You are on page 1of 18

#1&#2 Boiler FOR STEPC - 2X 600 MW AT CUDDALORE

Quant
ity
weight
( MT)

ONE Heat Flow Diagram
1 Boiler Steel Structure
1.1
Main Structuresteel
framing
Scope of Works: Installation of column, beam horizontal
& vertical brace and connector etc.. Contents of Works:
Foundation cleaning, lining; fabrication of pad block ;
manufacturing, installation and removal of temporary
facilities; check, calibration, assembly, reinforcement,
hoisting, aligning and fixing of steel structure.
set 2 8890 3200.4 6400.8
1.2
Stairs, platform, walkway,
handrails and the supports
for these
Scope of Works: Installation of platform, ladder, railing and
toe plate belong to the steam generator .
Contents of Works: Check, assembly and installation of
platform, support, ladder as well as fabrication and
installation of railing and toe plate; process calibration of
platform, ladder and railing in the whole steam generator.
set 2 2010 785.7 1571.4
1.3
Over Roof of boiler &drum
house
Scope of Works:Roof structure & inclosure , drum house
and storm sewer.etc. content of work: Calibration,
assembly, installation of skin casing and its framework
,storm sewer erection etc..
set 2 668 190.8 381.6
1.4 Ceiling girde
Scope of Works:Installation of Boiler ceiling girde.
Contents of Works: lining; installation and removal of
temporary facilities; check, calibration, assembly,
reinforcement, hoisting, aligning and fixing of steel
structure.
set 2 760 370.6 741.2
1.5
Steel structure for gas &
duct,rail beam for electric
hoist,furnace inspection
system
scope of works:steel structure for maintaining gas &
duct,rail beam for electric hoist.content of works:
assemblage and erection, lifting, accessories device, etc
set 2 1600 2007.2 4014.4
2 Boiler Proper
Bill of Quantity
NO. Item Working Description Unit
MT BOQ
Remark
1/18
2.1
Drum (including inner
Equipment and
accessories)
Scope of works: Installation of drum and its internal
devices, the underbed and u-type hanger rod etc.
Contents of Works: Inspection on internal and external
walls of drum; reassembly, hoisting, aligning and fixing of
the center line; disassembly and assembly of internal
devices; amendment of the underbed and hanger; cleaning
up, sealing of access door; installation of expansion
indicator and fabrication of the support.
set 2 536 259.2 518.4
2.2
Water-cool Wall System (
piping, fitting, sealing part
etc) and Header
Scope of Works: panel welding and erection,sealing
welding etc.
Contents of Works: 1. Line and regulate the panel arrays
on the platform. 2. balls passing of per pipe of totall
panel; the internal clean-up, inspection, lining of headers.
3. Assembly and butt welding of pipes and panel; lifting,
aligning and fixing of components or panel; the inspection
and adjustment of overall dimensions of heaters.
set 2 1762 799.2 1598.4
2.3
Superheat System (piping,
fitting, sealing part etc)
and Header
Scope of Works: 1.Installation & welding of coil tube
arrays, roof tube, exclosure wall tube, header etc. 2.
sealing welding of superheat system etc..
Contents of Works: 1. Line and regulate the pipe or tube
arrays on the pipe calibration platform. 2.balls passing of
all tubes, the internal clean-up,inspection, lining of
headers. 3. Assembly and butt welding of pipes and tube
arrays; hoisting, aligning and fixing of components or
tubes; the inspection and adjustment of overall dimensions
of panel.
set 2 3730 1615.45 3230.9
2.4
Reheat System ( piping,
fitting,sealing part etc.)
and Header
Scope of Works:1. Installation & welding of coil tube arrays
and components, header etc..2. sealing welding of reheat
system etc.
Contents of Works: 1. Line and regulate the pipe or tube
arrays on the pipe calibration platform. 2.balls passing of
panel , the internal clean-up, inspection, lining of headers.
3. Assembly and butt welding of pipes and tube arrays;
hoisting, aligning and fixing of components or tubes; the
inspection and adjustment of overall dimensions of panel.
set 2 918 416.3 832.6
2/18
2.5
Economizers ( piping,
fitting, etc.)
Scope of Works: Installation & welding of coil tube arrays
and components, hanged pipe, header, wear-preventing
device etc. Contents of Works: 1. Line and regulate the
pipe or tube arrays on the pipe calibration platform. 2.
balls passing of coil tube arrays ; the internal clean-up,
inspection, lining of headers. 3. Assembly and butt
welding of pipes and tube arrays; hoisting, aligning and
fixing of components or tubes; the inspection and
adjustment of overall dimensions 4.installation of wear-
preventing devices for economizer.
set 2 1600 848.6 1697.2
2.6
connection piping between
pressure parts(including
support and
hanger,accessories )
scope of work: welding, erection ,ball passing etc.
Content of work:transportation,welding,erection and
support etc.
set 2 960 277.2 554.4
2.7 downcomer
scope of work: welding, erection,sand blasting etc.
