Sheet Nr-01
Calculation of dead load of staircase slab: T Left side length Right side length Middle length Assumed thickness 0 Effective thickness (d) Size of tread Size of rise Calculation of dead load: Dead load Live load Factored load (Dead & live) Landing load Factored load (landing) = = = = = 11 2 19.5 5.5 11.25 Kn/m Kn/m2 Kn/m2 Kn/m2 Kn/m2
2
= = = = = = =
m m m mm mm m m
G W R D B G
11.25
kn/m
19.5
kn/m
11.25 kn/m
B = 0.2968 where: G = Tread R = Rise 2 Dead load per m of Horizontal span = (WB +RT*0.5)*(25/G)
a 1.4
b 2.85 4.25
c 0
Calculation of reaction: 39.535 23.785 SFD e Calculation of shear force: Shear force @ L.H.S of 'a' Shear force @ R.H.S of 'a' Shear force @ L.H.S of 'b' Shear force @ L.H.S of 'c' Shear force @ L.H.S of 'd' Shear force @ R.H.S of 'd' Max 0 Point of shear point Calculation of bending moment: Bending moment at 'a' Bending moment at 'b' Bending moment at 'e' Bending moment at 'c' Bending moment at 'd' = = = = = = = = 0 39.5351 23.7851 -31.79 -31.79 7.74529 39.5351 kn kn kn kn kn kn kn RA RB 31.79 KN 39.535 KN
up up down down
1.21975 m
= = = = =
Calculation of depth: Max Required effective depth Calculation of main reinforcement: Mu/Bd2 Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 16 mm dia bar @ 150 mm C/C Calculation of distribution reinforcement: Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 8 mm dia bar @ 200 mm C/C Check for shear: Shear force Actual shear force Allowable shear stress check Check for deflection:
fs (steel stress of service) in N/mm2 modification factor Basic span/Depth Minimum depth to be provided to avoid deflection = = = = 170.445 1.5191541 23
96.4834 mm
119.48
= = = = = =
1340.4
= = = = =
0.12 204
% mm2
= = =
39.5351 kn 0.27 0.730 safe N/mm2 N/mm2 0.5 1.28 Table 3.8 BS 8110-1-1997 1.28
121.64 mm
SAFE
Project
Sheet Nr-01
Calculation of dead load of staircase slab: T Left side length Right side length Middle length Assumed thickness 0 Effective thickness (d) Size of tread Size of rise Calculation of dead load: Dead load Live load Factored load (Dead & live) Landing load Factored load (landing) = = = = = 9.65 2 11.65 5.5 7.5 Kn/m Kn/m2 Kn/m2 Kn/m2 Kn/m2
2
= = = = = = =
m m m mm mm m m
G W R D B G
7.5
kn/m
11.65
kn/m
7.5 kn/m
B = 0.2968 where: G = Tread R = Rise 2 Dead load per m of Horizontal span = (WB +RT*0.5)*(25/G)
a 1.2
b 3.1 4.3
c 0
Calculation of reaction: 24.353 15.353 SFD e Calculation of shear force: Shear force @ L.H.S of 'a' Shear force @ R.H.S of 'a' Shear force @ L.H.S of 'b' Shear force @ L.H.S of 'c' Shear force @ L.H.S of 'd' Shear force @ R.H.S of 'd' Max 0 Point of shear point Calculation of bending moment: Bending moment at 'a' Bending moment at 'b' Bending moment at 'e' Bending moment at 'c' Bending moment at 'd' = = = = = = = = 0 24.3526 15.3526 -20.762 -20.762 3.59023 24.3526 kn kn kn kn kn kn kn RA RB 20.762 KN 24.353 KN
up up down down
1.31782 m
= = = = =
Calculation of depth: Max Required effective depth Calculation of main reinforcement: Mu/Bd2 Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 16 mm dia bar @ 150 mm C/C Calculation of distribution reinforcement: Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 8 mm dia bar @ 200 mm C/C Check for shear: Shear force Actual shear force Allowable shear stress check Check for deflection:
fs (steel stress of service) in N/mm2 modification factor Basic span/Depth Minimum depth to be provided to avoid deflection = = = = 170.445 1.8136949 23
77.5525 mm
100.55
= = = = = =
1340.4
= = = = =
0.12 204
% mm2
= = =
