You are on page 1of 7

1. Shell plate dimension check 2.Annular bottom plate dimension check 3.Sketch plate dimension check 4.

Manhole ,Nozzle , reinforcing pad dimension check 5.Annular bottom radius dimension check 6.Peaking & Banding Inspection check 7.Roundness of shell course inspection check 8.Plumness at shell course inspection check 9.Fit-up & Welding Visual inspection check 10.Shell & Nozzle inspection after welded 11.Tank appurtenance orientation & Elevation check 12.Oil penetrant leak test 13.Vacuum testing 14.Air pressure leak test at reinforcing pad 15. hydrostatic test for storage tank 16.Air pressure leak test water draw of sump 17.Pontoon air leak test 18. Dome roof plate dimension check 19. Flushing & Internal tank cleaning inspection 20. Final inspection punch list & Punch clear

Job Responsibility (Shop Fabricated Tanks) Tank No. &Size:218-D-1302(3.658m dia x 4.850m Ht) 575-D-1302(3.048m dia x 4.0m Ht) 515-D-1302(3.048m dia x 4.0m Ht) 573-D-1302(3.048m dia x 4.0m Ht) Over all coordination with client and contactors and subcontractor. Performing all inspection as per ITP as follows Bottom plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Shell plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Shell plate rolling inspection. Dimension Check, Marking, Cutting of plates for Clean Out Door assembly. COD assembly Fit-up inspection. Weld visual inspection of COD assembly. Carry out Pneumatic test and MPI before PWHT of COD assembly (internal). Carry out Pneumatic test and MPI after PWHT of COD assembly. Bottom plate laying, Alignment and Fit-up with COD assembly. Weld Visual inspection of Bottom plate. Witnessing Vacuum box test on Bottom plate weld. Offering RT on the Bottom plate weld as per requirement. Fit-up Inspection of Shell with COD assembly. Joint Fit-up check for root gap, alignment etc for vertical and Horizontal joints. Weld Visual Inspection of Horizontal & vertical Joints. Peacking, Banding, Roundness &Plumbness Check. Location marking, Cutting, Fit-up and weld visual inspection of Bottom Sump. Shell to Bottom plate Fit-up & weld visual inspection. Curb angle fit-up inspection & weld Visual Inspection. Roof plate layout alignment, fit-up& weld visual inspection. Shell & Roof Nozzle and manway opening orientation, location, Size, alignment marking, cutting, fit -up and weld visual inspection. Pneumatic test on R.F.Pads welds. Fit-up & weld visual inspection of tank inside attachment like Pipe support, cathodic protection cleat Fit-up & weld visual inspection shell attachment like Pipe support clip, Earthing clip, Anchor chair, Nameplate, cage ladder suppor cooling water deflector Plate. Roof handrail alignment, Fit-Up & weld visual inspection. RT spot marking & review of RT films.

Prefabrication of Site Fabricated Tanks Tank No. &Size :- 218-D-1301(A/B) 2Nos (34.44m dai x 14.63m Ht) Location CIPF 218-D-2201 (31.9m dai x 10 m Ht) Location CIPF 575-D-1301 (38.5m dai x 12.2m Ht) Location GC-25 515-D-1301 (38.5m dai x 12.2m Ht) Location GC-15 515-D-1003 (36.5m dai x 12.2m Ht) Location GC-15 573-D-1301 (33.5m dai x 12.2m Ht) Location GC-23

Over all coordination with client, contactors and subcontractor. Performing all inspection as per ITP for all 7 tanks prefabricated materials Bottom plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Shell plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Shell plate rolling inspection. Dimension Check, Marking, Cutting of plates for Clean Out Door as sembly. COD assembly Fit-up inspection. Weld visual inspection of COD assembly. Carry out Pneumatic test and MPI before PWHT of COD assembly (internal). Carry out Pneumatic test and MPI after PWHT of COD assembly. Roof plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Compression Ring Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer. Roof Structure layout Marking, Fit-Up & weld visual inspection. Sump assembly dimension check, fit-up, weld Visual and water fill test. Nozzles to flange Fit-up and weld visual inspection. RT film interpretation Bottom plate fit-up & weld visual inspection MPI on three lap joint root pass & on final weld. Joint Fit-up check for root gap, alignment etc for vertical and Horizontal joints. Weld Visual Inspection of Horizontal & vertical Joints. Peacking, Banding, Roundness &Plumbness Check. Compression ring fit-up & weld visual inspection. Compression ring to shell fit-up & weld visual inspection. Location marking, Cutting, Fit-up and weld visual inspection of Bottom Sump. Shell to Annular plate Fit-up & weld visual inspection. Anchor chair Fit-up & weld visual inspection. Shell Nozzle and manway opening orientation, location, Size, alignment marking, cutting, fit -up and weld visual inspection. RT spot marking & review of RT films.

