You are on page 1of 62

Item # 1 the Municipality upon award of the project. 2 have been incorporated in the design?

3 considered during design stage.

Queries

Kindly confirm that the Building Permit will be ready for the Contractor t

Since this is a fully designed project, kindly confirm Estidama Pearl 2 R

If the answer to the above is yes, kindly provide us with the Estidama

As per Estidama requirements, a commissioning agent reporting to th from the beginning of the project till the final handing-over whose main 4

to make sure the contractor is complying with the Estidama requiremen appointed by the Employer at the award of the project.

this regard, kindly confirm that this commissioning agent will be availab

Kindly confirm if our In-house MEP Subcontractor who has successfu 5 similar industrial projects in the past will be accepted. 6 Kindly confirm the plot is free from any underground services

7 Kindly confirm that no demolition works is required. 8 projects in the past. 9 EAD and that regular monitoring (i.e. every 3 months) is required

Kindly confirm that the Main Contractor can propose/submit an alternat

than those listed, complying the drawings & specifications, who have e

Kindly confirm that a CEMP is required to be prepared by a third party a

Kindly confirm that the Issued for Construction drawings will be provid 10 successful Main Contractor upon award of the project. 11 12 downstand) are shown. 13 grid M:N-5:7 & grid K:L-5:9. 14 wall (CW01 to CW06). 15 16 17 Floor Plan". 18 advice which one to follow. 19 the same was submitted along with the Schematic Tender.

Kindly confirm no technical submission is required along with this Fin

Please provide the Architectural wall sections, where the 200mm width

Please provide the details of the doors missing in First Floor plan (refer

Refer drawing 298557/-MM-TRC-AR-00-1001, please provide the detai

Refer Drawing Nr 298557-MM-TRC-AR-XX-2001, Elevation 03, Externa

between Grid E&F is double Glazing curtain wall whereas In Drawing A 1 Please provide structural detail for mezzanine floor. 2 Please provide detail for 1.2m concrete wall around building perimeter

AR-00-1001 there is a 500mm thick wall please confirm which one to fo

mentioned in drawing no. 298557-MM-EXB-AR-00-1001 Rev. 02, "Gen

Refer Drawing Nr: 298557/D/1002 section "A" thickness of the Paving A

50mm thick; whereas Section "B" of same drawing mention as 150mm

Refer Landscape detail Drawing 298557/D/1001-1007; please provide k

of following paving types : A-1 , A-2 , A-3 , A-4 , A-5 , A-6 C-1, C-2 and 20 Schedules (00 0001) and Luminary Schedules (00 0002), whereas the issues with the documents received. Please provide.

Electrical specification Rev 1, page 3 of 4 Volume 1 index, listed for Dis

M.V. Schematic drawing 298557-MM-XX-EP-0300 Incoming indicates cables HV to MAIN incoming MV PANEL-1 cable to is not included, but cable termi 21 Main MV Panell-1 by others ( Scope not included included. ). For Allthe other sake MV of cables clarityi.e. please internal distribution is included. confirm incoming cable for Main MV panel are not included in contractor scope. MV Transformers:-

a) Electrical MV Schematic drawing reference 298557 -MM-XX-EP-XX-0300 indicates Dry type transformer, whereas Electrical specification Dry type transformers. section 261200-4 & 5 specifies 22 for oil type and Dry type. Please confirm the transformer, type to be followed. b) Electrical specification section 261200-4 specifies for HV & LV winding shall be either Aluminium or copper, whereas page 261200-10 High conductivity specifies Aluminium. "The windings The offered shall be TX shall be fully compliance with ADDC specs and made of copper of high conductivity. Pleaseapproved confirm the by HV ADDC, & LV Abu winding Dhabi materials as per the to latest technical specification/ circular if any. be used. LV Cables: Electrical small power legend and standard notes ref 298557-MM-XX-EPXX-0100 specifies "Cable types to be used are Non-essential services Schematic drawing reference 298557-MM-XX-EP-XX-0301 to 0308-3 indicates all cables shall be of XLPEL/LSF/SWA/LSF. Please confirm which one has to be considered. We refer to LV Schematic drawing, 298557-MM-XX-EP-0304, indicating outgoing

23 XLPE/SWA/PVC, Essential and life safety services All cables - FP shall 400' bewhereas LSF grade, Electrical exceptLV buried cables i.e. MV cables from

cables from the MDB\s to the "Process Equipments", Main Contractor whereas Scope the location includes and thedetails panel boards, cables from SS to in

for the process equipment are not available. Non-process We presume Equipment Contractorsupplier scope is islimited responsible for the cabling and rout provision and containment shall be by equipment cable trays supplier and or civil others. required Please for confirm, installation of cables. However, actual necessary details. 25 Please provide the schematics for lighting control Lighting system/ control Dimming system schematic system. shall be developed by the specialist concepts shown in the Lighting layouts and DB schedules. DMS & RTU Panel: Please confirm the scope of DMS/RTU Panel and its integration 26 work. If the same shall be provided by the contractor, Question is please not clear, provide need the drawing/ necessary spec reference. details. LV Switchboard: Specification reference section 262300 - 6 specifies, "The low voltage switchboards shall be completely factory assembly'/ For the sake of clarity please 27 confirm locally assembled switched gear byTTA authorized assembly panel of preferred builders shall manufacturer be are only acceptable. acceptable. 28 system, Firefighters Telephone, Fire Fighters shall Smoke-control be fully compliance station. with Whereas local authority. the same are not indicated in the Fire alarm layout. Please confirm the requirement .

24 to those particular panels (MDB) and the downstream insolators are including in the cabling, Main Contractor panel/isolator scope. Main Contractor is also res

else if the same are part of the contractor scope the buildings) of works to kindly the process/non-process provide us with the equipment is not in Main Con

Fire Alarm system specification section 283111-1 Fire alarm summary system species shall be foras Air per sampling the details shown in the layout and s

Fire Alarm schematic drawing reference 298557-MM-FA-XX-0302 Water Treatment Building sheet is located 2 of 2 left top corner of the Extrusion buil same are not available. Please provide. line with other buildings.

29 indicated Fire alarm panel and detectors forFA WTB. system Whereas requirements layout drawings i.e. Smoke for the detector, Manual call point, Sound Emergency lighting schematic drawing reference 298557-MM-XX-0306 sheet 1 of 1 for the same are not available. Please provide. emergency luminaries. Street lighting: Light fitting shown in MEP Street lighting Layout (298557-MM-INF-EL31 XX-100) and Landscape Lighting drawings (298557-LL-1001-001 Street lighting layout, refer are contradicting. drawing no.. 298557-MM-INF-EL-XX-1000. Please confirm which one has to be followed. Light fitting: Please provide the Light fitting legends for the following types since the same are not indicated in the drawing Electrical Refer Lighting the Luminaire Legends schedule and Notes as per (298557above item#20. MM-XX-EL-XX-0100);32 a) Types - A3,A4,A,D,P,P2,P3,P4,W1,W2,W3,W4,W5,W6,W7,C,C2,C3,ML,W1,W/E and R 33 Issued layout drawings do not indicate clean FM agent 200 Fire Confirmed Suppression system (FM200) for the SUBSTATIONS, Kindly confirm

30 indicates Central Battery system panel and Allow lighting emergency for WTB,whereas lighting requirements layout drawings for WTB (Minimum 10 Lux) with

34 The CO2 Extinguishers in Substation buildings 30kg do capacity, not indicate trolley the mounted capacity; CO2 kindly fire extinguishers are considered fo provide us with the same. 35 in the tender documents given in dwg 298557-MM-XX-FP-0100 of 27.12.2012 Kindly provide us with the specification for DX CRAC Split unit since it is not available Kindly provide us with the schedule of SEF-MAB-02 as indicated in Main Admin the equipment schedule 38 Administration Building MM-MAB-ME-XX-0201

Specification for DX CRAC attached separately along with this clarifica

37 Building drawing no 298557-MM-MAB-ME-02-1001 Schedule asof the SEF-MAB-02 same are not fan available is already in in the schedule provided for te Kindly provide the specification for Ecology unit for Entrance Building and Main

Ecology unit specification attached separately along with this clarificatio

The Main administration Building Fire Fighting Main Layout Admin does building not indicate has a sprinkler Sprinkler system. Process areas in Extrusio sprinkler system, kindly confirm with specification for MML review.

39 system; similarly the Process/Plant areas ofsteelwork the Extrusion is painted building with also intumescent do not indicate paint. Please prvide separate pric Master plan 2987-MM-INFPD-XX-1003 indicates to connect foul water service to boundary. award. Contractor is to make an allowance

40 external network. Please provide distance of This the can external be determined network from off the as-built plot information which will be supplie

41 Drawing No 298577-MM-INF-PD-XX-1003 indicates This is a water specific and process oil underground vendor requirement, tanks. the bidder is to allow for Kindly confirm this is part of the process that as shall indicated be provided within that by others. area in his price. 42 pipework forms part of the process system and point. thus shall be considered as owner furnished products In view of the discrepancy in VRF unit references between equipment schedule 29855743 MM-MAB-ME-XX-0201 and layout drawing for VRF Main unit Admin reference building, to beplease considered confirm as per the layout drawing which one has to be followed. Issued layout drawing 298557-MM-INF-PW-XX-030 indicates compressed air header 44 pipes as running at high level. Kindly confirm Assume the height rafter of height. the header pipe from floor level. Kindly advise us of the sizes of the compressed air pipes dropping from the header as 45 the same is not indicated in the issued drawings 25mm 46 to the isolation/ ball valves. We presume that scope the final (party connection who supply of the those compressed equipments). air pipes to all the equipment shall be by others. 47a plot limit contractor. All interconnecting pipework (network) up to and from the main process water storage tanks under the We presume the scope of Process Water distribution sports field (including to each tie pipes, in point fittings, shallvalves be priced by the MAIN CONRACTOR. MAIN CONTRACTOR and accessories) to Cast house building / Extrusion shall allow building a provisional and further amount internal for routing of pipe from the tie in point at each process (extrusion, 47b distribution shall be by others, casting, anodising etc.) to meet vendor requirements. Cooled potable water booster set - 4.75 L/S @ 16.5 bar each. Filter feed pump set - 35 m3/hr @ 4 bar each Kindly provide us with equipment schedules for Cold Water Booster set, Heat Booster Pumps, Heat Exchanger

We presume that the Chillers, Cooling Towers, Theassociated chillers and pumps pumps and areinterconnecting in Main Contractor scope. Please see resp

Compressed air layout drawings and schematics indicates the pipe distribution only up Yes. Connection from the rings to the process or non-process equipme

We presume incoming supply for water main Confirmed. and process Connection water shall to be plot available boundary atfrom the water main will be pro

48 exchanger Feed Pump, Irrigation Booster Pump, Heat exchanger Filter Feedfeed Pump pump set, set Process - 35 m3/hr Water @ 3.5 bar each.

tem #

Queries

Response by MML

The project duration along with the milestones stipulated in the tender documents are not realistic at all especially now that we have soil improvement that needs significant time to complete. We have approached a very reputable specialist soil improvement subcontractor who has executed similar projects in the KIZAD area and we were advised 1 that the soil improvement will require not Contractor less thanis 6to months adhere toto complete the project including programme testing. and milestone Since this is a very critical issue and is unavoidable, please advise us on a more realistic timescale to hand-over the project or will this be up to the main contractor to propose a realistic time frame. For main extrusion building, we have noticed in structural drawings that there is only one

2 (1) pile under each steel column and without This ishaving not a municipality tie beams on requirement. minimum 3 Contractor sides, as per to provide co municipality requirements. Since this isspecial a buildrequirements only contract,will kindly for a confirm variation that we shall follow the structural drawings as is.

which one to follow.