Content of work:transportation,welding,erection and
support etc.
set 2 256 128.8 257.6
2.8
down -comer water header
and recirculating pump
system
Scope of Works: header, support saddle of header etc..
Contents of Works: 1.the internal clean-up, inspection,
lining of headers. 2. hoisting, aligning, fixing, inspection
and adjustment and hydraulic test etc..
set 2 210 3.617 7.234
2.9 Boiler Buckstay
Scope of Works: buckstays and connectors etc..
Contents of Works: hoisting, welding,placing and fixing of
buckstays and connectors.
set 2 1040 361.2 722.4
2.10
Hanger and support for
pressure part
Scope and contents of works: Inspection,assemble,
installation, adjustment and fixing of rigid support and
hanger, spring support and hanger as well as support and
hanger of constant force.
set 2 960 168.3 336.6
2.11 sootblower system
instalation of sootblower, piping, including sandblast of
pipes, valve, fitting and hangers & supports, hydraulic test
steam blowing,commissioning etc.
set 2 520 106.1 212.2
2.12 Burners,oil gun,ignitor etc. Inspection and installation of burner and its support etc. set 2 720 161.9 323.8
2.13
Fuel oil pipes, valves and
supports in boiler area
scope of work: piping,vavle, fitting and hangers &
supports, sandblast of pipes, oil flushing ,hydraulic test,
steam blowing etc. oil circulate with pressure, etc..
set 2 38 24.3 48.6
3/18
2.14 accessories of boiler proper
scope of work:installation of silencers,safe valve,drain
steam piping of safe valve,hangers & supports,pressure
gauge,expansion indicator ,fitting, manhole gate, sealing
device,instrument sampling socket for I&C,etc
set 2 200 141.97 283.94
2.15
Pipes of boiler proper
(including pipings ,valves,
fitting ,hangers & supports
etc)
scope of work:sandblasting and installation of drain water
pipe ,dozing pipe ,water level gauge and relative pipe
,recycle pipe of economizer ,spray pipe of super heater
and reheater ,sampling pipe ,vent pipe ,blowdown pipe and
primary isolation valves etc..
set 2 160 44.95 89.9
2.16 Air Preheater
Scope of Works:installation of key body, fitting, auxiliary
equipment,sealing device, supports & hangers and sealing
adjustment,assemblage and erection the Steam heated
airheater , the overall cold trial run.
Contents of Works: Clean-up of foundation; assembly of
rotor and housing; assembly, installation of heat transfer
elements and gearing devices; installation and adjustment
of sealing glands, oil system, firefighting soot-blowing or
cleaning devices;the overall cold trial run.
set 4 2400 1703 3406
2.17
Hydrostatic test for
pressure part
Scope of Works: 1.contractor shall provide temporary
booster pump,feeder pump, and piping,fitting,valves etc. 2.
Installation and removal of temporary equipment and pipe,
and system recovery
Contents of Works: 1. Installation and removal of
temporary water-feeding, water-draining, pressure-lifting,
chemical-dosing and heating pipes, compressed air
equipment and piping system. 2. Locking of exit, constant
hanger, inspection and cutting off of temporary fixtures; 3.
air test and defect treatment. 4. Defect treatment after
water feeding, flushing, pressure lifting, pressure
regulation, inspecting, pressure relief and pneumatic test.
5. System recovery.
set 2
4/18
2.18 Chemical cleaning
1.The contractor supply all the temporary material,
equipment,chemicals, acid trough, water tank, pipes,
pump, valves and accessories ect... (including but not
limited checking, recover after cleaning, waste liquid
treatment and drain), 2. The contractor shall submit to
employer necessary qualified test/report and qualification
of company as per india relevant regulation or requirement
of employer and owner, etc... 3.Chemical cleaning shall
meet the india regulation, such as enviromental
antipollution, discharge of liquid effluent, treatment of
boiler cleaning effluent and monitoring requirements, etc
set 2
3 Fans
3.1
Primary fan of axial-flow
type
scope of work:1. Installation and alignment of the impeller
casing, main bearings, rotors, inlet box, diffuser, sealing
glands, dynamic blade regulator, motor etc.. 2. Installation
of platform, ladder and railing of the fan. 3. Installation of
the lubricant system; hydraulic system; internal treatment
of lubricant pipings and servo drive device. 4. Test and
adjustment of lubricant system etc.. 5. Structural
inspection and finishing of fan blades.
set 4 120 91.7 183.4
3.2
Forced draft fan of axial-
flow type
scope of work:1. Installation and alignment of the impeller
casing, main bearings, rotors, inlet box, diffuser, sealing
glands, dynamic blade regulator, motor etc.. 2. Installation
of platform, ladder and railing of the fan. 3. Installation of
the lubricant system; hydraulic system; internal treatment
of lubricant pipings and servo drive device. 4. Test and
adjustment of lubricant system etc.. 5. Structural
inspection and finishing of fan blades.
set 4 140 52.3 104.6
3.3
Induced draft fan of axial-
flow type
scope of work:1. Installation and alignment of the impeller
casing , main bearings, rotors, inlet boxs, diffuser, motor
and cooling air fan and assessory etc.. 2. Installation of
platform, ladder and railing of the fan. 3. Installation of the
lubricant system; internal treatment of lubricant pipings. 4.
