You are on page 1of 24

Specification / Requisition

Document No. : B127-LS-EL-0005

Rev. A

Sheet : 1 of 3

Project No. : 2090 / 1764

Document Title : Load List for B-127 Cluster Well Platform.

INFORMATION
Pre-Bid

S2

SAK

NMC

SBL

Revision

Issued for

PEM Status
Level

Prepared by/
Date

Checked by/
Date

Approved by/
Date

Project : B-127 CLUSTER WELL PLATFORM PROJECT


Client

: OIL & NATURAL GAS CORPORATION LTD

PC1764001-00
Aker Powergas Pvt. Ltd.

2010 Aker Solutions


www.akersolutions.com

Aker Powergas Pvt Ltd


Revision Record Sheet
Sheet : 2 of 3

Document No. : B127-LS-EL-0005

Rev. A

Document Title : Load List for B-127 Cluster Well Platform.

Project : B-127 CLUSTER WELL


PLATFORM PROJECT

Client : OIL & NATURAL GAS CORPORATION LTD

Project No. : 2090/1764

Date
23.03.2012

PC1764002-00

Details of Revision
PREBID
ISSUED FOR INFORMATION.

Load List.doc

Rev.
A

Specification / Requisition
Document No. : B127-LS-EL-0005

Rev.

Sheet : 3 of 3

Project No. : 2090/1764


Document Title : Load List for B-127 Cluster Well Platform.
Enter the Rev of each document enclosed under the current revision of this EDL. Even if document is not revised,
repeat the Document Rev under the current revision of EDL.
Document Title

Document Number

Document Rev

No.
Sheets

EDL
Rev.
of

Load List for B-127 Well Platform

B127-LS-EL-0001

Load List for B-157 Well Platform

B127-LS-EL-0002

Load List for B-55-5 Well Platform

B127-LS-EL-0003

Load List for ZC Well Platform

B127-LS-EL-0004

PC1764001-00

PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT


ELECTRICAL LOAD LIST FOR B127 PLATFORM.

Notes:
1

This is preliminary load list.The load data is based on the experience on similar ONGC Projects.

Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same
in previous similar projects.

Reference Documents:1

Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4

Functional Specification for Solar Power System - FS 4007, Rev. 3

Functional Specification for Navigational Aids System - FS 4003, Rev. 4

OIL AND NATURAL GAS


CORPORATION LTD. INDIA

Aker Power Gas Pvt. Ltd.

PC8012301-00

CLIENT : ONGC

S2
PEM
STATUS

23.03.2012
SAK
MADE
BY & DATE

23.03.2012
NMC
BY & DATE

23.03.2012
SBL
APP
BY & DATE

ISSUED FOR ENQUIRY

A
REV

STATUS

Page 1 of 6

DOCUMENT NO:

B-127-LS-EL-0001

TITLE :

ELECTRICAL LOAD LIST


FOR B127 PLATFORM.

SHT 1 OF 6
REV
A

ELECTRICAL LOAD LIST


(B127 - System I : 24V DC )
NAV-AIDS SYSTEM

Aker Powergas Pvt. Ltd.

Client:

Load Description

Nav Aid Lanterns

Qty.

Rated
Voltage

ON

OFF

ON

OFF

ON

24

0.4

0.5

0.4

0.50

1.2

TOTAL

1.20

OFF

Duty
Cycle

AV. Lamp
current incl.
Surge

Flasher
Quiescent
current (A)

12.00

0.13

3.33

0.005

0.13

0.005

Total Daily load = 30.42 AH/DAY

P: PRELIMINARY

D: DESIGN APPROVED

2090/1764

DOC NO.:

B-127-LS-EL-0001

DATE:

3/23/2012

REV :

ONGC

Morse code "U" Nav-Aids Lanterns 15 Sec.


Sr.
No.

PROJECT NO

F: FINAL

SH. 2 OF 6

AV. Daily power


Average daily
AV. Daily drain including
power drain @
power drain battery
worse
charge/discharge,
@ 24V
case(Ah/Day)
efficiency

7.22

7.6

7.60

30.42

30.42

Status

Remarks

ELECTRICAL LOAD LIST


(B127: 24V DC )

Aker Powergas Pvt. Ltd.


Client:

PROJECT NO
DOC NO.:
DATE:

2090/1764
B-127-LS-EL-0001
3/23/2012

REV :

ONGC
Duty
Average
Energy
Run Up
Total
Energy
Unit Load @
Cycle/
Current
Time In Consumed in Consumed in
24V DC
Load 24V
Load Drawn @ 24V
Hrs./Day
(Amp.)
Ah/Day
WH/Day
DC (Amp.)
Factor
(Amp.)

Qty.

