INEDON

INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS


FECHA OBJETO ELABOR Iniciales REVIS Iniciales APROB Iniciales/Cargo

APR.10

Emisin Original

JRR

HC/PPC/ LU

MS/VPO SN/VPO

903-HM150-E09-EDU-710.DOCREV0

1 de 7

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS ndice Pgina 1. PROPSITO................................................................................................................. 3 2. OBJETIVOS .................................................................................................................. 3 3. ALCANCE ..................................................................................................................... 3 4. RECURSOS .................................................................................................................. 3 ANEXO N 1 - PRESENTACIN ......................................................................................... 4 ANEXO N 2 - MATERIAL DEL FACILITADOR ................................................................... 5 ANEXO N 3 - MATERIAL DEL PARTICIPANTE ................................................................. 6 ANEXO N 4 - REFERENCIAS ............................................................................................ 7

903-HM150-E09-EDU-710.DOCREV0

2 de 7

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS 1. PROPSITO Ensear al participante el uso del programa ETAP Power Station como herramienta para el clculo de ampacidades en cables instalados en canalizaciones subterrneas. 2. OBJETIVOS GENERALES Al finalizar el curso los participantes estarn en capacidad de realizar estudios de ampacidad en cables instalados en canalizaciones subterrneas con la ayuda del mdulo de canalizaciones subterrneas del ETAP. 3. ALCANCE Este curso est dirigido a Tcnicos e Ingenieros que estn involucrados en el diseo de canalizaciones subterrneas y en el dimensionamiento de los cables. 4. RECURSOS Los materiales y herramientas necesarios para la correcta realizacin del curso se incluyen en los Anexos de este documento: Presentacin: Constituye las lminas que debern usarse durante el dictado del curso, las mismas estn incluidas en el Anexo N 1 de este INEDON, la cual consta de 61 diapositivas diseadas para ser dictadas en 8 horas (1 da). El facilitador deber dictar el curso apoyndose en la herramienta (ETAP). Solo se utilizara las diapositivas de paso a paso del uso de la herramienta, cuando no se disponga del ETAP. Material de Facilitador: Informacin necesaria para que el Facilitador dicte el Curso. Incluye material de apoyo y ejercicios. Esta informacin se encuentra en el Anexo N 2. Material del Participante: Informacin que se le dar al participante en copia dura. Incluye el manual del curso y material de referencia. Esta informacin se encuentra en el Anexo N 3. Referencias: Material que podra ayudar al Facilitador a expandir sus conocimientos del tema o indicar los basamentos de la informacin que presenta. Esta informacin se encuentra en el Anexo N 4.

903-HM150-E09-EDU-710.DOCREV0

3 de 7

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

A N E X O N 1 - P R E S E N T A C I N

903-HM150-E09-EDU-710.DOCREV0

4 de 7

INEDON

Mdulo de Sistemas de Canalizaciones Subterrneas - ETAP

N903-HM150-E09-EDU-710-1 Rev. 0 / JRR / 15-01-2010

Sistema de Canalizaciones Subterrneas


Agenda: Objetivos. Anlisis de la capacidad trmica de conduccin. Atributos y caractersticas del mdulo de canalizaciones ETAP. Capacidades de clculo. Creacin de una bancada. Estudio de ampacidad en bancadas. Creacin de una trinchera. Estudio de ampacidad en trincheras. Recomendaciones.

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Objetivo General: Aprender a realizar estudios de ampacidad en cables instalados en canalizaciones subterrneas con la ayuda del mdulo de canalizaciones subterrneas del ETAP. Duracin del Curso: 8 Horas.

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Anlisis de la Capacidad Trmica de Conduccin. El anlisis de la capacidad trmica de conduccin determina la ampacidad de los cables de potencia en canalizaciones subterrneas. Esta ampacidad es determinada por la mxima temperatura permitida por el conductor que es funcin del dao que el aislamiento puede sufrir como consecuencia de las altas temperaturas de operacin.

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Anlisis de la Capacidad Trmica de Conduccin. Los principales factores para determinar la temperatura de operacin de los cables son: La temperatura ambiente. sta puede variar a lo largo del conductor y con el tiempo. El calor generado interiormente en el conductor por el paso de la corriente elctrica, incluidas las corrientes fundamentales y sus armnicas. El factor de disipacin del calor generado al medio ambiente. El aislamiento trmico que cubre o rodea a los cables, puede afectar ese factor de disipacin. Conductores adyacentes que transportan carga. Los conductores adyacentes tienen el doble efecto de elevar la temperatura del cable en estudio y de impedir la disipacin del calor. Fuente de calor externa que est prxima a la bancada, tal como, una tubera de proceso.
Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Atributos y Caractersticas Principales del Mdulo de Canalizaciones del ETAP: Clculo de temperatura en rgimen permanente y transitorio. Optimizacin de la capacidad amperimtrica. Diseo automtico de cables por capacidad amperimtrica. Interface grfica que permite la manipulacin de modelos de canalizaciones, cables, conduits, entre otros. Seleccin dinmica de cables desde el esquema unifilar. Permite posicionar canalizaciones en forma no simtrica. Seleccin de cables armados definidos por el usuario.

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Capacidades del Clculo: Anlisis de temperaturas No existen limitaciones en niveles de tensin Verificacin automtica de errores

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Diagrama de Sistemas de Canalizaciones Subterrneas :
Clculo de Alimentadores Lista de Cargas

Lista de Cables

si Anlisis de Ampacidad ETAP

Validacin del Diseo de Canalizaciones Subterrneas y Lista de Cables Cambiar posicin del cable

si no Cambiar calibre

Resultado esperado

no

si
Diseo de Canalizaciones Subterrneas

no

Plot Plan

Unidad de Ingeniera Elctrica

Sistema de Canalizaciones Subterrneas


Anlisis de Ampacidad: Bancadas Bancada a simular
Tubos ID de la Bancada ID del Tubo
Tamao Tipo de Tubo Distancia horizontal con respecto al extremo izquierdo de la bancada Distancia vertical con respecto al extremo superior de la bancada Tipo de Concreto Distancia horizontal con respecto al extremo izquierdo del terreno Distancia vertical con respecto a la superficie Ancho Largo Rho del concreto y del terreno

Cables ID del Cable


Tipo de conductor y conexin Tamao Tipo de Instalacin Frecuencia Carga Capacidad de Temperatura Capacidad de tensin

Reportes
Unidad de Ingeniera Elctrica 9

Sistema de Canalizaciones Subterrneas


Creacin de una Bancada en el ETAP

Unidad de Ingeniera Elctrica

10

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP: Se debe abrir el programa y seleccionar la opcin New Project

Se asigna el nombre a la nueva carpeta de trabajo

Unidad de Ingeniera Elctrica

11

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Se hace click derecho en la carpeta U/G raceway Systems para iniciar un nuevo Underground Raceway System. Se selecciona Create New y aparece la pantalla UGS

Unidad de Ingeniera Elctrica

12

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Ventana de edicin UGS Underground System Raceway Editor

Unidad de Ingeniera Elctrica

13

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Puntero Aadir una fuente existente/nueva de calor Aadir un cable existente/nuevo Aadir una bancada existente/nueva Aadir una trinchera existente/nueva Aadir un ducto nuevo para una bancada/ Aadir una nueva localizacin para una trinchera Opciones de Presentacin

Unidad de Ingeniera Elctrica

14

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Ventana de edicin UGS

Unidad de Ingeniera Elctrica

15

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Se debe estar en el modo Edit.

Unidad de Ingeniera Elctrica

16

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Ventana de entrada de datos del terreno

Unidad de Ingeniera Elctrica

17

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP: Tipos de terreno: la escogencia del tipo de terreno no afecta los clculos.