2.Kudankulam Nuclear Power Project, India (May 2010-August 2011) Client: Kudankulam Nuclear Power Project, India. Contractor :-M/S Larsen Toubro ECC Division. Project:-Kudankulam Nuclear Power Project, India. Position: Mechanical Piping and Structural Supervisor. Job Responsibilities:-

Inspectionofinc oming Raw material&welding consumable with approved certificates(MTC) and release for usage. Fit up and dimensional inspection of piping and structural steels ,as per approved drawings. Monitoring backing of welding electrode consumable. Surveillance of before, during and after welding. Conduct Visual inspection on complete weld before NDT and offered to TPI. Monitoring NDT activities. Co-ordinate with NDT Technician. Preparing stage wise inspection reports for the respective job. Reviewing all the Welding, NDT reports, monitoring NDT backlog status and clearing it with a Systematic manner. Coordinating with Third part agency &knowledge on customer handling and negotiation. Schedule the fabrication and erection work and o rganize the site / facilities in order to meet an agreed programmers of deadlines. Check safety matters on the site. Checking field erection as per international standards & project technical specification. Report day today activities to project manager. Documentation related to fit-up & layout, weld visual of joint, surface preparation & protective coating, field inspection report, orien alignment report etc.

Attend regular meetings with clients and consultants and keeping them inf ormed of progress. Resolve any unexpected technical difficulties and other problems that may arise at any time. Preparation of reconciliation statement of materials in monthly basis and after completion of work.

Summary

A dynamic professional with over 3 years of rich experience in Quality Assurance, Incoming Material Inspection, Welding Inspection, NDT and Product Design & Development.Associated with Kharafi Steel- Kuwait as QA/QC Inspector.

Expertise in designing world class systems and implementing processes that will enable organization to consistently mee enhance customer satisfaction.

Successfully performed inspection activities like Dimensional Inspection, Fit-up &Welding Visual Inspection, Welder Qual Test, Witnessed Pneumatic/Vacuum box Testing, Hydrostatic test, Preparation & Submission of Final Documents.

An effective communicator with excellent relationship management skills and strong analytical, problem solving & organiz abilities.

EDUCATIONAL QUALIFICATION:

Diploma in Mechanical Engineering, Directorate of Technical Education, India

IT SKILL SET AUTO CAD MS OFFICE Package CNC Programming and Operation

PROFEESIONAL COURSES NDT Qualification : ASNT NDT LEVEL II Certification in o RT o LPT o MPT o UT

1.Khalid Ali AL Kharafi&Bros. Co(Since SEP2011) Client: Kuwait Oil Company (KOC)

Contractor :- Petrofac International Limited Project:-Shop Fabricated Tanks Position: QC Inspector

Job Responsibility (Shop Fabricated Tanks) Tank No. &Size:218-D-1302(3.658m dia x 4.850m Ht) 575-D-1302(3.048m dia x 4.0m Ht) 515-D-1302(3.048m dia x 4.0m Ht) 573-D-1302(3.048m dia x 4.0m Ht) Over all coordination with client and contactors and subcontractor. Performing all inspection as per ITP as follows

Bottom plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number trans

Shell plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer Shell plate rolling inspection. Dimension Check, Marking, Cutting of plates for Clean Out Door assembly. COD assembly Fit-up inspection. Weld visual inspection of COD assembly. Carry out Pneumatic test and MPI before PWHT of COD assembly (internal). Carry out Pneumatic test and MPI after PWHT of COD assembly. Bottom plate laying, Alignment and Fit-up with COD assembly. Weld Visual inspection of Bottom plate. Witnessing Vacuum box test on Bottom plate weld. Offering RT on the Bottom plate weld as per requirement. Fit-up Inspection of Shell with COD assembly. Joint Fit-up check for root gap, alignment etc for vertical and Horizontal joints. Weld Visual Inspection of Horizontal & vertical Joints. Peacking, Banding, Roundness &Plumbness Check. Location marking, Cutting, Fit-up and weld visual inspection of Bottom Sump. Shell to Bottom plate Fit-up & weld visual inspection.