Test and adjustment of lubricant system.
set 4 260 194.9 389.8
5/18
3.4
Scanner cooling air
fan(centrifugal type)
scope of work:Sizing block & shims erection, equipment
alignment and accessory.
set 4 8 2 4
3.5
Seal air fan(centrifugal
type)
scope of work:1. Hydraulic test of bearing box. 2. sizing
block & shims erection, equipment alignment and
accessory.
set 4 28 14 28
flow 11.52m3/s
,pressure :9000Pa
,including motor
185kw, 415v
4 electrostatic precipitator 0
4.1 electrostatic precipitator
Scope of Works: the ESP proper(include steel
structureShell and top capfrom inlet duct to outlet
duct, and flange of ash hopper upward, the whole
machinery, shaking devices and junction piece)Stairs,
platform, walkway, anode system, cathode system, small
ash bucket of the ESPaccessories, etc... Contents of
Works: Assembly, alignment and installation of
equipment, kerosene test and air leakage test etc.
set 4 5800 4750 9500
5 Milling system
5.1 Medium speed mills,
Scope of works: type:HP1163/Dyn motor:850KW
11kV(including oil system, motor, dynamic classifier, gear
box, sealing device, valvesfix/mobile mill rejects hopper,
steel structure, platform , support and hangeretc).
Contents of works: installation and alignment of
equipment and accessory, internal treatment of lubricant
pipings
set 14 3500 1815.6 3631.2
5.2 Belt coal feeder,
Scope of works:max.conveying capacity:101t/h feeding
distance:2.25m inlet/outlet raw coal piping, inlet/outlet
gate valves, coal chutesealing device , accessories
etc
set 14 182 42 84
6
Installation of flues & air
duct
6.1
Assembly and erection of
wind box
Scope of Works: wind box, expansion joint and supports &
hangers etc..
Contents of Works: Assembly, welding and installation of
wind box, expansion joint, supports & hangers and
kerosene test etc.
set 4 192 35.8 71.6
6.2 Steam coil air preheater
Scope of Works: Installation of steam coil air pre Heater
including drain piping, pump, valve hydraulic test etc.
Contents of Works: alignment, installation, welding, hydro-
test etc..
set 4 72 9 18
6/18
6.3
Assembly and erection of
flue duct
Scope of Works: inlet & outlet duct of air preheater, inlet
and outlet duct of ESP, inlet and outlet duct of IDF
,manhole gate and baffle and support&hanger etc.
Contents of Works: Assembly, welding and installation of
flue duct, supports and hangers; inspection and installation
of various doors;kerosene test etc..
set 2 1600 1372.8 2745.6
6.4
Assembly and erection of
Primer cold duct and
Secondary cold duct
Scope of Works: inlet & outlet of PA fan,inlet & outlet of FD
fan,silenser, explosion door,manhole gate and baffle
,support & hangers etc.
Contents of Works: Assembly, welding and installation of
primer cold duct and secondary cold duct, supports and
hangers; inspection and installation of various
doors;kerosene test etc..
set 2 560 303.1 606.2
6.5
Assembly and erection the
ducts of Primary hot duct
and Secondary hot air duc
Scope of Works: outlet hot duct of APH, explosion
doorexpansion joint ,manhole gate and baffle ,support &
hangers etc.
Contents of Works: Assembly, welding and installation of
primary hot duct and secondary hot duct, supports and
hangers; inspection and installation of various
doors;kerosene test etc..
set 2 700 354 708
6.6 Sealing air duct
Scope of Works: pipe ,valve, supports & hangers etc..
Contents of Works: Assembly,weldind and installation of
seal Air duct, welding of pipe, support & hanger erection
etc..
set 2 48 22.4 44.8
6.7
Piping of pulverized coal
system
Scope of Works: the coal pipe is from outlet of coal mill to
burner,include valves, elbows, expansion joint ,
accessories, supports & hangers etc.