Unidad de Ingeniera Elctrica

18

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Ventana de entrada de datos de la bancada

Unidad de Ingeniera Elctrica

19

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP: Tipos de concreto:

Light Aggregate: Ligero Heavy Aggregate: Pesado

Unidad de Ingeniera Elctrica

20

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP: Se agregan los conduits

Ventana de edicin del conduit

Unidad de Ingeniera Elctrica

21

Sistema de Canalizaciones Subterrneas


Fundamentos para ingresar los cables en la canalizacin: Se agregan los cables Ventana de edicin del cable

En botn Library se pueden seleccionar elementos con propiedades preestablecidas para ingresarlos en el editor.

Unidad de Ingeniera Elctrica

22

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una bancada en ETAP:

Modo U/G cable Raceway

Unidad de Ingeniera Elctrica

23

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo de la Temperatura del Cable en Rgimen Permanente Clculo de la Capacidad Amperimtrica del Cable (Ampacidad Constante) Clculo de la Capacidad Amperimtrica del Cable (Temperatura Constante) Dimensin (calibre) del cable Clculo Transitorio de la Temperatura del Cable Opciones de Presentacin Reportes Grficos de la Temperatura del Cable
Unidad de Ingeniera Elctrica 24

Sistema de Canalizaciones Subterrneas


Estudio de Ampacidad en bancadas

Ejemplo de estudio de ampacidad. Bancada a la cual se le ha realizado un estudio de ampacidad.

Unidad de Ingeniera Elctrica

25

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo de la Temperatura del Cable en Rgimen Permanente: Este clculo determina la temperatura del conductor en rgimen permanente para una carga especfica del cable y una configuracin dada. Considera el efecto del calor generado por cables vecinos y fuentes externas de calor.

Unidad de Ingeniera Elctrica

26

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo de la Capacidad Amperimtrica del Cable (Ampacidad Constante): Este clculo asume que la carga de todos los cables aumenta o disminuye uniformemente basada en la ampacidad base del cable, la cual est definida en la librera del cable. La capacidad amperimtrica del cable se calcula por el incremento de la carga en todos los cables hasta que la temperatura del cable ms caliente alcance el lmite mximo permitido.

Unidad de Ingeniera Elctrica

27

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo de la Capacidad Amperimtrica del Cable (Temperatura Constante): Este clculo ajusta la carga de los cables de forma individual para mantener la temperatura constante en el sistema. La capacidad amperimtrica del cable se obtiene cuando la temperatura del cable alcanza su lmite mximo permitido.

Unidad de Ingeniera Elctrica

28

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo del Calibre del Cable: El resultado de este estudio presenta el calibre ms pequeo posible para todos los cables en el sistema, que puedan llevar la carga especfica dentro de la temperatura lmite. Clculo Transitorio de la Temperatura del Cable: Este estudio permite investigar las condiciones de operacin transitorias del cable y verificar la temperatura del cable en funcin del tiempo para determinar el lmite de la carga en un determinado tiempo.

Unidad de Ingeniera Elctrica

29

Sistema de Canalizaciones Subterrneas


Ingreso de datos para Clculo Transitorio:

Load Factor = 100% (kWi * Ti) (kWp * Tt) Donde: kWi kWp Ti Tt Carga en el intervalo i Carga pico Nde horas del intervalo i Horas totales

Unidad de Ingeniera Elctrica

30

Sistema de Canalizaciones Subterrneas


Ingreso de datos para Clculo Transitorio: Si no se quiere variar la corriente en un cable para los estudios de capacidad amperimtrica se selecciona Fixed Current. Si no se quiere variar el calibre del cable para los estudios de dimensionamiento se selecciona Fixed Size.

Unidad de Ingeniera Elctrica

31

Sistema de Canalizaciones Subterrneas


Presentacin de resultados de Clculo Transitorio: Clculo Transitorio de la Temperatura del Cable:

Unidad de Ingeniera Elctrica

32

Sistema de Canalizaciones Subterrneas


Presentacin de resultados de Clculo Transitorio: Clculo transitorio de temperatura basado en perfiles de carga. Opcin de visualizar varios cables en forma simultnea. Disponibilidad de vista ampliada. Disponibilidad exportar datos a Microsoft Excel. de

Unidad de Ingeniera Elctrica

33

Sistema de Canalizaciones Subterrneas


Reportes: Opcin para colocarle el nombre al reporte

Unidad de Ingeniera Elctrica

34

Sistema de Canalizaciones Subterrneas


Reportes: Se resaltan automticamente los cables excedidos en lmites crticos y marginales El cable ha excedido el lmite de seguridad especificado por el usuario, y no ha excedido el aislamiento trmico del cable. El cable ha excedido el aislamiento trmico del cable. El cable est bajo condiciones normales de operacin, no ha excedido el lmite de seguridad especificado por el usuario.

Unidad de Ingeniera Elctrica

35

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la temperatura del ambiente (terreno) y las temperaturas de alarma (crtica) y alerta (marginal) de los cables.

Unidad de Ingeniera Elctrica

36

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la canalizacin (datos de entrada).

Unidad de Ingeniera Elctrica

37

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la configuracin de los cables(datos de entrada).

Unidad de Ingeniera Elctrica

38

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la temperatura de cada uno de los cables en la bancada.

Unidad de Ingeniera Elctrica

39

Sistema de Canalizaciones Subterrneas


Creacin de una Trinchera en el ETAP

Unidad de Ingeniera Elctrica

40

Sistema de Canalizaciones Subterrneas


Anlisis de Ampacidad: Trincheras Trinchera a simular
Espacio para el cable

Cables ID de la Trinchera
Tipo de Relleno Distancia horizontal con respecto al extremo izquierdo del terreno Distancia vertical con respecto a la superficie Ancho Largo Rho del terreno y de la arena

ID del Espacio para el cable


Tamao (manual) Distancia horizontal con respecto al extremo izquierdo de la trinchera Distancia vertical con respecto al extremo superior de la trinchera

ID del Cable
Tipo de conductor y conexin Tamao Tipo de Instalacin Frecuencia Carga Capacidad de Temperatura Capacidad de tensin

Reportes
Unidad de Ingeniera Elctrica 41

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP: Se debe abrir el programa y seleccionar la opcin New Project

Se asigna el nombre a la nueva carpeta de trabajo

Unidad de Ingeniera Elctrica

42

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Se hace click derecho en la carpeta U/G raceway Systems para iniciar un nuevo Underground Raceway System. Se selecciona Create New y aparece la pantalla UGS

Unidad de Ingeniera Elctrica

43

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Puntero Aadir una fuente existente/nueva de calor Aadir un cable existente/nuevo Aadir una bancada existente/nueva Aadir una trinchera existente/nueva Aadir un ducto nuevo para una bancada/ Aadir una nueva localizacin para una trinchera Opciones de Presentacin

Unidad de Ingeniera Elctrica

44

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Ventana de entrada de datos del terreno

Unidad de Ingeniera Elctrica

45

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Tipos de terreno: la escogencia del tipo de terreno no afecta los clculos.

Unidad de Ingeniera Elctrica

46

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Ventana de entrada de datos de la trinchera Resistencia trmica del material de relleno

Unidad de Ingeniera Elctrica

47

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP: Tipos de relleno: la escogencia del tipo de relleno no afecta los clculos.

Unidad de Ingeniera Elctrica

48

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP: Se agregan las localizaciones de los cables de la trincheras Ventana de edicin de los espacios para cables

Unidad de Ingeniera Elctrica

49

Sistema de Canalizaciones Subterrneas


Fundamentos para ingresar los cables en la trinchera: Se agregan los cables Ventana de edicin del cable

En botn Library se pueden seleccionar elementos con propiedades preestablecidas para ingresarlos en el editor.

