THE MECHANICS OF PROJECT

FINANCE A DISTANCE LEARNING


COURSE IN PROJECT FINANCING

CORE MODULE 1

An Introduction to Project Finance

Steve Mills
BA (Hons), MEI
CEO, Abbotwood Limited


2











TABLE OF CONTENTS

Page


1. STUDYING THE COURSE 3
2. MODULE 1 CONTENT 4
3. INTRODUCTION 5
4. STRUCTURE OF THIS COURSE 5
5. PROJECT FINANCE BASICS 7
5.1 What is Project Finance? 7
5.2 Corporate Structures in Project Financing 7
5.3 Project vs. Corporate Lending 10
5.4 Structuring to the Cashflow Envelope 10
5.5 The Sponsors and Lenders RiskReward Relationship
with the Project
12
5.6 An Important Digression Internal Rate of Return
(IRR)
12
5.7 The Disadvantages of Project Financing for Borrowers
and Sponsors
14
5.8 Reasons to Project Finance 17
5.9 Enter the Dragon! The Impact of the Credit Crunch on
Project Financing
18
6. SUMMARY & CONCLUSIONS 21






Copyright IIR Limited 2010. All rights reserved.

These materials are protected by international copyright laws. This manual is only for the use
of course participants undertaking this course. Unauthorised use, distribution, reproduction
or copying of these materials either in whole or in part, in any shape or form or by any means
electronically, mechanically, by photocopying, recording or otherwise, including, without
limitation, using the manual for any commercial purpose whatsoever is strictly forbidden
without prior written consent of IIR Limited.

This manual shall not affect the legal relationship or liability of IIR Limited with, or to, any
third party and neither shall such third party be entitled to rely upon it. All information and
content in this manual is provided on an "as is" basis and you assume total responsibility and
risk for your use of such information and content. IIR Limited shall have no liability for
technical errors, editorial errors or omissions in this manual; nor any damage including but
not limited to direct, punitive, incidental or consequential damages resulting from or arising
out of its use.
3
1. STUDYING THE COURSE

We all have our preferred learning styles and tackle reading and learning activities in our own unique
way. As the author and tutor for this course, it is my responsibility to keep you interested in the
content and to try and help you remain motivated to learn. We will give you all the materials you need to
gain a thorough understanding of the project finance sector. You will be able to take these away with you
so you will need to set aside sufficient time and find a place where you can study the modules, be it at
home, travelling or at work. For optimal personal development, you will need to fully engage in the
learning process studying the materials thoroughly, thinking about what you have read, reflecting on it,
and no doubt challenging it.

We aim to cover the subjects addressed in the course thoroughly, but you may at time wish to consult
other sources on the internet, or maybe in a library, in order to delve deeper into particular issues that
interest you. All these additional activities will enrich the value you get from this course.

To gain a more complete understanding of project finance, you must go beyond just reading the content
of each module, learning it parrot fashion and then moving on, without further thought or discussion
with others.

A large degree of thought has gone into the chronology of the modules and their sections the running
order of this course. The sections in the modules are akin to the chapters in a book or a story, in that
they build upon one another. We would respectfully encourage you to read them, in order to put you in
the strongest position to address and absorb the key messages. Naturally, you will have your preferred
pace and you may choose to dip in and out of the text, which is your prerogative.

As a final note, a great idea that suits many people when studying by distance learning, is to consider
writing their own brief summary of the key learning points being taken away at the end of each major
section which is sometimes called an Elevator Pitch. Where does the term Elevator Pitch come
from? Imagine you are travelling a few floors in an elevator with your boss and he/she asks you what
did you learn from that last chapter of your course I saw you reading? Youve got the time the elevator
travels those few floors to succinctly tell them the main points you drew from the text. Have a go at
drafting one. Remember that whatever you produce will probably vary from someone else this is not a
problem as you will probably have a different priority or focus on what is important to you in the section.
Additionally, the disciplines of summarising and prioritising are very important for people to practice.

Enough of the preparation and guidance for this course, lets turn our focus to the first module.
























4
2. MODULE 1 CONTENT - AN INTRODUCTION TO PROJECT FINANCE

What is Project Finance How Does it Differ From Other Forms of Lending


Who Uses Project Finance & Why?

Off-Balance-Sheet lending
Project finance Carve-Outs
Joint ventures/unequal partnerships
Risk sharing
Capital rationing/return maximisation
No Choice


Key Characteristics of Project Finance Corporate Structures & Contractual Relationships

Usually (not always) limited-liability SPV
Multiple contractual relationships:
o Construction contractor(s)
o Suppliers
o Offtakers
o Operators
o Insurance providers
o Public sector government bodies and agencies


Disadvantages for Borrowers/Sponsors

Increased complexity (risk identification/mitigation/allocation)
Need for third-party due diligence reports
Longer time-lines
Higher debt costs interest margins & fees
Supervision by & reporting to lender group
Tighter debt covenants and undertakings


Risk/Reward Relationships of the Players Lenders & Borrowers/Sponsors

Borrower/sponsor seeks to optimise return through NPV/IRR/WACC analysis and wide
sensitivity analysis on both upside and downside
Lender is not exposed to upside in business of analysing and
managing/mitigating/transferring risk


The Impact of the Credit Crunch on the Project Finance Markets



Learning Outcomes
Explain the meaning of the term Project Finance and compare and contrast it with other
forms of debt capital especially corporate borrowing

Set out the reasons why companies choose (or do not choose) to use project finance and
explain the contractual structures typically employed

Contrast the risk/reward relationship with the project enjoyed by the sponsor with that of the
banker and how this affects the lenders attitude to acceptance of risk

Explore the impact of the credit crisis on project financing in particular how lenders
attitudes have changed
5
3. INTRODUCTION

The good news is that project finance is not rocket science. It is often complicated, in the sense that it is
necessary to master a large amount of detail and interpret the meaning of complex, interlocking
contracts. The principles underlying project finance are quite simple, however, and can be easily
understood. It is perhaps helpful to make a comparison with learning a new language. We can learn
phrases and words and these can be quite useful, but only in a limited range of circumstances. As soon
as we learn the grammar of the language, however, we can generate our own sentences and deal with a
much larger range of situations. Our confidence is boosted and learning becomes easier and more
enjoyable.

Similarly, in learning about project finance we can look at a wide range of historical project structures
and learn from them. We will not necessarily understand the logic which underlies how they have been
put together, however, and what features are common to all or most of the structures. Or at least we will
need to look at a very wide range of transactions over a long period of time before this becomes clear.

The aim of this course is to provide its users with an accelerated and structured method of learning about
this fascinating area of finance. To become a real expert does require experience, but the general
principles of project finance are straightforward and can be learnt quickly, avoiding the need to learn by
drawing ones own conclusions from a large range of transactions.

4. STRUCTURE OF THIS COURSE

In this distance learning course we will move from general principles to the specific methodologies
applied in particular areas of project financing. First of all (in this module) we will consider:

what is meant by the term project financing;
what makes project financing different from other forms of lending;
the difference in the risk-reward relationships with the project enjoyed by the lender and the
sponsor
1
(or sponsors) and how this difference affects their approach to the structure of the
financing;
the reasons why some companies use project financing and others do not;
the disadvantages of project financing when compared with other types of funding.