Content of Works: installation, welding of pipe,
support&hanger erection etc..
set 2 900 889.3 1778.6
6.8
Fabrication and erection of
flue&air duct
Scope of Works: fabricaiton and erection of square circle
node,elbow
Content of Works: 1. Blanking, fabrication, inspection and
painting of binding, reinforcer, sealing plate at the corners,
rectangle flanges and connecting pipe . 2. Rolling of steel
plate; inspection on welding and seam of groove; painting
of one coat of anticorrosion paint etc..3.kerosene test.
set 2 120 0
7
Steam generator and
other auxiliaries
7/18
7.1
intermittent blowdown flash
tank and accessories
Scope of Works: Installation of the tank and its
attachment. Contents of Works: 1. Foundation lining;
fabrication of pad block; hoisting, placing and fixing of the
tank. 2. Internal cleaning; cushioning and sealing of port
lid; grinding installation of valves and glass water gauge ;
installation and adjustment of other attachments.
set 2 24 35.518 71.036
7.2
continuous blowdown flash
tank and accessories
Scope of Works: Installation of the tank and its
attachment. Contents of Works: 1. Foundation lining;
fabrication of pad block; hoisting, placing and fixing of the
tank. 2. Internal cleaning; cushioning and sealing of port
lid; grinding installation of valves and glass water gauge ;
installation and adjustment of other attachments.
set 2 16 25.5 51
7.3 electric hoist
Scope of work:1. installation of electric hoist 2. Load test of
electric hoist.
set 2 10 0
7.4 Elevator
7.4.1 Elevator structure
Scope of Works:Installation of Elevator structure. Contents
of Works:Foundation lining; installation and removal of
temporary facilities; check, calibration, assembly, welding,
reinforcement, hoisting, aligning and fixing of steel
structure.
set 2 182 74 148
7.4.2 Equipment
Scope of work: 1.Support and guide rail
erection,2.Installation and adjustment of the traction
motor,3.The erection of Carrier Safety clamps and guide
shoe,4.Installation of car,5.Buffer erection,6.installation of
door system, 7.the report of usage etc.
set 2 15 0
TWO Fuel supply system 0
1 mill reject system 0
1.1 mill hopper
including double disc valve of mill, discharge valve of
accident etc.
set 14 7 26.5 53
1.2 blow tank including feed valve,expansion joint and accessory set 14 4.2 0
1.3 mill bin
including proper,structure, platform,pressure relief valve
,indicator etc
set 2 12 0
1.4 exhaust air filter
Inspection, clearing, wrapping with cloth bags, installation
of the machine proper etc..
set 2 2 0.9 1.8
1.5 manual knife gate
Dismantling inspection, clearing and installation, motor
installation
set 2 0.8 0.12 0.24
8/18
1.6 pneumatic knife gate
Dismantling inspection, clearing and installation, motor
installation
set 2 0.8 0.44 0.88
1.7
diameter of the pipe
57
including valve, hanger and support, accessories etc. set 2 2 0
1.8
diameter of the pipe
133 and219
including valve, hanger and support, accessories etc. set 2 4 53.1 105.7
1.9
fittings:ceramic
-lined
set 2 4 0
THREE Ash disposal system 0
1 bottom ash system 0
1.1 steel band conveyor output: 3~14t/h, including belt ,motor structure etc. set 4 60 0 Drawing no have
1.2
hydraulically operated
isolating gate and oil
system
including related equipment and piping ,accessory ,etc set 2 60 0 Drawing no have
1.3 BA hopper including anchor bolt ,steel structure, platform,etc set 2 70 0 Drawing no have
1.4 clinker grinder including motor and accessory set 4 12 0 Drawing no have
1.5 bottom ash bin
including structure, platform, supports, gate,auxiliary
equipment, pipe,accessory ,etc.
set 2 160 0 Drawing no have
1.6 double paddle mixer including motor and accessory etc. set 2 16 0 Drawing no have
1.7 motor-driven air-lock feeder include motor and accessory etc. set 8 2 0 Drawing no have
1.8 pneumatic knife gate set 8 2 0 Drawing no have
1.9 manual knife gate set 8 2 0 Drawing no have
1.10 dry ash unloader include motor and accessory etc. set 2 0.6 0 Drawing no have
1.11 scraper conveyor include motor and accessory etc. set 4 8 0 Drawing no have
1.12 slurry pump including motor , accessory , etc. set 4 11.6 0 Drawing no have
1.13 water pump including motor , accessory ,etc. set 4 4 0 Drawing no have
1.14 bottom ash slurry mixer set 2 5 0 Drawing no have
1.15 bottom slurry sump set 2 3 0 Drawing no have
1.16
cast stone -lined steel pipe
and valves
including pipe,valves, supports and hangers, accessory,
etc
set 2 50 0 Drawing no have
1.17 the other pipe including valve,gate and accessory set 2 6 0 Drawing no have
Four Miscellaneous Piping 0
9/18
1.1
diameter of the pipe
57
including compressed air pipe of boiler house, closed cycle
cooling water pipeopen cycle coling water pipeservice
water pipeauxiliary steam pipeflush pipe of air
preheater ,boiler hall washing water piping, and valves,
hanger&support , accessory etc. For cooling water,
service water pipe,and compressed air pipe, sandblasting
shall be included; For auxiliary steam pipe, sandblasting
and steam blowing shall be included;
set 2 20 0
1.2
diameter of the pipe 57
and133
including compressed air pipe of boiler house, closed cycle
