Buildings
Nearly
N l 13,000
13 000 S
School
h lB Buildings
ildi
School Buildings
g on Average
g More Than 50 Years Old
1976 CCode
d Ch
Changes ffor N
New B
Buildings
ildi ffor D
Ductile
til CConcrete
t andd
Positive Wall Anchorage
AB 300 Requires
q DSA to Surveyy K-12 School Buildings
g for the
Minimum Requirements of the 1976 California Building Code
P
Priority
i it 2 Implementation
I l t ti -- Developing
D l i Plan Pl tot Evaluate
E l t all ll Priority
P i it 2
Buildings to Retrofit as Necessary - 165 Buildings at 83 School Sites
LAUSD Seismic Mitigation
1998-2004: Post-Northridge Earthquake hazard mitigation
2004-2005: Review of schools with buildings on or near active earthquake faults
2004-2012:
2004 2012: Replaced MP Building and 2-Story
2 Story Classroom Building at Burbank MS discovered
to be on a fault
2004-2014: University HS Gym was discovered to be on a previously unmapped fault;
Gym was removed and replaced, and the remaining buildings are in the seismic
program for future evaluation and retrofit as needed.
2010-2016: Jordan HS, Fremont HS, Dorsey HS address AB 300 buildings as part of a campus-
wide modernization.
2013-2016: Evaluate and stabilize hillside and classroom building at Marquez ES to prevent
possible collapse in a seismic event.
2014-2019: Structurally evaluate 4474 buildings with suspended plaster ceilings constructed
prior to the 1976 California Building Code.
2014- 2015: Initiate geotechnical investigation of Atwater ES campus for potential mitigation
action due to impact of the newly discovered Hollywood Fault.
LAUSD Seismic Mitigation
Priority 1A Buildings