It will be important also to discuss in general terms the impact of the Credit Crunch on the project
financing market, as this has been very significant.

This will set the scene for us to study in the remaining core modules the project financing methodologies
which provide the internal engine of most project financing structures. These can be seen as the project
financiers toolkit and they consist of three main elements:

1. Qualitative Risk Assessment, Risk Mitigation and Allocation (Core Modules 2 and 3);
2. Quantitative Risk Assessment, Economic Debt Modelling and Debt Structuring (Core Module 4);
3. Project Finance Documentation (Core Module 5).

First we will be looking at the risk factors which a banker typically analyses when trying to decide
whether or not to support a particular project with debt. The banker will essentially be trying to decide
which risks are bankable and which require to be allocated to third parties or controlled by other means
(risk mitigation). We shall study the risk areas of most concern to bankers and learn to apply a
qualitative risk matrix which has been designed to prompt the key questions which must be answered to
determine whether a project is bankable.

Having decided to support a particular project, the lender will have to consider how much can be safely
lent and how the financing (especially repayment of the debt) should be structured. This involves the use
of the debt-to-equity ratio and forward-looking cover ratios. The former is used to ensure that a
minimum amount of capital is injected by the sponsor. The latter have a number of uses:

To build in to the structure appropriate cushions or safety margins to ensure that the lenders debt
service is adequately protected if the economics of the project deteriorate;

1
Sponsor means here (and throughout this course) the investor who is providing part of the project
construction cost and who wishes to raise funding from banks or other lenders to finance the rest of the
project costs. The Sponsor will generally create and invest in a separate company (a Single-Purpose
Vehicle Company or SPV) to own, construct and operate the project. This SPV will be the borrower of
the project financing (see also below).
6

To allow the stress-testing of the projects economics under adverse conditions by means of
sensitivity analysis;

To incorporate into the loan agreement certain command-and-control mechanisms which provide
early warnings of potential problems with the servicing of debt and which will bring the parties to the
table for discussions well before the project company actually fails to meet its obligations or
defaults.

There is an close relationship, which we shall explore, between the debt-to-equity ratio and the other
cover ratios. Just as important is the relationship between the cover ratios and the investors return from
the project, which is usually measured by the Internal Rate of Return on capital invested. It is very
important for lenders to understand this relationship and to take it into account when structuring a
potential loan. In my experience project lenders who have mainly participated in transactions structured
by other banks, rather than acting as Lead Arrangers themselves, often do not understand this
relationship well. They therefore frequently fail to appreciate the impact of their actions on an investors
return, with obvious consequences for their chances of winning the opportunity to lead a financing.

The final stage of the bankers work is to document the transaction by means of detailed loan and
security agreements, which will incorporate command and control structures designed to provide early
warning signals as well as triggers to allow the lender to protect their position if the project begins to
deteriorate and their debt service
2
appears to be threatened. In Core Module 5 we will examine how
these mechanisms operate and how they are embedded in the loan agreement. For those who are not
especially familiar with wholesale lending agreements for financing to be provided by syndicates of banks
it will be necessary to provide some explanation of the terminology used in such agreements. The
emphasis however will be on the practical and commercial aspects of project loan documentation. In
particular we shall focus on what borrowers and lenders disagree about most and the options which are
available for resolving such differences.

In Core Module 6 we will study the security instruments which are usually required by lenders to protect
their interests when they are lending to a project SPV. Often a project lender will be providing a very
large part (perhaps as much as 90%) of the costs of constructing the project. The lender will therefore
require formal security documents to provide him with a first-ranking security interest in the assets and
revenue streams of the project. This security is mainly defensive. It is taken to prevent other creditors
acquiring a better position and a prior claim to assets and revenues. In this way the lender ensures that
only a very small pool of preferential creditors (e.g. tax liabilities or employees salaries for a limited
period) can enjoy a higher-ranking claim. If the project SPV becomes insolvent however, the banker will
wish to have the right to enforce the security rights and, if necessary, to sell the project SPV or its assets
to recover the project loans.

Core Module 6 also traces the process of structuring, arranging and syndicating a project loan from start
to finish. The roles of the different players (sponsor, lead arrangers, financial advisers and syndicate
participant banks) are discussed in some detail and the impact of recent developments in the financing
markets on lenders and borrowers are reviewed.

The toolkit discussed in the core modules is widely applicable to all types of project financing, regardless
of the nature of the project being financed (oil and gas, power, infrastructure or PPP). The differences
between the sectors are really differences of emphasis. It is logical therefore for the newcomer to project
finance to master these techniques before looking at how project finance in used in different sectors of
the market.

In the elective modules we will move on to examine how these tools are used in different business
sectors. Each elective also includes a certain amount of sector background information on the oil and
gas value chain and the workings of liberalised power markets for example so that newcomers to these
sectors can appreciate how and why project financing methodology has been adapted by lenders to meet
the needs of sector projects.

The structure of the electives has been standardised as far as possible to make the learning process
easier. Each elective is built up in the same way, with the following major areas:

Industry Background Information


2
Debt service means the sum of interest payments and loan principal repayments required to be paid by
the borrower.
7
Key Lender Risk Issues and Structuring/Pricing Drivers

Sector Structuring Methodologies

Case Study

Building on the industry background information, the electives outline the key risks evaluated by lenders
working in the sector and the major issues which determine the interest return and other fees which
lenders will require to accept project risk. This leads naturally to an analysis of the standard structures
and their variants which are used in the relevant sector. Each elective also includes a summary sheet
which is intended to act as a quick reference (for example in the back of the taxi on the way to the
meeting!). The electives all close with a detailed case study designed to allow trainees to test their
understanding on a realistic transaction.


5. PROJECT FINANCE BASICS


5.1 What is Project Finance?

Projects can be financed in many ways, not all of which
may be regarded as project financing in the sense in
which bankers understand that term. The definition of
project financing in the box (left) is one which most
bankers would accept.

The key issue in a project financing is that the lenders to
the project have very limited access (recourse) to the
balance sheet and revenues of the sponsor(s). Unless
other rights are negotiated, the lenders will typically have recourse only to the amount of equity which is
being injected. If problems arise, such as construction cost increases or time delays, the lenders will not
have a contractual right to call for more equity.

This is why project financing is often also referred to as limited-recourse or non-recourse finance. The
difference between the two terms is mainly one of point of view. Investors will tend to speak of non-
recourse finance. They wish to emphasise the fact that once they have injected their equity into the SPV
they cannot be called upon to provide further funding. Lenders tend to talk in terms of limited-recourse
financing because they wish to stress the fact that few financings are truly non-recourse. Well-structured
project financings, the lender will say, usually result from a careful risk analysis and an agreed sharing of
risk with all parties understanding well which risks they accept. It is not always the case, as we shall see,
that the best structure for a sponsor is one which limits recourse to the maximum. A sponsor may be
able to negotiate a lower interest cost or increase the amount of funds lent to a project, for example, if
he is prepared to accept certain defined risks.