Unidad de Ingeniera Elctrica

50

Sistema de Canalizaciones Subterrneas


Fundamentos para crear y manipular una trinchera en ETAP:

Modo U/G Cable Raceway

Unidad de Ingeniera Elctrica

51

Sistema de Canalizaciones Subterrneas


Estudio de Ampacidad en Trincheras

Ejemplo de estudio de ampacidad. Trinchera a la cual se le ha realizado un estudio de ampacidad.

Unidad de Ingeniera Elctrica

52

Sistema de Canalizaciones Subterrneas


Opciones de clculo:

Clculo de la Temperatura del Cable en Rgimen Permanente Clculo de la Capacidad Amperimtrica del Cable (Ampacidad Constante) Clculo de la Capacidad Amperimtrica del Cable (Temperatura Constante) Dimensin (calibre) del cable Clculo Transitorio de la Temperatura del Cable Opciones de Presentacin Reportes Grficos de la Temperatura del Cable
Unidad de Ingeniera Elctrica 53

Sistema de Canalizaciones Subterrneas


Reportes: Opcin para colocarle el nombre al reporte

Unidad de Ingeniera Elctrica

54

Sistema de Canalizaciones Subterrneas


Reportes: Se resaltan automticamente los cables excedidos en lmites crticos y marginales El cable ha excedido el lmite de seguridad especificado por el usuario, y no ha excedido el aislamiento trmico del cable. El cable ha excedido el aislamiento trmico del cable. El cable est bajo condiciones normales de operacin, no ha excedido el lmite de seguridad especificado por el usuario.

Unidad de Ingeniera Elctrica

55

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la temperatura del ambiente (terreno) y las temperaturas de alarma (crtica) y alerta (marginal) de los cables.

Unidad de Ingeniera Elctrica

56

Sistema de Canalizaciones Subterrneas


Reportes:

En el reporte el usuario puede visualizar la informacin relacionada con la canalizacin (datos de entrada).

Unidad de Ingeniera Elctrica

57

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la configuracin de los cables(datos de entrada).

Unidad de Ingeniera Elctrica

58

Sistema de Canalizaciones Subterrneas


Reportes: En el reporte el usuario puede visualizar la informacin relacionada con la temperatura de cada uno de los cables en la trinchera.

Unidad de Ingeniera Elctrica

59

Sistema de Canalizaciones Subterrneas


Recomendaciones: Al crear un proyecto en ETAP el usuario debe decidir el sistema de unidades a utilizar (sistema mtrico ingles). Es importante recordar que las dimensiones de la canalizacin y dimetros de tuberas estn expresadas en cm o pulg dependiendo del sistema de unidades. La profundidad mnima para bancadas y trincheras debe ser de 2 (diseo ETAP). El usuario debe consultar las normas que apliquen en el diseo de canalizaciones subterrneas para determinar las profundidades de acuerdo con el tipo de canalizacin. En caso de no poseer los valores de resistividad trmica el usuario debe utilizar los valores indicados en el anexo B de CEN los valores indicados en la IEEE Std.399.

Unidad de Ingeniera Elctrica

60

Sistema de Canalizaciones Subterrneas


Recomendaciones: En el caso de necesitar un cable no listado en la librera del ETAP se debe utilizar uno con caractersticas fsicas similares. Crear cables en la librera del ETAP es un proceso complicado debido a la cantidad de datos que requiere el programa. Adicionalmente el usuario no tiene forma de corroborar que el programa esta utilizando la informacin del cable creado de forma correcta. La informacin relacionada con la temperatura del aislamiento del cable, temperatura ambiente y resistividad trmica debe ser indicada modificada en la configuracin del terreno y en los datos de entrada de los cables. En caso de no obtener los resultados deseados se recomienda reubicar el cable de mayor temperatura, de no ser posible se recomienda aumentar el calibre del cable. Si las condiciones no mejoran se debe considerar disear una nueva canalizacin.

Unidad de Ingeniera Elctrica

61

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

A N E X O N 2 - M A T E R I A L D E L F A C I L I T A D O R

903-HM150-E09-EDU-710.DOCREV0

5 de 7

INEDON

N 903-HM150-E09-EDU-710-2

Cable Derating Analysis

Page 2 of 2

IEC 60287-3-1 Amd.1 Ed. 1.0 b:1999

Amendment 1

The cable ampacity calculation and cable sizing are based on the NEC accepted Neher-McGrath method only. The transient temperature calculation is based on a dynamic thermal circuit model. All of these calculations can handle multi-raceway systems and consider the effect of heat generated by neighboring cables and external heat sources. This chapter contains the following sections:

The GUI section explains the various toolbars and their functions, how to launch calculations, open and view an output report, and how to select display options. The Editor section explains how to add/edit elements of the system, how to create a new study case, what parameters are required to specify a study case, and how to set them. The Display Options section explains what options are available for displaying some key system parameters and the output results on the UGS diagram, and how to set them. The Calculation Methods section briefly describes calculation methods for steady-state temperature calculation, cable ampacity calculation, cable sizing, and transient temperature calculation. The Required Data section describes what data is necessary to perform Cable Ampacity Derating calculations and where to enter them. The Output Reports and Plots section illustrates and explains the data contents of the output report and how to interpret results on the plots. The Tutorial section provides an overview of the operation and of some key functions of the Underground Raceway Systems module.

UGS Graphic User Interface UGS Edit Toolbar UGS Display Options Editing UGS UGS Calculation Methods UGS Output Reports UGS Plots UGS Tutorial

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Edit Toolbar, Underground Raceway System

Page 1 of 3

UGS Edit Toolbar

UGS Edit Toolbar

Pointer
The mouse pointer allows you to select or move items. Clicking on the Pointer icon returns the cursor to its original shape after an element icon has been clicked on, displaying an element to be placed into the UGS.

Existing External Heat Source


Click on the Existing External Heat Source icon to open a drop-down list from which you can choose an external heat source that has been previously created.

If no existing external heat sources are available a message box will appear. These external heat sources can be found either in the Dumpster or in other underground systems. For more information on external heat sources see the External Heat Source Editor.

New External Heat Source


Click on the New External Heat Source icon to create a new external heat source. This will enable you to place it in the UGS wherever there is space available. For more information on external heat sources see External Heat Source Editor.

Existing Cable
Click on the Existing Cable icon to open a drop-down list from which you can choose a cable that has been previously created. This list includes one-line, equipment, and UGS cables.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Edit Toolbar, Underground Raceway System

Page 2 of 3

The cables in this list can be found in the one-line diagram (either as a one-line or equipment cable), Dumpster (deleted cables), or in other underground raceway systems (UGS cables). Cables selected from the one-line diagram will be converted from one-line or equipment cables to compound cables. A compound cable represents a cable that exits in the one-line diagram and UGS. For more information on cables, see Cable Editor Overview. Note: you can graphically add existing one-line cables to any location (conduit) in UGS. To do this, press and hold Control+Shift and drag the cable from the one-line diagram into a location in UGS. A message will appear if no existing cables are available. These cables can be found in the one-line diagram, Dumpster, or in other underground raceway systems. Cables selected from the one-line diagram will be converted from one-line cables to compound cables. For more information on cables, see Cable Editor Overview.

New Cable
Click the New Cable icon to create a new cable. This will enable you to place it in the UGS wherever there is space available. This cable will be a UGS cable since it only exists in the UGS. To add this cable (or any other cable in the UGS) to the one-line diagram press and hold Control+Shift and drag the cable, using the mouse, from the UGS into the one-line diagram. For more information on cables see the Cable Editor Overview.