Rated
Voltage

Unit
Load
(Watt)

Total
Load
(Watt)

24

50

200

0.25

2.0833

50

2.083333333

8.333333 0.01042 0.086805556

2.1 Electronic transmitter (FT, TT, PT, LT)

44

24

0.5

22

24

22.0000

528

0.020833333

0.916667

0.916666667

2.2 Isolating barriers

61

24

1.6

97.6

24

97.6000

2342.4

0.066666667

4.066667

4.066666667

2.3 PLC System

24

300

300

24

300.0000

7200

12.5

12.5

12.5

2.4 Patch Panel

24

100

200

24

200.0000

4800

4.166666667

8.333333

8.333333333

2.5 Ethernet switches

20

24

100

24

100.0000

2400

0.208333333

4.166667

4.166666667

2.6 Magnetically latched, pulse operated SOV

24

15

90

3.7500

90

0.625

3.75

0.04167

0.15625

2.7 Multivariable Transmitter

24

35

315

24

315.0000

7560

1.458333333

13.125

13.125

2.8 Coriolis Flow Meter

24

24

0.000

0.292

0.000

0.000

2.9 Pressure Switch

22

24

1.2

26.4

0.01

0.0110

0.264

0.0500

1.1000

0.0004

0.0005

2.10 Limit Switch

24

1.2

0.01

0.0000

0.0500

0.0000

0.0004

0.0000

2.11 Solenoid Valve

15

24

24

360

0.01

0.1500

3.6

1.0000

15.0000

0.0004

0.0063

3.1 Hydrogen Detectors

24

4.6

13.8

24

13.8000

331.2

0.191666667

0.575

0.575

3.2 HC Gas Detectors

23

24

7.5

172.5

24

172.5000

4140

0.3125

7.1875

7.1875

3.3 H2S Gas Detectors

23

24

4.2

96.6

24

96.600

2318.4

0.175

4.025

1.000

4.025

3.4 Heat Detectors

10

24

0.25

2.5

24

2.500

60

0.010

0.104

1.000

0.104

3.5 Relays and timers

24

10

24

0.0000

0.416666667

3.6 Flashing beacons

24

33.6

134.4

0.25

1.4000

33.6

1.4

5.6

0.01042 0.058333333

Run-Up time of 0.25hr/day is assumed.

3.7 Electronic hooter

24

24

0.25

0.2500

0.25

0.01042 0.010416667

Run-Up time of 0.25hr/day is assumed.

3.8 Smoke Detectors

20

24

0.25

24

5.000

120

0.010

0.208

1.000

0.208

3.9 F&G PLC

24

300

300

24

300.0000

7200

12.5

12.5

12.5

Sr.
No.

Load Description

Illumination for Level Gauge

WELL HEAD PLC

Status

Remarks

Run-Up time of 0.25hr/day is assumed.

Run-Up time of 1 hr/day is assumed.

F&G PLC

DCS

Page 3 of 6

ELECTRICAL LOAD LIST


(B127: 24V DC )

Aker Powergas Pvt. Ltd.


Client:

PROJECT NO
DOC NO.:
DATE:

2090/1764
B-127-LS-EL-0001
3/23/2012

REV :

ONGC

4.1 Wet Gas Meter

24

35

24

0.0000

1.458333333

4.2 Electronic transmitter (FT, TT, PT, LT)

65

24

0.5

32.5

24

32.5000

780

0.020833333

1.354167

1.354166667

4.3 Pig detectors

24

1.2

7.2

0.01

0.0030

0.072

0.0500

0.3000

0.0004

0.0001

4.4 Isolating barriers

70

24

1.6

112

24

112.0000

2688

0.066666667

4.666667

4.666666667

4.5 Limit Switch

48

24

1.2

57.6

0.01

0.0240

0.576

0.0500

2.4000

0.0004

0.0010

4.6 Solenoid Valve

24

24

24

0.01

0.0100

0.24

1.0000

1.0000

0.0004

0.0004

4.7 Coriolis Flow Meter

24

24

7.000

168

0.292

0.292

0.292

5.1 Electronic transmitter (FT, TT, PT, LT)

24

0.5

24

2.0000

48

0.020833333

0.083333

0.083333333

5.2 Isolating barriers

24

1.6

6.4

24

6.4000

153.6

0.066666667

0.266667

0.266666667

5.3 Pressure Switch

50

24

1.2

60

0.01

0.0250

0.6

0.0500

2.5000

0.0004

0.0010

5.4 Solenoid Valve

24

24

24

576

0.01

0.2400

5.76

1.0000

24.0000

0.0004

0.0100

5.5 Electronic hooter

24

0.25

0.0625

1.5

0.25

0.25

5.6 PLC System

24

300

300

24

300.0000

7200

12.5

12.5

12.5

6.1 Solenoid Valve

24

24

24

0.01

0.0100

0.24

1.0000

1.0000

0.0004

0.0004

6.2 Limit Switch

24

1.2

4.8

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

6.3 Pressure Switch

24

1.2

1.2

0.01

0.0005

0.012

0.0500

0.0500

0.0004

0.0000

6.4 Detectors

24

1.2

4.8

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

6.5 Hooter

24

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

6.6 Panel (Internal Load)

24

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

Flow Computer

24

14

24

14.000

336

0.292

0.583

1.000

0.583

2,107

50,567

SDP PLC

0.01042 0.002604167

CO2 Snuffing system

3,719

155

88

Note : These instrumentation loads will be fed from 24V DC power supply from Sagar Laxmi Platform and shall not be considered while designing Solar Power System.
TOTAL AVERAGE DEMAND:
TOTAL PEAK DEMAND:

97
171

Amps
Amps

Page 4 of 6

ELECTRICAL LOAD LIST


(B127 - 6.9kV LOADS)

Aker Powergas Pvt. Ltd.


Client:

Equipment
Sr. No.
No.

PGC-PM-01

Description

PGC Main Motor

Vendor

PGC

Load

Feeder

Motor

PROJECT NO
DOC NO.:
DATE:

2090/1764
B-127-LS-EL-0001
3/23/2012

REV :

ONGC
Rating in Load
kW
Factor

3000

0.89

P.F. ( LAG) Efficiency


at
at
Absorbed
Load, kW absorbed absorbed
load
load

2670

0.90

SH. 5 OF 6

0.92

Input Power
Continuous (A)

Stand by (B)

Intermittent (C)

100%

20

2902.17

1405.59

0.00

0.00

0.00

0.00

Remarks

Preliminary

ELECTRICAL LOAD LIST


(B127 - 440V LOADS)

Aker Powergas Pvt. Ltd.


