BASICS OF

QUANTITY SURVEYING
R0 110209 BUSINESS DIAGNOSTICS 1

SUB-HEAD

ITEM:

ITEM DESRIPTION

UNITS OF MEASUREMENT

RATE

TENDERED RATE

AGREED/FINAL RATE

ACTUAL RATE
R0 110209 BUSINESS DIAGNOSTICS 2

COST

PRELIMINARY ESTIMATE

DETAILED ESTIMATES

QUANTITY SURVEYING

ANALYSIS OF RATES
ABSTRACT SHEET/SUMMARY SHEET
MEASUREMENT SHEET
DEDUCTIONS
R0 110209 BUSINESS DIAGNOSTICS 3

A BUILDING ESTIMATE IS BROKEN


DOWN IN VARIOUS CATEGORIES

KNOWN AS SUB-HEADS

FOR EXAMPLE:

EXCAVATION,

CONCRETE,

MASONRY WORK ETC


R0 110209 BUSINESS DIAGNOSTICS 4

A SUBHEAD IS DIVIDED INTO VARIOUS


ITEMS

FOR EXAMPLE:

UNDER SUB-HEAD OF RCC

RCC M 15 ,

RCC M ! ,

RCC M 5 ,

CENTERING SHUTTERING

REINFORCEMENT

ARE DIFFERENT ITEMS


R0 110209 BUSINESS DIAGNOSTICS 5

A BRIEF SPECIFICATION OF THE ITEM

FOR EXAMPLE:

RCC WORK OF GRADE M! IN


FOOTINGS,COLUMNS,BEAMS,SLABS,LIN
TELS,

CHA""A UPTO A HEIGHT OF 5#!M#


INCLUDING THE CURING $ THE
CENTERING /SHUTTERING % THE
REINF#SHALL BE PAID EXTRA &
R0 110209 BUSINESS DIAGNOSTICS 6

ALSO TELLS US WHICH WORKS

ARE INCLUDED OR EXCLUDED

FROM THAT ITEM#

FOR EXAMPLE:

RCC WORK OF GRADE M! IN


FOOTINGS,COLUMNS,BEAMS,SLABS,LINTELS,

CHA""A UPTO A HEIGHT OF 5#!M# INCLUDING THE CURING

$ THE CENTERING /SHUTTERING % THE REINF# SHALL BE


PAID EXTRA &

INCLUDES: COST OF CURING

EXCLUDES: COST OF CENTERING /SHUTTERING

COST OF REINF#STEEL
R0 110209 BUSINESS DIAGNOSTICS 7

HOW THAT ITEM IS MEASURED AND


PAID AT THE SITE

FOR EXAMPLE:

RCC IS ALWAYS MEASURED AND PAID


IN CUBIC METRES#

CEMENT PLASTER IS MEASURED AND


PAID IN SQUARE METRES#

A GROOVE IN PLASTER IS MEASURED


AND PAID IN RUNNING METRES#
R0 110209 BUSINESS DIAGNOSTICS 8
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 9

ALL TYPES OF COCKS,

VALVES,

WASH BASINS,

COMMODES,

ELECTRICAL POINTS,

GEYSER,MIXER $ HOT % COLD&,

BATH TUB,

FAN HOOKS,
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 10

1#SKIRTING

#ALL GI/HDPE/PVC PIPE LINES

$HIGH DENSITY POLY ETHELENE&

POLY VINYL CHLORIDE

'#SANITARY PIPES $ SW SALT GLA(ED


PIPE LINES&

SW: SANITARY WARE

)# CHASE CUTTING

5#RIDGE /VALLEY GUTTERS

*#WIND TIES

+#BEADING/ARCHITRAVE/MOULDING
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 11

1# FLOORING

# DADO

'# PAINTING

)#PLASTERING

5#BRICKWORK $ HALF BRICK &

*#SUSPENDED CEILING$ FALSE CEILING&

+#WINDOWS

,#DOORS

-#VENTILATORS

1!#GLASS

11#ROLLING SHUTTERS
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 12

1#RCC

#PCC

'#BRICKWORK

)# STONE MASONRY $UCR/CR/RRM&

RRM: RANDOM RUBBLE MASONRY

5#EXCAVATION $ SOFT SOIL,HARD SOIL,


MURRUM, SOFT ROCK,HARD ROCK&

*#BACKFILLING
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 13

1,WATER TANK

#SEPTIC TANK
R4 2298R0 2948 R1 1058
BUSINESS
DIAGNOSTICSBUSINESS
DIAGNOSTICS 14

1,STRUCTURAL STEEL FOR TRUSSES,


PURLINS,BOTTOM TIE RUNNERS, RAFTER
BRACINGS, TIE BRACINGS

#REINFORCEMENT

'#GALVANISED CORRUGATED SHEETS,


ALUMINIUM SHEETS , COLOUR COATED
SHEETS#

)#WINDOWS IN COLD ROLLED SECTIONS

5#GRILL WORK

*#COLLAPSIBLE GATES

UNIT RATE OF THAT ITEM

AMOUNT PER UNIT OF MEASUREMENT

FOR EXAMPLE:

