ATTACHMENT - III
ENGINEERING DEPT.
CERTIFIED
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
1
OF
23
01
CERT.
APPD
CHKD
TABLE OF CONTENTS
DESCRIPTION
SECTION
BASIC REQUIREMENTS AND GUIDELINES
1.01
GENERAL CONDITIONS
1.02
KICK-OFF MEETING
1.03
1.04
1.05
PROJECT DRAWINGS
1.06
PROGRESS REPORTING
1.07
1.08
1.09
1.10
1.11
1.12
NO.
PAGE NO.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
2
OF
23
01
CERT.
APPD
CHKD
NO.
DESCRIPTION
A. All components and accessories required for the completion and successful operation
of the WORK covered under the scope of this PROJECT, either specified in detail or
not, shall be supplied and installed by the CONTRACTOR as necessary.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
C. The drawings enclosed with this Scope of WORK and Technical Specifications are
only conceptual for the information of the CONTRACTOR and are to be read in
conjunction for the Scope of WORK and Technical Specifications. CONTRACTOR
shall develop detailed design drawings for construction based on these drawings.
D. Copies of existing drawings, design calculations, technical reports and other
information as deemed appropriate by the COMPANY may be provided to the
CONTRACTOR upon request, if available. However, if such information are not
available, then the CONTRACTOR should be responsible for the independent
development of the information required to complete the specified PROJECT.
OPERATING DEPT.
CERTIFIED
BY:
The base design shall be finalized at base design review meeting based on the
guideline drawings issued hereof, manufacturers drawings, calculations and data
sheets, and detailed design shall be finalized based on the base design review and
other required information.
DATE:
F.
The submission of detail design drawings shall be progressive and phased suitably for
every stage to give sufficient review time to COMPANY.
G. COMPANYs approval of the CONTACTORs design doesnt relieve him of any part of
his obligations to meet all the requirements of the CONTRACT nor the responsibility
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
3
OF
23
01
CERT.
APPD
CHKD
for the correctness of the design and construction drawings of the PROJECT.
NO.
DESCRIPTION
J.
The CONTRACTOR shall submit along with bid proposal the manufacturer
recommended operational spare parts required for a period of ten (10) years, per list
of operational spare parts annexed at Appendix V. For operational spare parts for
communications equipment, refer to Appendix VI.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
1.
2.
DATE:
C. The base design submittal shall be submitted fully complete, containing all discipline
drawings and calculations as stated. Partial submittals or packages are unacceptable
and will be rejected. Base design shall include drawings required to define the project.
Additional drawings if provided will not be reviewed during the base design phase.
THIS DRAWING IS NOT TO
BE
USED
FOR
CONSTRUCTION OR FOR
ORDERING
MATERIALS
UNTIL
CERTIFIED
AND
DATED
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
4
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
NO.
CONTRACTOR may initiate the material procurement WORK during the base design
phase of the PROJECT but the final approval of the material shall be done only after
consideration of comments generated during Base Design Phase and resolution of
comments during the Base Design Review meeting.
1.05 PROJECT DRAWINGS
REVISIONS
A. General
DRAWN BY:
DATE:
1.
CHKD BY:
The CONTRACTOR shall provide all drawings required for this PROJECT
covering the new transmission line in accordance with the requirements of the
COMPANY Engineering Drawings Standard, SEEDS-II.
APPROVED
The drawings shall be assigned with drawings numbers and indexed as outlined
in the above procedure. A block of drawing numbers shall be provided by the
COMPANY for all the drawings based on CONTRACTOR request.
ENGINEERING DEPT.
2.
3.
The existing system drawings of the source substation are generally available
with the COMPANY in digital format except in certain cases where it is in the
form of transparencies. Copies of available existing drawings shall be provided
on CONTRACTORs written request. However, if any related information is not
available, the CONTRACTOR shall be responsible to develop all the required
drawings to satisfy the PROJECT requirements.
4.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
B.
THIS DRAWING IS NOT TO
BE
USED
FOR
CONSTRUCTION OR FOR
ORDERING
MATERIALS
UNTIL
CERTIFIED
AND
DATED
Vendor Drawings
Vendor drawings are manufacturers drawings, data schedules, specification sheets,
installation and operating instructions and any other data required for material or
equipment. Requirements of such information are an integral part of the purchase
order and shall be specified by the CONTRACTOR.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
5
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
All vendor drawings shall be subject to review and approval by the COMPANY at
various stages (bid/base design/detail design/construction) of the CONTRACT.