Client:

Equipmen
Sr. No.
t No.

Description

Vendor

Load

Feeder

PROJECT NO
DOC NO.:
DATE:

2090/1764
B-127-LS-EL-0001
3/23/2012

REV :

ONGC
Rating in Load
kW
Factor

Absorbed
Load, kW

P.F. ( LAG) Efficiency


at
at
absorbed absorbed
load
load

Input Power
Continuous (A)

Stand by (B)

Intermittent (C)

100%

20

Remarks

A)

PGC Auxillary Load

OCI Transfer Pump

PGC

Motor

2.2

0.89

1.958

0.90

0.92

2.13

1.03

0.00

0.00

0.00

0.00

Preliminary

OCI Injection Pump

PGC

Motor

0.37

0.89

0.3293

0.90

0.92

0.36

0.17

0.00

0.00

0.00

0.00

Preliminary

OCI Injection Pump

PGC

Motor

0.37

0.89

0.3293

0.90

0.92

0.00

0.00

0.36

0.17

0.00

0.00

Preliminary

Crude Condensate
Pump

PGC

Motor

2.2

0.89

1.958

0.90

0.92

2.13

1.03

0.00

0.00

0.00

0.00

Preliminary

Ligting

20 (25kVA)

0.85

17

1.00

0.950

0.00

0.00

0.00

0.00

17.89

0.00

Preliminary

B)

Lighting Transformer Package

C)

HPU (B-59 S/S)

Package

Supply

75

0.85

63.75

0.90

0.900

70.83

34.31

0.00

0.00

0.00

0.00

Preliminary

D)

HVAC

Package

Supply

75

0.85

63.75

0.90

0.900

70.83

34.31

0.00

0.00

0.00

0.00

Preliminary

SH. 6 OF 6

PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT


ELECTRICAL LOAD LIST FOR B157 WELL PLATFORM

Notes:
1

This is preliminary load list.The load data is based on the experience on similar ONGC Projects.

Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.

Reference Documents:1

Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4

Functional Specification for Hybrid Power System - FS 4007A, Rev. 0

Functional Specification for Navigational Aids System - FS 4003, Rev. 4

OIL AND NATURAL GAS


CORPORATION LTD. INDIA

Aker Power Gas Pvt. Ltd.

PC8012301-00

CLIENT : ONGC

S2
PEM
STATUS

23.03.2012
SAK
MADE
BY & DATE

23.03.2012
NMC
BY & DATE

23.03.2012
SBL
APP
BY & DATE

ISSUED FOR ENQUIRY

A
REV

STATUS

Page 1 of 5

DOCUMENT NO:

B-127-LS-EL-0002

TITLE :

ELECTRICAL LOAD LIST


FOR B157 WELL PLATFORM.

SHT 1 OF 5
REV
A

ELECTRICAL LOAD LIST


(B157 - System I : 24V DC )
TELEMETRY & WELL HEAD SYSTEM

Aker Powergas Pvt. Ltd.


Client:
Sr.
No.
1

Load Description

Qty.

Rated
Voltage

Unit
Load
(Watt)

PROJECT NO
DOC NO.:
DATE:
REV :

2090/1764
B-127-LS-EL-0002
3/23/2012
A

ONGC
Total
Load
(Watt)

Run Up
Time In
Hrs./Day

Energy
Consumed in
Ah/Day

Total
Energy Unit Load
Load 24V
Consumed @ 24V DC
DC
in WH/Day (Amp.)
(Amp.)

Duty
Cycle/
Load
Factor

Average
Current
Drawn @ 24V
(Amp.)

Status

RTU PLC

1.1

Wet Gas Meter

24

35

35

24

35.000

840

1.458

1.458

1.458

1.2

Electronic Transmitter (FT, TT, PT, LT)

13

24

0.5

6.5

24

6.500

156

0.021

0.271

0.271

1.3

Pig Detectors

24

1.2

1.2

0.01

0.001

0.012

0.050

0.050

0.00042

0.000

1.4

Isolating Barriers

13

24

1.6

20.8

24

20.800

499.2

0.067

0.867

0.867

1.5

PLC System

24

300

300

24

300.000

7200

12.500

12.500

12.500

1.6

Microwave Radio during Transmit Micro Radio during


Receive Microwave Radio during Sleep Mode

24

272

272

24

272.000

6528

11.333

11.333

11.333

Remarks

WELL HEAD PLC

2.1

Electronic Transmitter (FT, TT, PT, LT)

10

24

0.5

24

5.000

120

0.021

0.208

1.000

0.208

2.2

Isolating Barriers

10

24

1.6

16

24

16.000

384

0.067

0.667

1.000

0.667

2.3

PLC System

24

300

300

24

300.000

7200

12.500

12.500

1.000

12.500

2.4

Patch Panel

24

100

200

24

200.000

4800

4.167

8.333

1.000

8.333

2.5

Ethernet Switches

20

24

100

24

100.000

2400

0.208

4.167

1.000

4.167

2.6

Magnetically Latched, pulse operated SOV

24

15

90

3.750

90

0.625

3.750

0.042

0.156

TOTAL

1,347

1,260

30,218

57

53

10% MARGIN

135

126

3,022

TOTAL (WITH 10% MARGIN )

1,482

1,386

33,240

63

58

TOTAL AVERAGE DEMAND:


TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

58
63

Amps
Amps

C: CERTIFIED

F : Final

Page 2 of 5

Run-Up time of 0.25 hr/day is assumed.