Refer BOQ pg no: EX1/C/1 item no:P, the Indicative stone columns column centres spacing are is 1.5m 2500mm. c/c, whereas This is for pricing purpo 3 refer drawing no: 298557-MM-EXB-ST-00-1001 specification it is the mentioned Main Contractor 2.50m c/c. geotechnical Please advise subcontractor is as per the performance specification As per Specifications Section Temporary Facilities and Controls (Sec 015000) the Vehicles for employers not applicable. There Please is Confirm a requirement the BOQ for pg three no:4x4 A/A/1, vehicles item no: (Toyota H Land Cru 4 to J provision and maintenance of Toyota Toyota pickups pick-up & Toyota for TALEX. - four wheels are not applicable. If applicable provide the quantity. Refer Landscape Specifications Section - L08, pg no: 2 of 3, item no: 3.1.5, Car park fabric is special grade polyethylene conditioned Contractor with high isgrade to allow amine for alight tent UV fabric stabilizers, which is the compliant to Esti 5 density shall be 80%. Whereas refer BOQ requirements Pg no: EXT.W/1 and is to Item provide no:I itan is SRI mentioned 29 Tent fabric with PTFE coated glass for 1hour. Please advise which one to follow. As per the specifications the irrigation design is a contractors d 6 Irrigation layout drawings not available flow in the rates tender provided documents. by the Please Consultant provide the same. 7 Soft Landscaping Plants Schedule are Please not available. find attached Pleasethe provide schedules the Schedule of

Plants. 8

Refer Specification Section - 09970 pgPowder no:2, item coating no: 1.1 section it is mentioned is highlighted Powder on the Coating architectural plans

9 10 11 12 13 14 15 16 no. GWT-ST-00-1000.

please provide the location where it will building be applicable. Please revise and re issue the BOQ General Summary page by adding Training & Recreation Building and Compressor Rooms. BofQ's are issued for information only and Contractor is provide MEP Bill not included in each Building summary. BofQ's are issued for information only and Contractor is provide Please provide the missing BOQ for following BofQ's Buildings: are issued for information only and Contractor is provide a. Civil Works BOQ for Training and Recreation Drawings Building take precedent over the specs and BofQ. b. MEP works BOQ for Switch Gear Building Drawings available and will be issued as addenda for undergro c. Civil and MEP works BOQ for Compressor Confirmed Rooms and contractor is to consider Please provide the locations of Picnic No tables architectural and litter bins drawings on the are drawings produced forfor the these itemssmall rooms a mentioned in the specifications sectionassume L08, Page details 2 of from 3. the structural drawings to provide a suitab Since the architectural drawing is not available for underground water tank, kindly confirm that the area between grids A-I and 4-5 Not is for applicable pump room to this as design shown on structural drawing

Since the architectural drawing is not available for underground water tank, kindly confirm 17 to consider RCC room at ground level [above Door schedules staircase are area] available for access andto on underground the drawings pump room.

item 2.16.

Building.

Architectural drawings for compressed Contractor air rooms and to assume structural a nominal drawings deluge for MV shower and eye wash 18 Switchgear room are not available in the noted. tender There documents. s no preferred Kindly supplier provide the same. Kindly provide the area/location/drawing Water for under tank platform ground storm details water are available. collection The system structural details 19 [VERSICELL] as mentioned in the landscaping already inspecification the drawings section No: (298557-MM-MWB-ST-00-1000, L04, page 8 of 16, 29 2000, 298557-MM-MWB-ST-00-3002). Please provide details and length of trench Typical as detail shown shown in drawing in 298557-MM-GAM-ST-XX-0403. no. 298557-MM-MWBAssume 20 CHB-ST-00-2001 1.5m and length of 101m 21 Please provide the schedule of sand trap Sand louvers trap louver showndesign in elevation is based for Cast on a performance House specificatio Mechanical Tender Specifications. There is no preferred vendo

Please provide stack details 298557-MM-CHB-AR-XX-2001 elevation 4 marked Stack as "stack for the Cast House will be supplied by the Proces Equipm 22 details TBA" for Cast House building or to confirm hold will it is be not MAIN in our CONTRACTOR scope of works. responsibility. 23 Kindly provide us with the BOQ for Basement BofQ's Water are issued Tank for and information Pump Room. only and Contractor is provide The pipes would be referring to the refrigerant ''liquid'' and ''vapour'' lines. Three will The BOQ for Training and Recreational not building, be anyMain chilled Administration water supplybuilding, and return Entrance pipes as this is a DX system. This is building, Casthouse building and Extrusion applicable building to measures comfort systems. chilled water supply and 24

return pipes. We presume this is not applicable However,since the Anodizing all AC Equipments line has chilled are ofwater the DXfrom a dedicated CHW plant, other Type. Kindly confirm process lines in the extrusion and casting processes will have cooling water from cooling towers. Casthouse Building BOQ measures wind driven roof ventilators where as the HVAC layout 25 drawing indicates Labyrinth instead of roof Casthouse ventilators ventilation . Kindlywill confirm be done which viato Labyrinths follow. and not roof v There is a discrepancy in the quantity of Quantity wind driven of wind roof driven ventilators roof ventilators measured will in the be as BOQ indicated in the drawing for the 26 and as indicated in the issued Roof layout Extrusion for thebuilding Extrusion building. Kindly advice. The VRF units measured in the BOQ for VRF theunit Main reference Administration and number Building to be does considered not match as shown in the layout drawing for 27 with the quantity indicated in the issued the HVAC MainLayout. Administration Kindly advice. Building.
Item # Queries 1 Please provide the MEP BOQ's buildings 3 Kindly provide the details and specification for Please the waste refer to water response in other sheet. treatment plant , since there is no info on the same Kindly provide the equipment schedule for the Chillers, Cooling 4 Towers, Pumps , Heat Exchangers etc for Please the process refer to cold response in other sheet. water system in the Extrusion Building. Ecology units & BMS schedule provided for all the different discipline equipments Response by MML These have been provided

2 Kinldy provide the fire protection drawings for Fire the protection substation to be as standard for ADDC substations

5 Kindly provide the specification for the close Specification control units, for Close control units , Ecology unit separately attached. Kindly provide the schedule and specification for the equipment 6 mentioned in the drawing Ref 298557-MM-INF-PW-XX-4001 as the following: a) b) c) d) e) f) g) h) Process cold booster pump (PRW/BP/00/01) To be supplied by Contractor. Details not finalised with vendor Filter feed pump (PW/RRFP/00/01) Chlorine Dosing unit Multimedia Filters (PW/MF/00/01) COPW/BP/00/01 Heat Exchanger Irrigation booster pump (IRW/BP/00/01) To be advised Heat Exchanger feed pump (HX-PW-FP/00/01) 35 m3/hr @ 3.5 bar each (1 duty / 1 standby pumps) 35 m3/Hr. @ 4.0 bar each (1 duty / 1 standby pumps) 4 Litre/Hour. Separate spec sheet attached along with this

Cooled Potable Water Booster Pump-set Drwg. 4.75 Ref: Litre/sec. @ 16.5 bar (2 duty / 1 standby)

To be design by contractor as part of the package as per specifications

Item #

Queries Response by MML Refer to item 6 on clarification 1 from clarification number one General Comment Site visit to be arranged through TALEX General Comment BofQ has been provided - for information only Kindly confirm for which buildings the Wind Casthouse driven ventilation roof ventilators will be and done via Laybrinths. Maintanance Labyrinth Ventilators are to be used asExtrusion though the building designventilation drawings show will be by the wind driven roof ven Labyrinth Ventilators, however the BOQ Ventilators mentions are Wind to Driven be in non Roof metallic standard RAL color. Ventilators; Also for the Maintenance workshop design drawing does not show the type of Ventilators to be used. Further please provide colour scheme incase Ventilators are to bepainted other than non-metallic standard RAL colour 5 In the design drawings for the Extrusion Please building, refer cooling to response towers in and other chillers sheet. are shown; We assume that these are part of the equipment cooling towers and not in the scope of this tender. However kindly provide the equipment schedules and the chilled water pipe layout, associated electrical switchgear, L.V Cable network etc. if these are in the scope of work of the current tender. 6 In the Extrusion building, the BOQ mentions For the VRV Extrusion units, energy buildingrecovery VRV units, energy recovery units, K units and KEF-TRC-01 extract fans which fans are are not not shown used. ont the design drawing. Please clarify. 1 2 3 4

Item # 1 Please provide Final DB Schedules

Response by MML Attached DB will answer query 2 Please provide the schedules for the Lighting Attached Fixtures luminaire schedule will answer the query Drawing No. 298557-MM-XX-EL-XX-0100 Electric Lighting Legend & Standard Notes. the appropriate legend for the Light Fixtures. 4 Kindly confirm for which buildings the Wind Drawings Driven Roof take Ventilators precidentand over the BofQ. BoQ is for reference only Labyrinth Ventilators are to be used as though the design drawings show In the design drawings for the Extrusion building, cooling towers and chillers are shown; We assume that these are part of the equipment cooling process 5 and not in the scope of this tender. However part kindly and provide parcel of the the equipment current tender scope of works schedules and the chilled water pipe layout, associated Electrical switchgear, L.V. Cable network etc. if these are in the scope of work of the current tender. In the Extrusion building, the BOQ mentions VRV units, energy recovery units 6 and KEF-TRC -01 extract fans which are not Drawings shown on take theprecident design drawing. over the BofQ. BoQ is for reference only Please clarify. Kindly confirm if Fire Suppression system for the sub-station is required. If so, 7 please provide details. Please included the following within the relevant documents within Item No.2 - Documents: 9 1. Bills of Quantity 2.Specifications 3.List of Drawings 4.List of Relevant Documents and Addenda Defects Liability Period 10 Please change 24 months to 12 months Laws and Language 11 Please advise the country of whose laws apply Laws to be as UAE, Abu Dhabi. Language - English Kindly provide as adequate and realistic construction duration considering the 23 additional scope of more than 38,000 nos. of Contractor 900mm dia. is to stone provide column a detailed for realistic programme to deliver close ground strengthening works. Standard is 12months but opion price for 24months. Fire protection to be as standard for ADDC substations

3 Legend given completely different than shown Refer on to layout the layout itself. Please in conjunction providewith luminaire and associated legend

Electrical requirements, refer drawing no. EP-0301, 0304, 0305, 0306 a

8 Design drawings for Extrusion building mentions Waste Water Treatment and EContractor to install. Plant supplied

Specifications, drawings and addenda will form part of the contract. Bo only

Crane supply and erection is an optional pricing item however TALEX r 24 contractors work.

Please confirm that supply and installation of include crane in is the not Main part of Contractor the main scope of work. Please be aware that Ma

Extrusion and Cast House Building ready for process equipment erectio

commissioning of Cranes. Therefore, TALEX will include Cranes in Ma works. 26 Please provide earthworks quantity. able to source a reputable sub-contractor Contrcator is to do own quantities

25 Please provide list of specialists and their contact There is details no preferred for the stone subcontractor column for the stone column works. Main C

Please confirm whether the loose furnishes, white goods/kitchen & laundry 27 equipments, office furnitures are not included Not in in contractors scope scope Item # Query 1 General Comments 2 General Comments 3 General Comments Response by MML BofQ's have been Issued Standard Fire Protection for ADDC substations is to be provided Waste Water treatment Plant is Vendor supplied, Contractor installed Kindly confirm for which buildings the Wind driven roof ventilators and Labyrinth Ventilators are to be used as Casthouse though the ventilation design will be done via Laybrinths. drawings show Labyrinth Ventilators, however Maintanance the BOQ mentions Workshop and Extrusion building ventilation

Wind Driven Roof Ventilators; Also for the Maintenance will be by the workshop wind driven roof ventilators. Ventilators are to design drawing does not show the type of Ventilators be in non metallic to be used. standard RAL color. Further please provide colour scheme incase Ventilators are to 4 bepainted other than non-metallic standard RAL colour In the design drawings for the Extrusion building, cooling towers and chillers are shown; We assume that these Construction are part of of the Extrusion Building Cooling Towers and equipment cooling towers and not in the scope Piezometric of this tender. Tower for the Cast House is in the Main However kindly provide the equipment schedules Contractor and the scope. chilled These will be as per MML design. water pipe layout, associated electrical switchgear, However, L.V these Cable are excluded from the scope until MML network etc. if these are in the scope of work has of finalised the current the design. 5 tender. In the Extrusion building, the BOQ mentions VRV units, energy recovery units and KEF-TRC-01 extract fans For which the Extrusion are not shown building- VRV units, energy recovery 6 ont the design drawing. Please clarify. units, KEF-TRC-01 extract fans are not used.

