You are on page 1of 2

APPROVED A

Approved without exception


APPROVED WITH COMMENTS AC
Approved Subject to Incorporation of comments
RETURNED FOR CORRECTION RT
Insufficient Information/ Detail
Resubmit for Approval
REJECTED RJ
Complete redesign required
RECEIVED FOR INFORMATION I
Returned without comments
RECEIVED FOR INFORMATION IC
Returned with comments
any obligations covered under contract
Engineer:
Discipline:
Date:
Note: Approval or comments does not relieve the Contractor of
Pyry Energy
TWO(2) X 500MW
MONG DUONG 1 THERMAL POWER PLANT
Soumen Mitra
Senior Mec Engineer
30-May-12
Pyry Comment
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project

Dwg. / Doc. Title
Steam Turbine
Mechanical Outline(1/2)

Dwg. / Doc. No. MD1-0-V-111-01-00001
HDEC DT No. MD1-HDH-EVN-X-119 Submitted Date Rev. A
Pyry TR No. Received Date
New HDEC DT No. Re-Submitted Date
Status Approved with Comments

Page 1 / 1
No. Pyrys Comments Contractors Reply / Action
1 This drawing is treated for information, not for
approval


2 Number of nozzles for the 16
th
stage extraction
shown as 4 on the table in this drawing (for
nozzle E3) does not match the drawing MD1-0-
V-111-01-00002 (shown as 2 nos. Nozzles on
that drawing). Check and correct as required.


3 Refer drawing MD1-0-V-111-01-00002 on this
drawing for sectional views.


4. Submit the lifting arrangement drawings MD1-0-
V-111-01-00004 to 00007 mentioned as
reference on this drawing

5. Mark the location of bearings, turning gear, shaft
driven pumps, rupture diaphragms, etc on the
outline drawing

6. The component weights are mentioned as +/-
10%. Confirm either the exact weight in the next
revision or mention the not to exceed weights for
consideration in lifting capacities

7. Confirm whether the Dimension E shown on
the drawing is meant to be the minimum height
clearances on the components