ELECTRICAL LOAD LIST


(B157 - System II : 24V DC )
LIGHTING, CO2 SNUFFING SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Unit Load
Total
@ 24V Load 24V
DC
DC
(Amp.)
(Amp.)

4.167

0.010

0.043

1.0000

1.0000

0.0004

0.0004

0.048

0.0500

0.2000

0.0004

0.0001

0.0005

0.012

0.0500

0.0500

0.0004

0.0000

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

51

51

24

51.000

1224

2.125

2.125

2.125

100

0.25

1.042

25

2.083

24

24

0.01

0.0100

0.24

24

1.2

4.8

0.01

0.0020

24

1.2

1.2

0.01

2.4 Detectors

24

1.2

4.8

2.5 Hooter

24

9.6

2.6 Panel (Internal Load)

24

3.1 Electrical/Telemetry Room Lighting

3.2 Battery Room Lighting


3.3 Bunk House

24

50

2.1 Solenoid Valve

24

2.2 Limit Switch

2.3 Pressure Switch

Co2 Snuffing System

Status

Illumination for Level Gauge

3/23/2012

REV :
Average
Current
Drawn @
24V (Amp.)

Energy
Consumed
in WH/Day

B-127-LS-EL-0002

DATE:

Duty
Cycle/
Load
Factor

Energy
Consumed
in Ah/Day

Rated
Voltage

Load Description

2090/1764

DOC NO.:

ONGC
Run Up
Time In
Hrs./Day

Qty.

Sr.
No.

PROJECT NO

Unit Load Total Load


(Watt)
(Watt)

Remarks

Run-Up time of 0.25hr/day is


assumed.

Lighting System

Down Hole Instrument

TOTAL

565

98

2,330

24

10% MARGIN

57

10

233

TOTAL (WITH 10% MARGIN )

622

108

2,563

26

TOTAL AVERAGE DEMAND:

Amps

TOTAL PEAK DEMAND:

26

Amps

P: PRELIMINARY

D: DESIGN APPROVED

F: FINAL

SH. 3 OF 5

Electrical Design Basis


Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8

ELECTRICAL LOAD LIST


(B157 - System III : 24V DC )
FIRE & GAS, SDP PLC SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Sr. No.

Load Description

PROJECT NO

2090/1764

DOC NO.:

B-127-LS-EL-0002

DATE:

3/23/2012

REV :

ONGC

Qty.

Rated
Voltage

Unit Load
(Watt)

Total Load
(Watt)

Run Up
Time In
Hrs./Day

Average
Energy
Unit Load
Energy
Total Load Duty Cycle/ Current
Consume
@ 24V
24V DC
Consumed
Load
Drawn @
d in
DC
(Amp.)
Factor
in WH/Day
24V
Ah/Day
(Amp.)
(Amp.)

Status

Remarks

FIRE AND GAS PLC

1.1

Hydrogen Detectors

24

4.6

13.8

24

13.800

331.2

0.192

0.575

1.000

0.575

1.2

HC Gas Detectors

24

7.5

60

24

60.000

1440

0.313

2.500

1.000

2.500

1.3

H2S Gas Detectors

24

4.2

33.6

24

33.600

806.4

0.175

1.400

1.000

1.400

1.4

Heat Detectors

10

24

0.25

2.5

24

2.500

60

0.010

0.104

1.000

0.104

1.5

Smoke Detectors

20

24

0.25

24

5.000

120

0.010

0.208

1.000

0.208

1.6

Flashing beacons

24

33.6

134.4

0.25

1.400

33.6

1.400

5.600

0.010

0.058

Run-Up time of 0.25hr/day is assumed.

1.8

Electronic hooter

24

24

0.25

0.250

0.250

1.000

0.010

0.010

Run-Up time of 0.25hr/day is assumed.

1.9

Relays & Timers

24

0.25

0.000

0.250

0.000

0.010

0.000

Run-Up time of 0.25hr/day is assumed.

1.10

F&G PLC

24

300

300

24

300.000

7200

12.500

12.500

1.000

12.500

SDP PLC

2.1

Pressure Switch

24

1.2

9.6

0.01

0.004

0.096

0.050

0.400

0.0004

0.0002

2.2

Solenoid Valve

24

24

24

0.01

0.010

0.24

1.000

1.000

0.0004

0.0004

2.3

Limit Switch

24

1.2

2.4

0.01

0.001

0.024

0.050

0.100

0.0004

0.0000

2.4

PLC System

24

300

300

24

300.000

7200

12.500

12.500

1.0000

12.5000

717
72
789

17,198
1,720
18,918

TOTAL
10% MARGIN
TOTAL (WITH 10% MARGIN )
TOTAL AVERAGE DEMAND:
TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

910
91
1,001
33
42

Amps
Amps

C: CERTIFIED

F : Final

SH. 4 OF 5

38
4
42

30
3
33

ELECTRICAL LOAD LIST


(B157 - System IV : 24V DC )
NAV-AIDS SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Load Description

Nav Aid Lanterns

Qty.