Item # Response by MML With reference to electrical LV schematic diagram 296567-MM-XX-EP-XX-0904 REV3, 298557-MM-EP-XX0305 REV3, 298557-MM-XX-0306 REV3, 298557-MM-XX-EP-XX-0307 REV3 the name of MDB & DB 1.0 mentioned are not matching with the ground MDB'sfloor and Plan DB's 288557-MM-EXB-EP-00-1001 mentioned in the Schematic drawings REV2, 298557-M shall be EXB-EP-XX-1002 REV2, 298557-MM-EXB-EP-00-1003 REV2, 298557-MM-EXB-EP-00-1004 considered. REV2, 298557-MM-EXB-EP-00-1005 REV2, 298557-MM-EXB-EP-00-1008 REV2, 298567-MM-EXB-EP-00-1007 REV2, 298557-MM-EXB-EP-EP-001-1008 REV2, 298557-MM-EXB-EP-00-1009 REV2 names kindly clarify. With reference to electrical LV schematic diagram 296567-MM-XX-EP-XX-035 REV3 kindly provide the 2.0 location of DB-OFF-L, DB-OFF-P from Refer SMDB-SS3-OFF drawing no.enabling 298557-MM-EXB-EP-900-4002 us to measure the cable Rev.1 length & containment. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0305 REV3 kindly provide the 3.0 location of DB-OFF-P feeding from SMDB-SS4-OFF Refer drawing enabling no. 298557-MM-EXB-EP-900-4001 us to measure the cable length Rev.1 & & 400 containment. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0307 REV3 kindly provide the 4.0 location of DB-OFF-L, DB-OFF-P feeding Refer from drawing SMDR-EXB-OFF no. 298557-MM-EXB-EP-900-4003 enabling us to measure the Rev.1 cable len &containment. 5.0 With reference to electrical ground floor MDB-SS3-08 plan 298557-MM-EXB-EP-00-1003 is no longer required and REV2 hence kindly not advise shown from in thew the MDB-SS3-08 is feeding from since it is not showing in LV schematics. Schematics. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0304 Please REV3, refer 298557-MM-XX-EPto Extrusion Building layout drawing. This will just XX-0306 REV3, 298557-MM-XX-EP-XX-D306 REV3, kindly provide the location idea of about process machine equipments locations. However, this does not cover all 6.0 feeding from MDB's enabling us to measure machines the cable yet. Please length also & containment refer to Cast and House also advice layout drawing isolatorsf required to terminate the cable before the processing equipment since it is not same. shown. With reference to electrical ground floor plan 298557-MM-EXB-EP-00-1001 REV3, 298557-MM-EXB-EP-001002 REV3, 298557-MM-EXB-EP-00-1003 REV3, 298557-MM-EXB-EP-00-1004 HDG REV3, Heavy 298557-MM-EXBDuty Cable tray/ Ladder. Exact size shall be calcul 7.0 EP-00-1005 REV3, 298557-MM-EXB-EP-00-1006 contractor based REV3, on 298557-MM-EXB-EP-00-1007 the no. of cables intended to REV3,298557 install. EXB-EP-001-1008 REV3, 298557-MM-EXB-EP-00-1009 REV3 kindly provide the size & type of containment (cable tray) shown in the drawing. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0306 Please REV3 read kindly as advise DB-SS4-P3, the DB-SS4-P4 & DB-SS4-P5. This wi 8.0 location of DB-SS4-LPS, DB-SS4-L5, DB-SS4-P6 feeding from MDB-SS4-EXB-7 since it is not shown plan drawings located at Grod-9/E, 18/E and 30-GH With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0307 REV3 kindly advise the 9.0 location of DB-EXB-LP5 (CHM) feeding Please from MDB-SS5-EXB-5 read as DB-EXB-LP5(STORE) since it is not shown and located in plan indrawings side store With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0302 MCC-TRC REV3 kindly will be advise located thein Electrical room at Ground Floor an 10.0 location of MCC-TRC and its related isolators will be located since it at is not Roof. in plan drawings With reference to Sports facility building electrical floor plan 298557-MM-TRC-EP-00-1001HDG Heavy Duty REV3, Cable 298557tray. Exact size shall be calculated by t 11.0 MM-SFB-EP-01-1001 REV3, kindly provide contractor the size based & type on of the containment no. of cables (cable intended tray0 to shown install. in the drawings With reference to Maintenance Workshop building electrical floor plan 298557-MM-MWB-EP-00-1001 HDG Heavy Duty Cable tray. Exact size shall be calculated by t 12.0 REV3, 298557-MM-MWB-EP-00-1002 contractor REV3, kindly based provide on the the no. size of & cables type of intended containment to install. (cable tray shown in the drawing

With the reference to Extrusion building electrical LV schematic diagram 298557-MM-EP-XX13.0 0304,0305,0307 REV3, kindly advice the SMDB's location will of be SMDB-SS3-CR1,CR2,SMDB-SS5-CRS,SMDB-SS located within the respective CR's and CT's are CT1,CT2,SMDB-SSS-CTS,SMDB-SS4-CY3,CT4 and its related isolators enabling detailed us to in measure the Architectural the cable drawings/Mechanical drawings. & containment length. Since it is not shown in plan drawing. All MV & LV cables are buried underground. Cable ducts shall 14.0 Kindly provide the size of electrical LV for & MV road cable crossing duct between and hardstand substations whereand applicable. each building LV/ MV since cabl mentioned in the drawings. 150mm and 100mm duct for street lighting. Duct shall be provid each cable run and one spare duct at all locations. 15.0 With reference to street light layout 298557-MM-INF-EL-XX-1000 Please read "5 Core 25mm2" REV3 as "4Core it is showing 25mm2 the XLPE/SWA size of earthl + cable for street lighting is 5 core 25sqmm XLPE/SWA/PVC cable. Kindly confirm earth this cable". is correct. Kindly confirm whether electrical scada is required for this project. If required kindly there is provide a communication the specification network throughout the plant. This wi 16.0 & schematics for the same. all the process equipment as well as BMS. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0301MDB-SS2-EXB REV3, kindly and provide MDB-SS2-WTP the located in Water treatmen 17.0 location of MDB-SS2-EXB, MDB-SS1-WTP,MDB-SS2-PUMP,MCC-SS2-FWP,MCC-SS2-FIRE room. MDB-SS-PUMP, MCC-SS-FWP & MCC-SS2-FIRE PUMP PUM it's related isolators enabling us to measure the cable & containment length. Since refer the it is PHE not shown & Fire in protection the plan layout drawings. drawings. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0308 SMDB's REV0will kindly be located provide within the the respective CT's area as detai 18.0 location of SMDB-EXB-CT-3,4 DB-EXB-LP1,DB-EXB-SS Architectural drawings/Mechanical and its related isolators drawings. enabling DB-EXB-SS us to meas is no the cable & containment length. Since it is not shown in the plan drawings. use. DB-EXB-LP is renamed as DB-SS-LP1 and is located in S Kindly provide the detailed description of following light fixture since it is not showing In Electrical lighting legend & Standards notes drawing 298557-MM-XX-EL-XX-0100 REV3 a. Light fixture TYPE W1, TYPE W7, TYPE P showing on drawing 296557-MM-EXB-EL-00-1001 REV2. b. Light fixture TYPE A5. TYPE W2 showing on drawing 298557-MM-PFF-EL-00-4001 REV0 c. Light fixture TYPE A4. TYPE A, TYPE D, TYPE C, TYPE ML, TYPE W1, TYPE P2 showing on drawing 298557-MM-TRC-EL-00-1001 REV3 19.0 Refer the attached Luminaire Schedule. d. Light fixture TYPE W1/E showing on drawing 298557-MM-MWB-EL-00-1001 REV3. e. Light fixture TYPE P4 showing on drawings 298557-MM-MWB-EL-00-1002 REV3. f. Light fixture TYPE W5 showing on drawing 298557-MM-ENB-EL-01-1001 REV3. g. Light fixture TYPE P2, TYPE P3, TYPE C2, TYPE C3 showing 298557-MM-ENB-EL-00-1001 REV3. h. Light fixture TYPE R showing on drawing 298557-MM-CHB-EL-1001 REV2. i. Light fixture TYPE W3 on drawing 288557-MM-DGE-EF-00-1001 REV3.

With the reference to drawing 298557-LL-EXB-EL-00-4001 REV2 kindly provide the details of the legend M 20.0 shown inside a circle, since it is not shown in the Electrical ligh MM-XX-0100 REV0 with Lighting Control panels. With reference to drawing 298557-LL-1001 REV0. Kindly provide the detailed description on the Bollard 21.0 light, recessed ground light , In ground Refer lip light, to the Spike Landscape Light, since Materials it is not schedule providedattached With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0308 MDB-SS6-CHB, REV3 kindly provide SMDB-SS6-CHB the are located in CHB main elec 22.0 location of MDB-SS6-CHB-1,SMDR-SS6-CHB,SMDB-CHB-CT,SMDB,CHA-CR-MCC-CHB-XX, room. Locations of SMDB-CHB-CT, MCC-CHB & SMDB-CHB-C proces equipment and its related isolators enabling us to measure the cable & containment the respective length. Since mechanical it is not plant room layouts. shown in the plan drawings. With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0303 MCC-MAB-SF-2E REV3, kindly provide is located the at 2nd floor electrical room (Grid- F 23.0 location of MCC-MAS-SF-2E, MCCMAB-ROFF-2E and MCC-MAB-ROOF-2E and its relatedis isolated locatedenabling 1st floor us electrical to measure roomthe (G & containment length. Since it is not shown in the pan drawings. 9 With reference to electrical LV scheme diagram 288557-MM-EP-XX-0303 REV3. Emergency Kindly advise powerfrom supply where for MCC's are from MDB-MAB-G loca 24.0 the emergency power supply to MCC's are coming from enabling us to measure the cable & containm length. Since it is mentioned TBC in the drawing. ground floor electrical room (Grid-K-L/5-9). With reference to electrical LV schematic diagram 298557-MM-XX-EP-XX-0302 REV3, kindly provide the 25.0 location of MCC-MAB-GF, MCC-MAB-ROOF-1 MCC-MAB-SF-1 and its related is located isolators, at 2ndDB's floorenabling electricalus room to measure (Grid- F-

cable & containment length. Since it is not shown in the plan drawings. MCC-MAB-ROOF-1 is located 1st floor electrical room (Grid-K26.0 Kindly provide the electrical Load Schedule Please forfind the attached project since electrical it is not load provided. schedule (DB Schedule) fo reference. With reference to speciation section 260934 asking for addressable lighting control Fully programmable, based on DALI lighting digital control panel with automatic opera control but in the drawing 298557-MM-XX-EL-XX-0100 REV0 standard noted lights 6, it isupon mentioned Motion normal sensors, timers, etc also PC in addition for e 27.0 control using switches, Motion sensors, lights. Photo Dimming/ electric call switching kindly confirm control requirements which one to follow shall be if DALI as per is required kindly provide the drawings. given in lighting layout and DB schedules. DALI control is not b this project.

With reference to the email dated 8th November 2012 from .. & General specification section 011000 page 3&4 kindly advise how to identify the 9 phase since we did not have drawings or specification 28.0 differentiating these three phases and description Summary document provided in clearly the above defines mentioned the gridlines pages for cannot the 3 phas be identified form the MEP drawings. Kindly advice the exact location of MDB-SS3-05, MDE+SS3-08 since it is not MDB-SS3-05 shown in drawing & 06298557-MMare located at Grid-A/28-29 as shown in the 29.0 EXB-EP-00-1001 REV2 between grid 6 & D and also in drawing 298557-MM-EXB-EP-00-003 REV2 between grid 29-28 & A. Enabling us to measure the cable length from it respective no. EP-1003 substation Kindly advice the exact location of MDB-SS3-07 since it is shown in drawing 298557-MM-EXB-EP-00-1001 MDB-SS3-07 is located at Grid-A/5-6 as shown in the drawings 30.0 REV2 between grid 6 & A and also in drawing 298557-MM-EXB-EP-00-1009 1001 REV2 between grid 28 & Enabling us to measure the cable length from it respective substation. 31.0 Kindly advice the exact location of DB-SS3-L4 DB-SS3-L4 since is it located is shown at Grid-A/17-18 in drawing 298557-MM-EXB-EP-00-10 as shown in the drawing REV2 between grid 18 & A. Enabling u to measure the cable length from it respective MDB 1002 Kindly advice the exact location of MDB-SS5-03, MDR-SS5-04 since it is shown in drawing 298557-MM-ExbMDB-SS5-03 & 04 are located at Grid-K/20-21 as shown in the 32.0 EP-00-1008 REV2 between grid 20-21 no. & KEP-1008 and also in drawing398567-MM-EXB-EP-00-006 REV2 be grid 7-6 & I. Enabling us to measure the cable length from it respective substation. Kindly advice the exact location of MDB-SSS-05 since it is shown in drawing 286557-MM-EXB-EP-00-1007 33.0 REV2 between grid 2-3 & K and also in drawing 298557-MM-EX J. Enabling us to measure the cable length from it respective substation. 1007 Kindly advice the exact location of MDB-SS4-04 since it is shown in drawing 298557-MM-EXB-EP-00-1006 MDB-SS4-04 is located at Grid-H/6-7 as shown in the drawing 34.0 REV2 between grid 6-7 & H and also in drawing 288557-MM-EXB-EP-1005 REV2 between grid 26 & F Enabling us to cable length from it respective substation. 1006 Kindly advice the exact loading of MDB-SS4-03 since it is shown in drawing 298557-MM-EXB-EP-00-1008 35.0 REV2 between grid6-7 & E also in drawing MDB-SS4-03 288557-MM-EXB-EP-00-1005 is located at Grid-E/6-7 REV2 as shown between in the grid drawing 22&F. n Enabling us to measure the cable length from it respective substation. 1006 Kindly advice the exact location of MDB-SS4-07 since it is shown in drawing 298557-MM-EXB-EP-00-1006 36.0 REV2 between grid 1 & E-F and also in MDB-SS4-07 drawing 298567-MM-EXB-EP-00-1000 is located at Grid-E-F/1 as REV2 shownbetween in the drawing grid 18 D-E. Enabling us to measure the cable length from the respective substation 1006 Kindly provide the location of MDB-SS6-EXB-2 showing the schematic drawing MDB-SS4-02 298557-MM-XX-EP-XXis located at Grid-E-F/1 as shown in the drawing 37.0 0307 REV3, since it is not showing in plan drawings. 1006 Kindly advice the exact location of DB-SS5-L4 & P4 since it is shown in drawing DB-SS5-L4 298557-MM-EXB-EP-00& P4 are located at Grid-K/26-27 as shown in the d 38.0 1004 REV2 between grid 28 & F-G and repeated in grid 29 & H-I also in drawing 298557-MM-EXB-EP 1009 REV2 between grid 26-27 & I-J. Enabling EP-1009us to measure the cable length from it respective MDB.