cooling water pipeopen cycle coling water pipeservice
water pipeauxiliary steam pipeflush pipe of air
preheater ,boiler hall washing water piping, and valves,
hanger&support , accessory etc. For cooling water,
service water pipe,and compressed air pipe, sandblasting
shall be included; For auxiliary steam pipe, sandblasting
and steam blowing shall be included;
set 2 70 0
1.3
diameter of the pipe
133 and219
including compressed air pipe of boiler house, closed cycle
cooling water pipeopen cycle coling water pipeservice
water pipeauxiliary steam pipeflush pipe of air
preheater ,boiler hall washing water piping, and valves,
hanger&support , accessory etc. For cooling water,
service water pipe,and compressed air pipe, sandblasting
shall be included; For auxiliary steam pipe, sandblasting
and steam blowing shall be included;
set 2 80 0
1.4
diameter of the pipe
219 and273
including compressed air pipe of boiler house, closed cycle
cooling water pipeopen cycle coling water pipeservice
water pipeauxiliary steam pipeflush pipe of air
preheater ,boiler hall washing water piping, and valves,
hanger&support , accessory etc. For cooling water,
service water pipe,and compressed air pipe, sandblasting
shall be included; For auxiliary steam pipe, sandblasting
and steam blowing shall be included;
set 2 34 0
10/18
1.5
diameter of the pipe
273
including compressed air pipe of boiler house, closed cycle
cooling water pipeopen cycle coling water pipeservice
water pipeauxiliary steam pipeflush pipe of air
preheater ,boiler hall washing water piping, and valves,
hanger&support , accessory etc. For cooling water,
service water pipe,and compressed air pipe, sandblasting
shall be included; For auxiliary steam pipe, sandblasting
and steam blowing shall be included;
set 2 20 0
1.6
diameter of the pipe
57
Buried pipes,valves, accessory, etc Excavation, backfill
and anticorrosive layer structure asphalt primer shall be
includedand the asphalt ,fabric glass and other paint for
the buried pipes are suppiled by subcontractor.
set 2 2 0
one layer of
bitumen sandwich
one layers of fabric
glass; the total
thickness is
2mm.All work and
test should be
completed to satify
the design
requirements
1.7
diameter of the pipe 57
and133
Buried pipes,valves, accessory, etc Excavation, backfill
and anticorrosive layer structure asphalt primer shall be
includedand the asphalt ,fabric glass and other paint for
the buried pipes are suppiled by subcontractor.
set 2 10 0
one layer of
bitumen sandwich
one layers of fabric
glass; the total
thickness is
3mm.All work and
test should be
completed to satify
the design
requirements
1.8
diameter of the pipe
133 and219
Buried pipes,valves, accessory, etc Excavation, backfill
and anticorrosive layer structure asphalt primer shall be
includedand the asphalt ,fabric glass and other paint for
the buried pipes are suppiled by subcontractor.
set 2 20 0
one layer of
bitumen sandwich
one layers of fabric
glass; the total
thickness is
4mm.All work and
test should be
completed to satify
the design
requirements
11/18
1.9
diameter of the pipe
219 and273
Buried pipes,valves, accessory, etc Excavation, backfill
and anticorrosive layer structure asphalt primer shall be
includedand the asphalt ,fabric glass and other paint for
the buried pipes are suppiled by subcontractor.
set 2 4 0
one layer of
bitumen sandwich
one layers of fabric
glass; the total
thickness is
5mm.All work and
test should be
completed to satify
the design
requirements
1.10
diameter of the pipe
273
Buried pipes,valves, accessory, etc Excavation, backfill
and anticorrosive layer structure asphalt primer shall be
includedand the asphalt ,fabric glass and other paint for
the buried pipes are suppiled by subcontractor.
set 2 40 0
one layer of
bitumen sandwich
one layers of fabric
glass; the total
thickness is
6mm.All work and
test should be
completed to satify
the design
requirements
1.11
diameter of the pipe
57
including stainless steel piping,argon arc welding,valves,
support and hanger etc.
set 2 6 0
1.12
diameter of the pipe 57
and133
including stainless steel piping,argon arc welding,valves,
support and hanger etc.
set 2 20 0
1.13
diameter of the pipe
133 and219
including stainless steel piping,argon arc welding,valves,
support and hanger etc.
set 2 10 0
1.14
diameter of the pipe
219 and273
including stainless steel piping,argon arc welding,valves,
support and hanger etc.
set 2 4 0
Five BOP area system 0
1 Coal-fired system 0
1.1
Bucket-wheel stacker
reclaimer
Type: stacking: Q=4000t/h,reclaiming:Q=4000t/h boom
length:42m Scope of Works: assembly and installation of
running mechanism, door seat frame, rotary disk,
cantilever frame, tail lathe, platform, walkway, handrails,
conveyor and hydraulic system etc..
set 3 3300 750 2250
1.2 no.2A,B conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=122.2
54m,=6-12
set 2 94 227.239 227.239
1.3 no.3A,B,C conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=1130
m,=0-16
set 3 866 1695.405 1695.405
compressed air
pipe & accessories
in #1 boiler house
1. Installation of central
nonstandard metal
framework, groove-type
carrier roller, and
parallel roller. 2.