Rated
Voltage

ON

OFF

ON

OFF

ON

OFF

Duty
Cycle

24

0.4

0.5

0.4

0.50

1.2

12.00

0.13

TOTAL

1.20

AV.
Flasher AV. Daily
Lamp
Quiescen power
current
t current drain @
incl.
24V
(A)
Surge

3.33

0.13

D: DESIGN APPROVED

0.005

0.005

Total Daily load = 30.42 AH/DAY

P: PRELIMINARY

2090/1764
B-127-LS-EL-0002

DATE:

3/23/2012

REV :

ONGC

Morse code "U" Nav-Aids Lanterns 15 Sec.


Sr.
No.

PROJECT NO
DOC NO.:

F: FINAL

SH. 5 OF 5

7.22

AV. Daily power


Average daily
drain including
power drain @
battery
worse
charge/dischar
case(Ah/Day)
ge, efficiency

7.6

7.60

30.42

30.42

Status

Remarks

PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT


ELECTRICAL LOAD LIST FOR B55-5 WELL PLATFORM.

Notes:
1

This is preliminary load list. The load data is based on the experience on similar ONGC Projects.

Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.

Reference Documents:1

Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4

Functional Specification for Hybrid Power System - FS 4007A, Rev. 0

Functional Specification for Navigational Aids System - FS 4003, Rev. 4

OIL AND NATURAL GAS


CORPORATION LTD. INDIA

Aker Power Gas Pvt. Ltd.

PC8012301-00

CLIENT : ONGC

S2
PEM
STATUS

23.03.2012
SAK
MADE
BY & DATE

23.03.2012
NMC
BY & DATE

23.03.2012
SBL
APP
BY & DATE

ISSUED FOR ENQUIRY

A
REV

STATUS

Page 1 of 5

DOCUMENT NO:

B-127-LS-EL-0003

TITLE :

ELECTRICAL LOAD LIST


FOR B-55-5 WELL
PLATFORM.

SHT 1 OF 5
REV
A

ELECTRICAL LOAD LIST


(B55-5 - System I : 24V DC )
TELEMETRY, WELL HEAD PLC SYSTEM

Aker Powergas Pvt. Ltd.


Client:
Sr.
No.
1

Load Description

Qty.

Rated
Voltage

Unit
Load
(Watt)

PROJECT NO
DOC NO.:
DATE:
REV :

2090/1764
B-127-LS-EL-0003
3/23/2012
A

ONGC
Total
Load
(Watt)

Run Up
Time In
Hrs./Day

Energy
Consumed in
Ah/Day

Total
Energy Unit Load
Load 24V
Consumed @ 24V DC
DC
in WH/Day (Amp.)
(Amp.)

Duty
Cycle/
Load
Factor

Average
Current
Drawn @ 24V
(Amp.)

Status

RTU PLC

1.1

Wet Gas Meter

24

35

35

24

35.000

840

1.458

1.458

1.458

1.2

Electronic Transmitter (FT, TT, PT, LT)

13

24

0.5

6.5

24

6.500

156

0.021

0.271

0.271

1.3

Pig Detectors

24

1.2

1.2

0.01

0.001

0.012

0.050

0.050

0.00042

0.000

1.4

Isolating Barriers

13

24

1.6

20.8

24

20.800

499.2

0.067

0.867

0.867

1.5

PLC System

24

300

300

24

300.000

7200

12.500

12.500

12.500

1.6

Microwave Radio during Transmit Micro Radio during


Receive Microwave Radio during Sleep Mode

24

272

272

24

272.000

6528

11.333

11.333

11.333

Remarks

WELL HEAD PLC

2.1

Electronic Transmitter (FT, TT, PT, LT)

10

24

0.5

24

5.000

120

0.021

0.208

1.000

0.208

2.2

Isolating Barriers

10

24

1.6

16

24

16.000

384

0.067

0.667

1.000

0.667

2.3

PLC System

24

300

300

24

300.000

7200

12.500

12.500

1.000

12.500

2.4

Patch Panel

24

100

200

24

200.000

4800

4.167

8.333

1.000

8.333

2.5

Ethernet Switches

20

24

100

24

100.000

2400

0.208

4.167

1.000

4.167

2.6

Magnetically Latched, pulse operated SOV

24

15

90

3.750

90

0.625

3.750

0.042

0.156

TOTAL

1,347

1,260

30,218

57

53

10% MARGIN

135

126

3,022

TOTAL (WITH 10% MARGIN )

1,482

1,386

33,240

63

58

TOTAL AVERAGE DEMAND:


TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

58
63

Amps
Amps

C: CERTIFIED

F : Final

Page 2 of 5

Run-Up time of 0.25 hr/day is assumed.

ELECTRICAL LOAD LIST


(B55-5 - System II : 24V DC )
LIGHTING, CO2 SNUFFING SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Unit Load
Total
@ 24V Load 24V
DC
DC
(Amp.)
(Amp.)

4.167

0.010

0.043

1.0000

1.0000

0.0004

0.0004

0.048

0.0500

0.2000

0.0004

0.0001

0.0005

0.012

0.0500

0.0500

0.0004

0.0000

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

51

51

24

51.000

1224

2.125

2.125

2.125

100

0.25

1.042

25

2.083

24

24

0.01

0.0100

0.24

24

1.2

4.8

0.01

0.0020

24

1.2

1.2

0.01

2.4 Detectors

24

1.2

4.8

2.5 Hooter

24

9.6

2.6 Panel (Internal Load)

24

3.1 Electrical/Telemetry Room Lighting

3.2 Battery Room Lighting


3.3 Bunk House

24

50

2.1 Solenoid Valve

24

2.2 Limit Switch

2.3 Pressure Switch

Co2 Snuffing System

Status

Illumination for Level Gauge

3/23/2012

REV :
Average
Current
Drawn @
24V (Amp.)