Kindly advice the exact location of MDB-SS4-05, MDB-SS4-05 since it is shown in drawing 298557-MM39.0 EXB-EP-00-1008 REV2 between grid 6-7 MDB-SS4-05 & H and also & 06 in are drawing located 2985578-MM-EXB-EP-00-1004 at Grid-H/5-6 as shown in the RE dr between grid 31 & E-F. Enabling us to measure the cable length from it respective EP-1006 substation. Access control is required for MV room doors. The Access con 40.0 Kindly provide the security drawing, ELV equipment drawingsshall for MV be room connected if it is to required, the security sincecontrol it is not panels provided loc adjacent VGB.

Kindly confirm the emergency & exit light for substation SS2,SS3,SS4,SS5 are self-contained lights, since 41.0 these substation are not allowed in theEmergency Emergencyand lighting Exit schematic lights for SS2, 288557-MM-XX-FA-XXSS3, SS4 and SS5 are feed 0301,0302,0306 REV3 Extrusion building CBS. Kindly provide the locating of isolators, MCC & Mechanical Equipment shown in schematic drawings 296557For the details of Isolators and MCC's, refer the respective build

42.0 MM-XX-EP-XX-0301 REV3, 298557-MM-XX-EP-XX-0902 power layouts. REV3, 298557-MM-XX-EP-XX-0309 REV3, 298557-MM-XX-EP-XX-0308 REV3 43.0 With reference to electrical ground floor DB-CHB-COMM1 plan 298557-MM-CHB-EP-00-1001 Is no longer required. REV2. DB-CHB-L1 Kindly advice & P1 feed from where the DB-CHB-COMM1, DB-CHB-P1, DB-CHB-L1 is feeding from since it SMDB-SS6-CHB is not show in LV schematics 44.0 With reference to electrical ground floor DB-CHB-COMM2 plan 298557-MM-CHB-EP-00-1002 (To be read as DB-CHB-UPS) REV2 kindly isadvice feeding from from it is not showing in LV schematics SS6-CHB, Refer DB Load Schedule. 45.0 With reference to electrical ground floor DB-VGB-UPS plan 298557-MM-VGB-EP-00-1001 is feeding from DB-VGB-LP, REV3 Refer kindlyDB advice loadfrom sche the DB-VGB-UPS is feeding from since it is not showing 46.0 With reference to electrical ground floor DB-DGB-UPS plan 298557-MM-DGB-EP-00-1001 is feeding from DB-DGB-LP, REVs Refer kindly DB advice loadfrom sche the DB-DGB-UPS is feeding from since it is not showing in LV schematics 47.0 With reference to drawing 298557-MM-INF-EV-XX-1001-1004 Length gate barrier shall REV2. be suitable Kindly for advice the proposed the length road of gate widt barriers if required, since it is not mentioned in the drawings. road layout drawing. With reference to electrical ground floor plan 298557-MM-EXB-EP-00-1001 REV2 kindly advice from where 48.0 the DS-SS5-CAB1,CAB2, CAB3,CAB4, DB-SS3-CAB1,2, DB-OFF2-LP is feeding 3 & 4 and from DB-OFF2 since it is are not feeding showing from in SMDBLV schematics 49.0 With reference to electrical ground floor DB-SS3-CAB5 plan 298557-MM-EXB-EP-00-1002 is feeding from SMDB-SS3-OFF2 REV2 kindly advice from w the DB-SS5-CAB5 is feeding from since it is not showing in LV schematics With reference to electrical ground floor plan 298557-MM-EXB-EP-00-1003 REV2 DB-SS3-CAB6, . Kindly advice DB-POWER from COATING & DB-OFF-3 are feedin 50.0 where the DB-SS3-CAB6,SMDB-SS3-OFF2,DB-Power coating, DB-OFF-LP is feeding from since it is showing in LV schematics SMDB-SS3-OFF2. SMDB-SS3-OFF2 is feeding from MDB-SS3 51.0 With reference to electrical ground floor DB-SS4-CAB6, plan 296557-MM-EXB-EP-00-1004 DB-OFF7 & DB-OFF6 REV2, are feeding kindly from advice SMDBfrom the DB-SS4-CAB5,DB-OFF7-LP,DB-OFF5-I P is feeding from since it is not showing OFF1 in LV schematics With reference in electrical ground floor plan 298557-MM-EXB-EP-00-1005 REV2 kindly advice from where 52.0 the SMDB-SS4-OFF2 is feeding from since SMDB-SS4-OFF2 it is not showing is feeding in LV schematics from MDB-SS4-07 With reference to electrical ground floor plan 298557-MM-EXB-EP-00-1006 REV2 DB-SS4-CAB1, kindly advice CAB2, from CAB3 where& CAB4 are feeding from SMDB53.0 the DB-SS4CAB1, CAB2, CAB3, CAB4, DB-SS4-L3 DB-SS4-P3, & DB-SS4-P3 DB-SS4-L3 are is feeding feeding from from since MDB-SS4-EXB-07 it is not showin LV schematics 54.0 With reference to electrical ground floor DB-OFF-LP plan 298557-MM-EXB-EP-00-1007 is feeding from SMDB-SS5-OFF1 REV 2 Kindly advice from the DB-OFF-LP is feeding from since it is not showing in LV schematics. Waste Water treatment Plant supply is in TALEX vendors scope. Main Contractor has to ensure scope work as per MML available drawings. Exact details of equipment, tanks, installation etc to be agreed separately. Waste Water treatment plant to be advised by TALEX upon vendor appointment. Water (piezometric) tower in Casthouse is supplied by Kindly provide details and plans for waste vendor, water installation treatment by plant, Main water Contractor tower, cooling - detailstower, to be confirmed scrap builidng when 55.0 vendor appointed. Extrusion Building cooling towers to be specificed in and bailing press detailed design and supplied/installed by Main Contractor. However, these are not fully detailed in current Tender document therefore excluded from the bse PRICE. Scrap buildings and bailing press shed are nominal small steelwork portal framed sheds (with back, side and partitiion reinforced concrete 5m high walls) with nominal foundations and concrete slab. 56.0 General Comment 57.0 General Comment Item # Queries 1 General Comment

AutoCAD drawnigs have been provided Ston Columnns are nominally 2500mm centres. Contractor des

2 General Comment building

Response by MML Soil improvement i.e. Stone columns is reqired for the complete vibration affecting plant later. Same will apply for Pilings. All the will be covered and not cut - these will be maintained at floor le BofQ are for information only. However please find attached Bo

Item #

Queries 1 Kindly provide the spec for the DX CRAC Units and Ecology units as mentioned in items ref3 & 5 in TALEX combined queries

Response by MML

DX CRAC specfication has been provided within the MEP Tender spec

date 06.02.2013 issued via addendum No. 5 2 Cannot find underground oil tank drawings These are going to 10,000l per Press. Item # Queries Response by MML

1 Parapets height: Please provide answers for the notes on the attached drawing. 2 Reference is made to drawing no. (298557-MM-EXB-AR-00-1004, EXB building/Internal offices, Generic Elevations & sections) Detail No.6: Protective Glass screen: Please provide Contractor technical to provide specifications options and - there approved is no preferred supplier vendor list. Detail no.4: (Elevation D): It is mentioned that Standard Structure portacabin Light weight type porta construction cabin type. The schedule of finishes mentions for the same Plaster & emulsion paint. Please confirm the type of the internal partitions and intermediate slab of the said offices.

3 Reference is made to drawing no. (298557-MM-MP-AR-XX-1000): Contractor to make Please a provisional provide details sum allownace as no details are avail %m concrete walls 300 thicj reinforced and assocaited drainage and lighting Logs/Logs store. Talex scrap. Gulfex scrap. Profile saw/Profile bailing press. Dross presses. Storage area. 4 Reference is made to drawings no. (298557-MM-XX-EP-XX-0304 TO 0308):

(sections, structural drawings, etc..) for the following Light areas/buildings: weight steelwork portal frame, ground slab, foundations. Metal sh

Please provide length of cable run from each Not panel into scope the relevant - Routing process of utilities equipment. from the Take Over Points to the actu supplier. Please be aware that these Take Over Points are inside the buildings. On drawing no. (0307) panel MDB-SS5-EXB-4 appears once on SLD whereas it appears twice on EXB layout. Please confirm the total number of this panel type. Unit of capacitor bank is mentioned as (kWR): Please confirm it is (KVAR). 5 Process equipment: Please provide schedule of process TALEX equipment Vendors to weights supplyand thereactions. information erquired when appointed 6 Reference is made to drawings: (298557-MM-MWB-PD-00-1001/1002), (298557-MM-ENBPD-00-1001) & (298557-MM-CHB-PD-00-1001 to 1006):

Process Machines is designed and supplied by TALEX process equipm

The drawings listed above include indications toStormwater connect the buildings is attenuated stormon water the outlets plot in drainage ponds. All as per deta water network for the outlets to be connected to; stormwater. please clarify. Please follow drawing for this. 7 Please specify location of furniture (Drawing Reference: As per materials 298557/D/1008). schedule 8 Please provide sections on technical galleries (Drawing No sections Reference: available 298557/MM/CHB/ST/00/2001) and routing on all the Plant. Item # Queries Response by MML

to an external storm water network, but the Master drawings. Plan does There notis show a confusion any external in the storm specification for underground pum

1 Reference level: Reference is made to drawing no.( 298557-MM-GEN-ST-XX-0400). As per the pile schedule, cut off levels of piles are mostly at (-1.40m) with respect to SSL, whereas Cross therefer toe to road drawings. These indicate the level in the drawing sheet referred above is with respect to NADD (New Abu Dhabi Datum), EGLground in the Soil level in NADD and the SSL for each report is also with respect to NADD . Please clarify the relation between SSL with respect to NADD. building is generall 0.300m above NADD Lightning protection layouts: Tender documents include lightning protection design for EXB andLightning Cast house protection is applicable for 2 buildings only. However, the BOQ includes lightning protection systems for all buildings: Please EXTRUSION confirm. and CAST HOUSE buildings only. Allow Earth pit for each down Extrusion Building: The locations of the double flanged earth pits are missing or not shown. Please conductor advise. same as shown in Cast House building layout.

3 With reference to drawing (298557-MM-MP-AR-XX-1000), Fence details we are appreciate as the drawings receiving and more supplied details about the fence types and sections. specifications Industrial security fence: There is a contradiction between Master plan (Drawing reference: 298557-MM-MPAR-XX-1000) and Road works plan (Drawing reference: Masterplan 298557-MM-INF-TR-XX-101 takes precident and 298557-MM-INF-TRXX-103). Please advise which drawing to adopt.

Item #

Queries Response by MML 1 The following items are not listed in theBofQ BOQis whereas for information they are only. mentioned Contractor on the to do Drawings: own BofQ Please ad listed for info or shall be included in our based cost, and on the if so drawings where to which include take their precident. price. This Addressable Lighting (Electrical Specs project Tender does Section not require 260943 any-260993): addressable It isluminaires, mentioned in the spe is controlled whereas the drawings do not hence mention not shown or show in the any layout/ control luminary unit or addressable schedule. fixtures. BMS system (Mechanical non process Lighting Specs control Tender requirements p.312): The are BMS asschedule shown inis the mentioned DB in th Complete CCTV network (drawing 298557-MM-INF-EV-XX-0302-2): Schedule and layout drawings. It s not specified in the drawing are wireless or not. Master Plan Complete BOQ: o Exterior Lighting (drawing 298557-MM-INF-EL-XX-1000-3) o Raceways for Power and Communication (drawing 298557-MM-INF-EP-XX-10011004-2) o Security System (drawing 298557-MM-INF-EV-XX-10011004-2) o Switches in all the buildings (drawing 298557-MM-MAB-EL-00-1001-3) o UPS backed up connection unit (drawing 298557-MM-INF-EV-XX-0401) o UPS backed up distribution board (drawing 298557-MM-INF-EV-XX-0401) o Fiber optic network(drawing 298557-MM-INF-EV-XX-0300/0303) o Edometers (drawing 298557-MM-MAB-EL-00-1001-3) o Telecommunication earth bar (drawing 298557-MM-INF-EV-XX-0401) o Security Control Panel and Fire Alarm Interface (drawing 298557-MM-INF-EV-XX-0401) o Fire Control Panels and Fire alarm repeater (drawing 298557-MM-XX-FA-XX-0301-3) o Loop powered interface unit (drawing 298557-MM-XX-FA-XX-0301-3) o Central Battery system (drawing 298557-MM-XX-FA-XX-0306-3) o Extrusion Building Offices BOQ (drawing 298557-MM-EXB-EL-00-40014004) / (drawing 298557-M 40014004) / (drawing 298557-MM-EXB-FA-00-40014004) o MV switchgear Room BOQ (drawing 298557-MM-MVR-EP-00-1001-1)/ (drawing 298557-MM-MVR (drawing 298557-MM-MVR-FA-00-1001-1) o Type W2 luminaires for store powder chemicals/anodizing chemicals store (drawing 298557-MM-E

o MV cables (drawing 298557-MM-XX-EP-XX-0300) o UPS 16KVA 30min (drawing 298557-MM-XX-EP-XX-0308) o ATS 63A (drawing 298557-MM-XX-EP-XX-0301) / (drawing 298557-MM-XX-EP-XX-0302) 2 Cable length in BOQ: The mentioned length BofQ is forfor the information following cables only. Contractor is less than tothe do effective own BofQ routing a final tender drawings. Please advise which based value on the to adopt drawings and which in case take we precident have to adopt the values of where to add the cost of additional quantities. 298557-MM-XX-EP-XX-0302 Cable from MDB-SS2-MAB-GF to: FP-01 is shortened 100 meters in the BOQ FP-02 is shortened 150 meters in the BOQ DB-MV Room is shortened 150 meters in the BOQ 298557-MM-XX-EP-XX-0304 Cable from MDB-SS3-EXB-7 to: DB-SS3-L3 is shortened 15 meters in the BOQ DB-SS3-P3 is shortened 15 meters in the BOQ DB-SS3-L4 is shortened 80 meters in the BOQ DB-SS3-P4 is shortened 80 meters in the BOQ DB-SS3-L5 is shortened 250 meters in the BOQ DB-SS3-P5 is shortened 250 meters in the BOQ DB-SS3-LP5 is shortened 240 meters in the BOQ DB-SS3-LP7 is shortened 180 meters in the BOQ DB-SS3-LP8 is shortened 180 meters in the BOQ SMDB-SS3-CR1 is shortened 170 meters in the BOQ

