Agenda 11:00 am Consortium Call 4/28/2011 1. Plant status update/ information from 0300 call and 0830 call

(b)(5)

2.
(b)(5)

(b)(5)

3.
(b)(5)

(b)(5)

4.
(b)(5)

(b)(5)

DK 31 of 1892

6.

(bX)(5

-7-

(b)(5)

7. Concerns still exist about the Unit 4 SFP, Site team would like us to address

(b)(5)

8. RST took an action to determine how the Safety Culture was added to the Analysis of the TEPCO road map.

DK 32 of 1892

From: Sent: To:

RST01 Hoc Thursday, April 28, 2011 2:17 PM

(b)(6)

Cc: Subject: Attachments:

Norton, Charles 11 am call minutes April 28 1100 Agenda Minutes.docx

Here are the minutes from the 11 am call. The one major change is that I mis-spoke on when we need comments back on the TEPCO roadmap. Apparently, we will have the TEPCO roadmap analysis out today and we need to have comments back by COB ;tomorrow. -Sorry for the rapid turnaround. Mike !Mike Brown Reactor Safety Team

DK 33 of 1892

Agenda 11:00 am Consortium Call 4/28/2011 1. Plant status update/information from 0300 call and 0830 call

(b)(5)

2.
(b)(5)

(b)(5)

3.
(b)(5)
(b)(5)

4.
(b)(5)

(b)(5)

DK 34 of 1892

5.

6.

(b)(5)

(b)(5)

7. Concerns still exist about the Unit 4 SFP. Site team would like us to address

(b)(5)

8. RST took an action to determine how the Safety Culture was added to the Analysis of the TEPCO road map.

DK 35 of 1892

From:

Sent: To:

RSTO1 Hoc Tuesday, April 26, 2011 10:08 AM

(b)(6)

Subject:
Attachments:

Consortium Agenda for 4/26 April 26 1100 Agenda.docx

All:

Attached is the April 26th meeting Agenda. Thanks, 'Steve Campbell Reactor Safety Team

DK 36 of 1892

Agenda 11:00 am Consortium Call 4/26/2011


1.

(b)(5)

2. 3. When RPV / PCV level above TAF, need strategies on possible recirculation path and heat exchange system. Discuss any options that the Consortium has come up with.

DK 37 of 1892

F-

From:

Sent: To:

RST01 Hoc Monday, April 25, 2011 11:14 AM

(b)(6)

Cc: Kokajko, Lawrence 1100hrs Consortium ConfCall: Meeting Summary And 04.25.11 Meeting Agenda April 22 rev 1 1100 Agenda.docx; April 22 rev 1 1100 Agenda Minutes.docx; April 25 1100 Agenda.docx

Subject
Attachments:

All: Please find attached the meeting minutes that covers the 04.22.11 1100hrs Consortium Conference call. If there any icomments, etc please forward to RSTO1. 'Also find attached the April
I
2 5 th

meeting Agenda.

'Thanks, 'Don Reactor Safety Team

DK 58 of 1892

Consortium Call

Summary 04.22.11 1100hrs Document Instructions: This meeting summary follows the Agenda that has been provided for the 04.22.11 consortium meeting where appropriate. Definitions Used: " Consortium: refers to all members of the conference call " Site Team: refers to NRC members located in Japan Attendees: NRC Ops Center; Naval Reactors, INPO ERC, DOE and Mike Brown Meeting Summary: 1. Follow-up items from 1100hrs a. Site Team is working on the questions. Upon completion will be provided by the NRC Ops Center to the Consortium 2. Source of Leakage to the Turbine Building a. NRC Ops Center requests that those in the Consortium able to work on this request, to do so. Please provide any data to the NRC Ops Center RST01. 3. RPV/PCV Level Above TAF, Strategies on Possible Recirculation Path and Heat Exchange System. a. No updates were provided by the Consortium
FOLLOWING ITEMS WERE ADDITIONAL TO THE PROVIDED AGENDA

4. Roadma r5
(b)(5)

(b)(5)

6.

E PV Breack Document to RST01


NRC Ops Center Status

(b)(5

7.

DK 59 of 1892

a. The NRC Ops Center will be standing down for the Easter weekend starting on 04.21.11 at 1700hrs, and will be stood up on 04.25.11 at 0700hrs. However, NRC staff will remain on-call during this weekend. Next Consortium Call on 04.25.11 1100hrs

DK 60 of 1892

Agenda 11:00am Consortium Call 4/22/2011 1. Followup items from 11am: a. I


(b)(5)

b. Japan Site team to ask TEPCO about

(b)(5)

2.
(b)(5)

(b)(5)

(b)(5)

3.

(b)(5)

DK 61 of 1892

Agenda 11:00am Consortium Call 4/25/2011


1.

(b)(5)

2.
(b)(5)

4. Is there any additional input from Consortium members related to source of leakage into the turbine building?