Energy
Consumed
in WH/Day

B-127-LS-EL-0003

DATE:

Duty
Cycle/
Load
Factor

Energy
Consumed
in Ah/Day

Rated
Voltage

Load Description

2090/1764

DOC NO.:

ONGC
Run Up
Time In
Hrs./Day

Qty.

Sr.
No.

PROJECT NO

Unit Load Total Load


(Watt)
(Watt)

Remarks

Run-Up time of 0.25hr/day is


assumed.

Lighting System

Down Hole Instrument

TOTAL

565

98

2,330

24

10% MARGIN

57

10

233

TOTAL (WITH 10% MARGIN )

622

108

2,563

26

TOTAL AVERAGE DEMAND:

Amps

TOTAL PEAK DEMAND:

26

Amps

P: PRELIMINARY

D: DESIGN APPROVED

F: FINAL

SH. 3 OF 5

Electrical Design Basis


Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8

ELECTRICAL LOAD LIST


(B55-5 - System III : 24V DC )
FIRE & GAS, SDP PLC SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Sr. No.

Load Description

FIRE AND GAS PLC

1.1

Hydrogen Detectors

PROJECT NO

2090/1764

DOC NO.:

B-127-LS-EL-0003

DATE:

3/23/2012

REV :

ONGC

Qty.

Rated
Voltage

Unit Load
(Watt)

Total Load
(Watt)

Run Up
Time In
Hrs./Day

24

4.6

13.8

24

Average
Energy
Unit Load
Energy
Total Load Duty Cycle/ Current
Consume
@ 24V
24V DC
Consumed
Load
Drawn @
d in
DC
(Amp.)
Factor
in WH/Day
24V
Ah/Day
(Amp.)
(Amp.)

13.800

331.2

0.192

0.575

1.000

0.575

Status

Remarks

1.2

HC Gas Detectors

24

7.5

60

24

60.000

1440

0.313

2.500

1.000

2.500

1.3

H2S Gas Detectors

24

4.2

33.6

24

33.600

806.4

0.175

1.400

1.000

1.400

1.4

Heat Detectors

10

24

0.25

2.5

24

2.500

60

0.010

0.104

1.000

0.104

1.5

Smoke Detectors

43

24

0.25

10.75

24

10.750

258

0.010

0.448

1.000

0.448

1.6

Flashing beacons

24

33.6

134.4

0.25

1.400

33.6

1.400

5.600

0.010

0.058

Run-Up time of 0.25hr/day is assumed.

1.8

Electronic hooter

24

24

0.25

0.250

0.250

1.000

0.010

0.010

Run-Up time of 0.25hr/day is assumed.

1.9

Relays & Timers

24

0.25

0.000

0.250

0.000

0.010

0.000

Run-Up time of 0.25hr/day is assumed.

1.10

F&G PLC

24

300

300

24

300.000

7200

12.500

12.500

1.000

12.500

SDP PLC

2.1

Pressure Switch

24

1.2

9.6

0.01

0.004

0.096

0.050

0.400

0.0004

0.0002

2.2

Solenoid Valve

24

24

24

0.01

0.010

0.24

1.000

1.000

0.0004

0.0004

2.3

Limit Switch

24

1.2

2.4

0.01

0.001

0.024

0.050

0.100

0.0004

0.0000

2.4

PLC System

24

300

300

24

300.000

7200

12.500

12.500

1.0000

12.5000

723
72
795

17,336
1,734
19,070

TOTAL
10% MARGIN
TOTAL (WITH 10% MARGIN )
TOTAL AVERAGE DEMAND:
TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

916
92
1,008
34
43

Amps
Amps

C: CERTIFIED

F : Final

SH. 4 OF 5

39
4
43

31
3
34

ELECTRICAL LOAD LIST


(B55- 5 System IV : 24V DC )
NAV-AIDS SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Load Description

Nav Aid Lanterns

Qty.

Rated
Voltage

ON

OFF

ON

OFF

ON

OFF

Duty
Cycle

24

0.4

0.5

0.4

0.50

1.2

12.00

0.13

TOTAL

1.20

0.13

AV.
Flasher AV. Daily
Lamp
Quiescen power
current
t current drain @
incl.
24V
(A)
Surge

3.33

0.005

0.005

Total Daily load = 30.42 AH/DAY

P: PRELIMINARY

2090/1764

DOC NO.:

B-127-LS-EL-0003

DATE:

3/23/2012

REV :

ONGC

Morse code "U" Nav-Aids Lanterns 15 Sec.


Sr.
No.

PROJECT NO

D: DESIGN APPROVED

F: FINAL

SH. 5 OF 5

7.22

AV. Daily power


Average daily
drain including
power drain @
battery
worse
charge/dischar
case(Ah/Day)
ge, efficiency

7.6

7.60

30.42

30.42

Status

Remarks

PROJECT : B-127 CLUSTER WELL PLATFORM PROJECT


ELECTRICAL LOAD LIST FOR ZC WELL PLATFORM

Notes:
1

This is preliminary load list.The load data is based on the experience on similar ONGC Projects.

Nav Aid wattage is calculated based on current data available from vendor and average current drawn specified for the same in previous similar projects.