Existing Duct Bank Raceway


Click the Existing Duct Bank Raceway icon to open a dialog box from which you can choose a duct bank raceway that has been previously created.

A message will appear if no existing duct bank raceways are available. These duct bank raceways can be found either in the Dumpster or in other underground systems. For more information on duct bank raceways, see Duct Bank Raceway Editor.

New Duct Bank Raceway


Click the New Duct Bank Raceway icon to create a new duct bank raceway. This will enable you to place it in the UGS wherever there is space available. For more information on duct bank raceways, see Duct Bank Raceway Editor.

Existing Direct Buried Raceway


Click the Existing Direct Buried Raceway icon to open a dialog box from which you can choose a direct buried raceway that has been previously created.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Edit Toolbar, Underground Raceway System

Page 3 of 3

A message will appear if no existing direct buried raceways are available. These direct buried raceways can be found either in the Dumpster or in other U/G Systems. For more information on direct buried raceways, see Direct Buried Raceway Editor.

New Direct Buried Raceway


Click the New Direct Buried Raceway icon to create a new direct buried raceway. This will enable you to place it in the UGS wherever there is space available. For more information on direct buried raceways, see Direct Buried Raceway Editor.

New Conduit
Click the New Conduit icon to create a new conduit. This will enable you to place it in any duct bank raceway wherever there is space available. For more information on conduits, see Conduit Editor.

New Location
Click the New Location icon to create a new location. This will enable you to place any Direct Buried Raceway wherever there is space available. For more information on locations, see Location Editor.

Display Option
Click on the Display Options icon to change the appearance of element IDs and ratings in the UGS. For more information, see Display Options

Cable Derating Analysis UGS Graphic User Interface UGS Edit Toolbar UGS Display Options Editing UGS UGS Calculation Methods UGS Output Reports UGS Plots UGS Tutorial

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Underground System Tutorial

Page 1 of 2

Underground System Tutorial


This tutorial provides a brief overview of the operation of the Underground Raceway System (UGS). Once you finish this tutorial, you will be familiar with some the key features and capabilities of the program and the various options available for performing cable derating analysis. Cable derating analysis is an important part of power system design and analysis. For designing a new system, it determines the proper size of cables to carry the specified loads. For analysis of an existing system, it examines cable temperatures and determines their ampacities.

Starting the ETAP Program and Opening the Example Project


Start the ETAP program by double-clicking on the icon.

ETAP organizes your work on a project basis. Each project provides all the necessary tools and support for modeling and analyzing an electrical power system. A project consists of an electrical system that requires a unique set of electrical components and interconnections. In ETAP, each project provides a set of users, user access controls, and a separate database in which its elements and connectivity data are stored. Follow these simple steps to open the EXAMPLE project file. Enter your User Name in the Logon Editor and select the Project Editor option in the Select Access Level Editor.

The Example project includes a one-line diagram of an electrical system. Notice the UGS1 view located behind the Study View. Click on the UGS1 view to bring it to the foreground or click on the UGS button on the System Toolbar.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Underground System Tutorial

Page 2 of 2

Cable Derating Analysis

Continue

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Cross Section Diagrams and Editors

Page 1 of 3

Cross Section Diagrams and Editors


ETAP provides a fully graphical Underground (U/G) Raceway System. Each ETAP project supports a unique U/G raceway system with multiple views of the U/G system. Each view is conceptually a cross-section of the desired raceways and heat sources that are in the same vicinity.

Notice the toolbars on the top and the right-hand side of the U/G raceway cross-section view.

Editors

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Cross Section Diagrams and Editors

Page 2 of 3

Click on OK and close the editor. Double-click on the underground system and view Underground System Editor. This editor provides details regarding the overall layout of underground raceways, which includes global properties such as soil type and temperature

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Cross Section Diagrams and Editors

Page 3 of 3

Click on OK and close the editor. Double-click on the External Heat Source. External heat sources can be placed in underground raceway systems to simulate steam pipes or other sources of heat in the vicinity of raceways.

Continue Start Back

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Menu Bars and Toolbars

Page 1 of 5

Menu Bars and Toolbars ETAP Menu Bar

The ETAP Menu Bar contains a comprehensive collection of menu options. This menu bar is displayed when a UGS view is active. The ETAP menu bar contains a list of menu options which, when an option is selected, activates a drop-down list of commands. Some of the menu options also activate an additional list of menus (an arrow pointing to the right denotes an additional menu). For example, select Project, Settings, and Data Type.

Project Toolbar

The Project Toolbar contains icons that allow you to perform shortcuts of many commonly used functions in ETAP.

Mode Toolbar

Underground raceway system has two modes of operation, Edit, and U/G Cable Raceway.

Edit Mode
Edit mode allows you to create a cross-section view of your underground raceway system.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Menu Bars and Toolbars

Page 2 of 5

To add elements to the UGS view you click on the elements on the Edit toolbar and add it to the UGS view. Lets start by adding a New Duct Bank Raceway to the UGS View. Then add two New Conduits to the raceway. Resize a conduit as follows:

Click once on one of the conduits so it is selected. Then move your cursor to one corner of the selection box. A double-end arrow appears. Left-click, hold, and drag the cursor. Release the cursor when the desired conduit size is reached.

Note that you can also resize a conduit from its editor.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Menu Bars and Toolbars

Page 3 of 5

Next click on the New Cable icon on the Edit Toolbar and add a cable to the conduit. Then double-click on the cable cross-section and select a cable from the library.

Select different cable sizes and notice how the cross-section size of the cable changes accordingly. Click on one conductor and notice the cable phase annotation. Select a conductor and drag it to the second conduit.

Study Mode
Cable Derating Study mode enables you to create and modify study cases, perform system analysis, and view output reports and plots.

Click on the U/G Cable Raceway icon on the Mode Toolbar to go to the Cable Derating Study Mode. Cable Derating Study Toolbar and Cable Derating Study Case Toolbar are available in the Study mode of operation.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Menu Bars and Toolbars

Page 4 of 5

Cable Derating Study Toolbar


When a study mode is active (selected), the Study Toolbar for the selected study is displayed on the right side of the screen.

By clicking on the buttons on the Study Toolbar, you can run studies, view output reports, view plots, and change display options. Cable Derating Study Case Toolbar and Editor When program is in Study mode, the Study Case toolbar appears on the top toolbar. This toolbar contains Cable Derating Study Case, output report name, and viewer.

Click on the Edit Study Case icon on the Study Case toolbar.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Menu Bars and Toolbars

Page 5 of 5

The Cable Derating Study Case Editor contains solution control variables, cable loading parameters, and options for output reports. ETAP allows you to create and save unlimited numbers of study cases. Cable derating calculations are conducted and reported in accordance with the settings you have specified in the study case editor. Note that you can have an unlimited number of study cases and can easily switch between the study cases without the trouble of resetting the study case options each time. This feature is designed to organize your study efforts and save you time. Click on OK and close the editor.

Continue Start Back

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Exercise

Page 1 of 3

Exercise
Letdo an exercise to get the feel of how UGS works. You learned how to add elements to the UGS view earlier in this tutorial. In this exercise you can run a study and study the calculation results.

Steps
1. Go to the Project View and open UGS2 view. This is a working example and you can perform all Cable Derating Analyses for learning purposes.

This example consists of one Raceway (RW2), six conduits, and six routed cables. There is a steam pipe in the close vicinity of this raceway.