5.2 Corporate Structures in Project Financing

The diagram (left) illustrates a
typical project financing
structure. Two sponsors
working in joint venture have
created a single-purpose project
company into which they will
inject equity. Project lenders
are to provide loans to finance
the remainder of the project
cost. There could of course be a
single sponsor, or more than
two. The lender(s) could be a
single bank, a small group or
club, or a very large syndicate
of financial institutions working
under the leadership of a
smaller number of lead
arrangers.

A financial structure where lenders
have recourse primarily to the
revenue-stream of the project or asset
they are financing, rather than to the
balance sheet of the sponsors.
8
The lender(s) and sponsors will agree the percentage of equity (owners funds) to be injected into the
project company, with the balance of funds required to finance construction being provided by the banks.
The sponsors will provide their equity in proportion to their ownership of the project company and will
typically regulate their relationship by means of a formal joint venture agreement.

The project vehicle is almost always a limited liability company. The sponsors will generally desire this, as
they will want to have the protection which this provides against the banks looking through the project
vehicle and being able to have recourse against the balance sheet and revenue streams of the sponsors.
Project financings have been successfully structured however in cases where the project vehicle has been
a limited liability partnership. Oil industry joint ventures can often be structured on an unincorporated
basis and this does not prevent the use of project financing by one or more partners. Limited-liability
project SPVs are much more usual however.

The sponsors will usually inject their equity as a mix of ordinary share capital and inter-company loans.
The ordinary share capital element will usually be kept to a minimum. Many countries insist on minimum
levels of capital being provided as ordinary share capital and these levels will set an effective floor when
the share to loan ratio is being considered.

There are two main reasons for the sponsor to prefer debt over shares:

1. Ease of distribution

Accounting rules usually prevent the distribution of dividends on ordinary share capital until a
company has generated accounting profits. It is quite possible for a company to be cash-positive
before it has accounting profits. Injecting a large proportion of the equity funds as inter-company
loans therefore allows a quicker return of capital through interest on the loans and repayment of
principal than would be possible if all of the equity were injected as ordinary shares.

2. Tax efficiency

Interest on inter-company loans can usually be applied as a deduction against profits tax payable by
the borrower and/or its group.

Lenders are generally quite comfortable to have equity funds injected in this way, provided that their own
rights are protected by means of agreements which ensure sponsors payments have a lower priority
than (i.e. are subordinated to) the debt service payments to the lenders. This may be a subject
requiring considerable negotiation, with lenders for example being willing to permit interest payments on
the subordinated loans but reluctant to allow the repayment of any of the loans until a certain amount of
the bank loans have been repaid.
3


We need, however, to add more boxes and arrows to create a picture of a typical project financing
structure. The diagram on the next page builds on the one above, and is fairly typical of a project
financing structure in the infrastructure or PublicPrivate Partnership (PPP) sector.

The reader will note that in this case the SPV benefits from a concession granted by the government
which might provide an exclusive right for example to construct, own, operate and maintain a road,
tunnel, hospital or other major asset to be used by the public. In the upstream oil and gas sector
(exploration, development and operation of oil and gas fields) project companies are usually granted a
licence, concession or production sharing agreement by a state body such as the Ministry of Energy. The
diagram also shows oversight by a regulator, who is also frequently a very important counter-party for
project companies. The regulator exists to ensure that business which operate as natural monopolies or
near-monopolies (such as water, gas or power transmission utilities) do not abuse their position and that
the security of supply for the end-user of the relevant services is not endangered.

In addition to these contractual and oversight relationships, however, project SPVs generally also have
contractual links to a significant number of other third parties. The most common ones are shown in the
diagram below. There will usually be formal contracts with one or more construction companies
governing the building or development of the asset in question. These contracts are, in project-financed
transactions, frequently fixed-price turnkey (FPTK) in nature. FPTK contracts have the benefit (for the
SPV) of transferring to the contractor a significant portion of the risk that the project may suffer time
delays or cost overruns. We will examine this type of contract much more closely in Core Module 2.

3
There are some indications that banks are taking a stronger line on this issue since the Credit Crunch.
Before the crisis banks were often quite happy to allow repayment of sponsor loans even if this resulted
in effect in an increase in the debt-to-equity ratio. It would seem that some banks are now only
permitting such repayments if they do not result in an increase in this ratio.
9


Where they are for example generating power, manufacturing products for sale or processing inputs into
saleable outputs such as renewable fuels, project SPVs frequently need reliable supplies of feedstocks,
raw materials or energy. For this reason they may contract on a long-term basis with suppliers, for
specified volumes at a fixed, formula-driven (e.g. inflation-linked) or market price. As we shall see in
Core Module 2, project lenders are generally much more comfortable accepting the price risk on the
supply side than the so-called volume risk the risk that sufficient volume of what is required will be
available at appropriate quality. Where the project company is developing a mine, quarry or oil/gas field
the supply risk is really one of the availability of sufficient reserves of ore or petroleum. This reserve or
reservoir risk is a rather specialised form of supply risk and we shall spend much more time considering it
in the oil and gas elective module.

Banks look at offtake or sales risk in a very similar way, splitting it into volume and price risk. Some
projects do not have long-term sale contracts for their output. This often reflects the fact that banks do
not believe that there is a substantial risk that a projects production will not be sold. This might be the
case for example in the crude oil sector. Black oil (as opposed to natural gas) is traded in very large
volumes on a spot basis. Where lenders see a substantial volume risk, perhaps because the projects
output has a limited number of potential buyers, they will generally seek the comfort of a committed
long-term contract with a reliable offtaker, even if this is at current market prices. Banks feel much
better able to assess and accept the risk of price fluctuation, which they will do through financial
modelling, than to
accept the danger that
the SPV might not find
buyers for its output at
all.

Project SPVs may well
benefit from a range of
insurances. During the
construction phase there
will usually be cover
such as contractors all-
risk and third-party
liability policies and
perhaps also marine
cargo to protect
equipment packages on
the high seas. When the
project begins to
operate it will be
necessary to put in place also policies to deal with issues like physical damage risk and environmental
pollution hazards. In addition to these insurance covers, which are normal for any major construction
project, project-financed transactions may also include additional insurance-based risk mitigation
features such as:

delay-in-startup insurance;
business interruption insurance;
political risk insurance;
inherent defects cover.

Because of the tailored nature of project financings, limited-recourse lenders generally prefer the
insurance arrangements of a project to be structured by and for the project SPV. It is not usually
acceptable for the project insurances to be handled within a comprehensive insurance package arranged
by the sponsor on a group basis for its wider business. If the project financing is to be syndicated,
prospective lenders will normally require a report from an experienced insurance due diligence consultant
as part of the project information package submitted to them for review, so that they can satisfy
themselves that the insurances arranged are appropriate and comprehensive.

