You are on page 1of 27

W.H. W.H.

DN
UP
DN
UP
S S
UP
DN UP
UP
UP
C C C C C C TELEPHONE
CCCCC C C CCCCCCCCCCCCCC
UP
UP
DN
DN
UP
DN
Project North
211-2141 Thurston Drive
Ottawa ON K1G 6C9
T 613-739-3699
F 613-739-3965
info@LWG-ai.com
LWG-ai.com
Architectural Interior Drawings Key Plan
I
s
s
u
e
d

f
o
r
:

T
e
n
d
e
r





D
a
t
e
:

D
e
c
e
m
b
e
r

9
,

2
0
1
3
Project Phasing and Temporary Hoarding - Plan A
Project Phasing and Temporary Hoarding - Plan B
Furniture Plan
Furniture Screen Plan
Demolition Plan
Partition Plan
Reflected Ceiling Plan
Power/Voice/Data Plan
Floor and Wall Finish Plan
Door Schedule and Elevations
Door Elevations, Sections and Architectural Elevation
and Section
Partition Sections
ID01A
ID01B
ID02
ID03
ID04
ID05
ID06
ID07
ID08
ID09
ID10
ID11
OPS Fit-up Leitrim
Ottawa ON
Mechanical & Electrical Consultants
McKee Engineering
Structural Consultant
Adjeleian Allen Rubeli Ltd
Mechanical Drawings
Mechanical - Fire Protection, Legends and Drawing List
Mechanical - HVAC - Ceiling Plan
Mechanical - HVAC - Raised Floor Plan
M-1
M-2
M-3
Electrical Drawings
Electrical - Demolition
Electrical - Demolition
Electrical - Legend & Drawing List
Electrical - Lighting & Fire Alarm
Electrical - Power & Systems
Electrical - Black Cable Tray
Electrical - Red Cable Tray
Electrical - Schedules & Details
Electrical - Details
Electrical - Details
ED-1
ED-2
E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
Structural Drawings
Part Plan & Details S01
P
r
o
j
e
c
t
:

O
P
S

F
i
t
-
u
p

L
e
i
t
r
i
m
P
W
G
S
C

N
u
m
b
e
r
:

R
.
0
5
0
1
3
4
.
0
0
2
The undersigned has reviewed and takes responsibility for
this design, and has the qualifications and meets the
requirements set in the Ontario Building Code to be a
designer.
QUALIFICATION INFORMATION
REGISTRATION INFORMATION
Required unless design is exempt under 2.17.5.1 of the building code
Required unless design is exempt under 2.17.4.1 of the building code
NAME SIGNATURE BCIN
FIRM NAME BCIN
LWG Architectural Interiors Inc. 42687
David Gibbons 25030
S S
DN
9
1
5
C
le
a
r
915
Clear
9
1
5
C
le
a
r
9
1
5
C
le
a
r
915
Clear
1525
Clear
915
Clear
4
4
2
0
9
1
5
C
le
a
r
915
Clear
1
5
2
5
C
le
a
r
1146
(915
min.)
1525
Clear
1
5
2
5
C
le
a
r
1038
(915
Min.)
915
Clear
1525
Clear
9
1
5
C
le
a
r
9
1
5
C
le
a
r
9
1
5
C
le
a
r
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
915 Clear 1525 Clear
915Clear
915Clear915 Clear 915Clear
915Clear915Clear
915 Clear
915Clear 915Clear 915Clear
Phasing Legend - Plan A:
Indicates Phase 1 of the project.
Protect Construction and Tenant occupied zone as indicated. Protection required at Main
Corridors and around equipment to remain as shown above - Protection type varies. Extent and
location to be confirmed on site with Project Manager. Ensure adequate space is left for
Occupant access to remainder of space. Ensure not to leave construction materials and
equipment that could be a tripping hazard or other for Occupants. Upon completion of work,
Contractor to remove protection material. Do NOT perforate and/or damage existing partitions,
ceiling, finishes and all other components to remain and to adjacent spaces.
Indicates activities part of Phase 1 and Phase 2 of the project.
Indicates area not included in Phase 1 and/or Phase 2. Area to be manned and operational
during Construction. Work required in these areas must be schedule with Client ahead of time,
either during Phase 1 or Phase 2.
Temporary Hoarding Legend - Plan A:
Protect Construction/Equipment and Tenant occupied zone with POLY 6 mil (minimum) and
construction tape on all joints. Ensure not to leave construction materials and equipment
that could be a tripping hazard or other for Occupants. Upon completion of all work,
Contractor to remove POLY. Do NOT perforate and/or damage existing partitions, ceiling,
finishes and all other components to remain and to adjacent spaces. Contractor will be held
responsible for any damage done to existing spaces.
Main Corridors
Ensure adequate space is left for Occupant access to remainder of space within each Main
Corridors.
Equipment
Equipment shown above to remain. Ensure to leave 915mm clear space between
equipment and POLY. Ensure all joints are taped and top and bottom edges are properly
sealed. Ensure no dust and construction debris enters the protected spaces.
Erect temporary hoarding as follows. Partition to be 65mm metal stud at 410mm, 0.45
gauge o.c. with 13mm gypsum board one side only (Exterior side of room) to u/s of
suspended T-bar ceiling at approximately 3016mm A.F.F. 5
1 11
Temporary Hoarding Notes - Plan A:
1. Provide adequate ventilation (supply and return) inside temporary POLY enclosure. Perforated raised floor tiles
to be relocated as required surrounding the server racks.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Project Phasing and
Temporary Hoarding -
Plan A
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID01A
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Key Plan
Project
North
Scale 1:100
O
A
R
I D
S S
DN
915
Clear
1525
Clear
9
1
5
C
le
a
r
9
1
5
C
le
a
r
915
Clear
9
1
5
C
le
a
r
9
1
5
C
le
a
r
9
1
5
C
le
a
r
915
Clear
9
1
5
C
le
a
r
9
1
5
C
le
a
r
9
1
5
C
le
a
r
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
915 Clear 1525 Clear
915Clear
915Clear915 Clear 915Clear
915Clear915Clear
915 Clear
915Clear 915Clear 915Clear
Phasing Legend - Plan B:
Indicates Phase 2 of the project.
Protect Construction and Tenant occupied zone as indicated. Protection required at Main
Corridors and around equipment to remain as shown above - Protection type varies. Extent and
location to be confirmed on site with Project Manager. Ensure adequate space is left for
Occupant access to remainder of space. Ensure not to leave construction materials and
equipment that could be a tripping hazard or other for Occupants. Upon completion of work,
Contractor to remove protection material. Do NOT perforate and/or damage existing partitions,
ceiling, finishes and all other components to remain and to adjacent spaces.
Indicates activities part of Phase 1 and Phase 2 of the project.
Indicates area not included in Phase 1 and/or Phase 2. Area to be manned and operational
during Construction. Work required in these areas must be schedule with Client ahead of time,
either during Phase 1 or Phase 2.
Temporary Hoarding Legend - Plan B:
Protect Construction/Equipment and Tenant occupied zone with POLY 6 mil (minimum) and
construction tape on all joints. Ensure not to leave construction materials and equipment
that could be a tripping hazard or other for Occupants. Upon completion of all work,
Contractor to remove POLY. Do NOT perforate and/or damage existing partitions, ceiling,
finishes and all other components to remain and to adjacent spaces. Contractor will be held
responsible for any damage done to existing spaces.
Main Corridors
Ensure adequate space is left for Occupant access to remainder of space within each Main
Corridors.
Equipment
Equipment shown above to remain. Ensure to leave 915mm clear space between
equipment and POLY. Ensure all joints are taped and top and bottom edges are properly
sealed. Ensure no dust and construction debris enters the protected spaces.
Erect temporary hoarding as follows. Partition to be 65mm metal stud at 410mm, 0.45
gauge o.c. with 13mm gypsum board one side only (Exterior side of room) to u/s of
suspended T-bar ceiling at approximately 3016mm A.F.F. 5
1 11
Temporary Hoarding Notes - Plan B:
1. Provide adequate ventilation (supply and return) inside temporary POLY enclosure. Perforated raised floor tiles
to be relocated as required surrounding the server racks.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Project Phasing and
Temporary Hoarding -
Plan B
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID01B
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
FAX
PHOTO
COPIER
1
6
2
9
1
4
1
0
1100
Min.
1100
Min.
1
2
2
7
1
1
0
0
M
in
.
1
1
0
0
M
in
.
1
1
0
0
M
in
.
1100
Min.
1100
Min.
1271
2178
1100
Min. 1220
1220
Clear
1
5
2
4
C
le
a
r
1486
1
1
0
0
C
le
a
r
1
1
0
0
M
in
.
Existing equipment and
associated desks to
remain.
Existing equipment and
associated desks to remain.
Existing
equipment
to remain.
Existing
equipment and
associated
desks to
remain.
Existing equipment and
desk to remain.
2182
