MAHA Group Adriadi, Espaldon, Thandarki Green field projects are projects which do not create any environmental

nuisance (pollution), follows environmental management system and EIA (environment impact assessment). These projects are usually of ig magnitude. Greenfield is a new project.
The singular most damaging mista!e in project today is the common practice of overloo!ing Asset "anagement concepts during the design, construction and start#up of green#field facilities. "any companies have developed Asset "anagement $trategies for their rown#field operations ut are unaware of the process for developing an effective approach to Asset "anagement in new projects. The glo al cost of this poor management practice is truly astronomical. %ew facilities e&perience e&cessive unplanned downtime resulting in e&cessive costs and loss of critical production due to 'uality and 'uantity issues. $o, our project strategy is to avoid these losses y esta lishing the elements of (erformance E&cellence ()perational E&cellence plus )rgani*ational E&cellence) prior to facility start#up.

Ideally for a Greenfield project, "A+A practices are the following, )perational E&cellence -oadmap to $uccess (roject "entality .s )perating "entality (roject /esign 0 A(1/I$2 Assess 3 (lan (roject 2onstruction 0 A(1/I$2 /esign (roject $tartup 0 A(1/I$2 Install )rgani*ational E&cellence

A(1/I$2 2lose#loop Improvement (rocess "A+A Group has served the engineering and plant design needs of the 2hemical (rocess Industries for more than 45 years. "A+A Inc. has een a leading supplier for green field growing industry. )ur advance fa rication facilities, team of industry professionals 3 technical !now how ena le us to meet client6s specific re'uirement y developing custom design machinery. The first "A+A Group greenfield project was 7io#8uels plant in Indonesia at 4555. )ur project for 7io#8uels 7lending, $torage, and /istri ution $ystem was Ethanol $torage Tan!s

7io#/iesel $torage Tan!s .apor -ecovery (ump $tations /istri ution (iping 7lending $ystems and 2ontrols "oisture 2ontrol

The second e&perience for greenfield project was 9ater Treatment (lant (9T() in (hilippines at 4554 and a small A(I plant facility somewhere in 2e u city -aw water storage tan!, $edimentation tan!, Transfer, slurry, dosing and feed pump systems, Activated 2ar on Adsor er (iping system small s!id#mounted reactor1 crystalli*er systems from upstream to wor!#up The third e&perience was Evaporated "il! (lant in "yanmar at 455:. /esign and 2onstruction for "ultistage Evaporator $pray /ryer Autoclave for sterili*ation