ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1 Suministro e instal. acometida domiciliaria


alcantarillado 8" x 6" (200 * 160) L = 6 m, = 6"

Cantidad

Vr.Unitario

und

Vr.Total

225,544.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

13,740

Tuberia alcantarillado PVC 6 "

Ins

6.0000

20,918.00

125,508.00

15,362

Kit Silla Yee 8*6 (Incl. Hidros. y Abrazaderas)

Ins

und

1.0000

82,261.00

82,261.00

55
4,515

3 Descapote a maquina E = 0.20 m, pagado por m3


20

Bulldozer Cat D6D o D6H

m
Eqp

4 Explanacion y extendida, pagada en m3


20

Bulldozer Cat D6D o D6H

HR

1,633.13

0.0125

130,650.00

m
Eqp

7 Replanteo Mano de Obra "Arquitectonico"

HR

1,633.13

1,306.50

0.0100

130,650.00

1,306.50

3,439.42

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1649

1,469.00

242.24

1,617

Cuerda de nylon

Ins

0.5000

500.00

250.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.0100

2,480.00

24.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.1649

14,690.00

2,422.38

8,165

Estacas de Madera =0.10 L=0.60 m

Ins

und

0.5000

1,000.00

500.00

17

9 Campamento de 18 M2

und

1,175,004.00

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

28.0000

350.00

9,800.00

1,067

Teja ondulada de asbesto No.6 eternit

Ins

und

14.0000

20,550.00

287,700.00

1,794

Candado

Ins

und

2.0000

5,000.00

10,000.00

2,210

Tabla chapa ordinario 0.30

Ins

130.0000

4,000.00

520,000.00

2,243

Vara de clavo 3M -1

Ins

54.0000

1,500.00

81,000.00

3,797

Puntilla con cabeza 2"

Ins

lb

4.0000

1,990.00

7,960.00

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

17
830

13 Cerca en Madera, alambre de pua Cal. 12, c/2.50 m


y Hp = 2.50 m, 4 Hilos

1,469.00

23,504.00

13,078.20

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.2000

2,010.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0320

22,829.00

730.53

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.2630

4,300.00

5,430.90

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0270

16,458.20

444.37

5,144

69
324

402.00

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.2000

20,097.00

4,019.40

15,655

Alambre de puas galvanizado Cal. 12

Ins

4.2000

454.00

1,906.80

16,221

Grapa galvanizada para Cerca 1 x 9

Ins

und

2.0600

70.00

144.20

19 Red agua provisional L - 50 M, pagado por und

und

199,189.90

Herramienta Menor 10% M.O. BB

Eqp

HR

2.9147

1,616.00

4,710.16

2,197

Repisa Ordinario 3 m

Ins

10.0000

1,500.00

15,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.9147

16,159.00

47,098.64

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,757

Registro paso directo 1/2"

Ins

und

14,991

Tubo presin RDE 9 PVC 1/2 "

Ins

15,021

Codo 90 presion PVC 1/2"

Ins

15,039

Union presion PVC 1/2"

Ins

20 Suministro e Instal. union mecanica rapida RDE 21


10"

Cantidad

Vr.Unitario

Vr.Total

1.0000

22,000.00

22,000.00

50.5000

2,109.00

106,504.50

und

5.0000

375.00

1,875.00

und

8.3400

240.00

2,001.60

und

332,942.06

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7273

1,616.00

1,175.32

Cuadrilla BB (Instalaciones)

Ins

0.7273

16,159.00

11,752.44

14,118

Lubricante 500 gr

Ins

und

0.0600

12,305.00

738.30

15,264

Union mecanica rapida RDE 21 PVC 10 "

Ins

und

1.0000

319,276.00

319,276.00

55
4,515

21 Desmonte aparatos sanitarios, pagado en un

und

24,945.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

Cuadrilla AA (Albaileria)

Ins

1.2000

14,690.00

17,628.00

4,489

27 Caseton de lona 0.80 x 0.70, pagado por ml

1,762.80

39,239.18

Sub-Contrato Carpinteria

Esp

45.0000

27,061.50

12,177.68

2,289

Lona plastica para caseton

Ins

3.0000

4,500.00

13,500.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.9000

2,480.00

2,232.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

13,235

Liston ordinario 0.05 x 0.05

Ins

5.5200

1,300.00

7,176.00

13,326

Durmiente ordinario 3 M

Ins

3.5000

767.00

2,684.50

28 Demolicion muro de ladrillo de espesor menor a


0.15 metros, pagado en m2

7,574.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

29 Demolicion a mano de placa piso, espesor 0-5 cm,


pagado en m2

11,394.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

4,489

30 Perforacion de Muro en concreto reforzado e=0.3 m


17
4,489

und

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

11,752.00

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

31 Desmonte de madera Puentes colgantes


17
4,489

129,272.00

4,039.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

32 Perro de 1/2" Tipo Pesado. Suministro e Instal.

und

10,771.25

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
19
4,489
14,061

Nombre

Tipo U.M.

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

Perro de 1/2 " Tipo pesado.

Ins

und

1.0000

10,000.00

10,000.00

33 Viga Transversal o polin de 0.10 x 0.10 x 1, pagado


en ml

Cantidad

Vr.Unitario

Vr.Total

16,536.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

Transporte de materiales Tn

Ana

0.0075

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0500

52,200.00

2,610.00

15,988

Madera de 0.10 x 0.10 x 1 Polin

Ins

1.0000

9,079.00

9,079.00

56

34 Demolicion vigas y columnas, pagado en m3

170,582.48

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.0000

35,000.00

35,000.00

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

4,489

35 Suministro e Instal. union mecanica rapida RDE 21


8", pagado en un

und

11,752.00

188,544.55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5333

1,616.00

861.81

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

8,617.59

14,118

Lubricante 500 gr

Ins

und

0.0300

12,305.00

369.15

15,263

Union mecanica rapida RDE 21 PVC 8 "

Ins

und

1.0000

178,696.00

178,696.00

55
4,515

36 Escalera maciza 1/2 tramo, pagado en m3

394,236.96

Vibrador a gasolina

Eqp

HR

0.0400

46,000.00

1,840.00

A.C.P.M.

Ins

gal

0.2000

6,165.00

1,233.00

2,197

Repisa Ordinario 3 m

Ins

2.7400

1,500.00

4,110.00

2,200

Tabla burra ordinario 0.30

Ins

10.5000

4,333.00

45,496.50

3,797

Puntilla con cabeza 2"

Ins

lb

1.2000

1,990.00

2,388.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.5000

14,690.00

139,555.00

4,867

Paral telescopico 2 a 4 ml

Ins

2.9000

340.00

986.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.5500

333,142.66

183,228.46

Formaleta entrepisos

Ins

mes

4.4000

3,500.00

15,400.00

52
767

13,627

37 Dintel en concreto de 3000 psi 0.25 x 0.25, pagado


en ml

43,926.63

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

1,572

Tabla burra ordinaria 0.10

Ins

0.1500

1,200.00

180.00

1,870

Alambre Negro No 18

Ins

kg

0.1500

3,903.00

585.45

2,243

Vara de clavo 3M -1

Ins

0.0100

1,500.00

15.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2700

1,990.00

537.30

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0625

318,473.24

19,904.58

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.9000

2,257.00

6,545.30

17

38 Dintel en U en ladrillo prensado, pagado en ml

55,592.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cemento gris

Ins

kg

4.0000

383.34

1,533.36

2,208

Tabla chapa ordinario 0.10

Ins

1.5800

2,667.00

4,213.86

2,311

Ladrillo prensado

Ins

und

16.0000

480.00

7,680.00

3,684

Agua para obra

Ins

2.6600

10.00

26.60

3,797

Puntilla con cabeza 2"

Ins

lb

0.4000

1,990.00

796.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.3500

14,690.00

34,521.50

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.9000

2,257.00

6,545.30

804

39 Pasamuro en PRFV = 8" E.L. x E.B. L= 0.8 m


(Suministro e instal. con tornilleria y empaques)

und

488,819.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

Pasamuro =8" E.L. x E.B. L=0.8 m en PRFV

Ins

und

1.0000

465,120.00

465,120.00

55

14,856

40 Cielo raso de icopor texturizado 18 mm con


perfilera de aluminio crudo

24,007.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6500

1,763.00

1,145.95

Cuadrilla DD (Carpinteria)

Ins

0.6500

17,628.00

11,458.20

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0300

5,000.00

150.00

13,935

Angulo cielo falso aluminio

Ins

1.3000

2,000.00

2,600.00

13,936

Tee cielo falso en aluminio

Ins

2.0000

2,000.00

4,000.00

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

16,457

Lamina icopor texturizado 18mm

Ins

und

1.4000

3,300.00

4,620.00

56
5,064

43 Material de prestamo, conglomerado (Incluye:


regalias, explotacion y cargue)
4
15,862

8,514.62

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0333

111,550.00

3,714.62

Material de prstamo (Conglomerado)

Ins

1.2000

4,000.00

4,800.00

46 Baranda en Madera 0.04 x 0.07 x 1

11,213.20

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2000

1,763.00

352.60

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2000

17,628.00

3,525.60

5,144

56

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

14,400

Tornillo goloso de 1 1/2``

Ins

und

2.0000

190.00

380.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

2.3000

670.00

1,541.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0200

52,200.00

1,044.00

15,726

Madera de 0.04 x 0.07 x 1

Ins

1.0000

4,370.00

4,370.00

49 Guaya de 7/8" (para amarre de Hexapodos)

19,889.40

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

15,659

Cable alma de acero (guaya) 7/8`` 6x26

Ins

1.0000

14,616.00

14,616.00

15,740

Perro de 7/8" Tipo pesado

Ins

und

0.1000

20,416.00

2,041.60

17
4,489

50 Material de prestamo (Incluye: regalias, explotacion


y cargue)

5,214.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4
858

Nombre

Tipo U.M.

Retroexcavadora 4 x 4 (llanta)

Eqp

Material de prestamo (tierra-arena-arcilla-limo)

Ins

51 Cal viva. Suministro e Instal.


17
4,489
16,300

Cantidad

Vr.Unitario

Vr.Total

HR

0.0333

111,550.00

3,714.62

1.2000

1,250.00

1,500.00

kg

613.59

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0100

1,469.00

14.69

Cuadrilla AA (Albaileria)

Ins

0.0100

14,690.00

146.90

Cal viva o Dolomita

Ins

kg

1.0000

452.00

452.00

53 Rellenos tierra negra, pagado por m3

86,288.20

Herramienta menor 5% M.O. AA

Eqp

HR

0.7000

735.00

514.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

Tierra Negra

Ins

1.1000

26,667.00

29,333.70

19

16,365

55 Demolicion paete A= 0.10, pagado por ml

1,994.63

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1200

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0010

55,550.00

55.55

Cuadrilla AA (Albaileria)

Ins

0.1200

14,690.00

1,762.80

4,489

58 Vidrio incoloro 3 mm. Suministro e Instal.

176.28

27,387.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

3,746

Vidrio incoloro 3 mm

Ins

1.0000

22,500.00

22,500.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17

16,093

61 Transporte de Materiales a lomo de Mula


16,308

Transporte por peso a lomo de Mula hasta 8 Km

kg
Ins

62 Transporte de materiales a lomo de Mula (Viaje de


100 Kg)
16,309

Transporte a lomo de Mula

51

3.0000

31.25

vj

Ins

63 Excavacion mecanica en Roca (martillo


neumatico) , pagado en m3

8,145

kg-km

93.75

vj

93.75

24,000.00

1.0000

24,000.00

24,000.00

137,383.80

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

3.4000

35,000.00

119,000.00

Ayudante de construccion

Ins

3.4000

5,407.00

18,383.80

70 Ductos electricos pvc de 4", pagado en ml

81,595.76

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

4,251

Ducto Electrico liviano EB 4"

Ins

1.0300

11,649.00

11,998.47

4,268

Union conduit PVC 4"

Ins

und

0.2100

23,149.00

4,861.29

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

Recebo comun

Ins

0.0100

10,000.00

100.00

17

14,759

71 Retiro material sobrante entre 1-5 km, pagado en


m3

13,420.44

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

17

Herramienta Menor 10% M.O. AA

Eqp

21

Volqueta (6 m3 )

Eqp

Cuadrilla AA (Albaileria)

Ins

4,489

72 Base en recebo comun compactado

Cantidad

Vr.Unitario

Vr.Total

HR

0.4400

1,469.00

646.36

HR

0.1136

55,550.00

6,310.48

0.4400

14,690.00

6,463.60

92,359.05

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

41

Vibrocompactador tipo rana

Eqp

HR

0.4000

5,000.00

2,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,143

Transporte de materiales m

Ana

1.3400

46,157.00

61,850.38

Recebo comun

Ins

1.3400

10,000.00

13,400.00

14,759

74 Empradizacion por Cespedon, pagado por m2

1,469.00

1,373.52

7,288.45

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1650

1,469.00

242.39

Material de prestamo (tierra-arena-arcilla-limo)

Ins

0.0300

1,250.00

37.50

3,684

Agua para obra

Ins

5.0000

10.00

50.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1650

14,690.00

2,423.85

5,143

Transporte de materiales m

Ana

0.0300

46,157.00

1,384.71

5,144

Transporte de materiales Tn

Ana

0.1800

0.00

0.00

5,765

Cesped (1.0 x 1.0)

Ins

1.0500

3,000.00

3,150.00

17
858

75 LLave Terminal Manguera 1/2", pagado por un

und

20,960.88

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0850

1,616.00

137.36

4,341

Llave jardn pesada

Ins

und

1.0000

19,350.00

19,350.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0850

16,159.00

1,373.52

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

55

14,020

76 Zapata en concreto para cimentacion de


resistencia 3000 Psi, pagado en m3

505,935.16

17

Herramienta Menor 10% M.O. AA

Eqp

HR

9.0000

1,469.00

13,221.00

49

Vibrador de concretos

Eqp

HR

1.1000

4,375.00

4,812.50

2,195

Planchon ordinario 3 M

Ins

3.0000

3,200.00

9,600.00

2,210

Tabla chapa ordinario 0.30

Ins

3.0000

4,000.00

12,000.00

2,243

Vara de clavo 3M -1

Ins

0.5000

1,500.00

750.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.0000

14,690.00

132,210.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

78 Empradizacion por Biomanto Tipo I, pagado por m2

7,001.72

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1350

1,469.00

198.32

3,682

Grama (Semilla)

Ins

kg

0.0010

25,000.00

25.00

3,684

Agua para obra

Ins

4.0000

10.00

40.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1350

14,690.00

1,983.15

13,326

Durmiente ordinario 3 M

Ins

0.7500

767.00

575.25

16,228

Telon en fique (2 x 50 m)

Ins

1.1000

3,800.00

4,180.00

17

79 Muro en bloque No. 5 de 0.12 mts, con andamio,


pagado en m2

28,484.49

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

HR

1,540

Mortero 1:4 (desperdicio 5%)

Ana

2,053

Bloque No. 5

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

13,641

Seccin de Andamio

Ins

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

17

80 Empradizacion por Biomanto Tipo II, pagado por


m2

Cantidad

Vr.Unitario

Vr.Total

0.8500

1,469.00

1,248.65

0.0100

248,144.84

2,481.45

13.2700

922.00

12,234.94

0.8500

14,690.00

12,486.50

0.0620

0.00

0.00

mes

0.0012

17,120.00

20.54

0.0050

2,482.00

12.41

Herramienta Menor 10% M.O. AA

Eqp

0.2000

1,469.00

293.80

3,684

Agua para obra

Ins

4.0000

10.00

40.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

13,326

Durmiente ordinario 3 M

Ins

0.7500

767.00

575.25

15,951

Estolon

Ins

und

12.0000

22.00

264.00

16,228

Telon en fique (2 x 50 m)

Ins

1.1000

3,800.00

4,180.00

17

81 Empradizacion por Barrera viva (Vetiver), pagado


por ml
17
4,489
16,229

HR

8,291.05

7,115.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

Pasto de corte tipo Vetiver (3 matines)

Ins

und

10.0000

550.00

5,500.00

82 Trincho Tipo I

36,299.10

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,144

Transporte de materiales Tn

Ana

0.0470

0.00

0.00

8,165

Estacas de Madera =0.10 L=0.60 m

Ins

und

1.0500

1,000.00

1,050.00

13,850

Alambre Galvanizado No. 12

Ins

kg

0.5000

5,000.00

2,500.00

14,128

Puntilla con cabeza 2 1/2"

Ins

lb

0.2200

1,990.00

437.80

14,778

Tabla burra cedro macho 0.30

Ins

3.0000

5,000.00

15,000.00

15,368

Estocon de Madera =0.15

Ins

1.5000

4,000.00

6,000.00

17

83 Sobrecimiento impermeabilizado e=0.15, pagado


ml

26,489.97

Impermeabilizado con Sika


Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

Cemento gris

Ins

kg

11.6900

383.34

4,481.24

2,085

Ladrillo tolete comn

Ins

und

12.1000

305.00

3,690.50

3,684

Agua para obra

Ins

4.6300

10.00

46.30

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

5,143

Transporte de materiales m

Ana

0.0300

46,157.00

1,384.71

5,144

Transporte de materiales Tn

Ana

0.0604

0.00

0.00

Sika 1 imp. integral

Ins

kg

0.3500

6,438.00

2,253.30

17
804

14,122

84 Excavacion de cortes, canales y prestamo en Rio


(Incluye: Transporte acarreo max. 200 m)

7,988.40

14

Retroexcavadora de orugas

Eqp

HR

0.0400

144,160.00

5,766.40

21

Volqueta (6 m3 )

Eqp

HR

0.0400

55,550.00

2,222.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

85 Paral en madera 0.04 x 0.07 x 1

Cantidad

Vr.Unitario

Vr.Total

9,846.31

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1666

1,763.00

293.72

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1667

17,628.00

2,938.59

5,144

56

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0200

52,200.00

1,044.00

15,726

Madera de 0.04 x 0.07 x 1

Ins

1.0000

4,370.00

4,370.00

15,986

Tornillo = 5/16" x 6" G-2 para Madera

Ins

und

2.0000

600.00

1,200.00

86 Flotador mecanico bola de cobre completo 2"

und

268,148.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

1,625

Flotador completo (bola de cobre) 2"

Ins

und

1.0000

220,748.00

220,748.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

55

87 Cruz en H.D. 2" x 2" J.H. Suministro e Instal.

und

110,206.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.3000

12,305.00

3,691.50

14,825

Cruz H.D. 2" x 2" jh

Ins

und

1.0000

88,740.00

88,740.00

55
4,515

88 Replanteo canchas, zonas duras / plazoletas


pagado en m2

1,122.18

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0200

1,469.00

29.38

1,617

Cuerda de nylon

Ins

0.2000

500.00

100.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0200

14,690.00

293.80

8,165

Estacas de Madera =0.10 L=0.60 m

Ins

und

0.2000

1,000.00

200.00

Durmiente - abarco 4mm

Ins

0.1000

3,000.00

300.00

17

14,775

89 Muro en ladrillo tolete comun e=0.12 m (12 x 24.5 x


6)

34,658.44

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0220

248,144.84

5,459.19

2,085

Ladrillo tolete comn

Ins

und

56.0000

305.00

17,080.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,144

Transporte de materiales Tn

Ana

0.1510

0.00

0.00

17

91 Tabla para piso 0.05 x 0.25 x 1.00

1,101.75

12,749.20

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2000

1,763.00

352.60

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2000

17,628.00

3,525.60

5,144

56

Transporte de materiales Tn

Ana

0.0095

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0550

52,200.00

2,871.00

15,992

Tabla 0.05 x 0.25 x 1

Ins

1.0000

6,000.00

6,000.00

93 Dinteles Concreto de 3000 psi 15 x 15 reforzado

35,382.57

Incluye refuerzo
17
1,572

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,101.75

Tabla burra ordinaria 0.10

Ins

0.1500

1,200.00

180.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

1,870

Alambre Negro No 18

Ins

1,901

Acero de refuerzo 37000 Psi

Ins

2,243

Vara de clavo 3M -1

4,489
5,053

kg

0.1100

3,903.00

429.33

kg

5.8000

2,295.00

13,311.00

Ins

0.0100

1,500.00

15.00

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0280

333,142.66

9,327.99

95 Alfajia ladrillo estructural, pagado en ml

Vr.Total

26,374.54

Imperm. con Tec


Herramienta Menor 10% M.O. AA

Eqp

HR

0.8600

1,469.00

Cemento gris

Ins

kg

2.3900

383.34

916.18

2,075

Ladrillo portante prensado

Ins

und

11.4000

950.00

10,830.00

3,684

Agua para obra

Ins

1.4200

10.00

14.20

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8600

14,690.00

12,633.40

Sika 1 imp. integral

Ins

kg

0.0900

6,438.00

579.42

17
804

14,122

96 Remates ladrillo prensado, pagado en ml

1,263.34

25,102.44

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

Cemento gris

Ins

kg

2.9400

383.34

1,127.02

2,076

Ladrillo prensado macizo

Ins

und

16.0000

600.00

9,600.00

3,684

Agua para obra

Ins

1.7500

10.00

17.50

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

17
804

97 Arcos 0.25 ladrillo prensado, pagado en ml

100,758.35

Herramienta Menor 10% M.O. AA

Eqp

HR

4.3500

1,469.00

6,390.15

Cemento gris

Ins

kg

5.0000

383.34

1,916.70

2,076

Ladrillo prensado macizo

Ins

und

15.8500

600.00

9,510.00

2,210

Tabla chapa ordinario 0.30

Ins

1.5800

4,000.00

6,320.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.4000

1,990.00

796.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.3500

14,690.00

63,901.50

13,326

Durmiente ordinario 3 M

Ins

4.0000

767.00

3,068.00

16,047

Liston m.h pino cipres

Ins

1.0000

8,580.00

8,580.00

17
804

98 Registro de corte =3" Tipo liviano. Suministro e


Instal.

und

210,680.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

1,837

Registro de corte = 3" Tipo liviano

Ins

und

1.0000

194,880.00

194,880.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

55

99 Enchapes fachada tableta, pagada en m2

27,576.63

Pega impermeable SIKA


Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

Cemento gris

Ins

kg

6.7100

383.34

2,572.21

2,253

Ladrillo 10 x 10

Ins

und

60.0000

174.00

10,440.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Sika 1 imp. integral

Ins

kg

0.1900

6,438.00

1,223.22

17
804

14,122

1,175.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

10

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

102 Alfajia concreto de 3000 PSI 0.20 x 0.07 reforzada,


pagada en m

Cantidad

Vr.Unitario

Vr.Total
24,083.29

CON REFUERZO
Herramienta Menor 10% M.O. AA

Eqp

HR

0.6667

1,469.00

979.38

Cemento gris

Ins

kg

2.0000

383.34

766.68

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.6200

2,295.00

3,717.90

2,208

Tabla chapa ordinario 0.10

Ins

0.6667

2,667.00

1,778.09

2,209

Tabla chapa ordinaria 0.20

Ins

0.3333

3,333.00

1,110.89

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

5,053

17
804

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0150

333,142.66

4,997.14

13,235

Liston ordinario 0.05 x 0.05

Ins

0.3333

1,300.00

433.29

13,326

Durmiente ordinario 3 M

Ins

0.3000

767.00

230.10

103 Suministro e instal. flotador automtico para


control de nivel, pagado por un

und

114,610.12

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,129

Cable al. aisl. pvc 1/0 awg

Ins

3.0000

8,294.00

24,882.00

15,543

Flotador completo (bola de cobre) 1/2"

Ins

und

1.0000

53,592.00

53,592.00

55

104 Retiro y traslado de Tuberia de alcantarilla de 36" ,


< a 1 Km

und

3,232.00

22,387.75

21

Volqueta (6 m3 )

Eqp

HR

0.2500

55,550.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2500

3,091.00

772.75

Cuadrilla AA-4

Ins

0.2500

30,910.00

7,727.50

13,960

105 Sondeo, limpieza de redes sanitarias/aguas lluvias


menor a 36" con suministro de agua
16,483

Sondeo redes desages/aguas lluvias hasta 16"

Ins

109 Viga metalica longitudinal 0.06 x 0.15 son 3 =1/2"


y celosia de 3/8"

13,887.50

11,000.00

1.0000

11,000.00

11,000.00

39,506.97

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

68

Equipo Pintura

Eqp

HR

0.4000

2,200.00

880.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.5000

5,313.00

2,656.50

Soldador

Ins

1.0000

6,759.00

6,759.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.3000

2,295.00

2,983.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0300

42,950.00

1,288.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.4500

2,257.00

7,786.65

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1429

5,800.00

828.82

519

111 Viga metalica transversal 0.10 x 0.25 son 2 =1/2"


+ 1 = 5/8" y celosia de 3/8"

48,419.10

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

11

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

44

Pulidora electrica manual

Eqp

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2875

4,350.00

1,250.63

HR

1.0000

1,616.00

68

Equipo Pintura

1,616.00

Eqp

HR

74

0.5000

2,200.00

1,100.00

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.5750

5,313.00

3,054.98

Soldador

Ins

1.1500

6,759.00

7,772.85

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.7000

2,295.00

3,901.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

5,144

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.1800

2,257.00

9,434.26

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1786

5,800.00

1,035.88

519

112 Bala incandescente 100 W, pagado en un

und

28,498.00

5,107

Cuadrilla AA (Electrica)

Ins

0.7000

15,140.00

10,598.00

5,285

Bala incadescente 9 cm especular prismtica

Ins

und

1.0000

17,900.00

17,900.00

113 Cauela concreto 0.20 x 0.12, pagada por ml

22,795.55

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,848

Tabla burra 3.00 m

Ins

0.3300

4,666.00

1,539.78

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0250

333,142.66

8,328.57

17

114 Recubrimiento sinttico multitruflex, pagado por


m2
2,676

Recubrimiento multitruflex T-MT

Ins

115 Sanitario fluxmetro blanco, pagado por un

1,175.20

16,200.00

1.0000

16,200.00

und

16,200.00

358,839.20

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

Cemento blanco

Ins

kg

1.0000

975.00

975.00

1,754

Sanitario fluxmetro blanco

Ins

und

1.0000

327,162.00

327,162.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.8000

16,159.00

29,086.20

55
829

120 Paete interior allanado, proporcin de la mezcla


1:4, espesor 1.5 cm, pagado en m2

1,616.00

13,505.64

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.4959

1,469.00

728.48

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0220

248,144.84

5,459.19

4,489

Cuadrilla AA (Albaileria)

Ins

0.4959

14,690.00

7,284.77

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

121 Paete liso (allanado) muros 1:4, incluye filos y


dilataciones, pagado en M2

15,526.09

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0220

248,144.84

5,459.19

4,328

Filos y dilataciones 1:4, pagado en ML

Ana

0.5000

4,231.58

2,115.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

12

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,641

Seccin de Andamio

Ins

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

125 Tuberia drenaje de gres 4", pagado en ml

Cantidad

Vr.Unitario

Vr.Total

mes

0.0012

17,120.00

20.54

0.0051

2,482.00

12.66

21,876.72

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

Cemento gris

Ins

kg

1.5000

383.34

575.01

3,434

Tubo drenaje de gres 4"

Ins

1.0300

10,148.00

10,452.44

3,684

Agua para obra

Ins

1.6000

10.00

16.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

Base Triturada T.max 1 1/2"

Ins

0.0300

33,329.00

999.87

17
804

14,777

126 Paete bajo placa 1:4 con filos y dilataciones,


pagado en M2

881.40

17,111.23

E=2; desp=10%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0320

248,144.84

7,940.63

4,328

Filos y dilataciones 1:4, pagado en ML

Ana

0.2500

4,231.58

1,057.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

127 Jarillon, con material granular de rio con acarreo


max. 100 m

11,632.04

E=2; desp=10%
14

Retroexcavadora de orugas

Eqp

HR

0.0370

144,160.00

5,333.92

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0167

130,650.00

2,181.86

21

Volqueta (6 m3 )

Eqp

HR

0.0741

55,550.00

4,116.26

128 Carpeta Asfaltica en MDC-2 e = 0.10 m

37,042.08

E=2; desp=10%
1

Compactador Vibratorio

Eqp

HR

0.0045

100,000.00

450.00

Terminadora de Asfalto o Finisher

Eqp

HR

0.0045

127,600.00

574.20

Compactador Neumatico

Eqp

HR

0.0045

120,900.00

544.05

Herramienta menor 10% M.O. AA-9

Eqp

HR

0.0045

5,795.00

26.08

13,849

Mezcla asfaltica MDC-2

Ins

0.1000

351,870.00

35,187.00

14,621

Cuadrilla AA-9 (Asfalto)

Ins

0.0045

57,945.00

260.75

24
110

129 Carpeta Asfaltica en MDC-2 e = 0.07 m

25,908.84

E=2; desp=10%
1

Compactador Vibratorio

Eqp

HR

0.0031

100,000.00

310.00

Terminadora de Asfalto o Finisher

Eqp

HR

0.0031

127,600.00

395.56

Compactador Neumatico

Eqp

HR

0.0031

120,900.00

374.79

Herramienta menor 10% M.O. AA-9

Eqp

HR

0.0031

5,795.00

17.96

13,849

Mezcla asfaltica MDC-2

Ins

0.0700

351,870.00

24,630.90

14,621

Cuadrilla AA-9 (Asfalto)

Ins

0.0031

57,945.00

179.63

24
110

130 Carpeta Asfaltica en MDC-2 e = 0.05 m

22,019.13

E=2.5; desp=20%
1

Compactador Vibratorio

Eqp

HR

0.0022

100,000.00

220.00

Terminadora de Asfalto o Finisher

Eqp

HR

0.0022

127,600.00

280.72

Compactador Neumatico

Eqp

HR

0.0022

120,900.00

265.98

Herramienta menor 10% M.O. AA-9

Eqp

HR

0.0022

5,795.00

12.75

24
110

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

13

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,849

Mezcla asfaltica MDC-2

Ins

14,621

Cuadrilla AA-9 (Asfalto)

Ins

131 Paete bajo malla 1:4, pagado en m2

Cantidad

Vr.Unitario

Vr.Total

0.0600

351,870.00

21,112.20

0.0022

57,945.00

127.48

14,069.47

E=2.5; desp=12%
Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

17
804

132 Paete bajo malla 1:5, pagado en m2

0.6000

1,469.00

881.40

10.2000

383.34

3,910.07

5.0000

10.00

50.00

0.0300

13,800.00

414.00

0.6000

14,690.00

8,814.00

13,390.32

E=2.5; desp=12%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

Cemento gris

Ins

kg

8.4500

383.34

3,239.22

3,684

Agua para obra

Ins

4.1700

10.00

41.70

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

17
804

133 Caja de inspeccion 40 x 40, pagada por un

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

5,144
8,194

17

111,434.44

4.2553

1,469.00

6,251.04

30.7400

383.34

11,783.87

0.0100

3,903.00

39.03

36.8200

305.00

11,230.10

15.7800

10.00

157.80

0.0500

13,800.00

690.00

4.2553

14,690.00

62,510.36

Ana

0.2800

46,157.00

12,923.96

Transporte de materiales Tn

Ana

0.4800

0.00

0.00

Acero de refuerzo 60000 Psi

Ins

kg

0.6000

2,257.00

1,354.20

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0800

15,660.00

1,252.80

13,961

Triturado de 1/2" - 3/4"

Ins

0.0700

46,304.00

3,241.28

804

134 Paete bajo guadua 1:5, pagado en m2

17,641.98

E=3; desp=12%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

Cemento gris

Ins

kg

6.8500

383.34

2,625.88

3,684

Agua para obra

Ins

5.9000

10.00

59.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

17
804

135 Caja de inspeccion 60 x 60

und

163,484.65

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

31.8800

10.00

318.80

4,426

Arena lavada de rio

Ins

0.1400

13,800.00

1,932.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.4832

14,690.00

80,548.21

5,143

Transporte de materiales m

Ana

0.3400

46,157.00

15,693.38

5,144

Transporte de materiales Tn

Ana

0.5480

0.00

0.00

17
804

5.4832

1,469.00

8,054.82

57.1900

383.34

21,923.21

0.0300

3,903.00

117.09

93.0000

305.00

28,365.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

14

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Acero de refuerzo 60000 Psi

Ins

kg

0.9000

2,257.00

2,031.30

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.1100

15,660.00

1,722.60

13,961

Triturado de 1/2" - 3/4"

Ins

0.0600

46,304.00

2,778.24

8,194

136 Caja de inspeccion 80 x 80

und

271,868.45

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

68.5200

10.00

685.20

4,426

Arena lavada de rio

Ins

0.2800

13,800.00

3,864.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.7929

14,690.00

85,097.70

5,143

Transporte de materiales m

Ana

0.5300

46,157.00

24,463.21

5,144

Transporte de materiales Tn

Ana

0.7560

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

15.2900

2,257.00

34,509.53

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0600

15,660.00

939.60

13,961

Triturado de 1/2" - 3/4"

Ins

0.1900

46,304.00

8,797.76

17
804

137 Caja de inspeccion 100 x 100

1,469.00

8,509.77

383.34

51,651.23

0.1500

3,903.00

585.45

173.0000

305.00

52,765.00

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

5,144
8,194

17

5.7929
134.7400

370,977.48

6.2549

1,469.00

9,188.45

204.0000

383.34

78,201.36

0.2300

3,903.00

897.69

264.0000

305.00

80,520.00

104.0000

10.00

1,040.00

0.4100

13,800.00

5,658.00

6.2549

14,690.00

91,884.48

Ana

0.7800

46,157.00

36,002.46

Transporte de materiales Tn

Ana

1.1500

0.00

0.00

Acero de refuerzo 60000 Psi

Ins

kg

23.4400

2,257.00

52,904.08

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0800

15,660.00

1,252.80

13,961

Triturado de 1/2" - 3/4"

Ins

0.2900

46,304.00

13,428.16

804

138 Caja de inspeccin fibrit trfico liviano, pagado por


un

und

140,807.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

2,828

Tapa caja trfico liviano 72 x 72 x 13 CAI-TL

Ins

und

1.0000

61,080.00

61,080.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

13,462

Caja de inspeccin fibrit panda 70 x 70 x 65

Ins

und

1.0000

47,209.00

47,209.00

14,759

Recebo comun

Ins

0.0200

10,000.00

200.00

17

139 Caja de inspeccin fibrit trfico pesado, pagado


por un

und

163,038.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

13,463

Caja de inspeccin fibrit profunda 70 x 70 x 97

Ins

und

1.0000

69,440.00

69,440.00

14,759

Recebo comun

Ins

0.0200

10,000.00

200.00

16,380

Tapa caja trfico pesado 72 x 72 x 13 CAI-TL

Ins

und

1.0000

61,080.00

61,080.00

17
4,489

140 Camaras electricas dobles, pagado por un

und

452,475.37

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

15

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,056

Ladrillo recocido oscuro

Ins

und

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

8,194

17
804

Cantidad

Vr.Unitario

Vr.Total

10.0000

1,469.00

14,690.00

255.5800

383.34

97,974.04

0.6200

3,903.00

2,419.86

527.4100

220.00

116,030.20

0.6200

13,800.00

8,556.00

10.0000

14,690.00

146,900.00

Acero de refuerzo 60000 Psi

Ins

kg

20.6300

2,257.00

46,561.91

13,961

Triturado de 1/2" - 3/4"

Ins

0.3400

46,304.00

15,743.36

14,759

Recebo comun

Ins

0.3600

10,000.00

3,600.00

142 Gavion en Piedra comun

180,588.77

Herramienta Menor 10% M.O. AA

Eqp

HR

3.5000

1,469.00

5,141.50

Piedra Comun

Ana

1.0000

82,093.10

82,093.10

4,489

Cuadrilla AA (Albaileria)

Ins

3.5000

14,690.00

51,415.00

5,061

Formaleta (1 uso)

Ana

0.3400

32,375.50

11,007.67

5,144

Transporte de materiales Tn

Ana

0.0107

0.00

0.00

13,847

Malla Para Gavion t. torsion 2 x 1 x 1

Ins

und

0.5000

52,863.00

26,431.50

13,850

Alambre Galvanizado No. 12

Ins

kg

0.9000

5,000.00

4,500.00

17
156

143 Espigo bridado PRFV =8" para acople de tuberia


(Suministro e inst. con tornilleria y empaques)

und

372,000.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

1,515

Espigo bridado en PRFV de 8"

Ins

und

1.0000

300,900.00

300,900.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

55

144 Rejilla de cribado fino 0.20 x 0.50 en acero


inoxidable con marco (suminist. e instal.)

und

199,621.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

565.60

1,810

Rejilla de Cribado 0.20 x 0.50 en A.I.

Ins

und

1.0000

193,400.00

193,400.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

55

146 Pasamanos Viga metalica 0.06 x 0.15 son 3 =1/2"


y celosia de 3/8" H= 0.90 m con herrajes

und

43,502.05

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

68

Equipo Pintura

Eqp

HR

0.4000

2,200.00

880.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.5000

5,313.00

2,656.50

Soldador

Ins

1.0000

6,759.00

6,759.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.2000

2,295.00

2,754.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0300

42,950.00

1,288.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.8500

2,257.00

6,432.45

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

519

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

16

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

15,779

Lamina HR 1/8"

Ins

147 Tapa pozo en va, pagado por un

Cantidad

Vr.Unitario

Vr.Total

0.2500

5,800.00

1,450.00

0.0300

64,382.59

1,931.48

und

171,307.51

2,823

Tapa pozo en vas D/0.60

Ins

und

1.0000

157,850.00

157,850.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9161

14,690.00

13,457.51

148 Caja para medidor de agua exterior y de pared

und

86,950.80

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

1,469.00

1,762.80

2,842

Caja contador acueducto 77*28*14

Ins

und

1.0000

67,560.00

67,560.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2000

14,690.00

17,628.00

17

151 Tapa para camara de media y baja tension AP

und

132,940.86

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0200

1,469.00

2,967.38

Soldador

Ins

1.5000

6,759.00

10,138.50

1,367

Placa de identificacin 8 x 5 CM

Ins

und

2.9800

9,500.00

28,310.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2500

6,805.00

1,701.25

1,901

Acero de refuerzo 37000 Psi

Ins

kg

4.0000

2,295.00

9,180.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0200

14,690.00

29,673.80

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.0330

378,352.56

12,485.63

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.4000

2,257.00

3,159.80

Platina 3/16" x 2 1/2"

Ins

2.8600

8,275.00

23,666.50

8
17
519

14,412

152 Tapa para camaras dobles AP

und

8,750.00

374,753.73

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

2.0000

8,750.00

17,500.00

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

7,345.00

Soldador

Ins

3.0000

6,759.00

20,277.00

1,367

Placa de identificacin 8 x 5 CM

Ins

und

2.0000

9,500.00

19,000.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5357

6,805.00

3,645.44

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1000

42,950.00

4,295.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0000

14,690.00

73,450.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.2100

378,352.56

79,454.04

8,194

Acero de refuerzo 60000 Psi

Ins

kg

34.2500

2,257.00

77,302.25

Platina 3/16" x 2 1/2"

Ins

8.4000

8,275.00

69,510.00

8
17
519

14,412

153 Marco para tapa de camara de inspeccion

und

74,530.67

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2857

6,805.00

1,944.19

2,458

Platina 1/4" x 2 1/2"

Ins

0.8000

8,463.00

6,770.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

3.0200

11,609.00

35,059.18

8
17

14,782

8,750.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

17

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

156 Piedra Comun

Cantidad

Vr.Unitario

Vr.Total

0.9000

11,436.00

10,292.40

82,093.10

Transporte de materiales m

Ana

1.2500

46,157.00

57,696.25

13,966

Piedra comun o bolo

Ins

1.2500

16,057.00

20,071.25

14,159

Ayudantes (Ay-2)

Ins

0.4000

10,814.00

4,325.60

5,143

157 Pendolon en Varilla de 1/2"

5,601.44

43

Equipo de Oxicorte

Eqp

HR

0.0175

5,000.00

44

Pulidora electrica manual

Eqp

HR

0.0175

4,350.00

76.13

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0700

1,616.00

113.12

68

Equipo Pintura

Eqp

HR

0.0350

2,200.00

77.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.0175

5,313.00

92.98

Soldador

Ins

0.0700

6,759.00

473.13

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0100

42,950.00

429.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0700

16,159.00

1,131.13

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.0000

2,257.00

2,257.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0030

6,200.00

18.60

14,745

Oxigeno Industrial

Ins

0.0150

15,662.00

234.93

14,746

Acetileno

Ins

kg

0.0050

41,820.00

209.10

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.0179

5,800.00

103.82

519

158 Tapon soldado PVC 3". Suministro e Instal.

und

87.50

16,385.33

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0180

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0180

28,250.00

508.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

Tapon soldado presin PVC 3

Ins

und

1.0000

13,744.00

13,744.00

15,088

159 Sumidero de 1.0 x 0.45 en ladrillo tolete, paete,


angulo y rejilla, placa piso en concreto

und

1,055.02

534,777.61

Herramienta Menor 10% M.O. AA

Eqp

HR

7.0000

1,469.00

10,283.00

187

Angulo 2" x 2" x 1/4". Suministro y colocacion

Ana

2.9000

16,138.77

46,802.43

804

Cemento gris

Ins

kg

181.2000

383.34

69,461.21

2,085

Ladrillo tolete comn

Ins

und

268.0000

305.00

81,740.00

3,684

Agua para obra

Ins

60.0000

10.00

600.00

4,426

Arena lavada de rio

Ins

0.4200

13,800.00

5,796.00

4,489

Cuadrilla AA (Albaileria)

Ins

7.0000

14,690.00

102,830.00

6,614

Piso en rejilla platina de 2" x 1/4", incluye instalacion

Ana

0.4500

405,333.00

182,399.85

8,194

Acero de refuerzo 60000 Psi

Ins

kg

5.6000

2,257.00

12,639.20

Triturado de 1/2" - 3/4"

Ins

0.4800

46,304.00

22,225.92

17

13,961

160 Formaleta metalica Tipo Caisson H=1.00 M DI=1.00


M, DE=1.10 M (para 20 usos)

und

790,281.50

42

Motosoldador Diesel

Eqp

HR

1.5000

14,833.00

22,249.50

43

Equipo de Oxicorte

Eqp

HR

1.5000

5,000.00

7,500.00

44

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

45

Cilindro

Eqp

HR

1.5000

41.00

61.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

18

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.5000

3,226.00

4,839.00

Lamina HR 5/16"

Ins

3.3000

191,819.00

633,002.70

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.5000

6,856.00

3,428.00

5,144

Transporte de materiales Tn

Ana

0.1500

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.5000

32,262.00

48,393.00

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

5.0000

11,609.00

58,045.00

48
381

163 Suministro e Instal. union mecanica rapida RDE 21


12"

Cantidad

Vr.Unitario

und

Vr.Total

512,073.45

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0900

12,305.00

1,107.45

15,265

Union mecanica rapida RDE 21 PVC 12 "

Ins

und

1.0000

494,807.00

494,807.00

4,515

164 Baranda en madera cedro, pagada en ml

16,159.00

84,933.75

Sub-Contrato Carpinteria

Esp

45.0000

58,575.00

26,358.75

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

3,789

Tornillo para madera 2" No. 9

Ins

und

2.0000

32.00

64.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.2500

2,480.00

620.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Cedro macho pieza 3.0

Ins

und

0.7000

55,000.00

38,500.00

4
56

13,452

165 Entramado teja de barro, pagado en m2

39,612.20

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,644.20

2,195

Planchon ordinario 3 M

Ins

2.6200

3,200.00

8,384.00

2,197

Repisa Ordinario 3 m

Ins

1.0300

1,500.00

1,545.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.3000

1,990.00

597.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

17

166 Teja en fibrocemento No.4, pagado en m2

24,190.17

No incluye entramado
19

Herramienta menor 5% M.O. AA

Eqp

HR

0.5333

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.0600

188.00

199.28

752

Teja ondulada de asbesto No.4 eternit

Ins

und

1.0616

13,800.00

14,650.08

830

735.00

391.98

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

3.1847

350.00

1,114.65

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

5,144

Transporte de materiales Tn

Ana

0.0121

0.00

0.00

167 Teja en fibrocemento No.6, pagado por m2

23,070.21

No incluye entramado
19

Herramienta menor 5% M.O. AA

Eqp

HR

0.5333

735.00

391.98

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.0600

188.00

199.28

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

2.0339

350.00

711.87

1,067

Teja ondulada de asbesto No.6 eternit

Ins

und

0.6780

20,550.00

13,932.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

830

168 Teja en fibrocemento No.8, pagado en m2

22,278.15

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

19

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

735.00

391.98

No incluye entramado
19

Herramienta menor 5% M.O. AA

Eqp

HR

0.5333

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.0600

188.00

199.28

755

Teja ondulada de asbesto No.8 eternit

Ins

und

0.4983

26,750.00

13,329.53

830

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

1.4948

350.00

523.18

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

5,144

Transporte de materiales Tn

Ana

0.0121

0.00

0.00

169 Caballete teja asbesto cemento, pagado ml

41,496.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5400

1,469.00

793.26

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

4.6000

350.00

1,610.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5400

14,690.00

7,932.60

5,144

Transporte de materiales Tn

Ana

0.0049

0.00

0.00

Caballete fijo teja ondulada asbesto 15, 20, 25

Ins

und

1.1500

27,096.00

31,160.40

17
830

15,513

170 Muro en ladrillo fachada de arcilla tipo prensado


macizo 12*6*24

58,772.89

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0600

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0300

248,144.84

7,444.35

2,076

Ladrillo prensado macizo

Ins

und

57.0000

600.00

34,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0600

14,690.00

15,571.40

5,144

Transporte de materiales Tn

Ana

0.1770

0.00

0.00

17

171 Muro en ladrillo prensado macizo 24.5 cm (24.5 x 5


x 12)

1,557.14

105,541.22

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2900

1,469.00

1,895.01

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0560

248,144.84

13,896.11

2,076

Ladrillo prensado macizo

Ins

und

118.0000

600.00

70,800.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2900

14,690.00

18,950.10

17

173 Pendolon en varilla de 5/8"

6,988.19

43

Equipo de Oxicorte

Eqp

HR

0.0175

5,000.00

44

Pulidora electrica manual

Eqp

HR

0.0175

4,350.00

76.13

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0700

1,616.00

113.12

68

Equipo Pintura

Eqp

HR

0.0350

2,200.00

77.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.0175

5,313.00

92.98

Soldador

Ins

0.0700

6,759.00

473.13

2,502

Anticorrosivo rojo claro

Ins

gal

0.0120

29,750.00

357.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0120

42,950.00

515.40

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0700

16,159.00

1,131.13

5,144

Transporte de materiales Tn

Ana

0.0015

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.5500

2,257.00

3,498.35

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0030

6,200.00

18.60

14,745

Oxigeno Industrial

Ins

0.0150

15,662.00

234.93

14,746

Acetileno

Ins

kg

0.0050

41,820.00

209.10

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.0179

5,800.00

103.82

519

174 Canaleta 90 de 3.75, pagado por m2


17

Herramienta Menor 10% M.O. AA

m
Eqp

HR

87.50

39,533.00

1.0000

1,469.00

1,469.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

20

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Canaleta asbesto cemento 90 X 3.75

Ins

und

0.3500

68,377.00

23,931.95

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.0800

12,760.00

1,020.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.8250

14,690.00

12,119.25

14,709

Tornillo para canaleta 90

Ins

und

0.3200

3,100.00

992.00

876

175 Canaleta 90 de 4.50, pagado por m2

35,386.03

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8300

1,469.00

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1000

12,760.00

1,276.00

2,327

Canaleta 90 x 4.5

Ins

und

0.2600

76,031.00

19,768.06

4,489

Cuadrilla AA (Albaileria)

Ins

0.8300

14,690.00

12,192.70

14,709

Tornillo para canaleta 90

Ins

und

0.3000

3,100.00

930.00

17

176 Cruz en H.D. 4" x 4" J.H. Suministro e Instal

und

1,219.27

227,692.30

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,118

Lubricante 500 gr

Ins

und

0.4500

12,305.00

5,537.25

16,347

Cruz H.D. 4" x 4" jh

Ins

und

1.0000

201,840.00

201,840.00

55
4,515

177 Viga Diagonal en madera 0.10 x 0.10 x 1 con perno

23,666.58

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3000

1,763.00

528.90

5,064

Cuadrilla DD (Carpinteria)

Ins

0.3000

17,628.00

5,288.40

5,144

56

Transporte de materiales Tn

Ana

0.0075

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0450

52,200.00

2,349.00

15,988

Madera de 0.10 x 0.10 x 1 Polin

Ins

1.0000

9,079.00

9,079.00

15,989

Tornillo = 9/16" x 10 " R.O con T.A

Ins

und

0.6700

9,584.00

6,421.28

178 Pasamuro en Hierro Fundido =2" L=0.5 m

und

109,385.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3333

1,469.00

489.62

1,626

Pasamuro en H.F. de 2" extremo Campana

Ins

und

1.0000

104,000.00

104,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3333

14,690.00

4,896.18

17

179 Pasamuro en H.F. = 4" L=0.50 m E.C. Suministro e


Instal.

und

245,385.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3333

1,469.00

489.62

1,627

Pasamuro en H.F. de 4" extremo Campana

Ins

und

1.0000

240,000.00

240,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3333

14,690.00

4,896.18

17

180 Viga Longitudinal en madera 0.10 x 0.15 x 1

24,166.91

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

56

Transporte de materiales Tn

Ana

0.0112

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0550

52,200.00

2,871.00

15,990

Madera de 0.10 x 0.15 x 1

Ins

1.0000

6,960.00

6,960.00

15,991

Tornillo = 9/16" x 15 " R.O con T.A

Ins

und

0.6600

14,376.00

9,488.16

181 Paral en madera 0.10 x 0.20 x 1


56

Herramienta Menor 10% M.O. DD

m
Eqp

HR

20,975.68

0.2000

1,763.00

352.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

21

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,515

Cuadrilla BB (Instalaciones)

Ins

5,144

Transporte de materiales Tn

Ana

0.2000

16,159.00

3,231.80

0.0150

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

0.00

Ins

gal

15,987

0.0500

52,200.00

2,610.00

Madera de 0.10 x 0.20 x 1 Polin

Ins

1.0000

8,360.00

15,989

8,360.00

Tornillo = 9/16" x 10 " R.O con T.A

Ins

und

0.6700

9,584.00

6,421.28

182 Sobrecimientos en ladrillo tolete recocido 0.15,


pagado en ml

29,873.35

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

1,541

Mortero 1:5 (desperdicio 5 %)

Ana

0.0500

221,256.93

11,062.85

2,059

Ladrillo tolete recocido

Ins

und

12.1000

300.00

3,630.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0170

0.00

0.00

Sika 1 imp. integral

Ins

kg

0.3500

6,438.00

2,253.30

17

14,122

183 Canaleta 43 de 5.00, pagado por m2

62,216.89

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

1,112

Canaleta 43 asbesto cemento x 500

Ins

und

0.4800

94,000.00

45,120.00

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1100

12,760.00

1,403.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

Tornillo para canaleta 43 MET

Ins

und

0.4800

713.00

342.24

17

14,715

184 Canaleta 43 de 5.50, paagada por m2

56,857.78

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1000

12,760.00

1,276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

14,715

Tornillo para canaleta 43 MET

Ins

und

0.8600

713.00

613.18

14,716

Canaleta asbesto cemento 43 x 550

Ins

und

0.5000

80,851.00

40,425.50

17

185 Canaleta 43 de 6.00, pagada por m2

1,322.10

58,625.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

1,114

Canaleta 43 asbesto cemento x 600

Ins

und

0.3800

110,514.00

41,995.32

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1200

12,760.00

1,531.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

Tornillo para canaleta 43 MET

Ins

und

0.7800

713.00

556.14

17

14,715

186 Compuerta deslizable manual en PRFV 0.42 x 0.65


m, en PFVR (Incl: Marco en PFRV y anclajes),
suminis. e inst.

und

513,300.00

Espesor promedio= 5 cm
Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,099

Compuerta deslizable manual en PRFV 0.42 x 0.65 m

Ins

und

1.0000

477,750.00

477,750.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0900

0.00

0.00

55

187 Angulo 2" x 2" x 1/4". Suministro y colocacion

16,138.77

Sub Contrato Todo Costo


8
19
519

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0350

8,750.00

306.25

Herramienta menor 5% M.O. AA

Eqp

HR

0.0833

735.00

61.23

Soldador

Ins

0.0833

6,759.00

563.02

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

22

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla AA (Albaileria)

Ins

0.0833

14,690.00

1,223.68

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

1.0000

13,493.00

13,493.00

4,489

188 Muro en ladrillo tolete comun 0.06 m (6 x 24.5 x 12


pandereta)

Herramienta Menor 10% M.O. AA

Eqp

HR

1,540

Mortero 1:4 (desperdicio 5%)

Ana

2,085

Ladrillo tolete comn

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

17

189 Teja espaola de barro, pagada en m2

24,808.57

0.8600

1,469.00

1,263.34

0.0071

248,144.84

1,761.83

und

30.0000

305.00

9,150.00

0.8600

14,690.00

12,633.40

0.1500

0.00

0.00

45,735.70

No incluye entramado
Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

Cemento gris

Ins

kg

9.6700

383.34

3,706.90

2,364

Teja Bavaria

Ins

1.2000

21,228.00

25,473.60

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0300

14,690.00

15,130.70

17
804

190 Canaleta lamina galvanizada 6.00 MTS.

31,092.60

calibre 24
Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

Canaleta 90 lmina galvanizada L = 6.00

Ins

und

0.1900

120,000.00

22,800.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

14,709

Tornillo para canaleta 90

Ins

und

0.5900

3,100.00

1,829.00

17
864

191 Cruz en H.D. 6" x 6" E.L. Suministro e Instal.

und

455,672.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

2,699

Cruz H.D. 6" x 6" E.L.

Ins

und

1.0000

421,080.00

421,080.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Lubricante 500 gr

Ins

und

0.5000

12,305.00

6,152.50

55

14,118

192 Suministro e instal. canal en latn 50 cms, pagado


ml

61,734.22

Sub-Contrato Latoneria

Esp

80.0000

34,296.79

27,437.43

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8100

1,469.00

1,189.89

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.4000

20,300.00

8,120.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0350

42,950.00

1,503.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.8100

14,690.00

11,898.90

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2500

46,339.00

11,584.75

1
17

15,746

193 Empedrado, para camino de herradura. A= 1.00 m,


E= 0.20 m

62,758.69

Retiro de material (riego lateral)

Ana

0.2000

7,051.25

1,410.25

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0500

248,144.84

12,407.24

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

0.0500

354,419.99

17,721.00

5,063

Piedra rajon o media zonga

Ana

0.1200

90,495.15

10,859.42

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.2400

76,218.46

18,292.43

200

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

23

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,988

Nombre

Tipo U.M.

Rellenos de excavacion (con material local), pagado en


M3

Ana

194 Muro en ladrillo prensado 5.5 cm (5.5 x 12 x 24.5


pandereta)

Cantidad

Vr.Unitario

Vr.Total

0.2000

10,341.76

2,068.35

33,509.68

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8600

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0065

248,144.84

1,612.94

2,076

Ladrillo prensado macizo

Ins

und

30.0000

600.00

18,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8600

14,690.00

12,633.40

5,144

Transporte de materiales Tn

Ana

0.1500

0.00

0.00

17

195 Flanche laton lamina galvanizada cal. 22 A = 0.20,


pagado por ml

1,263.34

20,276.14

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4700

1,469.00

690.43

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

2,502

Anticorrosivo rojo claro

Ins

gal

0.0090

29,750.00

267.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.4700

14,690.00

6,904.30

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2500

46,339.00

11,584.75

17

15,746

196 Valvula de coladera = 2 1/2". Suministro e Instal.

und

316,687.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,831

Valvula de coladera = 2 1/2"

Ins

und

1.0000

307,400.00

307,400.00

55
4,515

197 Registro de corte = 4" Tipo liviano. Suministro e


Instal.

und

364,391.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

1,828

Registro de corte = 4" Tipo liviano

Ins

und

1.0000

340,692.00

340,692.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

55

198 Pintura Aluminio antirreflectiva para tuberia =4"


Pasos elevados

4,209.77

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1250

1,469.00

183.63

1,405

Pintura aluminio antirreflectiva

Ins

gal

0.0294

74,486.00

2,189.89

4,489

Cuadrilla AA (Albaileria)

Ins

0.1250

14,690.00

1,836.25

17

199 Pintura epoxica para tuberia =4" .


17
4,489
14,980

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0677

1,469.00

99.45

Cuadrilla AA (Albaileria)

Ins

0.0677

14,690.00

994.51

Pintura esmalte Epxico

Ins

gal

0.0444

224,109.00

9,950.44

200 Retiro de material (riego lateral)


73
8,145

11,044.40

7,051.25

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

1.2500

234.00

292.50

Ayudante de construccion

Ins

1.2500

5,407.00

6,758.75

201 Madera para pasamanos (0.05 x 0.10 )

10,172.01

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

24

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta menor 5% M.O. AA

Eqp

HR

0.1500

735.00

110.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

5,144

Transporte de materiales Tn

Ana

0.0038

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0333

52,200.00

1,738.26

15,985

Madera de 0.05 x 0.10 x 1

Ins

1.0000

4,920.00

4,920.00

15,986

Tornillo = 5/16" x 6" G-2 para Madera

Ins

und

2.0000

600.00

1,200.00

19

202 Reduccion en HF 6" x 3" E.L. Suministro e Instal.

und

134,398.18

Herramienta Menor 5% M.O. BB

Eqp

HR

0.8000

808.00

646.40

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

14,156

Reduccion en HF 6" x 3" E.L.

Ins

und

1.0000

120,640.00

120,640.00

109
4,515

203 Reduccion en HF 6" x 4" E.L. Suministro e Instal.

und

175,491.58

Herramienta Menor 5% M.O. BB

Eqp

HR

1.0000

808.00

808.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

13,648

Reduccion en HF 6" x 4" E.L.

Ins

und

1.0000

158,340.00

158,340.00

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

109
4,515

206 Muro en ladrillo tolete recocido 0.25 (12 x 25 x 6),


pagado por m2

58,110.23

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3000

1,469.00

1,909.70

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0520

248,144.84

12,903.53

2,056

Ladrillo recocido oscuro

Ins

und

110.0000

220.00

24,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.3000

14,690.00

19,097.00

5,144

Transporte de materiales Tn

Ana

0.5500

0.00

0.00

17

207 Muro en bloque concreto 0.10, pagado por m2

26,058.93

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7200

1,469.00

1,057.68

1,456

Bloque de Concreto 10 x 20 x 40

Ins

und

13.2700

900.00

11,943.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0100

248,144.84

2,481.45

4,489

Cuadrilla AA (Albaileria)

Ins

0.7200

14,690.00

10,576.80

17

208 Muro en bloque concreto 0.20, pagado por m2

46,591.32

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1200

1,469.00

1,645.28

1,457

Bloque de Concreto 20 x 20 x 40

Ins

und

11.4900

1,400.00

16,086.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0500

248,144.84

12,407.24

4,489

Cuadrilla AA (Albaileria)

Ins

1.1200

14,690.00

16,452.80

17

210 Dinteles en bloque 0.15, pagado en ml

15,283.24

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4500

1,469.00

661.05

804

Cemento gris

Ins

kg

3.1500

383.34

1,207.52

2,053

Bloque No. 5

Ins

und

3.6000

922.00

3,319.20

3,684

Agua para obra

Ins

2.6600

10.00

26.60

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.4100

2,257.00

3,182.37

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

25

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

211 Dintel en mortero 1:3, pagado en ml

Cantidad

Vr.Unitario

Vr.Total
14,770.51

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4500

1,469.00

661.05

Cemento gris

Ins

kg

2.1000

383.34

805.01

2,210

Tabla chapa ordinario 0.30

Ins

0.2000

4,000.00

800.00

2,243

Vara de clavo 3M -1

Ins

0.4400

1,500.00

660.00

3,684

Agua para obra

Ins

1.7700

10.00

17.70

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.2500

2,257.00

5,078.25

17
804

214 Viga longitudinal en madera o cuarton 0.05 x 0.10 x


1

12,728.64

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1800

1,763.00

317.34

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1800

17,628.00

3,173.04

5,144

56

Transporte de materiales Tn

Ana

0.0038

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0333

52,200.00

1,738.26

15,993

Madera o Cuarton de 0.05 x 0.10 x 1.0

Ins

1.0000

7,500.00

7,500.00

216 Valvula compuerta elastica vastago ascendente


=6" E.B. Suministro e instal.
55
4,515
16,178

und

1,651,020.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. vast. asc. (comp. elast.) e. brida 6"

Ins

und

1.0000

1,579,920.00

1,579,920.00

217 Arcos 0.25 ladrillo prensado, pagado en ml

93,478.35

Herramienta Menor 10% M.O. AA

Eqp

HR

4.3500

1,469.00

6,390.15

Cemento gris

Ins

kg

5.0000

383.34

1,916.70

2,076

Ladrillo prensado macizo

Ins

und

15.8500

600.00

9,510.00

2,210

Tabla chapa ordinario 0.30

Ins

1.5800

4,000.00

6,320.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.4000

1,990.00

796.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.3500

14,690.00

63,901.50

13,235

Liston ordinario 0.05 x 0.05

Ins

1.0000

1,300.00

1,300.00

13,326

Durmiente ordinario 3 M

Ins

4.0000

767.00

3,068.00

17
804

218 Valvula de bola en H.D. 2"

und

100,441.25

Cuadrilla BB (Instalaciones)

Ins

0.5714

16,159.00

9,233.25

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,530

Valvula de bola para agua H.D. 2"

Ins

und

1.0000

83,288.00

83,288.00

4,515

219 Enchapes fachada tableta, pagada por m2

27,576.63

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

Cemento gris

Ins

kg

6.7100

383.34

2,572.21

2,253

Ladrillo 10 x 10

Ins

und

60.0000

174.00

10,440.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Sika 1 imp. integral

Ins

kg

0.1900

6,438.00

1,223.22

17
804

14,122

1,175.20

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

26

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

221 Chimeneas 0.80, pagadas por un

Cantidad

Vr.Unitario

und

Vr.Total

531,591.10

Herramienta Menor 10% M.O. AA

Eqp

HR

25.0000

1,469.00

36,725.00

Cemento gris

Ins

kg

62.5800

383.34

23,989.42

1,870

Alambre Negro No 18

Ins

kg

0.1600

3,903.00

624.48

2,058

Ladrillo prensado rejilla

Ins

und

73.5000

550.00

40,425.00

2,059

Ladrillo tolete recocido

Ins

und

159.6000

300.00

47,880.00

3,684

Agua para obra

Ins

52.3200

10.00

523.20

4,426

Arena lavada de rio

Ins

0.1300

13,800.00

1,794.00

4,489

Cuadrilla AA (Albaileria)

Ins

25.0000

14,690.00

367,250.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

5.2800

2,257.00

11,916.96

Triturado de 1/2" - 3/4"

Ins

0.0100

46,304.00

463.04

17
804

13,961

222 Alfajias en tabln, pagado en ml

15,802.94

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7700

1,469.00

Cemento gris

Ins

kg

0.9300

383.34

356.51

2,601

Tablon tono natural

Ins

0.2600

11,000.00

2,860.00

3,684

Agua para obra

Ins

0.6000

10.00

6.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7700

14,690.00

11,311.30

17
804

223 Alfajias en concreto de 3000 psi 0.15, pagado en ml

1,131.13

22,165.48

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7700

1,469.00

1,131.13

Cemento gris

Ins

kg

0.7100

383.34

272.17

1,870

Alambre Negro No 18

Ins

kg

0.0200

3,903.00

78.06

2,208

Tabla chapa ordinario 0.10

Ins

0.1800

2,667.00

480.06

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7700

14,690.00

11,311.30

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0200

318,473.24

6,369.46

5,143

Transporte de materiales m

Ana

0.0100

46,157.00

461.57

5,144

Transporte de materiales Tn

Ana

0.0015

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.7300

2,257.00

1,647.61

Durmiente ordinario 3 M

Ins

0.3600

767.00

276.12

17
804

13,326

224 Alfajias concreto 0.25, pagado por ml

36,080.10

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5900

1,469.00

2,335.71

Cemento gris

Ins

kg

1.1900

383.34

456.17

1,870

Alambre Negro No 18

Ins

kg

0.0300

3,903.00

117.09

2,208

Tabla chapa ordinario 0.10

Ins

0.1800

2,667.00

480.06

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.5900

14,690.00

23,357.10

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0200

333,142.66

6,662.85

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.0000

2,257.00

2,257.00

Durmiente ordinario 3 M

Ins

0.3600

767.00

276.12

17
804

13,326

225 Alfajias ladrillo prensado, pagado en ml


17
804
2,076

22,687.12

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8600

1,469.00

Cemento gris

Ins

kg

2.3900

383.34

916.18

Ladrillo prensado macizo

Ins

und

12.8700

600.00

7,722.00

1,263.34

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

27

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,684

Agua para obra

Ins

1.4200

10.00

14.20

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8600

14,690.00

12,633.40

5,144

Transporte de materiales Tn

Ana

0.0345

0.00

0.00

226 Enchapes ladrillo prensado, pagado en m2

Cantidad

Vr.Unitario

Vr.Total

32,994.01

Cemento gris

Ins

kg

8.0500

383.34

1,854

Disco Diamantado 14" x 350 mm

Ins

und

0.0001

834,200.00

83.42

2,076

Ladrillo prensado macizo

Ins

und

33.0000

600.00

19,800.00

3,684

Agua para obra

Ins

5.2000

10.00

52.00

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6413

14,690.00

9,420.70

804

228 Instalacin carpintera metlica con mortero 1:3,


pagada por m2

3,085.89

16,865.43

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0100

276,302.97

2,763.03

4,489

Cuadrilla AA (Albaileria)

Ins

0.9600

14,690.00

14,102.40

229 Chazos para carpintera madera, pagado por un

und

3,630.18

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1500

1,469.00

Cemento gris

Ins

kg

0.1000

383.34

38.33

2,238

Chazo para madera 10 x 10

Ins

und

1.0300

1,000.00

1,030.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

17
804

230 Mesones en concreto de 3000 psi 0.10 mts, A =


0.60 pagado M2

220.35

128,153.42

Herramienta Menor 10% M.O. AA

Eqp

HR

1.9500

1,469.00

2,864.55

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0090

248,144.84

2,233.30

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.3400

3,903.00

1,327.02

1,901

Acero de refuerzo 37000 Psi

Ins

kg

11.2000

2,295.00

25,704.00

2,085

Ladrillo tolete comn

Ins

und

56.8700

305.00

17,345.35

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.0000

4,300.00

4,300.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

1.2000

3,500.00

4,200.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.0000

1,990.00

3,980.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.9500

14,690.00

28,645.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,144

Transporte de materiales Tn

Ana

0.1820

0.00

0.00

Durmiente ordinario 3 M

Ins

3.8300

767.00

2,937.61

17

13,326

232 Chimenea carioca combinada, pagada por un


641

Chimenea carioca combinada

und
Ins

238 Acero de Transferencia liso de 60000 Psi


19
1,850

und

1,418,000.00

1.0000

1,418,000.00

kg

1,418,000.00

2,973.32

Herramienta menor 5% M.O. AA

Eqp

HR

0.0265

735.00

19.48

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

28

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

Acero de refuerzo 60000 Psi (liso)

Ins

15,604

239 Drenaje en Tuberia PVC RDE 21 de 4" para


Puentes (con rejilla 0.15 x 0.45 m

Cantidad

Vr.Unitario

Vr.Total

0.0265

14,690.00

389.29

0.0010

0.00

0.00

kg

1.0500

2,371.00

2,489.55

und

45,503.60

Soldador

Ins

2.0000

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

4,489

Cuadrilla AA (Albaileria)

Ins

8,194

Acero de refuerzo 60000 Psi

Ins

Tubo presin RDE 21 PVC 4 "

Ins

519

15,002

241 Sardinel en Concreto 3000 Psi 0.5 m x 0.3 m x 0.15


m (Con ref.)

6,759.00

13,518.00

1.0000

6,805.00

6,805.00

0.1600

14,690.00

2,350.40

kg

2.1000

2,257.00

4,739.70

0.5000

36,181.00

18,090.50

57,040.03

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

675.74

49

Vibrador de concretos

Eqp

HR

0.1352

4,375.00

591.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.7000

3,092.35

11,441.70

242 Sardinel en Concreto 3000 Psi 0.4 m x 0.3 m x 0.15


m (Con ref.)

49,604.09

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

675.74

49

Vibrador de concretos

Eqp

HR

0.1352

4,375.00

591.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0900

333,142.66

29,982.84

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.4500

3,092.35

10,668.61

247 Juego completo de incrustar bao, pagado por UN

und

87,051.30

Herramienta Menor 10% M.O. AA

Eqp

HR

2.2000

1,469.00

3,231.80

Cemento blanco

Ins

kg

1.5400

975.00

1,501.50

4,489

Cuadrilla AA (Albaileria)

Ins

2.2000

14,690.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Juego accesorios bao porcelana blanca

Ins

und

1.0000

50,000.00

50,000.00

17
829

15,591

248 Viga Transversal en madera 0.10 x 0.20 x 1

15,817.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

56

Transporte de materiales Tn

Ana

0.0150

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0500

52,200.00

2,610.00

15,987

Madera de 0.10 x 0.20 x 1 Polin

Ins

1.0000

8,360.00

8,360.00

249 Baranda en Malla eslabonada cal. 10

14,619.30

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0025

47,500.00

118.75

Esmalte Sintetico Pintuco

Ins

gal

0.0250

42,950.00

1,073.75

3,837

293.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

29

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

0.2000

14,690.00

2,938.00

0.0024

0.00

13,850

Alambre Galvanizado No. 12

0.00

Ins

kg

15,556

Malla eslabonada Cal. 10

0.0350

5,000.00

175.00

Ins

1.0000

10,020.00

10,020.00

250 Pintura en esmalte para Guayas, cables y varillas (2


manos)

1,751.89

Herramienta menor 10% M.O. CC

Eqp

HR

0.0667

1,689.00

112.66

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0800

1,691.00

135.28

1,990

Disolvente Thinner

Ins

gal

0.0027

12,440.00

33.59

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0080

42,950.00

343.60

5,066

Cuadrilla CC (Pintura)

Ins

0.0667

16,893.00

1,126.76

61

251 Remate bocel win plastico


829
4,489
15,827

Cemento blanco

Ins

kg

0.2000

975.00

195.00

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

Bocel win plstico

Ins

1.0500

1,667.00

1,750.35

252 Valvula de Mariposa =3" en H.F. (suministro e


Instal.)
55
4,515
14,855

4,883.35

und

406,150.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Valvula de Mariposa =3" en HF disco en A.I.

Ins

und

1.0000

370,600.00

370,600.00

253 Compuerta deslizable manual en PRFV 0.45 x 0.60


m, en PFVR (Incl: Marco en PFRV y anclajes),
suminis. e inst.

und

508,050.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,207

Compuerta deslizable manual en PRFV 0.45 x 0.60 m

Ins

und

1.0000

472,500.00

472,500.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0900

0.00

0.00

55

254 Tierra Tablero General Distribuidor, pagado por


Un

und

179,022.50

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cable de cobre desnudo N 1/0, 7H

Ins

2.0000

13,100.00

26,200.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

14,284

Soldadura exotermica 115 gr.

Ins

und

1.5000

21,847.00

32,770.50

14,299

Varilla de Cobre de 5/8" x 1.8 mts.

Ins

und

1.0000

48,952.00

48,952.00

55
848

255 Codo PRFV 90 =4" E.B x E.B. Incluye: empaques


y tornilleria. Suministro e Instal.

und

301,700.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,222

Codo PRFV 90 =4" B x B. (Inc: empa, y torni.)

Ins

und

1.0000

266,150.00

266,150.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

55

256 Rejilla metalica 3" * 2" con sosco, pagado un

und

9,121.14

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

30

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

17
804
4,489
15,745

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cemento gris

Ins

Cuadrilla AA (Albaileria)

Ins

Rejilla metlica sosco 3 x 2"

Ins

und

257 Strip telefonos 20 pares

Cantidad

Vr.Unitario

Vr.Total

HR

0.3300

1,469.00

484.77

kg

0.2000

383.34

76.67

0.3300

14,690.00

4,847.70

1.0000

3,712.00

3,712.00

und

220,706.73

Caja 40 x 45 x 12 cm

Ins

und

1.0000

35,000.00

35,000.00

1,231

Placa identificacin 2 x 1 cm

Ins

und

20.0000

3,000.00

60,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

5.7681

16,159.00

93,206.73

Regleta strip telefnico 20 pares

Ins

und

1.0000

32,500.00

32,500.00

412

13,647

258 Desmonte y limpieza en zona boscosa (por Ha)

ha

188,915.00

38

Motosierra o equipo de desmonte

Eqp

HR

2.7500

5,350.00

14,712.50

40

Guadaadora

Eqp

HR

5.7500

12,000.00

69,000.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

3.7500

2,550.00

9,562.50

Cuadrilla AA-3 (Limpieza)

Ins

3.7500

25,504.00

95,640.00

14,749

259 Acometica hidrulica PVC 1/2" 5 metros, pagada


por UN

und

291,529.62

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

1,841

Cheque hidro 1 1/2"

Ins

und

1.0500

117,508.00

123,383.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

211,253.35

80,276.27

14,757

Registro paso directo 1/2"

Ins

und

1.0500

22,000.00

23,100.00

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

5.1500

1,504.00

7,745.60

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.0500

375.00

768.75

55

260 Acometida red hidraulica pvc 3/4" x 10 ml, pagado


un

und

176,249.74

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

127,717.20

48,532.54

14,995

Tubo presin RDE 21 PVC 3/4 "

Ins

10.3000

1,873.00

19,291.90

15,022

Codo 90 presion PVC 3/4"

Ins

und

4.1000

601.00

2,464.10

16,324

Cheque hidro 3/4"

Ins

und

1.0000

29,000.00

29,000.00

55

261 Sanitario fluxmetro, pagado por un

und

6,464.00

538,927.50

131

Taza fluxometro completa

Ins

und

1.0000

510,000.00

510,000.00

788

Instalacion de aparatos sanitarios, pagado en und

Ana

und

1.0000

28,927.50

28,927.50

262 Red de suministro PVC 3/4", pagado en ML

10,160.22

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

55

565.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

31

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,992

Tubo presion RDE 11 PVC 3/4 "

Ins

15,022

Codo 90 presion PVC 3/4"

Ins

263 Filos y dilataciones Mortero 1:3, pagado en ML

Cantidad

Vr.Unitario

Vr.Total

1.0500

2,907.00

3,052.35

und

0.5000

601.00

300.50

4,381.41

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1600

1,469.00

235.04

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0065

276,302.97

1,795.97

4,489

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

17

264 Goteros, pagado en ml

5,019.09

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2300

1,469.00

337.87

Cemento gris

Ins

kg

3.0000

383.34

1,150.02

3,684

Agua para obra

Ins

1.4500

10.00

14.50

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2300

14,690.00

3,378.70

17
804

265 Paete interior allanado, proporcin de la mezcla


1:4, espesor 2 cm, pagado en m2

12,557.34

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0426

1,469.00

62.58

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0250

248,144.84

6,203.62

4,489

17

Cuadrilla AA (Albaileria)

Ins

0.4260

14,690.00

6,257.94

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

266 Paete liso (allanado) muros 1:3, incluye filos y


dilat., pagado en M2

16,220.49

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

Filos y dilataciones Mortero 1:3, pagado en ML

Ana

0.5000

4,381.41

2,190.71

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0220

276,302.97

6,078.67

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17
263

267 Pintura Aluminio antirreflectiva para tuberia =3"


Pasos elevados

3,172.54

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0940

1,469.00

138.09

1,405

Pintura aluminio antirreflectiva

Ins

gal

0.0222

74,486.00

1,653.59

4,489

Cuadrilla AA (Albaileria)

Ins

0.0940

14,690.00

1,380.86

17

268 Punto desage sanitario pvc 3" o 4"

und

83,290.41

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

1.0000

4,485.00

4,485.00

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

1.0000

7,729.00

7,729.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

60,355.37

22,935.04

15,438

Tubo PVC sanitario de 3"

Ins

0.9300

10,595.00

9,853.35

15,439

Tubo PVC sanitario de 4"

Ins

0.2700

14,766.00

3,986.82

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

32

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

271 Valvula de Pie bronce integral =2". Suministro e


instal.

Cantidad

Vr.Unitario

und

Vr.Total
176,527.58

Herramienta Menor 5% M.O. BB

Eqp

HR

1.1429

808.00

923.46

2,263

Valvula de Pie bronce Integral =2"

Ins

und

1.0000

156,136.00

156,136.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

109

14,020

272 Bajante A.LL. PVC 4", pagado por ml

28,475.82

Sub-Contrato Sanitario

Esp

38.0000

20,634.65

7,841.17

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

0.0600

7,729.00

463.74

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

Tubo PVC A. LL. 4"

Ins

1.0500

10,467.00

10,990.35

2
55

12,047

273 Perro de 3/8" Tipo Pesado. Suministro e Instal.

und

8,162.23

Herramienta menor 5% M.O. AA

Eqp

HR

0.0476

735.00

34.99

4,489

Cuadrilla AA (Albaileria)

Ins

0.0476

14,690.00

699.24

15,506

Perro de 3/8" Tipo pesado.

Ins

und

1.0000

7,428.00

7,428.00

19

274 Paete liso placas 1:5, pagado por m2

10,633.36

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4800

1,469.00

705.12

Cemento gris

Ins

kg

6.3000

383.34

2,415.04

3,684

Agua para obra

Ins

4.8000

10.00

48.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4800

14,690.00

7,051.20

17
804

275 Bajante A.N. PVC 4", pagado por ml

35,931.54

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5500

1,616.00

888.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

0.0600

7,729.00

463.74

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5500

16,159.00

8,887.45

5,144

Transporte de materiales Tn

Ana

13,607

Sub-Contrato Hidraulico Sanitario

Esp

15,439

Tubo PVC sanitario de 4"

Ins

55

276 Niple = 2" en A.C. con E.L x E.B. L=3.20 m.


Suministro e Instal.

%
m

0.0036

0.00

0.00

38.0000

26,037.35

9,894.19

1.0500

14,766.00

15,504.30

und

244,440.82

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

0.5000

3,330.00

1,665.00

Soldador

Ins

0.5000

6,759.00

3,379.50

2,307

Niple = 2" en A.C. con E.L x E.B. L=3.20 m

Ins

und

1.0000

229,680.00

229,680.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1429

5,800.00

828.82

519

14,795

277 Reduccion en HF 8" x 6" E.L. Suministro e Instal.


Valor promedio inst.tipica

und

287,536.16

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

33

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 5% M.O. BB

Eqp

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

und

16,341

Reduccion en HF 8" x 6" E.L.

Ins

und

109
4,515

278 Paete bajo placa 1:4, pagado en m2

Cantidad

Vr.Unitario

Vr.Total

HR

1.1429

808.00

923.46

1.1429

16,159.00

18,468.12

0.0150

12,305.00

184.58

1.0000

267,960.00

267,960.00

14,102.67

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

5.0000

10.00

50.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

17
804

0.6000

1,469.00

881.40

10.2000

383.34

3,910.07

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

279 Paete liso muros 1:4

10,132.78

Cemento gris

Ins

kg

7.6000

383.34

2,913.38

3,684

Agua para obra

Ins

4.8000

10.00

48.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

804

288 Entramado madera cielo raso, pagado por m2

12,286.65

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5500

1,469.00

807.95

2,197

Repisa Ordinario 3 m

Ins

2.1600

1,500.00

3,240.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.0800

1,990.00

159.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.5500

14,690.00

8,079.50

17

289 Malla bajo entramado para paetes, pagado por m2

10,562.48

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

3,797

Puntilla con cabeza 2"

Ins

lb

0.0400

1,990.00

79.60

4,008

Andamio metalico tubular

Ins

sm

0.0200

4,200.00

84.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

13,206

Malla con vena 0.60 x 2.00

Ins

und

0.7300

3,268.00

2,385.64

13,850

Alambre Galvanizado No. 12

Ins

kg

0.3000

5,000.00

1,500.00

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0200

2,482.00

49.64

17

290 Guardaescoba en madera 0.07 x 0.01 x 1, pagado


en ml

10,243.65

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1500

1,763.00

264.45

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1500

17,628.00

2,644.20

14,400

Tornillo goloso de 1 1/2``

Ins

und

2.0000

190.00

380.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

2.3000

670.00

1,541.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0200

52,200.00

1,044.00

15,726

Madera de 0.04 x 0.07 x 1

Ins

1.0000

4,370.00

4,370.00

56

291 Conector superior entre cable superior - pendolon


(guaya)

und

36,313.75

Instalada
19
4,489

Herramienta menor 5% M.O. AA

Eqp

HR

0.1500

735.00

110.25

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

34

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,739

Perro de 1" Tipo pesado

Ins

292 Conector inferior entre Viga - pendolon (guaya)

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

34,000.00

34,000.00

und

12,313.75

Instalado
19
4,489
14,061

Herramienta menor 5% M.O. AA

Eqp

HR

0.1500

735.00

110.25

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

Perro de 1/2 " Tipo pesado.

Ins

und

1.0000

10,000.00

10,000.00

293 Niple = 2" en A.C. con E.B x E.B. L=1.10 m.


Suministro e Instal.

und

219,811.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7500

1,616.00

1,212.00

2,371

Niple = 2" en A.C. con E.B x E.B. L=1.10 m.

Ins

und

1.0000

206,480.00

206,480.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7500

16,159.00

12,119.25

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

55

294 Brida PVC =2". Suministro e instal.

und

54,400.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

484.80

2,518

Brida en PVC =2"

Ins

und

1.0000

16,588.00

16,588.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

4,767

Conjunto brida =2"

Ins

und

1.0000

32,480.00

32,480.00

55

295 Union tipo Dresser = 2" en A.C. Suministro e


instal.

und

59,927.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

16,263

Union Dresser =2" en A.C

Ins

und

1.0000

51,040.00

51,040.00

55

296 Valvula compuerta elastica vastago no ascendente


=2" E.B. Suministro e instal.
55
4,515
16,161

und

375,600.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. elast. vast. n.asc. ext. brida 2"

Ins

und

1.0000

304,500.00

304,500.00

298 Salida lampara conmut. PVC, pagado por UN

und

119,545.09

Valor promedio inst.tipica


Sub-Contrato Electrico

Esp

38.0000

86,626.88

32,918.21

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

245

Roseta (Plafn)

Ins

und

1.0500

1,560.00

1,638.00

869

Alambre cobre THW 14 AWG THHN/NN

Ins

4.5000

1,033.00

4,648.50

3,495

Caja sencilla conduit

Ins

und

1.8900

1,218.00

2,302.02

3,553

Adaptador terminal conduit 1/2"

Ins

und

3.3600

269.00

903.84

3,556

Tubo conduit PVC 1/2"

Ins

4.2800

1,384.00

5,923.52

4,515

3
55

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

13,653

Interruptor conmutable doble

Ins

und

0.8400

5,500.00

4,620.00

303 Ampliacion de la Perforacion de prueba hasta 12


" (Sabana)
85
112

68,423.92

Equipo de perforacion y rotacion

Eqp

HR

0.3200

76,000.00

24,320.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.3200

2,305.00

737.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

35

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Agua para obra

Ins

75.0000

10.00

750.00

15,636

Bentonita x 50 Kg

Ins

kg

40.0000

719.00

28,760.00

15,953

Broca tugsteno 12 ``

Ins

und

0.0036

1,800,000.00

6,480.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.3200

23,051.00

7,376.32

3,684

305 Tuberia pvc conduit de 3/4", pagado por ML

und

12,782.07

Sub-Contrato Electrico

Esp

38.0000

9,262.37

3,519.70

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3300

1,616.00

533.28

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,534

Tubo conduit PVC 3/4"

Ins

1.0000

1,812.00

1,812.00

3,554

Adaptador terminal conduit 3/4"

Ins

und

2.0000

358.00

716.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3300

16,159.00

5,332.47

3
55

306 Tuberia pvc conduit de 1/2", pagado por ML

11,640.53

Sub-Contrato Electrico

Esp

38.0000

8,435.17

3,205.36

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3300

1,616.00

533.28

1,702

Boquillas juego pvc 1/2"

Ins

und

0.3300

960.00

316.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,556

Tubo conduit PVC 1/2"

Ins

1.0000

1,384.00

1,384.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3300

16,159.00

5,332.47

3
55

307 Niple = 2" en A.C. con E.L x E.B. L=0.40 m.


Suministro e Instal.

und

198,040.82

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

0.5000

3,330.00

1,665.00

Soldador

Ins

0.5000

6,759.00

3,379.50

2,524

Niple = 2" en A.C. con E.L x E.B. L=0.40 m

Ins

und

1.0000

183,280.00

183,280.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1429

5,800.00

828.82

519

14,795

308 Niple = 2" en A.C. con E.L x E.B. L=0.60 m.


Suministro e Instal.

und

206,160.82

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

0.5000

3,330.00

1,665.00

Soldador

Ins

0.5000

6,759.00

3,379.50

2,526

Niple = 2" en A.C. con E.L x E.B. L=0.60 m

Ins

und

1.0000

191,400.00

191,400.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1429

5,800.00

828.82

519

14,795

309 Suministro e Instal. union mecanica rapida RDE 21


4"

und

47,458.68

Cuadrilla BB (Instalaciones)

Ins

0.3478

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,261

Union mecanica rapida RDE 21 PVC 4 "

Ins

und

1.0000

41,654.00

41,654.00

4,515

5,620.10

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

36

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

310 Corte en Pavimento rigido 0 - 15 cm con retiro


lateral (Impuesto IDURY)

Cantidad

Vr.Unitario

Vr.Total
24,318.20

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

57

Cortadora concreto (Disco Diaman. 14")

Eqp

HR

0.2398

45,000.00

10,791.00

3,684

Agua para obra

Ins

60.0000

10.00

600.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Impuesto IDURY corte Pavimento Rigido

Ins

0.0000

21,686.00

0.00

16,323

311 Suministro e Instal. union mecanica rapida RDE 21


3"

und

29,950.45

Cuadrilla BB (Instalaciones)

Ins

0.2581

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,260

Union mecanica rapida RDE 21 PVC 3 "

Ins

und

1.0000

25,626.00

25,626.00

4,515

312 Suministro e Instal. union mecanica rapida RDE 21


2"

und

4,170.64

17,899.10

Cuadrilla BB (Instalaciones)

Ins

0.1739

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,258

Union mecanica rapida RDE 21 PVC 2 "

Ins

und

1.0000

14,966.00

14,966.00

4,515

313 Suministro e Instal. union mecanica rapida RDE 21


2 1/2"

und

2,810.05

23,044.98

Cuadrilla BB (Instalaciones)

Ins

0.2105

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0115

12,305.00

141.51

15,259

Union mecanica rapida RDE 21 PVC 2 1/2 "

Ins

und

1.0000

19,502.00

19,502.00

4,515

317 Puertas marco y hoja, pagado por un

und

3,401.47

249,762.50

Sub-Contrato Carpinteria

Esp

45.0000

1,505

Bisagra comn 3``

Ins

und

1,807

Puntilla sin cabeza 1"

Ins

lb

2,933

Pegante colbn

Ins

kg

3,789

Tornillo para madera 2" No. 9

Ins

und

18.0000

32.00

576.00

4,823

Triplex lmina 4 mm 1.22 x 2.44

Ins

und

2.0000

35,000.00

70,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

3.0000

17,628.00

52,884.00

Cedro macho pieza 3.0

Ins

und

0.8000

55,000.00

44,000.00

13,452

318 Closet tipo A forrado, pagado en m2

172,250.00

77,512.50

3.0000

674.00

2,022.00

0.3500

2,480.00

868.00

0.2000

9,500.00

1,900.00

435,766.96

Sub-Contrato Carpinteria

Esp

45.0000

300,528.94

1,505

Bisagra comn 3``

Ins

und

1.3900

674.00

936.86

1,807

Puntilla sin cabeza 1"

Ins

lb

0.5000

2,480.00

1,240.00

2,933

Pegante colbn

Ins

kg

0.2500

9,500.00

2,375.00

3,789

Tornillo para madera 2" No. 9

Ins

und

3.8500

32.00

123.20

4,823

Triplex lmina 4 mm 1.22 x 2.44

Ins

und

2.1800

35,000.00

76,300.00

5,064

Cuadrilla DD (Carpinteria)

Ins

9.2100

17,628.00

162,353.88

Cedro macho pieza 3.0

Ins

und

1.0400

55,000.00

57,200.00

13,452

319 Closet tipo B, pagado en m2

135,238.02

346,247.94

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

37

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Sub-Contrato Carpinteria

Esp

45.0000

238,791.68

107,456.26

1,505

Bisagra comn 3``

Ins

und

0.7600

674.00

512.24

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1500

2,480.00

372.00

2,933

Pegante colbn

Ins

kg

0.2500

9,500.00

2,375.00

3,789

Tornillo para madera 2" No. 9

Ins

und

4.6800

32.00

149.76

4,823

Triplex lmina 4 mm 1.22 x 2.44

Ins

und

2.1800

35,000.00

76,300.00

5,064

Cuadrilla DD (Carpinteria)

Ins

6.3100

17,628.00

111,232.68

Cedro macho pieza 3.0

Ins

und

0.8700

55,000.00

47,850.00

13,452

320 Caseton de lona 0.80 x 0.35, pagado por ml

21,410.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

2,255

Tiras alistado 3 x 3 x 3

Ins

3.3000

600.00

1,980.00

2,289

Lona plastica para caseton

Ins

1.9600

4,500.00

8,820.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

14,283

Liston ordinario 0.08 x 0.02

Ins

5.4000

1,333.00

7,198.20

16,385

Grapa industrial

Ins

lb

0.0400

4,500.00

180.00

17

321 Pirlanes de madera 0.10, pagado por ml

Sub-Contrato Carpinteria

Esp

45.0000

21,578.96

9,710.53

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1400

2,480.00

347.20

3,789

Tornillo para madera 2" No. 9

Ins

und

2.0000

32.00

64.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.9200

17,628.00

16,217.76

Cedro macho pieza 3.0

Ins

und

0.0900

55,000.00

4,950.00

13,452

322 Columna circular 0.30 M, pagada por ml

31,289.49

107,933.48

Herramienta Menor 10% M.O. AA

Eqp

HR

2.1600

1,469.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.0800

1,990.00

159.20

4,489

Cuadrilla AA (Albaileria)

Ins

2.1600

14,690.00

31,730.40

4,867

Paral telescopico 2 a 4 ml

Ins

6.4000

340.00

2,176.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0900

333,142.66

29,982.84

13,235

Liston ordinario 0.05 x 0.05

Ins

30.0000

1,300.00

39,000.00

13,641

Seccin de Andamio

Ins

mes

0.1000

17,120.00

1,712.00

17

324 Excavacion a mano en material comun, pagado en


m3
19
4,489

3,173.04

22,829.00

Herramienta menor 5% M.O. AA

Eqp

HR

1.4800

735.00

1,087.80

Cuadrilla AA (Albaileria)

Ins

1.4800

14,690.00

21,741.20

326 Suministro e Instal. union mecanica rapida RDE 21


6"

und

104,344.41

Cuadrilla BB (Instalaciones)

Ins

0.4211

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0225

12,305.00

276.86

15,262

Union mecanica rapida RDE 21 PVC 6 "

Ins

und

1.0000

97,263.00

97,263.00

4,515

327 Demolicion cimientos enterrados con retiro,


pagado en m3

6,804.55

241,923.48

17

Herramienta Menor 10% M.O. AA

Eqp

HR

7.0000

1,469.00

10,283.00

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

38

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
51
4,489

Nombre

Tipo U.M.

Compresor 125 cpm (2 martillos Neum.)

Eqp

Cuadrilla AA (Albaileria)

Ins

328 Cuneta tipo C-1. en Piedra Pegada (a=1.20 m)

Cantidad

Vr.Unitario

Vr.Total

HR

3.5000

35,000.00

122,500.00

7.0000

14,690.00

102,830.00

31,359.40

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5300

1,469.00

778.57

2,208

Tabla chapa ordinario 0.10

Ins

1.2000

2,667.00

3,200.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0360

333,142.66

11,993.14

5,063

Piedra rajon o media zonga

Ana

0.0840

90,495.15

7,601.59

17

329 Base Concreto pobre 2000 Psi E=0.05

19,109.25

Herramienta menor 5% M.O. AA

Eqp

HR

0.2300

4,489

Cuadrilla AA (Albaileria)

Ins

0.2300

14,690.00

3,378.70

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.0500

311,229.99

15,561.50

19

332 Viga de amarre en concreto para cimentacin de


resistencia 3500 Psi, pagado en m3

735.00

169.05

510,967.15

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.1500

1,469.00

11,972.35

49

Vibrador de concretos

Eqp

HR

0.3200

4,375.00

1,400.00

2,197

Repisa Ordinario 3 m

Ins

1.0000

1,500.00

1,500.00

3,323

Tabla Burra Ordinaria 0.25

Ins

3.5556

4,333.00

15,406.41

3,797

Puntilla con cabeza 2"

Ins

lb

1.5000

1,990.00

2,985.00

4,489

Cuadrilla AA (Albaileria)

Ins

8.1500

14,690.00

119,723.50

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

Durmiente ordinario 3 M

Ins

8.0000

767.00

6,136.00

13,326

333 Columna en concreto de resistencia 3000 psi,


pagada en m3

568,211.47

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

4,867

Paral telescopico 2 a 4 ml

Ins

14.0000

340.00

4,760.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

13,641

Seccin de Andamio

Ins

mes

0.2000

17,120.00

3,424.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

334 Suministro e instal. closet en madera A = 0.60


flormorado, pagado m2

17,628.00

203,717.81

Sub-Contrato Carpinteria

Esp

45.0000

140,495.04

63,222.77

1,505

Bisagra comn 3``

Ins

und

0.7600

674.00

512.24

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1500

2,480.00

372.00

2,933

Pegante colbn

Ins

kg

0.2500

9,500.00

2,375.00

3,789

Tornillo para madera 2" No. 9

Ins

und

4.6800

32.00

149.76

5,064

Cuadrilla DD (Carpinteria)

Ins

6.3100

17,628.00

111,232.68

5,086

Triplex flormorado 4 mm

Ins

und

0.5200

49,718.00

25,853.36

335 Pasos Pref. escalera L/1, Long 1.10, ancho 0.25,


contrahuella 0.17, pagado en un

und

46,810.02

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

39

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,644.20

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

2,200

Tabla burra ordinario 0.30

Ins

0.1100

4,333.00

476.63

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0300

333,142.66

9,994.28

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.9700

2,257.00

6,703.29

Durmiente ordinario 3 M

Ins

0.0800

767.00

61.36

17

13,326

336 Muro en concreto de 3000 psi impermeabilizado de


resistencia 210 kg/cm.

685,526.40

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,061

Formaleta (1 uso)

Ana

2.3200

32,375.50

75,111.16

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.0000

345,308.74

345,308.74

337 Tanque subterraneo 2 x 3 x 2 (a x l x h)

und

Cemento gris

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

804

23,504.00

1,925,633.74

88.0000

383.34

33,733.92

1,187.0000

305.00

362,035.00

24.0000

14,690.00

352,560.00

0.4700

430,750.59

202,452.78

0.3000

367,816.92

110,345.08

Ana

2.2400

333,142.66

746,239.56

Ana

0.3800

311,229.99

118,267.40

338 Concreto de 3000 psi impermeabilizado para


tanque subterrneo, pagado en M3

704,056.19

17

Herramienta Menor 10% M.O. AA

Eqp

HR

10.0000

1,469.00

14,690.00

49

Vibrador de concretos

Eqp

HR

0.3200

4,375.00

1,400.00

2,200

Tabla burra ordinario 0.30

Ins

0.7600

4,333.00

3,293.08

2,243

Vara de clavo 3M -1

Ins

0.4700

1,500.00

705.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.1200

1,990.00

4,218.80

4,040

Paral corriente 2 a 3.50 ml

Ins

15.0000

170.00

2,550.00

4,489

Cuadrilla AA (Albaileria)

Ins

17.5500

14,690.00

257,809.50

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.0900

311,229.99

28,010.70

5,144

Transporte de materiales Tn

Ana

0.8000

0.00

0.00

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.1000

345,308.74

379,839.61

13,326

Durmiente ordinario 3 M

Ins

3.5000

767.00

2,684.50

13,627

Formaleta entrepisos

Ins

mes

2.5300

3,500.00

8,855.00

339 Viga aerea, en concreto de resistencia 3500 psi,


pagada en m3

688,623.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

15.0000

1,469.00

22,035.00

49

Vibrador de concretos

Eqp

HR

0.3200

4,375.00

1,400.00

2,197

Repisa Ordinario 3 m

Ins

4.5300

1,500.00

6,795.00

2,200

Tabla burra ordinario 0.30

Ins

7.0000

4,333.00

30,331.00

2,243

Vara de clavo 3M -1

Ins

4.1200

1,500.00

6,180.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

40

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,489

Cuadrilla AA (Albaileria)

Ins

4,867

Paral telescopico 2 a 4 ml

Ins

15.0000

14,690.00

220,350.00

30.0000

340.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

10,200.00

13,641

Seccin de Andamio

1.0500

351,843.89

369,436.08

Ins

mes

1.0000

17,120.00

14,128

Puntilla con cabeza 2 1/2"

17,120.00

Ins

lb

2.4000

1,990.00

4,776.00

340 Losa maciza en concreto 3000 psi h=0.10m,


reforzada con malla electrosoldada Q-5

63,808.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

2,198

Durmiente ordinario 4 M

Ins

0.1000

3,500.00

350.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1600

2,480.00

396.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.6800

14,690.00

9,989.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,822

4,164.40

998.92

Formaleta entrepiso, pagado en m2

Ana

0.2500

16,657.60

13,641

Seccin de Andamio

Ins

mes

0.0300

17,120.00

513.60

14,779

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

1.0300

8,323.00

8,572.69

341 Yee 4" x 4" en A.C. E.B. x E.B. Suministro e Instal.

und

427,630.00

Con instalacin
Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,561

Yee 4" x 4" en H.D. E.B x E.B

Ins

und

1.0000

392,080.00

392,080.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

55

342 Reja tipo bancaria en varilla cuadrada de 9 mm.


Instalada.

66,524.10

Con instalacin
Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

Varilla cuadrada 9 mm o 3/8" x 6 mts

Ins

und

2.2217

9,492.00

21,088.38

Herramienta Menor 10% M.O. SA-1

Eqp

HR

2.3000

1,144.00

2,631.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5714

6,805.00

3,888.38

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.3494

1,691.00

590.84

2,502

Anticorrosivo rojo claro

Ins

gal

0.1100

29,750.00

3,272.50

Cuadrilla SA-1 (Metalisteria)

Ins

2.3000

11,436.00

26,302.80

8
84
115

16,423

343 Caseton de Guadua 0.80 x 0.90

32,874.61

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9344

1,469.00

1,870

Alambre Negro No 18

Ins

kg

0.0800

3,903.00

312.24

2,237

Esterilla de guadua

Ins

3.1200

3,500.00

10,920.00

2,255

Tiras alistado 3 x 3 x 3

Ins

4.4000

600.00

2,640.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1500

1,990.00

298.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.9344

14,690.00

13,726.34

Durmiente ordinario 3 M

Ins

4.7000

767.00

3,604.90

17

13,326

344 Ventanas aluminio guillotina, pagada por m2


228
2,606

1,372.63

116,865.43

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

Ventana proyectante 1.2 x 1.6

Ins

1.0000

100,000.00

100,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

41

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

348 Entrepiso caseton con vigas, H= 0.40, pagado en


M2

Cantidad

Vr.Unitario

Vr.Total
222,201.34

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0231

1,469.00

5,909.93

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

1,870

Alambre Negro No 18

Ins

kg

0.3000

3,903.00

1,170.90

1,901

Acero de refuerzo 37000 Psi

Ins

kg

5.9000

2,295.00

13,540.50

2,197

Repisa Ordinario 3 m

Ins

0.3000

1,500.00

450.00

2,200

Tabla burra ordinario 0.30

Ins

0.3000

4,333.00

1,299.90

2,237

Esterilla de guadua

Ins

1.7000

3,500.00

5,950.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.9900

600.00

2,394.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1300

1,990.00

258.70

4,040

Paral corriente 2 a 3.50 ml

Ins

30.0000

170.00

5,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0231

14,690.00

59,099.34

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2500

333,142.66

83,285.67

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13.9500

2,257.00

31,485.15

13,627

Formaleta entrepisos

Ins

mes

1.0000

3,500.00

3,500.00

13,903

Malla Electrosoldada R-2.1o H-084 (2.35 x 6 m)

Ins

und

0.2500

31,529.00

7,882.25

351 Entrepisos vigueta bloque, pagado en m2

54,735.43

1,453

Pisopak residencial 1.6 mm

Ins

1.0300

15,500.00

15,965.00

1,458

Bloque de Concreto C22-85

Ins

und

2.0700

1,740.00

3,601.80

1,901

Acero de refuerzo 37000 Psi

Ins

kg

0.2400

2,295.00

550.80

2,197

Repisa Ordinario 3 m

Ins

0.0600

1,500.00

90.00

2,200

Tabla burra ordinario 0.30

Ins

0.0700

4,333.00

303.31

3,797

Puntilla con cabeza 2"

Ins

lb

0.0200

1,990.00

39.80

4,489

Cuadrilla AA (Albaileria)

Ins

2.2902

14,690.00

33,643.04

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.2400

2,257.00

541.68

352 Entrepisos vigueta placa, pagado en m2

51,579.64

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0700

1,469.00

804

Cemento gris

Ins

kg

0.5700

383.34

218.50

1,452

Vigueta I22 5

Ins

und

0.9700

12,600.00

12,222.00

2,197

Repisa Ordinario 3 m

Ins

0.0500

1,500.00

75.00

2,200

Tabla burra ordinario 0.30

Ins

0.0600

4,333.00

259.98

3,684

Agua para obra

Ins

0.1600

10.00

1.60

3,797

Puntilla con cabeza 2"

Ins

lb

0.0200

1,990.00

39.80

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0700

14,690.00

15,718.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0100

333,142.66

3,331.43

Plaqueta PL4 (100)

Ins

und

0.9700

18,560.00

18,003.20

17

13,152

353 Entrepisos placalista, pagado en m2

1,571.83

60,249.21

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6700

1,469.00

984.23

1,470

Placa lista muro estructural

Ins

1.0300

38,280.00

39,428.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.6700

14,690.00

9,842.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0300

333,142.66

9,994.28

17

354 Desmonte flanche metalico

4,039.75

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

42

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
17
4,489

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

356 Esmalte sobre marcos madera, pagada por m2

Cantidad

Vr.Unitario

Vr.Total

7,650.10

Sub-Contrato Pintura

Esp

45.0000

5,275.93

2,374.17

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.6000

1,691.00

1,014.60

1,984

Tapaporos Nogal

Ins

gal

0.0100

25,500.00

255.00

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

3,838

Esmalte mate supersinttico

Ins

gal

0.0200

50,506.00

1,010.12

5,066

Cuadrilla CC (Pintura)

Ins

0.1700

16,893.00

2,871.81

357 Talud en Piedra Pegada, Concreto 2500 Psi

334,118.33

Herramienta Menor 10% M.O. AA

Eqp

HR

6.7000

1,469.00

9,842.30

3,323

Tabla Burra Ordinaria 0.25

Ins

6.0000

4,333.00

25,998.00

4,489

Cuadrilla AA (Albaileria)

Ins

6.7000

14,690.00

98,423.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.4400

318,473.24

140,128.23

5,063

Piedra rajon o media zonga

Ana

0.6600

90,495.15

59,726.80

17

358 Niple = 2" en A.C. con E.L x E.B. L=0.18 m.


Suministro e Instal.

und

188,760.82

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

0.5000

3,330.00

1,665.00

Soldador

Ins

0.5000

6,759.00

3,379.50

2,831

Niple = 2" en A.C. con E.L x E.B. L=0.18 m

Ins

und

1.0000

174,000.00

174,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1429

5,800.00

828.82

519

14,795

359 Reapertura de via (unicamente con Bulldozer)


20

Bulldozer Cat D6D o D6H

km
Eqp

360 Zarpa para muro de contencion concreto 3000 Psi


H=0,5 - 0.80 m

HR

1,829,100.00

14.0000

130,650.00

1,829,100.00

569,226.21

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.1000

32,375.50

35,613.05

361 Zapata en concreto para cimentacion de


resistencia 3500 Psi, pagado en m3

17,628.00

524,636.39

17

Herramienta Menor 10% M.O. AA

Eqp

HR

9.0000

1,469.00

13,221.00

49

Vibrador de concretos

Eqp

HR

1.1000

4,375.00

4,812.50

2,195

Planchon ordinario 3 M

Ins

3.0000

3,200.00

9,600.00

2,210

Tabla chapa ordinario 0.30

Ins

3.0000

4,000.00

12,000.00

2,243

Vara de clavo 3M -1

Ins

0.5000

1,500.00

750.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.0000

14,690.00

132,210.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

43

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

362 Canaleta metalica 10 x 4, pagada por ml

Cantidad

Vr.Unitario

Vr.Total

1.0000

351,843.89

351,843.89

0.0200

0.00

0.00

30,752.55

383

Tapa troquelada metalica 2 orificios

Ins

und

1.0000

3,067.00

3,067.00

387

Canaleta matalica con division 10 x 4

Ins

und

1.0000

15,133.00

15,133.00

1,679

Chazo para tornillo 1/8" x 1 1/4

Ins

und

3.0000

50.00

150.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

0.5400

19,096.00

10,311.84

13,597

Herramientas Electricas

Esp

5.0000

29,011.84

1,450.59

13,598

Herramienta Menor

Esp

1.0000

29,011.84

290.12

16,386

Tornillo goloso 1/8" x 1 1/4

Ins

und

7.0000

50.00

350.00

363 Anticorrosivo sobre lmina llena, pagado por m2

12,132.35

Sub-Contrato Pintura

Esp

45.0000

8,367.14

3,765.21

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1.0500

1,691.00

1,775.55

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

5,066

Cuadrilla CC (Pintura)

Ins

0.3300

16,893.00

5,574.69

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

364 Canaleta plastica 10 x 4, pagado por ml

28,947.50

385

Accesorio T para canaleta plstica

Ins

und

0.1500

16,947.00

2,542.05

389

Canaleta plstica pnduit 10

Ins

und

1.0000

14,007.00

14,007.00

1,680

Clavo alta velocidad 1/4" x 2"

Ins

und

3.0000

600.00

1,800.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

0.5400

19,096.00

10,311.84

Herramienta Menor

Esp

1.0000

28,660.89

286.61

13,598

366 Ductos verticales 30 x 8, pagado por ml

72,695.76

390

Ducto metalico sin divisin .30

Ins

und

1.2000

25,533.00

391

Soporte para bandeja portacables

Ins

und

0.6000

7,600.00

4,560.00

1,678

Anclaje autoperforante 1/2"

Ins

und

4.0000

5,200.00

20,800.00

5,137

30,639.60

Cuadrilla EE (Cableado estruct.)

Ins

0.5600

19,096.00

10,693.76

13,597

Herramientas Electricas

Esp

6.0000

66,693.36

4,001.60

13,598

Herramienta Menor

Esp

3.0000

66,693.36

2,000.80

367 Cable AWG/THW, pagado por ml

10,781.57

Herramienta Menor

Esp

15.0000

9,375.28

393

Amarre plstico

Ins

und

1.2500

100.00

125.00

877

Cable de cobre THW N 10 AWG

Ins

1.0200

2,008.00

2,048.16

3,265

Alambre de cobre THW 10 AWG

Ins

1.0000

950.00

950.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

0.0600

19,096.00

1,145.76

7,186

Alambre de cobre desnudo No. 10 AWG

Ins

1.0300

1,860.00

1,915.80

Cable de cobre THW N 12 AWG

Ins

2.0400

1,564.00

3,190.56

14,205

369 Cable UTP cat 5 tendido, pagado por ml

1,406.29

2,005.95

357

Cable UTP categora 5/4 pares

Ins

1.0200

1,127.00

1,149.54

393

Amarre plstico

Ins

und

1.2500

100.00

125.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

44

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,137
13,598

Nombre

Tipo U.M.

Cuadrilla EE (Cableado estruct.)

Ins

Herramienta Menor

Esp

370 Salida de datos y voz, pagada por un

h
%

Cantidad

Vr.Unitario

Vr.Total

0.0246

19,096.00

469.76

15.0000

1,744.30

261.65

und

35,048.09

373

Toma Jack RJ45-110 Jack Cat. 5E AMP

Ins

und

1.0300

10,987.00

11,316.61

375

Wall plate ajuste sencillo

Ins

und

1.0300

6,667.00

6,867.01

396

Libro etiquet .190 datos

Ins

und

0.0100

26,250.00

262.50

Cuadrilla EE (Cableado estruct.)

Ins

0.6300

19,096.00

12,030.48

Herramienta Menor

Esp

15.0000

30,476.60

4,571.49

5,137
13,598

371 Salida elctrica corriente regulada, pagada por un

und

29,009.88

300

Tomacorriente con polo a tierra aislado

Ins

und

1.0000

12,933.00

396

Libro etiquet .190 datos

Ins

und

0.0100

26,250.00

262.50

Cuadrilla EE (Cableado estruct.)

Ins

0.6300

19,096.00

12,030.48

Herramienta Menor

Esp

15.0000

25,225.98

3,783.90

5,137
13,598

372 Cuartos de control, pagado por un

und

12,933.00

262,258.36

Ducto vertical 80" para manejo de cables

Ins

und

1.0300

28,400.00

Cuadrilla EE (Cableado estruct.)

Ins

5.0000

19,096.00

95,480.00

13,541

Bandeja Rack C/16 toma ele

Ins

und

1.0200

113,600.00

115,872.00

13,597

Herramientas Electricas

Esp

6.0000

240,604.00

14,436.24

13,598

Herramienta Menor

Esp

3.0000

240,604.00

7,218.12

401
5,137

373 Patch panel, pagado por un

und

29,252.00

484,379.38

Patch panel 24 puertos CAT 5E AMP

Ins

und

1.0300

328,267.00

338,115.01

Cuadrilla EE (Cableado estruct.)

Ins

6.0000

19,096.00

114,576.00

13,597

Herramientas Electricas

Esp

5.0000

452,691.01

22,634.55

13,598

Herramienta Menor

Esp

2.0000

452,691.01

9,053.82

404
5,137

374 Rack abierto, pagado por un

und

750,404.14

401

Ducto vertical 80" para manejo de cables

Ins

und

1.0300

28,400.00

29,252.00

402

Rack 19" XH 1.10 aluminio

Ins

und

1.0300

240,267.00

247,475.01

1,681

Anclaje chazo expansivo 1/2" x 2"

Ins

und

4.0000

5,600.00

22,400.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

5.0000

19,096.00

95,480.00

13,541

Bandeja Rack C/16 toma ele

Ins

und

1.0200

113,600.00

115,872.00

13,597

Herramientas Electricas

Esp

32.0000

510,479.01

163,353.28

13,598

Herramienta Menor

Esp

15.0000

510,479.01

76,571.85

375 Gabinete rack cerrado, pagado por un

und

592,415.88

Ducto vertical 80" para manejo de cables

Ins

und

1.0300

28,400.00

29,252.00

1,681

Anclaje chazo expansivo 1/2" x 2"

Ins

und

4.0000

5,600.00

22,400.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

5.0000

19,096.00

95,480.00

13,541

Bandeja Rack C/16 toma ele

Ins

und

1.0200

113,600.00

115,872.00

13,597

Herramientas Electricas

Esp

32.0000

403,004.00

128,961.28

13,598

Herramienta Menor

Esp

15.0000

403,004.00

60,450.60

16,394

Gabinete pared 19" 5 rms

Ins

und

1.0000

140,000.00

140,000.00

401

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

45

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

376 Suministro e instal. lavamanos sobreponer, pagado


un

Cantidad

Vr.Unitario

und

Vr.Total
118,086.67

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

Cemento blanco

Ins

kg

0.4000

975.00

390.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Lavamanos sobreponer blanco marsella

Ins

und

1.0000

96,366.67

96,366.67

55
829

15,597

377 Anden concreto acabado escobillado e=0.08 m con


dilatacin en ladrillo c/2m, con excavacin 0.2 m y
recebo 0.2 m

87,098.05

Base en recebo comun compactado

Ana

0.2000

92,359.05

18,471.81

Excavacion a mano en material comun, pagado en m3

Ana

0.2000

22,829.00

4,565.80

4,645

Dilatacion en ladrillo tipo rejilla vitrificado A=0.07 m

Ana

0.5000

12,662.74

6,331.37

5,265

Anden en concreto escobillado 2500 psi e=0.08 m con


dilatacin en ladrillo c/2m, incluye relleno y excavacin

Ana

1.0000

57,729.07

57,729.07

72
324

378 Lavamanos pedestal porcelana, instalado, pagado


por un
2
154

und

154,577.70

Sub-Contrato Sanitario

Esp

35.0000

114,502.00

40,075.70

Lavamanos pedestal porcelana

Ins

und

1.0000

114,502.00

114,502.00

379 Sanitario blanco porcelana con accesorios


instalado, pagado por un

und

182,775.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

3,769

Sanitario blanco porcelana con accesorios

Ins

und

1.0000

165,000.00

165,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55

381 Tapon roscado de Presion PVC 2". Suministro e


Instal.

und

6,493.85

Cuadrilla BB (Instalaciones)

Ins

0.0909

16,159.00

14,020

Cinta teflon

Ins

rl

0.3300

1,000.00

330.00

15,117

Tapon roscado presin PVC 2

Ins

und

1.0000

4,695.00

4,695.00

4,515

382 Orinal comn, pagado por UN


17
829
4,489
15,871

und
Eqp

HR

1.8300

Cemento blanco

Ins

kg

0.4000

975.00

390.00

Cuadrilla AA (Albaileria)

Ins

1.8300

14,690.00

26,882.70

Orinal comn

Ins

und

1.0000

70,000.00

70,000.00

Canacha tenis tenissinco

Cancha mltiple tenisleibo

1,469.00

m
Ins

386 Piso sinttico tenisleibo, pagado en m2


13,447

99,960.97

Herramienta Menor 10% M.O. AA

385 Piso sinttico tenissinco, pagado en m2


2,672

1,468.85

49,152.00

1.0000

49,152.00

m
Ins

2,688.27

49,152.00

59,385.00

1.0000

59,385.00

59,385.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

46

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

390 Suministro y colocacin tanque lavadero de 300 lts


portatil, en fibra de vidrio, pagado por un
204

LAVADERO POLIESTER L= 47 x 60

Cantidad

Vr.Unitario

und

Ins

392 Registro de corte =1 1/4". Suministro e Instal.

und

Vr.Total
113,000.00

1.0000

113,000.00

und

113,000.00

73,685.10

Herramienta Menor 5% M.O. BB

Eqp

HR

0.3333

808.00

269.31

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

4,571

Registro de corte = 1 1/4"

Ins

und

1.0000

67,280.00

67,280.00

Cinta teflon

Ins

rl

0.7500

1,000.00

750.00

109

14,020

393 Registro de corte = 1 1/2". Suministro e Instal.

und

83,115.10

Herramienta Menor 5% M.O. BB

Eqp

HR

0.3333

808.00

269.31

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,020

Cinta teflon

Ins

rl

0.9000

1,000.00

900.00

14,732

Registro de corte = 1 1/2"

Ins

und

1.0000

76,560.00

76,560.00

109
4,515

397 Entramado teja ondulada, pagado en m2

37,930.92

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

1,848

Tabla burra 3.00 m

Ins

2.6200

4,666.00

12,224.92

2,195

Planchon ordinario 3 M

Ins

2.6200

3,200.00

8,384.00

2,197

Repisa Ordinario 3 m

Ins

0.5100

1,500.00

765.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

17

398 Entramado teja moore, pagado en m2

58,184.20

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,644.20

2,198

Durmiente ordinario 4 M

Ins

8.2000

3,500.00

28,700.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

17

399 Estructura de madera para teja de barro, pagado


por m2

37,441.02

2,195

Planchon ordinario 3 M

Ins

2.6200

3,200.00

8,384.00

2,197

Repisa Ordinario 3 m

Ins

1.0300

1,500.00

1,545.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.3000

1,990.00

597.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

400 Impermeabilizacin cubiertas planas, pagado por


m2

13,804.83

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0040

248,144.84

992.58

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

Manto fiberglas 400 X

Ins

0.1100

6,300.00

693.00

17

13,167

401 Teja en fibrocemento No.10, pagado por m2

1,101.75

22,736.44

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

47

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

19

Herramienta menor 5% M.O. AA

Eqp

82

Andamio tubular stand. (inc. tijeras)

Eqp

Gancho teja ondulada de Asbesto cemento 55 mm

830
4,489
15,510

Cantidad

Vr.Unitario

Vr.Total

HR

0.5333

735.00

391.98

HR

1.0600

188.00

199.28

Ins

und

1.1811

350.00

413.39

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

Teja ondulada de asbesto No.10 eternit

Ins

und

0.3937

35,300.00

13,897.61

402 Tanque Filtro Fafa V= 15 M3, =1.85 m, L= 5.63 m.


en PRFV. Suministro e instal.

und

26,636,634.00

26

Camabaja

Eqp

HR

3.0000

589,546.00

1,768,638.00

62

Grua Telescopica

Eqp

HR

0.4000

579,600.00

231,840.00

1,363

Banda de neopreno a= 0.15 m

Ins

5.9600

12,000.00

71,520.00

1,404

Tanque Filtro Fafa V= 15 M3, =1.85 m, L= 5.63 m.

Ins

und

1.0000

24,500,000.00

24,500,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

403 Teja tipo termoacstica ondulada, pagado en M2

41,038.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

15,790

Teja termoacustica ondulada

Ins

1.0500

29,324.00

30,790.20

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

und

2.5000

525.00

1,312.50

17

404 Tanque Biodigestor V= 40 M3, =2.30 m, L= 10.09


m. en PRFV. Suministro e instal.

und

54,575,632.00

26

Camabaja

Eqp

HR

3.0000

589,546.00

62

Grua Telescopica

Eqp

HR

0.4000

579,600.00

231,840.00

1,362

Tanque Biodigestor V= 40 M3, =2.30 m, L= 10.09 m.

Ins

und

1.0000

52,300,000.00

52,300,000.00

1,363

Banda de neopreno a= 0.15 m

Ins

14.8500

12,000.00

178,200.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

405 Colombina no convencional (base en concreto 0.3


x 0.25 x 0.08) paral guadua 2.05 m

und

1,768,638.00

11,667.61

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3333

1,469.00

489.62

1,572

Tabla burra ordinaria 0.10

Ins

0.3667

1,200.00

440.04

1,870

Alambre Negro No 18

Ins

kg

0.0200

3,903.00

78.06

1,901

Acero de refuerzo 37000 Psi

Ins

kg

0.8700

2,295.00

1,996.65

3,797

Puntilla con cabeza 2"

Ins

lb

0.0300

1,990.00

59.70

4,368

Guadua 6 m

Ins

und

0.3417

5,000.00

1,708.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.3333

14,690.00

4,896.18

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0060

333,142.66

1,998.86

17

406 Teja de barro, pagado en M2

48,822.12

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0300

1,469.00

1,513.07

Cemento gris

Ins

kg

9.6700

383.34

3,706.90

2,364

Teja Bavaria

Ins

1.2000

21,228.00

25,473.60

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0300

14,690.00

15,130.70

5,143

Transporte de materiales m

Ana

0.0500

46,157.00

2,307.85

17
804

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

48

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,144

Nombre

Tipo U.M.

Transporte de materiales Tn

Ana

409 Caballete fijo teja ondulada asbesto, pagado por ml


17
830
4,489
15,513

Cantidad

Vr.Unitario

Vr.Total

0.0600

0.00

0.00

40,586.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5400

1,469.00

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

2.0000

350.00

700.00

Cuadrilla AA (Albaileria)

Ins

0.5400

14,690.00

7,932.60

Caballete fijo teja ondulada asbesto 15, 20, 25

Ins

und

1.1500

27,096.00

31,160.40

410 Teja de barro sobre teja de asbesto cemento,


pagado en M2

793.26

22,700.53

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

Cemento gris

Ins

kg

7.5000

383.34

2,875.05

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,143

Transporte de materiales m

Ana

0.0400

46,157.00

1,846.28

5,144

Transporte de materiales Tn

Ana

0.0120

0.00

0.00

Teja Bavaria 30 x 15

Ins

0.5000

9,000.00

4,500.00

17
804

15,940

412 Descapote a maquina, pagado por m2


20

Bulldozer Cat D6D o D6H

m
Eqp

413 Canaleta 90 fibrocemento L = 6.00 mts, pagado por


m2

HR

378.89

0.0029

130,650.00

378.89

34,035.82

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

1,125

Canaleta 90 asbesto cemento x 600

Ins

und

0.1900

129,458.00

24,597.02

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1700

12,760.00

2,169.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

14,709

Tornillo para canaleta 90

Ins

und

0.2600

3,100.00

806.00

17

415 Canaleta 90 de 9.00 mts, pagado en m2

50,729.40

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1700

12,760.00

2,169.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,150

Canaleta 90 asbesto cemento x 900

Ins

und

0.2000

206,453.00

41,290.60

Tornillo para canaleta 90

Ins

und

0.2600

3,100.00

806.00

17

14,709

417 Canaleta 43 de 6.00 mts, pagado por m2

58,625.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

1,114

Canaleta 43 asbesto cemento x 600

Ins

und

0.3800

110,514.00

41,995.32

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1200

12,760.00

1,531.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

Tornillo para canaleta 43 MET

Ins

und

0.7800

713.00

556.14

17

14,715

419 Canaleta 43 deE 4.00, pagado por m2

66,180.24

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

1,110

Canaleta 43 asbesto cemento x 400

Ins

und

0.6000

82,583.00

49,549.80

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1200

12,760.00

1,531.20

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

49

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489
14,715

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

Tornillo para canaleta 43 MET

Ins

421 Valvula de Mariposa =3" E.B. Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.9000

14,690.00

13,221.00

und

0.7800

713.00

556.14

und

1,984,444.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Soldador

Ins

1.0000

6,759.00

6,759.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6000

6,805.00

4,083.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,174

Empaquetadura para brida =3"

Ins

und

2.0000

27,066.00

54,132.00

14,175

Tornillo = 3/4" x 3" G-8 en A.I. Con T. A

Ins

und

4.0000

12,550.00

50,200.00

14,176

Valvula de Mariposa =3" E.B.

Ins

und

1.0000

1,824,970.00

1,824,970.00

8
55
519

423 Canaleta 43 de 5.00, pagado por m2

53,290.44

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

1,112

Canaleta 43 asbesto cemento x 500

Ins

und

0.3900

94,000.00

36,660.00

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

0.1200

12,760.00

1,531.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

Tornillo para canaleta 43 MET

Ins

und

0.7800

713.00

556.14

17

14,715

424 Pasamuro en H.D. =4" L=0.50 m E.L x E.B.


Suministro e Instal.
17
860
4,489
14,246

und

267,733.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6667

1,469.00

979.38

Pasamuro en H.D. =4" L=0.50 m E.L x E.B

Ins

und

1.0000

192,000.00

192,000.00

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

425 Perma ply 3 capas, pagado en m2

29,976.17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7600

1,469.00

1,116.44

1,170

Asfalto tipo 190/220 200 KG

Ins

kg

2.0800

2,250.00

4,680.00

1,961

Alumol, recubrimiento de aluminio

Ins

kg

0.2400

21,112.00

5,066.88

1,985

Perma glass 6 fiberglass

Ins

3.5500

2,239.00

7,948.45

4,489

Cuadrilla AA (Albaileria)

Ins

0.7600

14,690.00

11,164.40

17

426 Manto fiberglass 3 M, pagado en m2


6
1,540
13,168

Sub-Contrato Instalacion

Esp

45.0000

18,085.79

8,138.61

Mortero 1:4 (desperdicio 5%)

Ana

0.0400

248,144.84

9,925.79

Manto fiberglass 600 XT

Ins

1.0000

8,160.00

8,160.00

427 Manto fiberglass 2 M, pagado por m2


6
1,540
13,167

26,224.40

23,527.40

Sub-Contrato Instalacion

Esp

45.0000

16,225.79

7,301.61

Mortero 1:4 (desperdicio 5%)

Ana

0.0400

248,144.84

9,925.79

Manto fiberglas 400 X

Ins

1.0000

6,300.00

6,300.00

428 Salida lmpara + roseta CN, pagada en un

und

53,122.95

Longitud promedio = 4.50 m


245

Roseta (Plafn)

Ins

und

1.0000

1,560.00

1,560.00

811

Alambre cobre THW 14 AWG

Ins

4.5000

720.00

3,240.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

50

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

3,266

Alambre cobre THW 12 AWG

Ins

9.0000

1,000.00

9,000.00

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0500

16,159.00

16,966.95

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

13,557

429 Tuberia de Polietileno PE 100 PN-16 de =90 mm =


3"

Cantidad

Vr.Unitario

Vr.Total

31,651.11

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,137

Tuberia de Polietileno PE 100 PN-16 de 90 mm

Ins

1.0000

27,139.00

27,139.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

430 Vertedero graduale en PRFV h=0.10 m. Suministro


e instal.
55
849
4,515

und

297,300.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Vertedero graduale en PRFV h=0.10 m

Ins

und

1.0000

226,200.00

226,200.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

431 Teja plstica traslcida No. 6 ajonit e=1.8mm

36,422.36

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

1.3000

350.00

455.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,144

Transporte de materiales Tn

Ana

0.0048

0.00

0.00

Teja plstica No.6 ajonit 92*183 cm e=1.8mm marfil

Ins

und

0.7400

40,664.00

30,091.36

830

16,480

432 Pasamuro en H.D. =2" L=0.50 m E.L x E.L.


Suministro e Instal.
17
862
4,489

und

88,079.50

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

Pasamuro en H.D. =2" L=0.50 m E.L x E.L.

Ins

und

1.0000

80,000.00

80,000.00

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

433 Roseta de Porcelana

und

5,729.00

Sin tuberia, cajas, cable


892
2,906

Roseta de Porcelana

Ins

und

1.0000

2,800.00

2,800.00

Ayudante (Electrico)

Ins

0.5000

5,858.00

2,929.00

435 Bala incandescente 150 W, pagado en un

und

25,508.90

Sin tuberia, cajas, cable


1,940

Bala incadescente 150 W

Ins

und

1.0000

13,500.00

13,500.00

2,906

Ayudante (Electrico)

Ins

2.0500

5,858.00

12,008.90

436 Pasamuro en H.D. =3" L=0.60 m E.L x E.B.


Suministro e Instal.

und

216,453.20

Sin tuberia, cajas, cable


Herramienta Menor 10% M.O. AA

Eqp

HR

0.6667

1,469.00

979.38

Pasamuro en H.D. =3" L=0.60 m E.L x E.B

Ins

und

1.0000

161,600.00

161,600.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

17
886

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

51

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

437 Valvula de Pie canastilla bronce =4". Suministro e


instal.

Cantidad

Vr.Unitario

und

Vr.Total

630,556.90

109

Herramienta Menor 5% M.O. BB

Eqp

HR

0.6667

808.00

538.69

887

Valvula de Pie bronce =4"

Ins

und

1.0000

593,920.00

593,920.00

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

14,020

Cinta teflon

Ins

rl

0.3000

1,000.00

300.00

15,056

Adaptador macho presin PVC 4"

Ins

und

1.0000

25,025.00

25,025.00

4,515

438 Niple = 4" en H.D. con E.L x E.B. L=2.20 m.


Suministro e Instal.
55
888
4,515
14,246

und

675,580.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Niple = 4" en H.D. con E.L x E.B. L=2.20 m

Ins

und

1.0000

596,400.00

596,400.00

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

439 Niple = 4" en H.D. con E.L x E.B. L=3.20 m.


Suministro e Instal.

und

927,580.00

Sin tuberia, cajas, cable


55
889
4,515
14,246

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Niple = 4" en H.D. con E.L x E.B. L=3.20 m.

Ins

und

1.0000

848,400.00

848,400.00

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

442 Canal Raingo Pavco, pagado por ml

31,330.05

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6000

1,616.00

969.60

470

Canal Raingo L= 3.00 m

Ins

1.0000

12,042.00

12,042.00

471

Tapa externa blanca Raingo

Ins

und

0.6800

4,653.00

3,164.04

475

Union de canal blanca Raingo

Ins

und

0.3400

5,531.00

1,880.54

476

Soporte Metalico de canal Raingo

Ins

und

0.6700

5,341.00

3,578.47

Cuadrilla BB (Instalaciones)

Ins

0.6000

16,159.00

9,695.40

55

4,515

443 Codo de pedestal 90 =4" en H.D. Suministro e


Instal.

und

211,483.50

Herramienta Menor 5% M.O. BB

Eqp

HR

0.5000

808.00

404.00

4,045

Codo de pedestal 90 =4" en H.D.

Ins

und

1.0000

203,000.00

203,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

109

444 Niple = 4" en H.D. con E.B x E.B. L=0.50 m.


Suministro e Instal.

und

354,140.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

2,844

Niple = 4" en H.D. con E.B x E.B. L=0.50 m

Ins

und

1.0000

210,000.00

210,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Conjunto brida =4"

Ins

und

2.0000

64,960.00

129,920.00

55

14,246

445 Union tipo Dresser = 3" en A.C. Suministro e


instal.
55
4,515

und

71,010.60

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

52

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
8,238

Nombre

Tipo U.M.

Union Dresser = 3" en A.C.

Ins

448 Niple = 4" en H.D. con E.L x E.B. L=1.50 m.


Suministro e Instal.

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

59,160.00

59,160.00

und

499,180.00

Longitud promedio = 4.50 m


Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

6,643

Niple = 4" en H.D. con E.L x E.B. L=1.50 m.

Ins

und

1.0000

420,000.00

420,000.00

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

55

14,246

449 Salida sencilla conmutable CN, pagado por un

und

58,519.00

Longitud promedio = 4.50 m


Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

9.0000

1,384.00

12,456.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Alambre cobre THW 12 AWG THHN/NN

Ins

18.0000

1,474.00

26,532.00

55

13,557

451 Salida doble conmutable pvc, pagado por un

und

60,335.62

Longitud promedio = 4.50 m


55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.1300

47,500.00

6,175.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

3.0000

327.00

981.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Alambre cobre THW 12 AWG THHN/NN

Ins

18.0000

1,474.00

26,532.00

13,557

457 Tapon roscado de Presion PVC 1/2". Suministro e


Instal.

und

1,078.23

Cuadrilla BB (Instalaciones)

Ins

0.0455

16,159.00

735.23

14,020

Cinta teflon

Ins

rl

0.0500

1,000.00

50.00

15,112

Tapon roscado presin PVC 1/2

Ins

und

1.0000

293.00

293.00

4,515

459 Niple = 3" en A.C. con E.L x E.B. L=0.30 m.


Suministro e Instal.
55
4,515
14,293

und

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Niple = 3" en A.C. con E.L x E.B. L=0.30 m

Ins

und

1.0000

184,304.00

184,304.00

461 Niple = 3" en A.C. con E.B x E.B. L=1.00 m.


Suministro e Instal.
55
4,515
15,441

196,154.60

und

309,833.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Niple = 3" en A.C. con E.B x E.B. L=1.00 m.

Ins

und

1.0000

295,613.00

295,613.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

53

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

462 Perfil estructural en Aluminio 3" x 1 1/2" Tipo


boquillera, para soporte de modulos en ABC.
Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total
26,661.50

Herramienta Menor 10% M.O. DD

Eqp

HR

0.5000

1,763.00

881.50

4,043

Perfil en AL. 3" x 1 1/2" Tipo boquillera

Ins

1.0000

11,666.00

11,666.00

5,064

56

Cuadrilla DD (Carpinteria)

Ins

0.5000

17,628.00

8,814.00

14,954

Tornillo fijador de techo

Ins

und

4.0000

325.00

1,300.00

15,947

Chazo plstico - metlico 3/8" - 1/4"

Ins

und

4.0000

1,000.00

4,000.00

463 Tee en H.F. 8" x 4" E.L. Suministro e Instal.


55
4,515
15,442

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Tee en H.F. 8" x 4" E.L.

Ins

und

1.0000

561,440.00

561,440.00

464 Pasamuro en tuberia union mecanica PVC RDE 21


=3" L=0.50 m. Suministro e Instal.
19
4,489
15,167

und

19

15,165

Eqp

HR

0.3200

735.00

235.20

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

Tubo union mecanica RDE 21 PVC 3 "

Ins

0.5000

14,572.00

7,286.00

und

55

16,134

8,329.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.3200

735.00

235.20

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

Tubo union mecanica RDE 21 PVC 2 "

Ins

0.5000

6,787.00

3,393.50

467 Valvula de compuerta sello de bronce vastago no


ascendente =8" E.L x E. L. Suministro e instal.

4,515

12,222.00

Herramienta menor 5% M.O. AA

465 Pasamuro en tuberia union mecanica PVC RDE 21


=2" L=0.50 m. Suministro e Instal.

4,489

581,755.05

und

2,009,540.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 8"

Ins

und

1.0000

1,962,140.00

1,962,140.00

470 Guardacable = 5/8" Tipo Pesado. Suministro e


Instal.

und

21,168.50

Longitud promedio = 4.50 m


19
4,489
16,352

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Guardacable de 5/8" o Portacable T.P.

Ins

und

1.0000

13,456.00

13,456.00

471 Guardacable = 1/2" Tipo Pesado. Suministro e


Instal.

und

367.50

19,428.50

Longitud promedio = 4.50 m


19
4,489
14,387

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Guardacable de 1/2" o Portacable T.P.

Ins

und

1.0000

11,716.00

11,716.00

478 Malla con vena para paetes, pagado en m2


17
3,797

8,928.84

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

Puntilla con cabeza 2"

Ins

lb

0.0400

1,990.00

79.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

54

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,489

Cuadrilla AA (Albaileria)

Ins

13,206

Malla con vena 0.60 x 2.00

Ins

479 Guardacable = 3/8" Tipo Pesado. Suministro e


Instal.

Cantidad

Vr.Unitario

Vr.Total

0.4000

14,690.00

5,876.00

und

0.7300

3,268.00

2,385.64

und

13,350.87

Longitud promedio = 4.50 m


19
4,489
16,353

Herramienta menor 5% M.O. AA

Eqp

HR

0.4444

735.00

326.63

Cuadrilla AA (Albaileria)

Ins

0.4444

14,690.00

6,528.24

Guardacable de 3/8" o Portacable T.P.

Ins

und

1.0000

6,496.00

6,496.00

481 Guardacable = 1" Tipo Pesado. Suministro e


Instal.

und

66,872.50

Longitud promedio = 4.50 m


19
4,489
16,354

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Guardacable de 1" o Portacable T.P.

Ins

und

1.0000

59,160.00

59,160.00

482 Guardacable = 1 1/4" Tipo Pesado. Suministro e


Instal.

und

97,979.84

Longitud promedio = 4.50 m


19
4,489
16,355

Herramienta menor 5% M.O. AA

Eqp

HR

0.6667

735.00

490.02

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

Guardacable de 1 1/4" o Portacable T.P.

Ins

und

1.0000

87,696.00

87,696.00

483 Manguera en polipropileno =1". Suministro e


instal.

11,376.00

Longitud promedio = 4.50 m


19
4,489
16,015

Herramienta menor 5% M.O. AA

Eqp

HR

0.1600

735.00

117.60

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

Manguera en polipropileno =1"

Ins

und

1.0000

8,908.00

8,908.00

485 Cielo raso lamina plana tipo eternit 4 mm, pagado


en m2

37,450.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

Placa eternit media 122 x 61x 4mm

Ins

und

1.3700

5,800.00

7,946.00

2,213

Media caa chingale lisa

Ins

0.5400

1,515.00

818.10

2,625

Liston piso ordinario

Ins

4.3200

3,500.00

15,120.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2700

1,990.00

537.30

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Merulex IFA Transparente (20 kg)

Ins

kg

0.0100

10,200.00

102.00

17
851

16,384

486 Suministro e instal. de cielo raso duracustic,


pagado por m2

40,039.45

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

4,397

Lamina duracstic 5/8

Ins

1.1000

15,015.00

16,516.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0300

5,000.00

150.00

13,935

Angulo cielo falso aluminio

Ins

2.2800

2,000.00

4,560.00

13,936

Tee cielo falso en aluminio

Ins

2.2800

2,000.00

4,560.00

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

55

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

487 Tapon roscado de Presion PVC 1". Suministro e


Instal.

Cantidad

Vr.Unitario

und

Vr.Total
2,473.81

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

14,020

Cinta teflon

Ins

rl

0.1700

1,000.00

170.00

15,114

Tapon roscado presin PVC 1

Ins

und

1.0000

1,226.00

1,226.00

4,515

488 Cielo raso tipo aluminio acstico p 80, pagado por


m2
668

Cielo raso aluminio acstico 84 R V5

Ins

489 Boveda en policarbonato alveolar 6mm azul con


tubo estructural de 2 1/2" de soporte (Sabanalarga)

112,339.01

1.0300

109,067.00

112,339.01

94,449.40

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7000

1,616.00

1,131.20

Cuadrilla BB (Instalaciones)

Ins

0.7000

16,159.00

11,311.30

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1000

6,885.00

688.50

16,431

Lamina policarbonato alveolar 6 mm azul 5.9*2.1 mt

Ins

und

0.1050

520,445.00

54,646.73

16,432

Conector estruct 5.9 mt para lmina policarbonato

Ins

und

0.0700

79,999.00

5,599.93

16,433

U de remate aluminio para lmina policarbonato 2.1

Ins

und

0.2300

11,139.00

2,561.97

16,434

Cinta microperforada *35 mt

Ins

und

0.0110

86,800.00

954.80

16,435

Silicona para policarbonato o acrlico

Ins

und

0.0230

28,000.00

644.00

16,436

Tornillo autoperforante de acero cubierta policarb

Ins

und

1.2000

300.00

360.00

16,437

Tubo estructural redondo 2 1/2" 4mm * 6m

Ins

und

0.0750

220,679.56

16,550.97

55
4,515

490 Canaleta Parshall w:2" y sistema aforador con


pasamuro en PRFV 2". Suministro e Instal.

und

1,668,653.33

Sin tuberia, cajas, cable


Herramienta Menor 10% M.O. AA

Eqp

HR

3.0000

1,469.00

4,407.00

342

Sistema aforador con Pasamuro en PRFV =2"

Ins

und

1.0000

430,000.00

430,000.00
1,000,000.00

17

841

Canaleta Parshall w:2"

Ins

und

1.0000

1,000,000.00

1,870

Alambre Negro No 18

Ins

kg

2.0000

3,903.00

7,806.00

4,489

Cuadrilla AA (Albaileria)

Ins

3.0000

14,690.00

44,070.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.5000

333,142.66

166,571.33

8,194

Acero de refuerzo 60000 Psi

Ins

kg

7.0000

2,257.00

15,799.00

495 Reparacion de andenes y cunetas en Concreto


3000 Psi e=0.07 m

38,223.67

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2700

1,469.00

396.63

2,208

Tabla chapa ordinario 0.10

Ins

3.1500

2,667.00

8,401.05

3,797

Puntilla con cabeza 2"

Ins

lb

0.0300

1,990.00

59.70

4,489

Cuadrilla AA (Albaileria)

Ins

0.2700

14,690.00

3,966.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

Liston ordinario 0.05 x 0.05

Ins

1.6000

1,300.00

2,080.00

17

13,235

498 Cielo raso en madera talex 19 mm, pagado por m2

57,136.43

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3000

1,469.00

1,909.70

2,197

Repisa Ordinario 3 m

Ins

2.5400

1,500.00

3,810.00

2,202

Tabla burra cedro macho 0.10

Ins

2.6000

3,550.00

9,230.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.0600

1,990.00

4,099.40

4,489

Cuadrilla AA (Albaileria)

Ins

1.3000

14,690.00

19,097.00

Hoja puerta tablex 0.51 - 0.75

Ins

und

0.2700

62,779.00

16,950.33

17

13,860

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

56

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,384

Merulex IFA Transparente (20 kg)

Ins

500 Acometida domiciliaria acueducto PF+UAD (L=6m)


D=1/2", incluye Micromedidor, registro de corte.
Suministro e Instal.

kg

Cantidad

Vr.Unitario

Vr.Total

0.2000

10,200.00

2,040.00

und

149,523.78

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4200

1,469.00

616.98

Cuadrilla AA (Albaileria)

Ins

0.4200

14,690.00

6,169.80

12,142

Registro de incorporacion 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,365

Registro de corte 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,791

Tuberia PF+UAD 1/2"

Ins

6.0000

1,429.00

8,574.00

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

15,664

Adaptador Macho PF+UAD 1/2 "

Ins

und

2.0000

1,481.00

2,962.00

16,348

Micromedidor de agua 1/2"

Ins

und

1.0000

76,792.00

76,792.00

17
4,489

501 Limpieza Torres y Vigas Puentes colgantes para


recalce

8,228.03

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.2857

2,550.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.1330

188.00

213.00

Cuadrilla AA-3 (Limpieza)

Ins

0.2857

25,504.00

7,286.49

14,749

502 Tablon para piso 0.05 x 0.30 x 1.00

728.54

20,967.73

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2000

1,763.00

352.60

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2000

17,628.00

3,525.60

5,144

56

Transporte de materiales Tn

Ana

0.0110

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0600

52,200.00

3,132.00

16,362

Tablon de 0.05 x 0.30 x 1

Ins

1.0300

13,551.00

13,957.53

503 Viga Transversal en madera 0.12 x 0.15 x 1.00

20,645.77

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3333

1,763.00

587.61

5,064

Cuadrilla DD (Carpinteria)

Ins

0.3333

17,628.00

5,875.41

5,144

Transporte de materiales Tn

Ana

0.0135

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0510

52,200.00

2,662.20

16,363

Madera de 0.12 x 0.15 x 1 Polin

Ins

1.0300

11,185.00

11,520.55

56

504 Viga Longitudinal en madera 0.12 x 0.15 x 1.00

19,030.50

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

56

Transporte de materiales Tn

Ana

0.0135

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0510

52,200.00

2,662.20

16,363

Madera de 0.12 x 0.15 x 1 Polin

Ins

1.0300

11,185.00

11,520.55

505 Tuberia drenaje pvc 100 mm o 4", pagado en ml

47,714.33

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

3,466

Tubo de drenaje PVC 100 mm o 4"

Ins

1.0000

20,447.00

20,447.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,143

Transporte de materiales m

Ana

0.2250

46,157.00

10,385.33

Triturado de 1/2" - 3/4"

Ins

0.2250

46,304.00

10,418.40

17

13,961

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

57

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

507 Columna en concreto de resistencia 3500 psi de


6-9 m, pagada en m3

Cantidad

Vr.Unitario

Vr.Total
741,960.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,867

Paral telescopico 2 a 4 ml

Ins

28.0000

340.00

9,520.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0500

351,843.89

369,436.08

13,641

Seccin de Andamio

Ins

mes

0.4000

17,120.00

6,848.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

508 Transporte de materiales Canoa o Motor fuera de


borda (Viaje 2.0 TN)

vj

50,814.00

14,159

Ayudantes (Ay-2)

Ins

1.0000

10,814.00

10,814.00

16,383

Transporte Canoa o motor fuera de borda

Ins

vj

1.0000

40,000.00

40,000.00

509 Tubera PVC conduit 1 1/4", pagada por ML

16,029.29

Sub-Contrato Electrico

Esp

38.0000

11,615.43

4,413.86

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3300

1,616.00

533.28

1,697

Boquillas juego pvc 1 1/2"

Ins

und

2.0000

1,800.00

3,600.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3300

16,159.00

5,332.47

5,616

Tubo conduit PVC 1 1/4"

Ins

0.3300

3,882.00

1,281.06

3
55

510 Banqueo Manual Caminos de herradura A=1.0 m


98
14,944

Herramienta menor 10% M.O. Ay-4

Eqp

HR

0.0667

2,163.00

144.27

Cuadrilla Ay-4

Ins

0.0667

21,628.00

1,442.59

511 Roceria manual para caminos de Herradura


40
106
14,703

1,586.86

380.62

Guadaadora

Eqp

HR

0.0222

12,000.00

Herramienta menor 10% M.O. Ayudante (A)

Eqp

HR

0.0222

468.00

10.39

Ayudante (A)

Ins

0.0222

4,677.00

103.83

512 Cuneta tipo C-1, concreto 3000 Psi e=0.10 m

266.40

402,660.16

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.5600

4,375.00

2,450.00

2,208

Tabla chapa ordinario 0.10

Ins

10.0000

2,667.00

26,670.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.5000

14,690.00

36,725.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

515 Valvula de Mariposa =2" en Bronce (suministro e


Instal.)
55
4,515
14,020

und

3,672.50

102,604.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

58

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,839

Valvula de Mariposa =2" bronce

Ins

517 Valvula de Mariposa =2 1/2 " en Bronce


(suministro e Instal.)

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

74,942.00

74,942.00

und

180,782.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,842

Valvula de Mariposa =2 1/2" bronce

Ins

und

1.0000

153,120.00

153,120.00

55
4,515

522 Tuberia de Polietileno PE 100 PN-16 de =160 mm


= 6"

91,895.07

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0204

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,524

Tuberia de Polietileno PE 100 PN-16 de 160 mm

Ins

1.0100

85,681.00

86,537.81

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

699

535 Baranda en perfil WF 8" x 18" (dos Tubos HG =3")


y (Un Tubo HG =2"), Hu=0.90 m

1,380.81

254,200.94

42

Motosoldador Diesel

Eqp

HR

0.2000

14,833.00

2,966.60

43

Equipo de Oxicorte

Eqp

HR

0.3000

5,000.00

1,500.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

45

Cilindro

Eqp

HR

0.3000

41.00

12.30

48

2,688.23

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.8333

3,226.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0750

6,805.00

510.38

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

2.0000

34,693.00

69,386.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1000

42,950.00

4,295.00

5,144

Transporte de materiales Tn

Ana

0.0450

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.2500

2,257.00

9,592.25

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0100

6,200.00

62.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.8333

32,262.00

26,883.92

15,564

Perfil WF 8" x 18"

Ins

0.9000

89,514.00

80,562.60

15,619

Tubo cerramiento Galvanizado =2"

Ins

1.0000

10,833.00

10,833.00

16,231

Platina 3/16" x 1"

Ins

0.4600

3,362.00

1,546.52

16,232

Tornillo = 1" x 5" G-8 R.O. Con T. A.

Ins

und

2.6700

13,470.00

35,964.90

536 Tuberia de Polietileno PE 100 PN-16 de =75 mm =


2 1/2"

23,580.11

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

3,674

Tuberia de Polietileno PE 100 PN-16 de 75 mm

Ins

1.0000

19,068.00

19,068.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

537 Relleno con material de prestamo y transportado a


lomo de mula.

42,000.50

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.5000

3,091.00

1,545.50

13,960

Cuadrilla AA-4

Ins

0.5000

30,910.00

15,455.00

15,982

Alquiler mula

Ins

5.0000

5,000.00

25,000.00

59

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

59

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

538 Bomba autocebante de 4.5 HP para agua residual


con doble sello mecanico, sensor temperatura y
flotador de mercurio.
55
355
4,515
14,051

Cantidad

Vr.Unitario

und

Vr.Total

5,079,550.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Bomba autocebante 4.5 HP Db SM 230 V

Ins

und

1.0000

4,959,000.00

4,959,000.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Flotador automtico de mercurio

Ins

und

1.0000

85,000.00

85,000.00

539 Placa base en concreto 3000 psi, e=0.08 m


reforzada con malla Q5

48,585.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0800

333,142.66

26,651.41

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

1.0600

8,323.00

8,822.38

17

14,779

546 Impermeabilizacin en manto edil 3 mm


transitable, pagado m2

1,469.00

26,148.18

56

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3000

1,763.00

528.90

81

Soplete a gasolina 2 lbs

Eqp

HR

0.2300

10,000.00

2,300.00

1,961

Alumol, recubrimiento de aluminio

Ins

kg

0.2400

21,112.00

5,066.88

5,064

Cuadrilla DD (Carpinteria)

Ins

0.3000

17,628.00

5,288.40

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

15,587

Manto edil 3 mm transitable a.l. 22

Ins

1.0500

12,000.00

12,600.00

15,588

Gas natural 40 lb

Ins

und

0.0140

26,000.00

364.00

547 Perma ply 2 capas, pagado por m2

19,481.37

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

1,170

Asfalto tipo 190/220 200 KG

Ins

kg

1.5600

2,250.00

3,510.00

1,985

Perma glass 6 fiberglass

Ins

2.3700

2,239.00

5,306.43

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

17

550 Alistado de pisos e= 0.04, pagado en m2

16,844.91

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

Cemento gris

Ins

kg

19.0000

383.34

7,283.46

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,143

Transporte de materiales m

Ana

0.0500

46,157.00

2,307.85

5,144

Transporte de materiales Tn

Ana

0.0190

0.00

0.00

17
804

552 Alistado impermeabilizado para pisos en mortero


1:3, pagado por m2

23,953.87

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4500

1,469.00

661.05

Cemento gris

Ins

kg

22.0000

383.34

8,433.48

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

17
804

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

60

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489
14,122

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

Sika 1 imp. integral

Ins

554 Alistado pisos terrazas 0.08, mortero 1:5. pagado


por m2

Cantidad

Vr.Unitario

Vr.Total

0.4500

14,690.00

6,610.50

kg

1.1800

6,438.00

7,596.84

35,182.32

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

Cemento gris

Ins

kg

24.8800

383.34

9,537.50

3,684

Agua para obra

Ins

14.8300

10.00

148.30

4,426

Arena lavada de rio

Ins

0.1000

13,800.00

1,380.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

Sika 1 imp. integral

Ins

kg

2.2400

6,438.00

14,421.12

17
804

14,122

556 Pegante mortero - concreto, pagado por m2

15,093.84

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

23

Adercril - Adherente

Ins

kg

0.4000

16,565.00

6,626.00
383.34

Cemento gris

Ins

kg

1.0000

383.34

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

804

560 Bomba autocebante de 2 HP descarga 3" con


accesorios. Suministro e Instal.
55
4,515
15,443

und

2,080,630.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Bomba autocebante de 2 HP con descarga 3"

Ins

und

1.0000

2,045,080.00

2,045,080.00

589 Adoquin concreto 6 cm, pagado m

1,616.00

3,232.00

64,002.54

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1000

1,469.00

1,615.90

2,899

Adoquin en concreto 10 x 6 x 20

Ins

und

50.0000

900.00

45,000.00

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1000

14,690.00

16,159.00

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0750

0.00

0.00

17

593 Canal amazonas blanca. Suministro e Instal.

40,590.27

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5333

1,469.00

783.42

379

Soporte canal amazonas

Ins

und

0.6700

2,192.00

1,468.64

380

Hidrosello canal amazonas

Ins

und

0.3333

1,373.00

457.62

382

Canal amazonas blanca

Ins

1.0000

21,129.00

21,129.00

384

Union canal amazonas blanca

Ins

und

0.3333

12,353.00

4,117.25

408

Tapa Ext. derecha amazonas

Ins

und

0.1200

6,010.00

721.20

2,816

Soporte matalico canal amazona

Ins

und

0.6700

6,088.00

4,078.96

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

17

594 Bajante amazonas blanca. Suministro e Instal.

30,017.53

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4444

1,469.00

652.82

425

Bajante amazonas blanca

Ins

1.0000

18,892.00

18,892.00

450

Tornillo inoxidable para bajante

Ins

und

2.0000

119.00

238.00

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

61

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

463

Union de bajante amazonas

Ins

480

Codo bajante 45 blanco

Ins

489

Soporte de bajante amazonas


Cuadrilla AA (Albaileria)

4,489

Cantidad

Vr.Unitario

Vr.Total

und

0.3333

3,205.00

1,068.23

und

0.3333

4,525.00

1,508.18

Ins

und

0.6667

1,695.00

1,130.06

Ins

0.4444

14,690.00

6,528.24

596 Baldosa grano de mrmol 33 x 33 Perlato claro o


Blanco Huila

65,926.54

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

804

Cemento gris

Ins

kg

6.2700

383.34

2,403.54

829

Cemento blanco

Ins

kg

1.0300

975.00

1,004.25

2,907

Baldosa grano de marmol 33x33 perlato o blanco hui

Ins

1.0300

44,602.00

45,940.06

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0693

0.00

0.00

17

597 Baldosa grano de mrmol 30*30 perlato claro

58,378.99

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

804

Cemento gris

Ins

kg

6.2700

383.34

2,403.54

829

Cemento blanco

Ins

kg

1.0300

975.00

1,004.25

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0593

0.00

0.00

Baldosa grano de mrmol 30*30 perlato claro

Ins

1.0300

37,274.28

38,392.51

17

15,813

608 Ampliacion de la Perforacion de prueba hasta 12


" (piedemonte - montaoso)

206,540.04

Equipo de perforacion y rotacion

Eqp

HR

1.6667

76,000.00

126,669.20

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

1.6667

2,305.00

3,841.74

Agua para obra

Ins

75.0000

10.00

750.00

15,636

Bentonita x 50 Kg

Ins

kg

40.0000

719.00

28,760.00

15,953

Broca tugsteno 12 ``

Ins

und

0.0045

1,800,000.00

8,100.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

1.6667

23,051.00

38,419.10

85
112
3,684

609 Tableta rustica de gres egipcia 10cm*10cm

28,338.21

Cemento gris

Ins

kg

6.5900

383.34

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

Tableta rstica egipcia 10*10

Ins

1.0500

11,700.00

12,285.00

804

16,408

612 Perforacion de prueba en 8 " (piedemonte montaoso)


85
112
3,684

2,526.21

251,574.94

Equipo de perforacion y rotacion

Eqp

HR

2.1622

76,000.00

164,327.20

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

2.1622

2,305.00

4,983.87

Agua para obra

Ins

50.0000

10.00

500.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

62

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,635

Broca tugsteno 8 ``

Ins

und

15,636

Bentonita x 50 Kg

Ins

kg

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

2.1622

617 Suministro e instal. piso granito, travertino


peruano No 2, diltacion bronce c/mineral, espesor
2 cm, pagado en m

Cantidad

Vr.Unitario

0.0056

950,000.00

5,320.00

37.0000

719.00

26,603.00

23,051.00

49,840.87

Vr.Total

82,679.29

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

804

Cemento gris

Ins

kg

18.7000

383.34

7,168.46

829

Cemento blanco

Ins

kg

21.0000

975.00

20,475.00

2,448

Dilatacin en bronce PC 09

Ins

1.3600

3,735.00

5,079.60

2,486

Marmolina 20 kg

Ins

bt

0.5000

12,800.00

6,400.00

3,684

Agua para obra

Ins

7.4100

10.00

74.10

4,426

Arena lavada de rio

Ins

0.0900

13,800.00

1,242.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

5,143

Transporte de materiales m

Ana

0.0900

46,157.00

4,154.13

5,144

Transporte de materiales Tn

Ana

0.0825

0.00

0.00

13,381

Color mineral

Ins

kg

0.3300

7,000.00

2,310.00

14,946

Granito travertino peruano No.2

Ins

bt

0.7500

17,342.00

13,006.50

17

618 Paso escalera granito, pagado en ml

67,393.24

Herramienta Menor 10% M.O. AA

Eqp

HR

2.3000

1,469.00

804

Cemento gris

Ins

kg

12.0000

383.34

4,600.08

829

Cemento blanco

Ins

kg

10.5000

975.00

10,237.50

2,448

Dilatacin en bronce PC 09

Ins

0.2000

3,735.00

747.00

2,486

Marmolina 20 kg

Ins

bt

0.2500

12,800.00

3,200.00

2,637

Pirlan aluminio dorado

Ins

0.8000

3,500.00

2,800.00

3,684

Agua para obra

Ins

3.7000

10.00

37.00

4,426

Arena lavada de rio

Ins

0.0700

13,800.00

966.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.3000

14,690.00

33,787.00

13,381

Color mineral

Ins

kg

0.1500

7,000.00

1,050.00

14,720

Granito travertino peruano No.3

Ins

bt

0.3800

17,342.00

6,589.96

17

619 Guardaescoba en granito, pagado ml

3,378.70

23,473.55

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

829

Cemento blanco

Ins

kg

4.0000

975.00

3,900.00

2,486

Marmolina 20 kg

Ins

bt

0.1000

12,800.00

1,280.00

3,684

Agua para obra

Ins

1.4800

10.00

14.80

4,426

Arena lavada de rio

Ins

0.0180

13,800.00

248.40

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,143

Transporte de materiales m

Ana

0.0180

46,157.00

830.83

5,144

Transporte de materiales Tn

Ana

0.0091

0.00

0.00

Granito travertino peruano No.3

Ins

bt

0.0600

17,342.00

1,040.52

17

14,720

620 Conformacion de Botaderos en ladera (ver especf.)

4,091.33

14

Retroexcavadora de orugas

Eqp

HR

0.0100

144,160.00

1,441.60

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0200

130,650.00

2,613.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0025

14,690.00

36.73

621 Paso escalera en Gravilla lavada

26,920.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

63

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 5% M.O. AA

Eqp

Cemento gris

Ins

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)
Gravilla para piso

19
804

15,575

Cantidad

Vr.Unitario

Vr.Total

HR

1.5000

735.00

1,102.50

kg

1.7500

383.34

670.85

0.8000

10.00

8.00

0.0050

13,800.00

69.00

Ins

1.5000

14,690.00

22,035.00

Ins

bt

0.1750

17,342.00

3,034.85

622 Guardaescoba gravilla lavada, pagado por ML

17,970.42

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0581

1,469.00

1,554.35

Cemento gris

Ins

kg

0.7000

383.34

268.34

3,684

Agua para obra

Ins

0.3200

10.00

3.20

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0581

14,690.00

15,543.49

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Triturado de 1/2" - 3/4"

Ins

0.0100

46,304.00

463.04

17
804

13,961

623 Suministro e instal. de tablon en gres, tipo


vitrificado, con dimensiones de 33 x 33 cm,
espesor de 2,5 cm pagado m2

36,089.88

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

Tablon de gres vitrificado 33 x 33

Ins

1.0500

14,776.00

15,514.80

804

15,568

625 Suministro e instal. de tablon de gres grafilado 25


x 25, pagado en m2

34,158.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

Tablon ladrillo grafilado 25 x 25

Ins

1.0300

14,757.00

15,199.71

804

15,822

627 Piso baldosa de gres interiores 30 x 30 mate,


pagado m

33,635.36

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

6.5900

383.34

2,526.21

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

Tableta de gres no vitrificado 30 x 30

Ins

1.0300

15,600.00

16,068.00

804

15,569

629 Zocalo opara tableta 7.5 CM, pagado en ml

8,792.99

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

64

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cortadora ladrillo (Disco Diaman. 14")

Eqp

Cemento gris

Ins

2,551

Tablon de gres vitrificado 25 x 25

Ins

3,684

Agua para obra

Ins

0.2900

10.00

2.90

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4397

14,690.00

6,459.19

97
804

630 Zocalo para tableta 10 CM, pagado en ml

Cantidad

Vr.Unitario

Vr.Total

HR

0.0120

40,000.00

480.00

kg

0.6300

383.34

241.50

0.1000

14,714.00

1,471.40

8,638.57

Cemento gris

Ins

kg

1.0900

383.34

417.84

2,551

Tablon de gres vitrificado 25 x 25

Ins

0.1100

14,714.00

1,618.54

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4397

14,690.00

6,459.19

804

631 Pirlan en aluminio para piso, Suministro e instal.


pagado ml

5,980.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3300

1,469.00

484.77

2,637

Pirlan aluminio dorado

Ins

0.1700

3,500.00

595.00

3,798

Tornillo para madera 1" No.6

Ins

und

3.0900

17.00

52.53

4,489

Cuadrilla AA (Albaileria)

Ins

0.3300

14,690.00

4,847.70

17

632 PIRLANES LADRILLO X ARREGLAR X S/ GRAF

16,394.19

Cemento gris

Ins

kg

3.3200

383.34

1,272.69

2,059

Ladrillo tolete recocido

Ins

und

15.8400

300.00

4,752.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6871

14,690.00

10,093.50

804

682 Enchape muro y piso en ceramica lisa 20 x 20,


pagado m2

31,952.65

15

Pegacor blanco

Ins

kg

3.0000

1,120.00

3,360.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

Cemento blanco

Ins

kg

0.7000

975.00

682.50

2,549

Tableta cermica corriente 20 x 20

Ins

1.0500

13,500.00

14,175.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

5,144

Transporte de materiales Tn

Ana

0.0120

0.00

0.00

829

686 Tuberia de Polietileno PE 100 PN-16 de =200 mm


= 8"

141,656.74

699

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0238

67,686.73

1,610.94

1,358

Tuberia de Polietileno PE 100 PN-16 de 200 mm

Ins

1.0100

134,559.00

135,904.59

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0120

28,250.00

339.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2353

16,159.00

3,802.21

689 Perro de 7/8" Tipo Pesado. Suministro e Instal.

und

21,444.84

Herramienta menor 5% M.O. AA

Eqp

HR

0.0667

735.00

49.02

4,489

Cuadrilla AA (Albaileria)

Ins

0.0667

14,690.00

979.82

15,740

Perro de 7/8" Tipo pesado

Ins

und

1.0000

20,416.00

20,416.00

19

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

65

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

699 Union a Termofusion a Tope Diametro > 110 mm

Cantidad

Vr.Unitario

und

Vr.Total
67,686.73

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

79

Planta electrica 50 Kw

Eqp

HR

0.6667

31,250.00

20,834.38

Equipo de Termofusion > 110 mm

Eqp

HR

0.6667

52,500.00

35,001.75

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

113
4,515

701 Juego de Incrustaciones para Bao tipo


economico (sumistro e instalacion)

und

53,100.65

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

Cemento blanco

Ins

kg

0.2500

975.00

243.75

3,684

Agua para obra

Ins

0.2500

10.00

2.50

4,126

Juego de Incrustaciones economico

Ins

und

1.0000

27,000.00

27,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

17
829

703 Niple = 6" en A.C. con E.B x E.B. L=0.50 m.


Suministro e Instal.

und

470,320.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

3,286

Niple = 6" en A.C. con E.B x E.B. L=0.50 m

Ins

und

1.0000

456,100.00

456,100.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

55

704 Jabonera porcelana, pagado un

und

20,927.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

829

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,125

Jabonera blanca

Ins

und

1.0300

12,000.00

12,360.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

17

706 Sealizacion horizontal para senderos peatonales y


aislamiento de areas de trabajo (zona urbana)

734.50

40,577.32

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1860

1,469.00

273.23

Colombina no convencional (base en concreto 0.3 x 0.25


x 0.08) paral guadua 2.05 m

Ana

und

0.2000

11,667.61

2,333.52

4,489

Cuadrilla AA (Albaileria)

Ins

0.1860

14,690.00

2,732.34

8,112

Tela cerramiento fibra (Verde)

Ins

1.1000

3,762.00

4,138.20

8,210

Seales Preventivas y regla. 60 x 60 cm

Ins

und

0.0250

168,333.00

4,208.33

8,212

Seales Preventivas y regla. 90 x 90 cm

Ins

und

0.0250

245,000.00

6,125.00

13,793

Colombina de seguridad plastica reflectiva

Ins

und

0.2250

57,500.00

12,937.50

13,794

Polisombra

Ins

1.1000

3,095.00

3,404.50

13,795

Pasacalle en tela 6.0 x 0.75 m

Ins

und

0.0200

210,000.00

4,200.00

14,760

Cinta de Sealizacion

Ins

2.1000

107.00

224.70

17
405

707 Remate bocel win en aluminio

5,979.10

Herramienta menor 5% M.O. AA

Eqp

HR

0.2900

Cemento blanco

Ins

kg

0.2000

975.00

195.00

2,658

Perfil aluminio 1/2 x 1/2`` (Win)

Ins

1.0300

1,334.00

1,374.02

4,489

Cuadrilla AA (Albaileria)

Ins

0.2857

14,690.00

4,196.93

19
829

709 Pirlan ducha porcelana 20x20, pagado ml

735.00

213.15

35,402.52

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

66

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15

Pegacor blanco

Ins

17

Herramienta Menor 10% M.O. AA

Eqp

kg

1.8900

1,120.00

2,116.80

HR

Cemento blanco

1.7380

1,469.00

2,553.12

Ins

kg

0.5800

975.00

2,658

565.50

Perfil aluminio 1/2 x 1/2`` (Win)

Ins

2.0600

1,334.00

2,748.04

3,572

Porcelana esfumado - base

Ins

0.2300

8,208.00

1,887.84

4,489

Cuadrilla AA (Albaileria)

Ins

1.7380

14,690.00

25,531.22

829

711 Excavacion mecanica en material comun hasta 8


mts (Oruga)
14

Retroexcavadora de orugas

Eqp

712 Perro de 3/4" Tipo Pesado. Suministro e Instal.

HR

4,512.21

0.0313

144,160.00

4,512.21

18,064.07

Herramienta menor 5% M.O. AA

Eqp

HR

0.0625

735.00

45.94

4,489

Cuadrilla AA (Albaileria)

Ins

0.0625

14,690.00

918.13

14,593

Perro de 3/4" Tipo pesado

Ins

und

1.0000

17,100.00

17,100.00

19

717 Piedra mueca en piso e = 0.02 m. Suministro e


instal.