1
5
2
4
C
le
a
r
1
6
2
9
2
2
2
3
New hotelling station
(6 at 24x36)
1142
1919
1100
Min.
1
4
9
9
1142
1
1
0
0
M
in
.
1
4
9
9
9
1
5
915
Clear
Podium
Relocated
A/V rack.
Existing
ceiling
projector unit
Existing wall mounted
projector screen and
adjacent equipment.
1585
9
9
4
1509
2
6
0
1New
hotelling
station (3 at
24x36)
1
9
4
0
Space Allocation Count:
- New hotelling station = 9
- New 5x6 workstation = 124
- Existing work area with equipment
to remain = 13
- New work area (Bottom right of
plan) = 5
- New enclosed office = 6
- Existing enclosed office = 7
1033
S S
DN
1
5
2
9
1169 1169
Wall mounted
projector screen
Wall mounted
television and clock
Wall mounted
television
Ceiling projector unit
3
6
5
8
2248
9
1
5
1
0
6
7
1067
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Furniture Plan
New 5x6
Workstations
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID02
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
1
6
2
9
1
4
1
0
1100
Min.
1100
Min.
1
2
2
7
1
1
0
0
M
in
.
1
1
0
0
M
in
.
1
1
0
0
M
in
.
1100
Min.
1100
Min.
1271
2178
1100
Min. 1220
1220
Clear
1
5
2
4
C
le
a
r
1486
1
1
0
0
C
le
a
r
1
1
0
0
M
in
.
2182
1
5
2
4
C
le
a
r
1
6
2
9
2
2
2
3
1142
1919
1100
Min.
1
4
9
9
1142
1
1
0
0
M
in
.
1
4
9
9
9
1
5
915
Clear
1585
9
9
4
1509
2
6
0
1
1
9
4
0
1033
S S
DN
1
5
2
9
1169 1169
2248
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Furniture Screen Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID03
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
S S
DN
Refer to
Note #3
102
1017 1
0
2
1
0
1
7
1
6
7
9
Refer to
Note #2
Refer to
Note #2
Refer to
Note #5
1017 102
Refer to
Note #2
R R R R
R
Refer to
Note #7
and #10
R
R
R R
Refer to
Note #8
Refer to
Note #9
Refer to
Note #10
R
Refer to
Note #11
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Demolition Legend:
Existing Interior Tenant partition to remain.
Interior Tenant partition to be removed and discarded.
Above finished floor to u/s of slab. Perimeter gypsum wallboard partition.
Above finished floor to u/s of suspended T-bar ceiling. Gypsum wallboard partition.
Above finished floor to u/s of suspended T-bar ceiling. Gypsum wallboard partition c/w acoustic
panels both sides for the majority of the space. Acoustic panels to be discarded.
Existing door, door frame, hardware and components to remain.
Existing door, sidelight, frame, hardware and components to remain.
Existing single door, door frame, hardware and components to be removed and retain for reuse,
unless otherwise noted. Refer to door Schedule on Sheet ID09.
Existing door, door frame, hardware, glazing assembly c/w blinds and related components to be
removed and retained for relocation. Refer to door Schedule on Sheet ID09.
Existing double doors, door frame, hardware, glazing assembly c/w blinds and related
components to be removed and retained for relocation. Refer to door Schedule on Sheet ID09.
Denotes door assembly identification number for relocation to be read in conjunction with Door
Schedule on Sheet ID09.
Existing glazing, frame, blinds and related components to remain - Size varies.
Existing duplex outlet and related components to be removed and discarded. Refer to Electrical
Consultant's drawings.
Demolition Notes:
1. Existing raised floor system to remain except where modifications required to accommodate new partitions as
indicated in Demolition Legend.
2. Modify existing partition to accommodate new door and frame where indicated above. Secure remainder of
partition as required.
3. Existing "shield" door and associated door hardware to be removed and turned over to Tenant. Door frame to
remain. Door equipped with security alarm to be disconnected and reconnected to new door #010 on Partition Plan
on Sheet ID05. Ensure the security alarm work is completed by a Contractor that is familiar with the type as it is an
older system and no longer available in North America.
4. All door, frame and glazing not reused to be removed and discarded. All door hardware not reused to be turned
over to Tenant.
5. Remove and discard existing top of partition 152mm high x 64mm wide brushed aluminum channel secured to
suspended T-bar ceiling.
6. Refer to Electrical, Demolition Plan on Sheet ED-1 for the removal of electrical components within raised floor
system.
7. Cut back existing partition as shown and ensure stability. Ensure no damage to remainder of partition. Cut back
existing wall mounted acoustic panel to suit new partition length. Ensure cut is straight and fabric secured to panel
backing.
8. Reserved.
9. Existing gypsum wallboard partition outside of enclosed offices as shown above to be cut open to accommodate
new blocking for equipment. Refer to Partition Legend on Sheet ID05 for additional information.
10. Where existing partition finished with brushed aluminum top channel below ceiling requires to be cut due to
adjacent partition to be removed, ensure cut is straight and no damage is done to remaining portion as shown.
Retain top channel from demolition for patching as identified on Partition Plan on Sheet ID05.
11. Existing circular trap door located above baseboard to be removed and discarded. Cut existing piping for central
vacuum below raised floor and cap piping to remain.
Demolition Legend (Cont'):
Existing telephone outlet and related components to be removed and discarded. Refer to
Electrical Consultant's drawings.
Existing combined voice/data outlet and related components to be removed and discarded.
Refer to Electrical Consultant's drawings.
Existing blank plate, junction box and related components to be removed and discarded.
Refer to Electrical Consultant's drawings.
Existing door bell and related components to be removed and discarded.
Existing light switch and related components to be removed and discarded. Refer to Electrical
Consultant's drawings.
Indicates existing outlet or light switch and related components to be removed and retained
for relocation. Refer to Power/Voice/Data Plan and Reflected Ceiling Plan on Sheet ID06 and
ID07.
Indicates area where existing raised floor system to be modified to suit new slab to slab
partition. Refer to Partition Plan on Sheet ID05 for location.
Note:
- Raised floor support system to be modified. Refer to Structural Consultant's drawings for
additional information and details.
Indicates area where existing suspended T-bar ceiling to be removed and discarded. Secure
remainder of suspended T-bar ceiling within Interior Tenant space and gypsum wallboard
bulkhead in Main Corridors as required.
R
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Demolition Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID04
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
S S
DN
3
0
4
8
3
0
4
8
3048
CL
CL
CL
Align
3048
CL

