500 - 29/500 access controlled Service Road length 39.0 Km Vehicular Under Passes 7Nos. Pedestrian Under Passes 14 Nos. 4 lane length 80 Km Kunigal Bybass - 15 KM 4 lane main carriageway with 5.5 m bituminous cart track on both sides 5 nos. of VUP & one ROB Service Road 44.17 KM Vehicular Over Passed 9 nos. Pedestrian under passes 6 nos. ROB cum interchnage - 1 no. Major
346
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
4.80% of physical progress achieved. The project is being developed under NHDP Phase IIIA, NH 4.
6 lane length 16 km (KR puram to Hostake) 4 lane length 64 Km Service road length 69.20 Km Vehicular Over passes 12 nos. Pedestrian under passes 3 nos. ROB cum interchnage 1 no. Major bridges 2 nos. Minor Bridges 9 nos. Culverts 116 nos.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
347
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
348
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
349
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
350
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 Bid Submission date is 17.04.2009 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
351
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka. 1 The State Highways & Major District Roads for a length of 9772 Kms is planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.
Bidding process is underway in Shimoga town, Identification of landfill sites and technical studies at the other towns are underway. Completed
iDeCK has been mandated to provide assistance in setting up MSW treatment and disposal landfill facilities in the following towns in Karnataka through private participation on a BOT basis. Hubli-Dharwad, Gulbarga, Belgaum, Shimoga, Raichur, Hassan, Tumkur As per the Municipal Solid Waste (Management & Handling) Rules 1999. It is the responsibility of the Municipal authority to dispose municipal solid waste in a scientific manner. iDeCK has assisted in carrying out the project development activities includi BMP has developed a commercial plaza (300,000 sq.ft.) at Madivala in Bangalore. Subsequently, in order to leverage the commercial potential of the complex, BMP has requested iDeCK to provide assistance in identification of a suitable private developer (th
The Concession Agreement between BMP and the Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed. Cleared by SLSWA and recommended for approval by SHLC
Development of land parcel to The land is being developed Hypermarket,KLAC Ofiice space,3 Star with an intention to : Business Hotel. 1.Office space for KLAC 2. To unlock the value of real estate to provide KLAC with additional revenues Rapid Urbanization has resulted in an increase in the quantum of MSW generation and increased problems of handling MSW over part few years. In view of the MoEF has framed MSW rules which reuqires all Municiple authorities to manage MSW sciintifically Most ULB is Karnataka receive water only for few hours on alternate days due to limitation in distribution networks, erratic power supply amd poor management practices among other operating constraints. ULB also suffer from sub-optimal service The three towns selected for investments in the first phase are Belgaum, Gulbarga & Hubli-Dharwad. Subsequent phases of the Project will involve scaling up to the rest of the areas in the three cities and also to more cities. Rs.28cr for Operator Remune The Mysore city generate 220 MT of MSW daily covering 65 municiple wards. The city does not have a disposal site conforming to the Municiple solid Waste rules. The above project would enable provision of sustainable hygine MSW A Performance based deffered payment structure (PBDPS) is being used for implementation of the project. The contracter will design and methodology to meet performance targets and payment will based on that. This is a project for reforms & service improvements through Private Sector Participation (PSP) in the water sector in Karnataka. The project mainly seeks to implement the strategy enunciated in the Urban Drinking Water & Sanitation Policy of GoK. It will
Under approval (Detailed DPR of technical study has been submitted to MCC). The approval of funding under JNNURM is awaited from GOI. 1. DPR of technical feasibility and has been prepared and approved. 2. Project has been cancelled and moved to ADB. Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli Construction
1 PDF funding 75% from GOI of Rs. 50.25 Lacs + VGF of 3000 lacs is required
Project involves setting up a 8 MW solid waste based power plant covering an area of 85 acres land.
352
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
Land Acqusition notification to be issued. Agreement to be executed with DLF tld. Operationalised on 2nd October 2008
Township is being developed with the theme of work, live and play. 9178.29 acres of Land has been proposed to to be acquired. As per Municipal Solid Wastes ( Management & Handling) rules 2000, all the Urban Local Bodies are responsible for treatment and safe disposal (sanitary landfill) of municipal
Population and traffic pressure will be reduced in Bangalore. The GoK is geeting financial benefit of Rs 3450 Cr. Towards pre. Dev. Charges paid to GoK Compliance of the rules, value returns in the form of compost, safe disposal of waste, protection of environment etc
Construction is over.
