APPROVED WITH COMMENTS AC Approved Subject to Incorporation of comments RETURNED FOR CORRECTION RT Insufficient Information/ Detail Resubmit for Approval REJECTED RJ Complete redesign required RECEIVED FOR INFORMATION I Returned without comments RECEIVED FOR INFORMATION IC Returned with comments any obligations covered under contract Engineer: Discipline: Date: Note: Approval or comments does not relieve the Contractor of Pyry Energy TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT David Langhorne Senior Mec Engineer 07-Dec-12 Pyry Comment Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project
Dwg. / Doc. Title G A Drawing BFP and Booster Pump
Dwg. / Doc. No. MD1-0-V-121-01-00001 HDEC DT No. MD1-HDH-EVN-X-1219 Submitted Date Rev. A Pyry TR No. Received Date New HDEC DT No. Re-Submitted Date Status Submitted for Information Returned with Comment
Page 1 / 1 No. Pyrys Comments Contractors Reply / Action 1 Please provide KKS identifying number for equipment and instruments on the drawings.
2 Include a parts list for the major components (e.g. main pump, variable speed drive etc) with reference drawings.
3 Foundation drawings with loading data and anchor bolt information to be provided. These drawings shall be identified as reference drawings.
4 Confirm that there is personnel protection for all rotating components.
5 State what DBSE means 6 Identify the equipment on the edge of the booster and main pump base plates at grid reference A2, A3, C5 and C6.