3
1
0
7
Align
166
167 168
002
170 171 172
006
169 173
005
174 175 176
007 008
177 178
010
4007
CL
Align
Align Align - both
sides
305 EQ 305 EQ
9
1
5
C
le
a
r
Align - both
sides
Align
3048
CL
CL
Align - both
sides
6
0
0
C
le
a
r
915
Clear
3048 3048
3
0
4
8
CL
CL CL
Align - both
sides
Align
1830

1
5
6
3
600
Clear
Refer to
Note #4
Refer to
Note #4
Refer to
Note #4
Refer to
Note #4
Refer to
Note #4
Refer to
Note #5
Refer to
Note #1
Refer to
Note #1
001 003 004
Active
door leaf
Refer to
Note #3
10001 Refer to Partition Legend for instructions
Align - both
sides
Refer to
Note #8
Refer to
Note #9
009
Refer to
Note #8
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Partition Legend:
Existing Interior Tenant partition to remain.
Interior Tenant Partition - Above Finished Floor (Raised Floor) to u/s of Steel Shield- Thickness
to Match Existing +/- 180mm
Partition to be 150mm metal stud, 0.81 gauge at 400mm o.c. with 16mm gypsum board both
sides from above finished floor to u/s of shield. Cavity of partition to receive 65mm sound
attenuation blankets suitable for metal stud application. Finish partition ready to receive paint
unless otherwise noted.
Note:
- Approximate 25mm spacing from top of metal track and u/s of steel shield to be maintained.
Interior Tenant Partition - Above Finished Floor (Raised Floor) to u/s of T-bar - Thickness 90 mm
Partition to be 65mm metal stud at 400mm, 0.45 gauge o.c. with 13mm gypsum board both
sides to u/s of suspended T-bar ceiling at approximately 3016mm A.F.F. Cavity of partition to
receive 65mm sound attenuation blankets suitable for metal stud application. Finish partition
ready to receive paint unless otherwise noted.
Interior Tenant Partition - Secured Slab to u/s of Steel Shield Slab- Thickness 217mm
Partition to be as follows:
- 2.6 gauge flattened expanded metal mesh diamond dimensions of 20mm x 40mm secured to
32mm x 150mm x 1.22 galvanized steel studs at 400mm o.c.1.22 gauge or greater that has
been solidly and permanently attached to the true floor and true ceiling.
- Covered with 2 layers of 16mm Fire-resistant gypsum board both sides, staggered, mudded
and taped between layers. All seams mudded and taped including screw heads.
- All pipe/conduit penetrations shall have a 100mm drywall patch on both sides of the wall
surrounding the pipe.
Door number
Room Number
1
5 11
2
5 11
3
5 11
Partition Notes:
1. Infill opening within existing partition where door and frame was removed as shown above. Construction to match
partition Type 1. Ensure new and existing partition surfaces are align and transition is smooth and seamless.
Prepare partition to receive new paint finish.
2. Where new partitions meet existing wall mounted acoustic panels, cut acoustic panel back to suit new partition
width. Ensure cut is straight and fabric secured to panel backing. Secure remainder of acoustic panels as required.
Supply and install brushed aluminum "L" trim at cut edges on both sides of new partition.
3. Cut existing wall mounted acoustic panels as required both sides of existing door frame to suit new secured
partition Type 3 as shown above. Panels located on the outside of the new Vestibule to remain. Ensure cut is
straight and fabric secured to panel backing. Secure remainder of acoustic panels as required. Supply and install
brushed aluminum "L" trim at cut edges on the outside of the new Vestibule partition. Remove and discard portion
of wall mounted acoustic panels within the new Vestibule. Repair, patch, sand and make good ready to receive new
paint finish gypsum wallboard partitions where existing wall mounted acoustic panels where removed on each side
of door frame.
4. Supply and install full partition height wood blocking to match wall mounted acoustic panels thickness finished
with a brushed aluminum plate secured with screws. All screws to be countersunk and flush with plate fascia. Refer
to Detail 6/5/10 and Elevation 7/5/10 for information.
5. Finish partition edge with gypsum wallboard where existing partition was removed. Repair, patch, sand and make
good ready to receive new paint finish. Supply and install new full partition height brushed aluminum "L" trim to
finish edge of cut wall mounted acoustic panel where indicated above. Finish brushed aluminum top channel as
required at partition edge/corner with material retained from demolition.
6. All partition dimensions on plan above are shown from fascia of wall mounted acoustic panels where applicable.
Where no wall mounted acoustic panels located, dimensions are shown from gypsum wallboard fascia.
7. Door frame for door #010 to be braced horizontally half way up on either side between studs and frame to
prevent force entry.
8. New gypsum wallboard finish to align with existing where existing partitions where cut open to accommodate
new blocking for equipment. Repair, patch, sand and make good ready to receive new paint finish.
9. Where existing partition finished with brushed aluminum top channel below ceiling was cut due demolition of
adjacent partition, finish top partition edge/corner as required with material retained from demolition .
Partition Legend (Cont'):