Installation of tension
apparatus framework,
slide groove, roller,
trolley, fixed pulley,
heavy hammer, steel
wire, spring and guard
grating.3. Laying and
glued jointing of belt,
installation of coal guide
groove. 4. Installation of
clamping roller device
and various protection
devices, signal device
(such as tape fracture
protection, tape slip
protection, tape off
tracking switch, coal
flow signal, coal
blockage signal, bi-
12/18
1.4 no.4A,B conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=146.7
16m,=6-10
set 2 113 247.474 247.474
1.5 no.5A,B conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=146.7
16m,=6-10
set 2 113 247.474 247.474
1.6 no.6A,B conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=103.8
0m,=5.5
set 2 81 280.66 280.66
1.7 no.7A,B conveyor
B=2000mm,V=3.25m/s,Q=4000t/h,Qmax=4400t/h,L=227.1
41m,=4.5
set 2 175 254.1 254.1
1.8 no.8A,B conveyor
B=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=187.15
13m,=4-10.8
set 2 101 153.641 153.641
1.9 no.9A,B conveyor
B=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=318.02
3m,=4-10.8
set 2 171 109.653 109.653
1.10 no.10A,B conveyor
B=1400mm,V=2.5m/s,Q=1275t/h,Qmax=1400t/h,L=205.4
m,=0
set 2 110 109.653 109.653
1.11
3-location head moveable
device
B=2000mm,Q=4000t/h set 3 33 0
1.12 vibration screen
Q=1300t/h,Qmax=1400t/h
Installation and alignment of of baasement frame, screen
frame, shaft, plate spring, spring seat, bearing seat, rubber
bumper and motor.
set 2 26 16.4 32.8
1.13 ring hammer crusher
Q=1300t/h,
Ring-hummer-type coal crusher: 1. Sweeping and
checking of rotor bearing seat, hammer, lining board of
hammer, and screening bar. 2. Installation of shell,
materials loading hopper, bearing coupling, motor, and
electric pusher.
set 2 68 33.5 67
1.14 belt scale
B=1400mm, V=2.5m/s, Q=1275t/h,=10.8
Checking of shifting frame and carrier roller; installation of
shifting frame, underbed, weight roller, cross spring
lamination, sensor, standard weight scale, and
counterweight block.
set 2 1.2 9.06 9.06
1.15 dynamic circle chain B=1400mm, V=2.5m/s, Q=1275t/h,=10.8 set 2 8.4 4.3 8.6
1.16 sampling system
B=1400mm, V=2.5m/s, Q=1275t/h,=10.8
Machanical sampling device:1. Strip inspection of reducer,
roller, and chain wheel breaker. 2. Installation of
framework, chain, chain wheel, chain hopper, shell, chain
wheel breaker device, tension device,reducer, and motor.
set 2 11 14.6 14.6
1. Installation of central
nonstandard metal
framework, groove-type
carrier roller, and
parallel roller. 2.
Installation of tension
apparatus framework,
slide groove, roller,
trolley, fixed pulley,
heavy hammer, steel
wire, spring and guard
grating.3. Laying and
glued jointing of belt,
installation of coal guide
groove. 4. Installation of
clamping roller device
and various protection
devices, signal device
(such as tape fracture
protection, tape slip
protection, tape off
tracking switch, coal
flow signal, coal
blockage signal, bi-
13/18
1.17
electric drive double- side
plough
B=1400mm troughing angle:35
Installation of coal plough and coal drop hopper, and
installation of electric pusher.
set 26 78 128 128
1.18 wiper B=2000mm set 6 6 0
1.19
belt-type magnetic
separater
B=2000mm
Check and installation of electromagnetic iron, motor,
reducer, driving (driven) roller, and cooling fan; installation
of iron abandon belt, and supporting carrier roller.
set 7 43 14.2 113.6
1.20
hang-type magnetic
separater
B=1400mm
Checking and installation of singal track crane; installation
of separator noumenon.
set 2 8 8.7 8.7
1.21 metal detector set 2 0.6 0.04 0.04
1.22 electric driven diverter gate
B=2000mm 1400mm*1400mm
Dismantling inspection, clearing and installation, including
motor installation
set 8 20 0
1.23
electric driven billabong
gate
B=1400mm 1000mm*1000mm
Dismantling inspection, clearing and installation, including
motor installation
set 2 3.7 0
1.24
electric driven billabong
gate
B=2000mm 1400mm*1400mm
Dismantling inspection, clearing and installation,including
motor installation
set 5 13 0
1.25 absorber
B=2000mm 1400mm*1400mm
dismantling inspection, clearing, air-tight test and
installation,including motor installation.
set 14 32 0
1.26 absorber
B=1400mm 1000mm*1000mm
dismantling inspection, clearing, air-tight test and
installation including,motor installation.