24.3526 kn 0.17 0.730 safe N/mm2 N/mm2 0.5 1.28 Table 3.8 BS 8110-1-1997 1.28
103.09 mm
SAFE
Project
Sheet Nr-01
Calculation of dead load of staircase slab: T Left side length Right side length Middle length Assumed thickness 0 Effective thickness (d) Size of tread Size of rise Calculation of dead load: Dead load Live load Factored load (Dead & live) Landing load Factored load (landing) = = = = = 9.525 0 9.525 5.375 5.375 Kn/m Kn/m2 Kn/m2 Kn/m2 Kn/m2
2
= = = = = = =
m m m mm mm m m
G W R D B G
5.375
kn/m
9.525
kn/m
5.375 kn/m
B = 0.2968 where: G = Tread R = Rise 2 Dead load per m of Horizontal span = (WB +RT*0.5)*(25/G)
a 1.1
b 3 5.2
c 1.1
Calculation of reaction: 20.2 14.288 SFD e Calculation of shear force: Shear force @ L.H.S of 'a' Shear force @ R.H.S of 'a' Shear force @ L.H.S of 'b' Shear force @ L.H.S of 'c' Shear force @ L.H.S of 'd' Shear force @ R.H.S of 'd' Max 18.968 Point of shear point Calculation of bending moment: Bending moment at 'a' Bending moment at 'b' Bending moment at 'e' Bending moment at 'c' Bending moment at 'd' = = = = = = = = 0 20.2 14.2875 -14.288 -20.2 0 20.2 1.5 kn kn kn kn kn kn kn m RA RB 20.2 20.2 KN KN
up up down down
= = = = =
Calculation of depth: Max Required effective depth Calculation of main reinforcement: Mu/Bd2 Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 16 mm dia bar @ 150 mm C/C Calculation of distribution reinforcement: Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 8 mm dia bar @ 200 mm C/C Check for shear: Shear force Actual shear force Allowable shear stress check Check for deflection:
fs (steel stress of service) in N/mm2 modification factor Basic span/Depth Minimum depth to be provided to avoid deflection = = = = 164.72537 1.6661397 23
84.6758 mm
107.68
= = = = = =
1340.4
= = = = =
0.12 198
% mm2
= = =
135.7 mm
SAFE
Project
Sheet Nr-01
Calculation of dead load of staircase slab: T Left side length Right side length Middle length Assumed thickness 0 Effective thickness (d) Size of tread Size of rise Calculation of dead load: Dead load Live load Factored load (Dead & live) Landing load Factored load (landing) = = = = = 0 2 2 0 2 Kn/m Kn/m2 Kn/m2 Kn/m2 Kn/m2
2
= = = = = = =
m m m mm mm m m
G W R D B G
kn/m
kn/m
2 kn/m
B = 0.2968 where: G = Tread R = Rise 2 Dead load per m of Horizontal span = (WB +RT*0.5)*(25/G)
a 1
b 3 5
c 1
Calculation of reaction: 5 3 SFD e Calculation of shear force: Shear force @ L.H.S of 'a' Shear force @ R.H.S of 'a' Shear force @ L.H.S of 'b' Shear force @ L.H.S of 'c' Shear force @ L.H.S of 'd' Shear force @ R.H.S of 'd' Max 4 Point of shear point Calculation of bending moment: Bending moment at 'a' Bending moment at 'b' Bending moment at 'e' Bending moment at 'c' Bending moment at 'd' = = = = = = = = 0 5 3 -3 -5 0 5 1.5 kn kn kn kn kn kn kn m RA RB 5 5 KN KN
up up down down
= = = = =
0 4 6.25 4 0.00
Calculation of depth: Max Required effective depth Calculation of main reinforcement: Mu/Bd2 Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 16 mm dia bar @ 150 mm C/C Calculation of distribution reinforcement: Percentage of steel Area of steel (Ast) Area of bar (ast) Spacing of bar Provide spacing of bar Provide 8 mm dia bar @ 200 mm C/C Check for shear: Shear force Actual shear force Allowable shear stress check Check for deflection:
fs (steel stress of service) in N/mm2 modification factor Basic span/Depth Minimum depth to be provided to avoid deflection = = = = 164.72537 2.716032 23
38.8544 mm
61.854
= = = = = =
1340.4
= = = = =
0.12 198
% mm2
= = =
80.05 mm
SAFE