158,051.94

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8333

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0300

248,144.84

7,444.35

2,325

Piedra mueca e= 0.02 m

Ins

1.0300

132,643.00

136,622.29

4,489

Cuadrilla AA (Albaileria)

Ins

0.8333

14,690.00

12,241.18

5,144

Transporte de materiales Tn

Ana

0.0550

0.00

0.00

Concolor boquilla lista blanco nacar

Ins

kg

0.2000

2,600.00

520.00

17

16,411

727 Yee 8" x 8" en H.D. J.H. Suministro e Instal.

und

1,224.12

1,037,790.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

13,937

Yee 8" x 8" en H.D. JH o EL.

Ins

und

1.0000

1,002,240.00

1,002,240.00

55

728 Rejillas plsticas sosco 3 x 2, pagado por un

und

7,771.70

15

Pegacor blanco

Ins

kg

0.2000

1,120.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

2,817

Rejilla plstica con sosco 3 x 2

Ins

und

1.0000

2,700.00

2,700.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

729 Rejillas sifon piso sosco 4 x 3, pagado por UN

und

224.00

14,846.52

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

Rejilla sifn 3 x 4 plstica con sosco

Ins

und

1.0000

4,000.00

4,000.00

17

15,843

731 Tapas registro 6 x 6, pagado en UN


17
804

und

13,924.37

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

Cemento gris

Ins

kg

0.2000

383.34

76.67

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

67

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,811

Tapa registro R 6 x 6

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

732 Tapa registro plstica 20 x 20, pagado un

Cantidad

Vr.Unitario

Vr.Total

1.0000

9,000.00

9,000.00

0.3000

14,690.00

4,407.00

und

21,048.37

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

Cemento gris

Ins

kg

0.2000

383.34

76.67

2,812

Tapa registro plstica R 20 x 20

Ins

und

1.0000

16,124.00

16,124.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

17
804

734 Placa entrepiso sistema reticular celulado con


viguetas cada 1.1 m en ambos sentidos sin viga
H=0.65 m

und

440.70

125,222.81

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.4000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1100

4,375.00

481.25

4,489

Cuadrilla AA (Albaileria)

Ins

2.4000

14,690.00

35,256.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1900

333,142.66

63,297.11

5,061

Formaleta (1 uso)

Ana

0.7000

32,375.50

22,662.85

735 Paete liso 1:3, sobre estructuras de concreto de 0


- 0.50 m (vigas, columnas en una cara)

3,525.60

13,579.70

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7273

1,469.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.6000

188.00

300.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0053

276,302.97

1,464.41

4,489

Cuadrilla AA (Albaileria)

Ins

0.7273

14,690.00

10,684.04

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0250

2,482.00

62.05

14,786

770 Acometida pvc 1/2 5 MTS, pagada por un

und

1,068.40

129,309.73

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

93,702.70

35,607.03

13,939

Cheque hidro 1/2"

Ins

und

1.0000

24,824.00

24,824.00

14,757

Registro paso directo 1/2"

Ins

und

1.0000

22,000.00

22,000.00

14,991

Tubo presin RDE 9 PVC 1/2 "

Ins

5.1500

2,109.00

10,861.35

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.0500

375.00

768.75

771 Baranda metalica en A/C. Tubo SCH-40 de =2"

111,677.45

43

Equipo de Oxicorte

Eqp

HR

0.0500

5,000.00

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.6000

3,226.00

1,935.60

74

250.00

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.1000

5,313.00

531.30

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0667

6,885.00

459.23

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.6000

32,262.00

19,357.20

15,643

Tuberia en A.C S/C = 2" SCH 40

Ins

2.4500

34,220.00

83,839.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

68

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

772 Regleta de medida en PRFV

Cantidad

Vr.Unitario

und

Vr.Total
101,159.00

419

Regleta de medida en PRFV

Ins

und

1.0000

85,000.00

85,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

773 Tee Reducida PVC de presion union platino 4" x 3".


Suministro e Instal.

und

241,618.49

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

3,697

Tee reducida PVC de presion union platino 4" x 3"

Ins

und

1.0000

232,699.00

232,699.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

Lubricante 500 gr

Ins

und

0.0026

12,305.00

31.99

55

14,118

774 Red de suministro PVC 1", pagado en ML

11,514.52

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

565.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

1.0500

3,923.00

4,119.15

15,023

Codo 90 presion PVC 1"

Ins

und

0.5000

1,176.00

588.00

55

775 Valvula de Globo 4" E.B x E.B. Suministro e Instal.


55
4,515
16,358

und

1,222,230.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Valvula de Globo 4" E.B x E.B

Ins

und

1.0000

1,186,680.00

1,186,680.00

776 Pasamuro en PRFV = 3" E.L x E.B. L= 1.00 m


(Suministro e instal. con tornilleria y empaques)

und

154,587.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

Pasamuro =3" E.L. x E.B. L=1.0 m en PRFV

Ins

und

1.0000

145,700.00

145,700.00

55

14,189

777 Rehabilitacin de punto hidrulico y/o sanitario

und

21,700.86

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

Cemento blanco

Ins

kg

0.2000

975.00

195.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0300

58,612.00

1,758.36

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0300

28,250.00

847.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

16,395

Manguera plstica conexin 1/2"

Ins

und

0.2500

2,500.00

625.00

55
829

778 Baranda en madera o cuarton 0.05 x 0.12 x 1.0

1,616.00

12,146.47

Herramienta Menor 10% M.O. DD

Eqp

HR

0.0833

1,763.00

146.86

1,949

Madera o cuarton de 0.05 x 0.12 x 1.0

Ins

1.0300

8,400.00

8,652.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.0833

17,628.00

1,468.41

5,144

Transporte de materiales Tn

Ana

0.0064

0.00

0.00

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0360

52,200.00

1,879.20

56

15,722

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

69

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

781 Viga longitudinal en madera o cuarton 0.05 x 0.12 x


1.0

Cantidad

Vr.Unitario

Vr.Total
13,763.68

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1667

1,763.00

293.89

1,949

Madera o cuarton de 0.05 x 0.12 x 1.0

Ins

1.0300

8,400.00

8,652.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1667

17,628.00

2,938.59

5,144

Transporte de materiales Tn

Ana

0.0064

0.00

0.00

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0360

52,200.00

1,879.20

56

15,722

782 Bajante A.LL. PVC 3", pagado por ml

21,834.51

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

0.0600

4,485.00

269.10

3,655

Tubo PVC A.LL. 3"

Ins

1.0500

6,069.00

6,372.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

15,822.11

6,012.40

55

13,607

783 Sistema muestreador para reactor UASB con


soporteria, juego 3 Unidades. Suministro e Instal.
55
4,515
14,194

und

595,662.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

Sistema muestreador para reactor UASB con soportes

Ins

und

1.0000

569,000.00

569,000.00

784 Reventilacion PVC 3", pagado por ML

1,616.00

2,424.00

20,281.13

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

0.1400

4,485.00

627.90

3,655

Tubo PVC A.LL. 3"

Ins

1.0500

6,069.00

6,372.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

14,696.47

5,584.66

55

13,607

785 Campana en PRFV para recoleccion de gases y


accesorios, Suministro e instal.

2,066,625.00

Herramienta Menor 10% M.O. BB

Eqp

HR

15.0000

1,616.00

24,240.00

4,515

Cuadrilla BB (Instalaciones)

Ins

15.0000

16,159.00

242,385.00

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

Campana en PRFV para recoleccion de gases y acces.

Ins

1.0000

1,800,000.00

1,800,000.00

55

14,193

786 Sistema quemador de gas y trampa de agua,


incluye accesorios y cilindros. Suministro e instal.

und

12,401,206.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

4,193

Sistema quemador de gas y trampa de agua

Ins

und

1.0000

12,238,000.00

12,238,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

10.0000

16,159.00

161,590.00

55

787 Bajante A.N. PVC 6", pagado por ml

71,437.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

3,609

Codo sanitario 90 1/4 C x C PVC 6"

Ins

und

0.0600

70,982.00

4,258.92

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

70

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,657

Tubo PVC sanitario de 6"

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

Sub-Contrato Hidraulico Sanitario

Esp

13,607

788 Instalacion de aparatos sanitarios, pagado en und


55
829
4,515

Vr.Unitario

Vr.Total

1.0500

31,269.00

32,832.45

0.8900

16,159.00

14,381.51

38.0000

51,765.94

19,671.06

und

28,927.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

789 Conexion tanque elevado pvc de 1" y 1/2", pagado


un
6

Cantidad

und

Sub-Contrato Instalacion

Esp

270,123.55

38.0000

195,741.70

74,381.85
12,928.00

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

2.0000

1,504.00

3,008.00

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

2.0000

3,923.00

7,846.00

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.1000

375.00

787.50

15,023

Codo 90 presion PVC 1"

Ins

und

2.1000

1,176.00

2,469.60

55

790 Instalacion equipo hidroneumatico, pagado un


55
4,515

und

Herramienta Menor 10% M.O. BB

Eqp

HR

40.0000

1,616.00

64,640.00

Cuadrilla BB (Instalaciones)

Ins

40.0000

16,159.00

646,360.00

791 Extraccion de Tuberia de produccion, incluye el


equipo de bombeo y cableado.
112
16,415

711,000.00

7,512.98

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.2963

2,305.00

682.97

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.2963

23,051.00

6,830.01

796 Aplicacion de quimicos para lavado y desinfeccion


de pozos profundos.

6,179.98

3,684

Agua para obra

Ins

20.0000

10.00

200.00

4,250

Tripolisfosfato de Sodio x 50 Kg

Ins

bt

0.0300

186,000.00

5,580.00

Ayudante de maquinaria

Ins

0.1000

3,999.84

399.98

14,650

798 Revision de equipo de bombeo, cable


encauchetado, tablero de control y tuberia de
produccion
69
6,918

und

552,192.00

Herramienta Menor 10% M.O. AA-2

Eqp

HR

24.0000

2,010.00

48,240.00

Cuadrilla AA-2 (Electrica)

Ins

24.0000

20,998.00

503,952.00

799 Registro de paso 1/2". Suministro e instal. pagado


por unidad.

und

41,157.81

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

484.80

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

29,824.50

11,333.31

14,020

Cinta teflon

Ins

0.4000

1,000.00

400.00

55
4,515

%
rl

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

71

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,757

Registro paso directo 1/2"

Ins

15,066

Universal presin PVC 1/2"

Ins

800 Registro de paso 3/4". Suministro e instal. pagado


por unidad.

Cantidad

Vr.Unitario

Vr.Total

und

1.0000

22,000.00

22,000.00

und

1.0000

2,092.00

2,092.00

und

53,050.65

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

484.80

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

38,442.50

14,608.15

13,940

Registro paso directo 3/4"

Ins

und

1.0000

29,000.00

29,000.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

15,067

Universal presin PVC 3/4"

Ins

und

1.0000

3,710.00

3,710.00

55
4,515

801 Registro = 1" instalado

und

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

47,357.70

17,995.93

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

15,068

Universal presin PVC 1"

Ins

und

1.0000

5,610.00

5,610.00

4,515

802 Tuberia de Produccion, A.C. =3" SCH 40, incluye


el Suministro e Instal.

65,353.63

104,498.02

Equipo de perforacion y rotacion

Eqp

HR

0.1481

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1481

2,305.00

341.37

15,444

Union roscada A/C, 3"

Ins

und

0.1667

16,000.00

2,667.20

15,511

Tuberia en A.C S/C = 3" SCH 40

Ins

1.0000

86,820.00

86,820.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1481

23,051.00

3,413.85

85
112

804 Cable encauchetado 3 x 8 AWG. Suministro e


instal.

76,000.00

11,255.60

13,474.52

Cable encauchetado 3 x 8 AWG

Ins

1.0000

8,978.00

8,978.00

Tubo conduit PVC 1/2"

Ins

1.0000

1,384.00

1,384.00

14,664

Tecnico 1

Ins

0.1000

8,575.16

857.52

15,646

Alambre de cobre THW No. 8

Ins

1.0000

2,255.00

2,255.00

870
3,556

810 Suministro e instal. bajante latn 12 x 6 cms.


pagado ml

36,706.14

Sub-Contrato Ornamentacion

Esp

80.0000

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.1500

20,300.00

3,045.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2000

46,339.00

9,267.80

7
17

15,746

846 Valvula de coladera = 4" Suministro e Instal.


55
4,515
14,849

20,392.30

und

16,313.84

644,299.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Valvula de coladera = 4"

Ins

und

1.0000

620,600.00

620,600.00

848 Acometida aerea 10 mts pvc, pagada por Un

und

338,667.17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

72

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Sub-Contrato Electrico

Esp

Alambre cobre THW 10 AWG THHN/NN

Ins

38.0000

245,410.99

93,256.18

18.9000

2,902.00

2,830

Caja 60 x 60 x 12 cm

Ins

54,847.80

und

1.0000

60,000.00

3,553

Adaptador terminal conduit 1/2"

60,000.00

Ins

und

4.0000

269.00

3,556

1,076.00

Tubo conduit PVC 1/2"

Ins

6.3000

1,384.00

8,719.20

3,561

Adaptador terminal conduit 1"

Ins

und

3.0000

660.00

1,980.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.1100

16,159.00

66,413.49

12,066

Tubo conduit PVC 1"

Ins

6.3000

2,511.00

15,819.30

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

24.8000

1,474.00

36,555.20

3
822

849 Acometida parcial pvc 30 m, pagado un

und

789,533.19

Sub-Contrato Electrico

Esp

38.0000

572,125.50

Herramienta Menor 10% M.O. BB

Eqp

HR

7.4000

1,616.00

11,958.40

Alambre cobre THW 8 AWG THHN/NN

Ins

94.5000

3,818.00

360,801.00

3,561

Adaptador terminal conduit 1"

Ins

und

1.0500

660.00

693.00

4,515

Cuadrilla BB (Instalaciones)

Ins

7.4000

16,159.00

119,576.60

Tubo conduit PVC 1"

Ins

31.5000

2,511.00

79,096.50

3
55
821

12,066

850 Union tipo Dresser = 6" en A.C. Suministro e


instal.

und

217,407.69

139,920.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

14,328

Union Dresser =6" en A.C

Ins

und

1.0000

124,120.00

124,120.00

55

851 Tablero parciales 12 circuitos, pagado por unidad

und

457,055.25

Herramienta Menor 10% M.O. BB

Eqp

HR

4.1100

1,616.00

6,641.76

2,019

Taco termomagntico unipolar HQP 30A

Ins

und

12.0000

17,000.00

204,000.00

2,971

Tablero parciales 12 C con llave

Ins

und

1.0000

180,000.00

180,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.1100

16,159.00

66,413.49

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

55

852 Tablero parciales 4 circuitos, pagado un

und

154,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

2,019

Taco termomagntico unipolar HQP 30A

Ins

und

4.0000

17,000.00

68,000.00

5,107

Cuadrilla AA (Electrica)

Ins

3.0000

15,140.00

45,420.00

Tablero monof. 4 circuitos

Ins

und

1.0000

36,482.00

36,482.00

55

15,854

853 Tablero general 10 cuentas, gado por un

und

3,168,851.34

821

Alambre cobre THW 8 AWG THHN/NN

Ins

42.0000

3,818.00

160,356.00

822

Alambre cobre THW 10 AWG THHN/NN

Ins

14.0000

2,902.00

40,628.00

1,492

Bisagra comn 2"

Ins

und

1.0000

217.00

217.00

1,957

Breaker 2000 tripolar HQP 50 A

Ins

und

10.0000

50,000.00

500,000.00

1,979

Cuchilla en pizarra 3 x 60

Ins

und

12.7200

21,600.00

274,752.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

6.1000

88,083.67

537,310.39

2,375

Platina cobre 1 1/2 x 1/8

Ins

4.5000

12,500.00

56,250.00

2,376

Platina cobre 5/8 x 1/8

Ins

1.5000

5,500.00

8,250.00

2,502

Anticorrosivo rojo claro

Ins

gal

12.7200

29,750.00

378,420.00

3,789

Tornillo para madera 2" No. 9

Ins

und

60.0000

32.00

1,920.00

4,515

Cuadrilla BB (Instalaciones)

Ins

72.0000

16,159.00

1,163,448.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

73

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

854 Tablero timbre PVC, pagado por unidad

kg

Cantidad

Vr.Unitario

Vr.Total

6.8700

6,885.00

47,299.95

und

105,844.90

Sub-Contrato Electrico

Esp

38.0000

76,699.20

29,145.70

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6000

1,616.00

4,201.60

3,495

Caja sencilla conduit

Ins

und

1.0500

1,218.00

1,278.90

3,561

Adaptador terminal conduit 1"

Ins

und

2.1000

660.00

1,386.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6000

16,159.00

42,013.40

12,066

Tubo conduit PVC 1"

Ins

6.3000

2,511.00

15,819.30

15,853

Pulsado sencillo para timbre

Ins

und

1.0000

12,000.00

12,000.00

3
55

855 Salida lampara + toma PVC completa, pagado por


UN

und

109,196.79

Sub-Contrato Electrico

Esp

38.0000

79,128.11

30,068.68

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

245

Roseta (Plafn)

Ins

und

1.0000

1,560.00

1,560.00

252

Interruptor doble de incrustar galica luminex

Ins

und

1.0000

5,100.00

5,100.00

271

Toma sencilla

Ins

und

1.0000

4,500.00

4,500.00

811

Alambre cobre THW 14 AWG

Ins

2.7900

720.00

2,008.80

3,266

Alambre cobre THW 12 AWG

Ins

5.6100

1,000.00

5,610.00

3,495

Caja sencilla conduit

Ins

und

1.3500

1,218.00

1,644.30

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.6100

269.00

702.09

3,556

Tubo conduit PVC 1/2"

Ins

3.3800

1,384.00

4,677.92

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

3
55

856 Demolicion caja de inspeccin prom. 0.60*0.60 m y


retiro escombros

und

24,467.26

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,143

Transporte de materiales m

Ana

0.1800

46,157.00

8,308.26

17

857 Salida trifasica PVC, pagado por unidad

und

186,509.07

Sub-Contrato Electrico

Esp

38.0000

135,151.50

51,357.57

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

271

Toma sencilla

Ins

und

1.0500

4,500.00

4,725.00

406

Caja 4 x 4 met. AK 2V

Ins

und

1.0500

5,600.00

5,880.00

822

Alambre cobre THW 10 AWG THHN/NN

Ins

8.2600

2,902.00

23,970.52

3,553

Adaptador terminal conduit 1/2"

Ins

und

1.0500

269.00

282.45

3,556

Tubo conduit PVC 1/2"

Ins

2.9900

1,384.00

4,138.16

3,561

Adaptador terminal conduit 1"

Ins

und

1.0500

660.00

693.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,144

3
55

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

12,066

Tubo conduit PVC 1"

Ins

2.5700

2,511.00

6,453.27

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

12.1500

1,474.00

17,909.10

858 Tuberia de Produccion, A.C. =2" SCH 40, incluye


el Suministro e Instal.
85

Equipo de perforacion y rotacion

Eqp

HR

48,981.01

0.1333

76,000.00

10,130.80

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

74

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1333

2,305.00

307.26

15,643

Tuberia en A.C S/C = 2" SCH 40

Ins

1.0000

34,220.00

34,220.00

15,650

Union roscada A/C, 2"

Ins

und

0.1667

7,500.00

1,250.25

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1333

23,051.00

3,072.70

112

859 Salida y toma telefono pvc, pagado un

und

48,523.02

105

Herramienta Menor 10% M.O. AA-2 Elc

Eqp

HR

0.8000

2,100.00

1,680.00

240

Toma telefnica

Ins

und

1.0000

6,833.00

6,833.00

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.1000

269.00

564.90

3,554

Adaptador terminal conduit 3/4"

Ins

und

2.0000

358.00

716.00

3,556

Tubo conduit PVC 1/2"

Ins

9.6600

1,384.00

13,369.44

6,918

Cuadrilla AA-2 (Electrica)

Ins

0.8000

20,998.00

16,798.40

Alambre telefnico N 22 estao

Ins

9.8700

744.00

7,343.28

13,656

860 Salida timbre PVC, pagado por unidad

und

127,728.77

Sub-Contrato Electrico

Esp

38.0000

92,557.08

35,171.69

Herramienta Menor 10% M.O. BB

Eqp

HR

3.2000

1,616.00

5,171.20

3,495

Caja sencilla conduit

Ins

und

1.0500

1,218.00

1,278.90

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.1000

269.00

564.90

3,556

Tubo conduit PVC 1/2"

Ins

9.9200

1,384.00

13,729.28

4,515

51,708.80

3
55

Cuadrilla BB (Instalaciones)

Ins

3.2000

16,159.00

13,657

Alambre telefnico 2 x 22 trenzado

Ins

10.1300

800.00

8,104.00

15,853

Pulsado sencillo para timbre

Ins

und

1.0000

12,000.00

12,000.00

861 Acometida television (coaxial) pvc, longitud 12 mts


pagado un

und

74,729.64

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0600

58,612.00

3,516.72

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0600

28,250.00

1,695.00

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

12.0000

1,384.00

16,608.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.8800

16,159.00

46,537.92

Toma tv coaxial

Ins

und

1.0000

3,000.00

3,000.00

55

13,881

862 Tuberia de presin RDE 21 PVC 6 ". Suministro e


Instal.
94
109
4,515

73,329.35

Tubo presin RDE 21 PVC 6 "

Ins

1.0000

71,916.00

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0833

808.00

67.31

Cuadrilla BB (Instalaciones)

Ins

0.0833

16,159.00

1,346.04

863 Desplazamiento de tuberia de acueducto en = 3",


4" y 6" (sin excavacion)

71,916.00

11,900.56

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4444

1,616.00

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4444

16,159.00

7,181.06

5,143

Transporte de materiales m

Ana

0.0500

46,157.00

2,307.85

Union de reparacion u.m RDE 21 PVC 4 "

Ins

und

0.0208

48,245.00

1,003.50

55

15,277

718.15

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

75

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

866 Strip telefonos 10 pares

Cantidad

Vr.Unitario

und

Vr.Total
123,841.94

395

Regleta strip telfono 10 pares

Ins

und

1.0000

11,500.00

11,500.00

413

Caja 30 x 30 x 10 cm

Ins

und

1.0000

27,000.00

27,000.00

1,231

Placa identificacin 2 x 1 cm

Ins

und

10.0000

3,000.00

30,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.3311

16,159.00

53,827.24

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.2200

6,885.00

1,514.70

14,116

867 Suministro e instal. de cielo raso supercel, pagado


m2

32,343.70

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6500

1,616.00

1,050.40

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6500

16,159.00

10,503.35

5,144

Transporte de materiales Tn

Ana

0.0084

0.00

0.00

5,696

Lamina cielo raso supercel de eternit 1.22*0.61*4

Ins

und

1.4000

10,005.00

14,007.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0300

5,000.00

150.00

13,935

Angulo cielo falso aluminio

Ins

1.3000

2,000.00

2,600.00

13,936

Tee cielo falso en aluminio

Ins

2.0000

2,000.00

4,000.00

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

55

878 Tuberia conduit pvc 3/4", pagado por ml

8,186.98

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2695

1,616.00

435.51

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,534

Tubo conduit PVC 3/4"

Ins

1.0000

1,812.00

1,812.00

3,554

Adaptador terminal conduit 3/4"

Ins

und

2.0000

358.00

716.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2695

16,159.00

4,354.85

55

880 Tubera PVC conduit 1", pagada por ML

13,305.09

Sub-Contrato Electrico

Esp

38.0000

9,641.37

3,663.72

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3300

1,616.00

533.28

1,703

Boquillas juego 1"

Ins

und

0.3300

1,200.00

396.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3300

16,159.00

5,332.47

Tubo conduit PVC 1"

Ins

1.0000

2,511.00

2,511.00

3
55

12,066

881 Prueba de bombeo - minimo 24 horas

und

956,595.80

Campero 2000cc-3000cc

Eqp

HR

16.0000

21,534.00

344,544.00

Motobomba de 3"

Eqp

HR

24.0000

12,250.00

294,000.00

14,664

Tecnico 1

Ins

24.0000

8,575.16

205,803.80

14,703

Ayudante (A)

Ins

24.0000

4,677.00

112,248.00

46
108

885 Valvula de coladera = 3" Suministro e Instal.


55
4,515
14,257

und

278,413.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Valvula de coladera = 3"

Ins

und

1.0000

260,638.00

260,638.00

1,616.00

1,616.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

76

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

887 Tablero con puerta 36 circuitos X ARREGLAR X S/


GRAF

Cantidad

Vr.Unitario

und

Vr.Total
671,839.20

Sub-Contrato Electrico

Esp

38.0000

486,840.00

184,999.20

1,231

Placa identificacin 2 x 1 cm

Ins

und

36.0000

3,000.00

108,000.00

3,046

Tablero para llave 36 circuitos

Ins

und

1.0000

288,000.00

288,000.00

5,107

Cuadrilla AA (Electrica)

Ins

6.0000

15,140.00

90,840.00

890 Valvula de Ventosa 4". Camara doble accion


multiple E.B.

und

1,227,580.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

14,246

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

16,212

Valv. ventosa (cam. doble) acc. multiple 4" E.B.

Ins

und

1.0000

1,148,400.00

1,148,400.00

55
4,515

891 Valvula de Purga =3" en HF. roscada.

und

332,428.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

1,823

Valvula de Purga de 3" roscada.

Ins

und

1.0000

290,000.00

290,000.00

4,515

12,927.20

55

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

892 Tee Sanitaria doble reducida PVC 4" x 3 ".


Suministro e Instal.

und

29,159.68

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

Tee Sanitaria doble reducida PVC 4 x 3 "

Ins

und

1.0000

23,817.00

23,817.00

15,484

893 Guardacable = 1/4" Tipo Pesado. Suministro e


Instal.
19
645
4,489

und

879.18

9,473.00

Herramienta menor 5% M.O. AA

Eqp

HR

0.3200

735.00

235.20

Guardacable de 1/4" o Portacable T.P.

Ins

und

1.0000

4,537.00

4,537.00

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

894 Electrobomba sumergible tipo lapicero 10 HP. 220


V. 60 HZ. 3" de salida, bomba acero inoxidable.
Suministro e Instal.

und

9,746,295.00

Herramienta Menor 10% M.O. BB

Eqp

HR

10.0000

1,616.00

16,160.00

Cuadrilla BB (Instalaciones)

Ins

10.0000

16,159.00

161,590.00

16,277

Electrobomba sumerg. 10 HP, 220 V, =3", Q=10 gpm

Ins

und

1.0000

6,909,545.00

6,909,545.00

16,281

Accesorios electricos, arranq. brek. control,caja

Ins

und

1.0000

2,659,000.00

2,659,000.00

55
4,515

910 Hoja puerta triplex 0.60 - 1.00, pagado por un

und

107,971.70

Herramienta Menor 10% M.O. DD

Eqp

HR

0.7000

1,763.00

1,234.10

2,772

Hoja puerta F1 Triplex 0.60 - 1.00 mt

Ins

und

1.0000

94,398.00

94,398.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

56

911 Hoja puerta econmica triplex 1.01, pagado por un

und

120,374.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

77

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. DD

Eqp

2,770

Hoja puerta F2 Triplex 1.01

Ins

5,064

Cuadrilla DD (Carpinteria)

Ins

56

912 Hoja puerta fortec residencial 0.71 - 0.80, pagada


por un

Cantidad

Vr.Unitario

Vr.Total

HR

0.7000

1,763.00

1,234.10

und

1.0000

106,801.00

106,801.00

0.7000

17,628.00

12,339.60

und

162,039.70

Herramienta Menor 10% M.O. DD

Eqp

HR

0.7000

1,763.00

1,234.10

2,759

Hoja puerta fortec providenza 0.71 - 0.80

Ins

und

1.0000

148,466.00

148,466.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

56

913 Hoja puerta fortec residencial 0.81 - 0.90, pagada


por un

und

212,195.70

Herramienta Menor 10% M.O. DD

Eqp

HR

0.7000

1,763.00

1,234.10

2,761

Hoja puerta fortec providenza 0.81 - 0.90

Ins

und

1.0000

198,622.00

198,622.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

56

915 Suministro e instal. puerta y marco en triplex y


lmina coll rol calibre 18, pagado m2

226,563.50

Sub-Contrato Carpinteria

Esp

45.0000

156,250.69

Herramienta Menor 10% M.O. DD

Eqp

HR

1.6500

1,763.00

2,908.95

Suministro e instal. marco puerta en lamina coll roll


calibre 18, 0.80 x 2.10, pagado un

Ana

und

0.4760

145,306.17

69,165.74

1,236

Cedro Caquet pieza

Ins

und

0.4000

50,000.00

20,000.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1750

2,480.00

434.00

1,849

Tornillo para madera 2" No. 8

Ins

und

9.0000

150.00

1,350.00

2,126

Lamina de triplex 4mm

Ins

und

1.0000

35,000.00

35,000.00

2,933

Pegante colbn

Ins

kg

0.1000

9,500.00

950.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.5000

17,628.00

26,442.00

5,144

Transporte de materiales Tn

Ana

0.0072

0.00

0.00

4
56
981

917 Closet forrado flormorado, pagado por m2

70,312.81

285,446.62

Sub-Contrato Carpinteria

Esp

45.0000

196,859.74

88,586.88

1,505

Bisagra comn 3``

Ins

und

1.3900

674.00

936.86

1,807

Puntilla sin cabeza 1"

Ins

lb

0.5000

2,480.00

1,240.00

2,933

Pegante colbn

Ins

kg

0.2500

9,500.00

2,375.00

3,789

Tornillo para madera 2" No. 9

Ins

und

3.8500

32.00

123.20

5,064

Cuadrilla DD (Carpinteria)

Ins

9.2100

17,628.00

162,353.88

5,086

Triplex flormorado 4 mm

Ins

und

0.6000

49,718.00

29,830.80

918 Mueble tipo linos, pagado por M2

282,190.18

Sub-Contrato Carpinteria

Esp

45.0000

194,613.92

87,576.26

Herramienta Menor 10% M.O. DD

Eqp

HR

6.0000

1,763.00

10,578.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1500

2,480.00

372.00

2,126

Lamina de triplex 4mm

Ins

und

0.8000

35,000.00

28,000.00

2,933

Pegante colbn

Ins

kg

0.2000

9,500.00

1,900.00

3,789

Tornillo para madera 2" No. 9

Ins

und

4.5600

32.00

145.92

5,064

Cuadrilla DD (Carpinteria)

Ins

6.0000

17,628.00

105,768.00

Cedro macho pieza 3.0

Ins

und

0.8700

55,000.00

47,850.00

4
56

13,452

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

78

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

919 Suministro e instal. puerta y marco en madera,


pagado Un

Cantidad

Vr.Unitario

und

Vr.Total
249,762.50

Sub-Contrato Carpinteria

Esp

45.0000

172,250.00

77,512.50

1,505

Bisagra comn 3``

Ins

und

3.0000

674.00

2,022.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.3500

2,480.00

868.00

2,126

Lamina de triplex 4mm

Ins

und

2.0000

35,000.00

70,000.00

2,933

Pegante colbn

Ins

kg

1,900.00

3,789

Tornillo para madera 2" No. 9

Ins

und

5,064

Cuadrilla DD (Carpinteria)

Ins

Cedro macho pieza 3.0

Ins

13,452

921 Cable encauchetado 4 x 8 AWG. Suministro e


instal.

0.2000

9,500.00

18.0000

32.00

576.00

3.0000

17,628.00

52,884.00

und

0.8000

55,000.00

44,000.00

28,141.52

Tubo conduit PVC 1/2"

Ins

1.0000

1,384.00

1,384.00

14,595

Cable Encauchetado 4 x 8 AWG

Ins

1.0000

19,500.00

19,500.00

14,664

Tecnico 1

Ins

0.1000

8,575.16

857.52

16,064

Cable de cobre THW N 2 AWG

Ins

1.0000

6,400.00

6,400.00

3,556

922 Pasamanos en cedro para escalera 0.15 x 0.023


s/grafica

30,664.50

Herramienta Menor 10% M.O. DD

Eqp

HR

1.5000

1,763.00

2,644.50

1,236

Cedro Caquet pieza

Ins

und

0.0278

50,000.00

1,390.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.0500

2,480.00

124.00

3,789

Tornillo para madera 2" No. 9

Ins

und

2.0000

32.00

64.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.5000

17,628.00

26,442.00

56

925 HOJA PUERTA FORTEC RESIDENCIAL 0.91 - 1.0 X


ARREGLAR X S/GRAF
5,064
13,859

und

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

HOJA PUERTA TABLEX 0.30 - 0.50

Ins

und

1.0000

52,125.00

52,125.00

927 HOJA PUERTA FORTEC RESIDENCIAL 0.61 - 0.70


X ARREGLAR X S/GRAF
5,064
13,860

und

13,861

Ins

0.7000

17,628.00

12,339.60

Hoja puerta tablex 0.51 - 0.75

Ins

und

1.0000

62,779.00

62,779.00

und

4,489

86,899.60

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

HOJA PUERTA TABLEX 0.76 - 1.00

Ins

und

1.0000

74,560.00

74,560.00

930 Limpieza cubierta de asbesto cemento


17

75,118.60

Cuadrilla DD (Carpinteria)

928 HOJA PUERTA FORTEC RESIDENCIAL 0.51 - 0.60


X ARREGLAR X S/GRAF
5,064

64,464.60

4,201.34

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2600

1,469.00

381.94

Cuadrilla AA (Albaileria)

Ins

0.2600

14,690.00

3,819.40

931 Demolicion borde de placa 0.10 y construccin


remate antidesborde 0.05*0.08 en mortero
impermeabilizado

12,579.07

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

79

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

1,572

Tabla burra ordinaria 0.10

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

17

932 Relleno con material crudo de rio T.m 4",


compactado y Transportado, pagado en m3

Cantidad

Vr.Unitario

Vr.Total

HR

0.2800

1,469.00

411.32

1.0000

1,200.00

1,200.00

0.6000

14,690.00

8,814.00

0.0050

430,750.59

2,153.75

84,110.77

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7300

1,469.00

41

Vibrocompactador tipo rana

Eqp

HR

0.6080

5,000.00

3,040.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7300

14,690.00

10,723.70

5,143

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

Crudo de rio clasificado T.m. 4"

Ins

1.1000

16,820.00

18,502.00

14,170

933 Ducto en lmina galvanizada para campana


extractora cal. 18 instalado
55
4,515
16,496

1,072.37

90,087.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

Ducto lmina galvanizada cal. 18

Ins

1.0000

81,200.00

81,200.00

980 Masilla plstica igas gris para sello de traslapos,


juntas, perforaciones en cubiertas metlicas /
fibrocemento aplicada

kg

808.00

29,158.68

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

1,973

Igas gris - masilla plstica 30 kg

Ins

kg

1.0000

12,760.00

12,760.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

Seccin de Andamio

Ins

mes

0.0140

17,120.00

239.68

17

13,641

981 Suministro e instal. marco puerta en lamina coll roll


calibre 18, 0.80 x 2.10, pagado un

und

145,306.17

Sub-Contrato Ornamentacion

Esp

50.0000

96,870.78

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

875.00

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.6800

16,865.43

28,333.92

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.6700

88,083.67

59,016.06

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0800

6,885.00

550.80

228

14,116

982 Suministro e instal. puerta ventana lmina coll roll


18, pagado m2

48,435.39

118,408.98

Sub-Contrato Ornamentacion

Esp

50.0000

78,939.32

39,469.66

Herramienta Menor 10% M.O. DD

Eqp

HR

0.8000

1,763.00

1,410.40

1,519

Bisagra alum. EXT 3"

Ins

und

1.7500

2,500.00

4,375.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.5500

88,083.67

48,446.02

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.0500

2,700.00

2,835.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2300

29,750.00

6,842.50

5,064

Cuadrilla DD (Carpinteria)

Ins

0.8000

17,628.00

14,102.40

5,144

Transporte de materiales Tn

Ana

0.2410

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1600

5,800.00

928.00

7
56

14,795

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

80

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

983 Reja bancaria hierro cuadrado 9 mm (VER 342 o


6480)

Cantidad

Vr.Unitario

Vr.Total
53,779.13

Varilla cuadrada 9 mm o 3/8" x 6 mts

Ins

und

1.7400

9,492.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.5000

1,691.00

845.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0200

50,506.00

1,010.12

5,064

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.6000

6,885.00

4,131.00

84

14,116

984 Instalacin de cercha y/o correa


4,489

Cuadrilla AA (Albaileria)

m
Ins

985 Correa tubo rectangular 120*60*2.5 mm con


anticorrosivo y esmalte instalada

7,785.70

0.5300

Esp

50.0000

Eqp

HR

2,502

Anticorrosivo rojo claro

Ins

gal

3,837

Esmalte Sintetico Pintuco

Ins

4,489

Cuadrilla AA (Albaileria)

14,116
14,395
16,424

39,261.62

19,630.81

0.3200

1,469.00

470.08

0.0100

29,750.00

297.50

gal

0.0100

42,950.00

429.50

Ins

0.3200

14,690.00

4,700.80

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5000

6,885.00

3,442.50

Perno de ojo de 5/8`` x 4``

Ins

und

0.0800

3,582.00

286.56

Tubo rectangular 120*60*2.5 mm*6 m

Ins

und

0.1750

169,341.00

29,634.68

986 Manhole para Inspeccion de =24" en PRFV, con


accesorios, sellos y tornilleria. Suministro e Instal.

und

1,525,850.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4,382

Manhole para inspeccion =24" en PRFV

Ins

und

4,515

Cuadrilla BB (Instalaciones)

Ins

5,144

Transporte de materiales Tn

Ana

0.1200

55

7,785.70

58,892.43

Herramienta Menor 10% M.O. AA

17

14,690.00

Sub-Contrato Ornamentacion

16,516.08

988 Rejillas metalicas piso A = 0.30, pagado en ml

12.0000

1,616.00

19,392.00

1.0000

1,312,550.00

1,312,550.00

12.0000

16,159.00

193,908.00

0.00

0.00

43,689.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.5000

1,763.00

2,644.50

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.5000

2,295.00

3,442.50

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

2.1000

2,700.00

5,670.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

5,064

Cuadrilla DD (Carpinteria)

Ins

1.5000

17,628.00

26,442.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5000

6,885.00

3,442.50

8
56

14,116

991 Escalera de gato, pagada en ml

121,183.68

Herramienta Menor 10% M.O. DD

Eqp

HR

3.0534

1,763.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

3,295

Tubo cerramiento Galvanizado =1" e=0.128"

Ins

5.0000

12,308.00

61,540.00

5,064

Cuadrilla DD (Carpinteria)

Ins

3.0534

17,628.00

53,825.34

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0200

6,885.00

137.70

56

14,116

5,383.14

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

81

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

992 Succion y almacenamiento de materia organica y


solidos de pozos septicos de 10 a 15 m
71
14,703

Cantidad

Vr.Unitario

und

Vr.Total
156,774.06

Camion vactor

Eqp

HR

0.3125

497,000.00

155,312.50

Ayudante (A)

Ins

0.3125

4,677.00

1,461.56

994 Suministro e instal. ventana aluminio fija, con


vidrio incoloro 4 mm, pagado m2

147,458.43

1,822

Ventana aluminio fija

Ins

1.0000

110,000.00

110,000.00

3,747

Vidrio incoloro 4 mm

Ins

1.0000

25,000.00

25,000.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

995 Suministro e instal. ventana aluminio guillotina,


pagado m2

129,086.50

Herramienta Menor 10% M.O. DD

Eqp

HR

1.5000

1,763.00

2,644.50

3,702

Ventana proyectante 1.5 x 2.0

Ins

1.0000

100,000.00

100,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.5000

17,628.00

26,442.00

56

996 Suministro e instal. ventana aluminio corrediza,


pagado m2

162,458.43

3,698

Ventana corrediza aluminio

Ins

1.0000

150,000.00

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

998 Desmonte, reinstalacin y soldadura tubo de


perforacin 6m gimnasio hospital yopal

glb

150,000.00

46,869.50

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.5000

5,313.00

7,969.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

3.0000

1,144.00

3,432.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.2000

5,800.00

1,160.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

3.0000

11,436.00

34,308.00

74
115

999 Apoyo paral cercha lmina doble de 3/16 y 1/4"


24*24 cm 4 perf 1/2" + 2 pernos en C de 1/2" L=56
cm tuerca y contratuerc

und

93,857.40

Angulo 2" x 2" x 1/4". Suministro y colocacion

Ana

0.5000

16,138.77

8,069.39

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1900

6,885.00

1,308.15

14,742

Lamina HR 1/4"

Ins

0.0576

125,317.09

7,218.26

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.6000

11,436.00

6,861.60

16,471

Corte en lmina HR 1/4"

Ins

0.9600

20,000.00

19,200.00

16,537

Perno en C de 1/2" a=56 cm

Ins

und

2.0000

12,000.00

24,000.00

16,538

Lamina 3/16" 24*24 cm 4 perforaciones 1/2"

Ins

und

1.0000

20,000.00

20,000.00

16,539

Tuerca de 1/2"

Ins

und

8.0000

900.00

7,200.00

187

1,000 Dilatacin en adoqun de arcilla a=0.20 m

9,919.45

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0100

248,144.84

2,481.45

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

Adoqun de arcilla 10*20*5 cm

Ins

und

10.0000

450.00

4,500.00

16,413

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

82

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,001 Pintura en esmalte sobre malla de cerramiento.

Cantidad

Vr.Unitario

Vr.Total
9,150.80

Herramienta menor 10% M.O. CC

Eqp

HR

0.4000

1,689.00

675.60

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,066

Cuadrilla CC (Pintura)

Ins

0.4000

16,893.00

6,757.20

61

1,028 Domo en PRFV tipo Tas para techo de reactor


UASB 0.85 x 5.0 m. Suministro e Instal.

und

1,462,900.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

4,616

Domo en PRFV tipo Tas 0.85 x 5.0 m

Ins

und

1.0000

1,356,250.00

1,356,250.00

5,144

Transporte de materiales Tn

Ana

0.7000

0.00

0.00

55

1,031 Suministro e instal. de estuco y pintura 2 manos,


pagado en m2

11,290.15

Sub-Contrato Pintura

Esp

45.0000

7,786.31

3,503.84

Herramienta menor 10% M.O. CC

Eqp

HR

0.2500

1,689.00

422.25

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,066

Cuadrilla CC (Pintura)

Ins

0.2500

16,893.00

4,223.25

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

1,034 Pintura interior vinilo sobre paete 2 manos,


pagado m2

6,386.66

Sub-Contrato Pintura

Esp

45.0000

4,404.59

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1390

1,469.00

204.19

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,066

Cuadrilla CC (Pintura)

Ins

0.1390

16,893.00

2,348.13

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
17

1,035 Marmolina sobre paete

1,982.07

11,694.89

Herramienta menor 10% M.O. CC

Eqp

HR

0.3200

1,689.00

540.48

829

Cemento blanco

Ins

kg

1.0500

975.00

1,023.75

2,486

Marmolina 20 kg

Ins

bt

0.3600

12,800.00

4,608.00

3,684

Agua para obra

Ins

2.0000

10.00

20.00

5,066

Cuadrilla CC (Pintura)

Ins

0.3200

16,893.00

5,405.76

Cal

Ins

kg

0.1700

570.00

96.90

61

13,435

1,036 Pintura en carburo muros sobre paetes, pagado


por m2

6,092.55

Sub-Contrato Pintura

Esp

45.0000

4,201.76

1,890.79

Herramienta menor 10% M.O. CC

Eqp

HR

0.1800

1,689.00

304.02

3,684

Agua para obra

Ins

0.2000

10.00

2.00

5,066

Cuadrilla CC (Pintura)

Ins

0.1800

16,893.00

3,040.74

5
61

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

83

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,435

Cal

Ins

1,037 Marmolina bajo placa

kg

Cantidad

Vr.Unitario

Vr.Total

1.5000

570.00

855.00

13,341.45

Herramienta menor 10% M.O. CC

Eqp

HR

0.4000

1,689.00

675.60

829

Cemento blanco

Ins

kg

1.0500

975.00

1,023.75

2,486

Marmolina 20 kg

Ins

bt

0.3600

12,800.00

4,608.00

3,684

Agua para obra

Ins

2.0000

10.00

20.00

5,066

Cuadrilla CC (Pintura)

Ins

0.4000

16,893.00

6,757.20

13,435

Cal

Ins

kg

0.1700

570.00

96.90

15,889

Rollo de Cinta de enmascarar 1"

Ins

und

0.0400

4,000.00

160.00

61

1,038 Esmalte sobre lmina llena

14,498.27

Sub-Contrato Pintura

Esp

45.0000

9,998.81

Herramienta menor 10% M.O. CC

Eqp

HR

0.3300

1,689.00

557.37

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1.0500

1,691.00

1,775.55

1,990

Disolvente Thinner

Ins

gal

0.0300

12,440.00

373.20

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,066

Cuadrilla CC (Pintura)

Ins

0.3300

16,893.00

5,574.69

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

5
61

1,039 Suministro e instal. estuco plstico muros, pagada


por m2
5
61
5,066
16,387

4,499.46

11,452.27

Sub-Contrato Pintura

Esp

45.0000

Herramienta menor 10% M.O. CC

Eqp

HR

0.1600

1,689.00

270.24

Cuadrilla CC (Pintura)

Ins

0.1600

16,893.00

2,702.88

Estuco acrlico

Ins

gal

0.2500

19,700.00

4,925.00

1,040 Reduccion soldada PVC 2.1/2" x 1". Suministro e


instal.

7,898.12

und

3,554.15

15,237.95

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1455

16,159.00

2,351.13

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

0.1000

6,392.00

639.20

15,098

Buje soldado presion PVC 1.1/2 x 1

Ins

und

1.0000

2,150.00

2,150.00

15,105

Buje soldado presion PVC 2.1/2 x 1.1/2

Ins

und

1.0000

9,229.00

9,229.00

1,041 Tuberia Biaxial PVC RDE21 de =4". Suministro e


Instal.

586.12

27,377.24

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1509

808.00

121.93

Cuadrilla BB (Instalaciones)

Ins

0.1509

16,159.00

2,438.39

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

16,428

Tuberia Biaxial PVC RDE21 de =4"

Ins

1.0000

24,796.00

24,796.00

109
4,515

1,042 Tuberia Biaxial PVC RDE26 de =4". Suministro e


Instal.

23,161.24

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1509

808.00

121.93

Cuadrilla BB (Instalaciones)

Ins

0.1509

16,159.00

2,438.39

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

16,427

Tuberia Biaxial PVC RDE26 de =4"

Ins

1.0000

20,580.00

20,580.00

109
4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

84

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,045 Limpieza mamposteria a la vista con cido

Cantidad

Vr.Unitario

Vr.Total

5,556.25

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.2500

735.00

183.75

41

Acido muriatico

Ins

gal

0.0500

32,000.00

1,600.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

1,046 Revisin, Ajuste y correccin de fugas punto


desage sifn 4" incluye rejilla 5"*4" sosco
aluminio

und

59,182.05

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,489

Cuadrilla AA (Albaileria)

Ins

13,607

Sub-Contrato Hidraulico Sanitario

Esp

14,020

Cinta teflon

Ins

15,439

Tubo PVC sanitario de 4"

16,429

Rejilla 5"*4" sosco aluminio

1.5000

14,690.00

22,035.00

50.0000

39,454.70

19,727.35

rl

2.0000

1,000.00

2,000.00

Ins

0.1000

14,766.00

1,476.60

Ins

und

1.0000

9,600.00

9,600.00

1,047 Barniz sobre muebles, pagado en m2

52,321.09

Sub-Contrato Pintura

Esp

45.0000

36,083.51

16,237.58

Herramienta menor 10% M.O. CC

Eqp

HR

1.2300

1,689.00

2,077.47

1,792

Pabmeril Pliego 9" x 11"

Ins

und

3.1500

1,691.00

5,326.65

1,984

Tapaporos Nogal

Ins

gal

0.1100

25,500.00

2,805.00

2,534

Barniz brillante exterior (muebles)

Ins

gal

0.2800

18,200.00

5,096.00

5,066

Cuadrilla CC (Pintura)

Ins

1.2300

16,893.00

20,778.39

5
61

1,050 Antihumedad fachadas sika transparente 10 (2


capas)

10,796.92

4,489

Cuadrilla AA (Albaileria)

Ins

0.1667

14,690.00

2,448.82

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

Sika transparente 10 * 3 kg

Ins

kg

0.3000

16,565.00

4,969.50

16,404

1,054 Tornillo de carruaje 5/16" x 2 1/2" R.O con T.A.


Suministro e instal.

und

2,115.27

Herramienta Menor 10% M.O. DD

Eqp

HR

0.0833

1,763.00

1,064

Tornillo de carruaje 5/16" x 2 1/2" R.O con T.A.

Ins

und

1.0000

500.00

500.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.0833

17,628.00

1,468.41

56

1,055 Demolicion a mano mortero de piso

146.86

7,574.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

1,056 Antihumedad fachada sika transparente 10 (1 capa)

6,622.87

4,489

Cuadrilla AA (Albaileria)

Ins

0.1667

14,690.00

2,448.82

5,066

Cuadrilla CC (Pintura)

Ins

0.1000

16,893.00

1,689.30

Sika transparente 10 * 3 kg

Ins

kg

0.1500

16,565.00

2,484.75

16,404

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

85

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,057 Suministro e instal, tejido en fibra de vidrio para


reforzamiento estructural A = 0.10, pado en ml

Cantidad

Vr.Unitario

Vr.Total
20,672.33

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4300

1,469.00

631.67

Cuadrilla AA (Albaileria)

Ins

0.4300

14,690.00

6,316.70

16,381

Sikawrap hex 100 G tejido fibra de vidrio 1.27 m*1

Ins

und

0.0530

106,720.00

5,656.16

16,382

Sikadur hex 300 resina de impregnacin

Ins

kg

0.0650

124,120.00

8,067.80

17
4,489

1,058 Resane en mortero 1:4 A = 0.10, E = 1.5 cm,


pagado en ml

2,012.93

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0016

248,144.84

397.03

4,489

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

17

1,059 Wash Primer sobre aluminio

146.90

6,014.66

61

Herramienta menor 10% M.O. CC

Eqp

HR

0.0750

1,689.00

68

Equipo Pintura

Eqp

HR

0.0750

2,200.00

165.00

2,519

Wash Primer A Pintura 1/4 GL

Ins

und

0.1600

17,350.00

2,776.00

2,520

Wash Primer B Catalizador 1/4 GL

Ins

und

0.1600

10,500.00

1,680.00

5,066

Cuadrilla CC (Pintura)

Ins

0.0750

16,893.00

1,266.98

1,062 Filtro acampanado en Tuberia PVC RDE 21 6"


espacio 0.250" Ranura 0.030". Suministro e Instal.

126.68

214,512.42

Equipo de perforacion y rotacion

Eqp

HR

0.1905

76,000.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1905

2,305.00

439.10

1,613

Filtro acampanado Tuberia PVC RDE 21 =6" 0.030"

Ins

1.0000

190,861.00

190,861.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1905

23,051.00

4,391.22

85
112

16,415

1,212 Suministro e instal. griferia lavamanos mezclador,


pagado un
6
4,301

und

14,478.00

68,655.00

Sub-Contrato Instalacion

Esp

38.0000

49,750.00

18,905.00

Grifera lavamanos mezclador 4" prisma

Ins

und

1.0000

49,750.00

49,750.00

1,213 Suministro e instal. de lavaplatos en acero


inoxidable 1.4 m con griferia, pagado por un

und

163,736.12

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cemento blanco

Ins

kg

0.5000

975.00

487.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,337

Llave individual cromada conexion 1/2"

Ins

und

1.0000

22,000.00

22,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

Lavaplatos acero inoxidable 1.4 mts

Ins

und

1.0000

114,000.00

114,000.00

55
829

15,657

1,217 Filtro con rosca en Tuberia PVC RDE 21 4"


espacio 0.250" Ranura 0.030". Suministro e Instal.
85
112

156,960.76

Equipo de perforacion y rotacion

Eqp

HR

0.1333

76,000.00

10,130.80

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1333

2,305.00

307.26

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

86

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
2,660
16,415

Nombre

Tipo U.M.

Filtro con rosca Tuberia PVC RDE 21 =4" 0.030"

Ins

Cuadrilla PAm-3 (Pozos profundos)

Ins

1,219 Suministro e instal. de lavadero cemento


prefabricado de 60 x 60, pagado por un

Cantidad

Vr.Unitario

Vr.Total

1.0000

143,450.00

143,450.00

0.1333

23,051.00

3,072.70

und

68,675.76

205

LAVADERO CEMENTO 60 x 60

Ins

und

1.0000

52,200.00

52,200.00

804

Cemento gris

Ins

kg

3.8200

383.34

1,464.36

3,684

Agua para obra

Ins

2.4000

10.00

24.00

4,426

Arena lavada de rio

Ins

0.1280

13,800.00

1,766.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,144

Transporte de materiales Tn

Ana

0.2038

0.00

0.00

1,220 Angulo 3/4" x 1/8". Suministro y colocacion

4,687.96

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0300

8,750.00

Herramienta menor 5% M.O. AA

Eqp

HR

0.0667

735.00

49.02

Soldador

Ins

0.0667

6,759.00

450.83

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.0000

2,700.00

2,700.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0667

14,690.00

979.82

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0357

6,885.00

245.79

8
19
519

14,116

1,222 LAVAMANOS NOVA LOIRA DE COLGAR X


ARREGLAR S/GRAFICO x

und

262.50

217,402.52

159

Lavamanos sobreponer mezc. lnea media

Ins

und

1.0000

190,000.00

829

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

4,489

1,224 Lavamanos avanti pedestal, pagado por un

und

190,000.00

144,560.47

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8300

1,469.00

2,688.27

154

Lavamanos pedestal porcelana

Ins

und

1.0000

114,502.00

114,502.00

829

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

1.8300

14,690.00

26,882.70

17

4,489

1,228 Instalacion y Dotacion bao tipo sala milenium y/u


similar

und

833,513.00

Herramienta menor 5% M.O. AA

Eqp

HR

4.0000

735.00

Cemento blanco

Ins

kg

0.4000

975.00

390.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

8,136

Sanitario milenium elongado blanco

Ins

und

1.0000

516,306.00

516,306.00

8,160

Lavamanos milenium S.P. blanco

Ins

und

1.0000

212,597.00

212,597.00

8,166

Pedestal milenium blanco

Ins

und

1.0000

42,520.00

42,520.00

19
829

1,230 Sanitario Acuacer blanco instalado


55
829
4,515
16,399

und

2,940.00

185,894.17

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Sanitario acuacer blanco

Ins

und

1.0000

156,966.67

156,966.67

1,231 Sanitario Avanti instalado

und

1,616.00

2,585.60

318,927.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

87

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

55
829
4,515
13,801

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. BB

Eqp

Cemento blanco

Ins

Cuadrilla BB (Instalaciones)

Ins

Sanitario avanti completo

Ins

und

1,232 SANITARIO ROYAL BLANCO X ARREGLAR X


S/GRAF
829
4,489

Cantidad

Vr.Unitario

Vr.Total

HR

1.6000

1,616.00

2,585.60

kg

0.5000

975.00

487.50

1.6000

16,159.00

25,854.40

1.0000

290,000.00

290,000.00

und

27,402.52

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

1,238 Orinal mediano (fluxmetro) blanco, pagado un

und

471,264.02

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8322

1,469.00

2,691.50

166

Orinal mediano fluxmetro

Ins

und

1.0000

441,170.00

441,170.00

829

17

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

1,239 Orinal pequeo, pagado por unidad

und

101,282.02

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8322

1,469.00

2,691.50

132

Orinal infantil

Ins

und

1.0000

71,188.00

71,188.00

829

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

17

4,489

1,240 Orinal Fluxmetro Institucional, pagado por UN


17
829
4,489
13,863

und

236,094.02

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8322

1,469.00

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

Orinal institucional fluxmetro grif Quik

Ins

und

1.0000

206,000.00

206,000.00

1,242 Ducha economica con registro, pagada por un

und

2,691.50

43,950.64

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

675.74

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,358

Regadera veneciana CR

Ins

und

1.0000

14,030.00

14,030.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

14,757

Registro paso directo 1/2"

Ins

und

1.0000

22,000.00

22,000.00

17
829

1,243 Suministro e instal. ducha cromada, pagado un

und

37,400.82

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4580

1,469.00

672.80

4,302

Ducha cromada

Ins

und

1.0000

30,000.00

30,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4580

14,690.00

6,728.02

17

1,248 Platina 3/4" x 3/16". Suministro e Instal.


8
19
519
4,489

4,552.96

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0300

8,750.00

Herramienta menor 5% M.O. AA

Eqp

HR

0.0667

735.00

49.02

Soldador

Ins

0.0667

6,759.00

450.83

Cuadrilla AA (Albaileria)

Ins

0.0667

14,690.00

979.82

262.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

88

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,711

Platina 3/4" x 3/16"

Ins

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

1,254 Malla eslabonada C.10. Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

1.0000

2,565.00

2,565.00

kg

0.0357

6,885.00

245.79

16,396.41

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3636

1,469.00

534.13

4,489

Cuadrilla AA (Albaileria)

Ins

0.3636

14,690.00

5,341.28

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

17

1,255 Suministro e instal. tanque plstico de 5000 LT,


pagado por un

und

2,162,215.85

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

3,092

Tanque plstico 5000 lt

Ins

und

1.0000

1,869,920.00

1,869,920.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

6,297

Conexin tanque elevado pvc de 1" y 2", pagado un

Ana

und

1.0000

220,428.85

220,428.85

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

15,543

Flotador completo (bola de cobre) 1/2"

Ins

und

1.0000

53,592.00

53,592.00

55

1,256 Registro de corte =1/2". Suministro e Instal.

und

16,805.10

Herramienta Menor 5% M.O. BB

Eqp

HR

0.3333

808.00

269.31

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,020

Cinta teflon

Ins

rl

0.1500

1,000.00

150.00

14,067

Registro corte para tub galv o pvc =1/2"

Ins

und

1.0000

11,000.00

11,000.00

109
4,515

1,258 Llave terminal corriente = 1/2". Suministro e


Instal.

und

14,656.16

Herramienta menor 5% M.O. AA

Eqp

HR

0.1333

735.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1333

14,690.00

1,958.18

4,864

Llave jardin liviana 1/2"

Ins

und

1.0000

12,500.00

12,500.00

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

19

14,020

1,292 CERRADURA ENTRADA CLASICO X ARREGLAR X

und

97.98

32,179.00

595

Cerradura baos madera - aluminio

Ins

und

1.0000

31,204.00

31,204.00

621

Clip tipo C de fijacion

Ins

und

1.0000

975.00

975.00

1,293 CERRADURA PASO LIBRE (PC) X ARREGLAR X


S/GRAF

und

29,627.00

590

Cerradura alcoba classic madera

Ins

und

1.0000

28,652.00

28,652.00

621

Clip tipo C de fijacion

Ins

und

1.0000

975.00

975.00

1,302 Cerradura Schlage O.G Bao


56
576
5,064

und

80,774.41

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6660

1,763.00

1,174.16

Cerradura Schlage O.G Bao

Ins

und

1.0000

67,860.00

67,860.00

Cuadrilla DD (Carpinteria)

Ins

0.6660

17,628.00

11,740.25

1,303 Cerradura Schlage O.G tipo interior o alcobas

und

87,154.41

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

89

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
56
579
5,064

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6660

1,763.00

1,174.16

Cerradura Schlage O.G tipo C o interiores

Ins

und

1.0000

74,240.00

74,240.00

Cuadrilla DD (Carpinteria)

Ins

0.6660

17,628.00

11,740.25

1,309 Placa entrepiso sistema reticular celulado con


viguetas cada 0.70 m en ambos sentidos sin viga
H=0.45 m

Cantidad

Vr.Unitario

Vr.Total

112,096.35

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1100

4,375.00

481.25

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1700

333,142.66

56,634.25

5,061

Formaleta (1 uso)

Ana

0.7000

32,375.50

22,662.85

1,310 Desmonte instalaciones sanitarias pvc 2",3",4"


55
4,515

1,791

3,999.38

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2250

1,616.00

363.60

Cuadrilla BB (Instalaciones)

Ins

0.2250

16,159.00

3,635.78

1,311 BISAGRA PISO VAIVEN 90 X ARREGLAR X


S/GRAF
621

2,938.00

und

27,767.00

Clip tipo C de fijacion

Ins

und

1.0000

975.00

975.00

BISAGRA VAIVN 90

Ins

und

1.0000

26,792.00

26,792.00

1,312 Montaje superestructura en Viga longitudinales y


Transversales, riostra en Tuberia Petrolera =7"

und

395,888.00

14

Retroexcavadora de orugas

Eqp

HR

2.5000

144,160.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

14,752

1,315 Bajante exterior 2" en tubera sanitaria

360,400.00

14,554.88

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.3200

735.00

1,679

Chazo para tornillo 1/8" x 1 1/4

Ins

und

1.4000

50.00

70.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,489

235.20

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

0.0600

1,936.00

116.16

15,437

Tubo PVC sanitario de 2"

Ins

1.0500

7,092.00

7,446.60

16,426

Abrazadera para tubo 2"

Ins

und

0.7000

2,000.00

1,400.00

1,348 Vidrio color bronce 4 mm. Suministro e Instal.

41,387.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

16,303

Vidrio bronce 4 mm

Ins

1.0000

36,500.00

36,500.00

17
4,489

1,349 Vidrio color bronce 5 mm. Suministro e Instal.

50,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

4,934

Vidrio bronce 5 mm

Ins

1.0000

46,000.00

46,000.00

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

90

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,093

Silicona transparente 280 ml

Ins

1,350 Viga cinta de 0.12 x 0.08 m en concreto de


resistencia 3000 Psi

und

Cantidad

Vr.Unitario

Vr.Total

0.1000

8,473.00

847.30

17,263.68

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

3.0000

188.00

564.00

2,197

Repisa Ordinario 3 m

Ins

0.7000

1,500.00

1,050.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0100

333,142.66

3,331.43

Puntilla con cabeza 2 1/2"

Ins

lb

0.1000

1,990.00

199.00

14,128

1,353 Vidrio templado reflectivo 6 mm. Suministro e


Instal

1,101.75

354,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

3,714

Vidrio templado reflectivo 6 mm

Ins

1.0000

350,000.00

350,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17

16,093

1,355 Vidrio reflectivo verde 5 mm. Suministro e instal.

114,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,436

Vidrio reflectivo verde 5 mm

Ins

1.0000

110,000.00

110,000.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17

1,359 Reduccion union mecanica RDE 21 6 x 4".


Suministro e instal.

und

285,469.99

2,544

Reduccion de 6 x 4 (ens.) u.m RDE 21

Ins

und

1.0000

279,410.00

279,410.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3636

16,159.00

5,875.41

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

14,118

1,361 Suministro e instal. espejo 4mm, pagado m2

65,000.00

3,740

Espejo cristal 4 MM instalado

Ins

1.0000

65,000.00

65,000.00

5,144

Transporte de materiales Tn

Ana

0.0040

0.00

0.00

1,362 Suministro e instal. espejo 5mm, pagado m2

52,756.40

Herramienta Menor 10% M.O. DD

Eqp

HR

0.4000

1,763.00

705.20

3,741

Espejo cristal 5 MM

Ins

1.0000

45,000.00

45,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.4000

17,628.00

7,051.20

56

1,395 Tuberia en PRFV =10". Suministro e Instal.

305,323.82

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3839

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3839

16,159.00

6,203.44

4,765

Tuberia en PRFV =10"

Ins

1.0000

298,500.00

298,500.00

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

55

1,401 Pasamuro en PRFV = 6" E.L. x E.B. L= 1.2 m


(Suministro e instal. con tornilleria y empaques)

und

1,616.00

620.38

288,199.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

91

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. BB

Eqp

4,515

Cuadrilla BB (Instalaciones)

Ins

4,766

Pasamuro =6" E.L. x E.B. L=1.2 m en PRFV

Ins

und

5,144

Transporte de materiales Tn

Ana

55

1,403 Suministro e instal. equipo presion hidroflo,


pagado un
55
352
4,515

Cantidad

Vr.Unitario

Vr.Total

HR

1.3333

1,616.00

2,154.61

1.3333

16,159.00

21,544.79

1.0000

264,500.00

264,500.00

0.0350

0.00

0.00

und

6,211,000.00

Herramienta Menor 10% M.O. BB

Eqp

HR

40.0000

1,616.00

64,640.00

Equipo presion 1 hp p-1060

Ins

und

1.0000

5,500,000.00

5,500,000.00

Cuadrilla BB (Instalaciones)

Ins

40.0000

16,159.00

646,360.00

1,409 Dique, construccion con material de sitio,


seleccionado

17,601.34

Compactador Vibratorio

Eqp

HR

0.0278

100,000.00

2,780.00

Motoniveladora

Eqp

HR

0.0278

132,800.00

3,691.84

11

Carrotanque de Agua

Eqp

HR

0.0278

53,125.00

1,476.88

14

Retroexcavadora de orugas

Eqp

HR

0.0333

144,160.00

4,800.53

21

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

6,618

Zaranda en Varilla de 1" seleccion de material

Ana

und

0.0008

1,111,071.46

888.86

8,144

Oficial de Construccion

Ins

0.0278

9,282.00

258.04

1,422 Brida PVC =3". Suministro e instal.

und

79,456.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

484.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

4,793

Brida en PVC =3"

Ins

und

1.0000

30,044.00

30,044.00

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

55

1,426 Electrobomba sumergible tipo lapicero 7.5 HP. 220


V. 60 HZ. 2" de salida, bomba acero inoxidable.
Suministro e Instal.

und

5,595,083.00

Herramienta Menor 10% M.O. BB

Eqp

HR

10.0000

1,616.00

16,160.00

4,515

Cuadrilla BB (Instalaciones)

Ins

10.0000

16,159.00

161,590.00

4,928

Electrobomba sumerg. 7.5 HP tipo lapicero =2"

Ins

und

1.0000

5,417,333.00

5,417,333.00

55

1,504 Electrobomba de 10 H.P. 220 V. 60 HZ. 2" de salida,


bomba multietapas. Suministro e Instal.

und

4,072,650.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

4,931

Electrobomba 10 HP, 220 V, 2" de salida

Ins

und

1.0000

3,966,000.00

3,966,000.00

55

1,505 Reparacion de cielo raso con paete bajo malla 1:4

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

4,489

Cuadrilla AA (Albaileria)

17
804

1,538 Mortero 1:2 (desperdicio 5%)

17,301.27

0.8000

1,469.00

1,175.20

10.2000

383.34

3,910.07

5.0000

10.00

50.00

Ins

0.0300

13,800.00

414.00

Ins

0.8000

14,690.00

11,752.00

338,382.44

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

92

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

5,143

Transporte de materiales m

5,144

Transporte de materiales Tn

8,145

Ayudante de construccion

73
804

Cantidad

Vr.Unitario

Vr.Total

4.0000

234.00

936.00

656.0000

383.34

251,471.04

328.1200

10.00

3,281.20

1.0185

13,800.00

14,055.30

Ana

1.0185

46,157.00

47,010.90

Ana

0.6560

0.00

0.00

Ins

4.0000

5,407.00

21,628.00

1,539 Mortero 1:3 (desperdicio 5%)

276,302.97

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

476.7000

383.34

182,738.18

3,684

Agua para obra

Ins

238.0000

10.00

2,380.00

4,426

Arena lavada de rio

Ins

1.1445

13,800.00

15,794.10

5,143

Transporte de materiales m

Ana

1.1445

46,157.00

52,826.69

5,144

Transporte de materiales Tn

Ana

0.4767

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

1,540 Mortero 1:4 (desperdicio 5%)

248,144.84

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

382.0000

383.34

146,435.88

3,684

Agua para obra

Ins

240.0000

10.00

2,400.00

4,426

Arena lavada de rio

Ins

1.2800

13,800.00

17,664.00

5,143

Transporte de materiales m

Ana

1.2800

46,157.00

59,080.96

5,144

Transporte de materiales Tn

Ana

0.3822

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

1,541 Mortero 1:5 (desperdicio 5 %)

221,256.93

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

317.1000

383.34

121,557.11

3,684

Agua para obra

Ins

159.0000

10.00

1,590.00

4,426

Arena lavada de rio

Ins

1.2600

13,800.00

17,388.00

5,143

Transporte de materiales m

Ana

1.2600

46,157.00

58,157.82

5,144

Transporte de materiales Tn

Ana

0.3171

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

1,542 Mortero 1:6 (desperdicio 5 %)

204,534.15

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

274.0500

383.34

105,054.33

3,684

Agua para obra

Ins

137.0000

10.00

1,370.00

4,426

Arena lavada de rio

Ins

1.2600

13,800.00

17,388.00

5,143

Transporte de materiales m

Ana

1.2600

46,157.00

58,157.82

5,144

Transporte de materiales Tn

Ana

0.2741

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

1,543 Mortero 1:7 (desperdicio 5%)


73
804

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

Cemento gris

Ins

kg

194,229.16

4.0000

234.00

936.00

239.4000

383.34

91,771.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

93

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

3,684

Agua para obra

Ins

120.0000

10.00

1,200.00

4,426

Arena lavada de rio

Ins

1.3125

13,800.00

18,112.50

5,143

Transporte de materiales m

Ana

1.3125

46,157.00

60,581.06

5,144

Transporte de materiales Tn

Ana

0.2394

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

1,800 Salida lampara techo (bala inc. 100w) pvc, pagado


un

Vr.Unitario

und

Vr.Total

63,548.12

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Alambre cobre THW 14 AWG THHN/NN

Ins

4.5000

1,033.00

4,648.50

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

5,285

Bala incadescente 9 cm especular prismtica

Ins

und

1.0000

17,900.00

17,900.00

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

55
869

13,557

1,801 Salida lampara (roseta porc.) alumbrado muro pvc,


pagado un

und

42,076.72

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

869

Alambre cobre THW 14 AWG THHN/NN

Ins

4.5000

1,033.00

4,648.50

892

Roseta de Porcelana

Ins

und

1.0000

2,800.00

2,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.8000

327.00

915.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Alambre cobre THW 12 AWG THHN/NN

Ins

4.5000

1,474.00

6,633.00

55

13,557

1,802 Salida lampara piso PVC, pagado por Un

und

76,011.87

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3500

1,616.00

2,181.60

Alambre cobre THW 14 AWG THHN/NN

Ins

9.0000

1,033.00

9,297.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

9.0000

1,384.00

12,456.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3500

16,159.00

21,814.65

Alambre cobre THW 12 AWG THHN/NN

Ins

18.0000

1,474.00

26,532.00

55
869

13,557

1,803 Salida lmpara + roseta PVC, pagado por un

und

45,330.12

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

94

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

245

Roseta (Plafn)

Ins

869

Alambre cobre THW 14 AWG THHN/NN

Ins

und

1.0000

1,560.00

1,560.00

4.5000

1,033.00

1,709

Tornillo lmina Dia.3/8``

4,648.50

Ins

und

2,471

1.0000

20.00

20.00

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

5,107

Cuadrilla AA (Electrica)

Ins

1.0500

15,140.00

15,897.00

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

13,557

1,824 Bala fluorescente.pagado en un

und

82,897.00

5,107

Cuadrilla AA (Electrica)

Ins

1.0500

15,140.00

15,897.00

5,283

Bala fluorescente D= 17.5 CM

Ins

und

1.0000

67,000.00

67,000.00

1,832 Correa 2 ngulos 1"*1/8" + celosa varilla 3/8"


H=0.15

Sub-Contrato Ornamentacion

Esp

70.0000

10,318.40

7,222.88

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

2.0000

2,422.00

4,844.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5000

6,885.00

3,442.50

16,459

Varilla corrugada 3/8"

Ins

1.3000

1,563.00

2,031.90

1,843 Puerta en lmina cold roled cal. 18 instalada y


pintada

17,541.28

242,229.38

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1.0500

1,691.00

1,775.55

1,990

Disolvente Thinner

Ins

gal

0.0300

12,440.00

373.20

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.5000

88,083.67

132,125.51

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

5,064

Cuadrilla DD (Carpinteria)

Ins

4.5000

17,628.00

79,326.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

228

14,116

1,847 Luminaria colonial con pedestal, pagado por


unidad

und

400,187.95

55

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

1,371

Farol colonial 70 W. sodio 208 V

Ins

und

1.0000

265,000.00

265,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

12.0000

1,474.00

17,688.00

15,856

Tubo galvanizado 1 1/2" Conduit

Ins

3.1500

20,373.00

64,174.95

1,852 Luminaria con pedestal 70 W 208 V sodio, incluida


base concreto de 3000 psi, pagado por unidad

und

532,944.72

Herramienta Menor 10% M.O. BB

Eqp

HR

3.7000

1,616.00

5,979.20

1,374

Farol de pedestal 70 W 208 V sodio

Ins

und

1.0000

352,000.00

352,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.7000

16,159.00

59,788.30

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

95

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

0.1000

333,142.66

33,314.27

0.8000

0.00

13,557

Alambre cobre THW 12 AWG THHN/NN

0.00

Ins

15,856

Tubo galvanizado 1 1/2" Conduit

12.0000

1,474.00

17,688.00

Ins

3.1500

20,373.00

64,174.95

1,865 Cielo raso fibra mineral 60*60 (slo lmina


instalada, sin perfilera, incluye desp 5%)
56
5,064
16,430

17,996.81

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1600

1,763.00

282.08

Cuadrilla DD (Carpinteria)

Ins

0.1600

17,628.00

2,820.48

Lamina en fibra mineral 60*60 para cielo raso

Ins

und

1.7500

8,511.00

14,894.25

1,866 Tuberia con rosca PVC RDE 21 =4" de 2 TPI.


Suministro e Instal.

55,956.76

Equipo de perforacion y rotacion

Eqp

HR

0.1333

76,000.00

10,130.80

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1333

2,305.00

307.26

14,841

Puntera Hembra PVC RDE 21 4" de 2 o 4 TPI

Ins

und

0.0125

39,440.00

493.00

14,918

Tuberia con rosca PVC RDE 21 4" de 2 o 4 TPI

Ins

1.0000

41,953.00

41,953.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1333

23,051.00

3,072.70

85
112

1,880 Salida Sencilla conmutable PVC

und

38,536.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

5,107

Cuadrilla AA (Electrica)

Ins

0.7000

15,140.00

10,598.00

Alambre cobre THW 12 AWG THHN/NN

Ins

18.0000

1,474.00

26,532.00

13,557

1,881 Salida Sencilla PVC

und

18,637.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

5,107

Cuadrilla AA (Electrica)

Ins

0.7000

15,140.00

10,598.00

Alambre cobre THW 12 AWG THHN/NN

Ins

4.5000

1,474.00

6,633.00

13,557

1,882 Corpalosa 1.5" cal. 22 con malla electrosoldada


M-131 Q-3 concreto 1:2:3 e=0.10 m

73,630.25

2,200

Tabla burra ordinario 0.30

Ins

0.0500

4,333.00

216.65

4,489

Cuadrilla AA (Albaileria)

Ins

0.6700

14,690.00

9,842.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0752

333,142.66

25,052.33

16,492

Malla electrosoldada M-131 Q-3 de 2.35*6 m

Ins

und

0.0750

101,494.58

7,612.09

16,493

Corpalosa 1.5" cal. 22

Ins

1.0000

30,906.88

30,906.88

1,883 Tensor varilla lisa 1/2" roscado 0.20 m ambos


extremos
16,489

Tensor varilla lisa 1/2"*6m rosca 0.20 m extremos

Ins

1,885 Salida trifasica C.N., pagada por unidad


3
55

und

3,417.17

0.1700

20,101.00

und

3,417.17

178,270.88

Sub-Contrato Electrico

Esp

38.0000

129,181.80

49,089.08

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

96

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

271

Toma sencilla

Ins

406

Caja 4 x 4 met. AK 2V

Ins

und

1.0500

4,500.00

4,725.00

und

1.0500

5,600.00

822

Alambre cobre THW 10 AWG THHN/NN

5,880.00

Ins

8.2600

2,902.00

23,970.52

3,553
3,556

Adaptador terminal conduit 1/2"

Ins

und

1.0500

269.00

282.45

Tubo conduit PVC 1/2"

Ins

2.9900

1,384.00

4,138.16

3,561

Adaptador terminal conduit 1"

Ins

und

1.0500

660.00

693.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

12,066

Tubo conduit PVC 1"

Ins

2.5700

2,511.00

6,453.27

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

8.1000

1,474.00

11,939.40

1,887 Demolicion manual placa de piso 0.10 m prom

16,825.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0120

55,550.00

666.60

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

4,489

1,888 Mediacaa mortero imp 1:3 esmaltado 0.12*0.12m

1,469.00

18,274.57

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0072

430,750.59

3,101.40

6,040

Alistado esmaltado impermeabilizado muros y placas


e=3 mm

Ana

0.1900

10,274.60

1,952.17

17

1,889 Impermeabilizacin terrazas semi-transitable


sikafill 10 (imprim+ 2 capas) + sikafill refuerzo +
sikacolor-555 W 2 capas

Sub-Contrato Pintura

Esp

50.0000

25,303.03

12,651.52

16,484

Sikafill 10 *25 kg

Ins

kg

1.3280

12,760.00

16,945.28

16,485

Sikacolor-555 W

Ins

kg

0.3750

21,460.00

8,047.50

16,486

Sikafill refuerzo

Ins

0.2500

1,241.00

310.25

1,891 Impermeabilizacin placas/viga canal con


sikatecho E (4 capas) + sikafelt (2 capas) + 1 capa
de alumol

37,954.55

26,059.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7272

1,469.00

1,961

Alumol, recubrimiento de aluminio

Ins

kg

0.1250

21,112.00

2,639.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7272

14,690.00

10,682.57

16,421

Sikatecho E * 3.5 kg

Ins

und

0.7000

9,947.00

6,962.90

16,422

Sikafelt rollo 1.2m*40 m

Ins

und

0.0490

96,048.00

4,706.35

1,892 Reparacion red de alcantarillado = 8"

1,068.26

54,118.13

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5333

1,616.00

861.81

4,426

Arena lavada de rio

Ins

0.0800

13,800.00

1,104.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

8,617.59

5,143

Transporte de materiales m

Ana

0.0800

46,157.00

3,692.56

13,741

Tuberia alcantarillado PVC 8 "

Ins

1.0000

30,558.00

30,558.00

13,747

Adhesivo Alcantarillado

Ins

und

0.1000

43,753.00

4,375.30

15,363

Acondicionador de Superficie

Ins

tr

0.0300

83,629.00

2,508.87

15,366

Saco en fibra (0.60 x 0.80)

Ins

und

3.0000

800.00

2,400.00

55

1,895 Salida + Interruptor AVE 601 CN, pagado por un

und

46,047.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

97

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

Interruptor sencillo ave 601

Ins

HR

1.0000

1,616.00

1,616.00

und

1.0000

5,500.00

2,471

Conector resorte rojo

Ins

5,500.00

und

2.0000

327.00

2,927

Soldadura para PVC 1/4 gl

654.00

Ins

und

0.0100

58,612.00

2,938

586.12

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

55
242

13,557

1,897 Red de suministro pvc 2"

und

18,676.05

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

879.18

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,999

Tubo presin RDE 21 PVC 2 "

Ins

1.0500

9,802.00

10,292.10

15,044

Union presion PVC 2"

Ins

und

0.3300

2,549.00

841.17

1,908 Salida + Interruptor AVE 611 CN, pagado en un

und

55,047.62

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

55

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

9.0000

1,474.00

13,266.00

16,125

Interruptor doble lnea decorativa

Ins

und

1.0000

14,500.00

14,500.00

1,911 Recubrimiento poliuretano Sikafloor 400N elastic 1


capa acabado + 1 capa imprimante previo de
sikafloor 156 CO

54,401.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

16,499

Sikafloor - 400N elastic * 18 kg

Ins

und

0.0500

709,920.00

35,496.00

16,500

Sikafloor - 156 CO * 4 kg

Ins

und

0.0500

184,208.00

9,210.40

17
4,489

1,919 INTERRUPTOR DOBLE CONMUTABLE X


ARREGLAR X
2,906

Ayudante (Electrico)

und

Ins

1,921 INTERRUPTOR DOBLE CONMUTABLE X


ARREGLAR X
4,515

Cuadrilla BB (Instalaciones)

1,922 Pintura exterior vinilo coraza para estructuras 2


manos (seccion 0.50 m)

11,447.12

1.9541

5,858.00

und

Ins

11,447.12

4,039.75

0.2500

16,159.00

4,039.75

15,946.65

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

98

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Sub-Contrato Pintura

Esp

Herramienta menor 10% M.O. CC

5,066
5,144

5
61

15,934

Cantidad

Vr.Unitario

Vr.Total

45.0000

10,997.69

4,948.96

Eqp

HR

0.3077

1,689.00

519.71

Cuadrilla CC (Pintura)

Ins

0.3077

16,893.00

5,197.98

Transporte de materiales Tn

Ana

0.0003

0.00

0.00

Vinilo tipo Koraza para exteriores

Ins

gal

0.1000

52,800.00

5,280.00

1,923 Pintura interior vinilo para estructuras 3 manos


(seccion 0.50 m)

10,961.03

Sub-Contrato Pintura

Esp

40.0000

7,829.31

3,131.72

Herramienta menor 10% M.O. CC

Eqp

HR

0.2500

1,689.00

422.25

3,832

Vinilo tipo viniltex

Ins

gal

0.0700

45,483.00

3,183.81

5,066

Cuadrilla CC (Pintura)

Ins

0.2500

16,893.00

4,223.25

5
61

1,926 CONMUTABLE SENCILLO CONMUTABLE X


ARREGLAR X S GRAF
277
2,906

und

16,947.12

CONMUTABLE SENCILLO

Ins

und

1.0000

5,500.00

5,500.00

Ayudante (Electrico)

Ins

1.9541

5,858.00

11,447.12

1,927 Compuerta lateral deslizante sello de bronce,


circular =8" en H.F.

und

3,500,025.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

3,280

Compuerta lateral deslizante s.b. circular =8"

Ins

und

1.0000

1,748,120.00

1,748,120.00

4,134

Soporte guia vastago No 1

Ins

und

1.0000

272,600.00

272,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

13,731

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

14,038

Columna de maniobra crm

Ins

und

1.0000

524,320.00

524,320.00

14,721

Guia No 1

Ins

und

1.0000

62,640.00

62,640.00

14,737

Rueda Volante = 6" a 8"

Ins

und

1.0000

46,400.00

46,400.00

14,938

Vastago para compuerta =6" - 8"

Ins

1.8000

307,400.00

553,320.00

55

1,928 CONMUTABLE SENCILLO LUMINEX X ARREGLAR


X S/GRAF
2,906

Ayudante (Electrico)

und

Ins

1,932 Compuerta lateral deslizante sello de bronce,


circular =6" en H.F.

5,723.27

0.9770

5,858.00

und

5,723.27

2,925,825.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

4,134

Soporte guia vastago No 1

Ins

und

1.0000

272,600.00

272,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

8,254

Conjunto brida =6"

Ins

und

1.0000

78,880.00

78,880.00

13,540

Compuerta lateral deslizante s.b. circular =6"

Ins

und

1.0000

1,263,240.00

1,263,240.00

14,038

Columna de maniobra crm

Ins

und

1.0000

524,320.00

524,320.00

14,721

Guia No 1

Ins

und

1.0000

62,640.00

62,640.00

14,737

Rueda Volante = 6" a 8"

Ins

und

1.0000

46,400.00

46,400.00

14,938

Vastago para compuerta =6" - 8"

Ins

1.8000

307,400.00

553,320.00

55

1,933 Interruptor doble de incrustar Luminex

und

7,764.64

121

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1600

1,514.00

242.24

252

Interruptor doble de incrustar galica luminex

Ins

und

1.0000

5,100.00

5,100.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

99

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,107

Nombre

Tipo U.M.

Cuadrilla AA (Electrica)

Ins

1,937 Transporte de Rocas para enrocado en rios.


Acarreo max. 5 Km

Cantidad

Vr.Unitario

Vr.Total

0.1600

15,140.00

2,422.40

vj

327,092.62

26

Camabaja

Eqp

HR

0.5333

589,546.00

98

Herramienta menor 10% M.O. Ay-4

Eqp

HR

0.5333

2,163.00

1,153.53

Cuadrilla Ay-4

Ins

0.5333

21,628.00

11,534.21

14,944

1,940 Interruptor sencillo Ave

und

314,404.88

8,164.64

121

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1600

1,514.00

242.24

242

Interruptor sencillo ave 601

Ins

und

1.0000

5,500.00

5,500.00

Cuadrilla AA (Electrica)

Ins

0.1600

15,140.00

2,422.40

5,107

1,941 Grifera para tanque de sanitario


109
4,515
16,450

und

30,599.11

Herramienta Menor 5% M.O. BB

Eqp

HR

0.3300

808.00

266.64

Cuadrilla BB (Instalaciones)

Ins

0.3300

16,159.00

5,332.47

Grifera para tanque de sanitario

Ins

und

1.0000

25,000.00

25,000.00

1,969 Salida toma sencilla muro PVC, pagado por UN

und

45,265.37

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2500

1,616.00

2,020.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

3.0000

269.00

807.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2500

16,159.00

20,198.75

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

13,557

1,970 Perno de anclaje 5/8" roscado con tuerca L=0.52 m


16,476

Perno bastn roscado de 5/8" con tuerca L=0.52 m

und
Ins

1,971 Correa en tubo estructural cerrado rectangular


60*40*2.5 mm pintado e instalado a Hprom 4 m

und

17,600.00

1.0000

17,600.00

Sub-Contrato Ornamentacion

Esp

2,502

Anticorrosivo rojo claro

3,838

17,600.00

35,506.97

50.0000

23,671.31

Ins

gal

0.0300

29,750.00

892.50

Esmalte mate supersinttico

Ins

gal

0.0300

50,506.00

1,515.18

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.2000

6,885.00

1,377.00

16,468

Tubo estructural rectang 60*40*2.5 mm*6m

Ins

und

0.1700

116,980.20

19,886.63

1,972 Picado superficie placa de piso en concreto o


cancha con retiro de sobrantes

11,835.66

6,849.00

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0800

35,000.00

2,800.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

100

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

1,973 Paral en 2 ngulos 1 1/2"*1/8" H=0.12m + 1 ngulo


transversal 1"*3/16" cada 0.40m

Cantidad

Vr.Unitario

Vr.Total

0.2000

14,690.00

2,938.00

Sub-Contrato Ornamentacion

Esp

55.0000

16,477.10

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

0.3000

2,422.00

726.60

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5000

6,885.00

3,442.50

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

Ins

2.0000

6,154.00

12,308.00

1,974 Salida toma bifsica 20 A PVC, pagada por UN

25,539.51

und

9,062.41

46,531.62

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

3.0000

1,384.00

4,152.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

15,864

Toma bifsica

Ins

und

1.0000

4,500.00

4,500.00

1,990 Sello de juntas, dilataciones, fisuras horizontales


prom. 1*1 cm con sikaflex-1CSL o similar
17
4,489
16,406

9,271.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

Sikaflex-1CSL cartucho 300 cc

Ins

und

0.3300

23,200.00

7,656.00

1,991 Salida toma doble pvc incluye toma, pagado un

und

44,069.12

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1000

1,616.00

1,777.60

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,183

Toma doble conduit

Ins

und

1.0000

3,815.00

3,815.00

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

3.0000

1,384.00

4,152.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1000

16,159.00

17,774.90

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

13,557

1,993 Campana extractora de 2*0.8*0.5 acero inoxidable,


motor y bombillo
55
4,515
16,497

und

1,155,325.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

Campana extractora industrial cocina 200*80*50mm

Ins

und

1.0000

1,102,000.00

1,102,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

101

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,994 Extractor de aire 12" incluye apertura del vano


55
4,515
16,498

Cantidad

Vr.Unitario

und

Vr.Total
204,950.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Extractor de aire 12"

Ins

und

1.0000

169,400.00

169,400.00

1,995 Perfil estructural circular 2"*3 mm para estructura


de cubierta, instalado.

35,565.04

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

875.00

Equipo de Oxicorte

Eqp

HR

0.1000

5,000.00

500.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0950

6,805.00

646.48

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.5000

11,436.00

5,718.00

16,477

Tubo estructural redondo 2"*3mm*6 mt

Ins

und

0.1600

137,936.36

22,069.82

8
43

2,001 Collar de derivacion en Polipropileno PP-R 20 mm


x 1/2". Suministro e Instal.

und

6,173.78

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1702

808.00

137.52

1,951

Collar de derivacion 20 mm x 1/2" PP-R

Ins

und

1.0000

3,086.00

3,086.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

109

14,020

2,003 TOMA DOBLE POLO A TIERRA X ARREGLAR X


S/GRAF
5,107

Cuadrilla AA (Electrica)

und

Ins

2,004 Tomacorriente doble con polo a tierra de incrustar

10,598.00

0.7000

und

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1600

244

Tomacorriente doble con polo a tierra de incrustar

Ins

und

Cuadrilla AA (Electrica)

Ins

2,007 Collar de derivacion en Polipropileno PP-R 32 mm


x 3/4". Suministro e Instal.
50
109
4,515
14,020

55

16,103

1,514.00

242.24

1.0000

4,900.00

4,900.00

0.1600

15,140.00

2,422.40

und

6,961.47

Collar de derivacion 32 mm x 3/4" PP-R

Ins

und

1.0000

3,944.00

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0213

808.00

17.21

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

2,008 Suministro e instal. toma doble con polo a tierra.


pagada por un

4,515

10,598.00

7,564.64

121

5,107

15,140.00

und

3,944.00

14,177.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1000

1,616.00

161.60

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

Toma monofsica doble, polo a tierra

Ins

und

1.0000

12,400.00

12,400.00

2,012 Collar de derivacion en Polipropileno PP-R 32 mm


x 1/2". Suministro e Instal.

und

7,031.78

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

102

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1702

808.00

137.52

1,950

Collar de derivacion 32 mm x 1/2" PP-R

Ins

und

1.0000

3,944.00

3,944.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

109

14,020

2,013 TOMA + INTERRUPTOR X ARREGLAR X S/GRAF


5,107

Cuadrilla AA (Electrica)

und
Ins

2,015 TOMA TRIFSICA 20 A X ARREGLAR X S/GRAF


2,906

Ayudante (Electrico)

10,598.00

0.7000

15,140.00

und
Ins

2,016 Collar de derivacion en Polipropileno PP-R 25 mm


x 1/2". Suministro e Instal.

10,598.00

3,576.89

0.6106

5,858.00

und

3,576.89

6,358.78

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1702

808.00

137.52

1,711

Collar de derivacion 25 mm x 1/2" PP-R

Ins

und

1.0000

3,271.00

3,271.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

109

14,020

2,031 Salida ventilador (cordon) pvc, pagado un

und

43,765.62

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

283

Salida para cordn

Ins

und

1.0000

6,000.00

6,000.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,366

Placa de identificacin 3 x 5 CM

Ins

und

0.1000

5,500.00

550.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

3.0000

1,384.00

4,152.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

55

13,557

2,035 Perfil estructural abierto en C de 305*80*2.5 mm


doble pintado e instalado a Hprom de 4 m

91,821.90

Sub-Contrato Ornamentacion

Esp

50.0000

61,214.60

30,607.30

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.6000

6,885.00

4,131.00

16,467

Perfil estructural abierto en C 305*80*2.5 mm*6m

Ins

und

0.3300

163,252.60

53,873.36

2,037 Salida sistema sonido PVC, pagado por unidad

und

30,543.12

Salida para cordn

Ins

und

1.0000

6,000.00

6,000.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,495

Caja sencilla conduit

Ins

und

1.0000

1,218.00

1,218.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

9.0000

1,384.00

12,456.00

5,107

Cuadrilla AA (Electrica)

Ins

0.6250

15,140.00

9,462.50

283

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

103

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,144

Nombre

Tipo U.M.

Transporte de materiales Tn

Ana

2,038 Ventana Persiana aluminio con vidrio 5 mm


instalada
16,466

Ventana persiana aluminio

Cantidad

Vr.Unitario

Vr.Total

0.0100

0.00

0.00

Ins

2,075 Pozo de Inspeccion recto (sin cono truncado) H=


6.0 - 6.50 m 1.20 m Concreto reforzado

140,000.00

1.0000

140,000.00

und

140,000.00

8,362,182.72

Herramienta menor 10% M.O. AA-4

Eqp

HR

50.0000

3,091.00

154,550.00

1,870

Alambre Negro No 18

Ins

kg

32.0000

3,903.00

124,896.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

67.3300

2,295.00

154,522.35

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

8.6000

333,142.66

2,865,026.88

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1500

311,229.99

46,684.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0100

378,352.56

382,136.09

5,061

Formaleta (1 uso)

Ana

19.6333

32,375.50

635,637.90

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

997.0000

2,257.00

2,250,229.00

Cuadrilla AA-4

Ins

50.0000

30,910.00

1,545,500.00

59

13,960

2,077 Pozo de Inspeccion recto (sin cono truncado) H=


5.0 - 5.50 m 1.20 m

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

1,901

Acero de refuerzo 37000 Psi

Ins

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061

69

4,028,628.31

44.0000

2,010.00

88,440.00

kg

4.7000

3,903.00

18,344.10

kg

41.0600

2,295.00

94,232.70

3,600.0000

305.00

1,098,000.00

2.2500

367,816.92

827,588.07

0.1500

311,229.99

46,684.50

Ana

0.9630

378,352.56

364,353.52

Formaleta (1 uso)

Ana

12,195.85

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

0.3767

32,375.50

16.2000

0.00

0.00

1.0000

203,000.00

203,000.00

Acero de refuerzo 60000 Psi

Ins

kg

115.7400

2,257.00

261,225.18

13,894

Geotextil No Tejido 2000

Ins

31.7100

4,109.00

130,296.39

14,669

Cuadrilla AA-2 (Tuberias)

Ins

44.0000

20,097.00

884,268.00

2,079 Pozo de Inspeccion recto (sin cono truncado) H=


5.5 - 6.00 m 1.20 m

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061
5,144

69

4,252,134.01

47.0000

2,010.00

94,470.00

4.7900

3,903.00

18,695.37

41.0600

2,295.00

94,232.70

3,850.0000

305.00

1,174,250.00

2.4200

367,816.92

890,116.95

0.1500

311,229.99

46,684.50

Ana

0.9630

378,352.56

364,353.52

Formaleta (1 uso)

Ana

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13,894

Geotextil No Tejido 2000

Ins

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3767

32,375.50

12,195.85

17.3300

0.00

0.00

1.0000

203,000.00

203,000.00

118.6600

2,257.00

267,815.62

34.5000

4,109.00

141,760.50

47.0000

20,097.00

944,559.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

104

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,081 Pozo de Inspeccion recto (sin cono truncado) H=


6.0 - 6.50 m 1.20 m

Vr.Unitario

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061
5,144

69

Cantidad

Vr.Total
4,475,221.02

50.0000

2,010.00

100,500.00

4.9700

3,903.00

19,397.91

41.0600

2,295.00

94,232.70

4,100.0000

305.00

1,250,500.00

2.5700

367,816.92

945,289.48

0.1500

311,229.99

46,684.50

Ana

0.9630

378,352.56

364,353.52

Formaleta (1 uso)

Ana

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13,894

Geotextil No Tejido 2000

Ins

37.3000

4,109.00

153,265.70

14,669

Cuadrilla AA-2 (Tuberias)

Ins

50.0000

20,097.00

1,004,850.00

2,091 TABLERO CON PUERTA 24 CIRCUITOS X


ARREGLAR X S/GRAF

0.3767

32,375.50

12,195.85

18.4500

0.00

0.00

1.0000

203,000.00

203,000.00

124.4800

2,257.00

280,951.36

und

299,292.00

3,042

Tablero con puerta 24 circuitos

Ins

und

1.0000

208,452.00

208,452.00

5,107

Cuadrilla AA (Electrica)

Ins

6.0000

15,140.00

90,840.00

2,095 Extraccion de agua

463.57

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0167

1,469.00

24.53

58

Motobomba de 4" o 6"

Eqp

HR

0.0167

11,600.00

193.72

Cuadrilla AA (Albaileria)

Ins

0.0167

14,690.00

245.32

4,489

2,097 Pozo de Inspeccion recto (sin cono truncado) H=


6.5 - 7.00 m 1.20 m

und

5,223,162.72

Herramienta Menor 10% M.O. AA-2

Eqp

HR

54.0000

2,010.00

108,540.00

1,870

Alambre Negro No 18

Ins

kg

5.0500

3,903.00

19,710.15

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

4,351.0000

305.00

1,327,055.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

2.7400

551,059.84

1,509,903.96

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1500

311,229.99

46,684.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.9630

378,352.56

364,353.52

5,061

Formaleta (1 uso)

Ana

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13,894

Geotextil No Tejido 2000

Ins

40.0900

4,109.00

164,729.81

14,669

Cuadrilla AA-2 (Tuberias)

Ins

54.0000

20,097.00

1,085,238.00

69

2,099 Pozo de Inspeccion recto (sin cono truncado) H=


1.0 - 2.0 m 2.00 m

0.3767

32,375.50

12,195.85

19.5800

0.00

0.00

1.0000

203,000.00

203,000.00

127.3900

2,257.00

287,519.23

und

2,347,027.16

Herramienta Menor 10% M.O. AA-2

Eqp

HR

14.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

6.6700

3,903.00

26,033.01

1,901

Acero de refuerzo 37000 Psi

Ins

kg

44.9000

2,295.00

103,045.50

2,085

Ladrillo tolete comn

Ins

und

1,166.0000

305.00

355,630.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.7500

367,816.92

275,862.69

69

28,140.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

105

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5,144
8,194

0.2500

311,229.99

77,807.50

1.8900

378,352.56

715,086.34

Ana

1.0467

32,375.50

33,887.44

Transporte de materiales Tn

Ana

5.2500

0.00

0.00

Acero de refuerzo 60000 Psi

Ins

kg

177.3200

2,257.00

400,211.24

13,894

Geotextil No Tejido 2000

Ins

12.1600

4,109.00

49,965.44

14,669

Cuadrilla AA-2 (Tuberias)

Ins

14.0000

20,097.00

281,358.00

2,101 Pozo de Inspeccion recto (sin cono truncado) H=


2.0 - 3.0 m 2.00 m

und

Vr.Total

3,043,296.91

Herramienta Menor 10% M.O. AA-2

Eqp

HR

24.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

6.9300

3,903.00

27,047.79

1,901

Acero de refuerzo 37000 Psi

Ins

kg

44.9000

2,295.00

103,045.50

2,085

Ladrillo tolete comn

Ins

und

1,944.0000

305.00

592,920.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.2500

367,816.92

459,771.15

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.2500

311,229.99

77,807.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.8900

378,352.56

715,086.34

5,061

Formaleta (1 uso)

Ana

1.0467

32,375.50

33,887.44

5,144

Transporte de materiales Tn

Ana

8.7500

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

186.0500

2,257.00

419,914.85

13,894

Geotextil No Tejido 2000

Ins

20.2600

4,109.00

83,248.34

14,669

Cuadrilla AA-2 (Tuberias)

Ins

24.0000

20,097.00

482,328.00

69

2,102 Pozo de Inspeccion recto (sin cono truncado) H=


3.0 - 4.0 m 2.00 m

und

48,240.00

3,710,258.09

Herramienta Menor 10% M.O. AA-2

Eqp

HR

33.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

7.1000

3,903.00

27,711.30

1,901

Acero de refuerzo 37000 Psi

Ins

kg

44.9000

2,295.00

103,045.50

2,085

Ladrillo tolete comn

Ins

und

2,721.0000

305.00

829,905.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.7500

367,816.92

643,679.61

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.2500

311,229.99

77,807.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.8900

378,352.56

715,086.34

5,061

Formaleta (1 uso)

Ana

1.0467

32,375.50

33,887.44

5,144

Transporte de materiales Tn

Ana

12.2400

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

191.8800

2,257.00

433,073.16

13,894

Geotextil No Tejido 2000

Ins

28.3600

4,109.00

116,531.24

14,669

Cuadrilla AA-2 (Tuberias)

Ins

33.0000

20,097.00

663,201.00

69

2,103 Pozo de Inspeccion recto (sin cono truncado) H=


4.0 - 5.0 m 2.00 m

und

66,330.00

5,576,915.96

Herramienta Menor 10% M.O. AA-2

Eqp

HR

60.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

7.2800

3,903.00

28,413.84

1,901

Acero de refuerzo 37000 Psi

Ins

kg

44.9000

2,295.00

103,045.50

2,085

Ladrillo tolete comn

Ins

und

4,874.0000

305.00

1,486,570.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

3.0300

367,816.92

1,114,485.27

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.2900

311,229.99

90,256.70

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

2.0840

378,352.56

788,486.74

5,061

Formaleta (1 uso)

Ana

1.0467

32,375.50

33,887.44

5,144

Transporte de materiales Tn

Ana

21.9300

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

197.7000

2,257.00

446,208.90

Geotextil No Tejido 2000

Ins

38.7300

4,109.00

159,141.57

69

13,894

120,600.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

106

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,669

Cuadrilla AA-2 (Tuberias)

Ins

2,105 Tablon de gres labrado 33*33 con pega en mortero


impermeabilizado

Cantidad

Vr.Unitario

Vr.Total

60.0000

20,097.00

1,205,820.00

37,665.08

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

14,122

Sika 1 imp. integral

Ins

kg

0.4000

6,438.00

2,575.20

15,568

Tablon de gres vitrificado 33 x 33

Ins

1.0500

14,776.00

15,514.80

17
804

2,160 Codo radio corto 90 PVC union mecanica =4".


Suministro e Instal.

und

134,173.19

2,872

Codo radio corto 90 PVC unin mecnica =4"

Ins

und

1.0000

129,679.00

129,679.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

14,118

2,162 Codo radio corto 90 PVC union mecanica =6".


Suministro e Instal.

und

315,316.07

Cuadrilla BB (Instalaciones)

Ins

0.3200

16,159.00

5,170.88

13,800

Codo radio corto 90 PVC u.m =6"

Ins

und

1.0000

309,936.00

309,936.00

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

4,515

2,170 Tee de presion PVC 1". Suministro e instal.

und

2,721.80

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0040

58,612.00

234.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

15,059

Tee sencilla presion PVC 1"

Ins

und

1.0000

1,639.00

1,639.00

109

2,172 Tee de presion PVC 1 1/4". Suministro e instal.

und

5,375.41

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

Tee sencilla presion PVC 1 1/4 "

Ins

und

1.0000

4,234.00

4,234.00

109

15,060

2,179 Tee de presion PVC 3". Suministro e instal.

und

31,526.47

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

15,064

Tee sencilla presion PVC 3 "

Ins

und

1.0000

30,092.00

30,092.00

109

2,180 Tee de presion PVC 4". Suministro e instal.

und

66,627.69

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0120

58,612.00

703.34

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

15,065

Tee sencilla presion PVC 4 "

Ins

und

1.0000

65,076.00

65,076.00

109

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

107

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,181 Adaptador macho de presion PVC 2 1/2".


Suministro e Instal.

Cantidad

Vr.Unitario

und

Vr.Total
10,401.88

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0090

58,612.00

527.51

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0090

28,250.00

254.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 2 1/2"

Ins

und

1.0000

8,998.00

8,998.00

15,054

2,183 Union Universal PVC =2 1/2". Suministro e Instal.

und

52,738.59

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

14,487

Universal presin PVC 2 1/2"

Ins

und

1.0000

49,903.00

49,903.00

109

2,184 Union Universal PVC =1". Suministro e Instal.

und

6,618.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.1600

1,000.00

160.00

15,068

Universal presin PVC 1"

Ins

und

1.0000

5,610.00

5,610.00

109
4,515

2,185 Union Universal PVC = 1 1/2". Suministro e Instal.

und

18,426.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

16,328

Universal presin PVC 1 1/2"

Ins

und

1.0000

17,378.00

17,378.00

109
4,515

2,186 Union Universal PVC =4". Suministro e Instal.

und

63,540.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,488

Universal presin PVC 4"

Ins

und

1.0000

62,292.00

62,292.00

109
4,515

2,187 Union tipo Dresser = 2 1/2" en A.C. Suministro e


instal.
55
4,515
14,559

und

57,887.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

Union Dresser =2 1/2" en A.C

Ins

und

1.0000

49,000.00

49,000.00

2,193 Tuberia de agua Galvanizada =1" Suministro e


Instal.

13,675.87

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0833

1,616.00

134.61

3,293

Tubo de agua Galvanizado =1"

Ins

1.0000

11,938.00

11,938.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0833

16,159.00

1,346.04

Union Galvanizada = 1"

Ins

und

0.1667

1,543.00

257.22

55

14,289

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

108

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,194 Tuberia de agua Galvanizada =1 1/2" Suministro e


Instal.

Cantidad

Vr.Unitario

Vr.Total
20,939.74

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0833

1,616.00

134.61

Cuadrilla BB (Instalaciones)

Ins

0.0833

16,159.00

1,346.04

14,071

Tubo de agua Galvanizado =1 1/2"

Ins

1.0000

18,995.00

18,995.00

14,290

Union Galvanizada = 1 1/2"

Ins

und

0.1667

2,784.00

464.09

55
4,515

2,195 Pasamuro en A.C. =6" L=0.50 m E.B. Suministro e


Instal.

und

404,739.40

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

2,952

Pasamuro en A.C. =6" L=0.50 m E.B.

Ins

und

1.0000

378,885.00

378,885.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

17

2,197 Pasamuro en A.C. =8" L=0.50 m E.B. Suministro e


Instal.

und

530,021.47

Herramienta Menor 10% M.O. AA

Eqp

HR

1.7778

1,469.00

2,611.59

2,953

Pasamuro en A.C. =8" L=0.50 m E.B.

Ins

und

1.0000

501,294.00

501,294.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.7778

14,690.00

26,115.88

17

2,200 Brida Slip On =3" en A.C. 150 Psi

und

100,480.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

2,954

Brida Slip On =3" en A.C. 150 Psi

Ins

und

1.0000

40,600.00

40,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

55

2,202 Brida Slip On =4" en A.C. 150 Psi

und

133,995.05

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

2,956

Brida Slip On =4" en A.C. 150 Psi

Ins

und

1.0000

48,720.00

48,720.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

55

14,246

2,204 Brida Slip On =8" en A.C. 150 Psi

und

469,240.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

8,100

Brida Slip On =8" en A.C. 150 Psi

Ins

und

1.0000

272,600.00

272,600.00

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

55

13,731

2,206 Brida Slip On =10" en A.C. 150 Psi

und

636,430.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

13,524

Brida Slip On =10" en A.C. 150 Psi

Ins

und

1.0000

386,280.00

386,280.00

14,247

Conjunto brida =10"

Ins

und

1.0000

214,600.00

214,600.00

55
4,515

2,209 Tee en H.F. 3" x 3" E.B. Suministro e Instal.


55
4,515

1,616.00

und

3,232.00

192,935.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

109

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,178

Tee en H.F. 3" x 3" E.B.

Ins

2,211 Tee en H.F. 6" x 6" E.B. Suministro e Instal.


55
4,515
14,179

55

14,220

Vr.Unitario

Vr.Total

1.0000

175,160.00

175,160.00

und

635,019.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee en H.F. 6" x 6" E.B.

Ins

und

1.0000

611,320.00

611,320.00

2,213 Tee en H.F. 8" x 8" E.B. Suministro e Instal.

4,515

und

Cantidad

und

1,009,119.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee en H.F. 8" x 8" E.B.

Ins

und

1.0000

985,420.00

985,420.00

2,215 Codo 90 =3" en A.C. con E.B x E.B. Suministro e


instal.

und

162,587.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

14,221

Codo 90 =3" en A.C. E.B.

Ins

und

1.0000

153,700.00

153,700.00

55

2,218 Tuberia en A.C. =3" x 5.75 SCH-40 E.B x CC.


Suministro e Instal.

610,807.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1800

8,750.00

1,575.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

44

Pulidora electrica manual

Eqp

HR

0.1800

4,350.00

783.00

Soldador

Ins

1.0000

6,759.00

6,759.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2000

6,805.00

1,361.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

13,932

Tuberia en A.C. = 3" x 5.75 SCH-40 E.B x CC

Ins

1.0000

580,704.00

580,704.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.2000

6,885.00

1,377.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

519

2,221 Tuberia en A.C. =6" x 5.75 SCH-40 E.B x CC.


Suministro e Instal.

1,147,643.40

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3600

8,750.00

3,150.00

44

Pulidora electrica manual

Eqp

HR

0.3600

4,350.00

1,566.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Soldador

Ins

1.6000

6,759.00

10,814.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4000

6,805.00

2,722.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.4000

6,885.00

2,754.00

14,237

Tuberia en A.C. = 6" x 5.75 SCH-40 E.B x CC.

Ins

1.0000

1,096,957.00

1,096,957.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2000

6,200.00

1,240.00

519

2,224 Tuberia en A.C. =8" x 5.75 SCH-40 E.B x CC.


Suministro e Instal.

1,761,378.04

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.5200

8,750.00

4,550.00

44

Pulidora electrica manual

Eqp

HR

0.5200

4,350.00

2,262.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.7778

1,616.00

2,872.92

Soldador

Ins

1.7778

6,759.00

12,016.15

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5500

6,805.00

3,742.75

519
1,717

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

110

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,116

Soldadura electrosoldada 6013 de 1/8"

14,238
14,744

4,515

Cantidad

Vr.Unitario

Vr.Total

1.7778

16,159.00

28,727.47

Ins

kg

0.5500

6,885.00

3,786.75

Tuberia en A.C. = 8" x 5.75 SCH-40 E.B x CC.

Ins

1.0000

1,701,870.00

1,701,870.00

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2500

6,200.00

1,550.00

2,226 Platina 0.25*0.25 en lmina HR 1/4" con 6


perforaciones de 5/8" con mortero de nivelacin

und

27,764.66

Mortero 1:4 (desperdicio 5%)

Ana

0.0018

248,144.84

446.66

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.5000

11,436.00

5,718.00

16,469

Perforacin de 5/8" en lmina HR 1/4"

Ins

und

6.0000

1,100.00

6,600.00

16,471

Corte en lmina HR 1/4"

Ins

0.7500

20,000.00

15,000.00

1,540

2,227 Platina 0.25*0.25 m en lmina HR 3/8" con 6


perforaciones de 5/8"
16,487

Platina 0.25*0.25*3/8" con 6 perf. 5/8"

und

Ins

2,228 Sondeo redes sanitarias/aguas lluvias casa cultura


yopal
55
119
4,515

und

36,400.00

1.0000

36,400.00

glb

36,400.00

285,300.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

Rotasonda

Eqp

HR

12.0000

6,000.00

72,000.00

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

2,229 Poceta lavatraperos en mampostera paetada


1.20*0.60*0.3 m

1,616.00

und

19,392.00

122,202.17

72

Base en recebo comun compactado

Ana

0.0720

92,359.05

6,649.85

89

Muro en ladrillo tolete comun e=0.12 m (12 x 24.5 x 6)

Ana

1.0800

34,658.44

37,431.12

Paete liso (allanado) muros 1:4, incluye filos y


dilataciones, pagado en M2

Ana

2.2400

15,526.09

34,778.44

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

1.0000

4,485.00

4,485.00

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

4.6000

3,075.79

14,148.63

6,276

Placa base en concreto 2500 psi e=0.07 m

Ana

0.7200

34,318.24

24,709.13

121

2,230 Adaptador hembra de presion PVC 3". Suministro


e Instal.

und

21,502.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0220

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0220

28,250.00

621.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Adaptador hembra presin PVC 3"

Ins

und

1.0000

17,006.00

17,006.00

15,079

2,231 Malla eslabonada cal 10 con platina 1/2"*3/16"


contra tubo y ngulo soportes sup e inf 1/2"*3/16"

22,064.25

Sub-Contrato Ornamentacion

Esp

50.0000

14,709.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1000

6,885.00

688.50

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

16,418

Angulo o perfil 1/2" x 3/16"

Ins

1.0000

2,500.00

2,500.00

16,419

Platina 1/2"*3/16"

Ins

1.0000

1,000.00

1,000.00

2,232 Adaptador macho de presion PVC 3". Suministro e


Instal.

1,289.46

und

7,354.75

18,100.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

111

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)
Adaptador macho presin PVC 3"

15,055

Cantidad

Vr.Unitario

Vr.Total

und

0.0220

58,612.00

1,289.46

und

0.0220

28,250.00

621.50

Ins

0.1600

16,159.00

2,585.44

Ins

und

1.0000

13,604.00

13,604.00

2,233 Adaptador hembra de presion PVC 4". Suministro


e Instal.

und

38,364.36

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0330

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0330

28,250.00

932.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2963

16,159.00

4,787.91

Adaptador hembra presin PVC 4"

Ins

und

1.0000

30,710.00

30,710.00

15,080

2,234 Buje soldado 4 x 3". Suministro e instal.

und

1,934.20

20,580.23

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 4 x 3

Ins

und

1.0000

16,689.00

16,689.00

15,111

2,260 CAMARA INSPECCION SENCILLA ELECTRICA 60


X 60 X 85 X ARREGLAR X S/GRAF

und

1,172.24

62,073,418.49

151

Tapa para camara de media y baja tension AP

Ana

und

1.0000

132,940.86

132,940.86

265

Paete interior allanado, proporcin de la mezcla 1:4,


espesor 2 cm, pagado en m2

Ana

1.6800

12,557.34

21,096.33

358

Niple = 2" en A.C. con E.L x E.B. L=0.18 m. Suministro


e Instal.

Ana

und

0.0100

188,760.82

1,887.61

535

Baranda en perfil WF 8" x 18" (dos Tubos HG =3") y


(Un Tubo HG =2"), Hu=0.90 m

Ana

0.1000

254,200.94

25,420.09

1,538

Mortero 1:2 (desperdicio 5%)

Ana

0.0800

338,382.44

27,070.60

2,057

Tuberia de Polietileno PE 100 PN-10 de 450 mm

Ins

93.0000

663,384.00

61,694,712.00

2,209

Tabla chapa ordinaria 0.20

Ins

6.0000

3,333.00

19,998.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.7000

14,690.00

142,493.00

Liston ordinario 0.05 x 0.05

Ins

6.0000

1,300.00

7,800.00

13,235

2,261 Caja de inspeccion electrica 1.17 x 1.32 x 0.99


s/grafico

und

392,842.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0780

248,144.84

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2857

6,805.00

1,944.19

2,085

Ladrillo tolete comn

Ins

und

258.0000

305.00

78,690.00

2,209

Tabla chapa ordinaria 0.20

Ins

2.5667

3,333.00

8,554.81

2,458

Platina 1/4" x 2 1/2"

Ins

0.8000

8,463.00

6,770.40

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0540

333,142.66

17,989.70

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0810

318,473.24

25,796.33

5,143

Transporte de materiales m

Ana

0.0850

46,157.00

3,923.35

5,144

Transporte de materiales Tn

Ana

1.1600

0.00

0.00

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

3.6200

11,609.00

42,024.58

15,365

Crudo de rio sin clasificar

Ins

0.0850

14,364.00

1,220.94

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.9000

11,436.00

10,292.40

2,262 CAMARA INSPECCION ELECTRICA 181 X 149 X 132


X ARREGLAR X S/GRAF

und

19,355.30

252,253,100.57

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

112

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

151

Tapa para camara de media y baja tension AP

Ana

265

Paete interior allanado, proporcin de la mezcla 1:4,


espesor 2 cm, pagado en m2

Ana

und

2.0000

132,940.86

265,881.72

7.2100

12,557.34

90,538.42

358

Niple = 2" en A.C. con E.L x E.B. L=0.18 m. Suministro


e Instal.

Ana

und

0.0300

188,760.82

5,662.82

535

Baranda en perfil WF 8" x 18" (dos Tubos HG =3") y


(Un Tubo HG =2"), Hu=0.90 m

Ana

0.3100

254,200.94

78,802.29

1,538

Mortero 1:2 (desperdicio 5%)

Ana

0.1300

338,382.44

43,989.72

2,057

Tuberia de Polietileno PE 100 PN-10 de 450 mm

Ins

379.0000

663,384.00

251,422,536.00

2,209

Tabla chapa ordinaria 0.20

Ins

11.2000

3,333.00

37,329.60

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

Liston ordinario 0.05 x 0.05

Ins

11.2000

1,300.00

14,560.00

13,235

2,265 Andenes en concreto de resistencia 2500 psi,


espesor 8 cm, pagado m2

37,496.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,208

Tabla chapa ordinario 0.10

Ins

0.5000

2,667.00

1,333.50

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0800

318,473.24

25,477.86

17

2,266 Andenes en concreto de resistencia 2500 psi,


espesor 0.10 cm, pagado m2

43,892.33

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1000

318,473.24

31,847.32

17

2,269 Canal de recoleccion y distribucion en lamina A.I.


C-18. Suministro e Instal.

305,663.38

Sub-Contrato Ornamentacion

Esp

10.0000

277,875.80

27,787.58

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

44

Pulidora electrica manual

Eqp

HR

0.0800

4,350.00

348.00

Soldador

Ins

1.5000

6,759.00

10,138.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1000

6,805.00

680.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

14,241

Lamina en acero inoxidable C-18

Ins

1.3000

191,146.00

248,489.80

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

519

2,270 Meson en lamina A.I. C-18. Suministro e Instal.

271,280.70

Sub-Contrato Ornamentacion

Esp

20.0000

226,067.25

45,213.45

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

Soldador

Ins

1.1500

6,759.00

7,772.85

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1000

6,805.00

680.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

14,241

Lamina en acero inoxidable C-18

Ins

1.0500

191,146.00

200,703.30

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

519

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

113

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,279 Tuberia de Produccion o Succion en PVC RDE 21


1 1/2" y Cabezal de Pozo. Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total
35,712.48

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1667

1,616.00

269.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.2000

58,612.00

11,722.40

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.2000

28,250.00

5,650.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1667

16,159.00

2,693.71

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

1.0000

6,392.00

6,392.00

15,025

Codo 90 presion PVC 1 1/2"

Ins

und

0.0833

4,226.00

352.03

15,043

Union presion PVC 1 1/2"

Ins

und

0.0833

1,553.00

129.36

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

0.2500

2,422.00

605.50

15,061

Tee sencilla presion PVC 1 1/2 "

Ins

und

0.0833

5,560.00

463.15

15,069

Valvula de Pie bronce =1 1/2"

Ins

und

0.0833

58,464.00

4,870.05

15,105

Buje soldado presion PVC 2.1/2 x 1.1/2

Ins

und

0.0833

9,229.00

768.78

15,110

Buje soldado presion PVC 4 x 2.1/2

Ins

und

0.0833

18,691.00

1,556.96

15,116

Tapon roscado presin PVC 1 1/2

Ins

und

0.0833

2,871.00

239.15

55

2,280 Filtro en Y de =3". E.B. x E.B. Suministro e Instal

und

497,570.50

Herramienta Menor 5% M.O. BB

Eqp

HR

1.5000

808.00

1,212.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

Filtro en Y de =3". E.B. x E.B.

Ins

und

1.0000

428,040.00

428,040.00

109

14,243

2,284 Filtro en Y de =4". E.B. x E.B. Suministro e Instal

und

702,890.50

Herramienta Menor 5% M.O. BB

Eqp

HR

1.5000

808.00

1,212.00

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

14,245

Filtro en Y de =4". E.B. x E.B.

Ins

und

1.0000

612,480.00

612,480.00

14,246

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

109
4,515

2,285 Tuberia Galvanizada =3", para sistema


contraincendios, con accesorios. Suministro e
Instal.

57,086.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

14,404

Codo H.G. 90 3"

Ins

und

0.1667

21,460.00

3,577.38

14,405

Union Galvanizada =3"

Ins

und

0.1667

14,732.00

2,455.82

15,553

Tubo de agua Galvanizado =3"

Ins

1.0000

43,693.00

43,693.00

55
4,515

2,286 Impermeabilizante muros igol denso


17
4,489
14,407

25,537.50

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7692

1,469.00

1,129.95

Cuadrilla AA (Albaileria)

Ins

0.7692

14,690.00

11,299.55

Igol denso sika

Ins

kg

1.0000

13,108.00

13,108.00

2,287 Alumol recubrimiento en aluminio para Tuberia

7,543.86

61

Herramienta menor 10% M.O. CC

Eqp

HR

0.1333

1,689.00

225.14

1,961

Alumol, recubrimiento de aluminio

Ins

kg

0.2400

21,112.00

5,066.88

5,066

Cuadrilla CC (Pintura)

Ins

0.1333

16,893.00

2,251.84

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

114

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,288 Compuerta 1.2 x 1.2 en Lamina HR 1/2", reguladora


de Caudal. Instalada

Cantidad

Vr.Unitario

und

Vr.Total
478,290.90

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

2.0000

8,750.00

17,500.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

Soldador

Ins

2.0000

6,759.00

13,518.00

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,144

Transporte de materiales Tn

Ana

0.1440

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1000

6,885.00

688.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,945

Lamina HR 1/2"

Ins

1.4400

250,702.65

361,011.82

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

Ins

7.5000

6,154.00

46,155.00

519

2,289 Codo Sanitario 45 1/8 C x C PVC 6". Suministro e


Instal.

und

39,344.87

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0090

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0070

28,250.00

197.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x C PVC 6"

Ins

und

1.0000

34,310.00

34,310.00

15,455

2,290 Silla Yee PVC 16 x 6 (400 x 160 mm). Suministro e


Instal.

und

527.51

228,801.98

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

13,747

Adhesivo Alcantarillado

Ins

und

0.6667

43,753.00

29,170.13

14,408

Silla Yee PVC 16 x 6 (400 x 160 mm)

Ins

und

1.0000

159,929.00

159,929.00

14,410

Hidrosello 6" (152 - 160 mm)

Ins

und

1.0000

2,662.00

2,662.00

15,363

Acondicionador de Superficie

Ins

tr

0.2000

83,629.00

16,725.80

55
4,515

2,291 Union rapida para Tuberia Polietileno =2".


Suministro e Instal.
55
4,515
14,409

und

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2000

1,616.00

323.20

Cuadrilla BB (Instalaciones)

Ins

0.2000

16,159.00

3,231.80

Union rapida para Tuberia Polietileno 2"

Ins

und

1.0000

19,639.00

19,639.00

2,292 Racor macho mecanico 63 mm x 2" para Tuberia de


Polietileno PE
109
4,515
14,411

und

26,225.72

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1600

808.00

129.28

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Racor macho mecanico 63 mm x 2" para Tuberia de PE

Ins

und

1.0000

23,511.00

23,511.00

2,293 Tuberia de Polietileno PE 100 PN-16 de = 50 mm


= 1 1/2"
2,938

23,194.00

Limpiador PVC 1/4 gl o 760 gr

Ins

und

11,708.48

0.0003

28,250.00

8.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

115

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,036

Tuberia de Polietileno PE 100 PN-16 de 50 mm

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

2,294 Tuberia de Polietileno PE 100 PN-10 de =110 mm


= 4"

Cantidad

Vr.Unitario

Vr.Total

1.0000

8,927.00

8,927.00

0.1429

16,159.00

2,309.12

0.0100

46,387.50

463.88

31,861.47

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0008

28,250.00

22.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2222

16,159.00

3,590.53

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0179

46,387.50

830.34

13,862

Tuberia de Polietileno PE 100 PN-10 de 110 mm

Ins

1.0000

27,418.00

27,418.00

2,295 Racor macho mecanico 110 mm x 4" para Tuberia


de Polietileno PE
109
4,515
12,049

und

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1778

808.00

143.66

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

Racor macho mecanico 110 mm x 4" para Tuberia PE

Ins

und

1.0000

135,720.00

135,720.00

2,296 Perro de 1/4" Tipo Pesado. Suministro e Instal.


19
4,489
12,048

138,736.73

und

5,921.84

Herramienta menor 5% M.O. AA

Eqp

HR

0.0455

735.00

33.44

Cuadrilla AA (Albaileria)

Ins

0.0455

14,690.00

668.40

Perro de 1/4 " Tipo pesado.

Ins

und

1.0000

5,220.00

5,220.00

2,297 Perro de 5/8" Tipo Pesado. Suministro e Instal.

und

14,369.99

Herramienta menor 5% M.O. AA

Eqp

HR

0.0588

735.00

43.22

4,489

Cuadrilla AA (Albaileria)

Ins

0.0588

14,690.00

863.77

4,763

Perro de 5/8 " Tipo pesado.

Ins

und

1.0000

13,463.00

13,463.00

19

2,304 Sumidero lateral en concreto 3000 Psi (2.20 x 0.80)


con rejilla en platina.

und

1,573,768.97

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

7.0000

8,750.00

61,250.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

24.0000

1,469.00

35,256.00

44

Pulidora electrica manual

Eqp

HR

2.0000

4,350.00

8,700.00

49

Vibrador de concretos

Eqp

HR

2.1600

4,375.00

9,450.00

Soldador

Ins

9.0000

6,759.00

60,831.00

2,477

Angulo o perfil 1 1/2" x 1 1/2" x 1/4"

Ins

5.2000

8,591.00

44,673.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.2000

29,750.00

5,950.00

3,838

Esmalte mate supersinttico

Ins

gal

0.2000

50,506.00

10,101.20

4,489

Cuadrilla AA (Albaileria)

Ins

24.0000

14,690.00

352,560.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.4400

333,142.66

479,725.43

5,061

Formaleta (1 uso)

Ana

2.3700

32,375.50

76,729.94

8,194

Acero de refuerzo 60000 Psi

Ins

kg

108.6000

2,257.00

245,110.20

8,234

519

Bisagra redonda 3/8"

Ins

und

4.0000

928.00

3,712.00

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

1.2000

5,481.00

6,577.20

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5000

6,200.00

3,100.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

4.7000

5,800.00

27,260.00

15,559

Platina 1/4" x 1 1/2"

Ins

14.4000

5,043.00

72,619.20

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

5.2000

13,493.00

70,163.60

2,305 Material crudo de rio sin seleccionar

14,364.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

116

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,365

Crudo de rio sin clasificar

Ins

2,306 Corte en concreto, pagado por m

Cantidad

Vr.Unitario

Vr.Total

1.0000

14,364.00

14,364.00

Cortadora concreto (Disco Diaman. 14")

Eqp

0.1538

45,000.00

3,684

Agua para obra

Ins

40.0000

10.00

400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

57

2,308 Acometida televisin cable coaxial TV, pagado por


ML

HR

9,524.50

6,921.00

16,529.67

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6600

1,616.00

1,066.56

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,561

Adaptador terminal conduit 1"

Ins

und

0.3300

660.00

217.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6600

16,159.00

10,664.94

12,066

Tubo conduit PVC 1"

Ins

1.0500

2,511.00

2,636.55

14,596

Cable coaxial RG-6

Ins

1.0500

1,024.00

1,075.20

55

2,309 Instalacin elctrica global Aula tipo 25 alumnos


(detalle archivo asuntos Energticos copia Oficina
Programacin))
16,490

Instalacin elctrica Aula Tipo 25 alumnos

glb

Ins

2,312 Prueba de bombeo por Hora

glb

4,760,825.90

1.0000

4,760,825.90

4,760,825.90

39,929.94

Campero 2000cc-3000cc

Eqp

HR

0.6700

21,534.00

14,427.78

Motobomba de 3"

Eqp

HR

1.0000

12,250.00

12,250.00

14,664

Tecnico 1

Ins

1.0000

8,575.16

8,575.16

14,703

Ayudante (A)

Ins

1.0000

4,677.00

4,677.00

46
108

2,313 Sistema septico Ovoide 500 Lt (incluye:Tanque


septico, Tanque anaerobico, Tanque aerobico y
Trampa de grasas)

und

1,555,353.00

Herramienta Menor 10% M.O. AA

Eqp

HR

6.0000

1,469.00

8,814.00

1,565

Caja de Inspeccion y distribucion peq.

Ins

und

1.0000

54,752.00

54,752.00

2,964

Trampa de grasas 95 lts

Ins

und

1.0000

159,848.00

159,848.00

2,966

Tanque filtro anaerobico 500 Lts

Ins

und

1.0000

393,240.00

393,240.00

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

3.0000

7,729.00

23,187.00

4,489

Cuadrilla AA (Albaileria)

Ins

6.0000

14,690.00

88,140.00

13,520

Tanque filtro aerobico 500 lts

Ins

und

1.0000

242,556.00

242,556.00

14,717

Tanque septico imhoff 500 Lt

Ins

und

1.0000

407,624.00

407,624.00

15,439

Tubo PVC sanitario de 4"

Ins

12.0000

14,766.00

177,192.00

17

2,315 Silla Yee PVC 20 x 6 (500 x160 mm). Suministro e


instal.

und

329,061.92

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Silla Yee 20 x 6 (500 x 160 mm)

Ins

und

1.0000

258,564.00

258,564.00

2,957

Abrazadera inox silla kit 20" (500 mm)

Ins

und

1.0000

35,600.00

35,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Adhesivo Alcantarillado

Ins

und

0.3333

43,753.00

14,582.87

55
716

13,747

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

117

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,316 TOMA ANTENA TV X ARREGLAR X S/GRAF


2,906
13,881

Cantidad

Vr.Unitario

und

Vr.Total

14,349.88

Ayudante (Electrico)

Ins

1.9375

5,858.00

11,349.88

Toma tv coaxial

Ins

und

1.0000

3,000.00

3,000.00

2,318 Acometida telefonos suspendida 3" PVC, pagada


en ml

28,148.01

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1500

1,616.00

1,858.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

3,585

Adaptador terminal conduit 3"

Ins

und

0.3300

9,502.00

3,135.66

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1500

16,159.00

18,582.85

Arandela galvanizada de 1/2"

Ins

und

2.0000

114.00

228.00

55

16,360

2,319 Acometida telefonos incrustada 3" PVC, pagada en


ml

47,295.01

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1500

1,616.00

1,858.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

3,585

Adaptador terminal conduit 3"

Ins

und

0.3300

9,502.00

3,135.66

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1500

16,159.00

18,582.85

Tubo conduit PVC 3"

Ins

1.0000

19,375.00

19,375.00

55

15,981

2,321 Silla Yee PVC 18 x 6 (450 x160 mm). Suministro e


instal.

und

240,610.23

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

727

Silla Yee PVC 18 x 6 (450 x160 mm).

Ins

und

1.0000

177,735.00

177,735.00

2,958

Abrazadera inox silla kit 18" (450 mm)

Ins

und

1.0000

32,600.00

32,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Adhesivo Alcantarillado

Ins

und

0.2857

43,753.00

12,500.23

55

13,747

2,322 Union reducida de Polietileno PE 100 PN-10 de 110


mm x 90 mm. o 4" x 3"

und

108,367.13

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0400

28,250.00

1,130.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.9500

46,387.50

44,068.13

15,944

Union Reducida PE 100 PN-10 de 110 x 90 mm

Ins

und

1.0000

47,010.00

47,010.00

2,331 Camara de caida de 8"

und

326,809.51

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

4,136

Codo 90 PVC 8"

Ins

und

1.0000

100,465.00

100,465.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2000

333,142.66

66,628.53

5,061

Formaleta (1 uso)

Ana

0.4500

32,375.50

14,568.98

13,355

Kit Silla Tee 8*6 (200 x 160)

Ins

und

1.0000

82,271.00

82,271.00

13,741

Tuberia alcantarillado PVC 8 "

Ins

1.0000

30,558.00

30,558.00

17

2,332 Excavacion mecanica en roca con retiro

20,725.47

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

118

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14

Retroexcavadora de orugas

Eqp

21

Volqueta (6 m3 )

Eqp

2,335 Salida + toma telfono PVC, pagada en un

Cantidad

Vr.Unitario

HR

0.0667

144,160.00

9,615.47

HR

0.2000

55,550.00

11,110.00

und

Vr.Total

39,075.12

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1000

1,616.00

1,777.60

Cable telfonos 2 pares

Ins

9.0000

1,079.00

9,711.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

2.5000

1,384.00

3,460.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1000

16,159.00

17,774.90

Toma telfono americana doble 4 hilos

Ins

und

1.0000

3,120.00

3,120.00

55
852

15,849

2,337 Codo 90 en H.D. en J.H. =4" Suministro e Instal.

und

129,060.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

13,947

Codo 90 =4" en H.D. J.H.

Ins

und

1.0000

114,840.00

114,840.00

55

2,342 Vidrio martillado 4 mm

33,727.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

16,456

Vidrio martillado 4 mm

Ins

1.0300

28,000.00

28,840.00

17
4,489

2,344 Estacion macromedidora =8" con accesorios.


Suministro e Instal.

und

7,525,383.00

Herramienta Menor 10% M.O. BB

Eqp

HR

9.0000

Cuadrilla BB (Instalaciones)

Ins

13,731

Conjunto brida =8"

Ins

und

14,501

Valvula de Mariposa =8" bronce

Ins

14,505

Adaptador Brida Acople Universal HD 8"

14,507

55

1,616.00

14,544.00

9.0000

16,159.00

145,431.00

4.0000

168,200.00

672,800.00

und

1.0000

691,000.00

691,000.00

Ins

und

1.0000

255,200.00

255,200.00

Filtro en Y de =8". E.B. x E.B.

Ins

und

1.0000

1,704,040.00

1,704,040.00

14,508

Union Universal galvanizada 8"

Ins

und

2.0000

237,800.00

475,600.00

14,510

Pasamuro en A.C. =8" L=1.00 m E.L x E.B

Ins

und

2.0000

1,102,000.00

2,204,000.00

14,512

Niple espec. = 8" en A.C. con E.L x E.B. L=1.00 m

Ins

und

1.0000

1,102,000.00

1,102,000.00

15,880

Valvula de bola PVC 1 1/2"

Ins

und

1.0000

33,408.00

33,408.00

16,218

Valv. ventosa (cam. senc.) doble acc. 1 1/2" rosc

Ins

und

1.0000

227,360.00

227,360.00

4,515

2,347 Tee en H.F. 6" x 6" E.L. Suministro e Instal.

und

367,464.78

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

4,194

Tee en H.F. 6" x 6" E.L.

Ins

und

1.0000

351,480.00

351,480.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

55

14,118

2,350 Geodren Circular 200/5/200 100 mm de 2.00 m


19
1,595

71,714.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.1000

735.00

73.50

Geodren Circular 200/5/200 100 mm de 2.00 m

Ins

1.0000

70,172.00

70,172.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

119

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

2,352 Estacion macromedidora =4" con accesorios.


Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.1000

14,690.00

1,469.00

und

3,466,569.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

14,245

Filtro en Y de =4". E.B. x E.B.

Ins

und

1.0000

612,480.00

612,480.00

14,246

Conjunto brida =4"

Ins

und

4.0000

64,960.00

259,840.00

14,490

Union Universal galvanizada 4"

Ins

und

2.0000

128,760.00

257,520.00

14,497

Pasamuro en A.C. =4" L=0.90 m E.L x E.B

Ins

und

2.0000

545,200.00

1,090,400.00

14,499

Valvula de Mariposa =4" bronce

Ins

und

1.0000

255,500.00

255,500.00

14,502

Niple espec. = 4" en A.C. con E.L x E.B. L=0.51 m

Ins

und

1.0000

545,200.00

545,200.00

14,503

Adaptador Brida Acople Universal HD 4"

Ins

und

1.0000

77,720.00

77,720.00

15,879

Valvula de bola PVC 1"

Ins

und

1.0000

16,124.00

16,124.00

16,217

Valv. ventosa (cam. senc.) doble acc. 1" rosca

Ins

und

1.0000

227,360.00

227,360.00

55
4,515

2,355 Estacion macromedidora =6" con accesorios.


Suministro e Instal.

und

4,892,608.00

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

12,928.00

4,515

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

8,254

55

Conjunto brida =6"

Ins

und

4.0000

78,880.00

315,520.00

14,491

Union Universal galvanizada 6"

Ins

und

2.0000

110,200.00

220,400.00

14,500

Valvula de Mariposa =6" bronce

Ins

und

1.0000

425,000.00

425,000.00

14,504

Adaptador Brida Acople Universal HD 6"

Ins

und

1.0000

114,840.00

114,840.00

14,506

Filtro en Y de =6". E.B. x E.B.

Ins

und

1.0000

1,169,280.00

1,169,280.00

14,509

Pasamuro en A.C. =6" L=1.00 m E.L x E.B

Ins

und

2.0000

748,200.00

1,496,400.00

14,511

Niple espec. = 6" en A.C. con E.L x E.B. L=0.76 m

Ins

und

1.0000

748,200.00

748,200.00

15,880

Valvula de bola PVC 1 1/2"

Ins

und

1.0000

33,408.00

33,408.00

16,218

Valv. ventosa (cam. senc.) doble acc. 1 1/2" rosc

Ins

und

1.0000

227,360.00

227,360.00

2,358 Geodren Circular 200/5/200 100 mm de 1.00 m

46,865.00

Herramienta menor 5% M.O. AA

Eqp

HR

0.0800

735.00

58.80

1,610

Geodren Circular 200/5/200 100 mm de 1.00 m

Ins

1.0000

45,631.00

45,631.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0800

14,690.00

1,175.20

19

2,407 Estacion macromedidora =3" con accesorios.


Suministro e Instal.

und

2,179,798.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

4,866

Conjunto brida =3"

Ins

und

4.0000

44,080.00

176,320.00

14,243

Filtro en Y de =3". E.B. x E.B.

Ins

und

1.0000

428,040.00

428,040.00

14,489

Union Universal galvanizada 3"

Ins

und

2.0000

67,280.00

134,560.00

14,492

Pasamuro en A.C. =3" L=0.90 m E.L x E.B

Ins

und

2.0000

226,432.00

452,864.00

14,494

Adaptador Brida Acople Universal HD 3"

Ins

und

1.0000

67,280.00

67,280.00

14,495

Niple = 3" en A.C. con E.L x E.B. L=0.23 m

Ins

und

1.0000

203,000.00

203,000.00

14,496

Niple espec. = 3" en A.C. con E.L x E.B. L=0.38 m

Ins

und

1.0000

156,600.00

156,600.00

14,498

Valvula de Mariposa =3" bronce

Ins

und

1.0000

211,000.00

211,000.00

15,879

Valvula de bola PVC 1"

Ins

und

1.0000

16,124.00

16,124.00

16,217

Valv. ventosa (cam. senc.) doble acc. 1" rosca

Ins

und

1.0000

227,360.00

227,360.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

120

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,429 Gravilla lavada, incluye dilatacion en bronce

Cantidad

Vr.Unitario

Vr.Total
50,298.98

Herramienta menor 5% M.O. AA

Eqp

HR

2.0000

735.00

1,470.00

Cemento gris

Ins

kg

6.9800

383.34

2,675.71

2,448

Dilatacin en bronce PC 09

Ins

0.8000

3,735.00

2,988.00

3,684

Agua para obra

Ins

3.1800

10.00

31.80

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

Gravilla para piso

Ins

bt

0.7692

17,342.00

13,339.47

19
804

15,575

2,430 Transformador 3 de 30 KVA, 13.2 kv / 208-220,


Norma 711

und

6,980,216.00

Grua

Eqp

HR

3.0000

43,750.00

131,250.00

105

Herramienta Menor 10% M.O. AA-2 Elc

Eqp

HR

8.0000

2,100.00

16,800.00

728

Arandela de presion de =5/8"

Ins

und

10.0000

132.00

1,320.00

879

Cable de cobre THW N 6

Ins

1.0000

5,539.00

5,539.00

880

Cable de cobre THW N 4

Ins

1.0000

7,240.00

7,240.00
167,984.00

28

Cuadrilla AA-2 (Electrica)

Ins

8.0000

20,998.00

14,267

Conector bimetlico 2 pernos

Ins

und

4.0000

4,346.00

17,384.00

14,269

Cortacircuito de 15 KV, 100 A

Ins

und

3.0000

139,898.00

419,694.00

14,277

Fusible de 15 KV, 1 - 5 A, tipo H

Ins

und

3.0000

2,595.00

7,785.00

14,280

Pararrayos de ZnO, 12 KV, 10 KA, tipo lnea

Ins

und

3.0000

139,898.00

419,694.00

14,348

Arandela de presin de 1/2"

Ins

und

10.0000

114.00

1,140.00

14,350

Arandela redonda de 1/2``

Ins

und

10.0000

116.00

1,160.00

14,351

Arandela redonda de 5/8``

Ins

und

10.0000

124.00

1,240.00

14,362

Collarn para transformador

Ins

und

2.0000

27,245.00

54,490.00

14,363

Cruceta metlica de 2 1/2`` x 3/16`` x 2 mts.

Ins

und

2.0000

48,672.00

97,344.00

14,368

Diagonal angulo tipo recta 1 1/2"x 1 1/2" x 3/16"

Ins

und

2.0000

16,555.00

33,110.00

14,372

Esprrago galvanizado de 5/8`` x 10``

Ins

und

2.0000

3,876.00

7,752.00

14,396

Perno mquina de 1/2`` x 2``

Ins

und

10.0000

875.00

8,750.00

14,399

Perno mquina de 5/8`` x 8``

Ins

und

2.0000

2,770.00

5,540.00

14,443

Transformador trifsico de 30 KVA

Ins

und

1.0000

5,575,000.00

5,575,000.00

6,918

2,431 Drenaje para aire acondicionado en Tuberia PVC


RDE 21 = 1"

10,178.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3333

1,616.00

538.61

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,996

Tubo presin RDE 21 PVC 1 "

Ins

1.0300

2,716.00

2,797.48

15,023

Codo 90 presion PVC 1"

Ins

und

0.5000

1,176.00

588.00

55

2,433 Union espigo flanchado =2". Suministro e Instal.

und

431,080.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

3,116

Union espigo flanchado =2"

Ins

und

1.0000

415,280.00

415,280.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

55

2,434 Union espigo flanchado =3". Suministro e Instal.


55
3,117

und

616,680.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

Union espigo flanchado =3"

Ins

und

1.0000

600,880.00

600,880.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

121

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

2,435 Filtro en Yee flanchado =2". Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.8889

16,159.00

14,363.74

und

378,648.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

3,118

Filtro en Yee flanchado =2"

Ins

und

1.0000

362,848.00

362,848.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

55

2,436 Filtro en Yee flanchado =3". Suministro e Instal.

und

485,600.20

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

3,119

Filtro en Yee flanchado =3"

Ins

und

1.0000

469,800.00

469,800.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

55

2,438 Union Universal PVC =2". Suministro e Instal.

und

15,946.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

16,329

Universal presin PVC 2"

Ins

und

1.0000

14,848.00

14,848.00

109
4,515

2,439 Union Universal PVC =3". Suministro e Instal.

und

48,824.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.3000

1,000.00

300.00

14,800

Universal presin PVC 3"

Ins

und

1.0000

47,676.00

47,676.00

109
4,515

2,441 Valvula Reductora de presion HD =2" de 230 Psi.


Suministro e Instal.

und

2,830,899.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

3,123

Valvula Reductora de presion HD =2" de 230 Psi.

Ins

und

1.0000

2,807,200.00

2,807,200.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

55

2,459 Valvula Reductora de presion HD =3" de 230 Psi.


Suministro e Instal.
55
4,515
14,919

und

3,598,920.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Valvula Reductora de presion HD =3" de 230 Psi.

Ins

und

1.0000

3,570,480.00

3,570,480.00

2,460 Macromedidor =2". Suministro e Instal.

und

892,967.00

Herramienta Menor 5% M.O. BB

Eqp

HR

1.0000

808.00

808.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,223

Macromedidor =2"

Ins

und

1.0000

875,800.00

875,800.00

109
4,515

2,463 Macromedidor =3" E.B.x E.B. Suministro e Instal.


109
4,515
14,020

und

1,175,001.58

Herramienta Menor 5% M.O. BB

Eqp

HR

1.1429

808.00

923.46

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

122

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,222

Macromedidor =3"

Ins

2,466 Macromedidor =4" E.B.x E.B. Suministro e Instal.

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

1,155,360.00

1,155,360.00

und

1,646,972.10

Herramienta Menor 5% M.O. BB

Eqp

HR

1.3333

808.00

1,077.31

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,020

Cinta teflon

Ins

rl

0.3500

1,000.00

350.00

14,486

Macromedidor =4"

Ins

und

1.0000

1,624,000.00

1,624,000.00

109
4,515

2,467 Valvula de Pie bronce integral =3". Suministro e


instal.

und

438,902.10

Herramienta Menor 5% M.O. BB

Eqp

HR

1.3333

808.00

1,077.31

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,916

Valvula de Pie bronce integral =3"

Ins

und

1.0000

415,280.00

415,280.00

109
4,515

2,468 Control de nivel para pozo profundo. Suministro e


Instal.
109
4,515
14,233

und

436,973.10

Herramienta Menor 5% M.O. BB

Eqp

HR

0.2667

808.00

215.49

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Control de nivel para pozo profundo

Ins

und

1.0000

432,448.00

432,448.00

2,486 Manometro de glicerina =2". Suministro e Instal.

und

110,671.58

Herramienta Menor 5% M.O. BB

Eqp

HR

1.1429

808.00

923.46

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,020

Cinta teflon

Ins

rl

0.8000

1,000.00

800.00

14,234

Manometro =2" de glicerina

Ins

und

1.0000

90,480.00

90,480.00

109
4,515

2,491 Caja de inspeccin de .30 X .30 x 1 m, pagado por


un.

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

2,197

Repisa Ordinario 3 m

Ins

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

3,684

Agua para obra

Ins

3,797

Puntilla con cabeza 2"

Ins

lb

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

5,053
5,143

17
804

557,380.64

2.1053

1,469.00

3,092.69

35.0000

383.34

13,416.90

0.0100

3,903.00

39.03

70.0000

305.00

21,350.00

0.0500

1,500.00

75.00

2.4000

2,422.00

5,812.80

18.0000

10.00

180.00

0.1200

1,990.00

238.80

0.0500

13,800.00

690.00

Ins

2.1053

14,690.00

30,926.86

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0600

333,142.66

19,988.56

Transporte de materiales m

Ana

10.0000

46,157.00

461,570.00

2,492 Capacete de 3/4" Galvanizado

und

3,406.23

3,225

Capacete de 3/4" galvanizado

Ins

und

1.0000

2,030.00

2,030.00

5,107

Cuadrilla AA (Electrica)

Ins

0.0909

15,140.00

1,376.23

2,493 Capacete de 1" Galvanizado

und

3,696.23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

123

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,226

Capacete de 1"galvanizado

Ins

und

5,107

Cuadrilla AA (Electrica)

Ins

2,494 Canaleta Parshal w:3". en A.C revestida en PRFV.


Suministro e Instal.
55
4,515
14,240

Cantidad

Vr.Unitario

Vr.Total

1.0000

2,320.00

2,320.00

0.0909

15,140.00

1,376.23

und

4,389,905.50

Herramienta Menor 10% M.O. BB

Eqp

HR

6.5000

1,616.00

10,504.00

Cuadrilla BB (Instalaciones)

Ins

6.5000

16,159.00

105,033.50

Canaleta Parshall w:3". en A.C revestida en PRFV.

Ins

und

1.0000

4,274,368.00

4,274,368.00

2,504 Tuberia de agua Galvanizada =2 1/2" Suministro e


Instal.

38,330.65

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0833

1,616.00

134.61

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0833

16,159.00

1,346.04

14,292

Union Galvanizada = 2 1/2"

Ins

und

0.1667

9,976.00

1,663.00

14,983

Tubo de agua Galvanizado =2 1/2"

Ins

1.0000

35,187.00

35,187.00

55

2,505 Colector red drenaje de aire acondicionado en


tuberia PVC =3/4"

9,457.02

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3333

1,616.00

538.61

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

879.18

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,995

Tubo presin RDE 21 PVC 3/4 "

Ins

1.0300

1,873.00

1,929.19

15,022

Codo 90 presion PVC 3/4"

Ins

und

0.5000

601.00

300.50

55

2,506 Tee en A.C. SCH 40 =16"

und

48

Herramienta menor 10% M.O. ASA-3

Eqp

75

3,760,679.50

HR

6.0000

3,226.00

19,356.00

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

2.0000

3,330.00

6,660.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.5000

6,856.00

10,284.00

8,177

Tee en A.C. SCH 40 =16"

Ins

und

1.0000

3,520,600.00

3,520,600.00

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

6.0000

32,262.00

193,572.00

14,752

2,511 Brida Slip On =16" en A.C. 150 Psi

und

1,048,400.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

8,188

Brida Slip On =16" en A.C. 150 Psi

Ins

und

1.0000

648,440.00

648,440.00

Conjunto brida =16"

Ins

und

1.0000

328,860.00

328,860.00

55

14,254

2,700 Empedrado para caminos de herradura (piedra


rajon colocada) e = 0.15 m

19,321.71

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2900

1,469.00

Material de prestamo (tierra-arena-arcilla-limo)

Ins

0.0150

1,250.00

18.75

1,572

Tabla burra ordinaria 0.10

Ins

2.0000

1,200.00

2,400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2900

14,690.00

4,260.10

5,063

Piedra rajon o media zonga

Ana

0.1350

90,495.15

12,216.85

17
858

2,701 Tratamiento superficial doble TSD

426.01

12,021.30

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

124

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total
893.75

Camion Irrigador

Eqp

HR

0.0143

62,500.00

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

0.0143

3,632.00

51.94

24

Compactador Neumatico

Eqp

HR

0.0143

120,900.00

1,728.87

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0071

35,000.00

248.50

Esparcidora de agregado

Eqp

HR

0.0143

51,700.00

739.31

Arena lavada de rio

Ins

0.0035

13,800.00

48.30

13,851

Emulsion asfaltica CRL-1 o CRR-1

Ins

gal

1.6700

4,000.00

6,680.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.0240

46,304.00

1,111.30

13,962

Cuadrilla AA-5

Ins

0.0143

36,317.00

519.33

101
4,426

2,703 Reparcheo con mezcla asfaltica, por m3

517,434.04

41

Vibrocompactador tipo rana

Eqp

HR

1.5385

5,000.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

1.5385

3,091.00

4,755.50

13,849

Mezcla asfaltica MDC-2

Ins

1.3000

351,870.00

457,431.00

13,960

Cuadrilla AA-4

Ins

1.5385

30,910.00

47,555.04

2,704 Sello de arena - asfalto

7,692.50

1,656.31

Camion Irrigador

Eqp

HR

0.0038

62,500.00

237.50

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0038

35,000.00

133.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0038

3,091.00

11.75

Arena lavada de rio

Ins

0.0070

13,800.00

96.60

13,851

Emulsion asfaltica CRL-1 o CRR-1

Ins

gal

0.2650

4,000.00

1,060.00

13,960

Cuadrilla AA-4

Ins

0.0038

30,910.00

117.46

4,426

2,705 Reparcheo (Incluye: Sub-base e = 0.20 m, base e =


0.15 m, y mezcla asfaltica e = 0.08 m)

58,310.44

41

Vibrocompactador tipo rana

Eqp

HR

0.2841

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2841

3,091.00

878.15

Sub base triturada T. max. 2"

Ins

0.2400

31,048.00

7,451.52

13,849

Mezcla asfaltica MDC-2

Ins

0.0960

351,870.00

33,779.52

13,960

Cuadrilla AA-4

Ins

0.2841

30,910.00

8,781.53

14,777

Base Triturada T.max 1 1/2"

Ins

0.1800

33,329.00

5,999.22

8,154

2,706 Viga o Riel H WF 10 x 33 L=6.00 M

5,000.00

und

1,420.50

1,226,866.76

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

Lamina HR de 1/2"

Ana

0.8200

346,442.39

284,082.76

13,912

Viga o Riel H WF 10" x 33" Lb/Pie 6,0 m

Ins

und

1.0000

907,296.00

907,296.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

48
4,928

2,726 Instalacin elctrica unidad sanitaria mediana tipo


Departamento de Casanare
16,495

Instalacin elctrica unidad sanitaria tipo

glb

Ins

2,750 Columna en concreto de resistencia 3000 psi de


12-15 m

glb

4,342,973.90

1.0000

4,342,973.90

4,342,973.90

840,070.48

17

Herramienta Menor 10% M.O. AA

Eqp

HR

26.0000

1,469.00

38,194.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

80

Pluma grua o Malacate

Eqp

HR

0.5833

8,750.00

5,103.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

125

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,197

Repisa Ordinario 3 m

Ins

3,797

Puntilla con cabeza 2"

Ins

7.2600

1,500.00

10,890.00

lb

3.0000

1,990.00

4,489

Cuadrilla AA (Albaileria)

5,970.00

Ins

4,867

26.0000

14,690.00

381,940.00

Paral telescopico 2 a 4 ml

Ins

54.0000

340.00

5,053

18,360.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0500

333,142.66

349,799.79

13,641

Seccin de Andamio

Ins

mes

0.8000

17,120.00

13,696.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

2,751 Tornillo 5/16" x 6" G-2, R.O. con T.A.

und

4,593.20

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2000

1,763.00

352.60

Cuadrilla DD (Carpinteria)

Ins

0.2000

17,628.00

3,525.60

14,738

Tuerca =5/16" G-2 (arandela)

Ins

und

1.0000

115.00

115.00

15,986

Tornillo = 5/16" x 6" G-2 para Madera

Ins

und

1.0000

600.00

600.00

56
5,064

2,752 Columna en concreto de resistencia 3000 psi de


15-18 m

880,622.23

17

Herramienta Menor 10% M.O. AA

Eqp

HR

28.0000

1,469.00

41,132.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

80

Pluma grua o Malacate

Eqp

HR

0.6667

8,750.00

5,833.63

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

28.0000

14,690.00

411,320.00

4,867

Paral telescopico 2 a 4 ml

Ins

66.0000

340.00

22,440.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0500

333,142.66

349,799.79

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

2,761 Brida Slip On =22" en A.C. 150 Psi

und

1,340,868.00

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

12,928.00

1,370

Brida Slip On =22" en A.C. 150 Psi

Ins

und

1.0000

1,198,668.00

1,198,668.00

4,515

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

55

2,766 Tuberia en A.C. SCH 40 con costura =22"

und

2,934,272.70

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

12.0000

3,226.00

38,712.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

2.0000

3,330.00

6,660.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.7000

6,805.00

11,568.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.7000

6,856.00

11,655.20

8,219

Tuberia en A.C. =22" SCH 40 con costura

Ins

und

1.0000

2,478,533.00

2,478,533.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

12.0000

32,262.00

387,144.00

2,768 Valvula de Mariposa en A.I. =22", incluido


reductor de maniobra

und

21,553,481.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

2,841

Valvula de Mariposa en A.I. = 22"

Ins

und

1.0000

20,968,933.00

20,968,933.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

8,221

Empaquetadura para valvula =22"

Ins

und

2.0000

130,000.00

260,000.00

8,222

Tornillo = 1 1/2" x 8" R.O con W.T.A

Ins

und

16.0000

6,953.00

111,248.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

126

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,772 Puerta en madera maciza 1.50 x 2.10 m. Pintada e


instalada

Cantidad

Vr.Unitario

und

Vr.Total
603,203.38

56

Herramienta Menor 10% M.O. DD

Eqp

HR

16.0000

1,763.00

28,208.00

68

Equipo Pintura

Eqp

HR

1.5000

2,200.00

3,300.00

1,361

Tablero y Marco en madera puerta 1.5x2.1

Ins

und

1.0000

262,000.00

262,000.00

1,505

Bisagra comn 3``

Ins

und

6.0000

674.00

4,044.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1.5000

1,691.00

2,536.50

1,807

Puntilla sin cabeza 1"

Ins

lb

0.2000

2,480.00

496.00

2,933

Pegante colbn

Ins

kg

0.1500

9,500.00

1,425.00

5,064

Cuadrilla DD (Carpinteria)

Ins

16.0000

17,628.00

282,048.00

8,223

Laca brillante para madera

Ins

gal

0.2500

52,981.00

13,245.25

8,230

Sellador lijable para madera

Ins

gal

0.1250

47,205.00

5,900.63

2,774 Lineas de trafico de ancho 0.10 m, demarcacion


sotano

2,746.83

Herramienta menor 10% M.O. CC

Eqp

HR

0.0714

1,689.00

1,863

Brocha de Cerda 4"

Ins

und

0.0100

10,000.00

100.00

5,066

Cuadrilla CC (Pintura)

Ins

0.0714

16,893.00

1,206.16

8,187

Pintura trafico acrlica de demarcacin

Ins

gal

0.0167

79,047.00

1,320.08

61

2,778 Codo Galvanizado 45 de 1". Suministro e Instal.

und

120.59

3,595.36

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0800

808.00

64.64

3,301

Codo H.G. 45 1"

Ins

und

1.0000

2,088.00

2,088.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

Cinta teflon

Ins

rl

0.1500

1,000.00

150.00

109

14,020

2,827 Pedraplen, incluye colocacion y compactacion


mecanica (Sin acarreo)

22,479.15

Compactador Vibratorio

Eqp

HR

0.0222

100,000.00

2,220.00

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0222

111,550.00

2,476.41

Ayudante de construccion

Ins

0.0222

5,407.00

120.04

Piedra comun o bolo

Ins

1.1000

16,057.00

17,662.70

8,145
13,966

2,861 Instalacion hoja puerta, pagado m2

17,739.90

Herramienta Menor 10% M.O. DD

Eqp

HR

0.9000

3,789

Tornillo para madera 2" No. 9

Ins

und

9.0000

32.00

288.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.9000

17,628.00

15,865.20

56

2,863 Rejilla para sumidero 0.50 x 0.80 en platina de 1/4 x


2" y 3/16"x 2". Instalada

1,763.00

und

1,586.70

244,057.70

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

3.5000

8,750.00

30,625.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

44

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

Soldador

Ins

5.0000

6,759.00

33,795.00

2,457

Platina 1/4" x 2"

Ins

3.0000

6,649.00

19,947.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

3,838

Esmalte mate supersinttico

Ins

gal

0.1000

50,506.00

5,050.60

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

519

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

127

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Bisagra redonda 3/8"

Ins

und

3.0000

928.00

2,784.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5000

6,200.00

3,100.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

3.0000

5,800.00

17,400.00

15,618

Platina 3/16" x 2"

Ins

8.1000

6,723.00

54,456.30

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

2.6000

13,493.00

35,081.80

8,234

2,868 Pendolon en Varilla de 1/4", suministro e Instal.

3,608.10

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0700

1,616.00

113.12

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.0300

2,295.00

2,363.85

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0700

16,159.00

1,131.13

55

2,873 Sumidero lateral en Concreto 3000 Psi 1.10 x 0.80


m con rejilla en platina 1/4" x 2"

und

886,532.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

17.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.4500

4,375.00

1,968.75

2,863

Rejilla para sumidero 0.50 x 0.80 en platina de 1/4 x 2" y


3/16"x 2". Instalada

Ana

und

1.0000

244,057.70

244,057.70

4,489

Cuadrilla AA (Albaileria)

Ins

17.0000

14,690.00

249,730.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.7800

333,142.66

259,851.27

5,061

Formaleta (1 uso)

Ana

1.2300

32,375.50

39,821.87

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

21.5000

3,075.79

66,129.49

2,876 Pasamuro en PRFV = 10" E.B. x E.B. L= 0.8 m


(Suministro e instal. con tornilleria y empaques)

und

24,973.00

784,900.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

3,691

Pasamuro =10" E.B. x E.B. L=0.8 m en PRFV

Ins

und

1.0000

713,800.00

713,800.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

55

2,917 Excavacion mecanica en material comun hasta 3 m


14

Retroexcavadora de orugas

m
Eqp

2,977 Brida PVC =6". Suministro e instal.

HR

3,604.00

0.0250

144,160.00

und

3,604.00

167,959.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7500

1,616.00

1,212.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7500

16,159.00

12,119.25

8,249

Brida en PVC =6"

Ins

und

1.0000

75,748.00

75,748.00

8,254

Conjunto brida =6"

Ins

und

1.0000

78,880.00

78,880.00

55

2,978 Pasamuro en PRFV = 6" E.L. x E.B. L= 1.0 m


(Suministro e instal. con tornilleria y empaques)

und

273,679.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Pasamuro =6" E.L. x E.B. L=1.0 m en PRFV

Ins

und

1.0000

249,980.00

249,980.00

55

13,708

2,979 Pasamuro en PRFV = 6" E.B. x E.B. con Codo


90 para rebose de sobredenantes (Suministro e
instal. con torni. y emp.)

und

350,780.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

128

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

Pasamuro en PRFV = 6" E.B. x E.B. con Codo 90

Ins

und

1.0000

303,380.00

303,380.00

55

13,709

2,980 Valvula compuerta elastica vastago no ascendente


=12" E.B. Suministro e instal.
55
4,515
16,167

und

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

Valv. comp. elast. vast. n.asc. ext. brida 12"

Ins

und

1.0000

3,610,500.00

3,610,500.00

2,981 Valvula compuerta sello de bronce vastago no


ascendente =6", E.B. Suministro e instal.
55
4,515
16,152

3,734,925.00

und

1,729,900.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. vast. n.a (s. bronce) e. brida 6"

Ins

und

1.0000

1,658,800.00

1,658,800.00

2,982 Canaleta en PRFV de 0.25 x 0.25 m y con


soporteria. Suministro e instal.

310,463.70

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

Canaleta de 0.25 x 0.25 m en PRFV y con soporteria

Ins

1.0000

304,000.00

304,000.00

55

13,710

2,983 Camara de cloracion en PRFV de 1.0 x 1.0 x 8.0 m.