Existing double doors, frame, glazing assembly c/w blinds and hardware to remain.
Existing door, frame and hardware to remain.
Existing door, frame, sidelight and hardware to remain.
New double doors and relocated frame, glazing assembly c/w blinds and hardware retained
from Demolition. Refer to Door Schedule on Sheet ID09.
New/relocated door, frame and hardware to match existing style and finish. Refer to Door
Schedule on Sheet ID09.
Indicates existing raised floor tile system to remain. Raised floor tile and support system to be
modified to suit new secured slab to slab partition Type 3. Only cut/modify raised floor
supports on the outside of the new Vestibule as shown.
Supply and install blocking within new and existing gypsum wallboard partition to support wall
mounted Tenant supplied equipment.
Notes:
- Room #160: Install blocking from 915mm A.F.F to u/s of suspended T-bar ceiling by
3050mm wide centered within the narrowest width of the room.
- Outside Room #169 and #170: Install blocking within existing partition from 915mm A.F.F to
u/s of suspended T-bar ceiling from door frame to door frame.
- Outside Room #171: Install blocking from 915mm A.F.F to u/s of suspended T-bar ceiling
from door frame to partition edge.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Partition Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID05
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
S S
DN
Refer to
Note #1
Refer to
Note #2
Refer to
Note #2
R R
R
R
R
R
R
CL CL
CL
R
Refer to
Note #4
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Reflected Ceiling Legend:
Denotes existing Building Standard fluorescent fixture to remain.
Denotes existing Building Standard fluorescent fixture to be relocated.
Denotes relocated and/or new fluorescent fixture. Where new required, supply and install new to
match existing Building Standard.
Denotes existing suspended T-bar ceiling to remain.
Denotes new suspended T-bar ceiling to be centered within new Vestibule. Ceiling height to
match existing, +/- 3016mm A.F.F..
Denotes area where existing gypsum wallboard finished ceiling to be extended. Construction to
match existing. Prepare surface to receive new paint finish. Ensure transition between new and
existing is smooth and seamless. Contractor to ensure stability.
Denotes existing light switch to remain.
Denotes light switch to be mounted to match existing height unless otherwise noted. Body and
cover plate to match existing style and colour.
Relocated light switch and related components retained from demolition. Height to match
existing unless otherwise noted.
120V Duplex outlet above suspended T-bar ceiling within plenum space. Refer to Electrical
Consultant's drawings.
CL
R
Reflected Ceiling Notes:
1. Existing suspended T-bar ceiling to be modified to suit new secured partition Type 3. Existing suspended T-bar,
ceiling tiles and related components within Vestibule to be removed and discarded. Modify suspended T-bar and
cut ceiling tiles as required on outside of Vestibule. Secure remainder of suspended T-bar and supply and install
new "L" trim along new partition.
2. Paint new and existing gypsum wallboard bulkhead on all exposed surfaces as shown.
3. Open existing gypsum wallboard partition were required to accommodate new electrical conduits. Repair, patch,
sand and make good ready to receive new paint finish.
4. Supply and install blank cover plate where existing light switch was removed.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Reflected Ceiling Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID06
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
FAX
PHOTO
COPIER
S S
DN
BF
BF
BF
BF
BF
BF BF BF BF
BF BF BF BF BF BF
BF BF BF BF BF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF BF BF
BF BF
BF BF
BF BF BF BF BF BF BF BF BF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF BF
BF
BF
BF
BF
BF
Refer to
Note #2
Refer to
Note #2
Refer to
Note #1
Refer to
Note #1
Refer to
Note #2
Refer to
Note #2
Refer to
Note #2
Refer to
Note #1
Refer to
Note #3
Refer to
Note #1
Refer to
Note #1
CL CL CL
CL
BF
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Power/Voice/Data Legend:
120V Duplex outlet mounted. Refer to Electrical Consultant's drawings.
Duplex outlet within system's furniture panel by others.
Existing duplex outlet and related components to remain.
Combined voice/data outlet within system furniture panel by others.
Existing telephone outlet and related components to remain.
Existing combined voice/data outlet and related components to remain.
Existing blank plate and related components to remain.
Systems furniture base feed module - plug connection. Coordinate installation with systems
furniture Contractor/Installer.
Indicates duplex outlet above suspended T-bar ceiling within plenum space.
BF
CL
Power/Voice/Data Notes:
1. Existing equipment and associated desks to remain. Protect from dust and construction debris as identified on
Project Phasing and Temporary Hoard on Sheet ID01.
2. Existing recessed electrical panel and other wall mounted electrical devices and transformers to remain.
3. Relocated A/V rack and related components by others.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Power/Voice/Data Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID07