4 5 6

SMDB-SS3-CR2 is shortened 70 meters in the BOQ SMDB-SS3-OFF is shortened 140 meters in the BOQ 298557-MM-XX-EP-XX-0307 Cable from MDB-SS5-EXB-05 to: DB-SS5-L2 is shortened 50 meters in the BOQ DB-SS5-P2 is shortened 50 meters in the BOQ DB-SS5-L3 is shortened 110 meters in the BOQ DB-SS5-P3 is shortened 110 meters in the BOQ DB-SS5-L4 is shortened 200 meters in the BOQ DB-SS5-P4 is shortened 200 meters in the BOQ DB-SS5-LP5 is shortened 60 meters in the BOQ 298557-MM-XX-EP-XX-0307 Cable from SMDB-EXB-OFF to: DB-OFF-P is shortened 300 meters in the BOQ PAC-EXB-OF6-01 is shortened 370 meters in the BOQ KEF-EXB-OF6-01-A is shortened 360 meters in the BOQ KEF-EXB-OF6-01-B is shortened 360 meters in the BOQ Analysis of steel re-bars quantity versus BofQ reinforced is for information concrete quantity: only. Contractor The totalto quantity do ownof BofQ steel re-bar compared to concrete quantity gives a based rate of on 45kg theof drawings steel/m3 which of concrete take precident whereas the drawings take of 95kg/m3 which is more logic. Please advise. Piling: Drawings ref: 298557-MM-GEN-ST-XX-0400, Piling design is Standard by contracort. details, Piles the drawing lengths indicative shows the piling P1 length as 15.9m whereas BOQ/Site work/items K&L mention 13m. Please clarify. Piling: Drawings ref: 298557-MM-EXB-ST-00-1001, 2500mm EXB Building, the drawing shows the stone colum center distance as 2.5m whereas BOQ/Concrete works/item Q mentions the same distance as 1.5m, The BOQs for the following areas are not See included: attachedSports facility training and recreational center, Co LPG storage area, underground water tank whereas they are included on drawings. Please clarify and include their price. BOQ/ Concrete works, item P mentions BofQ Construction is for information of ETP/water only. Contractor treatment plant to do own : Please BofQ provide d same. based on the drawings which take precident. See attached BofQ Landscaping works Asphalt Pavement Type 2 (Light duty): Given Discrepancy Estimatedbetween quantities BOQ are (Ref. checked External for pavement works/item G,H,I, drawings(Ref. 298557-MM-INF-TR-XX-0700). type 1, for The pavement mentioned type area 2 revised for asphalt quantity pavement is 18257 type 2 is less area as per final tender drawings. Please m2, advise Refer which drawing value no. to 298557-MM-INF-TR-XX-0700 adopt; in case we have to adopt the v drawings, where to add the cost of additional and 298557-MM-INF-TR-XX-0200 quantities. Kerb Stone: Please confirm unit (in square Typo error meter consider or in linear Unit as meter?). M Security Gates: Discrepancy between Given BOQ Estimated (Ref. External quantities works/security are checked, gates) as per anddrawing final tender dr 298557-MM-AR-XX-1000). The mentioned no. 298557-MM-INF-TR-XX-051 number of gates is less thandetail effective design number issue as per final t Please advise which number to adopt; dated in case 22-12-2012 we have to adopt the number of the drawings, where to additional quantities. Detention Pond: Discrepancy between Please BOQ Refer (Ref.drawing External no. works/Detention 298557-MM-INF-TR-XXpond) and final tender 298557-MM-INF-TR-XX-0200). Please 051(22-12-2012) clarify detention pond and 298557-MM-INF-TR-XX-0200 width (is it top or bottom?) and location o size on final tender drawings. (Section B) Shaded Structure: Discrepancy between Shade BOQ structure (Ref. External Estimated works/Shaded area = 4880 structure) m2. Referand final ten 298557-MM-AR-XX-1000). The mentioned Dwg.no area 298557-MM-MP-AR-XX-1100 for shaded structure is less than the effective area as drawings. Please advise which value to adopt; in case we have to adopt the values of the drawings, w cost of additional quantities.

Soft Landscape: Discrepancy between BOQ (Ref. External w 298557-SL-1000). Please clarify soft landscape names on final tender drawings. Pavement (Footpath): Discrepancy between Layout plan pav 0700) and hardscape layout(Ref. 298557-HL-1000). The menti classification is not the same as mentioned in hardscape layou

2 Substations:

a-

Discrepancy between BOQ (Ref. SS2/Concrete works/item C) a 00-1000). The mentioned concrete volume for basement walls final tender drawings. Please advise which value to adopt; in ca

add the cost of additional quantities. b Extrusion building (phase 1): a-

Skirting: Please confirm unit of skirting in all substations (in squ

Trenches 600mm deep & 2200mm deep: (Ref. 298557-MM-EX please provide sections in order to be able to determine width o bTrenches for fork lift/underpass 21m length x 5m wide: Discrep works/substructures) and final tender drawings (Ref. 298557-M is less than the effective number as per final tender drawings. P adopt the number of the drawings, where to add the cost of additional quantities. cInternal offices 1 to 7: Discrepancy between BOQ (Ref. Finishe structure inside Extrusion Building are mentioned to be light we ceiling Please provide clarifications and details for the mentio dFull height masonry walls: (Ref. 298557-MM-EXB-AR-00-1001) height masonry wall and its height. eTrenches under pipes: Discrepancy between final tender drawin tender drawings (Ref.298557-MM-EXB-ST-00-2000).In mechan drawings no trenches found under ground slab. Please provide

fDoors and windows: Discrepancy between BOQ (Ref. Door and MM-EXB-AR-00-1002 & 1003). In the drawings, please refer all the to (Maintenance doors have the Building same name and Cast D1 whereas house in the BOQ the doors are categorized. Please specify the correspondence building door schedule)/ between D1 Design and the team mentioned to confirm categories, and clarify if we should consider the doors of internal offices only or we also include the doors of AC Glass cabin, operator desk cabin & comms room. Please provide outside doors specifications. gAluminium windows: Discrepancy between Given BOQ Estimated (Ref. Door quantity and windows) is checked and for final offices tender inside drawings (R MM-EXB-AR-00-1002 & 1003).The mentioned the Extrusion number building of windows phase is1 less than the effective number as drawings. Please advise which number to adopt; in case we have to adopt the number of the drawings cost of additional quantities. hEpoxy coating to walls: Discrepancy between The given BOQ Estimated (Ref. Finishes/item area is (for E) external and final wall tender 1.2m drawings high, (R MM-EXB-AR-00-1001).The mentioned for area comms is less room than 4.0m the effective high forarea all others as per 7.50m final tender high) drawings which value to adopt; in case we have to please adopt note the that value height of the for drawings, comms and where partition to addwalls the cost is of add assumed as there is no detail available/Design team to confirm iPlaster on walls: Discrepancy betweenDitto BOQ (Ref. Finishes/item I) and final tender drawings (Ref. 298 EXB-AR-00-1001).The mentioned area is less than the effective area as per final tender drawings. Ple value to adopt; in case we have to adopt the value of the drawings, where to add the cost of additiona jGlass Cabins, operator desk cabins & comms For finished rooms: please please refer provide to Dwg. type No of 298557-MM-EXBfinishes and categories o AR-XX-5001 /Design team to confirm kDrawing (Ref. 298557-MM-EXB-AR-00-1001) shows the plan view of the following elements: 1.5m deep walkway below equipment. Steel bridge type walkway above equipment. 1.5m deep /1m wide scrap conveyor Contract belt trench to assume discharge and toqualify outside scrap containers. Please provide sections on the mentioned elements. lGlass protective screen: Discrepancy between Estimated BOQ quantities (Ref. accessories/item will remain same E) and final tender drawin 298557-MM-EXB-AR-00-1001).The mentioned area is less than the effective area as per final tender d advise which value to adopt; in case we have to adopt the value of drawings, where to add the cost of quantities. mMissing items in the BOQ: 1.2m concrete Building wall around perimeter building wall is perimeter. assumed as concrete Block wall /Design team to confirm. Extrusion building (phase 2): a200mm thick block wall: No internal offices The given or full Estimated height masonry Quantity walls, is for please Comms clarify room location and of these 1.2m high perimeter wall in phase 2 please refer Dwg. No 298557-MM-EXB-AR-00-1001

bDoors and windows: In BOQ (Ref. doors For and door windows/item schedule please A), please refer to clarify Maintenance if steel doors building refer to the glass cabin, operator desk cabin and comms rooms. door schedule cFinishes: Discrepancy between BOQ (Ref. Finishes Finishes) are inside and final the Glass tenderCabin drawings for reference (Ref. 298557-MM-EXB please 1001). The offices are glass cabins. Please check clarify Dwg. location No 298557-MM-EXB-AR-XX-5001 of mentioned finishes. (Finish schedule) Extrusion building (phase 3): a200mm thick block wall: In drawing (Ref. The 298577-MM-EXB-AR-00-1001) given Estimated Quantity is for Please Comms specify roomlocation and and h block walls. 1.2m high perimeter wall in phase 3 please refer Dwg. No 298557-MM-EXB-AR-00-1001 bDoor and windows: In BOQ (Ref. Door For anddoor windows), schedule please please clarify refer if timber to Maintenance doors & steel building doors refer of AC glass cabin, operator desk cabin and comms rooms. door schedule Cast House Building: aPile caps: Discrepancy between BOQ (Ref. Pile caps concrete total works/item quantity 44 D) m3 and for final Casttender house drawings building (Ref. 29 CHB-ST-00-1000 & 1001).The mentioned andvolume there are is more no pile than caps the below effective water volume tank and as per raft final 2m tende clarify if there are any pile caps below water tank and raft 2m thick. thick. bPedestals: Discrepancy between BOQ Pedestal (Ref. concrete total quantity works/item 12 G) m3and for cast final house tenderbuilding drawings (Ref. 29 CHB-ST-00-1000 & 1001).The mentioned andvolume there are is more no pedestals than thebelow effective water volume tanksas and per raft final tende clarify if there are any pedestals below 2m water thick. tank and raft 2m thick. cIn final tender drawings (Ref.298557-MM-CHB-ST-00-2001): As per drawings. Contractor Please to provide assume section nominal fordepth the remaining of 1000mm unles noted otherwise dMasonry walls: In final tender drawingsHeight (Ref. 298557-MM-CHB-AR-00-1001): of wall is 4.10M please refer to Dwg. Please No precise 298557height of building and the location of block walls outside the building. MM-CHB-AR-XX-2001 & 3001 eWaterproofing for vertical sides of water Please tank: Discrepancy note that given between quantity BOQ in the (Ref. BOQ thermal is for and sidemoisture of item M) and final tender drawings (Ref.water 298557-MM-CHB-ST-00-1001).The tank base (which is below ground mentioned level) area is more th area as per final tender drawings. Please clarify the location of waterproofing. fDoor and windows: In BOQ (Ref. Door Considered and windows), as steel please doors clarify if timber doors & steel doors inclu rooms doors.

3 The FM-200 Fire protection system shown BofQ on guidamnce latest tender only. drawings Refer to isdrawings not listed in the BOQ: Please a for info or shall be included in our cost, and if so where to include its price. 4 The Cast House Building drawings shows BofQ 42guidamnce roof rain water only.outlets Refer to while drawings the received BOQ mentions 5 The received BOQ lists all Master Planrefer items towithout detail design accurate drawings take-off while the tender drawings are d advise. 6 Pipes length in BOQ: The mentioned pipes Refer length to drawings is less than the effective layouts in many buildings p tender drawings. Please advise which value to adopt and in case we have to adopt the values of the d add the cost of additional quantities. CONTRACTOQuery No.Reference Mechanical 41308 1 Detailed MEP BOQ, HVAC Section for Main Admin Building. 2 Detailed MEP BOQ, HVAC Section for Main Admin Buiding, Cast House, Entrance Building and Training & Recreational Center Building.