Suministro e instal.

und

7,106,463.70

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

5,144

Transporte de materiales Tn

Ana

0.2400

0.00

0.00

Camara de cloracion PRFV 1 x 1 x 8.0 m

Ins

und

1.0000

7,100,000.00

7,100,000.00

55

12,136

3,001 Graniplast sobre paete en fachada, pagado m2

11,732.00

Herramienta menor 5% M.O. AA

Eqp

HR

0.4000

735.00

294.00

2,489

Graniplast color

Ins

1.0300

5,400.00

5,562.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

19

3,002 Puerta en Vidrio templado 10 mm, 2.10 x 2.00 m


con zocalo, chapa e Instalada.

und

2,683,910.00

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

8,080.00

5,064

Cuadrilla DD (Carpinteria)

Ins

5.0000

17,628.00

88,140.00

8,152

Puerta Vidrio Templado 10 mm 2,10 x 2,0

Ins

und

1.0000

2,587,690.00

2,587,690.00

55

3,003 Zona verde y plantas ornamentales, pagado por M2

31,607.86

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

Tierra Negra abonada

Ins

0.1000

34,000.00

3,400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,143

Transporte de materiales m

Ana

0.0800

46,157.00

3,692.56

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

17
223

1,028.30

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

129

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,901

Plantas ornamentales

Ins

15,902

Grama en cesped

Ins

3,007 Compuerta rectangular deslizante en PRFV de 0.25


x 0.25 m con volante. Suministro e Instal.
55
4,515
13,713

Cantidad

Vr.Unitario

Vr.Total

0.5000

22,000.00

11,000.00

0.5000

4,408.00

2,204.00

und

1,748,425.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

Compuerta desliz. PRFV 0.25 x 0.25

Ins

und

1.0000

1,624,000.00

1,624,000.00

3,012 Codo Galvanizado 45 de 1 1/2". Suministro e


Instal.

und

5,849.36

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0800

808.00

64.64

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

13,858

Codo H.G. 45 1 1/2"

Ins

und

1.0000

4,292.00

4,292.00

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

109
4,515

3,013 Codo Galvanizado 45 de 2". Suministro e Instal.

und

9,263.36

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0800

808.00

64.64

3,313

Codo H.G. 45 2"

Ins

und

1.0000

7,656.00

7,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

109

14,020

3,016 Excavacion mecanica en material comun hasta 4 m


(oruga)
14

Retroexcavadora de orugas

Eqp

3,024 Union Universal PVC =1/2". Suministro e Instal.

HR

4,122.98

0.0286

144,160.00

und

4,122.98

3,040.35

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0500

808.00

40.40

Cuadrilla BB (Instalaciones)

Ins

0.0500

16,159.00

807.95

14,020

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

15,066

Universal presin PVC 1/2"

Ins

und

1.0000

2,092.00

2,092.00

109
4,515

3,027 Sardinel Prefabricado Modulo A - 10 (0.5 x 0.80 x


0.20)

35,540.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0015

276,302.97

414.45

4,426

Arena lavada de rio

Ins

0.0120

13,800.00

165.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,143

Transporte de materiales m

Ana

0.0120

46,157.00

553.88

5,144

Transporte de materiales Tn

Ana

0.1875

0.00

0.00

8,161

Sardinel Prefabricado Modulo A-10

Ins

und

1.2500

24,940.00

31,175.00

17

3,028 Codo Galvanizado 45 de 2 1/2". Suministro e


Instal.

und

18,109.36

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0800

808.00

64.64

3,299

Codo H.G. 45 2 1/2"

Ins

und

1.0000

16,472.00

16,472.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

Cinta teflon

Ins

rl

0.2800

1,000.00

280.00

109

14,020

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

130

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,052 Replanteo General, medido en m2

Cantidad

Vr.Unitario

Vr.Total

3,867.67

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2250

1,469.00

330.53

3,804

Puntilla con cabeza 1"

Ins

lb

0.0100

2,480.00

24.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.2250

14,690.00

3,305.25

Durmiente ordinario 3 M

Ins

0.2700

767.00

207.09

17

13,326

3,090 Malla electrosoldada Q-5 o Tipo ME-1, pagado por


m2

9,564.39

Herramienta menor 5% M.O. AA

Eqp

HR

0.0535

735.00

39.32

4,489

Cuadrilla AA (Albaileria)

Ins

0.0535

14,690.00

785.92

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

1.0500

8,323.00

8,739.15

19

14,779

3,091 Malla electrosoldada Q-6, pagado por m2

11,799.98

Herramienta menor 5% M.O. AA

Eqp

HR

0.0630

735.00

46.31

4,489

Cuadrilla AA (Albaileria)

Ins

0.0630

14,690.00

925.47

5,144

Transporte de materiales Tn

Ana

0.0035

0.00

0.00

Malla Electrosoldada Q-6 o M-221 (2.35 x 6 m)

Ins

und

0.0709

152,725.00

10,828.20

19

16,079

3,123 Salida toma RJ-45 X Jack Cat. 5E amp

und

40,752.12

357

Cable UTP categora 5/4 pares

Ins

6.0000

1,127.00

6,762.00

373

Toma Jack RJ45-110 Jack Cat. 5E AMP

Ins

und

1.0000

10,987.00

10,987.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,586

Adaptador caja conduit 1/2 "

Ins

und

2.0000

269.00

538.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3365

16,159.00

21,596.50

3,137 Malla electrosoldada Q-8, pagado por m2

13,510.73

Herramienta menor 5% M.O. AA

Eqp

HR

0.0630

735.00

46.31

4,489

Cuadrilla AA (Albaileria)

Ins

0.0630

14,690.00

925.47

5,144

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

Malla Electrosoldada Q-8 o M-378 (2.35 x 6 m)

Ins

und

0.0709

176,854.00

12,538.95

19

13,904

3,138 Banca modular en concreto M-40, pagado por UN


8,138

Banca en concreto modular tipo IDU M-40

und
Ins

3,151 Bafles en PRFV de 0.80 x 0.90 m. Suministro e


Instal.

und

82,000.00

1.0000

82,000.00

und

82,000.00

376,087.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

5,144

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

8,184

Bafles en PRFV de 0.80 x 0.90

Ins

und

1.0000

349,425.00

349,425.00

55

3,175 Placa de soporte en PRFV =4.1 m, e=0.015 m.


Suministro e Instal.

und

8,463,300.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

131

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

5,144

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

Placa de soporte en PRFV =4.1 m, e=0.015 m

Ins

und

1.0000

8,250,000.00

8,250,000.00

55

13,714

3,209 Carcaza tipo Tas en PRFV para filtro percolador


=4.0 m, H=4.7 m. Suministro e Instal.

und

35,036,000.00

Herramienta Menor 10% M.O. BB

Eqp

HR

40.0000

1,616.00

64,640.00

4,373

Carcaza tipo Tas en PRFV para filtro percolador

Ins

und

1.0000

34,325,000.00

34,325,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

40.0000

16,159.00

646,360.00

5,144

Transporte de materiales Tn

Ana

3.0000

0.00

0.00

55

3,210 Codo PRFV 90 =10" E.L x E.B. Incluye: accesorio


de conexion espigo bridado. Suministro e Instal.

und

690,513.30

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,715

Codo PRFV 90 =10" E.L x E.B. con acce. conex.

Ins

und

1.0000

654,225.00

654,225.00

14,118

Lubricante 500 gr

Ins

und

0.0600

12,305.00

738.30

55

3,223 Carcaza en PRFV espesador de lodos =2.5 m,


H=1.1 m, Incluye perfiles para soporte laminas y
acce. Suministro e Instal.

und

5,803,800.00

Herramienta Menor 10% M.O. BB

Eqp

HR

32.0000

1,616.00

51,712.00

4,515

Cuadrilla BB (Instalaciones)

Ins

32.0000

16,159.00

517,088.00

5,144

Transporte de materiales Tn

Ana

1.4000

0.00

0.00

8,191

Carcaza en PRFV espesador de lodos =2.5 m, H=1.1

Ins

und

1.0000

5,235,000.00

5,235,000.00

55

3,228 Pozo septico asbesto cemento, pagado por unidad

und

562,277.00

Herramienta Menor 10% M.O. AA

Eqp

HR

3.0000

1,469.00

4,407.00

4,489

Cuadrilla AA (Albaileria)

Ins

3.0000

14,690.00

44,070.00

5,144

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

14,759

Recebo comun

Ins

0.1000

10,000.00

1,000.00

16,082

Tanque sptico asbesto cemento

Ins

und

1.0000

512,800.00

512,800.00

17

3,235 Modulo de sedimentacion acelerada tipo Tas


H=1.05 m en ABS

695,085.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Modulo de sedimentacion acelerada tipo Tas H=1.05

Ins

1.0000

641,760.00

641,760.00

55

13,716

3,236 Excavacion mecanica en Material Conglomerado


Bajo agua hasta 14 m

20,359.55

14

Retroexcavadora de orugas

Eqp

HR

0.0667

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0667

1,469.00

97.98

58

Motobomba de 4" o 6"

Eqp

HR

0.8333

11,600.00

9,666.28

Cuadrilla AA (Albaileria)

Ins

0.0667

14,690.00

979.82

4,489

9,615.47

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

132

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,240 Baranda en viga IPE 120 y tubo HG 2 1/2" - 1 1/2".


Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total
112,756.76

42

Motosoldador Diesel

Eqp

HR

0.1000

14,833.00

1,483.30

43

Equipo de Oxicorte

Eqp

HR

0.1700

5,000.00

850.00

44

Pulidora electrica manual

Eqp

HR

0.0500

4,350.00

217.50

45

Cilindro

Eqp

HR

0.1700

41.00

6.97

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5926

3,226.00

1,911.73

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1786

6,805.00

1,215.37

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

3,312

Tubo cerramiento Galvanizado =1 1/2" e=0.075"

Ins

4.0000

11,245.00

44,980.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0800

42,950.00

3,436.00

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

13,717

Viga IPE A-36 120 x 6 m

Ins

0.3140

36,916.00

11,591.62

13,718

Tornillo = 1/2 x 1 1/2" G-8 con T. A. R.O

Ins

und

1.1900

1,155.00

1,374.45

14,742

Lamina HR 1/4"

Ins

0.0130

125,317.09

1,629.12

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.5926

32,262.00

19,118.46

14,956

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

1.0000

18,700.00

18,700.00

3,241 Relleno plastico tipo biopack tas color verde lima


y/o verde mar, para filtro percolador. Suministro e
Instal.

457,437.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

Relleno plastico tipo biopack tas color verde lima

Ins

1.0000

413,000.00

413,000.00

55

13,719

3,242 Distribuidor superior con moto reductor y tanque


de carga. Suministro e Instal.

und

10,187,222.00

Herramienta Menor 10% M.O. BB

Eqp

HR

72.0000

1,616.00

116,352.00

4,515

Cuadrilla BB (Instalaciones)

Ins

72.0000

16,159.00

1,163,448.00

5,144

Transporte de materiales Tn

Ana

3.0000

0.00

0.00

Distribuidor superior con moto reductor y tanque

Ins

und

1.0000

8,907,422.00

8,907,422.00

55

13,720

3,243 Electrobomba sumergible tipo lapicero 5 HP. 220 V.


60 HZ. 2" de salida, bomba acero inoxidable.
Suministro e Instal.
55
4,515
13,914

und

Herramienta Menor 10% M.O. BB

Eqp

HR

10.0000

1,616.00

16,160.00

Cuadrilla BB (Instalaciones)

Ins

10.0000

16,159.00

161,590.00

Electrobomba sumerg. 5 HP, 220 V =2", Q=75 gpm

Ins

und

1.0000

4,145,889.00

4,145,889.00

3,245 Registro de corte = 4". Suministro e Instal.


55
4,515
13,918

4,323,639.00

und

545,968.79

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Registro de corte = 4"

Ins

und

1.0000

522,000.00

522,000.00

3,254 Lavado y desinfeccion de placa - muros para


tanque elevado.

2,653.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

133

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 10% M.O. Ayudante (A)

Eqp

3,684

Agua para obra

Ins

8,200

Hipoclorito de Calcio x 45 Kg

Ins

bt

Ayudante (A)

Ins

106

14,703

3,266 Collar de derivacion RDE 21 PVC 8" x 2".


Suministro e Instal.

HR

Cantidad

Vr.Unitario

Vr.Total

0.5000

468.00

234.00

6.0000

10.00

60.00

0.0020

10,500.00

21.00

0.5000

4,677.00

2,338.50

und

271,465.37

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2286

1,616.00

369.42

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

13,724

Collar de derivacion RDE 21 PVC 8" x 2"

Ins

und

1.0000

267,102.00

267,102.00

14,020

Cinta teflon

Ins

rl

0.3000

1,000.00

300.00

55
4,515

3,268 Polarizacion de vidrios en ventanas

15,616.70

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1000

808.00

80.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

8,202

Papel para polarizar

Ins

1.0000

13,920.00

13,920.00

109

3,294 Sub base granular clasificada mezclada en via con


Base triturada en dosificacion de 70% Sub base 30% Base triturada.

49,134.74

Compactador Vibratorio

Eqp

HR

0.0667

100,000.00

6,670.00

Motoniveladora

Eqp

HR

0.0667

132,800.00

8,857.76

Carrotanque de Agua

Eqp

HR

0.0667

53,125.00

3,543.44

Sub-base granular seleccionada o clasificada

Ins

0.9100

18,753.00

17,065.23

Base Triturada T.max 1 1/2"

Ins

0.3900

33,329.00

12,998.31

11
769
14,777

3,324 Compuerta circular =2" Vastago ascendente


L=1.7 m. Suministro e instal.

und

2,016,437.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

8,204

Compuerta circular =2" Vastago ascendente L=1.7 m

Ins

und

1.0000

1,972,000.00

1,972,000.00

55

3,325 Compuerta circular =2" Vastago ascendente


L=1.28 m. Suministro e instal.

1,616.00

und

4,040.00

1,900,437.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

8,205

Compuerta circular =2" Vastago ascendente L=1.28

Ins

und

1.0000

1,856,000.00

1,856,000.00

55

3,328 Compuerta circular =2" Vastago ascendente


L=1.38 m. Suministro e Instal.

und

1,958,437.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

3,113

Compuerta circular =2" Vastago ascendente L=1.38

Ins

und

1.0000

1,914,000.00

1,914,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

55

3,330 Recubrimiento epoxico de alta resistencia quimica,


sin solventes ( 2 Capas )
61

Herramienta menor 10% M.O. CC

Eqp

HR

59,369.22

0.1667

1,689.00

281.56

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

134

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,066

Cuadrilla CC (Pintura)

Ins

8,207

Sikaguard-63 N Recubrimiento

Ins

3,426 Conformacion de banca en sabana (Incluye:


perfilar, conformar, cuneteo)
3

Motoniveladora

Cantidad

Vr.Unitario

0.1667

16,893.00

2,816.06

kg

0.6300

89,320.00

56,271.60

km

Eqp

3,428 Seal sencilla ciclo ruta

HR

Vr.Total

730,400.00

5.5000

132,800.00

und

730,400.00

296,351.32

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

Seal sencilla cicloruta

Ins

und

1.0000

266,800.00

266,800.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.0420

76,218.46

3,201.18

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

17
438

3,429 Seal doble de ciclo ruta

und

435,551.32

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

4,489

Cuadrilla AA (Albaileria)

Ins

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

5,144

Transporte de materiales Tn

8,209

Seal doble cicloruta

17

1,469.00

1,469.00

1.0000

14,690.00

14,690.00

0.0320

318,473.24

10,191.14

0.0420

76,218.46

3,201.18

Ana

0.0500

0.00

0.00

Ins

und

1.0000

406,000.00

406,000.00

3,430 Seales preventivas (SP) y reglamentarias (SR) 60


X 60 cm

und

195,641.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0420

22,829.00

958.82

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0180

0.00

0.00

8,210

Seales Preventivas y regla. 60 x 60 cm

Ins

und

1.0000

168,333.00

168,333.00

17
324

3,431 Seales Preventivas (SP) y Reglamentarias (SR) 75


X 75 cm

und

255,641.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0420

22,829.00

958.82

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

8,211

Seales Preventivas y regla. 75 x 75 cm

Ins

und

1.0000

228,333.00

228,333.00

17
324

3,432 Seales preventivas (SP) y reglamentarias (SR) 90


X 90 cm

und

1,469.00

272,308.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0420

22,829.00

958.82

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

8,212

Seales Preventivas y regla. 90 x 90 cm

Ins

und

1.0000

245,000.00

245,000.00

17
324

1,469.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

135

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,463 Cable IPS - IWRC 6 x 19 AA = 3/16"

Cantidad

Vr.Unitario

Vr.Total

3,717.36

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0400

3,091.00

123.64

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0400

2,958.00

118.32

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0400

30,910.00

1,236.40

15,955

Cable IPS-IWRC 6 x 19 AA = 3/16"

Ins

1.0000

2,239.00

2,239.00

5,144

3,473 Cable IPS - IWRC 6 x 19 AA = 1/4"

4,192.36

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0400

3,091.00

123.64

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0400

2,958.00

118.32

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0400

30,910.00

1,236.40

15,956

Cable IPS-IWRC 6 x 19 AA = 1/4"

Ins

1.0000

2,714.00

2,714.00

5,144

3,474 Cable IPS - IWRC 6 x 19 AA = 5/16"

5,283.36

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0400

3,091.00

123.64

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0400

2,958.00

118.32

Transporte de materiales Tn

Ana

0.0003

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0400

30,910.00

1,236.40

15,957

Cable IPS-IWRC 6 x 19 AA = 5/16"

Ins

1.0000

3,805.00

3,805.00

5,144

3,478 Cable IPS - IWRC 6 x 19 AA = 1 1/2"

63,373.80

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2000

3,091.00

618.20

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.2000

2,958.00

591.60

Transporte de materiales Tn

Ana

0.0062

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.2000

30,910.00

6,182.00

15,966

Cable IPS-IWRC 6 x 19 AA = 1 1/2"

Ins

1.0000

55,982.00

55,982.00

5,144

3,479 Cable IPS - IWRC 6 x 19 AA = 1 3/4 "

85,695.75

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2500

3,091.00

772.75

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.2500

2,958.00

739.50

Transporte de materiales Tn

Ana

0.0084

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.2500

30,910.00

7,727.50

15,968

Cable IPS-IWRC 6 x 19 AA = 1 3/4"

Ins

1.0000

76,456.00

76,456.00

5,144

3,480 Terraplen con material crudo de rio Seleccionado


(zaranda) T.max. 4"

28,173.13

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

Crudo de rio clasificado T.m. 4"

Ins

1.2500

16,820.00

21,025.00

11
14,170

3,482 Cable IPS - IWRC 6 x 19 AA = 1 1/8 "

33,737.08

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1200

3,091.00

370.92

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1200

2,958.00

354.96

Transporte de materiales Tn

Ana

0.0035

0.00

0.00

5,144

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

136

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,960

Cuadrilla AA-4

Ins

15,963

Cable IPS-IWRC 6 x 19 AA = 1 1/8"

Ins

3,493 Macromedidor mecanico de turbina =3".


Suministro e Instal.
55
778

Cantidad

Vr.Unitario

Vr.Total

0.1200

30,910.00

3,709.20

1.0000

29,302.00

29,302.00

und

1,815,198.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Macromedidor mecanico de turbina 3"

Ins

und

1.0000

1,750,440.00

1,750,440.00
32,318.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

14,020

Cinta teflon

Ins

rl

2.0000

1,000.00

2,000.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

4,515

3,494 Izada de Vigas para Puentes 26 m - 50 m


62
14,944

781,596.40

Grua Telescopica

Eqp

HR

1.3000

579,600.00

753,480.00

Cuadrilla Ay-4

Ins

1.3000

21,628.00

28,116.40

3,495 Baranda metalica en acero; A-36 y Tubo HG de 4"

109,426.32

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3500

6,856.00

2,399.60

3,308

Tubo cerramiento Galvanizado =4" e=0.128"

Ins

1.0000

45,000.00

45,000.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

14,742

Lamina HR 1/4"

Ins

0.0053

125,317.09

664.18

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.0800

15,662.00

1,252.96

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

15,735

Lamina HR 3/8"

Ins

0.0120

165,592.00

1,987.10

15,780

Lamina HR 3/16"

Ins

0.0700

114,944.00

8,046.08

3,549 Piso o placa en Piedra Pegada e = 0.25 m

59,256.39

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6500

1,469.00

954.85

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0740

248,144.84

18,362.72

4,489

Cuadrilla AA (Albaileria)

Ins

0.6500

14,690.00

9,548.50

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

0.0500

354,419.99

17,721.00

5,063

Piedra rajon o media zonga

Ana

0.1400

90,495.15

12,669.32

17

3,560 Bolsacreto de 1.20 x 2.4 x 0.35 en Concreto 1500


Psi

und

328,206.73

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,056

Concreto 1:3:6 o 1500 Psi (Basico, 5% desperdicio)

Ana

1.0000

288,180.33

288,180.33

Bolsacreto 1101 de 1.20 x 2.40 (1 m3)

Ins

und

1.0000

14,172.00

14,172.00

17

13,923

3,561 Bolsacreto de 1.20 x 2.4 x 0.35 en Concreto 2000


Psi

und

351,256.39

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

137

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

1.0000

311,229.99

311,229.99

Bolsacreto 1101 de 1.20 x 2.40 (1 m3)

Ins

und

1.0000

14,172.00

14,172.00

17

13,923

3,630 Muro en tierra armada con geotextil

54,600.15

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

41

Vibrocompactador tipo rana

Eqp

HR

0.7000

5,000.00

3,500.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

8,224

Geotextil tejido 2100

Ins

8.1500

4,193.00

34,172.95

Material de prstamo (Conglomerado)

Ins

1.0000

4,000.00

4,000.00

15,862

3,698 Reparacion de acometida PF+UAD de 1/2" para


acueducto

1,175.20

7,531.87

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2286

1,616.00

369.42

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

14,791

Tuberia PF+UAD 1/2"

Ins

1.0000

1,429.00

1,429.00

15,346

Union PF+UAD 1/2 "

Ins

und

0.5000

2,598.00

1,299.00

15,664

Adaptador Macho PF+UAD 1/2 "

Ins

und

0.5000

1,481.00

740.50

55
4,515

3,900 Izada de Vigas para Puentes 20 m - 25 m


62
14,944

601,228.00

Grua Telescopica

Eqp

HR

1.0000

579,600.00

579,600.00

Cuadrilla Ay-4

Ins

1.0000

21,628.00

21,628.00

3,904 Relleno en material seleccionado de la excavacon


compactado, pagado m3

16,458.20

41

Vibrocompactador tipo rana

Eqp

HR

0.2994

5,000.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.5333

2,550.00

1,359.92

Cuadrilla AA-3 (Limpieza)

Ins

0.5333

25,504.00

13,601.28

14,749

3,905 Cerramiento en alambre de puas 5 hilos H=2.50,


pagado en ML

1,497.00

13,500.46

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0200

16,458.20

329.16

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

8,146

Poste cerca 10 x 10 cm 210 kg/cm2

Ins

und

0.3500

12,000.00

4,200.00

15,655

Alambre de puas galvanizado Cal. 12

Ins

5.2000

454.00

2,360.80

3,925 Entibado tipo 2 (1/7 utilizaciones), pagada en m2

22,781.81

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7300

1,469.00

1,072.37

3,797

Puntilla con cabeza 2"

Ins

lb

0.0900

1,990.00

179.10

4,489

Cuadrilla AA (Albaileria)

Ins

0.7300

14,690.00

10,723.70

8,186

Viga ordinario 0.2 X 0.1 X 4 M

Ins

0.1400

7,100.00

994.00

8,244

Planchon abarco 0.2 X 0.04 X 3 M

Ins

0.7900

12,000.00

9,480.00

8,245

Madera rolliza eucalipto D=0.15 M

Ins

0.0900

3,696.00

332.64

17

3,945 Muro de gravedad en concreto ciclopeo de 3000


Psi

386,326.69

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

138

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 10% M.O. AA-3

Eqp

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

5,063

Piedra rajon o media zonga

Ana

Cuadrilla AA-3 (Limpieza)

Ins

53

14,749

3,992 Entibado tipo 1 (1/7 utilizaciones), pagado en m2

Cantidad

Vr.Unitario

Vr.Total

HR

4.5000

2,550.00

11,475.00

0.6300

333,142.66

209,879.88

0.3767

32,375.50

12,195.85

0.4200

90,495.15

38,007.96

4.5000

25,504.00

114,768.00

9,549.14

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.0400

1,990.00

79.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

8,186

Viga ordinario 0.2 X 0.1 X 4 M

Ins

0.1400

7,100.00

994.00

8,244

Planchon abarco 0.2 X 0.04 X 3 M

Ins

0.2900

12,000.00

3,480.00

8,245

Madera rolliza eucalipto D=0.15 M

Ins

0.0400

3,696.00

147.84

17

4,110 Valvula de corte 1/2". Suministro e Instal.

und

440.70

29,007.99

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5333

1,616.00

861.81

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0030

58,612.00

175.84

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

8,617.59

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,832

Valvula de corte 1/2"

Ins

und

1.0000

18,548.00

18,548.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

2.0000

260.00

520.00

55

4,127 Concreto Ciclopeo para alcantarillas de resistencia


2500 Psi. o 175 Kg/cm2

381,080.58

Herramienta Menor 10% M.O. AA

Eqp

HR

7.2500

1,469.00

10,650.25

4,489

Cuadrilla AA (Albaileria)

Ins

7.2500

14,690.00

106,502.50

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.6000

318,473.24

191,083.94

5,061

Formaleta (1 uso)

Ana

1.1319

32,375.50

36,645.83

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

4,131 Valvula de Purga = 2". Suministro e Instal.

und

279,948.82

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

13,725

Valvula de Purga 2"

Ins

und

1.0000

256,360.00

256,360.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

55

4,132 Guardacable = 1 1/2" Tipo Pesado. Suministro e


Instal.
19
4,489
16,356

und

Herramienta menor 5% M.O. AA

Eqp

HR

0.6667

735.00

490.02

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

Guardacable de 1 1/2" o Portacable T.P.

Ins

und

1.0000

210,296.00

210,296.00

4,137 Hilada antirrebose en ladrillo tolete, pagada en ml


17

220,579.84

Herramienta Menor 10% M.O. AA

m
Eqp

HR

17,698.61

0.5000

1,469.00

734.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

139

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cemento gris

Ins

kg

10.0000

383.34

3,833.40

2,085

Ladrillo tolete comn

Ins

und

13.0000

305.00

3,965.00

3,684

Agua para obra

Ins

2.2000

10.00

22.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,143

Transporte de materiales m

Ana

0.0300

46,157.00

1,384.71

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

804

4,144 Perro de 1 1/2" Tipo Pesado. Suministro e Instal.


19
4,489
13,726

und

Herramienta menor 5% M.O. AA

Eqp

HR

0.0833

735.00

61.23

Cuadrilla AA (Albaileria)

Ins

0.0833

14,690.00

1,223.68

Perro de 1 1/2 " Tipo pesado.

Ins

und

1.0000

35,814.00

35,814.00

4,146 Manija pomo acrlico ref. prysma cristal


4,515
16,449

37,098.91

und

22,100.67

Cuadrilla BB (Instalaciones)

Ins

0.1300

16,159.00

2,100.67

Pomo grifera lavamanos ref prysma cristal

Ins

und

1.0000

20,000.00

20,000.00

4,197 Bordillo 8 x 15 cm fundido en concreto 2.500 psi,


pagado ml

8,080.04

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1800

1,469.00

264.42

49

Vibrador de concretos

Eqp

HR

0.0600

4,375.00

262.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1800

14,690.00

2,644.20

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0125

318,473.24

3,980.92

4,202 Anclaje en Cable IPS - IWRC 6 x 19 AA = 1 1/2"


para tarabitas

60,895.17

Herramienta menor 5% M.O. AA

Eqp

HR

0.2000

735.00

147.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.8100

2,257.00

1,828.17

Cable IPS-IWRC 6 x 19 AA = 1 1/2"

Ins

1.0000

55,982.00

55,982.00

19

15,966

4,216 Tensor para Cable de = 1 1/2"

und

618,672.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Tensor para Cables

Ins

und

1.0000

615,000.00

615,000.00

13,727

4,220 Canasta para Tarabita (1.70 x 1.00 x 0.94)

und

3,672.50

1,645,884.60

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

3.0000

8,750.00

44

Pulidora electrica manual

Eqp

HR

1.0000

4,350.00

4,350.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

32.0000

3,226.00

103,232.00

68

4,400.00

26,250.00

Equipo Pintura

Eqp

HR

2.0000

2,200.00

1,505

Bisagra comn 3``

Ins

und

3.0000

674.00

2,022.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.5000

29,750.00

14,875.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.5000

42,950.00

21,475.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

39.0000

2,257.00

88,023.00

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

5.6000

5,481.00

30,693.60

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

2.0000

6,885.00

13,770.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

140

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5000

6,200.00

3,100.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

32.0000

32,262.00

1,032,384.00

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

16.2000

13,493.00

218,586.60

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

Ins

1.1000

6,154.00

6,769.40

16,231

Platina 3/16" x 1"

Ins

10.5000

3,362.00

35,301.00

16,362

Tablon de 0.05 x 0.30 x 1

Ins

3.0000

13,551.00

40,653.00

4,224 Valvula de ventosa 8". Camara doble accion


multiple. Suministro e instal.
55
4,515
16,214

Cantidad

Vr.Unitario

und

Vr.Total

5,520,780.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. ventosa (cam. doble) acc. multiple 8" E.B.

Ins

und

1.0000

5,449,680.00

5,449,680.00

4,227 Tee en H.F. 18" x 8" E.B. Suministro e Instal.

und

5,219,840.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

13,731

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

13,732

Tee en H.F. 18" x 8" E.B.

Ins

und

1.0000

5,004,240.00

5,004,240.00

55
4,515

4,228 Niple = 8" en A.C. con E.L x E.B. L=3.00 m.


Suministro e Instal.

und

1,263,018.40

55

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

1.6000

3,330.00

5,328.00

Soldador

Ins

1.6000

6,759.00

10,814.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.5000

6,856.00

3,428.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

8,100

Brida Slip On =8" en A.C. 150 Psi

Ins

und

1.0000

272,600.00

272,600.00

13,917

Tuberia en A.C S/C = 8" SCH 40

Ins

3.0000

307,400.00

922,200.00

519

4,230 Terraplen estabilizado (con aceite naftalenico


estabilizador de arcillas = Geostab) de prestamo
lateral

4,848.00

20,158.16

Compactador Vibratorio

Eqp

HR

0.0370

100,000.00

3,700.00

Motoniveladora

Eqp

HR

0.0370

132,800.00

4,913.60

11

Carrotanque de Agua

Eqp

HR

0.0370

53,125.00

1,965.63

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0370

130,650.00

4,834.05

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0370

16,159.00

597.88

8,252

Geostab

Ins

0.0650

63,800.00

4,147.00

4,232 Bordillo 20 x 20 cm fundido en concreto 4000 psi,


para Puente. pagado ml

26,047.55

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1352

4,375.00

591.50

3,323

Tabla Burra Ordinaria 0.25

Ins

0.6667

4,333.00

2,888.81

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.0400

378,352.56

15,134.10

4,290 Malla electrosoldada Q-10, pagada por m2

675.74

22,703.90

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

141

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta menor 5% M.O. AA

Eqp

HR

0.0720

735.00

52.92

4,489

Cuadrilla AA (Albaileria)

Ins

0.0720

14,690.00

1,057.68

5,144

Transporte de materiales Tn

Ana

0.0090

0.00

0.00

Malla Electrosoldada Q-10 o M-567 (2.35 x 6 m)

Ins

und

0.0709

304,560.00

21,593.30

19

16,078

4,291 Arena para escenarios deportivos. Suministro e


Instal.

69,124.85

Herramienta menor 5% M.O. AA

Eqp

HR

0.4000

735.00

294.00

4,426

Arena lavada de rio

Ins

1.0500

13,800.00

14,490.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,143

Transporte de materiales m

Ana

1.0500

46,157.00

48,464.85

19

4,292 Demolicion cajas de inspeccin prom. 0.60*0.60 m


17
4,489

und

16,159.00

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

4,293 Cerramiento poletileno h=2.00 ml, pagado ml

15,319.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2280

1,469.00

1,870

Alambre Negro No 18

Ins

kg

0.1500

3,903.00

585.45

2,289

Lona plastica para caseton

Ins

2.0000

4,500.00

9,000.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1000

2,480.00

248.00

4,368

Guadua 6 m

Ins

und

0.2200

5,000.00

1,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2280

14,690.00

3,349.32

5,138

Excavacion manual en conglomerado

Ana

0.0200

35,065.03

701.30

17

4,297 Banca en madera tipo IDU M-50

und

334.93

325,262.15

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6500

1,763.00

1,145.95

5,064

Cuadrilla DD (Carpinteria)

Ins

0.6500

17,628.00

11,458.20

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

8,113

Banca en madera tipo IDU M-50

Ins

und

1.0000

280,800.00

280,800.00

15,927

Perno de anclaje 5/8" x 2" grado 8

Ins

und

4.0000

3,100.00

12,400.00

16,222

Platina 1/4" x 1"

Ins

6.0000

3,243.00

19,458.00

56

4,301 Dado para puentes concreto de resistencia 4000


Psi.

550,620.03

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

0.9400

32,375.50

30,432.97

Durmiente - abarco 4mm

Ins

2.0000

3,000.00

6,000.00

14,775

4,302 Relleno con crudo de rio hidrocompactado

8,772.73

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0222

58

Motobomba de 4" o 6"

Eqp

HR

Retroexcavadora de orugas (en Rio)

Eqp

HR

Cuadrilla AA (Albaileria)

Ins

102
4,489

11,752.00

1,469.00

32.61

0.4000

11,600.00

4,640.00

0.0222

170,000.00

3,774.00

0.0222

14,690.00

326.12

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

142

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,303 Montaje e izada de formaleta metalica tipo camisa


para pilotes de 0 - 7.0 m

Cantidad

Vr.Unitario

und

Vr.Total
2,417,095.00

14

Retroexcavadora de orugas

Eqp

HR

16.0000

144,160.00

2,306,560.00

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

5.0000

2,010.00

10,050.00

Cuadrilla AA-2 (Tuberias)

Ins

5.0000

20,097.00

100,485.00

14,669

4,313 Montaje canasta de refuerzo para pilotes,


profundidad 0 - 14 m

und

608,958.00

14

Retroexcavadora de orugas

Eqp

HR

4.0000

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

4,489

4,315 Fabricacion platina de refuerzo 1/2" para viga


principal

576,640.00

130,011.06

42

Motosoldador Diesel

Eqp

HR

1.7300

14,833.00

25,661.09

43

Equipo de Oxicorte

Eqp

HR

0.8700

5,000.00

4,350.00

44

Pulidora electrica manual

Eqp

HR

0.8700

4,350.00

3,784.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.8600

6,805.00

12,657.30

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.6200

6,856.00

4,250.72

5,144

Transporte de materiales Tn

Ana

0.0159

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

96,304.49

33,706.57

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1040

6,200.00

644.80

14,745

Oxigeno Industrial

Ins

0.1730

15,662.00

2,709.53

14,746

Acetileno

Ins

kg

0.0870

41,820.00

3,638.34

14,945

Lamina HR 1/2"

Ins

0.1540

250,702.65

38,608.21

4,322 Geomembrana 40 mils, 1.00 mm HDPE


6
17
814
4,489

18,478.51

Sub-Contrato Instalacion

Esp

23.0000

15,023.18

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0200

1,469.00

29.38

Geomembrana 40 mil 1.00 mm HDPE

Ins

1.0500

14,000.00

14,700.00

Cuadrilla AA (Albaileria)

Ins

0.0200

14,690.00

293.80

4,323 Columna de 0.20 x 0.20 en Concreto resistencia


3000 Psi

3,455.33

25,848.71

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6400

1,469.00

940.16

49

Vibrador de concretos

Eqp

HR

0.0500

4,375.00

218.75

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.2600

188.00

236.88

4,489

Cuadrilla AA (Albaileria)

Ins

0.6400

14,690.00

9,401.60

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

5,061

Formaleta (1 uso)

Ana

0.0533

32,375.50

1,725.61

4,324 Tapa en lamina alfajor 1/4" (0.80 x 0.80 m)

und

358,143.95

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.7500

5,313.00

3,984.75

Soldador

Ins

5.0000

6,759.00

33,795.00

2,475

Angulo o perfil 3" x 3" x 1/4"

Ins

6.5000

20,623.00

134,049.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.1500

29,750.00

4,462.50

519

7,345.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

143

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,489

Cuadrilla AA (Albaileria)

Ins

8,194

Acero de refuerzo 60000 Psi

Ins

5.0000

14,690.00

73,450.00

kg

1.0000

2,257.00

14,116

Soldadura electrosoldada 6013 de 1/8"

2,257.00

Ins

kg

14,744

0.4200

6,885.00

2,891.70

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

14,758

620.00

Lamina alfajor 1/4" (6 mm)

Ins

0.7000

135,505.00

94,853.50

4,325 Fabricacion platina de refuerzo 3/4" para viga


principal

170,271.29

42

Motosoldador Diesel

Eqp

HR

1.7300

14,833.00

25,661.09

43

Equipo de Oxicorte

Eqp

HR

0.8700

5,000.00

4,350.00

44

Pulidora electrica manual

Eqp

HR

0.8700

4,350.00

3,784.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.8600

6,805.00

12,657.30

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.6200

6,856.00

4,250.72

5,144

Transporte de materiales Tn

Ana

0.0220

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

126,126.88

44,144.41

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1040

6,200.00

644.80

14,745

Oxigeno Industrial

Ins

0.1700

15,662.00

2,662.54

14,746

Acetileno

Ins

kg

0.0900

41,820.00

3,763.80

15,782

Lamina HR 3/4"

Ins

0.1540

443,845.00

68,352.13

4,328 Filos y dilataciones 1:4, pagado en ML

4,231.58

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1600

1,469.00

235.04

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0065

248,144.84

1,612.94

4,489

17

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

4,344 Acople, sello y conexin de bajante de latn a.ll. a


red pvc sanitaria (incluye accesorios para
conexin)

und

56,084.27

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

463

Union de bajante amazonas

Ins

und

1.0000

3,205.00

3,205.00

594

Bajante amazonas blanca. Suministro e Instal.

Ana

0.5000

30,017.53

15,008.77

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.1400

20,300.00

2,842.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

15,746

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.0450

46,339.00

2,085.26

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.6700

11,436.00

7,662.12

16,502

Adaptador bajante pvc blanca a alcantarillado

Ins

und

1.0000

6,786.00

6,786.00

4,440 Corona Pozos de Inspeccion, incluye aro y contra


aro.

und

322,085.89

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5000

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

17

4,441 Viga de amarre en concreto para cimentacin de


resistencia 3000 Psi, pagado en m3

1,469.00

3,672.50

2.5000

14,690.00

36,725.00

0.2200

333,142.66

73,291.39

0.1667

32,375.50

5,397.00

und

1.0000

203,000.00

203,000.00

485,092.81

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

144

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

17

Herramienta Menor 10% M.O. AA

Eqp

49

Vibrador de concretos

Eqp

HR

8.1500

1,469.00

11,972.35

HR

0.3200

4,375.00

2,195

Planchon ordinario 3 M

1,400.00

Ins

2,197

3.5200

3,200.00

11,264.00

Repisa Ordinario 3 m

Ins

3.1100

1,500.00

4,665.00

3,797

Puntilla con cabeza 2"

Ins

lb

1.4700

1,990.00

2,925.30

4,489

Cuadrilla AA (Albaileria)

Ins

8.1500

14,690.00

119,723.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

4,442 Fabricacion platina de refuerzo 3/8" para viga


principal

112,253.12

42

Motosoldador Diesel

Eqp

HR

1.7300

14,833.00

25,661.09

43

Equipo de Oxicorte

Eqp

HR

0.8700

5,000.00

4,350.00

44

Pulidora electrica manual

Eqp

HR

0.8700

4,350.00

3,784.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.8600

6,805.00

12,657.30

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.6200

6,856.00

4,250.72

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

83,150.46

29,102.66

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1040

6,200.00

644.80

14,745

Oxigeno Industrial

Ins

0.1700

15,662.00

2,662.54

14,746

Acetileno

Ins

kg

0.0870

41,820.00

3,638.34

15,735

Lamina HR 3/8"

Ins

0.1540

165,592.00

25,501.17

4,452 Fabricacion platina, anclaje estribo - pila 1900 x


400

und

789,398.73

42

Motosoldador Diesel

Eqp

HR

1.0800

14,833.00

16,019.64

43

Equipo de Oxicorte

Eqp

HR

1.5500

5,000.00

7,750.00

44

Pulidora electrica manual

Eqp

HR

1.5500

4,350.00

6,742.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.1600

6,805.00

7,893.80

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3900

6,856.00

2,673.84

5,144

Transporte de materiales Tn

Ana

0.1592

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

584,739.80

204,658.93

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

320.0000

180.00

57,600.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1860

6,200.00

1,153.20

14,745

Oxigeno Industrial

Ins

0.3100

15,662.00

4,855.22

14,746

Acetileno

Ins

kg

0.1550

41,820.00

6,482.10

15,783

Lamina HR 1"

Ins

0.7720

613,432.00

473,569.50

4,459 Muro ladrillo tolete comun 0.245 (24.5 x 12 x 6)

67,212.09

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3000

1,469.00

1,909.70

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0510

248,144.84

12,655.39

2,085

Ladrillo tolete comn

Ins

und

110.0000

305.00

33,550.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.3000

14,690.00

19,097.00

5,144

Transporte de materiales Tn

Ana

0.5500

0.00

0.00

17

4,475 Valvula flotadora control piloto =2". Suministro e


Instal.

und

1,772,772.10

Herramienta Menor 5% M.O. BB

Eqp

HR

1.3333

808.00

1,077.31

3,287

Valvula flotadora control piloto =2".

Ins

und

1.0000

1,750,150.00

1,750,150.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

109

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

145

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,476 Demolicion muro en ladrillo brecha de 0.12*0.25 m


para insercin de columna

Cantidad

Vr.Unitario

Vr.Total
7,009.70

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.0020

55,550.00

111.10

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,480 Fabricacion platina, anclaje estribo - pila 1840 x


400

und

770,139.33

42

Motosoldador Diesel

Eqp

HR

1.0800

14,833.00

16,019.64

43

Equipo de Oxicorte

Eqp

HR

1.5100

5,000.00

7,550.00

44

Pulidora electrica manual

Eqp

HR

1.5100

4,350.00

6,568.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.1600

6,805.00

7,893.80

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3900

6,856.00

2,673.84

5,144

Transporte de materiales Tn

Ana

0.1592

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

570,473.58

199,665.75

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

320.0000

180.00

57,600.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1810

6,200.00

1,122.20

14,745

Oxigeno Industrial

Ins

0.3000

15,662.00

4,698.60

14,746

Acetileno

Ins

kg

0.1500

41,820.00

6,273.00

15,783

Lamina HR 1"

Ins

0.7500

613,432.00

460,074.00

4,482 Fabricacion torre 800 x 800 platina 120 x 9.5

und

69,599,434.71

42

Motosoldador Diesel

Eqp

HR

463.4700

14,833.00

6,874,650.51

43

Equipo de Oxicorte

Eqp

HR

78.5200

5,000.00

392,600.00

44

Pulidora electrica manual

Eqp

HR

78.5200

4,350.00

341,562.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

496.5000

6,805.00

3,378,682.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

165.5000

6,856.00

1,134,668.00

5,144

Transporte de materiales Tn

Ana

15.6420

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

51,555,136.82

18,044,297.89

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

9.4000

6,200.00

58,280.00

14,745

Oxigeno Industrial

Ins

15.7000

15,662.00

245,893.40

14,746

Acetileno

Ins

kg

7.8500

41,820.00

328,287.00

15,735

Lamina HR 3/8"

Ins

13.0240

165,592.00

2,156,670.21

15,782

Lamina HR 3/4"

Ins

82.5600

443,845.00

36,643,843.20

4,500 Demolicion enchape muros

4,519.49

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2625

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0050

55,550.00

277.75

Cuadrilla AA (Albaileria)

Ins

0.2625

14,690.00

3,856.13

4,489

4,501 Desmonte correas en madera, pagado en ml

385.61

3,509.55

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0050

55,550.00

277.75

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

4,489

4,502 Desmonte mesones y pocetas, pagado en m2


17

Herramienta Menor 10% M.O. AA

m
Eqp

HR

293.80

10,515.54

0.5820

1,469.00

854.96

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

146

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
21
4,489

Nombre

Tipo U.M.

Volqueta (6 m3 )

Eqp

Cuadrilla AA (Albaileria)

Ins

4,506 Alistado impermeabilizado 0.04 con sika 1 y juntas


sikaflex-1CSL (incluye 0.45 ml*m2)

Cantidad

Vr.Unitario

Vr.Total

HR

0.0200

55,550.00

1,111.00

0.5820

14,690.00

8,549.58

23,314.36

Cemento gris

Ins

kg

19.0000

383.34

7,283.46

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

14,122

Sika 1 imp. integral

Ins

kg

0.8000

6,438.00

5,150.40

16,406

Sikaflex-1CSL cartucho 300 cc

Ins

und

0.1500

23,200.00

3,480.00

804

4,513 Llave individual para lavamanos cromada sencilla


con manguera para conexin

und

16,714.28

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2400

16,159.00

3,878.16

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

16,452

Llave lavamanos individual cromada incl manguera

Ins

und

1.0000

12,000.00

12,000.00

4,515 Suministro e Instal. Puerta-Ventana en aluminio,


pagado en m2

238,477.50

Herramienta Menor 10% M.O. DD

Eqp

HR

2.5000

1,763.00

4,407.50

1,822

Ventana aluminio fija

Ins

0.5000

110,000.00

55,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

2.5000

17,628.00

44,070.00

Puerta aluminio llena, bisagras, marco e instalaci

Ins

0.5000

270,000.00

135,000.00

56

15,594

4,516 Suministro e instal. cerradura alcoba y oficina,


clsica madera pagado por UN

und

40,286.60

56

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

590

Cerradura alcoba classic madera

Ins

und

1.0000

28,652.00

28,652.00

Cuadrilla DD (Carpinteria)

Ins

0.6000

17,628.00

10,576.80

5,064

4,517 Tee en H.F. 8" x 6" E.L. Suministro e Instal.

und

612,979.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

3,300

Tee en H.F. 8" x 6" E.L.

Ins

und

1.0000

589,280.00

589,280.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

55

4,558 Citofono un botn, pagado por UN


55
4,515
15,860

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2500

1,616.00

2,020.00

Cuadrilla BB (Instalaciones)

Ins

1.2500

16,159.00

20,198.75

Citofono un pulsador

Ins

und

1.0000

33,000.00

33,000.00

4,559 Asiento para sanitario acuacer


109
4,515
16,451

55,218.75

und

35,381.54

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1050

808.00

84.84

Cuadrilla BB (Instalaciones)

Ins

0.1050

16,159.00

1,696.70

Asiento para sanitario acuacer

Ins

und

1.0000

33,600.00

33,600.00

4,560 Mortero 1:8 (desperdicio 5%)

184,036.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

147

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

107.0000

10.00

1,070.00

4,426

Arena lavada de rio

Ins

1.3125

13,800.00

18,112.50

5,143

Transporte de materiales m

Ana

1.3125

46,157.00

60,581.06

5,144

Transporte de materiales Tn

Ana

0.2132

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

4,562 Mortero 1:10 (desperdicio 5%)

Cantidad

Vr.Unitario

4.0000

234.00

936.00

213.1500

383.34

81,708.92

Vr.Total

168,943.72

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

87.0000

10.00

870.00

4,426

Arena lavada de rio

Ins

1.3125

13,800.00

18,112.50

5,143

Transporte de materiales m

Ana

1.3125

46,157.00

60,581.06

5,144

Transporte de materiales Tn

Ana

0.1743

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

73
804

4,563 Mortero 1:12 (desperdicio 5%)

234.00

936.00

383.34

66,816.16

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

8,145

Ayudante de construccion

Ins

73
804

4.0000
174.3000

4,564 Mortero Impermeabilizado 1:2 (desperdicio 5%)

158,751.05

4.0000

234.00

936.00

148.0500

383.34

56,753.49

74.0000

10.00

740.00

1.3125

13,800.00

18,112.50

1.3125

46,157.00

60,581.06

0.1480

0.00

0.00

4.0000

5,407.00

21,628.00

551,059.84

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

656.2500

383.34

251,566.88

3,684

Agua para obra

Ins

328.0000

10.00

3,280.00

4,426

Arena lavada de rio

Ins

1.0185

13,800.00

14,055.30

5,143

Transporte de materiales m

Ana

1.0185

46,157.00

47,010.90

5,144

Transporte de materiales Tn

Ana

0.6560

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

Sika 1 imp. integral

Ins

kg

33.0200

6,438.00

212,582.76

73
804

14,122

4,565 Fabricacion platina, anclaje estribo - pila 400 x 300

und

692,807.73

42

Motosoldador Diesel

Eqp

HR

0.5420

14,833.00

8,039.49

43

Equipo de Oxicorte

Eqp

HR

0.6400

5,000.00

3,200.00

44

Pulidora electrica manual

Eqp

HR

0.6400

4,350.00

2,784.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5800

6,805.00

3,946.90

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1940

6,856.00

1,330.06

5,144

Transporte de materiales Tn

Ana

0.1592

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

513,190.91

179,616.82

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

160.0000

180.00

28,800.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0760

6,200.00

471.20

14,745

Oxigeno Industrial

Ins

0.1300

15,662.00

2,036.06

14,746

Acetileno

Ins

kg

0.0600

41,820.00

2,509.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

148

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,783

Lamina HR 1"

Ins

4,571 Tee de presion PVC 2 1/2". Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.7500

613,432.00

460,074.00

und

22,322.61

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0449

1,616.00

72.56

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0090

58,612.00

527.51

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0449

16,159.00

725.54

Tee sencilla presion PVC 2 1/2 "

Ins

und

1.0000

20,997.00

20,997.00

55

15,063

4,572 Buje soldado 2 1/2" x 1 1/2". Suministro e Instal.

und

13,414.73

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0190

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0190

28,250.00

536.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1569

16,159.00

2,535.35

Buje soldado presion PVC 2.1/2 x 1.1/2

Ins

und

1.0000

9,229.00

9,229.00

15,105

4,573 Fabricacion Viga de anclaje tensores 500 x 250,


incluye UPN 100 y 200

und

1,113.63

5,186,278.53

42

Motosoldador Diesel

Eqp

HR

28.4800

14,833.00

422,443.84

43

Equipo de Oxicorte

Eqp

HR

12.4000

5,000.00

62,000.00

44

Pulidora electrica manual

Eqp

HR

12.4000

4,350.00

53,940.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

30.5100

6,805.00

207,620.55

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

10.1700

6,856.00

69,725.52

5,144

Transporte de materiales Tn

Ana

1.1040

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

3,841,687.80

1,344,590.73

13,889

Viga UPN 200

Ins

3.0000

41,600.00

124,800.00

13,890

Viga UPN 100

Ins

3.0000

18,400.00

55,200.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

1.5000

6,200.00

9,300.00

14,745

Oxigeno Industrial

Ins

2.4900

15,662.00

38,998.38

14,746

Acetileno

Ins

kg

1.2400

41,820.00

51,856.80

15,782

Lamina HR 3/4"

Ins

6.1864

443,845.00

2,745,802.71

4,574 Correa metlica 2 3/4" +1 7/8" y celosia 5/8"


de H = 0.45 , A = 0.15

66,922.26

Sub-Contrato Ornamentacion

Esp

50.0000

44,614.84

22,307.42

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1030

8,750.00

901.25

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

1,850

Segueta Ncholson

Ins

und

0.0017

2,500.00

4.25

2,502

Anticorrosivo rojo claro

Ins

gal

0.1300

29,750.00

3,867.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,144

Transporte de materiales Tn

Ana

0.0112

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

11.0200

2,257.00

24,872.14

14,794

Platina 20 x 20 x 1/4"

Ins

und

0.2200

11,620.00

2,556.40

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1900

5,800.00

1,102.00

17

4,575 Fabricacion Viga Principal 300 x 300 x 1500 " I "

1,190,773.80

42

Motosoldador Diesel

Eqp

HR

5.8600

14,833.00

86,921.38

43

Equipo de Oxicorte

Eqp

HR

2.5600

5,000.00

12,800.00

44

Pulidora electrica manual

Eqp

HR

2.5600

4,350.00

11,136.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

6.2850

6,805.00

42,769.43

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

2.0950

6,856.00

14,363.32

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

149

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Vr.Unitario

Vr.Total

Transporte de materiales Tn

Ana

0.2670

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

882,054.67

308,719.13

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.3100

6,200.00

1,922.00

14,745

Oxigeno Industrial

Ins

0.5100

15,662.00

7,987.62

14,746

Acetileno

Ins

kg

0.2600

41,820.00

10,873.20

14,945

Lamina HR 1/2"

Ins

1.6500

250,702.65

413,659.37

15,782

Lamina HR 3/4"

Ins

0.6300

443,845.00

279,622.35

5,144

4,576 Fabricacion platinas verticales 3/4", refuerzo


exterior viga en torre

Cantidad

und

779,501.91

42

Motosoldador Diesel

Eqp

HR

7.8900

14,833.00

117,032.37

43

Equipo de Oxicorte

Eqp

HR

3.9300

5,000.00

19,650.00

44

Pulidora electrica manual

Eqp

HR

3.9300

4,350.00

17,095.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

8.4600

6,805.00

57,570.30

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

2.8200

6,856.00

19,333.92

5,144

Transporte de materiales Tn

Ana

0.1090

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

577,408.82

202,093.09

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.4700

6,200.00

2,914.00

14,745

Oxigeno Industrial

Ins

0.7900

15,662.00

12,372.98

14,746

Acetileno

Ins

kg

0.3900

41,820.00

16,309.80

15,782

Lamina HR 3/4"

Ins

0.7100

443,845.00

315,129.95

4,577 Tubo Petrolero = 4" para Quiebrapatas

53,446.92

4,489

Cuadrilla AA (Albaileria)

Ins

0.1938

14,690.00

2,846.92

5,144

Transporte de materiales Tn

Ana

0.0210

0.00

0.00

Tuberia en A.C. = 4" Dril Pipe Usd

Ins

1.0000

50,600.00

50,600.00

13,893

4,581 Fabricacion riostras verticales 3" x 3" x 5/16" entre


pilas, incluye platina 5/16"

und

758,307.78

42

Motosoldador Diesel

Eqp

HR

9.4700

14,833.00

140,468.51

43

Equipo de Oxicorte

Eqp

HR

2.1300

5,000.00

10,650.00

44

Pulidora electrica manual

Eqp

HR

2.1300

4,350.00

9,265.50

Lamina HR 5/16"

Ins

0.3400

191,819.00

65,218.46

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

10.1400

6,805.00

69,002.70

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

3.3800

6,856.00

23,173.28

5,144

Transporte de materiales Tn

Ana

0.0655

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

561,709.47

196,598.31

13,885

Angulo o perfil 3" x 3" x 5/16"

Ins

9.8400

23,049.00

226,802.16

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2600

6,200.00

1,612.00

14,745

Oxigeno Industrial

Ins

0.4300

15,662.00

6,734.66

14,746

Acetileno

Ins

kg

0.2100

41,820.00

8,782.20

381

4,583 Cargue y retiro mecanico de material, con acarreo


a 6 Kms
4
21

8,541.48

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0200

111,550.00

2,231.00

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

4,584 Cargue manual y retiro de material, pagado en m3


21

Volqueta (6 m3 )

m
Eqp

HR

16,152.78

0.1136

55,550.00

6,310.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

150

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

4,585 Resalto u Ondulacion (Reductor de velocidad)


Concreto 4000 Psi, 280 Kg/cm2

Cantidad

Vr.Unitario

Vr.Total

0.6700

14,690.00

9,842.30

326,246.69

Herramienta Menor 10% M.O. AA

Eqp

HR

2.7000

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.7000

2,667.00

1,866.90

4,489

Cuadrilla AA (Albaileria)

Ins

2.7000

14,690.00

39,663.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.7140

378,352.56

270,143.73

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.4300

3,092.35

10,606.76

17

4,586 Canal en piedra pegada (0.50 x 0.50 ) Trapezoidal,


concreto 2500 Psi

3,966.30

60,888.27

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1000

318,473.24

31,847.32

5,061

Formaleta (1 uso)

Ana

0.3330

32,375.50

10,781.04

5,063

Piedra rajon o media zonga

Ana

0.0500

90,495.15

4,524.76

17

4,587 Riostras o diafragmas Concreto 3000 Psi; Puente


Viga Cajon, resistencia 210 Kg/cm2

770,371.82

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

3.3200

32,375.50

107,486.66

4,588 Bolsacreto con arena de 1.20 x 2.4 x 0.35

und

81,022.55

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6667

1,469.00

979.38

4,489

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

5,143

17

Transporte de materiales m

Ana

1.0500

46,157.00

48,464.85

13,923

Bolsacreto 1101 de 1.20 x 2.40 (1 m3)

Ins

und

1.0000

14,172.00

14,172.00

15,528

Arena de rio (sucia)

Ins

1.0500

7,250.00

7,612.50

4,589 Filtro para aliviaderos (Estribos, Aletas y muros)

147,577.69

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,143

17

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

12,047

Tubo PVC A. LL. 4"

Ins

0.8700

10,467.00

9,106.29

13,783

Geotextil No Tejido 1600

Ins

9.1500

2,758.00

25,235.70

13,961

Triturado de 1/2" - 3/4"

Ins

1.0000

46,304.00

46,304.00

4,590 Fabricacion riostras horizontales 3" x 3" x 5/16"


entre pilas, incluye platina 5/16"

und

1,005,454.49

42

Motosoldador Diesel

Eqp

HR

11.5600

14,833.00

171,469.48

43

Equipo de Oxicorte

Eqp

HR

2.5200

5,000.00

12,600.00

44

Pulidora electrica manual

Eqp

HR

2.5200

4,350.00

10,962.00

Lamina HR 5/16"

Ins

0.5300

191,819.00

101,664.07

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

12.3900

6,805.00

84,313.95

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

4.1300

6,856.00

28,315.28

381

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

151

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Transporte de materiales Tn

Ana

13,613

Sub-Contrato Estructura Metalica

Esp

13,885

Angulo o perfil 3" x 3" x 5/16"

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

5,144

4,591 Fabricacion rigidizadores torres en vigas UPN 180

Cantidad

Vr.Unitario

Vr.Total

0.0940

0.00

0.00

35.0000

744,781.10

260,673.39

13.6800

23,049.00

315,310.32

0.3000

6,200.00

1,860.00

0.5000

15,662.00

7,831.00

kg

0.2500

41,820.00

10,455.00

und

1,076,788.46

42

Motosoldador Diesel

Eqp

HR

11.7000

14,833.00

173,546.10

43

Equipo de Oxicorte

Eqp

HR

2.9100

5,000.00

14,550.00

44

Pulidora electrica manual

Eqp

HR

2.9100

4,350.00

12,658.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

12.5100

6,805.00

85,130.55

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

4.1700

6,856.00

28,589.52

5,144

Transporte de materiales Tn

Ana

0.1270

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

797,621.08

279,167.38

13,733

Pasador = 3 1/2" SAE 1045 de 200 mm

Ins

und

1.0000

160,000.00

160,000.00

13,734

Tuerca =1" G-8

Ins

und

4.0000

2,200.00

8,800.00

13,888

Viga UPN 180

Ins

2.5000

32,300.00

80,750.00

14,742

Lamina HR 1/4"

Ins

0.1600

125,317.09

20,050.73

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.3500

6,200.00

2,170.00

14,745

Oxigeno Industrial

Ins

0.5800

15,662.00

9,083.96

14,746

Acetileno

Ins

kg

0.2900

41,820.00

12,127.80

15,783

Lamina HR 1"

Ins

0.3100

613,432.00

190,163.92

4,592 Concreto 3000 Psi, para cimentacion tipo cajon

676,626.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

15.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

15.0000

14,690.00

220,350.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.9200

32,375.50

94,536.46

4,593 Viga de rigidez o Diagonal 0.10 x 0.10 x 1.0

22,035.00

18,163.39

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3333

1,763.00

587.61

5,064

Cuadrilla DD (Carpinteria)

Ins

0.3333

17,628.00

5,875.41

5,144

Transporte de materiales Tn

Ana

0.0075

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0450

52,200.00

2,349.00

15,988

Madera de 0.10 x 0.10 x 1 Polin

Ins

1.0300

9,079.00

9,351.37

56

4,595 Guardarueda Concreto 3500 Psi, resistencia 245


Kg/cm2

554,048.16

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.0500

32,375.50

66,369.77

4,598 Defensa metalica (Norma 730 INV), importada


17
4,489

11,752.00

276,440.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5300

1,469.00

778.57

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

152

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,138

Excavacion manual en conglomerado

Ana

5,144

Transporte de materiales Tn

Ana

Defensa metalica (Incluye: postes,amortig y capta)

Ins

13,956

4,599 Conformacion Via Urbana (incluye perfilada,


escarificada, conformar, y cuneteada)
3

Motoniveladora

17

Eqp

21

Vr.Total

0.0250

35,065.03

876.63

0.0200

0.00

0.00

1.0000

267,000.00

267,000.00

HR

889,760.00

6.7000

132,800.00

889,760.00

807.95

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0500

1,469.00

73.45

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

4,601 Limpieza cunetas (con retiro max. A 2 Km)

4,489

Vr.Unitario

km

4,600 Limpieza de cunetas (retiro lateral)

4,489

Cantidad

2,196.70

Volqueta (6 m3 )

Eqp

HR

0.0250

55,550.00

1,388.75

Cuadrilla AA (Albaileria)

Ins

0.0550

14,690.00

807.95

4,602 Replanteo y localizacion Manual para obras de


proteccion, pagado por ml

532.71

3,804

Puntilla con cabeza 1"

Ins

lb

0.0022

2,480.00

5.46

4,489

Cuadrilla AA (Albaileria)

Ins

0.0250

14,690.00

367.25

8,165

Estacas de Madera =0.10 L=0.60 m

Ins

und

0.0600

1,000.00

60.00

Piola

Ins

1.0000

100.00

100.00

16,299

4,603 Dilatacion en Cinta PVC-015


19
4,489
16,373

23,187.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.3000

735.00

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

Cinta sika PVC 0-15

Ins

1.0000

18,560.00

18,560.00

4,604 Pavimento en Concreto Hidraulico resistencia 280


kg/cm2 - 4000 psi, Incluye Juntas y Pasadores

220.50

543,176.28

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.3000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

Acero de Transferencia liso de 60000 Psi

Ana

kg

6.9000

2,973.32

20,515.91

3,323

Tabla Burra Ordinaria 0.25

Ins

3.9000

4,333.00

16,898.70

4,489

Cuadrilla AA (Albaileria)

Ins

5.3000

14,690.00

77,857.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,430

Junta de Dilatacion de 10 mm x 10 mm (Cortada,


inducida y sellada)

Ana

3.1000

11,356.10

35,203.91

238

4,605 Extraccion de Raices y eliminacion de especies


altura entre 0 - 3,0 m

und

7,785.70

99,108.00

21

Volqueta (6 m3 )

Eqp

HR

0.7500

55,550.00

41,662.50

38

Motosierra o equipo de desmonte

Eqp

HR

0.2500

5,350.00

1,337.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

2.0000

2,550.00

5,100.00

Cuadrilla AA-3 (Limpieza)

Ins

2.0000

25,504.00

51,008.00

14,749

4,606 Pernos de 1/2" - 5/8" con corte y ensamble

und

8,896.26

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

153

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

44

Pulidora electrica manual

Eqp

56

Herramienta Menor 10% M.O. DD

Eqp

HR

0.0500

4,350.00

217.50

HR

0.1000

1,763.00

75

Equipo de soldadura Marca Linconl 250 A

176.30

Eqp

HR

0.1429

3,330.00

475.86

Soldador

Ins

0.1429

6,759.00

965.86

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0357

6,805.00

242.94

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0250

6,200.00

155.00

16,374

Tornillo = 5/8" x 5" R.O G-8 con T.A

Ins

und

1.0000

4,900.00

4,900.00

519

4,607 Geodren Planar Tipo DG-3, H=0.50 m con tubo de


drenaje PVC 4"

31,283.66

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

3,466

Tubo de drenaje PVC 100 mm o 4"

Ins

1.0300

20,447.00

21,060.41

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

Geodren Planar DG-3 H=0.50 m

Ins

1.0000

9,452.00

9,452.00

19

15,357

4,608 Formaleta para Poste de referencia

und

19,404.45

Herramienta Menor 10% M.O. DD

Eqp

HR

0.5000

1,763.00

881.50

2,197

Repisa Ordinario 3 m

Ins

2.8200

1,500.00

4,230.00

2,200

Tabla burra ordinario 0.30

Ins

1.1500

4,333.00

4,982.95

3,804

Puntilla con cabeza 1"

Ins

lb

0.2000

2,480.00

496.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.5000

17,628.00

8,814.00

56

4,609 Tornillo 1/2" x 10" G-8 , R.O, con T.A


56
5,064
16,375

und

14,697.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

Tornillo = 1/2" x 10" R.O G-8 con T.A

Ins

und

1.0000

9,850.00

9,850.00

4,610 Suministro y siembra arbol Oity h = 1.50 m (para 2


aos de mantenimiento)

und

50,271.29

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7500

1,616.00

Tierra Negra abonada

Ins

0.2550

34,000.00

8,670.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7500

16,159.00

12,119.25

5,143

Transporte de materiales m

Ana

0.2550

46,157.00

11,770.04

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

15,911

Oity 1.50 m

Ins

und

1.0000

10,000.00

10,000.00

15,917

Insecticida tipio roxin

Ins

0.0050

40,000.00

200.00

15,918

Dap (fertilizantes)

Ins

bt

0.1125

46,000.00

5,175.00

15,919

Cascarilla

Ins

bt

0.3750

3,000.00

1,125.00

55
223

4,611 Relleno con material crudo de rio sin clasificar,


compactado y Transportado

1,212.00

78,230.70

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5333

1,469.00

783.42

41

Vibrocompactador tipo rana

Eqp

HR

0.6080

5,000.00

3,040.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

5,143

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

Crudo de rio sin clasificar

Ins

1.1000

14,364.00

15,800.40

15,365

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

154

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,612 Sub-base Granular seleccionada o clasificada

Cantidad

Vr.Unitario

Vr.Total
39,418.56

Compactador Vibratorio

Eqp

HR

0.0526

100,000.00

5,260.00

Motoniveladora

Eqp

HR

0.0526

132,800.00

6,985.28

Carrotanque de Agua

Eqp

HR

0.0526

53,125.00

2,794.38

Sub-base granular seleccionada o clasificada

Ins

1.3000

18,753.00

24,378.90

11
769

4,613 Junta de Dilatacion JD-2

168,339.46

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.3000

5,000.00

1,500.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

45

Cilindro

Eqp

HR

0.3000

41.00

12.30

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.7750

3,226.00

2,500.15

84

Varilla cuadrada 9 mm o 3/8" x 6 mts

Ins

und

0.3333

9,492.00

3,163.68

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.1200

2,295.00

2,570.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0600

29,750.00

1,785.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0700

42,950.00

3,006.50

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.8000

2,257.00

4,062.60

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0100

6,200.00

62.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.7750

32,262.00

25,003.05

15,603

Neopreno WD 1625 (40 mm x 1") D=70

Ins

1.0000

11,020.00

11,020.00

16,233

Angulo o perfil 5" x 5" x 3/8"

Ins

2.1000

47,286.00

99,300.60

4,614 Malla de cribado en lamina PRFV de 3/4"

und

283,043.75

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2500

1,616.00

404.00

1,847

Malla de cribado en lamina PRFV de 3/4"

Ins

und

1.0000

278,600.00

278,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

55

4,615 Pasamuro en PRFV = 3" E.L x E.B. L= 0.60 m


(Suministro e instal. con tornilleria y empaques)

und

110,587.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

1,858

Pasamuro =3" E.L. x E.B. L=0.6 m en PRFV

Ins

und

1.0000

101,700.00

101,700.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

55

4,617 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.12

55,136.95

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6300

1,469.00

925.47

49

Vibrador de concretos

Eqp

HR

0.1280

4,375.00

560.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.6300

14,690.00

9,254.70

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

4,618 Valvula de corte 1 1/2". Suministro e Instal.

und

203,173.91

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

155

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

13,843

Valvula de corte 1 1/2"

Ins

und

1.0000

185,545.00

185,545.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

2.0000

2,422.00

4,844.00

55

4,622 Concreto 3000 Psi Impermeabilizado para Tanque


elevado

784,502.86

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

14.0000

2,010.00

28,140.00

80

Pluma grua o Malacate

Eqp

HR

1.6500

8,750.00

14,437.50

4,867

Paral telescopico 2 a 4 ml

Ins

30.0000

340.00

10,200.00

5,061

Formaleta (1 uso)

Ana

2.2400

32,375.50

72,521.12

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.0000

345,308.74

345,308.74

13,627

Formaleta entrepisos

Ins

mes

2.5300

3,500.00

8,855.00

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

14.0000

20,097.00

281,358.00

4,626 Apoyo de Neopreno D=60 (0.50 m x 0.31 m x 1")

und

41,596.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

8,178

Neopreno (0.50 x 0.31) m D=60 E=1"

Ins

und

1.0000

33,884.00

33,884.00

19

4,627 Mezcla Asfaltica MDC-2

440,794.81

Compactador Vibratorio

Eqp

HR

0.0450

100,000.00

4,500.00

Terminadora de Asfalto o Finisher

Eqp

HR

0.0450

127,600.00

5,742.00

Compactador Neumatico

Eqp

HR

0.0450

120,900.00

5,440.50

Herramienta menor 10% M.O. AA-9

Eqp

HR

0.0450

5,795.00

260.78

13,849

Mezcla asfaltica MDC-2

Ins

1.2000

351,870.00

422,244.00

14,621

Cuadrilla AA-9 (Asfalto)

Ins

0.0450

57,945.00

2,607.53

24
110

4,630 Marcas transversales con pintura acrilica para vias


(simbolos y letreros)

19,382.79

Equipo Delineador de Pintura

Eqp

HR

0.0100

42,000.00

420.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1700

14,690.00

2,497.30

8,187

Pintura trafico acrlica de demarcacin

Ins

gal

0.2083

79,047.00

16,465.49

12

4,632 Geotextil No Tejido 2000

5,085.70

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Geotextil No Tejido 2000

Ins

1.0500

4,109.00

4,314.45

19

13,894

4,633 Imprimacion con Emulsion Asfaltica

1,739.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

156

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
7
39
4,489
13,851

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Camion Irrigador

Eqp

Compresor de capacidad 120

Eqp

HR

0.0020

62,500.00

125.00

HR

0.0020

27,511.00

Cuadrilla AA (Albaileria)

55.02

Ins

Emulsion asfaltica CRL-1 o CRR-1

0.0020

14,690.00

29.38

Ins

gal

0.3825

4,000.00

1,530.00

4,635 Sub-Base Granular Triturada

53,849.66

Compactador Vibratorio

Eqp

HR

0.0526

100,000.00

5,260.00

Motoniveladora

Eqp

HR

0.0526

132,800.00

6,985.28

Carrotanque de Agua

Eqp

HR

0.0526

53,125.00

2,794.38

Sub base triturada T. max. 2"

Ins

1.2500

31,048.00

38,810.00

11
8,154

4,636 Nivelacion de Pozos de Inspeccion (No incluye:


Tapa ni aro)

und

107,981.65

Herramienta Menor 10% M.O. AA

Eqp

HR

2.6700

1,469.00

3,922.23

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0213

248,144.84

5,285.49

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.6200

2,295.00

3,717.90

2,085

Ladrillo tolete comn

Ins

und

48.0000

305.00

14,640.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.6700

14,690.00

39,222.30

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0120

430,750.59

5,169.01

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0310

333,142.66

10,327.42

5,144

17

Transporte de materiales Tn

Ana

0.2420

0.00

0.00

13,931

Tablon Ordinario ( 5 x 20 )

Ins

4.0000

5,500.00

22,000.00

15,593

Lamina cold roll calibre 20 (2.40 mt x 1.20 mt)

Ins

und

0.0550

67,223.67

3,697.30

4,637 Poste de Kilometraje

und

99,335.30

Herramienta Menor 10% M.O. AA

Eqp

HR

3.7500

1,469.00

3,838

Esmalte mate supersinttico

Ins

gal

0.1000

50,506.00

5,050.60

4,489

Cuadrilla AA (Albaileria)

Ins

3.7500

14,690.00

55,087.50

4,608

Formaleta para Poste de referencia

Ana

und

0.2000

19,404.45

3,880.89

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0520

318,473.24

16,560.61

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.1500

3,092.35

9,740.90

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.0460

76,218.46

3,506.05

17

4,638 Base granular para reparcheo e=0.15 m (colocacion


manual)

5,508.75

13,018.62

11

Carrotanque de Agua

Eqp

HR

0.0820

53,125.00

4,356.25

41

Vibrocompactador tipo rana

Eqp

HR

0.0750

5,000.00

375.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0820

3,091.00

253.46

13,960

Cuadrilla AA-4

Ins

0.0820

30,910.00

2,534.62

14,777

Base Triturada T.max 1 1/2"

Ins

0.1650

33,329.00

5,499.29

4,642 Replanteo y localizacion para puentes colgantes,


pagado por m2

6,353.46

15

Estacion Total

Eqp

HR

0.0400

7,500.00

300.00

46

Campero 2000cc-3000cc

Eqp

HR

0.2381

21,534.00

5,127.25

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0010

42,950.00

42.95

8,108

Topografo

Ins

0.0400

7,660.00

306.40

8,109

Cadenero

Ins

0.0400

4,957.00

198.28

8,145

Ayudante de construccion

Ins

0.0400

5,407.00

216.28

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

157

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,326

Durmiente ordinario 3 M

Ins

14,760

Cinta de Sealizacion

Ins

4,643 Demolicion manual de concreto ciclopeo (Incluye:


retiro maximo a 6 Km)

Cantidad

Vr.Unitario

Vr.Total

0.1000

767.00

76.70

0.8000

107.00

85.60

119,056.18

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

5.1000

2,010.00

10,251.00

Cuadrilla AA-2 (Tuberias)

Ins

5.1000

20,097.00

102,494.70

14,669

4,644 Geomembrana de 30 mils, 0.75 mm HDPE


6
17
4,489
16,225

Sub-Contrato Instalacion

Esp

24.0000

12,169.28

2,920.63

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0200

1,469.00

29.38

Cuadrilla AA (Albaileria)

Ins

0.0200

14,690.00

293.80

Geomembrana 30 mil 0.75 mm HDPE

Ins

1.0500

11,282.00

11,846.10

4,645 Dilatacion en ladrillo tipo rejilla vitrificado A=0.07 m

Herramienta menor 5% M.O. AA

Eqp

HR

1,540

Mortero 1:4 (desperdicio 5%)

Ana

2,058

Ladrillo prensado rejilla

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

19

15,089.91

4,650 Base estabilizada crudo de castilla e=0.10 m


(extendida, nivelada y compactada), sin sello y sin
crudo de castilla

12,662.74

0.2000

735.00

147.00

0.0120

248,144.84

2,977.74

und

12.0000

550.00

6,600.00

0.2000

14,690.00

2,938.00

0.0360

0.00

0.00

110,153.88

Compactador Vibratorio

Eqp

HR

0.0840

100,000.00

8,400.00

Motoniveladora

Eqp

HR

0.0840

132,800.00

11,155.20

5,250.00

Camion Irrigador

Eqp

HR

0.0840

62,500.00

11

Carrotanque de Agua

Eqp

HR

0.0840

53,125.00

4,462.50

24

Compactador Neumatico

Eqp

HR

0.0840

120,900.00

10,155.60

98

Herramienta menor 10% M.O. Ay-4

Eqp

HR

605.64

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

0.2800

2,163.00

95.0000

10.00

950.00

0.2000

13,800.00

2,760.00

5,143

Transporte de materiales m

Ana

0.2000

46,157.00

9,231.40

14,777

Base Triturada T.max 1 1/2"

Ins

1.3000

33,329.00

43,327.70

14,944

Cuadrilla Ay-4

Ins

0.2800

21,628.00

6,055.84

15,868

Exor 1

Ins

gal

0.0130

600,000.00

7,800.00

4,651 Placa Piso Concreto resistencia 280 kg/cm2-4000


psi e=0.10

49,583.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5300

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1060

4,375.00

463.75

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.1000

378,352.56

37,835.26

4,652 Cable IPS - IWRC 6 x 19 AA = 9/16 "


59

Herramienta menor 10% M.O. AA-4

m
Eqp

HR

778.57

10,647.72

0.0800

3,091.00

247.28

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

158

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Diferencial 3 Tn con cadena crosby 10 m

Eqp

Transporte de materiales Tn

Ana

13,960

Cuadrilla AA-4

Ins

15,960

Cable IPS-IWRC 6 x 19 AA = 9/16"

Ins

76
5,144

4,653 Cable IPS - IWRC 6 x 19 AA = 7/16 "

Cantidad

Vr.Unitario

Vr.Total

HR

0.0800

2,958.00

236.64

0.0009

0.00

0.00

0.0800

30,910.00

2,472.80

1.0000

7,691.00

7,691.00

7,496.95

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0500

3,091.00

154.55

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0500

2,958.00

147.90

Transporte de materiales Tn

Ana

0.0005

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0500

30,910.00

1,545.50

15,959

Cable IPS-IWRC 6 x 19 AA = 7/16"

Ins

1.0000

5,649.00

5,649.00

5,144

4,654 Cable IPS - IWRC 6 x 19 AA = 5/8 "

12,813.90

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1000

3,091.00

309.10

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1000

2,958.00

295.80

Transporte de materiales Tn

Ana

0.0011

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1000

30,910.00

3,091.00

15,961

Cable IPS-IWRC 6 x 19 AA = 5/8"

Ins

1.0000

9,118.00

9,118.00

5,144

4,655 Cable IPS - IWRC 6 x 19 AA = 7/8 "

21,790.49

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1100

3,091.00

340.01

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1100

2,958.00

325.38

Transporte de materiales Tn

Ana

0.0021

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1100

30,910.00

3,400.10

15,962

Cable IPS-IWRC 6 x 19 AA = 7/8"

Ins

1.0000

17,725.00

17,725.00

5,144

4,656 Cable IPS - IWRC 6 x 19 AA = 1 3/8 "

54,429.80

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2000

3,091.00

618.20

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.2000

2,958.00

591.60

Transporte de materiales Tn

Ana

0.0052

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.2000

30,910.00

6,182.00

15,965

Cable IPS-IWRC 6 x 19 AA = 1 3/8"

Ins

1.0000

47,038.00

47,038.00

5,144

4,657 Cable IPS - IWRC 6 x 19 AA = 1 5/8 "

75,069.75

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2500

3,091.00

772.75

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.2500

2,958.00

739.50

Transporte de materiales Tn

Ana

0.0073

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.2500

30,910.00

7,727.50

15,967

Cable IPS-IWRC 6 x 19 AA = 1 5/8"

Ins

1.0000

65,830.00

65,830.00

5,144

4,658 Cable IPS - IWRC 6 x 19 AA = 2 "

111,134.88

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.3200

3,091.00

989.12

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.3200

2,958.00

946.56

Transporte de materiales Tn

Ana

0.0110

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.3200

30,910.00

9,891.20

15,969

Cable IPS-IWRC 6 x 19 AA = 2"

Ins

1.0000

99,308.00

99,308.00

5,144

4,659 Cable IPS - IWRC 6 x 19 AA = 2 1/8 "

132,879.65

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

159

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

59

Herramienta menor 10% M.O. AA-4

Eqp

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.3500

3,091.00

1,081.85

HR

0.3500

2,958.00

Transporte de materiales Tn

1,035.30

Ana

0.0124

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.3500

30,910.00

10,818.50

15,970

Cable IPS-IWRC 6 x 19 AA = 2 1/8"

Ins

1.0000

119,944.00

119,944.00

5,144

4,660 Dilatacion gravilla lavado a=0.25, pagado ml

29,260.53

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0077

Cemento gris

Ins

kg

1.8148

383.34

695.69

2,448

Dilatacin en bronce PC 09

Ins

2.0000

3,735.00

7,470.00

3,684

Agua para obra

Ins

0.8258

10.00

8.26

4,426

Arena lavada de rio

Ins

0.0078

13,800.00

107.64

4,489

Cuadrilla AA (Albaileria)

Ins

1.0077

14,690.00

14,803.11

5,143

Transporte de materiales m

Ana

0.0078

46,157.00

360.02

5,144

Transporte de materiales Tn

Ana

0.0068

0.00

0.00

Gravilla para piso

Ins

bt

0.2500

17,342.00

4,335.50

17
804

15,575

4,661 Codo 90 =8" en A.C. con E.B x E.B. Suministro e


Instal.

1,469.00

und

1,480.31

925,850.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

3,303

Codo 90 =8" en A.C. E.B.

Ins

und

1.0000

722,100.00

722,100.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

55

13,731

4,662 Fabricacion rigidizadores torres en vigas UPN 120

und

555,391.01

42

Motosoldador Diesel

Eqp

HR

6.0000

14,833.00

88,998.00

43

Equipo de Oxicorte

Eqp

HR

1.5700

5,000.00

7,850.00

44

Pulidora electrica manual

Eqp

HR

1.5700

4,350.00

6,829.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

6.4400

6,805.00

43,824.20

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

2.1500

6,856.00

14,740.40

5,144

Transporte de materiales Tn

Ana

13,613

Sub-Contrato Estructura Metalica

Esp

13,736

Tuerca =3/4" G-8

Ins

und

13,790

Eje cabeza y rosca 1" 1045 (SAE 1020) 1000 mm

Ins

cm

13,884

Viga UPN 120

Ins

14,742

Lamina HR 1/4"

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

14,745

Oxigeno Industrial

14,746
15,782

0.0800

0.00

0.00

35.0000

411,400.75

143,990.26

4.0000

980.00

3,920.00

440.0000

250.00

110,000.00

2.5000

30,856.00

77,140.00

0.0704

125,317.09

8,822.32

und

0.1900

6,200.00

1,178.00

Ins

0.3200

15,662.00

5,011.84

Acetileno

Ins

kg

0.1600

41,820.00

6,691.20

Lamina HR 3/4"

Ins

0.0820

443,845.00

36,395.29

4,663 Fabricacion viga transversal de anclaje 500 x 250 x


1/2"

und

2,074,208.89

42

Motosoldador Diesel

Eqp

HR

22.6500

14,833.00

335,967.45

43

Equipo de Oxicorte

Eqp

HR

6.3800

5,000.00

31,900.00

44

Pulidora electrica manual

Eqp

HR

6.3800

4,350.00

27,753.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

24.2700

6,805.00

165,157.35

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

8.0900

6,856.00

55,465.04

5,144

Transporte de materiales Tn

Ana

0.3590

0.00

0.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

160

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

13,613

Sub-Contrato Estructura Metalica

Esp

14,744

Disco pulidora LT W 7 x 1/4"

Ins

35.0000

1,536,451.03

537,757.86

und

0.7700

6,200.00

14,745

Oxigeno Industrial

Ins

4,774.00

14,746

Acetileno

1.2760

15,662.00

19,984.71

Ins

kg

0.6400

41,820.00

14,945

Lamina HR 1/2"

26,764.80

Ins

3.4650

250,702.65

868,684.68

4,666 Malla electrosoldada Q-2 Tipo ME-1, pagado por m2

4,388.55

Herramienta menor 5% M.O. AA

Eqp

HR

0.0240

735.00

17.64

4,489

Cuadrilla AA (Albaileria)

Ins

0.0240

14,690.00

352.56

5,144

Transporte de materiales Tn

Ana

0.0013

0.00

0.00

Malla electrosoldada Q-2 o M-084 (2.35 x 6m)

Ins

1.0500

3,827.00

4,018.35

19

16,077

4,667 Viga puentes en concreto reforzado resistencia 210


Kg/cm2-3000 psi

706,166.41

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

3.3333

32,375.50

107,917.25

4,668 Viga puentes en concreto reforzado resistencia 245


Kg/cm2-3500 psi

23,504.00

724,867.64

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

3.3333

32,375.50

107,917.25

4,669 Viga Puentes en concreto reforzado resistencia 280


kg/cm2-4000 psi

23,504.00

751,376.31

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

3.3333

32,375.50

107,917.25

4,670 Riostras o diafragmas Concreto 5000 Psi,


resistencia 350 kg/cm2

23,504.00

809,665.46

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,057

Concreto 5000 Psi (Basico, 5% desperdicio)

Ana

1.0000

416,790.73

416,790.73

5,061

Formaleta (1 uso)

Ana

1.9500

32,375.50

63,132.23

4,671 Riostras o diafragmas Concreto 3500 Psi,


resistencia 245 kg/cm2

29,380.00

744,718.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,489

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

161

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

4,672 Placa de aproximacion Concreto 3500 Psi,


resistencia 245 Kg/cm2

Cantidad

Vr.Unitario

Vr.Total

1.0000

351,843.89

351,843.89

1.9500

32,375.50

63,132.23

456,599.09

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.3000

1,469.00

7,785.70

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

5.3000

14,690.00

77,857.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

Tabla burra cedro macho 0.30

Ins

2.5100

5,000.00

12,550.00

14,778

4,673 Placa de aproximacion Concreto 4000 Psi,


resistencia 280 Kg/cm2

483,107.76

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.3000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

5.3000

14,690.00

77,857.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

Tabla burra cedro macho 0.30

Ins

2.5100

5,000.00

12,550.00

14,778

4,674 Guardarueda aligerado en Caseton, Concreto 4000


Psi, resistencia 280 Kg/cm2

17

Herramienta Menor 10% M.O. AA

Eqp

49

Vibrador de concretos
Caseton de Guadua 0.80 x 0.90

4,489
5,058
5,061

343

7,785.70

713,645.30

HR

9.0000

Eqp

HR

1.5000

4,375.00

6,562.50

Ana

4.0000

32,874.61

131,498.44

Cuadrilla AA (Albaileria)

Ins

9.0000

14,690.00

132,210.00

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

Formaleta (1 uso)

Ana

1.6000

32,375.50

51,800.80

4,675 Concreto Ciclopeo para base o fundacion de


Puentes resistencia 3000 Psi o 210 Kg/cm2.

1,469.00

13,221.00

394,802.99

Herramienta Menor 10% M.O. AA

Eqp

HR

8.5000

1,469.00

12,486.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.5000

14,690.00

124,865.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

0.6600

32,375.50

21,367.83

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

4,677 Conformacion de Sub-base existente para


reparcheo (Incluye: colocacion manual y
compactacion)

1,304.83

11

Carrotanque de Agua

Eqp

HR

0.0070

53,125.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0500

1,469.00

73.45

41

Vibrocompactador tipo rana

Eqp

HR

0.0250

5,000.00

125.00

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

4,489

4,678 Conformacion Subrasante Mejorada (Incluye:


escarificar, perfilar, conformar, riego y
compactacion)

km

371.88

2,042,333.68

Compactador Vibratorio

Eqp

HR

7.1429

100,000.00

714,290.00

Motoniveladora

Eqp

HR

7.1429

132,800.00

948,577.12

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

162

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
11

Nombre

Tipo U.M.

Carrotanque de Agua

Eqp

4,686 Hexapodo en Concreto 3000 Psi ( Vol = 1.71 m)

HR

Cantidad

Vr.Unitario

Vr.Total

7.1429

53,125.00

379,466.56

und

965,460.95

14

Retroexcavadora de orugas

Eqp

HR

0.2500

144,160.00

36,040.00

49

Vibrador de concretos

Eqp

HR

2.5700

4,375.00

11,243.75

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

4.0000

2,010.00

8,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.7100

333,142.66

569,673.95

5,061

Formaleta (1 uso)

Ana

2.5500

32,375.50

82,557.52

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

21.2700

3,092.35

65,774.28

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

36.3300

3,075.79

111,743.45

5,144

Transporte de materiales Tn

Ana

4.1000

0.00

0.00

Cuadrilla AA-2 (Tuberias)

Ins

4.0000

20,097.00

80,388.00

14,669

4,687 Terraplen, construccion y conformacion de


variante en acceso a rios (acarreo max. 1 Km)

16,501.79

Motoniveladora

Eqp

HR

0.0333

132,800.00

4,422.24

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0333

111,550.00

3,714.62

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0333

130,650.00

4,350.65

21

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

Oficial de Construccion

Ins

0.0333

9,282.00

309.09

8,144

4,688 Terraplen en material conglomerado


Incluye:regalias, explotar,cargar, extender, riego,
compactar)

8,899.93

Compactador Vibratorio

Eqp

HR

0.0167

100,000.00

1,670.00

Motoniveladora

Eqp

HR

0.0167

132,800.00

2,217.76

11

Carrotanque de Agua

Eqp

HR

0.0167

53,125.00

887.19

14

Retroexcavadora de orugas

Eqp

HR

0.0167

144,160.00

2,407.47

Material de prestamo (tierra-arena-arcilla-limo)

Ins

1.2500

1,250.00

1,562.50

Oficial de Construccion

Ins

0.0167

9,282.00

155.01

858
8,144

4,689 Baranda en concreto 3000 Psi, sin refuerzo H=0.80

77,145.37

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.4500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.4500

14,690.00

21,300.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

5,061

Formaleta (1 uso)

Ana

0.4000

32,375.50

12,950.20

4,691 Concreto Ciclopeo para base o fundacion de


Puentes resistencia 2500 Psi o 175 Kg/cm2.

386,001.33

Herramienta Menor 10% M.O. AA

Eqp

HR

8.5000

4,489

Cuadrilla AA (Albaileria)

Ins

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

5,063

Piedra rajon o media zonga

Ana

17

4,693 Fabricacion viga riostra UPN 320 x 2300


42

Motosoldador Diesel

1,469.00

12,486.50

8.5000

14,690.00

124,865.00

0.6000

318,473.24

191,083.94

0.6600

32,375.50

21,367.83

0.4000

90,495.15

36,198.06

und
Eqp

2,130.05

HR

704,188.43

6.5900

14,833.00

97,749.47

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

163

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

43

Equipo de Oxicorte

Eqp

44

Pulidora electrica manual

Eqp

HR

0.8500

5,000.00

4,250.00

HR

0.8500

4,350.00

1,717

Soldadura electrosoldada 7018 de 1/8"

3,697.50

Ins

kg

2,934

7.0500

6,805.00

47,975.25

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

2.3500

6,856.00

5,144

16,111.60

Transporte de materiales Tn

Ana

0.2740

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

521,621.06

182,567.37

13,804

Viga UPN 320

Ins

4.6000

75,000.00

345,000.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

14,745

Oxigeno Industrial

Ins

0.1700

15,662.00

2,662.54

14,746

Acetileno

Ins

kg

0.0850

41,820.00

3,554.70

4,694 Drenaje en Tuberia PVC RDE 21 de 3" para Puentes


4,489
15,001

und

15,002

12,955.90

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

Tubo presin RDE 21 PVC 3 "

Ins

0.5000

21,211.00

10,605.50

4,695 Drenaje en Tuberia PVC RDE 21 de 4" para


Puentes
4,489

und

20,440.90

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

Tubo presin RDE 21 PVC 4 "

Ins

0.5000

36,181.00

18,090.50

4,697 Guardarueda Concreto 4000 Psi, resistencia 280


Kg/cm2

580,556.83

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

2.0500

32,375.50

66,369.77

4,701 Pases en Tuberia HG de 1 1/2" para puentes

und

11,752.00

15,072.04

1,870

Alambre Negro No 18

Ins

kg

0.0300

3,903.00

117.09

4,489

Cuadrilla AA (Albaileria)

Ins

0.0800

14,690.00

1,175.20

Tubo cerramiento Galvanizado =1 1/2 " e=0.128"

Ins

0.7500

18,373.00

13,779.75

13,897

4,703 Concreto 3000 Psi, para el anillo del Caisson


(H=1.00 M, Prof=7.0 m, =1.30 m

809,011.54

49

Vibrador de concretos

Eqp

HR

4.5000

4,375.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

10.0000

3,091.00

30,910.00

Formaleta metalica Tipo Caisson H=1.00 M DI=1.00 M,


DE=1.10 M (para 20 usos)

Ana

und

0.1470

790,281.50

116,171.38

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-4

Ins

10.0000

30,910.00

309,100.00

160
5,053
13,960

4,704 Concreto 3000 Psi para el pilote tipo Caisson


(Profundidad 7.0 m, = 1.20 m)

19,687.50

479,975.16

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

5.0000

2,550.00

12,750.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-3 (Limpieza)

Ins

5.0000

25,504.00

127,520.00

5,053
14,749

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

164

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,705 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.20

Cantidad

Vr.Unitario

Vr.Total
92,609.36

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0500

1,469.00

1,542.45

49

Vibrador de concretos

Eqp

HR

0.2150

4,375.00

940.63

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0000

4,333.00

4,333.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.2000

351,843.89

70,368.78

4,709 Viga Cajon Postensada 5000 Psi (350 Kg/cm2) H=


2.0 - 2.50 m.

1,170,687.37

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

16.0000

3,091.00

49,456.00

5,057

Concreto 5000 Psi (Basico, 5% desperdicio)

Ana

1.0000

416,790.73

416,790.73

5,061

Formaleta (1 uso)

Ana

6.2800

32,375.50

203,318.14

Cuadrilla AA-4

Ins

16.0000

30,910.00

494,560.00

13,960

4,714 Replanteo y localizacion para puentes (Planimetria


y Altimetria), pagado por ml

25,761.14

15

Estacion Total

Eqp

HR

0.1667

7,500.00

1,250.25

46

Campero 2000cc-3000cc

Eqp

HR

0.9600

21,534.00

20,672.64

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0050

42,950.00

214.75

8,108

Topografo

Ins

0.1667

7,660.00

1,276.92

8,109

Cadenero

Ins

0.1667

4,957.00

826.33

8,145

Ayudante de construccion

Ins

0.1667

5,407.00

901.35

13,326

Durmiente ordinario 3 M

Ins

0.5000

767.00

383.50

14,760

Cinta de Sealizacion

Ins

2.2000

107.00

235.40

4,715 Alcantarilla doble 36" de 6 m aleta - aleta

und

10,995,471.48

5,052

Tuberia Concreto Reforzado, clase I de dimetro 36",


pagado en ml (INV.661)

Ana

12.0000

167,318.00

2,007,816.00

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

1.8000

354,419.99

637,955.98

5,062

Concreto para alcantarilla, resistencia 210 kg/cm2 - 3000


psi, pagado en m3.

Ana

5.1000

424,728.75

2,166,116.62

5,064

Concreto Ciclopeo para alcantarillas de resistencia 3000


Psi o 210 Kg/cm2.

Ana

13.9500

389,882.24

5,438,857.25

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

71.1200

3,075.79

218,750.18

5,138

Excavacion manual en conglomerado

Ana

15.0000

35,065.03

525,975.45

4,726 Cuneta tipo C-1. Concreto 3000 Psi (a=1.20 m)

47,511.27

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

1.2000

2,667.00

3,200.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

4,727 Cuneta tipo C-2. Concreto 3000 Psi (a = 1.70 m)

367.25

65,501.90

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

Tabla chapa ordinario 0.10

Ins

1.7000

2,667.00

4,533.90

2,208

367.25

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

165

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

4,728 Cuneta tipo C-3. Concreto 3000 Psi. (a = 1.60 m)

Cantidad

Vr.Unitario

Vr.Total

0.2500

14,690.00

3,672.50

0.1700

333,142.66

56,634.25

61,903.78

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

1.6000

2,667.00

4,267.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1600

333,142.66

53,302.83

4,729 Cuneta tipo C-4 concreto de 3000 psi (a = 0.90 m),


pagado en ml

36,716.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

0.9000

2,667.00

2,400.30

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0900

333,142.66

29,982.84

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

4,731 Hincada de pilotes en tuberia de 3 1/2"


9
8,144

367.25

79,355.10

Maquina de Pilotaje

Eqp

HR

0.5500

135,000.00

74,250.00

Oficial de Construccion

Ins

0.5500

9,282.00

5,105.10

4,734 Geotextil No Tejido 1600

3,844.54

Herramienta menor 5% M.O. AA

Eqp

HR

0.0615

735.00

45.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.0615

14,690.00

903.44

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Geotextil No Tejido 1600

Ins

1.0500

2,758.00

2,895.90

19

13,783

4,735 Hincada de pilotes en tuberia de 6 5/8"


9
8,144
14,755

155,661.50

Maquina de Pilotaje

Eqp

HR

0.5000

135,000.00

67,500.00

Oficial de Construccion

Ins

0.7500

9,282.00

6,961.50

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

Ins

1.0000

81,200.00

81,200.00

4,736 Dique, construccion con material de sitio, sin


seleccionar

12,000.41

Compactador Vibratorio

Eqp

HR

0.0238

100,000.00

2,380.00

Motoniveladora

Eqp

HR

0.0238

132,800.00

3,160.64

14

Retroexcavadora de orugas

Eqp

HR

0.0238

144,160.00

3,431.01

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0238

1,469.00

34.96

21

Volqueta (6 m3 )

Eqp

HR

0.0476

55,550.00

2,644.18

Cuadrilla AA (Albaileria)

Ins

0.0238

14,690.00

349.62

4,489

4,739 Bolsacreto con cemento - arena de 1.20 x 2.4 x 0.35


Relacion 1:8
17
804

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

163,188.25

1.6000

1,469.00

2,350.40

175.0000

383.34

67,084.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

166

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

1.6000

14,690.00

23,504.00

1.0500

46,157.00

5,144

Transporte de materiales Tn

48,464.85

Ana

13,923

0.1750

0.00

0.00

Bolsacreto 1101 de 1.20 x 2.40 (1 m3)

Ins

und

1.0000

14,172.00

14,172.00

15,528

Arena de rio (sucia)

Ins

1.0500

7,250.00

7,612.50

4,740 Dique, reconformacion de taludes con material del


sitio

9,364.44

14

Retroexcavadora de orugas

Eqp

HR

0.0185

144,160.00

2,666.96

21

Volqueta (6 m3 )

Eqp

HR

0.0185

55,550.00

1,027.68

41

Vibrocompactador tipo rana

Eqp

HR

0.3030

5,000.00

1,515.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.1481

2,550.00

377.66

Cuadrilla AA-3 (Limpieza)

Ins

0.1481

25,504.00

3,777.14

14,749

4,741 Geotextil No Tejido 4000

8,125.45

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0004

0.00

0.00

Geotextil No Tejido 4000

Ins

1.0500

7,004.00

7,354.20

19

15,777

4,742 Colchoneta Reno (Gavion) e= 0.30 m

216,237.72

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,061

Formaleta (1 uso)

Ana

0.1400

32,375.50

4,532.57

5,063

Piedra rajon o media zonga

Ana

1.0000

90,495.15

90,495.15

17

5,144

Transporte de materiales Tn

Ana

0.0096

0.00

0.00

13,850

Alambre Galvanizado No. 12

Ins

kg

1.8000

5,000.00

9,000.00

15,743

Malla Doble torsion 6 x 8 (C. reno)

Ins

9.0000

5,286.00

47,574.00

4,743 Replanteo y localizacion pavimento rigido


(Planimetria y Altimetria), pagado por m2

3,691.09

15

Estacion Total

Eqp

HR

0.0714

7,500.00

535.50

46

Campero 2000cc-3000cc

Eqp

HR

0.0714

21,534.00

1,537.53

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0020

42,950.00

85.90

8,108

Topografo

Ins

0.0714

7,660.00

546.92

8,109

Cadenero

Ins

0.0714

4,957.00

353.93

8,145

Ayudante de construccion

Ins

0.0714

5,407.00

386.06

13,326

Durmiente ordinario 3 M

Ins

0.2500

767.00

191.75

14,760

Cinta de Sealizacion

Ins

0.5000

107.00

53.50

4,744 Hexapodo en Concreto 3000 Psi.

560,604.87

14

Retroexcavadora de orugas

Eqp

HR

0.1500

144,160.00

21,624.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

2.3500

2,010.00

4,723.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.4900

32,375.50

48,239.50

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

21.2500

3,092.35

65,712.44

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

10.8500

3,075.79

33,372.32

5,144

Transporte de materiales Tn

Ana

2.4000

0.00

0.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

167

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,669

Cuadrilla AA-2 (Tuberias)

Ins

4,745 Demolicion de estructuras en concreto ciclopeo


(aletas y/o estribos H >= 3.0 m), sin retiro

Cantidad

Vr.Unitario

Vr.Total

2.3500

20,097.00

47,227.95

86,416.50

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.5000

35,000.00

52,500.00

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1.5000

2,010.00

3,015.00

4,008

Andamio metalico tubular

Ins

sm

0.1800

4,200.00

756.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

1.5000

20,097.00

30,145.50

4,748 Pedraplen, acarreo maximo 1 a 6 Km

68,196.08

14

Retroexcavadora de orugas

Eqp

HR

0.1250

144,160.00

18,020.00

16

Cargador sobre llantas

Eqp

HR

0.1250

113,000.00

14,125.00

25

Volqueta articulada Dumper

Eqp

HR

0.1250

125,000.00

15,625.00

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.1250

2,010.00

251.25

13,966

Piedra comun o bolo

Ins

1.1000

16,057.00

17,662.70

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.1250

20,097.00

2,512.13

4,749 Fabricacion viga riostra UPN 260 x 2300

und

558,228.11

42

Motosoldador Diesel

Eqp

HR

5.9500

14,833.00

88,256.35

43

Equipo de Oxicorte

Eqp

HR

0.6900

5,000.00

3,450.00

44

Pulidora electrica manual

Eqp

HR

0.6900

4,350.00

3,001.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

6.3800

6,805.00

43,415.90

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

2.1300

6,856.00

14,603.28

5,144

Transporte de materiales Tn

Ana

13,613

Sub-Contrato Estructura Metalica

Esp

13,805

Viga UPN 260

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

14,745

Oxigeno Industrial

14,746

Acetileno

0.1740

0.00

0.00

35.0000

413,502.30

144,725.81

4.6000

55,486.00

255,235.60

und

0.0820

6,200.00

508.40

Ins

0.1370

15,662.00

2,145.69

Ins

kg

0.0690

41,820.00

2,885.58

4,750 Tuberia de Polietileno PE-80 de 1" . Gas

6,363.64

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0132

16,159.00

213.30

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0250

46,387.50

1,159.69

13,848

Tuberia de Polietileno PE-80 de 1"

Ins

1.0500

4,646.00

4,878.30

14,760

Cinta de Sealizacion

Ins

1.0500

107.00

112.35

4,751 Reparacion tuberia de gas Polietileno PE-80 de 1/2"

und

156,249.75

46

Campero 2000cc-3000cc

Eqp

HR

1.5000

21,534.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

1.5000

46,387.50

69,581.25

14,760

Cinta de Sealizacion

Ins

2.0000

107.00

214.00

15,893

Tuberia para Gas en polietileno de 1/2"

Ins

1.0000

1,786.00

1,786.00

16,372

Union tipo socket para gas 1/2"

Ins

und

2.0000

3,965.00

7,930.00

4,752 Tuberia de Polietileno PE 80 PN-16 de 20 mm =


1/2"
2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

32,301.00

3,127.32

0.0003

28,250.00

8.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

168

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

Tuberia de Polietileno PE 80 PN-16 de 20 mm

Ins

13,812

4,753 Tuberia de Polietileno PE 80 PN-12.5 de =25 mm


= 3/4"

Cantidad

Vr.Unitario

Vr.Total

0.0526

16,159.00

849.96

und

0.0100

46,387.50

463.88

1.0000

1,805.00

1,805.00

3,904.17

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,811

Tuberia de Polietileno PE 80 PN-12.5 de 25 mm

Ins

1.0000

2,354.00

2,354.00

4,754 Tuberia de Polietileno PE 80 PN-12.5 de =32 mm


= 1"

6,535.26

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,813

Tuberia de Polietileno PE 80 PN-12.5 de 32 mm

Ins

1.0000

4,447.00

4,447.00

4,755 Tuberia de Polietileno PE 100 PN-16 de = 40 mm


= 1 1/4"

8,269.24

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1250

16,159.00

2,019.88

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,809

Tuberia de Polietileno PE 100 PN-16 de 40 mm

Ins

1.0000

5,777.00

5,777.00

4,756 Tuberia de Polietileno PE 100 PN-10 de =50 mm =


1 1/2"

9,134.48

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1429

16,159.00

2,309.12

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,814

Tuberia de Polietileno PE 100 PN-10 de 50 mm

Ins

1.0000

6,353.00

6,353.00

4,757 Tuberia de Polietileno PE 100 PN-10 de =63 mm =


2"

12,125.80

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,815

Tuberia de Polietileno PE 100 PN-10 de 63 mm

Ins

1.0000

9,068.00

9,068.00

4,758 Tuberia de Polietileno PE 100 PN-10 de =75 mm =


2 1/2"

16,370.43

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

13,810

Tuberia de Polietileno PE 100 PN-10 de 75 mm

Ins

1.0000

13,025.00

13,025.00

4,759 Tuberia de Polietileno PE 100 PN-10 de =90 mm =


3"

22,172.16

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

169

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

4,769

Union a Termofusion a Tope Diametro < 110 mm

16,342

Tuberia de Polietileno PE 100 PN-10 de 90 mm

und

0.0003

28,250.00

8.48

0.2000

16,159.00

3,231.80

Ana

und

0.0100

46,387.50

463.88

Ins

1.0000

18,468.00

18,468.00

4,760 Union reducida de Polietileno PE 25 mm x 20 mm


Socket

und

Vr.Total

8,082.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0714

16,159.00

1,153.75

Union reducida PE 25 mm x 20 mm Socket

Ins

und

1.0000

6,787.00

6,787.00

16,343

4,761 Union reducida de Polietileno PE 32 mm x 20 mm


Socket

und

9,856.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0714

16,159.00

1,153.75

Union reducida PE 32 mm x 20 mm Socket

Ins

und

1.0000

8,561.00

8,561.00

16,344

4,762 Union reducida de Polietileno PE 32 mm x 25 mm


Socket

und

10,498.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0714

16,159.00

1,153.75

Union reducida PE 32 mm x 25 mm Socket

Ins

und

1.0000

9,203.00

9,203.00

16,345

4,763 Excavacion mecanica conglomerado de 0-6 m zona


urbana (area restringida por tuberias gas, agua,
lluvias, ductos, etc)

10,019.94

14

Retroexcavadora de orugas

Eqp

HR

0.0625

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0625

1,469.00

91.81

Cuadrilla AA (Albaileria)

Ins

0.0625

14,690.00

918.13

4,489

4,764 Reposicion de Tuberia de Polietileno PE-80 de 1"

9,010.00

26,560.56

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.1400

4,750

Tuberia de Polietileno PE-80 de 1" . Gas

Ana

1.0000

6,363.64

6,363.64

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.1800

76,218.46

13,719.32

5,832

Relleno en arena lavada apisonada para atraque de la


tuberia, pagado en m3

Ana

0.0500

83,468.97

4,173.45

4,765 Fabricacion vigas receptoras de cables 350 x 200 x


1/2"

16,458.20

und

2,304.15

1,962,240.89

42

Motosoldador Diesel

Eqp

HR

21.1200

14,833.00

313,272.96

43

Equipo de Oxicorte

Eqp

HR

6.0100

5,000.00

30,050.00

44

Pulidora electrica manual

Eqp

HR

6.0100

4,350.00

26,143.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

22.6300

6,805.00

153,997.15

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

7.5400

6,856.00

51,694.24

5,144

Transporte de materiales Tn

Ana

0.3100

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

1,453,511.77

508,729.12

13,726

Perro de 1 1/2 " Tipo pesado.

Ins

und

2.0000

35,814.00

71,628.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.7200

6,200.00

4,464.00

14,745

Oxigeno Industrial

Ins

1.2000

15,662.00

18,794.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

170

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,746

Acetileno

Ins

kg

0.6000

41,820.00

25,092.00

14,945

Lamina HR 1/2"

Ins

3.0250

250,702.65

758,375.52

4,766 Fabricacion platinas horizontales 3/4" refuerzo


torre " H "

Cantidad

Vr.Unitario

und

Vr.Total

3,768,086.02

42

Motosoldador Diesel

Eqp

HR

16.0100

14,833.00

237,476.33

43

Equipo de Oxicorte

Eqp

HR

4.8800

5,000.00

24,400.00

44

4.8800

4,350.00

21,228.00

17.1600

6,805.00

116,773.80

Pulidora electrica manual

Eqp

HR

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2,934

kg

Soldadura electrosoldada 6010 de 1/8"

Ins

13,613

Sub-Contrato Estructura Metalica

Esp

13,885

Angulo o perfil 3" x 3" x 5/16"

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

15,782

Lamina HR 3/4"

5.7200

6,856.00

39,216.32

35.0000

2,791,174.83

976,911.19

13.6800

23,049.00

315,310.32

0.5850

6,200.00

3,627.00

0.9800

15,662.00

15,348.76

Ins

kg

0.4900

41,820.00

20,491.80

Ins

4.5000

443,845.00

1,997,302.50

4,768 Fabricacion platinas verticales 3/4" refuerzo torre


"H"

und

4,706,371.38

42

Motosoldador Diesel

Eqp

HR

58.7400

14,833.00

871,290.42

43

Equipo de Oxicorte

Eqp

HR

13.0600

5,000.00

65,300.00

44

Pulidora electrica manual

Eqp

HR

13.0600

4,350.00

56,811.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

62.9300

6,805.00

428,238.65

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

20.9800

6,856.00

143,838.88

5,144

Transporte de materiales Tn

Ana

0.6310

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

3,486,201.02

1,220,170.36

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

1.5700

6,200.00

9,734.00

14,745

Oxigeno Industrial

Ins

2.6100

15,662.00

40,877.82

14,746

Acetileno

Ins

kg

1.3100

41,820.00

54,784.20

15,782

Lamina HR 3/4"

Ins

4.0900

443,845.00

1,815,326.05

4,769 Union a Termofusion a Tope Diametro < 110 mm

und

46,387.50

55

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

79

Planta electrica 50 Kw

Eqp

HR

0.5000

31,250.00

15,625.00

Equipo de Termofusion < 110 mm

Eqp

HR

0.5000

43,750.00

21,875.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

104
4,515

4,771 Fabricacion espigo tipo B (anclaje estribo - pila)

und

400,260.91

42

Motosoldador Diesel

Eqp

HR

2.6700

14,833.00

39,604.11

43

Equipo de Oxicorte

Eqp

HR

1.6700

5,000.00

8,350.00

44

Pulidora electrica manual

Eqp

HR

1.6700

4,350.00

7,264.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2.8600

6,805.00

19,462.30

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.9500

6,856.00

6,513.20

3,684

Agua para obra

Ins

3.6750

10.00

36.75

5,144

Transporte de materiales Tn

Ana

0.0430

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

296,489.56

103,771.35

13,736

Tuerca =3/4" G-8

Ins

und

12.0000

980.00

11,760.00

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

360.0000

180.00

64,800.00

13,806

Sikagrout 200

Ins

kg

0.3712

2,436.00

904.24

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2000

6,200.00

1,240.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

171

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

15,782

Lamina HR 3/4"

Ins

4,772 Fabricacion conexion pendulo a dado de anclaje

Cantidad

Vr.Unitario

Vr.Total

0.3300

15,662.00

5,168.46

kg

0.1700

41,820.00

7,109.40

0.2800

443,845.00

124,276.60

und

1,175,391.59

42

Motosoldador Diesel

Eqp

HR

3.4800

14,833.00

51,618.84

43

Equipo de Oxicorte

Eqp

HR

4.4600

5,000.00

22,300.00

44

Pulidora electrica manual

Eqp

HR

4.4600

4,350.00

19,401.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

3.7200

6,805.00

25,314.60

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.2400

6,856.00

8,501.44

5,144

Transporte de materiales Tn

Ana

0.2570

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

870,660.44

304,731.15

13,852

Lamina HR 1 1/4"

Ins

0.3200

692,632.00

221,642.24

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5300

6,200.00

3,286.00

14,745

Oxigeno Industrial

Ins

0.8900

15,662.00

13,939.18

14,746

Acetileno

Ins

kg

0.4500

41,820.00

18,819.00

15,783

Lamina HR 1"

Ins

0.7920

613,432.00

485,838.14

4,803 Pasamuro en A.C. =8" L=0.95 m E.B. Suministro e


instal.
17
4,489
14,798

und

971,513.47

Herramienta Menor 10% M.O. AA

Eqp

HR

1.7778

1,469.00

2,611.59

Cuadrilla AA (Albaileria)

Ins

1.7778

14,690.00

26,115.88

Pasamuro en A.C. =8" L=0.95 m E.B.

Ins

und

1.0000

942,786.00

942,786.00

4,804 Correa tubo rectangular 80*40*3 mm, anticorrosivo


y esmalte instalada.

44,371.64

Sub-Contrato Ornamentacion

Esp

50.0000

29,581.09

14,790.55

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2600

1,469.00

381.94

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0100

42,950.00

429.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.2600

14,690.00

3,819.40

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3000

6,885.00

2,065.50

16,425

Tubo rectangular 80*40*3 mm*6 m

Ins

und

0.1750

129,070.00

22,587.25

7
17

4,805 Canaleta lmina galvanizada cal. 22 desarrollo


prom. 0.50 m

42,516.30

Sub-Contrato Latoneria

Esp

60.0000

26,572.69

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.4000

20,300.00

8,120.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2500

46,339.00

11,584.75

1
17

15,746

4,806 Pantalla contra solidos flotantes en PRFV, e= 5


mm. Suministro e instal.

15,943.61

357,742.00

2,032

Lamina en PRFV e= 5 mm

Ins

1.0000

341,583.00

341,583.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,807 Teja termoacustica tipo Cindu

31,508.25

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

172

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

1,298

Teja tipo cindu

Ins

1.1500

22,000.00

25,300.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0120

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

und

2.5000

525.00

1,312.50

17

4,808 Terraplen con material crudo de rio selecionado T.


max. 3" (zaranda)

Cantidad

Vr.Unitario

Vr.Total

30,699.45

Compactador Vibratorio

Eqp

HR

0.0313

100,000.00

3,130.00

Motoniveladora

Eqp

HR

0.0313

132,800.00

4,156.64

Carrotanque de Agua

Eqp

HR

0.0313

53,125.00

1,662.81

Crudo de rio clasificado T.m. 3"

Ins

1.2500

17,400.00

21,750.00

11
14,171

4,809 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.15

70,823.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1600

4,375.00

700.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1500

351,843.89

52,776.58

4,810 Hidrante tipo Milan =3" en ext. liso.


109
4,515
14,514

und

1,175.20

1,611,828.00

Herramienta Menor 5% M.O. BB

Eqp

HR

4.0000

808.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Hidrante tipo Milan =3" en ext. liso

Ins

und

1.0000

1,543,960.00

1,543,960.00

4,811 Caja en concreto reforzado 3000 Psi para estacion


macromedidora =3" (2.20 x 1.0 x 1.20 libres)

und

2,644,509.66

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

17,628.00

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

3.1800

333,142.66

1,059,393.66

8,194

Acero de refuerzo 60000 Psi

Ins

kg

344.0000

2,257.00

776,408.00

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

17

14,513

4,812 Caja en concreto reforzado 3000 Psi para estacion


macromedidora =4" (2.30 x 1.2 x 1.20 libres)

und

2,893,485.58

Herramienta Menor 10% M.O. AA

Eqp

HR

14.0000

1,469.00

20,566.00

4,489

Cuadrilla AA (Albaileria)

Ins

14.0000

14,690.00

205,660.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

3.6000

333,142.66

1,199,313.58

8,194

Acero de refuerzo 60000 Psi

Ins

kg

378.0000

2,257.00

853,146.00

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

17

14,513

4,813 Caja en concreto reforzado 3000 Psi para estacion


macromedidora =6" (2.60 x 1.2 x 1.30 libres)

und

3,195,836.91

Herramienta Menor 10% M.O. AA

Eqp

HR

15.0000

4,489

Cuadrilla AA (Albaileria)

Ins

15.0000

14,690.00

220,350.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

4.1000

333,142.66

1,365,884.91

8,194

Acero de refuerzo 60000 Psi

Ins

kg

431.0000

2,257.00

972,767.00

17

1,469.00

22,035.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

173

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,513

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

4,814 Caja en concreto reforzado 3000 Psi para estacion


macromedidora =8" (3.00 x 1.2 x 1.40 libres)

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

614,800.00

614,800.00

und

3,609,956.77

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

4.8000

333,142.66

1,599,084.77

8,194

Acero de refuerzo 60000 Psi

Ins

kg

504.0000

2,257.00

1,137,528.00

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

17

14,513

4,815 Hidrante tipo Milan =4" en ext. liso.


109
4,515
14,515

und

Herramienta Menor 5% M.O. BB

Eqp

HR

4.0000

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Hidrante tipo Milan =4" en ext. liso

Ins

und

1.0000

2,017,240.00

2,017,240.00

4,816 Hidrante tipo Milan =6" en ext. liso.


109
4,515
14,516

2,085,108.00

808.00

und

3,232.00

2,758,635.00

Herramienta Menor 5% M.O. BB

Eqp

HR

5.0000

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

Hidrante tipo Milan =6" en ext. liso

Ins

und

1.0000

2,673,800.00

2,673,800.00

4,817 Junta de dilatacion 10 mm x 10 mm

808.00

17

Herramienta Menor 10% M.O. AA

Eqp

51

4,040.00

7,456.10

HR

0.1250

1,469.00

183.63

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0200

35,000.00

700.00

3,178

Cordon de respaldo Sika road 16 mm

Ins

1.0000

1,114.00

1,114.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1250

14,690.00

1,836.25

Sellante Sika flex 15 LM SL

Ins

kg

0.1201

30,160.00

3,622.22

14,797

4,818 Junta de dilatacion 6 mm x 6 mm

4,137.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0200

35,000.00

700.00

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

14,796

Cordon de respaldo Sika road 10 mm

Ins

1.0000

522.00

522.00

14,797

Sellante Sika flex 15 LM SL

Ins

kg

0.0431

30,160.00

1,299.90

4,489

4,819 Suministro e instal. tuberia PVC alcantarillado 6"

146.90

24,676.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

3,713.34

13,740

Tuberia alcantarillado PVC 6 "

Ins

1.0000

20,918.00

20,918.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

4,515

4,820 Suministro e instal. tuberia PVC alcantarillado 8"

35,579.64

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

4,952.73

13,741

Tuberia alcantarillado PVC 8 "

Ins

1.0000

30,558.00

30,558.00

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

4,515

4,821 Suministro e instal. tuberia PVC alcantarillado 10"


55

Herramienta Menor 10% M.O. BB

m
Eqp

HR

51,120.97

0.0040

1,616.00

6.46

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

174

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.4024

16,159.00

6,502.38

13,742

Tuberia alcantarillado PVC 10 "

Ins

1.0000

44,510.00

44,510.00

14,118

Lubricante 500 gr

Ins

und

0.0083

12,305.00

102.13

4,515

4,822 Suministro e instal. tuberia PVC alcantarillado 12"

73,287.50

Cuadrilla BB (Instalaciones)

Ins

0.4598

16,159.00

7,429.91

13,743

Tuberia alcantarillado PVC 12 "

Ins

1.0000

65,721.00

65,721.00

14,118

Lubricante 500 gr

Ins

und

0.0111

12,305.00

136.59

4,515

4,823 Suministro e instal. tuberia PVC alcantarillado 16"

112,182.86

Cuadrilla BB (Instalaciones)

Ins

0.6126

16,159.00

9,899.00

13,744

Tuberia alcantarillado PVC 16 "

Ins

1.0000

101,991.00

101,991.00

14,118

Lubricante 500 gr

Ins

und

0.0238

12,305.00

292.86

4,515

4,824 Suministro e instal. tuberia PVC alcantarillado 18"

153,130.94

Cuadrilla BB (Instalaciones)

Ins

0.6897

16,159.00

11,144.86

13,745

Tuberia alcantarillado PVC 18 "

Ins

1.0000

141,644.00

141,644.00

14,118

Lubricante 500 gr

Ins

und

0.0278

12,305.00

342.08

4,515

4,825 Suministro e instal. tuberia PVC alcantarillado 20"

184,259.40

Cuadrilla BB (Instalaciones)

Ins

0.7663

16,159.00

12,382.64

13,746

Tuberia alcantarillado PVC 20 "

Ins

1.0000

171,467.00

171,467.00

14,118

Lubricante 500 gr

Ins

und

0.0333

12,305.00

409.76

4,515

4,831 Suministro e instal. tuberia sanitaria PVC 3",


pagado m

15,307.94

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2000

1,616.00

323.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0019

58,612.00

111.36

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2000

16,159.00

3,231.80

15,438

Tubo PVC sanitario de 3"

Ins

1.0500

10,595.00

11,124.75

15,539

Union sanitaria PVC 3"

Ins

und

0.1667

2,253.00

375.58

55

4,832 Suministro e instal. tuberia sanitaria PVC 4",


pagado m

21,186.61

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2286

1,616.00

369.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

14,086

Union sanitaria PVC 4"

Ins

und

0.1667

4,501.00

750.32

15,439

Tubo PVC sanitario de 4"

Ins

1.0500

14,766.00

15,504.30

55

4,834 Fabricacion conexion pendulo a viga de anclaje


superior

und

1,372,150.53

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

3.7200

6,805.00

25,314.60

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.2400

6,856.00

8,501.44

5,144

Transporte de materiales Tn

Ana

0.1630

0.00

0.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

175

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,613

Sub-Contrato Estructura Metalica

Esp

13,750

Eje 4" 1045 (SAE 1020)

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

15,783

Lamina HR 1"

Ins

4,835 Fabricacion conexion entre vigas con paltinas 3/4"


y 5/8"

Cantidad

Vr.Unitario

Vr.Total

35.0000

1,016,407.80

355,742.73

cm

60.0000

8,000.00

480,000.00

0.2500

6,200.00

1,550.00

0.4100

15,662.00

6,421.42

kg

0.2100

41,820.00

8,782.20

0.7920

613,432.00

485,838.14

und

2,441,589.63

43

Equipo de Oxicorte

Eqp

HR

8.0000

5,000.00

40,000.00

44

Pulidora electrica manual

Eqp

HR

8.0000

4,350.00

34,800.00

Transporte de materiales Tn

Ana

0.3320

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

1,808,584.91

633,004.72

13,749

Tornillo = 5/8" x 3" G-8 R.O. Con T. A.

Ins

und

56.0000

2,960.00

165,760.00

13,751

Tornillo = 1" x 4" G-8 R.O. Con T. A.

Ins

und

48.0000

10,650.00

511,200.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.9600

6,200.00

5,952.00

14,745

Oxigeno Industrial

Ins

1.6000

15,662.00

25,059.20

14,746

Acetileno

Ins

kg

0.8000

41,820.00

33,456.00

15,781

Lamina HR 5/8"

Ins

0.8400

383,514.00

322,151.76

15,782

Lamina HR 3/4"

Ins

1.5100

443,845.00

670,205.95

5,144

4,856 Suministro e instal. tuberia presion PVC RDE 21 1"

4,598.06

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0010

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0010

28,250.00

28.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1047

16,159.00

1,691.85

14,996

Tubo presin RDE 21 PVC 1 "

Ins

1.0000

2,716.00

2,716.00

15,041

Union presion PVC 1"

Ins

und

0.1667

620.00

103.35

4,858 Suministro e instal. tuberia presion PVC RDE 21 1


1/4"

58.61

7,329.44

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0015

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0015

28,250.00

42.38

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1308

16,159.00

2,113.60

14,997

Tubo presin RDE 21 PVC 1 1/4 "

Ins

1.0000

4,896.00

4,896.00

15,042

Union presion PVC 1 1/4"

Ins

und

0.1667

1,137.00

189.54

4,862 Suministro e instal. tuberia union mecanica RDE 21


2"

87.92

8,034.62

Cuadrilla BB (Instalaciones)

Ins

0.0766

16,159.00

1,237.78

14,118

Lubricante 500 gr

Ins

und

0.0008

12,305.00

9.84

15,165

Tubo union mecanica RDE 21 PVC 2 "

Ins

1.0000

6,787.00

6,787.00

4,515

4,899 Fabricacion tope sismico - pendulo

und

468,669.65

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

4.0200

6,805.00

27,356.10

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.3400

6,856.00

9,187.04

3,684

Agua para obra

Ins

4.7000

10.00

47.00

5,144

Transporte de materiales Tn

Ana

0.4480

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

347,162.70

121,506.95

13,734

Tuerca =1" G-8

Ins

und

8.0000

2,200.00

17,600.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

176

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

13,790

Eje cabeza y rosca 1" 1045 (SAE 1020) 1000 mm

Ins

cm

13,806

Sikagrout 200

Ins

kg

361.0000

250.00

90,250.00

9.9700

2,436.00

13,913

Viga IPE 270

Ins

24,286.92

14,744

Disco pulidora LT W 7 x 1/4"

0.2582

128,200.00

33,101.24

Ins

und

0.2100

6,200.00

14,745

1,302.00

Oxigeno Industrial

Ins

0.3500

15,662.00

5,481.70

14,746

Acetileno

Ins

kg

0.1800

41,820.00

7,527.60

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

0.5000

13,493.00

6,746.50

15,782

Lamina HR 3/4"

Ins

0.2800

443,845.00

124,276.60

4,903 Obra falsa en Ciclopeo y Madera para Puentes en


Concreto reforzado

440,915.22

Herramienta menor 10% M.O. AA-3

Eqp

HR

2.4600

2,550.00

6,273.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.6000

318,473.24

191,083.94

5,061

Formaleta (1 uso)

Ana

0.4833

32,375.50

15,647.08

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

2.4600

25,504.00

62,739.84

15,987

Madera de 0.10 x 0.20 x 1 Polin

Ins

7.5000

8,360.00

62,700.00

15,988

Madera de 0.10 x 0.10 x 1 Polin

Ins

2.7000

9,079.00

24,513.30

15,990

Madera de 0.10 x 0.15 x 1

Ins

6.0000

6,960.00

41,760.00

53

4,905 Terraplen en material de rio Seleccionado (zaranda)


T.max. 4", acarreo max. 2 Km

32,046.13

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

11

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

Crudo de rio clasificado T.m. 4"

Ins

1.1500

16,820.00

19,343.00

14,170

4,906 Saco (0.7 x 1.0) con suelo arcilloso - cemento (7:1),


cemento al 6% en peso

und

5,684.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1300

1,469.00

190.97

Cemento gris

Ins

kg

7.0000

383.34

2,683.38

4,489

Cuadrilla AA (Albaileria)

Ins

0.1300

14,690.00

1,909.70

5,144

Transporte de materiales Tn

Ana

0.0070

0.00

0.00

Saco en fibra (0.70 x 1.00)

Ins

und

1.0000

900.00

900.00

17
804

16,285

4,907 Cuneta revestida en Sacos (0.1 x 0.6 x 0.7) con


suelo-cemento (7:1), cemento al 6 % en peso,
Trapezoidal, L1= 0.6 L2=1

51,188.97

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

4,906

Saco (0.7 x 1.0) con suelo arcilloso - cemento (7:1),


cemento al 6% en peso

Ana

und

7.3000

5,684.05

41,493.57

17

4,908 Demolicion mecanica de pavimento en concreto


asfaltico (inc. retiro)

8,827.01

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0083

111,550.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0042

1,469.00

6.17

21

Volqueta (6 m3 )

Eqp

HR

0.0114

55,550.00

633.27

925.87

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

177

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
57
4,489

Nombre

Tipo U.M.

Cortadora concreto (Disco Diaman. 14")

Eqp

Cuadrilla AA (Albaileria)

Ins

4,913 Sardinel Prefabricado (0.4 x 0.80 x 0.20)

Cantidad

Vr.Unitario

Vr.Total

HR

0.1600

45,000.00

7,200.00

0.0042

14,690.00

61.70

31,915.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0015

276,302.97

414.45

4,426

Arena lavada de rio

Ins

0.0120

13,800.00

165.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,143

Transporte de materiales m

Ana

0.0120

46,157.00

553.88

5,144

Transporte de materiales Tn

Ana

0.1500

0.00

0.00

Sardinel Prefabricado 0.4 x 0.8 x 0.2

Ins

und

1.2500

22,040.00

27,550.00

17

13,895

4,914 Dilatacion en ladrillo tolete comun A=0.07

8,464.64

Herramienta menor 5% M.O. AA

Eqp

HR

0.1667

735.00

122.52

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0090

248,144.84

2,233.30

2,085

Ladrillo tolete comn

Ins

und

12.0000

305.00

3,660.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1667

14,690.00

2,448.82

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

19

4,915 Placa o losa Concreto resistencia 210 kg/cm2-3000


psi

576,348.82

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

17,628.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.3200

32,375.50

42,735.66

4,920 Apoyo de Neopreno D=60 (0.56 m x 0.50 m x 1 1/2")

und

212,712.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.50 x 0.56) m D=60 E=1 1/2"

Ins

und

1.0000

205,000.00

205,000.00

19

16,226

4,921 Geotextil No Tejido 2500

5,162.35

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Geotextil No Tejido 2500

Ins

1.0500

4,182.00

4,391.10

19

16,227

4,922 Tuberia con rosca PVC RDE 21 =6" de 2 TPI.


Suministro e Instal.

112,957.87

Equipo de perforacion y rotacion

Eqp

HR

0.1905

76,000.00

14,478.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1905

2,305.00

439.10

14,841

Puntera Hembra PVC RDE 21 4" de 2 o 4 TPI

Ins

und

0.0125

39,440.00

493.00

16,274

Tuberia con rosca PVC RDE 21 6" de 2 o 4 TPI

Ins

1.0000

90,403.00

90,403.00

16,276

Reduccion de Pozo PVC RDE 21 6" x 4"

Ins

und

0.0125

220,284.00

2,753.55

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1905

23,051.00

4,391.22

85
112

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

178

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,923 Paete impermeabilizado muros 1:3 espesor de 2


cm, pagado en m2

Cantidad

Vr.Unitario

Vr.Total
18,719.87

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0250

430,750.59

10,768.76

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

4,924 Paete impermeabilizado muros 1:3 espesor 2


cms, filos y dilataciones, pagado en m2

19,187.58

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

Filos y dilataciones Mortero 1:3, pagado en ML

Ana

0.5000

4,381.41

2,190.71

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0210

430,750.59

9,045.76

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17
263

4,925 Canal en lamina galvanizada cal. 22 desarrollo 0.50


m

45,715.48

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.4000

20,300.00

8,120.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

80.0000

25,397.49

20,317.99

15,746

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2500

46,339.00

11,584.75

4,926 Cielo raso dry-wall plano pintado

38,393.28

Herramienta Menor 10% M.O. DD

Eqp

HR

1.2000

1,763.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0500

45,483.00

2,274.15

5,064

Cuadrilla DD (Carpinteria)

Ins

1.2000

17,628.00

21,153.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

15,834

Perfil omega 2.44

Ins

und

0.5000

3,150.00

1,575.00

15,839

Angulo cal 26-24 x 1" L=2.44 m cielo raso drywall

Ins

und

0.4200

1,851.00

777.42

16,442

Lamina superplaca 1/2" para dry wall

Ins

und

0.3800

18,500.00

7,030.00

16,443

Canaleta vigueta gyplac

Ins

und

0.6500

3,150.00

2,047.50

16,444

Tornillo 8*9/16" corto entre perf estruct dry wall

Ins

und

10.0000

20.00

200.00

16,445

Tornillo standar 6*1" largo lminas dry wall

Ins

und

15.0000

20.00

300.00

16,446

Cinta de papel rollo 75 m para juntas dry wall

Ins

und

0.0200

9,000.50

180.01

16,447

Masilla para juntas de gyplac dry wall

Ins

gal

0.0200

37,000.00

740.00

56

4,927 Muro en concreto ciclpeo 3.000 psi

2,115.60

410,909.86

Herramienta Menor 10% M.O. AA

Eqp

HR

6.7000

4,489

Cuadrilla AA (Albaileria)

Ins

6.7000

14,690.00

98,423.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

2.0000

32,375.50

64,751.00

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

17

4,928 Lamina HR de 1/2"

1,469.00

9,842.30

346,442.39

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

179

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

42

Motosoldador Diesel

Eqp

43

Equipo de Oxicorte

Eqp

HR

0.5000

14,833.00

7,416.50

HR

0.5000

5,000.00

44

Pulidora electrica manual

2,500.00

Eqp

HR

48

0.2500

4,350.00

1,087.50

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

14,945

Lamina HR 1/2"

Ins

1.0000

250,702.65

250,702.65

4,929 Lamina HR de 3/8"

259,943.68

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

5,144

Transporte de materiales Tn

Ana

0.0750

0.00

0.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

15,735

Lamina HR 3/8"

Ins

1.0000

165,592.00

165,592.00

4,930 Lamina HR de 3/16"

207,407.62

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.2000

5,000.00

1,000.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

5,144

Transporte de materiales Tn

Ana

0.0370

0.00

0.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

15,780

Lamina HR 3/16"

Ins

1.0000

114,944.00

114,944.00

4,931 Bolsacreto con cemento - arena de 1.20 x 2.4 x 0.35


Relacion 1:10

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

13,923
15,528

17
804

149,771.35

1.6000

1,469.00

2,350.40

140.0000

383.34

53,667.60

1.6000

14,690.00

23,504.00

1.0500

46,157.00

48,464.85

Ana

0.1400

0.00

0.00

Bolsacreto 1101 de 1.20 x 2.40 (1 m3)

Ins

und

1.0000

14,172.00

14,172.00

Arena de rio (sucia)

Ins

1.0500

7,250.00

7,612.50

4,932 Viga aerea concreto 3000 Psi (h= 0 - 6 m)

778,331.20

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

16.0000

2,010.00

32,160.00

80

Pluma grua o Malacate

Eqp

HR

1.6500

8,750.00

14,437.50

Paral telescopico 2 a 4 ml

Ins

30.0000

340.00

10,200.00

4,867

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

180

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

13,641

Seccin de Andamio

Ins

mes

14,669

Cuadrilla AA-2 (Tuberias)

Ins

4,933 Bolsacreto con cemento - arena de 0.60 x 0.80


Relacion 1:10

Cantidad

Vr.Unitario

Vr.Total

1.0000

333,142.66

333,142.66

1.3330

32,375.50

43,156.54

1.0000

17,120.00

17,120.00

16.0000

20,097.00

321,552.00

und

21,941.16

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1951

1,469.00

286.60

Cemento gris

Ins

kg

23.5200

383.34

9,016.16

4,489

Cuadrilla AA (Albaileria)

Ins

0.1951

14,690.00

2,866.02

5,143

Transporte de materiales m

Ana

0.1680

46,157.00

7,754.38

5,144

Transporte de materiales Tn

Ana

0.0235

0.00

0.00

15,366

Saco en fibra (0.60 x 0.80)

Ins

und

1.0000

800.00

800.00

15,528

Arena de rio (sucia)

Ins

0.1680

7,250.00

1,218.00

17
804

4,934 Mejoramiento de la subrasante o afirmado (incluye:


conformar, extender, riego y compactacion)

7,148.13

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

11

4,936 Muro de Contencion (elevacion) Concreto 3000 Psi.


e =0,30 - 0 60

637,776.02

17

Herramienta Menor 10% M.O. AA

Eqp

HR

15.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

15.0000

14,690.00

220,350.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.7200

32,375.50

55,685.86

4,937 Mezcla asfaltica MDC-2 para reparcheo e=0.05 0.10 m (colocacion manual)

22,035.00

26,271.18

Compactador Vibratorio

Eqp

HR

0.0230

100,000.00

2,300.00

24

Compactador Neumatico

Eqp

HR

0.0230

120,900.00

2,780.70

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0230

3,091.00

71.09

13,849

Mezcla asfaltica MDC-2

Ins

0.0580

351,870.00

20,408.46

13,960

Cuadrilla AA-4

Ins

0.0230

30,910.00

710.93

4,938 Bolsacreto con cemento - arena de 0.6 x 0.80


Relacion 1:8

und

24,195.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1951

1,469.00

286.60

Cemento gris

Ins

kg

29.4000

383.34

11,270.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.1951

14,690.00

2,866.02

5,143

Transporte de materiales m

Ana

0.1680

46,157.00

7,754.38

5,144

Transporte de materiales Tn

Ana

0.0294

0.00

0.00

15,366

Saco en fibra (0.60 x 0.80)

Ins

und

1.0000

800.00

800.00

15,528

Arena de rio (sucia)

Ins

0.1680

7,250.00

1,218.00

17
804

4,939 Conformacion de la banca y/o Terraplen (Incluye:


escarificar, perfilar, conformar, riego y
compactacion)

486.07

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

181

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Compactador Vibratorio

Eqp

Motoniveladora

Eqp

Carrotanque de Agua

Eqp

11

4,942 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.17

Cantidad

Vr.Unitario

Vr.Total

HR

0.0017

100,000.00

170.00

HR

0.0017

132,800.00

225.76

HR

0.0017

53,125.00

90.31

79,563.72

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1700

351,843.89

59,813.46

4,943 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.12

1,322.10

57,381.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6300

1,469.00

925.47

49

Vibrador de concretos

Eqp

HR

0.1280

4,375.00

560.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.6300

14,690.00

9,254.70

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1200

351,843.89

42,221.27

4,944 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.10

46,932.75

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5300

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1060

4,375.00

463.75

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1000

351,843.89

35,184.39

4,945 Placa Piso Concreto resistencia 280 kg/cm2-4000


psi e=0.20

778.57

97,997.75

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2150

4,375.00

940.63

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.2000

378,352.56

75,670.51

4,946 Placa Piso Concreto resistencia 280 kg/cm2-4000


psi e=0.17

1,542.45

84,070.20

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.1700

378,352.56

64,319.94

4,947 Placa Piso Concreto resistencia 280 kg/cm2-4000


psi e=0.15

1,322.10

74,799.74

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

49

Vibrador de concretos

Eqp

HR

0.1600

4,375.00

700.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

182

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.1500

378,352.56

56,752.88

4,948 Placa Piso Concreto resistencia 280 kg/cm2-4000


psi e=0.12

Cantidad

Vr.Unitario

17

Herramienta Menor 10% M.O. AA

Eqp

49

Vr.Total

60,562.14

HR

0.6300

1,469.00

925.47

Vibrador de concretos

Eqp

HR

0.1280

4,375.00

560.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.6300

14,690.00

9,254.70

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.1200

378,352.56

45,402.31

4,949 Tacha reflectiva

und

7,058.77

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0357

1,469.00

52.44

4,489

Cuadrilla AA (Albaileria)

Ins

0.0357

14,690.00

524.43

8,213

Tachas reflectivas

Ins

und

1.0000

5,000.00

5,000.00

13,855

Pegante Epoxico

Ins

kg

0.0350

42,340.00

1,481.90

17

4,950 Sobrecimientos en ladrillo tolete recocido 0.25, H =


0.51, pagado en m2

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

2,059

Ladrillo tolete recocido

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

5,144

Transporte de materiales Tn
Sika 1 imp. integral

17
804

14,122

157,471.48

4.8720

1,469.00

7,156.97

77.3000

383.34

29,632.18

105.3135

300.00

31,594.05

31.0000

10.00

310.00

0.1740

13,800.00

2,401.20

Ins

4.8720

14,690.00

71,569.68

Ana

0.1479

0.00

0.00

Ins

kg

2.3000

6,438.00

14,807.40

4,957 Mortero Impermeabilizado 1:3 (desperdicio 5%)

430,750.59

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

476.7000

383.34

182,738.18

3,684

Agua para obra

Ins

238.0000

10.00

2,380.00

4,426

Arena lavada de rio

Ins

1.1445

13,800.00

15,794.10

5,143

Transporte de materiales m

Ana

1.1445

46,157.00

52,826.69

5,144

Transporte de materiales Tn

Ana

0.4767

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

Sika 1 imp. integral

Ins

kg

23.9900

6,438.00

154,447.62

73
804

14,122

4,965 Mortero Impermeabilizado 1:4 (desperdicio 5%)

367,816.92

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

382.2000

383.34

146,512.55

3,684

Agua para obra

Ins

191.0000

10.00

1,910.00

4,426

Arena lavada de rio

Ins

1.2180

13,800.00

16,808.40

5,143

Transporte de materiales m

Ana

1.2180

46,157.00

56,219.23

5,144

Transporte de materiales Tn

Ana

0.3822

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

Sika 1 imp. integral

Ins

kg

19.2300

6,438.00

123,802.74

73
804

14,122

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

183

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,966 Tapon en H.D. =12" ext. liso. Suministro e Instal.


55
4,515
15,793

Cantidad

Vr.Unitario

und

Vr.Total
546,527.76

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7273

1,616.00

1,175.32

Cuadrilla BB (Instalaciones)

Ins

0.7273

16,159.00

11,752.44

Tapon en H.D. =12" ext. liso

Ins

und

1.0000

533,600.00

533,600.00

4,967 Valvula de Ventosa 3". Camara doble accion


multiple E.B.

und

819,159.40

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5333

1,616.00

861.81

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

8,617.59

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

Valv. ventosa (cam. doble) acc. multiple 3" E.B

Ins

und

1.0000

765,600.00

765,600.00

55

16,211

4,968 Resina de impregnacion epoxica de alta


resistencia.
61
5,066
16,382

49,392.56

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

337.80

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

Sikadur hex 300 resina de impregnacin

Ins

kg

0.3680

124,120.00

45,676.16

4,969 Pedestal en concreto de 3000 psi, pagado en m3

427,161.66

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

2,195

Planchon ordinario 3 M

Ins

3.0000

3,200.00

9,600.00

2,243

Vara de clavo 3M -1

Ins

0.5000

1,500.00

750.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.0000

600.00

1,800.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0000

14,690.00

73,450.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

4,972 Bolsacreto con arena de 0.60 x 0.80

und

7,345.00

11,388.28

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

5,143

7,754.38

17

Transporte de materiales m

Ana

0.1680

46,157.00

15,366

Saco en fibra (0.60 x 0.80)

Ins

und

1.0000

800.00

800.00

15,528

Arena de rio (sucia)

Ins

0.1680

7,250.00

1,218.00

4,989 Limpieza y sello de juntas entre muros y carpintera


metlica de 10*10 mm
17
4,489
16,482

9,097.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

Sikaflex-1a cartucho 305 cc

Ins

und

0.3225

23,200.00

7,482.00

4,990 Sardinel Prefabricado (0.3 x 0.80 x 0.20)

25,449.98

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0010

276,302.97

276.30

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

184

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

Sardinel Prefabricado 0.3 x 0.8 x 0.2

Ins

13,898

4,991 Fabricacion platinas 1" de conexion pendulo dado de conexion

Vr.Unitario

Vr.Total

0.0120

46,157.00

553.88

0.0900

0.00

0.00

und

1.2500

17,000.00

21,250.00

und

43

Equipo de Oxicorte

Eqp

44

Pulidora electrica manual


Transporte de materiales Tn

13,613

Sub-Contrato Estructura Metalica

Esp

14,744

Disco pulidora LT W 7 x 1/4"

14,745

Oxigeno Industrial

14,746
15,783

5,144

Cantidad

3,832,760.48

HR

15.0800

5,000.00

75,400.00

Eqp

HR

15.0800

4,350.00

65,598.00

Ana

0.8660

0.00

0.00

35.0000

2,839,081.84

993,678.64

Ins

und

1.8100

6,200.00

11,222.00

Ins

3.0200

15,662.00

47,299.24

Acetileno

Ins

kg

1.5100

41,820.00

63,148.20

Lamina HR 1"

Ins

4.2000

613,432.00

2,576,414.40

4,992 Demolicion placas macizas de espesor menor a


0.15 metros, pagado en m2

34,881.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0220

55,550.00

1,222.10

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.5000

35,000.00

17,500.00

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

4,489

4,993 Muro en ladrillo tolete recocido 0.12 (12 x 25 x 6)

1,469.00

29,430.29

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0210

248,144.84

5,211.04

2,056

Ladrillo recocido oscuro

Ins

und

55.0000

220.00

12,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,144

Transporte de materiales Tn

Ana

0.2750

0.00

0.00

17

4,994 Canal perimetral con tapa, en concreto 3000 psi


a=0.53 * h=0.45 todos los e=0.10m

1,101.75

58,500.23

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3700

1,469.00

543.53

2,200

Tabla burra ordinario 0.30

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.3700

14,690.00

5,435.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

Durmiente ordinario 3 M

Ins

0.5000

767.00

383.50

17

13,326

4,995 Placa gradera en concreto 3000 psi prefabricada


e=0.10 m reforzada 4 varillas de 1/2"

63,083.67

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6800

1,469.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1600

2,480.00

396.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.6800

14,690.00

9,989.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

4.5000

3,075.79

13,841.06

13,326

Durmiente ordinario 3 M

Ins

1.0000

767.00

767.00

13,853

Camilla para formaleta 0.7x1.4

Ins

1.0000

285.00

285.00

15,501

Camilla para formaleta 0.35x1.4

Ins

1.0000

160.00

160.00

17

4,996 Remate en concreto de 2500 psi e=0.12 h=0.40


segn perfil de teja canaleta

998.92

15,390.27

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

185

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

4,489

Cuadrilla AA (Albaileria)

Ins

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

13,641

Seccin de Andamio

Ins

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

17

5,004 Material crudo de rio T.max 6"


13,921

Crudo de rio clasificado T.m. 6"

Cantidad

Vr.Unitario

Vr.Total

HR

0.3000

1,469.00

440.70

0.3000

14,690.00

4,407.00

0.0330

318,473.24

10,509.62

mes

0.0012

17,120.00

20.54

0.0050

2,482.00

12.41

m
Ins

5,005 Conformacion de la Banca Existente (Incluye:


Escarificar, perfilar, extender, cunetear, riego y
compactacion)

19,575.00

1.2500

15,660.00

km

19,575.00

2,387,484.59

Compactador Vibratorio

Eqp

HR

8.3330

100,000.00

833,300.00

Motoniveladora

Eqp

HR

8.3330

132,800.00

1,106,622.40

Carrotanque de Agua

Eqp

HR

8.3330

53,125.00

442,690.63

Ayudante (A)

Ins

1.0416

4,677.00

4,871.56

11
14,703

5,008 Cerca poste en concreto, alambre pua cal.12, c/3.0


m, hp = 2.00 m, 4 hilos

13,538.73

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.2283

2,010.00

458.88

Excavacion a mano en material comun, pagado en m3

Ana

0.0320

22,829.00

730.53

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0270

16,458.20

444.37

5,144

Transporte de materiales Tn

Ana

0.0240

0.00

0.00

8,146

Poste cerca 10 x 10 cm 210 kg/cm2

Ins

und

0.4300

12,000.00

5,160.00

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0500

5,000.00

250.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.2283

20,097.00

4,588.15

15,655

Alambre de puas galvanizado Cal. 12

Ins

4.2000

454.00

1,906.80

69
324

5,012 Replanteo y localizacion para vias, pagado en km

km

2,166,775.50

15

Estacion Total

Eqp

HR

44.0000

7,500.00

330,000.00

46

Campero 2000cc-3000cc

Eqp

HR

44.0000

21,534.00

947,496.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.3300

42,950.00

14,173.50

8,108

Topografo

Ins

44.0000

7,660.00

337,040.00

8,109

Cadenero

Ins

44.0000

4,957.00

218,108.00

8,145

Ayudante de construccion

Ins

44.0000

5,407.00

237,908.00

13,326

Durmiente ordinario 3 M

Ins

100.0000

767.00

76,700.00

14,760

Cinta de Sealizacion

Ins

50.0000

107.00

5,350.00

5,014 Acarreo a pala material suelto a 1 m.

4,819.42

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,015 Acarreo a carretilla a 10 m

h
%

0.8103

5,407.00

4,381.29

10.0000

4,381.29

438.13

8,564.69

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,016 Acarreo a carretilla a 100 m

h
%

1.4400

5,407.00

7,786.08

10.0000

7,786.08

778.61

21,947.01

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

186

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Ayudante de construccion

Ins

Herramienta Menor

Esp

Cantidad

Vr.Unitario

Vr.Total

3.6900

5,407.00

19,951.83

10.0000

19,951.83

1,995.18

cg
8,145
13,598

5,017 Acarreo a pala material suelto a 2 m.

h
%

5,590.24

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,018 Acarreo a carretilla a 20 m

h
%

0.9399

5,407.00

5,082.04

10.0000

5,082.04

508.20

10,051.02

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,019 Acarreo a carretilla a 30 m

h
%

1.6899

5,407.00

9,137.29

10.0000

9,137.29

913.73

9,229.64

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,020 Acarreo a carretilla a 40 m

h
%

1.5518

5,407.00

8,390.58

10.0000

8,390.58

839.06

13,024.87

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,021 Acarreo a carretilla a 50 m

h
%

2.1899

5,407.00

11,840.79

10.0000

11,840.79

1,184.08

14,510.61

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,022 Acarreo a carretilla a 60 m

h
%

2.4397

5,407.00

13,191.46

10.0000

13,191.46

1,319.15

15,939.84

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,023 Acarreo a carretilla a 70 m

h
%

2.6800

5,407.00

14,490.76

10.0000

14,490.76

1,449.08

17,486.24

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,024 Acarreo a carretilla a 80 m

h
%

2.9400

5,407.00

15,896.58

10.0000

15,896.58

1,589.66

18,911.31

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,025 Acarreo a carretilla a 90 m

h
%

3.1796

5,407.00

17,192.10

10.0000

17,192.10

1,719.21

20,455.93

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,028 Acarreo en baldes de 5 gl a 10 m

h
%

3.4393

5,407.00

18,596.30

10.0000

18,596.30

1,859.63

8,505.81

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

h
%

1.4301

5,407.00

7,732.55

10.0000

7,732.55

773.26

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

187

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,029 Acarreo en baldes de 5 gl a 15 m

Cantidad

Vr.Unitario

Vr.Total

10,051.02

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,030 Acarreo en baldes de 5 gl a 20 m

h
%

1.6899

5,407.00

9,137.29

10.0000

9,137.29

913.73

11,537.35

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,031 Acarreo en baldes de 5 gl a 5 m

h
%

1.9398

5,407.00

10,488.50

10.0000

10,488.50

1,048.85

7,077.17

cg
8,145
13,598

Ayudante de construccion

Ins

Herramienta Menor

Esp

5,032 Accesorio de gres 4" (sin excavacion)

h
%

1.1899

5,407.00

6,433.79

10.0000

6,433.79

643.38

15,591.25

cg
Cemento gris

Ins

kg

1.7700

383.34

3,684

Agua para obra

Ins

0.8600

10.00

8.60

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0576

14,690.00

846.14

Sifon de gres 4"

Ins

und

1.0000

13,920.00

13,920.00

804

13,957

5,033 Accesorio de gres 6" (sin excavacion)

678.51

28,506.64

cg
Cemento gris

Ins

kg

1.7700

383.34

3,684

Agua para obra

Ins

0.8600

10.00

8.60

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6999

14,690.00

10,281.53

Sifion de gres 6"

Ins

und

1.0000

17,400.00

17,400.00

804

13,958

5,036 Adoquin de gres peatonal (no incluye mortero)

678.51

49,080.40

cg
2,902

Adoquin gres 10 x 20 x 2.5

Ins

1.0300

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

Color mineral

Ins

kg

1.0300

7,000.00

7,210.00

13,381

5,037 Adoquin de gres vehicular (no incluye mortero)

25,380.00

26,141.40

49,235.20

cg
2,902

Adoquin gres 10 x 20 x 2.5

Ins

1.0300

25,380.00

3,684

Agua para obra

Ins

4.5300

10.00

45.30

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

Color mineral

Ins

kg

1.0300

7,000.00

7,210.00

13,381

5,038 Afinado / olimpia

26,141.40

49,238.91

cg
550
13,959

Alistado de pisos e= 0.04, pagado en m2

Ana

1.0000

16,844.91

16,844.91

Olimpia base (20 X 20)

Ins

1.0000

32,394.00

32,394.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

188

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,039 Afinado cubiertas planas (espesor promedio 5m),


pagado en m2

Cantidad

Vr.Unitario

Vr.Total
18,187.84

cg
Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

8.7600

10.00

87.60

4,426

Arena lavada de rio

Ins

0.0600

13,800.00

828.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

17
804

5,043 Fabricacion de conectores de cortante en viga UPN


100

0.7000

1,469.00

1,028.30

15.5500

383.34

5,960.94

und

13,063.92

42

Motosoldador Diesel

Eqp

HR

0.2640

14,833.00

3,915.91

43

Equipo de Oxicorte

Eqp

HR

0.0660

5,000.00

330.00

44

Pulidora electrica manual

Eqp

HR

0.0660

4,350.00

287.10

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2850

6,805.00

1,939.43

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0950

6,856.00

651.32

5,144

Transporte de materiales Tn

Ana

13,613

Sub-Contrato Estructura Metalica

Esp

13,890

Viga UPN 100

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

14,745

Oxigeno Industrial

14,746

Acetileno

0.0012

0.00

0.00

35.0000

9,676.97

3,386.94

0.1100

18,400.00

2,024.00

und

0.0080

6,200.00

49.60

Ins

0.0130

15,662.00

203.61

Ins

kg

0.0066

41,820.00

276.01

5,044 Fabricacion espigo tipo A (anclaje estribo - pila)

und

262,111.88

42

Motosoldador Diesel

Eqp

HR

2.1120

14,833.00

31,327.30

43

Equipo de Oxicorte

Eqp

HR

1.4400

5,000.00

7,200.00

44

Pulidora electrica manual

Eqp

HR

1.4400

4,350.00

6,264.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2.2650

6,805.00

15,413.33

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.7550

6,856.00

5,176.28

3,684

Agua para obra

Ins

1.2000

10.00

12.00

5,144

Transporte de materiales Tn

Ana

0.0185

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

194,156.95

67,954.93

13,736

Tuerca =3/4" G-8

Ins

und

8.0000

980.00

7,840.00

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

240.0000

180.00

43,200.00

13,806

Sikagrout 200

Ins

kg

2.5450

2,436.00

6,199.62

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1730

6,200.00

1,072.60

14,745

Oxigeno Industrial

Ins

0.2880

15,662.00

4,510.66

14,746

Acetileno

Ins

kg

0.1440

41,820.00

6,022.08

15,782

Lamina HR 3/4"

Ins

0.1350

443,845.00

59,919.08

5,045 Tanque desarenador en poliuretano con fibra de


vidrio (ver especificacion)

und

2,455,500.00

Herramienta Menor 10% M.O. BB

Eqp

HR

20.0000

1,616.00

32,320.00

1,291

Tanque desarenador en poliuretano con PRFV

Ins

und

1.0000

2,100,000.00

2,100,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

20.0000

16,159.00

323,180.00

55

5,046 Alcantarilla sencilla 36 " de 6 m, aleta - aleta

und

6,736,714.53

5,052

Tuberia Concreto Reforzado, clase I de dimetro 36",


pagado en ml (INV.661)

Ana

6.0000

167,318.00

1,003,908.00

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

0.9000

354,419.99

318,977.99

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

189

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,062

Concreto para alcantarilla, resistencia 210 kg/cm2 - 3000


psi, pagado en m3.

Ana

2.8800

424,728.75

1,223,218.80

5,064

Concreto Ciclopeo para alcantarillas de resistencia 3000


Psi o 210 Kg/cm2.

Ana

9.5600

389,882.24

3,727,274.21

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

5,138

36.4400

3,092.35

112,685.23

Excavacion manual en conglomerado

Ana

10.0000

35,065.03

350,650.30

5,052 Tuberia Concreto Reforzado, clase I de dimetro


36", pagado en ml (INV.661)

167,318.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,144

Transporte de materiales Tn

Ana

0.7920

0.00

0.00

Tubo en Concreto Reforzado 36"

Ins

1.0000

135,000.00

135,000.00

17

13,838

5,053 Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

333,142.66

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

367.5000

383.34

140,877.45

3,684

Agua para obra

Ins

199.5000

10.00

1,995.00

4,426

Arena lavada de rio

Ins

0.5880

13,800.00

8,114.40

5,143

Transporte de materiales m

Ana

1.4700

46,157.00

67,850.79

5,144

Transporte de materiales Tn

Ana

0.3675

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.8820

46,304.00

40,840.13

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

804

5,054 Concreto 1:3:3 o 2000 Psi (Basico, 5%


Desperdicio)

6,488.20

311,229.99

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

315.0000

383.34

120,752.10

3,684

Agua para obra

Ins

178.5000

10.00

1,785.00

4,426

Arena lavada de rio

Ins

0.7560

13,800.00

10,432.80

5,143

Transporte de materiales m

Ana

1.5120

46,157.00

69,789.38

5,144

Transporte de materiales Tn

Ana

0.3150

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.7560

46,304.00

35,005.82

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

804

5,055 Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

6,488.20

318,473.24

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

315.0000

383.34

120,752.10

3,684

Agua para obra

Ins

178.5000

10.00

1,785.00

4,426

Arena lavada de rio

Ins

0.5040

13,800.00

6,955.20

5,143

Transporte de materiales m

Ana

1.5020

46,157.00

69,327.81

5,144

Transporte de materiales Tn

Ana

0.3150

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.9975

46,304.00

46,188.24

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

804

5,056 Concreto 1:3:6 o 1500 Psi (Basico, 5% desperdicio)

6,488.20

288,180.34

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

6,488.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

190

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Mezcladora de 9 ft

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

5,143

Transporte de materiales m

Ana

5,144

70
804

Cantidad

Vr.Unitario

Vr.Total

0.4800

4,375.00

2,100.00

220.5000

383.34

84,526.47

162.7500

10.00

1,627.50

0.5250

13,800.00

7,245.00

1.5750

46,157.00

72,697.28

Transporte de materiales Tn

Ana

0.2205

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

1.0500

46,304.00

48,619.20

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

5,057 Concreto 5000 Psi (Basico, 5% desperdicio)

416,790.73

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

577.5000

383.34

221,378.85

3,684

Agua para obra

Ins

210.0000

10.00

2,100.00

4,426

Arena lavada de rio

Ins

0.7035

13,800.00

9,708.30

5,143

Transporte de materiales m

Ana

1.5435

46,157.00

71,243.33

5,144

804

6,488.20

Transporte de materiales Tn

Ana

0.5775

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.8400

46,304.00

38,895.36

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

5,058 Concreto 4000 Psi (Basico, 5% desperdicio)

378,352.56

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

472.5000

383.34

181,128.15

3,684

Agua para obra

Ins

210.0000

10.00

2,100.00

4,426

Arena lavada de rio

Ins

0.5880

13,800.00

8,114.40

5,143

Transporte de materiales m

Ana

1.5225

46,157.00

70,274.03

5,144

Transporte de materiales Tn

Ana

0.4725

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.9345

46,304.00

43,271.09

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

804

5,059 Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

6,488.20

351,843.89

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

441.0000

383.34

169,052.94

3,684

Agua para obra

Ins

210.0000

10.00

2,100.00

4,426

Arena lavada de rio

Ins

0.7035

13,800.00

9,708.30

5,143

Transporte de materiales m

Ana

1.4070

46,157.00

64,942.90

5,144

Transporte de materiales Tn

Ana

0.4410

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.7035

46,304.00

32,574.86

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

804

5,060 Concreto para solado resistencia 140 kg/cm2 2000 psi pagado en m3.

6,488.20

354,419.99

Herramienta menor 5% M.O. AA

Eqp

HR

2.8000

735.00

2,058.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.8000

14,690.00

41,132.00

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

1.0000

311,229.99

311,229.99

19

5,061 Formaleta (1 uso)

32,375.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

191

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta menor 5% M.O. AA

Eqp

HR

0.7000

735.00

514.50

2,197

Repisa Ordinario 3 m

Ins

0.7500

1,500.00

1,125.00

2,200

Tabla burra ordinario 0.30

Ins

3.3300

4,333.00

14,428.89

2,243

Vara de clavo 3M -1

Ins

1.5000

1,500.00

2,250.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.2500

2,480.00

620.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

13,326

Durmiente ordinario 3 M

Ins

3.3300

767.00

2,554.11

13,850

Alambre Galvanizado No. 12

Ins

kg

0.1200

5,000.00

600.00

19

5,062 Concreto para alcantarilla, resistencia 210 kg/cm2 3000 psi, pagado en m3.

424,728.75

Herramienta Menor 10% M.O. AA

Eqp

HR

4.2000

1,469.00

6,169.80

4,489

Cuadrilla AA (Albaileria)

Ins

4.2000

14,690.00

61,698.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

0.7326

32,375.50

23,718.29

17

5,063 Piedra rajon o media zonga

90,495.15

Herramienta Menor 10% M.O. Ay-2

Eqp

HR

1.0700

1,081.00

1,156.67

Transporte de materiales m

Ana

1.2500

46,157.00

57,696.25

13,966

Piedra comun o bolo

Ins

1.2500

16,057.00

20,071.25

14,159

Ayudantes (Ay-2)

Ins

1.0700

10,814.00

11,570.98

23
5,143

5,064 Concreto Ciclopeo para alcantarillas de resistencia


3000 Psi o 210 Kg/cm2.

389,882.24

Herramienta Menor 10% M.O. AA

Eqp

HR

7.2500

1,469.00

10,650.25

4,489

Cuadrilla AA (Albaileria)

Ins

7.2500

14,690.00

106,502.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

1.1319

32,375.50

36,645.83

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

5,065 Concreto resistencia 3000 Psi o 210 kg/cm2, para


box culvert, pagado en m3. (INV.630.4)

17

Herramienta Menor 10% M.O. AA

Eqp

HR

49

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

5,066 Acero de Refuerzo Grado 37, pagado en kg.

650,254.21

13.4000

1,469.00

19,684.60

1.5000

4,375.00

6,562.50

13.4000

14,690.00

196,846.00

1.0000

333,142.66

333,142.66

2.9040

32,375.50

94,018.45

kg

3,092.35

Herramienta menor 5% M.O. AA

Eqp

HR

0.0318

735.00

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.0300

3,903.00

117.09

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.0500

2,295.00

2,409.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0318

14,690.00

467.14

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

19

5,067 Acero de Refuerzo Grado 60, pagado en kg.


17

Herramienta Menor 10% M.O. AA

kg
Eqp

HR

23.37

3,075.79

0.0318

1,469.00

46.71

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

192

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

1,850

Segueta Ncholson

Ins

1,870

Alambre Negro No 18

Ins

4,489

Cuadrilla AA (Albaileria)

5,144
8,194

und

0.0300

2,500.00

75.00

kg

0.0300

3,903.00

117.09

Ins

0.0318

14,690.00

467.14

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Acero de refuerzo 60000 Psi

Ins

kg

1.0500

2,257.00

2,369.85

5,068 Gavion en piedra rajon o media zonga, pagado en


m3.

Vr.Total

197,070.32

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,061

Formaleta (1 uso)

Ana

0.3400

32,375.50

11,007.67

5,063

Piedra rajon o media zonga

Ana

1.0000

90,495.15

90,495.15

5,144

Transporte de materiales Tn

Ana

0.0107

0.00

0.00

13,847

Malla Para Gavion t. torsion 2 x 1 x 1

Ins

und

0.5000

52,863.00

26,431.50

13,850

Alambre Galvanizado No. 12

Ins

kg

0.9000

5,000.00

4,500.00

17

5,094 Valvula de compuerta en bronce tipo Red White 4".