The bidder has been selected. The process of awarding is underway. Bidding completed. The project has been awarded.
BMP proposes to provide public toilets in Bangalore on BOT basis. BMP has invited for expression of interest (EOI) and has received responses to the same. iDeCK was requested to assist in evaluation of EoIs submitted and The bid process has MCC requested iDeCK to assist in the been completed. The development of a commercialcomplex Concession Agreement at Makkaji Chowk, Mysore through has been signed and private sector participation.The project project has been was envisaged to be developed on a awarded. BOT basis and rehabilitate the existing shops on the same site. Rehabilitation Building 50% under progress Main commercial complex - 50% under progress The construction of both the buildings are under progress Undre construction (final stage) The extent of Makkaji Chowk site is 4.19 acres. This project comprises of two buildings i.e., Main Commercial complex and rehabilitation building to existing tenants of old building. MCC will get income in the form of rent which will be fixed after words
Detailed feasibilty reports completed . Awaiting approval of land use conversion after which Bidding will be done.
As per Municipal Solid Wastes ( Management & Handling) rules 2000, all the Urban Local Bodies are responsible for treatment and safe disposal (sanitary landfill) of to municipal Development of land parcel commercial space, Star Business Hotel.
Compliance of the rules, value returns in the form of compost, safe disposal of waste, protection of environment etc The land is being developed with an intention to : 1.Office space for Animal Husbandry 2. To unlock the value of real estate to provide Animal husbandry with additional revenues
353
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
354
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
355
Government of Karnataka
Additional Investment
Issues
Brief Description
Processing column
356
Government of Karnataka
Stage
Agri Marketing
Initial
4 Bidding
Agri Marketing
Initial
Initial
6 Implementation
6 Implementation
IT&BT
Bidding
4 Bidding
KSIIDC / ILFS
Bidding
1 Project Identification
Bidding
5 Financial Close
Bidding
357
Government of Karnataka
Stage
Bidding
Bidding
Initial
1 Project Identification
Initial
2 Project Development
IDD website
Implementation
1 Project Identification
Ideck / IDD
Evaluation
4 Bidding
Completed
7 Operation
Initial
2 Project Development
Ideck / IDD
Implementation
2 Project Development
358
Government of Karnataka
Stage
Ideck / IDD
Implementation
2 Project Development
IDD
Award
2 Project Development
Ports Deptt
Bidding
4 Bidding
Ports Deptt
Initial
1 Project Identification
Ports Deptt
Initial
1 Project Identification
7 Operation
Initial
4 Bidding
NEKRTC
Initial
4 Bidding
359
Government of Karnataka
Stage
KSRTC
Initial
4 Bidding
KSRTC
Initial
4 Bidding
KSRTC
Initial
4 Bidding
KSRTC
Initial
4 Bidding
KSRTC
Initial
4 Bidding
NWKRTC
Initial
4 Bidding
BMTC
Initial
JSW proposal
Concept
360
Government of Karnataka
Stage
JSW proposal
Concept
NWKRTC
Initial
PPP website
No Info
1 Project Identification
6 Implementation
NHAI
Bidding
2 Project Development
NHAI
Bidding
2 Project Development
NHAI
Bidding
4 Bidding
KRDCL
Bidding
4 Bidding
KRDCL
Bidding
4 Bidding
NHAI
Completed
7 Operation
Completed
7 Operation
Initial
1 Project Identification
361
Government of Karnataka
Stage
NHAI
Initial
2 Project Development
BDA
Initial
ppp website
Initial
Initial
2 Project Development
Initial
2 Project Development
Initial
1 Project Identification
JSW proposal
Concept
2 Project Development
JSW proposal
Concept
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
362
Government of Karnataka
Stage
Initial
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
Initial
1 Project Identification
4 Bidding
NHAI
Implementation
6 Implementation
NHAI
Implementation
6 Implementation
NHAI
Implementation
6 Implementation
NHAI
Implementation
6 Implementation
363
Government of Karnataka
Stage
NHAI
Implementation
6 Implementation
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
364
Government of Karnataka
Stage
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
365
Government of Karnataka
Stage