2. Activate UGS2 view by clicking once on the view. Study toolbar appears on the right-hand side.

3. Run Steady-State Temperature analysis by clicking on its icon.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Exercise

Page 2 of 3

4. View the output report for the calculated results.

5. Perform other calculation methods and view the output report.

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

Exercise

Page 3 of 3

UGS Graphic User Interface UGS Edit Toolbar UGS Display Options Editing UGS UGS Calculation Methods UGS Output Reports UGS Plots UGS Tutorial

mk:@MSITStore:C:\ETAP%20600\Etaps.chm::/Chapter_25___Underground_Raceway_... 10/23/2009

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

A N E X O N 3 - M A T E R I A L D E L P A R T I C I P A N T E

903-HM150-E09-EDU-710.DOCREV0

6 de 7

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS


FECHA OBJETO ELABOR Iniciales REVIS Iniciales APROB Iniciales/Cargo

Ene.10

EMISION ORIGINAL

JRR

FC/HC

PPC/GIE

MANUAL.DOC/26/11/2009/MSOFFICE/

1 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS ndice Pgina 1. 2. 3. 3.1. 3.2. 3.3. INTRODUCCION .................................................................................................... 3 NORMAS DE REFERENCIA .................................................................................. 3 DESCRIPCIN DEL PROGRAMA ......................................................................... 4 ETAP (ELECTRICAL TRANSIENT ANALYSER PROGRAM) .............................. 4 ETAP: SISTEMAS DE CANALIZACIONES SUBTERRNEAS .............................. 4 INFORMACIN REQUERIDA PARA UNA ANLISIS DE CAPACIDAD AMPERIMTRICA DE CABLES ............................................................................. 4 3.3.1. DATOS DEL SISTEMA DE CANALIZACIONES SUBTERRNEAS ...................... 4 3.3.2. CONDUITS Y POSICIONES .................................................................................. 5 3.3.3. CABLES ................................................................................................................. 5 3.3.4. CASO EN ESTUDIO............................................................................................... 5 3.4. RECOMENDACIONES ........................................................................................... 5 4. INSTRUCCIONES DE TRABAJO........................................................................... 6 4.1. CREACIN DE UNA BANCADA ............................................................................ 9 4.2. CREACIN DE UNA TRINCHERA ...................................................................... 19 4.3. FUENTES EXTERNAS DE CALOR ..................................................................... 23 4.4. ESTUDIO DE AMPACIDAD.................................................................................. 23 4.4.1. CONFIGURACIN DEL CASO EN ESTUDIO. .................................................... 23 4.4.2. MTODOS DE CLCULO DE AMPACIDAD ....................................................... 25 4.4.2.1 ESTUDIO DE TEMPERATURA DEL CABLE EN RGIMEN PERMANENTE ...... 27 5. COMENTARIOS FINALES ................................................................................... 33

MANUAL.DOC/26/11/2009/MSOFFICE/

2 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

1.

INTRODUCCION El estudio de capacidad amperimtrica determina la ampacidad de los cables de potencia en canalizaciones subterrneas. Esta ampacidad es determinada por la mxima temperatura permitida por el conductor que es funcin del dao que el aislamiento puede sufrir como consecuencia de las altas temperaturas de operacin. La temperatura nominal de un conductor es la temperatura mxima en cualquier punto de su longitud, que el aislamiento puede soportar durante un perodo prolongado de tiempo sin que se produzca dao. Ningn conductor se debe utilizar de modo que su temperatura de funcionamiento supere la temperatura nominal. Los principales factores para determinar la temperatura de operacin de los cables son: 1. La temperatura ambiente. La temperatura ambiente puede variar a lo largo del conductor y con el tiempo. 2. El calor generado interiormente en el conductor por el paso de la corriente elctrica, incluidas las corrientes fundamentales y sus armnicas. 3. El factor de disipacin del calor generado al medio ambiente. El aislamiento trmico que cubre o rodea a los cables, puede afectar ese factor de disipacin. 4. Conductores adyacentes que transportan carga. Los conductores adyacentes tienen el doble efecto de elevar la temperatura del cable en estudio y de impedir la disipacin del calor. El estudio de capacidad amperimtrica es una parte importante del diseo y anlisis de sistemas de potencia. Al disear un nuevo sistema permite determinar el calibre apropiado de los cables para suplir las necesidades del sistema. En sistemas existentes determina la temperatura de los cables y sus ampacidades permitidas.

2.

NORMAS DE REFERENCIA C.E.N. Cdigo Elctrico Nacional (Fondonorma 200) N.E.C. National Electric Code 2008. (Cdigo Elctrico Nacional ) IEEE Std 399 Recommended Practice for Industrial and Commercial Power System Analysis. IEEE Std 442 Guide for Soil Thermal Resistivity Measurement. IEEE Std 835 Standard Power Cable Ampacity Tables.

MANUAL.DOC/26/11/2009/MSOFFICE/

3 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS 3. 3.1. IPCEA P46-426 Power Cable Ampacities. NEMA WC70/ICEA S-95-658. 903-P3070-E33-TEC-126 Instrucciones de Trabajo para Elaboracin la Elaboracin de Planos de Canalizaciones Subterrneas. 903-P3070-E09-TEC-052 Criterio para el Llenado de Lista de Cables

DESCRIPCIN DEL PROGRAMA ETAP (Electrical Transient Analyser Program) Es un programa grfico de anlisis transitorio de sistemas elctricos de potencia, que permite desarrollar : Estudios de Flujo de Carga, Cortocircuito, Arranque de Motores, Confiabilidad, Armnicos, Estabilidad Transitoria, Coordinacin de Protecciones, Malla de Tierra, Capacidad Amperimtrica de Cables, entre otros. En este taller solo nos abocaremos al mdulo de Capacidad Amperimtrica de Cables.

3.2.

ETAP: Sistemas de Canalizaciones Subterrneas El modulo es de gran utilidad para llevar a cabo el diseo de circuitos elctricos enterrados donde los cables puedan operar a su mximo potencial y al mismo tiempo garantizar un funcionamiento seguro y confiable. La interfase grfica avanzada permite verificar que los cables puedan cumplir con las exigencias de carga a futuro mediante la aplicacin de clculos detallados de secciones, capacidad fsica y capacidad amperimtrica ajustada por las condiciones del entorno. Adicionalmente se puede ejecutar un anlisis transitorio de temperatura y/o intensidades de operacin en funcin de las curvas de carga a fin de reducir los riesgos que conlleva la operacin de los circuitos en condiciones de emergencia.

3.3. 3.3.1.

Informacin Requerida para una Anlisis de Capacidad Amperimtrica de Cables Datos del Sistema de Canalizaciones Subterrneas Antes de realizar un estudio de ampacidad de cables el usuario debe contar con un diseo de canalizacin en donde se especifica el tipo de instalacin y sus dimensiones (bancada o trinchera). De igual forma el usuario debe conocer la informacin del terreno relacionada con la temperatura y la resistividad trmica (el anexo 4 muestra las tablas de resistividad trmica).

MANUAL.DOC/26/11/2009/MSOFFICE/

4 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

3.3.2.

Conduits y Posiciones Para colocar un conduit dentro de una bancada el usuario debe conocer el tipo de conduit, dimetro externo, espesor y su posicin dentro de la bancada. La posicin es el lugar dentro de la trinchera en los cuales se colocan los cables. El nico requerimiento para las posiciones es su posicin dentro de la trinchera.

3.3.3.

Cables Antes de realizar un estudio de ampacidad el usuario debe seleccionar los tipos de cables de la librera del programa. El calibre, el nmero de conductores por fase y la carga son requerimientos del programa.

3.3.4.