Curb angle fit-up inspection & weld Visual Inspection. Roof plate layout alignment, fit-up& weld visual inspection.

Shell & Roof Nozzle and manway opening orientation, location, Size, alignment marking, cutting, fit-up and weld visual in Pneumatic test on R.F.Pads welds. Fit-up & weld visual inspection of tank inside attachment like Pipe support, cathodic protection cleat

Fit-up & weld visual inspection shell attachment like Pipe support clip, Earthing clip, Anchor chair, Nameplate, cage ladde clip & cooling water deflector Plate. Roof handrail alignment, Fit-Up & weld visual inspection. RT spot marking & review of RT films.

Prefabrication of Site Fabricated Tanks

Tank No. &Size :- 218-D-1301(A/B) 2Nos (34.44m dai x 14.63m Ht) Location CIPF 218-D-2201 (31.9m dai x 10 m Ht) Location CIPF 575-D-1301 (38.5m dai x 12.2m Ht) Location GC-25 515-D-1301 (38.5m dai x 12.2m Ht) Location GC-15 515-D-1003 (36.5m dai x 12.2m Ht) Location GC-15 573-D-1301 (33.5m dai x 12.2m Ht) Location GC-23

Over all coordination with client, contactors and subcontractor. Performing all inspection as per ITP for all 7 tanks prefabricated materials

Bottom plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number trans

Shell plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer Shell plate rolling inspection. Dimension Check, Marking, Cutting of plates for Clean Out Door assembly. COD assembly Fit-up inspection. Weld visual inspection of COD assembly. Carry out Pneumatic test and MPI before PWHT of COD assembly (internal). Carry out Pneumatic test and MPI after PWHT of COD assembly.

Roof plate Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number transfer

Compression Ring Dimension check Plate size marking, cutting, Edge preparation, Material traceability & Heat number

Roof Structure layout Marking, Fit-Up & weld visual inspection. Sump assembly dimension check, fit-up, weld Visual and water fill test. Nozzles to flange Fit-up and weld visual inspection. RT film interpretation Bottom plate fit-up & weld visual inspection MPI on three lap joint root pass & on final weld. Joint Fit-up check for root gap, alignment etc for vertical and Horizontal joints. Weld Visual Inspection of Horizontal & vertical Joints. Peacking, Banding, Roundness &Plumbness Check. Compression ring fit-up & weld visual inspection. Compression ring to shell fit-up & weld visual inspection. Location marking, Cutting, Fit-up and weld visual inspection of Bottom Sump. Shell to Annular plate Fit-up & weld visual inspection. Anchor chair Fit-up & weld visual inspection.

Shell Nozzle and manway opening orientation, location, Size, alignment marking, cutting, fit-up and weld visual inspection RT spot marking & review of RT films.

2.Kud ankulam Nuclear Power Project, India (May 2010-August 2011)

Client: Kudankulam Nuclear Power Project, India. Contractor :-M/S Larsen Toubro ECC Division. Project:-Kudankulam Nuclear Power Project, India. Position: Mechanical Piping and Structural Supervisor.

Job Responsibilities:-

Inspectionofincoming Raw material&welding consumable with approved certificates(MTC) and release for usage. Fit up and dimensional inspection of piping and structural steels ,as per approved drawings. Monitoring backing of welding electrode consumable.

Surveillance of before, during and after welding. Conduct Visual inspection on complete weld before NDT and offered to TPI. Monitoring NDT activities. Co-ordinate with NDT Technician. Preparing stage wise inspection reports for the respective job. Reviewing all the Welding, NDT reports, monitoring NDT backlog status and clearing it with a Systematic manner. Coordinating with Third part agency &knowledge on customer handling and

negotiation. Schedule the fabrication and erection work and organize the site / facilities in order to meet an agreed programmers of Check safety matters on the site. Checking field erection as per international standards & project technical specification. Report day today activities to project manager.

Documentation related to fit-up & layout, weld visual of joint, surface preparation & protective coating, field inspection rep orientation and alignment report etc. Attend regular meetings with clients and consultants and keeping them informed of progress. Resolve any unexpected technical difficulties and other problems that may arise at any time. Preparation of reconciliation statement of materials in monthly basis and after completion of work.