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
366
Government of Karnataka
Stage
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
367
Government of Karnataka
Stage
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
4 Bidding
368
Government of Karnataka
Stage
4 Bidding
4 Bidding
Implementation
2 Project Development
4 Bidding
Completed
7 Operation
Completed
7 Operation
Initial
2 Project Development
Initial
2 Project Development
Initial
2 Project Development
Implementation
6 Implementation
PPP website
Implementation
6 Implementation
369
Government of Karnataka
Stage
BMRDA
Implementation
2 Project Development
Implementation
7 Operation
Implementation
7 Operation
Implementation
6 Implementation
Implementation
6 Implementation
Implementation
6 Implementation
Implementation
6 Implementation
2 Project Development
6 Implementation
Initial
2 Project Development
370
Government of Karnataka
Stage
371
Government of Karnataka
Stage
372
Government of Karnataka
Stage
373
Government of Karnataka
Bidding
Pipeline
Pipeline
Implemen tation
Implemen tation
Implemen tation
Bidding
Pipeline Pipeline
Pipeline
Pipeline
Pipeline
374
Government of Karnataka
Bidding
Pipeline
Pipeline
Pipeline
Bidding
Pipeline
Bidding
Implemen tation
Pipeline
Pipeline
375
Government of Karnataka
Pipeline
Bidding
Pipeline
Pipeline
Implemen tation
Bidding
Bidding
376
Government of Karnataka
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Pipeline
Pipeline
Pipeline
Pipeline
377
Government of Karnataka
Pipeline
Bidding
Pipeline
Implemen tation
Pipeline
Pipeline
Bidding
Bidding
Bidding
Implemen tation
Implemen tation
Pipeline
378
Government of Karnataka
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
379
Government of Karnataka
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Pipeline
Bidding
Implemen tation
Implemen tation
Implemen tation
Implemen tation
380
Government of Karnataka
Implemen tation
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
381
Government of Karnataka
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
382
Government of Karnataka
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
383
Government of Karnataka
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
384
Government of Karnataka
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
Bidding
385
Government of Karnataka
Bidding
Bidding
Pipeline
Bidding
Implemen tation
Implemen tation
Pipeline
Pipeline Pipeline
Implemen tation
Implemen tation
386
Government of Karnataka
Pipeline
Implemen tation
Implemen tation
Implemen tation
Implemen tation
Implemen tation
Implemen tation
Pipeline
Implemen tation
Pipeline
387
Government of Karnataka
388
Government of Karnataka
389
Government of Karnataka
390
Government of Karnataka
391
Government of Karnataka
392
Government of Karnataka
393
Government of Karnataka
394
Government of Karnataka
395
Government of Karnataka
396
Government of Karnataka
397
Government of Karnataka
398
Government of Karnataka
399
Government of Karnataka
400
Government of Karnataka
401
Government of Karnataka
402
Government of Karnataka
403
Government of Karnataka
404
Government of Karnataka
405
Government of Karnataka
406
Government of Karnataka
407
Government of Karnataka
408
Government of Karnataka
409
Government of Karnataka
410
Government of Karnataka
411
Government of Karnataka
412
Government of Karnataka
413
Government of Karnataka
414
Government of Karnataka
415
Government of Karnataka
416
Government of Karnataka
417
Government of Karnataka
418
Government of Karnataka
419
Government of Karnataka
420
Government of Karnataka
421
Government of Karnataka
422
Government of Karnataka
423
Government of Karnataka
424
Government of Karnataka
425
Government of Karnataka
426
Government of Karnataka
427
Government of Karnataka
428
Government of Karnataka
429
Government of Karnataka
430
Government of Karnataka
431
Government of Karnataka
432
Government of Karnataka
433
Government of Karnataka
434
Government of Karnataka
435
Government of Karnataka
436
Government of Karnataka
437
Government of Karnataka
438
Government of Karnataka
439
Government of Karnataka
440
Government of Karnataka
441
Government of Karnataka
442
Government of Karnataka
443
Government of Karnataka
444
Government of Karnataka
445
Government of Karnataka