Suministro e Instal.

und

1,120,754.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

13,846

Valvula compuerta en bronce 4"

Ins

und

1.0000

1,055,484.00

1,055,484.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,056

Adaptador macho presin PVC 4"

Ins

und

2.0000

25,025.00

50,050.00

55
4,515

5,109 Valvula de retencion (Cheque) con contrapesa


=3" en E.B. Operacion horizontal y/o vertical.
Suministro e instal.
55
4,515
13,901

und

616,317.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

Valvula de retencion (cheque) =3". E.B en HF

Ins

und

1.0000

571,880.00

571,880.00

5,111 Losa elevada en concreto 3000 psi e=0.15 m

76,218.46

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1600

333,142.66

53,302.83

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

5,112 Piedra pegada concreto de 2500 Psi, e=0.10 m

1,101.75

37,404.53

P.V.C.B.
Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,572

Tabla burra ordinaria 0.10

Ins

2.0000

1,200.00

2,400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0500

318,473.24

15,923.66

5,063

Piedra rajon o media zonga

Ana

0.0680

90,495.15

6,153.67

17

5,113 Demolicion de Alcantarilla Tipo = 36"

1,469.00

und

1,175.20

253,697.50

P.V.C.B.
14

Retroexcavadora de orugas

Eqp

HR

1.0000

144,160.00

144,160.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

193

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

19

Herramienta menor 5% M.O. AA

Eqp

HR

3.5000

735.00

2,572.50

21

Volqueta (6 m3 )

Eqp

HR

1.0000

55,550.00

55,550.00

Cuadrilla AA (Albaileria)

Ins

3.5000

14,690.00

51,415.00

4,489

5,115 Botaderos (conformacion, unicamente Bulldozer)


20

Bulldozer Cat D6D o D6H

Cantidad

Vr.Unitario

m
Eqp

5,116 Camara de quiebre Tipo 2, entrada en 2" y 2 salidas


en 2" y 1 1/2" en mampostera de 0.12m y
1.24x1.24x0.90

HR

Vr.Total

2,181.86

0.0167

130,650.00

und

2,181.86

2,518,852.19

OEGA
72

Base en recebo comun compactado

Ana

0.2300

92,359.05

21,242.58

89

Muro en ladrillo tolete comun e=0.12 m (12 x 24.5 x 6)

Ana

5.4300

34,658.44

188,195.33

1,625

Flotador completo (bola de cobre) 2"

Ins

und

1.0000

220,748.00

220,748.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

14.0000

3,075.79

43,061.06

13,844

Valvula de corte 2"

Ins

und

2.0000

551,000.00

1,102,000.00

13,941

Registro paso directo de 2"

Ins

und

2.0000

120,000.00

240,000.00

14,141

Valvula de coladera = 1/2"

Ins

und

1.0000

12,500.00

12,500.00

14,312

Valvula compuerta en bronce 3"

Ins

und

1.0000

449,732.00

449,732.00

15,028

Codo 90 presion PVC 3"

Ins

und

1.0000

23,261.00

23,261.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

2.0000

260.00

520.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,438

Tubo PVC sanitario de 3"

Ins

1.0000

10,595.00

10,595.00

15,469

Tee Sanitaria PVC 3 "

Ins

und

1.0000

4,959.00

4,959.00

5,117 Remocion y cargue de derrumbes, incluye


transporte y disposicin final
4
21
4,489

6,507.72

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0222

111,550.00

2,476.41

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

Cuadrilla AA (Albaileria)

Ins

0.0222

14,690.00

326.12

5,118 Camara de quiebre Tipo 4, entrada en 2" y salida


en 1" en mampostera de 0.12m y 1.24x1.24x0.90

und

1,225,197.19

OEGA
72

Base en recebo comun compactado

Ana

0.2300

89

Muro en ladrillo tolete comun e=0.12 m (12 x 24.5 x 6)

Ana

1,625

Flotador completo (bola de cobre) 2"

Ins

und

4,515

Cuadrilla BB (Instalaciones)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

5,067

92,359.05

21,242.58

5.4300

34,658.44

188,195.33

1.0000

220,748.00

220,748.00

4.0000

16,159.00

64,636.00

Ana

0.3100

333,142.66

103,274.22
43,061.06

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

14.0000

3,075.79

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,312

Valvula compuerta en bronce 3"

Ins

und

1.0000

449,732.00

449,732.00

15,028

Codo 90 presion PVC 3"

Ins

und

1.0000

23,261.00

23,261.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,438

Tubo PVC sanitario de 3"

Ins

4.0000

10,595.00

42,380.00

15,469

Tee Sanitaria PVC 3 "

Ins

und

1.0000

4,959.00

4,959.00

5,119 Camara de quiebre Tipo 3, entrada en 2" y 2 salidas


en 2" y 1" en mampostera de 0.12m y
1.24x1.24x0.90

und

1,723,661.98

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

194

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

OEGA
72

Base en recebo comun compactado

Ana

0.2300

92,359.05

21,242.58

89

Muro en ladrillo tolete comun e=0.12 m (12 x 24.5 x 6)

Ana

5.4300

34,658.44

188,195.33

Muro en ladrillo fachada de arcilla tipo prensado macizo


12*6*24

Ana

5.4300

58,772.89

319,136.79

1,625

Flotador completo (bola de cobre) 2"

Ins

und

1.0000

220,748.00

220,748.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,067

170

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

14.0000

3,075.79

43,061.06

13,941

Registro paso directo de 2"

Ins

und

1.0000

120,000.00

120,000.00

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,146

Valvula de coladera = 2"

Ins

und

2.0000

26,950.00

53,900.00

14,312

Valvula compuerta en bronce 3"

Ins

und

1.0000

449,732.00

449,732.00

15,028

Codo 90 presion PVC 3"

Ins

und

1.0000

23,261.00

23,261.00

15,050

Adaptador macho presin PVC 1"

Ins

und

2.0000

984.00

1,968.00

15,053

Adaptador macho presin PVC 2"

Ins

und

1.0000

3,460.00

3,460.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,438

Tubo PVC sanitario de 3"

Ins

4.0000

10,595.00

42,380.00

15,469

Tee Sanitaria PVC 3 "

Ins

und

1.0000

4,959.00

4,959.00

5,120 Valvula de ventosa Tipo 1de 1" con Caja en


mampostera de 0.12m y 1.24x1.24xh=0.90
(paetada)

und

916,772.12

OEGA
Base en recebo comun compactado

Ana

0.2300

92,359.05

21,242.58

Muro en ladrillo fachada de arcilla tipo prensado macizo


12*6*24

Ana

5.4300

58,772.89

319,136.79

2,931

Soldadura para CPVC 1/4 gl

Ins

und

0.0020

62,878.00

125.76

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

28,250.00

56.50

3,052

Replanteo General, medido en m2

Ana

1.5400

3,867.67

5,956.21

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

14.0000

3,075.79

43,061.06

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,148

Valvula de selenoide 1"

Ins

und

1.0000

92,800.00

92,800.00

15,050

Adaptador macho presin PVC 1"

Ins

und

1.0000

984.00

984.00

15,059

Tee sencilla presion PVC 1"

Ins

und

1.0000

1,639.00

1,639.00

16,217

Valv. ventosa (cam. senc.) doble acc. 1" rosca

Ins

und

1.0000

227,360.00

227,360.00

72
170

5,121 Valvula de ventosa 1 1/2". Camara sencilla doble


accion con rosca. Suministro e instal.

und

286,927.05

OEGA
Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

2.0000

2,422.00

4,844.00

15,880

Valvula de bola PVC 1 1/2"

Ins

und

1.0000

33,408.00

33,408.00

16,218

Valv. ventosa (cam. senc.) doble acc. 1 1/2" rosc

Ins

und

1.0000

227,360.00

227,360.00

55
4,515

5,128 Base Concreto pobre 1500 Psi E=0.05

17,867.31

P.V.C.B.
Herramienta menor 5% M.O. AA

Eqp

HR

0.2242

735.00

164.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.2242

14,690.00

3,293.50

5,056

Concreto 1:3:6 o 1500 Psi (Basico, 5% desperdicio)

Ana

0.0500

288,180.33

14,409.02

19

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

195

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,129 Desmonte y Limpieza Manual Zona Boscosa por


m2
17
4,489

Cantidad

Vr.Unitario

Vr.Total
565.57

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0350

1,469.00

51.42

Cuadrilla AA (Albaileria)

Ins

0.0350

14,690.00

514.15

5,130 Relleno con material crudo de rio T.m 6",


compactado y Transportado, pagado en m3

82,834.77

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7300

41

Vibrocompactador tipo rana

Eqp

HR

0.6080

5,000.00

3,040.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7300

14,690.00

10,723.70

5,143

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

Crudo de rio clasificado T.m. 6"

Ins

1.1000

15,660.00

17,226.00

13,921

5,131 Relleno para estructuras, pagado en m3, en


material seleccionado de la excavacin, (INV. 610)

1,469.00

1,072.37

17,543.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

41

Vibrocompactador tipo rana

Eqp

HR

0.6000

5,000.00

3,000.00

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

4,489

5,133 Replanteo y localizacion de tuberas de acueducto,


pagado por metro lineal

1,322.10

1,350.41

Estacion Total

Eqp

HR

0.0333

7,500.00

249.75

2,243

Vara de clavo 3M -1

Ins

0.1000

1,500.00

150.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0001

42,950.00

4.30

8,108

Topografo

Ins

0.0333

7,660.00

255.08

8,109

Cadenero

Ins

0.0667

4,957.00

330.63

8,145

Ayudante de construccion

Ins

0.0667

5,407.00

360.65

15

5,135 Relleno en arena lavada apisonada para solado,


pagado en m3

80,737.53

P.V.C.B.
Herramienta menor 10% M.O. AA-4

Eqp

HR

0.5300

3,091.00

1,638.23

4,426

Arena lavada de rio

Ins

1.2000

13,800.00

16,560.00

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

Cuadrilla AA-4

Ins

0.5300

30,910.00

16,382.30

59

13,960

5,137 Descapote a mano


17
4,489

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2915

1,469.00

428.21

Cuadrilla AA (Albaileria)

Ins

0.2915

14,690.00

4,282.14

5,138 Excavacion manual en conglomerado


17
4,489

35,065.03

Herramienta Menor 10% M.O. AA

Eqp

HR

2.1700

1,469.00

3,187.73

Cuadrilla AA (Albaileria)

Ins

2.1700

14,690.00

31,877.30

5,139 Excavacion mecanica en material comun 0 - 2 mts


(sin restriccion- incluye acarreo)

21

4,710.35

4,779.06

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0286

111,550.00

3,190.33

Volqueta (6 m3 )

Eqp

HR

0.0286

55,550.00

1,588.73

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

196

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,143 Transporte de materiales m

Cantidad

Vr.Unitario

Vr.Total

46,157.00

ver:5149 , 5150, 5652


14,165

Transporte por volumen en via (sin pavimentar)

Ins

m-km

0.0000

1,068.27

0.00

14,166

Transporte por volumen en via (pavimentada)

Ins

m-km

45.7000

1,010.00

46,157.00

14,671

Transporte por volumen en via (sin pav-montaa)

Ins

m-km

0.0000

1,587.14

0.00

5,144 Transporte de materiales Tn

0.00

14,153

Transporte por peso en via (sin pavimentar)

Ins

t-km

0.0000

470.00

0.00

14,154

Transporte por peso en via (pavimentada)

Ins

t-km

0.0000

256.00

0.00

14,169

Transporte por peso en via (sin pav-montaa)

Ins

t-km

0.0000

2,375.00

0.00

5,145 Mejoramiento de la subrasante involucrando el


suelo existente. (INV. 230.1)

7,283.31

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

Ayudante de construccion

Ins

0.0250

5,407.00

135.18

11
8,145

5,146 Excavacion mecanica en Roca (con explosivos)

46,601.10

14

Retroexcavadora de orugas

Eqp

HR

0.1000

144,160.00

39

Compresor de capacidad 120

Eqp

HR

0.1000

27,511.00

2,751.10

Dinamitero

Ins

1.0000

12,554.00

12,554.00

14,100

Mecha de seguridad

Ins

rl

0.0040

245,000.00

980.00

14,121

Detonadores

Ins

cj

0.0100

120,000.00

1,200.00

14,123

Indugel caja d=25 kg

Ins

cj

0.0400

350,000.00

14,000.00

14,131

Cordon detonante 6 gr. * mt.

Ins

0.5000

1,400.00

700.00

1,992

5,148 Terraplen con material de prestamo lateral


(acarreo libre 100 m)

14,416.00

8,601.70

Compactador Vibratorio

Eqp

HR

0.0200

100,000.00

2,000.00

Motoniveladora

Eqp

HR

0.0200

132,800.00

2,656.00

11

Carrotanque de Agua

Eqp

HR

0.0200

53,125.00

1,062.50

14

Retroexcavadora de orugas

Eqp

HR

0.0200

144,160.00

2,883.20

5,149 Sobreacarreos o transporte de material Petreo (via


destapada)
21

Volqueta (6 m3 )

m-km

Eqp

5,150 Sobreacarreos o transporte de material Petreo (via


pavimentada)
21

Volqueta (6 m3 )

HR

1,066.56

0.0192

55,550.00

m-km

Eqp

5,151 Base granular, pagado en m3. (INV. 330.1)

HR

1,066.56

1,011.01

0.0182

55,550.00

1,011.01

61,198.01

Compactador Vibratorio

Eqp

HR

0.0625

100,000.00

6,250.00

Motoniveladora

Eqp

HR

0.0625

132,800.00

8,300.00

Carrotanque de Agua

Eqp

HR

0.0625

53,125.00

3,320.31

Base Triturada T.max 1 1/2"

Ins

1.3000

33,329.00

43,327.70

11
14,777

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

197

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,152 Comision de topografia

Cantidad

Vr.Unitario

15

Estacion Total

Eqp

47

Vr.Total

54,519.99

HR

1.0000

7,500.00

7,500.00

Campero 3001cc en adelante

Eqp

HR

1.0000

22,476.00

22,476.00

6,977

Conductor

Ins

1.0000

4,523.00

4,523.00

8,108

Topografo

Ins

1.0000

7,660.00

7,660.00

8,109

Cadenero

Ins

2.0000

4,957.00

9,914.00

14,652

Dibujante

Ins

0.5000

4,893.98

2,446.99

5,153 Estabilizacion subrasante con Cemento + stasoil

42,828.89

Compactador Vibratorio

Eqp

HR

0.0125

100,000.00

1,250.00

Motoniveladora

Eqp

HR

0.0125

132,800.00

1,660.00

11

Carrotanque de Agua

Eqp

HR

0.0125

53,125.00

664.06

14

Retroexcavadora de orugas

Eqp

HR

0.0286

144,160.00

4,122.98

Cemento gris

Ins

kg

27.5000

383.34

10,541.85

Transporte de materiales Tn

Ana

0.0320

0.00

0.00

Stasoil

Ins

gal

1.0000

24,590.00

24,590.00

804
5,144
14,668

5,154 Suministro e instal. tuberia hierro ductil 10" (250


mm)

171,142.23

Herramienta Menor 10% M.O. Ay-2

Eqp

HR

0.5333

1,081.00

576.50

14,074

Tubo hierro ductil 10 pulg

Ins

1.0000

159,848.00

159,848.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5333

20,097.00

10,717.73

23

5,155 Filtro o Dren Frances PVC 100 mm (0.5 x 0.5) m

58,004.00

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2000

3,091.00

618.20

3,466

Tubo de drenaje PVC 100 mm o 4"

Ins

1.0500

20,447.00

21,469.35

5,143

59

Transporte de materiales m

Ana

0.2500

46,157.00

11,539.25

13,783

Geotextil No Tejido 1600

Ins

2.4000

2,758.00

6,619.20

13,960

Cuadrilla AA-4

Ins

0.2000

30,910.00

6,182.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.2500

46,304.00

11,576.00

5,158 Valvula de corte 2". Suministro e Instal.

und

573,408.62

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

13,844

Valvula de corte 2"

Ins

und

1.0000

551,000.00

551,000.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

55

5,193 Suministro e instal. tuberia hierro ductil 12" (300


mm)

200,606.23

Herramienta Menor 10% M.O. Ay-2

Eqp

HR

0.5333

1,081.00

576.50

14,075

Tubo hierro ductil 12pulg

Ins

1.0000

189,312.00

189,312.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5333

20,097.00

10,717.73

23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

198

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,194 Suministro e instal. tuberia hierro ductil 14" (350


mm)

Cantidad

Vr.Unitario

Vr.Total
262,086.23

Herramienta Menor 10% M.O. Ay-2

Eqp

HR

0.5333

1,081.00

576.50

14,076

Tubo hierro ductil 14pulg

Ins

1.0000

250,792.00

250,792.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5333

20,097.00

10,717.73

23

5,195 Limpieza alcantarillla tipo = 36"


69
14,669

und

84,338.21

Herramienta Menor 10% M.O. AA-2

Eqp

HR

3.8150

2,010.00

7,668.15

Cuadrilla AA-2 (Tuberias)

Ins

3.8150

20,097.00

76,670.06

5,196 Canal en Piedra pegada (0.60 x 0.90 ) trapezoidal,


Concreto 2500 Psi

85,541.70

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

4,489

Cuadrilla AA (Albaileria)

Ins

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

5,063

Piedra rajon o media zonga

Ana

17

5,197 Tubo Galvanizado de 3" (Para Quiebrapatas)

1,469.00

1,762.80

1.2000

14,690.00

17,628.00

0.1500

318,473.24

47,770.99

0.4000

32,375.50

12,950.20

0.0600

90,495.15

5,429.71

und

119,248.92

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0800

1,469.00

117.52

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

3.4000

34,693.00

117,956.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.0800

14,690.00

1,175.20

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

17

5,203 Escalera maciza en concreto de 3000 psi, un tramo,


pagado en M3

821,777.69

17

Herramienta Menor 10% M.O. AA

Eqp

HR

21.2000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

A.C.P.M.

Ins

gal

0.2200

6,165.00

1,356.30

1,848

Tabla burra 3.00 m

Ins

9.1200

4,666.00

42,553.92

2,197

Repisa Ordinario 3 m

Ins

2.7400

1,500.00

4,110.00

3,323

Tabla Burra Ordinaria 0.25

Ins

10.8600

4,333.00

47,056.38

3,797

Puntilla con cabeza 2"

Ins

lb

1.5000

1,990.00

2,985.00

4,040

Paral corriente 2 a 3.50 ml

Ins

2.9000

170.00

493.00

4,489

Cuadrilla AA (Albaileria)

Ins

21.2000

14,690.00

311,428.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0500

333,142.66

349,799.79

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

Formaleta entrepisos

Ins

mes

8.6900

3,500.00

30,415.00

767

13,627

5,204 Dilatacion gravilla lavada A = 0.10, pagado en ml

31,142.80

11,038.48

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

Cemento gris

Ins

kg

1.5800

383.34

605.68

2,448

Dilatacin en bronce PC 09

Ins

1.0000

3,735.00

3,735.00

3,684

Agua para obra

Ins

0.8258

10.00

8.26

4,426

Arena lavada de rio

Ins

0.0078

13,800.00

107.64

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

Gravilla para piso

Ins

bt

0.1000

17,342.00

1,734.20

17
804

15,575

440.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

199

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,206 Formaleta metalica tipo camisa para pilotes =1.5


m

Cantidad

Vr.Unitario

und

Vr.Total
2,679,364.00

42

Motosoldador Diesel

Eqp

HR

12.0000

14,833.00

177,996.00

43

Equipo de Oxicorte

Eqp

HR

4.0000

5,000.00

20,000.00

44

Pulidora electrica manual

Eqp

HR

12.0000

4,350.00

52,200.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

10.0000

3,226.00

32,260.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

19.0000

6,856.00

130,264.00

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

kg

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

3.9600

6,200.00

24,552.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

10.0000

32,262.00

322,620.00

15,780

Lamina HR 3/16"

Ins

14.5000

114,944.00

1,666,688.00

5,207 Drenes horizontales con instalacion de tuberia


perforada con filtro de 2", Incluye: perforacion

4.0000

0.00

0.00

112.0000

2,257.00

252,784.00

123,075.15

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.4444

2,010.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.3000

188.00

244.40

85

Equipo de perforacion y rotacion

Eqp

HR

1.3514

76,000.00

102,706.40

Tuberia de drenaje 2" con filtro

Ins

1.0000

10,300.00

10,300.00

Cuadrilla AA-2 (Tuberias)

Ins

0.4444

20,097.00

8,931.11

4,035
14,669

5,209 Apoyo de Neopreno D=60 (1.80 m x 0.30 m x 4 3/4")

und

893.24

723,380.73

Herramienta menor 5% M.O. AA

Eqp

HR

1.5000

735.00

1,102.50

Neopreno (1.80 x 0.30) m D=60 E= 4 3/4"

Ins

und

1.0000

632,572.00

632,572.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Lamina HR 1/4"

Ins

0.5400

125,317.09

67,671.23

19
720

14,742

5,210 Suministro e instal. de vidrio color bronce 6 mm.


pagado en m2
17

69,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

15,555

Vidrio bronce 6 mm

Ins

1.0000

65,000.00

65,000.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

4,489

5,211 Terraplen o rellenos con material mezclado


relacion 2:1, sub-base granular y material prestamo
(a. libre 2 Km)

30,122.59

Con material local


1

Compactador Vibratorio

Eqp

HR

0.0152

100,000.00

1,520.00

Motoniveladora

Eqp

HR

0.0152

132,800.00

2,018.56

11

Carrotanque de Agua

Eqp

HR

0.0152

53,125.00

807.50

14

Retroexcavadora de orugas

Eqp

HR

0.0152

144,160.00

2,191.23

21

Volqueta (6 m3 )

Eqp

HR

0.0455

55,550.00

2,527.53

Material de prestamo (tierra-arena-arcilla-limo)

Ins

0.3400

1,250.00

425.00

8,144

Oficial de Construccion

Ins

0.0152

9,282.00

141.09

8,154

Sub base triturada T. max. 2"

Ins

0.6600

31,048.00

20,491.68

858

5,212 Canalizacion y tendido ducto PVC 3" x 6 m tipo


pesado, pagado por ML

34,139.67

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

200

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7000

16,159.00

11,311.30

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

Tubo conduit PVC 3"

Ins

1.0500

19,375.00

20,343.75

55

15,981

5,213 Apoyo de Neopreno D=60 (0.30 m x 0.20 m x 4 3/4")

und

85,517.53

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

Neopreno (0.30 x 0.20) m D=60 E= 4 3/4"

Ins

und

1.0000

70,286.00

70,286.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Lamina HR 1/4"

Ins

0.0600

125,317.09

7,519.03

19
490

14,742

5,214 Fabricacion espigo tipo C (anclaje estribo - pila)

und

759,524.50

42

Motosoldador Diesel

Eqp

HR

4.0000

14,833.00

59,332.00

43

Equipo de Oxicorte

Eqp

HR

1.7600

5,000.00

8,800.00

44

Pulidora electrica manual

Eqp

HR

1.7600

4,350.00

7,656.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

4.2900

6,805.00

29,193.45

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.4300

6,856.00

9,804.08

3,684

Agua para obra

Ins

6.6000

10.00

66.00

5,144

Transporte de materiales Tn

Ana

0.0678

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

562,610.74

196,913.76

13,736

Tuerca =3/4" G-8

Ins

und

32.0000

980.00

31,360.00

13,802

Eje 3/4" 1045 (SAE 1020) 400 mm

Ins

cm

960.0000

180.00

172,800.00

13,806

Sikagrout 200

Ins

kg

14.0000

2,436.00

34,104.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2120

6,200.00

1,314.40

14,745

Oxigeno Industrial

Ins

0.3530

15,662.00

5,528.69

14,746

Acetileno

Ins

kg

0.1760

41,820.00

7,360.32

15,782

Lamina HR 3/4"

Ins

0.4400

443,845.00

195,291.80

5,215 Muro en bloque No. 5 de 0.23 mts, pagado en M2

48,150.25

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

2,053

Bloque No. 5

Ins

und

26.6500

922.00

24,571.30

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

5,216 Fabricacion viga principal 300 x 300 x 1200 tipo "I"

1,689.35

1,000,278.86

42

Motosoldador Diesel

Eqp

HR

5.8700

14,833.00

87,069.71

43

Equipo de Oxicorte

Eqp

HR

2.5700

5,000.00

12,850.00

44

Pulidora electrica manual

Eqp

HR

2.5700

4,350.00

11,179.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.0000

6,856.00

6,856.00

5,144

Transporte de materiales Tn

Ana

0.2270

0.00

0.00

13,613

Sub-Contrato Estructura Metalica

Esp

35.0000

740,947.30

259,331.56

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.3080

6,200.00

1,909.60

14,745

Oxigeno Industrial

Ins

0.5130

15,662.00

8,034.61

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

201

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,746

Acetileno

Ins

kg

0.2567

41,820.00

10,735.19

14,945

Lamina HR 1/2"

Ins

1.2600

250,702.65

315,885.34

15,782

Lamina HR 3/4"

Ins

0.6300

443,845.00

279,622.35

5,217 Relleno con material crudo de rio sin seleccionar


(conformacion, riego y compactacion)

Cantidad

Vr.Unitario

Vr.Total

82,799.38

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

Transporte de materiales m

Ana

1.2500

46,157.00

57,696.25

Crudo de rio sin clasificar

Ins

1.2500

14,364.00

17,955.00

11
5,143
15,365

5,219 Empradizacion por semilla ( tipo grama)

4,580.72

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0750

1,469.00

110.18

Material de prestamo (tierra-arena-arcilla-limo)

Ins

0.0700

1,250.00

87.50

3,682

Grama (Semilla)

Ins

kg

0.0005

25,000.00

12.50

3,684

Agua para obra

Ins

3.7800

10.00

37.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.0750

14,690.00

1,101.75

5,143

Transporte de materiales m

Ana

0.0700

46,157.00

3,230.99

17
858

5,220 Raspado superficie de muro pintado en vinilo


17
4,489

2,585.44

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1600

1,469.00

235.04

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

5,221 Paete rustico muros 1:5, pagado en m2

11,994.62

E=2; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.5600

1,469.00

822.64

Cemento gris

Ins

kg

6.5200

383.34

2,499.38

3,684

Agua para obra

Ins

3.2200

10.00

32.20

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5600

14,690.00

8,226.40

17
804

5,222 Suministro e instal. tuberia presion PVC RDE 51 4 "

25,651.88

E=2.5; desp=12%
2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4211

16,159.00

6,804.55

15,016

Tubo presin RDE 51 PVC 4 "

Ins

1.0000

13,838.00

13,838.00

15,047

Union presion PVC 4"

Ins

und

0.1667

27,132.00

4,522.90

5,223 Paete culatas 1:4, pagado en m2

328.23

14,579.07

E=4; desp=12%
Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

6.9800

10.00

69.80

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5200

14,690.00

7,638.80

17
804

5,224 Paete culatas 1:5, pagado en m2

0.5200

1,469.00

763.88

14.1300

383.34

5,416.59

13,543.09

E=4; desp=12%
17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5200

1,469.00

763.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

202

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total
4,523.41

Cemento gris

Ins

kg

11.8000

383.34

3,684

Agua para obra

Ins

6.5000

10.00

65.00

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5200

14,690.00

7,638.80

804

5,225 Paete culatas 1:6, pagado en m2

17,937.15

E=4; desp=12%
Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

6.0000

10.00

60.00

4,426

Arena lavada de rio

Ins

0.0300

13,800.00

414.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5200

14,690.00

7,638.80

Sika 1 imp. integral

Ins

kg

0.8000

6,438.00

5,150.40

17
804

14,122

5,226 Impermeabilizacin placas con Sika Integral,


pagado en M2

0.5200

1,469.00

763.88

10.2000

383.34

3,910.07

20,307.55

Con SIKA
Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

Sika 1 imp. integral

Ins

kg

0.2500

6,438.00

1,609.50

17

14,122

5,227 Raspado y resane superficie muro pintado

1,248.65

3,835.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2100

1,469.00

308.49

Cemento gris

Ins

kg

0.4400

383.34

168.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0350

1,691.00

59.19

2,484

Yeso corriente

Ins

bt

0.0150

14,300.00

214.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.2100

14,690.00

3,084.90

17
804

5,228 Liston de piso 0.03 x 0.07 inmunizado

7,250.88

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1250

1,763.00

220.38

1,279

Liston de piso 0.03 x 0.07

Ins

1.0000

3,000.00

3,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1250

17,628.00

2,203.50

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0350

52,200.00

1,827.00

56

15,722

5,229 Placa prefabricada para tapa canal abierto 3000 Psi


e=0.10 m

59,494.91

Incluye acarreo
Herramienta Menor 10% M.O. AA

Eqp

HR

0.9600

1,469.00

1,410.24

2,208

Tabla chapa ordinario 0.10

Ins

4.0000

2,667.00

10,668.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9600

14,690.00

14,102.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

17

5,230 Muro en concreto 3500 psi

692,061.55

Sin refuerzos
17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.3200

32,375.50

75,111.16

23,504.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

203

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,231 Baranda en madera 0.05 x 0.10 x 1.0

Cantidad

Vr.Unitario

Vr.Total
50,565.13

Sin refuerzos
Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

5,144

56

Transporte de materiales Tn

Ana

0.0168

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.1300

52,200.00

6,786.00

15,955

Cable IPS-IWRC 6 x 19 AA = 3/16"

Ins

1.0700

2,239.00

2,395.73

15,985

Madera de 0.05 x 0.10 x 1

Ins

4.4700

4,920.00

21,992.40

5,232 Manejo, control de aguas y limpieza de Cause


(L=30 m)

und

1,593,482.00

58

Motobomba de 4" o 6"

Eqp

HR

32.0000

11,600.00

371,200.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

32.0000

3,091.00

98,912.00

Material de prestamo (tierra-arena-arcilla-limo)

Ins

21.0000

1,250.00

26,250.00

13,960

Cuadrilla AA-4

Ins

32.0000

30,910.00

989,120.00

16,285

Saco en fibra (0.70 x 1.00)

Ins

und

120.0000

900.00

108,000.00

858

5,233 Canal perimetral rectangular para aguas lluvias en


concreto reforzado 3000 Psi ancho util 0.40 m, H
util 0.20m, e=0.10

58,795.47

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6667

1,469.00

979.38

1,901

Acero de refuerzo 37000 Psi

Ins

kg

5.6000

2,295.00

12,852.00

4,003

Formaleta sardinel

Ins

4.0000

464.00

1,856.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6667

14,690.00

9,793.82

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

17

5,234 Alistado sobre cubierta en concreto 2500 Psi


e=0.05 m

22,387.26

Incluye tela impermeable


Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0500

318,473.24

15,923.66

17

5,235 Replanteo y localizacion para sealizacion vial

km

258,471.93

No incluye base Eternit


15

Estacion Total

Eqp

HR

5.3333

7,500.00

39,999.75

46

Campero 2000cc-3000cc

Eqp

HR

5.3333

21,534.00

114,847.28

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

8,108

Topografo

Ins

5.3333

7,660.00

40,853.08

8,109

Cadenero

Ins

5.3333

4,957.00

26,437.17

8,145

Ayudante de construccion

Ins

5.3333

5,407.00

28,837.15

Cinta de Sealizacion

Ins

50.0000

107.00

5,350.00

14,760

5,236 Suministro e instal. tuberia presion PVC RDE 26 1"

4,326.06

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0010

58,612.00

58.61

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0010

28,250.00

28.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1047

16,159.00

1,691.85

15,003

Tubo presin RDE 26 PVC 1 "

Ins

1.0000

2,444.00

2,444.00

15,041

Union presion PVC 1"

Ins

und

0.1667

620.00

103.35

5,237 Suministro e instal. tuberia presion PVC RDE 26 1


1/2 "

7,634.57

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

204

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

58,612.00

117.22

und

0.0020

28,250.00

4,515

Cuadrilla BB (Instalaciones)

56.50

Ins

0.1570

16,159.00

2,536.96

15,005
15,043

Tubo presin RDE 26 PVC 1 1/2 "

Ins

1.0000

4,665.00

4,665.00

Union presion PVC 1 1/2"

Ins

und

0.1667

1,553.00

258.89

5,238 Valvula de ventosa triple accion 2". Suministro e


instal.

und

730,740.93

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

879.18

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,474

Valvula de ventosa triple accion 2" rosca

Ins

und

1.0000

682,080.00

682,080.00

15,062

Tee sencilla presion PVC 2 "

Ins

und

1.0000

8,852.00

8,852.00

15,077

Adaptador hembra presin PVC 2"

Ins

und

1.0000

5,788.00

5,788.00

5,239 Valvula de mariposa =8" E.B. Suministro e Instal.

und

4,238,141.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

3.0000

8,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

8,080.00

Soldador

Ins

5.0000

6,759.00

33,795.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,515

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

14,014

Tornillo = 7/8" x 4" G-8 en A.I. Con T. A

Ins

und

8.0000

21,350.00

170,800.00

14,037

Empaquetadura para brida =8"

Ins

und

2.0000

42,533.00

85,066.00

14,713

Valvula de mariposa =8" Bridada.

Ins

und

1.0000

3,826,550.00

3,826,550.00

8
55
519

5,240 Bafles en PRFV de 0.60 x 1.80 m. Suministro e


Instal.

und

26,250.00

476,100.50

55

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

824

Bafles en PRFV de 0.60 x 1.80 m

Ins

und

1.0000

413,888.00

413,888.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

5,241 Vastago en acero inoxidable de 1.0 m hasta 5.50 m


de longitud,con reductor de fuerza, guias y volante
de maniobra
55
4,515
14,177

und

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

Vastago en acero inoxidable de 1.0 m hasta 5.50 m

Ins

und

1.0000

2,008,999.00

2,008,999.00

5,242 Pasamuro en H.D. =4" L=0.25 m E.R x E.R.


Suministro e instal.
17
883
4,489

2,115,649.00

und

178,144.80

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3333

1,469.00

1,958.62

Pasamuro en H.D. =4" L=0.25 m E.R x E.R

Ins

und

1.0000

156,600.00

156,600.00

Cuadrilla AA (Albaileria)

Ins

1.3333

14,690.00

19,586.18

5,243 Impermeabilizacion acrilica con refuerzo en tela de


polipropileno (3 capas) para viga canal.
Sub Contrato Todo Costo

32,369.68

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

205

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. BB

Eqp

Sika Fill Refuerzo

Ins

1,676

Sika Fill 5

Ins

3,684

Agua para obra

4,515

Cuadrilla BB (Instalaciones)

55
942

Cantidad

Vr.Unitario

HR

0.5714

1,616.00

923.38

1.0500

1,241.00

1,303.05

kg

1.8000

11,600.00

20,880.00

Ins

3.0000

10.00

30.00

Ins

0.5714

16,159.00

9,233.25

5,244 Transporte de crudo de castilla (via pavimentada)


7

Camion Irrigador

m-km
Eqp

5,245 Empedrado, o piso para camino de herradura. E=


0.20 m, solado E=0.05 m, Piedra E = 0.15 m

HR

Vr.Total

168.75

0.0027

62,500.00

168.75

46,643.31

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3500

1,469.00

514.15

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0500

248,144.84

12,407.24

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

0.0500

354,419.99

17,721.00

5,063

Piedra rajon o media zonga

Ana

0.1200

90,495.15

10,859.42

17

5,246 Concreto lanzado de 4000 Psi para pila


(profundidad 0-15)

756,311.92

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

1.0000

2,958.00

2,958.00

80

Pluma grua o Malacate

Eqp

HR

1.5000

8,750.00

13,125.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

32.0000

188.00

6,016.00

3,657

Tubo PVC sanitario de 6"

Ins

0.2000

31,269.00

6,253.80

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

2.6100

32,375.50

84,500.06

5,247 Pedraplen, para base del Talud, colocacion manual


(No incluye acarreo)

21,347.94

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.1667

2,010.00

335.07

13,966

Piedra comun o bolo

Ins

1.1000

16,057.00

17,662.70

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.1667

20,097.00

3,350.17

69

5,248 Suministro y siembra arbol Pomarroso h = 1.60 m

und

41,250.90

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Tierra Negra abonada

Ins

0.2000

34,000.00

6,800.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,143

Transporte de materiales m

Ana

0.2000

46,157.00

9,231.40

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.2500

3,000.00

750.00

16,367

Pomarroso 1.60 m

Ins

und

1.0000

12,000.00

12,000.00

55
223

5,249 Cheque tipo compuerta de 1 1/2"


55

Herramienta Menor 10% M.O. BB

m
Eqp

HR

83,875.00

1.0000

1,616.00

1,616.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

206

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
16,410

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

Cheque tipo compuerta de 1 1/2" Itap - italiano

Ins

5,250 Suministro y siembra arbol Pomarroso h = 2.0 m

Cantidad

Vr.Unitario

Vr.Total

1.0000

16,159.00

16,159.00

und

1.0000

66,100.00

66,100.00

und

50,366.93

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6666

1,616.00

Tierra Negra abonada

Ins

0.2300

34,000.00

7,820.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6666

16,159.00

10,771.59

5,143

Transporte de materiales m

Ana

0.2300

46,157.00

10,616.11

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.5000

3,000.00

1,500.00

16,368

Pomarroso 2.0 m

Ins

und

1.0000

15,000.00

15,000.00

55
223

5,251 Suministro y siembra arbol Oity h = 1.50 m

und

1,077.23

36,846.19

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Tierra Negra abonada

Ins

0.1700

34,000.00

5,780.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,143

Transporte de materiales m

Ana

0.1700

46,157.00

7,846.69

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

15,911

Oity 1.50 m

Ins

und

1.0000

10,000.00

10,000.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.2500

3,000.00

750.00

55
223

5,252 Suministro y siembra arbol Oity h = 1.70 m

und

50,052.47

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Tierra Negra abonada

Ins

0.2100

34,000.00

7,140.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,143

Transporte de materiales m

Ana

0.2100

46,157.00

9,692.97

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.2500

3,000.00

750.00

16,370

Oity 1.70 m

Ins

und

1.0000

20,000.00

20,000.00

55
223

5,253 Red de suministro PVC 1/2", pagado en ML

8,574.07

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

1.0500

1,504.00

1,579.20

15,021

Codo 90 presion PVC 1/2"

Ins

und

0.5000

375.00

187.50

55

5,254 Red de suministro PVC 1 1/2"

565.60

16,167.38

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

879.18

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

1.0500

6,392.00

6,711.60

15,025

Codo 90 presion PVC 1 1/2"

Ins

und

0.5000

4,226.00

2,113.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

207

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,255 Suministro e instal. tuberia PVC alcantarillado 42"


(inc. union)

Cantidad

Vr.Unitario

Vr.Total
1,050,237.66

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0000

111,550.00

0.00

14

Retroexcavadora de orugas

Eqp

HR

0.2857

144,160.00

41,186.51

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

14,118

Lubricante 500 gr

Ins

und

0.1670

12,305.00

2,054.94

15,415

Tuberia alcantarillado PVC 42 "

Ins

1.0290

857,887.00

882,765.72

15,522

Union alcantarillado PVC 42 "

Ins

und

0.1667

574,628.00

95,790.49

4,515

5,256 Excavacion mecanica en material conglomerado en


sobretamaos entre 15" y 30" hasta < 4.0 m
14

Retroexcavadora de orugas

Eqp

5,257 Red suministro CPVC 1/2", pagado en ml

HR

14,416.00

0.1000

144,160.00

14,416.00

14,775.98

Sub-Contrato Sanitario

Esp

38.0000

10,707.23

4,068.75

2,931

Soldadura para CPVC 1/4 gl

Ins

und

0.0100

62,878.00

628.78

3,990

Codo 90 CPVC 1/2"

Ins

und

0.5000

832.00

416.00

3,996

Tubo CPVC 1/2"

Ins

1.0500

3,816.00

4,006.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,258 Punto agua fra PVC 1/2", pagado por UN

und

54,977.96

Valor promedio inst.tipica


Sub-Contrato Sanitario

Esp

38.0000

Herramienta Menor 10% M.O. BB

Eqp

HR

2,927

Soldadura para PVC 1/4 gl

Ins

und

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)

5,144

2
55

39,839.10

15,138.86

1.3000

1,616.00

2,100.80

0.0100

58,612.00

586.12

und

0.0100

28,250.00

282.50

Ins

1.3000

16,159.00

21,006.70

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

14,757

Registro paso directo 1/2"

Ins

und

0.5000

22,000.00

11,000.00

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

2.6200

1,504.00

3,940.48

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.4600

375.00

922.50

5,259 Tuberia de reventilacion 3", pagado ml

14,511.40

Sub-Contrato Sanitario

Esp

38.0000

10,515.51

3,995.89

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5500

1,616.00

888.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0019

58,612.00

111.36

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

0.1400

4,485.00

627.90

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5500

16,159.00

8,887.45

2
55

5,260 Valvula de Plato =8" con vastago de 1.80 m,


columna y rueda de manejo. Suministro e Instal.

und

4,683,773.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

2.5000

8,750.00

21,875.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

8,080.00

Soldador

Ins

5.0000

6,759.00

33,795.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

4,515

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

Valvula de Plato =8" con vastago de 1.80 m

Ins

1.0000

4,530,208.00

4,530,208.00

519

13,919

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

208

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

5,261 Valvula de Mariposa =10" E.B. Suministro e Instal.

kg

Cantidad

Vr.Unitario

Vr.Total

0.5000

6,885.00

3,442.50

und

7,597,415.50

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

3.0000

8,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

8,080.00

Soldador

Ins

5.0000

6,759.00

33,795.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

4,515

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

13,524

Brida Slip On =10" en A.C. 150 Psi

Ins

und

2.0000

386,280.00

772,560.00

13,922

Valvula de Mariposa =10" E.B.

Ins

und

1.0000

6,308,996.00

6,308,996.00

13,955

Empaquetadura para brida =10"

Ins

und

2.0000

50,266.00

100,532.00

14,014

Tornillo = 7/8" x 4" G-8 en A.I. Con T. A

Ins

und

12.0000

21,350.00

256,200.00

8
55
519

5,262 Canaleta en lamina Galvanizada Cal. 20 Au =


0.50m, incluye: accesorios instalacion

26,250.00

50,336.58

Instalada
48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.8000

3,226.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.1500

5,313.00

796.95

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2000

6,805.00

1,361.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0800

50,506.00

4,040.48

13,154

Platina 1/4" x 1 1/4"

Ins

0.5500

4,126.00

2,269.30

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.8000

32,262.00

25,809.60

16,312

Lamina galvanizada Cal 20

Ins

und

0.2750

40,358.00

11,098.45

5,263 Suministro y siembra arbol Oity h = 2.00 m

und

2,580.80

61,286.93

Instalada
Herramienta Menor 10% M.O. BB

Eqp

HR

0.6666

1,616.00

Tierra Negra abonada

Ins

0.2300

34,000.00

7,820.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6666

16,159.00

10,771.59

5,143

Transporte de materiales m

Ana

0.2300

46,157.00

10,616.11

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.2500

3,000.00

750.00

16,371

Oity 2.0 m

Ins

und

1.0000

26,670.00

26,670.00

55
223

5,264 Excavacion mecanica en material conglomerado en


sobretamaos entre 15" y 30" hasta < 8.0 m
14

Retroexcavadora de orugas

Eqp

5,265 Anden en concreto escobillado 2500 psi e=0.08 m


con dilatacin en ladrillo c/2m, incluye relleno y
excavacin

HR

1,077.23

16,016.18

0.1111

144,160.00

16,016.18

57,729.07

2,265

Andenes en concreto de resistencia 2500 psi, espesor 8


cm, pagado m2

Ana

1.0000

37,496.20

37,496.20

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.1500

16,458.20

2,468.73

4,645

Dilatacion en ladrillo tipo rejilla vitrificado A=0.07 m

Ana

0.5000

12,662.74

6,331.37

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.1500

76,218.46

11,432.77

5,266 Limpieza cajas de inspeccin

und

24,686.99

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

209

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

109
4,515

Nombre

Tipo U.M.

Herramienta Menor 5% M.O. BB

Eqp

Cuadrilla BB (Instalaciones)

Ins

5,267 Puerta en acrlico con marco de aluminio

Cantidad

Vr.Unitario

Vr.Total

HR

1.4550

808.00

1,175.64

1.4550

16,159.00

23,511.35

165,272.40

No incluye marco
Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

Puerta en aluminio y acrlico

Ins

1.0000

150,000.00

150,000.00

56

16,402

5,268 Suministro e instal. hoja puerta flormorado, pagado


m2

187,793.53

No incluye marco
Sub-Contrato Carpinteria

Esp

45.0000

129,512.78

Herramienta Menor 10% M.O. DD

Eqp

HR

1.8920

1,763.00

3,335.60

1,236

Cedro Caquet pieza

Ins

und

0.3600

50,000.00

18,000.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1000

2,480.00

248.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.8920

17,628.00

33,352.18

5,086

Triplex flormorado 4 mm

Ins

und

1.5000

49,718.00

74,577.00

4
56

5,269 Ventanas lamina cal. 16

58,280.75

114,660.38

Sin instalacion
Sub-Contrato Ornamentacion

Esp

50.0000

76,440.25

Manija para ventana

Ins

und

1.0000

1,981.00

1,981.00

2,155

Lamina cold rolled cal 16 (2.40 mt x 1.20 mt)

Ins

und

0.4400

110,644.33

48,683.51

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.9400

2,700.00

5,238.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2300

29,750.00

6,842.50

5,064

Cuadrilla DD (Carpinteria)

Ins

0.6667

17,628.00

11,752.59

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1600

6,885.00

1,101.60

14,726

Bisagra alum. exter. 2"

Ins

und

1.0500

801.00

841.05

7
810

5,270 Enchape muros en triplex 4mm

38,220.13

51,685.58

Sin instalacion
4

Sub-Contrato Carpinteria

Esp

45.0000

35,645.23

16,040.35

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.5000

1,691.00

845.50

2,933

Pegante colbn

Ins

kg

0.1000

9,500.00

950.00

5,064

Cuadrilla DD (Carpinteria)

Ins

0.5000

17,628.00

8,814.00

5,086

Triplex flormorado 4 mm

Ins

und

0.3600

49,718.00

17,898.48

8,223

Laca brillante para madera

Ins

gal

0.0500

52,981.00

2,649.05

8,230

Sellador lijable para madera

Ins

gal

0.0400

47,205.00

1,888.20

13,235

Liston ordinario 0.05 x 0.05

Ins

2.0000

1,300.00

2,600.00

5,271 Reja en tubo cuadrado 1" pintada

78,848.00

Coninstalacin
Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

Tubo cuadrado de 1" Cal. 18

Ins

7.0000

2,860.00

20,020.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6000

6,805.00

4,083.00

1,850

Segueta Ncholson

Ins

und

0.0500

2,500.00

125.00

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.2500

17,628.00

22,035.00

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

8
449

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

210

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,397

Tubo rectangular 2" x 1" cal. 18

Ins

5,272 Suministro e instalacin Tubo cerramiento 2 1/2"


pintado

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

25,878.00

25,878.00

Sub-Contrato Ornamentacion

Esp

35.0000

19,373.48

6,780.72

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0400

6,805.00

272.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0050

29,750.00

148.75

3,838

Esmalte mate supersinttico

Ins

gal

0.0050

50,506.00

252.53

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

1.0000

18,700.00

18,700.00

14,956

5,273 Suministro e instal. puerta lmina cold rolled


calibre 16, pagado m2

26,154.20

266,009.88

Sin instalacion
Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3000

8,750.00

2,625.00

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

2,155

Lamina cold rolled cal 16 (2.40 mt x 1.20 mt)

Ins

und

1.5000

110,644.33

165,966.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,064

Cuadrilla DD (Carpinteria)

Ins

4.0000

17,628.00

70,512.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

8
228

14,116

5,274 Marquesina en cristal templado 5 mm, pagado en


M2

201,705.00

Sin instalacion
Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

16,068

Vidrio templado 5 mm

Ins

1.0300

125,000.00

128,750.00

16,080

Cinta sika PVC V-10

Ins

1.5000

10,440.00

15,660.00

16,081

Estructura aluminio para marquesina

Ins

1.0300

36,800.00

37,904.00

56
5,064

5,275 Motobomba a gasolina 3.5 H.P. =1 1/4" x 1".


Suministro e Instalacion y funcionamiento.

und

1,485,550.00

Sin instalacion
55
540
4,515

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Motobomba a gasolina 3.5 H.P. =1 1/4" x 1"

Ins

und

1.0000

1,450,000.00

1,450,000.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

5,276 Retiro de tuberia existente con manejo de aguas


residuales de 14" a 36"

11,363.60

Anodizada. Sin instalacion


17
108
4,489

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

Motobomba de 3"

Eqp

HR

0.4000

12,250.00

4,900.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,280 Cercha en perfil estructural PHR en C 160 x 60 x 2.0


en Tipo Cajon. Suministro e instalacion, pintada.

58,685.84

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.7000

8,750.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.6667

1,144.00

762.70

943

Perfil estructural PHR en C 160 x 60 x 2.0

Ins

2.0500

17,376.00

35,620.80

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

6,125.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

211

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

5,281 Guardacable de 7/8" o Portacable T.P. Suministro e


instal.

Cantidad

Vr.Unitario

Vr.Total

0.7143

6,885.00

4,917.96

0.6667

11,436.00

7,624.38

und

39,380.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,740

Guardacable de 7/8" o Portacable T.P.

Ins

und

1.0000

31,668.00

31,668.00

19

5,282 Sikadur 301 como resina de impregnacin


61
5,066
16,401

99,984.80

Herramienta menor 10% M.O. CC

Eqp

HR

1.0000

1,689.00

1,689.00

Cuadrilla CC (Pintura)

Ins

0.6000

16,893.00

10,135.80

Sikadur 301

Ins

kg

1.0000

88,160.00

88,160.00

5,283 Valvula Reductora de presion HF =3" de 150 Psi.


Suministro e Instal.

und

1,718,328.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

4,793

Brida en PVC =3"

Ins

und

2.0000

30,044.00

60,088.00

4,866

Conjunto brida =3"

Ins

und

1.0000

44,080.00

44,080.00

Valvula Reductora de presion HF =3" de 150 Psi.

Ins

und

1.0000

1,585,720.00

1,585,720.00

55

14,556

5,284 Viga aerea de 0.20 x 0.20 en concreto de 3000 Psi

38,621.66

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1000

1,469.00

1,615.90

49

Vibrador de concretos

Eqp

HR

0.0500

4,375.00

218.75

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

4.4000

188.00

827.20

4,489

Cuadrilla AA (Albaileria)

Ins

1.1000

14,690.00

16,159.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,285 Tuberia Polietileno de alta densidad alcantarillado


40". Suministro e Instal.

1,043,945.22

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

3,281

Tuberia Alcantarillado Polietileno alta d. 40"

Ins

1.0000

989,799.00

989,799.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0100

16,159.00

16,320.59

Lubricante 500 gr

Ins

und

0.0525

12,305.00

646.01

14,118

5,286 Lineas de demarcacin flexicolor parqueadero


0.10, pagado ML

Sub-Contrato Pintura

Esp

30.0000

3,383.22

1,014.97

Cuadrilla CC (Pintura)

Ins

0.0800

16,893.00

1,351.44

15,888

Pintura flexicolor blanco

Ins

gal

0.0200

89,589.00

1,791.78

15,889

Rollo de Cinta de enmascarar 1"

Ins

und

0.0600

4,000.00

240.00

5
5,066

5,287 Divisin para ducha en acrlico y aluminio

4,398.19

146,634.60

Instalada
56
5,064
15,595

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

Cuadrilla DD (Carpinteria)

Ins

0.6000

17,628.00

10,576.80

Divisin para ducha en acrlico y aluminio

Ins

1.0000

135,000.00

135,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

212

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,288 Viga aerea de 0.12 x 0.20 en concreto de 3000 Psi

Cantidad

Vr.Unitario

Vr.Total

30,179.69

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

49

Vibrador de concretos

Eqp

HR

0.0400

4,375.00

175.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

3.8000

188.00

714.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0250

333,142.66

8,328.57

5,061

Formaleta (1 uso)

Ana

0.1733

32,375.50

5,610.67

5,289 Muro en ladrillo rejilla e=0.12 m (12 x 24 x 6)

50,048.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

2,058

Ladrillo prensado rejilla

Ins

und

57.0000

550.00

31,350.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

5,144

Transporte de materiales Tn

Ana

0.1425

0.00

0.00

17

5,290 Bordillo 10 x 40 cm fundido en concreto 2500 psi

1,248.65

24,906.29

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5400

1,469.00

793.26

49

Vibrador de concretos

Eqp

HR

0.1200

4,375.00

525.00

2,197

Repisa Ordinario 3 m

Ins

0.5000

1,500.00

750.00

2,200

Tabla burra ordinario 0.30

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5400

14,690.00

7,932.60

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0400

318,473.24

12,738.93

5,292 Lavamanos blanco incluy. llave + instalacin,


pagado por Un

und

98,637.00

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

4,615

LLAVE L/MANOS URANO CL.

Ins

und

1.0000

8,052.00

8,052.00

Lavamanos blanco

Ins

und

1.0000

65,859.00

65,859.00

829

14,729

5,293 Suministro e instal. de vidrio incoloro 5 mm,


pagado en m2

39,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

3,748

Vidrio incoloro 5 mm

Ins

1.0000

35,000.00

35,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17

5,294 Suministro e instal. de vidrio incoloro 6 mm.


pagado en m2

97,887.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

11,987

Vidrio incoloro 6 mm

Ins

1.0000

93,000.00

93,000.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17
4,489

5,295 Guardacable = 3/4" Tipo Pesado. Suministro e


Instal.

und

33,348.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

213

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 5% M.O. AA

Eqp

3,306

Guardacable de 3/4" o Portacable T.P.

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

19

5,296 Sobreacarreos o transporte de material Petreo (via


destapada en Montaa)
16,409

Volqueta 6 m

19

4,489

Vr.Unitario

Vr.Total

HR

0.5000

735.00

367.50

und

1.0000

25,636.00

25,636.00

0.5000

14,690.00

7,345.00

m-km

Ins

5,298 Nylon C- 9 o 9 mm. Suministro e Instal.

256

Cantidad

m-km

1,587.14

1.2500

1,269.71

1,587.14

2,671.25

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

Nylon Calibre 9 o 9 mm

Ins

1.0000

1,900.00

1,900.00

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,299 Macizo de anclaje en Concreto Ciclopeo 3000 Psi


puentes colgantes

439,790.56

Herramienta Menor 10% M.O. AA

Eqp

HR

9.0000

1,469.00

13,221.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.0000

14,690.00

132,210.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

1.8000

32,375.50

58,275.90

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

5,301 Concreto estriado rampas de 3000 psi, pagado en


m2

74,250.59

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

2,625

Liston piso ordinario

Ins

1.0200

3,500.00

3,570.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1600

333,142.66

53,302.83

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

5,302 Inyector para pozo =4". Suministro e Instal.


55
4,515
13,943

und

1,292.72

130,662.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

Inyector para pozo =4"

Ins

und

1.0000

104,000.00

104,000.00

5,305 Salida + lampara techo Slim 2 * 48 PVC, pagado


por unidad

und

112,648.12

Longitud promedio = 4.50 m


Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Alambre cobre THW 14 AWG THHN/NN

Ins

4.5000

1,033.00

4,648.50

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55
869

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

214

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

15,845

Lampara fluorescente 2 x 48" de incrustar

Ins

und

5,306 Guardaescoba en ceramica duropiso 33 x 7

Cantidad

Vr.Unitario

Vr.Total

9.0000

1,474.00

13,266.00

1.0000

67,000.00

67,000.00

9,184.95

Longitud promedio = 4.50 m


15

Pegacor blanco

Ins

kg

0.3333

1,120.00

373.30

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

44

Pulidora electrica manual

Eqp

HR

0.0800

4,350.00

348.00

3,684

Agua para obra

Ins

0.1500

10.00

1.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

16,072

Disco Diamantado 7"

Ins

und

0.0020

48,140.00

96.28

16,411

Concolor boquilla lista blanco nacar

Ins

kg

0.0300

2,600.00

78.00

16,412

Ceramica duropiso 33.8*33.8

Ins

0.0833

21,900.00

1,824.27

5,307 Paral para baranda en madera 0.06 x 0.1 x 1.0

11,694.89

Longitud promedio = 4 M
Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0290

52,200.00

1,513.80

16,364

Madera de 0.06 x 0.10 x 1

Ins

1.0300

5,178.00

5,333.34

56

5,308 Reja tipo bancaria en varilla cuadrada 1/2" o 12 mm


Pintada e Instalada.

86,909.68

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.8333

8,750.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

2.5000

1,144.00

2,860.00

1,528

Varilla cuadrada 1/2" x 6 mts

Ins

und

2.0333

17,195.00

34,962.59

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6786

6,805.00

4,617.87

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.3494

1,691.00

590.84

2,502

Anticorrosivo rojo claro

Ins

gal

0.1100

29,750.00

3,272.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1100

42,950.00

4,724.50

Cuadrilla SA-1 (Metalisteria)

Ins

2.5000

11,436.00

28,590.00

8
115

16,423

5,309 Suministro y siembra arbol Pomarroso h = 1.00 m


55

und

7,291.38

37,647.76

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Tierra Negra abonada

Ins

0.1800

34,000.00

6,120.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,143

Transporte de materiales m

Ana

0.1800

46,157.00

8,308.26

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0033

40,000.00

132.00

15,918

Dap (fertilizantes)

Ins

bt

0.0750

46,000.00

3,450.00

15,919

Cascarilla

Ins

bt

0.2500

3,000.00

750.00

16,366

Pomarroso 1.0 m

Ins

und

1.0000

10,000.00

10,000.00

223

5,316 Terraplen con material de prestamo localizado (a.


libre 2 Km)

11,677.43

son 3 volquetas
1

Compactador Vibratorio

Eqp

HR

0.0167

100,000.00

1,670.00

Motoniveladora

Eqp

HR

0.0167

132,800.00

2,217.76

11

Carrotanque de Agua

Eqp

HR

0.0167

53,125.00

887.19

14

Retroexcavadora de orugas

Eqp

HR

0.0167

144,160.00

2,407.47

21

Volqueta (6 m3 )

Eqp

HR

0.0500

55,550.00

2,777.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

215

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
858
8,144

Nombre

Tipo U.M.

Material de prestamo (tierra-arena-arcilla-limo)

Ins

Oficial de Construccion

Ins

5,317 Reparacion domiciliaria en tuberia de gres 6"

Cantidad

Vr.Unitario

Vr.Total

1.2500

1,250.00

1,562.50

0.0167

9,282.00

155.01

15,817.01

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3200

1,469.00

470.08

4,489

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0015

430,750.59

646.13

Tubo de gres 6"

Ins

1.0000

10,000.00

10,000.00

17

13,896

5,320 Excavacion de cortes, canales y prestamo (Acarreo


3 Kms)

8,138.75

14

Retroexcavadora de orugas

Eqp

HR

0.0222

144,160.00

3,200.35

21

Volqueta (6 m3 )

Eqp

HR

0.0889

55,550.00

4,938.40

5,321 Aletas en Tuberia Petrolera D=3 1/2"

34,199.97

14

Retroexcavadora de orugas

Eqp

HR

0.0437

144,160.00

6,299.79

42

Motosoldador Diesel

Eqp

HR

0.3500

14,833.00

5,191.55

43

Equipo de Oxicorte

Eqp

HR

0.3500

5,000.00

1,750.00

44

Pulidora electrica manual

Eqp

HR

0.3500

4,350.00

1,522.50

45

Cilindro

Eqp

HR

0.3500

41.00

14.35

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.3500

3,226.00

1,129.10

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4200

6,805.00

2,858.10

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1400

6,856.00

959.84

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.2800

32,262.00

9,033.36

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,322 Desmonte y Limpieza mecanica Terreno


Montaoso (acarreo max. 3 Km)

ha

326,041.00

21

Volqueta (6 m3 )

Eqp

HR

2.0000

55,550.00

111,100.00

38

Motosierra o equipo de desmonte

Eqp

HR

3.5000

5,350.00

18,725.00

40

Guadaadora

Eqp

HR

7.0000

12,000.00

84,000.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

4.0000

2,550.00

10,200.00

Cuadrilla AA-3 (Limpieza)

Ins

4.0000

25,504.00

102,016.00

14,749

5,323 Demolicion de estructuras en concreto reforzado


con retiro, pagado en m3

100,291.70

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.5000

35,000.00

52,500.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

1.2200

3,091.00

3,771.02

Cuadrilla AA-4

Ins

1.2200

30,910.00

37,710.20

13,960

5,324 Baranda en Tuberia Petrolera D=3 1/2 "

53,061.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

216

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

14

Retroexcavadora de orugas

Eqp

42

Motosoldador Diesel

Eqp

HR

0.0725

144,160.00

10,451.60

HR

0.5800

14,833.00

43

Equipo de Oxicorte

8,603.14

Eqp

HR

44

0.5800

5,000.00

2,900.00

Pulidora electrica manual

Eqp

HR

0.5800

4,350.00

2,523.00

45

Cilindro

Eqp

HR

0.5800

41.00

23.78

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5800

3,226.00

1,871.08

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6200

6,805.00

4,219.10

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2000

6,856.00

1,371.20

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1080

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.1400

15,662.00

2,192.68

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.4500

32,262.00

14,517.90

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,325 Pilotes en Tuberia Petrolera D=6 5/8 "

36,776.08

14

Retroexcavadora de orugas

Eqp

HR

0.0413

144,160.00

5,953.81

42

Motosoldador Diesel

Eqp

HR

0.3300

14,833.00

4,894.89

43

Equipo de Oxicorte

Eqp

HR

0.1650

5,000.00

825.00

44

Pulidora electrica manual

Eqp

HR

0.3300

4,350.00

1,435.50

45

Cilindro

Eqp

HR

0.3300

41.00

13.53

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.3300

3,226.00

1,064.58

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4700

6,805.00

3,198.35

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1600

6,856.00

1,096.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,144

Transporte de materiales Tn

Ana

0.1070

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1000

15,662.00

1,566.20

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.3300

32,262.00

10,646.46

14,755

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

Ins

0.0000

81,200.00

0.00

5,326 Vigas longitudinales Tuberia Petrolera D=3 1/2 "

20,924.82

14

Retroexcavadora de orugas

Eqp

HR

0.0244

144,160.00

3,517.50

42

Motosoldador Diesel

Eqp

HR

0.1950

14,833.00

2,892.44

43

Equipo de Oxicorte

Eqp

HR

0.1950

5,000.00

975.00

44

Pulidora electrica manual

Eqp

HR

0.1950

4,350.00

848.25

45

Cilindro

Eqp

HR

0.1950

41.00

8.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.1950

3,226.00

629.07

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2100

6,805.00

1,429.05

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0700

6,856.00

479.92

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1030

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.0500

15,662.00

783.10

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.1950

32,262.00

6,291.09

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

217

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,327 Columnas Tuberia Petrolera D=3 1/2 "

Cantidad

Vr.Unitario

Vr.Total

41,142.73

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

7,208.00

42

Motosoldador Diesel

Eqp

HR

0.4000

14,833.00

5,933.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

45

Cilindro

Eqp

HR

0.4000

41.00

16.40

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.4000

3,226.00

1,290.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4700

6,805.00

3,198.35

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1600

6,856.00

1,096.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1140

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.4000

32,262.00

12,904.80

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,328 Vigas transversales Tuberia Petrolera D=3 1/2 "

41,142.73

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

7,208.00

42

Motosoldador Diesel

Eqp

HR

0.4000

14,833.00

5,933.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

45

Cilindro

Eqp

HR

0.4000

41.00

16.40

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.4000

3,226.00

1,290.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4700

6,805.00

3,198.35

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1600

6,856.00

1,096.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1140

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.4000

32,262.00

12,904.80

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,329 Vigas longitudinales Tuberia Petrolera D=6 5/8"

25,959.63

14

Retroexcavadora de orugas

Eqp

HR

0.0263

144,160.00

3,791.41

42

Motosoldador Diesel

Eqp

HR

0.2100

14,833.00

3,114.93

43

Equipo de Oxicorte

Eqp

HR

0.2100

5,000.00

1,050.00

44

Pulidora electrica manual

Eqp

HR

0.2100

4,350.00

913.50

45

Cilindro

Eqp

HR

0.2100

41.00

8.61

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.2100

3,226.00

677.46

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3200

6,805.00

2,177.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1100

6,856.00

754.16

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,144

Transporte de materiales Tn

Ana

0.1070

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

218

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

0.0700

15,662.00

1,096.34

kg

0.0300

41,820.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

1,254.60

Ins

14,755

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

0.2100

32,262.00

6,775.02

Ins

0.0000

81,200.00

0.00

5,330 Vigas de apoyo Tuberia Petrolera D=3 1/2 ", pagado


ml

60,607.75

14

Retroexcavadora de orugas

Eqp

HR

0.0750

144,160.00

10,812.00

42

Motosoldador Diesel

Eqp

HR

0.6000

14,833.00

8,899.80

43

Equipo de Oxicorte

Eqp

HR

0.6000

5,000.00

3,000.00

44

Pulidora electrica manual

Eqp

HR

0.6000

4,350.00

2,610.00

45

Cilindro

Eqp

HR

0.6000

41.00

24.60

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.6000

3,226.00

1,935.60

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.7100

6,805.00

4,831.55

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2300

6,856.00

1,576.88

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1210

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0800

6,200.00

496.00

14,745

Oxigeno Industrial

Ins

0.1600

15,662.00

2,505.92

14,746

Acetileno

Ins

kg

0.0600

41,820.00

2,509.20

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.6000

32,262.00

19,357.20

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,331 Piso en lamina corrugada de 1/4", pagado en m2

203,684.35

14

Retroexcavadora de orugas

Eqp

HR

0.0469

144,160.00

6,761.10

42

Motosoldador Diesel

Eqp

HR

0.7500

14,833.00

11,124.75

44

Pulidora electrica manual

Eqp

HR

0.7500

4,350.00

3,262.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.7500

3,226.00

2,419.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

3.0000

6,805.00

20,415.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.7500

32,262.00

24,196.50

14,758

Lamina alfajor 1/4" (6 mm)

Ins

1.0000

135,505.00

135,505.00

5,332 Replanteo y localizacion para puentes (Planimetria


y Altimetria), pagado por m2

10,550.13

15

Estacion Total

Eqp

HR

0.0777

7,500.00

582.75

46

Campero 2000cc-3000cc

Eqp

HR

0.3885

21,534.00

8,365.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0009

42,950.00

38.66

8,108

Topografo

Ins

0.0777

7,660.00

595.18

8,109

Cadenero

Ins

0.0777

4,957.00

385.16

8,145

Ayudante de construccion

Ins

0.0777

5,407.00

420.12

13,326

Durmiente ordinario 3 M

Ins

0.1000

767.00

76.70

14,760

Cinta de Sealizacion

Ins

0.8000

107.00

85.60

5,333 Roceria con retiro

ha

476,513.57

21

Volqueta (6 m3 )

Eqp

HR

0.4600

55,550.00

25,553.00

40

Guadaadora

Eqp

HR

26.6667

12,000.00

320,000.40

73

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

26.6667

234.00

6,240.01

Ayudante (A)

Ins

26.6667

4,677.00

124,720.16

14,703

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

219

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,334 Cuneta tipo C-1, concreto 2500 Psi e=0.10 m

Cantidad

Vr.Unitario

Vr.Total

387,990.74

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.5600

4,375.00

2,450.00

2,208

Tabla chapa ordinario 0.10

Ins

10.0000

2,667.00

26,670.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.5000

14,690.00

36,725.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

1.0000

318,473.24

318,473.24

5,340 Camara de quiebre Tipo 1, entrada y salida en 2" en


mampostera de 0.12m y 1.24x1.24x0.90m (incluye
accesorios y paete)

und

3,672.50

2,176,035.42

OEGA
Cruz en H.D. 2" x 2" J.H. Suministro e Instal.

Ana

und

5.4300

110,206.50

598,421.30

1,625

Flotador completo (bola de cobre) 2"

Ins

und

1.0000

220,748.00

220,748.00

4,923

Paete impermeabilizado muros 1:3 espesor de 2 cm,


pagado en m2

Ana

5.4300

18,719.87

101,648.89

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

14.0000

3,075.79

43,061.06

5,130

Relleno con material crudo de rio T.m 6", compactado y


Transportado, pagado en m3

Ana

0.2300

82,834.77

19,052.00

5,143

Transporte de materiales m

Ana

0.3500

46,157.00

16,154.95

5,144

Transporte de materiales Tn

Ana

1.3600

0.00

0.00

13,844

Valvula de corte 2"

Ins

und

1.0000

551,000.00

551,000.00

14,312

Valvula compuerta en bronce 3"

Ins

und

1.0000

449,732.00

449,732.00

15,028

Codo 90 presion PVC 3"

Ins

und

1.0000

23,261.00

23,261.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,438

Tubo PVC sanitario de 3"

Ins

1.0000

10,595.00

10,595.00

15,469

Tee Sanitaria PVC 3 "

Ins

und

1.0000

4,959.00

4,959.00

87

5,341 Placa Piso Concreto resistencia 210 kg/cm2 - 3000


psi e=0.15

68,018.26

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1600

4,375.00

700.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,342 Zarpa (tipo dado) en concreto para puentes de


resistencia 3000 Psi, pagada en m3

1,175.20

514,626.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.4100

32,375.50

45,649.46

5,343 Replanteo y localizacion para arquitectura, sobre


terreno, pagado en m2

1,469.00

11,752.00

4,744.32

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2800

1,469.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.0200

1,990.00

39.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.2800

14,690.00

4,113.20

14,775

Durmiente - abarco 4mm

Ins

0.0600

3,000.00

180.00

17

411.32

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

220

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,344 Descapote a mano con transporte

Cantidad

Vr.Unitario

Vr.Total

5,343.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2915

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0114

55,550.00

633.27

Cuadrilla AA (Albaileria)

Ins

0.2915

14,690.00

4,282.14

4,489

5,345 Llantas en desuso (suministro e instalacion)

und

428.21

12,318.18

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1750

1,469.00

257.08

1,617

Cuerda de nylon

Ins

2.0000

500.00

1,000.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1750

14,690.00

2,570.75

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

1.0000

3,092.35

3,092.35

LLantas en desuso

Ins

und

1.0000

5,000.00

5,000.00

17

14,776

5,346 Concreto ciclopeo de resistencia 3000 psi, pagado


en m3

315,159.24

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.7000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.3000

4,375.00

1,312.50

4,489

Cuadrilla AA (Albaileria)

Ins

4.7004

14,690.00

69,048.88

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

5,347 Pilotes en Concreto 3500 Psi.

6,904.30

548,551.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.6400

4,375.00

2,800.00

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,348 Malla electrosoldada Q5, con marcos en angulo


1"x1/8", pagada en m2

17,628.00

44,875.01

Sub-Contrato Carpinteria

Esp

35.0000

33,240.75

11,634.26

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2500

8,750.00

2,187.50

1,850

Segueta Ncholson

Ins

und

0.0200

2,500.00

50.00

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

1.3000

2,422.00

3,148.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,064

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

1.0500

8,323.00

8,739.15

14,779

5,349 Codo 11 1/4 en H.D. ext liso 10" (250 mm),


Suministro e instal.
55
4,515
14,024

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Codo 11.25 10 " en HD. ext liso

Ins

und

1.0000

606,100.00

606,100.00

5,350 Codo 22.5 en H.D. ext liso 10" (250 mm).


Suministro e Instal.
55
4,515

623,875.00

1,616.00

und

1,616.00

629,799.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

221

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,025

Codo 22.5 10 " en HD. ext liso

Ins

5,351 Codo 45 en H.D. ext liso =10" (250 mm).


Suministro e Instal.

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

606,100.00

606,100.00

und

937,779.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,026

Codo 45 10 " en HD. ext liso

Ins

und

1.0000

914,080.00

914,080.00

55

5,352 Codo 90 en H.D. ext liso o J.H. =10" (250 mm).


Suministro e instal

und

118,739.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,027

Codo 90 10" en HD. ext liso

Ins

und

1.0000

95,040.00

95,040.00

55

5,353 Codo 11 1/4 en H.D. ext liso 12" (300 mm).


Suministro e Instal.
55
4,515
14,028

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Codo 11.25 12" en HD. ext liso

Ins

und

1.0000

847,960.00

847,960.00

5,354 Codo 22.5 en H.D. ext liso 12" (300 mm),


Suministro e instal.
55
4,515
14,029

865,735.00

und

1,063,639.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Codo 22.5 12" en HD. ext liso

Ins

und

1.0000

1,039,940.00

1,039,940.00

5,355 Codo 45 en H.D. ext liso 12" (300 mm), Suministro


e instal.

und

990,559.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,030

Codo 45 12" en HD. ext liso

Ins

und

1.0000

966,860.00

966,860.00

55

5,356 Codo 90 en H.D. ext liso 12" (300 mm), Suministro


e instal.

und

1,144,839.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,031

Codo 90 12" en HD. ext liso

Ins

und

1.0000

1,121,140.00

1,121,140.00

55

5,357 Codo 11 1/4 en H.D. ext liso 14" (350 mm),


Suministro e instal.
55
4,515
14,032

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Codo 11.25 14" en HD. ext liso

Ins

und

1.0000

1,212,200.00

1,212,200.00

5,358 Codo 22.5 en H.D. ext liso 14" (350 mm).


Suministro e Instal.
4,515
14,033

1,232,515.05

und

1,233,544.79

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Codo 22.5 14" en HD. ext liso

Ins

und

1.0000

1,212,000.00

1,212,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

222

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,359 Codo 45 en H.D. ext liso 14" (350 mm). Suministro


e Instal.

Cantidad

Vr.Unitario

und

Vr.Total

1,295,679.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

14,034

Codo 45 14" en HD. ext liso

Ins

und

1.0000

1,287,600.00

1,287,600.00

5,360 Codo 45 en H.D. ext liso 14" (350 mm). Suministro


e Instal.

und

1,642,064.79

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,035

Codo 90 14" en HD. ext liso

Ins

und

1.0000

1,620,520.00

1,620,520.00

5,361 Valvula de Purga =6". Suministro e Instal.


55
4,515
14,093

und

1,579,800.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Valvula de Purga 6"

Ins

und

1.0000

1,544,250.00

1,544,250.00

5,362 Concreto ciclopeo de resistencia 2500 psi, pagado


en m3

306,357.58

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.7000

49

Vibrador de concretos

Eqp

HR

0.3000

4,375.00

1,312.50

4,489

Cuadrilla AA (Albaileria)

Ins

4.7004

14,690.00

69,048.88

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.6000

318,473.24

191,083.94

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

5,363 Replanteo y localizacion de tuberas de


alcantarillado, pagado por metro lineal

1,469.00

6,904.30

1,948.70

Estacion Total

Eqp

HR

0.0500

7,500.00

375.00

2,243

Vara de clavo 3M -1

Ins

0.1000

1,500.00

150.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0001

42,950.00

4.30

8,108

Topografo

Ins

0.0500

7,660.00

383.00

8,109

Cadenero

Ins

0.1000

4,957.00

495.70

8,145

Ayudante de construccion

Ins

0.1000

5,407.00

540.70

15

5,367 Valvula de bola en H.D. 1 1/4"

und

47,507.60

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

13,845

Valvula de Bola para agua H.D. 1 1/4"

Ins

und

1.0000

36,308.00

36,308.00

14,020

Cinta teflon

Ins

rl

0.6000

1,000.00

600.00

15,051

Adaptador macho presin PVC 1 1/4"

Ins

und

2.0000

2,068.00

4,136.00

4,515

5,368 Suministro e instal. tuberia presion PVC RDE 11


3/4"

4,172.59

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0008

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0008

28,250.00

22.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0701

16,159.00

1,132.75

14,992

Tubo presion RDE 11 PVC 3/4 "

Ins

1.0000

2,907.00

2,907.00

15,040

Union presion PVC 3/4"

Ins

und

0.1667

380.00

63.35

5,370 Desmonte de ventanas

46.89

4,307.99

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

223

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

17
4,489

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cuadrilla AA (Albaileria)

Ins

5,371 Retiro de tuberia existente con manejo de aguas


residuales de 0" a 12"
17
108
4,489

Cantidad

Vr.Unitario

Vr.Total

HR

0.2666

1,469.00

391.64

0.2666

14,690.00

3,916.35

Herramienta Menor 10% M.O. AA

Eqp

Motobomba de 3"
Cuadrilla AA (Albaileria)

7,102.25

HR

0.2500

1,469.00

367.25

Eqp

HR

0.2500

12,250.00

3,062.50

Ins

0.2500

14,690.00

3,672.50

5,372 Rejillas para captacion ancho = 0.30 m.

66,671.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

9.0000

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

2,502

Anticorrosivo rojo claro

Ins

gal

5,064

Cuadrilla DD (Carpinteria)

Ins

Soldadura electrosoldada 6013 de 1/8"

Ins

14,116

5,373 Filtro en material triturado (1" a 1 1/2"), con


transporte

2,295.00

20,655.00

2.6000

2,700.00

7,020.00

0.0100

29,750.00

297.50

2.0000

17,628.00

35,256.00

kg

0.5000

6,885.00

3,442.50

112,971.35

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6500

1,469.00

954.85

1,821

Triturado de 1" - 1 1/2"

Ins

1.0000

39,875.00

39,875.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6500

14,690.00

9,548.50

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

Geotextil No Tejido 2000

Ins

4.0000

4,109.00

16,436.00

17

13,894

5,374 Suministro e instal. tuberia presion PVC RDE 13,5


1"

5,805.06

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0010

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0010

28,250.00

28.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1047

16,159.00

1,691.85

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

1.0000

3,923.00

3,923.00

15,041

Union presion PVC 1"

Ins

und

0.1667

620.00

103.35

5,375 Suministro e instal. tuberia presion PVC RDE 9 1/2"

58.61

3,028.87

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0004

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0004

28,250.00

11.30

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0523

16,159.00

845.12

14,991

Tubo presin RDE 9 PVC 1/2 "

Ins

1.0000

2,109.00

2,109.00

15,039

Union presion PVC 1/2"

Ins

und

0.1667

240.00

40.01

5,376 Valvula de ventosa 6" . Camara doble accion


multiple E.B. Suministro e instal.

und

23.44

2,826,605.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

14,020

Cinta teflon

Ins

rl

2.0000

1,000.00

2,000.00

16,213

Valv. ventosa (cam. doble) acc. multiple 6" E.B.

Ins

und

1.0000

2,795,600.00

2,795,600.00

55

5,377 Concreto 3000 psi para anclajes

2,585.60

461,630.78

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

224

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. AA

Eqp

HR

7.1429

1,469.00

10,492.92

2,198

Durmiente ordinario 4 M

Ins

1.0000

3,500.00

3,500.00

2,243

Vara de clavo 3M -1

Ins

0.6000

1,500.00

900.00

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0000

4,333.00

8,666.00

4,489

Cuadrilla AA (Albaileria)

Ins

7.1429

14,690.00

104,929.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

17

5,378 Muro en concreto 3500 psi Impermeabilizado

706,674.07

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,061

Formaleta (1 uso)

Ana

2.3200

32,375.50

75,111.16

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

1.0000

366,456.41

366,456.41

5,379 Baranda en Tubo HG =2 1/2 "pagado ml

117,040.54

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.1500

4,350.00

652.50

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.2500

3,226.00

4,032.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3200

6,856.00

2,193.92

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0300

42,950.00

1,288.50

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0250

6,200.00

155.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.2500

32,262.00

40,327.50

14,956

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

3.0500

18,700.00

57,035.00

5,381 Punto agua fra pvc instalacin tpica, pagado por


UN X ARREGLAR

und

85,988.05

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0400

58,612.00

2,344.48

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0400

28,250.00

1,130.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

5,144

55

Transporte de materiales Tn

Ana

0.3150

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

62,310.18

23,677.87

13,940

Registro paso directo 3/4"

Ins

und

0.5000

29,000.00

14,500.00

14,992

Tubo presion RDE 11 PVC 3/4 "

Ins

0.5800

2,907.00

1,686.06

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

2.6200

1,504.00

3,940.48

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

0.4900

3,923.00

1,922.27

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

0.4300

6,392.00

2,748.56

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.4600

375.00

922.50

15,022

Codo 90 presion PVC 3/4"

Ins

und

1.0700

601.00

643.07

15,023

Codo 90 presion PVC 1"

Ins

und

0.7700

1,176.00

905.52

15,025

Codo 90 presion PVC 1 1/2"

Ins

und

0.7400

4,226.00

3,127.24

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

225

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,382 Columna en Concreto 3500 psi impermeabilizado sobre placas superiores

Cantidad

Vr.Unitario

Vr.Total
738,981.22

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,867

Paral telescopico 2 a 4 ml

Ins

28.0000

340.00

9,520.00

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

1.0000

366,456.41

366,456.41

13,641

Seccin de Andamio

Ins

mes

0.4000

17,120.00

6,848.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

5,383 Punto desage sanitario pvc 2", pagado por und

und

41,830.77

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

0.6260

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6260

16,159.00

10,115.53

5,144

55

1,011.62

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

30,312.15

11,518.62

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

4.0000

1,936.00

7,744.00

15,437

Tubo PVC sanitario de 2"

Ins

1.2000

7,092.00

8,510.40

5,385 Acometida domiciliaria acueducto PF+UAD (L=6m)


D=1/2", incluye registro de corte. Suministro e
instal.

und

71,115.88

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3200

1,469.00

470.08

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

12,142

Registro de incorporacion 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,365

Registro de corte 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,791

Tuberia PF+UAD 1/2"

Ins

6.0000

1,429.00

8,574.00

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

15,664

Adaptador Macho PF+UAD 1/2 "

Ins

und

2.0000

1,481.00

2,962.00

17
4,489

5,386 Dilatacion en Cinta PVC-022

36,757.93

Herramienta menor 5% M.O. AA

Eqp

HR

0.3000

1,870

Alambre Negro No 18

Ins

kg

0.0100

3,903.00

39.03

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

Cinta sika PVC 0-22

Ins

1.0060

31,900.00

32,091.40

19

13,927

5,388 Torre (incluye accesorios segun diseos)

735.00

und

220.50

2,973,548.50

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

8.0000

8,750.00

Herramienta Menor 10% M.O. AA

Eqp

HR

24.2424

1,469.00

35,612.09

Soldador

Ins

24.2424

6,759.00

163,854.38

13,154

Platina 1/4" x 1 1/4"

Ins

4.0000

4,126.00

16,504.00

14,071

Tubo de agua Galvanizado =1 1/2"

Ins

68.0000

18,995.00

1,291,660.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

80.0000

6,885.00

550,800.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

24.2424

25,504.00

618,278.17

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

19.5400

11,609.00

226,839.86

8
17
519

70,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

226

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,389 Suministro e instal. electrobomba doble diafragma


2.0 hp trifsica, pagado por un

Cantidad

Vr.Unitario

und

Vr.Total
4,390,427.60

Herramienta Menor 10% M.O. BB

Eqp

HR

26.6667

1,616.00

43,093.39

Cuadrilla BB (Instalaciones)

Ins

26.6667

16,159.00

430,907.21

14,001

Acoples elctricos

Ins

gal

1.0000

200,000.00

200,000.00

14,047

Electrobomba doble diafragma 2.0 hp

Ins

und

1.0000

3,329,200.00

3,329,200.00

14,129

Cable al. aisl. pvc 1/0 awg

Ins

1.0000

8,294.00

8,294.00

15,350

Tablero bif 225A/240 V c/pta (24 C) ch plat totali

Ins

und

1.0000

378,933.00

378,933.00

55
4,515

5,390 Caja de control arrancadores estrellla tringulo


(alternacion automatica)

und

5,702,160.35

Cuadrilla AA (Albaileria)

Ins

6.0150

14,690.00

88,360.35

14,016

Caja control estrella triangulo

Ins

und

1.0000

5,336,000.00

5,336,000.00

14,119

Interruptor segur. tri. 100 a

Ins

und

2.0000

138,900.00

277,800.00

4,489

5,391 Suminstro e instal. flotador automatico para


control de nivel, pagado en un

und

146,018.12

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,051

Flotador automtico de mercurio

Ins

und

1.0000

85,000.00

85,000.00

14,129

Cable al. aisl. pvc 1/0 awg

Ins

3.0000

8,294.00

24,882.00

55

5,392 Suministro e instal. pasamuro ac 2" elxer l:0.60 m,


pagado por un

und

153,817.59

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,060

Pasamuro ac 2 pulg l:0.60 m

Ins

und

1.0000

145,000.00

145,000.00

4,515

5,393 Pendolon (incluye accesorios)

und

8,617.59

210,563.99

Acero de refuerzo 60000 Psi

Ins

kg

2.0000

2,257.00

4,514.00

13,154

Platina 1/4" x 1 1/4"

Ins

3.5000

4,126.00

14,441.00

14,052

Grapa 1/4"

Ins

und

2.0000

4,580.00

9,160.00

14,053

Grapa externa 3/8 pulg

Ins

und

4.0000

7,250.00

29,000.00

14,054

Grapa interna 3/8 pulg

Ins

und

4.0000

5,240.00

20,960.00

14,061

Perro de 1/2 " Tipo pesado.

Ins

und

4.0000

10,000.00

40,000.00

14,070

Tornillo = 3/8" x 3/4" G-5 R.O. Con T. A.

Ins

und

4.0000

300.00

1,200.00

14,082

Tuerca = 1/4" G-8

Ins

und

2.0000

102.00

204.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

3.5714

25,504.00

91,084.99

8,194

5,394 Valvula de Pie en bronce =2". Suministro e instal.

und

131,751.58

Herramienta Menor 5% M.O. BB

Eqp

HR

1.1429

808.00

923.46

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,092

Valvula de Pie bronce =2"

Ins

und

1.0000

111,360.00

111,360.00

109
4,515

5,396 Suministro e instal. tuberia A.C. 2"

41,029.49

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

227

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.1402

16,159.00

2,265.49

14,020

Cinta teflon

Ins

rl

0.6000

1,000.00

600.00

14,087

Union universal galvanizada 2"

Ins

und

0.1700

23,200.00

3,944.00

15,643

Tuberia en A.C S/C = 2" SCH 40

Ins

1.0000

34,220.00

34,220.00

4,515

5,397 Valvula de Pie en bronce =1 1/4". Suministro e


instal.

und

66,187.00

Herramienta Menor 5% M.O. BB

Eqp

HR

1.0000

808.00

808.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

13,946

Valvula de Pie bronce =1 1/4"

Ins

und

1.0000

48,720.00

48,720.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

109
4,515

5,398 Suministro e instal. Valvula de bola PVC 4" lisa

und

270,084.31

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Valvula de bola PVC 4"

Ins

und

1.0000

254,968.00

254,968.00

14,868

5,399 Collar de derivacion HF 2" x 1". Suministro e Instal.

und

2,930.60

28,607.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

1,446

Collar de derivacion H.D/ PVC 2" x 1"

Ins

und

1.0000

19,720.00

19,720.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

55

5,400 Terraplen o rellenos con material de corte (a. libre


2 Km)

8,423.64

son 3 volquetas
1

Compactador Vibratorio

Eqp

HR

0.0139

100,000.00

1,390.00

Motoniveladora

Eqp

HR

0.0139

132,800.00

1,845.92

11

Carrotanque de Agua

Eqp

HR

0.0139

53,125.00

738.44

14

Retroexcavadora de orugas

Eqp

HR

0.0139

144,160.00

2,003.82

21

Volqueta (6 m3 )

Eqp

HR

0.0417

55,550.00

2,316.44

Oficial de Construccion

Ins

0.0139

9,282.00

129.02

8,144

5,401 Codo 90 =2" en A.C. con E.B x E.B. Suministro e


instal.

und

76,684.40

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3333

1,616.00

538.61

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,021

Codo 90 =2" en A.C. E.B.

Ins

und

1.0000

70,760.00

70,760.00

55

5,402 Suministro e instal. tee acero al carbon 2 x 2"

und

56,167.56

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,020

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

14,069

Tee en A.C. SCH 40 2" x 2 "

Ins

und

1.0000

53,592.00

53,592.00

4,515

5,403 Valvula de alivio en bronce 2" x 2". Suministro e


instal.

und

2,475.56

753,678.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,088

Valvula de alivio 2 " x 2"

Ins

und

1.0000

720,360.00

720,360.00

4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

228

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,404 Valvula de retencion (Cheque) con contrapesa


=2" en E.B. Operacion horizontal y/o vertical.
Suministro e instal.
55
4,515
14,089

Cantidad

Vr.Unitario

und

Vr.Total

497,230.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Valvula de retencion (cheque) =2". E.B en HF

Ins

und

1.0000

461,680.00

461,680.00

5,405 Salida lampara/toma pvc, pagado en un

und

90,955.31

Longitud promedio = 4.50 m


Herramienta Menor 10% M.O. BB

Eqp

HR

3.3600

1,616.00

5,429.76

245

Roseta (Plafn)

Ins

und

1.0000

1,560.00

1,560.00

252

Interruptor doble de incrustar galica luminex

Ins

und

1.0000

5,100.00

5,100.00

271

Toma sencilla

Ins

und

1.0000

4,500.00

4,500.00

811

Alambre cobre THW 14 AWG

Ins

4.5000

720.00

3,240.00

3,266

Alambre cobre THW 12 AWG

Ins

9.0000

1,000.00

9,000.00

3,495

Caja sencilla conduit

Ins

und

1.3500

1,218.00

1,644.30

3,553

Adaptador terminal conduit 1/2"

Ins

und

5.6100

269.00

1,509.09

3,556

Tubo conduit PVC 1/2"

Ins

3.3800

1,384.00

4,677.92

4,515

Cuadrilla BB (Instalaciones)

Ins

3.3600

16,159.00

54,294.24

55

5,406 Filtro o Dren Frances PVC 100 mm (0.5 x 1.0) m

90,677.45

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.4000

3,091.00

1,236.40

3,466

Tubo de drenaje PVC 100 mm o 4"

Ins

1.0500

20,447.00

21,469.35

5,143

Transporte de materiales m

Ana

0.5000

46,157.00

23,078.50

13,783

Geotextil No Tejido 1600

Ins

3.4000

2,758.00

9,377.20

13,960

Cuadrilla AA-4

Ins

0.4000

30,910.00

12,364.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.5000

46,304.00

23,152.00

59

5,407 Valvula de compuerta sello de bronce vastago no


ascend. ext. j.h. = 2". Suministro e instal.

und

435,838.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,090

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 2"

Ins

und

1.0000

402,520.00

402,520.00

4,515

5,408 Placa de fondo en Concreto 3500 Psi


impermeabilizado

32,318.00

535,195.41

17

Herramienta Menor 10% M.O. AA

Eqp

HR

9.5000

1,469.00

13,955.50

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0000

4,333.00

8,666.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.5000

14,690.00

139,555.00

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

1.0000

366,456.41

366,456.41

5,409 Cuneta tipo C-2 en concreto 2500 Psi ( a = 1.70 m)

63,492.87

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

1.7000

2,667.00

4,533.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.2800

14,690.00

4,113.20

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1700

318,473.24

54,140.45

411.32

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

229

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,410 Suministro e instal. union universal H.G. 2"

Cantidad

Vr.Unitario

und

Vr.Total

26,173.07

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

14,020

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

14,087

Union universal galvanizada 2"

Ins

und

1.0000

23,200.00

23,200.00

4,515

5,412 Adaptador macho de presion PVC 2". Suministro e


Instal.

und

2,873.07

6,900.73

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0110

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0110

28,250.00

310.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1538

16,159.00

2,485.25

Adaptador macho presin PVC 2"

Ins

und

1.0000

3,460.00

3,460.00

15,053

5,413 Suministro e instal. lampara fluorescente 2 x 48 de


incrustar bajo placa, pagado por un

und

644.73

88,767.50

Sin tuberia, cajas, cable


Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,021

CARGA FULM.FUERTE 330

Ins

und

4.0000

750.00

3,000.00

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

15,845

Lampara fluorescente 2 x 48" de incrustar

Ins

und

1.0000

67,000.00

67,000.00

15,904

Perno alt.vel. 1/4" x 2

Ins

und

4.0000

220.00

880.00

16,511

Tubo slim 48"

Ins

und

2.0000

4,500.00

9,000.00

55

5,416 Adaptador macho de presion PVC 4". Suministro e


Instal.

und

32,679.36

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0330

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0330

28,250.00

932.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2963

16,159.00

4,787.91

Adaptador macho presin PVC 4"

Ins

und

1.0000

25,025.00

25,025.00

15,056

5,417 Suministro e instal. dosificador de quimicos en


solucion q:150 l/h, pagado por un

und

1,934.20

5,812,470.00

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,045

Dosificador blue &white q:150 l/h

Ins

und

1.0000

5,630,000.00

5,630,000.00

14,127

Cable al. aisl. pvc 4/0 awg

Ins

10.0000

6,395.00

63,950.00

4,489

5,418 Suministro e instal. arena silice malla 20 - 40 para


filtros
17
4,489
14,006

117,520.00

617,427.47

Herramienta Menor 10% M.O. AA

Eqp

HR

1.7778

1,469.00

2,611.59

Cuadrilla AA (Albaileria)

Ins

1.7778

14,690.00

26,115.88

Arena silicice Cu 2 -3, malla 20 - 40

Ins

bt

35.0000

16,820.00

588,700.00

5,419 Sum e instal. sistema de agitacion de quimicos


(incluye blower 0.50 hp, agitacion nuematica y
tanque pvc 1000, pagado u

und

857,274.00

3,077

Tanque plastico 1000 lt

Ins

und

1.0000

304,074.00

304,074.00

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

230

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,005

Agitadores fibra de vidrio

Ins

und

14,009

Blower 0.50 hp

Ins

und

5,420 Suministro e instal. gravilla gruesa para filtros,


pagado por m3
17
4,489
14,056

Cantidad

Vr.Unitario

Vr.Total

4.0000

55,420.00

221,680.00

1.0000

214,000.00

214,000.00

431,335.15

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

Gravilla gruesa

Ins

1.0000

417,600.00

417,600.00

5,421 Suministro e instal. codo pvc 90 cxc 1/2", pagado


por un

und

1,575.87

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0067

58,612.00

392.70

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0067

28,250.00

189.28

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0383

16,159.00

618.89

15,021

Codo 90 presion PVC 1/2"

Ins

und

1.0000

375.00

375.00

5,422 Cercha y correa metlica por KG

kg

4,842.20

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0784

8,750.00

1,850

Segueta Ncholson

Ins

und

0.0017

2,500.00

4.25

1,901

Acero de refuerzo 37000 Psi

Ins

kg

0.3620

2,295.00

830.79

2,502

Anticorrosivo rojo claro

Ins

gal

0.0035

29,750.00

104.13

5,064

Cuadrilla DD (Carpinteria)

Ins

0.0889

17,628.00

1,567.13

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.6880

2,257.00

1,552.82

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0141

6,885.00

97.08

14,116

5,423 Adaptador macho de presion PVC 1/2". Suministro


e Instal.

und

686.00

1,464.10

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0067

58,612.00

392.70

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0067

28,250.00

189.28

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 1/2"

Ins

und

1.0000

260.00

260.00

15,048

5,424 Buje soldado 2 1/2 x 2". Suministro e instal.

und

12,911.90

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1538

16,159.00

2,485.25

Buje soldado presion PVC 2.1/2 x 2

Ins

und

1.0000

8,950.00

8,950.00

15,106

5,425 Placa base en concreto 3000 psi e=0.15 m


reforzado con acero grado 37

996.40

90,838.17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7700

1,469.00

1,131.13

1,901

Acero de refuerzo 37000 Psi

Ins

kg

11.2000

2,295.00

25,704.00

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.7700

14,690.00

11,311.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

17

5,427 Suministro e instal. difusores de aire

und

26,636.90

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

231

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489
14,044

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

Difusores de aire

Ins

5,428 Suministro e instal. sistema de dosificacion de


cloro gaseoso (incluye accesorios), pagado un

Cantidad

Vr.Unitario

0.0842

14,690.00

1,236.90

und

1.0000

25,400.00

25,400.00

und

Vr.Total

18,233,180.00

14,008

Balanza digital 158 kg

Ins

und

1.0000

4,500,000.00

4,500,000.00

14,011

Bomba reforzadora tipo jet 0.5hp

Ins

und

1.0000

438,480.00

438,480.00

14,018

Carretilla

Ins

und

1.0000

133,400.00

133,400.00

14,019

Cilindros cloro gaseoso

Ins

und

5.0000

1,420,188.00

7,100,940.00

14,046

Dosificador cloro gaseoso

Ins

und

1.0000

5,040,200.00

5,040,200.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

40.0000

25,504.00

1,020,160.00

5,429 Collar de derivacion RDE 21 PVC 4" x 1/2".


Suministro e Instal.

und

16,017.39

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1778

1,616.00

287.32

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,288

Collar de derivacion RDE 21 PVC 4" x 1/2"

Ins

und

1.0000

12,657.00

12,657.00

55
4,515

5,430 Junta de Dilatacion de 10 mm x 10 mm (Cortada,


inducida y sellada)

11,356.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1250

1,469.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0200

35,000.00

700.00

57

Cortadora concreto (Disco Diaman. 14")

Eqp

HR

0.0800

45,000.00

3,600.00

3,178

Cordon de respaldo Sika road 16 mm

Ins

1.0000

1,114.00

1,114.00

3,684

Agua para obra

Ins

30.0000

10.00

300.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1250

14,690.00

1,836.25

Sellante Sika flex 15 LM SL

Ins

kg

0.1201

30,160.00

3,622.22

14,797

5,431 Concreto resistencia 3500 Psi o 245 kg/cm2, para


box culvert, pagado en m3. (INV.630.4)

183.63

668,955.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

13.4000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

13.4000

14,690.00

196,846.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.9040

32,375.50

94,018.45

5,436 Tapa para valvula h.f.

und

19,684.60

96,792.74

1,367

Placa de identificacin 8 x 5 CM

Ins

und

1.0000

9,500.00

1,492

Bisagra comn 2"

Ins

und

3.0000

217.00

651.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.5000

88,083.67

44,041.84

2,458

Platina 1/4" x 2 1/2"

Ins

0.5000

8,463.00

4,231.50

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.0000

2,700.00

2,700.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Tubo estructural redondo =1/2" e=2.5 mm

Ins

0.1000

4,424.00

442.40

13,934

5,459 Pasamuro en A.C. =3" L=0.50 m E.B. Suministro e


Instal.

und

9,500.00

207,385.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

232

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

17
4,489
14,826

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cuadrilla AA (Albaileria)

Ins

Pasamuro en A.C. =3" L=0.50 m E.B.

Ins

und

5,460 Pasamuro en A.C. =10" L=0.50 m E.B. Suministro


e Instal.
17
4,489
14,827

Cantidad

Vr.Unitario

Vr.Total

HR

1.3333

1,469.00

1,958.62

1.3333

14,690.00

19,586.18

1.0000

185,841.00

185,841.00

und

723,562.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

Pasamuro en A.C. =10" L=0.50 m E.B.

Ins

und

1.0000

691,244.00

691,244.00

5,461 Pasamuro acero al carbon 12"

und

768,931.90

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

PASAMURO ACERO AL CARBON 12"

Ins

und

1.0000

733,120.00

733,120.00

17

14,828

5,462 Pasamuro acero al carbon 14"

und

1,469.00

1,009,051.90

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

PASAMURO ACERO AL CARBON 14"

Ins

und

1.0000

973,240.00

973,240.00

17

14,829

5,463 Pasamuro en A.C. =16" L=0.70 m E.B x E.B.


Suministro e Instal.
17
4,489
14,830

und

4,515
16,162

Eqp

HR

4.0000

1,469.00

5,876.00

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

Pasamuro en A.C. =16" L=0.70 m E.B x E.B

Ins

und

1.0000

2,187,760.00

2,187,760.00

und

55

16,163

499,720.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. elast. vast. n.asc. ext. brida 3"

Ins

und

1.0000

428,620.00

428,620.00

5,465 Valvula compuerta elastica vastago no ascendente


=4" E.B. Suministro e instal.

4,515

2,252,396.00

Herramienta Menor 10% M.O. AA

5,464 Valvula compuerta elastica vastago no ascendente


=3" E.B. Suministro e instal.
55

1,469.00

und

597,160.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. elast. vast. n.asc. ext. brida 4"

Ins

und

1.0000

526,060.00

526,060.00

5,466 Codo Sanitario 90 1/4 C x C PVC 3". Suministro e


Instal.

und

7,579.72

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

1.0000

4,485.00

4,485.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1500

16,159.00

2,423.85

586.12

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

233

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,467 Yee sanitaria reducida 4" x 3". Suministro e instal.

Cantidad

Vr.Unitario

und

Vr.Total
17,576.76

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

Yee Sanitaria reducida PVC 4 x 3 "

Ins

und

1.0000

13,505.00

13,505.00

15,491

5,468 Suministro e instal. Tee pvc sanitaria PVC 3"

und

293.06

9,382.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2200

16,159.00

3,554.98

Tee Sanitaria PVC 3 "

Ins

und

1.0000

4,959.00

4,959.00

15,469

5,469 Suministro e instal. Tee pvc sanitaria PVC 4"

und

586.12

14,660.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2200

16,159.00

3,554.98

Tee Sanitaria PVC 4 "

Ins

und

1.0000

10,237.00

10,237.00

15,470

5,470 Suministro e Instal. Tapon sanitario 3"

und

2,100.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0200

16,159.00

323.18

Tapon sanitario PVC 3 "

Ins

und

1.0000

909.00

909.00

16,339

5,471 Suministro e Instal. Tapon sanitario 4"

und

2,981.80

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0200

16,159.00

323.18

Tapon sanitario PVC 4 "

Ins

und

1.0000

1,790.00

1,790.00

14,912

5,472 Valvula de Purga = 8". Suministro e Instal.

und

2,182,571.30

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,913

Valvula de Purga 8"

Ins

und

1.0000

2,161,950.00

2,161,950.00

4,515

5,473 Suministro e Instal. Valvula de bola PVC 1"

und

19,390.80

32,019.20

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,050

Adaptador macho presin PVC 1"

Ins

und

2.0000

984.00

1,968.00

15,879

Valvula de bola PVC 1"

Ins

und

1.0000

16,124.00

16,124.00

4,515

5,474 Valvula de ventosa 2". Camara sencilla, doble


accion. E.B. Suministro e instal.

und

330,615.62

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

234

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

14,020

Cinta teflon

1.0000

16,159.00

16,159.00

Ins

rl

0.4000

1,000.00

15,053

400.00

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,062

Tee sencilla presion PVC 2 "

Ins

und

1.0000

8,852.00

8,852.00

16,219

Valv. ventosa (cam. senc.) doble acc. 2" E.B

Ins

und

1.0000

295,800.00

295,800.00

4,515

5,475 Valvula de ventosa 1". Camara sencilla doble


accion. Suministro e instal.

und

253,313.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

15,050

Adaptador macho presin PVC 1"

Ins

und

2.0000

984.00

1,968.00

15,068

Universal presin PVC 1"

Ins

und

1.0000

5,610.00

5,610.00

16,217

Valv. ventosa (cam. senc.) doble acc. 1" rosca

Ins

und

1.0000

227,360.00

227,360.00

5,476 Valvula de bola en H.D. 2 1/2".

und

207,681.21

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

14,020

Cinta teflon

Ins

rl

1.2000

1,000.00

1,200.00

14,921

Valvula de Bola para agua H.D. 2 1/2"

Ins

und

1.0000

177,712.00

177,712.00

15,054

Adaptador macho presin PVC 2 1/2"

Ins

und

2.0000

8,998.00

17,996.00

4,515

5,477 Codo 90 =16" en A.C. con E.B x E.B. Suministro


e Instal.

und

10,773.21

3,318,350.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,922

Codo 90 =16" en A.C. E.B.

Ins

und

1.0000

3,282,800.00

3,282,800.00

55

5,478 Codo 90 =14" en A.C. con E.B x E.B. Suministro


e Instal.

und

2,237,230.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,923

Codo 90 =14" en A.C. E.B.

Ins

und

1.0000

2,201,680.00

2,201,680.00

55

5,479 Suministro e instal. codo 45 acero al carbn 14",


pagado por un

und

2,350,115.30

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,118

Lubricante 500 gr

Ins

und

0.0600

12,305.00

738.30

14,924

Codo 45 en A.C. =16"

Ins

und

1.0000

2,329,280.00

2,329,280.00

17
4,515

5,480 Suministro e instal. codo 22.5 acero al carbn 14",


pagado por un

und

1,539,275.30

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,118

Lubricante 500 gr

Ins

und

0.0600

12,305.00

738.30

14,925

Codo 22.5 =14"en A.C.

Ins

und

1.0000

1,518,440.00

1,518,440.00

17
4,515

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

235

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,481 Suministro e instal. codo 22.5 acero al carbn 16",


pagado por un

Cantidad

Vr.Unitario

und

Vr.Total

1,701,335.30

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,118

Lubricante 500 gr

Ins

und

0.0600

12,305.00

738.30

14,926

Codo 22.5 =16"en A.C.

Ins

und

1.0000

1,680,500.00

1,680,500.00

17
4,515

5,482 Valvula compuerta elastica vastago no ascendente


=6" E.B. Suministro e instal.
55
4,515
16,164

und

1,013,020.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Valv. comp. elast. vast. n.asc. ext. brida 6"

Ins

und

1.0000

941,920.00

941,920.00

5,483 Valvula compuerta elastica vastago no ascendente


=8" E.B. Suministro e instal.

1,616.00

und

6,464.00

1,646,380.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

13,731

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

16,165

Valv. comp. elast. vast. n.asc. ext. brida 8"

Ins

und

1.0000

1,407,080.00

1,407,080.00

55
4,515

5,486 Collar de derivacion HF 6" x 2". Suministro e Instal.

und

67,655.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

1,430

Collar de derivacion H.D./ PVC 6" x 2"

Ins

und

1.0000

49,880.00

49,880.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55

5,487 Collar de derivacion HF 3" x 1". Suministro e Instal.

und

35,100.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

1,431

Collar de derivacion H.D/ PVC 3" x 1"

Ins

und

1.0000

20,880.00

20,880.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

55

5,488 Valvula de Mariposa =6" E.B. Suministro e Instal.

und

3,211,312.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.5000

8,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

Soldador

Ins

3.0000

6,759.00

20,277.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

14,014

Tornillo = 7/8" x 4" G-8 en A.I. Con T. A

Ins

und

8.0000

21,350.00

170,800.00

14,106

Empaquetadura para brida =6"

Ins

und

2.0000

34,800.00

69,600.00

14,932

Valvula de Mariposa =6" E.B.

Ins

und

1.0000

2,877,380.00

2,877,380.00

8
55
519

5,489 Valvula de Mariposa =4" E.B. Suministro e Instal.


8
55
519
1,717

und

13,125.00

2,447,992.50

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

Soldador

Ins

1.0000

6,759.00

6,759.00

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.8000

6,805.00

5,444.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

236

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

14,173

Empaquetadura para brida =4"

Ins

und

2.0000

27,066.00

54,132.00

14,175

Tornillo = 3/4" x 3" G-8 en A.I. Con T. A

Ins

und

8.0000

12,550.00

100,400.00

14,933

Valvula de Mariposa =4" E.B.

Ins

und

1.0000

2,228,070.00

2,228,070.00

4,515

5,490 Brida Slip On =6" en A.C. 150 Psi

und

328,779.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

8,254

Conjunto brida =6"

Ins

und

1.0000

78,880.00

78,880.00

Brida Slip On =6" en A.C. 150 Psi

Ins

und

1.0000

226,200.00

226,200.00

55

14,934

5,491 Sum e inst brida acero al carbon 12"

und

578,692.70

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1000

28,250.00

2,825.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

14,020

Cinta teflon

Ins

rl

0.8000

1,000.00

800.00

14,935

BRIDA ACERO AL CARBON 12``

Ins

und

1.0000

544,968.00

544,968.00

5,492 Codo 90 =12" en A.C. con E.B x E.B. Suministro


e Instal.

und

5,861.20

1,497,150.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,936

Codo 90 =12" en A.C. E.B.

Ins

und

1.0000

1,461,600.00

1,461,600.00

55

5,493 Codo 90 =6" en A.C. con E.B x E.B. Suministro e


Instal.

und

426,095.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,860

Codo 90 =6" en A.C. E.B.

Ins

und

1.0000

408,320.00

408,320.00

55

5,494 Suministro e instal. tuberia presion PVC RDE 13,5


1/2"

1,616.00

1,616.00

2,423.87

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0004

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0004

28,250.00

11.30

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0523

16,159.00

845.12

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

1.0000

1,504.00

1,504.00

15,039

Union presion PVC 1/2"

Ins

und

0.1667

240.00

40.01

5,495 Caballete supertermoacustico 0.70 x 2.

23.44

34,013.84

Herramienta menor 5% M.O. AA

Eqp

HR

0.2667

735.00

196.02

Cuadrilla AA (Albaileria)

Ins

0.2667

14,690.00

3,917.82

15,802

Caballete supertermoacustico 0.70 x 2

Ins

1.0000

28,850.00

28,850.00

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

und

2.0000

525.00

1,050.00

19
4,489

5,496 Pasamuro en A.C. =4" L=0.50 m E.B. Suministro e


Instal.
17
4,489

und

269,539.27

Herramienta Menor 10% M.O. AA

Eqp

HR

1.4545

1,469.00

2,136.66

Cuadrilla AA (Albaileria)

Ins

1.4545

14,690.00

21,366.61

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

237

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,353

Pasamuro en A.C. =4" L=0.50 m E.B.

Ins

5,497 Suministro e instal. compuerta rectangular


deslizante 4 pulg con vastago no ascendente,
pagado por un

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

246,036.00

246,036.00

und

2,662,038.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,038

Columna de maniobra crm

Ins

und

1.0000

524,320.00

524,320.00

14,039

Compuerta lateral deslizante s.b. rectan. =4"

Ins

und

1.0000

1,183,200.00

1,183,200.00

14,938

Vastago para compuerta =6" - 8"

Ins

3.0000

307,400.00

922,200.00

4,515

5,498 Valvula de compuerta sello de bronce vastago no


ascend. ext. j.h. = 4". Suministro e instal.

und

744,398.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,091

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 4"

Ins

und

1.0000

711,080.00

711,080.00

4,515

5,499 Suministro e instal. brida ciega ac 4"

und

32,318.00

70,391.88

4,489

Cuadrilla AA (Albaileria)

Ins

0.1778

14,690.00

2,611.88

14,012

Brida ciega ac 4 pulg. act

Ins

und

1.0000

67,280.00

67,280.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

5,500 Union tipo Dresser = 4" en A.C. Suministro e


instal.

und

82,610.60

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

14,083

Union Dresser =4" en A.C

Ins

und

1.0000

70,760.00

70,760.00

55

5,502 Tuberia corrugada de uso agricola con filtro 100


mm
55
4,515
14,073

29,696.10

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1667

1,616.00

269.39

Cuadrilla BB (Instalaciones)

Ins

0.1667

16,159.00

2,693.71

Tuberia corrugada con filtro 100 mm

Ins

1.0000

26,733.00

26,733.00

5,503 Suministro e instal. tuberia presion PVC RDE 21


3/4"

3,138.59

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0008

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0008

28,250.00

22.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0701

16,159.00

1,132.75

14,995

Tubo presin RDE 21 PVC 3/4 "

Ins

1.0000

1,873.00

1,873.00

15,040

Union presion PVC 3/4"

Ins

und

0.1667

380.00

63.35

5,504 Suministro e instal. codo presion PVC 90 4,


pagado por un

und

46.89

53,374.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

Codo 90 presion PVC 4"

Ins

und

1.0000

50,015.00

50,015.00

15,029

328.23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

238

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,505 Demolicion y construccion Cerca en Madera,


alambre de pua Cal. 12, c/3.00 m y Hp = 2.50 m, 4
hilos

Cantidad

Vr.Unitario

Vr.Total
15,171.36

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.3333

2,010.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0320

22,829.00

730.53

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.0700

4,300.00

4,601.00

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0270

16,458.20

444.37

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3333

20,097.00

6,698.33

15,655

Alambre de puas galvanizado Cal. 12

Ins

4.2000

454.00

1,906.80

16,221

Grapa galvanizada para Cerca 1 x 9

Ins

und

1.7200

70.00

120.40

69
324

5,507 Suministro e instal. pasamuro ac 1/4" elxer l:0.50


m, pagado por un

und

669.93

83,034.18

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,942

Pasamuro AC 1/4" ELxER L:0.50 M

Ins

und

1.0000

75,000.00

75,000.00

4,489

5,508 Suministro e instal. pasamuro ac 2 1/2" elxer l:0.50


m3, pagado por un

und

7,834.18

228,034.18

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

14,943

Pasamuro AC 2 1/2" ELxER L:0.50M

Ins

und

1.0000

220,000.00

220,000.00

4,489

5,509 Rellenos o aproches con material de prestamo


localizado (a. libre 2 Km)

14,110.72

son 3 volquetas
1

Compactador Vibratorio

Eqp

HR

0.0208

100,000.00

2,080.00

Motoniveladora

Eqp

HR

0.0208

132,800.00

2,762.24

11

Carrotanque de Agua

Eqp

HR

0.0208

53,125.00

1,105.00

14

Retroexcavadora de orugas

Eqp

HR

0.0208

144,160.00

2,998.53

21

Volqueta (6 m3 )

Eqp

HR

0.0625

55,550.00

3,471.88

Material de prestamo (tierra-arena-arcilla-limo)

Ins

1.2000

1,250.00

1,500.00

Oficial de Construccion

Ins

0.0208

9,282.00

193.07

858
8,144

5,510 Excavacion de cortes, canales y prestamo (Acarreo


hasta 5
Kms)

9,159.00

14

Retroexcavadora de orugas

Eqp

HR

0.0250

144,160.00

3,604.00

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

5,511 Excavacion a mano en conglomerado Bajo agua


pagado en m3, a una profundidad de 2 m

55,814.25

58

Motobomba de 4" o 6"

Eqp

HR

0.3330

11,600.00

3,862.80

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

2.3500

2,010.00

4,723.50

Cuadrilla AA-2 (Tuberias)

Ins

2.3500

20,097.00

47,227.95

14,669

5,512 Junta de Expansion


42

Motosoldador Diesel

m
Eqp

HR

223,967.33

0.8500

14,833.00

12,608.05

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

239

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

43

Equipo de Oxicorte

Eqp

44

Pulidora electrica manual

Eqp

HR

0.8000

5,000.00

4,000.00

HR

45

Cilindro

0.5000

4,350.00

2,175.00

Eqp

HR

0.8000

41.00

48

32.80

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.9000

6,805.00

6,124.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0800

42,950.00

3,436.00

5,144

Transporte de materiales Tn

Ana

0.0610

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

7.2000

2,257.00

16,250.40

13,926

Angulo o perfil 4" x 4 " x 3/8"

Ins

2.1000

36,877.00

77,441.70

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

14,945

Lamina HR 1/2"

Ins

0.2400

250,702.65

60,168.64

5,513 Excavacion mecanica en Material Comun Bajo


agua hasta 2 m

8,426.93

14

Retroexcavadora de orugas

Eqp

HR

0.0286

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0286

735.00

21.02

58

Motobomba de 4" o 6"

Eqp

HR

0.3330

11,600.00

3,862.80

Cuadrilla AA (Albaileria)

Ins

0.0286

14,690.00

420.13

4,489

5,514 Zarpa en concreto para puentes de resistencia


3500 Psi, pagada en m3

144,160.00

4,122.98

568,502.14

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

0.5000

32,375.50

16,187.75

5,515 Muros o elevaciones estribos, concreto para


puentes de resistencia 3500 Psi, pagada en m3

17

Herramienta Menor 10% M.O. AA

Eqp

49

HR

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

5,516 Placa de aproximacion Concreto 3000 Psi,


resistencia 210 Kg/cm2

17,628.00

692,385.31

16.0000

1,469.00

23,504.00

1.5000

4,375.00

6,562.50

16.0000

14,690.00

235,040.00

1.0000

351,843.89

351,843.89

2.3300

32,375.50

75,434.92

437,897.86

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.3000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

5.3000

14,690.00

77,857.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Tabla burra cedro macho 0.30

Ins

2.5100

5,000.00

12,550.00

14,778

5,517 Material crudo de rio T.max 4"


14,170

Crudo de rio clasificado T.m. 4"

m
Ins

7,785.70

21,025.00

1.2500

16,820.00

21,025.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

240

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,518 Muros o elevaciones Pilas, concreto para puentes


de resistencia 3500 Psi, pagada en m3

Cantidad

Vr.Unitario

Vr.Total
720,494.49

17

Herramienta Menor 10% M.O. AA

Eqp

HR

18.0000

1,469.00

26,442.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

18.0000

14,690.00

264,420.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.2000

32,375.50

71,226.10

5,519 Viga Cabezal para Pila, concreto para puentes de


resistencia 3500 Psi, pagada en m3

730,092.14

17

Herramienta Menor 10% M.O. AA

Eqp

HR

22.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

22.0000

14,690.00

323,180.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

0.5000

32,375.50

16,187.75

5,520 Estructura metalica Acero A-36 (Incluye:Suministro


y fabricacion)

kg

32,318.00

6,170.56

42

Motosoldador Diesel

Eqp

HR

0.0300

14,833.00

444.99

43

Equipo de Oxicorte

Eqp

HR

0.0300

5,000.00

150.00

44

Pulidora electrica manual

Eqp

HR

0.0300

4,350.00

130.50

45

Cilindro

Eqp

HR

0.0300

41.00

1.23

62

Grua Telescopica

Eqp

HR

0.0020

579,600.00

1,159.20

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0300

4,443.00

133.29

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0200

6,805.00

136.10

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

14,937

Acero ASTM - 36

Ins

kg

1.0000

2,543.00

2,543.00

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0300

44,428.00

1,332.84

5,521 Placa o losa Concreto resistencia 245 kg/cm2-3500


psi

595,050.05

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

17,628.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

1.3200

32,375.50

42,735.66

5,522 Placa Piso Concreto resistencia 245 kg/cm2-3500


psi e=0.15

70,823.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1600

4,375.00

700.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1500

351,843.89

52,776.58

1,175.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

241

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,523 Suministro e instal. piso granito, travertino


peruano No 2, dilatacion plastico, espesor 2 cm,
pagado en m

Cantidad

Vr.Unitario

Vr.Total
73,989.77

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5143

1,469.00

804

Cemento gris

Ins

kg

18.7000

383.34

7,168.46

829

Cemento blanco

Ins

kg

21.0000

975.00

20,475.00

3,684

Agua para obra

Ins

7.4100

10.00

74.10

4,426

Arena lavada de rio

Ins

0.0900

13,800.00

1,242.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.5143

14,690.00

22,245.07

5,143

Transporte de materiales m

Ana

0.0900

46,157.00

4,154.13

5,144

Transporte de materiales Tn

Ana

0.0825

0.00

0.00

14,946

Granito travertino peruano No.2

Ins

bt

0.7500

17,342.00

13,006.50

14,947

Dilatacion plastica (canchas deportivas)

Ins

1.3600

2,500.00

3,400.00

17

5,524 Replanteo y localizacion para vias, pagado en m2

2,224.51

3,211.29

lag
15

Estacion Total

Eqp

HR

0.0620

7,500.00

465.00

46

Campero 2000cc-3000cc

Eqp

HR

0.0620

21,534.00

1,335.11

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0020

42,950.00

85.90

8,108

Topografo

Ins

0.0620

7,660.00

474.92

8,109

Cadenero

Ins

0.0620

4,957.00

307.33

8,145

Ayudante de construccion

Ins

0.0620

5,407.00

335.23

13,326

Durmiente ordinario 3 M

Ins

0.2500

767.00

191.75

14,760

Cinta de Sealizacion

Ins

0.1500

107.00

16.05

5,526 Placa o losa Concreto resistencia 4000 psi

638,717.74

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

1.8500

32,375.50

59,894.68

5,527 Pulida piso granito, pagado en m2

17,628.00

10,467.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2252

1,469.00

330.82

Maquina de Pulir

Eqp

HR

0.2250

8,750.00

1,968.75

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2252

14,690.00

3,308.19

Piedras para pulir, brillar, destroncar (granito)

Ins

jg

0.0085

560,000.00

4,760.00

17
114

14,948

5,528 Baranda en madera, (pista patinaje), pagada en ml

13,909.96

Herramienta Menor 10% M.O. DD

Eqp

HR

0.5000

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1,984

Tapaporos Nogal

Ins

gal

1,990

Disolvente Thinner

Ins

3,837

Esmalte Sintetico Pintuco

5,064

56

1,763.00

881.50

0.1600

1,691.00

270.56

0.0100

25,500.00

255.00

gal

0.0100

12,440.00

124.40

Ins

gal

0.0100

42,950.00

429.50

Cuadrilla DD (Carpinteria)

Ins

0.5000

17,628.00

8,814.00

14,950

Tablon de pardillo 3 x 0.28x.04 (rutiado)-alquiler

Ins

sm

1.0000

2,600.00

2,600.00

14,951

Tornillo de Carruaje 3/16x2" (inc. tuerca)

Ins

und

2.1400

250.00

535.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

242

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,529 Reconstruccion puerta en lamina metalica, pagada


en m2

Cantidad

Vr.Unitario

Vr.Total
27,518.34

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1451

1,763.00

255.81

2,155

Lamina cold rolled cal 16 (2.40 mt x 1.20 mt)

Ins

und

0.1875

110,644.33

20,745.81

2,502

Anticorrosivo rojo claro

Ins

gal

0.1050

29,750.00

3,123.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1451

17,628.00

2,557.82

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1213

6,885.00

835.15

56

14,116

5,530 Baranda en Tubo HG D=2"

120,602.84

42

Motosoldador Diesel

Eqp

HR

1.0000

14,833.00

14,833.00

43

Equipo de Oxicorte

Eqp

HR

1.0000

5,000.00

5,000.00

44

Pulidora electrica manual

Eqp

HR

1.0000

4,350.00

4,350.00

45

Cilindro

Eqp

HR

1.0000

41.00

41.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3500

6,856.00

2,399.60

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1230

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

15,896

Tubo cerramiento Galvanizado =2" e=0.098"

Ins

3.0000

17,568.00

52,704.00

5,531 Baranda en Tubo HG D=2" (pista patinaje)

76,631.28

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0600

8,750.00

525.00

43

Equipo de Oxicorte

Eqp

HR

0.0250

5,000.00

125.00

45

Cilindro

Eqp

HR

0.0250

41.00

1.03

56

Herramienta Menor 10% M.O. DD

Eqp

HR

0.4200

1,763.00

740.46

60

Compresor pintura

Eqp

HR

0.4200

3,500.00

1,470.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0800

1,691.00

135.28

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,155

Lamina cold rolled cal 16 (2.40 mt x 1.20 mt)

Ins

und

0.0120

110,644.33

1,327.73

2,455

Platina 1/8" x 1/2"

Ins

0.2500

1,668.00

417.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0100

42,950.00

429.50

5,064

Cuadrilla DD (Carpinteria)

Ins

0.4200

17,628.00

7,403.76

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.2000

6,885.00

8,262.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

15,896

Tubo cerramiento Galvanizado =2" e=0.098"

Ins

3.0000

17,568.00

52,704.00

5,532 Lineas de demarcacion canchas 2 manos, pagado


ml

4,901.31

Sub-Contrato Pintura

Esp

30.0000

3,770.24

1,863

Brocha de Cerda 4"

Ins

und

0.0500

10,000.00

500.00

5,066

Cuadrilla CC (Pintura)

Ins

0.1000

16,893.00

1,689.30

8,187

Pintura trafico acrlica de demarcacin

Ins

gal

0.0200

79,047.00

1,580.94

1,131.07

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

243

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,533 Pintura interior esmalte sobre paete 2 manos,


pagado ml

Cantidad

Vr.Unitario

Vr.Total
5,907.62

Sub-Contrato Pintura

Esp

45.0000

4,074.22

1,833.40

Herramienta menor 10% M.O. CC

Eqp

HR

0.1800

1,689.00

304.02

1,863

Brocha de Cerda 4"

Ins

und

0.0100

10,000.00

100.00

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

3,838

Esmalte mate supersinttico

Ins

gal

0.0100

50,506.00

505.06

5,066

Cuadrilla CC (Pintura)

Ins

0.1800

16,893.00

3,040.74

5
61

5,534 Descapote a maquina, incluye transporte y


disposicion final, pagado m2
4
21

1,959.86

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0100

111,550.00

1,115.50

Volqueta (6 m3 )

Eqp

HR

0.0152

55,550.00

844.36

5,535 Pintura exterior esmalte sobre placa, 2 manos,


pagado m2

15,102.21

Sub-Contrato Pintura

Esp

45.0000

10,415.32

4,686.89

Herramienta menor 10% M.O. CC

Eqp

HR

0.3630

1,689.00

613.11

1,863

Brocha de Cerda 4"

Ins

und

0.0200

10,000.00

200.00

1,990

Disolvente Thinner

Ins

gal

0.0200

12,440.00

248.80

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0750

42,950.00

3,221.25

5,066

Cuadrilla CC (Pintura)

Ins

0.3630

16,893.00

6,132.16

5
61

5,536 Pintura interior esmalte cubierta, 2 manos, pagado


m2

16,033.65

Sub-Contrato Pintura

Esp

45.0000

11,057.69

4,975.96

Herramienta menor 10% M.O. CC

Eqp

HR

0.3630

1,689.00

613.11

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.3200

1,691.00

541.12

1,863

Brocha de Cerda 4"

Ins

und

0.0200

10,000.00

200.00

1,990

Disolvente Thinner

Ins

gal

0.0300

12,440.00

373.20

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

5,066

Cuadrilla CC (Pintura)

Ins

0.3630

16,893.00

6,132.16

Seccin de Andamio

Ins

mes

0.0688

17,120.00

1,177.86

5
61

13,641

5,537 Pintura interior esmalte cerchas, 2 manos, pagado


ml

5,632.00

Andamio tubular stand. (inc. tijeras)

Eqp

HR

0.5000

188.00

94.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.1600

1,691.00

270.56

1,863

Brocha de Cerda 4"

Ins

und

0.0100

10,000.00

100.00

1,990

Disolvente Thinner

Ins

gal

0.0150

12,440.00

186.60

3,838

Esmalte mate supersinttico

Ins

gal

0.0150

50,506.00

757.59

5,066

Cuadrilla CC (Pintura)

Ins

0.2500

16,893.00

4,223.25

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

82

5,538 Caballete cubierta en canaleta 60, fabricada en


galvanizada, pagada en ml.
17
4,489
14,786

14,865.92

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2200

1,469.00

323.18

Cuadrilla AA (Albaileria)

Ins

0.2200

14,690.00

3,231.80

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0730

2,482.00

181.19

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

244

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,952

Caballete galvanizado universal cal. 28

Ins

14,953

Tornillo fijador de ala

Ins

14,954

Tornillo fijador de techo

Ins

5,539 Suministro e instal. luminaria de sodio 220c*250w,


pagado por un

Cantidad

Vr.Unitario

Vr.Total

und

0.5000

19,800.00

9,900.00

und

0.9500

600.00

570.00

und

2.0300

325.00

659.75

und

220,198.86

Sin tuberia, cajas, cable


Herramienta Menor 10% M.O. BB

Eqp

HR

2.6000

1,616.00

4,201.60

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6000

16,159.00

42,013.40

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0688

17,120.00

1,177.86

14,314

Bombillo de 250W/220v tubular clara

Ins

und

1.0000

37,806.00

37,806.00

14,334

Luminaria de 70 W, 208 V

Ins

und

1.0000

135,000.00

135,000.00

55

5,540 Demolicion aletas en concreto ciclopeo con


acarreo

77,265.48

19

Herramienta menor 5% M.O. AA

Eqp

HR

4.6000

735.00

3,381.00

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Cuadrilla AA (Albaileria)

Ins

4.6000

14,690.00

67,574.00

4,489

5,541 Concreto 2000 Psi para anclaje

439,718.11

Herramienta Menor 10% M.O. AA

Eqp

HR

7.1429

1,469.00

10,492.92

2,198

Durmiente ordinario 4 M

Ins

1.0000

3,500.00

3,500.00

2,243

Vara de clavo 3M -1

Ins

0.6000

1,500.00

900.00

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0000

4,333.00

8,666.00

4,489

Cuadrilla AA (Albaileria)

Ins

7.1429

14,690.00

104,929.20

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

1.0000

311,229.99

311,229.99

17

5,543 Canaleta Parshall w:6" en PRFV. Suministro e


Instal.

und

1,673,250.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

14,017

Canaleta parshall prfv w:6 "

Ins

und

1.0000

1,566,600.00

1,566,600.00

55

5,544 Suministro e instal. conductivimetro Handylab lf 11


con celda lf 513 t, pagado por un
878
5,137
14,041

und

3,517,064.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

51,090.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Conductivimetro Handylab lf 11 con celda lf 513t

Ins

und

1.0000

3,389,590.00

3,389,590.00

5,545 Rejilla metalica 0.5 x 4.0 m (Barras 3/4" C/0.04)

und

63,383.49

Herramienta Menor 10% M.O. DD

Eqp

HR

1.9084

1,763.00

3,364.51

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

4.1000

2,700.00

11,070.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

5,064

Cuadrilla DD (Carpinteria)

Ins

1.9084

17,628.00

33,641.28

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.6000

2,257.00

8,125.20

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.0000

6,885.00

6,885.00

56

14,116

5,546 Rejilla metalica 0.6*2.3 m (Barras 1/2" C/0.04)

und

60,767.89

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

245

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. DD

Eqp

HR

1.9084

1,763.00

3,364.51

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

3.8000

2,700.00

10,260.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

5,064

Cuadrilla DD (Carpinteria)

Ins

1.9084

17,628.00

33,641.28

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.8000

2,257.00

6,319.60

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.0000

6,885.00

6,885.00

56

14,116

5,547 Suministro e instal. phmetro portatil hach


ha-51700-10, pagado por un
878
5,137
14,062

und

Cable de cobre THW N 8

Ins

15.0000

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Phmetro ha-51700--10

Ins

und

1.0000

2,782,840.00

2,782,840.00

5,548 Suministro e instal. destilador de agua schott 7 l/h,


pagado por un
878
5,137
14,043

878

14,048

878

14,059

5,137
14,004

Ins

15.0000

3,406.00

Ins

4.0000

19,096.00

76,384.00

Destilador 7 l/h 821.00/220 V

Ins

und

1.0000

9,659,422.00

9,659,422.00

und

4,515

878

14,007

4,767,474.00

Ins

15.0000

3,406.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Equipo prueba de jarras 6 puestos

Ins

und

1.0000

4,640,000.00

4,640,000.00

und

51,090.00

5,393,874.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

51,090.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Mufla furnace ha-14296-00

Ins

und

1.0000

5,266,400.00

5,266,400.00

und

2,542,251.80

Cable de cobre THW N 8

Ins

15.0000

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Agitador magntico mr-3001

Ins

und

1.0000

2,414,777.80

2,414,777.80

3,406.00

und

51,090.00

402,196.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Plato desecador 230 mm

Ins

und

1.0000

337,560.00

337,560.00

5,553 Suministro e instal. balanza analtica y de presicin


serie 320 xt top

5,137

51,090.00

Cable de cobre THW N 8

5,552 Suministro e instal. plato desecador 230 mm,


pagado por un

14,064

9,786,896.00

Cuadrilla EE (Cableado estruct.)

5,551 Suministro e instal. agitador magnetico con


calentamiento mr-3001
878

51,090.00

Cable de cobre THW N 8

5,550 Suministro e instal. mufla furnace ha-14296-00,


pagado por un

5,137

3,406.00

und

5,549 Suministro e instal. floculador para prueba de


jarras 6 puestos, pagado por un

5,137

2,910,314.00

und

6,954,016.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Balanza analitica y de presicion serie 320 xt

Ins

und

1.0000

6,826,542.00

6,826,542.00

51,090.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

246

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,554 Suministro e instal. filtro de membrana manifold, 3


place-holder, pagado por un
878
5,137
14,050

Cantidad

Vr.Unitario

und

Vr.Total
4,355,674.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

51,090.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Filtro de membrana manifold, place-holder

Ins

und

1.0000

4,228,200.00

4,228,200.00

5,555 Suministro e instal. espectofotometro odissey


dr/2500, pagado por un

und

14,327,034.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

5,137

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

14,049

Espectofotmetro odissey dr/2500

Ins

und

1.0000

14,199,560.00

14,199,560.00

878

5,556 Suministro e instal. bomba de vacio m2,


vaccubrand
878
5,137
14,010

und

51,090.00

3,273,394.00

Cable de cobre THW N 8

Ins

15.0000

3,406.00

Cuadrilla EE (Cableado estruct.)

Ins

4.0000

19,096.00

76,384.00

Bomba de vacio me2 vaccumbrand

Ins

und

1.0000

3,145,920.00

3,145,920.00

5,557 Suministro e instal. accesorios en porcelana y


vidrieria

und

51,090.00

417,150.32

14,664

Tecnico 1

Ins

2.0000

8,575.16

17,150.32

14,955

Accesorios en porcelana y vidrieria

Ins

gal

1.0000

400,000.00

400,000.00

5,558 Excavacion manual en conglomerado entre 1 - 2


m. (zanjas angostas)
17
4,489

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5350

1,469.00

3,723.92

Cuadrilla AA (Albaileria)

Ins

2.5350

14,690.00

37,239.15

5,559 Movilizacion y desmovilizacion de equipo pesado


26

40,963.07

Camabaja

km
Eqp

5,560 Filtro en piedra rajon (0.5 x 1.0) m

HR

11,790.92

0.0200

589,546.00

11,790.92

88,878.84

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2000

3,091.00

618.20

5,063

Piedra rajon o media zonga

Ana

0.5300

90,495.15

47,962.43

5,143

59

Transporte de materiales m

Ana

0.5300

46,157.00

24,463.21

13,783

Geotextil No Tejido 1600

Ins

3.5000

2,758.00

9,653.00

13,960

Cuadrilla AA-4

Ins

0.2000

30,910.00

6,182.00

5,561 Concreto 1:2:3 o 3000 Psi, impermeabilizado para


estructuras hidraulicas

662,420.29

17

Herramienta Menor 10% M.O. AA

Eqp

HR

49

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,061

Formaleta (1 uso)

Ana

2.9040

32,375.50

94,018.45

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.0000

345,308.74

345,308.74

13.4000

1,469.00

19,684.60

1.5000

4,375.00

6,562.50

13.4000

14,690.00

196,846.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

247

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,562 Corte en Carpeta Asfaltica

Cantidad

Vr.Unitario

4,478.00

Cortadora concreto (Disco Diaman. 14")

Eqp

0.0602

45,000.00

3,684

Agua para obra

Ins

30.0000

10.00

300.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

57

5,563 Mejoramiento de la subrasante con material crudo


de rio clasificado Tmax. 3"

HR

Vr.Total

2,709.00

29,033.31

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

Ayudante de construccion

Ins

0.0250

5,407.00

135.18

Crudo de rio clasificado T.m. 3"

Ins

1.2500

17,400.00

21,750.00

11
8,145
14,171

5,564 Excavacion manual en Roca (con explosivos)

78,499.94

17

Herramienta Menor 10% M.O. AA

Eqp

HR

3.5556

1,469.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.1000

35,000.00

3,500.00

Cuadrilla AA (Albaileria)

Ins

3.5556

14,690.00

52,231.76

14,100

Mecha de seguridad

Ins

rl

0.0050

245,000.00

1,225.00

14,121

Detonadores

Ins

cj

0.0100

120,000.00

1,200.00

14,123

Indugel caja d=25 kg

Ins

cj

0.0400

350,000.00

14,000.00

14,131

Cordon detonante 6 gr. * mt.

Ins

0.8000

1,400.00

1,120.00

4,489

5,565 Suministro e instal. Valvula de bola PVC 3"

und

5,223.18

184,779.20

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

14,020

Cinta teflon

Ins

rl

1.5000

1,000.00

1,500.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,542

Valvula de bola PVC 3"

Ins

und

1.0000

143,144.00

143,144.00

4,515

5,567 Suministro e instal. valvula de purga h.f. 1 1/2"

und

12,927.20

79,229.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,963

Valvula de purga 1 1/2"

Ins

und

1.0000

55,200.00

55,200.00

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

1.0000

2,422.00

2,422.00

5,569 Suministro e instal. tuberia presion PVC RDE 21 1


1/2"

9,361.57

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0020

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

28,250.00

56.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1570

16,159.00

2,536.96

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

1.0000

6,392.00

6,392.00

15,043

Union presion PVC 1 1/2"

Ins

und

0.1667

1,553.00

258.89

5,572 Tensor o Contraviento en Guaya de 5/8"


17
2,502

117.22

13,235.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1818

1,469.00

267.06

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

248

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

Cable alma de acero (guaya) 5/8``

Ins

14,969

5,575 Registro de corte = 2". Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.1818

14,690.00

2,670.64

0.0011

0.00

0.00

1.0000

10,000.00

10,000.00

und

121,510.37

Herramienta Menor 5% M.O. BB

Eqp

HR

0.4000

808.00

323.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

3,677

Registro de bola = 2"

Ins

und

1.0000

90,783.33

90,783.33

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

16,329

Universal presin PVC 2"

Ins

und

1.0000

14,848.00

14,848.00

109

5,576 Valvula de ventosa 1/2". Camara sencilla doble


accion. Suministro e instal.

und

221,895.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,973

Valv. ventosa (cam. senc.) doble acc. 1/2" rosc

Ins

und

1.0000

203,000.00

203,000.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

2.0000

260.00

520.00

5,577 Excavacion de cortes, canales y prestamo en Rio


14

Retroexcavadora de orugas

m
Eqp

5,578 Cable IPS-IWRC 6 x 19 Galvanizado = 1 3/8"


17
4,489
14,975

0.0500

144,160.00

kg

7,208.00

10,800.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0250

1,469.00

36.73

Cuadrilla AA (Albaileria)

Ins

0.0250

14,690.00

367.25

Cable IPS-IWRC 6 x 19 Galvanizado = 1 3/8"

Ins

kg

1.0300

10,094.00

10,396.82

5,579 Cargue de Material (Incluye: explotacion)


4

HR

7,208.00

Retroexcavadora 4 x 4 (llanta)

m
Eqp

5,580 Pendolones en Acero SA-1045 =2"

HR

3,714.62

0.0333

111,550.00

kg

3,714.62

8,126.54

Sub-Contrato Acero SAE-1045

Esp

10.0000

7,387.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0300

1,469.00

44.07

Cuadrilla AA (Albaileria)

Ins

0.0300

14,690.00

440.70

14,976

Acero SAE 1045 = 2"

Ins

kg

1.0000

4,546.49

4,546.49

14,977

Tuerca =2" G-5

Ins

und

0.0775

22,600.00

1,751.50

14,978

Arandela =2"

Ins

und

0.2200

2,750.00

605.00

9
17
4,489

5,581 Limpieza Chorro de Arena SSPC-SP6

kg

738.78

557.59

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0045

61

Herramienta menor 10% M.O. CC

Eqp

HR

0.0045

1,689.00

7.60

65

Sand Blansting (tolva, mang. boqui.tng)

Eqp

HR

0.0045

16,875.00

75.94

5,066

Cuadrilla CC (Pintura)

Ins

0.0045

16,893.00

76.02

5,143

Transporte de materiales m

Ana

0.0006

46,157.00

27.69

35,000.00

157.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

249

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,586

Arena para San Blasting (G12 - 60)

Ins

5,582 Montaje Estructura metalica Acero A-36

Cantidad

Vr.Unitario

Vr.Total

0.0006

354,728.00

212.84

kg

3,279.48

42

Motosoldador Diesel

Eqp

HR

0.0220

14,833.00

326.33

43

Equipo de Oxicorte

Eqp

HR

0.0220

5,000.00

110.00

44

Pulidora electrica manual

Eqp

HR

0.0220

4,350.00

95.70

45

Cilindro

Eqp

HR

0.0220

41.00

0.90

62

Grua Telescopica

Eqp

HR

0.0028

579,600.00

1,622.88

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0220

4,443.00

97.75

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0040

6,805.00

27.22

5,144

Transporte de materiales Tn

Ana

0.0000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0020

6,200.00

12.40

14,745

Oxigeno Industrial

Ins

0.0003

15,662.00

4.70

14,746

Acetileno

Ins

kg

0.0001

41,820.00

4.18

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0220

44,428.00

977.42

5,583 Placa o losa Concreto resistencia 3000 psi


(metaldeck - Puentes)

725,960.46

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

17,628.00

42

Motosoldador Diesel

Eqp

HR

1.5000

14,833.00

22,249.50

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

Soldador

Ins

1.5000

6,759.00

10,138.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.3500

6,805.00

9,186.75

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

Corpalosa 0.70 mm

Ins

5.7100

26,405.00

150,772.55

519

14,981

5,584 Apoyo de Neopreno D=60 (0.35 m x 0.35 m x 3.5")

und

202,712.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.35 x 0.35) m D=60 E=3.5"

Ins

und

1.0000

195,000.00

195,000.00

19

14,984

5,585 Tambor de anclaje HF e=0.25 m, S=0.20 m


19
4,489
14,990

kg

17,801.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Tambor de Anclaje HF e=0.25 m S=0.20 m

Ins

kg

1.0000

10,089.00

10,089.00

5,586 Pernos de Anclaje Acero SA-1045 =2"

kg

7,948.79

Sub-Contrato Acero SAE-1045

Esp

10.0000

7,226.17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0200

1,469.00

29.38

Cuadrilla AA (Albaileria)

Ins

0.0200

14,690.00

293.80

14,976

Acero SAE 1045 = 2"

Ins

kg

1.0000

4,546.49

4,546.49

14,977

Tuerca =2" G-5

Ins

und

0.0775

22,600.00

1,751.50

14,978

Arandela =2"

Ins

und

0.2200

2,750.00

605.00

9
17
4,489

5,587 Tornillos ASTM-1325 = 2" (Suministro e


Instalacion)

kg

722.62

5,537.77

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

250

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

17
4,489
14,982

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cuadrilla AA (Albaileria)

Ins

Tornillo = 2" G-5

Ins

kg

5,588 Pintura anticorrosiva epoxico y esmalte epoxico 3


mls (puentes)

Cantidad

Vr.Unitario

Vr.Total

HR

0.0300

1,469.00

44.07

0.0300

14,690.00

440.70

1.0000

5,053.00

5,053.00

kg

517.76

60

Compresor pintura

Eqp

HR

0.0050

3,500.00

61

Herramienta menor 10% M.O. CC

Eqp

HR

0.0050

1,689.00

8.45

68

Equipo Pintura

Eqp

HR

0.0050

2,200.00

11.00

1,990

Disolvente Thinner

Ins

gal

0.0004

12,440.00

4.98

5,066

Cuadrilla CC (Pintura)

Ins

0.0050

16,893.00

84.47

13,641

Seccin de Andamio

Ins

mes

0.0015

17,120.00

25.68

14,979

Anticorrosivo Epxico

Ins

gal

0.0010

141,570.00

141.57

14,980

Pintura esmalte Epxico

Ins

gal

0.0010

224,109.00

224.11

5,589 Lechada de Inyeccion Mortero 1:2 (desperdicio


5%)

17.50

338,291.02

Cemento gris

Ins

kg

656.2500

383.34

3,684

Agua para obra

Ins

394.0000

10.00

3,940.00

4,426

Arena lavada de rio

Ins

1.0200

13,800.00

14,076.00

5,143

Transporte de materiales m

Ana

1.0200

46,157.00

47,080.14

5,144

Transporte de materiales Tn

Ana

0.6560

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

804

5,590 Tensionamiento para acero de Preesfuerzo

t-m

251,566.88

1,127.01

42

Motosoldador Diesel

Eqp

HR

0.0033

14,833.00

44

Pulidora electrica manual

Eqp

HR

0.0033

4,350.00

14.36

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0033

35,000.00

115.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0033

3,091.00

10.20

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0010

6,856.00

6.86

5,589

Lechada de Inyeccion Mortero 1:2 (desperdicio 5%)

Ana

0.0001

338,291.02

33.83

13,612

Sub-Contrato Cables Postensados

Esp

236.0000

335.42

791.59

13,960

Cuadrilla AA-4

Ins

0.0033

30,910.00

102.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0006

6,200.00

3.72

5,591 Transporte material de Tensionamiento para acero


de Preesfuerzo
5,144

Transporte de materiales Tn

t-m

Ana

5,592 Cimbra metalica para vigas de Puentes


Postensados (Obra falsa) < 45 m

48.95

0.00

0.0011

0.00

0.00

145,320.54

14

Retroexcavadora de orugas

Eqp

HR

0.0320

144,160.00

4,613.12

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.0320

2,010.00

64.32

Transporte de materiales Tn

Ana

0.2500

0.00

0.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.0320

20,097.00

643.10

15,349

Cimbra metalica para Vigas Postensadas (Puentes)

Ins

1.0000

140,000.00

140,000.00

5,144

5,593 Mejoramiento de la subrasante con material crudo


de rio Tmax. 4"

28,308.31

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

251

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Compactador Vibratorio

Eqp

Motoniveladora

Eqp

Carrotanque de Agua

11
8,145
14,170

Cantidad

Vr.Unitario

Vr.Total

HR

0.0250

100,000.00

2,500.00

HR

0.0250

132,800.00

3,320.00

Eqp

HR

0.0250

53,125.00

1,328.13

Ayudante de construccion

Ins

0.0250

5,407.00

135.18

Crudo de rio clasificado T.m. 4"

Ins

1.2500

16,820.00

21,025.00

5,594 Mejoramiento de la subrasante con material crudo


de rio Tmax. 6"

26,858.31

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Carrotanque de Agua

Eqp

HR

0.0250

53,125.00

1,328.13

Ayudante de construccion

Ins

0.0250

5,407.00

135.18

Crudo de rio clasificado T.m. 6"

Ins

1.2500

15,660.00

19,575.00

11
8,145
13,921

5,595 Baranda en Tubo HG D=2 1/2 " Tipo B

46,852.11

42

Motosoldador Diesel

Eqp

HR

0.1400

14,833.00

2,076.62

43

Equipo de Oxicorte

Eqp

HR

0.1400

5,000.00

700.00

44

Pulidora electrica manual

Eqp

HR

0.1400

4,350.00

609.00

45

Cilindro

Eqp

HR

0.1400

41.00

5.74

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.1400

3,226.00

451.64

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0070

6,856.00

47.99

5,144

Transporte de materiales Tn

Ana

0.0158

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0050

6,200.00

31.00

14,745

Oxigeno Industrial

Ins

0.0100

15,662.00

156.62

14,746

Acetileno

Ins

kg

0.0030

41,820.00

125.46

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.1400

32,262.00

4,516.68

14,956

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

2.0000

18,700.00

37,400.00

14,979

Anticorrosivo Epxico

Ins

gal

0.0020

141,570.00

283.14

14,980

Pintura esmalte Epxico

Ins

gal

0.0020

224,109.00

448.22

5,596 Lloraderos en Tuberia PVC RDE 41 de 4"


4,489
15,014

21,751.40

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

Tubo presin RDE 41 PVC 4 "

Ins

1.0000

19,401.00

19,401.00

5,597 Suministro e instal. tuberia presion PVC RDE 21 2"

13,844.53

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0026

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0026

28,250.00

73.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2099

16,159.00

3,391.77

14,999

Tubo presin RDE 21 PVC 2 "

Ins

1.0000

9,802.00

9,802.00

15,044

Union presion PVC 2"

Ins

und

0.1667

2,549.00

424.92

5,598 Suministro e instal. tuberia presion PVC RDE 21 3"

152.39

28,803.78

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0041

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0041

28,250.00

115.83

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3190

16,159.00

5,154.72

15,001

Tubo presin RDE 21 PVC 3 "

Ins

1.0000

21,211.00

21,211.00

15,046

Union presion PVC 3"

Ins

und

0.1667

12,489.00

2,081.92

240.31

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

252

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,599 Suministro e instal. tuberia presion PVC RDE 21 2


1/2"

Cantidad

Vr.Unitario

Vr.Total
22,252.84

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0034

58,612.00

199.28

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0034

28,250.00

96.05

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2643

16,159.00

4,270.82

15,000

Tubo presin RDE 21 PVC 2 1/2 "

Ins

1.0000

15,887.00

15,887.00

15,045

Union presion PVC 2 1/2"

Ins

und

0.1667

10,796.00

1,799.69

5,600 Suministro e instal. tuberia presion PVC RDE 21 4"

47,994.88

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4211

16,159.00

6,804.55

15,002

Tubo presin RDE 21 PVC 4 "

Ins

1.0000

36,181.00

36,181.00

15,047

Union presion PVC 4"

Ins

und

0.1667

27,132.00

4,522.90

5,601 Suministro e instal. tuberia union mecanica RDE 21


2 1/2"

328.23

11,814.10

Cuadrilla BB (Instalaciones)

Ins

0.0958

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0009

12,305.00

11.07

15,166

Tubo union mecanica RDE 21 PVC 2 1/2 "

Ins

1.0000

10,255.00

10,255.00

4,515

5,602 Suministro e instal. tuberia union mecanica RDE 21


3"

1,548.03

16,440.98

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0010

12,305.00

12.31

15,167

Tubo union mecanica RDE 21 PVC 3 "

Ins

1.0000

14,572.00

14,572.00

4,515

5,603 Suministro e instal. tuberia union mecanica RDE 21


4"

1,856.67

26,538.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,168

Tubo union mecanica RDE 21 PVC 4 "

Ins

1.0000

24,042.00

24,042.00

4,515

5,604 Suministro e instal. tuberia union mecanica RDE 21


6"

2,475.56

55,947.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,169

Tubo union mecanica RDE 21 PVC 6 "

Ins

1.0000

52,189.00

52,189.00

4,515

5,605 Suministro e instal. tuberia union mecanica RDE 21


8"

3,713.34

94,484.64

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

4,952.73

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,170

Tubo union mecanica RDE 21 PVC 8 "

Ins

1.0000

89,463.00

89,463.00

4,515

5,606 Suministro e instal. tuberia union mecanica RDE 21


10"

146,301.57

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

253

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.3839

16,159.00

6,203.44

14,118

Lubricante 500 gr

Ins

und

0.0083

12,305.00

102.13

15,171

Tubo union mecanica RDE 21 PVC 10 "

Ins

1.0000

139,996.00

139,996.00

4,515

5,607 Suministro e instal. tuberia union mecanica RDE 21


12"

202,338.88

Cuadrilla BB (Instalaciones)

Ins

0.4608

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,172

Tubo union mecanica RDE 21 PVC 12 "

Ins

1.0000

194,723.00

194,723.00

4,515

5,608 Suministro e instal. tuberia union mecanica RDE 21


14"

16,159.00

7,446.07

259,965.34

Cuadrilla BB (Instalaciones)

Ins

0.5376

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,173

Tubo union mecanica RDE 21 PVC 14 "

Ins

1.0000

251,074.00

251,074.00

4,515

5,609 Suministro e instal. tuberia union mecanica RDE 21


16"

8,687.08

355,383.43

Cuadrilla BB (Instalaciones)

Ins

0.6149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,174

Tubo union mecanica RDE 21 PVC 16 "

Ins

1.0000

345,243.00

345,243.00

4,515

5,610 Suministro e instal. tuberia union mecanica RDE 21


18"

9,936.17

449,040.97

Cuadrilla BB (Instalaciones)

Ins

0.6914

16,159.00

11,172.33

14,118

Lubricante 500 gr

Ins

und

0.0185

12,305.00

227.64

15,175

Tubo union mecanica RDE 21 PVC 18 "

Ins

1.0000

437,641.00

437,641.00

4,515

5,611 Suministro e instal. tuberia union mecanica RDE 21


20"

538,337.13

Cuadrilla BB (Instalaciones)

Ins

0.7685

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0208

12,305.00

255.94

15,176

Tubo union mecanica RDE 21 PVC 20 "

Ins

1.0000

525,663.00

525,663.00

4,515

5,612 Suministro e instal. tuberia union mecanica RDE 26


2"

12,418.19

6,871.62

Cuadrilla BB (Instalaciones)

Ins

0.0766

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0008

12,305.00

9.84

15,177

Tubo union mecanica RDE 26 PVC 2 "

Ins

1.0000

5,624.00

5,624.00

4,515

5,613 Suministro e instal. tuberia union mecanica RDE 26


2 1/2"

1,237.78

10,018.10

Cuadrilla BB (Instalaciones)

Ins

0.0958

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0009

12,305.00

11.07

15,178

Tubo union mecanica RDE 26 PVC 2 1/2 "

Ins

1.0000

8,459.00

8,459.00

4,515

5,614 Suministro e instal. tuberia union mecanica RDE 26


3"

1,548.03

14,094.98

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

254

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,179

Tubo union mecanica RDE 26 PVC 3 "

Ins

4,515

5,615 Suministro e instal. tuberia union mecanica RDE 26


4"

Cantidad

Vr.Unitario

Vr.Total

0.1149

16,159.00

1,856.67

und

0.0010

12,305.00

12.31

1.0000

12,226.00

12,226.00

22,450.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,180

Tubo union mecanica RDE 26 PVC 4 "

Ins

1.0000

19,954.00

19,954.00

4,515

5,616 Suministro e instal. tuberia union mecanica RDE 26


6"

2,475.56

46,503.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,181

Tubo union mecanica RDE 26 PVC 6 "

Ins

1.0000

42,745.00

42,745.00

4,515

5,617 Suministro e instal. tuberia union mecanica RDE 26


8"

3,713.34

77,741.64

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

4,952.73

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,182

Tubo union mecanica RDE 26 PVC 8 "

Ins

1.0000

72,720.00

72,720.00

4,515

5,618 Suministro e instal. tuberia union mecanica RDE 26


10"

118,830.57

Cuadrilla BB (Instalaciones)

Ins

0.3839

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0083

12,305.00

102.13

15,183

Tubo union mecanica RDE 26 PVC 10 "

Ins

1.0000

112,525.00

112,525.00

4,515

5,619 Suministro e instal. tuberia union mecanica RDE 26


12"

6,203.44

168,126.88

Cuadrilla BB (Instalaciones)

Ins

0.4608

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,184

Tubo union mecanica RDE 26 PVC 12 "

Ins

1.0000

160,511.00

160,511.00

4,515

5,620 Suministro e instal. tuberia union mecanica RDE 26


14"

7,446.07

207,853.34

Cuadrilla BB (Instalaciones)

Ins

0.5376

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,185

Tubo union mecanica RDE 26 PVC 14 "

Ins

1.0000

198,962.00

198,962.00

4,515

5,621 Suministro e instal. tuberia union mecanica RDE 26


16"

8,687.08

288,376.43

Cuadrilla BB (Instalaciones)

Ins

0.6149

16,159.00

9,936.17

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,186

Tubo union mecanica RDE 26 PVC 16 "

Ins

1.0000

278,236.00

278,236.00

4,515

5,622 Suministro e instal. tuberia union mecanica RDE 26


18"

363,770.97

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

255

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

15,187

Tubo union mecanica RDE 26 PVC 18 "

4,515

Cantidad

Vr.Unitario

Vr.Total

0.6914

16,159.00

11,172.33

Ins

und

0.0185

12,305.00

227.64

Ins

1.0000

352,371.00

352,371.00

5,623 Suministro e instal. tuberia union mecanica RDE 26


20"

438,618.13

Cuadrilla BB (Instalaciones)

Ins

0.7685

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0208

12,305.00

255.94

15,188

Tubo union mecanica RDE 26 PVC 20 "

Ins

1.0000

425,944.00

425,944.00

4,515

5,624 Suministro e instal. tuberia union mecanica RDE


32.5 2 "

12,418.19

5,625.62

Cuadrilla BB (Instalaciones)

Ins

0.0766

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0008

12,305.00

9.84

15,189

Tubo union mecanica RDE 32.5 PVC 2 "

Ins

1.0000

4,378.00

4,378.00

4,515

5,625 Suministro e instal. tuberia union mecanica RDE


32.5 2 1/2"

1,237.78

9,288.10

Cuadrilla BB (Instalaciones)

Ins

0.0958

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0009

12,305.00

11.07

15,190

Tubo union mecanica RDE 32.5 PVC 2 1/2 "

Ins

1.0000

7,729.00

7,729.00

4,515

5,626 Suministro e instal. tuberia union mecanica RDE


32.5 3"

1,548.03

11,689.98

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0010

12,305.00

12.31

15,191

Tubo union mecanica RDE 32.5 PVC 3 "

Ins

1.0000

9,821.00

9,821.00

4,515

5,627 Suministro e instal. tuberia union mecanica RDE


32.5 4"

1,856.67

18,592.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,192

Tubo union mecanica RDE 32.5 PVC 4 "

Ins

1.0000

16,096.00

16,096.00

4,515

5,628 Suministro e instal. tuberia union mecanica RDE


32.5 6"

2,475.56

38,840.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

3,713.34

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,193

Tubo union mecanica RDE 32.5 PVC 6 "

Ins

1.0000

35,082.00

35,082.00

4,515

5,629 Suministro e instal. tuberia union mecanica RDE


32.5 8"

64,363.64

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,194

Tubo union mecanica RDE 32.5 PVC 8 "

Ins

1.0000

59,342.00

59,342.00

4,515

5,630 Suministro e instal. tuberia union mecanica RDE


32.5 10"

4,952.73

98,522.57

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

256

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,195

Tubo union mecanica RDE 32.5 PVC 10 "

Ins

4,515

5,631 Suministro e instal. tuberia union mecanica RDE


32.5 12"

Cantidad

Vr.Unitario

Vr.Total

0.3839

16,159.00

6,203.44

und

0.0083

12,305.00

102.13

1.0000

92,217.00

92,217.00

136,763.88

Cuadrilla BB (Instalaciones)

Ins

0.4608

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,196

Tubo union mecanica RDE 32.5 PVC 12 "

Ins

1.0000

129,148.00

129,148.00

4,515

5,632 Suministro e instal. tuberia union mecanica RDE


32.5 14"

7,446.07

167,212.34

Cuadrilla BB (Instalaciones)

Ins

0.5376

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,197

Tubo union mecanica RDE 32.5 PVC 14 "

Ins

1.0000

158,321.00

158,321.00

4,515

5,633 Suministro e instal. tuberia union mecanica RDE


32.5 16"

8,687.08

228,161.43

Cuadrilla BB (Instalaciones)

Ins

0.6149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,198

Tubo union mecanica RDE 32.5 PVC 16 "

Ins

1.0000

218,021.00

218,021.00

4,515

5,634 Suministro e instal. tuberia union mecanica RDE


32.5 18"

9,936.17

292,736.97

Cuadrilla BB (Instalaciones)

Ins

0.6914

14,118

Lubricante 500 gr

Ins

und

0.0185

12,305.00

227.64

15,199

Tubo union mecanica RDE 32.5 PVC 18 "

Ins

1.0000

281,337.00

281,337.00

4,515

5,635 Suministro e instal. tuberia union mecanica RDE


32.5 20"

16,159.00

11,172.33

359,725.13

Cuadrilla BB (Instalaciones)

Ins

0.7685

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0208

12,305.00

255.94

15,200

Tubo union mecanica RDE 32.5 PVC 20 "

Ins

1.0000

347,051.00

347,051.00

4,515

5,636 Suministro e instal. tuberia union mecanica RDE 41


2"

12,418.19

4,928.62

Cuadrilla BB (Instalaciones)

Ins

0.0766

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0008

12,305.00

9.84

15,201

Tubo union mecanica RDE 41 PVC 2 "

Ins

1.0000

3,681.00

3,681.00

4,515

5,637 Suministro e instal. tuberia union mecanica RDE 41


2 1/2"

1,237.78

8,517.10

Cuadrilla BB (Instalaciones)

Ins

0.0958

16,159.00

1,548.03

14,118

Lubricante 500 gr

Ins

und

0.0009

12,305.00

11.07

15,202

Tubo union mecanica RDE 41 PVC 2 1/2 "

Ins

1.0000

6,958.00

6,958.00

4,515

5,638 Suministro e instal. tuberia union mecanica RDE 41


3"

9,438.98

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

257

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

15,203

Tubo union mecanica RDE 41 PVC 3 "

4,515

Cantidad

Vr.Unitario

Vr.Total

0.1149

16,159.00

1,856.67

Ins

und

0.0010

12,305.00

12.31

Ins

1.0000

7,570.00

7,570.00

5,639 Suministro e instal. tuberia union mecanica RDE 41


4"

15,677.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,204

Tubo union mecanica RDE 41 PVC 4 "

Ins

1.0000

13,181.00

13,181.00

4,515

5,640 Suministro e instal. tuberia union mecanica RDE 41


6"

2,475.56

31,378.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,205

Tubo union mecanica RDE 41 PVC 6 "

Ins

1.0000

27,620.00

27,620.00

4,515

5,641 Suministro e instal. tuberia union mecanica RDE 41


8"

3,713.34

51,674.64

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,206

Tubo union mecanica RDE 41 PVC 8 "

Ins

1.0000

46,653.00

46,653.00

4,515

5,642 Suministro e instal. tuberia union mecanica RDE 41


10"

4,952.73

79,260.57

Cuadrilla BB (Instalaciones)

Ins

0.3839

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0083

12,305.00

102.13

15,207

Tubo union mecanica RDE 41 PVC 10 "

Ins

1.0000

72,955.00

72,955.00

4,515

5,643 Suministro e instal. tuberia union mecanica RDE 41


12"

6,203.44

110,839.88

Cuadrilla BB (Instalaciones)

Ins

0.4608

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,208

Tubo union mecanica RDE 41 PVC 12 "

Ins

1.0000

103,224.00

103,224.00

4,515

5,644 Suministro e instal. tuberia union mecanica RDE 41


14"

7,446.07

141,977.34

Cuadrilla BB (Instalaciones)

Ins

0.5376

16,159.00

8,687.08

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,209

Tubo union mecanica RDE 41 PVC 14 "

Ins

1.0000

133,086.00

133,086.00

4,515

5,645 Suministro e instal. tuberia union mecanica RDE 41


16"

193,420.43

Cuadrilla BB (Instalaciones)

Ins

0.6149

14,118

Lubricante 500 gr

Ins

und

0.0166

12,305.00

204.26

15,210

Tubo union mecanica RDE 41 PVC 16 "

Ins

1.0000

183,280.00

183,280.00

4,515

5,646 Suministro e instal. tuberia union mecanica RDE 41


18"

16,159.00

9,936.17

249,842.97

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

258

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

11,172.33

Cuadrilla BB (Instalaciones)

Ins

0.6914

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0185

12,305.00

227.64

15,211

Tubo union mecanica RDE 41 PVC 18 "

Ins

1.0000

238,443.00

238,443.00

4,515

5,647 Suministro e instal. tuberia union mecanica RDE 41


20"

308,297.13

Cuadrilla BB (Instalaciones)

Ins

0.7685

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0208

12,305.00

255.94

15,212

Tubo union mecanica RDE 41 PVC 20 "

Ins

1.0000

295,623.00

295,623.00

4,515

5,648 Suministro e instal. tuberia union mecanica RDE 9


3"

12,418.19

61,717.98

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

1,856.67

14,118

Lubricante 500 gr

Ins

und

0.0010

12,305.00

12.31

15,145

Tubo union mecanica RDE 9 PVC 3 "

Ins

1.0000

59,849.00

59,849.00

4,515

5,649 Suministro e instal. tuberia union mecanica RDE 9


4"

134,987.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,146

Tubo union mecanica RDE 9 PVC 4 "

Ins

1.0000

132,491.00

132,491.00

4,515

5,650 Suministro e instal. tuberia union mecanica RDE 9


6"

2,475.56

216,995.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,147

Tubo union mecanica RDE 9 PVC 6 "

Ins

1.0000

213,237.00

213,237.00

4,515

5,651 Suministro e instal. tuberia union mecanica RDE 9


8"

3,713.34

333,175.20

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,148

Tubo union mecanica RDE 9 PVC 8 "

Ins

1.0000

328,153.56

328,153.56

4,515

5,652 Sobreacarreos o transporte de material Petreo (via


destapada en Montaa)
21

Volqueta (6 m3 )

m-km

Eqp

5,653 Suministro e instal. tuberia union mecanica RDE 11


3"

HR

4,952.73

1,588.73

0.0286

55,550.00

1,588.73

52,057.98

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0010

12,305.00

12.31

15,149

Tubo union mecanica RDE 11 PVC 3 "

Ins

1.0000

50,189.00

50,189.00

4,515

5,654 Suministro e instal. tuberia union mecanica RDE 11


4"

1,856.67

85,906.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

259

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

2,475.56

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,150

Tubo union mecanica RDE 11 PVC 4 "

Ins

1.0000

83,410.00

83,410.00

4,515

5,655 Suministro e instal. tuberia union mecanica RDE 11


6"

182,503.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,151

Tubo union mecanica RDE 11 PVC 6 "

Ins

1.0000

178,745.00

178,745.00

4,515

5,656 Suministro e instal. tuberia union mecanica RDE 11


8"

16,159.00

3,713.34

280,073.88

Cuadrilla BB (Instalaciones)

Ins

0.3065

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0056

12,305.00

68.91

15,152

Tubo union mecanica RDE 11 PVC 8 "

Ins

1.0000

275,052.24

275,052.24

4,515

5,657 Suministro e instal. tuberia union mecanica RDE


13.5 2 "

4,952.73

21,481.62

Cuadrilla BB (Instalaciones)

Ins

0.0766

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0008

12,305.00

9.84

15,153

Tubo union mecanica RDE 13.5 PVC 2 "

Ins

1.0000

20,234.00

20,234.00

4,515

5,658 Suministro e instal. tuberia union mecanica RDE


13.5 2 1/2"

1,237.78

29,818.10

Cuadrilla BB (Instalaciones)

Ins

0.0958

16,159.00

1,548.03

14,118

Lubricante 500 gr

Ins

und

0.0009

12,305.00

11.07

15,154

Tubo union mecanica RDE 13.5 PVC 2 1/2 "

Ins

1.0000

28,259.00

28,259.00

4,515

5,659 Suministro e instal. tuberia union mecanica RDE


13.5 3"

36,535.98

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0010

12,305.00

12.31

15,155

Tubo union mecanica RDE 13.5 PVC 3 "

Ins

1.0000

34,667.00

34,667.00

4,515

5,660 Suministro e instal. tuberia union mecanica RDE


13.5 4"

1,856.67

59,252.48

Cuadrilla BB (Instalaciones)

Ins

0.1532

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

15,156

Tubo union mecanica RDE 13.5 PVC 4 "

Ins

1.0000

56,756.00

56,756.00

4,515

5,661 Suministro e instal. tuberia union mecanica RDE


13.5 6"

2,475.56

126,165.87

Cuadrilla BB (Instalaciones)

Ins

0.2298

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0037

12,305.00

45.53

15,157

Tubo union mecanica RDE 13.5 PVC 6 "

Ins

1.0000

122,407.00

122,407.00

4,515

5,662 Suministro e instal. tuberia union mecanica RDE


13.5 8"

3,713.34

198,994.64

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

260

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,158

Tubo union mecanica RDE 13.5 PVC 8 "

Ins

4,515

5,663 Suministro e instal. tuberia union mecanica RDE


13.5 10"

Cantidad

Vr.Unitario

Vr.Total

0.3065

16,159.00

4,952.73

und

0.0056

12,305.00

68.91

1.0000

193,973.00

193,973.00

332,658.81

Cuadrilla BB (Instalaciones)

Ins

0.3839

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0083

12,305.00

102.13

15,159

Tubo union mecanica RDE 13.5 PVC 10 "

Ins

1.0000

326,353.24

326,353.24

4,515

5,664 Suministro e instal. tuberia union mecanica RDE


13.5 12"

6,203.44

468,826.08

Cuadrilla BB (Instalaciones)

Ins

0.4608

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,160

Tubo union mecanica RDE 13.5 PVC 12 "

Ins

1.0000

461,210.20

461,210.20

4,515

5,665 Suministro e instal. codo gran radio 90 unin


mecnica 2", pagado por un

und

7,446.07

23,373.93

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

2,772.88

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,223

Codo gran radio 90 u.m RDE 21 PVC 2 "

Ins

und

1.0000

20,478.00

20,478.00

4,515

5,666 Suministro e instal. codo gran radio 90 unin


mecnica 2 1/2", pagado por un

und

29,986.93

Cuadrilla BB (Instalaciones)

Ins

0.2145

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0112

12,305.00

137.82

15,224

Codo gran radio 90 u.m RDE 21 PVC 2 1/2 "

Ins

und

1.0000

26,383.00

26,383.00

4,515

5,667 Suministro e instal. codo gran radio 90 unin


mecnica 3", pagado por un

und

3,466.11

52,090.75

Cuadrilla BB (Instalaciones)

Ins

0.2575

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,225

Codo gran radio 90 u.m RDE 21 PVC 3 "

Ins

und

1.0000

47,776.00

47,776.00

4,515

5,668 Suministro e instal. codo gran radio 90 unin


mecnica 4", pagado por un

und

4,160.94

97,473.20

Cuadrilla BB (Instalaciones)

Ins

0.3435

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,226

Codo gran radio 90 u.m RDE 21 PVC 4 "

Ins

und

1.0000

91,738.00

91,738.00

4,515

5,669 Suministro e instal. codo gran radio 90 unin


mecnica 6", pagado por un

und

5,550.62

252,899.15

Cuadrilla BB (Instalaciones)

Ins

0.5155

16,159.00

8,329.96

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

15,227

Codo gran radio 90 u.m RDE 21 PVC 6 "

Ins

und

1.0000

244,360.00

244,360.00

4,515

5,670 Suministro e instal. codo gran radio 90 unin


mecnica 8", pagado por un

und

592,435.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

261

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

15,228

Codo gran radio 90 u.m RDE 21 PVC 8 "

4,515

Cantidad

Vr.Unitario

Vr.Total

0.6873

16,159.00

11,106.08

Ins

und

0.0190

12,305.00

233.80

Ins

und

1.0000

581,096.00

581,096.00

5,671 Suministro e instal. codo gran radio 90 unin


mecnica 10", pagado por un

und

1,278,002.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,229

Codo gran radio 90 u.m RDE 21 PVC 10 "

Ins

und

1.0000

1,263,859.00

1,263,859.00

4,515

5,672 Suministro e instal. codo gran radio 90 unin


mecnica 12", pagado por un

und

13,885.43

1,732,231.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,230

Codo gran radio 90 u.m RDE 21 PVC 12 "

Ins

und

1.0000

1,715,290.00

1,715,290.00

4,515

5,673 Suministro e instal. codo gran radio 45 unin


mecnica 2", pagado por un

und

16,658.31

20,600.93

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,231

Codo gran radio 45 u.m RDE 21 PVC 2 "

Ins

und

1.0000

17,705.00

17,705.00

4,515

5,674 Suministro e instal. codo gran radio 45 unin


mecnica 2 1/2", pagado por un

und

2,772.88

23,864.93

Cuadrilla BB (Instalaciones)

Ins

0.2145

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0112

12,305.00

137.82

15,232

Codo gran radio 45 u.m RDE 21 PVC 2 1/2 "

Ins

und

1.0000

20,261.00

20,261.00

4,515

5,675 Suministro e instal. codo gran radio 45 unin


mecnica 3", pagado por un

und

3,466.11

36,350.75

Cuadrilla BB (Instalaciones)

Ins

0.2575

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,233

Codo gran radio 45 u.m RDE 21 PVC 3 "

Ins

und

1.0000

32,036.00

32,036.00

4,515

5,676 Suministro e instal. codo gran radio 45 unin


mecnica 4", pagado por un

und

4,160.94

70,846.20

Cuadrilla BB (Instalaciones)

Ins

0.3435

16,159.00

5,550.62

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,234

Codo gran radio 45 u.m RDE 21 PVC 4 "

Ins

und

1.0000

65,111.00

65,111.00

4,515

5,677 Suministro e instal. codo gran radio 45 unin


mecnica 6", pagado por un

und

186,341.15

Cuadrilla BB (Instalaciones)

Ins

0.5155

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

15,235

Codo gran radio 45 u.m RDE 21 PVC 6 "

Ins

und

1.0000

177,802.00

177,802.00

4,515

5,678 Suministro e instal. codo gran radio 45 unin


mecnica 8", pagado por un

und

8,329.96

397,409.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

262

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,236

Codo gran radio 45 u.m RDE 21 PVC 8 "

Ins

4,515

5,679 Suministro e instal. codo gran radio 45 unin


mecnica 10", pagado por un

Cantidad

Vr.Unitario

Vr.Total

0.6873

16,159.00

11,106.08

und

0.0190

12,305.00

233.80

und

1.0000

386,070.00

386,070.00

und

840,949.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,237

Codo gran radio 45 u.m RDE 21 PVC 10 "

Ins

und

1.0000

826,806.00

826,806.00

4,515

5,680 Suministro e instal. codo gran radio 45 unin


mecnica 12", pagado por un

und

13,885.43

1,177,536.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,238

Codo gran radio 45 u.m RDE 21 PVC 12 "

Ins

und

1.0000

1,160,595.00

1,160,595.00

4,515

5,681 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 2", pagado por un

und

16,658.31

18,506.93

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,239

Codo gran radio 22 1/2 u.m RDE 21 PVC 2 "

Ins

und

1.0000

15,611.00

15,611.00

4,515

5,682 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 2 1/2", pagado por un

und

2,772.88

25,495.93

Cuadrilla BB (Instalaciones)

Ins

0.2145

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0112

12,305.00

137.82

15,240

Codo gran radio 22 1/2 u.m RDE 21 PVC 2 1/2 "

Ins

und

1.0000

21,892.00

21,892.00

4,515

5,683 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 3", pagado por un

und

3,466.11

35,833.75

Cuadrilla BB (Instalaciones)

Ins

0.2575

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,241

Codo gran radio 22 1/2 u.m RDE 21 PVC 3 "

Ins

und

1.0000

31,519.00

31,519.00

4,515

5,684 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 4", pagado por un

und

4,160.94

63,218.20

Cuadrilla BB (Instalaciones)

Ins

0.3435

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,242

Codo gran radio 22 1/2 u.m RDE 21 PVC 4 "

Ins

und

1.0000

57,483.00

57,483.00

4,515

5,685 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 6", pagado por un

und

5,550.62

150,532.15

Cuadrilla BB (Instalaciones)

Ins

0.5155

16,159.00

8,329.96

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

15,243

Codo gran radio 22 1/2 u.m RDE 21 PVC 6 "

Ins

und

1.0000

141,993.00

141,993.00

4,515

5,686 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 8", pagado por un

und

311,783.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

263

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

15,244

Codo gran radio 22 1/2 u.m RDE 21 PVC 8 "

4,515

Cantidad

Vr.Unitario

Vr.Total

0.6873

16,159.00

11,106.08

Ins

und

0.0190

12,305.00

233.80

Ins

und

1.0000

300,444.00

300,444.00

5,687 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 10", pagado por un

und

687,368.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,245

Codo gran radio 22 1/2 u.m RDE 21 PVC 10 "

Ins

und

1.0000

673,225.00

673,225.00

4,515

5,688 Suministro e instal. codo gran radio 22 1/2 unin


mecnica 12", pagado por un

und

13,885.43

923,526.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,246

Codo gran radio 22 1/2 u.m RDE 21 PVC 12 "

Ins

und

1.0000

906,585.00

906,585.00

4,515

5,689 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 2", pagado por un

und

16,658.31

20,901.93

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,247

Codo gran radio 11 1/4 u.m RDE 21 PVC 2 "

Ins

und

1.0000

18,006.00

18,006.00

4,515

5,690 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 2 1/2", pagado por un

und

2,772.88

24,303.93

Cuadrilla BB (Instalaciones)

Ins

0.2145

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0112

12,305.00

137.82

15,248

Codo gran radio 11 1/4 u.m RDE 21 PVC 2 1/2 "

Ins

und

1.0000

20,700.00

20,700.00

4,515

5,691 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 3", pagado por un

und

3,466.11

33,040.75

Cuadrilla BB (Instalaciones)

Ins

0.2575

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,249

Codo gran radio 11 1/4 u.m RDE 21 PVC 3 "

Ins

und

1.0000

28,726.00

28,726.00

4,515

5,692 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 4", pagado por un

und

4,160.94

60,773.20

Cuadrilla BB (Instalaciones)

Ins

0.3435

16,159.00

5,550.62

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,250

Codo gran radio 11 1/4 u.m RDE 21 PVC 4 "

Ins

und

1.0000

55,038.00

55,038.00

4,515

5,693 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 6", pagado por un

und

135,506.15

Cuadrilla BB (Instalaciones)

Ins

0.5155

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

15,251

Codo gran radio 11 1/4 u.m RDE 21 PVC 6 "

Ins

und

1.0000

126,967.00

126,967.00

4,515

5,694 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 8", pagado por un

und

16,159.00

8,329.96

269,325.88

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

264

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

11,106.08

Cuadrilla BB (Instalaciones)

Ins

0.6873

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0190

12,305.00

233.80

15,252

Codo gran radio 11 1/4 u.m RDE 21 PVC 8 "

Ins

und

1.0000

257,986.00

257,986.00

4,515

5,695 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 10", pagado por un

und

564,898.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,253

Codo gran radio 11 1/4 u.m RDE 21 PVC 10 "

Ins

und

1.0000

550,755.00

550,755.00

4,515

5,696 Suministro e instal. codo gran radio 11 1/4 unin


mecnica 12", pagado por un

und

13,885.43

745,952.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

16,658.31

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,254

Codo gran radio 11 1/4 u.m RDE 21 PVC 12 "

Ins

und

1.0000

729,011.00

729,011.00

4,515

5,697 Suministro e instal. codo gran radio 6 unin


mecnica 8", pagado por un

und

168,441.88

Cuadrilla BB (Instalaciones)

Ins

0.6873

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0190

12,305.00

233.80

15,255

Codo gran radio 6 u.m RDE 21 PVC 8 "

Ins

und

1.0000

157,102.00

157,102.00

4,515

5,698 Suministro e instal. codo gran radio 6 unin


mecnica 10", pagado por un

und

11,106.08

326,814.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,256

Codo gran radio 6 u.m RDE 21 PVC 10 "

Ins

und

1.0000

312,671.00

312,671.00

4,515

5,699 Suministro e instal. codo gran radio 6 unin


mecnica 12", pagado por un

und

13,885.43

458,743.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,257

Codo gran radio 6 u.m RDE 21 PVC 12 "

Ins

und

1.0000

441,802.00

441,802.00

4,515

5,700 Suministro e instal. tee union mecanica PVC 4x4x4

und

16,658.31

113,897.39

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0263

12,305.00

323.62

15,293

Tee (ens.) u.m RDE 21 PVC 4 x 4 x 4 "

Ins

und

1.0000

108,028.00

108,028.00

4,515

5,701 Suministro e instal. tee union mecanica PVC 4x4x3

und

5,545.77

103,581.70

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0260

12,305.00

319.93

15,294

Tee (ens.) u.m RDE 21 PVC 4 x 4 x 3 "

Ins

und

1.0000

97,716.00

97,716.00

4,515

5,702 Suministro e instal. tee union mecanica PVC 4x4x2


1/2

und

5,545.77

96,589.01

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

265

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

5,545.77

14,118

Lubricante 500 gr

Ins

und

0.0257

12,305.00

316.24

15,295

Tee (ens.) u.m RDE 21 PVC 4 x 4 x 2 1/2 "

Ins

und

1.0000

90,727.00

90,727.00

4,515

5,703 Suministro e instal. tee union mecanica PVC 4x4x2

und

93,515.40

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

5,545.77

14,118

Lubricante 500 gr

Ins

und

0.0250

12,305.00

307.63

15,296

Tee (ens.) u.m RDE 21 PVC 4 x 4 x 2 "

Ins

und

1.0000

87,662.00

87,662.00

4,515

5,704 Suministro e instal. tee union mecanica PVC 4x3x4

und

103,581.70

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

5,545.77

14,118

Lubricante 500 gr

Ins

und

0.0260

12,305.00

319.93

15,297

Tee (ens.) u.m RDE 21 PVC 4 x 3 x 4 "

Ins

und

1.0000

97,716.00

97,716.00

4,515

5,705 Suministro e instal. tee union mecanica PVC 4x3x3

und

98,177.24

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

5,545.77

14,118

Lubricante 500 gr

Ins

und

0.0258

12,305.00

317.47

15,298

Tee (ens.) u.m RDE 21 PVC 4 x 3 x 3 "

Ins

und

1.0000

92,314.00

92,314.00

4,515

5,706 Suministro e instal. tee union mecanica PVC 4x3x2


1/2

und

91,186.78

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0256

12,305.00

315.01

15,299

Tee (ens.) u.m RDE 21 PVC 4 x 3 x 2 1/2 "

Ins

und

1.0000

85,326.00

85,326.00

4,515

5,707 Suministro e instal. tee union mecanica PVC 4x3x2

und

5,545.77

88,103.32

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0254

12,305.00

312.55

15,300

Tee (ens.) u.m RDE 21 PVC 4 x 3 x 2 "

Ins

und

1.0000

82,245.00

82,245.00

4,515

5,708 Suministro e instal. tee union mecanica PVC 4x2


1/2x4

und

5,545.77

96,589.01

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0257

12,305.00

316.24

15,301

Tee (ens.) u.m RDE 21 PVC 4 x 2 1/2 x 4 "

Ins

und

1.0000

90,727.00

90,727.00

4,515

5,709 Suministro e instal. tee union mecanica PVC 4x2x4

und

5,545.77

93,515.40

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0250

12,305.00

307.63

15,302

Tee (ens.) u.m RDE 21 PVC 4 x 2 x 4 "

Ins

und

1.0000

87,662.00

87,662.00

4,515

5,710 Suministro e instal. tee union mecanica PVC 4x2x3

und

5,545.77

88,094.70

Cuadrilla BB (Instalaciones)

Ins

0.3432

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0247

12,305.00

303.93

15,303

Tee (ens.) u.m RDE 21 PVC 4 x 2 x 3 "

Ins

und

1.0000

82,245.00

82,245.00

4,515

5,545.77

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

266

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,711 Suministro e instal. tee union mecanica PVC 3x3x3

Cantidad

Vr.Unitario

und

Vr.Total
67,718.43

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0187

12,305.00

230.10

15,304

Tee (ens.) u.m RDE 21 PVC 3 x 3 x 3 "

Ins

und

1.0000

63,329.00

63,329.00

4,515

5,712 Suministro e instal. tee union mecanica PVC 3x3x2


1/2

und

4,159.33

61,501.97

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

4,159.33

14,118

Lubricante 500 gr

Ins

und

0.0185

12,305.00

227.64

15,305

Tee (ens.) u.m RDE 21 PVC 3 x 3 x 2 1/2 "

Ins

und

1.0000

57,115.00

57,115.00

4,515

5,713 Suministro e instal. tee union mecanica PVC 3x3x2

und

58,476.51

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

4,159.33

14,118

Lubricante 500 gr

Ins

und

0.0183

12,305.00

225.18

15,306

Tee (ens.) u.m RDE 21 PVC 3 x 3 x 2 "

Ins

und

1.0000

54,092.00

54,092.00

4,515

5,714 Suministro e instal. tee union mecanica PVC 3x2


1/2x3

und

61,497.05

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0181

12,305.00

222.72

15,307

Tee (ens.) u.m RDE 21 PVC 3 x 2 1/2 x 3 "

Ins

und

1.0000

57,115.00

57,115.00

4,515

5,715 Suministro e instal. tee union mecanica PVC 3x2


1/2x2 1/2

und

4,159.33

58,106.36

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0178

12,305.00

219.03

15,308

Tee (ens.) u.m RDE 21 PVC 3 x 2 1/2 x 2 1/2 "

Ins

und

1.0000

53,728.00

53,728.00

4,515

5,716 Suministro e instal. tee union mecanica PVC 3x2x3

und

4,159.33

58,476.51

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0183

12,305.00

225.18

15,309

Tee (ens.) u.m RDE 21 PVC 3 x 2 x 3 "

Ins

und

1.0000

54,092.00

54,092.00

4,515

5,717 Suministro e instal. tee union mecanica PVC 3x2x2


1/2

und

4,159.33

55,102.36

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0178

12,305.00

219.03

15,310

Tee (ens.) u.m RDE 21 PVC 3 x 2 x 2 1/2 "

Ins

und

1.0000

50,724.00

50,724.00

4,515

5,718 Suministro e instal. tee union mecanica PVC 3x2x2

und

4,159.33

52,069.67

Cuadrilla BB (Instalaciones)

Ins

0.2574

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0175

12,305.00

215.34

15,311

Tee (ens.) u.m RDE 21 PVC 3 x 2 x 2 "

Ins

und

1.0000

47,695.00

47,695.00

4,515

5,719 Suministro e instal. tee union mecanica PVC 2x2x2

und

4,159.33

31,289.46

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

267

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

2,772.88

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,316

Tee (ens.) u.m RDE 21 PVC 2 x 2 x 2 "

Ins

und

1.0000

28,332.00

28,332.00

4,515

5,720 Suministro e instal. tee union mecanica PVC 2


1/2x2x2

und

45,509.15

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0153

12,305.00

188.27

15,315

Tee (ens.) u.m RDE 21 PVC 2 1/2 x 2 x 2"

Ins

und

1.0000

42,548.00

42,548.00

4,515

5,721 Suministro e instal. tee union mecanica PVC 2


1/2x2x2 1/2

und

2,772.88

43,543.84

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0156

12,305.00

191.96

15,314

Tee (ens.) u.m RDE 21 PVC 2 1/2 x 2 x 2 1/2 "

Ins

und

1.0000

40,579.00

40,579.00

4,515

5,722 Suministro e instal. tee union mecanica PVC 2


1/2x2 1/2x2

und

2,772.88

37,729.84

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0156

12,305.00

191.96

15,313

Tee (ens.) u.m RDE 21 PVC 2 1/2 x 2 1/2 x 2 "

Ins

und

1.0000

34,765.00

34,765.00

4,515

5,723 Suministro e instal. tee union mecanica PVC 2


1/2x2 1/2x2 1/2

und

2,772.88

41,584.53

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

2,772.88

14,118

Lubricante 500 gr

Ins

und

0.0159

12,305.00

195.65

15,312

Tee (ens.) u.m RDE 21 PVC 2 1/2 x 2 1/2 x 2 1/2 "

Ins

und

1.0000

38,616.00

38,616.00

4,515

5,724 Union de reparacion (u.m) RDE 21 2". Suministro e


instal.

und

19,963.93

Cuadrilla BB (Instalaciones)

Ins

0.1716

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,274

Union de reparacion u.m RDE 21 PVC 2 "

Ins

und

1.0000

17,068.00

17,068.00

4,515

5,725 Union de reparacion (u.m) RDE 21 2 1/2".