41308

41308

3 Detailed MEP BOQ, HVAC Section for Cast House Building.

instead were Labyrinth Ventilators. However this labyrinth ventilators were not mentioned in the HVAC BOQ. Please clarify if these labyrinth ventilators should be added in the HVAC cost or will it be included in

the civil cost by others? 41308 4 Detailed MEP BOQ, HVAC Section for Extrusion Building.

41308

5 Detailed MEP BOQ, HVAC Section for Extrusion Building.

while only 1 no. was reflected in the BOQ and equipment schedule. Same also applies for some models of mini split dx units & fans. Please advise how should we go about filling up the pricing for the HVAC BOQ when we find such discrepancy? 6 MV Switchgear Building - MVS (MEP BOQ BofQMissing). is for information only. Contractor to do own BofQ based on the drawings which take precident 7 Training and Recreational Building (Civil BofQ BOQ is for Missing). information only. Contractor to do own BofQ based on the drawings which take precident
Rev.0 CONTRACTOR Response Date Query No. 1 2 3 4

Chiller pipe routings were specified in the Schematic Tender. It is required to supply 2,000KW cooling. It is Air Cooled Screw Chiller. Temperature In at 12oC and Out at 7oC. Configuration will be based on n=1 basis. Total pump head is 8m. 5 Drainage Sewage,Fire Fighting,Liquid Petrolium Gas(LPG),Water Services,Compressed Air,Cooling Water 6 Lifts commision/testing We understand that supply and erection of Lifts are not including in Scope. Please confirm.

What will be the material of piping,thickness and schedule of piping and fittings for each system?

Rev.0 Reference Query No. 1 Supply of Material we understand that Transformers & Query Narrative

2 Division of Responsibility Matrix 3 Cranes

Switchgears are in scope of Supply. Please clarify. Please provide the Division of Responsibility Matrix We understand the supply and erection of cranes are not in scope.

4 BOQ\Extrusion Building phase-1 (EX1)\Item P

Contruction of ETP/water treatment plant complete.Please provide quantities.

5 BOQ\Extrusion Building phase-1 (EX1)\Item R TALEX is expecting one oil tank and water tank per Press. Rev.0 CONTRACTOR Response Date

Contruction of oil and water underground tanks complete.Please provide quantities.

Reference Query No. 1 HVAC

2 HVAC work scope?


Item Query Description Response

1 Refer to Extrusion Building Ground Floor Plan Small Power & ELV System Layout Drawing Series No 298557-MM-EXB-EP-00-1001 to 1009. Please clarify the following: 1.1 MDB SS4-03, MDB SS4-05, MDB SS4 06, MDB SS3-05, MDB SS3-06, MDB SS3-07 are shown in 2 different location which will affect the length incoming cable, containment and cable feeding the DB Panel. Please MDB Panel. 1003 1.2 MDB SS3-08 are shown in SHEET no 3 which is not shown in Single Line Diagram, please advise if this is included in our scope, if yes, please provide Single Line Diagram. 1.3 Cable containment for Security System mentioned as 1x100mmx100mm Cable Duct, please confirm if cable contatinment for Security system in Extrusion Building is Duct or Cable Trunking, since cable trunking are used in other building. 2 Please provide schedule of equipments in 298557-MM-INFO-PW-XX-4001 standby pumps) , 1006 provide a revised drawing confirming the exact location for the mentioned

3 Please confirm the capacity shown on schedule 298557-MM-CHB-PW-XX0201of Calorifier is 800liters but on drawing shown it is 2500liters 4 Please confirm if the process cold water system (Extrusion Building) are part of our scope of works, if yes please from provide current specification base price.& drawings. 5

Please provide capacity of sump pumps shown on 298557-MM

4001 6 Please confirm if the waste water treatment No shown in Extrusion Building ref 298557-MM-EXB-PD-00-1009 are part of our scope of works, if yes please provide drawings and schedules. 7 MM-INFO-PW-XX-4001 8 Please provide schedule of HEX and pumps Schedules in 298557-MM-INFO-PW-XXto be produced 4001 9 77 nos wind driven roof ventilators are mentioned at page no. 42 of 58 of "Cast house building" BOQ, but the same ventilators are not reflecting in the roof layout of "Cast house building". Again, 719 nos wind driven roof ventillators are mentioned at page no.for 26 the of 38 Extrusion of "Extrusion building. building phase 1" BOQ. While the roof layout drawings of "Extrusion Building" have not been provided. Kindly confirm the scope. If those are in mechanical scope of work, kindly provide the detail of the same. 10 Chilled water pipe quantities have been provided at page no 30 of 42, 27 of 38, 28 of 41, 30 of 41, 32 of 45 and 32 of 44 of corresponding BOQ of Entrance Building, Extrusion Building Phase 1, Phase 2, Phase 3, Main Admin building and training & recreation buildin. Since all equipments of HVAC in this project are direct expansion (DX) type, kindly clarify about chilled watercooling pipe. towers. 11 Kindly clarify the scope of work for "Labyrinth for ventilation", which has been shown on roof layout of "Cast house the mechanical building". If those are in mechanical scope of work, kindly provide the detail of the same. 12 Confirmation is requested that the Bills of Quantities issued under Addendum Nr 4 in excel format on the 27th January are identical in content to the Bills of Quantities issued under Addendum Nr 2 in PDF format on 21st January. Please clarify. 13 The relationship between SSL and NADD is not identifiable from the tender documents. Confirmation is requested of the relationship between SSL and NADD. Please clarify Query Specification/Dwg Ref. Ref: As per Mechanical Non-Process Specs, Section 233113, Clause No. 3.11.D.3; pg 175/331, Commercial Kitchen Mechanical Non-Process 1 Specs & Drg. No: 298557MM-XX-ME-XX-0100-3 316. Kindly confirm the material to be used for kitchen exhaust duct. For Enterance Building: As per Drg. No: 298557-MM-ENBME-00-1001-3; ductwork sizes and grille sizes for following units are not shown: 1. DS-ENT-GF-05 2. DS-ENT-GF-03 2 Drg. No: 298557-MM-ENBME-00-1001-3 6. DS-ENT-GF-01 Kindly provide the sizes for ducting & grilles /diffusers required for this area. For Enterance Building: The following equipment details 4. DS-ENT-GF-02 5. DS-ENT-GF-04 3. DS-ENT-GF-06 Ductwork to be SS 304 2D Finish and as per Drg No: 298557-MM-XX-ME-XX-0100-3, Note No 19, All Commercial Kitchen hood exhaust duct material to be SS Query

Please provide schedule of multimedia filters and chlorine dos

have not been provided: 3 Drg. No: 298557-MM-ENBME-00-1001-3 equipments. For Extrusion Building: Roof floor drawings are not Drg. No: 298557-MM-EXBAR-05-1001 ventilators are in HVAC scope of work. Drg. No: 298557-MM-MABNote that the extract ducts for each toilet cubicle space is of 100 x 100 (for 5 ME-00-1002 & For Main Admin Building: Fresh air and Toilet Exhaust air duct sizes are not given. Kindly provide the same. Drg. Nos: 298557-MM-SS200-1001, 298557-MM-SS3-00-1001, 298557-MM-SS4-00-1001, 6 298557-MM-SS5-00-1001, & 298557-MM-SS6-00-1001 Water Supply & Drainage System Pumps & Associated 1) 298557-MM-INF-PW-XX7 4001-0 298557-MM-INF-PD-XX4001-0 1) 298557-MM-CHB-PD-001001-2 298557-MM-CHB-PD-001002-2 298557-MM-CHB-PD-001003-2 298557-MM-CHB-PD-001004-2 298557-MM-CHB-PD-001005-2 8 298557-MM-ENB-PD-001001-3 298557-MM-MWB-PD-001001-3 298557-MM-MWB-PD-001002-3 298557-MM-INF-PD-XX1001-3 298557-MM-INF-PD-XX1002-3 Scope of work & schematic indicates 1) SECTION 261000-SCOPE OF WORKS 9 2) 298557-MM-XX-EP-XX0300-3 The main MV panel-1 and HV cabling is not inlcuded in the Boq's. Kindly confirm whether the HV cable & HV 1) Main incoming power supply is from Main MV panel-1 to Substations & from substations to transformers. 10 9 8 5 In Cast House Bldg, Entrance Gate Bldg & Maintenance Workshop Bldg , rainwater and surface water are to be 6 connected to stormwater netwrok as shown in drawings .But in external drainage layout stormwater network is not 7 indicated. Kindly provide the drawing of external stormwater network. 4 3 2 Equipments are shown in Water Tank & Pump room 2 for domestic water service and foul water service equipments are not available. Kindly provide equipment schedule for the same. For Sub Station Buildings: Transformer room exhaust air Ductwork and grille/diffuser sizes are not given. Kindly provide the same. 4 HVAC 2. DS-ENT-GF-06 Kindly provide the equipment schedule for these 1. DS-ENT-GF-05 2

available. Also wind driven ventilators are shown Windin driven ventilators are used for the extrusion building. Location is a Architectural drawing . Kindly confirm if these work. wind driven

shown on the Architectural drawing which will be in the HVAC scope of

switchgear is in Electrical Contractors Scope. 1) SECTION 260500-BASIC ELECTRICAL MATERIALS AND METHODS 2) SECTION 260513 MEDIUM-VOLTAGE CABLES 10 3) SECTION 261000-SCOPE OF WORKS 4) 298557-MM-XX-EP-XX0300-3 Scope of work indicates generator to serve full load backup and essential power to the entire development including all landlords services, tenants and life safety equipment and 1) SECTION 263213 11 2) 298557-MM-XX-EP-XX0303-3 is feeding SEF,SPF,LPF,ERU etc. Kindly confirm the no of Generators for the project and their ratings to be considered. Fire rated cables shall be provided for: 1) 298557-MM-XX-EP-XX0301-3 12 2) 298557-MM-XX-EP-XX0302-3 13 DB Schedules 14 Mechanical Schedules Kindly provide the updated Electrical Schedules. 1) SECTION 263213 2) 298557-MM-XX-EP-XXequipments fed from Emergency supply. 15 0301-3 3) 298557-MM-XX-EP-XX0303-3 Small Power There are some additional Distribution Boards found in 16 layouts(Extrusion Building) & Schematics 298557-MM-EXB-ME-XX0201 Rev 2, 17 298557-MM-XX-EP-XX0308 Rev 3 Extrusion Building-Phasing 18 04_298557-MM-EXB-AR-05Kindly provide the Extrusion Building Phasing layout. CRAC units.But as per Electrical Schematics normal supply has been provided.Kindly confirm. covered in Schematics. Kindly clarify the powersupply source for these DB's. As per Mechanical Schedule for CRAC Unit it has been indicated as Emergency power supply to be provided for Small Power layouts of Extrusion Building which are not Please confirm for which panels Fire Rated cables are to be considered. Fire rated cables are not shown in the schematics for supply is to be considered and accordingly please provide schematics with fire rated cables for the same. DB Schedules are not available.Kindly provide the same. Mechanical Equipments shown in Electrical Schematics are not matching with Mechanical Schedules. There is no essential supply provided to the lifts and fire pumps. Kindly clarify the items for which essential power critical load applications. Points 2, 3 & 4 indicates 11kV distribution. Kindly confirm the voltage rating. The specification section states that INCOMING MV SUPPLIES: 1 The local supply authority shall be responsible for the incoming MV power supplies including terminating the 20kV cables to switchgear within MV room. ELECTRICAL

Incoming HV cables are @ 11 kV. All HV switchgear and HV cables w

1001 (PHASING) 298557-MM-VGB-AR-001001 Rev 1, 19 298557-MM-VGB-EL-001001-3 298557-MM-DGB-EP-001001-3, 20 298557-MM-VGB-EP-001001-3 source of UPS power supply for the same. 298557-MM-XX-EP-XXReferred schematic shows 63A Changeover switch,but 21 0302-3, 298557-MM-XX-EP-XX0303-3 298557-MM-CHB-EP-0022 1002-2 298557-MM-CHB-EP-001002-2, 23 298557-MM-CHB-EP-001001-2 24 298557-LL-1001-001 details As per lighting layouts symbol M is found which we are 298557-MM-XX-EL-XX0100-3 same.Kindly confirm. considering it to be Motion Sensor,since the legend Notingsheet is correct. 25 ELECTRICAL no 298557-MM-XX-EL-XX-0100-3 does not include panel.the Referred drawing shows Pietzomteric Tower Pumps in Cast House Building for which power supply is not given. Kindly confirm In general as per Small Power layout there are some additional DB's which are not covered in Schematic.For eg in CHB DB's- DB-CHB-COM1 and DB-CHB-COM2 .Kindly confirm the power supply source for these Db's. There are no circuit reference given for Landscape lighting.Kindly confirm the circuit reference/power supply confirm which breaker rating to be followed. Incoming breaker and outgoing isolators are of 32A.Kindly Entrance Building and Cast house Building),the length of cables comes out to be very large.Kindly confirm the There is architectural difference in Buildings like VGB,DGB and Entrance Building etc.For e.g Telecom room is not shown in Electrical/ELV layouts. Please provide updated Electrical layouts. As per Small power layout for DGB and VGB,UPS DB is shown which is not covered in any Schematics.Supply for these DB if considered from existing UPS (located at

Motion sensor (M) for automated lighting control through lighting contro

Response by MML The Building Permit is being obtained by the Consultant and should be ready for the start of construction The Estidama requirements will be incorporated into the design and the full extent of the Pearl 2 will be confirmed upon contract award yes, kindly provide us with the Estidama Score Card As per item 2

nts, a commissioning agent reporting to the Employer The Commissioning Agent is EMS and appointed by TALEX.

oject till the final handing-over whose main responsibility is

at this commissioning agent will be available and

se MEP Subcontractor who has successfully executed TALEX to confirm the pre-qualified MEP sub-contractors The plot has 2 redundant 600 dia water pipes in the northwest corner. These are shown on as-built drawings and are to be removed by the contractor No demolition work is required on the plot The vendor list provided is specific for this project. The contractor must provide a compliant bid but alternatives may be offered for consideration as an option The CEMP is currently being prepared and will take into account comments from the approved EIA from the EAD. Regular monitoring will be required Issued for Construction will be provided A list is supplied by TALEX. In principle a complete full set is required. Follow structural drawings for parapet width, there is no downstand or edge beam in the design. Toilet doors between M-N/5-9 are DW03. Office door between grids K-L/5-9 is DW02.