C. Base Design Drawings
The CONTRACTOR shall submit base design drawings to the COMPANY with his
Base Design Package per Section 2.03.
NO.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
No WORK shall be started at site unless all drawings for a particular WORK has been
fully reviewed and agreed upon by the COMPANY and final construction drawings are
available at WORK SITE and with the COMPANY.
A complete list of drawings the CONTRACTOR shall provide as a minimum for this
PROJECT is given in Section 2.03.
Final detailed design drawings shall be submitted fully complete, by discipline
representing fully the part of the PROJECT to be constructed and all the related
drawings. Partial submittals are not acceptable and will be rejected.
OPERATING DEPT.
E. As-Built Drawings
1.
CERTIFIED
BY:
DATE:
2.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
6
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
3.
NO.
REVISIONS
DRAWN BY:
DATE:
One (1) sample of original (digital Microstation *.DGN format and Mylar) and five
(5) checkprints from different As-Built engineering drawings shall be submitted
to the COMPANY to verify the quality of digital Microstation *.DGN format and
Mylar and whether the correct drafting procedure is adopted, one (1) month
before initial submission of As-Built drawings.
CHKD BY:
Three (3) copies of the as-built documents shall be submitted to the COMPANY
for review as to adequacy, completeness, legibility and conforming to drafting
standards. If returned, the CONTRACTOR shall make corrections, provide
additional data and improve the quality as instructed prior to resubmittal and
COMPANY acceptance. The revised As-Built drawings shall be resubmitted
within four (4) weeks after commissioning. Three (3) sets of final As-Built
drawings, one (1) set of good quality As-Built Mylars and Two (2) sets of AsBuilt digital Microstation *.DGN format drawings (if applicable) in CDs shall be
submitted to the COMPANY for records.
APPROVED
ENGINEERING DEPT.
5.
The COMPANY will arrange for the microfilming of all final As-Built drawings
of the PROJECT at the COMPANYs Headquarters.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
1.
2.
3.
4.
1.
2.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
7
OF
23
01
CERT.
APPD
CHKD
4.
5.
6.
7.
8.
DESCRIPTION
NO.
3.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
1.
The PROJECT Quality Plan/Quality Program shall set out the specific quality
procedures and practices, resources, and all activities (in sequence) relevant to
this PROJECT. The PROJECT Quality Plan/Quality Program shall address all
QA/QC activities during design, procurement, manufacturing/fabrication,
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
8
OF
23
01
CERT.
APPD
CHKD
2.
3.
The PROJECT Quality Plan/Quality Program shall clearly define and address the
following:
a.
b.
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
c.
Procurement Control
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
9
OF
23
01
CERT.
APPD
CHKD
d.
Quality Audit
i.
ii.
iii.
iv.
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
Non-Conformance Control
CONTRACTOR shall ensure that items and services, which do not conform
to specified requirement, are controlled in accordance with documented
procedures to prevent unintended use. CONTRACTOR shall identify,
document, segregate, evaluate and dispose non-conforming items and
services after proper notification of concerned personnel within the
CONTRACTORs organization.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
i.
ii.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
10
OF
23
01
CERT.
APPD
CHKD
NO.
DESCRIPTION
f.
REVISIONS
DRAWN BY:
g.
DATE:
CHKD BY:
Quality Records
CONTRACTOR shall develop and maintain a system for preparation,
maintenance, protection and preservation of quality records. Documents
such as inspection reports, field inspection checklist, factory test reports,
laboratory test reports, witnessed test reports, inspection logbooks,
equipment calibration records/certificates, construction drawings and
specifications, approved submittals and non-conformance reports are part
of these records. All quality records shall be available at WORKSITE for
use
and/or
reference
by
CONTRACTOR
and
COMPANY
REPRESENTATIVE.
APPROVED
ENGINEERING DEPT.
h.
OPERATING DEPT.
CERTIFIED
BY:
i.
DATE:
Document Control
CONTRACTOR shall develop and maintain a documented control program
for the review, approval, revision and distribution of documents for the
activities affecting quality. Responsible personnel for revision, issuance
and approval of documents shall be identified. Control shall ensure that all
pertinent and current issues of appropriate documents are available at
locations where they are essential and obsolete or superseded documents
are promptly removed. CONTRACTOR shall list all the documents that
have to be controlled and shall include PROJECT Quality Plan/Quality
Program, Quality Control Plan/ Inspection and Test Plan, construction and
design drawings, calculations, correspondence, inspection and test
reports, field inspection checklist.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
11
OF
23
01
CERT.