Suministro e instal.

und

2,772.88

23,473.93

Cuadrilla BB (Instalaciones)

Ins

0.2145

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0112

12,305.00

137.82

15,275

Union de reparacion u.m RDE 21 PVC 2 1/2 "

Ins

und

1.0000

19,870.00

19,870.00

4,515

5,726 Union de reparacion (u.m) RDE 21 3". Suministro e


instal.

und

3,466.11

32,450.75

Cuadrilla BB (Instalaciones)

Ins

0.2575

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0125

12,305.00

153.81

15,276

Union de reparacion u.m RDE 21 PVC 3 "

Ins

und

1.0000

28,136.00

28,136.00

4,515

5,727 Union de reparacion (u.m) RDE 21 4". Suministro e


instal.

und

4,160.94

53,980.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

268

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,277

Union de reparacion u.m RDE 21 PVC 4 "

Ins

4,515

5,728 Union de reparacion (u.m) RDE 21 6". Suministro e


instal.

Cantidad

Vr.Unitario

Vr.Total

0.3435

16,159.00

5,550.62

und

0.0150

12,305.00

184.58

und

1.0000

48,245.00

48,245.00

und

120,767.15

Cuadrilla BB (Instalaciones)

Ins

0.5155

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0170

12,305.00

209.19

15,278

Union de reparacion u.m RDE 21 PVC 6 "

Ins

und

1.0000

112,228.00

112,228.00

4,515

5,729 Union de reparacion (u.m) RDE 21 8". Suministro e


instal.

und

8,329.96

217,689.88

Cuadrilla BB (Instalaciones)

Ins

0.6873

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0190

12,305.00

233.80

15,279

Union de reparacion u.m RDE 21 PVC 8 "

Ins

und

1.0000

206,350.00

206,350.00

4,515

5,730 Union de reparacion (u.m) RDE 21 10". Suministro


e instal.

und

11,106.08

366,591.84

Cuadrilla BB (Instalaciones)

Ins

0.8593

16,159.00

13,885.43

14,118

Lubricante 500 gr

Ins

und

0.0210

12,305.00

258.41

15,280

Union de reparacion u.m RDE 21 PVC 10 "

Ins

und

1.0000

352,448.00

352,448.00

4,515

5,731 Union de reparacion (u.m) RDE 21 12". Suministro


e instal.

und

662,132.33

Cuadrilla BB (Instalaciones)

Ins

1.0309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0230

12,305.00

283.02

15,281

Union de reparacion u.m RDE 21 PVC 12 "

Ins

und

1.0000

645,191.00

645,191.00

4,515

5,732 Collar de derivacion RDE 21 PVC 2" x 1/2".


Suministro e Instal.

und

16,658.31

8,753.10

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1667

1,616.00

269.39

Cuadrilla BB (Instalaciones)

Ins

0.1667

16,159.00

2,693.71

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,282

Collar de derivacion RDE 21 PVC 2" x 1/2"

Ins

und

1.0000

5,590.00

5,590.00

55
4,515

5,733 Collar de derivacion RDE 21 PVC 2" x 3/4".


Suministro e Instal.

und

8,815.30

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1702

1,616.00

275.04

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,283

Collar de derivacion RDE 21 PVC 2" x 3/4"

Ins

und

1.0000

5,590.00

5,590.00

55
4,515

5,734 Collar de derivacion RDE 21 PVC 2 1/2" x 1/2".


Suministro e Instal.

und

10,540.30

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1702

1,616.00

275.04

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,284

Collar de derivacion RDE 21 PVC 2 1/2" x 1/2 "

Ins

und

1.0000

7,315.00

7,315.00

55
4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

269

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,735 Collar de derivacion RDE 21 PVC 2 1/2" x 3/4".


Suministro e Instal.

Cantidad

Vr.Unitario

und

Vr.Total
10,606.07

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1739

1,616.00

281.02

Cuadrilla BB (Instalaciones)

Ins

0.1739

16,159.00

2,810.05

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,285

Collar de derivacion RDE 21 PVC 2 1/2" x 3/4 "

Ins

und

1.0000

7,315.00

7,315.00

55
4,515

5,736 Collar de derivacion RDE 21 PVC 3" x 1/2".


Suministro e Instal.

und

14,406.30

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1702

1,616.00

275.04

Cuadrilla BB (Instalaciones)

Ins

0.1702

16,159.00

2,750.26

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

55
4,515

5,737 Collar de derivacion RDE 21 PVC 3" x 3/4".


Suministro e Instal.

und

14,472.07

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1739

1,616.00

281.02

Cuadrilla BB (Instalaciones)

Ins

0.1739

16,159.00

2,810.05

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,287

Collar de derivacion RDE 21 PVC 3" x 3/4"

Ins

und

1.0000

11,181.00

11,181.00

55
4,515

5,738 Collar de derivacion RDE 21 PVC 4" x 3/4".


Suministro e Instal.

und

16,088.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1818

1,616.00

293.79

Cuadrilla BB (Instalaciones)

Ins

0.1818

16,159.00

2,937.71

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,289

Collar de derivacion RDE 21 PVC 4" x 3/4"

Ins

und

1.0000

12,657.00

12,657.00

55
4,515

5,739 Collar de derivacion RDE 21 PVC 6" x 1/2".


Suministro e Instal.

und

19,844.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2000

1,616.00

323.20

Cuadrilla BB (Instalaciones)

Ins

0.2000

16,159.00

3,231.80

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,290

Collar de derivacion RDE 21 PVC 6" x 1/2"

Ins

und

1.0000

16,089.00

16,089.00

55
4,515

5,740 Collar de derivacion RDE 21 PVC 6" x 3/4".


Suministro e Instal.

und

19,934.65

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2051

1,616.00

331.44

Cuadrilla BB (Instalaciones)

Ins

0.2051

16,159.00

3,314.21

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,291

Collar de derivacion RDE 21 PVC 6" x 3/4"

Ins

und

1.0000

16,089.00

16,089.00

55
4,515

5,741 Collar de derivacion RDE 21 PVC 8" x 1".


Suministro e Instal.

und

39,532.64

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2105

1,616.00

340.17

Cuadrilla BB (Instalaciones)

Ins

0.2105

16,159.00

3,401.47

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,292

Collar de derivacion RDE 21 PVC 8" x 1"

Ins

und

1.0000

35,591.00

35,591.00

55
4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

270

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,742 Reduccion union mecanica RDE 21 4 x 3".


Suministro e instal.

Cantidad

Vr.Unitario

und

Vr.Total

58,367.20

Cuadrilla BB (Instalaciones)

Ins

0.3435

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

15,317

Reduccion de 4 x 3 (ens.) u.m RDE 21

Ins

und

1.0000

52,632.00

52,632.00

4,515

5,743 Reduccion union mecanica RDE 21 4 x 2 1/2",


Suministro e instal.

und

5,550.62

55,105.90

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

14,118

Lubricante 500 gr

Ins

und

0.0148

12,305.00

182.11

15,318

Reduccion de 4 x 2 1/2 (ens.) u.m RDE 21

Ins

und

1.0000

49,538.00

49,538.00

4,515

5,744 Reduccion union mecanica RDE 21 4 x 2",


Suministro e instal.

und

102,412.30

Cuadrilla BB (Instalaciones)

Ins

0.3200

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0145

12,305.00

178.42

15,319

Reduccion de 4 x 2 (ens.) u.m RDE 21

Ins

und

1.0000

97,063.00

97,063.00

4,515

5,745 Reduccion union mecanica RDE 21 3 x 2 1/2",


Suministro e instal.

und

5,170.88

36,228.44

Cuadrilla BB (Instalaciones)

Ins

0.3162

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0143

12,305.00

175.96

15,320

Reduccion de 3 x 2 1/2 (ens.) u.m RDE 21

Ins

und

1.0000

30,943.00

30,943.00

4,515

5,746 Reduccion union mecanica RDE 21 3 x 2",


Suministro e instal.

und

5,109.48

34,247.84

Cuadrilla BB (Instalaciones)

Ins

0.3042

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0140

12,305.00

172.27

15,321

Reduccion de 3 x 2 (ens.) u.m RDE 21

Ins

und

1.0000

29,160.00

29,160.00

4,515

5,747 Reduccion union mecanica RDE 21 2 1/2 x 2",


Suministro e instal.

und

4,915.57

28,486.40

Cuadrilla BB (Instalaciones)

Ins

0.2930

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0138

12,305.00

169.81

15,322

Reduccion de 2 1/2 x 2 u.m RDE 21 PVC

Ins

und

1.0000

23,582.00

23,582.00

4,515

5,748 Relleno General (material granular y/comun - a.


libre 1.5 Km)

4,734.59

11,216.87

son 3 volquetas
1

Compactador Vibratorio

Eqp

HR

0.0185

100,000.00

1,850.00

Motoniveladora

Eqp

HR

0.0185

132,800.00

2,456.80

11

Carrotanque de Agua

Eqp

HR

0.0185

53,125.00

982.81

14

Retroexcavadora de orugas

Eqp

HR

0.0185

144,160.00

2,666.96

21

Volqueta (6 m3 )

Eqp

HR

0.0556

55,550.00

3,088.58

Oficial de Construccion

Ins

0.0185

9,282.00

171.72

8,144

5,749 Terraplen o rellenos con material de corte (a. libre


1.5 Km); terreno Montaoso
son 3 volquetas

10,114.93

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

271

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Compactador Vibratorio

Eqp

Motoniveladora

Eqp

11

Carrotanque de Agua

14
21
8,144

Cantidad

Vr.Unitario

Vr.Total

HR

0.0167

100,000.00

1,670.00

HR

0.0167

132,800.00

2,217.76

Eqp

HR

0.0167

53,125.00

887.19

Retroexcavadora de orugas

Eqp

HR

0.0167

144,160.00

2,407.47

Volqueta (6 m3 )

Eqp

HR

0.0500

55,550.00

2,777.50

Oficial de Construccion

Ins

0.0167

9,282.00

155.01

5,750 Excavacion General (material comun y/o


conglomerado)
14

Retroexcavadora de orugas

Eqp

5,751 Filtro frances (colocacion de piedra rajon y


conformacion)

HR

3,200.35

0.0222

144,160.00

3,200.35

122,813.15

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,063

Piedra rajon o media zonga

Ana

1.0000

90,495.15

90,495.15

17

5,752 Piedra pegada concreto de 2500 Psi, e=0.15 m

51,352.50

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

2,200

Tabla burra ordinario 0.30

Ins

1.0000

4,333.00

4,333.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0900

318,473.24

28,662.59

5,063

Piedra rajon o media zonga

Ana

0.0600

90,495.15

5,429.71

17

5,753 Concreto simple 1:2:4 o 2500 Psi para obras de


arte de BP

1,175.20

373,260.11

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

70

Mezcladora de 9 ft

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

5,061

Formaleta (1 uso)

Ana

5,144

Transporte de materiales Tn

13,961

Triturado de 1/2" - 3/4"

13,962

Cuadrilla AA-5

804

HR

4.3000

3,632.00

0.4800

4,375.00

2,100.00

315.0000

383.34

120,752.10

178.5000

10.00

1,785.00

0.5040

13,800.00

6,955.20

0.7320

32,375.50

23,698.87

Ana

0.3150

0.00

0.00

Ins

0.9975

46,304.00

46,188.24

Ins

4.3000

36,317.00

156,163.10

5,754 Concreto simple 1:3:6 o 1500 Psi pobre, para BP

15,617.60

303,914.17

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

70

Mezcladora de 9 ft

Eqp

HR

Cemento gris

Ins

kg

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

5,144

Transporte de materiales Tn

Ana

13,961

Triturado de 1/2" - 3/4"

13,962

Cuadrilla AA-5

804

4.0000

3,632.00

0.4800

4,375.00

2,100.00

220.5000

383.34

84,526.47

162.7500

10.00

1,627.50

0.5250

13,800.00

7,245.00

0.2205

0.00

0.00

Ins

1.0500

46,304.00

48,619.20

Ins

4.0000

36,317.00

145,268.00

5,755 Malla electrosoldada Q-5 Tipo ME-1, pagada por Kg


19

Herramienta menor 5% M.O. AA

kg
Eqp

HR

14,528.00

3,200.69

0.0180

735.00

13.23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

272

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

14,779

5,756 Geomembrana de 20 mils, 0.50 mm HDPE


6
17
4,489
15,354

Cantidad

Vr.Unitario

Vr.Total

0.0180

14,690.00

264.42

0.0010

0.00

0.00

0.3512

8,323.00

2,923.04

11,097.31

Sub-Contrato Instalacion

Esp

35.0000

8,220.23

2,877.08

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0200

1,469.00

29.38

Cuadrilla AA (Albaileria)

Ins

0.0200

14,690.00

293.80

Geomembrana 20 mil 0.5 mm HDPE

Ins

1.0500

7,521.00

7,897.05

5,757 Geotextil Tejido 1400

3,763.75

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

Geotextil Tejido 1400

Ins

1.0500

2,850.00

2,992.50

19

15,355

5,758 Tuberia PVC Corrugada y perforada para filtro 4"

21,831.66

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

3,466

Tubo de drenaje PVC 100 mm o 4"

Ins

1.0300

20,447.00

21,060.41

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

19

5,759 Malla electrosoldada Q-4 Tipo ME-1 pagada kg

kg

3,433.19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0180

735.00

13.23

4,489

Cuadrilla AA (Albaileria)

Ins

0.0180

14,690.00

264.42

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Malla electrosoldada Q-4 o M-159 (2.35 x 6m)

Ins

0.3980

7,928.48

3,155.54

19

15,356

5,760 Geodren Planar Tipo DG-2, H=1.05 m

26,291.25

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

Geodren Planar DG-2 H=1.05 m

Ins

1.0000

25,520.00

25,520.00

19

15,358

5,761 Geodren Planar Tipo DG-3, H=0.50 m

9,961.03

Herramienta menor 5% M.O. AA

Eqp

HR

0.0330

735.00

24.26

4,489

Cuadrilla AA (Albaileria)

Ins

0.0330

14,690.00

484.77

5,144

Transporte de materiales Tn

Ana

0.0015

0.00

0.00

Geodren Planar DG-3 H=0.50 m

Ins

1.0000

9,452.00

9,452.00

19

15,357

5,762 Excavacion mecanica en material comun 0 - 2 mts


(area restringida)
4
17
4,489

4,252.72

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0333

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0333

1,469.00

48.92

Cuadrilla AA (Albaileria)

Ins

0.0333

14,690.00

489.18

111,550.00

3,714.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

273

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,763 Excavacion mecanica en material comun 2 - 4 mts


(area restringida)

Cantidad

Vr.Unitario

Vr.Total
5,338.63

14

Retroexcavadora de orugas

Eqp

HR

0.0333

144,160.00

4,800.53

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0333

1,469.00

48.92

Cuadrilla AA (Albaileria)

Ins

0.0333

14,690.00

489.18

4,489

5,767 Muro Ladrillo Tolete Comun 0.245 (Tizn, mortero


impermeabilizado)

74,608.08

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3800

1,469.00

2,027.22

2,085

Ladrillo tolete comn

Ins

und

110.0000

305.00

33,550.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.3800

14,690.00

20,272.20

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.0510

367,816.92

18,758.66

5,144

Transporte de materiales Tn

Ana

0.5500

0.00

0.00

17

5,768 Mortero Impermeabilizado 1:5 (desperdicio 5%)

324,007.41

Herramienta menor 5% M.O. Ayudante (A)

Eqp

HR

4.0000

234.00

936.00

Cemento gris

Ins

kg

317.1000

383.34

121,557.11

3,684

Agua para obra

Ins

159.0000

10.00

1,590.00

4,426

Arena lavada de rio

Ins

1.2600

13,800.00

17,388.00

5,143

Transporte de materiales m

Ana

1.2600

46,157.00

58,157.82

5,144

Transporte de materiales Tn

Ana

0.3171

0.00

0.00

8,145

Ayudante de construccion

Ins

4.0000

5,407.00

21,628.00

Sika 1 imp. integral

Ins

kg

15.9600

6,438.00

102,750.48

73
804

14,122

5,769 Paete Impermeabilizado 1:3 para Pozos de


Inspeccion.. e= 2.0 Cm

15,856.51

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4800

1,469.00

705.12

4,489

Cuadrilla AA (Albaileria)

Ins

0.4800

14,690.00

7,051.20

5,768

Mortero Impermeabilizado 1:5 (desperdicio 5%)

Ana

0.0250

324,007.41

8,100.19

17

5,774 Pozo de Inspeccion H= 1.0 m 1.20. (Cono


Truncado, Ladrillo Tolete Tizn)

und

818,693.35

Herramienta Menor 10% M.O. AA-2

Eqp

HR

8.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

0.2300

3,903.00

897.69

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.7600

2,295.00

4,039.20

2,085

Ladrillo tolete comn

Ins

und

367.0000

305.00

111,935.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.2900

367,816.92

106,666.91

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.5600

333,142.66

186,559.89

5,061

Formaleta (1 uso)

Ana

0.2233

32,375.50

7,229.45

5,144

Transporte de materiales Tn

Ana

1.4800

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

9.5300

2,257.00

21,509.21

Cuadrilla AA-2 (Tuberias)

Ins

8.0000

20,097.00

160,776.00

69

14,669

5,775 Pozo de Inspeccion H= 1.5 - 2.0 m 1.20. (Cono


Truncado, Ladrillo Tolete Tizn)

und

16,080.00

1,121,767.36

Herramienta Menor 10% M.O. AA-2

Eqp

HR

13.0000

2,010.00

26,130.00

1,870

Alambre Negro No 18

Ins

kg

0.3100

3,903.00

1,209.93

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.7600

2,295.00

4,039.20

69

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

274

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

678.0000

305.00

206,790.00

0.5300

367,816.92

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

194,942.97

5,061

Formaleta (1 uso)

0.5600

333,142.66

186,559.89

Ana

0.2233

32,375.50

5,144

7,229.45

Transporte de materiales Tn

Ana

2.7300

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13.5600

2,257.00

30,604.92

Cuadrilla AA-2 (Tuberias)

Ins

13.0000

20,097.00

261,261.00

14,669

5,776 Pozo de Inspeccion H= 2.0 - 2.5 m 1.20. (Cono


Truncado, Ladrillo Tolete Tizn)

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5,144

69

1,292,964.75

15.0000

2,010.00

30,150.00

0.3500

3,903.00

1,366.05

1.7600

2,295.00

4,039.20

886.0000

305.00

270,230.00

0.6900

367,816.92

253,793.67

0.5600

333,142.66

186,559.89

Ana

0.2233

32,375.50

7,229.45

Transporte de materiales Tn

Ana

3.5600

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

15.5700

2,257.00

35,141.49

Cuadrilla AA-2 (Tuberias)

Ins

15.0000

20,097.00

301,455.00

14,669

5,778 Kit Silla Yee PVC 8 x 6 (200 x 160 mm), Suministro


e instal. pagado por un
55
4,515
15,362

und

Herramienta Menor 10% M.O. BB

Eqp

HR

0.9500

1,616.00

1,535.20

Cuadrilla BB (Instalaciones)

Ins

0.9500

16,159.00

15,351.05

Kit Silla Yee 8*6 (Incl. Hidros. y Abrazaderas)

Ins

und

1.0000

82,261.00

82,261.00

5,779 Kit Silla Yee PVC 10 x 6 (250 x 160 mm), Suministro


e instal. pagado por un
55
4,515
15,364

99,147.25

und

174,781.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.9500

1,616.00

1,535.20

Cuadrilla BB (Instalaciones)

Ins

0.9500

16,159.00

15,351.05

Kit Silla Yee 10*6 (Incl. Hidros. y Abrazaderas)

Ins

und

1.0000

157,895.00

157,895.00

5,781 Demolicion andenes, sardineles y cunetas (Incl.


Retiro)

83,048.98

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5000

1,469.00

2,203.50

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.5000

35,000.00

52,500.00

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

4,489

5,782 Tapado de alcantarillas

und

154,272.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

41

Vibrocompactador tipo rana

Eqp

HR

5.0000

5,000.00

25,000.00

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

4,489

5,783 Pozo de Inspeccion H= 1.0 - 1.5 m 1.20. (Cono


Truncado, Ladrillo Tolete Tizn)

und

1,469.00

11,752.00

928,745.39

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

275

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5,144

69

Cantidad

Vr.Unitario

Vr.Total

10.0000

2,010.00

20,100.00

0.2700

3,903.00

1,053.81

1.7600

2,295.00

4,039.20

471.0000

305.00

143,655.00

0.3700

367,816.92

136,092.26

0.5600

333,142.66

186,559.89

Ana

0.2233

32,375.50

7,229.45

Transporte de materiales Tn

Ana

1.9000

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

11.5400

2,257.00

26,045.78

Cuadrilla AA-2 (Tuberias)

Ins

10.0000

20,097.00

200,970.00

14,669

5,784 Excavacion manual en roca pagado en m3, a una


profundidad < 2 m
17
4,489

61,404.20

Herramienta Menor 10% M.O. AA

Eqp

HR

3.8000

1,469.00

5,582.20

Cuadrilla AA (Albaileria)

Ins

3.8000

14,690.00

55,822.00

5,785 Concreto de resistencia 3000 psi para placa pozos


(cauela)

450,457.00

Herramienta Menor 10% M.O. AA

Eqp

HR

7.2600

1,469.00

10,664.94

4,489

Cuadrilla AA (Albaileria)

Ins

7.2600

14,690.00

106,649.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

17

5,786 Reparacion de andenes, sardineles y cunetas en


Concreto 3000 psi

487,565.33

Herramienta Menor 10% M.O. AA

Eqp

HR

8.8800

1,469.00

13,044.72

2,208

Tabla chapa ordinario 0.10

Ins

3.1500

2,667.00

8,401.05

3,797

Puntilla con cabeza 2"

Ins

lb

0.0300

1,990.00

59.70

4,489

Cuadrilla AA (Albaileria)

Ins

8.8800

14,690.00

130,447.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Liston ordinario 0.05 x 0.05

Ins

1.9000

1,300.00

2,470.00

17

13,235

5,787 Descapote a maquina, Incluye transporte y


disposicion final, pagado m3
4
21

9,500.81

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0286

111,550.00

3,190.33

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

5,788 Excavacion mecanica en material comun bajo agua


0 - 2 mts (area restringida)

11,138.63

14

Retroexcavadora de orugas

Eqp

HR

0.0333

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0333

1,469.00

48.92

58

Motobomba de 4" o 6"

Eqp

HR

0.5000

11,600.00

5,800.00

Cuadrilla AA (Albaileria)

Ins

0.0333

14,690.00

489.18

4,489

5,789 Sobreacarreos o transporte de material Petreo


distancia <= 6 Km
21

Volqueta (6 m3 )

5,790 Sub-Base Granular con suelo cemento al 8% Tipo E

Eqp

HR

4,800.53

6,310.48

0.1136

55,550.00

6,310.48

116,013.24

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

276

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Compactador Vibratorio

Eqp

Motoniveladora

Eqp

HR

0.0555

100,000.00

5,550.00

HR

Carrotanque de Agua

0.0555

132,800.00

7,370.40

Eqp

HR

0.0555

53,125.00

2,948.44

Cemento gris

Ins

kg

160.0000

383.34

61,334.40

5,144

Transporte de materiales Tn

Ana

0.1600

0.00

0.00

8,154

Sub base triturada T. max. 2"

Ins

1.2500

31,048.00

38,810.00

11
804

5,791 Saco (0.6 x 0.8) con suelo arcilloso - cemento (7:1),


cemento al 12% en peso

und

6,350.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1300

1,469.00

190.97

Cemento gris

Ins

kg

9.0000

383.34

3,450.06

4,489

Cuadrilla AA (Albaileria)

Ins

0.1300

14,690.00

1,909.70

5,144

Transporte de materiales Tn

Ana

0.0090

0.00

0.00

Saco en fibra (0.60 x 0.80)

Ins

und

1.0000

800.00

800.00

17
804

15,366

5,792 Piedra pegada en Mortero 1:4, e=0.15 m

37,162.25

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0900

248,144.84

22,333.04

1,572

Tabla burra ordinaria 0.10

Ins

1.1000

1,200.00

1,320.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,063

Piedra rajon o media zonga

Ana

0.0600

90,495.15

5,429.71

17

5,793 Concreto simple 3000 Psi obras de arte; para BP

373,313.04

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

4.1500

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

367.5000

383.34

140,877.45

3,684

Agua para obra

Ins

199.5000

10.00

1,995.00

4,426

Arena lavada de rio

Ins

0.5880

13,800.00

8,114.40

5,061

Formaleta (1 uso)

Ana

0.4200

32,375.50

13,597.71

5,144

Transporte de materiales Tn

Ana

0.3680

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.8820

46,304.00

40,840.13

13,962

Cuadrilla AA-5

Ins

4.1500

36,317.00

150,715.55

804

5,794 Concreto ciclopeo 2500 Psi o 175 Kg/cm2 para


obras de arte para BP, pagado m3

15,072.80

365,930.25

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

4.8000

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

180.0000

383.34

69,001.20

3,684

Agua para obra

Ins

158.0000

10.00

1,580.00

4,426

Arena lavada de rio

Ins

0.3000

13,800.00

4,140.00

5,061

Formaleta (1 uso)

Ana

1.1300

32,375.50

36,584.31

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

5,144

Transporte de materiales Tn

Ana

0.1890

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.5700

46,304.00

26,393.28

13,962

Cuadrilla AA-5

Ins

4.7000

36,317.00

170,689.90

804

5,795 Tuberia Concreto Reforzado, de dimetro 24",


pagado en ml (INV.661)

17,433.60

125,318.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

277

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,144

Transporte de materiales Tn

Ana

0.4000

0.00

0.00

Tubo en Concreto Reforzado 24"

Ins

1.0000

93,000.00

93,000.00

17

15,367

5,796 Trincho tipo 4

49,482.15

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

5,144

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

8,165

Estacas de Madera =0.10 L=0.60 m

Ins

und

1.0000

1,000.00

1,000.00

13,850

Alambre Galvanizado No. 12

Ins

kg

0.7500

5,000.00

3,750.00

14,128

Puntilla con cabeza 2 1/2"

Ins

lb

0.3000

1,990.00

597.00

14,778

Tabla burra cedro macho 0.30

Ins

4.0000

5,000.00

20,000.00

15,368

Estocon de Madera =0.15

Ins

2.6000

4,000.00

10,400.00

17

5,797 Empradizacion por Estolon

797.77

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0300

1,469.00

44.07

Tierra Negra abonada

Ins

0.0025

34,000.00

85.00

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0300

14,690.00

440.70

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

Estolon

Ins

und

9.0000

22.00

198.00

17
223

15,951

5,799 Suministro e instal. sanitario blanco porcelana,


pagado un

und

193,927.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

Cemento blanco

Ins

kg

0.5000

975.00

487.50

3,769

Sanitario blanco porcelana con accesorios

Ins

und

1.0000

165,000.00

165,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

55
829

5,800 Suministro e instal. sanitaria - bao tipo vivienda,


pagado und

und

2,585.60

149,632.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

2,817

Rejilla plstica con sosco 3 x 2

Ins

und

1.0000

2,700.00

2,700.00

2,931

Soldadura para CPVC 1/4 gl

Ins

und

0.3000

62,878.00

18,863.40

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

1.0000

4,485.00

4,485.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

3.0000

1,936.00

5,808.00

15,425

Sifon Sanitario 3" 135 C x E

Ins

und

1.0000

6,466.00

6,466.00

15,437

Tubo PVC sanitario de 2"

Ins

3.0000

7,092.00

21,276.00

15,438

Tubo PVC sanitario de 3"

Ins

6.0000

10,595.00

63,570.00

15,486

Yee Sanitaria PVC 3 "

Ins

und

1.0000

8,689.00

8,689.00

55

5,801 Losa maciza para tanque elevado, e=0.10


reforzada, pagado en m2

1,616.00

1,616.00

108,950.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.4200

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0100

4,375.00

43.75

Acero de refuerzo 37000 Psi

Ins

kg

10.0800

2,295.00

23,133.60

1,901

3,554.98

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

278

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

2,197

Repisa Ordinario 3 m

Ins

2,200

Tabla burra ordinario 0.30

Ins

3,797

Puntilla con cabeza 2"

4,489

0.0500

1,500.00

75.00

0.0600

4,333.00

259.98

Ins

lb

0.0200

1,990.00

39.80

Cuadrilla AA (Albaileria)

Ins

2.4200

14,690.00

35,549.80

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,627

Formaleta entrepisos

Ins

mes

0.8000

3,500.00

2,800.00

13,641

Seccin de Andamio

Ins

mes

0.4000

17,120.00

6,848.00

5,802 Placa base en concreto 3000 psi, e=0.07 m


reforzada con malla Q5

Vr.Total

44,813.84

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

1.0600

8,323.00

8,822.38

17

14,779

5,803 Excavacion manual en material comun < 1 m.


(zanjas .30 >.60)
17
4,489

21,300.80

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3182

1,469.00

1,936.44

Cuadrilla AA (Albaileria)

Ins

1.3182

14,690.00

19,364.36

5,804 Suministro e instal. puerta y marco en lmina coll


rol calibre 18, pintado, pagado m2 (REVISAR)

318,707.75

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.4000

8,750.00

3,500.00

228

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

981

Suministro e instal. marco puerta en lamina coll roll


calibre 18, 0.80 x 2.10, pagado un

Ana

und

0.5000

145,306.17

72,653.09

1,038

Esmalte sobre lmina llena

Ana

1.0000

14,498.27

14,498.27

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.5000

88,083.67

132,125.51

5,064

Cuadrilla DD (Carpinteria)

Ins

4.0000

17,628.00

70,512.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

14,116

5,808 Suministro e instal. ventana en lamina cold rollled


calibre 18, pintada e instalada, con vidrio incoloro
4 mm

128,211.85

Manija para ventana

Ins

und

1.0000

1,981.00

1,981.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.4400

88,083.67

38,756.81

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.9400

2,700.00

5,238.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2300

29,750.00

6,842.50

3,747

Vidrio incoloro 4 mm

Ins

1.0000

25,000.00

25,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.6000

17,628.00

28,204.80

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

5,809

Esmalte sobre ventanas en lmina

Ana

1.0000

7,787.66

7,787.66

6,031

810

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1600

6,885.00

1,101.60

14,726

Bisagra alum. exter. 2"

Ins

und

1.0500

801.00

841.05

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

279

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,809 Esmalte sobre ventanas en lmina

Cantidad

Vr.Unitario

Vr.Total
7,787.66

Sub-Contrato Pintura

Esp

45.0000

5,370.80

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

337.80

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.6000

1,691.00

1,014.60

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0120

42,950.00

515.40

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

5,144

Transporte de materiales Tn

Ana

0.0001

0.00

0.00

5
61

5,810 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.10

2,416.86

45,062.63

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5300

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1060

4,375.00

463.75

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,811 Union de presion PVC 1/2" . Suministro e instal.

und

778.57

1,084.73

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0026

58,612.00

152.39

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0026

28,250.00

73.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0383

16,159.00

618.89

Union presion PVC 1/2"

Ins

und

1.0000

240.00

240.00

15,039

5,812 Union de presion PVC 3/4". Suministro e instal.

und

1,719.02

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0047

58,612.00

275.48

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0047

28,250.00

132.78

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0576

16,159.00

930.76

Union presion PVC 3/4"

Ins

und

1.0000

380.00

380.00

15,040

5,813 Union de presion PVC 1". Suministro e instal.

und

2,409.87

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0063

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0063

28,250.00

177.98

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0769

16,159.00

1,242.63

Union presion PVC 1"

Ins

und

1.0000

620.00

620.00

15,041

5,814 Union de presion PVC 1 1/2". Suministro e instal.

und

369.26

4,442.31

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0120

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0120

28,250.00

339.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1143

16,159.00

1,846.97

Union presion PVC 1 1/2"

Ins

und

1.0000

1,553.00

1,553.00

15,043

5,815 Suministro e instal. sanitaria - cocina tipo vivienda,


pagado und

und

703.34

40,429.95

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5300

1,616.00

856.48

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5300

16,159.00

8,564.27

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

2.0000

1,936.00

3,872.00

55

14,792

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

280

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,437

Tubo PVC sanitario de 2"

Ins

5,816 Torres, concreto para puentes colgantes de


resistencia 3000 Psi, pagada en m3

Cantidad

Vr.Unitario

Vr.Total

3.0000

7,092.00

21,276.00

636,160.84

17

Herramienta Menor 10% M.O. AA

Eqp

HR

13.0000

1,469.00

19,097.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,008

Andamio metalico tubular

Ins

sm

0.0180

4,200.00

75.60

4,489

Cuadrilla AA (Albaileria)

Ins

13.0000

14,690.00

190,970.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.6660

32,375.50

86,313.08

5,818 Viga canal, en concreto de resistencia 3500 psi,


pagada en m3

729,531.59

17

Herramienta Menor 10% M.O. AA

Eqp

HR

19.1000

1,469.00

28,057.90

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

2,197

Repisa Ordinario 3 m

Ins

5.2000

1,500.00

7,800.00

2,200

Tabla burra ordinario 0.30

Ins

8.0500

4,333.00

34,880.65

2,243

Vara de clavo 3M -1

Ins

4.7400

1,500.00

7,110.00

3,797

Puntilla con cabeza 2"

Ins

lb

1.5000

1,990.00

2,985.00

4,489

Cuadrilla AA (Albaileria)

Ins

19.1000

14,690.00

280,579.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

0.3000

32,375.50

9,712.65

5,819 Cable IPS - IWRC 6 x 19 AA = 1"

27,184.49

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1100

3,091.00

340.01

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1100

2,958.00

325.38

Transporte de materiales Tn

Ana

0.0028

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1100

30,910.00

3,400.10

15,500

Cable IPS-IWRC 6 x 19 AA = 1"

Ins

1.0000

23,119.00

23,119.00

5,144

5,820 Excavacion manual en material comun de 1 a 2 m.


(zanjas angostas)
17
4,489

26,628.42

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6479

1,469.00

2,420.77

Cuadrilla AA (Albaileria)

Ins

1.6479

14,690.00

24,207.65

5,821 Excavacion mecanica en Material Comun Bajo


agua de 2 - 6 m

15,635.25

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

58

Motobomba de 4" o 6"

Eqp

HR

0.6600

11,600.00

7,656.00

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

4,489

5,822 Formaleta entrepiso, pagado en m2

7,208.00

16,657.60

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,870

Alambre Negro No 18

Ins

kg

0.2000

3,903.00

780.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

4,867

17

1,469.00

Paral telescopico 2 a 4 ml

Ins

1.0000

340.00

340.00

13,627

Formaleta entrepisos

Ins

mes

1.0000

3,500.00

3,500.00

13,853

Camilla para formaleta 0.7x1.4

Ins

1.0000

285.00

285.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

281

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,823 Alistado de pisos e= 0.05, pagado en m2

Cantidad

Vr.Unitario

Vr.Total

19,408.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4400

1,469.00

646.36

Cemento gris

Ins

kg

20.3000

383.34

7,781.80

3,684

Agua para obra

Ins

11.0000

10.00

110.00

4,426

Arena lavada de rio

Ins

0.0735

13,800.00

1,014.30

4,489

Cuadrilla AA (Albaileria)

Ins

0.4400

14,690.00

6,463.60

5,143

Transporte de materiales m

Ana

0.0735

46,157.00

3,392.54

5,144

Transporte de materiales Tn

Ana

0.0203

0.00

0.00

17
804

5,824 Alistado de pisos e= 0.07, pagado en m2

24,328.06

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4400

1,469.00

646.36

Cemento gris

Ins

kg

28.4200

383.34

10,894.52

3,684

Agua para obra

Ins

15.4000

10.00

154.00

4,426

Arena lavada de rio

Ins

0.1029

13,800.00

1,420.02

4,489

Cuadrilla AA (Albaileria)

Ins

0.4400

14,690.00

6,463.60

5,143

Transporte de materiales m

Ana

0.1029

46,157.00

4,749.56

5,144

Transporte de materiales Tn

Ana

0.0284

0.00

0.00

17
804

5,825 Alistado de pisos en mineral e= 0.04, pagado en m2

17,726.91

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

211

Mineral rojo

Ins

kg

0.5000

1,764.00

882.00

804

Cemento gris

Ins

kg

19.0000

383.34

7,283.46

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

5,143

Transporte de materiales m

Ana

0.0500

46,157.00

2,307.85

5,144

Transporte de materiales Tn

Ana

0.0240

0.00

0.00

17

5,826 Estoperoles para Sealizacion Vial

und

14,830.30

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1600

1,469.00

235.04

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

13,855

Pegante Epoxico

Ins

kg

0.0790

42,340.00

3,344.86

15,495

Puntilla acerada con cabeza 2 1/2"

Ins

und

4.0000

50.00

200.00

15,496

Estoperol lmina de 1/8"

Ins

und

1.0000

8,700.00

8,700.00

17
4,489

5,827 Alistado placa - viga canal e= 0.02 a 0.01, pagado


en m2

5,981.85

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1760

1,469.00

258.54

Cemento gris

Ins

kg

4.9800

383.34

1,909.03

3,684

Agua para obra

Ins

2.9700

10.00

29.70

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1760

14,690.00

2,585.44

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0049

0.00

0.00

17
804

5,829 Alistado terrazas e= 0.08, pagado en m2


17

Herramienta Menor 10% M.O. AA

m
Eqp

HR

26,346.44

0.6600

1,469.00

969.54

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

282

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cemento gris

Ins

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

804

5,830 Placa o losa en concreto 4000 psi e=0.17 m para


sumideros y pozos

Cantidad

Vr.Unitario

Vr.Total

kg

24.8800

383.34

9,537.50

14.8300

10.00

148.30

0.1000

13,800.00

1,380.00

0.6600

14,690.00

9,695.40

0.1000

46,157.00

4,615.70

0.0248

0.00

0.00

79,650.54

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.1700

378,352.56

64,319.94

5,831 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.17

1,322.10

76,384.51

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1700

333,142.66

56,634.25

5,832 Relleno en arena lavada apisonada para atraque de


la tuberia, pagado en m3

1,322.10

83,468.97

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.5700

3,091.00

1,761.87

Transporte de materiales m

Ana

1.2000

46,157.00

55,388.40

13,960

Cuadrilla AA-4

Ins

0.5700

30,910.00

17,618.70

15,528

Arena de rio (sucia)

Ins

1.2000

7,250.00

8,700.00

59
5,143

5,833 Zarpa en concreto para puentes de resistencia


3000 Psi, pagada en m3

549,800.91

17

Herramienta Menor 10% M.O. AA

Eqp

HR

12.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

12.0000

14,690.00

176,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

0.5000

32,375.50

16,187.75

5,834 Pozo de Inspeccion recto (sin cono truncado) H=


1.0 - 1.5 m 1.20 m

und

17,628.00

1,389,564.37

Herramienta Menor 10% M.O. AA-2

Eqp

HR

9.0000

2,010.00

18,090.00

1,870

Alambre Negro No 18

Ins

kg

3.3200

3,903.00

12,957.96

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

626.0000

305.00

190,930.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.4000

367,816.92

147,126.77

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

2.8200

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

69.5400

2,257.00

156,951.78

69

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

283

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,894

Geotextil No Tejido 2000

Ins

6.9900

4,109.00

28,721.91

14,669

Cuadrilla AA-2 (Tuberias)

Ins

9.0000

20,097.00

180,873.00

5,835 Pilastra en concreto para puentes de resistencia


3000 Psi, pagada en m3

Cantidad

Vr.Unitario

Vr.Total

760,069.16

17

Herramienta Menor 10% M.O. AA

Eqp

HR

18.0000

1,469.00

26,442.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

18.0000

14,690.00

264,420.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

4.0000

32,375.50

129,502.00

5,836 Tapa pozo en via (inc. marco), pagado por un

und

265,100.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9161

1,469.00

1,345.75

2,823

Tapa pozo en vas D/0.60

Ins

und

1.0000

157,850.00

157,850.00

2,824

Marco tapa pozo MTPA - 60

Ins

und

1.0000

92,447.00

92,447.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9161

14,690.00

13,457.51

17

5,837 Riostras o diafragmas Concreto 3000 Psi,


resistencia 210 Kg/cm2

726,017.39

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.9500

32,375.50

63,132.23

5,838 Pozo de Inspeccion recto (sin cono truncado) H=


1.5 - 2.0 m 1.20 m

und

29,380.00

1,613,313.46

Herramienta Menor 10% M.O. AA-2

Eqp

HR

12.0000

2,010.00

24,120.00

1,870

Alambre Negro No 18

Ins

kg

3.4000

3,903.00

13,270.20

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

877.0000

305.00

267,485.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.5700

367,816.92

209,655.64

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

3.9500

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

163,519.65

69

Acero de refuerzo 60000 Psi

Ins

kg

72.4500

2,257.00

13,894

Geotextil No Tejido 2000

Ins

9.7800

4,109.00

40,186.02

14,669

Cuadrilla AA-2 (Tuberias)

Ins

12.0000

20,097.00

241,164.00

5,839 Riostras o diafragmas Concreto 4000 Psi,


resistencia 280 kg/cm2

17

Herramienta Menor 10% M.O. AA

Eqp

HR

49

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

771,227.29

20.0000

1,469.00

29,380.00

1.5000

4,375.00

6,562.50

20.0000

14,690.00

293,800.00

1.0000

378,352.56

378,352.56

1.9500

32,375.50

63,132.23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

284

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,840 Guardarueda en Concreto 3000 Psi, resistencia


210 Kg/cm2

Cantidad

Vr.Unitario

Vr.Total
535,346.93

17

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

11,752.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.0500

32,375.50

66,369.77

5,841 Pozo de Inspeccion recto (sin cono truncado) H=


2.0 - 2.5 m 1.20 m

und

1,807,679.34

Herramienta Menor 10% M.O. AA-2

Eqp

HR

14.0000

2,010.00

28,140.00

1,870

Alambre Negro No 18

Ins

kg

3.4900

3,903.00

13,621.47

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

1,128.0000

305.00

344,040.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.7200

367,816.92

264,828.18

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

5.0800

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

75.3600

2,257.00

170,087.52

13,894

Geotextil No Tejido 2000

Ins

12.5800

4,109.00

51,691.22

14,669

Cuadrilla AA-2 (Tuberias)

Ins

14.0000

20,097.00

281,358.00

69

5,842 Pozo de Inspeccion recto (sin cono truncado) H=


2.5 - 3.0 m 1.20 m

und

2,031,162.47

Herramienta Menor 10% M.O. AA-2

Eqp

HR

17.0000

2,010.00

34,170.00

1,870

Alambre Negro No 18

Ins

kg

3.5800

3,903.00

13,972.74

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

1,378.0000

305.00

420,290.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.8900

367,816.92

327,357.06

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

6.2000

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

176,655.39

69

Acero de refuerzo 60000 Psi

Ins

kg

78.2700

2,257.00

13,894

Geotextil No Tejido 2000

Ins

15.3700

4,109.00

63,155.33

14,669

Cuadrilla AA-2 (Tuberias)

Ins

17.0000

20,097.00

341,649.00

5,843 Pozo de Inspeccion recto (sin cono truncado) H=


3.0 - 3.5 m 1.20 m

und

2,267,498.60

Herramienta Menor 10% M.O. AA-2

Eqp

HR

20.0000

2,010.00

40,200.00

1,870

Alambre Negro No 18

Ins

kg

3.7500

3,903.00

14,636.25

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

1,628.0000

305.00

496,540.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.0500

367,816.92

386,207.77

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

69

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

285

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,144

Transporte de materiales Tn

Ana

7.3300

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

13,894

Geotextil No Tejido 2000

Ins

18.1700

4,109.00

74,660.53

14,669

Cuadrilla AA-2 (Tuberias)

Ins

20.0000

20,097.00

401,940.00

15,604

Acero de refuerzo 60000 Psi (liso)

Ins

kg

84.1000

2,371.00

199,401.10

5,844 Pozo de Inspeccion recto (sin cono truncado) H=


3.5 - 4.0 m 1.20 m

Cantidad

Vr.Unitario

und

Vr.Total

2,478,062.24

Herramienta Menor 10% M.O. AA-2

Eqp

HR

23.0000

2,010.00

46,230.00

1,870

Alambre Negro No 18

Ins

kg

3.8400

3,903.00

14,987.52

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

1,879.0000

305.00

573,095.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.2100

367,816.92

445,058.47

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1100

311,229.99

34,235.30

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8200

378,352.56

310,249.10

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

8.4600

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

69

Acero de refuerzo 60000 Psi

Ins

kg

87.0100

2,257.00

196,381.57

13,894

Geotextil No Tejido 2000

Ins

20.9700

4,109.00

86,165.73

14,669

Cuadrilla AA-2 (Tuberias)

Ins

23.0000

20,097.00

462,231.00

5,845 Pozo de Inspeccion recto (sin cono truncado) H=


4.0 - 4.5 m 1.20 m

und

3,600,937.22

Herramienta Menor 10% M.O. AA-2

Eqp

HR

38.0000

2,010.00

76,380.00

1,870

Alambre Negro No 18

Ins

kg

4.5300

3,903.00

17,680.59

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

3,098.0000

305.00

944,890.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.9300

367,816.92

709,886.66

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1500

311,229.99

46,684.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.9630

378,352.56

364,353.52

5,061

Formaleta (1 uso)

Ana

12,195.85

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

13,894

Geotextil No Tejido 2000

14,669

Cuadrilla AA-2 (Tuberias)

15,604

Acero de refuerzo 60000 Psi (liso)

69

0.3767

32,375.50

13.9400

0.00

0.00

und

1.0000

203,000.00

203,000.00

Ins

26.1200

4,109.00

107,327.08

Ins

38.0000

20,097.00

763,686.00

Ins

kg

109.9200

2,371.00

260,620.32

5,846 Pozo de Inspeccion recto (sin cono truncado) H=


4.5 - 5.0 m 1.20 m

und

3,812,194.46

Herramienta Menor 10% M.O. AA-2

Eqp

HR

41.0000

2,010.00

82,410.00

1,870

Alambre Negro No 18

Ins

kg

4.6200

3,903.00

18,031.86

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

3,349.0000

305.00

1,021,445.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

2.1000

367,816.92

772,415.53

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1500

311,229.99

46,684.50

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.9630

378,352.56

364,353.52

5,061

Formaleta (1 uso)

Ana

0.3767

32,375.50

12,195.85

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

Acero de refuerzo 60000 Psi

Ins

kg

69

15.0700

0.00

0.00

1.0000

203,000.00

203,000.00

112.8300

2,257.00

254,657.31

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

286

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,894

Geotextil No Tejido 2000

Ins

14,669

Cuadrilla AA-2 (Tuberias)

Ins

5,847 Muro en ladrillo tolete recocido 0.38 (tizon-soga)

Cantidad

Vr.Unitario

Vr.Total

28.9100

4,109.00

118,791.19

41.0000

20,097.00

823,977.00

97,293.52

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5000

1,469.00

3,672.50

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0830

248,144.84

20,596.02

2,056

Ladrillo recocido oscuro

Ins

und

165.0000

220.00

36,300.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.5000

14,690.00

36,725.00

5,144

Transporte de materiales Tn

Ana

0.8250

0.00

0.00

17

5,848 Concreto 1:2:2 o 3500 Psi, para estructura de la


camara (no incluye refuerzo)

669,892.94

17

Herramienta Menor 10% M.O. AA

Eqp

HR

13.4000

1,469.00

41

Vibrocompactador tipo rana

Eqp

HR

1.5000

5,000.00

7,500.00

4,489

Cuadrilla AA (Albaileria)

Ins

13.4000

14,690.00

196,846.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.9040

32,375.50

94,018.45

5,849 Pozo de Inspeccion o camara para un diametro de


40"

und

19,684.60

7,693,406.58

Muro en ladrillo tolete recocido 0.25 (12 x 25 x 6),


pagado por m2

Ana

3.6300

58,110.23

210,940.13

4,734

Geotextil No Tejido 1600

Ana

3.6300

3,844.54

13,955.68

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

0.4500

354,419.99

159,489.00

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

700.0000

3,075.79

2,153,053.00

5,769

Paete Impermeabilizado 1:3 para Pozos de Inspeccion..


e= 2.0 Cm

Ana

7.2600

15,856.51

115,118.26

5,836

Tapa pozo en via (inc. marco), pagado por un

Ana

und

1.0000

265,100.26

265,100.26

5,847

Muro en ladrillo tolete recocido 0.38 (tizon-soga)

Ana

3.6300

97,293.52

353,175.48

5,848

Concreto 1:2:2 o 3500 Psi, para estructura de la camara


(no incluye refuerzo)

Ana

5.8400

669,892.94

3,912,174.77

Cinta sika PVC 0-22

Ins

16.0000

31,900.00

510,400.00

206

13,927

5,850 Sumidero lateral SL-250 en mamposteria

und

1,772,658.05

Herramienta Menor 10% M.O. AA

Eqp

HR

28.0000

1,469.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

42.3000

2,295.00

97,078.50

2,085

Ladrillo tolete comn

Ins

und

473.0000

305.00

144,265.00

4,489

Cuadrilla AA (Albaileria)

Ins

28.0000

14,690.00

411,320.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

0.2200

551,059.84

121,233.16

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.2000

311,229.99

62,246.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.5000

378,352.56

567,528.84

5,061

Formaleta (1 uso)

Ana

0.7333

32,375.50

23,740.95

5,144

Transporte de materiales Tn

Ana

1.9800

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

44.8000

2,257.00

101,113.60

17

5,851 Suministro e instal. tuberia PVC alcantarillado 4"


4,515
14,118

41,132.00

14,063.86

Cuadrilla BB (Instalaciones)

Ins

0.1531

16,159.00

2,473.94

Lubricante 500 gr

Ins

und

0.0017

12,305.00

20.92

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

287

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,370

Tuberia alcantarillado PVC 4 "

Ins

5,852 Cercha y/o correa metalica tubo estructural


rectangular 3" x 1 1/2", calibre 18, por ml

Cantidad

Vr.Unitario

Vr.Total

1.0000

11,569.00

11,569.00

15,377.81

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1300

8,750.00

1,137.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1569

1,144.00

179.49

2,502

Anticorrosivo rojo claro

Ins

gal

0.0220

29,750.00

654.50

3,837

8
115

Esmalte Sintetico Pintuco

Ins

gal

0.0220

42,950.00

944.90

13,723

Tubo rectangular 3" x 1 1/2" C-18

Ins

1.0200

9,976.00

10,175.52

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1569

11,436.00

1,794.31

5,853 Suministro e instal. de teja ondulada de asbesto


cemento No.10, pagado por m2

23,733.39

No incluye entramado
Herramienta Menor 10% M.O. AA

Eqp

HR

0.5940

1,469.00

Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

1.3000

350.00

455.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5940

14,690.00

8,725.86

5,144

Transporte de materiales Tn

Ana

0.0134

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0140

2,482.00

34.75

15,510

Teja ondulada de asbesto No.10 eternit

Ins

und

0.3623

35,300.00

12,789.19

17
830

5,854 Suministro e instal. tuberia PVC alcantarillado 9"

872.59

43,292.73

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0008

28,250.00

22.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3447

16,159.00

5,570.01

Tuberia alcantarillado PVC 9 "

Ins

1.0000

37,114.00

37,114.00

15,373

5,855 Suministro e instal. tuberia PVC alcantarillado 11"

586.12

68,825.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0128

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0010

28,250.00

28.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4215

16,159.00

6,811.02

Tuberia alcantarillado PVC 11 "

Ins

1.0000

61,236.00

61,236.00

15,375

5,856 Suministro e instal. tuberia PVC alcantarillado 13"

750.23

80,629.78

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0152

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0011

28,250.00

31.08

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4981

16,159.00

8,048.80

Tuberia alcantarillado PVC 13 "

Ins

1.0000

71,659.00

71,659.00

15,377

5,857 Suministro e instal. tuberia PVC alcantarillado 14"

890.90

92,563.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0167

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0012

28,250.00

33.90

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5366

16,159.00

8,670.92

Tuberia alcantarillado PVC 14 "

Ins

1.0000

82,880.00

82,880.00

15,378

5,858 Suministro e instal. tuberia PVC alcantarillado 15"

978.82

95,174.63

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

288

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)
Tuberia alcantarillado PVC 15 "

15,379

Cantidad

Vr.Unitario

Vr.Total

und

0.0185

58,612.00

1,084.32

und

0.0013

28,250.00

36.73

Ins

0.5747

16,159.00

9,286.58

Ins

1.0000

84,767.00

84,767.00

5,859 Suministro e instal. tuberia PVC alcantarillado 17"

132,702.10

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0208

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0015

28,250.00

42.38

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6515

16,159.00

10,527.59

Tuberia alcantarillado PVC 17 "

Ins

1.0000

120,913.00

120,913.00

15,381

5,860 Suministro e instal. tuberia PVC alcantarillado 19"

1,219.13

155,496.14

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0238

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0017

28,250.00

48.03

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7279

16,159.00

11,762.14

Tuberia alcantarillado PVC 19 "

Ins

1.0000

142,291.00

142,291.00

15,383

5,861 Suministro e instal. tuberia PVC alcantarillado 21"

1,394.97

214,427.85

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0278

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0019

28,250.00

53.68

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8048

16,159.00

13,004.76

Tuberia alcantarillado PVC 21 "

Ins

1.0000

199,740.00

199,740.00

15,385

5,862 Suministro e instal. tuberia PVC alcantarillado 22"

1,629.41

222,873.03

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0278

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

28,250.00

56.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8448

16,159.00

13,651.12

Tuberia alcantarillado PVC 22 "

Ins

1.0000

207,536.00

207,536.00

15,386

5,863 Suministro e instal. tuberia PVC alcantarillado 23"

1,629.41

233,571.15

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0278

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

28,250.00

56.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8820

16,159.00

14,252.24

Tuberia alcantarillado PVC 23 "

Ins

1.0000

217,633.00

217,633.00

15,387

5,864 Suministro e instal. tuberia PVC alcantarillado 25"

1,629.41

302,963.52

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3030

111,550.00

33,799.65

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0333

58,612.00

1,951.78

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0022

28,250.00

62.15

4,515

Cuadrilla BB (Instalaciones)

Ins

0.9581

16,159.00

15,481.94

Tuberia alcantarillado PVC 25 "

Ins

1.0000

251,668.00

251,668.00

15,389

5,865 Suministro e instal. tuberia PVC alcantarillado 26"

314,745.73

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3226

111,550.00

35,986.03

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0333

58,612.00

1,951.78

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0023

28,250.00

64.98

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

289

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
15,390

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

0.9581

16,159.00

15,481.94

Tuberia alcantarillado PVC 26 "

Ins

1.0000

261,261.00

261,261.00

5,866 Suministro e instal. tuberia PVC alcantarillado 24"


(inc. union)

Cantidad

Vr.Unitario

Vr.Total

297,854.45

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.2000

111,550.00

22,310.00

Cuadrilla BB (Instalaciones)

Ins

0.9206

16,159.00

14,875.98

14,118

Lubricante 500 gr

Ins

und

0.0833

12,305.00

1,025.01

15,388

Tuberia alcantarillado PVC 24 "

Ins

1.0290

227,055.00

233,639.59

15,516

Union alcantarillado PVC 24 "

Ins

und

0.1667

155,992.00

26,003.87

4
4,515

5,867 Suministro e instal. tuberia PVC alcantarillado 27"


(inc. union)

371,663.58

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3226

111,550.00

35,986.03

Cuadrilla BB (Instalaciones)

Ins

1.0336

16,159.00

16,701.94

14,118

Lubricante 500 gr

Ins

und

0.0833

12,305.00

1,025.01

15,400

Tuberia alcantarillado PVC 27 "

Ins

1.0290

277,649.00

285,700.82

15,517

Union alcantarillado PVC 27 "

Ins

und

0.1667

193,460.00

32,249.78

4
4,515

5,868 Suministro e instal. tuberia PVC alcantarillado 30"


(inc. union)
4

445,487.30

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3226

111,550.00

35,986.03
18,653.95

Cuadrilla BB (Instalaciones)

Ins

1.1544

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0833

12,305.00

1,025.01

15,403

Tuberia alcantarillado PVC 30 "

Ins

1.0290

343,212.00

353,165.15

15,518

Union alcantarillado PVC 30 "

Ins

und

0.1667

219,899.00

36,657.16

4,515

5,869 Suministro e instal. tuberia PVC alcantarillado 33"


(inc. union)

540,556.57

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3226

111,550.00

35,986.03

Cuadrilla BB (Instalaciones)

Ins

1.2638

16,159.00

20,421.74

14,118

Lubricante 500 gr

Ins

und

0.1667

12,305.00

2,051.24

15,406

Tuberia alcantarillado PVC 33 "

Ins

1.0290

420,541.00

432,736.69

15,519

Union alcantarillado PVC 33 "

Ins

und

0.1667

296,106.00

49,360.87

4
4,515

5,870 Suministro e instal. tuberia PVC alcantarillado 36"


(inc. union)

771,514.29

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

1.3817

16,159.00

22,326.89

14,118

Lubricante 500 gr

Ins

und

0.1667

12,305.00

2,051.24

15,409

Tuberia alcantarillado PVC 36 "

Ins

1.0290

609,511.00

627,186.82

15,520

Union alcantarillado PVC 36 "

Ins

und

0.1667

496,519.00

82,769.72

4
4,515

5,871 Suministro e instal. tuberia PVC alcantarillado 39"


(inc. union)

964,194.42

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

1.4953

16,159.00

24,162.55

14,118

Lubricante 500 gr

Ins

und

0.1667

12,305.00

2,051.24

15,412

Tuberia alcantarillado PVC 39 "

Ins

1.0290

788,678.00

811,549.66

4
4,515

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

290

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,521

Union alcantarillado PVC 39 "

Ins

5,873 Suministro e instal. tuberia PVC alcantarillado 28"

und

Cantidad

Vr.Unitario

Vr.Total

0.1667

535,401.00

89,251.35

356,409.59

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3030

111,550.00

33,799.65

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0333

58,612.00

1,951.78

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0025

28,250.00

70.63

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0738

16,159.00

17,351.53

Tuberia alcantarillado PVC 28 "

Ins

1.0000

303,236.00

303,236.00

15,401

5,874 Suministro e instal. tuberia PVC alcantarillado 29"

375,183.00

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3030

111,550.00

33,799.65

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0333

58,612.00

1,951.78

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0026

28,250.00

73.45

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1127

16,159.00

17,980.12

Tuberia alcantarillado PVC 29 "

Ins

1.0000

321,378.00

321,378.00

15,402

5,875 Suministro e instal. tuberia PVC alcantarillado 31"

432,727.04

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0417

58,612.00

2,444.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0028

28,250.00

79.10

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1887

16,159.00

19,208.20

Tuberia alcantarillado PVC 31 "

Ins

1.0000

373,816.00

373,816.00

15,404

5,876 Suministro e instal. tuberia PVC alcantarillado 32"

408,695.76

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0417

58,612.00

2,444.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0029

28,250.00

81.93

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2270

16,159.00

19,827.09

Tuberia alcantarillado PVC 32 "

Ins

1.0000

349,163.00

349,163.00

15,405

5,877 Suministro e instal. tuberia PVC alcantarillado 34"

528,474.05

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0417

58,612.00

2,444.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3029

16,159.00

21,053.56

Tuberia alcantarillado PVC 34 "

Ins

1.0000

467,712.00

467,712.00

15,407

5,878 Suministro e instal. tuberia PVC alcantarillado 35"

622,963.55

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0417

58,612.00

2,444.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0031

28,250.00

87.58

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3423

16,159.00

21,690.23

Tuberia alcantarillado PVC 35 "

Ins

1.0000

561,562.00

561,562.00

15,408

5,879 Suministro e instal. tuberia PVC alcantarillado 36"


4

Retroexcavadora 4 x 4 (llanta)

m
Eqp

HR

671,552.03

0.3333

111,550.00

37,179.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

291

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)
Tuberia alcantarillado PVC 36 "

15,409

Cantidad

Vr.Unitario

Vr.Total

und

0.0417

58,612.00

2,444.12

und

0.0032

28,250.00

90.40

Ins

1.3817

16,159.00

22,326.89

Ins

1.0000

609,511.00

609,511.00

5,880 Suministro e instal. tuberia PVC alcantarillado 37"

771,080.61

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0556

58,612.00

3,258.83

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0033

28,250.00

93.23

4,515

Cuadrilla BB (Instalaciones)

Ins

1.4184

16,159.00

22,919.93

Tuberia alcantarillado PVC 37 "

Ins

1.0000

707,629.00

707,629.00

15,410

5,881 Suministro e instal. tuberia PVC alcantarillado 38"

819,235.39

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0556

58,612.00

3,258.83

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0034

28,250.00

96.05

4,515

Cuadrilla BB (Instalaciones)

Ins

1.4572

16,159.00

23,546.89

Tuberia alcantarillado PVC 38 "

Ins

1.0000

755,154.00

755,154.00

15,411

5,882 Excavacion manual en conglomerado para


Caisson, Bajo agua y profundidad 7 m, =1.50 m

294,266.60

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

3.4000

3,632.00

12,348.80

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

3.4000

35,000.00

119,000.00

58

Motobomba de 4" o 6"

Eqp

HR

3.4000

11,600.00

39,440.00

Cuadrilla AA-5

Ins

3.4000

36,317.00

123,477.80

13,962

5,883 Demolicion de estructuras en concreto reforzado


(estribos H >= 3.0 m), con retiro a 1 km

141,168.88

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.5000

35,000.00

52,500.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

2.4000

3,091.00

7,418.40

Andamio metalico tubular

Ins

sm

0.1800

4,200.00

756.00

Cuadrilla AA-4

Ins

2.4000

30,910.00

74,184.00

4,008
13,960

5,884 Cubierta en teja metlica ondulada, fabricada en


zinc, de 0,3 mm de espesor, pagado en m2

21,079.10

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

15,527

Lamina de zinc ondulada

Ins

und

0.4800

25,520.00

12,249.60

15,532

Gancho teja metaliza

Ins

und

3.0000

250.00

750.00

17

5,885 Malla eslabonada Cal. 10. con platina para


adhesion al tubo y angulos agarre superior e
inferior, con anticorrosivo y es
8
17
519
2,455

35,823.21

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

Soldador

Ins

0.1000

6,759.00

675.90

Platina 1/8" x 1/2"

Ins

1.3600

1,668.00

2,268.48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

292

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

2,502

Anticorrosivo rojo claro

Ins

3,837

Esmalte Sintetico Pintuco

Ins

4,489

Cuadrilla AA (Albaileria)

14,116

gal

0.0150

29,750.00

446.25

gal

0.0300

42,950.00

1,288.50

Ins

0.5000

14,690.00

7,345.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0800

6,885.00

550.80

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

0.9200

11,609.00

10,680.28

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

5,887 Encamado tuberia con arena apisonada (arena


sucia de rio)

Vr.Total

82,218.80

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1220

1,469.00

1,648.22

4,489

Cuadrilla AA (Albaileria)

Ins

1.1220

14,690.00

16,482.18

5,143

Transporte de materiales m

Ana

1.2000

46,157.00

55,388.40

Arena de rio (sucia)

Ins

1.2000

7,250.00

8,700.00

17

15,528

5,889 Relleno zona de atraque de tuberia con material


granular triturado (tamao maximo 1 1/2")

96,750.43

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.6154

2,550.00

1,569.27

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

0.6154

25,504.00

15,695.16

14,777

Base Triturada T.max 1 1/2"

Ins

1.0000

33,329.00

33,329.00

53
5,143

5,890 Relleno con material granular triturado (tamao


maximo 2") compactado

95,058.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5333

1,469.00

783.42

41

Vibrocompactador tipo rana

Eqp

HR

0.3030

5,000.00

1,515.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

5,143

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

8,154

Sub base triturada T. max. 2"

Ins

1.1000

31,048.00

34,152.80

5,891 Suministro e instal. tuberia PVC alcantarillado 24"

265,926.89

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.2000

111,550.00

22,310.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0278

58,612.00

1,629.41

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0020

28,250.00

56.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.9206

16,159.00

14,875.98

Tuberia alcantarillado PVC 24 "

Ins

1.0000

227,055.00

227,055.00

15,388

5,892 Tee en H.F. 12" x 4" J.H. Suministro e Instal.


55
4,515
15,795

und

1,179,639.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee en H.F. 12" x 4" J.H.

Ins

und

1.0000

1,155,940.00

1,155,940.00

5,893 Colcha gavion para estructuras de descarga e=0.20


m, cosida cada 0.30 m. tam. maximo bolo 3"
(estructura de descarga T1)

1,616.00

2,154.61

99,748.61

Retroexcavadora de orugas

Eqp

HR

0.2000

144,160.00

28,832.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.3333

14,690.00

19,586.18

5,063

Piedra rajon o media zonga

Ana

0.2000

90,495.15

18,099.03

5,143

Transporte de materiales m

Ana

0.2000

46,157.00

9,231.40

Geomalla de refuerzo

Ins

3.0000

8,000.00

24,000.00

14

15,529

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

293

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,894 Demolicion de pavimento en concreto rigido (inc.


retiro)

Cantidad

Vr.Unitario

Vr.Total

24,671.55

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0170

55,550.00

944.35

57

Cortadora concreto (Disco Diaman. 14")

Eqp

HR

0.2400

45,000.00

10,800.00

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

4,489

5,895 Reparacion de pavimento en concreto rigido (3500


psi) e=0.17, incluye dilatacion

1,175.20

73,166.10

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7273

2,208

Tabla chapa ordinario 0.10

Ins

0.6000

2,667.00

1,600.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.7273

14,690.00

10,684.04

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1700

351,843.89

59,813.46

17

5,896 Sumidero vertical 55*80*62 (incluye tapa


prefabricada en concreto y rejilla en angulo, de
acuerdo a plano)

1,469.00

und

1,068.40

406,151.82

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

11,752.00

Cemento gris

Ins

kg

84.0000

383.34

32,200.56

2,059

Ladrillo tolete recocido

Ins

und

48.0000

300.00

14,400.00

3,684

Agua para obra

Ins

66.2200

10.00

662.20

4,426

Arena lavada de rio

Ins

0.1500

13,800.00

2,070.00

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

5,143

Transporte de materiales m

Ana

0.4600

46,157.00

21,232.22

5,144

Transporte de materiales Tn

Ana

0.1200

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

12.7000

2,257.00

28,663.90

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.1600

15,660.00

2,505.60

13,961

Triturado de 1/2" - 3/4"

Ins

0.1500

46,304.00

6,945.60

14,122

Sika 1 imp. integral

Ins

kg

0.7300

6,438.00

4,699.74

15,531

Tapa prefabricada en concreto

Ins

und

1.0000

163,500.00

163,500.00

17
804

5,897 Concreto para solado resistencia 175 kg/cm2 2500 psi pagado en m2.

19,381.95

Herramienta menor 5% M.O. AA

Eqp

HR

0.2242

735.00

164.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.2242

14,690.00

3,293.50

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0500

318,473.24

15,923.66

19

5,898 Placa base en concreto 3000 psi e=0.10 m

45,339.38

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

17

5,899 Placa base en concreto 3000 psi e=0.12 m

52,646.97

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6999

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.6999

14,690.00

10,281.53

17

1,028.15

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

294

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,053

Nombre

Tipo U.M.

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,900 Placa base en concreto 3000 psi e=0.14 m

Cantidad

Vr.Unitario

Vr.Total

0.1200

333,142.66

39,977.12

64,686.83

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1600

4,375.00

700.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1400

333,142.66

46,639.97

5,901 Muro de concreto 3000 psi 0.10 m, cara interna lisa


(formaleta metalica)

17

Herramienta Menor 10% M.O. AA

Eqp

49

1,175.20

59,524.95

HR

1.1200

1,469.00

1,645.28

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

1,572

Tabla burra ordinaria 0.10

Ins

1.0000

1,200.00

1,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1200

14,690.00

16,452.80

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,902 Muro de concreto 3000 psi 0.12 m, cara interna lisa


(formaleta metalica)

67,394.87

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1947

1,469.00

1,755.01

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

1,572

Tabla burra ordinaria 0.10

Ins

1.0000

1,200.00

1,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1947

14,690.00

17,550.14

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,903 Muro de concreto 3000 psi 0.14 m, cara interna lisa


(formaleta metalica)

75,436.09

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

1,572

Tabla burra ordinaria 0.10

Ins

1.0000

1,200.00

1,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2800

14,690.00

18,803.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1400

333,142.66

46,639.97

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,904 Placa superior en concreto de 3000 psi, e= 0.08


(inc. colocacion final)

1,880.32

38,999.08

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.3200

2,010.00

643.20

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,572

Tabla burra ordinaria 0.10

Ins

0.1100

1,200.00

132.00

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0800

333,142.66

26,651.41

13,326

Durmiente ordinario 3 M

Ins

0.0800

767.00

61.36

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3200

20,097.00

6,431.04

5,907 Pozo septico revestido en ladrillo 2.25 x 3.5 x 2,


con losa en concreto 3000 psi, pagado por Un

und

4,024,753.12

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

295

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

17

Herramienta Menor 10% M.O. AA

Eqp

49

Vibrador de concretos

Eqp

HR

76.0000

1,469.00

111,644.00

HR

1,850

Segueta Ncholson

4.5000

4,375.00

19,687.50

Ins

und

0.1200

2,500.00

1,870

300.00

Alambre Negro No 18

Ins

kg

7.0000

3,903.00

27,321.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

2,237

Esterilla de guadua

65.0000

2,295.00

149,175.00

972.0000

305.00

296,460.00

7.2000

4,300.00

30,960.00

Ins

8.0000

3,500.00

28,000.00

2,243

Vara de clavo 3M -1

Ins

1.5000

1,500.00

2,250.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

879.18

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

2.0000

7,729.00

15,458.00

4,489

Cuadrilla AA (Albaileria)

Ins

76.0000

14,690.00

1,116,440.00

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

1.1500

430,750.59

495,363.18

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

3.2500

333,142.66

1,082,713.65

5,144

Transporte de materiales Tn

Ana

4.8000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

280.0000

2,257.00

631,960.00

13,326

Durmiente ordinario 3 M

Ins

3.1500

767.00

2,416.05

14,124

Puntilla con cabeza 3"

Ins

lb

2.0000

1,990.00

3,980.00

15,439

Tubo PVC sanitario de 4"

Ins

0.6600

14,766.00

9,745.56

5,908 Puente de adherencia de concreto fresco a


endurecido
55
4,515
15,814

kg

68,887.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

Sikadur 32 premier

Ins

kg

1.0000

60,000.00

60,000.00

5,909 Excavacion mecanica en material comun 0 - 2 mts


(area restringida), incluye acarreo, pagado m3

11,338.05

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0400

111,550.00

4,462.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0350

1,469.00

51.42

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Cuadrilla AA (Albaileria)

Ins

0.0350

14,690.00

514.15

4,489

5,910 Explanacin, extendida, conformacin para la


nivelacion de terreno, pagada en m3
3
20

5,269.00

Motoniveladora

Eqp

HR

0.0200

132,800.00

2,656.00

Bulldozer Cat D6D o D6H

Eqp

HR

0.0200

130,650.00

2,613.00

5,911 Excavacion a mano en material comun, con


transporte, cargue y entibado, pagado en m3

29,525.75

19

Herramienta menor 5% M.O. AA

Eqp

HR

1.5000

735.00

21

Volqueta (6 m3 )

Eqp

HR

0.1150

55,550.00

6,388.25

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

4,489

5,912 Tubo Galvanizado de 3" (Para Corral) pagado por


ml

1,102.50

35,974.46

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

1.0200

34,693.00

35,386.86

4,489

Cuadrilla AA (Albaileria)

Ins

0.0400

14,690.00

587.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

296

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,913 Tubo Galvanizado de 1 1/2" (Para Corral) pagado


por ml

Cantidad

Vr.Unitario

Vr.Total

19,879.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.0400

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Tubo cerramiento Galvanizado =1 1/2 " e=0.128"

Ins

1.0500

18,373.00

19,291.65

13,897

5,914 Suministro e instal. tuberia sanitaria PVC 2"

14,690.00

587.60

11,820.33

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1905

1,616.00

307.85

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1905

16,159.00

3,078.29

15,437

Tubo PVC sanitario de 2"

Ins

1.0500

7,092.00

7,446.60

15,538

Union sanitaria PVC 2 "

Ins

und

0.1667

1,561.00

260.22

55

5,916 Yee sanitaria reducida 3" x 2". Suministro e instal.

und

11,580.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Yee Sanitaria reducida PVC 3 x 2 "

Ins

und

1.0000

8,617.00

8,617.00

15,489

5,917 Suministro e instal. codo sanitario 90 - 1/4 C x C


PVC 4", pagado por un

und

293.06

12,416.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

1.0000

7,729.00

7,729.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

5,918 Suministro, instal. y conexion tanque elevado 500


lts pvc (incluye accesorios)

und

493,802.59

Herramienta Menor 10% M.O. BB

Eqp

HR

3.7209

1,616.00

6,012.97

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.2500

58,612.00

14,653.00

3,079

Tanque plstico 500 lt

Ins

und

1.0000

178,652.00

178,652.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.7209

16,159.00

60,126.02

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,020

Cinta teflon

Ins

rl

2.0000

1,000.00

2,000.00

14,757

Registro paso directo 1/2"

Ins

und

3.0000

22,000.00

66,000.00

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

4.0000

1,504.00

6,016.00

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

3.0000

3,923.00

11,769.00

15,021

Codo 90 presion PVC 1/2"

Ins

und

3.0000

375.00

1,125.00

15,023

Codo 90 presion PVC 1"

Ins

und

2.1000

1,176.00

2,469.60

15,039

Union presion PVC 1/2"

Ins

und

2.0000

240.00

480.00

15,041

Union presion PVC 1"

Ins

und

1.0000

620.00

620.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

4.0000

260.00

1,040.00

15,050

Adaptador macho presin PVC 1"

Ins

und

1.0000

984.00

984.00

15,091

Buje soldado presion PVC 1 x 1/2

Ins

und

1.0000

723.00

723.00

15,543

Flotador completo (bola de cobre) 1/2"

Ins

und

1.0000

53,592.00

53,592.00

16,325

Cheque hidro 1"

Ins

und

1.0000

51,040.00

51,040.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

297

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,919 Estructura para soporte tanque agua 500 lts (en


tuberia acero estructural y placa en lamina HR 1/2")
segun plano

Cantidad

Vr.Unitario

und

Vr.Total
879,265.16

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

8.0000

8,750.00

70,000.00

Equipo de Oxicorte

Eqp

HR

6.0000

5,000.00

30,000.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

40.0000

20.00

800.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0700

6,885.00

481.95

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

12.0000

32,262.00

387,144.00

14,945

Lamina HR 1/2"

Ins

1.2100

250,702.65

303,350.21

15,544

Tubo cuadrado 70 x 70 x 2.25 x 6000 mm

Ins

5.5000

15,853.00

87,191.50

8
43

5,920 Pintura exterior vinilo sobre paete 2 manos,


pagado m2

7,994.91

Sub-Contrato Pintura

Esp

45.0000

5,513.73

Herramienta menor 10% M.O. CC

Eqp

HR

0.2390

1,689.00

403.67

3,832

Vinilo tipo viniltex

Ins

gal

0.0600

45,483.00

2,728.98

5,066

Cuadrilla CC (Pintura)

Ins

0.1390

16,893.00

2,348.13

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
61

5,921 Concreto impermeabilizado 1:2:3 o 3000 Psi


(Basico, 5% desperdicio)

2,481.18

345,308.74

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

367.5000

383.34

140,877.45

3,684

Agua para obra

Ins

199.5000

10.00

1,995.00

4,426

Arena lavada de rio

Ins

0.5880

13,800.00

8,114.40

5,143

Transporte de materiales m

Ana

1.4700

46,157.00

67,850.79

5,144

804

6,488.20

Transporte de materiales Tn

Ana

0.3680

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.8820

46,304.00

40,840.13

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

15,734

Plastocrete DM

Ins

kg

1.8400

6,612.00

12,166.08

5,922 Concreto impermeabilizado 1:2:2 o 3500 Psi


(Basico, 5% desperdicio)

366,456.41

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

441.0000

383.34

169,052.94

3,684

Agua para obra

Ins

210.0000

10.00

2,100.00

4,426

Arena lavada de rio

Ins

0.7035

13,800.00

9,708.30

5,143

Transporte de materiales m

Ana

1.4070

46,157.00

64,942.90

5,144

804

6,488.20

Transporte de materiales Tn

Ana

0.4410

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.7035

46,304.00

32,574.86

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

15,734

Plastocrete DM

Ins

kg

2.2100

6,612.00

14,612.52

5,924 Instalacion varilla acero de 1/2" para puente

kg

6,732.60

42

Motosoldador Diesel

Eqp

HR

0.0600

14,833.00

889.98

44

Pulidora electrica manual

Eqp

HR

0.0040

4,350.00

17.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

298

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta menor 10% M.O. ASA-3

Eqp

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

2,502

Anticorrosivo rojo claro

Ins

gal

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

48

Cantidad

Vr.Unitario

Vr.Total

HR

0.0600

3,226.00

193.56

kg

0.0700

6,805.00

476.35

0.0040

29,750.00

119.00

kg

1.0000

3,075.79

3,075.79

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0040

6,200.00

24.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.0600

32,262.00

1,935.72

5,925 Vigas transversales Tuberia Petrolera D=6 5/8 "

48,548.59

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

7,208.00

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5000

3,226.00

1,613.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5700

6,805.00

3,878.85

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2700

6,856.00

1,851.12

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1140

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.5000

32,262.00

16,131.00

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

0.0000

35,573.00

0.00

5,926 Rejillas para captacion ancho = 0.50 m.

71,145.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

10.0000

2,295.00

22,950.00

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

3.0000

2,700.00

8,100.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0150

29,750.00

446.25

5,064

Cuadrilla DD (Carpinteria)

Ins

2.0500

17,628.00

36,137.40

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5100

6,885.00

3,511.35

14,116

5,927 Suministro e instal. cabina sanitaria prefabricada


55
4,515
15,546

und

1,257,200.00

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

12,928.00

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

Cabina sanitaria

Ins

und

1.0000

1,115,000.00

1,115,000.00

5,928 Suministro e instal. tanques: septico, anaerobio


(incluye falso fondo) y trampa de grasas, inc. acc.
de conexion

und

1,309,979.80

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

12,928.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.2500

28,250.00

7,062.50

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

2.0000

7,729.00

15,458.00

4,515

55

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

1.0000

1,936.00

1,936.00

15,437

Tubo PVC sanitario de 2"

Ins

0.5500

7,092.00

3,900.60

15,439

Tubo PVC sanitario de 4"

Ins

1.2500

14,766.00

18,457.50

15,454

Codo Sanitario 45-1/8 C x C PVC 4"

Ins

und

2.0000

8,695.00

17,390.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

299

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15,487

Yee Sanitaria PVC 4 "

Ins

15,494

Codo reventilado PVC 4 x 2 "

Ins

und

2.0000

14,983.00

29,966.00

und

2.0000

16,235.00

15,547

Sistema de tratamiento (tanques PVC 1000 lt Ovoid)

32,470.00

Ins

und

15,653

Codo 90 en A.C. =2"

1.0000

1,002,566.00

1,002,566.00

Ins

und

1.0000

32,712.00

32,712.00

5,929 Concreto de 3000 psi tanque subterraneo, pagado


en m3

703,993.51

17

Herramienta Menor 10% M.O. AA

Eqp

HR

10.0000

1,469.00

14,690.00

52

Vibrador a gasolina

Eqp

HR

0.3200

46,000.00

14,720.00

2,200

Tabla burra ordinario 0.30

Ins

0.7600

4,333.00

3,293.08

2,243

Vara de clavo 3M -1

Ins

0.4700

1,500.00

705.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.1200

1,990.00

4,218.80

4,040

Paral corriente 2 a 3.50 ml

Ins

15.0000

170.00

2,550.00

4,489

Cuadrilla AA (Albaileria)

Ins

17.5500

14,690.00

257,809.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.1000

333,142.66

366,456.93

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.0900

311,229.99

28,010.70

13,326

Durmiente ordinario 3 M

Ins

3.5000

767.00

2,684.50

13,627

Formaleta entrepisos

Ins

mes

2.5300

3,500.00

8,855.00

5,930 Concreto impermeabilizado y ref. de 3000 psi


tanque elevado, pagado en m3

847,285.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2500

4,375.00

1,093.75

1,901

Acero de refuerzo 37000 Psi

Ins

kg

7.0000

2,295.00

16,065.00

2,200

Tabla burra ordinario 0.30

Ins

0.7600

4,333.00

3,293.08

2,243

Vara de clavo 3M -1

Ins

0.4700

1,500.00

705.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.1200

1,990.00

4,218.80

4,040

Paral corriente 2 a 3.50 ml

Ins

60.0000

170.00

10,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.0900

311,229.99

28,010.70

5,144

Transporte de materiales Tn

Ana

0.8000

0.00

0.00

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.1000

345,308.74

379,839.61

8,194

45,140.00

29,380.00

Acero de refuerzo 60000 Psi

Ins

kg

20.0000

2,257.00

13,326

Durmiente ordinario 3 M

Ins

3.5000

767.00

2,684.50

13,627

Formaleta entrepisos

Ins

mes

6.5300

3,500.00

22,855.00

13,850

Alambre Galvanizado No. 12

Ins

kg

2.0000

5,000.00

10,000.00

5,931 Desmonte y Limpieza incluye descapote e=0.20 m

ha

278,868.50

20

Bulldozer Cat D6D o D6H

Eqp

HR

1.5500

130,650.00

38

Motosierra o equipo de desmonte

Eqp

HR

0.8000

5,350.00

4,280.00

40

Guadaadora

Eqp

HR

2.5000

12,000.00

30,000.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

1.5000

2,550.00

3,825.00

Cuadrilla AA-3 (Limpieza)

Ins

1.5000

25,504.00

38,256.00

14,749

5,932 Excavacion de cortes, canales y prestamo (Acarreo


libre 100 m)

202,507.50

4,153.97

14

Retroexcavadora de orugas

Eqp

HR

0.0208

144,160.00

2,998.53

21

Volqueta (6 m3 )

Eqp

HR

0.0208

55,550.00

1,155.44

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

300

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,933 Terraplen y rellenos con material de prestamo para


conformacion proteccion de tuberia tramos finales

Cantidad

Vr.Unitario

Vr.Total
5,718.50

Compactador Vibratorio

Eqp

HR

0.0200

100,000.00

2,000.00

Motoniveladora

Eqp

HR

0.0200

132,800.00

2,656.00

Carrotanque de Agua

Eqp

HR

0.0200

53,125.00

1,062.50

11

5,934 Seales preventivas (SP) y reglamentarias (SR) 60


X 60 cm con papel reflectivo

und

127,308.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0420

22,829.00

958.82

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0180

0.00

0.00

Seal SP, SR, SI 60 x 60 cm papel reflectivo

Ins

und

1.0000

100,000.00

100,000.00

17
324

15,550

5,935 Seales Preventivas (SP) y Reglamentarias (SR) 75


X 75 cm, con papel reflectivo

und

1,469.00

142,308.96

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0420

22,829.00

958.82

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Seal SP, SR, SI 75 x 75 cm papel reflectivo

Ins

und

1.0000

115,000.00

115,000.00

17
324

15,551

5,936 Seales preventivas (SP) y reglamentarias (SR) 90


X 90 cm

und

154,551.32

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

0.0420

76,218.46

3,201.18

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Seal SP, SR, SI 90 x 90 cm papel reflectivo

Ins

und

1.0000

125,000.00

125,000.00

17

15,552

5,937 Caja de inspeccion 0.70 x 0.80 x 1.0 libres (sin


excav) paete impermeabilizado incluye tapa
removible en concreto.

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

13,921

Crudo de rio clasificado T.m. 6"

13,961

Triturado de 1/2" - 3/4"

14,122

Sika 1 imp. integral

17
804

406,745.43

10.0000

1,469.00

14,690.00

163.0000

383.34

62,484.42

0.1900

3,903.00

741.57

172.0000

305.00

52,460.00

66.2200

10.00

662.20

0.3100

13,800.00

4,278.00

10.0000

14,690.00

146,900.00

0.7000

46,157.00

32,309.90

0.9600

0.00

0.00

kg

27.5000

2,257.00

62,067.50

Ins

0.1600

15,660.00

2,505.60

Ins

0.2300

46,304.00

10,649.92

Ins

kg

2.6400

6,438.00

16,996.32

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

301

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,938 Caja de inspeccion 0.70 x 0.80 x 1.5 libres (sin


excav.) paete impermeabilizado incluye tapa
removible en concreto.

Cantidad

Vr.Unitario

und

Vr.Total
486,178.08

Herramienta Menor 10% M.O. AA

Eqp

HR

11.4286

1,469.00

16,788.61

Cemento gris

Ins

kg

200.0000

383.34

76,668.00

1,870

Alambre Negro No 18

Ins

kg

0.1900

3,903.00

741.57

2,085

Ladrillo tolete comn

Ins

und

263.0000

305.00

80,215.00

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

13,921

Crudo de rio clasificado T.m. 6"

13,961
14,122

17
804

66.2200

10.00

662.20

0.4000

13,800.00

5,520.00

11.4286

14,690.00

167,886.13

0.7900

46,157.00

36,464.03

1.4000

0.00

0.00

kg

27.5000

2,257.00

62,067.50

Ins

0.1600

15,660.00

2,505.60

Triturado de 1/2" - 3/4"

Ins

0.2300

46,304.00

10,649.92

Sika 1 imp. integral

Ins

kg

4.0400

6,438.00

26,009.52

5,939 Caja de inspeccion 0.70 x 0.80 x 2.0 libres (sin


excav.) paete impermeabilizado incluye tapa
removible en concreto.

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

13,921

Crudo de rio clasificado T.m. 6"

13,961

Triturado de 1/2" - 3/4"

14,122

Sika 1 imp. integral

17
804

616,149.71

16.0000

1,469.00

23,504.00

236.0000

383.34

90,468.24

0.1900

3,903.00

741.57

354.0000

305.00

107,970.00

80.0000

10.00

800.00

0.4900

13,800.00

6,762.00

16.0000

14,690.00

235,040.00

0.8800

46,157.00

40,618.16

1.8600

0.00

0.00

kg

27.5000

2,257.00

62,067.50

Ins

0.1600

15,660.00

2,505.60

Ins

0.2300

46,304.00

10,649.92

Ins

kg

5.4400

6,438.00

35,022.72

5,940 Sumidero de rejilla en concreto de 3000 psi y


platina de 2 x 1/4" de acuerdo a plano, longitud 2.0
m

und

1,741,386.14

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

20.0000

8,750.00

175,000.00

49

Vibrador de concretos

Eqp

HR

10.0000

4,375.00

43,750.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

27.5862

2,550.00

70,344.81

2,457

Platina 1/4" x 2"

Ins

11.0000

6,649.00

73,139.00

2,475

Angulo o perfil 3" x 3" x 1/4"

Ins

2.9000

20,623.00

59,806.70

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.2000

333,142.66

399,771.19

8,194

Acero de refuerzo 60000 Psi

Ins

kg

88.0000

2,257.00

198,616.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

27.5862

25,504.00

703,558.44

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

3.0000

5,800.00

17,400.00

5,941 Baranda en perfil WF 8" x 18" y tubo HG 3"

182,625.07

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

43

Equipo de Oxicorte

Eqp

HR

0.3500

5,000.00

1,750.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

302

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

45

Cilindro

Eqp

HR

0.3500

41.00

14.35

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.6667

3,226.00

2,150.77

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0400

6,805.00

272.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

2.0000

34,693.00

69,386.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0800

42,950.00

3,436.00

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0050

6,200.00

31.00

14,745

Oxigeno Industrial

Ins

0.1000

15,662.00

1,566.20

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.6667

32,262.00

21,509.08

15,564

Perfil WF 8" x 18"

Ins

0.8300

89,514.00

74,296.62

5,942 Junta de Dilatacion JD-1

Cantidad

Vr.Unitario

Vr.Total

141,087.70

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.3000

5,000.00

1,500.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

45

Cilindro

Eqp

HR

0.3000

41.00

12.30

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.7000

3,226.00

2,258.20

84

Varilla cuadrada 9 mm o 3/8" x 6 mts

Ins

und

0.3333

9,492.00

3,163.68

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4000

6,805.00

2,722.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.1200

2,295.00

2,570.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.8000

2,257.00

4,062.60

13,926

Angulo o perfil 4" x 4 " x 3/8"

Ins

2.1000

36,877.00

77,441.70

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0090

6,200.00

55.80

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.7000

32,262.00

22,583.40

15,603

Neopreno WD 1625 (40 mm x 1") D=70

Ins

1.0000

11,020.00

11,020.00

5,943 Pozo de Inspeccion H= 4.5 - 5.0 m 1.80. (Cono


Truncado, Ladrillo Tolete Tizn)

und

3,210,344.56

Herramienta Menor 10% M.O. AA-2

Eqp

HR

45.0000

2,010.00

90,450.00

1,870

Alambre Negro No 18

Ins

kg

0.6400

3,903.00

2,497.92

1,901

Acero de refuerzo 37000 Psi

Ins

kg

3.0200

2,295.00

6,930.90

2,085

Ladrillo tolete comn

Ins

und

2,756.0000

305.00

840,580.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

2.0800

367,816.92

765,059.19

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.9600

333,142.66

319,816.95

5,061

Formaleta (1 uso)

Ana

0.3933

32,375.50

12,733.28

5,144

Transporte de materiales Tn

Ana

11.0500

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

28.7600

2,257.00

64,911.32

Cuadrilla AA-2 (Tuberias)

Ins

45.0000

20,097.00

904,365.00

69

14,669

5,944 Excavacion mecanica con entibado


4
17
4,489

13,965.37

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0333

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0333

1,469.00

48.92

Cuadrilla AA (Albaileria)

Ins

0.0333

14,690.00

489.18

111,550.00

3,714.62

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

303

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,061

Nombre

Tipo U.M.

Formaleta (1 uso)

Ana

5,945 Pintura interior vinilo para cubierta 2 manos,


pagado m2

Cantidad

Vr.Unitario

Vr.Total

0.3000

32,375.50

9,712.65

7,750.00

Sub-Contrato Pintura

Esp

45.0000

5,344.83

Herramienta menor 10% M.O. CC

Eqp

HR

0.1390

1,689.00

234.77

3,832

Vinilo tipo viniltex

Ins

gal

0.0600

45,483.00

2,728.98

5,066

Cuadrilla CC (Pintura)

Ins

0.1390

16,893.00

2,348.13

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
61

5,946 Pintura exterior koraza para cubierta 2 manos,


pagado m2

2,405.17

11,137.23

Sub-Contrato Pintura

Esp

45.0000

7,680.85

Herramienta menor 10% M.O. CC

Eqp

HR

0.1390

1,689.00

234.77

Cuadrilla CC (Pintura)

Ins

0.1390

16,893.00

2,348.13

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,548

Koraza Vinilo exterior

Ins

gal

0.1000

50,650.00

5,065.00

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
61
5,066

5,947 Suministro e instal. de estuco y vinilo 3 manos,


pagado en m2

3,456.38

11,949.65

Sub-Contrato Pintura

Esp

45.0000

8,241.14

3,708.51

Herramienta menor 10% M.O. CC

Eqp

HR

0.2500

1,689.00

422.25

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0500

45,483.00

2,274.15

5,066

Cuadrilla CC (Pintura)

Ins

0.2500

16,893.00

4,223.25

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

5,948 Aseo general para entrega de obra, paga m2


8,145

Ayudante de construccion

m
Ins

5,949 Lavado de pisos para entrega de obra, paga m2


8,145

Ayudante de construccion

1,405.82

0.2600

5,407.00

m
Ins

5,950 Suministro e instal. de estuco sobre paete,


pagado en m2

1,405.82

1,892.45

0.3500

5,407.00

1,892.45

6,154.68

Sub-Contrato Pintura

Esp

45.0000

4,244.61

1,910.07

Herramienta menor 10% M.O. CC

Eqp

HR

0.1600

1,689.00

270.24

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

5.0000

10.00

50.00

5,066

Cuadrilla CC (Pintura)

Ins

0.1600

16,893.00

2,702.88

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

304

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,951 Valvula de Pie en bronce =8". Suministro e instal.

Cantidad

Vr.Unitario

und

Vr.Total

1,777,035.05

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

1,137

Valvula de Pie bronce =8"

Ins

und

1.0000

1,756,720.00

1,756,720.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

55

5,952 Suministro e instal. de estuco y pintura 3 manos,


filos y dilataciones, pagado en m2

13,956.35

Sub-Contrato Pintura

Esp

45.0000

9,625.07

4,331.28

Herramienta menor 10% M.O. CC

Eqp

HR

0.3000

1,689.00

506.70

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0600

45,483.00

2,728.98

5,066

Cuadrilla CC (Pintura)

Ins

0.3000

16,893.00

5,067.90

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

5,953 Estuco en filos y dilataciones, pagado en m2

4,674.02

Sub-Contrato Pintura

Esp

45.0000

3,223.46

1,450.56

Herramienta menor 10% M.O. CC

Eqp

HR

0.1550

1,689.00

261.80

Cemento gris

Ins

kg

0.1000

383.34

38.33

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0100

1,691.00

16.91

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

4.0000

10.00

40.00

5,066

Cuadrilla CC (Pintura)

Ins

0.1550

16,893.00

2,618.42

Caolin

Ins

bt

0.0100

10,500.00

105.00

5
61
804

13,448

5,954 Suministro e instal. de estuco y pintura 2 manos,


filos y dilataciones, pagado en m2

12,637.34

Sub-Contrato Pintura

Esp

45.0000

8,715.41

3,921.93

Herramienta menor 10% M.O. CC

Eqp

HR

0.3000

1,689.00

506.70

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,066

Cuadrilla CC (Pintura)

Ins

0.3000

16,893.00

5,067.90

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

5,955 Pintura en esmalte sobre lamina lineal, pagado en


ml
5

Sub-Contrato Pintura

Esp

8,168.04

45.0000

5,633.13

2,534.91

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

337.80

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.6300

1,691.00

1,065.33

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0100

42,950.00

429.50

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

61

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

305

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,956 Suministro e instal. malla eslabonada calibre 10,


ngulo 1x1/8", platina de fijacin 1*1/8", remate
alambre galv.No.12

Cantidad

Vr.Unitario

Vr.Total
26,728.06

Herramienta Menor 10% M.O. DD

Eqp

HR

0.4010

1,763.00

706.96

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

1.0000

2,422.00

2,422.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1000

6,856.00

685.60

3,838

Esmalte mate supersinttico

Ins

gal

0.0350

50,506.00

1,767.71

5,064

Cuadrilla DD (Carpinteria)

Ins

0.4010

17,628.00

7,068.83

14,063

Platina 1/8" x 1"

Ins

0.6666

3,103.00

2,068.46

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

56

5,957 REVISAR OJO Suministro e instal. tubo


galvanizado = 2" para cerramiento, pagado un

und

80,078.64

Sub-Contrato Carpinteria

Esp

45.0000

55,226.65

24,851.99

Herramienta Menor 10% M.O. DD

Eqp

HR

0.0950

1,763.00

167.49

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1000

6,805.00

680.50

5,064

Cuadrilla DD (Carpinteria)

Ins

0.0950

17,628.00

1,674.66

Tubo cerramiento Galvanizado =2" e=0.098"

Ins

3.0000

17,568.00

52,704.00

4
56

15,896

5,958 Porton tubo 2" y malla eslabonada cal 10, ngulo


de 1 1/4" x 1/8"

121,946.85

Sub-Contrato Ornamentacion

Esp

50.0000

81,297.90

40,648.95

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.0000

6,885.00

6,885.00

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

15,557

Angulo o perfil 1 1/4" x 1 1/4" x 1/8"

Ins

2.7000

3,882.00

10,481.40

15,619

Tubo cerramiento Galvanizado =2"

Ins

2.2000

10,833.00

23,832.60

16,231

Platina 3/16" x 1"

Ins

2.7000

3,362.00

9,077.40

16,420

Juego Bisagra tipo mueca para tubo galvanizado 2"

Ins

und

0.2500

15,000.00

3,750.00

7
56

5,959 Sardinel Prefabricado Modulo A - 80 (0.35 x 0.80 x


0.20)

30,327.58

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0010

276,302.97

276.30

4,426

Arena lavada de rio

Ins

0.0120

13,800.00

165.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,143

Transporte de materiales m

Ana

0.0120

46,157.00

553.88

5,144

Transporte de materiales Tn

Ana

0.1330

0.00

0.00

Sardinel Prefabricado Modulo A-80

Ins

und

1.2500

20,880.00

26,100.00

17

16,230

5,960 Niple pasamuro 2" L=0.25 m rosca 1 extremo


17
4,489
16,509

und

35,811.30

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

Niple pasamuro 2" L=0.25 m rosca 1 extremo

Ins

und

1.0000

24,500.00

24,500.00

5,961 Rejilla de entrada para limpieza 1.0 x 0.75

und

111,606.53

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

306

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Equipo de soldadura Marca Linconl 600 A

Eqp

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0667

8,750.00

583.63

HR

2,478

Angulo o perfil 1" x 1" x 1/8"

2.6667

1,616.00

4,309.39

Ins

3.5000

2,422.00

2,502

8,477.00

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

8,194

8
55

Acero de refuerzo 60000 Psi

Ins

kg

18.0000

2,257.00

40,626.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

1.0000

5,800.00

5,800.00

15,561

Angulo o perfil 2" x 2" x 1/8"

Ins

0.8500

6,758.00

5,744.30

5,962 Guardaescoba mediacaa en granito, pagado ml

29,276.15

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

1,469.00

1,762.80

44

Pulidora electrica manual

Eqp

HR

0.6400

4,350.00

2,784.00

829

Cemento blanco

Ins

kg

4.0000

975.00

3,900.00

2,486

Marmolina 20 kg

Ins

bt

0.1000

12,800.00

1,280.00

3,684

Agua para obra

Ins

5.0000

10.00

50.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2000

14,690.00

17,628.00

5,143

Transporte de materiales m

Ana

0.0180

46,157.00

830.83

5,144

Transporte de materiales Tn

Ana

0.0092

0.00

0.00

Granito travertino peruano No.3

Ins

bt

0.0600

17,342.00

1,040.52

14,720

5,963 Cable IPS - IWRC 6 x 19 AA = 3/4"

16,803.90

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1000

3,091.00

309.10

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1000

2,958.00

295.80

Transporte de materiales Tn

Ana

0.0016

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1000

30,910.00

3,091.00

15,562

Cable IPS-IWRC 6 x 19 AA = 3/4"

Ins

1.0000

13,108.00

13,108.00

5,144

5,964 Cable IPS - IWRC 6 x 19 AA = 1/2"

9,904.72

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0800

3,091.00

247.28

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0800

2,958.00

236.64

Transporte de materiales Tn

Ana

0.0007

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0800

30,910.00

2,472.80

15,563

Cable IPS-IWRC 6 x 19 AA = 1/2"

Ins

1.0000

6,948.00

6,948.00

5,144

5,965 Placa entrepiso caseton con vigas sin refuerzo, H=


0.25 m

149,331.96

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.7000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

80

Pluma grua o Malacate

Eqp

HR

0.2177

8,750.00

1,904.88

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

21.6000

188.00

4,060.80

1,870

Alambre Negro No 18

Ins

kg

0.1800

3,903.00

702.54

3,323

Tabla Burra Ordinaria 0.25

Ins

1.4500

4,333.00

6,282.85

4,489

Cuadrilla AA (Albaileria)

Ins

2.7000

14,690.00

39,663.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1360

333,142.66

45,307.40

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

5,822

Formaleta entrepiso, pagado en m2

Ana

1.1000

16,657.60

18,323.36

7,027

Caseton de lona 0.50 x 0.20, pagado por ml

Ana

1.6300

16,191.80

26,392.63

13,235

Liston ordinario 0.05 x 0.05

Ins

1.1500

1,300.00

1,495.00

14,128

Puntilla con cabeza 2 1/2"

Ins

lb

0.1800

1,990.00

358.20

3,966.30

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

307

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,966 Demolicion a mano de tableta piso, espesor 0-5 cm

Cantidad

Vr.Unitario

Vr.Total

8,974.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0350

40,000.00

1,400.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

5,967 Anclajes en angulo y varilla segun diseo

und

16,651.48

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0667

8,750.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5333

1,469.00

783.42

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3000

6,856.00

2,056.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.3000

2,257.00

677.10

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

0.1500

11,609.00

1,741.35

8
17

14,782

5,968 Montaje Estructura metalica Acero A-36 para


puente colgante de carga < a 3 TN

kg

583.63

1,446.32

43

Equipo de Oxicorte

Eqp

HR

0.0110

5,000.00

55.00

44

Pulidora electrica manual

Eqp

HR

0.0110

4,350.00

47.85

45

Cilindro

Eqp

HR

0.0110

41.00

0.45

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0110

4,443.00

48.87

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0110

2,958.00

32.54

77

Teleferico montaje mecanico

Eqp

HR

0.0110

12,080.00

132.88

79

Planta electrica 50 Kw

Eqp

HR

0.0110

31,250.00

343.75

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0100

6,805.00

68.05

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0075

15,662.00

117.47

14,746

Acetileno

Ins

kg

0.0025

41,820.00

104.55

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0110

44,428.00

488.71

1,717

5,969 Estructura metalica Acero A-36 para puente


colgante de carga < a 3 Tn (Incluye:Suministro y
fabricacion)

kg

4,703.89

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0067

8,750.00

58.63

43

Equipo de Oxicorte

Eqp

HR

0.0250

5,000.00

125.00

44

Pulidora electrica manual

Eqp

HR

0.0250

4,350.00

108.75

45

Cilindro

Eqp

HR

0.0250

41.00

1.03

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0267

4,443.00

118.63

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.0067

5,313.00

35.60

75

Equipo de soldadura Marca Linconl 250 A

Eqp

HR

0.0067

3,330.00

22.31

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0067

2,958.00

19.82

79

Planta electrica 50 Kw

Eqp

HR

0.0067

31,250.00

209.38

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0200

6,805.00

136.10

5,144

Transporte de materiales Tn

Ana

0.0000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

14,937

Acero ASTM - 36

Ins

kg

1.0000

2,543.00

2,543.00

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0267

44,428.00

1,186.23

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

308

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,970 Tensor en varilla 3/8". Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total
7,556.76

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0500

8,750.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.4000

1,144.00

457.60

1,901

Acero de refuerzo 37000 Psi

Ins

kg

0.5600

2,295.00

1,285.20

2,502

595.00

8
115

437.50

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.0357

5,800.00

207.06

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.4000

11,436.00

4,574.40

5,971 Placa base, en concreto de resistencia 3000 psi, e=


15 cm, pagado en m2

65,134.17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7700

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.7700

14,690.00

11,311.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

17

5,972 Suministro e instal. codo sanitario 90 - 1/4 C x C


PVC 6", pagado por un

1,469.00

und

1,131.13

77,021.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,609

Codo sanitario 90 1/4 C x C PVC 6"

Ins

und

1.0000

70,982.00

70,982.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3200

16,159.00

5,170.88

5,973 Demolicion de Alcantarilla, con retiro

586.12

50,213.67

14

Retroexcavadora de orugas

Eqp

HR

0.3030

144,160.00

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.3030

735.00

222.71

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

5,975 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.18

43,680.48

80,576.39

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1920

4,375.00

840.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1800

333,142.66

59,965.68

5,976 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.20

1,395.55

88,955.77

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2150

4,375.00

940.63

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2000

333,142.66

66,628.53

5,977 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.22
17

Herramienta Menor 10% M.O. AA

Eqp

HR

1,542.45

97,322.03

1.1500

1,469.00

1,689.35

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

309

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Vibrador de concretos

Eqp

HR

0.2350

4,375.00

1,028.13

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2200

333,142.66

73,291.39

49

5,978 Placa Piso Concreto resistencia 210 kg/cm2-3000


psi e=0.24

105,688.28

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2500

1,469.00

1,836.25

49

Vibrador de concretos

Eqp

HR

0.2550

4,375.00

1,115.63

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

1.2500

14,690.00

18,362.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2400

333,142.66

79,954.24

5,979 Placa superior en concreto de 3000 psi, e= 0.09


(inc. colocacion final)

42,350.18

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.3200

2,010.00

643.20

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,572

Tabla burra ordinaria 0.10

Ins

0.1200

1,200.00

144.00

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0900

333,142.66

29,982.84

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3200

20,097.00

6,431.04

5,980 Placa superior en concreto de 3000 psi, e= 0.10


(inc. colocacion final)

45,681.61

16

Cargador sobre llantas

Eqp

HR

0.0333

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,539

Mortero 1:3 (desperdicio 5%)

Ana

1,572

Tabla burra ordinaria 0.10

Ins

1,870

Alambre Negro No 18

3,797
5,053

113,000.00

3,762.90

0.3200

2,010.00

643.20

0.0030

276,302.97

828.91

0.1200

1,200.00

144.00

Ins

kg

0.1200

3,903.00

468.36

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3200

20,097.00

6,431.04

5,981 Placa superior en concreto de 3000 psi, e= 0.11


(inc. colocacion final)

49,307.05

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.3333

2,010.00

669.93

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,572

Tabla burra ordinaria 0.10

Ins

0.1200

1,200.00

144.00

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.3333

20,097.00

6,698.33

5,982 Placa superior en concreto de 3000 psi, e= 0.13


(inc. colocacion final)

58,286.87

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

310

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

16

Cargador sobre llantas

Eqp

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.0333

113,000.00

3,762.90

HR

1,539

Mortero 1:3 (desperdicio 5%)

0.4211

2,010.00

846.41

Ana

0.0030

276,302.97

1,870

828.91

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,323

Tabla Burra Ordinaria 0.25

Ins

0.1200

4,333.00

519.96

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1300

333,142.66

43,308.55

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.4211

20,097.00

8,462.85

5,983 Placa superior en concreto de 3000 psi, e= 0.14


(inc. colocacion final)

62,712.59

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.4706

2,010.00

945.91

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,323

Tabla Burra Ordinaria 0.25

Ins

0.1200

4,333.00

519.96

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1400

333,142.66

46,639.97

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.4706

20,097.00

9,457.65

5,984 Placa superior en concreto de 3000 psi, e= 0.15


(inc. colocacion final)

66,693.96

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.5000

2,010.00

1,005.00

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,323

Tabla Burra Ordinaria 0.25

Ins

0.1200

4,333.00

519.96

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5000

20,097.00

10,048.50

5,985 Placa superior en concreto de 3000 psi, e= 0.16


(inc. colocacion final)

70,761.55

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.5333

2,010.00

1,071.93

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,323

Tabla Burra Ordinaria 0.25

Ins

0.1200

4,333.00

519.96

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1600

333,142.66

53,302.83

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5333

20,097.00

10,717.73

5,986 Placa superior en concreto de 3000 psi, e= 0.19


(inc. colocacion final)

81,598.11

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.5714

2,010.00

1,148.51

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

311

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

1,539

Mortero 1:3 (desperdicio 5%)

Ana

1,870

Alambre Negro No 18

Ins

0.0030

276,302.97

828.91

kg

3,323

Tabla Burra Ordinaria 0.25

0.1200

3,903.00

468.36

Ins

0.1200

4,333.00

3,797

519.96

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

5,053

19.90

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1900

333,142.66

63,297.11

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.5714

20,097.00

11,483.43

5,987 Placa superior en concreto de 3000 psi, e= 0.20


(inc. colocacion final)

85,902.23

16

Cargador sobre llantas

Eqp

HR

0.0333

113,000.00

3,762.90

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.6154

2,010.00

1,236.95

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,323

Tabla Burra Ordinaria 0.25

Ins

0.1200

4,333.00

519.96

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2000

333,142.66

66,628.53

13,326

Durmiente ordinario 3 M

Ins

0.0900

767.00

69.03

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.6154

20,097.00

12,367.69

5,988 Rellenos de excavacion (con material local),


pagado en M3
17
4,489

10,341.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6400

1,469.00

940.16

Cuadrilla AA (Albaileria)

Ins

0.6400

14,690.00

9,401.60

5,989 Placa base en concreto 3000 psi e=0.13 m

57,750.45

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7593

1,469.00

1,115.41

3,323

Tabla Burra Ordinaria 0.25

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.7597

14,690.00

11,159.99

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1300

333,142.66

43,308.55

17

5,990 Chimenea en lamina c-18

und

34,180.46

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0667

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5333

1,469.00

783.42

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.2000

88,083.67

17,616.73

2,502

Anticorrosivo rojo claro

Ins

gal

0.1500

29,750.00

4,462.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5333

14,690.00

7,834.18

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.5000

5,800.00

2,900.00

8
17

14,795

5,991 Rejilla removible en platina de 2 x 1/4" hueco de


3" para tapa box, drenaje, inspeccion y limpieza
(inc. marco)

8,750.00

583.63

275,175.25

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.8000

2,550.00

2,040.00

2,457

Platina 1/4" x 2"

Ins

25.0000

6,649.00

166,225.00

2,475

Angulo o perfil 3" x 3" x 1/4"

Ins

2.4000

20,623.00

49,495.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0200

333,142.66

6,662.85

8,194

Acero de refuerzo 60000 Psi

Ins

kg

7.0000

2,257.00

15,799.00

Cuadrilla AA-3 (Limpieza)

Ins

0.8000

25,504.00

20,403.20

8
53

14,749

8,750.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

312

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

5,992 Muro de concreto 3000 psi 0.11 m, cara interna lisa


(formaleta metalica)

kg

Cantidad

Vr.Unitario

Vr.Total

1.0000

5,800.00

5,800.00

64,192.91

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1429

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

3,323

Tabla Burra Ordinaria 0.25

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.1429

14,690.00

16,789.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,993 Sumidero lateral SL-200 en mamposteria

und

1,678.92

1,542,410.78

Herramienta Menor 10% M.O. AA

Eqp

HR

24.0000

1,469.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

36.7000

2,295.00

84,226.50

2,085

Ladrillo tolete comn

Ins

und

441.0000

305.00

134,505.00

4,489

Cuadrilla AA (Albaileria)

Ins

24.0000

14,690.00

352,560.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

0.2000

551,059.84

110,211.97

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1800

311,229.99

56,021.40

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.2100

378,352.56

457,806.60

5,061

Formaleta (1 uso)

Ana

0.5867

32,375.50

18,994.71

5,144

Transporte de materiales Tn

Ana

1.8400

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

39.8000

2,257.00

89,828.60

17

5,994 Sumidero lateral SL-150 en mamposteria

und

35,256.00

1,339,456.95

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

31.4000

2,295.00

72,063.00

2,085

Ladrillo tolete comn

Ins

und

397.0000

305.00

121,085.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

0.1800

551,059.84

99,190.77

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1600

311,229.99

49,796.80

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

5,061

Formaleta (1 uso)

Ana

0.4400

32,375.50

14,245.22

5,144

Transporte de materiales Tn

Ana

1.6500

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

34.8000

2,257.00

78,543.60

17

5,995 Sumidero lateral SL-100 en mamposteria

und

29,380.00

1,132,842.05

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

26.1000

2,295.00

59,899.50

2,085

Ladrillo tolete comn

Ins

und

349.0000

305.00

106,445.00

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

0.1600

551,059.84

88,169.57

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1200

311,229.99

37,347.60

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

0.8000

378,352.56

302,682.05

5,061

Formaleta (1 uso)

Ana

0.2933

32,375.50

9,495.73

5,144

Transporte de materiales Tn

Ana

1.4500

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

29.8000

2,257.00

67,258.60

17

23,504.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

313

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,996 Desmonte y limpieza en zonas no boscosas


(Bulldozer)
20

Bulldozer Cat D6D o D6H

Cantidad

Vr.Unitario

ha

Eqp

5,997 Estufa industrial 4 puestos en Acero Inoxidable.


Suministro e Instal.

HR

Vr.Total
950,178.26

7.2727

130,650.00

und

950,178.26

1,493,683.50

Herramienta Menor 5% M.O. BB

Eqp

HR

0.5000

808.00

404.00

1,766

Estufa industrial 4 puestos en A.I.

Ins

und

1.0000

1,325,000.00

1,325,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

6,673

Cilindro de gas 100 Lbs

Ins

und

1.0000

129,200.00

129,200.00

13,916

Regulador gas r - 4 e 4 m3

Ins

und

1.0000

25,000.00

25,000.00

15,946

Manguera plstica 3/4"

Ins

2.0000

3,000.00

6,000.00

109

5,998 Muro de concreto 3000 psi 0.18 m, cara interna lisa


(formaleta metalica)

91,723.94

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.4035

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

3,323

Tabla Burra Ordinaria 0.25

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.4035

14,690.00

20,617.42

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1800

333,142.66

59,965.68

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

5,999 Muro de concreto 3000 psi 0.15 m, cara interna lisa


(formaleta metalica)

2,061.74

78,939.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2308

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

3,323

Tabla Burra Ordinaria 0.25

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.2308

14,690.00

18,080.45

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

6,000 Desmonte de cielo raso

1,808.05

7,574.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

6,001 Desmonte correas, pagado en m

6,787.06

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1450

1,469.00

213.01

21

Volqueta (6 m3 )

Eqp

HR

0.0800

55,550.00

4,444.00

Cuadrilla AA (Albaileria)

Ins

0.1450

14,690.00

2,130.05

4,489

6,002 Desmonte cubiertas, con correas y transporte,


pagado en m

12,018.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

314

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,003 Desmonte cubiertas asbesto cemento sin


transporte, pagado en m2
17
4,489

4,489

Vr.Unitario

Vr.Total
5,332.47

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3300

1,469.00

484.77

Cuadrilla AA (Albaileria)

Ins

0.3300

14,690.00

4,847.70

6,004 Desmonte marcos y puertas sin transporte, pagado


en m2
17

Cantidad

5,332.47

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3300

1,469.00

484.77

Cuadrilla AA (Albaileria)

Ins

0.3300

14,690.00

4,847.70

6,005 Desmonte marcos y puertas con transporte

10,402.70

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

4,489

6,006 Desmonte de ventanas, con transporte.

8,751.99

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2666

1,469.00

391.64

21

Volqueta (6 m3 )

Eqp

HR

0.0800

55,550.00

4,444.00

Cuadrilla AA (Albaileria)

Ins

0.2666

14,690.00

3,916.35

4,489

6,007 Paete interior impermeabilizado, proporcin de la


mezcla 1:4, espesor 1.5 cm, pagado en m2

15,558.31

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

675.74

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

4,965

17

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.0220

367,816.92

8,091.97

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

6,008 Desmonte tableros electricos, pagado en un


55
4,515

und

35,550.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

6,009 Suministro e instal. de tablon en gres, tipo


vitrificado, con dimens. de 30 x 30 cm, espesor de
2,5 cm, pagado m2

36,540.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

2,568

Tableta de gres vitrificado 30 x 30

Ins

1.0300

15,500.00

15,965.00

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

804

6,010 Suministro e instal. hoja puerta triplex, pagado m2

130,406.88

No incluye marco
4
56

Sub-Contrato Carpinteria

Esp

45.0000

89,935.78

40,471.10

Herramienta Menor 10% M.O. DD

Eqp

HR

1.8920

1,763.00

3,335.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

315

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

1,236

Cedro Caquet pieza

Ins

1,807

Puntilla sin cabeza 1"

Ins

und

0.3600

50,000.00

18,000.00

lb

0.1000

2,480.00

2,126

Lamina de triplex 4mm

248.00

Ins

und

1.0000

35,000.00

35,000.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.8920

17,628.00

33,352.18

6,011 Suministro e instal. de estuco y pintura 2 manos,


bajo placa, pagado en m2

14,126.78

Sub-Contrato Pintura

Esp

45.0000

9,742.61

4,384.17

Herramienta menor 10% M.O. CC

Eqp

HR

0.3000

1,689.00

506.70

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,066

5
61
804

Cuadrilla CC (Pintura)

Ins

0.3000

16,893.00

5,067.90

13,448

Caolin

Ins

bt

0.0900

10,500.00

945.00

13,641

Seccin de Andamio

Ins

mes

0.0600

17,120.00

1,027.20

6,025 Enchape muro y piso en ceramica lisa 30 x 20,


pagado m2

15

Pegacor blanco

Ins

17

40,028.71

kg

3.1500

1,120.00

3,528.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

804

Cemento gris

Ins

kg

6.2700

383.34

2,403.54

829

Cemento blanco

Ins

kg

0.7000

975.00

682.50

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.0311

0.00

0.00

Tableta cermica corriente 20 x 08

Ins

1.0000

18,000.00

18,000.00

13,644

6,026 Suministro e instal. cerradura entrada oficina,


clsica madera
56
5,064
15,890

und

39,534.60

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

Cuadrilla DD (Carpinteria)

Ins

0.6000

17,628.00

10,576.80

Cerradura entrada oficinas madera

Ins

und

1.0000

27,900.00

27,900.00

6,027 Suministro e instal. guardaescoba grano de


marmol 7.2x33, pagado ml

13,292.25

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

804

Cemento gris

Ins

kg

1.0900

383.34

417.84

829

Cemento blanco

Ins

kg

0.1000

975.00

97.50

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,143

Transporte de materiales m

Ana

0.0010

46,157.00

46.16

5,144

Transporte de materiales Tn

Ana

0.0040

0.00

0.00

Guardaescoba grano de marmol 7.2 x 33

Ins

1.0000

8,548.00

8,548.00

17

15,571

6,028 Cauela perimetral , en concreto de resistencia


3000 psi, pagada en ml

40,590.85

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

316

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

17

Herramienta Menor 10% M.O. AA

Eqp

HR

52

Vibrador a gasolina

Eqp

HR

2,197

Repisa Ordinario 3 m

Ins

2,200

Tabla burra ordinario 0.30

2,243
3,797

Vr.Unitario

Vr.Total

1.0314

1,469.00

1,515.13

0.0173

46,000.00

795.80

0.2808

1,500.00

421.20

Ins

0.4347

4,333.00

1,883.56

Vara de clavo 3M -1

Ins

0.2560

1,500.00

384.00

Puntilla con cabeza 2"

Ins

lb

0.2268

1,990.00

451.33

4,489

Cuadrilla AA (Albaileria)

Ins

1.0314

14,690.00

15,151.27

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0600

333,142.66

19,988.56

6,029 Suministro e instal. divisin lmina entamborada


calibre 18 para baos, pagado m2

Cantidad

169,088.26

Sub-Contrato Instalacion

Esp

18.0000

100,647.77

18,116.60

Sub-Contrato Ornamentacion

Esp

50.0000

100,647.77

50,323.89

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

1,038

Esmalte sobre lmina llena

Ana

1.0000

14,498.27

14,498.27

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

0.7000

2,700.00

1,890.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

5,144

Transporte de materiales Tn

Ana

0.6000

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.7000

6,885.00

4,819.50

15,572

Divisin lmina calibre 18 entamborado para bao

Ins

1.0200

75,000.00

76,500.00

6,030 Suministro e instal. division aluminio y acrilico,


pagado m2
6
5,144
14,728

Sub-Contrato Instalacion

Esp

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Divisin aluminio y lmina acrlica para bao

Ins

1.0000

95,000.00

95,000.00

6,031 Instalacin carpintera metlica ventanas

123,500.00

30.0000

95,000.00

28,500.00

12,458.43

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0100

276,302.97

2,763.03

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

17

6,032 Anclaje cable - macizo =1"

und

2,494,093.24

42

Motosoldador Diesel

Eqp

HR

2.0000

14,833.00

29,666.00

43

Equipo de Oxicorte

Eqp

HR

2.0000

5,000.00

10,000.00

44

Pulidora electrica manual

Eqp

HR

2.0000

4,350.00

8,700.00

45

Cilindro

Eqp

HR

2.0000

41.00

82.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

8.0000

3,226.00

25,808.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

12.0000

6,805.00

81,660.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

1.0000

6,200.00

6,200.00

14,745

Oxigeno Industrial

Ins

2.4200

15,662.00

37,902.04

14,746

Acetileno

Ins

kg

1.2100

41,820.00

50,602.20

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

8.0000

32,262.00

258,096.00

14,937

Acero ASTM - 36

Ins

kg

239.0000

2,543.00

607,777.00

15,573

Varilla Roscada de anclaje de 1" Acero SAE1045

Ins

10.0000

45,000.00

450,000.00

15,574

Tuerca =1" G-5

Ins

und

12.0000

1,340.00

16,080.00

15,576

Terminal Socket Crosby 1"

Ins

und

1.0000

721,520.00

721,520.00

15,578

Plomo

Ins

kg

2.5000

76,000.00

190,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

317

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,033 Dilatacion en granito a=0.20, pagado ml,

Cantidad

Vr.Unitario

Vr.Total
27,303.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

804

Cemento gris

Ins

kg

3.7400

383.34

1,433.69

829

17

Cemento blanco

Ins

kg

4.2000

975.00

4,095.00

2,448

Dilatacin en bronce PC 09

Ins

2.0000

3,735.00

7,470.00

2,486

Marmolina 20 kg

Ins

bt

0.1000

12,800.00

1,280.00

3,684

Agua para obra

Ins

1.4820

10.00

14.82

4,426

Arena lavada de rio

Ins

0.0180

13,800.00

248.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

5,143

Transporte de materiales m

Ana

0.0197

46,157.00

909.29

5,144

Transporte de materiales Tn

Ana

0.0018

0.00

0.00

5,527

Pulida piso granito, pagado en m2

Ana

0.2000

10,467.76

2,093.55

13,381

Color mineral

Ins

kg

0.3300

7,000.00

2,310.00

14,720

Granito travertino peruano No.3

Ins

bt

0.1500

17,342.00

2,601.30

6,034 Conector Superior de 1 " a Pendolon 1/2"

und

165,159.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

17

Transporte de materiales Tn

Ana

0.0150

0.00

0.00

14,387

Guardacable de 1/2" o Portacable T.P.

Ins

und

1.0000

11,716.00

11,716.00

14,937

Acero ASTM - 36

Ins

kg

12.0000

2,543.00

30,516.00

15,579

Tornillo = 5/8" x 1/2" G-8

Ins

und

2.0000

6,000.00

12,000.00

15,580

Perro crosby = 1/2" en HF

Ins

und

4.0000

24,500.00

98,000.00

6,035 Conector Inferior de Platina 3/4" a Pendolon 1/2"

und

544,436.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0120

0.00

0.00

15,578

Plomo

Ins

kg

2.5000

76,000.00

190,000.00

15,581

Casquillo T- Crosby - Socket 1/2`` HF

Ins

und

1.0000

322,009.00

322,009.00

15,582

Platina de conexin 3/4" x 125 mm x 80 mm

Ins

und

1.0000

19,500.00

19,500.00

17

6,036 Conexion de Cables de Contraviento 1/2"


(estructura y muerto)

und

253,561.84

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5650

1,469.00

829.99

4,489

Cuadrilla AA (Albaileria)

Ins

0.5650

14,690.00

8,299.85

5,144

17

Transporte de materiales Tn

Ana

0.0150

0.00

0.00

14,387

Guardacable de 1/2" o Portacable T.P.

Ins

und

2.0000

11,716.00

23,432.00

15,579

Tornillo = 5/8" x 1/2" G-8

Ins

und

2.0000

6,000.00

12,000.00

15,580

Perro crosby = 1/2" en HF

Ins

und

8.0000

24,500.00

196,000.00

15,583

Platina de conexin 1/2" x 125 mm x 100 mm

Ins

und

1.0000

13,000.00

13,000.00

6,037 Conexion piso (viga traviesa - viga de borde)

und

72,225.05

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.8000

5,313.00

4,250.40

381

Lamina HR 5/16"

Ins

0.0360

191,819.00

6,905.48

519

Soldador

Ins

0.8000

6,759.00

5,407.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

318

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2,502

Anticorrosivo rojo claro

Ins

gal

3,837

Esmalte Sintetico Pintuco

Ins

4,489

Cuadrilla AA (Albaileria)

Cantidad

Vr.Unitario

Vr.Total

0.8000

6,805.00

5,444.00

0.0800

29,750.00

2,380.00

gal

0.0800

42,950.00

3,436.00

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1000

15,662.00

1,566.20

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,945

Lamina HR 1/2"

Ins

0.0250

250,702.65

6,267.57

15,585

Pasador con pin = 1 1/2" SAE 1045 de 75 mm

Ins

und

1.0000

17,500.00

17,500.00

6,039 Conexion cercha de rigidez

und

92,389.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.8000

5,313.00

4,250.40

Soldador

Ins

0.8000

6,759.00

5,407.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

519

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

15,582

Platina de conexin 3/4" x 125 mm x 80 mm

Ins

und

1.0000

19,500.00

19,500.00

15,583

Platina de conexin 1/2" x 125 mm x 100 mm

Ins

und

2.0000

13,000.00

26,000.00

15,585

Pasador con pin = 1 1/2" SAE 1045 de 75 mm

Ins

und

1.0000

17,500.00

17,500.00

6,040 Alistado esmaltado impermeabilizado muros y


placas e=3 mm

10,274.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

Cemento gris

Ins

kg

3.0000

383.34

1,150.02

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Sika 1 imp. integral

Ins

kg

0.1600

6,438.00

1,030.08

17
804

14,122

6,041 Alistado impermeabilizado de pisos e= 0.04,


pagado en m2

22,803.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4500

1,469.00

661.05

Cemento gris

Ins

kg

19.0000

383.34

7,283.46

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,426

Arena lavada de rio

Ins

0.0500

13,800.00

690.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

5,143

Transporte de materiales m

Ana

0.0500

46,157.00

2,307.85

5,144

Transporte de materiales Tn

Ana

0.0190

0.00

0.00

Sika 1 imp. integral

Ins

kg

0.8000

6,438.00

5,150.40

17
804

14,122

6,042 Alistado impermeabilizado de pisos e= 0.05,


pagado en m2

25,910.98

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4400

1,469.00

646.36

Cemento gris

Ins

kg

20.3000

383.34

7,781.80

3,684

Agua para obra

Ins

11.0000

10.00

110.00

4,426

Arena lavada de rio

Ins

0.0735

13,800.00

1,014.30

4,489

Cuadrilla AA (Albaileria)

Ins

0.4400

14,690.00

6,463.60

5,143

Transporte de materiales m

Ana

0.0735

46,157.00

3,392.54

5,144

Transporte de materiales Tn

Ana

0.0203

0.00

0.00

17
804

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

319

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,122

Sika 1 imp. integral

Ins

6,043 Suministro e instal. de locker en lamina calibre 16,


pagado m2
56
5,064
15,589

5,144

Vr.Unitario

Vr.Total

1.0100

6,438.00

6,502.38

227,499.50

Herramienta Menor 10% M.O. DD

Eqp

HR

1.5000

1,763.00

2,644.50

Cuadrilla DD (Carpinteria)

Ins

1.5000

17,628.00

26,442.00

Locker en lamina metalica calibre 16, prof 30 cm

Ins

und

1.0000

198,413.00

198,413.00

6,044 Puerta en aluminio llena con marco e instalacin

15,594

kg

Cantidad

270,000.00

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

Puerta aluminio llena, bisagras, marco e instalaci

Ins

1.0000

270,000.00

270,000.00

6,045 Tapon soldado PVC 4". Suministro e Instal.

und

27,789.05

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

Tapon soldado presin PVC 4

Ins

und

1.0000

24,974.00

24,974.00

15,089

6,046 Apoyo metalico tipo 1

und

1,172.24

411,186.25

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.0000

5,313.00

5,313.00

Soldador

Ins

4.0000

6,759.00

27,036.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2500

6,805.00

1,701.25

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

Apoyo cercha tipo con pasador SAE 1045 1 1/4"

Ins

und

1.0000

312,500.00

312,500.00

519

15,598

6,047 Macizo de anclaje Concreto 3000 Psi puentes


colgantes

5,876.00

559,571.06

17

Herramienta Menor 10% M.O. AA

Eqp

HR

10.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

10.0000

14,690.00

146,900.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

1.8000

32,375.50

58,275.90

6,048 Sondeo, limpieza y retiro material solido de


tuberias alcantarillado y pozos de inspeccin

14,690.00

12,164.07

71

Camion vactor

Eqp

HR

0.0133

497,000.00

6,610.10

72

Camion de vacio (Vacum)

Eqp

HR

0.0133

173,000.00

2,300.90

Ayudante de maquinaria

Ins

0.8133

3,999.84

3,253.07

14,650

6,049 Limpieza, retiro y dispocision de material solido de


pozos septicos de 10 a 15 m

und

311,421.60

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.4000

2,550.00

1,020.00

71

Camion vactor

Eqp

HR

0.6000

497,000.00

298,200.00

Agua para obra

Ins

Cuadrilla AA-3 (Limpieza)

Ins

3,684
14,749

200.0000

10.00

2,000.00

0.4000

25,504.00

10,201.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

320

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,051 Tapa basculante con llave de seguridad y seguro


en 3 apoyos para pozo insp. en via (Inc. marco y
tapa)

Cantidad

Vr.Unitario

und

Vr.Total
779,530.40

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

Tapa basculante c/llave seguridad 3 apoyos

Ins

und

1.0000

713,400.00

713,400.00

17

15,600

6,052 Geotextil Tejido 2400

5,831.20

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Geotextil Tejido 2400

Ins

1.0500

4,819.00

5,059.95

19

15,601

6,053 Conformacion con material granular seleccionado


CBR > 10% para corona Terraplen

43,012.84

Compactador Vibratorio

Eqp

HR

0.0555

100,000.00

5,550.00

Motoniveladora

Eqp

HR

0.0555

132,800.00

7,370.40

Carrotanque de Agua

Eqp

HR

0.0555

53,125.00

2,948.44

Material triturado T. max. 3"

Ins

1.2000

22,620.00

27,144.00

11
15,602

6,054 Junta de dilatacion con Neopreno de 1"

153,203.12

42

Motosoldador Diesel

Eqp

HR

0.4000

14,833.00

5,933.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

45

Cilindro

Eqp

HR

0.4000

41.00

16.40

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.4000

3,226.00

1,290.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0800

6,805.00

544.40

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.1200

2,295.00

2,570.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.8000

2,257.00

4,062.60

13,926

Angulo o perfil 4" x 4 " x 3/8"

Ins

2.0000

36,877.00

73,754.00

13,927

Cinta sika PVC 0-22

Ins

1.0000

31,900.00

31,900.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0090

6,200.00

55.80

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.4000

32,262.00

12,904.80

15,603

Neopreno WD 1625 (40 mm x 1") D=70

Ins

1.0000

11,020.00

11,020.00

6,055 Adoquin concreto 8 cm, pagado m2

46,502.54

cg
Herramienta Menor 10% M.O. AA

Eqp

HR

1.1000

1,469.00

1,615.90

2,900

Adoquin en concreto 11 x 8 x 20

Ins

und

50.0000

550.00

27,500.00

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1000

14,690.00

16,159.00

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0750

0.00

0.00

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

321

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,056 Sardinel en Concreto 2500 Psi 0.5 m x 0.3 m x 0.15


m

Cantidad

Vr.Unitario

Vr.Total

55,426.40

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4600

1,469.00

675.74

49

Vibrador de concretos

Eqp

HR

0.1352

4,375.00

591.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4600

14,690.00

6,757.40

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1100

318,473.24

35,032.06

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.7000

3,092.35

11,441.70

6,057 Caja de inspeccion 50 x 50

und

150,612.76

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

16.7800

10.00

167.80

4,426

Arena lavada de rio

Ins

0.0820

13,800.00

1,131.60

4,489

Cuadrilla AA (Albaileria)

Ins

5.4054

14,690.00

79,405.33

5,143

Transporte de materiales m

Ana

0.3000

46,157.00

13,847.10

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.5000

2,257.00

10,156.50

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0820

15,660.00

1,284.12

13,961

Triturado de 1/2" - 3/4"

Ins

0.0400

46,304.00

1,852.16

17
804

6,058 Dinteles Concreto de 3000 psi 15 x 10 reforzado

5.4054

1,469.00

7,940.53

43.8500

383.34

16,809.46

0.0200

3,903.00

78.06

58.8200

305.00

17,940.10

30,758.15

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,101.75

1,572

Tabla burra ordinaria 0.10

Ins

0.5000

1,200.00

600.00

1,870

Alambre Negro No 18

Ins

kg

0.1000

3,903.00

390.30

2,197

Repisa Ordinario 3 m

Ins

1.0000

1,500.00

1,500.00

2,243

Vara de clavo 3M -1

Ins

0.0500

1,500.00

75.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0160

333,142.66

5,330.28

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.7600

2,257.00

10,743.32

17

6,059 Enchape muro cenefa ceramica lisa 8 x 25, pagado


ml

22,536.64

15

Pegacor blanco

Ins

kg

0.1683

1,120.00

188.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3500

1,469.00

514.15

804

Cemento gris

Ins

kg

0.3454

383.34

132.41

829

Cemento blanco

Ins

kg

0.0770

975.00

75.08

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

5,144

Transporte de materiales Tn

Ana

0.0034

0.00

0.00

Cenefa cermica corriente 8x25

Ins

1.0300

16,000.00

16,480.00

15,590

6,060 Muro circular en Concreto 3500 Psi e=0.30 m


=4.30 m

1,130,901.24

17

Herramienta Menor 10% M.O. AA

Eqp

HR

23.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

54

Paral metalico

Eqp

HR

1,008.0000

58.00

58,464.00

33,787.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

322

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

80

Pluma grua o Malacate

Eqp

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

1.5000

8,750.00

13,125.00

HR

92.0000

188.00

84

Cercha o viga metalica

17,296.00

Eqp

HR

2,198

437.0000

22.00

9,614.00

Durmiente ordinario 4 M

Ins

18.0000

3,500.00

63,000.00

3,797

Puntilla con cabeza 2"

Ins

lb

1.2000

1,990.00

2,388.00

4,489

Cuadrilla AA (Albaileria)

Ins

23.0000

14,690.00

337,870.00

4,867

Paral telescopico 2 a 4 ml

Ins

56.0000

340.00

19,040.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

6.7000

32,375.50

216,915.85

Puntilla con cabeza 3"

Ins

lb

0.5000

1,990.00

995.00

14,124

6,061 Demolicion pavimento en concreto y piedra pegada


(No inc. retiro de sobrantes)

22,734.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3333

1,469.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

0.0340

35,000.00

1,190.00

Cuadrilla AA (Albaileria)

Ins

1.3333

14,690.00

19,586.18

4,489

6,062 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 6"

1,958.62

28,014.67

Cuadrilla BB (Instalaciones)

Ins

0.2222

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0070

12,305.00

86.14

15,605

Tuberia Alcantarillado Polietileno alta d. 6"

Ins

1.0000

24,338.00

24,338.00

4,515

6,063 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 8"

3,590.53

40,010.66

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

15,606

Tuberia Alcantarillado Polietileno alta d. 8"

Ins

1.0000

35,578.00

35,578.00

4,515

6,064 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 10"

4,309.61

57,692.09

Cuadrilla BB (Instalaciones)

Ins

0.3215

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0130

12,305.00

159.97

15,607

Tuberia Alcantarillado Polietileno alta d. 10"

Ins

1.0000

52,337.00

52,337.00

4,515

6,065 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 12"

5,195.12

81,453.29

Cuadrilla BB (Instalaciones)

Ins

0.3497

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0180

12,305.00

221.49

15,608

Tuberia Alcantarillado Polietileno alta d. 12"

Ins

1.0000

75,581.00

75,581.00

4,515

6,066 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 15"

5,650.80

123,529.22

Cuadrilla BB (Instalaciones)

Ins

0.3831

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0220

12,305.00

270.71

15,609

Tuberia Alcantarillado Polietileno alta d. 15"

Ins

1.0000

117,068.00

117,068.00

4,515

6,067 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 18"

6,190.51

178,678.25

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

323

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,118

Lubricante 500 gr

Ins

15,610

Tuberia Alcantarillado Polietileno alta d. 18"

Ins

4,515

6,068 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 24"

Cantidad

Vr.Unitario

Vr.Total

0.5102

16,159.00

8,244.32

und

0.0260

12,305.00

319.93

1.0000

170,114.00

170,114.00

345,803.86

Cuadrilla BB (Instalaciones)

Ins

0.6309

16,159.00

14,118

Lubricante 500 gr

Ins

und

0.0300

12,305.00

369.15

15,617

Tuberia alcantarillado Polietileno alta d. 24"

Ins

1.0000

335,240.00

335,240.00

4,515

6,069 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 30"

10,194.71

505,558.57

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

0.7407

16,159.00

11,968.97

14,118

Lubricante 500 gr

Ins

und

0.0360

12,305.00

442.98

15,611

Tuberia Alcantarillado Polietileno alta d. 30"

Ins

1.0000

455,967.00

455,967.00

4
4,515

6,070 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 36"

975,514.58

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

0.9091

16,159.00

14,690.15

14,118

Lubricante 500 gr

Ins

und

0.0420

12,305.00

516.81

15,612

Tuberia Alcantarillado Polietileno alta d. 36"

Ins

1.0000

923,128.00

923,128.00

4
4,515

6,071 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 42"

1,358,905.93

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

1.1765

16,159.00

19,011.06

14,118

Lubricante 500 gr

Ins

und

0.0500

12,305.00

615.25

15,613

Tuberia Alcantarillado Polietileno alta d. 42"

Ins

1.0000

1,302,100.00

1,302,100.00

4
4,515

6,072 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 48"

1,763,277.02

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

1.5385

16,159.00

24,860.62

14,118

Lubricante 500 gr

Ins

und

0.0550

12,305.00

676.78

15,614

Tuberia Alcantarillado Polietileno alta d. 48"

Ins

1.0000

1,700,560.00

1,700,560.00

4
4,515

6,073 Suministro e instal. tuberia Polietileno de alta


densidad alcantarillado 60"

2,135,775.04

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

2.3529

16,159.00

38,020.51

14,118

Lubricante 500 gr

Ins

und

0.0620

12,305.00

762.91

15,615

Tuberia Alcantarillado Polietileno alta d. 60"

Ins

1.0000

2,059,812.00

2,059,812.00

4
4,515

6,074 Camara o Pozo de inspeccion con camara (sin


cono truncado) de h= 2.5 - 3.0 mts D=1.20 (Segun
planos)

und

8,909,353.94

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

324

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Muro en ladrillo tolete recocido 0.25 (12 x 25 x 6),


pagado por m2

Ana

5.3400

58,110.23

310,308.63

4,632

Geotextil No Tejido 2000

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

10.3400

5,085.70

52,586.14

Ana

0.9100

354,419.99

322,522.19

5,067
5,561

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

985.0000

3,075.79

3,029,653.15

Concreto 1:2:3 o 3000 Psi, impermeabilizado para


estructuras hidraulicas

Ana

4.5900

662,420.29

3,040,509.13

5,769

Paete Impermeabilizado 1:3 para Pozos de Inspeccion..


e= 2.0 Cm

Ana

5.3400

15,856.51

84,673.76

5,785

Concreto de resistencia 3000 psi para placa pozos


(cauela)

Ana

3.2400

450,457.00

1,459,480.68

5,836

Tapa pozo en via (inc. marco), pagado por un

Ana

und

1.0000

265,100.26

265,100.26

Cinta sika PVC 0-22

Ins

10.8000

31,900.00

344,520.00

206

13,927

6,075 Sumidero L=2.5, B= 1.00, losas en concreto


reforzado, muros 12 cm paetado e
impermeabilizado

und

1,847,733.32

206

Muro en ladrillo tolete recocido 0.25 (12 x 25 x 6),


pagado por m2

Ana

5.5000

4,821

Suministro e instal. tuberia PVC alcantarillado 10"

Ana

5,060

Concreto para solado resistencia 140 kg/cm2 - 2000 psi


pagado en m3.

