IDENTIFICATION - Pre planning, Method statement, Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities, Identify hazards Assess Impacts, Analyze Risk, Establish Mitigation Measures. Communication and Training Audit, Inspection and Up dating of Log.
IDENTIFICATION - Pre planning, Method statement, Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities, Identify hazards Assess Impacts, Analyze Risk, Establish Mitigation Measures. Communication and Training Audit, Inspection and Up dating of Log.
IDENTIFICATION - Pre planning, Method statement, Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities, Identify hazards Assess Impacts, Analyze Risk, Establish Mitigation Measures. Communication and Training Audit, Inspection and Up dating of Log.
INTRODUCTION The table below provides a simplified representation of the methodology used and the processes Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage proje Phase. IDENTIFICATION - Pre planning, Method statement , Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities , Identify hazards Assess Impacts, Analyze Risk , Establish Mitigation Measures. P r o b a b i l i t y & F r e q u e n c y Definite 5 5 10 15 20 High 4 4 8 12 16 Moderate 3 3 6 9 12 Low 2 2 4 6 8 Negligible 1 1 2 3 4 1 2 3 4 Minor Serious Major Catastrophic Severity Key to Priorities Medium Priority (5 days) High Priority (2-3 days) Immediate RISK ASSESSMENT FORM Date of Assessment: 14-07-2010 Assessment No: System/Activity: Installation fuel oil conditioning equipment The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage proje ct-related risks ASSESSMENT Impact, Risk factor, Mitigation measure, Residual risk IMPLEMENTATION & COMMUNICATION REVIEW & UP DATE Assess Impacts, Analyze Risk , Establish Mitigation Measures. Communication & Training Audit, Inspection & Up dating of Log. Page 2 of 5 98 Rev: 0 conditioning equipment (C03) involved in this Hazard Identification & Risk Analysis Procedure (Risk related risks throughout the Construction REVIEW & UP DATE Audit, Inspection & Up dating of Log.
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Transfer of equipment Transfer device collide with other things; Oil leakage 4 Locate the crane Hitting injury 4 Transport Traffic risk Collision with person Collision device 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 12 Chose a qualified driver before work Check the calibration of all tools Make sure the transport device in good condition 2 3 12 Solid the ground Reinforce the pads beneath the outriggers Check the around circumstance before working 2 3 9 The trucks must respect: The limited speed in the site The circulation signs The circulation plan (updated) 2 Page 3 of 5 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 1 2 1 2 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Movement of traffic Slip/trip/all 3 forklift Crushing of person Orderly person by gear Component fall down Collision with person Falling materials 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 9 All hose/ropes/cables in use shall be secured to the side of walkways and handrails All unnecessary materials and equipment to be immediately removed from site All exits and walkways to be kept clear for use of personnel High standard of housekeeping to be maintained at all times 2 4 12 Beep back Officer commanding the ship maneuver through regulatory actions to avoid accidents Forbids the person to move near the gear Mark the area of operations of forklift The load must be stable on the forklift 2 Page 4 of 5 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Use tools Hand injuries crushed fingers smooth head against the frame 3 Environmental Pollution the air: Exhaust gas, The dust Leaking oil or diesel machines on soil 3 Assessor Print : RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 9 ensure protection adequate PPE (gloves, helmet, goggles, harness 2 3 9 Checking the condition of equipments before beginning the work ventilation Workstation 2 Sign: Date: Page 5 of 5 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 6 2 4