Contractor can propose/submit an alternative vendor other

ed for Construction drawings will be provided to the

submission is required along with this Final Tender since

TRC-AR-00-1001, please provide the detail for Curtain Refer to drawing 298557-MM-TRC-AR-XX-6003. Please follow the plan. Finish type on the elevation should read type 1. Please refer to additional information as attached - drawing 298557-MM-EXB-ST-00-3018 Please refer to additional information as attached - drawing 298557-MM-EXB-ST-00-3018

M-TRC-AR-XX-2001, Elevation 03, External finishes in

m thick wall please confirm which one to follow.

m concrete wall around building perimeter as

/1002 section "A" thickness of the Paving A5 given as Attached materials schedule will answer the query Attached materials schedule will answer the query

-1 , A-2 , A-3 , A-4 , A-5 , A-6 C-1, C-2 and G-1, G-2, G-3. Please find the DB Schedules and Luminaire Schedules attached.

1, page 3 of 4 Volume 1 index, listed for Distribution Load

V PANEL-1 is not included, but cable terminations at MV PANEL is

s i.e. internal distribution is included.

ith ADDC specs and

e, except buried cables i.e. MV cables from MV panel to Substations.

des the panel boards, cables from SS to inside the building. Process and

plier is responsible for the cabling and routing from these Panels. All the for installation of cables. However, actual cabling from the TOPs (inside

ontractor scope. Main Contractor is also responsible for providing the

/non-process equipment is not in Main Contractor scope.

matic shall be developed by the specialist contractor based on the

ng layouts and DB schedules.

drawing/ spec reference.

The low voltage

manufacturer are only acceptable.

s per the details shown in the layout and schematic diagram. The system

h local authority.

located left top corner of the Extrusion building (Approx. 3000m2). Allow Smoke detector, Manual call point, Sounder, sounder strobe, IFU, etc in

quirements for WTB (Minimum 10 Lux) with CBS and independent

rawing no.. 298557-MM-INF-EL-XX-1000.

e as per above item#20.

ed CO2 fire extinguishers are considered for the sub station buildings (ref

X-FP-0100 of 27.12.2012

attached separately along with this clarification

n is already in the schedule provided for tender. Refer drawing 298557-

ached separately along with this clarification

prinkler system. Process areas in Extrusion and Cast House do not. The

umescent paint. Please prvide separate price for the cementitious option

he as-built information which will be supplied by KIZAD upon contract

ndor requirement, the bidder is to allow for a provisional amount for tanks

n Main Contractor scope. Please see response in other sheet on same

chedule 298557-

nsidered as per the layout drawing

ngs to the process or non-process equipment equipment is in vendor

se equipments).

ot boundary from the water main will be provided by ADWEA approved

water storage tanks under the

R. MAIN CONTRACTOR

t each process (extrusion,

eet vendor requirements.

r set - 4.75 L/S @ 16.5 bar each.

set - 35 m3/hr @ 3.5 bar each.

/hr @ 4 bar each

o the project programme and milestones provided

requirement. Contractor to provide compliant bid. Any ADM for a variation

s are 2500mm. This is for pricing purposes and as per ntractor geotechnical subcontractor is to confirm the design

(Sec 015000) the r three 4x4 vehicles (Toyota Land Cruiser/Prado) plus a

m no: 3.1.5, Car park fabric a tent fabric which is compliant to Estidama and UPC ovide an SRI 29

the irrigation design is a contractors designed element with

s highlighted on the architectural plans of the extrusion

adding Training & rmation only and Contractor is provide his own bills rmation only and Contractor is provide his own bills rmation only and Contractor is provide his own bills over the specs and BofQ. will be issued as addenda for underground water tank r is to consider s are produced for these small rooms and contractor is to structural drawings to provide a suitable room water tank, kindly confirm

water tank, kindly confirm able and on the drawings

ominal deluge shower and eye wash unit for the buildings as

ls are available. The structural details for the water tank is o: (298557-MM-MWB-ST-00-1000, 298557-MM-MWB-ST-00ST-00-3002). 98557-MM-GAM-ST-XX-0403. Assume height of 2m, width of

s based on a performance specification provided in the fications. There is no preferred vendor

will be supplied by the Proces Equipment however support NTRACTOR responsibility. rmation only and Contractor is provide his own bills

our'' lines. Three will system. This is

CHW plant, other ooling water from

be done via Labyrinths and not roof ventilators e drawing for the

e layout drawing for

dard for ADDC substations

ol units , Ecology unit separately attached. BMS Point different discipline equipments

r. Details not finalised with vendor

1 duty / 1 standby pumps)

ed along with this

2 duty / 1 standby)

duty / 1 standby pumps)

s part of the package as per specifications

hrough TALEX - for information only be done via Laybrinths. Maintanance Workshop and tion will be by the wind driven roof ventilators. on metallic standard RAL color.

in other sheet.

g- VRV units, energy recovery units, KEF-TRC-01 extract

will answer the query

ction with luminaire and associated legend/type

r the BofQ. BoQ is for reference only

r drawing no. EP-0301, 0304, 0305, 0306 and 0307. These are

t tender scope of works

r the BofQ. BoQ is for reference only

dard for ADDC substations

nt and EContractor to install. Plant supplied by Vendor

addenda will form part of the contract. BofQ is for information

pion price for 24months.

abi. Language - English

tailed realistic programme to deliver close to TALEX expectations. an optional pricing item however TALEX reserve the right to

or scope of work. Please be aware that Major Milestone i.e.

uilding ready for process equipment erection is associated with

herefore, TALEX will include Cranes in Main Contractor scope.

ntractor for the stone column works. Main Contractor should be

ADDC substations is to be

t is Vendor supplied,

done via Laybrinths. Extrusion building ventilation

of ventilators. Ventilators are to

ilding Cooling Towers and be as per MML design.

ast House is in the Main

d from the scope until MML

RV units, energy recovery

ans are not used.

ed in the Schematic drawings shall be

7-MM-EXB-EP-900-4002 Rev.1

7-MM-EXB-EP-900-4001 Rev.1 & 4004 Rev.1

7-MM-EXB-EP-900-4003 Rev.1

r required and hence not shown in the

Building layout drawing. This will just give you an ions. However, this does not cover all of the o refer to Cast House layout drawing for the

ray/ Ladder. Exact size shall be calculated by the no. of cables intended to install.

P3, DB-SS4-P4 & DB-SS4-P5. This will be MDB-SS4-EXB-7 since it is not shown in

LP5(STORE) and located in side store area. in Electrical room at Ground Floor and Isolators

ray. Exact size shall be calculated by the no. of cables intended to install.

ray. Exact size shall be calculated by the no. of cables intended to install.

ithin the respective CR's and CT's area as ral drawings/Mechanical drawings.

uried underground. Cable ducts shall be provided dstand where applicable. LV/ MV cable duct is for street lighting. Duct shall be provided for pare duct at all locations. m2" as "4Core 25mm2 XLPE/SWA + 1C 16mm2

network throughout the plant. This will connect t as well as BMS. -SS2-WTP located in Water treatment plant CC-SS-FWP & MCC-SS2-FIRE PUMP, please ection layout drawings.

ithin the respective CT's area as detailed in the echanical drawings. DB-EXB-SS is no longer in med as DB-SS-LP1 and is located in Substation.

ce it is not shown in the Electrical lighting legend & Standard notes drawing 298557-M stands for "Motion sensor" for automated lighting control in conjunc

Materials schedule attached S6-CHB are located in CHB main electrical B-CHB-CT, MCC-CHB & SMDB-CHB-CR, refer al plant room layouts.

ted at 2nd floor electrical room (Grid- F-H/6-8) E is located 1st floor electrical room (Grid-K-L/5-

for MCC's are from MDB-MAB-G located in g us to measure the cable & containment om (Grid-K-L/5-9).

d at 2nd floor electrical room (Grid- F-H/6-8) and

cated 1st floor electrical room (Grid-K-L/5-9) trical load schedule (DB Schedule) for ready

ing control panel with automatic operation of rs, timers, etc also PC in addition for external g control requirements shall be as per the details d DB schedules. DALI control is not been used in

rly defines the gridlines for the 3 phases

cated at Grid-A/28-29 as shown in the drawings 298557-MM-EXB-EP-00-003 REV2

t Grid-A/5-6 as shown in the drawings no. EP-

Grid-A/17-18 as shown in the drawing no. EP-

cated at Grid-K/20-21 as shown in the drawing

K and also in drawing 298557-MM-EXB-EP-00-1009 REV2 between grid 26-27 & I-MDB-SS5-05 is located at Grid-K/2-3 as shown in the drawing no. EP-

t Grid-H/6-7 as shown in the drawing no. EPXB-EP-1005 REV2 between grid 26 & F.

t Grid-E/6-7 as shown in the drawing no. EP-

t Grid-E-F/1 as shown in the drawing no. EP-

t Grid-E-F/1 as shown in the drawing no. EP-

ated at Grid-K/26-27 as shown in the drawing no. I also in drawing 298557-MM-EXB-EP-00-

cated at Grid-H/5-6 as shown in the drawing no.

d for MV room doors. The Access control ected to the security control panels located in the

s for SS2, SS3, SS4 and SS5 are feeding from

s and MCC's, refer the respective building Small

onger required. DB-CHB-L1 & P1 feeding from

read as DB-CHB-UPS) is feeding from SMDB-

from DB-VGB-LP, Refer DB load schedule.

from DB-DGB-LP, Refer DB load schedule.

be suitable for the proposed road width., Refer

nd DB-OFF2 are feeding from SMDB-SS3-OFF1 from SMDB-SS3-OFF2

ER COATING & DB-OFF-3 are feeding from DB-OFF-LP is feeding from since it is not B-SS3-OFF2 is feeding from MDB-SS3-EXB-07. 7 & DB-OFF6 are feeding from SMDB-SS5-EXB-

ing from MDB-SS4-07 AB3 & CAB4 are feeding from SMDB-SS4-OFF1. 3 are feeding from MDB-SS4-EXB-07

m SMDB-SS5-OFF1

been provided nally 2500mm centres. Contractor design

ne columns is reqired for the complete plot in phase 1. This to avoid any ater. Same will apply for Pilings. All the Pilings for phase 2 and Phase 3 ut - these will be maintained at floor level. only. However please find attached BofQ for training and recreational

been provided within the MEP Tender specifications. Attached copies

s - there is no preferred supplier

onal sum allownace as no details are available. frame, ground slab, foundations. Metal sheet roof.

ities from the Take Over Points to the actual

ed and supplied by TALEX process equipment

e information erquired when appointed

the plot in drainage ponds. All as per detail design

on in the specification for underground pumping of

hese indicate the

nly. Contractor to do own BofQ hich take precident. This any addressable luminaires, ayout/ luminary schedule. ents are as shown in the DB

MM-INF-EP-XX-10011004-2)

EV-XX-0401)

8557-MM-INF-EV-XX-0401) 7-MM-XX-FA-XX-0301-3)

L-00-40014004) / (drawing 298557-MM-EXB-EP-00-

0-1001-1)/ (drawing 298557-MM-MVR-EL-00-1001-1)/

hemicals store (drawing 298557-MM-EXB-EL-00-1004-2)