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
S S
DN
Refer to
Note #1W
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Floor Finish Legend:
Existing raised floor tile system to remain.
Wall Finish Legend:
General Office Paint
Colour: White
Finish: Gloss, Level 3
Door Paint
Colour: Light grey
Finish: Gloss, Level 4
Door Frame Paint
Colour: Black
Finish: Gloss, Level 5
Gypsum Wallboard Ceiling Bulkhead Paint
Colour: White
Finish: Gloss, Level 1
Secure Partition Paint
Colour: White
Finish, Gloss, Level 6
Note: 1 coat primer/sealer and 3 coats paint
Floor Finish Notes:
1F. New partitions within Interior Tenant and Main Corridor side to receive new black vinyl baseboard, unless
otherwise noted. New partitions inside and outside of Enclosed Office #171 to receive PVC snap on baseboard -
Refer to Detail 7/8/8.
Wall Finish Notes:
1W. Paint existing metal window frame P3 inside and outside of room.
Existing raised floor
system
Base J-Hook
PVC Base Clip On
Floor Track
Gypsum wallboard
19mm Plywood
blocking required
to reinforce base.
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Floor and Wall Finish Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID08
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
Door Schedule
001
002
003
004
005
006
007
008
009
010
166
167
168
169
170
171
172
173
174
175
176
177
178
Existing
A
Existing
Existing
Existing
B
Existing
Existing
Existing
D
C
C
C
C
C
C
C
Existing
Existing
Existing
Existing
C
C
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
Existing
Solid core-paint grade
Existing
Existing
Existing
Solid core-paint grade
Existing
Existing
Existing
Heavy cold rolled - paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Existing
Existing
Existing
Existing
Solid core-paint grade
Solid core-paint grade
P2
P2
P2
P2
P2
P2
Existing
Existing
Existing
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
Existing
Reused
Existing
Existing
Existing
Metal-paint grade
Existing
Existing
Existing
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Existing
Existing
Existing
Existing
Metal-paint grade
Metal-paint grade
P3
P3
P3
P3
P3
P3
Existing
Existing
Existing
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
Existing
H1
Existing
Existing
Existing
H2
Existing
Existing
Existing
H3
H4
H4
H4
H4
H4
H4
H4
Existing
Existing
Existing
Existing
H4
H4
Refer to note #8
Refer to note #3 and #8
Refer to note #7 and #8
Refer to note #8
Refer to note #8
Refer to note #4 and #8
--
--
--
3/4 Hr fire rated door and frame. Refer to note #13, #14 and #17
--
--
--
--
--
--
--
--
--
--
--
--
--
Hardware Notes:
1. All hardware to match Base Building standard, unless otherwise noted.
2. Ensure all door hardware is installed per Manufacturer's instructions.
3. Reuse existing metal frame and door hardware D01 retained from demolition. New door leaves required. Refer to
Demolition Plan on Sheet ID04.
4. Reuse existing metal frame and door hardware D04 retained from demolition. Refer to Demolition Plan on Sheet
ID04.
5. Reuse existing door leaves #D02, D03, D04, D06 and D07 on Demolition Plan on Sheet ID04 in good condition
where possible instead of purchasing new.
6. Reuse existing door hardware #D02, D03, D04, D06 and D07 on Demolition Plan on Sheet ID04 where possible
instead of purchasing new. Existing orbital knobs to be replaced with lever handles.
7. Existing orbital door knob to be removed and replaced with lever handle. Style and standard finish to suit Unican
lock. Ensure compatibility.
8. Paint new, existing and reused solid core wood door and steel frame #001, 002, 003, 004, 005 and 006 on all
exposed edges and both sides.
9. Paint all new, existing and reused enclosed office doors on all exposed edges and both sides.
10. Ensure all new and reused steel door frame depth suit partition type.
11. All surplus door hardware to be turned over to Tenant.
12. New lock cylinder to be by Tenant.
13. Install and reconnect to new door #010 security alarm retained from demolition. Ensure the security alarm work is
completed by a Contractor that is familiar with the type as it is an older system and no longer available in North
America. Refer to Demolition Notes, Note #4.
14. Additional notes regarding door and door hardware H3 as follows:
- Dead bolts must have at least 25mm throw and conform to Building Code
- Door frame is to be braced horizontally half way up on either side between studs and frame to prevent force entry
- Door hinges should be located on the interior; otherwise exterior hinges must be tamper-proof or pinned
- Have an STC rating of 51 unless a vestibule is constructed
15. Existing door stop for door #001, 003 and 005 may need to be relocated to suit new adjacent partition location.
16. All metal doors and frames to be painted with paint suitable for metal application. Properly prepare metal door and
frame as required and ensure no pealing, etc...
17. Heavy cold rolled door and metal frame for door #010 to be painted with Gloss, Level 1 finish.
18.Supply and install caulking suitable for painting around all door frame inside and outside of room.