Ana

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

5,769

Paete Impermeabilizado 1:3 para Pozos de Inspeccion..


e= 2.0 Cm

Ana

5,830

Placa o losa en concreto 4000 psi e=0.17 m para


sumideros y pozos

Ana

5,836

Tapa pozo en via (inc. marco), pagado por un

5,976

Placa Piso Concreto resistencia 210 kg/cm2-3000 psi


e=0.20

58,110.23

319,606.27

5.0000

51,120.97

255,604.85

0.2200

354,419.99

77,972.40

115.0000

3,075.79

353,715.85

5.5000

15,856.51

87,210.81

2.6600

79,650.54

211,870.44

Ana

und

1.0000

265,100.26

265,100.26

Ana

3.1100

88,955.77

276,652.44

6,076 Estructura de concreto para cabezal de entrega T1


(segun planos)

und

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

5,144

Transporte de materiales Tn

Ana

5,362

Concreto ciclopeo de resistencia 2500 psi, pagado en


m3

Ana

5,386

Dilatacion en Cinta PVC-022

5,561

Concreto 1:2:3 o 3000 Psi, impermeabilizado para


estructuras hidraulicas

6,077

Rejilla metalica 0.5*4.0 m (Barras 3/4" H=C/0.17 m y


V=C/0.15) para estructura de entrega T1 segun planos)

52,131,322.39

3,500.0000

3,075.79

0.3500

0.00

0.00

36.0600

306,357.58

11,047,254.33

Ana

36.0600

36,757.93

1,325,490.96

Ana

40.7000

662,420.29

26,960,505.80

Ana

und

3.0000

677,602.10

2,032,806.30

6,077 Rejilla metalica 0.5*4.0 m (Barras 3/4" H=C/0.17 m y


V=C/0.15) para estructura de entrega T1 segun
planos)

und

10,765,265.00

677,602.10

Herramienta Menor 10% M.O. DD

Eqp

HR

4.1000

1,763.00

7,228.30

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

5.0000

2,700.00

13,500.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

5,064

Cuadrilla DD (Carpinteria)

Ins

8,194

Acero de refuerzo 60000 Psi

Ins

kg

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

14,395

Perno de ojo de 5/8`` x 4``

Ins

und

56

4.1000

17,628.00

72,274.80

235.0000

2,257.00

530,395.00

1.5000

6,885.00

10,327.50

12.0000

3,582.00

42,984.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

325

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,078 Rejilla metalica 0.7*9.0 m (Barras 3/4" H=C/0.17 m y


V=C/0.15) para estructura de entrega T2 (segun
planos)

Cantidad

Vr.Unitario

und

Vr.Total
1,211,128.58

Herramienta Menor 10% M.O. DD

Eqp

HR

7.2000

1,763.00

12,693.60

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

10.4000

2,700.00

28,080.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,064

Cuadrilla DD (Carpinteria)

Ins

7.2000

17,628.00

126,921.60

8,194

Acero de refuerzo 60000 Psi

Ins

kg

427.8400

2,257.00

965,634.88

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

3.8000

6,885.00

26,163.00

14,395

Perno de ojo de 5/8`` x 4``

Ins

und

14.0000

3,582.00

50,148.00

56

6,079 Estructura de concreto para cabezal de entrega T2


(segun planos)

und

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

5,144

Transporte de materiales Tn

Ana

5,362

Concreto ciclopeo de resistencia 2500 psi, pagado en


m3

Ana

5,386

Dilatacion en Cinta PVC-022

5,561

Concreto 1:2:3 o 3000 Psi, impermeabilizado para


estructuras hidraulicas

6,078
6,080

49,805,685.44

2,997.0000

3,075.79

0.3000

0.00

0.00

28.7900

306,357.58

8,820,034.73

Ana

62.5000

36,757.93

2,297,370.63

Ana

39.8400

662,420.29

26,390,824.35

Rejilla metalica 0.7*9.0 m (Barras 3/4" H=C/0.17 m y


V=C/0.15) para estructura de entrega T2 (segun planos)

Ana

und

2.0000

1,211,128.58

2,422,257.16

Concreto ciclopeo de resistencia 1500 psi (para


proteccion cabezal de entrega)

Ana

2.2800

288,182.43

657,055.94

6,080 Concreto ciclopeo de resistencia 1500 psi (para


proteccion cabezal de entrega)

9,218,142.63

288,182.43

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.7004

1,469.00

49

Vibrador de concretos

Eqp

HR

0.3000

4,375.00

1,312.50

4,489

Cuadrilla AA (Albaileria)

Ins

4.7004

14,690.00

69,048.88

5,056

Concreto 1:3:6 o 1500 Psi (Basico, 5% desperdicio)

Ana

0.6000

288,180.33

172,908.20

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

6,081 Cunetas v h=0.30 mts. en concreto de 3000 psi


(vias circunvalares, segun planos)

6,904.89

66,614.11

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

1,572

Tabla burra ordinaria 0.10

Ins

1.2000

1,200.00

1,440.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

4,635

Sub-Base Granular Triturada

Ana

0.1100

53,849.66

5,923.46

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1400

333,142.66

46,639.97

5,430

Junta de Dilatacion de 10 mm x 10 mm (Cortada,


inducida y sellada)

Ana

0.8000

11,356.10

9,084.88

6,082 Cunetas v h=0.24 mts. en concreto de 3000 psi


(vias circunvalares, segun planos)

53,938.99

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1800

1,469.00

264.42

49

Vibrador de concretos

Eqp

HR

0.0600

4,375.00

262.50

1,572

Tabla burra ordinaria 0.10

Ins

1.2000

1,200.00

1,440.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1800

14,690.00

2,644.20

4,635

Sub-Base Granular Triturada

Ana

0.0900

53,849.66

4,846.47

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

326

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,430

Nombre

Tipo U.M.

Junta de Dilatacion de 10 mm x 10 mm (Cortada,


inducida y sellada)

Ana

6,083 Restauracion pavimento en concreto de 3000 psi y


piedra pegada

Cantidad

Vr.Unitario

Vr.Total

0.6900

11,356.10

7,835.71

71,884.11

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

2,200

Tabla burra ordinario 0.30

Ins

1.4300

4,333.00

6,196.19

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1250

333,142.66

41,642.83

5,063

Piedra rajon o media zonga

Ana

0.1050

90,495.15

9,501.99

17

6,084 Concreto de 3000 psi para reparacin de pavimento


y andn

1,322.10

363,416.72

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

3,323

Tabla Burra Ordinaria 0.25

Ins

1.0200

4,333.00

4,419.66

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

17

6,085 Losa inferior en concreto de 3500 psi


impermeabilizado, para tanque elevado, (inc. viga
perimetral y vigas centrales)

2,350.40

894,338.09

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.4000

4,375.00

6,125.00

54

Paral metalico

Eqp

HR

504.0000

58.00

29,232.00

80

Pluma grua o Malacate

Eqp

HR

1.5000

8,750.00

13,125.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

336.0000

188.00

63,168.00

84

672.0000

22.00

14,784.00

20.0000

14,690.00

293,800.00

29,380.00

Cercha o viga metalica

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

2.8000

32,375.50

90,651.40

Puntilla con cabeza 3"

Ins

lb

1.1200

1,990.00

2,228.80

14,124

6,086 Muro en concreto de 3500 psi impermeabilizado,


para tanque elevado, (inc. viga perimetral y vigas
centrales)

853,301.96

17

Herramienta Menor 10% M.O. AA

Eqp

HR

23.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.4000

4,375.00

6,125.00

54

Paral metalico

Eqp

HR

336.0000

58.00

19,488.00

80

Pluma grua o Malacate

Eqp

HR

1.5000

8,750.00

13,125.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

168.0000

188.00

31,584.00

84

Cercha o viga metalica

Eqp

HR

336.0000

22.00

7,392.00

4,489

Cuadrilla AA (Albaileria)

Ins

23.0000

14,690.00

337,870.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,061

Formaleta (1 uso)

Ana

1.5400

32,375.50

49,858.27

Puntilla con cabeza 3"

Ins

lb

1.1200

1,990.00

2,228.80

14,124

6,087 Losa superior en concreto de 3500 psi


impermeabilizado, para tanque elevado, (inc. viga
perimetral y vigas centrales)

33,787.00

844,704.09

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

49

Vibrador de concretos

Eqp

HR

1.4000

4,375.00

6,125.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

327

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

54

Paral metalico

Eqp

HR

168.0000

58.00

9,744.00

80

Pluma grua o Malacate

Eqp

HR

1.5000

8,750.00

13,125.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

336.0000

188.00

63,168.00

84

Cercha o viga metalica

Eqp

HR

168.0000

22.00

3,696.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,061

Formaleta (1 uso)

Ana

1.7600

32,375.50

56,980.88

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

1.0000

366,456.41

366,456.41

Puntilla con cabeza 3"

Ins

lb

1.1200

1,990.00

2,228.80

14,124

6,088 Anclaje apoyo Acero SAE 1045 y platinas A-36.


Suministro e Instal.

Vr.Unitario

und

Vr.Total

1,137,413.47

42

Motosoldador Diesel

Eqp

HR

0.1500

14,833.00

2,224.95

43

Equipo de Oxicorte

Eqp

HR

0.4250

5,000.00

2,125.00

44

Pulidora electrica manual

Eqp

HR

0.8500

4,350.00

3,697.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

8.0000

1,144.00

9,152.00

Anticorrosivo rojo claro

Ins

gal

0.2000

29,750.00

5,950.00

13,852

Lamina HR 1 1/4"

Ins

0.9650

692,632.00

668,389.88

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5000

6,885.00

3,442.50

14,323

Tuerca =1 1/4" G-8

Ins

und

8.0000

2,205.00

17,640.00

14,336

Tornillo = 1 1/4" x 20" G-8

Ins

und

4.0000

72,760.00

291,040.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

14,745

Oxigeno Industrial

Ins

0.3900

15,662.00

6,108.18

14,746

Acetileno

Ins

kg

0.1300

41,820.00

5,436.60

15,779

Lamina HR 1/8"

Ins

0.4675

64,382.59

30,098.86

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

8.0000

11,436.00

91,488.00

115
2,502

6,089 Canasta de seguridad en platina 2* 3/16" (inc.


anticorrosivo pintura)

139,822.48

Sub-Contrato Ornamentacion

Esp

30.0000

107,555.75

32,266.73

Herramienta Menor 10% M.O. AA

Eqp

HR

2.3000

1,469.00

3,378.70

2,502

Anticorrosivo rojo claro

Ins

gal

0.0550

29,750.00

1,636.25

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

4,489

Cuadrilla AA (Albaileria)

Ins

2.3000

14,690.00

33,787.00

5,144

7
17

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3000

6,885.00

2,065.50

15,618

Platina 3/16" x 2"

Ins

9.6000

6,723.00

64,540.80

6,090 Baranda en tubo galvanizado de 2", (inc.


anticorrosivo pintura), pagado por ML

100,903.20

Sub-Contrato Ornamentacion

Esp

50.0000

67,268.80

33,634.40

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,644.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0700

29,750.00

2,082.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1000

42,950.00

4,295.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,144

17

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3000

6,885.00

2,065.50

15,618

Platina 3/16" x 2"

Ins

0.2000

6,723.00

1,344.60

15,619

Tubo cerramiento Galvanizado =2"

Ins

2.5000

10,833.00

27,082.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

328

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,091 Estructura de llenado en tubo galvanizado 2" (incl.


niple, codos, uniones, valv. cheque, anticorrosivo y
pintura)

Cantidad

Vr.Unitario

und

Vr.Total
931,379.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2000

29,750.00

5,950.00

3,297

Tubo de agua Galvanizado =2"

Ins

18.0000

26,197.00

471,546.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.2000

42,950.00

8,590.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

15,541

Valvula cheque de cortina =2"

Ins

und

1.0000

272,368.00

272,368.00

15,545

Union Galvanizada = 2"

Ins

und

4.0000

5,336.00

21,344.00

15,618

Platina 3/16" x 2"

Ins

3.0000

6,723.00

20,169.00

15,624

Niple galvanizado 2`` x L=0.35 mts

Ins

und

1.0000

45,000.00

45,000.00

15,625

Codo H.G. 90 2"

Ins

und

2.0000

7,656.00

15,312.00

55

6,092 Estructura de salida en tubo galvanizado 3"


Tanque - red. dist. (incl. niple, codos, uniones,
anticorrosivo y pintura)

und

6,464.00

543,626.20

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2000

29,750.00

5,950.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1000

28,250.00

2,825.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.2000

42,950.00

8,590.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

15,001

Tubo presin RDE 21 PVC 3 "

Ins

16.0000

21,211.00

339,376.00

15,028

Codo 90 presion PVC 3"

Ins

und

2.0000

23,261.00

46,522.00

15,046

Union presion PVC 3"

Ins

und

4.0000

12,489.00

49,956.00

15,618

Platina 3/16" x 2"

Ins

2.0000

6,723.00

13,446.00

55

6,093 Estructura de lavado tubo PVC RDE 21 4".


Tanque. (incl. niple, adapt. macho, tapon rosc,
anticorrosivo y pintura)

und

109,412.86

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0300

58,612.00

1,758.36

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0400

28,250.00

1,130.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,002

Tubo presin RDE 21 PVC 4 "

Ins

1.0000

36,181.00

36,181.00

15,056

Adaptador macho presin PVC 4"

Ins

und

1.0000

25,025.00

25,025.00

15,120

Tapon roscado presin PVC 4

Ins

und

1.0000

31,796.00

31,796.00

55

6,094 Tuberia PF+UAD 3/4". Suministro e instal.

3,573.07

Herramienta Menor 5% M.O. BB

Eqp

HR

0.0430

808.00

34.74

Cuadrilla BB (Instalaciones)

Ins

0.0430

16,159.00

694.84

14,236

Union PF+UAD 3/4"

Ins

und

0.0111

3,287.00

36.49

16,330

Tuberia PF+UAD 3/4 "

Ins

1.0000

2,807.00

2,807.00

109
4,515

6,095 Tuberia PF+UAD 1/2". Suministro e instal.


109

Herramienta Menor 5% M.O. BB

m
Eqp

HR

2,187.42

0.0430

808.00

34.74

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

329

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

14,791

Tuberia PF+UAD 1/2"

Ins

15,346

Union PF+UAD 1/2 "

Ins

4,515

6,096 Valvula compuerta elastica vastago no ascendente


=10" E.B. Suministro e instal.
55
4,515
16,166

Cantidad

Vr.Unitario

Vr.Total

0.0430

16,159.00

694.84

1.0000

1,429.00

1,429.00

und

0.0111

2,598.00

28.84

und

2,995,425.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

Valv. comp. elast. vast. n.asc. ext. brida 10"

Ins

und

1.0000

2,871,000.00

2,871,000.00

6,097 Valvula de bola PVC 3" para purga de lodos

und

289,607.74

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,020

Cinta teflon

Ins

rl

2.0000

1,000.00

2,000.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

16,282

Valvula de bola radial rosca PVC 3"

Ins

und

1.0000

246,036.00

246,036.00

4,515

6,098 Valvula de compuerta elastica vastago no


ascendente extremo jh 2". Suministro e Instal.

und

14,363.74

303,564.48

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0400

58,612.00

2,344.48

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

16,142

Valv. comp. elast. vast. n.asc. ext. jh 2"

Ins

und

1.0000

281,880.00

281,880.00

55

6,099 Adecuacion del terreno y construccion de piscinas


para lodos
17
4,489

27,470.30

Herramienta Menor 10% M.O. AA

Eqp

HR

1.7000

1,469.00

2,497.30

Cuadrilla AA (Albaileria)

Ins

1.7000

14,690.00

24,973.00

6,100 Perforacion de prueba en 8 " (plano-sabana)

71,730.40

Equipo de perforacion y rotacion

Eqp

HR

0.4000

76,000.00

30,400.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.4000

2,305.00

922.00

Agua para obra

Ins

50.0000

10.00

500.00

15,635

Broca tugsteno 8 ``

Ins

und

0.0043

950,000.00

4,085.00

15,636

Bentonita x 50 Kg

Ins

kg

37.0000

719.00

26,603.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.4000

23,051.00

9,220.40

85
112
3,684

6,101 Registro electrico del pozo con sonda SP, Gamma


Ray y Resistividad
86
14,650

32,129.97

Equipo de resistividad

Eqp

HR

0.1700

185,000.00

31,450.00

Ayudante de maquinaria

Ins

0.1700

3,999.84

679.97

6,102 Tuberia acero al carbon SCH-40. 6". Suministro e


Instal.

226,134.94

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

85

Equipo de perforacion y rotacion

Eqp

HR

0.2500

76,000.00

19,000.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.2500

2,305.00

576.25

112

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

330

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Soldador

Ins

Transporte de materiales Tn

Ana

14,795

Soldadura electrosoldada 6012 de 1/8"

14,854
16,415

519
5,144

Cantidad

Vr.Unitario

Vr.Total

0.2500

6,759.00

1,689.75

0.1000

0.00

0.00

Ins

kg

0.0893

5,800.00

517.94

Tuberia en A.C S/C = 6" SCH 40

Ins

1.0000

194,880.00

194,880.00

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.2500

23,051.00

5,762.75

6,103 Filtro en Acero al Carbon Inoxidable SCH-40 6".


Suministro e Instal.

731,254.94

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

85

Equipo de perforacion y rotacion

Eqp

HR

0.2500

76,000.00

19,000.00

112

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.2500

2,305.00

576.25

519

Soldador

Ins

0.2500

6,759.00

1,689.75

Transporte de materiales Tn

Ana

0.1200

0.00

0.00

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.0893

5,800.00

517.94

15,639

Filtro en A.C. Inoxidable SCH 40 6" Ran 20 mm

Ins

1.0000

700,000.00

700,000.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.2500

23,051.00

5,762.75

5,144

6,104 Grava lavada y libre de calcareos para filtros 1/32" 1". Suministro e Instal.

971,011.40

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

Grava fina libre de calcareos 1/32" a 1"

Ins

bt

31.0000

29,000.00

899,000.00

17

15,640

6,105 Sello sanitario Placa base en Concreto 3000 Psi 1.0


x 1.0 x 0.08. Incluye alimentador gravilla 1 1/2" y
Tapon roscado

und

78,427.61

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,572

Tabla burra ordinaria 0.10

Ins

1.3300

1,200.00

1,596.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0800

333,142.66

26,651.41

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

5.0000

6,392.00

31,960.00

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

1.0000

2,422.00

2,422.00

15,116

Tapon roscado presin PVC 1 1/2

Ins

und

1.0000

2,871.00

2,871.00

17

6,106 Limpieza y desarrollo de pozo profundo con


compresor
51
106
14,703

1,175.20

40,145.00

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.0000

35,000.00

Herramienta menor 10% M.O. Ayudante (A)

Eqp

HR

1.0000

468.00

468.00

Ayudante (A)

Ins

1.0000

4,677.00

4,677.00

6,107 Suministro e instal. equipo de bombeo (Inc. tuberia


produccion A/C SCH-40. 2 pulg y tablero de
control), pagado un

und

35,000.00

9,370,331.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

9.0000

1,616.00

14,544.00

85

Equipo de perforacion y rotacion

Eqp

HR

5.0000

76,000.00

380,000.00
129,272.00

4,515

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

14,021

Codo 90 =2" en A.C. E.B.

Ins

und

1.0000

70,760.00

70,760.00

14,249

Cable duplex 2x12

Ins

50.0000

2,030.00

101,500.00

14,263

Cinta autofundente

Ins

und

1.0000

38,087.00

38,087.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

331

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,594

Cable Encauchetado 3 x 12

Ins

15,541

Valvula cheque de cortina =2"

Ins

und

15,643

Tuberia en A.C S/C = 2" SCH 40

Ins

15,644

Tablero control bomba. completo

Ins

und

15,645

Electrodos control de nivel

Ins

und

15,646

Alambre de cobre THW No. 8

Ins

15,647

Electrobomba sumerg. 5 HP. 220V. Q=90gpm

Ins

15,648

Cabeza de pozo

Ins

15,649

Sellador de roscas

Vr.Unitario

Vr.Total

50.0000

5,925.00

296,250.00

1.0000

272,368.00

272,368.00

40.0000

34,220.00

1,368,800.00

1.0000

1,200,000.00

1,200,000.00

2.0000

25,000.00

50,000.00

50.0000

2,255.00

112,750.00

und

1.0000

5,200,000.00

5,200,000.00

und

1.0000

50,000.00

50,000.00

Ins

und

1.0000

25,000.00

25,000.00

15,650

Union roscada A/C, 2"

Ins

und

6.0000

7,500.00

45,000.00

15,651

Zuncho c/grapas

Ins

und

10.0000

1,000.00

10,000.00

15,652

Uniones de proteccin p/cable

Ins

und

6.0000

1,000.00

6,000.00

6,108 Tubo galvanizado 2" con brazo portapuas


(Cerramientos - incluye pie de amigo esquinas e
intermedios)

Cantidad

21,730.50

Sub-Contrato Ornamentacion

Esp

50.0000

14,487.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1500

1,469.00

220.35

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1000

6,885.00

688.50

15,619

Tubo cerramiento Galvanizado =2"

Ins

1.0500

10,833.00

11,374.65

7
17
4,489

6,110 Alambre de puas cal. 12. 3 hilos


17
4,489
15,655

7,243.50

2,089.16

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0450

1,469.00

66.11

Cuadrilla AA (Albaileria)

Ins

0.0450

14,690.00

661.05

Alambre de puas galvanizado Cal. 12

Ins

3.0000

454.00

1,362.00

6,111 Porton en malla eslabonada Cal. 10 y tubo H. G. 2"


(Anticorrosivo y Pintura)

und

809,724.50

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

6.0000

8,750.00

Herramienta Menor 10% M.O. AA

Eqp

HR

7.0000

1,469.00

10,283.00

Soldador

Ins

15.0000

6,759.00

101,385.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.3500

29,750.00

10,412.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.3500

42,950.00

15,032.50

4,489

Cuadrilla AA (Albaileria)

Ins

7.0000

14,690.00

102,830.00

5,144

8
17
519

52,500.00

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

13,154

Platina 1/4" x 1 1/4"

Ins

15.8000

4,126.00

65,190.80

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

4.2200

6,885.00

29,054.70

15,556

Malla eslabonada Cal. 10

Ins

5.4000

10,020.00

54,108.00

15,896

Tubo cerramiento Galvanizado =2" e=0.098"

Ins

21.0000

17,568.00

368,928.00

6,112 Valvula de ventosa 1/2". Camara doble accion


multiple. Suministro e instal.

und

582,210.98

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0400

58,612.00

2,344.48

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

16,207

Valv. ventosa (cam. doble) acc. multiple 1/2" ros

Ins

und

1.0000

548,680.00

548,680.00

55

1,616.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

332

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,113 Tapon soldado PVC 2". Suministro e Instal.

Cantidad

Vr.Unitario

und

Vr.Total
5,973.74

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

Tapon soldado presin PVC 2

Ins

und

1.0000

3,593.00

3,593.00

15,086

6,114 Accesorios por unidad de acometida domiciliaria


de acueducto PF+UAD 1/2" (incluye registros)

und

879.18

63,559.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3200

1,616.00

517.12

Cuadrilla BB (Instalaciones)

Ins

0.3200

16,159.00

5,170.88

12,142

Registro de incorporacion 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

14,365

Registro de corte 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

15,664

Adaptador Macho PF+UAD 1/2 "

Ins

und

2.0000

1,481.00

2,962.00

55
4,515

6,115 Columna en concreto de resistencia 3000 psi de


6-9 m, pagada en m3

722,324.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,867

Paral telescopico 2 a 4 ml

Ins

28.0000

340.00

9,520.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0500

333,142.66

349,799.79

13,641

Seccin de Andamio

Ins

mes

0.4000

17,120.00

6,848.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

6,116 Columna en concreto de resistencia 3000 psi de


9-12 m, pagada en m3

29,380.00

795,144.60

17

Herramienta Menor 10% M.O. AA

Eqp

HR

24.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

24.0000

14,690.00

352,560.00

4,867

Paral telescopico 2 a 4 ml

Ins

42.0000

340.00

14,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0500

333,142.66

349,799.79

13,641

Seccin de Andamio

Ins

mes

0.6000

17,120.00

10,272.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

6,117 Suministro e instal. Tapa en lamina alfajor, con


marco en angulo y 2 agarraderas, pagado por m2

35,256.00

301,089.09

Sub-Contrato Ornamentacion

Esp

50.0000

200,726.06

100,363.03

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,064

Cuadrilla DD (Carpinteria)

Ins

1.4540

17,628.00

25,631.11

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.0000

2,257.00

4,514.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

14,758

Lamina alfajor 1/4" (6 mm)

Ins

1.0000

135,505.00

135,505.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

333

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,557

Angulo o perfil 1 1/4" x 1 1/4" x 1/8"

Ins

6,118 Excavacion a mano en material comun 2-3, pagado


en m3
19
4,489

Vr.Unitario

Vr.Total

5.0000

3,882.00

19,410.00

38,562.50

Herramienta menor 5% M.O. AA

Eqp

HR

2.5000

735.00

1,837.50

Cuadrilla AA (Albaileria)

Ins

2.5000

14,690.00

36,725.00

6,119 Analisis fisico - quimico de agua


15,656

Cantidad

Analisis fsico-qumico

und
Ins

6,120 Rejillas para captacin ancho = 0.70 m.

und

250,000.00

1.0000

250,000.00

250,000.00

204,994.02

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

12.0000

2,295.00

27,540.00

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

3.4000

2,700.00

9,180.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

5,064

Cuadrilla DD (Carpinteria)

Ins

8.8009

17,628.00

155,142.27

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5500

6,885.00

3,786.75

14,116

6,121 Suministro e instal. de lavaplatos en acero


inoxidable 36 lts, con griferia, pagado por un

und

131,352.12

Herramienta Menor 10% M.O. BB

Eqp

HR

0.9000

Cemento blanco

Ins

kg

2,927

Soldadura para PVC 1/4 gl

Ins

und

4,337

Llave individual cromada conexion 1/2"

Ins

4,515

Cuadrilla BB (Instalaciones)

5,144

Transporte de materiales Tn

5,145

Lavaplatos sencilla acero inoxidable 80 x 50

55
829

1,616.00

1,454.40

0.5000

975.00

487.50

0.0100

58,612.00

586.12

und

1.0000

22,000.00

22,000.00

Ins

0.9000

16,159.00

14,543.10

Ana

0.0250

0.00

0.00

Ins

und

1.0000

92,281.00

92,281.00

6,123 Poyo para ducha, en tolete comn y enchapado,


pagado en ML

18,507.74

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0100

248,144.84

2,481.45

2,085

Ladrillo tolete comn

Ins

und

8.0000

305.00

2,440.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

6,206

Enchape bordillo ducha en ceramica lisa h=20, pagado


ML

Ana

1.0000

7,122.69

7,122.69

17

6,124 Buje soldado 1" x 3/4". Suministro e instal.

und

3,622.01

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0120

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0120

28,250.00

339.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

1,856.67

Buje soldado presion PVC 1 x 3/4

Ins

und

1.0000

723.00

723.00

15,092

6,125 Cable IPS - IWRC 6 x 19 AA = 1 7/8"

703.34

96,831.75

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2500

3,091.00

772.75

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.2500

2,958.00

739.50

Transporte de materiales Tn

Ana

0.0097

0.00

0.00

Cuadrilla AA-4

Ins

0.2500

30,910.00

7,727.50

5,144
13,960

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

334

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,658

Cable IPS-IWRC 6 x 19 AA = 1 7/8"

Ins

6,126 Varilla roscada de anclaje =1 1/8" acero Sae 1045

Cantidad

Vr.Unitario

Vr.Total

1.0000

87,592.00

87,592.00

109,600.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

Arandela redonda de 1 1/8"

Ins

und

0.2500

250.00

62.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

14,349

Tuerca =1 1/8" G-5

Ins

und

0.5000

1,300.00

650.00

16,546

Varilla Roscada de anclaje de 1 1/8" Acero SAE1045

Ins

1.0000

100,000.00

100,000.00

55
863

6,127 Cimbra metalica para vigas de Puentes


Postensados (Obra falsa) > 45 m

808.00

250,934.12

14

Retroexcavadora de orugas

Eqp

HR

0.0320

144,160.00

4,613.12

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

3.0000

2,010.00

6,030.00

Transporte de materiales Tn

Ana

0.8000

0.00

0.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

3.0000

20,097.00

60,291.00

15,660

Cimbra metalica para Vigas Postensadas (Puentes)

Ins

1.0000

180,000.00

180,000.00

5,144

6,128 Baranda en concreto 3000 Psi, sin refuerzo H=0.90


de 0.25 x 0.50, L separacion 2.50 m

92,119.56

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1350

333,142.66

44,974.26

5,061

Formaleta (1 uso)

Ana

0.6333

32,375.50

20,503.40

6,129 Concreto 3000 Psi, para el anillo del Caisson


(H=1.00 M, Prof=7.0 - 12 m, =1.20 m

1,469.00

2,350.40

945,015.54

49

Vibrador de concretos

Eqp

HR

4.5000

4,375.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

14.0000

3,091.00

43,274.00

Formaleta metalica Tipo Caisson H=1.00 M DI=1.00 M,


DE=1.10 M (para 20 usos)

Ana

und

0.1470

790,281.50

116,171.38

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-4

Ins

14.0000

30,910.00

432,740.00

160
5,053
13,960

6,130 Concreto 3000 Psi para el pilote tipo Caisson


(Profundidad 7.0 m a 12 m, = 0.9 m)

19,687.50

620,245.16

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

10.0000

2,550.00

25,500.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-3 (Limpieza)

Ins

10.0000

25,504.00

255,040.00

5,053
14,749

6,131 Excavacion manual en conglomerado para


Caisson, Bajo agua y profundidad 7 m - 12 m,
=1.20 m

294,266.60

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

3.4000

3,632.00

12,348.80

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

3.4000

35,000.00

119,000.00

58

Motobomba de 4" o 6"

Eqp

HR

3.4000

11,600.00

39,440.00

Cuadrilla AA-5

Ins

3.4000

36,317.00

123,477.80

13,962

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

335

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,132 Formaleta metalica Para Vigas Postensadas Hp=1.3


- 3.00

Cantidad

Vr.Unitario

Vr.Total
350,305.25

42

Motosoldador Diesel

Eqp

HR

1.5000

14,833.00

22,249.50

43

Equipo de Oxicorte

Eqp

HR

1.5000

5,000.00

7,500.00

44

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

45

Cilindro

Eqp

HR

1.5000

41.00

61.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.5000

3,226.00

4,839.00

Lamina HR 5/16"

Ins

1.0500

191,819.00

201,409.95

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.8000

6,856.00

5,484.80

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

5.0000

2,257.00

11,285.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.5000

32,262.00

48,393.00

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

2.8000

11,609.00

32,505.20

14,937

Acero ASTM - 36

Ins

kg

1.5000

2,543.00

3,814.50

381

6,133 Viga Postensada 5000 Psi (350 Kg/cm2) H= 2.0 3.00 m.

1,563,763.92

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

16.0000

3,091.00

49,456.00

5,057

Concreto 5000 Psi (Basico, 5% desperdicio)

Ana

1.0000

416,790.73

416,790.73

6,132

Formaleta metalica Para Vigas Postensadas Hp=1.3 3.00

Ana

1.7025

350,305.25

596,394.69

Cuadrilla AA-4

Ins

16.0000

30,910.00

494,560.00

13,960

6,134 Valvula de ventosa 3/4". Camara sencilla doble


accion. Suministro e instal.

und

250,450.98

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0400

58,612.00

2,344.48

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

15,540

Valv. ventosa (cam. senc.) doble acc. 3/4" rosc

Ins

und

1.0000

216,920.00

216,920.00

55

6,135 Tapon soldado PVC 2 1/2". Suministro e Instal.

und

1,616.00

10,966.04

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0165

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0165

28,250.00

466.13

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0667

16,159.00

1,077.81

Tapon soldado presin PVC 2 1/2

Ins

und

1.0000

8,455.00

8,455.00

15,087

6,136 Tee de presion PVC 1 1/2". Suministro e instal.

und

967.10

7,843.11

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0070

58,612.00

410.28

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1159

16,159.00

1,872.83

Tee sencilla presion PVC 1 1/2 "

Ins

und

1.0000

5,560.00

5,560.00

15,061

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

336

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,137 Tee de presion PVC 1/2". Suministro e instal.

Cantidad

Vr.Unitario

und

Vr.Total
1,269.28

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0026

58,612.00

152.39

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0383

16,159.00

618.89

Tee sencilla presion PVC 1/2 "

Ins

und

1.0000

498.00

498.00

15,057

6,138 Buje soldado 3/4 x 1/2". Suministro e instal.

und

2,923.01

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0120

58,612.00

703.34

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1149

16,159.00

1,856.67

Buje soldado presion PVC 3/4 x 1/2

Ins

und

1.0000

363.00

363.00

15,090

6,139 Valvula de corte 1". Suministro e instal.

und

105,348.91

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

15,050

Adaptador macho presin PVC 1"

Ins

und

2.0000

984.00

1,968.00

15,661

Valvula de corte 1"

Ins

und

1.0000

90,596.00

90,596.00

55

6,140 Valvula de bola en H.D. 1/2"

und

15,229.61

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

2.0000

260.00

520.00

15,662

Valvula de Bola para agua H.D. 1/2"

Ins

und

1.0000

10,150.00

10,150.00

4,515

6,141 Suministro e instal. pasamuro h.f 1 1/2", pagado


por un

und

78,817.59

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

15,663

Pasamuro h.f 1 1/2`` L= 1m

Ins

und

1.0000

70,000.00

70,000.00

4,515

6,142 Reparacion de acometida domiciliaria acueducto


PVC =1/2".

8,617.59

6,049.22

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0020

58,612.00

117.22

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0010

28,250.00

28.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

1.0000

1,504.00

1,504.00

15,039

Union presion PVC 1/2"

Ins

und

1.5000

240.00

360.00

17

6,143 Reparacion de acometida domiciliaria


alcantarillado = 6"

44,918.76

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

13,740

Tuberia alcantarillado PVC 6 "

Ins

1.0000

20,918.00

20,918.00

13,747

Adhesivo Alcantarillado

Ins

und

0.1100

43,753.00

4,812.83

15,363

Acondicionador de Superficie

Ins

tr

0.0333

83,629.00

2,784.85

55
4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

337

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,665

Union sanitaria Novafort 6"

Ins

6,144 Conexion inferior (pendolon de 1")

und

Cantidad

Vr.Unitario

Vr.Total

0.3333

22,549.00

7,515.58

und

709,407.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.8000

5,313.00

4,250.40

Soldador

Ins

0.8000

6,759.00

5,407.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

15,581

Casquillo T- Crosby - Socket 1/2`` HF

Ins

und

2.0000

322,009.00

644,018.00

15,666

Platina de conexin 1/2" x 150 mm x 100 mm

Ins

und

2.0000

18,000.00

36,000.00

519

6,145 Conector Superior de 1 7/8 " a Pendolon 1"

und

2,375,299.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

17

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

14,387

Guardacable de 1/2" o Portacable T.P.

Ins

und

2.0000

11,716.00

23,432.00

15,574

Tuerca =1" G-5

Ins

und

16.0000

1,340.00

21,440.00

15,580

Perro crosby = 1/2" en HF

Ins

und

8.0000

24,500.00

196,000.00

15,667

Grapa =1" 440 mm x 103 mm

Ins

und

2.0000

40,000.00

80,000.00

15,668

Platina de conexin 2" x 210 mm x 563 mm Pos 1

Ins

und

2.0000

700,000.00

1,400,000.00

15,669

Platina de conexin 2" x 210 mm x 256 mm

Ins

und

2.0000

320,750.00

641,500.00

6,146 Conexion de Cables de Contraviento 3/4"


(estructura y muerto)

und

887,867.84

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5650

1,469.00

829.99

4,489

Cuadrilla AA (Albaileria)

Ins

0.5650

14,690.00

8,299.85

5,144

17

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

15,574

Tuerca =1" G-5

Ins

und

8.0000

1,340.00

10,720.00

15,581

Casquillo T- Crosby - Socket 1/2`` HF

Ins

und

2.0000

322,009.00

644,018.00

15,670

Platina 3/8" x 110 mm x 95 mm

Ins

und

2.0000

12,000.00

24,000.00

15,671

Platina 1" x 100 mm x 200 mm

Ins

und

2.0000

60,000.00

120,000.00

15,672

Grapa =1" 565 mm x 103 mm

Ins

und

1.0000

40,000.00

40,000.00

15,673

Tensor =1/2"

Ins

und

1.0000

40,000.00

40,000.00

6,147 Conexion cercha de rigidez Tipo 2

und

207,270.65

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1500

1,469.00

1,689.35

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.1500

5,313.00

6,109.95

Soldador

Ins

1.1500

6,759.00

7,772.85

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

15,577

Pasador con pin =2" SAE 1045 de 100 mm

Ins

und

1.0000

55,000.00

55,000.00

15,674

Platina de conexin 3/4" x 200 mm x 225 mm

Ins

und

1.0000

21,000.00

21,000.00

15,675

Platina de conexin 1/2" x 200 mm x 225 mm

Ins

und

2.0000

35,000.00

70,000.00

15,676

Platina de conexin 5/16" x 75 mm x 75 mm

Ins

und

4.0000

5,500.00

22,000.00

519

6,148 Galapago
17

Herramienta Menor 10% M.O. AA

und
Eqp

HR

44,083,559.50

16.0000

1,469.00

23,504.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

338

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

Soldador

Ins

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,144

74
519

Cantidad

Vr.Unitario

Vr.Total

8.0000

5,313.00

42,504.00

16.0000

6,759.00

108,144.00

Transporte de materiales Tn

Ana

4.6610

0.00

0.00

15,677

Platina 2" x 1300 mm x 300 mm

Ins

und

10.0000

600,000.00

6,000,000.00

15,678

Rigidizador 3/4" x 300 mm x 234 mm

Ins

und

24.0000

12,000.00

288,000.00

15,679

Rigidizador 3/4" x 300 mm x 112 mm

Ins

und

12.0000

12,000.00

144,000.00

15,680

Rigidizador 2" x 1000 mm x 1415 mm

Ins

und

2.0000

850,000.00

1,700,000.00

15,682

Tuerca =1 1/4" G-5

Ins

und

24.0000

1,340.00

32,160.00

15,683

Tornillo SAE 1045 = 1 1/4" L=0.8 m

Ins

und

12.0000

125,000.00

1,500,000.00

15,773

Casquillo T- Crosby - Socket 2 1/4`` HF

Ins

und

20.0000

1,700,000.00

34,000,000.00

6,149 Apoyo Tipo 2

und

772,270.65

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1500

1,469.00

1,689.35

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.1500

5,313.00

6,109.95

Soldador

Ins

1.1500

6,759.00

7,772.85

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,144

519

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

15,577

Pasador con pin =2" SAE 1045 de 100 mm

Ins

und

1.0000

55,000.00

55,000.00

15,684

Platina 1" x 300 mm x 300 mm

Ins

und

2.0000

275,000.00

550,000.00

15,685

Platina de conexin 3/4" x 216 mm x 216 mm

Ins

und

2.0000

22,000.00

44,000.00

15,686

Platina de conexin 1/2" x 216 mm x 216 mm

Ins

und

1.0000

70,000.00

70,000.00

15,687

Platina de conexiin 1/2" x 80 mm x 80 mm

Ins

und

8.0000

1,750.00

14,000.00

6,150 Anclaje cable - macizo =3"

und

5,575,788.24

42

Motosoldador Diesel

Eqp

HR

2.0000

14,833.00

29,666.00

43

Equipo de Oxicorte

Eqp

HR

2.0000

5,000.00

10,000.00

44

Pulidora electrica manual

Eqp

HR

2.0000

4,350.00

8,700.00

45

Cilindro

Eqp

HR

2.0000

41.00

82.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

8.0000

3,226.00

25,808.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

12.0000

6,805.00

81,660.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

1.0000

6,200.00

6,200.00

14,745

Oxigeno Industrial

Ins

2.4200

15,662.00

37,902.04

14,746

Acetileno

Ins

kg

1.2100

41,820.00

50,602.20

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

8.0000

32,262.00

258,096.00

14,937

Acero ASTM - 36

Ins

kg

304.0000

2,543.00

773,072.00

15,578

Plomo

Ins

kg

5.0000

76,000.00

380,000.00

15,681

Casquillo T- Crosby - Socket 1 7/8`` HF

Ins

und

1.0000

1,400,000.00

1,400,000.00

15,688

Varilla Roscada de anclaje de 3" Acero SAE1045

Ins

12.0000

179,500.00

2,154,000.00

15,689

Tuerca =3" G-5

Ins

und

12.0000

30,000.00

360,000.00

6,151 Pendolon en varilla de 5/8" (con herrajes)

und

338,373.87

43

Equipo de Oxicorte

Eqp

HR

1.5000

5,000.00

7,500.00

44

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.5000

5,313.00

7,969.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.2000

29,750.00

5,950.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

339

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

3,837

Esmalte Sintetico Pintuco

Ins

gal

5,144

Transporte de materiales Tn

0.2000

42,950.00

8,590.00

Ana

0.0400

0.00

8,194

0.00

Acero de refuerzo 60000 Psi

Ins

kg

2.4000

2,257.00

5,416.80

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

14,945

Lamina HR 1/2"

Ins

0.2900

250,702.65

72,703.77

15,690

Tornillo = 3/4 x 3" G-2 con T. A.

Ins

und

6.0000

2,780.00

16,680.00

15,691

Tornillo = 1 1/4" x 5" G-2 con T. A.

Ins

und

4.0000

31,900.00

127,600.00

6,152 Durmiente en Madera 0.10 x 0.08 x 1

18,255.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

56

Transporte de materiales Tn

Ana

0.0080

0.00

0.00

15,719

Madera de 0.10 x 0.08 x 1

Ins

1.0000

10,650.00

10,650.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

1.0000

670.00

670.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0400

52,200.00

2,088.00

6,153 Tabla para piso 0.03 x 0.20 x 1

15,347.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

14,124

Puntilla con cabeza 3"

Ins

lb

0.1000

1,990.00

199.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

2.3000

670.00

1,541.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0400

52,200.00

2,088.00

15,723

Madera de 0.03 x 0.20 x 1

Ins

1.0000

7,480.00

7,480.00

17

6,154 Durmiente metalico (100 x 100)

und

84,556.92

43

Equipo de Oxicorte

Eqp

HR

0.3000

5,000.00

1,500.00

44

Pulidora electrica manual

Eqp

HR

0.3000

4,350.00

1,305.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.3000

3,226.00

967.80

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.3000

5,313.00

1,593.90

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3000

6,805.00

2,041.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1000

42,950.00

4,295.00

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0050

6,200.00

31.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.3000

32,262.00

9,678.60

15,690

Tornillo = 3/4 x 3" G-2 con T. A.

Ins

und

6.0000

2,780.00

16,680.00

15,724

Perfil 100 x 100 cal 16 (3 mm)

Ins

1.0000

41,713.00

41,713.00

6,155 Tabla para calzada 0.04 x 0.20 x 1

16,381.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

Puntilla con cabeza 3"

Ins

lb

0.1000

1,990.00

199.00

17

14,124

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

340

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

15,725

Madera de 0.04 x 0.20 x 1

Ins

6,156 Riel en Madera 0.04 x 0.07 x 1

Cantidad

Vr.Unitario

Vr.Total

2.3000

670.00

1,541.00

0.0500

52,200.00

2,610.00

1.0000

7,992.00

7,992.00

11,802.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

5,064

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

5,144

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

2.3000

670.00

1,541.00

15,722

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.0200

52,200.00

1,044.00

15,726

Madera de 0.04 x 0.07 x 1

Ins

1.0000

4,370.00

4,370.00

56

6,157 Pintura Gris Basalto para estructuras de concreto.

7,770.35

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

337.80

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.3000

1,691.00

507.30

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

Pintura gris basalto

Ins

gal

0.0650

52,650.00

3,422.25

61

15,727

6,158 Pintura en Anticorrosivo para pendolones

2,360.17

Herramienta menor 10% M.O. CC

Eqp

HR

0.1000

1,689.00

168.90

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0080

1,691.00

13.53

1,990

Disolvente Thinner

Ins

gal

0.0010

12,440.00

12.44

2,502

Anticorrosivo rojo claro

Ins

gal

0.0160

29,750.00

476.00

5,066

Cuadrilla CC (Pintura)

Ins

0.1000

16,893.00

1,689.30

61

6,159 Pintura epoxica o de alta densidad para


pendolones

7,924.02

Sub-Contrato Pintura

Esp

45.0000

5,464.84

2,459.18

Herramienta menor 10% M.O. CC

Eqp

HR

0.1000

1,689.00

168.90

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0050

1,691.00

8.46

1,990

Disolvente Thinner

Ins

gal

0.0010

12,440.00

12.44

5,066

Cuadrilla CC (Pintura)

Ins

0.1000

16,893.00

1,689.30

Pintura esmalte Epxico

Ins

gal

0.0160

224,109.00

3,585.74

5
61

14,980

6,160 Valvula de compuerta sello de bronce vastago no


ascend. ext. j.h. = 3". Suministro e instal.

und

569,238.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,729

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 3"

Ins

und

1.0000

535,920.00

535,920.00

4,515

6,161 Respiradero tanque de almacenamiento tuberia


galvanizada 3"

und

54,965.50

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

0.5000

34,693.00

17,346.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

Codo H.G. 90 3"

Ins

und

1.0000

21,460.00

21,460.00

14,404

6,162 Buje soldado 2 x 1/2". Suministro e instal.

und

6,920.64

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

341

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)
Buje soldado presion PVC 2 x 1/2

15,100

Cantidad

Vr.Unitario

Vr.Total

und

0.0170

58,612.00

996.40

und

0.0170

28,250.00

480.25

Ins

0.1333

16,159.00

2,153.99

Ins

und

1.0000

3,290.00

3,290.00

6,163 Buje soldado 2" x 1". Suministro e instal.

und

6,920.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 2 x 1

Ins

und

1.0000

3,290.00

3,290.00

15,102

6,165 Caja de derivacion tipo I

und

996.40

2,354,091.80

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,923

Paete impermeabilizado muros 1:3 espesor de 2 cm,


pagado en m2

Ana

1.6200

18,719.87

30,326.19

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

6.1400

76,218.46

467,981.34

5,130

Relleno con material crudo de rio T.m 6", compactado y


Transportado, pagado en m3

Ana

0.1000

82,834.77

8,283.48

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

0.1320

366,456.41

48,372.25

6,123

Poyo para ducha, en tolete comn y enchapado, pagado


en ML

Ana

1.6200

18,507.74

29,982.54

14,090

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 2"

Ins

und

1.0000

402,520.00

402,520.00

14,091

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 4"

Ins

und

1.0000

711,080.00

711,080.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,056

Adaptador macho presin PVC 4"

Ins

und

2.0000

25,025.00

50,050.00

15,065

Tee sencilla presion PVC 4 "

Ins

und

1.0000

65,076.00

65,076.00

15,100

Buje soldado presion PVC 2 x 1/2

Ins

und

1.0000

3,290.00

3,290.00

15,102

Buje soldado presion PVC 2 x 1

Ins

und

1.0000

3,290.00

3,290.00

15,109

Buje soldado presion PVC 4 x 2

Ins

und

1.0000

18,689.00

18,689.00

15,353

Pasamuro en A.C. =4" L=0.50 m E.B.

Ins

und

2.0000

246,036.00

492,072.00

6,166 Caja de derivacion tipo II

und

1,826,289.60

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,923

Paete impermeabilizado muros 1:3 espesor de 2 cm,


pagado en m2

Ana

1.6200

18,719.87

30,326.19

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

6.1400

76,218.46

467,981.34

5,130

Relleno con material crudo de rio T.m 6", compactado y


Transportado, pagado en m3

Ana

0.1000

82,834.77

8,283.48

5,459

Pasamuro en A.C. =3" L=0.50 m E.B. Suministro e


Instal.

Ana

und

1.0000

207,385.80

207,385.80

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

0.1320

366,456.41

48,372.25

6,123

Poyo para ducha, en tolete comn y enchapado, pagado


en ML

Ana

1.6200

18,507.74

29,982.54

14,090

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 2"

Ins

und

1.0000

402,520.00

402,520.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

15,064

Tee sencilla presion PVC 3 "

Ins

und

1.0000

30,092.00

30,092.00

15,102

Buje soldado presion PVC 2 x 1

Ins

und

1.0000

3,290.00

3,290.00

15,107

Buje soldado presion PVC 3 x 2

Ins

und

1.0000

11,849.00

11,849.00

15,729

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 3"

Ins

und

1.0000

535,920.00

535,920.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

342

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,167 Movilizacion y desmovilizacion Maquina


piloteadora
96

Trailer equipo de pilotaje

Cantidad

Vr.Unitario

km

Eqp

6,168 Caja de derivacion tipo III

HR

Vr.Total
39,723.10

0.0200

1,986,155.00

und

39,723.10

2,028,747.80

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,923

Paete impermeabilizado muros 1:3 espesor de 2 cm,


pagado en m2

Ana

1.6200

18,719.87

30,326.19

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

6.1400

76,218.46

467,981.34

5,130

Relleno con material crudo de rio T.m 6", compactado y


Transportado, pagado en m3

Ana

0.1000

82,834.77

8,283.48

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

0.1320

366,456.41

48,372.25

6,123

Poyo para ducha, en tolete comn y enchapado, pagado


en ML

Ana

1.6200

18,507.74

29,982.54

14,090

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 2"

Ins

und

1.0000

402,520.00

402,520.00

14,943

Pasamuro AC 2 1/2" ELxER L:0.50M

Ins

und

2.0000

220,000.00

440,000.00

15,053

Adaptador macho presin PVC 2"

Ins

und

2.0000

3,460.00

6,920.00

15,054

Adaptador macho presin PVC 2 1/2"

Ins

und

2.0000

8,998.00

17,996.00

15,063

Tee sencilla presion PVC 2 1/2 "

Ins

und

1.0000

20,997.00

20,997.00

15,102

Buje soldado presion PVC 2 x 1

Ins

und

1.0000

3,290.00

3,290.00

15,729

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 3"

Ins

und

1.0000

535,920.00

535,920.00

6,169 Caja de derivacion tipo IV

und

1,432,126.80

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

4,923

Paete impermeabilizado muros 1:3 espesor de 2 cm,


pagado en m2

Ana

1.6200

18,719.87

30,326.19

5,111

Losa elevada en concreto 3000 psi e=0.15 m

Ana

6.1400

76,218.46

467,981.34

5,130

Relleno con material crudo de rio T.m 6", compactado y


Transportado, pagado en m3

Ana

0.1000

82,834.77

8,283.48

5,922

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

0.1320

366,456.41

48,372.25

6,123

Poyo para ducha, en tolete comn y enchapado, pagado


en ML

Ana

1.6200

18,507.74

29,982.54

14,090

Valv. comp. vast. n.a (s. bronce) e. liso o j.h 2"

Ins

und

2.0000

402,520.00

805,040.00

15,053

Adaptador macho presin PVC 2"

Ins

und

4.0000

3,460.00

13,840.00

15,062

Tee sencilla presion PVC 2 "

Ins

und

1.0000

8,852.00

8,852.00

15,102

Buje soldado presion PVC 2 x 1

Ins

und

1.0000

3,290.00

3,290.00

6,170 Pilotes pre-excavados y fundidos In-situ concreto


3500 psi, con Oscilador =1.0 - 1.30 m;
(bentoniticos)

1,657,581.60

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

1.1430

111,550.00

127,501.65

11

Sub-Contrato Inst-Des-Piloteadora

Esp

25.0000

1,326,065.28

331,516.32

21

Volqueta (6 m3 )

Eqp

HR

1.1430

55,550.00

63,493.65

87

Pala Principal para excavaciones

Eqp

HR

1.1430

190,650.00

217,912.95

88

Equipo Rotativo

Eqp

HR

1.1430

159,914.00

182,781.70

89

Barra Kelly

Eqp

HR

1.1430

83,018.00

94,889.57

91

Equipo de Bentonita

Eqp

HR

1.1430

60,494.00

69,144.64

92

Accesorios (equipo de pilotaje)

Eqp

HR

1.1430

9,140.00

10,447.02

93

Baldes (equipo de pilotaje)

Eqp

HR

1.1430

30,995.00

35,427.29

94

Herramienta Menor 10% M.O. IMOPA-13

Eqp

HR

1.1430

8,583.00

9,810.37

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

5,059

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

343

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Transporte de materiales Tn

Ana

0.0900

0.00

0.00

15,636

Bentonita x 50 Kg

Ins

kg

90.0000

719.00

64,710.00

15,733

Cuadrilla IMOPA-13 (Piloteadora)

Ins

1.1430

85,829.00

98,102.55

5,144

6,171 Camisa metalica para pilotes H=10.50 M , DE=1.30


M (para 17 usos)

und

9,126,193.60

42

Motosoldador Diesel

Eqp

HR

3.0000

14,833.00

44,499.00

43

Equipo de Oxicorte

Eqp

HR

3.0000

5,000.00

15,000.00

44

Pulidora electrica manual

Eqp

HR

3.0000

4,350.00

13,050.00

45

Cilindro

Eqp

HR

3.0000

41.00

123.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

7.0000

3,226.00

22,582.00

Lamina HR 5/16"

Ins

42.8000

191,819.00

8,209,853.20

2,502

Anticorrosivo rojo claro

Ins

gal

2.0000

29,750.00

59,500.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

6.0000

6,856.00

41,136.00

5,144

Transporte de materiales Tn

Ana

1.7000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

10.0000

2,257.00

22,570.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

3.0000

6,200.00

18,600.00

14,745

Oxigeno Industrial

Ins

1.2000

15,662.00

18,794.40

14,746

Acetileno

Ins

kg

0.4000

41,820.00

16,728.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

7.0000

32,262.00

225,834.00

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

36.0000

11,609.00

417,924.00

381

6,172 Pilotes pre-excavados y fundidos In-situ con


Oscilador =1.0 - 1.30 m. (encamisados)

1,721,233.66

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

1.1430

111,550.00

127,501.65

11

Sub-Contrato Inst-Des-Piloteadora

Esp

25.0000

1,376,986.93

344,246.73

21

Volqueta (6 m3 )

Eqp

HR

1.1430

55,550.00

63,493.65

87

Pala Principal para excavaciones

Eqp

HR

1.1430

190,650.00

217,912.95

88

Equipo Rotativo

Eqp

HR

1.1430

159,914.00

182,781.70

89

Barra Kelly

Eqp

HR

1.1430

83,018.00

94,889.57

92

Accesorios (equipo de pilotaje)

Eqp

HR

1.1430

9,140.00

10,447.02

93

Baldes (equipo de pilotaje)

Eqp

HR

1.1430

30,995.00

35,427.29

94

Herramienta Menor 10% M.O. IMOPA-13

Eqp

HR

1.1430

8,583.00

9,810.37

Camisa metalica para pilotes H=10.50 M , DE=1.30 M


(para 17 usos)

Ana

und

0.0588

9,126,193.60

536,620.18

Cuadrilla IMOPA-13 (Piloteadora)

Ins

1.1430

85,829.00

98,102.55

6,171
15,733

6,173 Concreto 3500 Psi tipo tremie para pilotes de


profundidad minima 10 m, = 1.3 m

670,358.91

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

10.0000

2,550.00

25,500.00

95

Bomba para concreto

Eqp

HR

0.8000

21,000.00

16,800.00

Concreto impermeabilizado 1:2:2 o 3500 Psi (Basico, 5%


desperdicio)

Ana

1.0000

366,456.41

366,456.41

Cuadrilla AA-3 (Limpieza)

Ins

10.0000

25,504.00

255,040.00

5,922
14,749

6,174 Construccin y adecuacin de variante en acceso a


ros (acarreo max. 1.5 Km)

28,825.46

14

Retroexcavadora de orugas

Eqp

HR

0.0333

144,160.00

4,800.53

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0333

130,650.00

4,350.65

21

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

344

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
8,144
13,921

Nombre

Tipo U.M.

Oficial de Construccion

Ins

0.0333

9,282.00

309.09

Crudo de rio clasificado T.m. 6"

Ins

1.0000

15,660.00

15,660.00

6,175 Armado y colocacion de Refuerzo Grado 60.000


para Pilotes
17
4,489

Cantidad

Vr.Unitario

kg

Vr.Total

646.36

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0400

1,469.00

58.76

Cuadrilla AA (Albaileria)

Ins

0.0400

14,690.00

587.60

6,176 Estabilizacion subrasante con Cemento + stasoil


(para reparcheo)

36,787.53

11

Carrotanque de Agua

Eqp

HR

0.0125

53,125.00

664.06

41

Vibrocompactador tipo rana

Eqp

HR

0.0300

5,000.00

150.00

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

0.0300

2,550.00

76.50

Cemento gris

Ins

kg

27.5000

383.34

10,541.85

804

Transporte de materiales Tn

Ana

0.0320

0.00

0.00

14,668

Stasoil

Ins

gal

1.0000

24,590.00

24,590.00

14,749

Cuadrilla AA-3 (Limpieza)

Ins

0.0300

25,504.00

765.12

5,144

6,177 Pilotes pre-excavados y fundidos In-situ con


Oscilador = 0.6 m; en concreto 3000 Psi

1,540,238.51

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

1.0666

111,550.00

118,979.23

11

Sub-Contrato Inst-Des-Piloteadora

Esp

25.0000

1,232,190.81

308,047.70

21

Volqueta (6 m3 )

Eqp

HR

1.0666

55,550.00

59,249.63

87

Pala Principal para excavaciones

Eqp

HR

1.0666

190,650.00

203,347.29

88

Equipo Rotativo

Eqp

HR

1.0666

159,914.00

170,564.27

89

Barra Kelly

Eqp

HR

1.0666

83,018.00

88,547.00

91

Equipo de Bentonita

Eqp

HR

1.0666

60,494.00

64,522.90

92

Accesorios (equipo de pilotaje)

Eqp

HR

1.0666

9,140.00

9,748.72

93

Baldes (equipo de pilotaje)

Eqp

HR

1.0666

30,995.00

33,059.27

94

Herramienta Menor 10% M.O. IMOPA-13

Eqp

HR

1.0666

8,583.00

9,154.63

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,144

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

15,636

Bentonita x 50 Kg

Ins

kg

70.0000

719.00

50,330.00

15,733

Cuadrilla IMOPA-13 (Piloteadora)

Ins

1.0666

85,829.00

91,545.21

6,178 Pilotes pre-excavados y fundidos In-situ con


Oscilador =0.60 m; (bentoniticos)

1,123,726.53

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

1.0660

111,550.00

118,912.30

11

Sub-Contrato Inst-Des-Piloteadora

Esp

25.0000

898,981.22

224,745.31

21

Volqueta (6 m3 )

Eqp

HR

1.0666

55,550.00

59,249.63

87

Pala Principal para excavaciones

Eqp

HR

1.0666

190,650.00

203,347.29

88

Equipo Rotativo

Eqp

HR

1.0666

159,914.00

170,564.27

89

Barra Kelly

Eqp

HR

1.0666

83,018.00

88,547.00

91

Equipo de Bentonita

Eqp

HR

1.0666

60,494.00

64,522.90

92

Accesorios (equipo de pilotaje)

Eqp

HR

1.0666

9,140.00

9,748.72

93

Baldes (equipo de pilotaje)

Eqp

HR

1.0666

30,995.00

33,059.27

94

Herramienta Menor 10% M.O. IMOPA-13

Eqp

HR

1.0666

8,583.00

9,154.63

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

15,636

Bentonita x 50 Kg

Ins

kg

70.0000

719.00

50,330.00

15,733

Cuadrilla IMOPA-13 (Piloteadora)

Ins

1.0666

85,829.00

91,545.21

5,144

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

345

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,179 Replanteo y localizacion para pilotes

Cantidad

Vr.Unitario

Vr.Total
19,271.85

Estacion Total

Eqp

HR

0.7500

7,500.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0030

42,950.00

128.85

8,108

Topografo

Ins

0.7500

7,660.00

5,745.00

8,109

Cadenero

Ins

0.7500

4,957.00

3,717.75

8,145

Ayudante de construccion

Ins

0.7500

5,407.00

4,055.25

15

6,180 Andenes en concreto de resistencia 3000 psi,


espesor 26 cm, pagado m2

5,625.00

101,860.89

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,200

Tabla burra ordinario 0.30

Ins

1.0200

4,333.00

4,419.66

3,797

Puntilla con cabeza 2"

Ins

lb

0.0800

1,990.00

159.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2600

333,142.66

86,617.09

17

6,181 Muros o elevaciones estribos, concreto para


puentes de resistencia 3000 Psi, pagada en m3

673,684.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.3300

32,375.50

75,434.92

6,182 Baranda en perfil tubular metalico 3" y lamina HR

23,504.00

330,927.79

42

Motosoldador Diesel

Eqp

HR

1.0000

14,833.00

14,833.00

43

Equipo de Oxicorte

Eqp

HR

1.0000

5,000.00

5,000.00

44

Pulidora electrica manual

Eqp

HR

1.0000

4,350.00

4,350.00

45

Cilindro

Eqp

HR

1.0000

41.00

41.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3500

6,856.00

2,399.60

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.1230

0.00

0.00

14,742

Lamina HR 1/4"

Ins

0.2700

125,317.09

33,835.61

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0300

6,200.00

186.00

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

15,735

Lamina HR 3/8"

Ins

0.0500

165,592.00

8,279.60

15,736

Perfil Tubular 3" ; e= 3.7 mm

Ins

2.0000

99,188.00

198,376.00

15,737

Tornillo = 7/8" x 8" G-5 R.O. Con T.A.W

Ins

und

2.5700

8,424.00

21,649.68

6,183 Viga Postensada 5000 Psi (350 Kg/cm2) H= 1.45


m.

1,464,802.69

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

16.0000

3,091.00

49,456.00

5,057

Concreto 5000 Psi (Basico, 5% desperdicio)

Ana

1.0000

416,790.73

416,790.73

6,132

Formaleta metalica Para Vigas Postensadas Hp=1.3 3.00

Ana

1.4200

350,305.25

497,433.46

Cuadrilla AA-4

Ins

16.0000

30,910.00

494,560.00

13,960

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

346

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,184 Excavacion mecanica en Material conglomerado


Bajo agua hasta 4 m (puentes)

Cantidad

Vr.Unitario

Vr.Total

12,212.76

14

Retroexcavadora de orugas

Eqp

HR

0.0400

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0400

1,469.00

58.76

58

Motobomba de 4" o 6"

Eqp

HR

0.5000

11,600.00

5,800.00

Cuadrilla AA (Albaileria)

Ins

0.0400

14,690.00

587.60

4,489

6,185 Muros o elevaciones Pilas, concreto para puentes


de resistencia 3000 Psi, pagada en m3

144,160.00

5,766.40

665,266.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.0700

32,375.50

67,017.28

6,186 Guaya de 1" (para amarre de Muertos)

23,504.00

31,131.50

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

15,738

Cable alma de acero (guaya) 1``

Ins

1.0000

25,800.00

25,800.00

15,739

Perro de 1" Tipo pesado

Ins

und

0.0920

34,000.00

3,128.00

4,489

6,187 Malla electrosoldada Q-3 o M-106, tipo ME-1


pagada m2

5,545.70

Herramienta menor 5% M.O. AA

Eqp

HR

0.0400

735.00

29.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.0400

14,690.00

587.60

5,144

Transporte de materiales Tn

Ana

0.0017

0.00

0.00

Malla electrosoldada Q-3 o M-106 (2.35 x 6m)

Ins

1.0500

4,694.00

4,928.70

19

15,741

6,188 Concreto para recubrimiento de Gaviones


resistencia 210 kg/cm2 - 3000 psi

402,728.02

Herramienta menor 5% M.O. AA

Eqp

HR

3.0000

735.00

2,205.00

4,489

Cuadrilla AA (Albaileria)

Ins

3.0000

14,690.00

44,070.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

0.7200

32,375.50

23,310.36

19

6,189 Concreto para solado resistencia 175 kg/cm2 2500 psi pagado en m3.

361,663.24

Herramienta menor 5% M.O. AA

Eqp

HR

2.8000

735.00

2,058.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.8000

14,690.00

41,132.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

1.0000

318,473.24

318,473.24

19

6,190 Excavacion de cortes, canales y prestamo (Acarreo


1 Kms)

6,112.66

14

Retroexcavadora de orugas

Eqp

HR

0.0167

144,160.00

2,407.47

21

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

6,191 Replanteo y localizacion para obras de proteccion


Planimetria y Altimetria)

2,864.84

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

347

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15

Estacion Total

Eqp

46

Campero 2000cc-3000cc

Eqp

HR

0.0200

7,500.00

150.00

HR

3,837

Esmalte Sintetico Pintuco

0.1000

21,534.00

2,153.40

Ins

gal

0.0009

42,950.00

8,108

38.66

Topografo

Ins

0.0200

7,660.00

153.20

8,109

Cadenero

Ins

0.0200

4,957.00

99.14

8,145

Ayudante de construccion

Ins

0.0200

5,407.00

108.14

13,326

Durmiente ordinario 3 M

Ins

0.1000

767.00

76.70

14,760

Cinta de Sealizacion

Ins

0.8000

107.00

85.60

6,192 Dique en piedra pegada, Mortero 1:3

266,615.84

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.6000

276,302.97

165,781.78

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

6,193 Relleno con material grueso T.max 1.0 m

9,778.72

son 3 volquetas
14

Retroexcavadora de orugas

Eqp

HR

0.0222

144,160.00

3,200.35

20

Bulldozer Cat D6D o D6H

Eqp

HR

0.0222

130,650.00

2,900.43

21

Volqueta (6 m3 )

Eqp

HR

0.0625

55,550.00

3,471.88

Oficial de Construccion

Ins

0.0222

9,282.00

206.06

8,144

6,194 Geomalla LBO 302


17
4,489
15,742

11,650.12

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0400

1,469.00

Cuadrilla AA (Albaileria)

Ins

0.0400

14,690.00

587.60

Geomalla LBO 302

Ins

1.0200

10,788.00

11,003.76

6,195 Canal en Piedra pegada en Mortero 1:3, e=0.20 m

58.76

50,926.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5700

1,469.00

837.33

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.1200

276,302.97

33,156.36

1,572

Tabla burra ordinaria 0.10

Ins

1.1000

1,200.00

1,320.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5700

14,690.00

8,373.30

5,063

Piedra rajon o media zonga

Ana

0.0800

90,495.15

7,239.61

17

6,196 Colchoneta Reno en malla triple torsion en alambre


galvanizado calibre 12 recubierta en PVC hueco
7.5 x 7.5 e= 0.30 m

333,364.98

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

1,133

Malla trip. tor. Cal. 12 7.5 x 7.5 rec. PVC e=0.3

Ins

3.3300

49,222.00

163,909.26

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,061

Formaleta (1 uso)

Ana

0.1400

32,375.50

4,532.57

5,063

Piedra rajon o media zonga

Ana

1.0000

90,495.15

90,495.15

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

Alambre Galvanizado No. 13 Recubierto PVC

Ins

kg

1.8000

5,440.00

9,792.00

17

14,367

6,197 Limpieza, retiro y disposicion de material solido de


pozos de inspeccion
17

Herramienta Menor 10% M.O. AA

und

Eqp

HR

12,483.77

0.2000

1,469.00

293.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

348

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

71

Camion vactor

Eqp

72

Camion de vacio (Vacum)

Eqp

Ayudante de maquinaria

Ins

14,650

6,198 Excavacion mecanica en material comun 0 - 2 mts


(Oruga)
14

Retroexcavadora de orugas

Cantidad

Vr.Unitario

Vr.Total

HR

0.0170

497,000.00

8,449.00

HR

0.0170

173,000.00

2,941.00

0.2000

3,999.84

799.97

Eqp

6,199 Concreto 3000 Psi, para el anillo del Caisson


(H=1.00 M, Prof=7.0 - 12 m, = 1.30 m

HR

3,200.35

0.0222

144,160.00

3,200.35

945,015.54

49

Vibrador de concretos

Eqp

HR

4.5000

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

14.0000

3,091.00

43,274.00

Formaleta metalica Tipo Caisson H=1.00 M DI=1.00 M,


DE=1.10 M (para 20 usos)

Ana

und

0.1470

790,281.50

116,171.38

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-4

Ins

14.0000

30,910.00

432,740.00

160
5,053
13,960

6,200 Concreto 3000 Psi para el pilote tipo Caisson


(Profundidad 7.0 m - 12 m , = 1.20 m)

4,375.00

19,687.50

620,245.16

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

10.0000

2,550.00

25,500.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-3 (Limpieza)

Ins

10.0000

25,504.00

255,040.00

5,053
14,749

6,201 Baranda en concreto 3000 Psi, sin refuerzo H=0.90


de 0.30 x 0.35 , L separacion 2.0 m

91,688.97

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1350

333,142.66

44,974.26

5,061

Formaleta (1 uso)

Ana

0.6200

32,375.50

20,072.81

6,202 Demolicion de pavimento en concreto asfaltico


(inc. retiro)

1,469.00

2,350.40

17,896.87

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0114

55,550.00

633.27

57

Cortadora concreto (Disco Diaman. 14")

Eqp

HR

0.2400

45,000.00

10,800.00

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,489

6,203 Excavacion a mano en material comn, con


transporte.

587.60

29,217.25

19

Herramienta menor 5% M.O. AA

Eqp

HR

1.4800

735.00

21

Volqueta (6 m3 )

Eqp

HR

0.1150

55,550.00

6,388.25

Cuadrilla AA (Albaileria)

Ins

1.4800

14,690.00

21,741.20

4,489

6,204 Concreto para solado resistencia 140 kg/cm2 2000 psi pagado en m2.
19
4,489

1,087.80

17,719.46

Herramienta menor 5% M.O. AA

Eqp

HR

0.1399

735.00

102.83

Cuadrilla AA (Albaileria)

Ins

0.1399

14,690.00

2,055.13

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

349

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,054

Nombre

Tipo U.M.

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

6,205 Paete interior allanado, proporcin de la mezcla


1:4, espesor 1.5 cm, pagado en ML

Cantidad

Vr.Unitario

Vr.Total

0.0500

311,229.99

15,561.50

2,784.81

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.1150

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0036

248,144.84

893.32

4,489

Cuadrilla AA (Albaileria)

Ins

0.1150

14,690.00

1,689.35

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

6,206 Enchape bordillo ducha en ceramica lisa h=20,


pagado ML

168.94

7,122.69

15

Pegacor blanco

Ins

kg

0.3060

1,120.00

342.72

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1870

1,469.00

274.70

804

Cemento gris

Ins

kg

0.6280

383.34

240.74

829

Cemento blanco

Ins

kg

0.1400

975.00

136.50

2,549

Tableta cermica corriente 20 x 20

Ins

0.2500

13,500.00

3,375.00

3,684

Agua para obra

Ins

0.6000

10.00

6.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1870

14,690.00

2,747.03

5,144

Transporte de materiales Tn

Ana

0.0062

0.00

0.00

6,207 Mesones en concreto 0.07 mts reforzado, con muro


lateral en ladrillo, pagado m2

124,821.98

Herramienta Menor 10% M.O. AA

Eqp

HR

2.4995

1,469.00

3,671.77

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0080

248,144.84

1,985.16

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.3400

3,903.00

1,327.02

1,901

Acero de refuerzo 37000 Psi

Ins

kg

10.0800

2,295.00

23,133.60

2,085

Ladrillo tolete comn

Ins

und

56.8700

305.00

17,345.35

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.1400

4,300.00

4,902.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

1.2000

3,500.00

4,200.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.0000

1,990.00

3,980.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.4995

14,690.00

36,717.66

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.1820

0.00

0.00

Durmiente ordinario 3 M

Ins

3.8300

767.00

2,937.61

17

13,326

6,208 Dinteles concreto de 3000 psi .12 x 25 reforzado,


pagado ml

37,048.29

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,101.75

1,572

Tabla burra ordinaria 0.10

Ins

0.1500

1,200.00

180.00

1,870

Alambre Negro No 18

Ins

kg

0.1100

3,903.00

429.33

1,901

Acero de refuerzo 37000 Psi

Ins

kg

5.8000

2,295.00

13,311.00

2,243

Vara de clavo 3M -1

Ins

0.0100

1,500.00

15.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0330

333,142.66

10,993.71

17

6,209 Demolicion paete bajo placa, pagado en m2


17

Herramienta Menor 10% M.O. AA

m
Eqp

HR

13,030.62

0.6800

1,469.00

998.92

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

350

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

21

Volqueta (6 m3 )

Eqp

82

Andamio tubular stand. (inc. tijeras)

Eqp

Cuadrilla AA (Albaileria)

Ins

4,489

6,210 Demolicion paete muro pagado en m2

Cantidad

Vr.Unitario

Vr.Total

HR

0.0300

55,550.00

1,666.50

HR

2.0000

188.00

376.00

0.6800

14,690.00

9,989.20

5,397.76

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3400

1,469.00

499.46

21

Volqueta (6 m3 )

Eqp

HR

0.0300

55,550.00

1,666.50

Cuadrilla AA (Albaileria)

Ins

0.2200

14,690.00

3,231.80

4,489

6,211 Suministro e instal. mueble lavamanos, pagado un


6
15,596

324,500.00

Sub-Contrato Instalacion

Esp

18.0000

275,000.00

49,500.00

Mueble en madera lavamanos 60x50x80

Ins

und

1.0000

275,000.00

275,000.00

6,212 Caja de inspeccion 70 x 70

und

201,175.19

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

46.7338

10.00

467.34

4,426

Arena lavada de rio

Ins

0.2100

13,800.00

2,898.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0688

14,690.00

74,460.67

5,143

Transporte de materiales m

Ana

0.4638

46,157.00

21,407.62

5,144

Transporte de materiales Tn

Ana

0.8137

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.8000

2,257.00

6,319.60

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.1400

15,660.00

2,192.40

13,961

Triturado de 1/2" - 3/4"

Ins

0.0788

46,304.00

3,648.76

17
804

6,213 ERROR- CORREGIR Suministro, instal. y conexin


tanque elevado 1.000 lts pvc (incluye accesorios)

5.0688

1,469.00

7,446.07

82.5825

383.34

31,657.18

0.0788

3,903.00

307.56

165.1475

305.00

50,369.99

und

847,791.39

Herramienta Menor 10% M.O. BB

Eqp

HR

3.7209

1,616.00

6,012.97

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.2500

58,612.00

14,653.00

3,077

Tanque plastico 1000 lt

Ins

und

1.0000

304,074.00

304,074.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.7209

16,159.00

60,126.02

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

614,341.59

233,449.80

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,020

Cinta teflon

Ins

rl

2.0000

1,000.00

2,000.00

14,757

Registro paso directo 1/2"

Ins

und

3.0000

22,000.00

66,000.00

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

4.0000

1,504.00

6,016.00

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

3.0000

3,923.00

11,769.00

15,021

Codo 90 presion PVC 1/2"

Ins

und

3.0000

375.00

1,125.00

15,023

Codo 90 presion PVC 1"

Ins

und

2.1000

1,176.00

2,469.60

15,039

Union presion PVC 1/2"

Ins

und

2.0000

240.00

480.00

15,041

Union presion PVC 1"

Ins

und

1.0000

620.00

620.00

15,048

Adaptador macho presin PVC 1/2"

Ins

und

4.0000

260.00

1,040.00

15,050

Adaptador macho presin PVC 1"

Ins

und

1.0000

984.00

984.00

15,091

Buje soldado presion PVC 1 x 1/2

Ins

und

1.0000

723.00

723.00

15,543

Flotador completo (bola de cobre) 1/2"

Ins

und

1.0000

53,592.00

53,592.00

55

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

351

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,214 Bordillo 12 x 20 cm fundido en concreto 2.500 psi,


pagado m

Cantidad

Vr.Unitario

Vr.Total
15,232.07

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3600

1,469.00

528.84

49

Vibrador de concretos

Eqp

HR

0.1200

4,375.00

525.00

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3600

14,690.00

5,288.40

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0250

318,473.24

7,961.83

6,215 Poyos en concreto de resistencia 3000 psi, 40 x 10


cm, pagado en m

18,334.76

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2640

1,469.00

387.82

2,208

Tabla chapa ordinario 0.10

Ins

0.2040

2,667.00

544.07

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2640

14,690.00

3,878.16

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

17

6,216 Poyos en concreto de resistencia 3000 psi, 60 x 10


cm, pagado en m

27,429.85

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4100

2,208

Tabla chapa ordinario 0.10

Ins

0.3060

2,667.00

816.10

4,489

Cuadrilla AA (Albaileria)

Ins

0.4100

14,690.00

6,022.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0600

333,142.66

19,988.56

17

6,217 Piso baldosa de gres exterior 30 x 30 vitrificado,


pagado m

1,469.00

602.29

32,842.36

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

Cemento gris

Ins

kg

6.5900

383.34

2,526.21

2,568

Tableta de gres vitrificado 30 x 30

Ins

1.0500

15,500.00

16,275.00

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

5,144

Transporte de materiales Tn

Ana

0.0270

0.00

0.00

17
804

6,218 Gancho porcelana, pagado un


17
829
4,489
15,747

und

1,248.65

17,067.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Gancho blanco

Ins

und

1.0000

8,500.00

8,500.00

6,219 Papelera porcelana, pagado un

1,469.00

und

734.50

16,267.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

Papelera blanca

Ins

und

1.0000

7,700.00

7,700.00

17
829

15,428

6,220 Toallero blanco, pagado un

und

734.50

17,067.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

352

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
17
829
4,489
15,749

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cemento blanco

Ins

Cuadrilla AA (Albaileria)

Ins

Toallero blanco

Ins

6,221 Vasero cepillo blanco, pagado un


17
829
4,489
15,748

Cantidad

Vr.Unitario

Vr.Total

HR

0.5000

1,469.00

734.50

kg

0.5000

975.00

487.50

0.5000

14,690.00

7,345.00

und

1.0000

8,500.00

8,500.00

und

17,067.00

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Vasero blanco

Ins

und

1.0000

8,500.00

8,500.00

6,222 Desmonte muebles madera con trasnporte, pagado


en m2

1,469.00

734.50

28,784.25

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,101.75

21

Volqueta (6 m3 )

Eqp

HR

0.3000

55,550.00

16,665.00

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

4,489

6,223 Desmonte comodas madera con transporte,


pagado en m2

10,402.70

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

21

Volqueta (6 m3 )

Eqp

HR

0.1000

55,550.00

5,555.00

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

4,489

6,224 Guardaescoba tabln en gres, tipo vitrificado, con


dimensiones de 0.08 x 33 cm, espesor de 2,5 cm,
pagado m2

12,474.67

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

Cemento gris

Ins

kg

0.9410

383.34

360.72

2,386

Tablon - zocalo

Ins

1.0000

8,004.00

8,004.00

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0040

13,800.00

55.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0005

0.00

0.00

17
804

6,225 Descapote a maquina, (cargador) Incluye


transporte y disposicion final, pagado m3

367.25

8,197.58

16

Cargador sobre llantas

Eqp

HR

0.0167

113,000.00

1,887.10

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

6,226 Demolicion de cunetas (Incl. Retiro)

40,244.38

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.1000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Cuadrilla AA (Albaileria)

Ins

2.1000

14,690.00

30,849.00

4,489

6,227 Cable IPS - IWRC 6 x 19 AA = 2 1/4 "

3,084.90

146,451.65

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.3500

3,091.00

1,081.85

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.3500

2,958.00

1,035.30

Transporte de materiales Tn

Ana

0.0139

0.00

0.00

5,144

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

353

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,960

Cuadrilla AA-4

Ins

0.3500

30,910.00

10,818.50

15,752

Cable IPS-IWRC 6 x 19 AA = 2 1/4"

Ins

1.0000

133,516.00

133,516.00

6,228 Cable IPS - IWRC 6 x 19 AA = 1" (Amarre


contravientos)

Cantidad

Vr.Unitario

Vr.Total

33,065.19

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1300

3,091.00

401.83

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1300

2,958.00

384.54

Transporte de materiales Tn

Ana

0.0027

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1300

30,910.00

4,018.30

15,500

Cable IPS-IWRC 6 x 19 AA = 1"

Ins

1.0000

23,119.00

23,119.00

15,563

Cable IPS-IWRC 6 x 19 AA = 1/2"

Ins

0.7400

6,948.00

5,141.52

5,144

6,229 Conector Superior de 2 1/4 (10 cables)

und

2,530,299.20

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

17

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

14,387

Guardacable de 1/2" o Portacable T.P.

Ins

und

2.0000

11,716.00

23,432.00

15,574

Tuerca =1" G-5

Ins

und

16.0000

1,340.00

21,440.00

15,580

Perro crosby = 1/2" en HF

Ins

und

8.0000

24,500.00

196,000.00

15,668

Platina de conexin 2" x 210 mm x 563 mm Pos 1

Ins

und

3.0000

700,000.00

2,100,000.00

15,750

Grapa =1" 372 mm x 103 mm

Ins

und

2.0000

88,250.00

176,500.00

6,230 Pendolon en Cable IPS - IWRC 6 x 19 AA = 1/2"

8,648.05

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0500

3,091.00

Transporte de materiales Tn

Ana

0.0007

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0500

30,910.00

1,545.50

15,563

Cable IPS-IWRC 6 x 19 AA = 1/2"

Ins

1.0000

6,948.00

6,948.00

59
5,144

6,231 Conexion inferior (pendolon de 1/2 ")

und

154.55

853,032.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.8000

5,313.00

4,250.40

Soldador

Ins

0.8000

6,759.00

5,407.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

15,581

Casquillo T- Crosby - Socket 1/2`` HF

Ins

und

2.0000

322,009.00

644,018.00

15,758

Platina de conexin 3/4" x 232 mm x 205 mm

Ins

und

2.0000

23,000.00

46,000.00

15,766

Rigidizador 1/2" x200 mm x 200 mm

Ins

und

1.0000

59,810.00

59,810.00

15,767

Rigidizador 3/4" x 100 mm x 165 mm

Ins

und

2.0000

36,907.50

73,815.00

519

6,232 Conexion contravientos (superior-inferior) a


Pendolon 1/2"

und

2,028,017.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

42

Motosoldador Diesel

Eqp

HR

2.0000

14,833.00

29,666.00

Soldador

Ins

2.0000

6,759.00

13,518.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Tuerca =1" G-5

Ins

und

8.0000

1,340.00

10,720.00

519

15,574

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

354

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15,581

Casquillo T- Crosby - Socket 1/2`` HF

Ins

15,669

Platina de conexin 2" x 210 mm x 256 mm

Ins

und

2.0000

322,009.00

644,018.00

und

2.0000

320,750.00

15,670

Platina 3/8" x 110 mm x 95 mm

641,500.00

Ins

und

15,751

2.0000

12,000.00

24,000.00

Grapa =1" 565 mm x 128 mm

Ins

und

1.0000

125,125.00

125,125.00

15,771

Tensor crosby =1" x 12"

Ins

und

1.0000

503,750.00

503,750.00

6,233 Viga canal, en concreto impermeabilizado 3000 psi,


pagada en m3

722,996.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

19.1000

1,469.00

28,057.90

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

2,197

Repisa Ordinario 3 m

Ins

5.2000

1,500.00

7,800.00

2,200

Tabla burra ordinario 0.30

Ins

8.0500

4,333.00

34,880.65

2,243

Vara de clavo 3M -1

Ins

4.7400

1,500.00

7,110.00

3,797

Puntilla con cabeza 2"

Ins

lb

1.5000

1,990.00

2,985.00

4,489

Cuadrilla AA (Albaileria)

Ins

19.1000

14,690.00

280,579.00

5,061

Formaleta (1 uso)

Ana

0.3000

32,375.50

9,712.65

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

1.0000

345,308.74

345,308.74

6,234 Placa base en concreto 2500 psi e=0.10 m

43,872.43

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1000

318,473.24

31,847.32

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

17

6,235 Muro en concreto de 3000 psi, resistencia 210


kg/cm.

673,360.32

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.3200

32,375.50

75,111.16

6,236 Apoyo Cercha Tipo 2

und

1,025,440.65

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1500

1,469.00

1,689.35

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.1500

5,313.00

6,109.95

Soldador

Ins

1.1500

6,759.00

7,772.85

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,007

Perno de 1" * 15" G8

Ins

und

4.0000

10,000.00

40,000.00

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

15,574

Tuerca =1" G-5

Ins

und

1.0000

1,340.00

1,340.00

15,577

Pasador con pin =2" SAE 1045 de 100 mm

Ins

und

1.0000

55,000.00

55,000.00

15,684

Platina 1" x 300 mm x 300 mm

Ins

und

2.0000

275,000.00

550,000.00

15,685

Platina de conexin 3/4" x 216 mm x 216 mm

Ins

und

2.0000

22,000.00

44,000.00

15,687

Platina de conexiin 1/2" x 80 mm x 80 mm

Ins

und

8.0000

1,750.00

14,000.00

15,757

Platina de conexin 1" x 216 mm x 218 mm

Ins

und

2.0000

140,915.00

281,830.00

519

6,237 Conexion cercha de


rigidez-superior-inferior-laterales

und

197,389.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

355

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

17

Herramienta Menor 10% M.O. AA

Eqp

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.8000

1,469.00

1,175.20

HR

Soldador

0.8000

5,313.00

4,250.40

Ins

0.8000

6,759.00

1,717

5,407.20

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.0000

6,805.00

6,805.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

519

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

15,759

Platina de conexin 3/4" x 248 mm x 205 mm

Ins

und

4.0000

24,000.00

96,000.00

15,763

Platina de conexin 5/16" x 40 mm x 35 mm

Ins

und

2.0000

4,000.00

8,000.00

15,764

Platina de conexin 5/16" x 40 mm x 60mm

Ins

und

2.0000

4,500.00

9,000.00

15,774

Pasador con pin = 76 mm SAE 1045 L=110mm

Ins

und

1.0000

55,000.00

55,000.00

6,238 Junta de dilatacion con Neopreno de 1", puente


colgante

106,435.12

42

Motosoldador Diesel

Eqp

HR

0.4000

14,833.00

5,933.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

45

Cilindro

Eqp

HR

0.4000

41.00

16.40

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.4000

3,226.00

1,290.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0800

6,805.00

544.40

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.1200

2,295.00

2,570.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.8000

2,257.00

4,062.60

13,927

Cinta sika PVC 0-22

Ins

1.0000

31,900.00

31,900.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0090

6,200.00

55.80

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.4000

32,262.00

12,904.80

15,603

Neopreno WD 1625 (40 mm x 1") D=70

Ins

1.0000

11,020.00

11,020.00

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

2.0000

13,493.00

26,986.00

6,239 Anclaje cable - macizo = 2 1/4"

und

25,969,305.76

Sub-Contrato Acero SAE-1045

Esp

2.5000

25,335,908.06

633,397.70

42

Motosoldador Diesel

Eqp

HR

2.0000

14,833.00

29,666.00

43

Equipo de Oxicorte

Eqp

HR

2.0000

5,000.00

10,000.00

44

Pulidora electrica manual

Eqp

HR

2.0000

4,350.00

8,700.00

45

Cilindro

Eqp

HR

2.0000

41.00

82.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

8.0000

3,226.00

25,808.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2.0000

6,805.00

13,610.00

3,310

Tubo cerramiento Galvanizado =3" e=0.128"

Ins

2.5000

34,693.00

86,732.50

5,144

Transporte de materiales Tn

Ana

1.8060

0.00

0.00

14,742

Lamina HR 1/4"

Ins

1.0000

125,317.09

125,317.09

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

5.0000

6,200.00

31,000.00

14,745

Oxigeno Industrial

Ins

3.2000

15,662.00

50,118.40

14,746

Acetileno

Ins

kg

1.3000

41,820.00

54,366.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

8.0000

32,262.00

258,096.00

15,688

Varilla Roscada de anclaje de 3" Acero SAE1045

Ins

50.0000

179,500.00

8,975,000.00

15,689

Tuerca =3" G-5

Ins

und

60.0000

30,000.00

1,800,000.00

15,773

Casquillo T- Crosby - Socket 2 1/4`` HF

Ins

und

5.0000

1,700,000.00

8,500,000.00

15,781

Lamina HR 5/8"

Ins

3.0100

383,514.00

1,154,377.14

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

356

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,782

Lamina HR 3/4"

Ins

2.2500

443,845.00

998,651.25

15,784

Lamina HR 2"

Ins

2.6200

1,226,864.00

3,214,383.68

6,240 Excavacion mecanica en material conglomerado


hasta 2 mts (Oruga)
14

Retroexcavadora de orugas

Retroexcavadora de orugas

Eqp

Retroexcavadora de orugas

HR

Eqp

HR

0.0250

144,160.00

6,243 Excavacion mecanica en conglomerado 0 - 2 mts,


incluye acarreo, pagado m3

HR

3,604.00

4,122.98

0.0286

144,160.00

Eqp

Vr.Total

3,604.00

6,242 Excavacion mecanica en material conglomerado


hasta 8 mts (Oruga)
14

Vr.Unitario

6,241 Excavacion mecanica en material conglomerado


hasta 4 mts (Oruga)
14

Cantidad

4,122.98

4,800.53

0.0333

144,160.00

4,800.53

11,338.05

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0400

111,550.00

4,462.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0350

1,469.00

51.42

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Cuadrilla AA (Albaileria)

Ins

0.0350

14,690.00

514.15

4,489

6,244 Impermeabilizacin con Polietileno calibre No 8


17
4,489
15,778

3,870.33

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1200

1,469.00

176.28

Cuadrilla AA (Albaileria)

Ins

0.1200

14,690.00

1,762.80

Polietileno Cal. 8

Ins

1.0300

1,875.00

1,931.25

6,245 Anclaje cable - macizo (contravientos) = 1"

und

5,364,688.28

Sub-Contrato Acero SAE-1045

Esp

2.5000

5,233,842.22

130,846.06

42

Motosoldador Diesel

Eqp

HR

2.0000

14,833.00

29,666.00

43

Equipo de Oxicorte

Eqp

HR

2.0000

5,000.00

10,000.00

44

Pulidora electrica manual

Eqp

HR

2.0000

4,350.00

8,700.00

45

Cilindro

Eqp

HR

2.0000

41.00

82.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

8.0000

3,226.00

25,808.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2.0000

6,805.00

13,610.00

5,144

Transporte de materiales Tn

Ana

0.8000

0.00

0.00

13,897

Tubo cerramiento Galvanizado =1 1/2 " e=0.128"

Ins

1.0000

18,373.00

18,373.00

14,742

Lamina HR 1/4"

Ins

2.2400

125,317.09

280,710.28

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

5.0000

6,200.00

31,000.00

14,745

Oxigeno Industrial

Ins

3.2000

15,662.00

50,118.40

14,746

Acetileno

Ins

kg

1.3000

41,820.00

54,366.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

8.0000

32,262.00

258,096.00

15,573

Varilla Roscada de anclaje de 1" Acero SAE1045

Ins

20.0000

45,000.00

900,000.00

15,574

Tuerca =1" G-5

Ins

und

12.0000

1,340.00

16,080.00

15,576

Terminal Socket Crosby 1"

Ins

und

2.0000

721,520.00

1,443,040.00

15,781

Lamina HR 5/8"

Ins

1.0600

383,514.00

406,524.84

15,782

Lamina HR 3/4"

Ins

0.9000

443,845.00

399,460.50

15,784

Lamina HR 2"

Ins

1.0500

1,226,864.00

1,288,207.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

357

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,246 Formaleta metalica Tipo Caisson H=1.00 M DI=1.50


M, DE=1.80 M (para 20 usos)

Cantidad

Vr.Unitario

und

Vr.Total
1,072,355.29

42

Motosoldador Diesel

Eqp

HR

1.5000

14,833.00

22,249.50

43

Equipo de Oxicorte

Eqp

HR

1.5000

5,000.00

7,500.00

44

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

45

Cilindro

Eqp

HR

1.5000

41.00

61.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.5000

3,226.00

4,839.00

Lamina HR 5/16"

Ins

4.7100

191,819.00

903,467.49

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.5000

6,856.00

3,428.00

5,144

Transporte de materiales Tn

Ana

0.2940

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.5000

32,262.00

48,393.00

14,782

Angulo o perfil 2 1/2" x 2 1/2" x 3/16"

Ins

6.0000

11,609.00

69,654.00

381

6,247 Concreto 3000 Psi, para el anillo del Caisson


(H=1.00 M, Prof= 0 - 10 m, i=1.50 m, e=1.8 m

753,691.84

49

Vibrador de concretos

Eqp

HR

4.5000

4,375.00

19,687.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

10.0000

3,091.00

30,910.00

Formaleta metalica Tipo Caisson H=1.00 M DI=1.00 M,


DE=1.10 M (para 20 usos)

Ana

und

0.0770

790,281.50

60,851.68

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-4

Ins

10.0000

30,910.00

309,100.00

160
5,053
13,960

6,248 Concreto 3000 Psi para el pilote tipo Caisson


(Profundidad 0- 10 m, = 1.50 m)

505,479.16

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

5.0000

2,550.00

12,750.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-3 (Limpieza)

Ins

6.0000

25,504.00

153,024.00

5,053
14,749

6,249 Excavacion manual en conglomerado para


Caisson, Bajo agua y profundidad 7 m - 14 m,
=1.50 m

346,196.00

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

4.0000

3,632.00

14,528.00

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

4.0000

35,000.00

140,000.00

58

Motobomba de 4" o 6"

Eqp

HR

4.0000

11,600.00

46,400.00

Cuadrilla AA-5

Ins

4.0000

36,317.00

145,268.00

13,962

6,250 Muros o elevaciones Torres (10 m - 27 m), concreto


para puentes de resistencia 3000 Psi, pagada en
m3

826,009.98

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

80

Pluma grua o Malacate

Eqp

HR

1.6500

8,750.00

14,437.50

4,016

Andamio colgante

Ins

mes

2.5000

16,000.00

40,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

4,867

Paral telescopico 2 a 4 ml

Ins

28.0000

340.00

9,520.00

29,380.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

358

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

Seccin de Andamio

Ins

13,641

6,251 Excavacion manual en conglomerado para


Caisson, Bajo agua y profundidad 14 m - 21 m,
=1.50 m

Cantidad

Vr.Unitario

Vr.Total

1.0000

333,142.66

333,142.66

2.6400

32,375.50

85,471.32

mes

0.8000

17,120.00

13,696.00

398,125.40

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

4.6000

3,632.00

16,707.20

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

4.6000

35,000.00

161,000.00

58

Motobomba de 4" o 6"

Eqp

HR

4.6000

11,600.00

53,360.00

Cuadrilla AA-5

Ins

4.6000

36,317.00

167,058.20

13,962

6,252 Concreto 3000 Psi, para el anillo del Caisson


(H=1.00 M, Prof= 10 - 20 m, i=1.50 m, e=1.8 m

923,696.84

49

Vibrador de concretos

Eqp

HR

4.5000

4,375.00

19,687.50

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

15.0000

3,091.00

46,365.00

Formaleta metalica Tipo Caisson H=1.00 M DI=1.00 M,


DE=1.10 M (para 20 usos)

Ana

und

0.0770

790,281.50

60,851.68

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-4

Ins

15.0000

30,910.00

463,650.00

160
5,053
13,960

6,253 Concreto 3000 Psi para el pilote tipo Caisson


(Profundidad 10 a 20 m, = 1.50 m)

676,353.16

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

53

Herramienta menor 10% M.O. AA-3

Eqp

HR

12.0000

2,550.00

30,600.00

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

Cuadrilla AA-3 (Limpieza)

Ins

12.0000

25,504.00

306,048.00

5,053
14,749

6,254 Viga aerea concreto 3000 Psi (h= 6 - 12 m)

844,652.20

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

19.0000

2,010.00

38,190.00

80

14,437.50

Pluma grua o Malacate

Eqp

HR

4,867

Paral telescopico 2 a 4 ml

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

1.6500

8,750.00

30.0000

340.00

10,200.00

1.0000

333,142.66

333,142.66
43,156.54

Formaleta (1 uso)

Ana

1.3330

32,375.50

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

19.0000

20,097.00

381,843.00

6,255 Viga aerea concreto 3000 Psi (h= 12 - 18 m)

910,973.20

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

22.0000

2,010.00

44,220.00

80

Pluma grua o Malacate

Eqp

HR

1.6500

8,750.00

14,437.50

4,867

Paral telescopico 2 a 4 ml

Ins

30.0000

340.00

10,200.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

43,156.54

Formaleta (1 uso)

Ana

1.3330

32,375.50

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

22.0000

20,097.00

442,134.00

6,256 Viga aerea concreto 3000 Psi (h= 18 - 24 m)

977,294.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

359

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

49

Vibrador de concretos

Eqp

69

Herramienta Menor 10% M.O. AA-2

Eqp

80

Pluma grua o Malacate

Eqp

HR

4,867

Paral telescopico 2 a 4 ml

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Vr.Total

HR

1.5000

4,375.00

6,562.50

HR

25.0000

2,010.00

50,250.00
14,437.50

1.6500

8,750.00

30.0000

340.00

10,200.00

1.0000

333,142.66

333,142.66
43,156.54

Formaleta (1 uso)

Ana

1.3330

32,375.50

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

25.0000

20,097.00

502,425.00

6,257 Anclaje en concreto para puentes de resistencia


3000 Psi, pagada en m3

620,264.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

0.6800

32,375.50

22,015.34

6,258 Placa base en concreto 3000 psi e=0.15 m


reforzado con acero grado 60 para parqueadero

105,760.17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7700

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

4,489

Cuadrilla AA (Albaileria)

Ins

0.7700

14,690.00

11,311.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

18.0000

2,257.00

40,626.00

17

6,259 Placa maciza antiexplosiva, en concreto de 3000


psi, E= 15 cm reforzada y rec. en lmina cold rolled,
pagado en m2

1,131.13

173,083.08

Herramienta Menor 10% M.O. AA

Eqp

HR

3.5000

1,469.00

5,141.50

1,870

Alambre Negro No 18

Ins

kg

0.3000

3,903.00

1,170.90

2,198

Durmiente ordinario 4 M

Ins

1.0000

3,500.00

3,500.00

4,489

Cuadrilla AA (Albaileria)

Ins

3.5000

14,690.00

51,415.00

4,867

Paral telescopico 2 a 4 ml

Ins

1.0000

340.00

340.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

kg

13,627

Formaleta entrepisos

Ins

14,778

Tabla burra cedro macho 0.30

Ins

15,593

Lamina cold roll calibre 20 (2.40 mt x 1.20 mt)

Ins

17

6,260 Muro antiexplosivo en concreto de 3000 psi, E= 15


cm reforzado y rec. en lmina cold rolled cal 20,
pagado en m2

0.5000

0.00

0.00

13.0000

2,257.00

29,341.00

mes

1.0500

3,500.00

3,675.00

1.0000

5,000.00

5,000.00

und

0.3500

67,223.67

23,528.28

134,901.01

Herramienta Menor 10% M.O. AA

Eqp

HR

2.1000

1,870

Alambre Negro No 18

Ins

kg

0.3000

3,903.00

1,170.90

4,489

Cuadrilla AA (Albaileria)

Ins

2.1000

14,690.00

30,849.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1500

333,142.66

49,971.40

5,061

Formaleta (1 uso)

Ana

0.6600

32,375.50

21,367.83

5,144

Transporte de materiales Tn

Ana

0.4000

0.00

0.00

Lamina cold roll calibre 20 (2.40 mt x 1.20 mt)

Ins

und

0.3500

67,223.67

23,528.28

17

15,593

1,469.00

3,084.90

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

360

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,741

Malla electrosoldada Q-3 o M-106 (2.35 x 6m)

Ins

6,261 Muro de Contencin Concreto 3000 Psi. reforzado


E= 0.30, pagado en M2

Cantidad

Vr.Unitario

Vr.Total

1.0500

4,694.00

4,928.70

216,625.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

4.0000

2,295.00

9,180.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.5000

14,690.00

36,725.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3000

333,142.66

99,942.80

5,061

Formaleta (1 uso)

Ana

1.0000

32,375.50

32,375.50

8,194

Acero de refuerzo 60000 Psi

Ins

kg

15.0000

2,257.00

33,855.00

6,262 Apoyo de Neopreno D=60 (0.25 m x 0.15 m x 0.5")

und

3,672.50

17,712.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.25 x 0.15) m D=60 E=0.5"

Ins

und

1.0000

10,000.00

10,000.00

19

15,787

6,263 Riostra transversales Tuberia Petrolera D=3 1/2 "

222,714.36

42

Motosoldador Diesel

Eqp

HR

1.2000

14,833.00

17,799.60

43

Equipo de Oxicorte

Eqp

HR

1.2000

5,000.00

6,000.00

44

Pulidora electrica manual

Eqp

HR

1.2000

4,350.00

5,220.00

45

Cilindro

Eqp

HR

1.2000

41.00

49.20

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.2000

3,226.00

3,871.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.2000

6,805.00

8,166.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.1200

29,750.00

3,570.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.4500

6,856.00

3,085.20

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1800

42,950.00

7,731.00

5,144

Transporte de materiales Tn

Ana

0.3400

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1500

6,200.00

930.00

14,745

Oxigeno Industrial

Ins

0.3300

15,662.00

5,168.46

14,746

Acetileno

Ins

kg

0.1200

41,820.00

5,018.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.2000

32,262.00

38,714.40

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

3.3000

35,573.00

117,390.90

6,264 Viga Cercha Longitudinal Tuberia Petrolera D= 6


5/8 y diagonales D=3 1/2 "

308,001.75

14

Retroexcavadora de orugas

Eqp

HR

0.0300

144,160.00

4,324.80

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5000

3,226.00

1,613.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.8000

6,805.00

5,444.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.1500

29,750.00

4,462.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2200

6,856.00

1,508.32

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1000

42,950.00

4,295.00

5,144

Transporte de materiales Tn

Ana

0.6000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1000

6,200.00

620.00

14,745

Oxigeno Industrial

Ins

0.1400

15,662.00

2,192.68

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

361

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

14,746

Acetileno

Ins

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

14,755
14,945

kg

0.0600

41,820.00

2,509.20

0.5000

32,262.00

16,131.00

Ins

2.4000

35,573.00

85,375.20

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

Ins

2.0000

81,200.00

162,400.00

Lamina HR 1/2"

Ins

0.0200

250,702.65

5,014.05

6,265 Caja de inspeccion 80 x 80, en concreto reforzado

und

Vr.Total

278,512.27

Herramienta Menor 10% M.O. AA

Eqp

HR

5.7929

1,469.00

8,509.77

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0500

248,144.84

12,407.24

1,848

Tabla burra 3.00 m

Ins

3.0000

4,666.00

13,998.00

1,870

Alambre Negro No 18

Ins

kg

0.2500

3,903.00

975.75

2,197

Repisa Ordinario 3 m

Ins

2.0000

1,500.00

3,000.00

3,684

Agua para obra

Ins

53.4100

10.00

534.10

3,797

Puntilla con cabeza 2"

Ins

lb

1.0000

1,990.00

1,990.00

4,426

Arena lavada de rio

Ins

0.2200

13,800.00

3,036.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.7929

14,690.00

85,097.70

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3000

333,142.66

99,942.80

5,143

Transporte de materiales m

Ana

0.5300

46,157.00

24,463.21

5,144

Transporte de materiales Tn

Ana

0.9300

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

6.5000

2,257.00

14,670.50

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0400

15,660.00

626.40

13,961

Triturado de 1/2" - 3/4"

Ins

0.2000

46,304.00

9,260.80

17

6,266 Poyo en concreto de resistencia 3000 psi, 50 x 0.08


cm, pagado en ml

22,936.08

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3450

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.2640

2,667.00

704.09

4,489

Cuadrilla AA (Albaileria)

Ins

0.3450

14,690.00

5,068.05

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0500

333,142.66

16,657.13

17

6,267 Punto desage pvc 2" y 3", pagado por UN

und

506.81

56,355.75

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6260

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

2.7600

4,485.00

12,378.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6260

16,159.00

10,115.53

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

40,837.50

15,518.25

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

1.3600

1,936.00

2,632.96

15,437

Tubo PVC sanitario de 2"

Ins

0.2700

7,092.00

1,914.84

15,438

Tubo PVC sanitario de 3"

Ins

0.9300

10,595.00

9,853.35

55

6,268 Concreto impermeabilizado de 3000 psi y reforzado


para tanque subterraneo, pagado en m3

1,011.62

765,308.64

17

Herramienta Menor 10% M.O. AA

Eqp

HR

17.5500

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

1,901

Acero de refuerzo 37000 Psi

Ins

kg

7.0000

2,295.00

16,065.00

2,200

Tabla burra ordinario 0.30

Ins

0.7600

4,333.00

3,293.08

2,243

Vara de clavo 3M -1

Ins

0.4700

1,500.00

705.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.1200

1,990.00

4,218.80

4,489

Cuadrilla AA (Albaileria)

Ins

17.5500

14,690.00

257,809.50

25,780.95

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

362

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

0.0900

311,229.99

28,010.70

1.0000

0.00

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

0.00

Ana

1.1000

345,308.74

379,839.61

8,194

Acero de refuerzo 60000 Psi

Ins

kg

12.0000

2,257.00

27,084.00

13,326

Durmiente ordinario 3 M

Ins

3.5000

767.00

2,684.50

13,627

Formaleta entrepisos

Ins

mes

2.5300

3,500.00

8,855.00

13,850

Alambre Galvanizado No. 12

Ins

kg

2.0000

5,000.00

10,000.00

6,269 Mesones en concreto de 3000 psi 0.08 mts, A =


0.60, incluye muro lateral en ladrillo, pagado ML

106,086.21

Herramienta Menor 10% M.O. AA

Eqp

HR

1.9000

1,469.00

2,791.10

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0080

248,144.84

1,985.16

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.2400

3,903.00

936.72

1,901

Acero de refuerzo 37000 Psi

Ins

kg

12.0000

2,295.00

27,540.00

2,085

Ladrillo tolete comn

Ins

und

32.2000

305.00

9,821.00

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.0000

4,300.00

4,300.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

0.7000

3,500.00

2,450.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.9000

14,690.00

27,911.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0800

333,142.66

26,651.41

5,144

Transporte de materiales Tn

Ana

0.1820

0.00

0.00

17

6,270 Suministro e instal. tuberia sanitaria PVC 6",


pagado m

44,970.35

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

2,942

Union sanitaria PVC 6 "

Ins

und

0.1667

19,740.00

3,290.66

3,657

Tubo PVC sanitario de 6"

Ins

1.0500

31,269.00

32,832.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

55

6,271 Acometida red hidraulica pvc 1/2" x 45 ml, pagado


UN

und

398,768.60

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

1,841

Cheque hidro 1 1/2"

Ins

und

1.0500

117,508.00

123,383.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

5,144

55

Transporte de materiales Tn

Ana

13,607

Sub-Contrato Hidraulico Sanitario

Esp

14,757

Registro paso directo 1/2"

Ins

und

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

15,021

Codo 90 presion PVC 1/2"

Ins

und

6,272 Zarpa en Concreto Ciclopeo de 3000 Psi.

0.5000

0.00

0.00

38.0000

288,962.75

109,805.85

1.0500

22,000.00

23,100.00

45.0000

1,504.00

67,680.00

2.0500

375.00

768.75

488,210.06

Herramienta Menor 10% M.O. AA

Eqp

HR

14.0000

1,469.00

20,566.00

4,489

Cuadrilla AA (Albaileria)

Ins

14.0000

14,690.00

205,660.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

0.8000

32,375.50

25,900.40

17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

363

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,063

Nombre

Tipo U.M.

Piedra rajon o media zonga

Ana

6,273 Muros o elevaciones estribos, en concreto ciclopeo


para puentes de resistencia 3000 Psi.

Cantidad

Vr.Unitario

Vr.Total

0.4000

90,495.15

36,198.06

570,062.58

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.6000

333,142.66

199,885.60

5,061

Formaleta (1 uso)

Ana

2.3300

32,375.50

75,434.92

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

6,274 Vigas longitudinales Tuberia Petrolera =7"

120,959.63

14

Retroexcavadora de orugas

Eqp

HR

0.0263

144,160.00

3,791.41

42

Motosoldador Diesel

Eqp

HR

0.2100

14,833.00

3,114.93

43

Equipo de Oxicorte

Eqp

HR

0.2100

5,000.00

1,050.00

44

Pulidora electrica manual

Eqp

HR

0.2100

4,350.00

913.50

45

Cilindro

Eqp

HR

0.2100

41.00

8.61

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.2100

3,226.00

677.46

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3200

6,805.00

2,177.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1100

6,856.00

754.16

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,144

Transporte de materiales Tn

Ana

0.3200

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.0700

15,662.00

1,096.34

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.2100

32,262.00

6,775.02

15,812

Tuberia en A.C. = 7" Dril Pipe Usd

Ins

1.0000

95,000.00

95,000.00

6,275 Vigas transversales Tuberia Petrolera D=7 "

142,113.93

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

7,208.00

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5000

3,226.00

1,613.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4700

6,805.00

3,198.35

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1600

6,856.00

1,096.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.5000

32,262.00

16,131.00

15,812

Tuberia en A.C. = 7" Dril Pipe Usd

Ins

1.0000

95,000.00

95,000.00

6,276 Placa base en concreto 2500 psi e=0.07 m

34,318.24

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

2,208

Tabla chapa ordinario 0.10

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

17

1,469.00

969.54

0.5100

2,667.00

1,360.17

0.6600

14,690.00

9,695.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

364

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

6,277 Suministro e instal. baldosa lisa L1 de 33 * 33,


pagado m2 cortadora y transporte

Cantidad

Vr.Unitario

Vr.Total

0.0700

318,473.24

22,293.13

0.0032

0.00

0.00

59,378.99

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

804

Cemento gris

Ins

kg

6.2700

383.34

2,403.54

829

Cemento blanco

Ins

kg

1.0300

975.00

1,004.25

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0693

0.00

0.00

Baldosa grano de mrmol 30*30 perlato claro

Ins

1.0300

37,274.28

38,392.51

15,813

6,278 Suministro e instal. de tablon en gres tipo


vitrificado, + gravilla lavada 33 x 33 cm, pagado m2

37,900.42

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0450

0.00

0.00

14,171

Crudo de rio clasificado T.m. 3"

Ins

0.0510

17,400.00

887.40

15,568

Tablon de gres vitrificado 33 x 33

Ins

1.0500

14,776.00

15,514.80

804

6,279 Salida toma sencilla pvc completa, pagado un

und

39,181.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

3,183

Toma doble conduit

Ins

und

1.0000

3,815.00

3,815.00

3,266

Alambre cobre THW 12 AWG

Ins

9.0000

1,000.00

9,000.00

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55

6,280 Relleno de prestamo lateral, compactado, Mat.


comun, Manual (excavacion, cargue manual y
acarreo max. 2 Km)

28,276.58

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

41

Vibrocompactador tipo rana

Eqp

HR

0.6061

5,000.00

3,030.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.8000

2,010.00

1,608.00

Material de prestamo (tierra-arena-arcilla-limo)

Ins

1.0000

1,250.00

1,250.00

Cuadrilla AA-2 (Tuberias)

Ins

0.8000

20,097.00

16,077.60

858
14,669

6,281 Relleno de prestamo lateral, compactado, mat.


comun, manual (con excavacion y cargue
mecanico, acarreo max. 2 Km)

23,204.08

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

365

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0250

111,550.00

2,788.75

21

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

41

Vibrocompactador tipo rana

Eqp

HR

0.6061

5,000.00

3,030.50

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.4444

2,010.00

893.24

Material de prestamo (tierra-arena-arcilla-limo)

Ins

1.0000

1,250.00

1,250.00

Cuadrilla AA-2 (Tuberias)

Ins

0.4444

20,097.00

8,931.11

858
14,669

6,282 Enchape piso en porcelanato 45 x 45, pagado m2

83,781.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

804

Cemento gris

Ins

kg

7.2700

383.34

2,786.88

829

Cemento blanco

Ins

kg

0.8000

975.00

780.00

3,684

Agua para obra

Ins

3.5000

10.00

35.00

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.1320

0.00

0.00

Ceramica porcelanato 45 x 45

Ins

1.0300

62,640.00

64,519.20

17

15,825

6,283 Suministro e instal. de tablon en gres, tipo


grafilado, con dimens. de 30 x 30 cm, espesor de
2,5 cm, pagado m2

33,450.08

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9500

1,469.00

1,395.55

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9500

14,690.00

13,955.50

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

Tablon ladrillo grafilado 30 x 30

Ins

1.0300

12,500.00

12,875.00

804

15,826

6,284 Enchape piso en retal de marmol para piso pagado


M2

50,466.18

15

Pegacor blanco

Ins

kg

3.0000

1,120.00

3,360.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8250

1,469.00

1,211.93

Cemento blanco

Ins

kg

0.8000

975.00

780.00

3,684

Agua para obra

Ins

3.5000

10.00

35.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8250

14,690.00

12,119.25

5,144

Transporte de materiales Tn

Ana

0.1320

0.00

0.00

Ceramica retal de marmol blanco

Ins

1.0300

32,000.00

32,960.00

829

15,818

6,285 Enchape piso-pared en ceramica blanco brillante


20.3 x 20.3, pagado M2

39,012.58

15

Pegacor blanco

Ins

kg

3.0000

1,120.00

3,360.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8250

1,469.00

1,211.93

Cemento blanco

Ins

kg

0.8000

975.00

780.00

3,684

Agua para obra

Ins

3.5000

10.00

35.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8250

14,690.00

12,119.25

5,144

Transporte de materiales Tn

Ana

0.0132

0.00

0.00

Ceramica blanco brillante 25.3 x 25.3

Ins

1.0300

20,880.00

21,506.40

829

16,361

6,286 Guardaescoba tabln en gres de 0.10 x 0.20 cm,


espesor de 2,5 cm, pagado ML

5,720.67

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

366

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cemento gris

Ins

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

5,144
15,828

17
804

Cantidad

Vr.Unitario

Vr.Total

HR

0.2500

1,469.00

367.25

kg

0.9410

383.34

360.72

1.5000

10.00

15.00

0.0040

13,800.00

55.20

Ins

0.2500

14,690.00

3,672.50

Transporte de materiales Tn

Ana

0.0005

0.00

0.00

Tablon de gres liso 20 x 20

Ins

0.1000

12,500.00

1,250.00

6,287 Guardaescoba en ceramica porcelanato pagado


ML

11,305.09

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

804

Cemento gris

Ins

kg

1.2700

383.34

486.84

829

Cemento blanco

Ins

kg

0.3000

975.00

292.50

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0150

13,800.00

207.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

Ceramica porcelanato 45 x 45

Ins

0.1000

62,640.00

6,264.00

17

15,825

6,288 Enchape gradas en ceramica porcelanato, pagado


ML

50,598.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

804

Cemento gris

Ins

kg

4.0000

383.34

1,533.36

829

Cemento blanco

Ins

kg

0.4000

975.00

390.00

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

15,825

Ceramica porcelanato 45 x 45

Ins

0.4700

62,640.00

29,440.80

15,829

Pirlan antideslizante

Ins

0.8000

5,500.00

4,400.00

17

6,289 Cielo raso en placa gyplac de yeso dry-wall,


pagado M2 con frescasa

54,004.71

Herramienta Menor 10% M.O. DD

Eqp

HR

1.1500

1,763.00

2,027.45

5,064

Cuadrilla DD (Carpinteria)

Ins

1.1500

17,628.00

20,272.20

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

15,830

Placa Gyplac 12.7 mm RH

Ins

und

0.3450

42,408.00

14,630.76

15,831

Cinta de papel rollo 152.5 m

Ins

und

0.0090

15,616.00

140.54

15,832

Masilla acrlica para interiores cuete 5 gal

Ins

und

0.0400

62,903.00

2,516.12

15,833

Perfil canal 40 mm

Ins

und

0.3900

4,640.00

1,809.60

15,834

Perfil omega 2.44

Ins

und

0.7600

3,150.00

2,394.00

15,835

Perfil paral 39 mm

Ins

und

0.5700

4,640.00

2,644.80

15,836

Tornillo cabeza extraplana

Ins

und

7.2000

39.00

280.80

15,837

Tornillo estandar 6 x 1"

Ins

und

8.7900

20.00

175.80

15,838

Frescasa 31/2" rollo 18.58 m2

Ins

und

0.0600

101,911.00

6,114.66

15,839

Angulo cal 26-24 x 1" L=2.44 m cielo raso drywall

Ins

und

0.0700

1,851.00

129.57

56

6,290 Suministro e instal. de cielo raso sonocor, pagado


m2

33,967.95

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

367

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

5,144

55

Cantidad

Vr.Unitario

Vr.Total

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0300

5,000.00

150.00

13,935

Angulo cielo falso aluminio

Ins

0.7000

2,000.00

1,400.00

13,936

Tee cielo falso en aluminio

Ins

1.1000

2,000.00

2,200.00

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

15,840

Lamina sonocor

Ins

1.0300

15,500.00

15,965.00

6,291 Granito pulido travertino peruano No2, para


enchape mesn, pagado en ml

54,259.04

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.7500

1,469.00

2,570.75

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

829

Cemento blanco

Ins

kg

2.0000

975.00

1,950.00

2,486

Marmolina 20 kg

Ins

bt

0.3000

12,800.00

3,840.00

3,684

Agua para obra

Ins

4.4100

10.00

44.10

4,489

Cuadrilla AA (Albaileria)

Ins

1.7500

14,690.00

25,707.50

5,143

Transporte de materiales m

Ana

0.0700

46,157.00

3,230.99

5,144

Transporte de materiales Tn

Ana

0.0750

0.00

0.00

Granito travertino peruano No.2

Ins

bt

0.8500

17,342.00

14,740.70

14,946

6,292 Enchape ceramico blanco brillante 20.3 x 20.3


para mesn, con bocel de remate, pagado ML

48,693.25

15

Pegacor blanco

Ins

kg

2.8500

1,120.00

3,192.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7500

1,469.00

1,101.75

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento blanco

Ins

kg

0.8000

975.00

780.00

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7500

14,690.00

11,017.50

5,144

Transporte de materiales Tn

Ana

0.1120

0.00

0.00

13,857

Bocel porcelana remate

Ins

und

9.0000

2,000.00

18,000.00

15,820

Ceramica blanco brillante 20.3 x 20.3

Ins

0.6500

20,880.00

13,572.00

829

6,293 Juego completo de incrustar bao tipo royal ,


pagado por UN

und

92,097.46

Herramienta Menor 10% M.O. AA

Eqp

HR

2.2000

1,469.00

Cemento blanco

Ins

kg

1.5400

975.00

1,501.50

4,489

Cuadrilla AA (Albaileria)

Ins

2.2000

14,690.00

32,318.00

5,143

Transporte de materiales m

Ana

0.0010

46,157.00

46.16

Juego accesorios bao porcelana tipo royal

Ins

und

1.0000

55,000.00

55,000.00

17
829

15,842

6,294 Acometida red hidraulica pvc 1/2" x 25 ml, pagado


UN

und

3,231.80

320,463.95

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

1,841

Cheque hidro 1 1/2"

Ins

und

1.0500

117,508.00

123,383.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

232,220.25

88,243.70

14,757

Registro paso directo 1/2"

Ins

und

1.0500

22,000.00

23,100.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

368

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

15,021

Codo 90 presion PVC 1/2"

Ins

und

6,295 Punto desage sanitario pvc 3", pagado un

Cantidad

Vr.Unitario

Vr.Total

25.0000

1,504.00

37,600.00

2.0500

375.00

768.75

und

60,548.41

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8500

1,616.00

1,373.60

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0800

58,612.00

4,688.96

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

2.7700

4,485.00

12,423.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8500

16,159.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

43,875.66

16,672.75

15,438

Tubo PVC sanitario de 3"

Ins

1.1000

10,595.00

11,654.50

55

6,296 Reventilacion PVC 2", pagado por ML

%
m

15,149.17

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

10,977.66

4,171.51

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

0.1400

1,936.00

271.04

15,844

Tubo PVC ventilacin 2"

Ins

1.0500

4,560.00

4,788.00

55

6,297 Conexin tanque elevado pvc de 1" y 2", pagado un

und

484.80

220,428.85

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

5,144

55

8,080.00

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

159,731.05

60,697.80

13,942

Registro paso directo 1"

Ins

und

1.0000

36,500.00

36,500.00

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

1.0500

3,923.00

4,119.15

14,999

Tubo presin RDE 21 PVC 2 "

Ins

1.0500

9,802.00

10,292.10

15,023

Codo 90 presion PVC 1"

Ins

und

2.1000

1,176.00

2,469.60

15,026

Codo 90 presion PVC 2"

Ins

und

2.1000

6,926.00

14,544.60

6,298 Flotador mecanico mercurio para tanque


subterrneo, pagado por unidad REPETIDO 5391

und

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

85,000.00

32,300.00

14,051

Flotador automtico de mercurio

Ins

und

1.0000

85,000.00

85,000.00

5,144

6,299 Salida para citofono pvc, pagado un

117,300.00

und

28,021.62

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,551

Caja doble conduit

Ins

und

1.0000

1,825.00

1,825.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

2.5000

1,384.00

3,460.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

55

6,300 Salida toma monofasica doble deko, pagado un

und

49,621.62

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

369

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

406

Caja 4 x 4 met. AK 2V

Ins

und

1.0000

5,600.00

5,600.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,183

Toma doble conduit

Ins

und

1.0000

3,815.00

3,815.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

3.0000

1,384.00

4,152.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

55

13,557

6,301 Acometida telefonica 1", pagada en ML

21,130.35

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5500

1,616.00

888.80

Cable telfonos 10 pares

Ins

1.0000

3,840.00

3,840.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

3,561

Adaptador terminal conduit 1"

Ins

und

1.0000

660.00

660.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5500

16,159.00

8,887.45

Tubo conduit PVC 1"

Ins

1.0000

2,511.00

2,511.00

55
853

12,066

6,302 Salida television pvc, pagado un

und

95,718.66

Sub-Contrato Electrico

Esp

38.0000

69,361.35

26,357.31

Herramienta Menor 10% M.O. BB

Eqp

HR

2.8800

1,616.00

4,654.08

3,495

Caja sencilla conduit

Ins

und

1.0500

1,218.00

1,278.90

3,553

Adaptador terminal conduit 1/2"

Ins

und

1.0500

269.00

282.45

3,556

Tubo conduit PVC 1/2"

Ins

12.0000

1,384.00

16,608.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.8800

16,159.00

46,537.92

3
55

6,303 Disipador de energia en Concreto 3000 Psi; con


muros laterales (h=0.50 m)

512,946.69

Herramienta Menor 10% M.O. AA

Eqp

HR

6.0000

1,469.00

8,814.00

4,489

Cuadrilla AA (Albaileria)

Ins

6.0000

14,690.00

88,140.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.0000

32,375.50

64,751.00

5,063

Piedra rajon o media zonga

Ana

0.2000

90,495.15

18,099.03

17

6,304 Tablero parciales 6 circuitos, pagado un

und

239,345.48

Sub-Contrato Electrico

Esp

38.0000

173,438.75

65,906.73

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0500

1,616.00

3,312.80

2,019

Taco termomagntico unipolar HQP 30A

Ins

und

6.0000

17,000.00

102,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0500

16,159.00

33,125.95

Tablero 6 circuitos

Ins

und

1.0000

35,000.00

35,000.00

3
55

15,855

6,305 Tablero parciales 8 circuitos, pagado un


3
55
2,019

und

315,144.74

Sub-Contrato Electrico

Esp

38.0000

228,365.75

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0500

1,616.00

3,312.80

Taco termomagntico unipolar HQP 30A

Ins

und

8.0000

17,000.00

136,000.00

86,778.99

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

370

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
14,229

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

Tablero monof. s/puerta (8 ventanas)

Ins

6,306 Cuneta revestida en Sacos (0.1 x 0.5 x 0.7) con


suelo - cemento (7:1), cemento al 6 % en peso, en
V, L= 1.0 m

Cantidad

Vr.Unitario

Vr.Total

2.0500

16,159.00

33,125.95

und

1.0000

55,927.00

55,927.00

75,813.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0400

248,144.84

9,925.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

6,307

Saco (0.6 x 0.8) con suelo arcilloso - cemento (7:1),


cemento al 6% en peso

Ana

und

12.0000

4,817.37

57,808.44

17

6,307 Saco (0.6 x 0.8) con suelo arcilloso - cemento (7:1),


cemento al 6% en peso

und

4,817.37

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1300

Cemento gris

Ins

kg

4,489

Cuadrilla AA (Albaileria)

Ins

5,144

Transporte de materiales Tn

Ana

Saco en fibra (0.60 x 0.80)

Ins

17
804

15,366

6,308 Delineador de curva Horizontal

1,469.00

190.97

5.0000

383.34

1,916.70

0.1300

14,690.00

1,909.70

0.0050

0.00

0.00

und

1.0000

800.00

800.00

und

186,603.64

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0320

318,473.24

10,191.14

5,144

Transporte de materiales Tn

Ana

0.0090

0.00

0.00

Delineador de curva Horizontal

Ins

und

1.0000

168,333.00

168,333.00

17

15,857

6,309 Timbre botn econmico, pagado por unidad

und

143,054.94

Sub-Contrato Electrico

Esp

38.0000

103,663.00

39,391.94

Herramienta Menor 10% M.O. BB

Eqp

HR

4.2000

1,616.00

6,787.20

1,702

Boquillas juego pvc 1/2"

Ins

und

4.0000

960.00

3,840.00

3,556

Tubo conduit PVC 1/2"

Ins

2.0000

1,384.00

2,768.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.2000

16,159.00

67,867.80

13,657

Alambre telefnico 2 x 22 trenzado

Ins

4.0000

800.00

3,200.00

15,853

Pulsado sencillo para timbre

Ins

und

1.0000

12,000.00

12,000.00

15,858

Zumbador 110 voltios 607

Ins

und

1.0000

6,500.00

6,500.00

15,859

Caja galvanizada 5800

Ins

und

2.0000

350.00

700.00

3
55

6,310 Portero fuente 1 botn, pagado por UN


55
4,515
15,861

und

187,537.50

Herramienta Menor 10% M.O. BB

Eqp

HR

6.5000

1,616.00

10,504.00

Cuadrilla BB (Instalaciones)

Ins

6.5000

16,159.00

105,033.50

Parlante portero elctrico 1 pulso

Ins

und

1.0000

72,000.00

72,000.00

6,311 Parcial PVC 2 1/2" 4 # 4/0, pagado por ML

62,449.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,127

Cable al. aisl. pvc 4/0 awg

Ins

4.0000

6,395.00

25,580.00

14,129

Cable al. aisl. pvc 1/0 awg

Ins

1.0000

8,294.00

8,294.00

15,865

Tubo conduit PVC 2 1/2"

Ins

1.0000

10,800.00

10,800.00

55
4,515

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

371

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,312 Suministro e instal. hoja puerta triplex, 2.10 x 0.70


pagado UN

Cantidad

Vr.Unitario

und

Vr.Total

163,324.67

No incluye marco
Sub-Contrato Carpinteria

Esp

45.0000

112,637.70

Herramienta Menor 10% M.O. DD

Eqp

HR

1.7000

1,763.00

2,997.10

1,236

Cedro Caquet pieza

Ins

und

0.3600

50,000.00

18,000.00

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.1000

2,480.00

248.00

2,126

Lamina de triplex 4mm

Ins

und

1.5000

35,000.00

52,500.00

2,933

Pegante colbn

Ins

kg

0.1500

9,500.00

1,425.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.7000

17,628.00

29,967.60

4
56

6,313 Suministro e instal. hoja puerta triplex, 2.10 x 0.90


pagado UN

und

50,686.97

175,447.85

No incluye marco
Sub-Contrato Carpinteria

Esp

45.0000

120,998.52

Herramienta Menor 10% M.O. DD

Eqp

HR

1.7200

1,763.00

3,032.36

1,236

Cedro Caquet pieza

Ins

und

0.4000

50,000.00

20,000.00

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.2000

2,480.00

496.00

2,126

Lamina de triplex 4mm

Ins

und

1.6500

35,000.00

57,750.00

2,933

Pegante colbn

Ins

kg

0.2000

9,500.00

1,900.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.7200

17,628.00

30,320.16

4
56

6,314 Suministro e instal. hoja puerta triplex, 2.10 x 1.00,


pagado UN

und

54,449.33

183,046.41

No incluye marco
Sub-Contrato Carpinteria

Esp

45.0000

126,238.90

Herramienta Menor 10% M.O. DD

Eqp

HR

1.9000

1,763.00

3,349.70

1,236

Cedro Caquet pieza

Ins

und

0.4000

50,000.00

20,000.00

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.2000

2,480.00

496.00

2,126

Lamina de triplex 4mm

Ins

und

1.7000

35,000.00

59,500.00

2,933

Pegante colbn

Ins

kg

0.2000

9,500.00

1,900.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.9000

17,628.00

33,493.20

4
56

6,315 Suministro e instal. hoja puerta triplex, 2.10 x 1.50,


pagado UN

und

56,807.51

281,224.89

No incluye marco
Sub-Contrato Carpinteria

Esp

45.0000

193,948.20

Herramienta Menor 10% M.O. DD

Eqp

HR

2.6000

1,763.00

4,583.80

1,236

Cedro Caquet pieza

Ins

und

0.4000

50,000.00

20,000.00

1,519

Bisagra alum. EXT 3"

Ins

und

3.0000

2,500.00

7,500.00

1,807

Puntilla sin cabeza 1"

Ins

lb

0.3000

2,480.00

744.00

2,139

Lamina de triplex estructural 7mm

Ins

und

2.2000

51,108.00

112,437.60

2,933

Pegante colbn

Ins

kg

0.3000

9,500.00

2,850.00

5,064

Cuadrilla DD (Carpinteria)

Ins

2.6000

17,628.00

45,832.80

4
56

6,316 Mueble linos flormorado, pagado por M2


4
56
1,807

87,276.69

228,032.68

Sub-Contrato Carpinteria

Esp

45.0000

157,263.92

70,768.76

Herramienta Menor 10% M.O. DD

Eqp

HR

6.0000

1,763.00

10,578.00

Puntilla sin cabeza 1"

Ins

lb

0.1500

2,480.00

372.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

372

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,191

Madera flormorado pieza

Ins

2,933

Pegante colbn

Ins

und

0.5200

35,000.00

18,200.00

kg

0.2000

9,500.00

3,789

Tornillo para madera 2" No. 9

1,900.00

Ins

und

5,064

4.5600

32.00

145.92

Cuadrilla DD (Carpinteria)

Ins

6.0000

17,628.00

105,768.00

15,867

Triplex flormorado 9 mm

Ins

und

0.3500

58,000.00

20,300.00

6,317 Suministro e instal. marcos y puertas en lamina


cold rolled calibre 18, 2.00, pagado un

und

226,094.42

Sub-Contrato Ornamentacion

Esp

50.0000

150,729.61

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

1,519

Bisagra alum. EXT 3"

Ins

und

6.0000

2,500.00

15,000.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.5000

88,083.67

132,125.51

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1600

6,885.00

1,101.60

14,116

6,318 Suministro e instal. marcos puertas en lamina coll


roll calibre 18, 3.00, pagado un

und

75,364.81

298,464.87

Sub-Contrato Ornamentacion

Esp

50.0000

198,976.58

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

0.7200

16,865.43

12,143.11

1,519

Bisagra alum. EXT 3"

Ins

und

6.0000

2,500.00

15,000.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.9000

88,083.67

167,358.97

2,502

Anticorrosivo rojo claro

Ins

gal

0.0600

29,750.00

1,785.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.2000

6,885.00

1,377.00

228

14,116

6,319 Suministro e instal. ventana aluminio corrediza


incluye vidrio, pagado m2

99,488.29

187,458.43

3,698

Ventana corrediza aluminio

Ins

1.0000

150,000.00

150,000.00

3,747

Vidrio incoloro 4 mm

Ins

1.0000

25,000.00

25,000.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

6,320 Ciclpeo para cimentacin, pagado en M3

233,532.54

Herramienta Menor 10% M.O. AA

Eqp

HR

4.7000

1,469.00

6,904.30

Cemento gris

Ins

kg

180.0000

383.34

69,001.20

3,684

Agua para obra

Ins

158.0000

10.00

1,580.00

4,426

Arena lavada de rio

Ins

0.3000

13,800.00

4,140.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.7000

14,690.00

69,043.00

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

5,143

Transporte de materiales m

Ana

0.4000

46,157.00

18,462.80

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

Triturado de 1/2" - 3/4"

Ins

0.5700

46,304.00

26,393.28

17
804

13,961

6,321 Muro en piedra pegada, concreto de 2500 Psi,


e=0.30 m

96,939.82

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,200

Tabla burra ordinario 0.30

Ins

1.0000

4,333.00

4,333.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.1000

318,473.24

31,847.32

17

2,644.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

373

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,063

Nombre

Tipo U.M.

Piedra rajon o media zonga

Ana

6,322 Suministro e instal. puertas aluminio con vidrio


bronce 6 mm, pagado m2

Cantidad

Vr.Unitario

Vr.Total

0.3500

90,495.15

31,673.30

228,775.60

Herramienta Menor 10% M.O. DD

Eqp

HR

1.6000

1,763.00

2,820.80

5,064

Cuadrilla DD (Carpinteria)

Ins

1.6000

17,628.00

28,204.80

5,144

Transporte de materiales Tn

Ana

0.4410

0.00

0.00

15,555

Vidrio bronce 6 mm

Ins

0.5500

65,000.00

35,750.00

15,594

Puerta aluminio llena, bisagras, marco e instalaci

Ins

0.6000

270,000.00

162,000.00

56

6,323 Divisin lmina entamborada cal. 18 con


anticorrosivo, pagado m2

150,385.40

Sub-Contrato Instalacion

Esp

20.0000

88,462.00

17,692.40

Sub-Contrato Ornamentacion

Esp

50.0000

88,462.00

44,231.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2500

8,750.00

2,187.50

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

0.7000

2,700.00

1,890.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.7000

6,885.00

4,819.50

15,572

Divisin lmina calibre 18 entamborado para bao

Ins

1.0200

75,000.00

76,500.00

6,324 Hexapodo en Concreto 3000 Psi ( Vol = 1.48 m)

und

819,087.82

14

Retroexcavadora de orugas

Eqp

HR

0.2500

144,160.00

36,040.00

49

Vibrador de concretos

Eqp

HR

2.5700

4,375.00

11,243.75

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

3.4600

2,010.00

6,954.60

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.4800

333,142.66

493,051.14

5,061

Formaleta (1 uso)

Ana

2.2200

32,375.50

71,873.61

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

17.1000

3,092.35

52,879.19

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

25.2000

3,075.79

77,509.91

5,144

Transporte de materiales Tn

Ana

3.5520

0.00

0.00

Cuadrilla AA-2 (Tuberias)

Ins

3.4600

20,097.00

69,535.62

14,669

6,325 Viga o pantalla en concreto Reforzado 3000 Psi

17

Herramienta Menor 10% M.O. AA

Eqp

HR

49

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

6,326 Apoyo de Neopreno D=60 (0.40 m x 0.35 m x 1/2")

556,333.51

10.0000

1,469.00

14,690.00

1.5000

4,375.00

6,562.50

10.0000

14,690.00

146,900.00

1.0000

333,142.66

333,142.66

1.7000

32,375.50

55,038.35

und

65,712.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.40 x 0.35) m D=60 E=1/2"

Ins

und

1.0000

58,000.00

58,000.00

19

15,883

6,327 Apoyo de Neopreno D=60 (0.38 m x 0.25 m x 3/8")


19
4,489

und

37,712.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

374

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,144
15,884

Nombre

Tipo U.M.

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.38 x 0.25) m D=60 E=3/8"

Ins

und

1.0000

30,000.00

30,000.00

6,328 Rejilla metalica varilla corrugada 1", pagado por


ML

Cantidad

Vr.Unitario

Vr.Total

184,107.42

Sub-Contrato Ornamentacion

Esp

50.0000

122,738.28

61,369.14

Herramienta Menor 10% M.O. DD

Eqp

HR

1.7300

1,763.00

3,049.99

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.7300

17,628.00

30,496.44

8,194

44,011.50

7
56

Acero de refuerzo 60000 Psi

Ins

kg

19.5000

2,257.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.5100

6,885.00

3,511.35

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

3.0000

13,493.00

40,479.00

6,329 Suministro e instal. de lavaplatos en acero


inoxidable doble, con mezclador, pagado por un

und

278,034.87

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3000

1,616.00

2,100.80

Cemento blanco

Ins

kg

0.3500

975.00

341.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3000

16,159.00

21,006.70

5,144

55
829

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

14,793

Mezclador lavaplatos 1/2"

Ins

und

1.0000

68,000.00

68,000.00

15,872

Lavaplatos acero inoxidable doble poceta

Ins

und

1.0000

186,000.00

186,000.00

6,330 Suministro e instal. lavamanos colgar blanco con


grifera, pagado un

und

111,302.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

Cemento blanco

Ins

kg

0.4000

975.00

390.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

15,811

Lavamanos colgar blanco

Ins

und

1.0000

67,330.00

67,330.00

15,885

Grifera 1120-611 cr

Ins

und

1.0000

16,920.00

16,920.00

55
829

6,331 Suministro e instal. lavamanos pedestal con


grifera, pagado un

und

2,424.00

191,304.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

154

Lavamanos pedestal porcelana

Ins

und

1.0000

114,502.00

114,502.00

829

55

Cemento blanco

Ins

kg

0.4000

975.00

390.00

4,301

Grifera lavamanos mezclador 4" prisma

Ins

und

1.0000

49,750.00

49,750.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

6,332 Suministro e instal. sanitario color porcelana,


pagado un
55
829
4,515
15,887

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

Cemento blanco

Ins

kg

0.5000

975.00

487.50

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Sanitario porcelana color con accesorios

Ins

und

1.0000

206,400.00

206,400.00

6,334 Orinal mediano grif tradicional blanco, pagado un


17

235,327.50

Herramienta Menor 10% M.O. AA

1,616.00

und
Eqp

HR

2,585.60

256,219.02

1.8322

1,469.00

2,691.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

375

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Cemento blanco

Ins

kg

0.5000

975.00

487.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.8322

14,690.00

26,915.02

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

Orinal mediano con grif. Tradicional

Ins

und

1.0000

226,125.00

226,125.00

829

15,873

6,335 Punto agua fra PVC 1/2" incluye ducha, pagado


por UN

und

92,706.61

Valor promedio inst.tipica


Sub-Contrato Sanitario

Esp

38.0000

67,178.70

25,527.91

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6800

1,616.00

2,714.88

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,302

Ducha cromada

Ins

und

1.0000

30,000.00

30,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6800

16,159.00

27,147.12

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

14,991

Tubo presin RDE 9 PVC 1/2 "

Ins

2.6200

2,109.00

5,525.58

15,021

Codo 90 presion PVC 1/2"

Ins

und

2.4600

375.00

922.50

2
55

6,336 Suministro e instal. de estuco bajo placa, pagado


en m2

10,968.25

Sub-Contrato Pintura

Esp

45.0000

7,564.31

3,403.94

Herramienta menor 10% M.O. CC

Eqp

HR

0.2800

1,689.00

472.92

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

5,066

Cuadrilla CC (Pintura)

Ins

0.2800

16,893.00

4,730.04

13,448

Caolin

Ins

bt

0.0900

10,500.00

945.00

13,641

Seccin de Andamio

Ins

mes

0.0600

17,120.00

1,027.20

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

5
61
804

6,337 Pintura interior vinilo sobre paete 3 manos,


pagado m2

10,429.07

Sub-Contrato Pintura

Esp

45.0000

7,192.46

Herramienta menor 10% M.O. CC

Eqp

HR

0.1650

1,689.00

278.69

3,832

Vinilo tipo viniltex

Ins

gal

0.0900

45,483.00

4,093.47

5,066

Cuadrilla CC (Pintura)

Ins

0.1650

16,893.00

2,787.35

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
61

6,338 Pintura interior vinilo sobre estuco 3 manos,


pagado m2

3,236.61

8,397.92

Sub-Contrato Pintura

Esp

45.0000

5,791.67

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1650

1,469.00

242.39

3,832

Vinilo tipo viniltex

Ins

gal

0.0600

45,483.00

2,728.98

5,066

Cuadrilla CC (Pintura)

Ins

0.1650

16,893.00

2,787.35

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
17

6,339 Pintura interior vinilo sobre estuco bajo placa 3


manos, pagado m2

2,606.25

9,589.92

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

376

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Sub-Contrato Pintura

Esp

Herramienta Menor 10% M.O. AA

Eqp

3,832

Vinilo tipo viniltex

Ins

gal

5,066

5
17

Cantidad

Vr.Unitario

Vr.Total

45.0000

6,613.73

2,976.18

HR

0.1850

1,469.00

271.77

0.0700

45,483.00

3,183.81

Cuadrilla CC (Pintura)

Ins

0.1850

16,893.00

3,125.21

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

6,340 Pintura en esmalte sobre madera llena, pagado en


m2

15,495.64

Sub-Contrato Pintura

Esp

45.0000

10,686.65

Herramienta menor 10% M.O. CC

Eqp

HR

0.3300

1,689.00

557.37

1,792

Pabmeril Pliego 9" x 11"

Ins

und

1.0500

1,691.00

1,775.55

1,984

Tapaporos Nogal

Ins

gal

0.0200

25,500.00

510.00

1,990

Disolvente Thinner

Ins

gal

0.0200

12,440.00

248.80

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

5,066

Cuadrilla CC (Pintura)

Ins

0.3300

16,893.00

5,574.69

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

5
61

6,341 Suministro e instal. cerrojo seguridad doble


cilindro para puerta de acceso, pagado por und
56
5,064
15,891

und

4,808.99

84,946.60

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

Cuadrilla DD (Carpinteria)

Ins

0.6000

17,628.00

10,576.80

Cerrojo doble cilindro Schlage

Ins

und

1.0000

73,312.00

73,312.00

6,342 Acometida a gas domiciliario un metro, pagado


por UN

und

274,792.94

Sub-Contrato Instalacion

Esp

25.0000

3,304

Union Universal galvanizada 1/2"

Ins

und

1.0000

4,640.00

4,640.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6500

16,159.00

10,503.35

5,144

219,834.35

54,958.59

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

13,916

Regulador gas r - 4 e 4 m3

Ins

und

1.0000

25,000.00

25,000.00

15,892

Codo H.G. 90 1/2"

Ins

und

1.0000

858.00

858.00

15,893

Tuberia para Gas en polietileno de 1/2"

Ins

1.0000

1,786.00

1,786.00

15,894

Tuberia Acero galvanizada =1/2" gas

Ins

1.0000

7,927.00

7,927.00

15,895

Valvula de bola para gas 1/2"

Ins

und

1.0000

11,890.00

11,890.00

15,897

Tee reducida polietileno 1 x 1/2

Ins

und

1.0000

23,350.00

23,350.00

15,898

Medidor de gas 2.5

Ins

und

1.0000

125,000.00

125,000.00

15,899

Loctigas F/media 36 ml

Ins

und

0.0600

13,000.00

780.00

15,900

Elevador para gas de 1/2"

Ins

und

1.0000

8,100.00

8,100.00

6,343 Zona verde, pagado por M2

13,332.57

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1500

1,469.00

220.35

Tierra Negra abonada

Ins

0.0800

34,000.00

2,720.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

5,143

Transporte de materiales m

Ana

0.0800

46,157.00

3,692.56

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

Grama en cesped

Ins

1.0200

4,408.00

4,496.16

17
223

15,902

6,344 Baranda en concreto 3000 Psi, sin refuerzo H=0.90

650,193.71

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

377

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

17

Herramienta Menor 10% M.O. AA

Eqp

HR

49

Vibrador de concretos

Eqp

HR

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

6,345 Enchape fachada marmol travertino peruano,


pagado M2

Cantidad

Vr.Unitario

Vr.Total

11.0000

1,469.00

16,159.00

1.5000

4,375.00

6,562.50

11.0000

14,690.00

161,590.00

1.0000

333,142.66

333,142.66

4.1000

32,375.50

132,739.55

107,360.82

15

Pegacor blanco

Ins

kg

6.5000

1,120.00

7,280.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9800

1,469.00

1,439.62

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0250

40,000.00

1,000.00

Cemento blanco

Ins

kg

0.8000

975.00

780.00

3,684

Agua para obra

Ins

6.5000

10.00

65.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9800

14,690.00

14,396.20

5,144

Transporte de materiales Tn

Ana

0.4000

0.00

0.00

Ceramica marmol travertino peruano (bogot)

Ins

1.0300

80,000.00

82,400.00

829

15,903

6,346 Punto desage sanitario pvc 4", pagado un

und

76,195.20

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

1.3000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0900

58,612.00

5,275.08

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

1.3700

7,729.00

10,588.73

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3000

16,159.00

21,006.70

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

55,213.91

20,981.29

15,439

Tubo PVC sanitario de 4"

Ins

1.1000

14,766.00

16,242.60

55

6,347 Salida toma doble pvc incluye toma con polo a


tierra, pagado un

%
m

und

2,100.80

41,253.60

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1000

1,616.00

1,777.60

244

Tomacorriente doble con polo a tierra de incrustar

Ins

und

1.0000

4,900.00

4,900.00

406

Caja 4 x 4 met. AK 2V

Ins

und

1.0000

5,600.00

5,600.00

819

Alambre cobre desnudo AWG 14

Ins

kg

0.0800

47,500.00

3,800.00

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

3.0000

1,384.00

4,152.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6250

16,159.00

10,099.38

Alambre cobre THW 12 AWG THHN/NN

Ins

6.0000

1,474.00

8,844.00

55

13,557

6,348 Acometida a gas domiciliario 36 m, pagado por UN

und

721,955.31

Sub-Contrato Instalacion

Esp

25.0000

577,564.25

3,304

Union Universal galvanizada 1/2"

Ins

und

1.0000

4,640.00

4,640.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.7500

16,159.00

28,278.25

5,144

Transporte de materiales Tn

Ana

2.0000

0.00

0.00

13,916

Regulador gas r - 4 e 4 m3

Ins

und

1.0000

25,000.00

25,000.00

15,892

Codo H.G. 90 1/2"

Ins

und

1.0000

858.00

858.00

15,893

Tuberia para Gas en polietileno de 1/2"

Ins

36.0000

1,786.00

64,296.00

144,391.06

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

378

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,894

Tuberia Acero galvanizada =1/2" gas

Ins

15,895

Valvula de bola para gas 1/2"

Ins

und

15,897

Tee reducida polietileno 1 x 1/2

Ins

und

1.0000

23,350.00

23,350.00

15,898

Medidor de gas 2.5

Ins

und

1.0000

125,000.00

125,000.00

15,899

Loctigas F/media 36 ml

Ins

und

0.0600

13,000.00

780.00

15,900

Elevador para gas de 1/2"

Ins

und

1.0000

8,100.00

8,100.00

6,349 Salida trifasica PVC, caja de 60 x 60, pagado por


unidad

Cantidad

Vr.Unitario

Vr.Total

36.0000

7,927.00

285,372.00

1.0000

11,890.00

11,890.00

und

339,265.58

Sub-Contrato Electrico

Esp

38.0000

245,844.62

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Alambre cobre THW 10 AWG THHN/NN

Ins

18.2600

2,902.00

52,990.52

2,830

Caja 60 x 60 x 12 cm

Ins

und

1.0000

60,000.00

60,000.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

3.0000

269.00

807.00

3,556

Tubo conduit PVC 1/2"

Ins

6.0000

1,384.00

8,304.00

3,561

Adaptador terminal conduit 1"

Ins

und

3.0000

660.00

1,980.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

12,066

Tubo conduit PVC 1"

Ins

6.0000

2,511.00

15,066.00

13,557

Alambre cobre THW 12 AWG THHN/NN

Ins

24.1500

1,474.00

35,597.10

3
55
822

6,350 Muro en bloque No. 4 de 0.10 mts, con andamio,


pagado en m2

93,420.96

35,639.91

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1900

1,469.00

1,748.11

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0210

248,144.84

5,211.04

2,054

Bloque No. 4

Ins

und

13.2700

841.50

11,166.71

4,489

Cuadrilla AA (Albaileria)

Ins

1.1900

14,690.00

17,481.10

5,144

Transporte de materiales Tn

Ana

0.2264

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

17

6,351 Suministro e instal. lampara Slim 2 x 96 x -20 km


bajo placa, pagado por unidad

und

145,655.00

Sin tuberia, cajas, cable


Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

1,644

Carga fulminante fuerte 330

Ins

und

6.0000

260.00

1,560.00

1,682

Perno 1/2" alt.vel. 1 3/4"

Ins

und

6.0000

220.00

1,320.00

4,091

Lampara Slim 2 x 96 x-20 KM

Ins

und

1.0000

125,000.00

125,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

55

6,352 Puerta en lmina cold rolled calibre 18

213,249.69

Sub-Contrato Ornamentacion

Esp

50.0000

142,166.46

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.5000

88,083.67

132,125.51

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

14,116

6,354 Correa metlica 2 1/2" +1 3/4" y celosia de


3/8", pagado en ML
7

Sub-Contrato Ornamentacion

Esp

71,083.23

51,740.25

50.0000

34,493.50

17,246.75

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

379

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Equipo de soldadura Marca Linconl 600 A

Eqp

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4800

8,750.00

4,200.00

HR

1,850

Segueta Ncholson

0.5500

1,469.00

807.95

Ins

und

0.0200

2,500.00

1,901

50.00

Acero de refuerzo 37000 Psi

Ins

kg

3.6000

2,295.00

8,262.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0450

29,750.00

1,338.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.5500

14,690.00

8,079.50

5,144

Transporte de materiales Tn

Ana

0.0112

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.9000

2,257.00

11,059.30

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1200

5,800.00

696.00

8
17

14,795

6,355 Guardaescoba media caa gravilla lavada, pagado


por ML

23,065.31

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0681

1,469.00

1,569.04

Cemento gris

Ins

kg

1.0000

383.34

383.34

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0681

14,690.00

15,690.39

5,143

Transporte de materiales m

Ana

0.0620

46,157.00

2,861.73

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Triturado de 1/2" - 3/4"

Ins

0.0520

46,304.00

2,407.81

17
804

13,961

6,356 Suministro e instal. tanque elevado 1.000 lts pvc 1


y 2" (incluye accesorios), pagado por UN

und

578,594.85

3,077

Tanque plastico 1000 lt

Ins

und

1.0000

304,074.00

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

6,297

Conexin tanque elevado pvc de 1" y 2", pagado un

Ana

und

1.0000

220,428.85

220,428.85

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

15,543

Flotador completo (bola de cobre) 1/2"

Ins

und

1.0000

53,592.00

53,592.00

6,357 Suministro e instal. de vidrio incoloro 4 mm.


pagado en m2

304,074.00

30,637.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

3,747

Vidrio incoloro 4 mm

Ins

1.0300

25,000.00

25,750.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0040

0.00

0.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17

6,358 Suministro e instal. de estuco venecia sobre


paete, pagado en m2

30,134.76

Sub-Contrato Pintura

Esp

45.0000

20,782.59

9,352.17

Herramienta menor 10% M.O. CC

Eqp

HR

1.0500

1,689.00

1,773.45

Cemento gris

Ins

kg

0.2600

383.34

99.67

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0200

1,691.00

33.82

2,484

Yeso corriente

Ins

bt

0.0100

14,300.00

143.00

3,684

Agua para obra

Ins

5.0000

10.00

50.00

5,066

Cuadrilla CC (Pintura)

Ins

1.0500

16,893.00

17,737.65

Caolin

Ins

bt

0.0900

10,500.00

945.00

5
61
804

13,448

6,359 Esgrafiado fachada, pagado por M2


5

Sub-Contrato Pintura

m
Esp

12,303.11

45.0000

8,484.90

3,818.21

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

380

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

2,489

Graniplast color

Ins

1.0000

5,400.00

5,400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

17

6,360 Cenefa adoqun cuarto 26 tipo colonial doble hilera,


pagado en ml

38,412.56

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0993

1,469.00

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0200

40,000.00

800.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0400

248,144.84

9,925.79

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0600

14,690.00

15,571.40

5,144

Transporte de materiales Tn

Ana

0.1770

0.00

0.00

Adoqun cuarto 26

Ins

und

32.0000

310.00

9,920.00

15,905

6,361 Concreto estriado rampas de 3000 psi reforzado,


pagado en m2

1,614.87

99,774.45

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

1,870

Alambre Negro No 18

Ins

kg

0.2600

3,903.00

1,014.78

2,208

Tabla chapa ordinario 0.10

Ins

1.0200

2,667.00

2,720.34

2,625

Liston piso ordinario

Ins

1.0200

3,500.00

3,570.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1600

333,142.66

53,302.83

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

10.0000

2,257.00

22,570.00

6,362 Rampas B5 tipo IDU, pagado en Un

und

1,469.00

522,984.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

6.1600

1,469.00

49

Vibrador de concretos

Eqp

HR

0.5000

4,375.00

2,187.50

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.1000

248,144.84

24,814.48

4,489

Cuadrilla AA (Albaileria)

Ins

6.1600

14,690.00

90,490.40

5,144

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

8,087

Loseta prefabricada A-60

Ins

0.9000

26,680.00

24,012.00

8,110

Loseta prefabricada A-50

Ins

1.7900

26,680.00

47,757.20

8,161

Sardinel Prefabricado Modulo A-10

Ins

und

9.1000

24,940.00

226,954.00

8,190

Bordillo prefabricado A-80

Ins

1.4000

22,800.00

31,920.00

Pieza remate rampa A-105

Ins

und

2.8000

23,500.00

65,800.00

15,906

6,363 Relleno de prestamo lateral, compactado, Mat.


comun (excav. comform. compact, cargue y
acarreo max. 2 Km), mecanico

9,049.04

16,169.23

Compactador Vibratorio

Eqp

HR

0.0250

100,000.00

2,500.00

Motoniveladora

Eqp

HR

0.0250

132,800.00

3,320.00

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0250

111,550.00

2,788.75

Volqueta (6 m3 )

Eqp

HR

0.1136

55,550.00

6,310.48

Material de prestamo (tierra-arena-arcilla-limo)

Ins

1.0000

1,250.00

1,250.00

21
858

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

381

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,364 Terraplen o rellenos con material mezclado


relacion 2:1, base granular y material prestamo (a.
libre 2 Km)

Cantidad

Vr.Unitario

Vr.Total
31,628.05

son 3 volquetas
1

Compactador Vibratorio

Eqp

HR

0.0152

100,000.00

1,520.00

Motoniveladora

Eqp

HR

0.0152

132,800.00

2,018.56

11

Carrotanque de Agua

Eqp

HR

0.0152

53,125.00

807.50

14

Retroexcavadora de orugas

Eqp

HR

0.0152

144,160.00

2,191.23

21

Volqueta (6 m3 )

Eqp

HR

0.0455

55,550.00

2,527.53

Material de prestamo (tierra-arena-arcilla-limo)

Ins

0.3400

1,250.00

425.00

Oficial de Construccion

Ins

0.0152

9,282.00

141.09

Base Triturada T.max 1 1/2"

Ins

0.6600

33,329.00

21,997.14

858
8,144
14,777

6,365 Enchape piso baldosa granitex mediterrneo,


pagado m

49,918.65

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0300

40,000.00

1,200.00

Cemento gris

Ins

kg

7.2700

383.34

2,786.88

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,143

Transporte de materiales m

Ana

0.1000

46,157.00

4,615.70

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Baldosa granitex ext. Mediterrneo

Ins

1.0500

24,372.00

25,590.60

804

15,909

6,366 Enchape piso Loseta prefabricada concreto A - 40,


pagado m

79,055.32

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0300

40,000.00

1,200.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0300

248,144.84

7,444.35

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0600

13,800.00

828.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.1320

0.00

0.00

8,088

Loseta prefabricada A-40

Ins

1.0300

52,860.00

54,445.80

6,367 Bordillo 8 x 15 cm fundido en concreto 3000 psi,


pagado m

8,263.40

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1800

1,469.00

264.42

49

Vibrador de concretos

Eqp

HR

0.0600

4,375.00

262.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1800

14,690.00

2,644.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0125

333,142.66

4,164.28

6,368 Suministro y siembra arbol Pomarroso h = 0.60 m

und

30,639.91

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

Tierra Negra abonada

Ins

0.1300

34,000.00

4,420.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

5,143

Transporte de materiales m

Ana

0.1300

46,157.00

6,000.41

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Pomarroso 0.60 m

Ins

und

1.0000

7,000.00

7,000.00

55
223

15,910

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

382

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,917

Insecticida tipio roxin

Ins

15,918

Dap (fertilizantes)

Ins

15,919

Cascarilla

Ins

6,369 Matera en ladrillo tolete comn con contenedor de


raices 1 x 1 y bordillo en concreto de 2000 psi,
pagado por Un

Cantidad

Vr.Unitario

Vr.Total

0.0033

40,000.00

132.00

bt

0.0750

46,000.00

3,450.00

bt

0.2500

3,000.00

750.00

und

286,012.58

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7860

1,469.00

1,154.63

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.1200

276,302.97

33,156.36

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.1500

248,144.84

37,221.73

2,059

Ladrillo tolete recocido

Ins

und

210.0000

300.00

63,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.9000

14,690.00

71,981.00

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1200

311,229.99

37,347.60

5,143

Transporte de materiales m

Ana

0.3000

46,157.00

13,847.10

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

15,920

Angulo o perfil 1 1/2" x 1 1/2" x 1/8"

Ins

4.0800

4,327.00

17,654.16

15,984

Lecho filtrante en Gravilla fina

Ins

0.3000

35,500.00

10,650.00

17

6,370 Banca en concreto M-31 sin espaldar, pagado en


und

und

299,662.15

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6500

1,763.00

1,145.95

5,064

Cuadrilla DD (Carpinteria)

Ins

0.6500

17,628.00

11,458.20

5,144

56

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

15,921

Banca en concreto tipo IDU M-31 sin espladar

Ins

und

1.0000

255,200.00

255,200.00

15,927

Perno de anclaje 5/8" x 2" grado 8

Ins

und

4.0000

3,100.00

12,400.00

16,222

Platina 1/4" x 1"

Ins

6.0000

3,243.00

19,458.00

6,371 Banca en concreto M-30 con espaldar, pagado en


und

und

434,462.15

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6500

1,763.00

1,145.95

5,064

Cuadrilla DD (Carpinteria)

Ins

0.6500

17,628.00

11,458.20

5,144

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

15,922

Banca en concreto tipo IDU M-30 con espaldar

Ins

und

1.0000

390,000.00

390,000.00

15,927

Perno de anclaje 5/8" x 2" grado 8

Ins

und

4.0000

3,100.00

12,400.00

16,222

Platina 1/4" x 1"

Ins

6.0000

3,243.00

19,458.00

56

6,372 Pintura exterior vinilo koraza 2 manos

11,697.59

Sub-Contrato Pintura

Esp

45.0000

8,067.30

Herramienta menor 10% M.O. CC

Eqp

HR

0.1500

1,689.00

253.35

5,066

Cuadrilla CC (Pintura)

Ins

0.1500

16,893.00

2,533.95

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Vinilo tipo Koraza para exteriores

Ins

gal

0.1000

52,800.00

5,280.00

5
61

15,934

6,373 Suministro e instal. piso vinisol comercial 2 mm,


pagado en M2

3,630.29

19,928.50

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

15,935

Vinisol comercial 2 mm

Ins

1.0300

15,950.00

16,428.50

15,936

Instalacin piso vinilo con pegante

Ins

1.0000

3,500.00

3,500.00

5,144

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

383

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,374 Suministro e instal. piso vinilo pisopak residencial


1.6 mm, pagado en M2

Cantidad

Vr.Unitario

Vr.Total
19,465.00

1,453

Pisopak residencial 1.6 mm

Ins

1.0300

15,500.00

15,965.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Instalacin piso vinilo con pegante

Ins

1.0000

3,500.00

3,500.00

15,936

6,375 Suministro e instal. piso vinilo pisopak trfico


pesado 3 mm, pagado en M2

30,589.00

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

15,936

Instalacin piso vinilo con pegante

Ins

1.0000

3,500.00

3,500.00

15,938

Pisopak trfico pesado 3 mm

Ins

1.0300

26,300.00

27,089.00

5,144

6,376 Viga aerea en concreto de resistencia 3000 psi,


pagada en m3

652,329.66

17

Herramienta Menor 10% M.O. AA

Eqp

HR

15.0000

1,469.00

22,035.00

49

Vibrador de concretos

Eqp

HR

0.3200

4,375.00

1,400.00

2,197

Repisa Ordinario 3 m

Ins

4.5300

1,500.00

6,795.00

2,200

Tabla burra ordinario 0.30

Ins

7.0000

4,333.00

30,331.00

2,243

Vara de clavo 3M -1

Ins

4.1200

1,500.00

6,180.00

4,489

Cuadrilla AA (Albaileria)

Ins

15.0000

14,690.00

220,350.00

4,867

Paral telescopico 2 a 4 ml

Ins

30.0000

340.00

10,200.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,144

Transporte de materiales Tn

Ana

0.1200

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

1.0000

17,120.00

17,120.00

14,128

Puntilla con cabeza 2 1/2"

Ins

lb

2.4000

1,990.00

4,776.00

6,377 Relleno y extendida material triturado de mquina


1/2" - 2", pagado en m3

102,650.53

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.3000

3,091.00

927.30

Transporte de materiales m

Ana

1.0300

46,157.00

47,541.71

13,961

Triturado de 1/2" - 3/4"

Ins

1.0300

46,304.00

47,693.12

14,944

Cuadrilla Ay-4

Ins

0.3000

21,628.00

6,488.40

59
5,143

6,378 Relleno con material triturado de mquina 1/2" 3/4", pagado en m2

18,704.11

41

Vibrocompactador tipo rana

Eqp

HR

0.1080

5,000.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.2000

3,091.00

618.20

Transporte de materiales m

Ana

0.1500

46,157.00

6,923.55

13,961

Triturado de 1/2" - 3/4"

Ins

0.1500

46,304.00

6,945.60

14,944

Cuadrilla Ay-4

Ins

0.1700

21,628.00

3,676.76

5,143

6,379 Suministro e instal. aire acondicionado tipo split,


18000 BTU - unidad difusora de lujo - unidad cond.
exter. Filtr

und

540.00

3,424,113.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

11.0000

1,616.00

99

Bomba inyectora de Nitrogeno

Eqp

HR

0.5000

80,000.00

40,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

11.0000

16,159.00

177,749.00

5,144

Transporte de materiales Tn

Ana

2.0000

0.00

0.00

Cable encauchetado 3 x 10 - 4 x 16

Ins

8.0000

6,000.00

48,000.00

14,592

17,776.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

384

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15,942

Aire acondicion. Split 18000 btu control filtro

Ins

15,943

Tuberia de cobre 1/2"

Ins

und

1.0000

2,900,000.00

2,900,000.00

8.0000

9,086.00

15,945

Aislante tubera 5/8"

72,688.00

Ins

15,946

8.0000

2,800.00

22,400.00

Manguera plstica 3/4"

Ins

6.0000

3,000.00

18,000.00

15,947

Chazo plstico - metlico 3/8" - 1/4"

Ins

und

10.0000

1,000.00

10,000.00

15,948

Base metlica para Unidad condensadora

Ins

und

1.0000

100,000.00

100,000.00

15,949

Tapa metlica - canaleta

Ins

5.0000

3,500.00

17,500.00

6,380 Imprimante y Puente de adherencia (incluye:


limpieza)
17
4,489
15,950

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3200

1,469.00

470.08

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

Epotoc 1 - 1

Ins

kg

0.4500

41,180.00

18,531.00

6,381 Hincada de pilotes en tuberia de 10"


9
8,144
15,952

23,701.88

218,184.00

Maquina de Pilotaje

Eqp

HR

0.5335

135,000.00

Oficial de Construccion

Ins

0.7500

9,282.00

6,961.50

Tuberia en A.C. =10" Dril Pipe Usd

Ins

1.0000

139,200.00

139,200.00

6,382 Placa base en concreto 3000 psi e=0.07 m

72,022.50

40,839.16

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

17

6,383 Tacha reflectiva (importada)

und

1,469.00

10,178.77

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0357

1,469.00

Cuadrilla AA (Albaileria)

Ins

0.0357

14,690.00

524.43

13,855

Pegante Epoxico

Ins

kg

0.0350

42,340.00

1,481.90

15,974

Tachas reflectiva (importada)

Ins

und

1.0000

8,120.00

8,120.00

17
4,489

6,384 Suministro e instal. de puesta a tierra, pagado un

und

52.44

423,723.25

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

100

Molde para soldadura

Eqp

HR

0.2500

103,950.00

25,987.50

847

55

Cable de cobre desnudo N 2

Ins

15.0000

13,813.00

207,195.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

14,284

Soldadura exotermica 115 gr.