Caso en Estudio Una vez definida la canalizacin y los cables es necesario definir el mtodo de clculo para el derrateo trmico. El ETAP ofrece los mtodos basados en IEC 60287 y Neher-McGrath. El mtodo a utilizar es el de Neher-McGrath. Este mtodo es utilizado por la mayora de los programas de anlisis de derrateo trmico de acuerdo con la IEEE Std 399. El ETAP ofrece varias opciones de clculo para los anlisis de ampacidad basados en el mtodo de Neher-McGrath. Para los estudios de ampacidad se debe utilizar la opcin de Clculo de la Temperatura del Cable en Rgimen Permanente debido a que determina la temperatura del conductor para una carga especfica del cable y una configuracin dada.

3.4.

Recomendaciones Al crear un proyecto en ETAP el usuario debe decidir el sistema de unidades a utilizar (sistema mtrico ingles). En la data requerida por el ETAP para el diseo de canalizaciones y estudio de ampacidad no se hace mencin a las unidades, razn por la cual el usuario puede cometer errores. Es importante recordar que las dimensiones de la canalizacin y dimetros de tuberas estn expresadas en cm o pulg dependiendo del sistema de unidades. La profundidad mnima para bancadas y trincheras debe ser de 2 (diseo ETAP). El usuario debe consultar las normas que apliquen en el diseo de canalizaciones subterrneas para determinar las profundidades de acuerdo con el tipo de canalizacin.

MANUAL.DOC/26/11/2009/MSOFFICE/

5 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

La librera de cables del ETAP es limitada, por lo tanto el usuario debe poseer los conocimientos necesarios para escoger de una forma adecuada el tipo de cable a utilizar para el estudio de ampacidad. 4. INSTRUCCIONES DE TRABAJO 1. Abrir el programa, seleccionar la opcin New Project y asignar el nombre a la nueva carpeta de trabajo

MANUAL.DOC/26/11/2009/MSOFFICE/

6 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

2. 3.

Presionar botn derecho del ratn en la carpeta U/G Raceway Systems para iniciar un nuevo Underground Raceway System. Seleccionar Create New Se abre la ventana de edicin de canalizaciones subterrneas UGS

MANUAL.DOC/26/11/2009/MSOFFICE/

7 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Ventana de edicin UGS.

MANUAL.DOC/26/11/2009/MSOFFICE/

8 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS Barra de Herramientas del UGS (modo edicin)

4.1.

Creacin de una Bancada La bancada debe ser diseada en el modo edit (editor). En el modo editor el usuario puede construir la bancada de acuerdo a los requerimientos del estudio. El usuario debe especificar la cantidad, posicin y dimetro de cada uno de los tubos de la bancada, as como los cables y las cargas asociadas.

MANUAL.DOC/26/11/2009/MSOFFICE/

9 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

1.

Para crear una bancada se debe presionar sobre new duct bank raceway (aadir bancada nueva) y arrastrarla con el ratn hacia la ventana del editor. La opcin de aadir bancada slo est habilitada si anteriormente ya se ha creado una bancada. Al hacer doble clic sobre la bancada aparece la ventana del editor de canalizaciones que se muestra a continuacin.

MANUAL.DOC/26/11/2009/MSOFFICE/

10 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Esta ventana permite al usuario colocar las dimensiones y profundidad de la bancada (el punto 0,0 se encuentra en la esquina superior izquierda de la ventana del editor). Las dimensiones pueden estar expresadas en pulgadas o centmetros (ver recomendaciones). En esta ventana el usuario tambin debe especificar el tipo de concreto (la escogencia del mismo no afecta los resultados) y la resistividad trmica del concreto (RHO). El ETAP trae como valor predeterminado 90 C-cm/W. La norma IEEE 399 establece un rango entre 55 y 85 (se recomienda utilizar 85 C-cm/W ya que es la peor condicin). 2. Para colocar los conduits el usuario debe presionar sobre new conduit (nueva tubera) y arrastrar utilizando el ratn hacia la bancada. Al hacer doble clic sobre la bancada aparece la ventana del editor de canalizaciones que se muestra a continuacin.

MANUAL.DOC/26/11/2009/MSOFFICE/

11 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Esta ventana permite al usuario asignarle un nombre a la tubera, especificar las caractersticas fsicas de la tubera y su posicin dentro de la bancada. La posicin se determina desde el centro de la tubera hasta el lmite de la canalizacin (punto 0,0 la esquina superior izquierda de la bancada). 3. Para colocar los cables en las tuberas el usuario debe presionar sobre new cable (nuevo cable) y arrastrar utilizando el ratn hacia la tubera. Al hacer doble clic sobre el cable aparece la ventana del cable editor (editor de cables) que se muestra a continuacin.

MANUAL.DOC/26/11/2009/MSOFFICE/

12 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

La ventana info permite al usuario asignarle un nombre al cable y a los equipos que alimenta. El usuario puede especificar la longitud cable y una tolerancia que modifica la impedancia de acuerdo a la longitud. El usuario debe especificar la conexin del cable (una fase o trifsico). Para escoger el calibre de cable, el usuario debe ingresar a la librera del ETAP y seleccionar el cable de acuerdo a los requerimientos de la carga. En el recuadro Library, se encuentra la opcin Link to Library. Cuando esta opcin es seleccionada, al momento de realizar los estudios de ampacidad el programa toma los datos de los cables (caractersticas fsicas) directamente de la librera de cables del ETAP; de lo contrario toma los datos indicados por el usuario en la pestaa Physical.

MANUAL.DOC/26/11/2009/MSOFFICE/

13 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Una vez seleccionado el cable el usuario debe ingresar los datos de la carga en la pestaa loading. En operating load/current el usuario debe indicar la corriente nominal de la carga en el campo Avg. La corriente por fase se actualiza cuando se hacen estudios de flujo de carga. El usuario debe colocar un growth factor (factor de crecimiento) utilizado con la finalidad de prever cargas futuras, de lo contario se colocara 100% indicando que el sistema est a su mxima capacidad. En loading current for sizing el usuario determina el criterio para escoger corriente de la carga en caso de que se desee utilizar la opcin de dimensionamiento de cables por ampacidad.

MANUAL.DOC/26/11/2009/MSOFFICE/

14 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

En underground raceway el usuario debe ingresar como dato el factor de carga del sistema y el porcentaje de corriente a ser drenado por la armadura de los cables. Se recomienda utilizar como factor de carga 100% y en la corriente de armadura 0%. El mtodo de Neher-McGrath no toma en cuenta la corriente en la armadura. En optimization options el usuario debe colocar si se requiere que el calibre del cable no se altere o si la corriente debe permanecer sin alteracin. Esta opcin se utiliza en los clculos de dimensionamiento de cables. En transient load profile el usuario debe colocar las variaciones en la carga que debe soportar el cable durante un perodo determinado. Esta opcin aplica para el estudio transitorio de temperatura.

MANUAL.DOC/26/11/2009/MSOFFICE/

15 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Una vez seleccionada la carga, es necesario determinar el mtodo de clculo para la ampacidad; con este fin el usuario debe ingresar los datos requeridos en la pestaa de ampacity.