2
1
7
8
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
1920 Site Dimension Required
Relocated metal door frame.
Paint to be applied both sides.

9
9
0
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
New solid core wood.
Paint to be applied both sides.
Reused unican lock c/w with
lever handle. Adjust to suit new
door swing.
Active door leaf Fixed door leaf
New full height steel astragal.
EQ
3061 Site Dimension Required
EQ
305 Site
Dimension Required
305 Site
Dimension Required
Relocated frameless glazing.
Relocate existing blinds located
on Interior side of Room.
Line of partition.
Align 12mm x 12mm reveal
painted black to match
door frame - both sides
of partition.
New black vinyl baseboard.
1
0
2
9
2
10
9
4
10
Line of partition.

2
1
7
8
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
1003 Site Dimension Required

9
9
0
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
Reused metal
door frame.
Paint to be
applied both
sides.
New solid core
wood door.
Paint to be
applied both
sides.
Reused unican
lock c/w with
lever handle.
12mm x 12mm reveal
painted black to match
door frame - both sides
of partition.
9
2
10
Reused kickplate.
Line of partition.
Line of partition.

2
1
8
5
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
1017 Site Dimension Required

9
9
0
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
New metal door
frame. Paint to be
applied both
sides.
New/reused solid
core wood door.
Paint to be
applied both
sides.
New lever lockset,
mortise.
51
9
3
10
9
5
10
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Door Schedule
and Elevations
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID09
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
2
1
8
5
1017
Heavy cold rolled door. Metal frame

9
9
0
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
5
1
180 Site
Dimension Required
Solid core wood door. Paint to
be applied both sides.
Relocated metal door frame.
Paint to be applied both sides.
The partition construction is an
assumption. Actual partition
construction to be confirmed on
site.
12mm x 12mm reveal to be
maintain on both sides to be
painted black - both sides of
partition.
Blocking as required.
90
Blocking as
required.
New 44mm solid
core wood door.
Paint to be applied
both sides.
5
1New metal door
frame to match
existing. Paint to
be applied both
sides.
305 Site Dimension
Required

1
8
0
T
o
M
a
tc
h
E
x
is
tin
g
Relocated
frameless
glazing.
Black
rubber
gasket.
E
Q
E
Q
Line of
baseboard
below
Existing wall mounted
acoustic panel to be
removed and discarded.
Existing partition to
be removed and
discarded.

3
8
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
Existing wall
mounted
acoustic.
165 Site Dimension
Required
30 Typ.
13 Typ.
Full partition height wood
blocking to match wall
mounted acoustic panels
thickness.
Aluminum plate secured
with screws. All screws
to be countersunk and
flush with plate fascia.
Ensure all edges are
smooth. Paint all
exposed surfaces to
blend with acoustic panel
colour.
CL
10
7
10
30 Typ.
13 Typ.
165 Site Dimension
Required 1
0
2
E
Q
Existing wall
mounted acoustic
panel.
CL
E
Q
E
Q
E
Q
E
Q
1
0
2
CL
CL
CL
CL
E
Q
CL
CL
Line of wall mounted
acoustic panel edge
beyond plate.
Full partition height wood
blocking beyond to match
wall mounted acoustic
panels thickness.
Aluminum plate secured
with screws. All screws to
be countersunk and flush
with plate fascia. Ensure all
edges are smooth. Paint all
exposed surfaces to blend
with acoustic panel colour.
Existing wall
mounted acoustic
panel.
Where existing partition
finished with brushed
aluminum top channel
below ceiling, return
brushed aluminum plate
tight against top channel
on both sides. Ensure no
visible blocking.
51
Heavy duty
hinge
New 44mm
solid core wood
door. Paint to
be applied both
sides.
New metal door
frame to match
existing. Paint to
be applied both
sides.
Blocking as
required
9
0
Line of
header
above
Line of
baseboard
below
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Door Elevations, Sections
and Architectural
Elevation and Section
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID10
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
DN
UP
UP C T ELEPHONE C CCC
UP
UP
DN
DN
UP
DN
16mm gypsum board both
sides on 150mm, 0.81 gauge
metal studs at 400mm o.c.
Tape, fill and sand smooth
ready for paint.
65mm sound attenuation
batts suitable for metal
stud application.
Baseboard as applicable.
Refer to Floor Finish Plan
ID08.
150mm metal runner.
U/S of existing Steel Shield
Line of finished
suspended T-bar ceiling
Line of finished raised
floor system to remain.
Acoustical caulk

3
0
1
6
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d

5
8
4
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
180 Site Dimension Required

2
5
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
Note:
- Approximate 25mm spacing from top of metal track and u/s of steel shield to be maintained.
Baseboard as applicable.
Refer to Floor Finish Plan
ID08.
65mm metal runner
Line of finished raised floor
system to remain.
Acoustical caulk
65mm sound attenuation
batts suitable for metal
stud application
13mm gypsum board both
sides on 65mm, 0.45 gauge
steel studs at 400mm o.c.
Tape, fill and sand smooth
ready for paint.
U/S of existing suspended
T-bar ceiling
Line of finished suspended
T-bar ceiling
Acoustical building felt liner
"L" trim (Typical)
Building standard ceiling 'T' clip
90

