ABB AB Power Automation & Substation Vsters - Sweden

Training Course SEP-602B

Exercise 2

Exercise 2 RED 670; Current measurement presented function CMMXU and versatile switch to control AR On-Off
Task
The aim is to implement a switch to monitor the AR ON/OFF and to measure the remote end phase current by CMMXU and to present it on LHMI Work in the CAP 1. Decompress the PCM 600 RED670A32_1p1_I0 project. Start CAP 530 for your IED 2. Open work sheet CB_AR 3. Disconnect the OR-gates O108 and O112 that goes to the ON respective OFF on the AR01 block 4. Delete the remaining signals BI_AR01-ON and BI_AR01-OFF 5. Import a Versatile block VSGGIO from CAP library (8 ms cycle time, execution order < AR execution order). 6. Import a versatile block VSGGIO from the CAP library (8 ms cycle time, execution order < AR execution order) 7. Connect the output CMDPOS12 at the VS01 block to the input ON at the AR01 block 8. Connect the output CMDPOS21 at the VS01 block to the input OFF at the AR01 block 9. Connect the output OUT on the new inverter (INV) to the input IPOS1 on the new VSGGIO block. 10. Connect the input IPOS2 on the new VSGGIO block to the input on the new inverter INV. 11. Connect the output SETON on the AR01 block to the input INPUT on the new inverter INV. 12. Save and compile the configuration 13. Close the CAP Creating the measurement function in the GDE tool 1. Select Graphical Display Editor from the Tools meny 2. Add display page 3. Select Measurands from the menu and click on the text Measurand and drag it into the working sheet three times. Place them in rows, one after each other. 4. Mark the first text string by double click and go outside the work sheet and select Properties. 5. Change Digits after decimal point from 2 to 0. 6. Change Name from Name to IL1rem 7. Set Scale factor = 1 8. Change the Unit text from kV to A 9. Repeat 5,6 and 7 for second and the third text string but label the second string Name as IL2rem and the third to IL3rem.

SA.T. Training SEP-602B

2007-10-25

Page 1 of 2

Substation Automation & Protection Training

ABB AB Power Automation & Substation Vsters - Sweden

Training Course SEP-602B

Exercise 2

10. Select Text button from the GDE library and select Select button and drag it into the working sheet. 11. Mark the xxx in the centre of the square by double clicking. 12. Click outside the working sheet and select Properties. 13. Fill in Name = AR, Name Position = North (the name AR will be placed above the manouver knob. 14. Open the Application configuration and check that a CMMXU block connected to remote line currents exists. If not add a new CMMXU block to the Measuring work sheet and connect the input to the pre-processing block RemLineCTDiff by copy the signal REMOTE_LINE_CT_DIFF_IL1. Leave the outputs as it is. 15. Save and compile the configuration. 16. Open the Graphical Display Editor, GDE , select the text string for phase L1 and click right on the mouse, select the remote phase L1 current by marking it. Repeat the sequence for phase L2 and L3. 17. Leave the GDE by click on the right X. 18. Download the configuration to the terminal 19. Open the Parameter Settings folder in PCM and go to General Settings/Control/Commands/Versatile Switch/VS01 and change Operation to ON and Mode to Steady. 20. Download the changed settings to the IED 21. Make the connections for testing the logic

SA.T. Training SEP-602B

2007-10-25

Page 2 of 2

Substation Automation & Protection Training