APPD
CHKD
j.
k.
l.
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
4.
DATE:
CHKD BY:
Design Control
a.
b.
c.
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
5.
BY:
DATE:
CONTRACTOR shall conduct inspection and testing activities at all phases and
quality audit at appropriate stages of the PROJECT construction/installation.
CONTRACTORs QA/QC engineers/inspectors shall develop and use field
inspection checklist to facilitate checking of a process, activity, material or
equipment. The field inspection checklist shall state the characteristic to be
verified, inspection method, acceptance criteria and clause reference of the
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
12
OF
23
01
CERT.
APPD
CHKD
CONTRACTOR shall develop and implement the use of inspection logbook for
use by the CONTRACTORs QA/QC engineers/inspectors in recording their
comments and observations as a result of their inspection. CONTRACTORs
personnel responsible for rectifying any observed deficiency or nonconformance should also write their reply in the logbook stating the actions
taken to correct the deficiency. CONTRACTORs QA/QC engineers/inspectors
shall ensure that all unsatisfactory observations on an item are cleared before
any activity proceeds to the succeeding stage of that item.
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
2.
The essential features of the required Quality Control Plan/Inspection and Test
Plan are as follows:
CERTIFIED
BY:
DATE:
a.
b.
c.
d.
e.
f.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
13
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
3.
g.
h.
The Quality Control Plan/Inspection and Test Plan shall indicate the scheduled
dates of testing and inspection at the designated location.
1.
CONTRACTOR shall procure all major material items for the PROJECT from
COMPANY qualified and approved sources.
2.
3.
NO.
D. Manufacturers/Suppliers
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
1.
2.
3.
4.
5.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
a.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
14
OF
23
01
CERT.
APPD
CHKD
c.
d.
e.
f.
g.
DESCRIPTION
NO.
b.
REVISIONS
DRAWN BY:
h.
DATE:
CHKD BY:
6.
APPROVED
ENGINEERING DEPT.
Relevant section
Specification.
c.
d.
e.
f.
OPERATING DEPT.
CERTIFIED
BY:
of
Scope
of
WORK
and
Technical
8.
9.
ATTACHMENT III
JOB ORDER NO.
PROJECT
7.
DATE:
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
15
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
F.
NO.
2.
REVISIONS
3.
4.
CONTRACTOR shall ensure that all inspection and surveillance reports and any
other requirements are satisfactorily completed before requesting the
COMPANY to approve the Release for Shipment Certificate.
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
G. Receipt Inspection
1.
2.
OPERATING DEPT.
1.
2.
3.
4.
5.
CERTIFIED
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
16
OF
23
01
CERT.
APPD
CHKD
6.
2.
3.
NO.
DESCRIPTION
I.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
2.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
17
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
NO.
A. The CONTRACTOR shall provide a Test Record Book which shall include the
following:
1.
2.
REVISIONS
DRAWN BY:
a.
b.
c.
d.
e.
f.
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
B. Each test form where applicable shall include a column quoting the acceptable
maximum and minimum limits of the test in terms of voltage, current, frequency, time,
etc. and include As Found and As Left values.
C. Three (3) copies of the "Test Record Book" shall be submitted to the COMPANY
within thirty (30) days after completion of the PROJECT.
1.09 CONTRACTOR/COMPANYS CONSTRUCTION SITE OFFICE AND FACILITY
OPERATING DEPT.
A. The CONTRACTOR shall install a temporary site office prior to mobilization of any
construction activity pertaining to the PROJECT. Proposal with layout sketch of the
site office shall be submitted for approval to the COMPANY. If located outside the
COMPANY premises, permission of the owner of the land/premises shall be obtained
and copy furnished to the COMPANY for records.
CERTIFIED
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
18
OF
23
01
CERT.
APPD
CHKD
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
The CONTRACTOR shall provide his own generators to meet construction, testing
and commissioning power requirements. However, if power supply point is available
near the PROJECT site, then a temporary metered electricity connection on
chargeable basis will be provided by the COMPANY to the site office by Operating
Area at the request of the CONTRACTOR.
The temporary electrical wiring and installation for the site office is to be performed in
accordance with the requirements of the latest revision of the National Electrical Code
(NEC) or the National Fire Protection Association (NFPA).
ENGINEERING DEPT.
C. Telephone Connection
OPERATING DEPT.
