TO DO LIST

1. Follow up for February payment with the Client (Due on 29th March, 2012) 2. Procurement Schedule to be prepared with dates JS 045:- B+G+2 COMMERCIAL BUILDING SHEIKH ZAYED ROAD 1. Payment certificate to be done for Sub-contractors/Suppliers- March (Desert Roofing, Galadari MEP, Ready mix Gulf, Emirates Rebar, Star Baskaran labour supply, Sandhya labour supply) 2. Reconcile steel and concrete quantity (raft and vertical elements)- compare BOQ quantity against the actual usage at site 3. Cost Value Reconciliation to be prepared as per the final cost to date report from Accounts as of 29 Feb 2012 and 31 March 2012 4. Sample of PC Rates items to be submitted to M/s. Emsquare once final design details are received from Client 5. Spray plaster: Need to be discussed personally with Mr. Mustafa (Emsquare) who may delete this item without Clients knowledge, if the slab soffit is good enough to receive directly the paint finish 6. Payment application to be submitted on 10th April 2012 (once FF slab Phase 1 is completed) 7. Cost implication due to changes in the sub-structure including the GF slab to be worked out for further discussion with Emsquare (omission of subhka, revision to raft thickness, perimeter wall shift, GF slab and beam revision, periphery beam revision, dune sand filling, ready mix design change for slabs etc.,) 8. Sub-contract document for Galadari MEP and Al Fayha aluminium to be prepared and issued 9. Follow up with Emsquare re PC Rate items and Provisional Sum items against the instruction requirement dates issued to Emsquare 10. Galadari Electro Mechanical contract BOQ- Emsquare/Client to approve 11. LOI to be issued to Galadari Electro Mechanical for the Provisional Sum ItemHVAC works TBA 05/04/2012 TBA

05 Apr 2012

09/04/2012 20/04/2012 TBA TBA

10/04/2012 TBA

TBA TBA TBA TBA

JS 046:-MULTI-STOREY PARKING BLDG. AND TEMPORARY PARKING 1. Design stage invoice revised and re- submitted, payment due on 4th April 2012 2. Payment application to be submitted for the month of March with mobilization progress and existing shade structure removal as per the progress report by Mr. Colin 3. Orders to be made as per the Procurement Schedule 4. Material submittals to be done as per the schedule 5. Letter/ Notice re cost/time implication on the approved DM drawings (soil improvement + isolated footings, boundary wall, internal substation etc.,), when compared to the Contract (raft) to be submitted to the Client 6. Concrete mix designs to be selected and approved by Emsquare 7. Standard Site Forms to be forwarded to H&H Page 1 of 3 Note 09/04/2012

Note Note TBA

TBA TBA

TO DO LIST
8. Quantity take-off to be carried out based on the approved DM drawings (given to external QS Mr. George). Budget cost allocation to be amended based on the final design 9. Soil improvement sub-contractor to be finalised 10. Quotes to be obtained for RCC structural works (labour contract only) 11. Quotes to be obtained for RCC structural works (including supply of concrete and steel) JS 054:- 3 VILLAS, AL JAFILIYA 1. Reconcile concrete and steel quantity compare the contract quantity with actual usage at site 2. Payment certificate for Sub-contractors to be done (Desert Roofing, Sadeeq Al Bahar, Newyork Labour supply) to be done for March 3. Cost Value Reconciliation to be prepared as per the final cost to date report from Accounts as of 29 Feb 2012 and 31 March 2012 4. Sub-contract packages to be released and finalised which are under Fraylands scope (such as Aluminium, painting etc.,) 5. Submitted to Consultant the impact programme; Awaiting approval 6. List of variations and its value between Contract drawing and DM revised drawings to be prepared (not to be officially submitted until it is discussed and agreed with Mr. Mustafa of Emsquare) TBA TBA 12/04/2012 TBA Note TBA TBA

05 Apr 2012

TBA TBA TBA

JS 068:- JUMEIRAH VILLA NO.11 (GEORGE KURIAN) 1. Final invoice submitted for AED13,400.00 on 25th Jan 2012; on account payment received Dhs.10,000.00; Balance payment to be followed up with Client DREC PROJECTS:1. DREC Mankhool DCD inspection followed by DM to be carried out; Awaiting documents from DREC; Invoice to be submitted once DM completion certificate is obtained including all fees paid to DM/DCD 2. Follow up with DREC for the outstanding payments yet to be released 3. DREC Jumeirah- DM drawings approval to be followed with CAE TBA Note

TBA TBA

ON-GOING TENDERS/PRICING:1. Sharaf DG H.Q.- Phase 2 ( Ground Floor Extension ) 2. Modification works to Lime Tree Valley East Villa Nos. 30,31,32, 34 and 39Budget Pricing 3. Mawarid revised price as per the DM drawings 4. 2B+G+6 Comm. & Residential Building, Al Barsha (Client: Al Hashimi) Page 2 of 3 05/04/2012 05/04/2012 09/04/2012 10/04/2012

TO DO LIST
5. Renovation works, Villa on Plot E5, Emirates Hills (Client: Navin Chanrai)Queries listed for clarification 6. Mr. Naseem Ul Haq Head Offices, Interior Fit-out, Jumeirah Lake Towers TBA TBA

05 Apr 2012

ANTICIPATED TENDERS:1. KPMG Development- 8 Villas, The Villa, Dubai Land 2. Private Villa at Emirates Hills, Consultancy & Int. Design (Architects: DSA) TBA TBA

PROBABLE NEW CONTRACTS:1. Modification works to Villa No.14 (Lime Tree Valley East)- Price to be agreed with CHI 2. Cube Arts Gallery, DIFC (Price submitted on 29th Feb; AED 2,734,103.00) TBA TBA

GENERAL:1. New Estimation QS and Project QS to be appointed 2. Breakdown of MEP cost with codes to be obtained from Shijo 3. New Labour Allocation Sheet to be implemented in sites from January 2012 and maintained consistently 4. CVR, Material and Labour monitors, Contract summary need to be implemented from Jan 2012 and maintained on a monthly basis 5. Subcontractor liabilities schedule to be maintained on a monthly basis 6. Payment (Revenue) Tracking Schedule to be maintained on a weekly basis 7. Rolling Forecast to be updated and reviewed on a monthly basis