set 6 9.6 0
1.27 the other pumps including transporting, erection, alignment etc. set 1 5 0
1.28
diameter of the pipe
57
including piping ,valves,hanging and support, accessory
etc,buried pipes (including antiseptic treatment, welding,
elbow, valves, excavation, backfill, accessories, hydraulic
test, etc.)
set 1 10 0
1.29
diameter of the pipe 57
and133
including piping ,valves,hanging and support, accessory
etc,buried pipes (including antiseptic treatment, welding,
elbow, valves, excavation, backfill, accessories, hydraulic
test, etc.)
set 1 50 0
2 Fuel oil system 0
14/18
2.1 HFO storage tank
HFO storage tank V=2000m
3
(including fabrication &
erction, sandblasting,and testing, platform & handrail,
accessories, etc.)
set 2 78.4 2 168
2.2 LDO storage tank
LDO storage tank V=1000m
3
(including fabrication &
erction,sandblasting,and testing , platform & handrail,
accessories, etc.)
set 1 43.2 1 47.46
2.3
centrifugal LDO supply
pumps
Q=28m3/h including proper equipment, local gauge, etc. set 3 9 3 9.3
2.4
strainers of LDO supply
pumps
filter screen checking, positioning, and installation set 3 0.6 3 0.3
2.5
centrifugal LDO unloading
pumps
Q=66m3/h including proper equipment, local gauge, etc. set 2 4 2 1.3
2.6
strainers of unloading
pumps
filter screen checking, positioning, and installation set 2 0.4 2 0.3
2.7 screw HFO supply pumps
Q=59m3/h including proper equipment, local
gauge,alginment, grouting etc.
set 3 3 3 4.98
2.8
strainers of HFO supply
pumps
filter screen checking, positioning, and installation set 3 0.6 3 0.6
2.9
screw HFO unloading
pumps
Q=66m3/h including proper equipment, local gauge,etc. set 3 1.8 3 1.9
2.10
strainers of HFO unloading
pumps
filter screen checking, positioning, and installation set 3 0.6 3 0.6
2.11 HFO heaters set 2 1.6 2 72
2.12
centrifugal waste water
pump
Q=10m3/h including proper equipment, local gauge, etc. set 1 1 1 0.428
2.13
strainer of centrifugal waste
water pump
filter screen checking, positioning, and installation set 1 0.2 1 0.056
2.14 drain flash tank V=10m3 including installation alignment ,grouting etc, set 1 3 1 4.5
2.15
centrifugal steam drain
pumps
Q=10m3/h including proper equipment, local gauge, etc. set 2 1.2 2 0.944
2.16 gear drain oil pump Q=2m3/h including proper equipment, local gauge, etc. set 1 0.6 2 0.19
2.17
strainers of gear drain oil
pump
filter screen checking, positioning, and installation set 1 0.2 2 0.072
2.18 HFO coolers set 2 1.6 2 42.4
2.19
centrifugal direct-link
pumps
Q=90m3/h including proper equipment, local gauge, etc. set 2 1.6 2 0.6
15/18
2.20
diameter of the pipe
57
including sandblasting, argon arc welding,valves, supports
& hangers ,accessories, hydraulic test, steam blowing,
buried pipes (including antiseptic treatment)etc.
set 1 5 1 13
2.21
diameter of the pipe 57
and133
including sandblasting, argon arc welding,valves, supports
& hangers ,accessories, hydraulic test, steam blowing, etc.
set 1 110 1 49
2.22
diameter of the pipe
133 and219
including sandblasting, argon arc welding,valves, supports
& hangers ,accessories, hydraulic test, steam blowing, etc.
set 1 10 1 67.4
2.23
diameter of the pipe
219 and273
including sandblasting, argon arc welding,valves, supports
& hangers ,accessories, hydraulic test, steam blowing, etc.
set 1 5 1 3.3
3 Diesel Generator system 0
3.1
diesel engines and the
other equipments
including porper,steel plate, cooling system, start-up
system, lubricate system, fule oil system, in/out gas/duct
system, daily oil tank, accessory , etc
set 3 100 0
3.2 relevant piping
including piping,valves, supports and hangers, accessory,
etc
set 3 1.5 0
4 fly ash system 0
4.1 hight efficiency setting tank
including porper,structure,plateform, drive device,
accessory,etc
set 1 95 0
4.2
Ash vessel of economizer
hopper
v=0.5m3 including support ,manual knife gate,expansion
joint, feed dome valve,vent valve,opening up valve etc.
set 12 6 0
4.3 ash vessel of ESP
v=2m3 including support ,manual knife gate,expansion
joint, feed dome valve,vent valve,opening up valve etc.
set 32 32 0
4.4
ash vessel of ESP third&
fourth &fifth&sixth field
v=0.5m3 including support ,manual knife gate,expansion
joint, feed dome valve,vent valve,opening up valve etc.
set 64 32 0
4.5 ash vessel of air preheater
v=0.5m3 including support ,manual knife gate,expansion
joint, feed dome valve,vent valve,opening up valve etc.