En installation el usuario debe escoger el mtodo de clculo para el estudio de ampacidad de acuerdo a las normas, as como el tipo de canalizacin. En el caso de estudio de ampacidad en bancadas (UG Duct) o

MANUAL.DOC/26/11/2009/MSOFFICE/

16 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS y trincheras (UG Buried) el usuario debe seleccionar como estndar la norma IEEE 399. En temperature los valores de Ta, Tc y RHO en los campos de base se actualizan automticamente con los valores de la librera de cables del ETAP. El usuario debe ingresar en los campos de operating el valor de la temperatura ambiente de la canalizacin subterrnea en C (Ta), el mximo valor de la temperatura del aislamiento del cable en C (Tc) y la resistividad trmica del terreno en C-cm/W (RHO). En ampacity el usuario ingresar en el campo de FLA/operating la corriente en la carga (aplica si no se ha indicado este valor en la pestaa de loading). En el campo base se muestra la corriente nominal del cable obtenida de la librera de cables. En derated el usuario puede observar el derrateo aplicado a los cables. Este campo se actualiza automticamente. En allowable ampacity el usuario debe ingresar la mxima ampacidad permitida por el cable de acuerdo a tres opciones. Derated toma como mxima corriente en el cable la ampacidad derrateada mencionada en el prrafo anterior (solo toma en cuenta el efecto de la temperatura ambiente) User-defined toma como mxima corriente en el cable la ampacidad definida por el usuario. UGS calculated toma como mxima corriente en el cable la ampacidad calculada por el mdulo de canalizaciones subterrneas del ETAP (toma en cuenta el efecto de la temperatura ambiente y de los cables del sistema) En grouping el usuario debe ingresar el numero de columnas y filas de la canalizacin ya que los conductores agrupados operan a una mayor temperatura que los aislados. Esta informacin es requerida si se va tomar como mxima corriente la calculada por el ETAP (UGS calculated). Si se deja en blanco este campo se recomienda tomar como mxima corriente en el cable la calculada en la opcin derated. El rengln de fire protection slo aplica a instalaciones superficiales. Por medio de la ventana sizing el usuario puede verificar si el calibre del cable escogido es adecuado. El programa permite dimensionar los cables por ampacidad, cada de tensin y corto circuito. El usuario debe llenar en requiretment los datos relacionados con la cada de tensin y marcar todos los campos. En result el usuario al hacer clic en select puede determinar el calibre optimo del cable de acuerdo a los requerimientos de la carga.
MANUAL.DOC/26/11/2009/MSOFFICE/ 17 de 33 INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

4.

Para agregar un cable previamente creado (el cable puede ser creado en cualquiera de los mdulos del ETAP), el usuario debe presionar el botn exiting cable (cable existente) y tomar de la lista presentada por el programa el cable requerido. El programa le asigna a cada cable un nombre (puede ser definido por el usuario) por lo cual no se puede agregar un mismo cable ms de una vez dentro de una misma canalizacin.

5.

Para configurar el terreno el usuario debe abrir el undeground system (editor del terreno) al hacer doble clic sobre cualquier rea fuera de la bancada. El editor del terreno le permite al usuario asignarle un nombre, escoger el tipo de terreno y su resistividad trmica (el tipo de terreno escogido no afecta el valor de la resistividad trmica (RHO)). Tambin el
18 de 33 INEDON

MANUAL.DOC/26/11/2009/MSOFFICE/

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS usuario debe ingresar los valores de la temperatura ambiente del terreno y temperaturas de alerta (critica) y alarma (marginal). La temperatura de alerta o crtica indica que la temperatura de cable se acerca a la temperatura del aislamiento del cable. La temperatura de alarma o marginal es la temperatura del aislamiento del cable.

Los valores de temperatura ambiente, temperatura del aislamiento del cable y RHO del terreno deben ser ingresados por el usuario tanto en la ventana de ampacidad como al momento de configurar el terreno. 4.2. Creacin de una Trinchera La trinchera debe ser diseada en el modo edit (editor). En el modo editor el usuario puede construir la trinchera de acuerdo a los requerimientos del estudio. El usuario debe especificar la cantidad y posicin de cada uno de los espacios en los cuales se colocaran los cables de la trinchera, as como los cables y las cargas asociadas

MANUAL.DOC/26/11/2009/MSOFFICE/

19 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

1.

Para crear una trinchera se debe presionar sobre new direct buried raceway (aadir trinchera nueva) y arrastrarla con el ratn hacia la ventana del editor La opcin de aadir trinchera slo est habilitada si anteriormente ya se ha creado una trinchera. Al hacer doble clic sobre la trinchera aparece la ventana del editor de canalizaciones que se muestra a continuacin.

MANUAL.DOC/26/11/2009/MSOFFICE/

20 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Esta ventana permite al usuario colocar las dimensiones y profundidad de la trinchera (el punto 0,0 se encuentra en la esquina superior izquierda de la ventana del editor). Las dimensiones pueden ser trabajadas en pulgadas o centmetros (ver recomendaciones). En esta ventana el usuario tambin debe especificar el tipo de relleno (la escogencia del mismo no afecta los resultados) y la resistividad trmica del relleno (RHO). El ETAP trae como valor predeterminado 90 C-cm/W. La norma IEEE 399 establece un valor de 120 C-cm/W. 2. Para colocar los espacios o posiciones de los cables el usuario debe presionar sobre new location (nueva posicin) y arrastrar utilizando el ratn hacia la trinchera. Al hacer doble clic sobre la trinchera

MANUAL.DOC/26/11/2009/MSOFFICE/

21 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS aparece la ventana del editor de canalizaciones que se muestra a continuacin

Esta ventana permite al usuario asignarle un nombre a la posicin, especificar la posicin del dentro de la trinchera. La posicin se determina desde el centro de la posicin del cable hasta el lmite de la canalizacin (punto 0,0 la esquina superior izquierda de la trinchera). 3. Para colocar los cables en los espacios el usuario debe presionar sobre new cable (nuevo cable) y arrastrar utilizando el ratn hacia el espacio de los cables. Al hacer doble clic sobre el cable aparece la ventana del cable editor (editor de cables). A continuacin se deben seguir los pasos explicados en el diseo de la bancada. 4. Para agregar un cable previamente creado (el cable puede ser creado en cualquiera de los mdulos del ETAP), el usuario debe presionar el botn exiting cable (cable existente)
MANUAL.DOC/26/11/2009/MSOFFICE/ 22 de 33

y tomar de la lista presentada por el


INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS programa el cable requerido. El programa le asigna a cada cable un nombre (puede ser definido por el usuario) por lo cual no se puede agregar un mismo cable ms de una vez dentro de una misma canalizacin. 4.3. Fuentes Externas de Calor Las fuentes externas de calor se colocan en el sistema de canalizaciones subterrneas con la finalidad de simular tuberas de vapor u otras fuentes de calor en las cercanas de la canalizacin. Para agregar una fuente externa de calor el usuario debe presionar el icono new external heat source (nueva fuente externa de calor) y arrastrar utilizando el ratn hacia la ventana del editor. Luego al hacer doble clic sobre la fuente calor el usuario puede asignar las coordenadas de la fuente de manera similar como se hizo con la canalizacin. Adicionalmente es necesario indicar las dimensiones y la temperatura de la fuente de calor. 4.4. 4.4.1. Estudio de Ampacidad Configuracin del Caso en Estudio. En el modo U/G Cable Raceway el usuario debe presionar sobre edit study case Esta ventana permite al usuario configurar variables, parmetros de carga y opciones de reporte.

MANUAL.DOC/26/11/2009/MSOFFICE/

23 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

En study case ID el usuario debe asignar un nombre al caso de estudio. En methods el usuario debe escoger el mtodo de clculo a ser empleado para el estudio. Se recomienda el mtodo Neher-McGrath ya que es el ms utilizado por la mayora de los programas de derrateo trmico. En initial/steady-state amp el usuario debe marcar la opcin de operating load. Bajo esta condicin se toma como valor inicial de corriente la corriente definida por el usuario al momento de configurar el cable. Load profile aplica slo cuando se desea observar como vara la temperatura en el cable tomando en cuenta las variaciones en la carga (clculo transitorio de la temperatura del cable). En update el usuario le indica al programa que tome como valor inicial del estudio el valor obtenido en el estudio anterior (proceso iterativo). En multiplication factor el usuario indica si los factores multiplicadores especificados durante la configuracin de los cables deben ser aplicados.
MANUAL.DOC/26/11/2009/MSOFFICE/ 24 de 33 INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

En transient temp. study el usuario debe ingresar el periodo para el clculo transitorio de la temperatura del cable. 4.4.2. Mtodos de Clculo de Ampacidad ETAP cuenta con cinco opciones para el clculo de la ampacidad en canalizaciones subterrneas.