CERTIFIED
The CONTRACTOR will be allowed to use the telephone only for making local calls.
BY:
DATE:
The temporary drainage connection from existing system shall be provided to the site
office. Alternate arrangement as per standards shall be provided if drainage facility
does not exist.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
19
OF
23
01
CERT.
APPD
CHKD
F.
DESCRIPTION
NO.
REVISIONS
H. Demobilization
DRAWN BY:
After obtaining the demobilization approval from the COMPANY, the CONTRACTOR
shall arrange to remove all temporary connections and submit clearance certificates
from the concerned authorities on completion of the PROJECT or fifteen (15) days
after removal of the temporary facilities whichever is later.
DATE:
CHKD BY:
APPROVED
Site office and facility is the property of the CONTRACTOR and after project
completion the CONTRACTOR will take back all the materials and accordingly all the
materials will be returned to the contractor.
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
1.
2.
3.
4.
The CONTRACTOR shall submit his Loss Prevention Program to the COMPANY
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
20
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
a.
NO.
i.
ii.
iii.
iv.
v.
vi.
REVISIONS
DRAWN BY:
b.
Table of Contents
c.
d.
Specific program items (suitable for the SOW) that the CONTRACTOR
proposes to implement during the CONTRACT execution.
e.
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
i.
ii.
iii.
iv.
v.
5.
The CONTRACTOR shall provide the necessary protective clothing (i.e. head,
eye, face, hand, and foot protection) and respiratory protective equipment
including personal protective equipment for fall protection such as safety belts
and lifelines, and implement wearing them.
6.
The CONTRACTOR shall provide and use adequate and suitable safety/warning
signs, cordon tapes, portable barricades, warning lights and personnel protective
equipment at JOB SITE to protect the safety of COMPANY and CONTRACTOR
personnel and the public, and to prevent damage to property.
7.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
8.
9.
10.
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
21
OF
23
01
CERT.
APPD
CHKD
The CONTRACTOR shall obtain from the COMPANY, ID cards for his employee
and stickers for his vehicles/equipment prior to mobilization to site.
12.
b.
c.
NO.
DESCRIPTION
11.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
The CONTRACTOR shall submit his heavy equipment (i.e. cranes and bucket
trucks) to the COMPANY for safety inspection and certification and
correspondingly stick with green safety sticker.
2.
OPERATING DEPT.
2.
The CONTRACTOR shall provide the welding gas cylinders with suitable rack
that is equipped with security chain(s).
CERTIFIED
BY:
DATE:
Submit material safety data sheets (MSDS) of chemicals required or which are to be
used in the execution of the PROJECT.
1.11 OUTAGE SCHEDULE/SHUTDOWN COORDINATION
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
22
OF
23
01
CERT.
APPD
CHKD
DESCRIPTION
NO.
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
In instances where performance of the work included in this Scope of Work may, or
will result in a communications link (or communications links) outage, such work will
only be performed during periods of planned communications outages for the link (or
links). During the Base Design stage of the project, in cases where planned
communications link outages are anticipated, CONTRACTOR shall develop a
communications outage plan, with the plan indicating the proposed extent, and
duration, and anticipated date (or dates) of the proposed communications link outage
(or outages).
CERTIFIED
BY:
DATE:
The communications link outage plan shall include the work procedures which the
CONTRACTOR will use to minimize the duration of the communications link outages,
and as part of the plan, CONTRACTOR shall confirm that he will have sufficient
manpower and all required equipment which will minimize the planned period of the
Communications Links Outages (as well as listing in his plan, the proposed manpower
and equipment which will be used to minimize the planned outage of the
communications link (or links).
THIS DRAWING IS NOT TO
BE
USED
FOR
CONSTRUCTION OR FOR
ORDERING
MATERIALS
UNTIL
CERTIFIED
AND
DATED
The duration, and date(s) of the planned outages of communications links will be
scheduled solely based on COMPANY Operational Requirements for the
Communications link(s) where the outages are planned (and NOT on CONTRACTOR
convenience of implementation of the work under this contract).
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
23
OF
23
01
CERT.
APPD
CHKD
NO.
DESCRIPTION
REVISIONS
DRAWN BY:
DATE:
CHKD BY:
APPROVED
ENGINEERING DEPT.
OPERATING DEPT.
CERTIFIED
BY:
DATE:
ATTACHMENT III
JOB ORDER NO.
PLANT NO.
J660
INDEX
DRAWING NO.
PAGE NO.
PTS-12WC1066
REV.
24
OF
23
01