set 8 4 0
4.6 bottom ash sluicing pump including motor and accessory etc. set 2 4 0
4.7 sealing water pump including motor and accessory etc. set 2 0.8 0
4.8 sewage pump include motor and accessory etc. set 5 3 0
4.9 fly ash slurry pump include motor and accessory etc. set 4 17 0
4.10 slurrying water pump include motor and accessory etc. set 2 2 0
4.11 fly ash slurry mixer including motor and accessory etc. set 2 5 0
4.12 water pump including motor and accessory etc. set 2 2 0
16/18
4.13 exhaust fan including accessory etc. set 1 1 0
4.14 double paddle mixer including motor and accessory etc. set 1 8 0
4.15 fluidizing blower of ash silo including motor and accessory etc. set 2 2 0
4.16
electric air heater of ash
silo
including motor and accessory etc. set 1 0.8 0
4.17 motor-driven air-lock feeder include motor and accessory set 4 1 0
4.18 dry ash unloader include motor and accessory set 1 0.3 0
4.19 exhaust air filter set 1 1.5 0
4.20 hopper fluidizing blower include motor and accessory set 4 5.2 0
4.21 hopper fluidizing air heater include motor and accessory set 4 1.2 0
4.22 aeration trough Inspection, clearing and installation set 92 1.84 0
4.23 discharge boxes set 6 3 0
4.24
cast stone -lined steel pipe
and vales
set 1 130 0
4.25 GRP & valve set 1 23 0
4.26 the other pipe including valve, and accessory etc.. set 1 6 0
4.27
Pressure relief valve
DN500
set 1 0.51 0
4.28 manhole door set 2 0.35 0
5 compressed air system 0
5.1
air compressor (including
proper equipment, motor,
etc.)
Q=42Nm /minP=0.80MPa250KW6.6KV set 6 42 0
5.2
air compressor (including
proper equipment, motor,
etc.)
Q=50Nm /minP=0.75MPa300KW6.6KV set 3 21 0
5.3 conveying air direr Q=50Nm /minP=0.80MPa415V, 9.5KW set 3 9 0
5.4 filter Q=50Nm /minP=0.80MPa set 18 9 0
5.5 combined dryer Q=40Nm /minP=0.8MPa415V, 7.5KW set 3 9 0
5.6 conveying air direr Q=60Nm /minP=0.80MPa415V, 9.5KW set 3 9 0
5.7 air storage tank
V=30m3 including proper equipment, safety valves, local
gauge etc..
set 7 56 0
5.8 air storage tank
V=15m3 including proper equipment, safety valves, local
gauge etc..
set 3 15 0
5.9
diameter of the pipe
57
including carbon steel piping,valves, support and hanger
etc.
set 1 1 0
in air compressor
house
17/18
5.10
diameter of the pipe 57
and133
including carbon steel piping,valves, support and hanger
etc.
set 1 2 0
5.11
diameter of the pipe
133 and219
including carbon steel piping,valves, support and hanger
etc.
set 1 10 0
5.12
diameter of the pipe
219 and273
including carbon steel piping,valves, support and hanger
etc.
set 1 8 0
5.13
diameter of the pipe
273
including carbon steel piping,valves, support and hanger
etc.
set 1 8 0
5.14
diameter of the pipe 57
and133
including stainless steel piping,valves, support and hanger
etc.
set 1 0.5 0
5.15
diameter of the pipe
133 and219
including stainless steel piping,valves, support and hanger
etc.
set 1 2 0
SIX Civil Work 0
1 Grouting 0
1.1 60 non shrinking cement Provide and construction, etc..
Cu.
m
20 0
1.2 40 non shrinking cement Provide and construction, etc..
Cu.
m
20 0
1.3
M25-M35 FINA
AGGREGATE ,CHIPS
DN20MM
Provide and construction, etc..
Cu.
m
20 0
1.4
HIGH-STRENGTH
GROUTING WITHOUT
SHRINKAGE
Provide and construction, etc..
Cu.
m
20 0
0 #REF!
0
Note:
in air compressor
house
6.Contractor shall perform the Works according to the related drawings and technical specifications and construction standards. The above working description
of the item are subject to approval of the Owner's/Employer's Engineer based on the agreed technical specification,if Owner's/Employer's Engineer doesn't agree
about it .the related modifications and related cost incurred will be undertaken by the Contractor,always based on the agreed technical specifications.
in air compressor
house
1.The QTY in BOQ is temperorary, payment will be calculated according to the work actually completed. The formulate of payment is: payment=quantity actually
completed rate in BOQ, inclusive all the costs of Contractor.
2. The Rate in BOQ is firm and final and not liable to any change under QTY change or whatever reasons.
3.Mobilization and demobilization of all necessary manpower and equipments as per specification including shifting & erecting the same from one location to the
other.
4.The above rates are all inclusive unless otherwise specified, firm and final and not liable to any change under any condition whatsoever from the date of
Commencement Date.
5.The rate includes all the taxes and duties.
18/18