As we shall see, the predictability of a projects forecast cashflow is one of the most important factors in
determining the cost of a limited-recourse financing and the level of debt which lenders will make
available. The arrangements for operating and maintaining the project are therefore of great importance
and lenders will review them carefully. In some cases the SPVs own staff will be responsible for the
operation and maintenance (O&M) and this may well be the cheapest option. As we shall see in more
10
detail in Core Module 2 however, lenders often feel much more comfortable if there is a long-term O&M
contract between the SPV and a recognised and financially-creditworthy contractor. This offers a deeper
reservoir of human and technical resources which can be drawn upon if the project experiences
difficulties. It is likely to be a more expensive option and may not be preferred by the sponsor and/or
borrower. The lender will usually be more interested in protecting the security of cashflow, however,
rather than maximising the sponsors return.


5.3 Project vs. Corporate Lending

With due respect to my former colleagues in corporate banking, I often think of corporate lending as the
work-horse of bank lending to companies. It is not especially complex. Most critically, when a lender
provides finance on a corporate basis by means of revolving credit lines or medium-term loans it is
usually on a basis of full recourse to all the assets and revenue streams represented by the borrowers
consolidated group balance sheet. There is thus a spread of risk, or portfolio effect. The lender generally
also has access to historical accounts which may go back over a long period of time and which provide a
good insight into a borrowers key strengths and weaknesses and potential areas of vulnerability.

Peer group analysis may also be possible to compare the borrowers income statement, cashflow and
balance sheet ratios with those of other companies in the same sector.

Especially if they have a maturity of several years, corporately-based facilities may well incorporate ratios
and covenants to protect the lenders position. Some forward-looking cashflow projection work may also
form part of the prospective lenders due diligence. The lender derives most comfort, however from the
breadth of his recourse and the historical performance analysis he has carried out.

Project finance is all about
predicting and projecting rather
than the application of historical
credit analysis. The project SPV is
generally a new company with no
performance history. A limited-
recourse lender is typically asked to
lend a high proportion of a projects
construction cost based on predicted
performance, with recourse being
limited (once equity has been
injected) to the revenue streams
and assets of a single venture. If
there is no cashflow, or insufficient
cash generation to meet operating
costs and debt service, the value of
the projects assets will probably be
low. Project lenders are thus
primarily cashflow-based lenders.


5.4 Structuring to the Cashflow Envelope

Project bankers must structure a financing around a predicted cashflow envelope. From the envelope,
the size of which is necessarily an estimate, certain costs will need to be paid in a strict order in a given
operating period. Operating costs must come first, since if they are not paid the project will come to a
halt. Taxation must effectively be treated in much the same way as direct operating costs, since a failure
to pay the projects tax liabilities is likely to result in the project being closed down.

Only once these two prior claims on cashflow have been met can the lender lay claim to project cashflow
to meet interest liabilities and to begin to repay his loan. Once the lenders claims in a given period have
been met, any remaining cashflow is available to be distributed to the sponsor(s) of the project, as
dividends on ordinary share capital and/or interest payments/capital repayments in respect of
intercompany loans from the sponsor to the SPV as part of the projects equity.

The need to regulate the use of project revenues carefully is the main driver behind the concept of the
cashflow waterfall or cascade. In any given period during the operating life of the project, lenders will
wish to control the expenditure of cash generated by the project, primarily to ensure that there is no
over-spend on operating costs (including taxes) during that period which might endanger the making of
debt service payments.
11

Surplus cashflow after the payment of operating costs including
taxes is normally referred to as Cashflow Available for Debt
Service or CFADS.

This is a very important measure in project financing, for a number
of reasons. Pre-CFADS cashflow is not available to the lender as it
must be spent for the project to function. Projected CFADS is
therefore the starting point for the lenders structuring of the
limited-recourse financing.

The lender will develop a base case cashflow projection against
which he will sculpt a loan repayment schedule to ensure that
sufficient margins of safety are available between total anticipated
CFADS and the amount which is to be used to pay interest and
repay loan principal.

The margins of safety will then be stress-tested under adverse
conditions, with the lender constructing sensitivity cases where in
particular:

the loan amount structured in the base case analysis has been
fully utilised, but CFADS is weaker than expected e.g. sales
revenues are reduced or operating costs are increased;
CFADS is as expected but the loan amount is increased e.g.
as a result of construction cost increases or time delays.

Because limited-recourse financings are tailored to a predicted
cashflow envelope, project finance cannot possibly be a fire and
forget type of instrument. It is indeed much more fly by wire, requiring detailed and project-specific
command-and-control mechanisms which must be forward rather than backward looking. These
mechanisms frequently require regular revisions of predicted projected cashflows so that
underperformance against base case expectations is picked up early and remedial action can be taken.
Project financings therefore generally include significantly greater reporting obligations, more forward-
looking ratio tests and tighter controls on cash distributions than corporately-based loan instruments.

Project financings are Term Loans

With few exceptions, limited-recourse project financings are generally structured as term loans.
One important exception is in the area of upstream oil and gas project lending, where certain
facilities are structured as revolving credits although they share many other features with
conventional project term loans.

The project SPV will utilise or draw down the loan facility during an availability period which
broadly matches the construction period of the project. During the construction period the borrower
will normally be cashflow-negative, meaning that interest due to the banks will have to be added to
the loan or capitalised. On completion of the projects construction the loan facility will cease to be
available for drawing and any unutilised debt capacity will be cancelled. An agreed repayment
schedule mechanism will then begin to apply and interest will be required to be paid rather than
capitalised.

Two features of term loans are worth emphasising further. They are:

drawn once and repaid once amounts repaid are not capable of being redrawn as in a
revolving loan facility;
not repayable on demand they are repaid in accordance with a pre-agreed schedule or
mechanism and can generally only be declared due for repayment at an earlier stage by the
lenders on occurrence of an event of default.
12
Sponsors and borrowers are sometimes surprised by the range of circumstances in which a project lender
can call an Event of Default. It should be remembered however that calling an event of default is
something of a nuclear button which lenders will certainly not use without a great deal of careful
deliberation. If an event of default is called, the SPV will almost certainly not be able to repay, since the
debt facility will have been structured so as to require the use of cashflow throughout much of the life of
the project in payment of debt service obligations. The failure to repay will admittedly give the lender the
ability to enforce security, including potentially the right to sell the project SPV as a going concern or on
a break-up basis.
4
Whether this will enable him to recover his debts however is another matter. It is
better therefore to see events of default or the threat of their use as a method of bringing all
interested parties to the table to discuss the restructuring of an ailing project. They will certainly be
invoked with caution and reluctance by lenders.
5



5.5 The Sponsors and Lenders Risk-Reward Relationship with the Project

It would be simplistic to think only in terms of sponsor versus lender when considering their
relationship with a given project. While their interests and drivers are different, it is critical to achieve a
balance between their needs if a well-structured project financing is to be achieved. What must not be
forgotten, however, is that their risk and reward profiles are quite different.

The sponsor is exposed both to downside risk and to upside potential. He or she ranks behind the
projects lenders as regards their claims on the projects cashflow. In an insolvency the return of their
capital will only happen if the banks have been fully repaid. If the project outperforms expectations,
however, the sponsor can expect to receive a return which reflects this outperformance. Indeed, because
of the effect of gearing (see below), the sponsors return on investment may in such cases be very
attractive indeed. The sponsor may be expected therefore to focus on the return on their investment.