3
0
1
6
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d

5
8
4
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
Two layers of 16mm
fire-resistant gypsum
board both sides. First
layer to be affixed
horizontally and caulked
at each joint. Second
layer to be affixed
perpendicularly and
caulked at each joints.
65mm sound attenuation
blankets between studs.
Baseboard vinyl
baseboard. Refer to Floor
Finish Plan ID08.
150mm metal runner.
U/S of existing Steel Shield
Line of finished
suspended T-bar ceiling
Line of concrete slab.
Fire rated acoustical caulk.

3
6
1
3
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
217
Unsecure
Side
Secure
Side
13mm rubber board gasket
150mm metal runner
Line of finished raised
floor system to remain.
13mm rubber board gasket
40mm x 20mm x 2.6 gauge
welded wire mesh to face of
studs.
32mm x 150mm x 1.22mm
galvanized steel stud at
300mm o.c.
Fire rated acoustical caulk.
65mm metal runner
Line of finished raised floor
system to remain.
Acoustical caulk
13mm gypsum board one
side only (Exterior side of
room) on 65mm, 0.45 gauge
steel studs at 400mm o.c.
Joints to be tight against
each other. Fill joints as
required and ensure no dust
and construction debris
enters the protected spaces.
U/S of existing suspended
T-bar ceiling
Line of finished suspended
T-bar ceiling
"L" trim (Typical)
Building standard ceiling 'T' clip
90

3
0
1
6
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d

5
8
4
S
ite
D
im
e
n
s
io
n
R
e
q
u
ire
d
PWGSC A1 (841x594)
Administrateur de projets
TPSGC No. du projet
No. du dessin
Date
Project Manager
PWGSC Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Partition Sections
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID11
This drawing is the property of the designer. Copyright is reserved.
No reproduction may be made without prior consent of the
designers and such copies must bear their names.
This drawing shall not be used for construction purposes until
signed by the designer.
The contractor is to verify dimensions and data noted herein with
the conditions on the site and report any discrepancy to the
designer. Do not scale this drawing.
Scale 1:100
Key Plan
Project
North
O
A
R
I D
PART PLAN
1 : 50
1
S01
SECTION
1 : 10
NEW SLAB TO SLAB PARTITION
CUT EXISTING CHANNEL AND
CONNECT TO NEW POST
NEW POST
41.3mm GALVANIZED STEEL CHANNEL OR
EQUIVALENT CONNECT TO EXISTING CHANNEL
w/ 3 SIDED WING SHAPE FITTING

EXISTING CHANNEL & VERT.


SUPPORT TO REMAIN
POST TO BEAR ON SLAB ON GRADE w/ POST
BASE AND BRACKET ANCHOR TO SLAB w/
MIN. 2 CONCRETE EXPANSION ANCHORS
LEVEL w/ NON SHRINK GROUT OR EPOXY
EXISTING SLAB ON GRADE
EXISTING RAISED FLOOR
TO REMAIN
2
S01
SECTION
1 : 10
NEW SLAB TO SLAB PARTITION
N
E
W
P
O
S
T
POST TO BEAR ON SLAB ON GRADE w/ POST
BASE AND BRACKET. ANCHOR TO SLAB w/
MIN. 2 CONCRETE EXPANSION ANCHORS
LEVEL w/ NON SHRINK GROUT OR EPOXY
EXISTING SLAB ON GRADE
N
E
W
P
O
S
T
N
E
W
P
O
S
T
N
E
W
P
O
S
T
NEW 41.3mm GALVANIZED STEEL CHANNEL
(TOES DOWN) TO SUPPORT EDGE OF RAISED
FLOOR TILES
CONNECT EXISTING
CHANNEL TO NEW POST
EXISTING OF WALL BEYOND
TYPICAL DETAIL
SLAB TO SLAB WALL
1 : 10
WELD DEFLECTION TRACK TO
EXISTING STEEL PANEL FOR A
LATERAL LOAD OF 1.0 kN/m
DEFLECTION TRACK TO ALLOW
FOR 25mm VERTICAL
MOVEMENT
EXISTING STEEL PANEL
REFER TO ID DRAWINGS FOR
WALL CONSTRUCTION
N
E
W
P
O
S
T
PWGSC A1 (841x594)
Administrateur de projets
No. du projet
No. du dessin
Date
Project Manager
Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Examin par
Approuv par
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
100 0 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. du detail
sur dessin no.
location drawing no.
drawing no.
dessin no.
detail no.
Canada
211-2141 Thurston Drive
Ottawa ON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Part Plan & Details
N.M.
2013
R.C. / XY.ZHANG
2013-
N.M.
2013/03/27
J.M.
2013/03/28
-
-
12108spti
S01

You might also like