Ins

und

1.0000

21,847.00

21,847.00

14,388

Hebilla cinta bandit 5/8``

Ins

und

3.0000

924.00

2,772.00

15,971

Cinta bandit de 5/8"

Ins

und

0.3500

5,445.00

1,905.75

15,972

Tubo galvanizado 3/4" x 3 m Conduit

Ins

und

1.0000

27,531.00

27,531.00

15,973

Varilla de cobre puesta a tierra 5/8" x 2.4 mts.

Ins

und

1.0000

83,160.00

83,160.00

6,385 Suministro e instal. bajante para cableado


subterraneo, pagado por UN
55
4,515

und

493,239.70

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

385

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Transporte de materiales Tn

Ana

5.0000

0.00

0.00

14,388

Hebilla cinta bandit 5/8``

Ins

und

3.0000

924.00

2,772.00

15,971

Cinta bandit de 5/8"

Ins

und

0.5600

5,445.00

3,049.20

15,975

Tubo galvanizado 3" x 3 m Conduit rigido

Ins

und

2.0000

207,079.00

414,158.00

15,976

Union adaptador de 3"

Ins

und

1.0000

10,063.00

10,063.00

15,977

Capacete de 3"

Ins

und

1.0000

28,640.00

28,640.00

15,978

Terminal conduit de 3"

Ins

und

1.0000

7,895.00

7,895.00

5,144

6,386 Suministro e instal. de camara de inspeccin


CS-274, CODENSA, pagado por unidad

und

Herramienta Menor 10% M.O. AA

Eqp

HR

1,539

Mortero 1:3 (desperdicio 5%)

Ana

2,085

Ladrillo tolete comn

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

8,194

17

540,715.51

10.2000

1,469.00

14,983.80

0.2200

276,302.97

60,786.65

150.0000

305.00

45,750.00

10.2000

14,690.00

149,838.00

0.5500

351,843.89

193,514.14

0.0150

46,157.00

692.36

Ana

0.5000

0.00

0.00

Acero de refuerzo 60000 Psi

Ins

kg

8.0000

2,257.00

18,056.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.0150

46,304.00

694.56

15,979

Marco tapa en ngulo cmara CS-274

Ins

und

1.0000

49,200.00

49,200.00

15,980

Placa identificadora

Ins

und

1.0000

7,200.00

7,200.00

6,387 Acometida desde red aerea baja tensin (EBSA)


hasta contador energ. kwh y tab de dist. de
circuitos en cable, pagado ml

34,913.75

Sub-Contrato Electrico

Esp

25.0000

27,931.00

6,982.75

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2000

1,616.00

323.20

Cable de cobre THW N 6

Ins

4.0000

5,539.00

22,156.00

3,264

Alambre cobre desnudo THW # 8 AWG

Ins

1.0000

2,220.00

2,220.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2000

16,159.00

3,231.80

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

3
55
879

6,388 Cuneta plana e=0.05 m concreto de 3000 psi (0.50 x


1)

15,281.20

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1250

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5000

2,667.00

1,333.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0250

333,142.66

8,328.57

6,389 Cuneta plana e=0.10m concreto de 3000 psi (0.50 x


1)

183.63

23,609.76

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1250

1,469.00

49

Vibrador de concretos

Eqp

HR

0.0672

4,375.00

294.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5000

2,667.00

1,333.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0500

333,142.66

16,657.13

6,390 Lamina HR de 1/4" para puentes tubera petrolera


42

Motosoldador Diesel

m
Eqp

HR

183.63

218,855.53

0.5000

14,833.00

7,416.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

386

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

43

Equipo de Oxicorte

Eqp

44

Pulidora electrica manual

Eqp

HR

0.3000

5,000.00

1,500.00

HR

0.2500

4,350.00

48

Herramienta menor 10% M.O. ASA-3

1,087.50

Eqp

HR

1,717

2.0000

3,226.00

6,452.00

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

14,742

Lamina HR 1/4"

Ins

1.0000

125,317.09

125,317.09

14,745

Oxigeno Industrial

Ins

0.0700

15,662.00

1,096.34

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

6,391 Fabricacion y suministro de Acero Maquinado


ASTM-36

kg

6,359.96

42

Motosoldador Diesel

Eqp

HR

0.0265

14,833.00

393.07

43

Equipo de Oxicorte

Eqp

HR

0.0265

5,000.00

132.50

44

Pulidora electrica manual

Eqp

HR

0.0265

4,350.00

115.28

45

Cilindro

Eqp

HR

0.0265

41.00

1.09

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0530

4,443.00

235.48

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0265

2,958.00

78.39

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0250

6,805.00

170.13

5,144

Transporte de materiales Tn

Ana

0.0000

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0250

6,885.00

172.13

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0050

6,200.00

31.00

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

14,937

Acero ASTM - 36

Ins

kg

1.0000

2,543.00

2,543.00

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0530

44,428.00

2,354.68

6,392 Cable IPS - IWRC 6 x 19 AA = 1 1/4"

41,690.85

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.1500

3,091.00

463.65

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.1500

2,958.00

443.70

Transporte de materiales Tn

Ana

0.0043

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.1500

30,910.00

4,636.50

15,964

Cable IPS-IWRC 6 x 19 AA = 1 1/4"

Ins

1.0000

36,147.00

36,147.00

5,144

6,393 Cable IPS - IWRC 6 x 19 AA = 3/8"

6,464.95

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0500

3,091.00

154.55

76

Diferencial 3 Tn con cadena crosby 10 m

Eqp

HR

0.0500

2,958.00

147.90

Transporte de materiales Tn

Ana

0.0004

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0500

30,910.00

1,545.50

15,958

Cable IPS-IWRC 6 x 19 AA = 3/8"

Ins

1.0000

4,617.00

4,617.00

5,144

6,394 Hexapodo en Concreto 3500 Psi

und

997,440.05

14

Retroexcavadora de orugas

Eqp

HR

0.2500

144,160.00

36,040.00

49

Vibrador de concretos

Eqp

HR

2.5700

4,375.00

11,243.75

69

Herramienta Menor 10% M.O. AA-2

Eqp

HR

4.0000

2,010.00

8,040.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.7100

351,843.89

601,653.05

5,061

Formaleta (1 uso)

Ana

2.5500

32,375.50

82,557.52

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

21.2700

3,092.35

65,774.28

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

36.3300

3,075.79

111,743.45

5,144

Transporte de materiales Tn

Ana

0.0000

0.00

0.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

387

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,669

Cuadrilla AA-2 (Tuberias)

Ins

6,395 Hincada de pilotes en tuberia de 8"


9
8,144
15,983

Cantidad

Vr.Unitario

Vr.Total

4.0000

20,097.00

80,388.00

194,461.50

Maquina de Pilotaje

Eqp

HR

0.5000

135,000.00

Oficial de Construccion

Ins

0.7500

9,282.00

6,961.50

Tuberia en A.C. = 8" Dril Pipe Usd

Ins

1.0000

120,000.00

120,000.00

6,396 Vigas transversales Tuberia Petrolera D=8 "

67,500.00

167,113.93

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

7,208.00

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5000

41.00

20.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5000

3,226.00

1,613.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4700

6,805.00

3,198.35

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1600

6,856.00

1,096.96

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.5000

32,262.00

16,131.00

15,983

Tuberia en A.C. = 8" Dril Pipe Usd

Ins

1.0000

120,000.00

120,000.00

6,398 Suministro e instal. ventana en lamina cold rolled


calibre 18, pintada, pagado m2

112,510.58

Sub-Contrato Ornamentacion

Esp

50.0000

75,007.05

Manija para ventana

Ins

und

1.0000

1,981.00

1,981.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.4400

88,083.67

38,756.81

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.9400

2,700.00

5,238.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2300

29,750.00

6,842.50

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

5,809

Esmalte sobre ventanas en lmina

Ana

1.0000

7,787.66

7,787.66

6,031

7
810

37,503.53

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1600

6,885.00

1,101.60

14,726

Bisagra alum. exter. 2"

Ins

und

1.0500

801.00

841.05

6,399 Correa metlica 3 1/2" y celosia 3/8" H = 0.20


A = 0.15, pagado en ML

36,509.90

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1050

8,750.00

918.75

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.6500

3,226.00

2,096.90

1,850

Segueta Ncholson

Ins

und

0.0200

2,500.00

50.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.5000

2,295.00

3,442.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0450

29,750.00

1,338.75

5,144

Transporte de materiales Tn

Ana

0.0046

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.1000

2,257.00

6,996.70

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.6500

32,262.00

20,970.30

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1200

5,800.00

696.00

8
48

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

388

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,400 Remate cubierta en mortero, proporcin de la


mezcla 1:4, pagado en ML

Cantidad

Vr.Unitario

Vr.Total
5,869.54

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.2844

1,469.00

417.78

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0050

248,144.84

1,240.72

4,489

Cuadrilla AA (Albaileria)

Ins

0.2844

14,690.00

4,177.84

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

17

6,401 Paete liso (allanado) muros 1:3, pagado en m

14,029.78

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0220

276,302.97

6,078.67

4,489

17

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

6,402 Sifon y rejilla piso sosco 4 x 3, pagado por UN

und

21,312.52

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

15,425

Sifon Sanitario 3" 135 C x E

Ins

und

1.0000

6,466.00

6,466.00

15,843

Rejilla sifn 3 x 4 plstica con sosco

Ins

und

1.0000

4,000.00

4,000.00

17

6,403 Placa base en concreto 3000 psi e=0.07 m


reforzada con acero grado 37

58,099.90

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,870

Alambre Negro No 18

Ins

kg

0.0300

3,903.00

117.09

1,901

Acero de refuerzo 37000 Psi

Ins

kg

7.4700

2,295.00

17,143.65

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.0032

0.00

0.00

17

6,404 Placa base en concreto 3000 psi e=0.08 m

38,676.52

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

2,208

Tabla chapa ordinario 0.10

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

17

6,405 Columnas en Tuberia Petrolera D=8 "

1,469.00

1,469.00

969.54

0.5100

2,667.00

1,360.17

0.6600

14,690.00

9,695.40

0.0800

333,142.66

26,651.41

0.0032

0.00

0.00

144,173.65

14

Retroexcavadora de orugas

Eqp

HR

0.0250

144,160.00

3,604.00

42

Motosoldador Diesel

Eqp

HR

0.2000

14,833.00

2,966.60

43

Equipo de Oxicorte

Eqp

HR

0.1000

5,000.00

500.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

45

Cilindro

Eqp

HR

0.2000

41.00

8.20

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.2000

3,226.00

645.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

389

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2,502

Anticorrosivo rojo claro

Ins

gal

0.3700

6,805.00

2,517.85

0.0100

29,750.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

297.50

0.1200

6,856.00

822.72

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0600

42,950.00

2,577.00

5,144

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.2000

32,262.00

6,452.40

15,983

Tuberia en A.C. = 8" Dril Pipe Usd

Ins

1.0000

120,000.00

120,000.00

6,406 Lamina HR de 3/4"

541,360.86

42

Motosoldador Diesel

Eqp

HR

0.5000

14,833.00

7,416.50

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

5,144

Transporte de materiales Tn

Ana

0.1500

0.00

0.00

14,745

Oxigeno Industrial

Ins

0.1800

15,662.00

2,819.16

14,746

Acetileno

Ins

kg

0.0600

41,820.00

2,509.20

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

15,782

Lamina HR 3/4"

Ins

1.0000

443,845.00

443,845.00

6,407 Tablero en Tuberia Petrolera D=3 1/2 "

46,234.52

14

Retroexcavadora de orugas

Eqp

HR

0.0075

144,160.00

1,081.20

42

Motosoldador Diesel

Eqp

HR

0.0600

14,833.00

889.98

43

Equipo de Oxicorte

Eqp

HR

0.0600

5,000.00

300.00

44

Pulidora electrica manual

Eqp

HR

0.0600

4,350.00

261.00

45

Cilindro

Eqp

HR

0.0600

41.00

2.46

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.0600

3,226.00

193.56

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1000

6,805.00

680.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0700

6,856.00

479.92

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.0210

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.0600

32,262.00

1,935.72

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

1.0000

35,573.00

35,573.00

6,408 Celosia en Tuberia Petrolera D=3 1/2 "

58,920.62

14

Retroexcavadora de orugas

Eqp

HR

0.0250

144,160.00

3,604.00

42

Motosoldador Diesel

Eqp

HR

0.2000

14,833.00

2,966.60

43

Equipo de Oxicorte

Eqp

HR

0.2000

5,000.00

1,000.00

44

Pulidora electrica manual

Eqp

HR

0.2000

4,350.00

870.00

45

Cilindro

Eqp

HR

0.2000

41.00

8.20

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.2000

3,226.00

645.20

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2000

6,805.00

1,361.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.1000

6,856.00

685.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

390

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

3,837

Esmalte Sintetico Pintuco

Ins

gal

5,144

Transporte de materiales Tn

0.0200

42,950.00

859.00

Ana

0.0210

0.00

14,744

0.00

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1100

15,662.00

1,722.82

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.2000

32,262.00

6,452.40

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

1.0000

35,573.00

35,573.00

6,409 Ataguias en Tuberia Petrolera D=6 5/8"

92,581.21

14

Retroexcavadora de orugas

Eqp

HR

0.0125

144,160.00

1,802.00

42

Motosoldador Diesel

Eqp

HR

0.1000

14,833.00

1,483.30

43

Equipo de Oxicorte

Eqp

HR

0.1000

5,000.00

500.00

44

Pulidora electrica manual

Eqp

HR

0.1000

4,350.00

435.00

45

Cilindro

Eqp

HR

0.1000

41.00

4.10

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.1000

3,226.00

322.60

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0300

6,805.00

204.15

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.0500

6,856.00

342.80

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,745

Oxigeno Industrial

Ins

0.0300

15,662.00

469.86

14,746

Acetileno

Ins

kg

0.0100

41,820.00

418.20

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.1000

32,262.00

3,226.20

14,755

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

Ins

1.0000

81,200.00

81,200.00

6,410 Barniz transparente ladrillo fachada, pagado en m2

13,266.05

Sub-Contrato Pintura

Esp

45.0000

9,149.00

4,117.05

Herramienta menor 10% M.O. CC

Eqp

HR

0.3000

1,689.00

506.70

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

5,066

Cuadrilla CC (Pintura)

Ins

0.3000

16,893.00

5,067.90

16,034

Barniz brillante exterior

Ins

gal

0.1000

34,500.00

3,450.00

5
61

6,411 Excavacion mecanica en Roca, sin retiro, pagado


en m3

17,167.10

14

Retroexcavadora de orugas

Eqp

HR

0.1000

144,160.00

14,416.00

39

Compresor de capacidad 120

Eqp

HR

0.1000

27,511.00

2,751.10

6,412 Galapago en tuberia petrolera 2"

und

127,313.59

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

43

Equipo de Oxicorte

Eqp

HR

0.5000

5,000.00

2,500.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.5000

5,313.00

2,656.50

Soldador

Ins

4.0000

6,759.00

27,036.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3500

6,805.00

2,381.75

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,144

Transporte de materiales Tn

Ana

0.0080

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

519

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

391

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

0.0600

15,662.00

939.72

kg

0.0200

41,820.00

14,945

Lamina HR 1/2"

836.40

Ins

15,643

Tuberia en A.C S/C = 2" SCH 40

0.0450

250,702.65

11,281.62

Ins

0.3300

34,220.00

11,292.60

6,413 Conector superior (Grapa - Pendolon)

und

49,972.76

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.4000

5,313.00

2,125.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0150

29,750.00

446.25

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0150

42,950.00

644.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0100

6,200.00

62.00

14,745

Oxigeno Industrial

Ins

0.0300

15,662.00

469.86

14,746

Acetileno

Ins

kg

0.0100

41,820.00

418.20

15,735

Lamina HR 3/8"

Ins

0.0250

165,592.00

4,139.80

16,035

Grapa de 7/8" acero 1045 roscada

Ins

und

1.0000

25,000.00

25,000.00

6,414 Conexion Piso (viga transversal tuberia petrolera


4")

und

337,113.17

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.2500

5,313.00

1,328.25

Soldador

Ins

4.0000

6,759.00

27,036.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1000

6,805.00

680.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,144

Transporte de materiales Tn

Ana

0.0080

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

14,746

Acetileno

Ins

kg

0.0200

41,820.00

836.40

15,735

Lamina HR 3/8"

Ins

0.0250

165,592.00

4,139.80

15,954

Tuberia en A.C S/C = 4" SCH 40

Ins

2.1000

110,200.00

231,420.00

519

6,415 Anclajes en cable doble IPS - IWRC 6 x 19 AA =1


1/2"

und

485,049.04

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2500

8,750.00

2,187.50

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

Soldador

Ins

1.0000

6,759.00

6,759.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2000

6,856.00

1,371.20

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

4.0200

2,257.00

9,073.14

15,739

Perro de 1" Tipo pesado

Ins

und

4.0000

34,000.00

136,000.00

15,966

Cable IPS-IWRC 6 x 19 AA = 1 1/2"

Ins

5.6000

55,982.00

313,499.20

8
17
519

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

392

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,416 Replanteo y localizacion de Canales, pagado por


metro lineal

Cantidad

Vr.Unitario

Vr.Total
2,451.99

Estacion Total

Eqp

HR

0.0625

7,500.00

468.75

2,243

Vara de clavo 3M -1

Ins

0.1250

1,500.00

187.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0005

42,950.00

21.48

8,108

Topografo

Ins

0.0625

7,660.00

478.75

8,109

Cadenero

Ins

0.1250

4,957.00

619.63

8,145

Ayudante de construccion

Ins

0.1250

5,407.00

675.88

15

6,417 Kit Silla Yee PVC 12 x 6 (315 x160 mm), Suministro


e instal. pagado por un
55
4,515
16,036

und

242,362.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.9500

1,616.00

1,535.20

Cuadrilla BB (Instalaciones)

Ins

0.9500

16,159.00

15,351.05

Kit Silla Yee 12*6 (Inc Hidrosello y abrazaderas)

Ins

und

1.0000

225,476.00

225,476.00

6,418 Buje soldado 2 x 1 1/2". Suministro e instal.

und

6,195.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0080

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 2 x 1.1/2

Ins

und

1.0000

3,290.00

3,290.00

15,104

6,419 Buje soldado 3 x 2". Suministro e instal.

und

468.90

15,479.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 3 x 2

Ins

und

1.0000

11,849.00

11,849.00

15,107

6,420 Buje soldado 4 x 2". Suministro e instal.

und

996.40

22,319.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

996.40

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 4 x 2

Ins

und

1.0000

18,689.00

18,689.00

15,109

6,421 Reventilacion PVC 4", pagado por ML

27,280.57

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

0.1400

7,729.00

1,082.06

4,515

6,463.60

55

Cuadrilla BB (Instalaciones)

Ins

13,607

Sub-Contrato Hidraulico Sanitario

Esp

16,037

Tubo PVC ventilacin 4"

Ins

6,422 Reventilacion PVC 1 1/2", pagado por ML

%
m

646.40

0.4000

16,159.00

38.0000

19,768.53

7,512.04

1.0500

10,467.00

10,990.35

13,056.81

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

9,461.46

3,595.35

16,038

Codo sanitario 90 1/4 C x C PVC 1 1/2"

Ins

und

0.1400

1,651.00

231.14

55

484.80

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

393

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,039

Tubo PVC ventilacin 1 1/2"

Ins

6,423 Codo sanitario 45 - 1/8 C x C PVC 4". Suministro e


instal.

Cantidad

Vr.Unitario

Vr.Total

1.0500

3,154.00

3,311.70

und

13,382.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x E PVC 4"

Ins

und

1.0000

8,695.00

8,695.00

15,459

6,424 Suministro e instal. codo sanitario 45 - 1/8 C x C


PVC 1 1/2", pagado por un

und

293.06

6,741.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x C PVC 1-1/2"

Ins

und

1.0000

2,054.00

2,054.00

15,451

6,425 Suministro e instal. codo sanitario 45 - 1/8 C x C


PVC 2", pagado por un

und

293.06

7,005.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x C PVC 2"

Ins

und

1.0000

2,318.00

2,318.00

15,452

6,426 Suministro e instal. codo sanitario 45 - 1/8 C x C


PVC 3", pagado por un

und

293.06

9,668.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x C PVC 3"

Ins

und

1.0000

4,981.00

4,981.00

15,453

6,427 Suministro e instal. codo sanitario 90 - 1/4 C x C


PVC 1 1/2", pagado por Un

und

293.06

6,338.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 90 1/4 C x C PVC 1 1/2"

Ins

und

1.0000

1,651.00

1,651.00

16,038

6,428 Suministro e instal. codo sanitario 90 - 1/4 C x C


PVC 2", pagado por Un

und

293.06

6,623.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

1.0000

1,936.00

1,936.00

14,792

6,429 Suministro e instal. codo sanitario 90 - 1/4 C x E


PVC 2", pagado por Un

und

7,074.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

394

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

15,447

Codo 90-1/4 C x E PVC 2"

Ins

6,430 Suministro e instal. codo sanitario 90 - 1/4 C x C


PVC 3", pagado por Un

Cantidad

Vr.Unitario

Vr.Total

0.2667

16,159.00

4,309.61

und

1.0000

2,387.00

2,387.00

und

9,172.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

3,653

Codo sanitario 90 1/4 C x C PVC 3"

Ins

und

1.0000

4,485.00

4,485.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

6,431 Yee sanitaria 2", Suministro e instal. pagada por


Un

und

7,193.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Yee Sanitaria PVC 2 "

Ins

und

1.0000

4,230.00

4,230.00

15,485

6,432 Yee sanitaria 3", Suministro e instal. pagada por


Un

und

293.06

11,652.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Yee Sanitaria PVC 3 "

Ins

und

1.0000

8,689.00

8,689.00

15,486

6,433 Yee sanitaria 4", Suministro e instal. pagada por


Un

und

293.06

17,946.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

Yee Sanitaria PVC 4 "

Ins

und

1.0000

14,983.00

14,983.00

15,487

6,434 Yee sanitaria reducida 4" x 2". Suministro e instal.

und

293.06

16,521.57

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1633

16,159.00

2,638.76

Yee Sanitaria reducida PVC 4 x 2 "

Ins

und

1.0000

13,505.00

13,505.00

15,490

6,435 Suministro e instal. superficie de trabajo modular


frmica 60 x 1.50 con accesorios y base, pagado
por un
56
5,064
16,001

und

184,391.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Superficie de trabajo modular frmica 60 x 1.5

Ins

und

1.0000

165,000.00

165,000.00

6,436 Suministro e instal. superficie de trabajo modular


frmica 50 x 90 con accesorios y base, pagado por
un
56

293.06

Herramienta Menor 10% M.O. DD

und

Eqp

HR

123,512.80

0.8000

1,763.00

1,410.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

395

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,064
15,996

Nombre

Tipo U.M.

Cuadrilla DD (Carpinteria)

Ins

0.8000

17,628.00

14,102.40

Superficie de trabajo modular frmica 50 x 90

Ins

und

1.0000

108,000.00

108,000.00

6,437 Suministro e instal. superficie de trabajo modular


frmica 60 x 1.20 con accesorios y base, pagado
por un
56
5,064
15,997

56

16,040

56

16,000

56

15,995

Eqp

HR

0.8300

1,763.00

1,463.29

Ins

0.8300

17,628.00

14,631.24

Superficie de trabajo modular frmica 60 x 1.20

Ins

und

1.0000

139,200.00

139,200.00

und

56

16,002

Eqp

HR

0.9000

1,763.00

1,586.70

Cuadrilla DD (Carpinteria)

Ins

0.9000

17,628.00

15,865.20

Superficie de trabajo modular frmica 30 x 1.50

Ins

und

1.0000

101,000.00

101,000.00

und

56

16,003

Eqp

HR

0.7000

1,763.00

1,234.10

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

Superficie de trabajo modular frmica 30 x R 60

Ins

und

1.0000

116,500.00

116,500.00

und

291,330.10

Herramienta Menor 10% M.O. DD

Eqp

HR

1.1000

1,763.00

1,939.30

Cuadrilla DD (Carpinteria)

Ins

1.1000

17,628.00

19,390.80

Superficie de trabajo modular frmica 90 x 2.10

Ins

und

1.0000

270,000.00

270,000.00

und

137,651.90

Herramienta Menor 10% M.O. DD

Eqp

HR

0.9000

1,763.00

1,586.70

Cuadrilla DD (Carpinteria)

Ins

0.9000

17,628.00

15,865.20

Superficie de trabajo modular frmica 60 x 90

Ins

und

1.0000

120,200.00

120,200.00

und

202,891.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Superficie de trabajo modular frmica 60 x 1.8

Ins

und

1.0000

183,500.00

183,500.00

6,443 Suministro e instal. superficie de trabajo modular


frmica 60 x 75 con accesorios y base, pagado por
un
56

130,073.70

Herramienta Menor 10% M.O. DD

6,442 Suministro e instal. superficie de trabajo modular


frmica 60 x 1.80 con accesorios y base, pagado
por un

5,064

118,451.90

Herramienta Menor 10% M.O. DD

6,441 Suministro e instal. superficie de trabajo modular


frmica 60 x 90 con accesorios y base, pagado por
un

5,064

155,294.53

Cuadrilla DD (Carpinteria)

6,440 Suministro e instal. superficie de trabajo modular


frmica 90 x 2.10 con accesorios y base, pagado
por un

5,064

Vr.Total

Herramienta Menor 10% M.O. DD

6,439 Suministro e instal. superficie de trabajo modular


frmica 30 x R60 con accesorios y base, pagado
por un

5,064

Vr.Unitario

und

6,438 Suministro e instal. superficie de trabajo modular


frmica 30 x 1.50 con accesorios y base, pagado
por un

5,064

Cantidad

Herramienta Menor 10% M.O. DD

und

Eqp

HR

125,451.90

0.9000

1,763.00

1,586.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

396

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,064
16,004

Nombre

Tipo U.M.

Cuadrilla DD (Carpinteria)

Ins

0.9000

17,628.00

15,865.20

Superficie de trabajo modular frmica 60 x 75

Ins

und

1.0000

108,000.00

108,000.00

6,444 Suministro e instal. superficie de trabajo modular


frmica 75 x 2.10 con accesorios y base, pagado
por un
56
5,064
16,005

56

16,006

56

16,007

56

16,008

Eqp

HR

1.1000

1,763.00

1,939.30

Ins

1.1000

17,628.00

19,390.80

Superficie de trabajo modular frmica 75 x 2.10

Ins

und

1.0000

240,000.00

240,000.00

und

56

16,010

Eqp

HR

1.2000

1,763.00

2,115.60

Cuadrilla DD (Carpinteria)

Ins

1.2000

17,628.00

21,153.60

Superficie de trabajo modular frmica 1.20 x 2.40

Ins

und

1.0000

385,500.00

385,500.00

und

5,064
15,999

Eqp

HR

1.0000

1,763.00

1,763.00

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Superficie de trabajo modular frmica 60 x 1.35

Ins

und

1.0000

152,000.00

152,000.00

und

56

16,017

167,573.70

Herramienta Menor 10% M.O. DD

Eqp

HR

0.7000

1,763.00

1,234.10

Cuadrilla DD (Carpinteria)

Ins

0.7000

17,628.00

12,339.60

Superficie de trabajo modular frmica 90 x 90

Ins

und

1.0000

154,000.00

154,000.00

und

440,817.30

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3000

1,763.00

528.90

Cuadrilla DD (Carpinteria)

Ins

0.3000

17,628.00

5,288.40

Mesa de juntas 90 x 1.8 (frente pared)

Ins

und

1.0000

435,000.00

435,000.00

und

334,895.50

Herramienta Menor 10% M.O. DD

Eqp

HR

0.5000

1,763.00

881.50

Cuadrilla DD (Carpinteria)

Ins

0.5000

17,628.00

8,814.00

Panel madera H = 90, L = 1.5 forrado pao

Ins

und

1.0000

325,200.00

325,200.00

6,450 Suministro e instal. base para cpu colgante en


lmina troquelada, pagado por un

5,064

171,391.00

Herramienta Menor 10% M.O. DD

6,449 Suministro e instal. panel offiplus 90 x 1.50,


pagado por un
56

408,769.20

Herramienta Menor 10% M.O. DD

6,448 Suministro e instal. mesa de juntas 90 x 1.80,


pagado por un

5,064

261,330.10

Cuadrilla DD (Carpinteria)

6,447 Suministro e instal. superficie de trabajo modular


frmica 90 x 90 redonda con accesorios y base,
pagado por un

5,064

Vr.Total

Herramienta Menor 10% M.O. DD

6,446 Suministro e instal. superficie de trabajo modular


frmica 60 x 1.35 con accesorios y base, pagado
por un

5,064

Vr.Unitario

und

6,445 Suministro e instal. superficie de trabajo modular


frmica 1.20 x 2.40 con accesorios y base, pagado
por un

5,064

Cantidad

und

80,817.30

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3000

1,763.00

528.90

Cuadrilla DD (Carpinteria)

Ins

0.3000

17,628.00

5,288.40

Base para CPU congante en lmina troquelada

Ins

und

1.0000

75,000.00

75,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

397

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,451 Suministro e instal. portateclado en Nylon, pagado


por un
56
5,064
16,041

5,064
16,042

56

16,024

56

16,028

Eqp

HR

0.3000

1,763.00

528.90

Ins

0.3000

17,628.00

5,288.40

Portateclado Nylon

Ins

und

1.0000

85,000.00

85,000.00

und

5,064
16,029

315,817.30

Herramienta Menor 10% M.O. DD

Eqp

HR

0.3000

1,763.00

528.90

Cuadrilla DD (Carpinteria)

Ins

0.3000

17,628.00

5,288.40

Repisa cerrada puerta corrediza

Ins

und

1.0000

310,000.00

310,000.00

und

361,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

1,763.00

176.30

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

Archivador 2 x 1 (2 caj. gav. carpetas)

Ins

und

1.0000

360,000.00

360,000.00

und

611,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

1,763.00

176.30

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

Silla tamdem de espera 4 puestos s/m

Ins

und

1.0000

610,000.00

610,000.00

6,455 Suministro e instal. silla tandem de espera 3


puestos, pagado por un
56

90,817.30

Cuadrilla DD (Carpinteria)

6,454 Suministro e instal. silla tandem de espera 4


puestos, pagado por un

5,064

Vr.Total

Herramienta Menor 10% M.O. DD

6,453 Suministro archivador 2 x 1 (2 cajones 1 gaveta),


pagado por un

5,064

Vr.Unitario

und

6,452 Suministro e instal. repisa cerrada puerta


corrediza, pagado por un
56

Cantidad

und

471,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

Silla tamdem de espera 3 puestos s/m

Ins

und

1.0000

470,000.00

470,000.00

6,456 Suministro silla secretarial sin brazos tapizada en


pao, pagado por un

1,763.00

und

176.30

221,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

1,763.00

176.30

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

16,030

Silla secretarial sin brazos

Ins

und

1.0000

220,000.00

220,000.00

56

6,457 Suministro silla secretarial con brazos tapizada en


pao, pagado por un

und

295,439.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

1,763.00

176.30

5,064

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

16,031

Silla secretarial con brazos

Ins

und

1.0000

293,500.00

293,500.00

56

6,458 Suministro silla interlocutor isosceles kiko en


pao, pagado por un
56
5,064
16,032

und

173,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

1,763.00

176.30

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

Silla interlocutor isseles kiko pao sin brazos

Ins

und

1.0000

172,000.00

172,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

398

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,459 Suministro silla texas tipo gerente neumtica con


brazos en pao, pagado por un
56
5,064
16,033

5,064
15,998

Vr.Unitario

und

Vr.Total
346,939.10

Herramienta Menor 10% M.O. DD

Eqp

HR

0.1000

Cuadrilla DD (Carpinteria)

Ins

0.1000

17,628.00

1,762.80

Silla texas gerente pao con brazos neumtica

Ins

und

1.0000

345,000.00

345,000.00

6,460 Suministro e instal. superficie de trabajo modular


frmica 90 x 1.50 con accesorios y base, pagado
por un
56

Cantidad

1,763.00

und

176.30

234,391.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

Superficie de trabajo modular frmica 90 x 1.50

Ins

und

1.0000

215,000.00

215,000.00

6,461 Adaptador macho de presion PVC 1". Suministro e


Instal.

1,763.00

und

1,763.00

2,188.10

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0067

58,612.00

392.70

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0067

28,250.00

189.28

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 1"

Ins

und

1.0000

984.00

984.00

15,050

6,462 Adaptador macho de presion PVC 3/4". Suministro


e Instal.

und

1,674.10

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0067

58,612.00

392.70

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0067

28,250.00

189.28

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 3/4"

Ins

und

1.0000

470.00

470.00

15,049

6,463 Buje soldado 1 x 1 1/2". Suministro e instal.

und

5,780.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

996.40

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 1.1/2 x 1

Ins

und

1.0000

2,150.00

2,150.00

15,098

6,464 Buje soldado 1 1/2 x 1/2". Suministro e instal.

und

5,780.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 1.1/2 x 1/2

Ins

und

1.0000

2,150.00

2,150.00

15,096

6,465 Buje soldado 1/2 x 1".Suministro e instal.

und

996.40

4,353.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 1 x 1/2

Ins

und

1.0000

723.00

723.00

15,091

6,466 Tapon soldado PVC 1/2". Suministro e Instal.

und

996.40

1,800.71

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

399

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)
Tapon soldado presin PVC 1/2

15,081

Cantidad

Vr.Unitario

Vr.Total

und

0.0090

58,612.00

527.51

und

0.0090

28,250.00

254.25

Ins

0.0500

16,159.00

807.95

Ins

und

1.0000

211.00

211.00

6,467 Tee de presion PVC 2". Suministro e instal.

und

10,005.24

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0385

1,616.00

62.22

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0080

58,612.00

468.90

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

15,062

Tee sencilla presion PVC 2 "

Ins

und

1.0000

8,852.00

8,852.00

55

6,468 Tee de presion PVC 3/4". Suministro e instal.

und

1,710.90

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0385

1,616.00

62.22

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0032

58,612.00

187.56

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Tee sencilla presion PVC 3/4 "

Ins

und

1.0000

839.00

839.00

55

15,058

6,469 Suministro e instal. Tee reducida presion PVC 1 x


3/4"

und

3,115.17

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0383

1,616.00

61.89

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0026

58,612.00

152.39

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0383

16,159.00

618.89

Tee reducida presin PVC 1 x 3/4

Ins

und

1.0000

2,282.00

2,282.00

55

15,020

6,470 Suministro e instal. Tee reducida presion PVC 1/2


x 3/4"

und

2,000.17

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0383

1,616.00

61.89

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0026

58,612.00

152.39

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0383

16,159.00

618.89

Tee reducida presin PVC 3/4 x 1/2

Ins

und

1.0000

1,167.00

1,167.00

55

15,018

6,471 Union de presion PVC 2". Suministro e instal.

und

6,337.18

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0150

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1538

16,159.00

2,485.25

Union presion PVC 2"

Ins

und

1.0000

2,549.00

2,549.00

15,044

6,472 Losa elevada en concreto 3000 psi e=0.12 m

879.18

63,994.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

6,473 Paete bajo placa 1:3, pagado en M2

2,938.00

15,807.27

E=2; desp=10%
17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

400

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

1,539

Mortero 1:3 (desperdicio 5%)

Ana

4,489

Cuadrilla AA (Albaileria)

Ins

0.0220

276,302.97

6,078.67

0.6000

14,690.00

13,641

Seccin de Andamio

8,814.00

Ins

mes

15,554

Planchn madera de 3 x 0.30 x 0.04

0.0012

17,120.00

20.54

Ins

0.0051

2,482.00

12.66

6,474 Carcamo en ladrillo tolete comn, pagado en ml

74,990.28

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0500

276,302.97

13,815.15

2,085

Ladrillo tolete comn

Ins

und

40.0000

305.00

12,200.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0500

333,142.66

16,657.13

5,144

Transporte de materiales Tn

Ana

0.0170

0.00

0.00

17

6,475 Concreto para solado resistencia 175 kg/cm2 2500 psi pagado en m2.

18,081.62

Herramienta menor 5% M.O. AA

Eqp

HR

0.1399

735.00

102.83

4,489

Cuadrilla AA (Albaileria)

Ins

0.1399

14,690.00

2,055.13

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0500

318,473.24

15,923.66

19

6,476 Cerramiento en malla verde h=2.00, pagado ml

19,525.63

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4500

1,469.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1000

2,480.00

248.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4500

14,690.00

6,610.50

5,988

Rellenos de excavacion (con material local), pagado en


M3

Ana

0.0200

10,341.76

206.84

8,112

Tela cerramiento fibra (Verde)

Ins

2.0200

3,762.00

7,599.24

8,146

Poste cerca 10 x 10 cm 210 kg/cm2

Ins

und

0.3500

12,000.00

4,200.00

17

6,477 Mesones en concreto reforzado E = 0.07 mts, sin


muro lateral, pagado m2

661.05

86,916.69

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3500

1,469.00

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.3400

3,903.00

1,327.02

1,901

Acero de refuerzo 37000 Psi

Ins

kg

10.0800

2,295.00

23,133.60

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.1400

4,300.00

4,902.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

1.2000

3,500.00

4,200.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.0000

1,990.00

3,980.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.3500

14,690.00

19,831.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.0820

0.00

0.00

Durmiente ordinario 3 M

Ins

3.8300

767.00

2,937.61

17

13,326

6,478 Acometica hidrulica PVC 1/2" 10 metros, pagada


por UN

und

1,983.15

313,289.81

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

1,841

Cheque hidro 1 1/2"

Ins

und

1.0500

117,508.00

123,383.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

227,021.60

86,268.21

55

13,607

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

401

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,757

Registro paso directo 1/2"

Ins

und

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

15,021

Codo 90 presion PVC 1/2"

Ins

und

6,479 Suministro e instal. lavamanos sobreponer, incluye


grifera prisma 4", pagado un
55

Cantidad

Vr.Unitario

Vr.Total

1.0500

22,000.00

23,100.00

10.1500

1,504.00

15,265.60

2.5000

375.00

937.50

und

167,836.67

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

Cemento blanco

Ins

kg

0.4000

975.00

390.00

4,301

Grifera lavamanos mezclador 4" prisma

Ins

und

1.0000

49,750.00

49,750.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

Lavamanos sobreponer blanco marsella

Ins

und

1.0000

96,366.67

96,366.67

829

15,597

6,480 Reja tipo bancaria en varilla cuadrada de 9 mm.


Pintada e Instalada.

76,909.60

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

Varilla cuadrada 9 mm o 3/8" x 6 mts

Ins

und

2.2217

9,492.00

21,088.38

Herramienta Menor 10% M.O. SA-1

Eqp

HR

2.7500

1,144.00

3,146.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5714

6,805.00

3,888.38

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.3494

1,691.00

590.84

2,502

Anticorrosivo rojo claro

Ins

gal

0.1100

29,750.00

3,272.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1100

42,950.00

4,724.50

Cuadrilla SA-1 (Metalisteria)

Ins

2.7500

11,436.00

31,449.00

8
84
115

16,423

6,481 Instalacin cubierta asbesto cemento mortero 1:3,


pagado m2

27,001.53

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5000

1,469.00

2,203.50

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0100

276,302.97

2,763.03

4,489

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

17

6,482 Malla electrosoldada Q-4 Tipo ME-1, pagado por m2

9,019.03

Herramienta menor 5% M.O. AA

Eqp

HR

0.0450

735.00

33.08

4,489

Cuadrilla AA (Albaileria)

Ins

0.0450

14,690.00

661.05

5,144

Transporte de materiales Tn

Ana

0.0025

0.00

0.00

Malla electrosoldada Q-4 o M-159 (2.35 x 6m)

Ins

1.0500

7,928.48

8,324.90

19

15,356

6,483 Sobreacarreos o transporte de material Petreo (via


destapada )
5,825

Volqueta 6 m

m-km

Ins

6,484 Entrepiso caseton con vigas y ref, H= 0.50, pagado


en M2

m-km

1,068.28

1.2500

854.62

1,068.28

234,230.84

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0231

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

1,870

Alambre Negro No 18

Ins

kg

0.3000

3,903.00

1,170.90

1,901

Acero de refuerzo 37000 Psi

Ins

kg

6.7000

2,295.00

15,376.50

2,197

Repisa Ordinario 3 m

Ins

0.3000

1,500.00

450.00

2,200

Tabla burra ordinario 0.30

Ins

0.3000

4,333.00

1,299.90

2,237

Esterilla de guadua

Ins

1.7000

3,500.00

5,950.00

5,909.93

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

402

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,255

Tiras alistado 3 x 3 x 3

Ins

3,797

Puntilla con cabeza 2"

Ins

lb

4,040

Paral corriente 2 a 3.50 ml

Ins

30.0000

170.00

5,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0231

14,690.00

59,099.34

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

9.3000

2,257.00

20,990.10

13,627

Formaleta entrepisos

Ins

mes

1.2000

3,500.00

4,200.00

13,903

Malla Electrosoldada R-2.1o H-084 (2.35 x 6 m)

Ins

und

0.2500

31,529.00

7,882.25

6,485 Entrepiso caseton con vigas, H= 0.35, pagado en


M2

Cantidad

Vr.Unitario

Vr.Total

3.9900

600.00

2,394.00

0.1300

1,990.00

258.70

119,768.36

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0100

1,469.00

2,952.69

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

1,870

Alambre Negro No 18

Ins

kg

0.1400

3,903.00

546.42

1,901

Acero de refuerzo 37000 Psi

Ins

kg

5.9000

2,295.00

13,540.50

2,197

Repisa Ordinario 3 m

Ins

0.1000

1,500.00

150.00

2,200

Tabla burra ordinario 0.30

Ins

0.1000

4,333.00

433.30

2,237

Esterilla de guadua

Ins

1.4300

3,500.00

5,005.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.8700

600.00

2,322.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.0200

1,990.00

39.80

4,040

Paral corriente 2 a 3.50 ml

Ins

30.0000

170.00

5,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0100

14,690.00

29,526.90

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1700

333,142.66

56,634.25

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

Formaleta entrepisos

Ins

mes

0.8800

3,500.00

3,080.00

13,627

6,486 Entrepiso caseton con vigas sin refuerzo, H= 0.50,


pagado en M2

173,039.52

17

Herramienta Menor 10% M.O. AA

Eqp

HR

3.0000

1,469.00

4,407.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

1,870

Alambre Negro No 18

Ins

kg

0.2000

3,903.00

780.60

2,197

Repisa Ordinario 3 m

Ins

0.3000

1,500.00

450.00

2,200

Tabla burra ordinario 0.30

Ins

0.3000

4,333.00

1,299.90

2,237

Esterilla de guadua

Ins

1.7000

3,500.00

5,950.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.9900

600.00

2,394.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1200

1,990.00

238.80

4,040

Paral corriente 2 a 3.50 ml

Ins

30.0000

170.00

5,100.00

4,489

Cuadrilla AA (Albaileria)

Ins

3.0000

14,690.00

44,070.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3100

333,142.66

103,274.22

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

Formaleta entrepisos

Ins

mes

1.2000

3,500.00

4,200.00

13,627

6,487 Canalizacion en conduit electrico PVC 4 x 4", prof


0.50, sol arena, rell arena, Norma CS 209, pagado
por ML

162,170.32

Herramienta Menor 10% M.O. BB

Eqp

HR

1.7000

1,616.00

2,747.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1100

58,612.00

6,447.32

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1100

28,250.00

3,107.50

4,426

Arena lavada de rio

Ins

0.1600

13,800.00

2,208.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.7000

16,159.00

27,470.30

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

403

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,759

Recebo comun

Ins

16,049

Tubo conduit PVC 4"

Ins

16,050

Cinta de Prevencin

Ins

6,488 Liston m. h. zapan e = 0,08, pagado en m2

Cantidad

Vr.Unitario

0.0500

10,000.00

500.00

4.0000

29,735.00

118,940.00

1.0000

750.00

750.00

Vr.Total

85,420.10

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

1,469.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2700

1,990.00

537.30

4,489

Cuadrilla AA (Albaileria)

Ins

1.2000

14,690.00

17,628.00

16,046

Liston m.h zapn 0.08 cm

Ins

1.1000

55,000.00

60,500.00

16,047

Liston m.h pino cipres

Ins

0.4000

8,580.00

3,432.00

16,048

Malla sin vena 0.53 x 2.40

Ins

und

0.4000

3,900.00

1,560.00

17

6,489 Suministro y tendido cable subter. 3 x 1/0 XLPE-15


Kv, pagado por ML

1,762.80

155,340.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

Cable cobre XLPE-15 KV 1/0 AWG

Ins

3.1500

44,800.00

141,120.00

55

16,051

6,490 Suministro y tendido cono de alivio para mt (13.2)


kv tipo interior, pagado por un

und

171,330.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

5,144

Transporte de materiales Tn

Ana

0.0020

0.00

0.00

Terminal premoldeada tipo interior 3 m

Ins

und

1.0000

150,000.00

150,000.00

55

16,052

6,491 Suministro e instal. de camara de inspeccin


CS-275, CODENSA, incluy. marco y atapa, pagado
por unidad

und

Herramienta Menor 10% M.O. AA

Eqp

HR

1,539

Mortero 1:3 (desperdicio 5%)

Ana

2,085

Ladrillo tolete comn

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,143

Transporte de materiales m

5,144

17

550,913.38

10.2000

1,469.00

14,983.80

0.5000

276,302.97

138,151.49

160.0000

305.00

48,800.00

10.2000

14,690.00

149,838.00

0.3000

351,843.89

105,553.17

Ana

0.0150

46,157.00

692.36

Transporte de materiales Tn

Ana

0.5000

0.00

0.00

13,961

Triturado de 1/2" - 3/4"

Ins

0.0150

46,304.00

694.56

15,980

Placa identificadora

Ins

und

1.0000

7,200.00

7,200.00

16,053

Marco tapa en ngulo cmara CS-275

Ins

und

1.0000

85,000.00

85,000.00

6,492 Suministro e instal. de puesta a tierra pararrayos,


con tratamiento Favigel, pagado un

und

Herramienta Menor 10% M.O. BB

Eqp

HR

100

Molde para soldadura

Eqp

HR

847

Cable de cobre desnudo N 2

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

5,144

Transporte de materiales Tn

Ana

14,250

Bulto de Favigel. Suelo artificial

Ins

14,284

Soldadura exotermica 115 gr.

15,973

Varilla de cobre puesta a tierra 5/8" x 2.4 mts.

55

609,300.50

3.0000

1,616.00

4,848.00

0.2500

103,950.00

25,987.50

15.0000

13,813.00

207,195.00

3.0000

16,159.00

48,477.00

0.3000

0.00

0.00

und

1.0000

196,427.00

196,427.00

Ins

und

1.0000

21,847.00

21,847.00

Ins

und

1.0000

83,160.00

83,160.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

404

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,054

Tubo galvanizado 1/2" x 3 m Conduit

Ins

6,493 Suministro e instal. de gabinete metlico A = 1.20,


Prof = 1.10, H = 1.8, Barrajes Ilum. Int y tierra,
pagado un

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

21,359.00

21,359.00

und

4,513,300.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

5,144

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

Celda triplex TSA

Ins

und

1.0000

4,300,000.00

4,300,000.00

55

16,055

6,494 Seccionador triple de operacin bajo carga 17.5 y


fusibles HH de 25 Amp., pagado un

und

8,097,300.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

5,144

55

Transporte de materiales Tn

Ana

0.3000

0.00

0.00

16,056

Fusible HH 25 Amp

Ins

und

3.0000

228,000.00

684,000.00

16,057

Seccionador de entrada y salida Oper. bajo carga

Ins

und

1.0000

4,400,000.00

4,400,000.00

16,058

Seccionador de proteccin Oper. bajo carga

Ins

und

1.0000

2,800,000.00

2,800,000.00

6,495 Transformador de potencia 3 150 KVA, 13.2 kv,


214/123 V Dyn 5, 60 hz refrigerado en aceite,
pagado un

und

9,413,300.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

5,144

Transporte de materiales Tn

Ana

10.3000

0.00

0.00

Transf de Potencia 3 de 150 KVA 13.2kv 214/123

Ins

und

1.0000

9,200,000.00

9,200,000.00

55

16,059

6,496 Suministro e instal. pasamuro cortafuego,


Cableados, premoldeados, barrajes y conectores,
pagado por un

und

5,483,150.00

Herramienta Menor 10% M.O. BB

Eqp

HR

14.0000

1,616.00

22,624.00

Cuadrilla BB (Instalaciones)

Ins

14.0000

16,159.00

226,226.00

14,262

Cinta aislante

Ins

und

1.5000

5,000.00

7,500.00

16,051

Cable cobre XLPE-15 KV 1/0 AWG

Ins

1.0000

44,800.00

44,800.00

16,052

Terminal premoldeada tipo interior 3 m

Ins

und

1.0000

150,000.00

150,000.00

16,060

Terminal de ponchar # 1/0, 3 m

Ins

und

12.0000

6,000.00

72,000.00

16,061

Terminal de ponchar # 2, 3 m

Ins

und

4.0000

4,500.00

18,000.00

16,062

Cinta aislante autofundente, 3 m

Ins

rl

1.0000

14,000.00

14,000.00

16,063

Cable de cobre THW N 1/0 AWG

Ins

50.0000

10,000.00

500,000.00

16,064

Cable de cobre THW N 2 AWG

Ins

20.0000

6,400.00

128,000.00

16,065

Pasamuros en baja tensin

Ins

jg

1.0000

1,800,000.00

1,800,000.00

16,066

Pasamuros en media tensin

Ins

jg

1.0000

2,500,000.00

2,500,000.00

55
4,515

6,497 Suministro e instal. ventana aluminio fija incluye


vidrio templado de 6 mm, pagado m2

252,458.43

1,822

Ventana aluminio fija

Ins

1.0000

110,000.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Vidrio templado 6 mm

Ins

1.0000

130,000.00

130,000.00

16,067

110,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

405

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,498 Suministro e instal. puertas aluminio con vidrio


templado 6 mm, pagado m2 x
ACTUALIZARRRRRRRRRRRRRRRR

Cantidad

Vr.Unitario

Vr.Total
264,525.60

Sin instalacion
Herramienta Menor 10% M.O. DD

Eqp

HR

1.6000

1,763.00

2,820.80

5,064

Cuadrilla DD (Carpinteria)

Ins

1.6000

17,628.00

28,204.80

5,144

56

Transporte de materiales Tn

Ana

0.4500

0.00

0.00

15,594

Puerta aluminio llena, bisagras, marco e instalaci

Ins

0.6000

270,000.00

162,000.00

16,067

Vidrio templado 6 mm

Ins

0.5500

130,000.00

71,500.00

6,499 Suministro e instal. baranda aluminio anodizado,


incluye vidrio templado de 5 mm, pagado ml

128,141.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

16,068

Vidrio templado 5 mm

Ins

0.3500

125,000.00

43,750.00

16,069

Baranda aluminio anodizado

Ins

1.0000

65,000.00

65,000.00

56
5,064

6,500 Suministro e instal. perfil en aluminio anodizado,


pagado ml

41,634.60

Herramienta Menor 10% M.O. DD

Eqp

HR

0.6000

1,763.00

1,057.80

5,064

Cuadrilla DD (Carpinteria)

Ins

0.6000

17,628.00

10,576.80

16,070

Perfil en aluminio 10 x 20

Ins

1.0000

30,000.00

30,000.00

56

6,501 Terraplen, construccion (Incluye: descapote,


acarreo libre 100 m, conformar y compactar,
unicamente Bulldozer)
20

Bulldozer Cat D6D o D6H

Eqp

6,502 Remocion de material producto de derrumbes


(manual)
53
14,749

HR

3,436.10

0.0263

130,650.00

3,436.10

30,859.40

Herramienta menor 10% M.O. AA-3

Eqp

HR

1.1000

2,550.00

2,805.00

Cuadrilla AA-3 (Limpieza)

Ins

1.1000

25,504.00

28,054.40

6,503 Concreto para solado resistencia 105 kg/cm2 1500 psi pagado en m3.

331,370.33

Herramienta menor 5% M.O. AA

Eqp

HR

2.8000

735.00

2,058.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.8000

14,690.00

41,132.00

5,056

Concreto 1:3:6 o 1500 Psi (Basico, 5% desperdicio)

Ana

1.0000

288,180.33

288,180.33

19

6,504 Remate cubierta termoacstica en mortero,


proporcin de la mezcla 1:4, regata con pulidora,
pagado en m

11,535.19

E=1.5; desp=8%
17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2844

1,469.00

417.78

44

Pulidora electrica manual

Eqp

HR

0.4000

4,350.00

1,740.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0150

248,144.84

3,722.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.2844

14,690.00

4,177.84

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

16,072

Disco Diamantado 7"

Ins

und

0.0300

48,140.00

1,444.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

406

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,505 Vidrio incoloro templado de 10 mm. pagado en m

Cantidad

Vr.Unitario

Vr.Total
83,270.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

15,869

Vidrio Incoloro Templado 10 mm

Ins

1.0300

76,100.00

78,383.00

16,093

Silicona transparente 280 ml

Ins

und

0.1000

8,473.00

847.30

17
4,489

6,506 Enchape muro y piso en ceramica lisa 30.5 x 30.5


traf 5, pagado m

41,453.71

15

Pegacor blanco

Ins

kg

3.1500

1,120.00

3,528.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

804

Cemento gris

Ins

kg

6.2700

383.34

2,403.54

829

Cemento blanco

Ins

kg

0.7000

975.00

682.50

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.0311

0.00

0.00

Ceramica granilla blanca 30.5 x 30.5 trfico 5

Ins

1.0500

18,500.00

19,425.00

15,816

6,507 Pared simple en placa gyplac de yeso dry-wall,


pagado m

64,955.46

Herramienta Menor 10% M.O. DD

Eqp

HR

1.1500

1,763.00

2,027.45

5,064

Cuadrilla DD (Carpinteria)

Ins

1.1500

17,628.00

20,272.20

5,144

56

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

15,830

Placa Gyplac 12.7 mm RH

Ins

und

0.6900

42,408.00

29,261.52

15,831

Cinta de papel rollo 152.5 m

Ins

und

0.0120

15,616.00

187.39

15,832

Masilla acrlica para interiores cuete 5 gal

Ins

und

0.0400

62,903.00

2,516.12

15,836

Tornillo cabeza extraplana

Ins

und

2.7500

39.00

107.25

15,837

Tornillo estandar 6 x 1"

Ins

und

23.0000

20.00

460.00

15,838

Frescasa 31/2" rollo 18.58 m2

Ins

und

0.0600

101,911.00

6,114.66

16,074

Canal 60 mm base 6

Ins

und

0.3400

3,465.00

1,178.10

16,075

Paral 59 mm base 6

Ins

und

0.7100

3,987.00

2,830.77

6,508 Mesones en concreto reforzado E = 0.10 mts sin


muro lateral, pagado m

86,652.31

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.2400

3,903.00

936.72

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

0.7700

4,300.00

3,311.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

1.0000

3,500.00

3,500.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1900

1,990.00

378.10

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,144

Transporte de materiales Tn

Ana

0.0820

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

8.0000

2,257.00

18,056.00

17

6,509 Dinteles en ladrillo prensado, pagado en m


17
804

2,350.40

27,085.54

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

Cemento gris

Ins

kg

2.9400

383.34

1,127.02

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

407

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,208

Tabla chapa ordinario 0.10

Ins

2,311

Ladrillo prensado

Ins

und

3,684

Agua para obra

Ins

2.6600

10.00

26.60

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

6,510 Entramado en madera con tratamiento artstico,


pagado en m

Cantidad

Vr.Unitario

Vr.Total

2.0000

2,667.00

5,334.00

13.0000

480.00

6,240.00

64,148.80

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2000

1,469.00

1,762.80

2,198

Durmiente ordinario 4 M

Ins

8.2000

3,500.00

28,700.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2000

14,690.00

17,628.00

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

Merulex IFS Transparente (inmunizante madera)

Ins

gal

0.3000

52,200.00

15,660.00

17

15,722

6,511 Suministro e instal. estufa a gas 4 puestos y


plancha asadora, pagado por Un

und

36,332.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3000

1,616.00

484.80

Cuadrilla BB (Instalaciones)

Ins

0.3000

16,159.00

4,847.70

13,916

Regulador gas r - 4 e 4 m3

Ins

und

1.0000

25,000.00

25,000.00

15,946

Manguera plstica 3/4"

Ins

2.0000

3,000.00

6,000.00

55
4,515

Ins

16,071

6,512 Pozo septico revestido en piedra 2 x 2 x 2, con losa


en concreto 3000 psi, pagado por Un

1.0000

und

2,015,453.62

17

Herramienta Menor 10% M.O. AA

Eqp

HR

50.0000

1,469.00

73,450.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

1,850

Segueta Ncholson

Ins

und

0.1000

2,500.00

250.00

1,870

Alambre Negro No 18

Ins

kg

1.0300

3,903.00

4,020.09

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

3.0000

4,300.00

12,900.00

2,237

Esterilla de guadua

Ins

18.0000

3,500.00

63,000.00

2,243

Vara de clavo 3M -1

Ins

1.5000

1,500.00

2,250.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

3,609

Codo sanitario 90 1/4 C x C PVC 6"

Ins

und

1.0000

70,982.00

70,982.00

3,657

Tubo PVC sanitario de 6"

Ins

0.3300

31,269.00

10,318.77

4,489

Cuadrilla AA (Albaileria)

Ins

50.0000

14,690.00

734,500.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.9600

351,843.89

337,770.13

5,063

Piedra rajon o media zonga

Ana

7.6200

90,495.15

689,573.04

5,144

Transporte de materiales Tn

Ana

2.0000

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.0000

2,257.00

6,771.00

13,326

Durmiente ordinario 3 M

Ins

1.2500

767.00

958.75

14,124

Puntilla con cabeza 3"

Ins

lb

0.4900

1,990.00

975.10

6,513 Suministro e instal. de gabinete metlico A = 0.70,


Prof = 0.40, H = 2.00, Barrajes, medidor cab, tierra,
pagado un

und

2,511,515.00

Herramienta Menor 10% M.O. BB

Eqp

HR

12.0000

1,616.00

19,392.00

4,515

Cuadrilla BB (Instalaciones)

Ins

12.0000

16,159.00

193,908.00

5,144

Transporte de materiales Tn

Ana

2.6000

0.00

0.00

Gabinete tablero metlico 70x40x2 mts

Ins

und

1.0000

2,298,215.00

2,298,215.00

55

16,083

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

408

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,514 Breaker totalizador principal de 3 x 600 Amp. caja


moldeada ICC 20 Ka Totalizador

Cantidad

Vr.Unitario

und

Vr.Total
812,212.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

1.5000

0.00

0.00

Breaker termomag. 3x600 Amp caja mold ICC 20 Ka To

Ins

und

1.0000

750,000.00

750,000.00

55

16,084

6,515 Breaker totalizador principal de 3 x 20 Amp. TSOT T1 - T3. caja moldeada ICC 20 Ka Totalizador

und

380,102.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.1000

1,616.00

5,009.60

4,515

Cuadrilla BB (Instalaciones)

Ins

3.1000

16,159.00

50,092.90

5,144

Transporte de materiales Tn

Ana

1.2000

0.00

0.00

Breaker termomag. 3x20 Amp caja mold ICC 20 Ka Tot

Ins

und

1.0000

325,000.00

325,000.00

55

16,085

6,516 Breaker totalizador principal de 3 x 60 Amp. T2


caja moldeada ICC 20 Ka Totalizador

und

503,325.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

1.2000

0.00

0.00

Breaker termomag. 3x60 Amp caja mold ICC 20 Ka Tot

Ins

und

1.0000

450,000.00

450,000.00

55

16,086

6,517 Breaker totalizador principal de 3 x 70 Amp. TSIS


caja moldeada ICC 20 Ka Totalizador

und

503,325.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

1.2000

0.00

0.00

Breaker termomag. 3x70 Amp caja mold ICC 20 Ka Tot

Ins

und

1.0000

450,000.00

450,000.00

55

16,087

6,518 Breaker totalizador principal de 3 x 380 Amp. TA


caja moldeada ICC 20 Ka Totalizador

und

633,325.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.0000

1,616.00

4,848.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.0000

16,159.00

48,477.00

5,144

Transporte de materiales Tn

Ana

1.2000

0.00

0.00

Breaker termomag. 3x380 Amp caja mold ICC 20 Ka To

Ins

und

1.0000

580,000.00

580,000.00

55

16,088

6,519 Barrajes, conductores, puesta a tierra, etc..L = 100


mts, pagado global

glb

807,225.00

Herramienta Menor 10% M.O. BB

Eqp

HR

15.0000

1,616.00

24,240.00

Cable de cobre THW N 8

Ins

100.0000

3,406.00

340,600.00

3,266

Alambre cobre THW 12 AWG

Ins

100.0000

1,000.00

100,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

15.0000

16,159.00

242,385.00

5,144

Transporte de materiales Tn

Ana

1.8000

0.00

0.00

14,262

Cinta aislante

Ins

und

3.0000

5,000.00

15,000.00

16,089

Platina cobre estaado

Ins

1.0000

85,000.00

85,000.00

55
878

6,520 Medidor electrnico trifsico, tetrafilar de energa


activa, clase 1 con calibracin, pagado por Un
55

Herramienta Menor 10% M.O. BB

und

Eqp

HR

908,657.50

3.3000

1,616.00

5,332.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

409

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

5,144

Transporte de materiales Tn

Ana

Equipo de medida elec trif 3x208/120 5(10) A

Ins

16,090

6,521 Transferencia de 3 x 500 Amp, pagado por Un

Cantidad

Vr.Unitario

Vr.Total

3.3000

16,159.00

53,324.70

1.8000

0.00

0.00

und

1.0000

850,000.00

850,000.00

und

6,452,125.00

Herramienta Menor 10% M.O. BB

Eqp

HR

35.0000

1,616.00

56,560.00

4,515

Cuadrilla BB (Instalaciones)

Ins

35.0000

16,159.00

565,565.00

5,144

Transporte de materiales Tn

Ana

3.8000

0.00

0.00

Transferencia Automtica de 3 x 500 Amp 600 V

Ins

und

1.0000

5,830,000.00

5,830,000.00

55

16,092

6,522 Barrajes, conductores, puesta a tierra, etc., pagado


Un

und

145,213.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.8000

1,616.00

2,908.80

Cable de cobre THW N 8

Ins

3.0000

3,406.00

10,218.00

3,266

Alambre cobre THW 12 AWG

Ins

3.0000

1,000.00

3,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.8000

16,159.00

29,086.20

5,144

55
878

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

14,262

Cinta aislante

Ins

und

3.0000

5,000.00

15,000.00

16,089

Platina cobre estaado

Ins

1.0000

85,000.00

85,000.00

6,523 Celda para Transferencia de 3 x 500 Amp, pagado


por Un

und

1,012,212.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

1.8000

0.00

0.00

Celda para transferencia de 3 x 500 Amp

Ins

und

1.0000

950,000.00

950,000.00

55

16,091

6,524 Carcamo en ladrillo tolete comn para media y


baja tensin, medicin con tapa y marco lam.
alfajor, pagado en un

und

Herramienta Menor 10% M.O. AA

Eqp

HR

1,539

Mortero 1:3 (desperdicio 5%)

Ana

2,085

Ladrillo tolete comn

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn
Tapa y marco en lmina alfajor

17

16,095

1,143,881.96

18.0000

1,469.00

26,442.00

0.7500

276,302.97

207,227.23

450.0000

305.00

137,250.00

18.0000

14,690.00

264,420.00

0.6500

333,142.66

216,542.73

Ana

1.5000

0.00

0.00

Ins

und

1.0000

292,000.00

292,000.00

6,525 Sum. e instal. planta de emergencia trif. para 150


KW nominal con mirilla de nivel y tanque y
vlvulas, pagado en un

und

91,251,588.00

Herramienta Menor 10% M.O. AA

Eqp

HR

71.0000

1,469.00

104,299.00

4,515

Cuadrilla BB (Instalaciones)

Ins

71.0000

16,159.00

1,147,289.00

5,144

Transporte de materiales Tn

Ana

40.5000

0.00

0.00

Planta Emergencia 150 KW nominal Mirilla y Vlvula

Ins

und

1.0000

90,000,000.00

90,000,000.00

17

16,096

6,526 Suministro e instal. de sistema general de malla a


tierra pararrayos, con tratamiento Favigel, pagado
un

und

6,350,625.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

410

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

95.0000

1,616.00

153,520.00

4,515

Cuadrilla BB (Instalaciones)

Ins

95.0000

16,159.00

1,535,105.00

5,144

Transporte de materiales Tn

Ana

5.3000

0.00

0.00

16,097

Varilla de cobre de 5/8" x 2.44 mts. 99% Cu

Ins

und

8.0000

76,500.00

612,000.00

16,098

Cable de cobre desnudo N 2/0 AWG

Ins

30.0000

11,500.00

345,000.00

16,099

Soldadura exotermica 150 gr.

Ins

und

20.0000

16,250.00

325,000.00

16,100

Favigel. Suelo artificial

Ins

und

20.0000

169,000.00

3,380,000.00

55

6,527 Salida toma monofasica doble con polo a tierra,


pagado un

und

68,371.24

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

3,266

Alambre cobre THW 12 AWG

Ins

13.5000

1,000.00

13,500.00

3,534

Tubo conduit PVC 3/4"

Ins

4.5000

1,812.00

8,154.00

3,554

Adaptador terminal conduit 3/4"

Ins

und

2.0000

358.00

716.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

13,555

Alambre de cobre desnudo AWG 12

Ins

4.5000

1,186.00

5,337.00

14,262

Cinta aislante

Ins

und

0.0100

5,000.00

50.00

16,101

Caja galvanizada 2400

Ins

und

1.0000

1,300.00

1,300.00

16,102

Suplemento galvanizado 2400

Ins

und

1.0000

425.00

425.00

16,103

Toma monofsica doble, polo a tierra

Ins

und

1.0000

12,400.00

12,400.00

16,104

Placa de identificacin circuito

Ins

und

1.0000

3,400.00

3,400.00

16,105

Tornillo galvanizado para lmina 12 x 1/2"

Ins

und

1.0000

22.00

22.00

55

6,528 Salida toma trifasica con polo a tierra, 50 A - 220


V, pagado un

und

131,050.74

Herramienta Menor 10% M.O. BB

Eqp

HR

1.7000

1,616.00

2,747.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0200

58,612.00

1,172.24

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

3,265

Alambre de cobre THW 10 AWG

Ins

36.0000

950.00

34,200.00

3,561

Adaptador terminal conduit 1"

Ins

und

4.0000

660.00

2,640.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.7000

16,159.00

27,470.30

12,066

Tubo conduit PVC 1"

Ins

12.0000

2,511.00

30,132.00

13,555

Alambre de cobre desnudo AWG 12

Ins

12.0000

1,186.00

14,232.00

16,105

Tornillo galvanizado para lmina 12 x 1/2"

Ins

und

2.0000

22.00

44.00

16,106

Caja galvanizada doble fondo

Ins

und

1.0000

1,300.00

1,300.00

16,107

Toma trifsica con polo a tierra

Ins

und

1.0000

15,000.00

15,000.00

16,108

Conector terminal tipo resorte No. 12

Ins

und

6.0000

258.00

1,548.00

55

6,529 Salida + lampara techo fluorescente Slim 2 * 48


PVC, pagado por unidad

und

124,648.12

Longitud promedio = 4.50 m


Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Alambre cobre THW 14 AWG THHN/NN

Ins

4.5000

1,033.00

4,648.50

1,709

Tornillo lmina Dia.3/8``

Ins

und

1.0000

20.00

20.00

2,471

Conector resorte rojo

Ins

und

2.0000

327.00

654.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,552

Caja octogonal conduit

Ins

und

1.0000

1,650.00

1,650.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

2.0000

269.00

538.00

3,556

Tubo conduit PVC 1/2"

Ins

4.5000

1,384.00

6,228.00

55
869

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

411

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,515

Cuadrilla BB (Instalaciones)

Ins

5,021

CARGA FULM.FUERTE 330

Ins

1.0000

16,159.00

16,159.00

und

4.0000

750.00

13,557

Alambre cobre THW 12 AWG THHN/NN

3,000.00

Ins

15,845

9.0000

1,474.00

13,266.00

Lampara fluorescente 2 x 48" de incrustar

Ins

und

1.0000

67,000.00

16,511

67,000.00

Tubo slim 48"

Ins

und

2.0000

4,500.00

9,000.00

6,530 Salida + lampara incandescente (roseta porc.)


alumbrado muro tipo aplique pvc, pagado un

und

83,379.12

Herramienta Menor 10% M.O. BB

Eqp

HR

1.2000

1,616.00

1,939.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,266

Alambre cobre THW 12 AWG

Ins

6.0000

1,000.00

6,000.00

3,553

Adaptador terminal conduit 1/2"

Ins

und

6.0000

269.00

1,614.00

3,556

Tubo conduit PVC 1/2"

Ins

6.0000

1,384.00

8,304.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.2000

16,159.00

19,390.80

13,555

Alambre de cobre desnudo AWG 12

Ins

6.0000

1,186.00

7,116.00

16,101

Caja galvanizada 2400

Ins

und

0.1700

1,300.00

221.00

16,105

Tornillo galvanizado para lmina 12 x 1/2"

Ins

und

3.0000

22.00

66.00

16,108

Conector terminal tipo resorte No. 12

Ins

und

6.0000

258.00

1,548.00

16,109

Caja galvanizada octogonal

Ins

und

1.0000

986.00

986.00

16,110

Caja galvanizada 5800

Ins

und

1.0000

560.00

560.00

16,111

Tapa ciega 2400

Ins

0.1700

150.00

25.50

16,112

Roseta de porcelana 4"

Ins

und

1.0000

1,740.00

1,740.00

16,113

Bombillo de 100 w/220v

Ins

und

1.0000

1,000.00

1,000.00

16,115

Lmpara tipo aplique 100 W

Ins

und

1.0000

32,000.00

32,000.00

55

6,531 Tablero trifsico 12 circuitos con chapa, puerta y


llave barraje 225 A, pagado por unidad

und

258,291.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

0.0330

0.00

0.00

Tablero tirf. 225 A /240V c/puerta (12 C) cerr opc

Ins

und

1.0000

196,079.00

196,079.00

55

14,242

6,532 Tablero trifsico 24 circuitos con chapa, puerta y


llave barraje 225 A, pagado por unidad

und

334,503.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

0.0330

0.00

0.00

Tablero tirf. 225 A /240V c/puerta (24 C) cerr opc

Ins

und

1.0000

272,291.00

272,291.00

55

14,244

6,533 Tablero trifsico 6 circuitos con chapa, puerta y


llave barraje 225 A, pagado por unidad

und

177,439.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

0.0330

0.00

0.00

Tablero tirf. 225A/240V s/p (6 C) 6h opc t aisla

Ins

und

1.0000

115,227.00

115,227.00

55

14,239

6,534 Tablero monofsico 6 circuitos con chapa, puerta


y llave, pagado por unidad
55

Herramienta Menor 10% M.O. BB

und

Eqp

HR

95,772.50

1.9000

1,616.00

3,070.40

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

412

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

5,144

Transporte de materiales Tn

Ana

Tablero monof. 6 circuitos

Ins

16,127

6,535 Tablero trifsico 42 circuitos con chapa, puerta y


llave barraje 400 A, pagado por unidad

Cantidad

Vr.Unitario

Vr.Total

1.9000

16,159.00

30,702.10

0.0330

0.00

0.00

und

1.0000

62,000.00

62,000.00

und

647,212.50

Herramienta Menor 10% M.O. BB

Eqp

HR

3.5000

1,616.00

5,656.00

4,515

Cuadrilla BB (Instalaciones)

Ins

3.5000

16,159.00

56,556.50

5,144

Transporte de materiales Tn

Ana

0.0330

0.00

0.00

Tablero tirf. 400 A /240V c/puerta (42 C) cerr opc

Ins

und

1.0000

585,000.00

585,000.00

55

16,128

6,536 Suministro y montaje de interruptor enchufable de


1 x 15 Amp., pagado por unidad

und

15,721.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

565.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

16,116

Interruptor enchufable 1 x 15

Ins

und

1.0000

9,500.00

9,500.00

55

6,537 Suministro y montaje de interruptor enchufable de


1 x 20 Amp., pagado por unidad

und

15,721.25

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3500

1,616.00

565.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3500

16,159.00

5,655.65

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

16,117

Interruptor enchufable 1 x 20

Ins

und

1.0000

9,500.00

9,500.00

55

6,538 Suministro y montaje de interruptor enchufable de


2 x 15 Amp., pagado por unidad

und

24,899.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3600

1,616.00

581.76

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3600

16,159.00

5,817.24

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Interruptor enchufable 2 x 15 Amp

Ins

und

1.0000

18,500.00

18,500.00

55

16,118

6,539 Suministro y montaje de interruptor enchufable de


2 x 20 Amp., pagado por unidad

und

25,254.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3800

1,616.00

614.08

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3800

16,159.00

6,140.42

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

16,119

Interruptor enchufable 2 x 20

Ins

und

1.0000

18,500.00

18,500.00

55

6,540 Suministro y montaje de interruptor enchufable de


2 x 30 Amp., pagado por unidad

und

25,254.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.3800

1,616.00

614.08

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3800

16,159.00

6,140.42

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Interruptor enchufable 2 x 30 Amp

Ins

und

1.0000

18,500.00

18,500.00

55

16,120

6,541 Suministro y montaje de interruptor enchufable de


3 x 30 Amp., pagado por unidad

und

62,110.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

413

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Interruptor enchufable 3 x 30 Amp

Ins

und

1.0000

55,000.00

55,000.00

55

16,121

6,542 Suministro y montaje de interruptor enchufable de


3 x 40 Amp., pagado por unidad

und

62,110.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Interruptor enchufable 3 x 40 Amp

Ins

und

1.0000

55,000.00

55,000.00

55

16,122

6,543 Suministro y montaje de interruptor enchufable de


3 x 70 Amp., pagado por unidad

und

62,110.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Interruptor enchufable 3 x 70 Amp

Ins

und

1.0000

55,000.00

55,000.00

55

16,123

6,544 Interruptor sencillo lnea decorativa, pagado por


unidad
121
5,107
16,124

und

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1600

1,514.00

Cuadrilla AA (Electrica)

Ins

0.1600

15,140.00

2,422.40

Interruptor sencillo lnea decorativa

Ins

und

1.0000

14,500.00

14,500.00

6,545 Interruptor doble lnea decorativa, pagado por


unidad
121
5,107
16,125

17,164.64

und

242.24

17,164.64

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1600

1,514.00

242.24

Cuadrilla AA (Electrica)

Ins

0.1600

15,140.00

2,422.40

Interruptor doble lnea decorativa

Ins

und

1.0000

14,500.00

14,500.00

6,546 Suministro e instal. caja de paso metlica 40 x 40 x


20 cm, pagado por unidad

und

108,385.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.4000

1,616.00

2,262.40

4,515

Cuadrilla BB (Instalaciones)

Ins

1.4000

16,159.00

22,622.60

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

Caja de paso metlica 40 x 40 x 20

Ins

und

1.0000

83,500.00

83,500.00

55

16,126

6,547 Placa superior en concreto de 3000 psi, e= 0.10


(inc. colocacion final)

51,927.34

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0030

276,302.97

828.91

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,061

Formaleta (1 uso)

Ana

0.1667

32,375.50

5,397.00

17

6,548 Mezcla Asfaltica MDC-3

317,920.49

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

414

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Compactador Vibratorio

Eqp

Terminadora de Asfalto o Finisher

Eqp

HR

0.0370

100,000.00

3,700.00

HR

Compactador Neumatico

0.0370

127,600.00

4,721.20

Eqp

HR

0.0370

120,900.00

4,473.30

Herramienta menor 10% M.O. AA-9

Eqp

HR

0.0370

5,795.00

214.42

14,621

Cuadrilla AA-9 (Asfalto)

Ins

0.0370

57,945.00

2,143.97

16,129

Mezcla asfaltica MDC-3

Ins

1.2000

252,223.00

302,667.60

24
110

6,549 Rampa o placa en elevacion para Puentes en


Concreto de resistencia 3000 Psi

735,539.69

17

Herramienta Menor 10% M.O. AA

Eqp

HR

18.0000

1,469.00

26,442.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

1,848

Tabla burra 3.00 m

Ins

0.3300

4,666.00

1,539.78

2,197

Repisa Ordinario 3 m

Ins

1.0000

1,500.00

1,500.00

4,005

Andamio Tubular 1.50 x 1.50

Ins

sec

30.0000

500.00

15,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

18.0000

14,690.00

264,420.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

2.6667

32,375.50

86,335.75

Puntilla con cabeza 3"

Ins

lb

0.3000

1,990.00

597.00

14,124

6,550 Base estabilizada con crudo de castilla y sello de


arena (extendida, nivelada y compactada)

173,809.54

Compactador Vibratorio

Eqp

HR

0.0833

100,000.00

8,330.00

Motoniveladora

Eqp

HR

0.0833

132,800.00

11,062.24

Camion Irrigador

Eqp

HR

0.0833

62,500.00

5,206.25

11

Carrotanque de Agua

Eqp

HR

0.0833

53,125.00

4,425.31

98

Herramienta menor 10% M.O. Ay-4

Eqp

HR

0.2800

2,163.00

605.64

3,684

Agua para obra

Ins

95.0000

10.00

950.00

4,426

Arena lavada de rio

Ins

0.0800

13,800.00

1,104.00

5,143

Transporte de materiales m

Ana

0.0800

46,157.00

3,692.56

5,144

Transporte de materiales Tn

Ana

0.1600

0.00

0.00

14,777

Base Triturada T.max 1 1/2"

Ins

1.3000

33,329.00

43,327.70

14,944

Cuadrilla Ay-4

Ins

0.2800

21,628.00

6,055.84

15,868

Exor 1

Ins

gal

0.0130

600,000.00

7,800.00

16,220

Crudo de Castilla

Ins

gal

25.0000

3,250.00

81,250.00

6,551 Camisas para barras de transferencia D=2 1/2"


L=0.30 m

und

32,390.45

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5000

1,469.00

734.50

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

Soldador

Ins

0.5000

6,759.00

3,379.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2000

6,805.00

1,361.00

2,458

Platina 1/4" x 2 1/2"

Ins

0.4000

8,463.00

3,385.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0800

0.00

0.00

14,742

Lamina HR 1/4"

Ins

0.0200

125,317.09

2,506.34

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0200

6,200.00

124.00

14,745

Oxigeno Industrial

Ins

0.0300

15,662.00

469.86

14,746

Acetileno

Ins

kg

0.0100

41,820.00

418.20

519

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

415

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,223

Tubo estructural redondo =2 1/2" e= 5 mm

Ins

6,552 Cercha o Viga Metalica H = 2 m, A = 0.20 m, Doble


perfil; incluye: Construccion, montaje y pintura

Cantidad

Vr.Unitario

Vr.Total

0.3000

34,312.00

10,293.60

223,090.90

28

Grua

Eqp

HR

0.1920

43,750.00

8,400.00

42

Motosoldador Diesel

Eqp

HR

0.3840

14,833.00

5,695.87

43

Equipo de Oxicorte

Eqp

HR

0.2880

5,000.00

1,440.00

44

Pulidora electrica manual

Eqp

HR

0.2304

4,350.00

1,002.24

45

Cilindro

Eqp

HR

0.2880

41.00

11.81

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.1520

3,226.00

3,716.35

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5700

6,805.00

3,878.85

2,475

Angulo o perfil 3" x 3" x 1/4"

Ins

4.4000

20,623.00

90,741.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.2900

29,750.00

8,627.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1400

42,950.00

6,013.00

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2100

6,200.00

1,302.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.1520

32,262.00

37,165.82

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

Ins

8.5200

6,154.00

52,432.08

6,553 Concreto ciclopeo de resistencia 2000 psi, pagado


en m3

302,011.63

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.7000

49

Vibrador de concretos

Eqp

HR

0.3000

4,375.00

1,312.50

4,489

Cuadrilla AA (Albaileria)

Ins

4.7004

14,690.00

69,048.88

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.6000

311,229.99

186,737.99

5,063

Piedra rajon o media zonga

Ana

0.4200

90,495.15

38,007.96

6,554 Sardinel en Concreto 3000 Psi 0.8m x 0.5 m x 0.20


m (Con ref.)

1,469.00

6,904.30

119,287.18

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

49

Vibrador de concretos

Eqp

HR

0.1352

4,375.00

591.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2800

333,142.66

93,279.94

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

4.4700

3,092.35

13,822.80

6,555 Suministro e instal. codo presion PVC 90 3,


pagado por un

und

25,901.42

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Codo 90 presion PVC 3"

Ins

und

1.0000

23,261.00

23,261.00

15,028

6,556 Suministro e instal. codo presion PVC 90 2 1/2,


pagado por un

und

328.23

23,743.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1143

16,159.00

1,846.97

328.23

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

416

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,027

Codo 90 presion PVC 2 1/2"

Ins

6,557 Suministro e instal. codo presion PVC 90 2 ,


pagado por un

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

21,410.00

21,410.00

und

9,028.33

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

Codo 90 presion PVC 2"

Ins

und

1.0000

6,926.00

6,926.00

15,026

6,558 Suministro e instal. codo presion PVC 90 1 1/2 ,


pagado por un

und

328.23

6,148.97

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0889

16,159.00

1,436.54

15,025

Codo 90 presion PVC 1 1/2"

Ins

und

1.0000

4,226.00

4,226.00

6,559 Suministro e instal. codo presion PVC 90 1 1/4 ,


pagado por un

und

328.23

4,110.02

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0842

16,159.00

1,360.59

15,024

Codo 90 presion PVC 1 1/4"

Ins

und

1.0000

2,263.00

2,263.00

6,560 Suministro e instal. codo presion PVC 90 1 ,


pagado por un

und

328.23

2,955.15

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

Codo 90 presion PVC 1"

Ins

und

1.0000

1,176.00

1,176.00

15,023

6,561 Suministro e instal. codo presion PVC 90 3/4 ,


pagado por un

und

328.23

2,318.75

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0762

16,159.00

1,231.32

15,022

Codo 90 presion PVC 3/4"

Ins

und

1.0000

601.00

601.00

6,562 Suministro e instal. codo presion PVC 90 1/2 ,


pagado por un

und

328.23

2,092.75

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

328.23

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0762

16,159.00

1,231.32

15,021

Codo 90 presion PVC 1/2"

Ins

und

1.0000

375.00

375.00

6,563 Suministro e instal. codo presion PVC 45 1/2 ,


pagado por un

und

2,337.75

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

328.23

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

417

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

15,030

Codo 45 presion PVC 1/2

Ins

6,564 Suministro e instal. codo presion PVC 45 3/4 ,


pagado por un

Cantidad

Vr.Unitario

Vr.Total

0.0762

16,159.00

1,231.32

und

1.0000

620.00

620.00

und

2,710.75

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

328.23

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0762

16,159.00

1,231.32

15,031

Codo 45 presion PVC 3/4

Ins

und

1.0000

993.00

993.00

6,565 Suministro e instal. codo presion PVC 45 1 ,


pagado por un

und

3,671.15

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0800

16,159.00

1,292.72

Codo 45 presion PVC 1

Ins

und

1.0000

1,892.00

1,892.00

15,032

6,566 Suministro e instal. codo presion PVC 45 1 1/4 ,


pagado por un

und

328.23

5,269.02

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0842

16,159.00

1,360.59

15,033

Codo 45 presion PVC 1 1/4

Ins

und

1.0000

3,422.00

3,422.00

6,567 Suministro e instal. codo presion PVC 45 1 1/2 ,


pagado por un

und

328.23

6,511.97

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0889

16,159.00

1,436.54

15,034

Codo 45 presion PVC 1 1/2

Ins

und

1.0000

4,589.00

4,589.00

6,568 Suministro e instal. codo presion PVC 45 2 ,


pagado por un

und

328.23

9,693.33

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

Codo 45 presion PVC 2"

Ins

und

1.0000

7,591.00

7,591.00

15,035

6,569 Suministro e instal. codo presion PVC 45 2 1/2,


pagado por un

und

328.23

25,824.40

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1143

16,159.00

1,846.97

15,036

Codo 45 presion PVC 2 1/2

Ins

und

1.0000

23,491.00

23,491.00

6,570 Suministro e instal. codo presion PVC 45 3,


pagado por un
2,927

Soldadura para PVC 1/4 gl

und

Ins

und

328.23

27,078.42

0.0056

58,612.00

328.23

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

418

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

Codo 45 presion PVC 3

Ins

15,037

6,571 Suministro e instal. codo presion PVC 45 4,


pagado por un

Cantidad

Vr.Unitario

und

0.0056

28,250.00

158.20

0.1333

16,159.00

2,153.99

und

1.0000

24,438.00

24,438.00

und

Vr.Total

55,351.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0056

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0056

28,250.00

158.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

Codo 45 presion PVC 4

Ins

und

1.0000

51,992.00

51,992.00

15,038

6,572 Losa elevada en concreto 3000 psi e=0.12 m,


reforzada con acero grado 60

328.23

66,470.58

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7200

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7200

14,690.00

10,576.80

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.8000

2,257.00

4,062.60

6,573 Suminstro e instal. de tablon liso de gres vitrificado


33 x 33, pagado en m2

1,057.68

33,178.46

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

Tablon de gres vitrificado 33 x 33

Ins

1.0300

14,776.00

15,219.28

17
804

15,568

6,574 Excavacion mecanica en Material Conglomerado


Bajo agua hasta 6 m

16,099.25

14

Retroexcavadora de orugas

Eqp

HR

0.0500

144,160.00

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

58

Motobomba de 4" o 6"

Eqp

HR

0.7000

11,600.00

8,120.00

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

4,489

6,575 Suministro e instal. de teja ondulada de asbesto


cemento No.6, pagado por m2

7,208.00

21,819.23

No incluye entramado
Gancho teja ondulada de Asbesto cemento 55 mm

Ins

und

1.3000

350.00

455.00

1,067

Teja ondulada de asbesto No.6 eternit

Ins

und

0.6500

20,550.00

13,357.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5400

14,690.00

7,932.60

5,144

Transporte de materiales Tn

Ana

0.0121

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0023

17,120.00

39.38

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0140

2,482.00

34.75

830

6,576 Descapote a mano, retiro lateral, pagado en m2


17
4,489

1,615.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

419

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,577 Tapon H.G 1/2 "

Cantidad

Vr.Unitario

und

Vr.Total

2,136.31

Cuadrilla BB (Instalaciones)

Ins

0.0900

16,159.00

1,454.31

14,020

Cinta teflon

Ins

rl

0.0900

1,000.00

90.00

16,265

Tapon H.G 1/2"

Ins

und

1.0000

592.00

592.00

4,515

6,578 Tapon H.G 3/4 "

und

2,326.31

Cuadrilla BB (Instalaciones)

Ins

0.0900

16,159.00

1,454.31

14,020

Cinta teflon

Ins

rl

0.0950

1,000.00

95.00

16,266

Tapon H.G 3/4"

Ins

und

1.0000

777.00

777.00

4,515

6,579 Tapon H.G 1 "

und

2,679.11

Cuadrilla BB (Instalaciones)

Ins

0.0950

16,159.00

1,535.11

14,020

Cinta teflon

Ins

rl

0.1000

1,000.00

100.00

16,267

Tapon H.G 1"

Ins

und

1.0000

1,044.00

1,044.00

4,515

6,580 Tapon H.G 1 1/4"

und

3,541.11

Cuadrilla BB (Instalaciones)

Ins

0.0950

16,159.00

1,535.11

14,020

Cinta teflon

Ins

rl

0.1500

1,000.00

150.00

16,268

Tapon H.G 1 1/4"

Ins

und

1.0000

1,856.00

1,856.00

4,515

6,581 Tapon H.G 1 1/2"

und

3,571.11

Cuadrilla BB (Instalaciones)

Ins

0.0950

16,159.00

1,535.11

14,020

Cinta teflon

Ins

rl

0.1800

1,000.00

180.00

16,269

Tapon H.G 1 1/2"

Ins

und

1.0000

1,856.00

1,856.00

4,515

6,582 Tapon H.G 2"

und

5,063.90

Cuadrilla BB (Instalaciones)

Ins

0.1000

16,159.00

1,615.90

14,020

Cinta teflon

Ins

rl

0.2000

1,000.00

200.00

16,270

Tapon H.G 2"

Ins

und

1.0000

3,248.00

3,248.00

4,515

6,584 Tapon H.G 2 1/2"

und

9,285.85

Cuadrilla BB (Instalaciones)

Ins

0.1500

16,159.00

2,423.85

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

16,271

Tapon H.G 2 1/2"

Ins

und

1.0000

6,612.00

6,612.00

4,515

6,585 Tapon H.G 3"

und

12,231.44

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

16,272

Tapon H.G 3"

Ins

und

1.0000

9,396.00

9,396.00

4,515

6,586 Tapon H.G 4"

und

19,680.62

Cuadrilla BB (Instalaciones)

Ins

0.1800

16,159.00

2,908.62

14,020

Cinta teflon

Ins

rl

0.3000

1,000.00

300.00

16,273

Tapon H.G 4"

Ins

und

1.0000

16,472.00

16,472.00

4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

420

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,587 Rellenos de excavacion (con material local)


compactado, pagado en M3

Cantidad

Vr.Unitario

Vr.Total

13,841.76

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6400

1,469.00

940.16

41

Vibrocompactador tipo rana

Eqp

HR

0.7000

5,000.00

3,500.00

Cuadrilla AA (Albaileria)

Ins

0.6400

14,690.00

9,401.60

4,489

6,588 Columna en concreto de resistencia 3000 psi ( 0.20


x 0.12 x 1), pagada en ml

27,144.85

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8889

1,469.00

1,305.79

49

Vibrador de concretos

Eqp

HR

0.1500

4,375.00

656.25

1,870

Alambre Negro No 18

Ins

kg

0.1500

3,903.00

585.45

2,197

Repisa Ordinario 3 m

Ins

0.3000

1,500.00

450.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8889

14,690.00

13,057.94

4,867

Paral telescopico 2 a 4 ml

Ins

1.0000

340.00

340.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0240

333,142.66

7,995.42

5,144

Transporte de materiales Tn

Ana

0.0600

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

14,778

Tabla burra cedro macho 0.30

Ins

0.3000

5,000.00

1,500.00

6,589 Mesones en concreto 3000 psi reforzado e=0.08 m


A=0.60m acabado en granito pulido blanco

114,448.10

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1700

1,469.00

1,718.73

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

0.6500

4,300.00

2,795.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

0.6000

3,500.00

2,100.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1900

1,990.00

378.10

4,489

Cuadrilla AA (Albaileria)

Ins

1.1700

14,690.00

17,187.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0600

333,142.66

19,988.56

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

4.8100

3,075.79

14,794.55

5,144

Transporte de materiales Tn

Ana

0.1820

0.00

0.00

6,291

Granito pulido travertino peruano No2, para enchape


mesn, pagado en ml

Ana

1.0000

54,259.04

54,259.04

6,590 Mesones en concreto de 3000 psi E = 0.08 mts, A


= 0.60, pagado ML sin refuerzo

54,717.77

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.9000

1,469.00

2,791.10

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.0000

4,300.00

4,300.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

0.6000

3,500.00

2,100.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.2000

1,990.00

398.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.9000

14,690.00

27,911.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0480

333,142.66

15,990.85

5,144

Transporte de materiales Tn

Ana

0.1820

0.00

0.00

6,591 Muro en dry-wall E = 0.10, pagado M2


6
56
3,832

78,202.14

Sub-Contrato Instalacion

Esp

20.0000

Herramienta Menor 10% M.O. DD

Eqp

HR

Vinilo tipo viniltex

Ins

gal

65,168.45

13,033.69

1.4300

1,763.00

2,521.09

0.0400

45,483.00

1,819.32

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

421

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,064

Cuadrilla DD (Carpinteria)

Ins

16,295

Pared en dry-wall E = 0.10

Ins

6,592 Muro en dry-wall E = 0.15, pagado M2

Cantidad

Vr.Unitario

Vr.Total

1.4300

17,628.00

25,208.04

1.0000

35,620.00

35,620.00

83,002.14

Sub-Contrato Instalacion

Esp

20.0000

69,168.45

13,833.69

Herramienta Menor 10% M.O. DD

Eqp

HR

1.4300

1,763.00

2,521.09

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,064

Cuadrilla DD (Carpinteria)

Ins

1.4300

17,628.00

25,208.04

16,296

Pared en dry-wall E = 0.15

Ins

1.0000

39,620.00

39,620.00

6
56

6,593 Muro en ladrillo estructural. (hueco) e=0.12, pagado


en m2

81,755.06

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0460

248,144.84

11,414.66

2,075

Ladrillo portante prensado

Ins

und

55.0000

950.00

52,250.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

Sika 1 imp. integral

Ins

kg

0.3000

6,438.00

1,931.40

17

14,122

6,594 Mesones en concreto sin refuerzo, E = 0.07 mts,


pagado m2

72,670.54

Herramienta Menor 10% M.O. AA

Eqp

HR

1.9000

1,469.00

2,791.10

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,870

Alambre Negro No 18

Ins

kg

0.3400

3,903.00

1,327.02

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

1.1400

4,300.00

4,902.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

2,237

Esterilla de guadua

Ins

1.2000

3,500.00

4,200.00

3,797

Puntilla con cabeza 2"

Ins

lb

2.0000

1,990.00

3,980.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.9000

14,690.00

27,911.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0700

333,142.66

23,319.99

5,144

Transporte de materiales Tn

Ana

0.0820

0.00

0.00

Durmiente ordinario 3 M

Ins

3.8300

767.00

2,937.61

17

13,326

6,595 Adoquin de gres peatonal (no incluye mortero)

7,362.07

2,902

Adoquin gres 10 x 20 x 2.5

Ins

0.1545

3,684

Agua para obra

Ins

0.4275

10.00

4.28

4,426

Arena lavada de rio

Ins

0.0030

13,800.00

41.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.1575

14,690.00

2,313.68

Color mineral

Ins

kg

0.1545

7,000.00

1,081.50

13,381

6,596 Alistado de pisos e= 0.04, pagado en ml

25,380.00

3,921.21

2,526.74

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0600

1,469.00

88.14

Cemento gris

Ins

kg

2.8500

383.34

1,092.52

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0075

13,800.00

103.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.0600

14,690.00

881.40

5,143

Transporte de materiales m

Ana

0.0075

46,157.00

346.18

5,144

Transporte de materiales Tn

Ana

0.0029

0.00

0.00

17
804

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

422

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,597 Demolicion placas aligeradas de espesor menor a


0.25 metros, pagado en m2

Cantidad

Vr.Unitario

Vr.Total
18,103.25

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.0350

55,550.00

1,944.25

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

4,489

6,598 Demolicion placas macizas de espesor menor a


0.30 metros, pagado en m2

59,312.55

21

Volqueta (6 m3 )

Eqp

HR

0.0410

55,550.00

2,277.55

51

Compresor 125 cpm (2 martillos Neum.)

Eqp

HR

1.0000

35,000.00

35,000.00

Cuadrilla AA (Albaileria)

Ins

1.5000

14,690.00

22,035.00

4,489

6,599 Columna en concreto de resistencia 4000 psi,


pagada en m3

637,659.87

17

Herramienta Menor 10% M.O. AA

Eqp

HR

13.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.6667

4,375.00

2,916.81

2,197

Repisa Ordinario 3 m

Ins

7.2600

1,500.00

10,890.00

3,797

Puntilla con cabeza 2"

Ins

lb

3.0000

1,990.00

5,970.00

4,489

Cuadrilla AA (Albaileria)

Ins

13.5000

14,690.00

198,315.00

4,867

Paral telescopico 2 a 4 ml

Ins

14.0000

340.00

4,760.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

13,641

Seccin de Andamio

Ins

mes

0.2000

17,120.00

3,424.00

14,778

Tabla burra cedro macho 0.30

Ins

2.6400

5,000.00

13,200.00

6,600 Guardaescoba en granitex mediterrneo, pagado


ML

19,831.50

7,478.29

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

804

Cemento gris

Ins

kg

1.2700

383.34

486.84

829

Cemento blanco

Ins

kg

0.3000

975.00

292.50

3,684

Agua para obra

Ins

1.5000

10.00

15.00

4,426

Arena lavada de rio

Ins

0.0150

13,800.00

207.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

Baldosa granitex ext. Mediterrneo

Ins

0.1000

24,372.00

2,437.20

17

15,909

6,601 Losa elevada en concreto 3500 psi e=0.10 m

56,968.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6800

14,690.00

9,989.20

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

0.1000

351,843.89

35,184.39

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

6,602 Extendido manual de material granular o crudo de


rio
17
4,489

998.92

3,231.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

423

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,603 Concreto Ciclopeo para alcantarillas de resistencia


2000 Psi

Cantidad

Vr.Unitario

Vr.Total
376,734.63

Herramienta Menor 10% M.O. AA

Eqp

HR

7.2500

1,469.00

10,650.25

4,489

Cuadrilla AA (Albaileria)

Ins

7.2500

14,690.00

106,502.50

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.6000

311,229.99

186,737.99

5,061

Formaleta (1 uso)

Ana

1.1319

32,375.50

36,645.83

5,063

Piedra rajon o media zonga

Ana

0.4000

90,495.15

36,198.06

17

6,604 Sobreacarreos o transporte de material Petreo (via


pavimentada )
16,311

Volqueta 6 m

m-km

Ins

6,605 Lineas de demarcacion de ancho 12 cm con


pintura acrlica, incluye micro esferas, pagada en
m. (INV. 700.1)

m-km

1,010.00

1.2500

808.00

1,010.00

1,991.20

12

Equipo Delineador de Pintura

Eqp

HR

0.0041

42,000.00

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0041

735.00

3.01

4,489

Cuadrilla AA (Albaileria)

Ins

0.0041

14,690.00

60.23

8,108

Topografo

Ins

0.0041

7,660.00

31.41

8,109

Cadenero

Ins

0.0082

4,957.00

40.65

8,187

Pintura trafico acrlica de demarcacin

Ins

gal

0.0213

79,047.00

1,683.70

6,606 Canaleta en lamina Galvanizada Cal. 20 Au =


0.45m, incluye: accesorios instalacion

172.20

47,980.88

Instalada
48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.8000

3,226.00

2,580.80

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.1500

5,313.00

796.95

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1800

6,805.00

1,224.90

2,502

Anticorrosivo rojo claro

Ins

gal

0.0700

29,750.00

2,082.50

3,838

Esmalte mate supersinttico

Ins

gal

0.0700

50,506.00

3,535.42

13,154

Platina 1/4" x 1 1/4"

Ins

0.5000

4,126.00

2,063.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.8000

32,262.00

25,809.60

16,312

Lamina galvanizada Cal 20

Ins

und

0.2450

40,358.00

9,887.71

6,607 Canaleta en lamina Galvanizada Cal. 18 Au =


0.70m, incluye: accesorios instalacion

79,128.53

Instalada
48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.2500

5,313.00

1,328.25

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2800

6,805.00

1,905.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.1000

29,750.00

2,975.00

3,838

Esmalte mate supersinttico

Ins

gal

0.1000

50,506.00

5,050.60

13,154

Platina 1/4" x 1 1/4"

Ins

0.7500

4,126.00

3,094.50

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

16,313

Lamina galvanizada Cal 18

Ins

und

0.3500

83,676.50

29,286.78

6,608 Canaleta en lamina Galvanizada Cal. 18 Au = 1.0 m,


incluye: accesorios instalacion

101,900.21

Instalada
48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.2000

3,226.00

3,871.20

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.3000

5,313.00

1,593.90

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4000

6,805.00

2,722.00

1,717

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

424

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,502

Anticorrosivo rojo claro

Ins

3,838

Esmalte mate supersinttico

Ins

gal

0.1100

29,750.00

3,272.50

gal

0.1100

50,506.00

13,154

Platina 1/4" x 1 1/4"

5,555.66

Ins

14,752

1.0500

4,126.00

4,332.30

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.2000

32,262.00

38,714.40

16,313

Lamina galvanizada Cal 18

Ins

und

0.5000

83,676.50

41,838.25

6,609 Remates pisos en Granito lavado A=0.40 m.

31,683.92

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3350

1,469.00

1,961.12

804

Cemento gris

Ins

kg

2.9000

383.34

1,111.69

829

Cemento blanco

Ins

kg

2.3000

975.00

2,242.50

3,684

Agua para obra

Ins

0.8000

10.00

8.00

4,426

Arena lavada de rio

Ins

0.0125

13,800.00

172.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.3350

14,690.00

19,611.15

5,143

Transporte de materiales m

Ana

0.0125

46,157.00

576.96

5,144

Transporte de materiales Tn

Ana

0.0052

0.00

0.00

15,874

Dilatacion plstica blanca x 2 mts

Ins

2.0000

1,000.00

2,000.00

16,314

Granito No.2

Ins

bt

0.4000

10,000.00

4,000.00

17

6,610 Correa metlica 2 1/2" +1 5/8" y celosia de


3/8", H= 0.30, A = 0.15 pagado en ML

41,248.10

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1050

8,750.00

918.75

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.7500

3,226.00

2,419.50

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.5000

2,295.00

3,442.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.5500

2,257.00

8,012.35

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.7500

32,262.00

24,196.50

14,795

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1200

5,800.00

696.00

8
48

6,611 Suministro, instal. conexin tanque plastico 2.000


lts (incluye accesorios)

und

1,166,931.93

1,625

Flotador completo (bola de cobre) 2"

Ins

und

1.0000

220,748.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

5,143

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

845,602.85

321,329.08

14,994

Tubo presion RDE 13.5 PVC 1 "

Ins

1.0500

3,923.00

4,119.15

14,999

Tubo presin RDE 21 PVC 2 "

Ins

1.0500

9,802.00

10,292.10

15,023

Codo 90 presion PVC 1"

Ins

und

2.0000

1,176.00

2,352.00

15,026

Codo 90 presion PVC 2"

Ins

und

2.0000

6,926.00

13,852.00

16,234

Tanque plstico 2000 lt

Ins

und

1.0000

545,152.00

545,152.00

6,612 Defensa metalica Norma 730 INV (anclaje e


instalacion)

220,748.00

136,737.60

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8600

1,616.00

1,389.76

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8600

16,159.00

13,896.74

5,138

Excavacion manual en conglomerado

Ana

0.0250

35,065.03

876.63

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

13,735

Guardavia o tramo curvo de 4.13 m (0.08 x 0.31)

Ins

und

0.1350

214,000.00

28,890.00

16,315

Guardavia o tramo recto de 4.13 m (0.08 x 0.31)

Ins

und

0.1315

183,000.00

24,064.50

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

425

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

16,316

Poste metalico de 1.80 m (0.06 x 0.13)

Ins

16,317

Terminal de 0.71 x 0.416

Ins

und

0.3944

89,145.00

35,158.79

und

0.2600

38,800.00

16,318

Amortiguador metalico de 0.38 m (0.06 x 0.13)

10,088.00

Ins

und

16,319

0.3940

17,920.00

7,060.48

Captafaro DVC

Ins

und

0.3940

6,800.00

2,679.20

16,320

Tornillo de Carruaje = 5/8 x 1 1/2" G-2 , T. A.

Ins

und

3.5000

3,300.00

11,550.00

16,321

Cua metalica de 0.06 m (0.06 x 0.13)

Ins

und

0.3940

2,750.00

1,083.50

6,613 Corte en Carpeta Asfaltica con retiro lateral


(Impuesto IDURY)

9,231.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

57

Cortadora concreto (Disco Diaman. 14")

Eqp

HR

0.1200

45,000.00

5,400.00

3,684

Agua para obra

Ins

60.0000

10.00

600.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

Impuesto IDURY corte Pavimento flexible

Ins

0.0000

18,794.00

0.00

16,322

6,614 Piso en rejilla platina de 2" x 1/4", incluye


instalacion

405,333.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

2.0000

8,750.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

4.0000

3,226.00

12,904.00

2,457

Platina 1/4" x 2"

Ins

33.0000

6,649.00

219,417.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.1500

29,750.00

4,462.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

1.5000

6,856.00

10,284.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1500

42,950.00

6,442.50

5,144

Transporte de materiales Tn

Ana

0.0210

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5000

6,200.00

3,100.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

4.0000

32,262.00

129,048.00

6,615 Transporte de materiales a lomo de Mula (Viaje


hasta 100 Kg), en area de influencia petrolera
Aguazul (cupiagua)
16,326

Transporte a lomo de Mula area Aguazul - petrolera

vj

Ins

6,616 Andenes en concreto de resistencia 3000 psi,


espesor 0.10 cm, pagado m2

vj

17,500.00

30,000.00

1.0000

30,000.00

30,000.00

45,359.28

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6600

1,469.00

969.54

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.6600

14,690.00

9,695.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

17

6,617 Estructura metalica Acero ASTM-500 C


(Incluye:Suministro y fabricacion y montaje)

kg

9,144.51

42

Motosoldador Diesel

Eqp

HR

0.0300

14,833.00

444.99

43

Equipo de Oxicorte

Eqp

HR

0.0300

5,000.00

150.00

44

Pulidora electrica manual

Eqp

HR

0.0300

4,350.00

130.50

45

Cilindro

Eqp

HR

0.0300

41.00

1.23

62

Grua Telescopica

Eqp

HR

0.0013

579,600.00

753.48

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.0300

4,443.00

133.29

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0200

6,805.00

136.10

1,717

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

426

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.0367

44,428.00

1,630.51

16,346

Acero ASTM - 500 C

Ins

kg

1.0000

5,625.00

5,625.00

6,618 Zaranda en Varilla de 1" seleccion de material

und

1,111,071.46

43

Equipo de Oxicorte

Eqp

HR

0.8000

5,000.00

4,000.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

45

Cilindro

Eqp

HR

0.5800

41.00

23.78

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0000

3,226.00

6,452.00

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

1.0000

5,313.00

5,313.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.5000

6,805.00

10,207.50

8,194

Acero de refuerzo 60000 Psi

Ins

kg

450.0000

2,257.00

1,015,650.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0100

6,200.00

62.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0000

32,262.00

64,524.00

6,619 Dique, construccion con material de sitio,


seleccionado y mezclado con arcilla relacion 1:6

30,582.74

Compactador Vibratorio

Eqp

HR

0.0278

100,000.00

2,780.00

Motoniveladora

Eqp

HR

0.0278

132,800.00

3,691.84

11

Carrotanque de Agua

Eqp

HR

0.0278

53,125.00

1,476.88

14

Retroexcavadora de orugas

Eqp

HR

0.0333

144,160.00

4,800.53

21

Volqueta (6 m3 )

Eqp

HR

0.0667

55,550.00

3,705.19

5,143

Transporte de materiales m

Ana

0.2000

46,157.00

9,231.40

6,618

Zaranda en Varilla de 1" seleccion de material

Ana

und

0.0008

1,111,071.46

888.86

8,144

Oficial de Construccion

Ins

0.0278

9,282.00

258.04

arcilla

Ins

0.2000

18,750.00

3,750.00

14,256

6,620 Geo-estructura o Geotubo H=1.4 m W=3.90 m,


L=34.40 m

und

9,337,805.60

14

Retroexcavadora de orugas

Eqp

HR

16.0000

144,160.00

2,306,560.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

20.0000

1,469.00

29,380.00

21

Volqueta (6 m3 )

Eqp

HR

12.0000

55,550.00

666,600.00

4,489

Cuadrilla AA (Albaileria)

Ins

20.0000

14,690.00

293,800.00

5,144

Transporte de materiales Tn

Ana

1.2380

0.00

0.00

15,528

Arena de rio (sucia)

Ins

0.0000

7,250.00

0.00

16,349

Geo-estructura H=1.4 m W=3.90m

Ins

34.4000

175,624.00

6,041,465.60

6,621 Geo-estructura o Geotubo H=1.4 m W=3.90 m

271,443.51

14

Retroexcavadora de orugas

Eqp

HR

0.4651

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5814

1,469.00

854.08

21

Volqueta (6 m3 )

Eqp

HR

0.3488

55,550.00

19,375.84

4,489

Cuadrilla AA (Albaileria)

Ins

0.5814

14,690.00

8,540.77

5,144

Transporte de materiales Tn

Ana

0.0360

0.00

0.00

15,528

Arena de rio (sucia)

Ins

0.0000

7,250.00

0.00

16,349

Geo-estructura H=1.4 m W=3.90m

Ins

1.0000

175,624.00

175,624.00

67,048.82

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

427

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,622 Geo-estructura o Geotubo H=1.25 m W=3.07 m

Cantidad

Vr.Unitario

Vr.Total

216,061.25

14

Retroexcavadora de orugas

Eqp

HR

0.3224

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4030

1,469.00

592.01

21

Volqueta (6 m3 )

Eqp

HR

0.2418

55,550.00

13,431.99

4,489

Cuadrilla AA (Albaileria)

Ins

0.4030

14,690.00

5,920.07

5,144

Transporte de materiales Tn

Ana

0.0300

0.00

0.00

15,528

Arena de rio (sucia)

Ins

0.0000

7,250.00

0.00

16,350

Geo-estructura H=1.25 m W=3.07m

Ins

1.0000

149,640.00

149,640.00

6,623 Manto antisocavacion Le=6.90 m

46,477.18

40,671.75

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,144

Transporte de materiales Tn

Ana

0.0045

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

0.3500

2,257.00

789.95

15,528

Arena de rio (sucia)

Ins

0.0000

7,250.00

0.00

16,351

Manto Antisocavacion Le=6.90 m

Ins

1.0000

36,650.00

36,650.00

17

6,624 Cerca poste en concreto, alambre pua cal.12, c/2.0


m, hp = 2.00 m, 5 hilos

14,147.60

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.2283

2,010.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0000

22,829.00

0.00

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0270

16,458.20

444.37

5,144

Transporte de materiales Tn

Ana

0.0240

0.00

0.00

8,146

Poste cerca 10 x 10 cm 210 kg/cm2

Ins

und

0.5000

12,000.00

6,000.00

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0500

5,000.00

250.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.2283

20,097.00

4,588.15

15,655

Alambre de puas galvanizado Cal. 12

Ins

5.3000

454.00

2,406.20

69
324

6,625 Pintura epoxica para muros a dos manos, pagado


por m2

458.88

30,691.38

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0050

1,691.00

8.46

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

Sika Guard 68 mate x 9 kg

Ins

kg

1.0800

24,969.00

26,966.52

61

16,357

6,626 Acometida red hidraulica pvc 2" x 20 ml, pagado


UN

und

337.80

520,602.38

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

4,515

Cuadrilla BB (Instalaciones)

Ins

13,607

Sub-Contrato Hidraulico Sanitario

Esp

13,941

Registro paso directo de 2"

Ins

und

14,999

Tubo presin RDE 21 PVC 2 "

Ins

15,053

Adaptador macho presin PVC 2"

Ins

und

55

6,627 Sifon Sanitario =4" 135 C x E. Suministro e


Instal.

und

2.5000

16,159.00

40,397.50

38.0000

377,248.10

143,354.28

1.0000

120,000.00

120,000.00

20.0000

9,802.00

196,040.00

4.0000

3,460.00

13,840.00

27,531.78

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

428

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

2,927

Soldadura para PVC 1/4 gl

Ins

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0060

58,612.00

351.67

und

0.0060

28,250.00

4,515

Cuadrilla BB (Instalaciones)

169.50

Ins

15,423

0.2667

16,159.00

4,309.61

Sifon Sanitario 4" 135 C x E

Ins

und

1.0000

14,006.00

14,006.00

15,454

Codo Sanitario 45-1/8 C x C PVC 4"

Ins

und

1.0000

8,695.00

8,695.00

6,628 Losa elevada en concreto 3000 psi e=0.10 m

55,236.11

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6800

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

2,198

Durmiente ordinario 4 M

Ins

0.1000

3,500.00

350.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1600

2,480.00

396.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.6800

14,690.00

9,989.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1100

333,142.66

36,645.69

5,822

Formaleta entrepiso, pagado en m2

Ana

0.2500

16,657.60

4,164.40

Seccin de Andamio

Ins

mes

0.0300

17,120.00

513.60

13,641

6,629 Losa en concreto 3000 psi e=0.07 m tipo metaldeck


- terraza

998.92

77,451.78

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1500

4,375.00

656.25

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1300

6,805.00

884.65

4,489

Cuadrilla AA (Albaileria)

Ins

0.6700

14,690.00

9,842.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0750

333,142.66

24,985.70

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

Corpalosa 0.70 mm

Ins

1.1000

26,405.00

29,045.50

14,981

6,630 Pozo septico con FAFA en poilietileno lineal, para


soluciones individuales, pagado por unidad

und

2,203.50

1,232,425.00

Herramienta Menor 10% M.O. BB

Eqp

HR

23.0000

1,616.00

37,168.00

4,515

Cuadrilla BB (Instalaciones)

Ins

23.0000

16,159.00

371,657.00

5,144

55

Transporte de materiales Tn

Ana

1.0000

0.00

0.00

16,376

Tanque 500 lt, 25 kg zeolita FAFA grava 0.3 m3 FA

Ins

und

1.0000

725,000.00

725,000.00

16,377

Biotecnologia para arranque

Ins

und

1.0000

29,000.00

29,000.00

16,378

Tuberias internas para distribucin

Ins

und

1.0000

69,600.00

69,600.00

6,631 Punto desage sanitario pvc 4", tubo de 6 ml,


pagado un

und

171,136.99

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

1.1000

1,616.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0900

58,612.00

5,275.08

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

1.3700

7,729.00

10,588.73

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1000

16,159.00

17,774.90

5,144

Transporte de materiales Tn

Ana

0.0036

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

38.0000

124,012.31

47,124.68

15,439

Tubo PVC sanitario de 4"

Ins

6.0000

14,766.00

88,596.00

55

6,632 Suministro e instal. tanques: septico, anaerobio


(incluye falso fondo) y trampa de grasas, inc. acc.
de conexion

%
m

und

1,777.60

1,815,101.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

429

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

8.0000

1,616.00

12,928.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.1000

58,612.00

5,861.20

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.2500

28,250.00

7,062.50

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

2.0000

7,729.00

15,458.00

4,515

55

Cuadrilla BB (Instalaciones)

Ins

8.0000

16,159.00

129,272.00

14,792

Codo sanitario 90 1/4 C x C PVC 2"

Ins

und

1.0000

1,936.00

1,936.00

15,437

Tubo PVC sanitario de 2"

Ins

0.5500

7,092.00

3,900.60

15,439

Tubo PVC sanitario de 4"

Ins

1.2500

14,766.00

18,457.50

15,454

Codo Sanitario 45-1/8 C x C PVC 4"

Ins

und

2.0000

8,695.00

17,390.00

15,487

Yee Sanitaria PVC 4 "

Ins

und

2.0000

14,983.00

29,966.00

15,494

Codo reventilado PVC 4 x 2 "

Ins

und

2.0000

16,235.00

32,470.00

16,379

Sistema de tratamiento in situ ovoide (tanques PVC

Ins

und

1.0000

1,540,400.00

1,540,400.00

6,633 Acometida a gas domiciliario 18 ml, pagado por UN

und

503,412.81

Sub-Contrato Instalacion

Esp

25.0000

402,730.25

3,304

Union Universal galvanizada 1/2"

Ins

und

1.0000

4,640.00

4,640.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.7500

16,159.00

28,278.25

5,144

100,682.56

Transporte de materiales Tn

Ana

2.0000

0.00

0.00

13,916

Regulador gas r - 4 e 4 m3

Ins

und

1.0000

25,000.00

25,000.00

15,892

Codo H.G. 90 1/2"

Ins

und

1.0000

858.00

858.00

15,893

Tuberia para Gas en polietileno de 1/2"

Ins

18.0000

1,786.00

32,148.00

15,894

Tuberia Acero galvanizada =1/2" gas

Ins

18.0000

7,927.00

142,686.00

15,895

Valvula de bola para gas 1/2"

Ins

und

1.0000

11,890.00

11,890.00

15,897

Tee reducida polietileno 1 x 1/2

Ins

und

1.0000

23,350.00

23,350.00

15,898

Medidor de gas 2.5

Ins

und

1.0000

125,000.00

125,000.00

15,899

Loctigas F/media 36 ml

Ins

und

0.0600

13,000.00

780.00

15,900

Elevador para gas de 1/2"

Ins

und

1.0000

8,100.00

8,100.00

6,634 Losa elevada en concreto 3000 psi e=0.04 m,


reforzada con malla Q8

68,996.72

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

49

Vibrador de concretos

Eqp

HR

0.2200

4,375.00

962.50

54

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

5,061

Formaleta (1 uso)

Ana

0.2500

32,375.50

8,093.88

Malla Electrosoldada Q-8 o M-378 (2.35 x 6 m)

Ins

und

0.0710

176,854.00

12,556.63

13,904

6,635 Suministro e instal. puerta ventana lmina coll roll


18 pintada, pagado m2

137,891.73

Sub-Contrato Ornamentacion

Esp

50.0000

91,927.82

45,963.91

Herramienta Menor 10% M.O. DD

Eqp

HR

0.8000

1,763.00

1,410.40

1,519

Bisagra alum. EXT 3"

Ins

und

1.7500

2,500.00

4,375.00

1,990

Disolvente Thinner

Ins

gal

0.2500

12,440.00

3,110.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

0.5500

88,083.67

48,446.02

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

1.0500

2,700.00

2,835.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.2300

29,750.00

6,842.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.2300

42,950.00

9,878.50

5,064

Cuadrilla DD (Carpinteria)

Ins

0.8000

17,628.00

14,102.40

5,144

Transporte de materiales Tn

Ana

0.2410

0.00

0.00

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1600

5,800.00

928.00

7
56

14,795

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

430

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,636 Pasos Pref. escalera L/1, Long 1.10, ancho 0.25,


contrahuella 0.17, recubierta en granito, pagado en
un

Cantidad

Vr.Unitario

und

Vr.Total

114,203.26

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8000

1,469.00

2,644.20

Paso escalera granito, pagado en ml

Ana

1.0000

67,393.24

67,393.24

1,870

Alambre Negro No 18

Ins

kg

0.1200

3,903.00

468.36

2,200

Tabla burra ordinario 0.30

Ins

0.1100

4,333.00

476.63

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

1.8000

14,690.00

26,442.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0300

333,142.66

9,994.28

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.9700

2,257.00

6,703.29

Durmiente ordinario 3 M

Ins

0.0800

767.00

61.36

17
618

13,326

6,637 Relleno zona de atraque de tuberia con sub - base


granular, pagado por m3
4
769
5,143

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0160

111,550.00

1,784.80

Sub-base granular seleccionada o clasificada

Ins

1.0000

18,753.00

18,753.00

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

6,638 Relleno zona de atraque de tuberia con recebo,


pagado por m3
4
5,143
14,759

66,694.80

57,941.80

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0160

111,550.00

1,784.80

Transporte de materiales m

Ana

1.0000

46,157.00

46,157.00

Recebo comun

Ins

1.0000

10,000.00

10,000.00

6,639 Manometro de rango 0 - 80 Psi con accesorios de


conexion. Suministro e Instal.

und

46,151.25

Herramienta Menor 5% M.O. BB

Eqp

HR

0.7500

808.00

606.00

Cuadrilla BB (Instalaciones)

Ins

0.7500

16,159.00

12,119.25

13,952

Manometro 0 - 80 Psi

Ins

und

1.0000

33,176.00

33,176.00

14,020

Cinta teflon

Ins

rl

0.2500

1,000.00

250.00

109
4,515

6,640 Suministro e instal. divisin para oficina en


aluminio, pao y vidrio, pagado m2

Sub-Contrato Instalacion

Esp

22.0000

196,000.00

Transporte de materiales Tn

Ana

0.6000

0.00

0.00

16,388

Tee proyectante

Ins

2.0000

11,000.00

22,000.00

16,389

Jamba 3831

Ins

2.0000

16,000.00

32,000.00

16,390

Sillar 3831

Ins

2.0000

17,000.00

34,000.00

16,391

Pisa vidrio

Ins

6.0000

7,500.00

45,000.00

16,392

Pao escorial

Ins

2.0000

24,000.00

48,000.00

16,393

Zocalo 3 x 1/2"

Ins

1.0000

15,000.00

15,000.00

6
5,144

6,641 Desmonte malla cerramiento, pagada por m2

239,120.00

43,120.00

2,171.40

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

21

Volqueta (6 m3 )

Eqp

HR

0.0100

55,550.00

555.50

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

4,489

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

431

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,642 Alfaja en concreto 3000 psi a=0.60 m, e=0.10 m,


reforzada con acero grado 37000

Cantidad

Vr.Unitario

Vr.Total
92,018.21

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

0.6500

4,300.00

2,795.00

2,208

Tabla chapa ordinario 0.10

Ins

0.4600

2,667.00

1,226.82

3,797

Puntilla con cabeza 2"

Ins

lb

0.1900

1,990.00

378.10

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

9.2000

3,092.35

28,449.62

5,144

Transporte de materiales Tn

Ana

0.0820

0.00

0.00

6,643 Muro en bloque No. 4 e=0.10 m

35,358.82

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1900

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

2,054

Bloque No. 4

Ins

und

13.2700

841.50

11,166.71

4,489

Cuadrilla AA (Albaileria)

Ins

1.1900

14,690.00

17,481.10

5,144

Transporte de materiales Tn

Ana

0.0620

0.00

0.00

17

6,644 Muro en bloque No. 5 e=0.12 m

1,748.11

27,643.59

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0100

248,144.84

2,481.45

2,053

Bloque No. 5

Ins

und

13.2700

922.00

12,234.94

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0620

0.00

0.00

17

6,645 Muro en bloque No. 5 e=0.23 m

46,427.70

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

2,053

Bloque No. 5

Ins

und

26.6500

922.00

24,571.30

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

6,647 Cercha h=0.30m a=0.18m 3N6 celosa N4 c/0.30 m


instalada

46,226.57

Sub-Contrato Ornamentacion

Esp

30.0000

35,558.90

10,667.67

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0450

29,750.00

1,338.75

4,489

Cuadrilla AA (Albaileria)

Ins

0.6666

14,690.00

9,792.35

5,144

Transporte de materiales Tn

Ana

0.0100

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

9.9000

2,257.00

22,344.30

Soldadura electrosoldada 6012 de 1/8"

Ins

kg

0.1200

5,800.00

696.00

14,795

6,648 Puerta en tubo cuadrado 1" y rectangular 2" cal.18


pintada e instalada

138,614.88

Coninstalacin
Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

Tubo cuadrado de 1" Cal. 18

Ins

7.0000

2,860.00

20,020.00

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6000

6,805.00

4,083.00

8
449

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

432

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,850

Segueta Ncholson

Ins

und

1,990

Disolvente Thinner

Ins

gal

2,474

Angulo o perfil 3/4" x 3/4" x 1/8"

Ins

2,502

Anticorrosivo rojo claro

Ins

gal

3,837

Esmalte Sintetico Pintuco

Ins

5,064

Cuadrilla DD (Carpinteria)

5,066

Cuadrilla CC (Pintura)

6,031
16,397

Vr.Unitario

Vr.Total

0.0600

2,500.00

150.00

0.0150

12,440.00

186.60

2.4500

2,700.00

6,615.00

0.0250

29,750.00

743.75

gal

0.0250

42,950.00

1,073.75

Ins

1.2500

17,628.00

22,035.00

Ins

0.2500

16,893.00

4,223.25

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Tubo rectangular 2" x 1" cal. 18

Ins

und

2.4500

25,878.00

63,401.10

6,649 Flanche lamina galvanizada cal. 22 A = 0.35


instalado
7
2,932
15,746

Cantidad

Sub-Contrato Ornamentacion

Esp

80.0000

16,372.80

13,098.24

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.3500

20,300.00

7,105.00

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.2000

46,339.00

9,267.80

6,650 Dilatacion en granito a=0.10, bordes en


dilataciones de bronce

29,471.04

19,356.09

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

804

Cemento gris

Ins

kg

1.8700

383.34

716.85

829

Cemento blanco

Ins

kg

2.1000

975.00

2,047.50

2,448

Dilatacin en bronce PC 09

Ins

2.0000

3,735.00

7,470.00

2,486

Marmolina 20 kg

Ins

bt

0.0500

12,800.00

640.00

3,684

Agua para obra

Ins

0.7410

10.00

7.41

4,426

Arena lavada de rio

Ins

0.0090

13,800.00

124.20

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

5,527

17

440.70

Pulida piso granito, pagado en m2

Ana

0.1000

10,467.76

1,046.78

13,381

Color mineral

Ins

kg

0.1650

7,000.00

1,155.00

14,720

Granito travertino peruano No.3

Ins

bt

0.0750

17,342.00

1,300.65

6,651 Desmonte cubiertas asbesto cemento con


transporte, pagado en m2
21
4,489

7,184.50

Volqueta (6 m3 )

Eqp

HR

0.0500

55,550.00

2,777.50

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

6,652 Ceramica duropiso 33*33

39,712.30

15

Pegacor blanco

Ins

kg

4.0000

1,120.00

4,480.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

3,684

Agua para obra

Ins

1.6000

10.00

16.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,144

Transporte de materiales Tn

Ana

0.0311

0.00

0.00

16,411

Concolor boquilla lista blanco nacar

Ins

kg

0.3500

2,600.00

910.00

16,412

Ceramica duropiso 33.8*33.8

Ins

1.0500

21,900.00

22,995.00

6,653 Rejilla metalica A=0.5m ngulo 2"*3/16" varilla No.


5 c/0.04 m

101,276.20

Herramienta Menor 10% M.O. DD

Eqp

HR

1.4000

1,763.00

2,468.20

2,476

Angulo o perfil 2" x 2 "x 3/16"

Ins

2.3000

11,287.50

25,961.25

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.4000

17,628.00

24,679.20

56

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

433

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
8,194
14,116

Nombre

Tipo U.M.

Acero de refuerzo 60000 Psi

Ins

Soldadura electrosoldada 6013 de 1/8"

Ins

6,654 Zocalo de gres biselado 10*25 cm

Cantidad

Vr.Unitario

Vr.Total

kg

19.4000

2,257.00

43,785.80

kg

0.5500

6,885.00

3,786.75

9,100.59

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

Cemento gris

Ins

kg

1.0900

383.34

417.84

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

Transporte de materiales Tn

Ana

0.0005

0.00

0.00

Tableta zcalo de gres 10*25 cm

Ins

1.0000

4,500.00

4,500.00

17
804

16,416

6,655 Porton tubo 2" y malla eslabonada cal 10, angulo


de 1" x 3/16" y platina 1"*3/16"

129,322.80

Sub-Contrato Ornamentacion

Esp

50.0000

86,215.20

43,107.60

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

2.7000

5,481.00

14,798.70

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.0000

6,885.00

6,885.00

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

15,619

Tubo cerramiento Galvanizado =2"

Ins

2.2000

10,833.00

23,832.60

16,231

Platina 3/16" x 1"

Ins

2.7000

3,362.00

9,077.40

16,420

Juego Bisagra tipo mueca para tubo galvanizado 2"

Ins

und

0.2900

15,000.00

4,350.00

7
56

6,656 Malla eslabonada cal 10, brazo portapas, alambre


pas 3 lneas, ngulo 1"*1/8",platina1/2"*1/8",
anticorrosivo/esmalte

Sub-Contrato Ornamentacion

Esp

50.0000

18,159.80

9,079.90

2,455

Platina 1/8" x 1/2"

Ins

0.3500

1,668.00

583.80

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

1.6000

2,422.00

3,875.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0100

42,950.00

429.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.1000

6,885.00

688.50

15,556

Malla eslabonada Cal. 10

Ins

1.0500

10,020.00

10,521.00

15,619

Tubo cerramiento Galvanizado =2"

Ins

0.1000

10,833.00

1,083.30

15,655

Alambre de puas galvanizado Cal. 12

Ins

1.5000

454.00

681.00

6,657 Pintura interior vinilo s/paete bajo placa 2 manos

27,239.70

7,212.02

Sub-Contrato Pintura

Esp

45.0000

4,973.81

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1700

1,469.00

249.73

3,832

Vinilo tipo viniltex

Ins

gal

0.0400

45,483.00

1,819.32

5,066

Cuadrilla CC (Pintura)

Ins

0.1700

16,893.00

2,871.81

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
17

6,658 Correa metlica de 4 ng de 1*3/16"+ 2 de 1*1/8"


celosa de 0.30, H=0.30 con anticorrosivo
7

Sub-Contrato Ornamentacion

Esp

2,238.21

72,647.10

50.0000

48,431.40

24,215.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

434

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

1,850

Segueta Ncholson

Ins

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

2,502

Anticorrosivo rojo claro

4,489

und

0.0400

2,500.00

100.00

4.7000

2,422.00

11,383.40

Ins

gal

0.1000

29,750.00

2,975.00

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

4.2000

5,481.00

23,020.20

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.4600

6,885.00

3,167.10

6,659 Correa metlica de 4 ng de 1*3/16"+ 2 de 1*1/8" y


celosa de 0.20, H=0.25 con anticorrosivo

Vr.Total

67,743.34

Sub-Contrato Ornamentacion

Esp

40.0000

48,388.10

1,850

Segueta Ncholson

Ins

und

0.0300

2,500.00

75.00

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

5.6000

2,422.00

13,563.20

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

4.2000

5,481.00

23,020.20

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.4000

6,885.00

2,754.00

6,660 Correa metlica de 4 ng de 1*3/16"+ 2 de 1*1/8" y


celosa de 0.25, H=0.25 con anticorrosivo

19,355.24

70,337.73

Sub-Contrato Ornamentacion

Esp

50.0000

46,891.82

1,850

Segueta Ncholson

Ins

und

0.0400

2,500.00

100.00

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

4.3100

2,422.00

10,438.82

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.5300

14,690.00

7,785.70

13,730

Angulo o perfil 1" x 1" x 3/16"

Ins

4.2000

5,481.00

23,020.20

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.4600

6,885.00

3,167.10

6,661 Demolicion pedestales, columnas, en mampostera


con retiro

23,445.91

52,650.02

17

Herramienta Menor 10% M.O. AA

Eqp

HR

2.8000

1,469.00

21

Volqueta (6 m3 )

Eqp

HR

0.1333

55,550.00

7,404.82

Cuadrilla AA (Albaileria)

Ins

2.8000

14,690.00

41,132.00

4,489

6,662 Suministro e instalacin de Lmina de icopor


texturizado 18 mm para cielo raso

4,113.20

5,561.93

Herramienta menor 5% M.O. DD

Eqp

HR

0.0500

881.00

44.05

Cuadrilla DD (Carpinteria)

Ins

0.0500

17,628.00

881.40

13,641

Seccin de Andamio

Ins

mes

0.0006

17,120.00

10.27

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0025

2,482.00

6.21

16,457

Lamina icopor texturizado 18mm

Ins

und

1.4000

3,300.00

4,620.00

120
5,064

6,663 Boveda acrilico 4mm color humo 2.6*1.1 mt

Sub-Contrato Instalacion

Esp

7.0000

233,184.56

16,322.92

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

16,435

Silicona para policarbonato o acrlico

Ins

und

0.0230

28,000.00

644.00

16,460

Bveda traslapable 2.6*1.1 acrlico humo 4mm

Ins

und

0.3000

628,488.00

188,546.40

16,461

Tmpano de remate 2.6*1.1 acrlico humo 4mm

Ins

und

0.0700

628,488.00

43,994.16

6
5,144

6,664 Placa base en concreto 3000 psi e=0.15 m


reforzado con malla electrosoldada

249,507.48

73,457.17

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

435

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

2,208

Tabla chapa ordinario 0.10

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,144

Transporte de materiales Tn

Ana

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

17

14,779

6,665 Pedestal en concreto impermeabilizado 2500 psi,


pagado en m3

Cantidad

Vr.Unitario

Vr.Total

HR

0.7700

1,469.00

1,131.13

1.0200

2,667.00

2,720.34

0.7700

14,690.00

11,311.30

0.1500

333,142.66

49,971.40

0.0100

0.00

0.00

1.0000

8,323.00

8,323.00

422,410.24

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

2,195

Planchon ordinario 3 M

Ins

3.0000

3,200.00

9,600.00

2,243

Vara de clavo 3M -1

Ins

0.5000

1,500.00

750.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.0000

600.00

1,800.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0000

14,690.00

73,450.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

1.0000

318,473.24

318,473.24

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

Plastocrete DM

Ins

kg

1.5000

6,612.00

9,918.00

15,734

6,666 Revisin, Ajuste y correccin de fugas punto


desage sifn 3" incluye rejilla 3"*4" sosco

und

7,345.00

35,033.04

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0300

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0300

28,250.00

847.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

50.0000

23,355.36

11,677.68

14,020

Cinta teflon

Ins

rl

1.0000

1,000.00

1,000.00

15,438

Tubo PVC sanitario de 3"

Ins

0.1000

10,595.00

1,059.50

15,843

Rejilla sifn 3 x 4 plstica con sosco

Ins

und

1.0000

4,000.00

4,000.00

6,667 Impermeabilizacin terrazas transitables con


sikatecho E (4 capas) + sikafelt (2 capas) + capa
mortero imp 1:3 e=0.03m

1,758.36

44,175.33

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7272

1,469.00

1,068.26

4,489

Cuadrilla AA (Albaileria)

Ins

1.1200

14,690.00

16,452.80

4,957

17

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0300

430,750.59

12,922.52

15,778

Polietileno Cal. 8

Ins

1.1000

1,875.00

2,062.50

16,421

Sikatecho E * 3.5 kg

Ins

und

0.7000

9,947.00

6,962.90

16,422

Sikafelt rollo 1.2m*40 m

Ins

und

0.0490

96,048.00

4,706.35

6,668 Perfil estructural circular 2 1/2"*3 mm para


estructura de cubierta, instalado.

48,011.45

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1250

8,750.00

1,093.75

Equipo de Oxicorte

Eqp

HR

0.1250

5,000.00

625.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1200

6,805.00

816.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

14,745

Oxigeno Industrial

Ins

0.1500

15,662.00

2,349.30

14,746

Acetileno

Ins

kg

0.0500

41,820.00

2,091.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.6200

11,436.00

7,090.32

16,438

Tubo estructural redondo 2 1/2" 3mm * 6m

Ins

und

0.1700

186,717.53

31,741.98

8
43

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

436

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,669 Perfil estructural circular 4"*5 mm para estructura


de cubierta, instalado.

Cantidad

Vr.Unitario

Vr.Total

92,102.60

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

1,750.00

Equipo de Oxicorte

Eqp

HR

0.2000

5,000.00

1,000.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1920

6,805.00

1,306.56

4,489

Cuadrilla AA (Albaileria)

Ins

0.2400

14,690.00

3,525.60

14,745

Oxigeno Industrial

Ins

0.2400

15,662.00

3,758.88

14,746

Acetileno

Ins

kg

0.0800

41,820.00

3,345.60

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

1.0000

11,436.00

11,436.00

16,478

Tubo estructural redondo 4"*5mm*6 mt

Ins

und

0.1700

388,117.41

65,979.96

8
43

6,670 Platina apoyo fijo 0.25*0.25 m lmina HR 1/4" con 4


perforaciones y 4 pernos 3/4"*500mm, tuerca
contratuerca instalada.

und

142,670.97

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3400

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0300

6,805.00

204.15

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

14,742

Lamina HR 1/4"

Ins

0.0625

125,317.09

7,832.32

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.5000

11,436.00

5,718.00

16,471

Corte en lmina HR 1/4"

Ins

0.7500

20,000.00

15,000.00

16,474

Perforacin de 3/4" en lmina HR 1/4"

Ins

und

4.0000

1,200.00

4,800.00

16,491

Perno anclaje 3/4" tuerca, contratuerca L=500 mm

Ins

und

4.0000

25,250.00

101,000.00

6,671 Platina apoyo mvil 0.25*0.25 m lmina HR 1/2" con


4 perforaciones 3/4" instalada.

8,750.00

und

2,975.00

54,090.07

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.6000

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3100

6,805.00

2,109.55

14,945

Lamina HR 1/2"

Ins

0.0625

250,702.65

15,668.92

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.6000

11,436.00

6,861.60

16,471

Corte en lmina HR 1/4"

Ins

0.7500

20,000.00

15,000.00

16,475

Perforacin de 3/4" en lmina HR 1/2"

Ins

und

4.0000

2,300.00

9,200.00

8
1,717

6,672 Perfil estructural tipo cajn de 203.2*63.5*3 mm


pintado e instalado

8,750.00

108,285.92

Sub-Contrato Ornamentacion

Esp

50.0000

72,190.61

36,095.31

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.8000

6,805.00

5,444.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0350

29,750.00

1,041.25

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

Perln tipo cajn 203.2*63.5*3mm (2P 8-11 acesco)

Ins

und

0.1600

398,031.99

63,685.12

16,494

6,673 Viga canal, en concreto de resistencia 3000 psi,


pagada en m3

5,250.00

710,830.36

17

Herramienta Menor 10% M.O. AA

Eqp

HR

19.1000

1,469.00

28,057.90

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

2,197

Repisa Ordinario 3 m

Ins

5.2000

1,500.00

7,800.00

2,200

Tabla burra ordinario 0.30

Ins

8.0500

4,333.00

34,880.65

2,243

Vara de clavo 3M -1

Ins

4.7400

1,500.00

7,110.00

3,797

Puntilla con cabeza 2"

Ins

lb

1.5000

1,990.00

2,985.00

4,489

Cuadrilla AA (Albaileria)

Ins

19.1000

14,690.00

280,579.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

437

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

Ana

6,674 Muro en bloque No. 4 e=0.23 m

Cantidad

Vr.Unitario

Vr.Total

1.0000

333,142.66

333,142.66

0.3000

32,375.50

9,712.65

44,282.38

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

2,054

Bloque No. 4

Ins

und

26.6500

841.50

22,425.98

4,489

Cuadrilla AA (Albaileria)

Ins

1.1500

14,690.00

16,893.50

5,144

Transporte de materiales Tn

Ana

0.0750

0.00

0.00

6,675 Impermeabilizacin terrazas transitables con Igasol


cubierta 4capas) + sikafelt (2 capas) + capa
mortero imp 1:3 e=0.03m

50,427.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7272

1,469.00

1,068.26

4,489

Cuadrilla AA (Albaileria)

Ins

1.1200

14,690.00

16,452.80

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0300

430,750.59

12,922.52

15,778

Polietileno Cal. 8

Ins

1.1000

1,875.00

2,062.50

16,422

Sikafelt rollo 1.2m*40 m

Ins

und

0.0490

96,048.00

4,706.35

16,501

Igasol cubierta * 3.5 kg

Ins

und

0.7000

18,879.00

13,215.30

17

6,676 Suministro e instal. bajante latn 10 x 6 cms.


pagado ml

32,927.36

Sub-Contrato Ornamentacion

Esp

80.0000

18,292.98

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4400

1,469.00

646.36

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.1400

20,300.00

2,842.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.4400

14,690.00

6,463.60

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.1800

46,339.00

8,341.02

7
17

15,746

6,677 Desmonte de alfombra

14,634.38

2,403.72

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0800

1,469.00

117.52

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.0800

14,690.00

1,175.20

4,489

6,678 Demolicion muro drywall incluye retiro

5,150.75

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

4,489

6,679 Picado superficie muro paetado

4,317.50

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

21

Volqueta (6 m3 )

Eqp

HR

0.0050

55,550.00

277.75

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

4,489

6,680 Piso en porcelanato 50 x 50, pagado m2

57,909.72

15

Pegacor blanco

Ins

kg

6.0000

1,120.00

6,720.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

3,684

Agua para obra

Ins

3.5000

10.00

35.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

438

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,144

Transporte de materiales Tn

Ana

0.1320

0.00

0.00

16,505

Porcelanatto 60*60 brillante

Ins

1.0000

37,800.00

37,800.00

16,506

Concolor boquilla lista para porcelanato

Ins

kg

0.0600

3,820.00

229.20

6,681 Cornisa de yeso


61
5,066
16,507

13,332.80

Herramienta menor 10% M.O. CC

Eqp

HR

0.4000

1,689.00

675.60

Cuadrilla CC (Pintura)

Ins

0.4000

16,893.00

6,757.20

Cornisa de yeso

Ins

1.0000

5,900.00

5,900.00

6,682 Lavado de pisos con cido

3,529.20

19

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

41

Acido muriatico

Ins

gal

0.0500

32,000.00

1,600.00

Ayudante de construccion

Ins

0.3500

5,407.00

1,892.45

8,145

6,683 Esmalte sobre muro

11,923.73

Sub-Contrato Pintura

Esp

45.0000

8,223.26

3,700.47

Herramienta menor 10% M.O. CC

Eqp

HR

0.3300

1,689.00

557.37

1,990

Disolvente Thinner

Ins

gal

0.0300

12,440.00

373.20

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0400

42,950.00

1,718.00

5,066

Cuadrilla CC (Pintura)

Ins

0.3300

16,893.00

5,574.69

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

5
61

6,684 Puerta en Vidrio templado 10 mm con zcalos de


aluminio inf y sup manija doble vertical de aluminio
sandblasting parcia

Sub-Contrato Carpinteria

Esp

25.0000

414,540.00

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

16,512

Vidrio de seguridad templado de 10 mm

Ins

1.0000

150,000.00

150,000.00

16,513

Zocalo aluminio para puerta de vidrio

Ins

1.4280

25,000.00

35,700.00

16,514

Pivote para puerta de vidrio y aluminio

Ins

und

0.9520

20,000.00

19,040.00

16,515

Manija tubo aluminio x 2 mts

Ins

und

0.9520

200,000.00

190,400.00

16,517

Empaque para zcalo de aluminio

Ins

1.9000

5,000.00

9,500.00

16,540

Sandblasting sobre vidrio

Ins

0.6600

15,000.00

9,900.00

4
5,144

6,685 Suministro e instal. cerradura seguridad tipo


bancaria para puerta de vidrio templado 10 mm
56
5,064
16,516

518,175.00

und

103,635.00

136,782.00

Herramienta Menor 10% M.O. DD

Eqp

HR

2.0000

1,763.00

3,526.00

Cuadrilla DD (Carpinteria)

Ins

2.0000

17,628.00

35,256.00

Cerradura bancaria de seguridad yale de 1/4

Ins

und

1.0000

98,000.00

98,000.00

6,686 Tablero de baloncesto reglamentario 1.20*1.80 m


en acrlico instalado (sin red)

und

417,431.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.0000

1,763.00

1,763.00

5,064

Cuadrilla DD (Carpinteria)

Ins

1.0000

17,628.00

17,628.00

5,144

56

Transporte de materiales Tn

Ana

0.0150

0.00

0.00

15,721

Tornillo = 1/2" x 1 1/4" G-2, con T. A.

Ins

und

12.0000

670.00

8,040.00

16,518

Tablero de acrlico 10 mm baloncesto 1.20*1.80

Ins

und

1.0000

390,000.00

390,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

439

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,687 Suministro e instal. espejo cristal flotado 3mm

Cantidad

Vr.Unitario

Vr.Total
47,756.40

Herramienta Menor 10% M.O. DD

Eqp

HR

0.4000

1,763.00

705.20

5,064

Cuadrilla DD (Carpinteria)

Ins

0.4000

17,628.00

7,051.20

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

16,523

Espejo cristal flotado 3 mm

Ins

1.0000

40,000.00

40,000.00

56

6,688 Paso de escalera en escalgres 30*30 (incluye huella


y contrahuella)

25,528.87

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5700

1,469.00

97

Cortadora ladrillo (Disco Diaman. 14")

Eqp

HR

0.0075

40,000.00

300.00

Cemento gris

Ins

kg

2.8230

383.34

1,082.17

3,684

Agua para obra

Ins

1.9440

10.00

19.44

4,426

Arena lavada de rio

Ins

0.0120

13,800.00

165.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.5700

14,690.00

8,373.30

5,144

Transporte de materiales Tn

Ana

0.0140

0.00

0.00

6,009

Suministro e instal. de tablon en gres, tipo vitrificado, con


dimens. de 30 x 30 cm, espesor de 2,5 cm, pagado m2

Ana

0.1700

36,540.08

6,211.81

Escalgres 30*30 alfa

Ins

0.3000

28,464.08

8,539.22

804

16,524

6,689 Suministro e instal. ventana aluminio proyectante


basculante, con vidrio 5mm

837.33

202,458.43

3,748

Vidrio incoloro 5 mm

Ins

1.0000

35,000.00

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Ventana aluminio proyectante a todo costo

Ins

1.0000

155,000.00

155,000.00

16,526

6,690 Codo 22.5 en H.D. en J.H. =10" (250 mm).


Suministro e instal.

und

35,000.00

635,599.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

5,653

Codo 22.5 =10" en H.D. J.H.

Ins

und

1.0000

611,900.00

611,900.00

55

6,691 Codo 11.25 en H.D. en J.H. =10" (250 mm).


Suministro e instal.

und

635,599.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

8,201

Codo 11.25 10" en HD. J.H.

Ins

und

1.0000

611,900.00

611,900.00

55

6,704 Muro en ladrillo prensado rejilla 24.5 cm (24.5 x 5 x


12)

99,641.22

Herramienta Menor 10% M.O. AA

Eqp

HR

1.2900

1,469.00

1,895.01

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0560

248,144.84

13,896.11

2,058

Ladrillo prensado rejilla

Ins

und

118.0000

550.00

64,900.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.2900

14,690.00

18,950.10

17

6,705 Demolicion manual placa de piso 0.20 m prom

25,627.25

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5000

1,469.00

2,203.50

21

Volqueta (6 m3 )

Eqp

HR

0.0250

55,550.00

1,388.75

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

440

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,489

Nombre

Tipo U.M.

Cuadrilla AA (Albaileria)

Ins

6,706 Suministro e Instalacin Canchas multifuncionales


en tubera 2" y 3" con tablero, aros y mallas.

Cantidad

Vr.Unitario

Vr.Total

1.5000

14,690.00

22,035.00

und

2,141,662.50

Herramienta Menor 10% M.O. BB

Eqp

HR

1.5000

1,616.00

2,424.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.5000

16,159.00

24,238.50

5,144

Transporte de materiales Tn

Ana

0.2500

0.00

0.00

16,518

Tablero de acrlico 10 mm baloncesto 1.20*1.80

Ins

und

1.0000

390,000.00

390,000.00

16,530

Cancha multifuncional tubo de 3" y 2" pintada

Ins

und

1.0000

1,610,000.00

1,610,000.00

16,531

Aro baloncesto

Ins

und

1.0000

55,000.00

55,000.00

16,533

Malla microfutbol

Ins

und

1.0000

50,000.00

50,000.00

16,535

Malla baloncesto

Ins

und

1.0000

10,000.00

10,000.00

55

6,707 Suministro e instal. porton en lmina cold rollled


cal 18, con marco en tubo acero de a.n. 2"pintado,
pagado m2

243,977.24

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.4000

8,750.00

3,500.00

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

1,038

Esmalte sobre lmina llena

Ana

1.0000

14,498.27

14,498.27

1,519

Bisagra alum. EXT 3"

Ins

und

0.2600

2,500.00

650.00

2,154

Lamina cold rolled cal 18 (2.40 mt x 1.20 mt)

Ins

und

1.0500

88,083.67

92,487.85

2,478

Angulo o perfil 1" x 1" x 1/8"

Ins

1.2600

2,422.00

3,051.72

5,064

Cuadrilla DD (Carpinteria)

Ins

3.5000

17,628.00

61,698.00

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

6,108

Tubo galvanizado 2" con brazo portapuas (Cerramientos


- incluye pie de amigo esquinas e intermedios)

Ana

2.0500

21,730.50

44,547.52

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.9700

6,885.00

6,678.45

8
228

14,116

6,708 Suministro e instal. electrobomba 1 HP 110 V, 1" de


salida, pagado por un

und

504,050.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

13,946

Valvula de Pie bronce =1 1/4"

Ins

und

1.0000

48,720.00

48,720.00

16,536

Electrobomba 1 HP 110 v descarga 1"

Ins

und

1.0000

348,680.00

348,680.00

55
4,515

6,709 Sistema septico Ovoide 2000 Lt (incluye:Tanque


septico, Tanque anaerobico y Trampa de grasas)

und

3,041,731.00

Herramienta Menor 10% M.O. AA

Eqp

HR

8.0000

1,469.00

11,752.00

854

Tanque septico imhoff 2000 Lt

Ins

und

1.0000

1,219,624.00

1,219,624.00

859

17

Tanque filtro anaerobico 2000 Lts

Ins

und

1.0000

1,124,040.00

1,124,040.00

1,632

Caja de Inspeccion y distribucion gran.

Ins

und

2.0000

104,284.00

208,568.00

2,964

Trampa de grasas 95 lts

Ins

und

1.0000

159,848.00

159,848.00

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

3.0000

7,729.00

23,187.00

4,489

Cuadrilla AA (Albaileria)

Ins

8.0000

14,690.00

117,520.00

15,439

Tubo PVC sanitario de 4"

Ins

12.0000

14,766.00

177,192.00

6,710 Losa maciza en concreto 3000 psi h=0.08 m, con


dilataciones

47,180.91

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

441

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Paral metalico

Eqp

HR

30.0000

58.00

1,740.00

2,198

Durmiente ordinario 4 M

Ins

0.1000

3,500.00

350.00

3,804

Puntilla con cabeza 1"

Ins

lb

0.1600

2,480.00

396.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0800

333,142.66

26,651.41

5,822

Formaleta entrepiso, pagado en m2

Ana

0.2500

16,657.60

4,164.40

Seccin de Andamio

Ins

mes

0.0300

17,120.00

513.60

54

13,641

6,711 Cercha y correa metlica en angulo por KG

kg

6,294.07

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0784

8,750.00

686.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2000

1,144.00

228.80

1,850

Segueta Ncholson

Ins

und

0.0050

2,500.00

12.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0055

29,750.00

163.63

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0357

6,885.00

245.79

14,937

Acero ASTM - 36

Ins

kg

1.0500

2,543.00

2,670.15

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.2000

11,436.00

2,287.20

8
115

6,712 Cercha y/o correa en perfil estructural PHR en C


160 x 60 x 2.5. Suministro e instalacion, pintada.

30,012.09

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1400

8,750.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1569

1,144.00

179.49

1,019

Perfil estructural PHR en C 160 x 60 x 2.5

Ins

1.0000

24,750.00

24,750.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0250

29,750.00

743.75

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0250

42,950.00

1,073.75

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0357

6,885.00

245.79

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1569

11,436.00

1,794.31

8
115

6,713 Cercha y/o correa metlica tubo estructural


rectangular 4" x 1 1/2", calibre 18, por ml

1,225.00

19,001.19

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1400

8,750.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1569

1,144.00

179.49

856

Tubo rectangular 4" x 1 1/2" C-18

Ins

1.0200

13,300.00

13,566.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0240

29,750.00

714.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0240

42,950.00

1,030.80

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1569

11,436.00

1,794.31

6,714 Demolicion muro de ladrillo en tizon espesor 0.25


metros, pagado en m2

1,225.00

10,806.40

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

881.40

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

4,489

6,715 Desmonte de canales y bajantes de aguas lluvias


17
4,489

1,615.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

6,716 Desmonte cubiertas en acrilico, fibra de vidrio,


pagado en m

2,585.44

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

442

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
17
4,489

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1600

1,469.00

235.04

Cuadrilla AA (Albaileria)

Ins

0.1600

14,690.00

2,350.40

6,717 Demolicion manual de meson A. max = 0.60 m


17
4,489

Cantidad

Vr.Unitario

Vr.Total

21,814.65

Herramienta Menor 10% M.O. AA

Eqp

HR

1.3500

1,469.00

1,983.15

Cuadrilla AA (Albaileria)

Ins

1.3500

14,690.00

19,831.50

6,718 Pedestal en concreto de 2500 psi, pagado en m3

412,492.24

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

7,345.00

49

Vibrador de concretos

Eqp

HR

0.2000

4,375.00

875.00

2,195

Planchon ordinario 3 M

Ins

3.0000

3,200.00

9,600.00

2,243

Vara de clavo 3M -1

Ins

0.5000

1,500.00

750.00

2,255

Tiras alistado 3 x 3 x 3

Ins

3.0000

600.00

1,800.00

3,797

Puntilla con cabeza 2"

Ins

lb

0.1000

1,990.00

199.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0000

14,690.00

73,450.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

1.0000

318,473.24

318,473.24

5,144

Transporte de materiales Tn

Ana

0.1000

0.00

0.00

6,719 Alambre de puas cal. 14. 1 hilo

886.10

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0333

1,469.00

48.92

2,589

Alambre de puas galvanizado Cal. 14

Ins

1.0000

348.00

348.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.0333

14,690.00

489.18

17

6,720 Poste concreto tipo baston, H = 2.50 m y baston


0.50 m de 10 x 10, reforzado

und

35,385.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3333

1,469.00

489.62

2,711

Poste concreto tipo baston, H= 2.50 m, baston 0.50

Ins

und

1.0000

30,000.00

30,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3333

14,690.00

4,896.18

17

6,721 Adoquin tipo ladrillo 0.05 m (5 x 10 x 20)

36,948.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6700

1,469.00

984.23

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

4,426

Arena lavada de rio

Ins

0.0039

13,800.00

53.82

4,489

Cuadrilla AA (Albaileria)

Ins

0.6700

14,690.00

9,842.30

5,143

Transporte de materiales m

Ana

0.0039

46,157.00

180.01

5,144

Transporte de materiales Tn

Ana

0.1200

0.00

0.00

Adoqun de arcilla 10*20*5 cm

Ins

und

46.5000

450.00

20,925.00

17

16,413

6,722 Tubo estructural redondo 3" e=2.5 mm, para


Cubierta

37,926.72

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1667

8,750.00

1,458.63

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.4444

1,144.00

508.39

1,357

Tubo estructural redondo =3" e= 2.5 mm

Ins

1.0500

28,310.00

29,725.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0222

29,750.00

660.45

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.4444

11,436.00

5,082.16

8
115

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

443

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,723 Suministro y siembra Plantula Limon Swinglia h =


0.40 - 0.50 m

Cantidad

Vr.Unitario

und

Vr.Total
2,712.84

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1143

1,616.00

184.71

Tierra Negra abonada

Ins

0.0040

34,000.00

136.00

2,730

Plantula limon swinglia 0.4 - 0.50

Ins

und

1.0000

400.00

400.00

3,684

Agua para obra

Ins

1.0000

10.00

10.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1143

16,159.00

1,846.97

5,143

Transporte de materiales m

Ana

0.0010

46,157.00

46.16

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

15,917

Insecticida tipio roxin

Ins

0.0010

40,000.00

40.00

15,918

Dap (fertilizantes)

Ins

bt

0.0010

46,000.00

46.00

15,919

Cascarilla

Ins

bt

0.0010

3,000.00

3.00

55
223

6,724 Cerramiento en poste en concreto, tipo Baston


alambre pua cal.12, c/1.50 m, hp = 3.00 m, 13 hilos

43,911.45

Herramienta Menor 10% M.O. AA-2

Eqp

HR

0.7273

2,010.00

Excavacion a mano en material comun, pagado en m3

Ana

0.0000

22,829.00

0.00

2,711

Poste concreto tipo baston, H= 2.50 m, baston 0.50

Ins

und

0.6700

30,000.00

20,100.00

3,832

Vinilo tipo viniltex

Ins

gal

0.0200

45,483.00

909.66

3,904

Relleno en material seleccionado de la excavacon


compactado, pagado m3

Ana

0.0270

16,458.20

444.37

5,144

Transporte de materiales Tn

Ana

0.0700

0.00

0.00

13,850

Alambre Galvanizado No. 12

Ins

kg

0.0500

5,000.00

250.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

0.7273

20,097.00

14,616.55

15,655

Alambre de puas galvanizado Cal. 12

Ins

13.5000

454.00

6,129.00

69
324

6,725 Malla electrosoldada Q-3 o M-106, tipo ME-1


pagada kg

kg

1,461.87

3,281.95

Herramienta menor 5% M.O. AA

Eqp

HR

0.0237

735.00

17.42

4,489

Cuadrilla AA (Albaileria)

Ins

0.0237

14,690.00

348.15

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

Malla electrosoldada Q-3 o M-106 (2.35 x 6m)

Ins

0.6213

4,694.00

2,916.38

19

15,741

6,726 Teja termoacustica 0.27 mm, pagado en M2

38,811.25

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,144

17

Transporte de materiales Tn

Ana

0.0070

0.00

0.00

13,641

Seccin de Andamio

Ins

mes

0.0500

17,120.00

856.00

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

und

2.5000

525.00

1,312.50

15,875

Teja termoacustica 0.27 mm

Ins

1.0000

32,603.00

32,603.00

6,727 Estuco en filos y dilataciones, pagado en m

5,538.49

Sub-Contrato Pintura

Esp

45.0000

3,819.65

1,718.84

Herramienta menor 10% M.O. CC

Eqp

HR

0.1500

1,689.00

253.35

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.0280

1,691.00

47.35

5,066

Cuadrilla CC (Pintura)

Ins

0.1500

16,893.00

2,533.95

Estuco acrlico

Ins

gal

0.0500

19,700.00

985.00

5
61

16,387

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

444

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,728 Relleno para base y atraque de tuberia PEAD en


material de la excavacion seleccionado con
zaranda.
69
14,669

Cantidad

Vr.Unitario

Vr.Total
25,266.09

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1.1429

2,010.00

2,297.23

Cuadrilla AA-2 (Tuberias)

Ins

1.1429

20,097.00

22,968.86

6,729 Tuberia de A.LL. PVC 4", pagado por ml

15,037.77

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1905

1,616.00

307.85

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1905

16,159.00

3,078.29

12,047

Tubo PVC A. LL. 4"

Ins

1.0000

10,467.00

10,467.00

14,086

Union sanitaria PVC 4"

Ins

und

0.1667

4,501.00

750.32

55

6,730 Estructura metalica Acero ASTM A-1010


(Incluye:Suministro y fabricacion y montaje)

kg

7,085.32

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.0800

8,750.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1200

1,144.00

137.28

986

Acero ASTM A-1011 - G 50

Ins

kg

1.0000

4,146.00

4,146.00

1,850

Segueta Ncholson

Ins

und

0.0060

2,500.00

15.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0075

29,750.00

223.13

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1200

11,436.00

1,372.32

6,731 Puerta en reja tubo cuadrado 1 1/2" y 1" cal.18


pintada e instalada

700.00

147,297.64

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2000

8,750.00

Herramienta Menor 10% M.O. DD

Eqp

HR

1.2500

1,763.00

2,203.75

Tubo cuadrado de 1" Cal. 18

Ins

9.5000

2,860.00

27,170.00

1,359

Tubo cuadrado de 1 1/2" Cal. 18

Ins

2.1000

4,313.00

9,057.30

1,519

Bisagra alum. EXT 3"

Ins

und

0.7500

2,500.00

1,875.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6000

6,805.00

4,083.00

1,850

Segueta Ncholson

Ins

und

0.0600

2,500.00

150.00

1,990

Disolvente Thinner

Ins

gal

0.0150

12,440.00

186.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0250

29,750.00

743.75

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0250

42,950.00

1,073.75

5,064

Cuadrilla DD (Carpinteria)

Ins

1.2500

17,628.00

22,035.00

5,066

Cuadrilla CC (Pintura)

Ins

0.2500

16,893.00

4,223.25

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Tuberia en A.C S/C = 3" SCH 40

Ins

0.6944

86,820.00

60,287.81

8
56
449

15,511

6,732 Fachada Superboard una cara 10 mm. Instalada y


pintada.

1,750.00

48,061.18

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1000

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

2.2000

188.00

413.60

3,832

Vinilo tipo viniltex

Ins

gal

0.0900

45,483.00

4,093.47

4,416

Placa superboard 1.20 x 2.44 10 mm

Ins

und

0.3400

49,500.00

16,830.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1000

16,159.00

17,774.90

5,144

Transporte de materiales Tn

Ana

0.0150

0.00

0.00

Angulo o perfil 2 1/2" x 2 1/2" x 1/4"

Ins

0.1500

17,350.00

2,602.50

13,526

1,616.00

1,777.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

445

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

15,834

Perfil omega 2.44

Ins

16,443

Canaleta vigueta gyplac

Ins

und

0.7100

3,150.00

2,236.50

und

16,444

Tornillo 8*9/16" corto entre perf estruct dry wall

0.3400

3,150.00

1,071.00

Ins

und

2.7000

20.00

16,445

54.00

Tornillo standar 6*1" largo lminas dry wall

Ins

und

8.7300

20.00

174.60

16,446

Cinta de papel rollo 75 m para juntas dry wall

Ins

und

0.0120

9,000.50

108.01

16,447

Masilla para juntas de gyplac dry wall

Ins

gal

0.0250

37,000.00

925.00

6,733 Tableta para urbanismo 40 x 40 e = 0.06 m

62,303.23

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7273

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0400

248,144.84

9,925.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.7273

14,690.00

10,684.04

Tableta 40 x 40 e=0.06

Ins

1.0000

40,625.00

40,625.00

17

13,431

6,734 Reja metalica en tubo estructural rectangular 3" x 1


1/2" y 1" calibre 18,

1,068.40

64,422.63

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3500

8,750.00

3,062.50

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

1.6000

1,144.00

1,830.40

449

Tubo cuadrado de 1" Cal. 18

Ins

7.0000

2,860.00

20,020.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0750

29,750.00

2,231.25

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0750

42,950.00

3,221.25

13,723

Tubo rectangular 3" x 1 1/2" C-18

Ins

1.3333

9,976.00

13,301.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3571

6,885.00

2,458.63

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

1.6000

11,436.00

18,297.60

6,735 Cercha y/o correa metlica tubo estructural


rectangular 2" x 1", calibre 18, por ml

9,543.65

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1400

8,750.00

1,225.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1569

1,144.00

179.49

2,502

Anticorrosivo rojo claro

Ins

gal

0.0200

29,750.00

595.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0200

42,950.00

859.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0714

6,885.00

491.59

16,397

Tubo rectangular 2" x 1" cal. 18

Ins

und

0.1700

25,878.00

4,399.26

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1569

11,436.00

1,794.31

8
115

6,736 Cubierta tipo HUNTER DOUGLAS Ref: 333C en


aluzinc 26, pintura poliester orneable, pintada por
ambas caras, curva

81,544.85

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6154

1,469.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

3.7000

188.00

695.60

Clip tipo C de fijacion

Ins

und

3.8000

975.00

3,705.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.6154

14,690.00

9,040.23

5,144

Transporte de materiales Tn

Ana

0.0663

0.00

0.00

13,432

Cubierta tipo HUNTER DOUGLAS Ref:333C aluzinc 26

Ins

3.0000

21,735.00

65,205.00

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

und

3.8000

525.00

1,995.00

621

6,737 Codo de polietileno 90 PE 100 - RDE 11 PN 16 315


mm =12".
55
699
2,938

und

904.02

1,216,042.39

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1000

28,250.00

2,825.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

446

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
14,518

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Codo 90 PE 100 - RDE 11 PN 16 315 mm =12"

Ins

und

1.0000

1,113,365.00

1,113,365.00

6,738 Tee de polietileno PE 100 - RDE 11 PN 16 315 mm


=12".