98557-MM-XX-EP-XX-0302) nly. Contractor to do own BofQ hich take precident

nly. Contractor to do own BofQ hich take precident

cort. Piles lengths indicative m. Please clarify.

mentions the same distance as 1.5m, please clarify.

cluded on drawings. Please clarify and advise where to

nly. Contractor to do own BofQ hich take precident. See

es are checked for pavement 2 revised quantity is 18257 8557-MM-INF-TR-XX-0700

es are checked, as per drawing XX-051 detail design issue

298557-MM-INF-TR-XX8557-MM-INF-TR-XX-0200

d area = 4880 m2. Refer

to adopt the values of the drawings, where to add the

For quantities take off please refer to DWG. No 298557MM-MAB-LS-XX-1003 Dwg. No 2798557-MM-INF-TR-XX-0700 shows the footpath only in parking areas but Dwg.298557-HL-1000 shows the footpath in all other areas ( BOTH DRAWINGS ARE USED TO CALCULATE THE FOOTPATH AREA) Tenderers should price taking care of all relevant drawings.

refer to drawings not BofQ concrete volume for basement walls of all substations is less than the effective volume as per ase advise which value to adopt; in case we have to adopt the values of the drawings, where to Typo error consider Unit as M

Assum 600x2200deep n order to be able to determine width of trench and thickness of its elements. refer to drawings not BofQ final tender drawings (Ref. 298557-MM-EXB-AR-00-1001).The mentioned number of trenches number as per final tender drawings. Please advise which number to adopt; in case we have to tional quantities. For finished inside the offices please refer to Dwg. No 298557-MM-EXB-AR-XX-5001 (Finish schedule) clarifications and details for the mentioned offices and the height of each building. refer to architectural drawings

screpancy between final tender drawings (Ref. 298577-MM-INF-LG-XX-1000) and final 557-MM-EXB-ST-00-2000).In mechanical drawing the pipes are trenched whereas in structural nd under ground slab. Please provide plan view and sections for the mentioned trenches. Sections not provided - assume worst case Given Estimated quantity is checked. for reference

k cabin & comms is checked for offices inside

e to adopt the number of the drawings, where to add the

a is (for external wall 1.2m high, gh for all others 7.50m high) r comms and partition walls is etail available/Design team to

area as per final tender drawings. Please advise which gs, where to add the cost of additional quantities. to Dwg. No 298557-MM-EXB-

ew of the following elements:

the effective area as per final tender drawings. Please of drawings, where to add the cost of additional assumed as concrete Block

ntity is for Comms room and in phase 2 please refer Dwg.

e refer to Maintenance building

lass Cabin for reference please MM-EXB-AR-XX-5001 (Finish

ntity is for Comms room and in phase 3 please refer Dwg.

e refer to Maintenance building

4 m3 for Cast house building s below water tank and raft 2m

2 m3 for cast house building ls below water tanks and raft

tor to assume nominal depth of

ease refer to Dwg. No 298557-

uantity in the BOQ is for side of below ground level) waterproofing.

efer to drawings

efer to drawings

e we have to adopt the values of the drawings, where to

Query Narrative

Reply

For Main Admin Building (MAB), BOQ quantity BofQ mentions is for information 100 nos. only. for Contractor indoor FCU while in the drawing and equipment to do own schedule BofQ based it is clearly on the drawings showing 55 nos. only. How do we proceed which in filling take up precident the BOQ? In the HVAC BOQ for Main Admin Building, BofQ Cast is House, for information Entrance only. Contractor Building and Training & Recreational Center to do Building own BofQ a line based item on for the drawings chilled water piping quantity was mention which whereas take there precident is no chilled water system used in these buildings. The buildings use a combination of VRF, Package Type and Mini Split Dx System. In this regard, should we consider the quantities for refrigerant piping to replace the chilled water piping lined item and just put remarks in the BOQ? For Cast House Building (CHB), HVAC BOQ BofQ mentioned is for information 77 nos. of only. Contractor Wind Driven Ventilator but in the HVAC drawings to do own there BofQ was based no wind on the drawings driven ventilator shown. What was shownwhich in the take HVAC precident drawings

For Extrusion Building (EXB), HVAC BOQBofQ mentioned is for information 719 nos. ofonly. Contractor Wind Driven Ventilator but nothing is shown to do in the own HVAC BofQ drawings. based on the drawings When I checked the Architectural drawingwhich there take I found precident shown the Wind Driven Ventilators. Please advise whose scope is it? Should we add it in HVAC cost even though it's not shown in the drawings or will it be included in the civil cost by others? For Extrusion Building, the equipment quantity BofQ in is the for information drawing plans only. Contractor and BOQ/equipment schedule were not matching. to do own For BofQ example basedthe on the drawings CRAC-EXB-CMR-OU-01 units shows 11 nos which in the take drawing precident plans

nly. Contractor the drawings

nly. Contractor

Reference Schedule Liquid Petrolium Gas (LPG) Pumps Cooling Water (Anodising, Cast House and Extrusion)

Query Narrative

TALEX Reply

What will be the construction schedule for each Contractor building with to propose CME&I items. Dia of pipes is given what will be the length for Lengths each pipe? to be ascertained off the detail design drawings What will be sizes,weight and capacity of pumps These in allquantities (Compressor are already answered air,cooling water systems) in seprate sheet. What will be siize,weght,volum and height of erection Cooling for Towers cooling for the Extrusion and towers,heat exchangers,water chillers,chemical Piezometric dozing Tower for the Cast House pumps,pressurization & expension of tank,air separator Please refer etc? to answer in other sheet.

Refer to detail design drawings and specifications

Lifts are in MAIN Contractor scope including suplpy, fix and

TALEX Reply Confirmed

pe of Supply. Not available for this round of negotiations. Contractor to make and state assumptions In Main Contractor scope - Supply, Erection and commissioning. This is extremly important because of first major milestone from the Main Contractor is availability of fully commissioned over head cranes for installation. ETP (waste Water Treatment Plant) is under TALEX Vendor supplier. Main Contractor to ensure area/building is ready as per the MML available/current design. Installation scope to be priced and agreed later. Tanks will be specfic to the TALEX vendors for the press lines. Oil tank is around 10,000l and water tank is 10,000l.

Query Narrative -

TALEX Reply

In the HVAC specification BMS is included. BofQ is But for nowhere information it only. is mention in the HVAC BOQ. Is the BMS Contractor included to in do the own BofQ based HVAC work scope? If it is, please provide on the details. drawings which take precident Please confirm if kitchen ecology units Yes are included in the

MDB-SS4-03 is located at Grid-E/6-7 as shown in the drawing no. EP-1006 MDB-SS4-05 & 06 are located at Grid-H/5-6 as shown in the drawing no. EP-

MDB-SS3-05 & 06 are located at Grid-A/28-29 as shown in the drawings no. EPMDB-SS3-07 is located at Grid-A/5-6 as shown in the drawings no. EP-1001 MDB-SS3-08 is no longer required and hence not shown in the Schematics.

lease provide It's 1X100X100 mm cable trunking for security systems cabling and 1x300x100 mm cable tray for communication cables.

Filter feed pump (PW/RRFP/00/01) - 35 m3/Hr. @ 4.0 bar each (1 duty / 1 Chlorine Dosing unit-4 litre/hour, Multimedia Filters (PW/MF/00/01)- (separate specs sheet attached Cooled along with this), Potable Water Booster Pump-set Drwg. Ref: COPW/BP/00/01-4.75 Litre/sec. @ 16.5 bar (2 duty / 1 standby), The size of the calorifier is 800ltrs Cooling Towers will be designed and included later. However, these are excluded Heat Exchanger feed pump (HX-PWFP/00/01)-35 m3/hr @ 3.5 bar each (1 duty / 1 standby pumps)

of sump pumps shown on 298557-MM-INFO-PD-XX- 3.35l/sec at 11m head with 1Working+1stand by

of multimedia filters and chlorine dosing in 298557-Chlorine Multimedia Dosing Filters unit-4 (PW/MF/00/01)litre/hour, (separate specs sheet attached along with this),

77 nos of wind driven roof ventilators in the "Cast house building" BOQ can be neglected as this is replaced by Laybrinths for the ventilation. For the extrusion building the roof ventilators will be as indicated in the architectural roof drawing

The pipes would be referring to the refrigerant ''liquid'' and ''vapour'' lines. Thre will not be any chilled water supply and return pipes as this is a DX system. This is applicable to comfort systems. However, the Anodizing line has chilled water from a dedicated CHW plant, other process lines in the extrusion and casting processess will have cooling water from Casthouse ventilation will be done via Laybrinths and not roof ventilators. Refer

BoQ issued for information only

cal in content

ormat on 21st Cross refer to road drawings. These indicate the ground level in NADD and the SSL for each building is generall 0.300m above NADD

Discipline

TALEX Response

ss Specs, Section 233113,

31, Commercial Kitchen HVAC SS 316 to be used for commercial kitchen exhaust duct.

nish and as per Drg No:

haust duct material to be SS

For Entrance Building Ductwork sizes refer the PDF attached along with this clarification '298557-MM-ENT-ME-XX-0301-1'. Refer also the schedule HVAC for the VRV units for the admin building attached separately along with this TC. Diffuser sizes based on the flowrate is provided in the PDF named ''diffuser size chart'' attached along with this TC.

HVAC

Provided along with response to schedule of VRV units mentioned in point

sed for the extrusion building. Location is as

rawing which will be in the HVAC scope of

HVAC

25 l/s). The extract duct size when added up goes above 75l/s is 150 x 150 mm. Once this is above 100 l/s it is 200 x 150 mm. For fresh air duct size refer to the CAD drawing of the same in which the sizes are provided.

ly provide the same.

Transformer room exhaust air ductwork main duct would be of 2500 x 1500 mm typically for all the substations. The air inlet before the extract fans can be a bellmouth with a wire mesh and insect screen. There will not be any requirement for diffusers or grilles. HVAC

ansformer room exhaust air

tem Pumps & Associated drawing at Basement floor plan . But equipment PLUMBING schedule PW-0202 Kindly provide equipment

ter Tank & Pump room

Please refer drawing no. 298557-MM-INF-PW-0201 & 298557-M

nd foul water service

Gate Bldg & Maintenance Refer to external drainage drawings 298557-MM-INF-TR-XX-0801 to 804 plus detail sheets

nd surface water are to be PLUMBING

wrok as shown in drawings

drawing of external

ply is from Main MV panel-1 ELECTRICAL HV cables and HV switchgears are included in the scope of works.

tions to transformers.

cabling is not inlcuded in the

r the HV cable & HV

11 kV. All HV switchgear and HV cables will be suitable for 11 kV system.

ELECTRICAL But the generator shown in the schematic is 100KVA which drawing.

a. MDB-MAB-G to MCC-MAB-SF-2E b. MDB-MAB-G to MCC-MAB-ROOF-2E c. Outgoing feeders SEF-MAB-01, SPF-MAB-01, SPF-MAB-02, LPF-MAB1, LPF-MAB-1A, LPF-MAB-2 & LPF-MAB-2A from MCC-MAB-SF-2E D. Outgoing feeders SEF-MAB-02, SPF-MAB-03, SPF-MAB-04, LPF-MAB3 & LPF-MAB-3A from MCC-MAB-ROOF-2E ELECTRICAL ELECTRICAL Refer the DB schedules attached. Mechanical equipments shown in the mechanical schedules to be considered as the correct one. ELECTRICAL

ms for which essential power

d accordingly please provide

bles for the same.

wn in Electrical Schematics are

ELECTRICAL

Refer the answer to item no. 12

ELECTRICAL

Refer electrical schematics EP-XX-0304, 0305, 0306 & 0307.

y source for these DB's.

or CRAC Unit it has been ELECTRICAL Normal power supply to be provided.

er supply to be provided for

cal Schematics normal supply

Refer to drawing 298557-MM-EXB-ST-00-0301 for phasing of the Extrusion ELECTRICAL building

nce in Buildings like VGB,DGB ELECTRICAL Refer the Architectural layouts and follow same for other disciplines.

r e.g Telecom room is not

r DGB and VGB,UPS DB is Details of DB-DGB-UPS and DB-VGB-UPS are shown in attached DB schedules which is self explanatory.

n any Schematics.Supply for ELECTRICAL

xisting UPS (located at

ouse Building),the length of

arge.Kindly confirm the

ELECTRICAL

32A circuit breaker and 63A C/O switch as shown.

zomteric Tower Pumps in ELECTRICAL

Common power supply provided for process equipments. Power to be distributed based on the loading of the process equipment.

r layout there are some covered in Schematic.For eg ELECTRICAL Power supply from SMDB-SS6-CHB Landscape lighting to be fed from near by Feeder pillars FP-01, 02, 03, 04 & 05 (Section-1) located in that area.

urce for these Db's. ELECTRICAL

e given for Landscape

ated lighting control through lighting control

automated lighting control in conjunction

K/2-3 as shown in the drawing no. EP-

ned off the detail

lready answered

e Extrusion and the Cast House -

r in other sheet.

no. 298557-MM-INF-PW-0201 & 298557-MM-INF-

Generator is applicable for Administration building only as shown in the