ENGLISH VERSION 1.

INSTALATION CHECK LIST AND SYSTEM START UP REQUEST PROJECT: CUSTOMER: INSTALLER: CITY/COUNTRY: ADDRESS: CONTACT TEL DATE:
DD / MM / YY

MRV SYSTEM CONFIGURATION


MASTER MODEL: SLAVE 1 MODEL: SLAVE 2 MODEL: SERIAL: SERIAL: SERIAL:

1. PREINSTALATION 1.1. REFRIGERATION PIPING * Refrigerant piping correctly insulated. * Refrigerant piping have enough fixed supports. * All welds were made with permanent nitrogen flow, to create an inert atmosphere. * All branch pipe are installed Horizontal way. * There are at least the distance of 1 m between branch and branch, and 0.5 m far from the indoor units. 1.2. DRAIN * Drain piping is corretly insulated. * Exhaust Outlet for drain pipe. * A drop of at least 1% is guaranteed (1 cm per linear meter). * Drain's piping diameter is according to requeriments. * Self Drain piping is separated with drain pump piping.

YES

1.3. COMMUNICATION WIRE * The communication wire is properly installed between Outdoor and Indoor units - P/Q (Assy chain). * The wire for centralized control is properly installed between A/C and interface (Assy chain). * Sequence of colors in the cord is guaranteed P-P, Q-Q. * The wiring is 2 x 20 with shield cord. The shield layer is fixed to ground on one point. * There is independet pipeline for communication wire. * There is a 10cm distance between communication wire and electricity wire at least. * Before starting, DO not connect the terminal P, Q on the outdoor unit, it may cause unexpected start. 1.4. ELECTRICITY WIRE * There is independent pipeline for electricity wire to each indoor unit. * There is general power supply for all indoor unit. * There is same phase power supply for all indoor units in one group under wired controller. * Security power off system: -Is there a breaker for each outdoor and indoor unit ? * Electricity wire is installed to indoor and outdoor units correctly.

ENGLISH VERSION 1.2

INSTALATION CHECK LIST AND SYSTEM START UP REQUEST


1.5. INDOOR UNITS * Please input total quantity of indoor units in this system * During instalation indoor units have antidust protection * All the units are properly leveled, and fixing system allows adjustments when is requiered * The flare nuts are correctly adjusted and tightened to each indoor unit. * Indoor Units are in the perfect physical conditions, free of dents or dings. * There is at least 50 cm of free space around indoor unit for service and maintenance. * 208-230V, 1PH + Ground line is suministrated

Indoor Units

1.6. OUTDOOR UNITS * Is Installed an anti-vibration system for the outdoor units. * The ground where the outdoor unit are must be properly leveled. * 1 meter of distane is guaranted for the Outdoor Units of walls and others. * Outdoor Units are in the perfect physical conditions, free of dents or dings. * The outdoor units in same system have 20cm distance to each other. * Gather pipe are at the same level. * Each outdoor unit have a security breaker. * A drain pan is required to the Outdoor unit (HEAT MODE). * The communication wire is properly done betwen the outdoor units A, B, C * The communication wire is corretly done for the centralized monitor between master outdoor unit and interface (Assy chain) * The balance oil pipeline is at the same level Without outlets and Piping trap. * Outdoor units are supported on anti-vibration system.

2. Pre Start Up * 100% Of the piping completed the preasure test at 80 psi (5,5 Kg/cm2) during 3 Minutes * 100% Of the piping completed the preasure test at 250 psi (17,5 Kg/cm2) during 2 Hours * 100% Of the piping completed the preasure test at 590 psi (40,5 Kg/cm2) during 24 Hours

* Vacuum test, reaching gauge preassure of: (-755mmHg)

mmHg

* Refrigerant recharge calculation


Liquid pipe size 6.35 (1/4") 9.52 (3/8") 12.7 (1/2") 15.88 (3/4") 19.05 (5/8") 22.22 (7/8") Multiple factor 0,022 0,054 0,11 0,17 0,25 0,35 Total(KG) Length Subtotal

*Please input measured voltage values before start up: L1 vs. L2 L2 vs. L3 L3 vs. L1 V V V L1 vs. N L2 vs. N L3 vs. N V V V L1 vs. Ground L2 vs. Ground L3 vs. Ground V V V

* The System have been with Electric power more than 6 hours before de start up. * Indoor units are addresed properly. * Outdoor units are adressed acording the position Master, Slave 1, Slave 2 y Slave 3 * Once the system is connected to Electric power, the master outdoor unit display show the indoor units quantity connected. * All the Indoor units work correctly in Fan Mode.

ENGLISH VERSION 1.2

INSTALATION CHECK LIST AND SYSTEM START UP REQUEST

ENGLISH VERSION 1.2

INSTALATION CHECK LIST AND SYSTEM START UP REQUEST


3. START UP * Do measurements with all units switched ON at least 30 minutes. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ITEMS Pressure Pd (bar) Pressure Ps (bar) Temp.Tdi (C) Temp.Tsi (C) Temp.TE (C) Temp.TA (C) Temp.Toil (C) Temp.Toci1/2 (C) Temp. Td1 (C) Temp. Tsuc(C) Inverter Compress current Fixed Compress current Compressor frequency Outdoor unit QTY Indoor unit QTY Running indoor unit QTY The end SW9/10/11 0/0/1 0/1/1 0/2/1 0/3/1 0/4/1 0/5/1 0/7/1 0/8/1 0/12/1 0/13/1 0/14/1 0/15/1 0/5/0 0/2/2 0/3/2 0/4/2 MASTER SW9/10/11 1/0/1 1/1/1 1/2/1 1/3/1 1/4/1 1/5/1 1/7/1 1/8/1 1/12/1 1/13/1 1/14/1 1/15/1 1/5/0 SLAVE 1 SW9/10/11 2/0/1 2/1/1 2/2/1 2/3/1 2/4/1 2/5/1 2/7/1 2/8/1 2/12/1 2/13/1 2/14/1 2/15/1 2/5/0 SLAVE 2

Unit No. 1 2 3

MODEL

SERIAL N0.

No. 1 2 3 4 5 6 7 8 9

Model

PMV

TA

TC1

TC2

SERIAL N

ENGLISH VERSION 1.2

INSTALATION CHECK LIST AND SYSTEM START UP REQUEST


No. 10 11 12 13 14 15 16 17 18 19 20 Model
PMV TA TC1 TC2

SERIAL N

4. COMMENTS

REQUESTER NAME :

SIGNATURE:

DATE :

DD

MM

YY