A project lender is exposed to potential downside risk, but rarely has any upside potential. If the project
under-performs expectations, the lender could lose a significant part of their loan capital. At the limit if
for example the project is never built they could lose it all. The lenders interest return is typically fixed
at the outset, or if it varies it does so within a known and relatively narrow band. If the project performs
well the lender will usually not share in the excess returns. Indeed, if the over-performance is substantial
there is a good chance that the lender will be repaid early. Thus a loan which a lender expected to have
on their books for a significant period generating an attractive return may well disappear much more
quickly than expected. With little or no upside potential and substantial downside risk, and with little
opportunity to increase their return, the lender may be expected to focus principally on the return of their
funds.

The above comparison is not intended to make the reader feel sorry for bankers. As an ex-banker myself
I know that it is almost impossible to generate sympathy for our profession. I have never understood
why this should be!

The reason for emphasising the contrasting positions of sponsor and lender is to make clearer why
lenders approach project analysis and debt structuring as they do. With little scope to share in upside and
the potential for losing all of their investment (which might represent as much as 90% of project
construction costs), the lender will be intensely focused on analysing and controlling risk, not maximising
returns. Although project finance returns are higher than those which can be earned in corporate lending,
they cannot possibly compensate for substantial losses of project principal. If a bank project finance team
incurs a substantial loss on more than a very small number of project loan transactions, its very survival
will potentially be at risk.


5.6 An Important Digression Internal Rate of Return (IRR)


4
There is significant evidence that project lenders who do not use their security rights to dispose of the
SPV or its assets in (part) settlement of their debt, but rather try to manage their way through the
issues, do ultimately achieve better outcomes in terms of their debt recovery percentage. Some project
lenders have indeed made substantial profits, after a period of care and maintenance from the disposal
of project assets which they were forced to acquire when changes in market conditions wiped out the
equity of the project sponsors.
5
In fact it is often the case that the collapse of a project SPV is precipitated by the directors of the
company rather than its lenders. Many legal systems impose harsh penalties on directors who allow their
company to continue trading when they are aware that the company is not solvent. It is frequently the
recognition of this situation, and the (often) personal liabilities which it could involve for the directors,
which triggers an approach by them to the banks.
13
IRR is a very important concept in project financing. It also one of which, I have certainly found, some
project lenders have only a hazy understanding. Readers who are fully familiar with the time value of
money, discounted cashflow and IRR may wish to skip over this section.

Many actions of the lender in structuring a financing have a major impact on IRR, which is a (perhaps
the) key measure of an investments attractiveness for the sponsor. We shall see in particular in Core
Module 4 how close the relationship is between the lenders cover ratios and the sponsors IRR.

Without wanting to enter deeply into investment appraisal techniques, it is perhaps useful to approach
this topic by examining the different ways in which an investor can measure the attractiveness of
competing investment opportunities.

The simplest way in which the return from investments can be compared is by using the cashback
technique. The investor calculates how long is required for his capital investment to be repaid. A project
which has a shorter cashback period looks more attractive than one which takes longer to return the
invested capital. The major drawback of cashback is that it takes no account of the time value of money.
Two projects with the same capital investment and the same time period to full cashback will be rated
equally, even if one has a slower rate of investment than the other or a different distribution of cash
received during the payback period. This is illustrated in the table below. Despite the different timing of
the capital injection in these two cases, the cashback method treats both projects as effectively being of
equal value.

These examples illustrate how cashback ignores the time value of money. Although in Project B the
investor does not need to inject capital until the final year of the construction period, the cashback
method gives no value for this, whereas in fact the investor would have the benefit of this cash for at
least two years and could for example earn deposit interest on it.

This important failing of cashback is addressed by the use of discounted cashflow (DCF) techniques. If
the investor discounts future inflows and outflows by a string of discount factors which increase over time
and which are set by reference to a chosen discount rate, the sum of all these discounted values will
provide a net present value for each potential investment. These net present values (NPVs) can then
be compared and an assessment can be made of their attractiveness which does take account of the time
value of money. The impact of this can be seen in the tables below, which apply NPV techniques to the
same two projects.


In Project A the sum of the discounted future values of inflows and outflows is 51.20, based on a discount
rate of 10.0%. Using the same discount rate we derive an NPV of 57.03 for Project B, with the difference
between the two values being due to the slower rate of equity injection in Project B. Assuming that the
investor is acting in a rational economic manner, he should prefer Project B.

NPV is clearly a major step forward from cashback, but when using it there is always a need to ensure
that the same discount rate is being used to evaluate competing investments. IRR removes the need for
this. The internal rate of return is that rate of discount which returns an NPV of zero. In the tables below
14
a spreadsheet-based model has been programmed to calculate that discount rate (it does this by a
process of iteration) which reduces the NPV of the cash inflows and outflows to zero.


It might help the reader to see IRR as measuring how hard the cashflows can be discounted before they
are effectively eliminated. In the case of Project A this occurs at 18.38%, while Project B can be
discounted by up to 21.37% before a zero NPV is reached.

An investor who knows an investments IRR does not need to ask what discount rate is being used as is
the case with NPV. Also, the investor can compare the IRR with his own Weighted Average Cost of
Capital. WACC measures the weighted average cost of the investors capital which will typically come
from a number of sources investors, creditors, bank lenders etc. If the IRR of a project exceeds the
investors WACC then logically it is worth considering, although a premium to reflect the risk of the
project will be required.

It may be felt that too much emphasis has been given to this topic but just as it is important for a
sponsor to understand the lenders drivers and hot buttons, so the lender must have an appreciation of
the tools which the sponsor will use to measure the attractiveness of a particular financing proposal.
6
We
shall refer to investor IRR repeatedly in the following modules.

Bankers who have structured project financings as lead arrangers typically appreciate much better the
potential impact of their actions on investor rates of return and how this might affect their prospects of
winning a particular transaction. Those who have not structured such financings, but who aspire to do so,
need to develop an understanding for those structural features which impact sponsor IRR most heavily.


5.7 The Disadvantages of Project Financing for Borrowers and Sponsors

It may seem rather odd to deal with the disadvantages of project financing for borrowers and sponsors
before addressing the reasons which lead some companies to use this technique. By looking first at the
disadvantages, however, we will perhaps see more clearly why limited-recourse financing is very much a
specialist form of finance which will be avoided by borrowers who have an alternative method of raising
debt.

First of all, project financing is expensive when compared with debt raised against a creditworthy
companys balance sheet. Because project lenders are asked to share in the risks of a project, to
contribute a very substantial portion of the projects costs and to limit their recourse to the projects
owners, it is logical that they will require a higher return. This requirement will be reflected in both higher
interest margins (see box overleaf) and higher arrangement fees. The higher interest margins recognise
the greater risks which are being assumed by the lenders and the higher arrangement fees compensate
them for the much greater burden of analytical and structuring work which they will need to undertake,
possibly over a period of many months.