Cantidad

Vr.Unitario

und

Vr.Total

1,648,178.89

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1500

28,250.00

4,237.50

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Tee PE 100 - RDE 11 PN 16 315 mm =12"

Ins

und

1.0000

1,544,089.00

1,544,089.00

55
699

14,519

6,739 Tee reducida de polietileno PE 100 - RDE 11 PN 16


315 mm x 110 mm o =12" x 4"

und

1,823,727.65

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,820

Tee reducida PE 100 - RDE 11 PN 16 315 mm x 110


mm

Ins

und

1.0000

1,729,572.76

1,729,572.76

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

55
699

6,740 Portaflanche de polietileno PE 100 - RDE 11 PN 16


315 mm =12".
55

und

461,571.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60
74,455.40

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

1.1000

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

5,335

Portaflanche PE 100 - RDE 11 PN 16 315 mm =12"

Ins

und

1.0000

357,264.00

357,264.00

699

6,741 Portaflanche de polietileno PE 100 - RDE 11 PN 16


110 mm =4".

und

121,633.94

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Portaflanche PE 100 - RDE 11 PN 16 110 mm =4"

Ins

und

1.0000

35,604.00

35,604.00

55
699

13,442

6,742 Brida metalica 110 mm =4"

und

61,495.05

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,857

Brida en H.D. 110 mm =4"

Ins

und

1.0000

41,180.00

41,180.00

55

6,743 Brida metalica 315 mm =12"

und

292,920.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

14,858

Brida en H.D. 315 mm =12"

Ins

und

1.0000

264,480.00

264,480.00

55

6,744 Adaptador tope Brida 315 mm =12" para PVC


55

Herramienta Menor 10% M.O. BB

1,616.00

und
Eqp

HR

2,585.60

1,014,394.68

0.1143

1,616.00

184.71

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

447

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,633

Adaptador tope Brida 315 mm =12" para PVC

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

6,745 Valvula de corte 3/4". Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

und

1.0000

1,012,363.00

1,012,363.00

0.1143

16,159.00

1,846.97

und

56,850.91

Herramienta Menor 10% M.O. BB

Eqp

HR

0.6667

1,616.00

1,077.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0050

58,612.00

293.06

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0050

28,250.00

141.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

13,798

Valvula de corte 3/4"

Ins

und

1.0000

42,826.00

42,826.00

14,020

Cinta teflon

Ins

rl

0.8000

1,000.00

800.00

15,049

Adaptador macho presin PVC 3/4"

Ins

und

2.0000

470.00

940.00

55

6,746 Tuberia de cobre para gas 1/2". Suministro e Instal.

15,741.35

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2667

1,616.00

430.99

1,712

Abrazadera plastica 5/8"

Ins

und

1.0000

100.00

100.00

1,733

Soldadura 95-5 Plata

Ins

lb

0.0200

33,000.00

660.00

2,498

Tornillo de acero 1/2" x 1/4"

Ins

und

2.0000

80.00

160.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0450

28,250.00

1,271.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

8,164

Tubo cobre tipo L 1/2" 20 pies

Ins

1.0500

8,390.00

8,809.50

55

6,747 Tuberia de cobre para gas 3/4". Suministro e Instal.

24,687.30

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

1,733

Soldadura 95-5 Plata

Ins

lb

0.0305

33,000.00

1,006.50

1,747

Tubo cobre tipo L 3/4" 20 pies

Ins

1.0500

13,611.00

14,291.55

2,498

Tornillo de acero 1/2" x 1/4"

Ins

und

2.0000

80.00

160.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0690

28,250.00

1,949.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

Abrazadera plastica 3/4"

Ins

und

1.0000

170.00

170.00

55

15,440

6,748 Caja de inspeccion 120 x 120 x 120

und

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

4,426

Arena lavada de rio

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,143

Transporte de materiales m

Ana

5,144

Transporte de materiales Tn

Ana

8,194

Acero de refuerzo 60000 Psi

Ins

13,921

Crudo de rio clasificado T.m. 6"

13,961

Triturado de 1/2" - 3/4"

14,122

Sika 1 imp. integral

17
804

566,327.35

12.0000

1,469.00

17,628.00

287.7600

383.34

110,309.92

0.6000

3,903.00

2,341.80

373.0000

305.00

113,765.00

146.3000

10.00

1,463.00

0.6000

13,800.00

8,280.00

12.0000

14,690.00

176,280.00

0.5300

46,157.00

24,463.21

0.9300

0.00

0.00

kg

30.2400

2,257.00

68,251.68

Ins

0.1500

15,660.00

2,349.00

Ins

0.4100

46,304.00

18,984.64

Ins

kg

3.4500

6,438.00

22,211.10

6,749 Suministro e instal. lampara de incrustar 2 x 32 T8

und

92,655.00

Sin tuberia, cajas, cable


55
1,644

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Carga fulminante fuerte 330

Ins

und

6.0000

260.00

1,560.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

448

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

1,682

Perno 1/2" alt.vel. 1 3/4"

Ins

und

6.0000

220.00

1,320.00

4,086

Lampara de incrustar 2 x 32 T8

Ins

und

1.0000

72,000.00

72,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

5,144

Transporte de materiales Tn

Ana

0.0050

0.00

0.00

6,750 Tee reducida de presion PVC 2 1/2" x 2"

Cantidad

Vr.Unitario

und

Vr.Total

31,252.76

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0588

1,616.00

95.02

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0030

58,612.00

175.84

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0030

28,250.00

84.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0588

16,159.00

950.15

15,063

Tee sencilla presion PVC 2 1/2 "

Ins

und

1.0000

20,997.00

20,997.00

15,106

Buje soldado presion PVC 2.1/2 x 2

Ins

und

1.0000

8,950.00

8,950.00

55

6,751 Fibra de vidrio PRFV. Preparacion e instalacion

Herramienta Menor 10% M.O. BB

Eqp

HR

935

Fibra de vidrio Mat atv

Ins

kg

936

Meck peroxido Ex1

Ins

955

Talco industrial

Ins

2,338

Resina de poliester cristalizado

3,055
4,515

55

535,379.28

0.6667

1,616.00

1,077.39

17.0000

10,057.00

170,969.00

kg

1.5000

18,015.00

27,022.50

kg

72.0000

870.00

62,640.00

Ins

kg

17.0000

11,651.00

198,067.00

Octoato de Cobalto 709

Ins

btl

1.9000

34,122.00

64,831.80

Cuadrilla BB (Instalaciones)

Ins

0.6666

16,159.00

10,771.59

6,752 Tapon en fibra de vidrio PRFV para tuberia =16".

und

143,520.70

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

6,751

Fibra de vidrio PRFV. Preparacion e instalacion

Ana

0.2560

535,379.28

137,057.10

17

6,753 Tapon en fibra de vidrio PRFV para tuberia =8".

1,469.00

und

587.60

56,458.26

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

6,751

Fibra de vidrio PRFV. Preparacion e instalacion

Ana

0.0964

535,379.28

51,610.56

17

6,754 Tapon en fibra de vidrio PRFV para tuberia =6".

1,469.00

und

440.70

28,404.39

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

6,751

Fibra de vidrio PRFV. Preparacion e instalacion

Ana

0.0440

535,379.28

23,556.69

17

6,755 Union en fibra de vidrio PRFV para tuberia


=16"con Tuberia =8".

1,469.00

und

440.70

69,093.21

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3000

1,469.00

440.70

4,489

Cuadrilla AA (Albaileria)

Ins

0.3000

14,690.00

4,407.00

6,751

Fibra de vidrio PRFV. Preparacion e instalacion

Ana

0.1200

535,379.28

64,245.51

17

6,756 Bajante A.LL. PVC 6", pagado por ml

63,144.65

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

3,609

Codo sanitario 90 1/4 C x C PVC 6"

Ins

und

0.0600

70,982.00

4,258.92

3,657

Tubo PVC sanitario de 6"

Ins

1.0500

31,269.00

32,832.45

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

449

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
13,607

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

Sub-Contrato Hidraulico Sanitario

Esp

6,757 Cupula tragante 6" x 4" sin sosco, pagado un


17
804
4,489
13,212

h
%

Vr.Unitario

0.5000

16,159.00

8,079.50

38.0000

45,756.99

17,387.66

und

Vr.Total

14,530.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

Cemento gris

Ins

kg

0.3000

383.34

115.00

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

Cupula tragante 6" x 4" sin sosco

Ins

und

1.0000

12,800.00

12,800.00

6,758 Tablon corriente 20 x 20 con granito espesor 2 cm,


pagado en m2.

Herramienta Menor 10% M.O. AA

Eqp

HR

804

Cemento gris

Ins

829

Cemento blanco

Ins

2,486

Marmolina 20 kg

2,549

Tableta cermica corriente 20 x 20

3,684

17

Cantidad

146.90

50,879.82

0.8889

1,469.00

kg

12.0000

383.34

4,600.08

kg

13.5000

975.00

13,162.50

Ins

bt

0.3200

12,800.00

4,096.00

Ins

0.3600

13,500.00

4,860.00

Agua para obra

Ins

5.0000

10.00

50.00

4,426

Arena lavada de rio

Ins

0.0580

13,800.00

800.40

4,489

Cuadrilla AA (Albaileria)

Ins

0.8889

14,690.00

13,057.94

5,143

Transporte de materiales m

Ana

0.0580

46,157.00

2,677.11

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

13,381

Color mineral

Ins

kg

0.2100

7,000.00

1,470.00

16,314

Granito No.2

Ins

bt

0.4800

10,000.00

4,800.00

6,759 Pintura en anticorrosivo sobre lamina lineal,


pagado en m

1,305.79

7,907.65

Sub-Contrato Pintura

Esp

45.0000

5,453.55

2,454.10

Herramienta menor 10% M.O. CC

Eqp

HR

0.2000

1,689.00

337.80

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.2500

1,691.00

422.75

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0400

29,750.00

1,190.00

5,066

Cuadrilla CC (Pintura)

Ins

0.2000

16,893.00

3,378.60

5
61

6,760 Tuberia de Polietileno PE 100 PN-10 de =450 mm


= 18"

687,252.01

699

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.1667

67,686.73

11,283.38

2,057

Tuberia de Polietileno PE 100 PN-10 de 450 mm

Ins

1.0100

663,384.00

670,017.84

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3333

16,159.00

5,385.79

6,761 Perforacion horizontal bajo carretera x 12 m. (con


aluvion)

und

9,039,075.00

Motobomba de 4" o 6"

Eqp

HR

80.0000

11,600.00

928,000.00

122

Herramienta Menor 10% M.O. PhAcA-2

Eqp

HR

96.0000

3,359.00

322,464.00

123

Equipo de perforacion horizontal

Eqp

HR

80.0000

43,750.00

3,500,000.00

767

A.C.P.M.

Ins

gal

45.0000

6,165.00

277,425.00

Transporte de materiales Tn

Ana

10.0000

0.00

0.00

14,108

Gasolina

Ins

gal

90.0000

7,540.00

678,600.00

15,636

Bentonita x 50 Kg

Ins

kg

150.0000

719.00

107,850.00

16,542

Cuadrilla PhAcA-2 (Perforacion horizontal)

Ins

96.0000

33,591.00

3,224,736.00

58

5,144

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

450

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,762 Perforacion horizontal bajo carretera x 12 m. (con


arcilla)

Cantidad

Vr.Unitario

und

Vr.Total

5,732,475.00

Motobomba de 4" o 6"

Eqp

HR

48.0000

11,600.00

556,800.00

122

Herramienta Menor 10% M.O. PhAcA-2

Eqp

HR

64.0000

3,359.00

214,976.00

123

Equipo de perforacion horizontal

Eqp

HR

48.0000

43,750.00

2,100,000.00

767

A.C.P.M.

Ins

gal

25.0000

6,165.00

154,125.00

Transporte de materiales Tn

Ana

10.0000

0.00

0.00

14,108

Gasolina

Ins

gal

50.0000

7,540.00

377,000.00

15,636

Bentonita x 50 Kg

Ins

kg

250.0000

719.00

179,750.00

16,542

Cuadrilla PhAcA-2 (Perforacion horizontal)

Ins

64.0000

33,591.00

2,149,824.00

58

5,144

6,763 Perforacion, reperforacion y/o ampliacion de


prueba en 8 " pozos unifamiliares
(plano-sabana)

55,193.40

Equipo de perforacion y rotacion

Eqp

HR

0.4000

76,000.00

30,400.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.4000

2,305.00

922.00

Agua para obra

Ins

50.0000

10.00

500.00

15,635

Broca tugsteno 8 ``

Ins

und

0.0043

950,000.00

4,085.00

15,636

Bentonita x 50 Kg

Ins

kg

14.0000

719.00

10,066.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.4000

23,051.00

9,220.40

85
112
3,684

6,764 Perforacion, reperforacion y/o ampliacion de


prueba en 8 " pozos unifamiliares (piedemonte
- montaoso)

Equipo de perforacion y rotacion

Eqp

HR

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

Agua para obra

Ins

15,635

Broca tugsteno 8 ``

Ins

und

15,636

Bentonita x 50 Kg

Ins

kg

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

85
112
3,684

6,765 Perforacion, reperforacion y/o ampliacion de


prueba en 8 " pozos unifamiliares (sector
transicion)

344,285.27

3.0769

76,000.00

233,844.40
7,092.25

3.0769

2,305.00

50.0000

10.00

500.00

0.0056

950,000.00

5,320.00

37.0000

719.00

26,603.00

3.0769

23,051.00

70,925.62

174,812.30

Equipo de perforacion y rotacion

Eqp

HR

1.4545

76,000.00

110,542.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

1.4545

2,305.00

3,352.62

Agua para obra

Ins

50.0000

10.00

500.00

15,635

Broca tugsteno 8 ``

Ins

und

0.0056

950,000.00

5,320.00

15,636

Bentonita x 50 Kg

Ins

kg

30.0000

719.00

21,570.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

1.4545

23,051.00

33,527.68

85
112
3,684

6,766 Sumidero en concreto reforzado, tipo lateral


(SL250), h = 1.25 m

und

3,734,107.68

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.3600

333,142.66

453,074.02

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5.5000

351,843.89

1,935,141.40

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

172.1400

3,092.35

532,317.13

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

178.3200

3,075.79

548,474.87

5,836

Tapa pozo en via (inc. marco), pagado por un

Ana

und

1.0000

265,100.26

265,100.26

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

451

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,767 Sumidero en concreto reforzado, tipo lateral


(SL150), h = 1.25 m

Cantidad

Vr.Unitario

und

Vr.Total
2,751,487.67

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.1200

333,142.66

373,119.78

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

3.7000

351,843.89

1,301,822.39

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

109.0000

3,092.35

337,066.15

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

154.2300

3,075.79

474,379.09

5,836

Tapa pozo en via (inc. marco), pagado por un

Ana

und

1.0000

265,100.26

265,100.26

6,768 Canal en lamina galvanizada cal. 22 desarrollo 0.60


m pintado con wash primer y esmalte

67,029.01

2,519

Wash Primer A Pintura 1/4 GL

Ins

und

0.1600

17,350.00

2,776.00

2,520

Wash Primer B Catalizador 1/4 GL

Ins

und

0.1600

10,500.00

1,680.00

2,932

Soldadura estao antimonio 95/5 para cobre

Ins

lb

0.4000

20,300.00

8,120.00

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

5,066

Cuadrilla CC (Pintura)

Ins

0.3000

16,893.00

5,067.90

5,144

Transporte de materiales Tn

Ana

0.0500

0.00

0.00

13,607

Sub-Contrato Hidraulico Sanitario

Esp

80.0000

37,238.34

29,790.67

15,746

Lamina galvanizada cal. 22 de 2m*1m

Ins

und

0.3000

46,339.00

13,901.70

6,769 Puerta en aluminio con vidrio bronce 4 mm, marco


e instalacin

178,554.82

1,348

Vidrio color bronce 4 mm. Suministro e Instal.

Ana

0.4000

41,387.05

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Puerta aluminio llena, bisagras, marco e instalaci

Ins

0.6000

270,000.00

162,000.00

15,594

6,770 Pintura exterior vinilo koraza 3 manos

16,554.82

17,546.39

Sub-Contrato Pintura

Esp

45.0000

12,100.96

Herramienta menor 10% M.O. CC

Eqp

HR

0.2250

1,689.00

380.03

5,066

Cuadrilla CC (Pintura)

Ins

0.2250

16,893.00

3,800.93

5,144

Transporte de materiales Tn

Ana

0.0002

0.00

0.00

Vinilo tipo Koraza para exteriores

Ins

gal

0.1500

52,800.00

7,920.00

5
61

15,934

6,771 Manguera para encamizar tuberias de 20 , 25 y 30


mm
19
4,489
16,395

und

5,445.43

3,271.25

Herramienta menor 5% M.O. AA

Eqp

HR

0.0500

735.00

36.75

Cuadrilla AA (Albaileria)

Ins

0.0500

14,690.00

734.50

Manguera plstica conexin 1/2"

Ins

und

1.0000

2,500.00

2,500.00

6,772 Paete impermeabilizado muros 1:5 espesor 2 cm,


pagado en m2

15,079.27

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

5,768

17

Mortero Impermeabilizado 1:5 (desperdicio 5%)

Ana

0.0220

324,007.41

7,128.16

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

14,786

Planchon madera de 3 x 0.30 x 0.04

Ins

0.0051

2,482.00

12.66

6,773 Demolicion de pozos de Inspeccion Di=1.20m H=


2.0 a 3.0 m

und

113,113.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

452

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

17
4,489

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

Cuadrilla AA (Albaileria)

Ins

6,774 Suminstro e instal. de tablon liso de gres vitrificado


25 x 25, pagado en m2
17

Cantidad

Vr.Unitario

Vr.Total

HR

7.0000

1,469.00

10,283.00

7.0000

14,690.00

102,830.00

33,114.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8500

1,469.00

1,248.65

Cemento gris

Ins

kg

9.4100

383.34

3,607.23

2,551

Tablon de gres vitrificado 25 x 25

Ins

1.0300

14,714.00

15,155.42

3,684

Agua para obra

Ins

6.4800

10.00

64.80

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8500

14,690.00

12,486.50

804

6,775 Tuberia acero al carbon SCH-40. 6". Suministro e


Instal.

249,551.96

28

Grua

Eqp

HR

0.2500

43,750.00

10,937.50

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

43

Equipo de Oxicorte

Eqp

HR

0.2100

5,000.00

1,050.00

44

Pulidora electrica manual

Eqp

HR

0.2100

4,350.00

913.50

45

Cilindro

Eqp

HR

0.2100

41.00

8.61

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.8000

3,226.00

2,580.80

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3200

6,805.00

2,177.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0800

29,750.00

2,380.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3200

6,856.00

2,193.92

5,144

Transporte de materiales Tn

Ana

0.3200

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0300

41,820.00

1,254.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.8000

32,262.00

25,809.60

14,854

Tuberia en A.C S/C = 6" SCH 40

Ins

1.0000

194,880.00

194,880.00

6,776 Tuberia acero al carbon SCH-40. 8". Suministro e


Instal.

370,344.80

28

Grua

Eqp

HR

0.2500

43,750.00

10,937.50

42

Motosoldador Diesel

Eqp

HR

0.3000

14,833.00

4,449.90

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

45

Cilindro

Eqp

HR

0.2100

41.00

8.61

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

1.0000

3,226.00

3,226.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.4000

6,805.00

2,722.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0150

29,750.00

446.25

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.4000

6,856.00

2,742.40

5,144

Transporte de materiales Tn

Ana

0.3500

0.00

0.00

13,917

Tuberia en A.C S/C = 8" SCH 40

Ins

1.0000

307,400.00

307,400.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0420

6,200.00

260.40

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

1.0000

32,262.00

32,262.00

6,777 Malla electrosoldada Q-7, pagado por m2

17,505.08

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

453

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta menor 5% M.O. AA

Eqp

HR

0.0630

735.00

46.31

4,489

Cuadrilla AA (Albaileria)

Ins

0.0630

14,690.00

925.47

5,144

Transporte de materiales Tn

Ana

0.0060

0.00

0.00

Malla Electrosoldada Q-7 o M-295 (2.35 x 6 m)

Ins

1.0500

15,746.00

16,533.30

19

16,543

6,778 Paete Sikatop 121 e= 4 mm


61
5,066
16,544

48,264.80

Herramienta menor 10% M.O. CC

Eqp

HR

0.4000

1,689.00

Cuadrilla CC (Pintura)

Ins

0.4000

16,893.00

6,757.20

SikaTop 121

Ins

kg

8.8000

4,640.00

40,832.00

6,779 Codo 90 =18" en A.C. con E.L x E.L. Suministro e


Instal.

und

675.60

2,970,350.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

16,545

Codo 90 =18" en A.C. E.L.

Ins

und

1.0000

2,934,800.00

2,934,800.00

55

6,780 Codo 90 =6" en A.C. con E.Lx E.L Suministro e


Instal.

und

288,055.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

14,850

Codo 90 =6" en A.C. E.L.

Ins

und

1.0000

270,280.00

270,280.00

55

6,781 Canalizacion en conduit electrico PVC 1 1/2".

9,423.67

Herramienta Menor 10% M.O. AA Elec

Eqp

HR

0.1333

1,514.00

201.82

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

586.12

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

3,555

Tubo conduit PVC 1 1/2"

Ins

1.0000

4,948.00

4,948.00

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

5,107

Cuadrilla AA (Electrica)

Ins

0.1333

15,140.00

2,018.16

5,143

Transporte de materiales m

Ana

0.0100

46,157.00

461.57

Cinta de Prevencin

Ins

1.0500

750.00

787.50

121

16,050

6,782 Codo 90 =8" en A.C. con E.Lx E.L Suministro e


Instal.

und

529,335.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

16,547

Codo 90 =8" en A.C. E.L.

Ins

und

1.0000

511,560.00

511,560.00

55

6,783 Tee en H.F. 8" x 8" E.L. Suministro e Instal.


55
4,515
16,548

und

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee en H.F. 8" x 8" E.L.

Ins

und

1.0000

574,200.00

574,200.00

6,784 Caballete para cubierta termoacustica


19
4,489
14,104

597,899.40

21,962.93

Herramienta menor 5% M.O. AA

Eqp

HR

0.2963

735.00

217.78

Cuadrilla AA (Albaileria)

Ins

0.2963

14,690.00

4,352.65

Caballete termoacstico * 2m

Ins

und

0.3350

48,000.00

16,080.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

454

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,809

Tornillo autoperforante para acero 5/16" x 3/4"

Ins

6,785 Placa lateral de canal Concreto 3000 Psi,


resistencia 210 Kg/cm2

und

Cantidad

Vr.Unitario

Vr.Total

2.5000

525.00

1,312.50

576,257.01

17

Herramienta Menor 10% M.O. AA

Eqp

HR

5.3000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

8.3000

14,690.00

121,927.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

5,061

Formaleta (1 uso)

Ana

3.3000

32,375.50

106,839.15

6,786 Muro bloque concreto abusardado 0.15 (15 x 20 x


40)

7,785.70

58,621.60

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0530

248,144.84

13,151.68

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.1890

0.00

0.00

Bloque Concreto abusardado 15 x 20 x 40

Ins

und

12.5000

2,500.00

31,250.00

17

16,549

6,787 Muro bloque concreto abusardado estructural 0.15


(15 x 20 x 40)

60,722.27

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0100

1,469.00

1,483.69

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0530

248,144.84

13,151.68

4,489

Cuadrilla AA (Albaileria)

Ins

1.0100

14,690.00

14,836.90

Bloque Concreto abusardado 15 x 20 x 40

Ins

und

12.5000

2,500.00

31,250.00

17

16,549

6,788 Valvula Cheque cortina =3" en rosca. Operacion


horizontal. Suministro e instal.

und

681,645.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.5000

1,616.00

4,040.00

Cuadrilla BB (Instalaciones)

Ins

2.5000

16,159.00

40,397.50

15,055

Adaptador macho presin PVC 3"

Ins

und

2.0000

13,604.00

27,208.00

16,550

Valvula cheque cortina =3"

Ins

und

1.0000

610,000.00

610,000.00

55
4,515

6,789 Tuberia PVC alcantarillado 40" (inc. union).


Suministro e instal.

998,207.10

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.3333

111,550.00

37,179.62

Cuadrilla BB (Instalaciones)

Ins

1.4953

16,159.00

24,162.55

14,118

Lubricante 500 gr

Ins

und

0.1667

12,305.00

2,051.24

15,413

Tuberia alcantarillado PVC 40 "

Ins

1.0290

820,584.00

844,380.94

16,551

Union alcantarillado PVC 40 "

Ins

und

0.1667

542,488.00

90,432.75

4
4,515

6,790 Placa lateral para canal en Piedra pegada e= 0.15


m, en Concreto 2500 Psi

62,551.12

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1000

1,469.00

1,615.90

4,489

Cuadrilla AA (Albaileria)

Ins

1.1000

14,690.00

16,159.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0900

318,473.24

28,662.59

5,061

Formaleta (1 uso)

Ana

0.3300

32,375.50

10,683.92

5,063

Piedra rajon o media zonga

Ana

0.0600

90,495.15

5,429.71

17

6,791 Piedra pegada en Mortero 1:4, e=0.10 m

27,261.64

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

455

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

1,540

Mortero 1:4 (desperdicio 5%)

Ana

1,572

Tabla burra ordinaria 0.10

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,063

Piedra rajon o media zonga

Ana

17

6,792 Piedra pegada concreto de 2500 Psi, e=0.12 m

Cantidad

Vr.Unitario

Vr.Total

HR

0.4600

1,469.00

675.74

0.0600

248,144.84

14,888.69

1.1000

1,200.00

1,320.00

0.4600

14,690.00

6,757.40

0.0400

90,495.15

3,619.81

41,252.14

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

1.0000

2,667.00

2,667.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0720

318,473.24

22,930.07

5,063

Piedra rajon o media zonga

Ana

0.0480

90,495.15

4,343.77

17

6,793 Placa lateral para canal en Piedra pegada e= 0.12


m, en Concreto 2500 Psi

1,028.30

52,500.86

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9000

1,469.00

1,322.10

4,489

Cuadrilla AA (Albaileria)

Ins

0.9000

14,690.00

13,221.00

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.0720

318,473.24

22,930.07

5,061

Formaleta (1 uso)

Ana

0.3300

32,375.50

10,683.92

5,063

Piedra rajon o media zonga

Ana

0.0480

90,495.15

4,343.77

17

6,794 Platina apoyo 0.2*0.2 m lamina HR 1/4" con 6


anclajes 1/2" y 4 pernos 5/8"*2" instalada.

und

57,229.47

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.5000

8,750.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0975

6,805.00

663.49

4,489

Cuadrilla AA (Albaileria)

Ins

0.3200

14,690.00

4,700.80

8,194

4,375.00

Acero de refuerzo 60000 Psi

Ins

kg

0.9000

2,257.00

2,031.30

14,742

Lamina HR 1/4"

Ins

0.0400

125,317.09

5,012.68

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.4500

11,436.00

5,146.20

16,471

Corte en lmina HR 1/4"

Ins

0.7500

20,000.00

15,000.00

16,552

Tornillo = 5/8" x 2" G-8 R.O. Con T. A.

Ins

und

7.0000

2,900.00

20,300.00

6,795 Bajante en tubo Conduit Galvanizada =2 "


Suministro e Instal.

53,019.79

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0552

1,616.00

89.20

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0552

16,159.00

891.98

14,260

Capacete de 2" galvanizado

Ins

und

0.3333

14,500.00

4,832.85

14,292

Union Galvanizada = 2 1/2"

Ins

und

0.1667

9,976.00

1,663.00

14,388

Hebilla cinta bandit 5/8``

Ins

und

0.3300

924.00

304.92

15,545

Union Galvanizada = 2"

Ins

und

0.3333

5,336.00

1,778.49

15,971

Cinta bandit de 5/8"

Ins

und

0.3300

5,445.00

1,796.85

16,553

Tubo Galvanizado 2" x 3 m Conduit EMT

Ins

und

0.3333

125,000.00

41,662.50

55

6,796 Cercha en perfil estructural PHR en C 120 x 60 x 2.0


en Tipo Cajon. Suministro e instalacion, pintada.

68,468.44

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.7000

8,750.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.6667

1,144.00

762.70

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

2,946

Perfil estructural PHR en C 120 x 60 x 2.0

Ins

2.0500

22,148.00

45,403.40

8
115

6,125.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

456

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Esmalte Sintetico Pintuco

Ins

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

3,837

6,797 Cercha y/o correa en perfil estructural PHR en C


160 x 60 x 2.0 Suministro e instalacion, pintada.

Cantidad

Vr.Unitario

Vr.Total

gal

0.0500

42,950.00

2,147.50

kg

0.7143

6,885.00

4,917.96

0.6667

11,436.00

7,624.38

22,638.09

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1400

8,750.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1569

1,144.00

179.49

943

Perfil estructural PHR en C 160 x 60 x 2.0

Ins

1.0000

17,376.00

17,376.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.0250

29,750.00

743.75

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0250

42,950.00

1,073.75

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0357

6,885.00

245.79

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1569

11,436.00

1,794.31

6,798 Parque infantil capacidad 20 Nios, modelo AB-06.


Suministro e instal.

und

1,225.00

4,111,829.67

Herramienta Menor 10% M.O. AA

Eqp

HR

16.0000

1,469.00

23,504.00

4,489

Cuadrilla AA (Albaileria)

Ins

16.0000

14,690.00

235,040.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2500

333,142.66

83,285.67

16,554

Parque infantil capacidad 20 Nios, modelo AB-06.

Ins

und

1.0000

3,770,000.00

3,770,000.00

17

6,799 Placa base en concreto 3000 psi, e=0.05 m


reforzada con malla Q4

38,922.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0550

333,142.66

18,322.85

5,144

Transporte de materiales Tn

Ana

0.0227

0.00

0.00

Malla electrosoldada Q-4 o M-159 (2.35 x 6m)

Ins

1.0000

7,928.48

7,928.48

17

15,356

6,800 Destronque piso granito, pagado en m2


17

Herramienta Menor 10% M.O. AA

Eqp

1,028.30

4,432.38

HR

0.1250

1,469.00

183.63

HR

962.50

Maquina de Pulir

Eqp

0.1100

8,750.00

3,684

Agua para obra

Ins

5.0000

10.00

50.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1250

14,690.00

1,836.25

Piedras para pulir, brillar, destroncar (granito)

Ins

jg

0.0025

560,000.00

1,400.00

114

14,948

6,801 Corte de piso para extraccin localizada

5,407.85

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1500

1,469.00

220.35

44

Pulidora electrica manual

Eqp

HR

0.6400

4,350.00

2,784.00

3,684

Agua para obra

Ins

20.0000

10.00

200.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1500

14,690.00

2,203.50

6,802 Filos y dilataciones en estuco


5
61
804
1,792

3,633.44

Sub-Contrato Pintura

Esp

45.0000

2,505.82

1,127.62

Herramienta menor 10% M.O. CC

Eqp

HR

0.1000

1,689.00

168.90

Cemento gris

Ins

kg

0.0650

383.34

24.92

Pabmeril Pliego 9" x 11"

Ins

und

0.2000

1,691.00

338.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

457

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,484

Yeso corriente

Ins

3,684

Agua para obra

Ins

5,066

Cuadrilla CC (Pintura)
Caolin

13,448

Cantidad

Vr.Unitario

Vr.Total

bt

0.0025

14,300.00

35.75

1.2500

10.00

12.50

Ins

0.1000

16,893.00

1,689.30

Ins

bt

0.0225

10,500.00

236.25

6,803 Enchape muro cenefa ceramica lisa 8 x 25 cm,


pagado ml

22,593.88

15

Pegacor blanco

Ins

kg

0.3150

1,120.00

352.80

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3500

1,469.00

514.15

Cemento blanco

Ins

kg

0.1030

975.00

100.43

3,684

Agua para obra

Ins

0.5000

10.00

5.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.3500

14,690.00

5,141.50

5,144

Transporte de materiales Tn

Ana

0.0004

0.00

0.00

Cenefa cermica corriente 8x25

Ins

1.0300

16,000.00

16,480.00

829

15,590

6,804 Enchape piso-pared ceramica valencia 30.5 x 20.5


cm

39,207.67

15

Pegacor blanco

Ins

kg

3.5000

1,120.00

3,920.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.9350

1,469.00

1,373.52

3,684

Agua para obra

Ins

3.0000

10.00

30.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.9350

14,690.00

13,735.15

5,144

Transporte de materiales Tn

Ana

0.0311

0.00

0.00

16,411

Concolor boquilla lista blanco nacar

Ins

kg

0.4400

2,600.00

1,144.00

16,558

Pared valencia 20.5*30.5

Ins

1.0500

18,100.00

19,005.00

6,805 Muro de concreto 3000 psi 0.25 m, cara interna lisa


(formaleta metalica)

118,219.17

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1000

4,375.00

437.50

3,323

Tabla Burra Ordinaria 0.25

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.2500

333,142.66

83,285.67

5,061

Formaleta (1 uso)

Ana

0.2000

32,375.50

6,475.10

6,806 Apoyo de Neopreno D=60 (0.38 m x 0.25 m x 4.23


cms)

und

2,350.40

535,512.50

Herramienta menor 5% M.O. AA

Eqp

HR

0.5000

735.00

367.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5000

14,690.00

7,345.00

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

Neopreno (0.34 x 0.25) m D=60 E=4.23 cm

Ins

und

1.0000

527,800.00

527,800.00

19

14,548

6,807 Conector viga - tablero en acero A-36. Incluye


suministro e instal.

und

15,421.41

42

Motosoldador Diesel

Eqp

HR

0.0600

14,833.00

889.98

43

Equipo de Oxicorte

Eqp

HR

0.0600

5,000.00

300.00

44

Pulidora electrica manual

Eqp

HR

0.0600

4,350.00

261.00

45

Cilindro

Eqp

HR

0.0600

41.00

2.46

67

Herramienta Menor 10% M.O. ASA-4

Eqp

HR

0.2000

4,443.00

888.60

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.1780

6,805.00

1,211.29

5,144

Transporte de materiales Tn

Ana

0.0018

0.00

0.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

458

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

14,937

Acero ASTM - 36

Ins

kg

1.1180

2,543.00

2,843.07

14,988

Cuadrilla ASA-4(Puentes metalicos)

Ins

0.2000

44,428.00

8,885.60

6,808 Baranda para tablero y rampa Puente peatonal en


tubos de 3" x 2.29 mm y 1 1/2" x 2 mm . Suministro
e instal.

Cantidad

Vr.Unitario

Vr.Total

226,983.85

42

Motosoldador Diesel

Eqp

HR

0.5700

14,833.00

8,454.81

43

Equipo de Oxicorte

Eqp

HR

0.6000

5,000.00

3,000.00

44

Pulidora electrica manual

Eqp

HR

0.1500

4,350.00

652.50

45

Cilindro

Eqp

HR

0.6000

41.00

24.60

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.7500

3,226.00

8,871.50

68

Equipo Pintura

Eqp

HR

0.2000

2,200.00

440.00

1,357

Tubo estructural redondo =3" e= 2.5 mm

Ins

1.0200

28,310.00

28,876.20

5,144

Transporte de materiales Tn

Ana

0.2000

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.4000

6,885.00

2,754.00

14,742

Lamina HR 1/4"

Ins

0.1800

125,317.09

22,557.08

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1200

6,200.00

744.00

14,745

Oxigeno Industrial

Ins

0.4500

15,662.00

7,047.90

14,746

Acetileno

Ins

kg

0.1500

41,820.00

6,273.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.7500

32,262.00

88,720.50

14,979

Anticorrosivo Epxico

Ins

gal

0.0800

141,570.00

11,325.60

14,980

Pintura esmalte Epxico

Ins

gal

0.0350

224,109.00

7,843.82

15,445

Soldadura electrosoldada 7018 de 5/32"

Ins

kg

0.1000

6,901.00

690.10

16,563

Tubo estructural redondo =1 1/2" e= 2,67 mm

Ins

2.0200

14,212.00

28,708.24

6,809 Baranda para separador Puente peatonal en tubos


de 2 1/2", 2" y 1 1/2" x 2. 67 mm. Suministro e
instal.

383,696.70

42

Motosoldador Diesel

Eqp

HR

0.6000

14,833.00

8,899.80

43

Equipo de Oxicorte

Eqp

HR

1.3000

5,000.00

6,500.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

45

Cilindro

Eqp

HR

1.3000

41.00

53.30

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

3.1000

3,226.00

10,000.60

68

Equipo Pintura

Eqp

HR

0.4000

2,200.00

880.00

Transporte de materiales Tn

Ana

0.1800

0.00

0.00

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.1000

6,885.00

7,573.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2000

6,200.00

1,240.00

14,745

Oxigeno Industrial

Ins

0.3000

15,662.00

4,698.60

14,746

Acetileno

Ins

kg

0.1000

41,820.00

4,182.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

3.1000

32,262.00

100,012.20

14,979

Anticorrosivo Epxico

Ins

gal

0.1500

141,570.00

21,235.50

14,980

Pintura esmalte Epxico

Ins

gal

0.1000

224,109.00

22,410.90

16,562

Tubo estructural redondo =2 1/2" e= 2.67 mm

Ins

3.0000

21,673.00

65,019.00

16,563

Tubo estructural redondo =1 1/2" e= 2,67 mm

Ins

6.1500

14,212.00

87,403.80

16,564

Tubo estructural redondo =2" e= 2.67 mm

Ins

2.5000

17,000.00

42,500.00

5,144

6,810 Anclaje en angulo 2" x 2" x 3/8" y platina 1/2".


Suministro e Instal.
8

Equipo de soldadura Marca Linconl 600 A

und

Eqp

HR

61,286.08

0.2000

8,750.00

1,750.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

459

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

43

Equipo de Oxicorte

Eqp

44

Pulidora electrica manual

Eqp

HR

0.1200

5,000.00

600.00

HR

0.0500

4,350.00

Herramienta Menor 10% M.O. SA-1

217.50

Eqp

HR

1.1500

1,144.00

1,315.60

Acero de refuerzo 60000 Psi

Ins

kg

2.4000

2,257.00

5,416.80

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3000

6,885.00

2,065.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.1200

15,662.00

1,879.44

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,945

Lamina HR 1/2"

Ins

0.0900

250,702.65

22,563.24

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

0.6000

13,493.00

8,095.80

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

1.1500

11,436.00

13,151.40

16,565

Tornillo = 3/8" x 1" G-8 R.O. Con T. A.

Ins

und

4.0000

562.00

2,248.00

115
8,194

6,811 Pendolon en Cable IPS - IWRC 6 x 19 AA = 3/8"

6,317.05

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0500

3,091.00

Transporte de materiales Tn

Ana

0.0004

0.00

0.00

13,960

Cuadrilla AA-4

Ins

0.0500

30,910.00

1,545.50

15,958

Cable IPS-IWRC 6 x 19 AA = 3/8"

Ins

1.0000

4,617.00

4,617.00

59
5,144

6,812 Conector superior platina de 1/4", puente colgante.

und

154.55

56,410.52

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

43

Equipo de Oxicorte

Eqp

HR

0.1480

5,000.00

740.00

44

Pulidora electrica manual

Eqp

HR

0.2960

4,350.00

1,287.60

2,502

Anticorrosivo rojo claro

Ins

gal

0.0150

29,750.00

446.25

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0150

42,950.00

644.25

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,144

Transporte de materiales Tn

Ana

0.0030

0.00

0.00

14,294

Tornillo = 1/2" x 1 1/2" G.8 R.O con W.T.A

Ins

und

4.0000

1,480.50

5,922.00

14,295

Perforacin de 1/2" en lmina HR 1/4"

Ins

und

4.0000

1,000.00

4,000.00

14,742

Lamina HR 1/4"

Ins

0.0600

125,317.09

7,519.03

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.1332

15,662.00

2,086.18

14,746

Acetileno

Ins

kg

0.0444

41,820.00

1,856.81

14,949

Tornillo =3/4" x 1 1/2" G.8 en A.I. R.O con W.T.A

Ins

und

1.0000

6,275.00

6,275.00

16,474

Perforacin de 3/4" en lmina HR 1/4"

Ins

und

1.0000

1,200.00

1,200.00

16,475

Perforacin de 3/4" en lmina HR 1/2"

Ins

und

5.0000

2,300.00

11,500.00

6,813 Conector inferior = 5/8" Puentes colgantes

und

1,175.20

9,212.79

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.0500

5,313.00

265.65

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.1667

1,144.00

190.70

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0357

6,805.00

242.94

5,144

Transporte de materiales Tn

Ana

0.0007

0.00

0.00

15,604

Acero de refuerzo 60000 Psi (liso)

Ins

kg

0.7200

2,371.00

1,707.12

16,374

Tornillo = 5/8" x 5" R.O G-8 con T.A

Ins

und

1.0000

4,900.00

4,900.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.1667

11,436.00

1,906.38

74
115

6,814 Angulo 3" x 3" x 1/4". Suministro y colocacion

33,341.29

Sub Contrato Todo Costo


115
2,475
14,295

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2286

1,144.00

261.52

Angulo o perfil 3" x 3" x 1/4"

Ins

1.0000

20,623.00

20,623.00

Perforacin de 1/2" en lmina HR 1/4"

Ins

und

9.8425

1,000.00

9,842.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

460

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

6,815 Tornillo 1/2" x 6" G-8 , R.O, con T.A


56
5,064
14,364

5,064
14,297

Vr.Unitario

Vr.Total

0.2286

11,436.00

2,614.27

und

10,769.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

Tornillo = 1/2" x 6" R.O G-8 con T.A

Ins

und

1.0000

5,922.00

5,922.00

6,816 Tornillo 1/2" x 7" G-8 , R.O, con T.A


56

Cantidad

und

11,756.75

Herramienta Menor 10% M.O. DD

Eqp

HR

0.2500

1,763.00

440.75

Cuadrilla DD (Carpinteria)

Ins

0.2500

17,628.00

4,407.00

Tornillo = 1/2" x 7" R.O G-8 con T.A

Ins

und

1.0000

6,909.00

6,909.00

6,817 Union tipo Dresser = 12" en A.C. Suministro e


instal.

und

529,675.00

Herramienta Menor 10% M.O. BB

Eqp

HR

5.0000

1,616.00

8,080.00

2,491

Union Dresser =12" en A.C

Ins

und

1.0000

440,800.00

440,800.00

4,515

Cuadrilla BB (Instalaciones)

Ins

5.0000

16,159.00

80,795.00

55

6,818 Pozo de Inspeccion Mixto recto (concreto


reforzado y mamposteria) H= 3.5 - 4.00 m

und

9,817,437.58

Herramienta Menor 10% M.O. AA-2

Eqp

HR

54.0000

2,010.00

108,540.00

1,870

Alambre Negro No 18

Ins

kg

23.0000

3,903.00

89,769.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

26.9400

2,295.00

61,827.30

2,085

Ladrillo tolete comn

Ins

und

682.0000

305.00

208,010.00

4,564

Mortero Impermeabilizado 1:2 (desperdicio 5%)

Ana

0.1800

551,059.84

99,190.77

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

10.4000

333,142.66

3,464,683.66

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.5100

311,229.99

158,727.29

5,061

Formaleta (1 uso)

Ana

9.6667

32,375.50

312,964.25

5,144

Transporte de materiales Tn

Ana

2.7200

0.00

0.00

5,921

Concreto impermeabilizado 1:2:3 o 3000 Psi (Basico, 5%


desperdicio)

Ana

0.4800

345,308.74

165,748.20

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1,493.3800

2,257.00

3,370,558.66

13,894

Geotextil No Tejido 2000

Ins

9.0500

4,109.00

37,186.45

14,513

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

56.0000

20,097.00

1,125,432.00

69

6,819 Yee 12" x 12" en A.C. EB x EB. Suministro e Instal.


55
4,515
14,366

und

3,090,170.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

Yee 12" x 12" en H.D. E.B x E.B

Ins

und

1.0000

2,983,520.00

2,983,520.00

6,820 Filtro en Y de =12". E.B. x E.B. Suministro e Instal

und

2,658,650.00

Herramienta Menor 10% M.O. BB

Eqp

HR

6.0000

1,616.00

9,696.00

2,732

Filtro en Y de =12". E.B. x E.B.

Ins

und

1.0000

2,552,000.00

2,552,000.00

4,515

Cuadrilla BB (Instalaciones)

Ins

6.0000

16,159.00

96,954.00

55

6,821 Niple = 12" en A.C. con E.B x E.B. L=0.80 m.


Suministro e Instal.

und

1,342,192.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

461

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. BB

Eqp

2,040

Niple = 12" en A.C. con E.B x E.B. L=0.80 m

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

55

6,822 Accesorios por unidad de acometida domiciliaria


de acueducto PF+UAD 1/2" (incluye micromedidor)

Cantidad

Vr.Unitario

Vr.Total

HR

2.6667

1,616.00

4,309.39

und

1.0000

1,294,792.00

1,294,792.00

2.6667

16,159.00

43,091.21

und

141,773.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.4000

1,616.00

646.40

Cuadrilla BB (Instalaciones)

Ins

0.4000

16,159.00

6,463.60

12,142

Registro de incorporacion 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

14,020

Cinta teflon

Ins

rl

0.5000

1,000.00

500.00

14,365

Registro de corte 1/2" en Cu. con acople

Ins

und

1.0000

21,614.00

21,614.00

15,286

Collar de derivacion RDE 21 PVC 3" x 1/2"

Ins

und

1.0000

11,181.00

11,181.00

15,664

Adaptador Macho PF+UAD 1/2 "

Ins

und

2.0000

1,481.00

2,962.00

16,348

Micromedidor de agua 1/2"

Ins

und

1.0000

76,792.00

76,792.00

55
4,515

6,823 Reparacion de acometida domiciliaria acueducto


PVC =3/4".

6,700.97

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2500

1,469.00

367.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0030

58,612.00

175.84

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0015

28,250.00

42.38

4,489

Cuadrilla AA (Albaileria)

Ins

0.2500

14,690.00

3,672.50

14,995

Tubo presin RDE 21 PVC 3/4 "

Ins

1.0000

1,873.00

1,873.00

15,040

Union presion PVC 3/4"

Ins

und

1.5000

380.00

570.00

17

6,824 Gavion en malla triple torsion en alambre


galvanizado calibre 12 recubierta en PVC hueco
7.5 x 7.5 cm

240,054.82

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,061

Formaleta (1 uso)

Ana

0.3400

32,375.50

11,007.67

5,063

Piedra rajon o media zonga

Ana

1.0000

90,495.15

90,495.15

5,144

Transporte de materiales Tn

Ana

0.0107

0.00

0.00

14,298

Malla t. tor. Cal. 12 7.5 x 7.5 rec. PVC 2 x 1 x 1

Ins

und

0.5000

138,040.00

69,020.00

14,367

Alambre Galvanizado No. 13 Recubierto PVC

Ins

kg

0.9000

5,440.00

4,896.00

17

6,825 Placa de fondo en Concreto 3000 Psi, resistencia


210 Kg/cm2

501,881.66

17

Herramienta Menor 10% M.O. AA

Eqp

HR

9.5000

1,469.00

13,955.50

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0000

4,333.00

8,666.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.5000

14,690.00

139,555.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.0000

333,142.66

333,142.66

6,826 Concreto 4000 Psi, placa de cubierta para pozos,


resistencia 280 Kg/cm2

595,348.94

17

Herramienta Menor 10% M.O. AA

Eqp

HR

11.5000

1,469.00

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

4,489

Cuadrilla AA (Albaileria)

Ins

11.5000

14,690.00

168,935.00

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.0000

378,352.56

378,352.56

16,893.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

462

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,061

Nombre

Tipo U.M.

Formaleta (1 uso)

Ana

6,827 Puesta a tierra mejorada para pozos profundos de


agua. Suministro e instal.

Cantidad

Vr.Unitario

Vr.Total

0.7600

32,375.50

24,605.38

und

1,067,396.50

Camion 350

Eqp

HR

3.0000

31,250.00

105

Herramienta Menor 10% M.O. AA-2 Elc

Eqp

HR

4.2500

2,100.00

8,925.00

847

Cable de cobre desnudo N 2

Ins

12.0000

13,813.00

165,756.00

36

93,750.00

Cuadrilla AA-2 (Electrica)

Ins

4.2500

20,998.00

89,241.50

16,559

Hidrosolta

Ins

kg

90.0000

5,522.00

496,980.00

16,560

Lamina de cobre (25 x 2 mm)

Ins

6.0000

29,232.00

175,392.00

16,561

Formaleta malla screen 5 mm

Ins

und

1.0000

37,352.00

37,352.00

6,918

6,828 Pintura anticorrosiva epoxico y esmalte epoxico 3


mls (puentes)

32,032.14

60

Compresor pintura

Eqp

HR

0.0500

3,500.00

175.00

61

Herramienta menor 10% M.O. CC

Eqp

HR

0.0700

1,689.00

118.23

68

Equipo Pintura

Eqp

HR

0.0500

2,200.00

110.00

1,990

Disolvente Thinner

Ins

gal

0.0800

12,440.00

995.20

5,066

Cuadrilla CC (Pintura)

Ins

0.0700

16,893.00

1,182.51

13,641

Seccin de Andamio

Ins

mes

0.0115

17,120.00

196.88

14,979

Anticorrosivo Epxico

Ins

gal

0.0800

141,570.00

11,325.60

14,980

Pintura esmalte Epxico

Ins

gal

0.0800

224,109.00

17,928.72

6,829 Vigas longitudinales Tuberia Petrolera =8", 6",4"

411,277.45

14

Retroexcavadora de orugas

Eqp

HR

0.0313

144,160.00

4,512.21

42

Motosoldador Diesel

Eqp

HR

0.2500

14,833.00

3,708.25

43

Equipo de Oxicorte

Eqp

HR

0.2500

5,000.00

1,250.00

44

Pulidora electrica manual

Eqp

HR

0.2500

4,350.00

1,087.50

45

Cilindro

Eqp

HR

0.2500

41.00

10.25

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.2500

3,226.00

806.50

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.6200

6,805.00

4,219.10

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.2100

6,856.00

1,439.76

5,144

Transporte de materiales Tn

Ana

0.5100

0.00

0.00

13,893

Tuberia en A.C. = 4" Dril Pipe Usd

Ins

1.7800

50,600.00

90,068.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.0900

15,662.00

1,409.58

14,746

Acetileno

Ins

kg

0.0400

41,820.00

1,672.80

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.2500

32,262.00

8,065.50

14,755

Tuberia en A.C. = 6 5/8" Dril Pipe Usd

Ins

0.6500

81,200.00

52,780.00

15,983

Tuberia en A.C. = 8" Dril Pipe Usd

Ins

2.0000

120,000.00

240,000.00

6,830 Tornillo conector 1" x 4" G-2 , R.O, con T.A

und

34,165.60

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.8000

3,226.00

2,580.80

74

Equipo de soldadura Marca Linconl 400 A

Eqp

HR

0.4000

5,313.00

2,125.20

14,402

Tornillo = 1" x 4" G-2 R.O. Con T. A.

Ins

und

1.0000

3,650.00

3,650.00

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.8000

32,262.00

25,809.60

6,831 Sistema de evacuacion de gases tipo chimenea.


PVC 4".
Valor promedio inst.tipica

36,603.70

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

463

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5714

1,616.00

923.38

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0080

58,612.00

468.90

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0080

28,250.00

226.00

3,654

Codo sanitario 90 1/4 C x C PVC 4"

Ins

und

0.5714

7,729.00

4,416.35

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5714

16,159.00

9,233.25

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0069

333,142.66

2,298.68

5,143

Transporte de materiales m

Ana

0.0430

46,157.00

1,984.75

13,961

Triturado de 1/2" - 3/4"

Ins

0.0430

46,304.00

1,991.07

15,439

Tubo PVC sanitario de 4"

Ins

1.0200

14,766.00

15,061.32

55

6,832 Captacion o Canal de lixiviados b=0.5, B=1.0 y


H=0.5 m

113,707.62

Valor promedio inst.tipica


Herramienta Menor 10% M.O. BB

Eqp

HR

0.8889

1,616.00

1,436.46

Geomembrana 40 mil 1.00 mm HDPE

Ins

2.0000

14,000.00

28,000.00

1,821

Triturado de 1" - 1 1/2"

Ins

0.3750

39,875.00

14,953.13

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0080

58,612.00

468.90

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0080

28,250.00

226.00

2,942

Union sanitaria PVC 6 "

Ins

und

0.1667

19,740.00

3,290.66

3,657

Tubo PVC sanitario de 6"

Ins

1.0500

31,269.00

32,832.45

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8889

16,159.00

14,363.74

5,143

Transporte de materiales m

Ana

0.3750

46,157.00

17,308.88

Geotextil No Tejido 1600

Ins

0.3000

2,758.00

827.40

55
814

13,783

6,833 Flexocreto en mortero fluido

44,910.91

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

95

Bomba para concreto

Eqp

HR

0.0100

21,000.00

210.00

1,541

Mortero 1:5 (desperdicio 5 %)

Ana

0.0950

221,256.93

21,019.41
5,876.00

1,469.00

587.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

13,783

Geotextil No Tejido 1600

Ins

1.0500

2,758.00

2,895.90

16,567

Flexocreto pavco 6000 h = 0.10 m

Ins

1.0500

13,640.00

14,322.00

6,834 Portaflanche de polietileno PE 100 - RDE 17 PN 10


110 mm =4".

und

121,633.94

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Portaflanche PE 100 - RDE 17 PN 10 110 mm =4"

Ins

und

1.0000

35,604.00

35,604.00

55
699

16,568

6,835 Tuberia de agua Galvanizada =2 " Suministro e


Instal.

29,843.42

Herramienta Menor 10% M.O. BB

Eqp

HR

0.0833

1,616.00

134.61

3,297

Tubo de agua Galvanizado =2"

Ins

1.0000

26,197.00

26,197.00

4,515

1,346.04

55

Cuadrilla BB (Instalaciones)

Ins

0.0833

16,159.00

15,545

Union Galvanizada = 2"

Ins

und

0.1667

5,336.00

889.51

16,275

Codo H.G. 90 2"

Ins

und

0.1667

7,656.00

1,276.26

6,836 Placa Piso en Concreto resistencia 210


kg/cm2-3000 psi
17

Herramienta Menor 10% M.O. AA

Eqp

HR

487,175.76

8.0000

1,469.00

11,752.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

464

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Vibrador de concretos

Eqp

3,323

Tabla Burra Ordinaria 0.25

Ins

4,489

Cuadrilla AA (Albaileria)

Ins

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

49

6,837 Tuberia Biaxial PVC RDE21 de =8". Suministro e


Instal.

Cantidad

Vr.Unitario

Vr.Total

HR

1.5000

4,375.00

6,562.50

4.2000

4,333.00

18,198.60

8.0000

14,690.00

117,520.00

1.0000

333,142.66

333,142.66

96,971.68

Herramienta Menor 5% M.O. BB

Eqp

HR

0.2667

808.00

215.49

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

14,118

Lubricante 500 gr

Ins

und

0.0150

12,305.00

184.58

14,382

Tuberia Biaxial PVC RDE21 de =8"

Ins

1.0000

92,262.00

92,262.00

109
4,515

6,838 Tuberia Biaxial PVC RDE21 de =6". Suministro e


Instal.

57,178.26

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1905

808.00

153.92

1,764

Tuberia Biaxial PVC RDE21 de =6"

Ins

1.0000

53,823.00

53,823.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1905

16,159.00

3,078.29

Lubricante 500 gr

Ins

und

0.0100

12,305.00

123.05

109

14,118

6,839 Valvula compuerta elastica vastago no ascendente


=8" J.H. Suministro e instal.

und

1,822,720.00

Herramienta Menor 10% M.O. BB

Eqp

HR

3.2000

1,616.00

5,171.20

Cuadrilla BB (Instalaciones)

Ins

3.2000

16,159.00

51,708.80

15,279

Union de reparacion u.m RDE 21 PVC 8 "

Ins

und

2.0000

206,350.00

412,700.00

16,147

Valv. comp. elast. vast. n.asc. ext. jh 8"

Ins

und

1.0000

1,353,140.00

1,353,140.00

55
4,515

6,840 Valvula compuerta elastica vastago no ascendente


=6" J.H. Suministro e instal.

und

1,186,516.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

15,278

Union de reparacion u.m RDE 21 PVC 6 "

Ins

und

2.0000

112,228.00

224,456.00

16,143

Valv. comp. elast. vast. n.asc. ext. jh 6"

Ins

und

1.0000

914,660.00

914,660.00

55
4,515

6,841 Reduccion en HF 12" x 8" J.H. Suministro e Instal.

und

966,852.95

Valor promedio inst.tipica


Herramienta Menor 5% M.O. BB

Eqp

HR

1.6000

808.00

1,292.80

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

14,118

Lubricante 500 gr

Ins

und

0.1500

12,305.00

1,845.75

14,384

Reduccion en HF 12" x 8" J.H.

Ins

und

1.0000

937,860.00

937,860.00

109
4,515

6,842 Codo 45 en H.D. en J.H =8" (200 mm). Suministro


e Instal.

und

573,029.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

15,789

Codo 45 8 " en HD. J.H.

Ins

und

1.0000

548,100.00

548,100.00

55
4,515

6,843 Tee en H.F. 8" x 8" J.H. Suministro e Instal.


55

Herramienta Menor 10% M.O. BB

und
Eqp

HR

689,768.20

1.3333

1,616.00

2,154.61

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

465

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

7,682

Tee en H.F. 8" x 8" J.H.

Ins

und

1.0000

664,100.00

664,100.00

Lubricante 500 gr

Ins

und

0.1600

12,305.00

1,968.80

14,118

6,844 Reduccion en HF 8" x 6" J.H. Suministro e Instal.

Cantidad

Vr.Unitario

und

Vr.Total

288,582.08

Valor promedio inst.tipica


109

Herramienta Menor 5% M.O. BB

Eqp

HR

1.1429

808.00

923.46

194

Reduccion en HF 8" x 6" J.H.

Ins

und

1.0000

267,960.00

267,960.00

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

4,515
14,118

6,845 Codo 45 en H.D. en J.H =6" (150 mm). Suministro


e Instal.

und

268,283.80

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

1,765

Codo 45 6 " en HD. J.H.

Ins

und

1.0000

243,600.00

243,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Lubricante 500 gr

Ins

und

0.0800

12,305.00

984.40

55

14,118

6,846 Tee en H.F. 6" x 6" J.H. Suministro e Instal.

und

390,671.65

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

1,156

Tee en H.F. 6" x 6" J.H.

Ins

und

1.0000

368,880.00

368,880.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Lubricante 500 gr

Ins

und

0.1200

12,305.00

1,476.60

55

14,118

6,847 Tapon en H.D. =6" J.H. Suministro e Instal.

und

221,856.63

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5714

1,616.00

923.38

1,665

Tapon en H.D. =6" J.H.

Ins

und

1.0000

211,700.00

211,700.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5714

16,159.00

9,233.25

55

6,848 Tapon en H.D. =8" J.H. Suministro e Instal.

und

246,216.63

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5714

1,616.00

923.38

2,492

Tapon en H.D. =8" J.H.

Ins

und

1.0000

236,060.00

236,060.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5714

16,159.00

9,233.25

55

6,849 Caja de inspeccion 80 x 80 para proteccion de


Valvulas con tapa valvula.

und

387,868.25

Herramienta Menor 10% M.O. AA

Eqp

HR

Cemento gris

Ins

kg

1,870

Alambre Negro No 18

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

3,684

Agua para obra

Ins

68.5000

10.00

685.00

4,426

Arena lavada de rio

Ins

0.2800

13,800.00

3,864.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.7929

14,690.00

85,097.70

5,143

Transporte de materiales m

Ana

0.5300

46,157.00

24,463.21

5,144

Transporte de materiales Tn

Ana

0.8270

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

15.2900

2,257.00

34,509.53

13,921

Crudo de rio clasificado T.m. 6"

Ins

0.0600

15,660.00

939.60

13,961

Triturado de 1/2" - 3/4"

Ins

0.1900

46,304.00

8,797.76

15,792

Tapa valvula tipo chorote - Traf. liviano

Ins

und

1.0000

116,000.00

116,000.00

17
804

5.7929

1,469.00

8,509.77

134.7400

383.34

51,651.23

0.1500

3,903.00

585.45

173.0000

305.00

52,765.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

466

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,850 Dovela doble concreto 0.07*0.07 m con 2 varillas de


1/2" y epxico para muro estructural.

Cantidad

Vr.Unitario

Vr.Total

36,847.03

Herramienta Menor 10% M.O. AA

Eqp

HR

1.1000

1,469.00

Taladro Rotomartillo

Eqp

HR

0.9259

8,750.00

8,101.63

4,489

Cuadrilla AA (Albaileria)

Ins

1.1000

14,690.00

16,159.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0098

333,142.66

3,264.80

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.1000

2,257.00

4,739.70

16,569

Sikadur Anchorfix 4*600 cc

Ins

und

0.0400

64,900.00

2,596.00

16,572

Broca de 5/8" para concreto WELLDONE

Ins

und

0.0200

18,500.00

370.00

17
125

6,851 Dovela sencilla en concreto 0.07*0.07 m con


anclaje en varilla 1/2" con epxico para muro
estructural

1,615.90

18,423.08

Herramienta Menor 10% M.O. AA

Eqp

HR

0.5500

1,469.00

807.95

Taladro Rotomartillo

Eqp

HR

0.4629

8,750.00

4,050.38

4,489

Cuadrilla AA (Albaileria)

Ins

0.5500

14,690.00

8,079.50

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0049

333,142.66

1,632.40

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.0500

2,257.00

2,369.85

16,569

Sikadur Anchorfix 4*600 cc

Ins

und

0.0200

64,900.00

1,298.00

16,572

Broca de 5/8" para concreto WELLDONE

Ins

und

0.0100

18,500.00

185.00

17
125

6,852 Alfaja curva en concreto 3000 psi a=0.70 m, e=0.07


m, reforzada con acero grado 37000

65,381.59

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.8600

1,469.00

2,732.34

2,196

Cerco ordinario 2.5 m 0,08 x 0,08

Ins

0.7600

4,300.00

3,268.00

2,208

Tabla chapa ordinario 0.10

Ins

0.5400

2,667.00

1,440.18

3,797

Puntilla con cabeza 2"

Ins

lb

0.1900

1,990.00

378.10

4,489

Cuadrilla AA (Albaileria)

Ins

1.8600

14,690.00

27,323.40

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0490

333,142.66

16,323.99

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

4.5000

3,092.35

13,915.58

5,144

Transporte de materiales Tn

Ana

0.0820

0.00

0.00

6,853 Tuberia acampanada PVC RDE 21 =4" .


Suministro e Instal.

54,870.21

Equipo de perforacion y rotacion

Eqp

HR

0.1333

112

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1333

2,305.00

307.26

881

Tubo RDE 21 PVC 4 " acampanada

Ins

1.0000

38,000.00

38,000.00

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0330

58,612.00

1,934.20

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0330

28,250.00

932.25

14,841

Puntera Hembra PVC RDE 21 4" de 2 o 4 TPI

Ins

und

0.0125

39,440.00

493.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1333

23,051.00

3,072.70

85

6,854 Filtro acampanado en tuberia PVC RDE 21 =4".


espacio 0.125". Suministro e Instal.

76,000.00

10,130.80

159,827.21

Equipo de perforacion y rotacion

Eqp

HR

0.1333

76,000.00

10,130.80

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1333

2,305.00

307.26

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0330

58,612.00

1,934.20

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0330

28,250.00

932.25

Filtro acampanado tuberia PVC RDE 21 =4" 0.03"

Ins

1.0000

143,450.00

143,450.00

85
112

15,698

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

467

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

6,855 Motobomba autocebante 2.2 H.P. =1 1/ 2" x 1 1/2"


de salida. Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.1333

23,051.00

3,072.70

und

765,992.40

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,020

Cinta teflon

Ins

rl

0.4000

1,000.00

400.00

14,215

Motobomba autocebante 2.2 H.P. 4 T. =1 1/2"

Ins

und

1.0000

630,000.00

630,000.00

14,216

Manguera de politileno 1 1/2"

Ins

und

1.0000

74,375.00

74,375.00

14,998

Tubo presin RDE 21 PVC 1 1/2 "

Ins

0.2000

6,392.00

1,278.40

15,034

Codo 45 presion PVC 1 1/2

Ins

und

1.0000

4,589.00

4,589.00

15,052

Adaptador macho presin PVC 1 1/2"

Ins

und

1.0000

2,422.00

2,422.00

16,328

Universal presin PVC 1 1/2"

Ins

und

1.0000

17,378.00

17,378.00

55
4,515

6,856 Bordillo Prefabricado (0.1 x 0.25 x 0.80)

19,533.73

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

1,539

Mortero 1:3 (desperdicio 5%)

Ana

0.0010

276,302.97

276.30

4,426

Arena lavada de rio

Ins

0.0100

13,800.00

138.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

5,143

Transporte de materiales m

Ana

0.0120

46,157.00

553.88

5,144

Transporte de materiales Tn

Ana

0.0295

0.00

0.00

Bordillo prefabricado 0.1 x 0.25 x 0.80

Ins

und

1.2500

12,267.00

15,333.75

17

13,899

6,857 Base granular para parcheo, estabilizada con


cemento al 2%.

87,839.98

Compactador Vibratorio

Eqp

HR

0.0625

100,000.00

6,250.00

18

Herramienta menor 10% M.O. AA-5

Eqp

HR

0.5000

3,632.00

1,816.00

70

Mezcladora de 9 ft

Eqp

HR

0.5000

4,375.00

2,187.50

Cemento gris

Ins

kg

42.0000

383.34

16,100.28

13,962

Cuadrilla AA-5

Ins

0.5000

36,317.00

18,158.50

14,777

Base Triturada T.max 1 1/2"

Ins

1.3000

33,329.00

43,327.70

804

6,858 Revestimiento columna en ladrillo tolete comn


con remate sup en pandereta vertical seccin final
0.50*0.5*2.5 m

und

Herramienta Menor 10% M.O. AA

Eqp

HR

1,540

Mortero 1:4 (desperdicio 5%)

Ana

2,085

Ladrillo tolete comn

Ins

und

4,489

Cuadrilla AA (Albaileria)

Ins

17

6,859 Alfaja en ladrillo tolete comn pandereta vertical


a=0.12m h=0.24m

215,263.82

5.5100

1,469.00

8,094.19

0.1252

248,144.84

31,067.73

312.0000

305.00

95,160.00

5.5100

14,690.00

80,941.90

21,035.45

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0078

248,144.84

1,935.53

2,085

Ladrillo tolete comn

Ins

und

16.0000

305.00

4,880.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

17

6,860 Pozo de Inspeccion recto (sin cono truncado) H=


2.0 - 2.5 m 1.50 m

und

2,111,846.31

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

468

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061
5,144

69

Cantidad

Vr.Unitario

Vr.Total

15.0000

2,010.00

30,150.00

3.4900

3,903.00

13,621.47

41.0600

2,295.00

94,232.70

1,361.0000

305.00

415,105.00

0.8800

367,816.92

323,678.89

0.1600

311,229.99

49,796.80

Ana

1.1400

378,352.56

431,321.92

Formaleta (1 uso)

Ana

0.5867

32,375.50

18,994.71

Transporte de materiales Tn

Ana

5.5600

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

75.3600

2,257.00

170,087.52

13,894

Geotextil No Tejido 2000

Ins

14.7000

4,109.00

60,402.30

14,669

Cuadrilla AA-2 (Tuberias)

Ins

15.0000

20,097.00

301,455.00

6,861 Pozo de Inspeccion H= 1.0 m 1.50. (Cono


Truncado, Ladrillo Tolete Tizn)

und

944,449.76

Herramienta Menor 10% M.O. AA-2

Eqp

HR

9.0000

2,010.00

18,090.00

1,870

Alambre Negro No 18

Ins

kg

0.2700

3,903.00

1,053.81

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2.6900

2,295.00

6,173.55

2,085

Ladrillo tolete comn

Ins

und

416.0000

305.00

126,880.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.3300

367,816.92

121,379.58

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.7600

333,142.66

253,188.42

5,061

Formaleta (1 uso)

Ana

0.3033

32,375.50

9,819.49

5,144

Transporte de materiales Tn

Ana

1.6700

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

10.6300

2,257.00

23,991.91

Cuadrilla AA-2 (Tuberias)

Ins

9.0000

20,097.00

180,873.00

69

14,669

6,862 Pozo de Inspeccion recto (sin cono truncado) H=


1.0 - 1.5 m 1.50 m

und

1,610,706.53

Herramienta Menor 10% M.O. AA-2

Eqp

HR

9.0000

2,010.00

18,090.00

1,870

Alambre Negro No 18

Ins

kg

3.3200

3,903.00

12,957.96

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

756.0000

305.00

230,580.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.4900

367,816.92

180,230.29

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1600

311,229.99

49,796.80

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.1400

378,352.56

431,321.92

5,061

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

5,144

Transporte de materiales Tn

Ana

3.1400

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

156,951.78

69

Acero de refuerzo 60000 Psi

Ins

kg

69.5400

2,257.00

13,894

Geotextil No Tejido 2000

Ins

8.1700

4,109.00

33,570.53

14,669

Cuadrilla AA-2 (Tuberias)

Ins

9.0000

20,097.00

180,873.00

6,863 Pozo de Inspeccion recto (sin cono truncado) H=


1.5 - 2.0 m 1.50 m

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

69

1,859,298.20

12.0000

2,010.00

24,120.00

3.4000

3,903.00

13,270.20

41.0600

2,295.00

94,232.70

1,058.0000

305.00

322,690.00

0.6800

367,816.92

250,115.51

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

469

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5,144

Vr.Total

0.1600

311,229.99

49,796.80

1.1400

378,352.56

431,321.92

Ana

0.5900

32,375.50

19,101.55

Transporte de materiales Tn

Ana

4.3500

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

163,519.65

Acero de refuerzo 60000 Psi

Ins

kg

72.4500

2,257.00

13,894

Geotextil No Tejido 2000

Ins

11.4300

4,109.00

46,965.87

14,669

Cuadrilla AA-2 (Tuberias)

Ins

12.0000

20,097.00

241,164.00

6,864 Pozo de Inspeccion recto (sin cono truncado) H=


2.5 - 3.0 m 1.50 m

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061
5,144

69

2,382,731.93

19.0000

2,010.00

38,190.00

3.5800

3,903.00

13,972.74

41.0600

2,295.00

94,232.70

1,663.0000

305.00

507,215.00

1.0700

367,816.92

393,564.10

0.1600

311,229.99

49,796.80

Ana

1.1400

378,352.56

431,321.92

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

Transporte de materiales Tn

Ana

6.7700

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

78.2700

2,257.00

176,655.39

13,894

Geotextil No Tejido 2000

Ins

17.9700

4,109.00

73,838.73

14,669

Cuadrilla AA-2 (Tuberias)

Ins

19.0000

20,097.00

381,843.00

6,865 Pozo de Inspeccion recto (sin cono truncado) H=


3.0 - 3.5 m 1.50 m

und

2,673,942.88

Herramienta Menor 10% M.O. AA-2

Eqp

HR

23.0000

2,010.00

46,230.00

1,870

Alambre Negro No 18

Ins

kg

3.7500

3,903.00

14,636.25

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

1,966.0000

305.00

599,630.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.2700

367,816.92

467,127.49

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1600

311,229.99

49,796.80

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.1400

378,352.56

431,321.92

5,061

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

5,144

Transporte de materiales Tn

Ana

7.9900

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

13,894

Geotextil No Tejido 2000

Ins

21.2300

4,109.00

87,234.07

14,669

Cuadrilla AA-2 (Tuberias)

Ins

23.0000

20,097.00

462,231.00

15,604

Acero de refuerzo 60000 Psi (liso)

Ins

kg

84.1000

2,371.00

199,401.10

69

6,866 Reja en ngulo de 1 1/2" x 1/8" pintada e instalada

112,030.88

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.8500

8,750.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

2.7500

1,144.00

3,146.00

228

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.7500

6,805.00

5,103.75

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.9000

1,691.00

1,521.90

2,502

Anticorrosivo rojo claro

Ins

gal

0.1100

29,750.00

3,272.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.1100

42,950.00

4,724.50

Angulo o perfil 1 1/2" x 1 1/2" x 1/8"

Ins

8.9000

4,327.00

38,510.30

15,920

7,437.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

470

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

6,867 Porton marco en tubo galvanizado de 1 1/2" con


reja en varilla cuadrada de 3/4" fijuras en platina
1/4"x1/2" flores met

Cantidad

Vr.Unitario

Vr.Total

2.7500

11,436.00

31,449.00

259,725.08

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

1.0000

8,750.00

8,750.00

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

16,865.43

16,865.43

1,792

Pabmeril Pliego 9" x 11"

Ins

und

0.9000

1,691.00

1,521.90

1,990

Disolvente Thinner

Ins

gal

0.0100

12,440.00

124.40

2,502

Anticorrosivo rojo claro

Ins

gal

0.0300

29,750.00

892.50

3,838

Esmalte mate supersinttico

Ins

gal

0.0400

50,506.00

2,020.24

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

8,233

Platina 1/4" * 1/2" * 6 mts

Ins

und

1.0500

10,795.00

11,334.75

13,897

Tubo cerramiento Galvanizado =1 1/2 " e=0.128"

Ins

2.0200

18,373.00

37,113.46

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

1.0000

6,885.00

6,885.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

5.4000

11,436.00

61,754.40

16,479

Varilla cuadrada 3/4"*6 mts

Ins

12.0000

7,624.00

91,488.00

16,570

Flor metlica de 5 puntas

Ins

und

10.5000

1,700.00

17,850.00

16,571

Juego bisagras tipo mueca para tubo galv 1 1/2"

Ins

und

0.2500

12,500.00

3,125.00

8
228

6,868 Traslado e hincada de poste media tensin

und

354,312.73

17

Herramienta Menor 10% M.O. AA

Eqp

HR

4.0000

1,469.00

5,876.00

28

Grua

Eqp

HR

2.6000

43,750.00

113,750.00

31

Herramienta menor linieros

Eqp

HR

2.6000

1,820.00

4,732.00

4,489

Cuadrilla AA (Albaileria)

Ins

4.0000

14,690.00

58,760.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.3500

333,142.66

116,599.93

6,918

Cuadrilla AA-2 (Electrica)

Ins

2.6000

20,998.00

54,594.80

6,869 Pozo de Inspeccion recto (sin cono truncado) H=


3.5 - 4.0 m 1.50 m

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

5,061
5,144

69

2,890,920.26

25.0000

2,010.00

50,250.00

3.8400

3,903.00

14,987.52

41.0600

2,295.00

94,232.70

2,268.0000

305.00

691,740.00

1.4600

367,816.92

537,012.70

0.1600

311,229.99

49,796.80

Ana

1.1400

378,352.56

431,321.92

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

Transporte de materiales Tn

Ana

9.2000

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

87.0100

2,257.00

196,381.57

13,894

Geotextil No Tejido 2000

Ins

24.5000

4,109.00

100,670.50

14,669

Cuadrilla AA-2 (Tuberias)

Ins

25.0000

20,097.00

502,425.00

6,870 Pozo de Inspeccion recto (sin cono truncado) H=


4.0 - 4.5 m 1.50 m - Tizon

und

3,330,682.10

Herramienta Menor 10% M.O. AA-2

Eqp

HR

36.0000

2,010.00

72,360.00

1,870

Alambre Negro No 18

Ins

kg

3.9300

3,903.00

15,338.79

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

2,571.0000

305.00

784,155.00

69

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

471

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

1.6600

367,816.92

610,576.09

0.1600

311,229.99

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

49,796.80

Ana

5,061

1.1400

378,352.56

431,321.92

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

5,144

Transporte de materiales Tn

Ana

10.4100

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

13,894

Geotextil No Tejido 2000

Ins

27.7700

4,109.00

114,106.93

14,669

Cuadrilla AA-2 (Tuberias)

Ins

36.0000

20,097.00

723,492.00

15,604

Acero de refuerzo 60000 Psi (liso)

Ins

kg

89.9200

2,371.00

213,200.32

6,871 Pozo de Inspeccion recto (sin cono truncado) H=


4.5 - 5.0 m 1.50 m - Tizon

und

3,568,756.91

Herramienta Menor 10% M.O. AA-2

Eqp

HR

39.0000

2,010.00

78,390.00

1,870

Alambre Negro No 18

Ins

kg

4.0200

3,903.00

15,690.06

1,901

Acero de refuerzo 37000 Psi

Ins

kg

41.0600

2,295.00

94,232.70

2,085

Ladrillo tolete comn

Ins

und

2,872.0000

305.00

875,960.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.8500

367,816.92

680,461.30

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.1600

311,229.99

49,796.80

5,058

Concreto 4000 Psi (Basico, 5% desperdicio)

Ana

1.1400

378,352.56

431,321.92

5,061

Formaleta (1 uso)

Ana

0.5900

32,375.50

19,101.55

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

8,194

69

11.6300

0.00

0.00

1.0000

203,000.00

203,000.00

Acero de refuerzo 60000 Psi

Ins

kg

92.8300

2,257.00

209,517.31

13,894

Geotextil No Tejido 2000

Ins

31.0300

4,109.00

127,502.27

14,669

Cuadrilla AA-2 (Tuberias)

Ins

39.0000

20,097.00

783,783.00

6,872 Pozo de Inspeccion H= 2.5 - 3.0 m 2.0 (Cono


Truncado, Ladrillo Tolete Tizn - Soga)

und

2,459,185.87

Herramienta Menor 10% M.O. AA-2

Eqp

HR

24.0000

2,010.00

48,240.00

1,870

Alambre Negro No 18

Ins

kg

0.4400

3,903.00

1,717.32

1,901

Acero de refuerzo 37000 Psi

Ins

kg

3.3600

2,295.00

7,711.20

2,085

Ladrillo tolete comn

Ins

und

2,166.0000

305.00

660,630.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.5100

367,816.92

555,403.55

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.3300

333,142.66

443,079.74

5,061

Formaleta (1 uso)

Ana

0.4600

32,375.50

14,892.73

5,144

Transporte de materiales Tn

Ana

8.6900

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

18.6900

2,257.00

42,183.33

Cuadrilla AA-2 (Tuberias)

Ins

24.0000

20,097.00

482,328.00

69

14,669

6,873 Pozo de Inspeccion H= 3.0 - 3.5 m 2.0 (Cono


Truncado, Ladrillo Tolete Tizn - Soga)

und

2,841,289.57

Herramienta Menor 10% M.O. AA-2

Eqp

HR

28.0000

2,010.00

56,280.00

1,870

Alambre Negro No 18

Ins

kg

0.5200

3,903.00

2,029.56

1,901

Acero de refuerzo 37000 Psi

Ins

kg

3.3600

2,295.00

7,711.20

2,085

Ladrillo tolete comn

Ins

und

2,688.0000

305.00

819,840.00

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

1.8500

367,816.92

680,461.30

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

1.3300

333,142.66

443,079.74

5,061

Formaleta (1 uso)

Ana

14,892.73

5,144

Transporte de materiales Tn

Ana

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

69

0.4600

32,375.50

10.7800

0.00

0.00

1.0000

203,000.00

203,000.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

472

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
8,194
14,669

Nombre

Tipo U.M.

Acero de refuerzo 60000 Psi

Ins

kg

22.7200

2,257.00

51,279.04

Cuadrilla AA-2 (Tuberias)

Ins

28.0000

20,097.00

562,716.00

6,874 Pozo de Inspeccion H= 3.5 - 4.0 m 2.0 (Cono


Truncado, Ladrillo Tolete Tizn - Soga)

Vr.Unitario

und

Herramienta Menor 10% M.O. AA-2

Eqp

HR

1,870

Alambre Negro No 18

Ins

kg

1,901

Acero de refuerzo 37000 Psi

Ins

kg

2,085

Ladrillo tolete comn

Ins

und

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5,144

69

Cantidad

Vr.Total

3,133,623.18

28.0000

2,010.00

56,280.00

0.5600

3,903.00

2,185.68

3.3600

2,295.00

7,711.20

3,209.0000

305.00

978,745.00

2.2000

367,816.92

809,197.22

1.3300

333,142.66

443,079.74

Ana

0.4600

32,375.50

14,892.73

Transporte de materiales Tn

Ana

12.8600

0.00

0.00

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

24.7300

2,257.00

55,815.61

Cuadrilla AA-2 (Tuberias)

Ins

28.0000

20,097.00

562,716.00

14,669

6,875 Reparacion de acometida PF+UAD de 3/4" para


acueducto

9,449.37

Herramienta Menor 10% M.O. BB

Eqp

HR

0.2286

1,616.00

369.42

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

14,236

Union PF+UAD 3/4"

Ins

und

0.5000

3,287.00

1,643.50

14,552

Adaptador Macho PF+UAD 3/4 "

Ins

und

0.5000

1,871.00

935.50

16,330

Tuberia PF+UAD 3/4 "

Ins

1.0000

2,807.00

2,807.00

55
4,515

6,876 Union de presion PVC 3". Suministro e instal.

und

17,540.85

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0190

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0190

28,250.00

536.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2105

16,159.00

3,401.47

Union presion PVC 3"

Ins

und

1.0000

12,489.00

12,489.00

15,046

6,877 Union de presion PVC 4". Suministro e instal.

und

1,113.63

33,343.30

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0250

58,612.00

1,465.30

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0250

28,250.00

706.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

Union presion PVC 4"

Ins

und

1.0000

27,132.00

27,132.00

15,047

6,878 Manejo, control y extraccion de agua


58
124
8,145

17,548.00

Motobomba de 4" o 6"

Eqp

HR

1.0000

Herramienta menor 10% M.O. Ayud. const

Eqp

HR

1.0000

541.00

541.00

Ayudante de construccion

Ins

1.0000

5,407.00

5,407.00

6,879 Placa superior para pozos en Concreto 3500 Psi.

11,600.00

11,600.00

590,889.49

17

Herramienta Menor 10% M.O. AA

Eqp

HR

10.5000

1,469.00

15,424.50

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0933

4,333.00

9,070.27

4,489

Cuadrilla AA (Albaileria)

Ins

10.5000

14,690.00

154,245.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

473

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
5,061

Nombre

Tipo U.M.

Formaleta (1 uso)

Ana

6,880 Placa de fondo en Concreto 3500 Psi

Cantidad

Vr.Unitario

Vr.Total

1.6600

32,375.50

53,743.33

520,582.89

17

Herramienta Menor 10% M.O. AA

Eqp

HR

9.5000

1,469.00

13,955.50

49

Vibrador de concretos

Eqp

HR

1.5000

4,375.00

6,562.50

3,323

Tabla Burra Ordinaria 0.25

Ins

2.0000

4,333.00

8,666.00

4,489

Cuadrilla AA (Albaileria)

Ins

9.5000

14,690.00

139,555.00

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

1.0000

351,843.89

351,843.89

6,881 Desmonte y Limpieza incluye retiro

2,079.07

21

Volqueta (6 m3 )

Eqp

HR

0.0286

55,550.00

1,588.73

40

Guadaadora

Eqp

HR

0.0286

12,000.00

343.20

Herramienta menor 10% M.O. Ayudante (A)

Eqp

HR

0.0286

468.00

13.38

Ayudante (A)

Ins

0.0286

4,677.00

133.76

106
14,703

6,882 Solado en base granular compactada para


cimentacion de tuberia.

59,032.90

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

41

Vibrocompactador tipo rana

Eqp

HR

0.5556

5,000.00

2,778.00

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

Base Triturada T.max 1 1/2"

Ins

1.3000

33,329.00

43,327.70

4,489
14,777

6,883 Codo campana x espigo 40" + salida perpendicular


30" convencional (espigo no reducido) en PEAD

und

1,175.20

11,914,849.51

14

Retroexcavadora de orugas

Eqp

HR

0.1429

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Codo C x E 40" + salida perpend. 3O" convencional

Ins

und

1.0000

11,873,934.00

11,873,934.00

4,515
14,597

6,884 Rejilla para sumidero transversal A= 0.70 pintada e


instalada.

20,600.46

421,642.20

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

4.0000

8,750.00

Pulidora electrica manual

Eqp

HR

1.5000

4,350.00

6,525.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

10.0000

1,144.00

11,440.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

2.5000

6,805.00

17,012.50

2,475

Angulo o perfil 3" x 3" x 1/4"

Ins

2.7000

20,623.00

55,682.10

2,502

Anticorrosivo rojo claro

Ins

gal

0.2500

29,750.00

7,437.50

3,838

Esmalte mate supersinttico

Ins

gal

0.3000

50,506.00

15,151.80

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1.4000

2,257.00

3,159.80

13,526

Angulo o perfil 2 1/2" x 2 1/2" x 1/4"

Ins

7.2500

17,350.00

125,787.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.5000

6,200.00

3,100.00

15,776

Angulo o perfil 2" x 2" x 1/4"

Ins

2.0000

13,493.00

26,986.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

10.0000

11,436.00

114,360.00

8
44
115

6,885 Pozo de Inspeccion en concreto 3500 Psi reforzado


H= 2.0 - 2.5 m 2.10 m

und

35,000.00

5,352,663.09

Herramienta Menor 10% M.O. AA-2

Eqp

HR

28.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

16.7900

3,903.00

65,531.37

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.4600

311,229.99

143,165.80

69

56,280.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

474

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5,061

Formaleta (1 uso)

5.1000

351,843.89

1,794,403.84

Ana

11.9933

32,375.50

8,193

388,289.08

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

8,194

203,000.00

Acero de refuerzo 60000 Psi

Ins

kg

840.0000

2,257.00

1,895,880.00

13,927

Cinta sika PVC 0-22

Ins

7.6300

31,900.00

243,397.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

28.0000

20,097.00

562,716.00

6,886 Pozo de Inspeccion en concreto 3500 Psi reforzado


H= 2.5 - 3.0 m 2.10 m

und

6,022,093.14

Herramienta Menor 10% M.O. AA-2

Eqp

HR

32.0000

2,010.00

64,320.00

1,870

Alambre Negro No 18

Ins

kg

19.1100

3,903.00

74,586.33

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.4600

311,229.99

143,165.80

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

5.7600

351,843.89

2,026,620.81

5,061

Formaleta (1 uso)

Ana

14.4000

32,375.50

466,207.20

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

956.0000

2,257.00

2,157,692.00

13,927

Cinta sika PVC 0-22

Ins

7.6300

31,900.00

243,397.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

32.0000

20,097.00

643,104.00

69

6,887 Pozo de Inspeccion en concreto 3500 Psi reforzado


H= 3.0 - 3.5 m 2.10 m

und

6,696,015.41

Herramienta Menor 10% M.O. AA-2

Eqp

HR

36.0000

1,870

Alambre Negro No 18

Ins

kg

21.4800

3,903.00

83,836.44

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.4600

311,229.99

143,165.80

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

6.4200

351,843.89

2,258,837.77

5,061

Formaleta (1 uso)

Ana

16.8000

32,375.50

543,908.40

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1,074.0000

2,257.00

2,424,018.00

13,927

Cinta sika PVC 0-22

Ins

7.6300

31,900.00

243,397.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

36.0000

20,097.00

723,492.00

69

6,888 Pozo de Inspeccion en concreto 3500 Psi reforzado


H= 3.5 - 4.0 m 2.10 m

2,010.00

und

72,360.00

7,366,306.64

Herramienta Menor 10% M.O. AA-2

Eqp

HR

40.0000

2,010.00

1,870

Alambre Negro No 18

Ins

kg

23.8000

3,903.00

92,891.40

5,054

Concreto 1:3:3 o 2000 Psi (Basico, 5% Desperdicio)

Ana

0.4600

311,229.99

143,165.80

5,059

Concreto 1:2:2 o 3500 Psi (Basico, 5% desperdicio)

Ana

7.0800

351,843.89

2,491,054.74

5,061

Formaleta (1 uso)

Ana

19.2333

32,375.50

622,687.70

8,193

Aro y Contra aro en HF para pozos de Insp.

Ins

und

1.0000

203,000.00

203,000.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

1,190.0000

2,257.00

2,685,830.00

13,927

Cinta sika PVC 0-22

Ins

7.6300

31,900.00

243,397.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

40.0000

20,097.00

803,880.00

69

6,889 Codo Sanitario 45 1/8 C x C PVC 8". Suministro e


Instal.

und

80,400.00

77,447.20

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0120

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0090

28,250.00

254.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Codo sanitario 45-1/8 C x C PVC 8"

Ins

und

1.0000

72,180.00

72,180.00

16,293

703.34

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

475

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,890 Tuberia acampanada o roscada PVC RDE 17 =6" .


Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total
116,721.42

Equipo de perforacion y rotacion

Eqp

HR

0.1905

76,000.00

14,478.00

Herramienta Menor 10% M.O. PAm-3

Eqp

HR

0.1905

2,305.00

439.10

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0500

58,612.00

2,930.60

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

2,960

Tubo RDE 17 PVC 6 " acampanada

Ins

1.0000

93,070.00

93,070.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1905

23,051.00

4,391.22

85
112

6,891 Tee manifold 2 campanas x 1 espigo 48" en PEAD

und

18,093,487.47

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Tee manifold 2 campanas x 1 espigo 48" en PEAD

Ins

und

1.0000

18,041,016.00

18,041,016.00

4,515
14,231

6,892 Doble manifold 3 campanas x 1 espigo 48" en


PEAD

und

24,031.47

38,527,699.47

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Doble manifold 3 campanas x 1 espigo 48" en PEAD

Ins

und

1.0000

38,475,228.00

38,475,228.00

4,515
14,232

6,893 Reduccion 48" x 40" campana - espigo en PEAD

und

24,031.47

8,731,794.87

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

24,031.47

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Reduccion 48" x 40" campana - espigo en PEAD

Ins

und

1.0000

8,684,064.00

8,684,064.00

4,515
14,235

6,894 Tee manifold 2 campanas x 1 espigo 40" en PEAD

und

14,775,090.87

14

Retroexcavadora de orugas

Eqp

HR

0.1667

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee manifold 2 campanas x 1 espigo 40" en PEAD

Ins

und

1.0000

14,727,360.00

14,727,360.00

4,515
14,230

6,895 Doble manifold 3 campanas x 1 espigo 40" en


PEAD

144,160.00

und

24,031.47

35,301,348.87

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Doble manifold 3 campanas x 1 espigo 40" en PEAD

Ins

und

1.0000

35,253,618.00

35,253,618.00

4,515
14,228

6,896 Tee manifold 1 campana x 1 espigo 48" por salida


perpendicular 40" connvencional no espigo
reducido en PEAD

und

24,031.47

14,558,921.47

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

Tee manifold 1 camp x 1 esp. 48" x salida per. 40"

Ins

und

1.0000

14,506,450.00

14,506,450.00

4,515
14,227

24,031.47

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

476

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,897 Tee manifold 1 campana x 1 espigo 40" por salida


perpendicular 40" connvencional no espigo
reducido en PEAD

Cantidad

Vr.Unitario

und

Vr.Total

12,888,147.87

14

Retroexcavadora de orugas

Eqp

HR

0.1667

144,160.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Tee manifold 1 camp x 1 esp. 40" x salida per. 40"

Ins

und

1.0000

12,840,417.00

12,840,417.00

4,515
14,226

6,898 Sello para estructura en concreto de 48", para


tuberia en PEAD
109
4,515
14,180

und

109

14,181

Eqp

HR

0.8000

808.00

646.40

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Sello para estructura en concreto de 48" tub. PEAD

Ins

und

1.0000

1,408,304.00

1,408,304.00

und

109

14,182

Eqp

HR

0.6667

808.00

538.69

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Sello para estructura en concreto de 42" tub. PEAD

Ins

und

1.0000

1,150,575.00

1,150,575.00

und

4,515
14,183

Eqp

HR

0.6667

808.00

538.69

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Sello para estructura en concreto de 40" tub. PEAD

Ins

und

1.0000

1,105,575.00

1,105,575.00

und

4,489

1,023,817.90

Herramienta Menor 5% M.O. BB

Eqp

HR

0.6667

Cuadrilla BB (Instalaciones)

Ins

0.6667

16,159.00

10,773.21

Sello para estructura en concreto de 36" tub. PEAD

Ins

und

1.0000

1,012,506.00

1,012,506.00

6,902 Retiro de adoquin


17

1,116,886.90

Herramienta Menor 5% M.O. BB

6,901 Sello para estructura en concreto de 36", para


tuberia en PEAD
109

1,161,886.90

Herramienta Menor 5% M.O. BB

6,900 Sello para estructura en concreto de 40", para


tuberia en PEAD

4,515

1,421,877.60

Herramienta Menor 5% M.O. BB

6,899 Sello para estructura en concreto de 42", para


tuberia en PEAD

4,515

24,031.47

808.00

538.69

1,615.90

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1000

1,469.00

146.90

Cuadrilla AA (Albaileria)

Ins

0.1000

14,690.00

1,469.00

6,903 Suministro e instal. tuberia PVC alcantarillado 48"


(inc. union)

1,495,823.89

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0000

111,550.00

0.00

14

Retroexcavadora de orugas

Eqp

HR

0.3125

144,160.00

45,050.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

1.7600

1,616.00

2,844.16

Cuadrilla BB (Instalaciones)

Ins

1.7600

16,159.00

28,439.84

14,118

Lubricante 500 gr

Ins

und

0.1780

12,305.00

2,190.29

15,421

Tuberia alcantarillado PVC 48 "

Ins

1.0290

1,278,596.00

1,315,675.28

15,524

Union alcantarillado PVC 48 "

Ins

und

0.1667

609,624.00

101,624.32

4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

477

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,904 Suministro e instal. tuberia PVC alcantarillado 60"


(inc. union)

Cantidad

Vr.Unitario

Vr.Total
1,919,873.15

Retroexcavadora 4 x 4 (llanta)

Eqp

HR

0.0000

111,550.00

0.00

14

Retroexcavadora de orugas

Eqp

HR

0.3448

144,160.00

49,706.37

55

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0600

1,616.00

3,328.96

Cuadrilla BB (Instalaciones)

Ins

2.0600

16,159.00

33,287.54

13,910

Tuberia alcantarillado PVC 60 "

Ins

1.0290

1,662,057.00

1,710,256.65

14,118

Lubricante 500 gr

Ins

und

0.2390

12,305.00

2,940.90

16,333

Union alcantarillado PVC 60 "

Ins

und

0.1667

721,972.00

120,352.73

4,515

6,905 Varilla grafil 4mm

703.52

Herramienta Menor 10% M.O. AA

Eqp

HR

0.0250

1,469.00

36.73

4,489

Cuadrilla AA (Albaileria)

Ins

0.0250

14,690.00

367.25

16,573

Varilla grafil 4 mm x 6 m

Ins

und

0.1700

1,762.00

299.54

17

6,906 Correa en perfil en C PHR de 254*64*2 mm pintada


e instalada

34,561.79

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

0.5000

188.00

94.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.4000

1,144.00

457.60

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0300

6,805.00

204.15

5,955

Pintura en esmalte sobre lamina lineal, pagado en ml

Ana

1.0000

8,168.04

8,168.04

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.4000

11,436.00

4,574.40

16,574

Perfil en C 254*64*2 mm* 6m

Ins

und

0.1700

118,756.45

20,188.60

6,907 Correa perfil C PHR 120*60*2.5 mm con


anticorrosivo y esmalte instalada a un H=4 m prom.

875.00

27,832.79

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

0.5000

188.00

94.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2000

1,144.00

228.80

Pintura en esmalte sobre lamina lineal, pagado en ml

Ana

1.0000

8,168.04

8,168.04

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0200

6,885.00

137.70

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.2000

11,436.00

2,287.20

16,575

Perfil estructural PHR en C 120 x 60 x 2.5 mm

Ins

und

0.1700

94,365.00

16,042.05

5,955

6,908 Codo 90 en H.D. en J.H =8" (200 mm). Suministro


e Instal.
55
885
4,515
14,118

und

875.00

536,489.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Codo 90 =8" en H.D J.H.

Ins

und

1.0000

511,560.00

511,560.00

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

6,909 Codo 22.5 en H.D. en J.H. =8" (200 mm).


Suministro e instal.

und

390,329.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

15,753

Codo 22.5 =8" en H.D. J.H.

Ins

und

1.0000

365,400.00

365,400.00

55
4,515

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

478

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,910 Codo 11 1/4 en H.D. en J.H. =8" (200 mm),


Suministro e instal.

Cantidad

Vr.Unitario

und

Vr.Total
411,209.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,321

Codo 11.25 8" en HD. J.H.

Ins

und

1.0000

386,280.00

386,280.00

55
4,515

6,911 Codo 90 en H.D. en J.H =6" (150 mm). Suministro


e Instal.

und

295,209.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,342

Codo 90 6 " en HD. J.H.

Ins

und

1.0000

270,280.00

270,280.00

55
4,515

6,912 Codo 22.5 en H.D. en J.H. =6" (150 mm).


Suministro e instal.

und

276,069.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,204

Codo 22.5 =6" en H.D. J.H.

Ins

und

1.0000

251,140.00

251,140.00

55
4,515

6,913 Codo 11 1/4 en H.D. en J.H. =6" (150 mm),


Suministro e instal.

und

260,989.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,118

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

14,698

Codo 11.25 6" en HD. J.H.

Ins

und

1.0000

236,060.00

236,060.00

55
4,515

6,914 Tee en H.F. 8" x 6" J.H. Suministro e Instal.

und

640,651.65

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

14,118

Lubricante 500 gr

Ins

und

0.1200

12,305.00

1,476.60

14,190

Tee en H.F. 8" x 8" x 6" J.H.

Ins

und

1.0000

618,860.00

618,860.00

55
4,515

6,915 Yee 8" x 8" x 6" en H.D. J.H. Suministro e Instal.

und

914,830.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

14,419

Yee 8" x 8" x 6" en H.D. J.H.

Ins

und

1.0000

879,280.00

879,280.00

55

6,916 Macromedidor =8" E.B.x E.B. Suministro e Instal.

und

8,262,452.10

Herramienta Menor 5% M.O. BB

Eqp

HR

1.3333

808.00

1,077.31

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,020

Cinta teflon

Ins

rl

0.3500

1,000.00

350.00

15,808

Macromedidor Helix E.B. 8"

Ins

und

1.0000

8,239,480.00

8,239,480.00

109
4,515

6,917 Filtro acampanado o roscado en Tuberia PVC RDE


17 6" espacio 0.125" Ranura 0.050". Suministro e
Instal.

195,872.42

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

479

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Equipo de perforacion y rotacion

Eqp

Herramienta Menor 10% M.O. PAm-3

Eqp

2,927

Soldadura para PVC 1/4 gl

2,938

85
112

Cantidad

Vr.Unitario

Vr.Total

HR

0.1905

76,000.00

14,478.00

HR

0.1905

2,305.00

439.10

Ins

und

0.0500

58,612.00

2,930.60

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

14,477

Filtro acampanado Tuberia PVC RDE 17 =6" 0.125"

Ins

1.0000

172,221.00

172,221.00

16,415

Cuadrilla PAm-3 (Pozos profundos)

Ins

0.1905

23,051.00

4,391.22

6,918 Correa perfil C PHR 120*60*1.5 mm con


anticorrosivo y esmalte instalada a un H=4 m prom.

22,001.00

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

82

Andamio tubular stand. (inc. tijeras)

Eqp

HR

0.5000

188.00

94.00

115

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2000

1,144.00

228.80

Pintura en esmalte sobre lamina lineal, pagado en ml

Ana

1.0000

8,168.04

8,168.04

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.0200

6,885.00

137.70

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.2000

11,436.00

2,287.20

16,576

Perfil estructural PHR en C 120 x 60 x 1.5 mm

Ins

und

0.1700

60,060.37

10,210.26

5,955

6,919 Platina apoyo 250*250*12mm + platina 250*250*6


con 8 perforaciones 3/4" instaladas sin pernos.

und

875.00

81,936.37

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3400

8,750.00

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0600

6,805.00

408.30

14,742

Lamina HR 1/4"

Ins

0.0600

125,317.09

7,519.03

14,945

Lamina HR 1/2"

Ins

0.0600

250,702.65

15,042.16

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.8300

11,436.00

9,491.88

16,471

Corte en lmina HR 1/4"

Ins

0.5000

20,000.00

10,000.00

16,473

Corte en lmina HR 1/2"

Ins

0.5000

45,000.00

22,500.00

16,474

Perforacin de 3/4" en lmina HR 1/4"

Ins

und

4.0000

1,200.00

4,800.00

16,475

Perforacin de 3/4" en lmina HR 1/2"

Ins

und

4.0000

2,300.00

9,200.00

8
1,717

6,920 Platina apoyo 300*300*12mm + platina


300*300*6mm con 8 perforaciones 3/4" instaladas
sin pernos.

und

2,975.00

104,831.18

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.3600

8,750.00

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0800

6,805.00

544.40

14,742

Lamina HR 1/4"

Ins

0.0900

125,317.09

11,278.54

14,945

Lamina HR 1/2"

Ins

0.0900

250,702.65

22,563.24

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

1.2500

11,436.00

14,295.00

16,471

Corte en lmina HR 1/4"

Ins

0.6000

20,000.00

12,000.00

16,473

Corte en lmina HR 1/2"

Ins

0.6000

45,000.00

27,000.00

16,474

Perforacin de 3/4" en lmina HR 1/4"

Ins

und

4.0000

1,200.00

4,800.00

16,475

Perforacin de 3/4" en lmina HR 1/2"

Ins

und

4.0000

2,300.00

9,200.00

8
1,717

6,921 Platina apoyo 150*150*12mm + platina


150*150*6mm con 8 perforaciones 3/4", instaladas,
sin pernos.

und

3,150.00

51,753.89

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0400

6,805.00

272.20

14,742

Lamina HR 1/4"

Ins

0.0200

125,317.09

2,506.34

14,945

Lamina HR 1/2"

Ins

0.0200

250,702.65

5,014.05

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.8000

11,436.00

9,148.80

8
1,717

1,312.50

Fecha :

23/03/10

Gobernacin Del Casanare

Pgina :

480

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

16,471

Corte en lmina HR 1/4"

Ins

16,473

Corte en lmina HR 1/2"

Ins

16,474

Perforacin de 3/4" en lmina HR 1/4"

16,475

Perforacin de 3/4" en lmina HR 1/2"

0.3000

20,000.00

6,000.00

0.3000

45,000.00

13,500.00

Ins

und

4.0000

1,200.00

4,800.00

Ins

und

4.0000

2,300.00

9,200.00

6,922 Cartela 150*80*3mm con perforaciones, instalada

und

Vr.Total

5,857.54

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1500

8,750.00

1,312.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2600

1,144.00

297.44

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0300

6,805.00

204.15

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

15,779

Lamina HR 1/8"

Ins

0.0120

64,382.59

772.59

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.2600

11,436.00

2,973.36

8
115

6,923 Cartela 100*80*3mm con perforaciones, instalada

und

4,968.66

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1000

8,750.00

875.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.2500

1,144.00

286.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0200

6,805.00

136.10

2,502

Anticorrosivo rojo claro

Ins

gal

0.0100

29,750.00

297.50

15,779

Lamina HR 1/8"

Ins

0.0080

64,382.59

515.06

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.2500

11,436.00

2,859.00

8
115

6,924 Relleno con material granular triturado (tamao


maximo 2") compactado para reas pequeas de
cimentacin.

102,852.70

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8000

1,469.00

1,175.20

Vibrocompactador tipo canguro

Eqp

HR

0.4000

12,500.00

5,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8000

14,690.00

11,752.00

5,143

Transporte de materiales m

Ana

1.1000

46,157.00

50,772.70

8,154

Sub base triturada T. max. 2"

Ins

1.1000

31,048.00

34,152.80

17
126

6,925 Baranda en concreto 3000 Psi, con refuerzo H=0.80


m

184,537.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

1.9000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1800

4,375.00

787.50

4,489

Cuadrilla AA (Albaileria)

Ins

1.9000

14,690.00

27,911.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1200

333,142.66

39,977.12

5,061

Formaleta (1 uso)

Ana

0.4000

32,375.50

12,950.20

8,194

Acero de refuerzo 60000 Psi

Ins

kg

44.3600

2,257.00

100,120.52

6,926 Relleno estructural mecanico con material de la


excavacion compactado

2,791.10

13,954.27

14

Retroexcavadora de orugas

Eqp

HR

0.0400

144,160.00

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2857

1,469.00

419.69

Vibrocompactador tipo canguro

Eqp

HR

0.2857

12,500.00

3,571.25

Cuadrilla AA (Albaileria)

Ins

0.2857

14,690.00

4,196.93

126
4,489

6,927 Bordillo 10 x 40 cm fundido en concreto 3000 psi


17

Herramienta Menor 10% M.O. AA

m
Eqp

HR

5,766.40

25,493.07

0.5400

1,469.00

793.26

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

481

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Vibrador de concretos

Eqp

HR

0.1200

4,375.00

525.00

2,197

Repisa Ordinario 3 m

Ins

0.5000

1,500.00

750.00

2,200

Tabla burra ordinario 0.30

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.5400

14,690.00

7,932.60

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

49

6,928 Andenes en concreto de resistencia 3000 psi,


espesor 0.10 m reforzado con malla Q-4

53,934.12

Herramienta Menor 10% M.O. AA

Eqp

HR

0.7000

1,469.00

1,028.30

2,208

Tabla chapa ordinario 0.10

Ins

0.5100

2,667.00

1,360.17

3,797

Puntilla con cabeza 2"

Ins

lb

0.0100

1,990.00

19.90

4,489

Cuadrilla AA (Albaileria)

Ins

0.7000

14,690.00

10,283.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1000

333,142.66

33,314.27

Malla electrosoldada Q-4 o M-159 (2.35 x 6m)

Ins

1.0000

7,928.48

7,928.48

17

15,356

6,929 Adoqun de gres peatonal 10*20*5 cm tipo corbatn


(no incluye mortero)

50,362.14

3,684

Agua para obra

Ins

2.8500

10.00

28.50

4,426

Arena lavada de rio

Ins

0.0200

13,800.00

276.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0500

14,690.00

15,424.50

5,143

Transporte de materiales m

Ana

0.0200

46,157.00

923.14

5,144

Transporte de materiales Tn

Ana

0.0966

0.00

0.00

13,381

Color mineral

Ins

kg

1.0300

7,000.00

7,210.00

16,578

Adoqun de gres peatonal 10*20*5 cm corbatn

Ins

1.0000

26,500.00

26,500.00

6,930 Bordillo 10*40 cm curvo fundido en concreto 3000


psi reforzado con acero 37000 psi

34,816.41

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6000

1,469.00

49

Vibrador de concretos

Eqp

HR

0.1200

4,375.00

525.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

3.6400

2,295.00

8,353.80

2,197

Repisa Ordinario 3 m

Ins

0.5000

1,500.00

750.00

2,200

Tabla burra ordinario 0.30

Ins

0.5000

4,333.00

2,166.50

4,489

Cuadrilla AA (Albaileria)

Ins

0.6000

14,690.00

8,814.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0400

333,142.66

13,325.71

6,931 Fresado de pavimento asfaltico

881.40

19,698.01

127

Barredora mecanica de cepillo

Eqp

HR

0.0625

45,000.00

2,812.50

128

Fresadora de Pavimento

Eqp

HR

0.0625

250,000.00

15,625.00

14,159

Ayudantes (Ay-2)

Ins

0.0625

10,814.00

675.88

16,582

Paleteros (2)

Ins

0.0625

9,354.00

584.63

6,932 Piso en granito natural ancho 0.15, espesor 0.02 m

163,457.47

Herramienta Menor 10% M.O. AA

Eqp

HR

1.5152

1,469.00

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0300

248,144.84

7,444.35

4,489

Cuadrilla AA (Albaileria)

Ins

1.5152

14,690.00

22,258.29

5,144

Transporte de materiales Tn

Ana

0.0550

0.00

0.00

Granito natural e = 0.02 m

Ins

1.0000

131,529.00

131,529.00

17

14,360

6,933 Piso en concreto estampado. Suministro e instal.

2,225.83

30,630.25

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

482

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Herramienta Menor 10% M.O. AA

Eqp

4,489

Cuadrilla AA (Albaileria)

Ins

14,184

Separol polvo gris / neutro

Ins

kg

14,185

Sika piso Decor Ocre

Ins

16,357

Sika Guard 68 mate x 9 kg

Ins

17

6,934 Caneca metalica en acero inoxidable. Suministro e


instal.

Cantidad

Vr.Unitario

Vr.Total

HR

0.8000

1,469.00

1,175.20

0.8000

14,690.00

11,752.00

0.3000

8,816.00

2,644.80

kg

4.0000

2,204.00

8,816.00

kg

0.2500

24,969.00

6,242.25

641,753.81

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.2500

8,750.00

2,187.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

1.1429

1,144.00

1,307.48

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3571

6,885.00

2,458.63

15,927

Perno de anclaje 5/8" x 2" grado 8

Ins

und

8.0000

3,100.00

24,800.00

16,094

Caneca basura basculante con pasador en A.I.

Ins

und

1.0000

565,500.00

565,500.00

16,222

Platina 1/4" x 1"

Ins

10.0000

3,243.00

32,430.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

1.1429

11,436.00

13,070.20

8
115

6,935 Banca en madera inmunizada 3.0 x 1.10 x 0. 50 m

und

4,111,561.00

Herramienta Menor 10% M.O. DD

Eqp

HR

5.0000

1,763.00

274

Lija para madera x pliego

Ins

und

5.0000

1,250.00

6,250.00

415

Madera tipo pardillo 0.04 x 0.08 x 3.00

Ins

und

78.0000

45,000.00

3,510,000.00

418

56

8,815.00

Sellador lijable para madera

Ins

gal

1.0000

47,205.00

47,205.00

1,990

Disolvente Thinner

Ins

gal

4.0000

12,440.00

49,760.00

2,502

Anticorrosivo rojo claro

Ins

gal

1.7500

29,750.00

52,062.50

5,064

Cuadrilla DD (Carpinteria)

Ins

5.0000

17,628.00

88,140.00

8,223

Laca brillante para madera

Ins

gal

0.5000

52,981.00

26,490.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

8.0000

6,885.00

55,080.00

14,956

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

1.0000

18,700.00

18,700.00

15,927

Perno de anclaje 5/8" x 2" grado 8

Ins

und

16.0000

3,100.00

49,600.00

15,986

Tornillo = 5/16" x 6" G-2 para Madera

Ins

und

300.0000

600.00

180,000.00

16,222

Platina 1/4" x 1"

Ins

6.0000

3,243.00

19,458.00

6,936 Pergola metalica en tubo galvanizado 2 1/2" e = 2


mm cal. 14. Suministro e instal.

35,204.33

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

0.1300

8,750.00

1,137.50

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.6667

1,144.00

762.70

2,502

Anticorrosivo rojo claro

Ins

gal

0.0500

29,750.00

1,487.50

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.0500

42,950.00

2,147.50

14,116

Soldadura electrosoldada 6013 de 1/8"

Ins

kg

0.3500

6,885.00

2,409.75

14,956

Tubo cerramiento Galvanizado =2 1/2" e=0.075"

Ins

1.0500

18,700.00

19,635.00

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.6667

11,436.00

7,624.38

8
115

6,937 Suministro y siembra arbol Palma botella h = 1.00


m

und

53,546.29

Herramienta Menor 10% M.O. BB

Eqp

HR

0.7500

1,616.00

1,212.00

Tierra Negra abonada

Ins

0.2550

34,000.00

8,670.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.7500

16,159.00

12,119.25

5,143

Transporte de materiales m

Ana

0.2550

46,157.00

11,770.04

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

Insecticida tipio roxin

Ins

0.0050

40,000.00

200.00

55
223

15,917

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

483

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,918

Dap (fertilizantes)

Ins

15,919

Cascarilla

Ins

16,258

Palma botella h = 1.00 m

Ins

6,938 Suministro y siembra arbusto Ixora h = 0.50 m

Cantidad

Vr.Unitario

Vr.Total

bt

0.0750

46,000.00

3,450.00

bt

0.3750

3,000.00

1,125.00

und

1.0000

15,000.00

15,000.00

und

9,760.42

Herramienta Menor 10% M.O. BB

Eqp

HR

0.1778

1,616.00

287.32

Tierra Negra abonada

Ins

0.0110

34,000.00

374.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1778

16,159.00

2,873.07

5,143

Transporte de materiales m

Ana

0.0110

46,157.00

507.73

5,144

Transporte de materiales Tn

Ana

0.0200

0.00

0.00

15,815

Ixora de 0.50 m

Ins

und

1.0000

5,000.00

5,000.00

15,917

Insecticida tipio roxin

Ins

0.0046

40,000.00

184.00

15,918

Dap (fertilizantes)

Ins

bt

0.0105

46,000.00

483.00

15,919

Cascarilla

Ins

bt

0.0171

3,000.00

51.30

55
223

6,939 Piso corian traslucido e=0.02 m. Suministro e


instal.

610,954.32

Sub-Contrato Instalacion

Esp

32.0000

462,844.18

148,110.14

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0200

248,144.84

4,962.90

4,426

Arena lavada de rio

Ins

0.0400

13,800.00

552.00

5,143

Transporte de materiales m

Ana

0.0400

46,157.00

1,846.28

5,144

Transporte de materiales Tn

Ana

0.0220

0.00

0.00

Corian traslucido 0.02 m

Ins

1.0000

455,483.00

455,483.00

14,188

6,940 Elemento en concreto abuzardado 3000 psi (0.15 x


0.50 x 0.60 m), incluye refuerzo.

und

144,671.77

Herramienta Menor 10% M.O. AA

Eqp

HR

5.0000

1,469.00

7,345.00

1,901

Acero de refuerzo 37000 Psi

Ins

kg

4.6000

2,295.00

10,557.00

4,489

Cuadrilla AA (Albaileria)

Ins

5.0000

14,690.00

73,450.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0900

333,142.66

29,982.84

5,061

Formaleta (1 uso)

Ana

0.5800

32,375.50

18,777.79

8,194

Acero de refuerzo 60000 Psi

Ins

kg

2.0200

2,257.00

4,559.14

17

6,941 Pozo de inspeccion cuadrado en concreto 3000 Psi


reforzado H= 2.0 - 2.5 m L= 1.50 m

und

3,698,321.56

Herramienta Menor 10% M.O. AA-2

Eqp

HR

24.0000

2,010.00

48,240.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

4.0600

333,142.66

1,352,559.20

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.5800

318,473.24

184,714.48

5,061

Formaleta (1 uso)

Ana

9.7500

32,375.50

315,661.13

8,194

Acero de refuerzo 60000 Psi

Ins

kg

189.7900

2,257.00

428,356.03

14,513

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

24.0000

20,097.00

482,328.00

14,779

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

32.6400

8,323.00

271,662.72

69

6,942 Concreto impermeabilizado 4000 Psi (Basico, 5%


desperdicio)

393,229.56

lag
18

Herramienta menor 10% M.O. AA-5

Eqp

HR

1.7864

3,632.00

70

Mezcladora de 9 ft

Eqp

HR

0.4800

4,375.00

2,100.00

Cemento gris

Ins

kg

472.5000

383.34

181,128.15

Agua para obra

Ins

210.0000

10.00

2,100.00

804
3,684

6,488.20

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

484

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

4,426

Arena lavada de rio

Ins

5,143

Transporte de materiales m

Ana

0.5880

13,800.00

8,114.40

5,144

Transporte de materiales Tn

1.5225

46,157.00

70,274.03

Ana

0.4725

0.00

13,961

0.00

Triturado de 1/2" - 3/4"

Ins

0.9345

46,304.00

43,271.09

13,962

Cuadrilla AA-5

Ins

1.7864

36,317.00

64,876.69

15,734

Plastocrete DM

Ins

kg

2.2500

6,612.00

14,877.00

6,943 Bordillo 12 x 15 cm fundido en concreto 3000 psi,


pagado m

10,095.69

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1800

1,469.00

264.42

49

Vibrador de concretos

Eqp

HR

0.0600

4,375.00

262.50

4,003

Formaleta sardinel

Ins

2.0000

464.00

928.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1800

14,690.00

2,644.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.0180

333,142.66

5,996.57

6,944 Placa gradera en concreto 3000 psi prefabricada


e=0.10 m reforzada 4 No4 + 1No5 Estribos No.3
c/0.2m

86,572.05

Herramienta Menor 10% M.O. AA

Eqp

HR

0.6800

3,804

Puntilla con cabeza 1"

Ins

lb

0.1600

2,480.00

396.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.6800

14,690.00

9,989.20

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

0.1050

333,142.66

34,979.98

5,066

Acero de Refuerzo Grado 37, pagado en kg.

Ana

kg

3.3600

3,092.35

10,390.30

5,067

Acero de Refuerzo Grado 60, pagado en kg.

Ana

kg

9.3000

3,075.79

28,604.85

13,326

Durmiente ordinario 3 M

Ins

1.0000

767.00

767.00

13,853

Camilla para formaleta 0.7x1.4

Ins

1.0000

285.00

285.00

15,501

Camilla para formaleta 0.35x1.4

Ins

1.0000

160.00

160.00

17

6,945 Desmonte cerca cerramiento en poste concreto y


alambre galvanizado 3 hilos incluye extraccin y
resiembra plantas ixora

1,469.00

998.92

2,985.44

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1160

1,469.00

170.40

21

Volqueta (6 m3 )

Eqp

HR

0.0200

55,550.00

1,111.00

Cuadrilla AA (Albaileria)

Ins

0.1160

14,690.00

1,704.04

4,489

6,946 Alfaja en ladrillo tipo rejilla en pandereta vertical


a=0.12m h=0.24m

24,955.45

Herramienta Menor 10% M.O. AA

Eqp

HR

0.8800

1,469.00

1,292.72

1,540

Mortero 1:4 (desperdicio 5%)

Ana

0.0078

248,144.84

1,935.53

2,058

Ladrillo prensado rejilla

Ins

und

16.0000

550.00

8,800.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.8800

14,690.00

12,927.20

5,144

Transporte de materiales Tn

Ana

0.0400

0.00

0.00

17

6,947 Malla eslabonada C.10. Suministro e Instal. con


remate en alambre galv. No. 12 y platina 1/2"*1/8"
para fijacin tubo

20,747.21

Herramienta Menor 10% M.O. AA

Eqp

HR

0.3636

1,469.00

534.13

2,455

Platina 1/8" x 1/2"

Ins

0.6000

1,668.00

1,000.80

4,489

Cuadrilla AA (Albaileria)

Ins

0.3636

14,690.00

5,341.28

Alambre Galvanizado No. 12

Ins

kg

0.6700

5,000.00

3,350.00

17

13,850

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

485

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,556

Malla eslabonada Cal. 10

Ins

6,948 Demolicion remate en mortero 0.12*0.1


17
4,489

Cantidad

Vr.Unitario

Vr.Total

1.0500

10,020.00

10,521.00

1,777.49

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1100

1,469.00

161.59

Cuadrilla AA (Albaileria)

Ins

0.1100

14,690.00

1,615.90

6,949 Limpieza mamposteria comn con agua

Herramienta menor 5% M.O. AA

Eqp

0.1667

735.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.1667

14,690.00

2,448.82

19

6,950 Paete liso impermeabilizado muros 1:4, incluye


filos y dilataciones, pagado en M2

HR

2,671.34

122.52

17,390.04

E=1.5; desp=8%
Herramienta Menor 10% M.O. AA

Eqp

HR

0.4900

1,469.00

719.81

4,328

Filos y dilataciones 1:4, pagado en ML

Ana

0.5000

4,231.58

2,115.79

4,489

Cuadrilla AA (Albaileria)

Ins

0.4900

14,690.00

7,198.10

4,965

Mortero Impermeabilizado 1:4 (desperdicio 5%)

Ana

0.0200

367,816.92

7,356.34

17

6,951 Pozo de inspeccion cuadrado en concreto 3000 Psi


reforzado H= 2.5 - 3.0 m L= 1.50 m

und

4,153,131.60

Herramienta Menor 10% M.O. AA-2

Eqp

HR

28.0000

2,010.00

56,280.00

5,053

Concreto 1:2:3 o 3000 Psi (Basico, 5% desperdicio)

Ana

4.7400

333,142.66

1,579,096.21

5,055

Concreto 1:2:4 o 2500 Psi (Basico, 5% desperdicio)

Ana

0.5800

318,473.24

184,714.48

5,061

Formaleta (1 uso)

Ana

12.0167

32,375.50

389,046.67

8,194

Acero de refuerzo 60000 Psi

Ins

kg

194.1600

2,257.00

438,219.12

14,513

Tapa Manhole =0.60 m con Bisagra (HN)

Ins

und

1.0000

614,800.00

614,800.00

14,669

Cuadrilla AA-2 (Tuberias)

Ins

28.0000

20,097.00

562,716.00

14,779

Malla electrosoldada Q-5 o M-188 (2.35 x 6m)

Ins

39.4400

8,323.00

328,259.12

69

6,952 Demolicion alfaja de remate en ladrillo prensado

2,055.24

17

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1100

1,469.00

161.59

21

Volqueta (6 m3 )

Eqp

HR

0.0050

55,550.00

277.75

Cuadrilla AA (Albaileria)

Ins

0.1100

14,690.00

1,615.90

4,489

6,953 Desmonte de cerca en madera con alambre de


puas 4 y 5 hilos
17
4,489

1,846.98

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1143

1,469.00

167.91

Cuadrilla AA (Albaileria)

Ins

0.1143

14,690.00

1,679.07

6,954 Sub base granular para reparcheo e=0.15 m


(colocacion manual)

12,642.25

11

Carrotanque de Agua

Eqp

HR

0.0820

53,125.00

4,356.25

41

Vibrocompactador tipo rana

Eqp

HR

0.0750

5,000.00

375.00

59

Herramienta menor 10% M.O. AA-4

Eqp

HR

0.0820

3,091.00

253.46

Sub base triturada T. max. 2"

Ins

0.1650

31,048.00

5,122.92

Cuadrilla AA-4

Ins

0.0820

30,910.00

2,534.62

8,154
13,960

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

486

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

6,955 Riostra vertical Tuberia Petrolera D=3 1/2 " L=1.80


m

Cantidad

Vr.Unitario

und

Vr.Total
126,456.88

42

Motosoldador Diesel

Eqp

HR

0.4000

14,833.00

5,933.20

43

Equipo de Oxicorte

Eqp

HR

0.4000

5,000.00

2,000.00

44

Pulidora electrica manual

Eqp

HR

0.1500

4,350.00

652.50

45

Cilindro

Eqp

HR

0.9000

41.00

36.90

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.9000

3,226.00

2,903.40

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.4400

6,805.00

9,799.20

5,144

Transporte de materiales Tn

Ana

0.1500

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.8000

6,200.00

4,960.00

14,745

Oxigeno Industrial

Ins

0.2400

15,662.00

3,758.88

14,746

Acetileno

Ins

kg

0.0800

41,820.00

3,345.60

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

0.9000

32,262.00

29,035.80

14,754

Tuberia en A.C. = 3 1/2" Dril Pipe Usd

Ins

1.8000

35,573.00

64,031.40

6,956 Unidad dosificadora de cloro unifamiliar. FALTA


REVISAR
17
4,489

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1143

1,469.00

167.91

Cuadrilla AA (Albaileria)

Ins

0.1143

14,690.00

1,679.07

6,957 Filtro acero al carbon con lecho filtrante. FALTA


REVISAR
17
4,489

1,846.98

1,846.98

Herramienta Menor 10% M.O. AA

Eqp

HR

0.1143

1,469.00

167.91

Cuadrilla AA (Albaileria)

Ins

0.1143

14,690.00

1,679.07

6,958 Suministro e instal. ventana aluminio fija incluye


vidrio templado de 4 mm, pagado m2 a todo costo

265,758.43

5,144

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

6,031

Instalacin carpintera metlica ventanas

Ana

1.0000

12,458.43

12,458.43

Ventana Aluminio fija + vidrio templado 4 mm

Ins

1.0000

253,300.00

253,300.00

16,580

6,959 Suministro e instal. Puerta aluminio con vidrio


templado de 6 mm, pagado m2 a todo costo
228
5,144
16,581

395,165.43

Instalacin carpintera metlica con mortero 1:3, pagada


por m2

Ana

1.0000

Transporte de materiales Tn

Ana

0.0350

0.00

0.00

Puerta Aluminio con vidrio templado de 6 mm

Ins

1.0000

378,300.00

378,300.00

6,960 Tuberia de Polietileno PE 100 PN-10 de =160 mm


= 6"

16,865.43

16,865.43

66,822.83

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0204

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2286

16,159.00

3,693.95

Tuberia de Polietileno PE 100 PN-10 de 160 mm

Ins

1.0100

60,857.00

61,465.57

699

15,701

6,961 Tuberia de Polietileno PE 100 PN-10 de =200 mm


= 8"
699
2,938

1,380.81

100,174.02

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0238

67,686.73

1,610.94

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0120

28,250.00

339.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

487

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
15,817

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

Tuberia de Polietileno PE 100 PN-10 de 200 mm

Ins

6,962 Tuberia de Polietileno PE 100 PN-10 de =250 mm


= 10"

Cantidad

Vr.Unitario

Vr.Total

0.2353

16,159.00

3,802.21

1.0100

93,487.00

94,421.87

156,405.55

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0286

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2500

16,159.00

4,039.75

Tuberia de Polietileno PE 100 PN-10 de 250 mm

Ins

1.0100

148,521.00

150,006.21

699

14,475

6,963 Tuberia de Polietileno PE 100 PN-10 de =315 mm


= 12"

1,935.84

256,273.29

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0357

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Tuberia de Polietileno PE 100 PN-10 de 315 mm

Ins

1.0100

246,601.00

249,067.01

699

15,806

6,964 Tuberia de Polietileno PE 100 PN-10 de =355 mm


= 14"

2,416.42

390,734.98

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0476

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2857

16,159.00

4,616.63

Tuberia de Polietileno PE 100 PN-10 de 355 mm

Ins

1.0100

378,546.00

382,331.46

699

15,706

6,965 Tuberia de Polietileno PE 100 PN-10 de =400 mm


= 16"

3,221.89

497,340.44

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0714

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3077

16,159.00

4,972.12

Tuberia de Polietileno PE 100 PN-10 de 400 mm

Ins

1.0100

482,149.00

486,970.49

699

16,280

6,966 Tuberia de Polietileno PE 100 PN-16 de = 63 mm


= 2"

4,832.83

16,980.80

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0003

28,250.00

8.48

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1600

16,159.00

2,585.44

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0100

46,387.50

463.88

15,770

Tuberia de Polietileno PE 100 PN-16 de 63 mm

Ins

1.0000

13,923.00

13,923.00

6,967 Tuberia de Polietileno PE 100 PN-16 de = 110 mm


= 4"

45,988.47

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0008

28,250.00

22.60

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2222

16,159.00

3,590.53

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

0.0179

46,387.50

830.34

14,202

Tuberia de Polietileno PE 100 PN-16 de 110 mm

Ins

1.0000

41,545.00

41,545.00

6,968 Tuberia de Polietileno PE 100 PN-16 de =250 mm


= 10"
699

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

227,783.26

0.0286

67,686.73

1,935.84

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

488

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

4,515

Cuadrilla BB (Instalaciones)

Ins

Tuberia de Polietileno PE 100 PN-16 de 250 mm

Ins

14,186

6,969 Tuberia de Polietileno PE 100 PN-16 de =315 mm


= 12"

Cantidad

Vr.Unitario

und

0.0150

28,250.00

423.75

0.2500

16,159.00

4,039.75

1.0100

219,192.00

221,383.92

Vr.Total

373,687.87

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0357

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0150

28,250.00

423.75

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2667

16,159.00

4,309.61

Tuberia de Polietileno PE 100 PN-16 de 315 mm

Ins

1.0100

362,909.00

366,538.09

699

14,452

6,970 Tuberia de Polietileno PE 100 PN-16 de =355 mm


= 14"

2,416.42

572,221.94

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0476

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0180

28,250.00

508.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.2857

16,159.00

4,616.63

Tuberia de Polietileno PE 100 PN-16 de 355 mm

Ins

1.0100

558,292.00

563,874.92

699

15,798

6,971 Tuberia de Polietileno PE 100 PN-16 de =400 mm


= 16"

3,221.89

726,597.31

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.0714

67,686.73

4,832.83

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0200

28,250.00

565.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.3077

16,159.00

4,972.12

Tuberia de Polietileno PE 100 PN-16 de 400 mm

Ins

1.0100

709,136.00

716,227.36

699

15,620

6,972 Anclaje epoxico con varilla de acero G-60 1"


sobre roca L=1.50 m

und

58,996.55

Herramienta Menor 10% M.O. AA

Eqp

HR

1.0000

1,469.00

1,469.00

125

Taladro Rotomartillo

Eqp

HR

0.5000

8,750.00

4,375.00

129

Planta electrica 9 Kw

Eqp

HR

0.5000

18,000.00

9,000.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.0000

14,690.00

14,690.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

5.9600

2,257.00

13,451.72

16,569

Sikadur Anchorfix 4*600 cc

Ins

und

0.2467

64,900.00

16,010.83

17

6,973 Accesorios para conexin de pasamuro H.D. con


Tubera de Polietileno =10"
55
699

und

860,964.39

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

13,524

Brida Slip On =10" en A.C. 150 Psi

Ins

und

1.0000

386,280.00

386,280.00

14,247

Conjunto brida =10"

Ins

und

1.0000

214,600.00

214,600.00

14,457

Portaflanche PE 100 - RDE 17 PN 10 250 mm =10"

Ins

und

1.0000

167,342.00

167,342.00

4,515

6,974 Accesorios para conexin de pasamuro H.D. con


Tubera de Polietileno =8"

und

642,342.06

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9000

67,686.73

60,918.06

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

8,100

Brida Slip On =8" en A.C. 150 Psi

Ins

und

1.0000

272,600.00

272,600.00

55
699

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

489

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

13,731

Conjunto brida =8"

Ins

14,225

Portaflanche PE 100 - RDE 17 PN 10 200 mm =8"

Ins

6,975 Accesorios para conexin de pasamuro H.D. con


Tubera de Polietileno =6"

Cantidad

Vr.Unitario

Vr.Total

und

1.0000

168,200.00

168,200.00

und

1.0000

112,184.00

112,184.00

und

454,869.72

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.8500

67,686.73

57,533.72

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

8,254

Conjunto brida =6"

Ins

und

1.0000

78,880.00

78,880.00

14,258

Portaflanche PE 100 - RDE 17 PN 10 160 mm =6"

Ins

und

1.0000

63,816.00

63,816.00

14,934

Brida Slip On =6" en A.C. 150 Psi

Ins

und

1.0000

226,200.00

226,200.00

55
699

6,976 Accesorios para conexin de pasamuro H.D. con


Tubera de Polietileno =4"

und

227,132.78

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.8000

67,686.73

54,149.38

2,956

Brida Slip On =4" en A.C. 150 Psi

Ins

und

1.0000

48,720.00

48,720.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

14,246

Conjunto brida =4"

Ins

und

1.0000

64,960.00

64,960.00

16,568

Portaflanche PE 100 - RDE 17 PN 10 110 mm =4"

Ins

und

1.0000

35,604.00

35,604.00

55
699

6,977 Accesorios para conexin de Valvula de 8" con


Tubera de Polietileno

und

792,095.09

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

1.3500

67,686.73

91,377.09

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

8,100

Brida Slip On =8" en A.C. 150 Psi

Ins

und

1.0000

272,600.00

272,600.00

13,731

Conjunto brida =8"

Ins

und

1.0000

168,200.00

168,200.00

14,225

Portaflanche PE 100 - RDE 17 PN 10 200 mm =8"

Ins

und

2.0000

112,184.00

224,368.00

55
699

6,978 Compuerta lateral deslizante sello de bronce,


rectangular =10" en H.F. de vastago 2.0 m

und

5,090,385.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

846

Soporte guia vastago No 2

Ins

und

1.0000

685,560.00

685,560.00

4,134

Soporte guia vastago No 1

Ins

und

1.0000

272,600.00

272,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

8,237

Vastago para compuerta =10" - 16"

Ins

2.0000

444,280.00

888,560.00

14,038

Columna de maniobra crm

Ins

und

1.0000

524,320.00

524,320.00

14,375

Rueda Volante = 10" a 16"

Ins

und

1.0000

106,720.00

106,720.00

15,599

Compuerta lateral deslizante s.b. rectan. =10"

Ins

und

1.0000

2,488,200.00

2,488,200.00

55

6,979 Compuerta lateral deslizante sello de bronce,


rectangular =8" en H.F. de vastago 1.71 m

und

3,927,079.00

Herramienta Menor 10% M.O. BB

Eqp

HR

7.0000

1,616.00

11,312.00

846

Soporte guia vastago No 2

Ins

und

1.0000

685,560.00

685,560.00

4,134

Soporte guia vastago No 1

Ins

und

1.0000

272,600.00

272,600.00

4,515

Cuadrilla BB (Instalaciones)

Ins

7.0000

16,159.00

113,113.00

14,038

Columna de maniobra crm

Ins

und

1.0000

524,320.00

524,320.00

14,737

Rueda Volante = 6" a 8"

Ins

und

1.0000

46,400.00

46,400.00

14,938

Vastago para compuerta =6" - 8"

Ins

1.7100

307,400.00

525,654.00

55

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

490

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,926

Compuerta lateral deslizante s.b. rectan. =8"

Ins

6,980 Collar de derivacion HF 4" x 1". Suministro e Instal.


55
4,515
14,201

und

Cantidad

Vr.Unitario

Vr.Total

1.0000

1,748,120.00

1,748,120.00

und

38,580.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

Collar de derivacion H.D/ PVC 4" x 1"

Ins

und

1.0000

24,360.00

24,360.00

6,981 Pintura exterior koraza para cubierta 3 manos,


pagado m2

16,681.96

Sub-Contrato Pintura

Esp

45.0000

11,504.80

Herramienta menor 10% M.O. CC

Eqp

HR

0.2085

1,689.00

352.16

Cuadrilla CC (Pintura)

Ins

0.2085

16,893.00

3,522.19

13,641

Seccin de Andamio

Ins

mes

0.0012

17,120.00

20.54

15,548

Koraza Vinilo exterior

Ins

gal

0.1500

50,650.00

7,597.50

15,554

Planchn madera de 3 x 0.30 x 0.04

Ins

0.0050

2,482.00

12.41

5
61
5,066

6,982 Sistema de riego por nebulizacion. Suministro e


Instal.

5,177.16

108,285.78

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1250

1,616.00

1,818.00

Amarre plstico

Ins

und

3.1250

100.00

312.50

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0104

58,612.00

609.56

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0104

28,250.00

293.80

3,556

Tubo conduit PVC 1/2"

Ins

0.4688

1,384.00

648.82

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1250

16,159.00

18,178.88
55.64

55
393

4,706

Curva 90 C x E 1/2" conduit

Ins

und

0.1042

534.00

13,882

Caja de paso plastica conduit

Ins

und

0.0521

1,500.00

78.15

14,015

Sellador 1/8"

Ins

und

0.0104

12,000.00

124.80

14,020

Cinta teflon

Ins

rl

0.1042

1,000.00

104.20

14,148

Valvula de selenoide 1"

Ins

und

0.0417

92,800.00

3,869.76

14,192

Filtro 1 1/2" anillo

Ins

und

0.0104

162,400.00

1,688.96

14,203

Alambre Galvanizado No. 14

Ins

kg

0.0313

2,900.00

90.77

14,262

Cinta aislante

Ins

und

0.0104

5,000.00

52.00

14,281

Cable de cobre THW N 16 AWG

Ins

2.0833

696.00

1,449.98

14,305

Equipo compacto Bomba y Tanque 1J2366

Ins

und

0.0104

2,603,040.00

27,071.62

14,338

Perro de 5/16" Tipo liviano

Ins

und

0.6250

928.00

580.00

14,352

Nebulizador con valvula antigoteo

Ins

und

1.1667

20,880.00

24,360.70

14,359

Cofre metalico y banco de relevos

Ins

und

0.0104

498,800.00

5,187.52

14,993

Tubo presion RDE 13.5 PVC 1/2 "

Ins

1.3125

1,504.00

1,974.00

14,996

Tubo presin RDE 21 PVC 1 "

Ins

0.4688

2,716.00

1,273.26

15,021

Codo 90 presion PVC 1/2"

Ins

und

0.2604

375.00

97.65

15,023

Codo 90 presion PVC 1"

Ins

und

0.1042

1,176.00

122.54

15,039

Union presion PVC 1/2"

Ins

und

0.2188

240.00

52.51

15,041

Union presion PVC 1"

Ins

und

0.0833

620.00

51.65

15,048

Adaptador macho presin PVC 1/2"

Ins

und

0.0833

260.00

21.66

15,050

Adaptador macho presin PVC 1"

Ins

und

0.0833

984.00

81.97

15,057

Tee sencilla presion PVC 1/2 "

Ins

und

0.0417

498.00

20.77

15,059

Tee sencilla presion PVC 1"

Ins

und

0.0521

1,639.00

85.39

15,091

Buje soldado presion PVC 1 x 1/2

Ins

und

0.0417

723.00

30.15

15,112

Tapon roscado presin PVC 1/2

Ins

und

0.0833

293.00

24.41

15,697

Tensor =5/16"

Ins

und

0.2708

5,220.00

1,413.58

15,744

Controlador de riego

Ins

und

0.0104

812,000.00

8,444.80

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

491

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

15,797

Guaya galvanizada 5/16"

Ins

16,583

Valvula de bola PVC 1/2"

Ins

6,983 Tee de polietileno PE 100 - RDE 11 PN 16 90 mm


=3".

Cantidad

Vr.Unitario

Vr.Total

und

2.3958

3,132.00

7,503.65

und

0.0833

6,148.00

512.13

und

196,784.75

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.1200

28,250.00

3,390.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

2.1000

46,387.50

97,413.75

Tee PE 100 - RDE 11 PN 16 90 mm =3"

Ins

und

1.0000

60,431.00

60,431.00

55

14,320

6,984 Codo de polietileno 90 PE 100 - RDE 17 PN 10 90


mm =3".

und

144,588.50

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0400

28,250.00

1,130.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

4,769

Union a Termofusion a Tope Diametro < 110 mm

Ana

und

1.4000

46,387.50

64,942.50

14,357

Codo 90 PE 100 - RDE 17 PN 10 90 mm =3"

Ins

und

1.0000

42,966.00

42,966.00

55

6,985 Excavacion en roca con cemento demoledor no


explosivo CRAS

17

Herramienta Menor 10% M.O. AA

Eqp

51

3,232.00

259,321.20

HR

2.6667

1,469.00

3,917.38

HR

57,750.00

Compresor 125 cpm (2 martillos Neum.)

Eqp

1.6500

35,000.00

3,684

Agua para obra

Ins

2.4000

10.00

24.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.6667

14,690.00

39,173.82

Cemento demoledor expansivo CRAS

Ins

kg

8.0000

19,807.00

158,456.00

14,191

6,986 Manto de proteccion

43,147.21

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5333

1,616.00

3,682

Grama (Semilla)

Ins

kg

0.0010

25,000.00

25.00

3,684

Agua para obra

Ins

10.0000

10.00

100.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5333

16,159.00

8,617.59

5,143

Transporte de materiales m

Ana

0.0525

46,157.00

2,423.24

5,144

Transporte de materiales Tn

Ana

0.0010

0.00

0.00

14,712

Amarre plastico para mantos

Ins

und

6.0000

1,200.00

7,200.00

14,714

Manto permanente TRM P300LW

Ins

1.0500

20,687.00

21,721.35

15,918

Dap (fertilizantes)

Ins

bt

0.0167

46,000.00

768.20

15,919

Cascarilla

Ins

bt

0.0100

3,000.00

30.00

16,365

Tierra Negra

Ins

0.0525

26,667.00

1,400.02

55

6,987 Valvula Cheque cortina =6" en E.B. Suministro e


instal.

und

861.81

1,509,500.00

55

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

3,120

Valvula cheque cortina =6" E.B.

Ins

und

1.0000

1,438,400.00

1,438,400.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

6,988 Codo de polietileno 90 PE 100 - RDE 11 PN 16 160


mm =6".
55

Herramienta Menor 10% M.O. BB

und

Eqp

HR

272,772.39

2.0000

1,616.00

3,232.00

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

492

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

699

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,722

Codo 90 PE 100 - RDE 11 PN 16 160 mm =6"

Ins

und

1.0000

170,660.00

170,660.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0800

28,250.00

2,260.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

6,989 Codo de polietileno 45 PE 100 - RDE 11 PN 16 160


mm =6".

und

272,772.39

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

420

Codo 45 PE 100 - RDE 11 PN 16 160 mm =6"

Ins

und

1.0000

170,660.00

170,660.00

699

64,302.39

55

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0800

28,250.00

2,260.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

6,990 Union reducida de Polietileno PE 100 PN-10 de 160


mm x 110 mm. o 6" x 4"

und

196,629.68

424

Union Reducida PE 100 PN-10 de 160 x 110 mm

Ins

und

1.0000

108,805.00

108,805.00

699

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9500

67,686.73

64,302.39

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0700

28,250.00

1,977.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

6,991 Portaflanche de polietileno PE 100 - RDE 17 PN 10


160 mm =6".

und

155,260.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

Union a Termofusion a Tope Diametro > 110 mm

Ana

und

0.9800

67,686.73

66,333.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0500

28,250.00

1,412.50

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Portaflanche PE 100 - RDE 17 PN 10 160 mm =6"

Ins

und

1.0000

63,816.00

63,816.00

55
699

14,258

6,992 Collar de derivacion HF 3" x 1/2". Suministro e


Instal.

und

28,140.00

Herramienta Menor 10% M.O. BB

Eqp

HR

0.8000

1,616.00

1,292.80

3,679

Collar de derivacion H.D/ PVC 3" x 1/2"

Ins

und

1.0000

13,920.00

13,920.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.8000

16,159.00

12,927.20

55

6,993 Collar de derivacion HF 6" x 1/2". Suministro e


Instal.

und

36,335.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

1,318

Collar de derivacion H.D./ PVC 6" x 1/2"

Ins

und

1.0000

18,560.00

18,560.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55

6,994 Collar de derivacion HF 8" x 1/2". Suministro e


Instal.
55
861
4,515

und

49,315.05

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

Collar de derivacion H.D./ PVC 8" x 1/2"

Ins

und

1.0000

29,000.00

29,000.00

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

6,995 Valvula compuerta elastica vastago no ascendente


=3" E.L. Suministro e instal.

und

456,880.60

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

493

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

3,045

Valv. comp. elast. vast. n.asc. ext. el 3"

Ins

und

1.0000

409,480.00

409,480.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

55

6,996 Union por acople universal en H.D. 8".


Suministro e instal

und

191,570.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

2,810

Union por acople universal en H.D. 8" R1

Ins

und

1.0000

156,020.00

156,020.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

55

6,997 Union por acople universal en H.D. 6".


Suministro e instal

und

157,350.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

3,047

Union por acople universal en H.D. 6" R1

Ins

und

1.0000

121,800.00

121,800.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

55

6,998 Union por acople universal en H.D. 3".


Suministro e instal

und

89,239.40

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

3,114

Union por acople universal en H.D. 3"

Ins

und

1.0000

65,540.00

65,540.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

55

6,999 Cruz en H.D. 8" x 8" E.L. Suministro e Instal.

und

822,453.00

Herramienta Menor 10% M.O. BB

Eqp

HR

2.0000

1,616.00

3,232.00

3,049

Cruz H.D. 8" x 8" E.L. o jh

Ins

und

1.0000

779,520.00

779,520.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.0000

16,159.00

32,318.00

Lubricante 500 gr

Ins

und

0.6000

12,305.00

7,383.00

55

14,118

7,000 Codo 45 en H.D. en E.L =8" (200 mm). Suministro


e Instal.

und

541,129.90

Herramienta Menor 10% M.O. BB

Eqp

HR

1.3333

1,616.00

2,154.61

1,763

Codo 45 8 " en HD. ext liso

Ins

und

1.0000

516,200.00

516,200.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.3333

16,159.00

21,544.79

Lubricante 500 gr

Ins

und

0.1000

12,305.00

1,230.50

55

14,118

7,001 Valvula compuerta elastica vastago ascendente


=3" E.B. Suministro e instal.
55
715
4,515

und

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

Valv. comp. vast. asc. (comp. elast.) e. brida 3"

Ins

und

1.0000

665,840.00

665,840.00

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

7,002 Tee en H.F. 3" x 3" E.L. Suministro e Instal.


55
865
4,515

713,240.60

und

127,395.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

Tee en H.F. 3" x 3" E.L.

Ins

und

1.0000

109,620.00

109,620.00

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

7,003 Cruz en H.D. 3" x 3" E.L. Suministro e Instal

und

158,092.30

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

494

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

Herramienta Menor 10% M.O. BB

Eqp

HR

1.1429

1,616.00

1,846.93

3,768

Cruz H.D. 3" x 3" el

Ins

und

1.0000

132,240.00

132,240.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.1429

16,159.00

18,468.12

Lubricante 500 gr

Ins

und

0.4500

12,305.00

5,537.25

55

14,118

7,004 Union por acople universal en H.D. 16".


Suministro e instal
55
397
4,515

und

1,142,940.00

Herramienta Menor 10% M.O. BB

Eqp

HR

4.0000

1,616.00

6,464.00

Union por acople universal en H.D. 16"

Ins

und

1.0000

1,071,840.00

1,071,840.00

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

7,005 Valvula compuerta elastica vastago ascendente


=4" E.B. Suministro e instal.

und

1,099,520.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

4,429

Valv. comp. vast. asc. (comp. elast.) e. brida 4"

Ins

und

1.0000

1,052,120.00

1,052,120.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

55

7,006 Tee en H.F. 16" x 8" E.B. Suministro e Instal.

und

3,261,760.60

Herramienta Menor 10% M.O. BB

Eqp

HR

2.6667

1,616.00

4,309.39

3,752

Tee en H.F. 16" x 8" E.B.

Ins

und

1.0000

3,214,360.00

3,214,360.00

4,515

Cuadrilla BB (Instalaciones)

Ins

2.6667

16,159.00

43,091.21

55

7,007 Reduccion concentrica en HD 16" x 6" E.L.


Suministro e Instal.

und

1,057,930.25

Valor promedio inst.tipica


Herramienta Menor 5% M.O. BB

Eqp

HR

4.0000

808.00

3,232.00

1,767

Reduccion concentrica en HD 16" x 6" E.L

Ins

und

1.0000

986,986.00

986,986.00

4,515

Cuadrilla BB (Instalaciones)

Ins

4.0000

16,159.00

64,636.00

Lubricante 500 gr

Ins

und

0.2500

12,305.00

3,076.25

109

14,118

7,008 Collar de derivacion HF 2 1/2" x 1/2". Suministro e


Instal.

und

22,227.50

Herramienta Menor 10% M.O. BB

Eqp

HR

0.5000

1,616.00

808.00

1,780

Collar de derivacion H.D/ PVC 2 1/2" x 1/2"

Ins

und

1.0000

13,340.00

13,340.00

4,515

Cuadrilla BB (Instalaciones)

Ins

0.5000

16,159.00

8,079.50

55

7,009 Tuberia acero al carbon SCH-40. 4". Suministro e


Instal.

146,080.92

28

Grua

Eqp

HR

0.1000

43,750.00

4,375.00

42

Motosoldador Diesel

Eqp

HR

0.2000

14,833.00

2,966.60

43

Equipo de Oxicorte

Eqp

HR

0.1500

5,000.00

750.00

44

Pulidora electrica manual

Eqp

HR

0.1500

4,350.00

652.50

45

Cilindro

Eqp

HR

0.1500

41.00

6.15

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

0.5333

3,226.00

1,720.43

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.3000

6,805.00

2,041.50

2,502

Anticorrosivo rojo claro

Ins

gal

0.0700

29,750.00

2,082.50

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.3000

6,856.00

2,056.80

5,144

Transporte de materiales Tn

Ana

0.1600

0.00

0.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0400

6,200.00

248.00

14,745

Oxigeno Industrial

Ins

0.0600

15,662.00

939.72

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

495

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

14,746

Acetileno

Ins

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

15,954

Tuberia en A.C S/C = 4" SCH 40

Ins

7,010 Valvula de Mariposa =4" cuerpo en HF y disco en


A.I. Suministro e Instal.

Cantidad

Vr.Unitario

kg

0.0200

41,820.00

836.40

0.5333

32,262.00

17,205.32

1.0000

110,200.00

110,200.00

und

Vr.Total

209,175.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.0000

1,616.00

1,616.00

2,714

Valvula de Mariposa =4" en HF disco en A.I.

Ins

und

1.0000

191,400.00

191,400.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.0000

16,159.00

16,159.00

55

7,011 Valvula de Mariposa =6" cuerpo en HF y disco en


A.I. Suministro e Instal.

und

362,520.00

Herramienta Menor 10% M.O. BB

Eqp

HR

1.6000

1,616.00

2,585.60

2,961

Valvula de Mariposa =6" en HF disco en A.I.

Ins

und

1.0000

334,080.00

334,080.00

4,515

Cuadrilla BB (Instalaciones)

Ins

1.6000

16,159.00

25,854.40

55

7,012 Pasamuro en A.C. =10" L=0.45 m E.B. x E.B.


Suministro e Instal.

und

712,758.00

Herramienta Menor 10% M.O. AA

Eqp

HR

2.0000

1,469.00

2,938.00

3,050

Pasamuro en A.C. =10" L=0.45 m E.B x E.B

Ins

und

1.0000

680,440.00

680,440.00

4,489

Cuadrilla AA (Albaileria)

Ins

2.0000

14,690.00

29,380.00

17

7,013 Pasamuro en A.C. =4" L=0.70 m E.B x E.B.


Suministro e Instal.

und

346,594.40

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

3,115

Pasamuro en A.C. =4" L=0.70 m E.B x E.B

Ins

und

1.0000

320,740.00

320,740.00

4,489

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

17

7,014 Pasamuro en A.C. =6" L=0.70 m E.B x E.B.


Suministro e Instal.
17
4,489
13,124

und

547,454.40

Herramienta Menor 10% M.O. AA

Eqp

HR

1.6000

1,469.00

2,350.40

Cuadrilla AA (Albaileria)

Ins

1.6000

14,690.00

23,504.00

Pasamuro en A.C. =6" L=0.75 m E.B x E.B

Ins

und

1.0000

521,600.00

521,600.00

7,015 Siembra de plantulas < 40 cm con mantenimiento


de un ao

und

3,695.00

Herramienta Menor 5% M.O. BB

Eqp

HR

0.1404

808.00

113.44

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1404

16,159.00

2,268.72

5,144

109

Transporte de materiales Tn

Ana

0.0080

0.00

0.00

14,266

Plantula (tipo nativo, nauno, acacio < 40 cm)

Ins

und

1.0000

800.00

800.00

15,917

Insecticida tipio roxin

Ins

0.0010

40,000.00

40.00

15,918

Dap (fertilizantes)

Ins

bt

0.0060

46,000.00

276.00

15,919

Cascarilla

Ins

bt

0.0400

3,000.00

120.00

16,300

Cal viva o Dolomita

Ins

kg

0.1700

452.00

76.84

7,016 Buje soldado 2 x 1 1/4". Suministro e instal.

und

6,195.39

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0080

58,612.00

468.90

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

496

ANALISIS DETALLADOS CONSECUTIVOS


Codigo
4,515
15,103

Nombre

Tipo U.M.

Cuadrilla BB (Instalaciones)

Ins

Buje soldado presion PVC 2 x 1.1/4

Ins

7,017 Adaptador macho de presion PVC 1 1/4".


Suministro e Instal.

Cantidad

Vr.Unitario

Vr.Total

0.1333

16,159.00

2,153.99

und

1.0000

3,290.00

3,290.00

und

3,211.29

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0060

58,612.00

351.67

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0060

28,250.00

169.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 1 1/4"

Ins

und

1.0000

2,068.00

2,068.00

15,051

7,018 Tapon soldado PVC 1". Suministro e Instal.

und

3,053.67

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0165

58,612.00

967.10

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0165

28,250.00

466.13

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0556

16,159.00

898.44

Tapon soldado presin PVC 1

Ins

und

1.0000

722.00

722.00

15,083

7,019 Union de presion PVC 1 1/4". Suministro e instal.

und

3,492.25

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0100

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0100

28,250.00

282.50

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0920

16,159.00

1,486.63

Union presion PVC 1 1/4"

Ins

und

1.0000

1,137.00

1,137.00

15,042

7,020 Tapon soldado PVC 3/4". Suministro e Instal.

und

586.12

2,130.21

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0098

58,612.00

574.40

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0098

28,250.00

276.85

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0526

16,159.00

849.96

Tapon soldado presin PVC 3/4

Ins

und

1.0000

429.00

429.00

15,082

7,021 Buje soldado 2 x 3/4". Suministro e instal.

und

6,920.64

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0170

58,612.00

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0170

28,250.00

480.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.1333

16,159.00

2,153.99

Buje soldado presion PVC 2 x 3/4

Ins

und

1.0000

3,290.00

3,290.00

15,101

7,022 Caja de proteccion en angulo y malla de 1.0 x 1.20.


Instalada

996.40

591,793.82

Equipo de soldadura Marca Linconl 600 A

Eqp

HR

3.5000

8,750.00

30,625.00

43

Equipo de Oxicorte

Eqp

HR

1.0000

5,000.00

5,000.00

44

Pulidora electrica manual

Eqp

HR

0.5000

4,350.00

2,175.00

Herramienta Menor 10% M.O. SA-1

Eqp

HR

12.0000

1,144.00

13,728.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.5000

6,805.00

3,402.50

1,901

Acero de refuerzo 37000 Psi

Ins

kg

1.0000

2,295.00

2,295.00

2,502

Anticorrosivo rojo claro

Ins

gal

0.4000

29,750.00

11,900.00

2,934

Soldadura electrosoldada 6010 de 1/8"

Ins

kg

0.5000

6,856.00

3,428.00

3,837

Esmalte Sintetico Pintuco

Ins

gal

0.4000

42,950.00

17,180.00

5,144

Transporte de materiales Tn

Ana

8.0000

0.00

0.00

8,232

Platina 1/4" x 3"

Ins

0.5000

10,343.00

5,171.50

Tornillo = 1/2" x 6" R.O G-8 con T.A

Ins

und

4.0000

5,922.00

23,688.00

115

14,364

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

497

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

14,374

Malla IMT 40 c/12

Ins

14,744

Disco pulidora LT W 7 x 1/4"

Ins

7.0000

30,534.00

213,738.00

und

0.2500

6,200.00

14,745

Oxigeno Industrial

1,550.00

Ins

14,746

0.2100

15,662.00

3,289.02

Acetileno

Ins

kg

0.0700

41,820.00

2,927.40

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

Ins

18.6000

6,154.00

114,464.40

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

12.0000

11,436.00

137,232.00

7,023 Adaptador macho de presion PVC 1 1/ 2".


Suministro e Instal.

und

3,825.88

2,927

Soldadura para PVC 1/4 gl

Ins

und

0.0090

58,612.00

527.51

2,938

Limpiador PVC 1/4 gl o 760 gr

Ins

und

0.0090

28,250.00

254.25

4,515

Cuadrilla BB (Instalaciones)

Ins

0.0385

16,159.00

622.12

Adaptador macho presin PVC 1 1/2"

Ins

und

1.0000

2,422.00

2,422.00

15,052

7,024 Valvula de bola en H.D. 1"

und

32,978.10

Cuadrilla BB (Instalaciones)

Ins

0.3478

16,159.00

14,020

Cinta teflon

Ins

rl

0.4500

1,000.00

450.00

15,050

Adaptador macho presin PVC 1"

Ins

und

2.0000

984.00

1,968.00

16,076

Valvula de Bola para agua H.D. 1"

Ins

und

1.0000

24,940.00

24,940.00

4,515

7,025 Valvula de bola en H.D. 3/4"

und

5,620.10

22,618.12

Cuadrilla BB (Instalaciones)

Ins

0.3077

16,159.00

4,972.12

14,020

Cinta teflon

Ins

rl

0.3500

1,000.00

350.00

14,376

Valvula de Bola para agua H.D. 3/4"

Ins

und

1.0000

16,356.00

16,356.00

15,049

Adaptador macho presin PVC 3/4"

Ins

und

2.0000

470.00

940.00

4,515

7,026 Baranda en acero A-36 con dos Tubos ASTM 500


G-C =4" e=3.5 mm Hu=1.00 m. Incluye pintura 3
mils

347,764.35

42

Motosoldador Diesel

Eqp

HR

0.8000

14,833.00

11,866.40

43

Equipo de Oxicorte

Eqp

HR

0.6000

5,000.00

3,000.00

44

Pulidora electrica manual

Eqp

HR

0.3000

4,350.00

1,305.00

45

Cilindro

Eqp

HR

0.8000

41.00

32.80

48

Herramienta menor 10% M.O. ASA-3

Eqp

HR

2.0500

3,226.00

6,613.30

60

Compresor pintura

Eqp

HR

0.0500

3,500.00

175.00

68

Equipo Pintura

Eqp

HR

0.0500

2,200.00

110.00

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

1.2000

6,805.00

8,166.00

1,990

Disolvente Thinner

Ins

gal

0.0800

12,440.00

995.20

5,144

Transporte de materiales Tn

Ana

0.0620

0.00

0.00

8,194

Acero de refuerzo 60000 Psi

Ins

kg

3.7500

2,257.00

8,463.75

14,318

Tubo estructural redondo =4" e= 3.5 mm

Ins

2.0000

34,124.00

68,248.00

14,358

Platina 3/16" x 4"

Ins

0.8800

9,762.00

8,590.56

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.2500

6,200.00

1,550.00

14,745

Oxigeno Industrial

Ins

0.2100

15,662.00

3,289.02

14,746

Acetileno

Ins

kg

0.0700

41,820.00

2,927.40

14,752

Cuadrilla ASA-3 (Puentes Tuberia Petrolera)

Ins

2.0500

32,262.00

66,137.10

14,979

Anticorrosivo Epxico

Ins

gal

0.0800

141,570.00

11,325.60

14,980

Pintura esmalte Epxico

Ins

gal

0.0800

224,109.00

17,928.72

15,735

Lamina HR 3/8"

Ins

0.5500

165,592.00

91,075.60

16,232

Tornillo = 1" x 5" G-8 R.O. Con T. A.

Ins

und

2.6700

13,470.00

35,964.90

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

498

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

7,027 Caseton de lona 0.50 x 0.20, pagado por ml

Cantidad

Vr.Unitario

Vr.Total
16,191.80

Herramienta Menor 10% M.O. AA

Eqp

HR

0.2000

1,469.00

293.80

2,255

Tiras alistado 3 x 3 x 3

Ins

12.0000

600.00

7,200.00

2,289

Lona plastica para caseton

Ins

1.2000

4,500.00

5,400.00

4,489

Cuadrilla AA (Albaileria)

Ins

0.2000

14,690.00

2,938.00

Grapa industrial

Ins

lb

0.0800

4,500.00

360.00

17

16,385

7,028 Tubo estructural redondo e= 3 mm =1 1/2".


Suministro e instal.

16,038.29

42

Motosoldador Diesel

Eqp

HR

0.0200

14,833.00

296.66

43

Equipo de Oxicorte

Eqp

HR

0.0200

5,000.00

100.00

44

Pulidora electrica manual

Eqp

HR

0.0200

4,350.00

87.00

45

Cilindro

Eqp

HR

0.0200

41.00

0.82

Herramienta Menor 10% M.O. SA-1

Eqp

HR

0.0909

1,144.00

103.99

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.0714

6,805.00

485.88

5,144

Transporte de materiales Tn

Ana

0.0034

0.00

0.00

14,347

Tubo estructural redondo =1 1/2" e= 3 mm

Ins

1.0000

13,785.00

13,785.00

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0010

6,200.00

6.20

14,745

Oxigeno Industrial

Ins

0.0045

15,662.00

70.48

14,746

Acetileno

Ins

kg

0.0015

41,820.00

62.73

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

0.0909

11,436.00

1,039.53

115

7,029 Puerta con marco en tubo estructural redondo e= 3


mm =1 1/2" c/0.30 m. Suministro e instal.

107,573.29

42

Motosoldador Diesel

Eqp

HR

0.1000

14,833.00

1,483.30

43

Equipo de Oxicorte

Eqp

HR

0.0500

5,000.00

250.00

44

Pulidora electrica manual

Eqp

HR

0.0500

4,350.00

217.50

45

Cilindro

Eqp

HR

0.0500

41.00

2.05

Herramienta Menor 10% M.O. SA-1

Eqp

HR

2.1739

1,144.00

2,486.94

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.2500

6,805.00

1,701.25

5,144

Transporte de materiales Tn

Ana

0.0190

0.00

0.00

14,347

Tubo estructural redondo =1 1/2" e= 3 mm

Ins

5.5000

13,785.00

75,817.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.0500

6,200.00

310.00

14,745

Oxigeno Industrial

Ins

0.0150

15,662.00

234.93

14,746

Acetileno

Ins

kg

0.0050

41,820.00

209.10

16,423

Cuadrilla SA-1 (Metalisteria)

Ins

2.1739

11,436.00

24,860.72

115

7,030 Puerta de corredera A=1.0 m H=1.75 m en tubo


estructural redondo e= 3 mm =1 1/2" . Suministro
e instal.

und

252,728.27

42

Motosoldador Diesel

Eqp

HR

0.7500

14,833.00

11,124.75

43

Equipo de Oxicorte

Eqp

HR

0.1500

5,000.00

750.00

44

Pulidora electrica manual

Eqp

HR

0.1500

4,350.00

652.50

45

Cilindro

Eqp

HR

0.1500

41.00

6.15

Herramienta Menor 10% M.O. SA-1

Eqp

HR

4.5714

1,144.00

5,229.68

1,717

Soldadura electrosoldada 7018 de 1/8"

Ins

kg

0.8929

6,805.00

6,076.18

5,144

Transporte de materiales Tn

Ana

0.0250

0.00

0.00

13,377

Rodachin o balinera =2"

Ins

und

2.0000

45,000.00

90,000.00

14,347

Tubo estructural redondo =1 1/2" e= 3 mm

Ins

5.5000

13,785.00

75,817.50

14,744

Disco pulidora LT W 7 x 1/4"

Ins

und

0.1200

6,200.00

744.00

115

Fecha :

Gobernacin Del Casanare

23/03/10

Pgina :

499

ANALISIS DETALLADOS CONSECUTIVOS


Codigo

Nombre

Tipo U.M.

Cantidad

Vr.Unitario

Vr.Total

14,745

Oxigeno Industrial

Ins

14,746

Acetileno

Ins

0.0900

15,662.00

1,409.58

kg

0.0300

41,820.00

16,224

Angulo o perfil 1 1/2" x 1 1/2" x 3/16"

1,254.60

Ins

16,423

Cuadrilla SA-1 (Metalisteria)

1.2000

6,154.00

7,384.80

Ins

4.5714

11,436.00

52,278.53

7,031 Reparacion red de alcantarillado en tuberia de


gres 8"

19,325.10

Herramienta Menor 10% M.O. AA

Eqp

HR

0.4000

1,469.00

587.60

4,489

Cuadrilla AA (Albaileria)

Ins

0.4000

14,690.00

5,876.00

4,957

Mortero Impermeabilizado 1:3 (desperdicio 5%)

Ana

0.0020

430,750.59

861.50

Tubo de gres 8"

Ins

1.0000

12,000.00

12,000.00

17

13,796

**********

You might also like