Reference Documents:1

Electrical Design Criteria for Well Platforms , SECTION 3.5 , Vol. II Rev 4

Functional Specification for Hybrid Power System - FS 4007A, Rev. 0

Functional Specification for Navigational Aids System - FS 4003, Rev. 4

OIL AND NATURAL GAS


CORPORATION LTD. INDIA

Aker Power Gas Pvt. Ltd.

PC8012301-00

CLIENT : ONGC

S2
PEM
STATUS

23.03.2012
SAK
MADE
BY & DATE

23.03.2012
NMC
BY & DATE

23.03.2012
SBL
APP
BY & DATE

ISSUED FOR ENQUIRY

A
REV

STATUS

Page 1 of 5

DOCUMENT NO:

B-127-LS-EL-0004

TITLE :

ELECTRICAL LOAD LIST


FOR ZC WELL PLATFORM.

SHT 1 OF 5
REV
A

ELECTRICAL LOAD LIST


(ZC - System I : 24V DC )
TELEMETRY & WELL HEAD SYSTEM

Aker Powergas Pvt. Ltd.


Client:
Sr.
No.
1

Load Description

Qty.

Rated
Voltage

Unit
Load
(Watt)

PROJECT NO
DOC NO.:
DATE:
REV :

2090/1764
B-127-LS-EL-0004
3/23/2012
A

ONGC
Total
Load
(Watt)

Run Up
Time In
Hrs./Day

Energy
Consumed in
Ah/Day

Total
Energy Unit Load
Load 24V
Consumed @ 24V DC
DC
in WH/Day (Amp.)
(Amp.)

Duty
Cycle/
Load
Factor

Average
Current
Drawn @ 24V
(Amp.)

Status

1.166666667

0.0004

0.0001

RTU PLC

1.1

Wet Gas Meter

24

35

24

0.0000

1.2

Electronic transmitter (FT, TT, PT, LT)

56

24

0.5

28

24

28.0000

672

1.3

Pig detectors

24

1.2

0.01

0.0025

0.06

1.458333

0.020833 1.166667
0.0500

0.2500

1.4

Isolating barriers

56

24

1.6

89.6

24

89.6000

2150.4

3.733333333

1.5

Limit Switch

46

24

1.2

55.2

0.01

0.0230

0.552

0.0500

2.3000

0.0004

0.0010

1.6

PLC System

24

300

300

24

300.0000

7200

12.5

12.5

12.5

1.7

Microwave Radio during Transmit


Micro Radio during Receive
Microwave Radio during sleep mode

24

272

272

24

272.000

6528

11.333

11.333

11.333

1.5

1.5

5.333333333

12.5

8.333333333

Remarks

0.066667 3.733333

WELL HEAD PLC

2.1

Electronic transmitter (FT, TT, PT, LT)

72

24

0.5

36

24

36.0000

864

0.020833

2.2

Isolating barriers

80

24

1.6

128

24

128.0000

3072

0.066667 5.333333

2.3

PLC System

24

300

300

24

300.0000

7200

2.4

Patch Panel

24

100

200

24

200.0000

4800

4.166667 8.333333
0.208333 4.166667

12.5

2.5

Ethernet switches

20

24

100

24

100.0000

2400

2.6

Magnetically latched, pulse operated SOV

24

15

90

3.7500

90

2.7

Multivariable Transmitter

13

24

35

455

24

455.0000

10920

2.8

Coriolis Flow Meter

24

14

24

14.000

336

0.292

2.9

Pressure Switch

25

24

1.2

30

0.01

0.0125

0.3

0.0500

0.625

12.5

4.166666667

0.04167

0.15625

18.95833333

0.583

0.583

1.2500

0.0004

0.0005

3.75

1.458333 18.95833

2.10 Limit Switch

24

1.2

2.4

0.01

0.0010

0.024

0.0500

0.1000

0.0004

0.0000

2.11 Solenoid Valve

24

24

192

0.01

0.0800

1.92

1.0000

8.0000

0.0004

0.0033

TOTAL

2,299

1,927

46,236

96

81

10% MARGIN

230

193

4,624

10

TOTAL (WITH 10% MARGIN )

2,529

2,120

50,860

106

89

TOTAL AVERAGE DEMAND:


TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

89
106

Amps
Amps

C: CERTIFIED

F : Final
Page 2 of 5

Run-Up time of 0.25 hr/day is assumed.

ELECTRICAL LOAD LIST


(ZC - System II : 24V DC )
LIGHTING, CO2 SNUFFING SYSTEM SYSTEM

Aker Powergas Pvt. Ltd.

Client:
Sr.
No.

Load Description

Illumination for Level Gauge

Co2 Snuffing System

Qty.

Rated Unit Load


Voltage
(Watt)

PROJECT NO

2090/1764

DOC NO.:

B-127-LS-EL-0004

DATE:

3/23/2012

REV :

ONGC
Total
Load
(Watt)

Energy Unit Load


Total
Energy
Run Up
Consume @ 24V Load 24V
Time In Consumed
d in
DC
DC
Hrs./Day in Ah/Day
WH/Day
(Amp.)
(Amp.)

Duty
Cycle/
Load
Factor

Average
Current
Drawn @
24V (Amp.)