The higher costs incurred by project borrowers do not arise solely as a result of increased lender returns
however. Banks providing debt against a project will frequently also require detailed reports from third-
party due diligence consultants to assist in the work of risk analysis and finance structuring. The costs
involved in due diligence reporting can be substantial and they are required to be borne by the project
SPV, whether or not the financing ultimately goes ahead. In most cases these costs are financeable, and
will be effectively be paid for out of equity and debt in the agreed ratio. The debt thus incurred will
however ultimately have to be serviced from project cashflow.


6
It may also be felt by those more familiar with this area that the treatment of investment appraisal
given here is simplified to the point of being simplistic. The intention is not, however, to provide the more
detailed analysis which would be appropriate in a corporate finance textbook. The aim is simply to lay the
foundations necessary for the quantitative analysis work to be undertaken in Core Module 4.
15
Given the above, the gestation period of project financings is generally much longer than that for
corporate loans of comparable size. The need for exhaustive bank analysis, due diligence reporting,
preparation of comprehensive information memoranda where syndication is planned and the obtaining of
credit approvals (potentially from a large number of banks) means that the time from first discussion to
financial close is rarely less than three or four months. It can extend to a period of a year or two for very
large projects with complex, multi-sourced financing arrangements.

Because of their greater risk acceptance and financial exposure, project lenders will also seek much
greater rights of supervision and will expect much more extensive reporting than would be the case for
corporate facilities where the lenders are protected by their access to a large and relatively liquid balance
sheet. Lenders will require that they and/or their technical consultants shall have the right to visit the
project to check on the progress of construction and on project operations, frequently at short notice. It
is common for the borrower to be required to submit technical information and to provide construction
milestone reporting in support of drawdown requests during the construction period, so that the lenders
can track progress and anticipate the emergence of any time or cost overrun. Even once the project is
operating, lenders will insist on regular financial and/or operational performance reporting, including
(usually) the running of regular revised cashflow projections to check that debt-servicing cover remains
acceptable.
Bips and Spreads Project Loan Interest Pricing

Project financing loan agreements are most often arranged by banks based in major money centres
(especially London), even if the borrower or project is located in emerging market. As such the way
in which such banks typically fund their operations has a major impact on the way in which these
borrowing instruments are priced.

Unlike emerging-market banks, which often fund themselves very heavily from customer deposits,
money-centre banks may well have quite a small deposit base, particularly if they do not have a
developed branch network. Equity/retained earnings will be a (small) source of funding for
operations and many banks also issue long-term fixed rate bonds to investors. This latter source of
finance is a very welcome source of long-term funding at stable cost, but its share of the overall
financing mix is generally small.

Many money-centre banks are therefore heavily reliant on the inter-bank money markets for the
funding of a large part of their loan portfolio. In this market banks lend to and borrow from each
other, with surplus banks funding deficit banks with short-term advances of up to 12 months
duration, which are frequently rolled over. The London Interbank Offered Rate (LIBOR) is a daily
reference rate based on the interest rates at which banks borrow unsecured funds from other banks
in the London wholesale money (interbank) markets. LIBOR is calculated by and published by the
British Bankers Association (BBA) after 11:00 am (and generally around 11:45 am) each day
(London time). It is an average of inter-bank deposit rates offered by designated contributor banks,
for maturities ranging from overnight to one year. LIBOR is calculated for 10 currencies. Euribor
(Euro Interbank Offered Rate) is the rate at which euro interbank term deposits are being offered by
one prime bank to another within the EMU zone.

Because inter-bank deposits are the dominant (and the marginal) source of finance for money
funding for money-centre banks, these financial institutions tend to price their loans to wholesale
borrowers such as major companies (and project borrowers) by reference to the cost of this source
of funding. Thus, in common with other types of large-scale corporate borrowing, the interest
payable by project borrowers is usually charged at a margin over LIBOR or Euribor. Although finance
is committed over a period of as long as 20 years or more, the day-to-day cost of the SPVs
borrowings is fixed periodically (usually for periods of 1, 3, 6 or possibly 12 months) with the
underlying LIBOR/Euribor rate changing to reflect movements in the markets and the margin
remaining the same (or at least not changing as Euribor/LIBOR changes). The size of the margin is a
reflection of the perceived risk of the borrower. Major corporate borrowers with a strong balance
sheet might borrow at a margin significantly below 1%. Project borrowers in todays market might
have to pay a risk margin or spread of 4% or more. Margins are often quoted in hundredths of 1%
or basis points (bips).
16

Project finance documentation is more detailed, prescriptive and onerous for the borrower than corporate
loan agreements. Indeed borrowers who are new to this type of financing are frequently surprised by the
extent to which the lenders could be seen as interfering in the day-to-day running of their business.
Lenders usually reject any suggestion that they are interfering unduly, and they will certainly wish to
avoid any suggestion that they might be regarded as shadow directors of the borrowing company. They
will point out that they:

are providing a substantial amount of the cost of project construction;
lend against a projected cashflow envelope, the predictability of which is by no means an exact
science;
commit funding to a project over periods of up to 20 years or even more, when their sources of
funding are overwhelmingly of much shorter duration;
generally will be expected by the sponsors/borrower to increase the debt level (as compared to
equity) to the highest level which the project SPV can sustain;
are not exposed to project upside potential, but do share downside risk;
receive returns which, although high by banking standards, cannot possibly compensate them for
losses of principal.

Against this background lenders requirements for further-reaching control features than would be
required in shorter-term corporate loan facilities may not seem so unusual.

The restrictive features included in project finance loan agreements typically include:

prohibitions/severe limits on the raising of new debt by the project SPV;
a requirement that the SPV shall not create new subsidiaries and/or engage in new projects without
the lenders approval;
limitations on contracts with other companies within the sponsor group;
controls on distributions to shareholders by the SPV when actual or predicted cashflow falls below
certain levels.

As we shall see in Core Module 5, these restrictions will be built into a detailed list of covenants or
undertakings within the project financing agreement, which will also include a set of events of default
designed to trigger lenders rights to accelerate repayment of the debt and if necessary to enforce their
security.

Especially where they receive significant levels of negotiated support from sponsors, lenders may also
seek to bind sponsors by means of selected covenants and events of default. If, for example, sponsors
are providing debt guarantees up until the point of project completion, lenders may seek to incorporate
an event of default which would become effective if the sponsors credit rating(s) suffered a downgrade.
They will often also try to constrain sponsors ability to dispose of their interest in the SPV, especially
during the all-important construction period. Given the limited-recourse nature of project finance,
sponsors will naturally seek to limit any extension of covenants and events of default beyond the project
SPV and, as we shall see, this is frequently a heavily-negotiated part of the financing agreements.