446
Government of Karnataka
447
Government of Karnataka
448
Government of Karnataka
449
Government of Karnataka
450
Government of Karnataka
451
Government of Karnataka
452
Government of Karnataka
453
Government of Karnataka
454
Government of Karnataka
455
Government of Karnataka
456
Government of Karnataka
457
Government of Karnataka
458
Government of Karnataka
459
Government of Karnataka
460
Government of Karnataka
461
Government of Karnataka
462
Government of Karnataka
463
Government of Karnataka
464
Government of Karnataka
465
Government of Karnataka
466
Government of Karnataka
467
Government of Karnataka
468
Government of Karnataka
469
Government of Karnataka
470
Government of Karnataka
471
Government of Karnataka
472
Government of Karnataka
473
Government of Karnataka
474
Government of Karnataka
475
Government of Karnataka
476
Government of Karnataka
477
Government of Karnataka
478
Government of Karnataka
479
Government of Karnataka
480
Government of Karnataka
481
Government of Karnataka
482
Government of Karnataka
483
Government of Karnataka
484
Government of Karnataka
485
Government of Karnataka
486
Government of Karnataka
487
Government of Karnataka
488
Government of Karnataka
489
Government of Karnataka
490
Government of Karnataka
491
Government of Karnataka
492
Government of Karnataka
493
Government of Karnataka
494
Government of Karnataka
495
Government of Karnataka
496
Government of Karnataka
497
Government of Karnataka
498
Government of Karnataka
499
Government of Karnataka
500
Government of Karnataka
501
Government of Karnataka
502
Government of Karnataka
503
Government of Karnataka
504
Government of Karnataka
505
Government of Karnataka
506
Government of Karnataka
507
Government of Karnataka
508
Government of Karnataka
509
Government of Karnataka
510
Government of Karnataka
511
Government of Karnataka
512
Government of Karnataka
513
Government of Karnataka
514
Government of Karnataka
515
Government of Karnataka
516
Government of Karnataka
517
Government of Karnataka
518
Government of Karnataka
519
Government of Karnataka
520
Government of Karnataka
521
Government of Karnataka
522
Government of Karnataka
523
Government of Karnataka
524
Government of Karnataka
525
Government of Karnataka
526
Government of Karnataka
527
Government of Karnataka
528
Government of Karnataka
529
Government of Karnataka
530
Government of Karnataka
531
Government of Karnataka
532
Government of Karnataka
533
Government of Karnataka
534
Government of Karnataka
535
Government of Karnataka
536
Government of Karnataka
537
Government of Karnataka
538
Government of Karnataka
539
Government of Karnataka
540
Government of Karnataka
541
Government of Karnataka
542
Government of Karnataka
543
Government of Karnataka
544
Government of Karnataka
545
Government of Karnataka
546
Government of Karnataka
547
Government of Karnataka
548
Government of Karnataka
549
Government of Karnataka
550
Government of Karnataka
551
Government of Karnataka
552
Government of Karnataka
553
Government of Karnataka
554
Government of Karnataka
555
Government of Karnataka
556
Government of Karnataka
557
Government of Karnataka
558
Government of Karnataka
559
Government of Karnataka
560
Government of Karnataka
Total Value
148
100927
Nos 1 0 1 1 0 3 10 0 40 5 0 2 69 7 8 0 1 0 148
Value (Rs.Cr.) 0 0 50 4 0 3238 1292 0 16736 1457 0 2505 34448 40312 766 0 120 0 100927
Total
100 80 60
40 20 0
18
11 0 2 0
Nos
Hotels/ Resorts
MSW Airport Rail 2
4 9
6
Commercial Development
Entertainment Power 0 3
5 4
3
3 2
Nos
2
1
1 1
0 1
Urban Infrastructure
Warehousing infrastructure
1 1
22
Nos 71
Agriculture Marketing Animal Husbandry Department BBMP BDA BMTC BUDA Dept of Shipping Dept of Tourism Direcotor of Ports & Inland Water Transport DMA DMA / Belguam CMC DMA/ Shimoga CMC DMA, CMC DMA/Mysore City Corporation (MCC) Health and Familiy Welfare / DH and FWO HUDA IDD IT , BT ,S&T Karnataka Land Army Corporation Ltd. KRDCL KSHIP KSHIP & IDD KSIIDC KSRTC KSRTC - NEKRTC KSRTC - NWKRTC KSTDC KUIDFC Mysore City Corporation (MCC) NHAI No Info Pilikula Nisarga Dhama, NGO PWD Transport Department UDD
3 1
7 1 1 1 1
7 3 1 1 1 1
4 3 1
10 1 1
56 4 1 1 4
Nos
2 2 1 1 1
14 6 1 3
1 1
50000
40000
48338.74 40847.11
30000
20000
10000
0
9522
1345.49
868.36
5.76