MANUAL.DOC/26/11/2009/MSOFFICE/

25 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Clculo de la Temperatura del Cable en Rgimen Permanente: Este clculo determina la temperatura del conductor en rgimen permanente para una carga especfica del cable y una configuracin dada. Considera el efecto del calor generado por cables vecinos y fuentes externas de calor. Clculo de la Capacidad Amperimtrica del Cable (Ampacidad Constante): Este clculo asume que la carga de todos los cables aumenta o disminuye uniformemente basada en la ampacidad base del cable, la cual est definida en la librera del cable. La capacidad amperimtrica del cable se calcula por el incremento de la carga en todos los cables hasta que la temperatura del cable ms caliente alcance el lmite mximo permitido. Clculo de la Capacidad Amperimtrica del Cable (Temperatura Constante): Este clculo ajusta la carga de los cables de forma individual para mantener la temperatura constante en el sistema. La capacidad amperimtrica del cable se obtiene cuando la temperatura del cable alcanza su lmite mximo permitido. Clculo del Calibre del Cable: El resultado de este estudio presenta el calibre ms pequeo posible para todos los cables en el sistema, que puedan llevar la carga especfica dentro de la temperatura lmite. Clculo Transitorio de la Temperatura del Cable: Este estudio permite investigar las condiciones de operacin transitorias del cable y verificar la
MANUAL.DOC/26/11/2009/MSOFFICE/ 26 de 33 INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS temperatura del cable en funcin del tiempo para determinar el lmite de la carga en un determinado tiempo. De las cinco opciones la ms empleada es el clculo de la temperatura del cable en rgimen permanente. 4.4.2.1 Estudio de Temperatura del Cable en Rgimen Permanente Una vez que ya se ha construido la canalizacin y configurado el caso en estudio, el usuario puede proceder a realizar un estudio de ampacidad. 1. Al presionar sobre el icono steady state temperature (temperatura del cable en rgimen permanente) el usuario realiza el estudio de ampacidad. Los cables resaltados en color rojo han excedido el aislamiento trmico del cable (temperatura de alarma o marginal). Los cables en color magenta han excedido el lmite de seguridad especificado por el usuario (temperatura de alerta o critica), y no han excedido el aislamiento trmico del cable. Los cables que no presentan variacin de color se encuentran en condiciones normales de operacin. Los lmites de temperatura son fijados por el usuario al momento de configurar el terreno.

Estudio de ampacidad en bancada

MANUAL.DOC/26/11/2009/MSOFFICE/

27 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

Estudio de ampacidad en trinchera

2.

Al presionar sobre el icono report (reporte) observar un reporte detallado de los resultados.

el usuario puede

MANUAL.DOC/26/11/2009/MSOFFICE/

28 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

El reporte muestra la configuracin del terreno (temperatura ambiente, temperatura del aislamiento de cable o marginal, temperatura critica).

MANUAL.DOC/26/11/2009/MSOFFICE/

29 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

El reporte muestra la configuracin de la canalizacin y los datos relacionados con los conduits, incluyendo el porcentaje de ocupacin de los cables.

MANUAL.DOC/26/11/2009/MSOFFICE/

30 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS El reporte muestra la configuracin de los cables.

MANUAL.DOC/26/11/2009/MSOFFICE/

31 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS El reporte muestra las condiciones de operacin de los cables. Los cables resaltados en color rojo han excedido el aislamiento trmico del cable (temperatura de alarma o marginal). Los cables en color magenta han excedido el lmite de seguridad especificado por el usuario (temperatura de alerta o crtica) y no han excedido el aislamiento trmico del cable. De todo el reporte esta es la informacin que el usuario necesita.

MANUAL.DOC/26/11/2009/MSOFFICE/

32 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-3
Rev.

MANUAL DEL CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS 5. COMENTARIOS FINALES Es importante recordar que las dimensiones de la canalizacin y dimetros de tuberas estn expresadas en cm o pulg dependiendo del sistema de unidades. 2. El usuario debe consultar las normas que apliquen en el diseo de canalizaciones subterrneas para determinar las profundidades de acuerdo con el tipo de canalizacin. 3. En caso de no poseer los valores de resistividad trmica el usuario debe utilizar los valores indicados en el anexo B de CEN los valores indicados en la IEEE Std.399. En el anexo 4 se muestran las tablas de resistividad trmica. 4. En el caso de necesitar un cable no listado en la librera del ETAP se debe utilizar uno con caractersticas fsicas similares. Crear cables en la librera del ETAP es un proceso complicado debido a la cantidad de datos que requiere el programa. Adicionalmente el usuario no tiene forma de corroborar que el programa esta utilizando la informacin del cable creado de forma correcta. 5. Seleccionar Fixed Current para mantener constante la corriente en un cable para los estudios de capacidad amperimtrica. 6. Seleccionar Fixed Size para mantener constante el calibre del cable para el dimensionamiento del cable. 7. La informacin relacionada con la temperatura del aislamiento del cable, temperatura ambiente y resistividad trmica debe ser indicada modificada en la configuracin del terreno y en los datos de entrada de los cables. 8. Es importante tomar en cuenta: Suelos ms calientes absorben menos calor (temperatura ambiente (Ta)). Los cables en trincheras disipan ms rpidamente el calor que los cables en ductos y los cables en las adyacencias contribuyen a aumentar el calor y pueden inducir prdidas adicionales en los mismos cables. Los cables cercanos tienen mayor efecto. 9. Es recomendable imprimir junto con el reporte del ETAP la canalizacin donde se muestra de forma grfica las condiciones de operacin de los cables. 10. En caso de no obtener los resultados deseados se recomienda reubicar el cable de mayor temperatura, de no ser posible se recomienda aumentar el calibre del cable. Si las condiciones no mejoran se debe considerar disear una nueva canalizacin. 1.

MANUAL.DOC/26/11/2009/MSOFFICE/

33 de 33

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS

A N E X O N 4 - R E F E R E N C I A S

903-HM150-E09-EDU-710.DOCREV0

7 de 7

INEDON

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS VALORES DE RESISTIVIDAD TERMICA DE ACUERDO CON EL CDIGO ELECTRICO NACIONAL

VALORES DE RESISTIVIDAD TERMICA DE ACUERDO A LA NORMA IEEE STD. 399

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS VALORES DE RESISTIVIDAD TERMICA RECOMENDADOS POR EL ETAP

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS TABLA DE DIAMETROS DE CABLES NEC 2008

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS TABLA DE PROPIEDADES DE LOS CONDUCTORES NEC 2008

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS RESISTENCIA EN DC EN CONDUCTORES NEMA WC70/ICEA S-95-658

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS RESISTENCIA EN DC EN CONDUCTORES NEMA WC70/ICEA S-95-658

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS RESISTENCIAS Y REACTANCIAS PARA CABLES DE 600V NEC 2008

INEDON
INGENIERA ELCTRICA

903-HM150-E09-EDU-710-4
Rev.

CURSO DE ETAP MODULO DE CANALIZACIONES SUBTERRNEAS. TABLAS