In addition to the financing agreement provisions, lenders will also ring-fence the project SPV by means
of far-reaching security agreements designed to give the lenders a first-ranking, fully-perfected security
interest in the assets and revenue-generating agreements of the company. We shall look in more detail
at the nature of the instruments used to create these security interests in Core Module 6. They tend to be
project-specific and will also be heavily influenced by where the project assets are located. Suffice it to
say here that wherever possible the lenders will wish to create security interests over most or all of the
following:

1. The share capital of the project SPV owned by the sponsor(s);
2. Any licence or concession agreements which regulate the activities of the SPV;
3. Contracts for the construction and operation/maintenance of the project;
4. Fuel and raw material supply agreements;
5. The fixed physical assets of the project;
6. Current assets such as stock, debtors and cash;
7. Key revenue-generating contracts such as sales agreements;
8. Policies of insurance (usually with the lenders named as loss-payee in the event of a claim being
made).
17

The objectives of the lenders in putting such security agreements in place are mainly defensive. They will
wish to ensure that:

their claims against the project SPV rank higher than almost all other creditors,
7
defeating the pari
passu principle whereby all creditors will generally be treated equally in the event of insolvency;
they have rights of inspection and supervision, so that they can monitor and protect the value of the
projects assets;
disposal or mortgaging of project assets will be difficult without their agreement;
they have rights of seizure and (especially importantly) sale with regard to the SPV or its assets if
this necessary to recover their debt.

The reader will not be surprised to learn that project financing documentary packages can run into many
hundreds of pages. The project finance loan agreement itself may well be 200 pages long. Indeed,
project financing documentation is almost certainly becoming longer. Fortunately however it also
becoming clearer and easier for non-lawyers to read and interpret!


5.8 Reasons to Project Finance

Against the above background, it might appear strange
that sponsors and borrowers should choose to use
project finance at all! But they do and for a variety of
reasons.

1. The most obvious is that some companies have no
choice. They simply do not have the financial
creditworthiness to be able to raise the required
funding against their balance sheets. An
independent oil and gas or mining company for
example, which might just have been established,
may be contemplating a project which dwarfs the
company at its current stage of development. A
developer of a renewable energy project, such as a
windfarm or biomass-burning power station, may
not have the financial track record and corporate
net worth to convince a bank to lend on a corporate
basis. Such borrowers have little option but to seek
to convince a lender that he should take a project
view and advance the bulk of the required capital as
loans against a limited equity injection from the
sponsor.

2. Slightly larger companies may have access to more
significant resources but may still wish to ration
available capital across a range of projects, asking
lenders once again to provide the largest part of the
required finance as debt. Construction companies
bidding on major infrastructure projects to be built
under concessions or PPP arrangements may be
required to take an equity stake in the
concessionaire company, but such investors will not
wish to tie up large amounts of scarce capital given
the capital-hungry nature of their core business.
Their prime objective is after all usually to win the
construction contract. The ability to inject a small
amount of equity, probably alongside other
investors, and have banks fund the largest part of
the projects cost is an attractive option. The fact that the gearing effect brought about by the lower
long-term cost of debt will enhance the return on equity invested is a happy by-product (see box).


7
As mentioned above the list of preferential creditors is quite small and will usually include liabilities to
the tax authorities and perhaps also employee payments for a short period.
Gearing or Leverage

When project lenders refer to the
gearing or leverage of a project, they
mean its debt-to-equity ratio. Gearing is
the English term, while leverage
originates from the US, but they are
used interchangeably in project lending.

It is important also to understand the
gearing effect of raising the debt level
of a project while reducing the amount
of equity subscribed by its sponsors. The
interest payable on debt is in most cases
available as an offset to reduce
corporate/profits taxes. The fact that the
lenders do not receive a return linked to
the performance of the project means
that any performance upside in a highly-
geared (high debt-to-equity) project
feeds through to a very small equity
base. The combination of these factors
means that there is a very considerable
accelerator effect on IRR as gearing
levels are increased.

Other things being equal, therefore, we
might expect sponsors to push for the
highest possible level of gearing to
maximise investor IRR.
18
3. Despite the significant disadvantages of limited-recourse finance for major corporate borrowers, large
companies do use project finance. A key reason for this can be the desire to share specific risks with
lenders.

We might consider the case of a major oil company considering the construction of a pipeline
spanning a number of emerging-market countries with a history of some political instability. The oil
company might be completely comfortable with the (possibly considerable) technical and construction
challenges presented by the pipeline, but nervous that changes of regime or government policy in a
transit country could result in negative consequences for the users of the pipeline and its investors. A
transit country situated at a mid-point on a long and major pipeline does after all have some
economic influence if it feels its interests are not being respected!

If the pipeline is financed on a project finance basis, the sponsor can simultaneously:

limit their exposure in financial terms (by investing a modest amount of equity rather than
funding the whole project on a corporate basis);

share the risk of adverse government actions with the lenders, who will suffer along with the
investors if the project is damaged.

The sponsor may also feel that the risk of interference by transit country governments will be
reduced if a wide range of important international financing institutions are also involved and stand to
lose in the event that a transit country host government takes hostile action. While an emerging
market country government may consider that it can accept the risk of upsetting a single
international oil company, it may think twice about incurring the hostility of a representative slice of
the international banking community. The support of such lenders may be required at a later stage.

4. Perhaps the most common reason why major companies overcome their general aversion to project
finance is in circumstances of joint venture or unequal partnership.

A major national power company, in expanding outside its own home country, might for example find
itself in partnership with much smaller renewable power developers who are quite incapable of
funding their share of the cost of project developments on a corporate basis.

The last 20 years have seen a number of joint venture oil and gas and petrochemical projects in the
Middle East between very large private-sector international companies and national oil or
petrochemical companies in the region. It would certainly not be the first instinct of the international
sponsors in such cases to employ project financing. Indeed they might resist it quite fiercely on the
basis that the higher cost of limited-recourse finance when compared with balance-sheet-based debt
constitutes a major drain of economic rent away from the project owners to the banks. If however
the national partner is capital-constrained, wishes to ration resources carefully to allow for upcoming
projects or (as is sometimes the case) believes that the involvement of international banks brings
valuable discipline and structure to the process, the international partner may have little choice to
agree to the use of project-based finance.



5.9 Enter the Dragon! The Impact of the Credit Crunch on Project Financing

The general impact of the Credit Crunch in 200708 is well understood and its effects are still with us.
The reduction of banks lending capacity as a result of losses arising in connection with the collapse of the
US housing market, coupled with an acute dislocation of the interbank markets, caused a sea-change in
the relative positions of lenders and borrowers in the wholesale debt markets.

Up until the advent of the credit crisis the financing markets had consistently been remarkably liquid for
the longest period of time that many market participants could remember. Banks and other financial
intermediaries were the beneficiaries of a regular flow of liquidity (if beneficiary is the right word to use
of a process which steadily eroded bank returns).

Banks ability in fact their need to lend during this period created conditions of acute lender
competition, with banks actively pursuing borrowers and offering pricing and structural conditions which
would certainly not have been available in conditions of lower market liquidity.