11

24

50

550

0.25

5.7292

137.5

2.1 Solenoid Valve

24

24

24

0.01

0.0100

0.24

1.0000

1.0000

0.0004

0.0004

2.2 Limit Switch

24

1.2

4.8

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

2.3 Pressure Switch

24

1.2

1.2

0.01

0.0005

0.012

0.0500

0.0500

0.0004

0.0000

2.4 Detectors

24

1.2

4.8

0.01

0.0020

0.048

0.0500

0.2000

0.0004

0.0001

2.5 Hooter

24

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

2.6 Panel (Internal Load)

24

9.6

9.6

0.01

0.0040

0.096

0.4000

0.4000

0.0004

0.0002

3.1 Electrical/Telemetry Room Lighting

24

60

120

15.000

360

2.500

5.000

0.125

0.625

3.2 Battery Room Lighting

24

60

120

15.000

360

2.500

5.000

0.125

0.625

3.3 Bunk House

24

60

120

15.000

360

2.500

5.000

0.125

0.625

24

14

24

14.000

336

0.292

0.583

1.000

0.583

2.083333 22.91667 0.010417 0.23871528

Status

Remarks

Run-Up time of 0.25hr/day is


assumed.

Lighting System

Flow Computer

TOTAL

964

51

1,219

41

10% MARGIN

96

122

TOTAL (WITH 10% MARGIN )

1,060

56

1,341

45

TOTAL AVERAGE DEMAND:

Amps

TOTAL PEAK DEMAND:

45

Amps

P: PRELIMINARY

D: DESIGN APPROVED

F: FINAL

SH. 3 OF 5

Electrical Design Basis


Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8
Electrical Design Basis
Section 3.5, Clause No. 3.5.7.8

ELECTRICAL LOAD LIST


(ZC - System III : 24V DC )
FIRE & GAS, SDP PLC SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Sr. No.

Load Description

PROJECT NO

2090/1764

DOC NO.:

B-127-LS-EL-0004

DATE:

3/23/2012

REV :

ONGC

Qty.

Rated
Voltage

Unit Load
(Watt)

Total Load
(Watt)

Run Up
Time In
Hrs./Day

Average
Energy
Unit Load
Energy
Total Load Duty Cycle/ Current
Consume
@ 24V
24V DC
Consumed
Load
Drawn @
d in
DC
(Amp.)
Factor
in WH/Day
24V
Ah/Day
(Amp.)
(Amp.)

Status

Remarks

FIRE AND GAS PLC

1.1

Hydrogen Detectors

24

4.6

13.8

24

13.8000

331.2

0.191667

0.575

0.575

1.2

HC Gas Detectors

32

24

7.5

240

24

240.0000

5760

0.3125

10

10

1.3

H2S Gas Detectors

32

24

4.2

134.4

24

134.400

3225.6

0.175

5.600

1.000

5.600

1.4

Heat Detectors

10

24

0.25

2.5

24

2.500

60

0.010

0.104

1.000

0.104

1.5

Relays and timers

24

10

24

0.0000

0.416667

1.6

Flashing beacons

24

33.6

134.4

0.25

1.4000

33.6

1.4

5.6

0.01041667 0.058333

Run-Up time of 0.25hr/day is assumed.

1.8

Electronic hooter

24

24

0.25

0.2500

0.25

0.01041667 0.010417

Run-Up time of 0.25hr/day is assumed.

1.9

Smoke Detectors

20

24

0.25

24

5.000

120

0.010

0.208

1.000

0.208

1.10

F&G PLC

24

300

300

24

300.0000

7200

12.5

12.5

12.5

SDP PLC

2.1

Pressure Switch

68

24

1.2

81.6

0.01

0.0340

0.816

0.0500

3.4000

0.0004

0.0014

2.2

Solenoid Valve

22

24

24

528

0.01

0.2200

5.28

1.0000

22.0000

0.0004

0.0092

2.3

Electronic hooter

24

18

0.25

0.1875

4.5

0.25

0.75

2.4

PLC System

24

300

300

24

300.0000

7200

12.5

12.5

1,782
178
1,960

998
100
1,098

23,947
2,395
26,342

C: CERTIFIED

F : Final

TOTAL
10% MARGIN
TOTAL (WITH 10% MARGIN )
TOTAL AVERAGE DEMAND:
TOTAL PEAK DEMAND:

P: PRELIMINARY

D: DESIGN APPROVED

46
83

Amps
Amps

SH. 4 OF 5

75
8
83

0.01041667 0.007813
1

12.5
42
4
46

P
P

ELECTRICAL LOAD LIST


(ZC - System IV : 24V DC )
NAV-AIDS SYSTEM

Aker Powergas Pvt. Ltd.


Client:

Load Description

Nav Aid Lanterns

Qty.

Rated
Voltage

ON

OFF

ON

OFF

ON

OFF

Duty
Cycle

24

0.4

0.5

0.4

0.50

1.2

12.00

0.13

TOTAL

1.20

0.13

AV.
Flasher AV. Daily
Lamp
Quiescen power
current
t current drain @
incl.
24V
(A)
Surge

3.33

0.005

0.005

Total Daily load = 30.42 AH/DAY

P: PRELIMINARY

2090/1764
B-127-LS-EL-0004

DATE:

3/23/2012

REV :

ONGC

Morse code "U" Nav-Aids Lanterns 15 Sec.


Sr.
No.

PROJECT NO
DOC NO.:

D: DESIGN APPROVED

F: FINAL

SH. 1 OF 1

7.22

AV. Daily power


Average daily
drain including
power drain @
battery
worse
charge/dischar
case(Ah/Day)
ge, efficiency

7.6

7.60

30.42

30.42

Status

Remarks

You might also like