RCC M! :RATE R.#)!!!//PER CUM

IF IT IS A CONTRACT, AFTER
COMPLETION

OF THAT ITEM, THIS RATE IS PAYABLE


TO THE CONTRACTOR#
R0 110209 BUSINESS DIAGNOSTICS 15

PART RATE MEANS A 0 OF THE FINAL RATE IS


PAID IN FOLLOWING CASES:

1#ITEM HAS NOT YET BEEN FULLY EXECUTED


AS PER THE SPECIFICATIONS

FOR EXAMPLE:

PROVIDING /FIXING OF ALUMINIUM WINDOWS

PART RATE OF +50 IS GIVEN IN CASE THE


WINDOWS ARE BROUGHT TO THE SITE BUT
NOT YET FIXED

#THERE IS A QUALITY PROBLEM


R0 110209 BUSINESS DIAGNOSTICS 16

COST / QUANTITY X RATE


R0 110209 BUSINESS DIAGNOSTICS 17

VOLUME WISE:

$ WHERE UNIT OF MEASUREMENT IS CUM&

VOLUME / LENGTH X WIDTH X HEIGHT

AREA WISE:

$ WHERE UNIT OF MEASUREMENT IS SQM&

AREA / LENGTH X WIDTH

LENGTH WISE:

$ WHERE UNIT OF MEASUREMENT IS M &

LENGTH / TOTAL LENGTH IN M#


R0 110209 BUSINESS DIAGNOSTICS 18

ESTIMATES OF THE

1#COST

#REQUIREMENT OF THE MATERIALS


R0 110209 BUSINESS DIAGNOSTICS 19

1.PRELIINARY ESTIATES

2.DETAILED ESTIATES
R0 110209 BUSINESS DIAGNOSTICS 20

ARE PREPARED BASED ON

THE AVAILABLE DATA OF THE PREVIOUS


WORKS

F12 3456783:

C1.9 1: 5 ;<=8>=?@ 1: 1!,!!! SA:9#

/1!,!!! 4 R.#*!! 732 SA:9#

H323 R.#*!! 732 SA:9 =. ;5.3> 1? B3295=?


5..<679=1?.,.73B=:=B59=1?.#

THUMB RULES
R0 110209 BUSINESS DIAGNOSTICS 21

SINCE DETAILED CALCULATIONS ARE NOT


DONE,THESE ARE QUITE FAST

SINCE THESE ARE NOT PREPARED FOR THIS


PARTICULAR SITE, THE RESULTS ARE
APPROXIMATE #

H3?B3 =9 B5? ;3 <.3> :12 :

I?=9=58 D3B=.=1? M5C=?@,

P21D3B9 R37129,

B<>@39 S5?B9=1?.
R0 110209 BUSINESS DIAGNOSTICS 22

IS PREPARED BASED ON

THE ACTUAL INFORMATION OF THE


EXISTING WORKS

DETAILED CALCULATIONS ARE DONE ,

HENCE TAKE MORE TIME

SINCE THIS IS PREPARED FOR THIS


PARTICULAR SITE , THE RESULTS ARE
QUITE ACCURATE % 238=5;83 #
R0 110209 BUSINESS DIAGNOSTICS 23

1#ESTIMATION OF THE QUANTITIES

#ANALYSIS OF RATES

'#BILLING:

PREPARATION OF BILLS

VERIFICATION OF BILLS

)#ASSESSMENT OF THE WORK DONE


R0 110209 BUSINESS DIAGNOSTICS 24

ANALYSIS:

A BUILDING ESTIMATE IS BROKEN DOWN IN VARIOUS


CATEGORIES ALSO KNOWN AS HEADS
$ EXCAVATION,CONCRETE,MASONRY WORK ETC&

IT REQUIRES MEASUREMENT SHEET

SYNTHESIS:

ABSTRACT OR SUMMARY OF COST IS PREPARED


WHERE ALL INDIVIDUAL HEADS ARE TOTALLED

IT REQUIRES ABSTRACT SHEET


R0 110209 BUSINESS DIAGNOSTICS 25