What was true in general terms was equally true for project finance. In these conditions of fierce lender
competition it was possible for the strongest and most sophisticated sponsors to achieve extremely fine
pricing by the standards of limited-recourse financing. Through the astute use of skilled financial
19
advisors, sponsors were also increasingly able to achieve more borrower/sponsor-friendly structures than
lenders would have preferred. For big-ticket, multi-sourced projects with the highest visibility in the
markets the financing competition increasingly became the norm, with potential lenders being required
to bid almost exclusively on price and in conditions of tight confidentiality on structures developed by
advisers to the sponsors.

So fierce was this competition that risk margins over LIBOR fell to levels which many lenders felt did not
reflect the risks they were being asked to accept, the more so since because of competition the level of
risk assumed by lenders was increasing. Risk margins for Middle Eastern transactions fell considerably
below 1%, while spreads for very long-term infrastructure or PPP projects (2530-year maturities) in
OECD countries often struggled to rise above 70 bps.

Arrangement fees for project finance transactions also came under severe pressure during this period. It
has always been the case that the amount of work involved to structure and arrange a transaction is by
no means proportionate to its size. Small transactions often require just as much work as much larger
ones. Across the board however fees were cut sharply as banks competed for the available transactions.
The rule of thumb arrangement fee of 1% for a transaction of reasonable size (at least as a starting
point for negotiation) came under very strong pressure.

The Credit Crunch triggered not so much a swing of the pendulum as a violent lurch! In all bank lending
sectors the power of the borrower diminished as the issue became one of raising sufficient credit capacity
to finance a transaction, rather than negotiating the last few basis points on the margin. Project finance
in particular came under significant pressure because of the very long maturities of its loan facilities.
Banks had just been reminded very forcibly of the fact that their business was one of borrowing short
and lending long and the spectre of depositors queuing to require the return of their funds caused an
understandable reassessment of whether it was really banking business to lend over 25 to 30 years.
This was particularly true when banks could earn attractive margins on much shorter-term transactions in
the new, tighter credit environment. Where banks did agree to offer long headline maturities they
showed a strong tendency to include features in loan structures designed to shorten actual loan maturity,
such as cash-sweeps
8
and mini-perms,
9
or to encourage refinancing (particularly aggressive margin
ratchets
10
).

Some banks have withdrawn completely from the project finance market. Other names have disappeared
as a result of mergers with other project finance market players (RBS and ABN-Amro, BNP Paribas and
Fortis). It has been noticeable that there has been a tendency by those banks which have received
significant state support to concentrate more strongly on projects in their own home markets. Even the
lenders who have remained most active have, for a time at least, been extremely cautious about longer-
term maturities.

Margins have increased sharply, with those in the infrastructure and PPP sectors doubling or even
trebling. Fees have also risen sharply so that the rule of thumb number is probably now closer to 2%
than 1%.

Bank credit committees are noticeably more cautious than before the crisis and the time taken for the
bank approval process has lengthened appreciably. Lenders have also in recent times been more
selective with regard to the projects (and sponsors) they will support. Debt-to-equity ratios have eased
down somewhat from their pre-Crunch levels and the safety margins required within structures have

8
We shall meet the cash-sweep again in Core Modules 4 and 5. Essentially a cash-sweep is a mechanism
which requires the borrower, after normal debt service, to use part of any surplus cash in a given
operating period to make additional debt repayments before any distributions to sponsors. Originally
used more for projects with highly-volatile cashflow profiles, the cash-sweep has been used more widely
since the credit crisis as a means of accelerating the repayment of project debt.
9
The mini-perm is a variation on a methodology previously used for assets with a very long operating
life (such as gas pipelines). Mini-perms have been used recently in financings with long maturities (15
years plus) to impose a refinancing obligation on the borrower, say by year 10 of a 20-year transaction.
In a hard mini-perm failure to refinance would result in an event of default. In a soft mini-perm a
100% cash-sweep obligation would result. Both types of mini-perm offer bank credit committees an
increased degree of comfort that the facility will not in fact ever reach its headline maturity.
10
Banks conventionally expect their margins on lending to increase over time, reflecting the increased
risk to them of long-term loans when they raise much of their debt in shorter-term markets. The rising
profile of margins over time is often referred to as the margin ratchet because the margin clicks up in
known steps over defined periods (years 15, years 610 etc.). Where banks wish to incentivise early
refinancing to shorten maturity perhaps or to give themselves an opportunity to earn additional fees
on a refinancing they will increase the size of the steps in the margin ratchet in the later years of the
facilitys life.
20
become more generous to lenders. Cover ratios have increased somewhat and banks tend to include
reserve accounts for debt service and maintenance costs in their term-sheets. They are not inclined to
negotiate too much on these issues and borrowers have found themselves agreeing to lenders
requirement in order to put financing in place. It must be expected that sponsors/borrowers will seek
refinancing when market conditions ease in order to improve their financing terms. Banks certainly
expect this and we have seen the re-emergence of the pre-payment penalty to a degree, with banks
seeking to compensate themselves for lost earnings when refinancing becomes attractive. We shall look
in more detail at the impact of the Credit Crunch on loan documentation in Core Module 5.

There has been some indication that banks, recognising on the one hand that they need to do business
and on the other hand that margins and fees are at very attractive levels, have become somewhat less
demanding in their requirements. The situation is a fragile one however, which is very susceptible to
influence by developments in the currency and interest rate markets. Syndication remains difficult, and
underwriting especially so, with lenders preferring in most cases to work on a club basis. This means
that smaller deals (say up to 150 million or so of project debt) will generally be done by single banks, or
small groups of banks, with no approach to the wider syndications markets.

Project finance remains an active market, and there is something of a back-log of projects to be financed.
Limited bank capacity, syndication difficulties and the reluctance of borrowers to commit in the long term
at todays levels of margins and fees have all played a part.

In the modules that follow we shall look in greater detail at how structuring practices and pricing have
changed over the last year or two and try to draw some (tentative) conclusions on whether and how the
current approach of banks may change in the future.


































21
6. SUMMARY & CONCLUSIONS

We hope that you have enjoyed Core Module one.

Now that we have reviewed the basics of project financing, we shall be in a position in the next core
module to move on to the first part of the project lenders toolkit Qualitative Risk Analysis.

Whether you as a reader approach project financing as a lender or as a borrower, it is critical to
understand how a lender will analyse the risks to which a particular project is subject.

It is obvious why a lender needs to know this. It is their job! But if a borrower is to maximise the amount
of debt within a project SPV and to optimise the transfer/ haring of project risk, they must understand:

how a lender typically views particular types of risk;

what risks they are likely to be prepared to accept (i.e. what risks are bankable);

how the lender will seek to mitigate or transfer risks which are not deemed to be bankable


The Next Module

In Core Module 2 we will study in particular:

sponsor risk

country & political risk

construction risk

operation & maintenance risk

The first two parts above, can, as we shall see, be on-off switches. If the lender cannot accept these
risks or mitigate them sufficiently there is a real chance that they will not proceed to a detailed review of
the risks specific to the project.

The construction period is the period of highest risk for the lender and will consequently receive a great
deal of attention. Once the project is operating, a satisfactory operation & maintenance regime can be a
critical element in the stability of cashflow generation.


What Now?

Hopefully you will have enjoyed this module and can see the quality of knowledge you could potentially