01.01
CONSTRUCCION CAMPAMENTO DE OBRA (03 unidades)
02.01.01
OBRAS PRELIMINARES Y PROVISIONALES
02.01.01.01
CORTE Y DESBROCE DE ARBOLES
1.00
33.00
10.00
02.01.01.02
TRAZO Y REPLANTEO SIN EQUIPO
1.00
33.00
10.00
02.01.01.03
CAMPAMENTO PROVISIONAL DE LA OBRA
1.00
33.00
10.00
02.01.01.04
REHABILITACION DE TROCHA DE ACCESO
1.00
9400.00
02.01.01.05
CONSTRUCCION DE CAMINO DE ACCESO
1.00
4950.00
02.01.02
CARTEL DE OBRA
02.01.02.01
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 2.40M.
1.00
02.01.03
CONSTRUCCION DE TROCHA CARROZABLE
02.01.03.01
CORTE Y DESBROCE DE ARBOLES
1.00
3850.00
3
TRAZO, NIVELACION Y REPLANTEO
1.00
3.85
1.00
CORTE ROCA SUELTA (PERF. Y DISP.) RENDIMIENTO=250
1.00M3/DIA
HOJA DE MOV. DE TIERRAS
DEMARCACION DE TALUDES
1.00
3850.00
MOBILIZACION Y DESMOBILIZACION DE EQUIPOS
1.00
PERFILADO Y REFINE DE CUNETAS
1.00
3850.00
CANTIDAD
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
330.00
330.00
330.00
9400.00
4950.00
330.00
330.00
330.00
9400.00
4950.00
330.00
330.00
330.00
9400.00
4950.00
m2
m2
m2
m
m
1.00
1.00
1.00
Gbl
10212
3.85
5080
3850
1
3850
10212
3.85
5080.00
3850.00
1.00
3850.00
10212
3.85
5080.00
3850.00
1.00
3850.00
m3
Km
m3
m
Gbl
m
CANTIDAD
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
57.72
16.00
57.72
57.72
57.72
16.00
57.72
57.72
57.72
16.00
57.72
57.72
m2
m2
m2
m2
7.25
1.87
17.76
3.71
3.88
34.47
34.47
m3
10.36
2.85
2.55
15.76
15.76
m2
31.46
31.46
m3
9.32
9.32
m3
3.62
3.62
m3
66.06
66.06
m2
73.11
73.11
Kg
66.06
66.06
m2
DESCRIPCION
BOCATOMA DE FONDO, GARGANTA 6m
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUALMENTE
DESVIO DE RIACHUELO
TRAZO Y REPLANTEO PRELIMINAR
TRAZO, NIVELACION EN EL PROCESO CONSTRUCTIVO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN ROCA SUELTA
Zapata
Solado
Camara de recoleccion
02.01.02.03
02.01.03
02.01.03.01
solado inferior
Garganta
Solado Superior
02.01.03.04
02.01.03.05
7.80
8.00
7.80
7.80
7.40
2.00
7.40
7.40
2.00
1.00
1.00
1.00
1.00
7.40
7.80
7.40
2.90
1.90
0.70
0.60
6.00
1.60
1.70
2.00
1.00
1.00
7.40
1.90
1.70
0.70
1.50
1.50
2.00
2.00
1.00
1.00
1.00
1.00
7.50
7.50
7.50
6.00
2.50
6.00
0.75
0.35
0.20
2.50
0.55
2.40
0.25
1.45
1.45
0.80
0.80
0.40
2.81
7.61
2.18
12.00
1.10
5.76
1.00
0.50
1.00
1.00
7.10
7.10
6.00
2.50
0.50
0.30
2.50
0.55
0.60
0.60
0.40
0.40
2.13
0.64
6.00
0.55
2.00
1.00
1.00
1.00
1.70
1.50
1.90
1.50
0.20
0.20
1.90
1.50
2.50
2.50
0.20
0.20
1.70
0.75
0.72
0.45
2.00
2.00
2.00
1.00
2.00
1.00
1.00
7.50
7.50
1.70
1.90
1.50
1.70
1.50
1.20
1.46
2.50
2.50
2.30
2.30
1.40
18.00
21.90
8.50
4.75
6.90
3.91
2.10
Diamet.
3/8"
3/8"
3/8"
3/8"
Veces
7.00
8.00
7.00
8.00
2.00
7.50
0.70
0.40
0.40
0.80
1.20
CONCRETO FC=175KG/CM2
Largo de pared
Ancho de pared
Losa
techo
ENCOFRADO Y DESENCOFRADO DE BOCATOMA
Muro interno
Muro externo
Camara de Recoleccion
45.58
Camara de Recoleccion
02.01.04
02.01.04.01
1.00
1.00
1.00
1.00
02.01.03.03
LARGO
OBRAS DE CONCRETO
CONCRETO FC=175KG/CM2 + 30%PM
Talon
Muro
02.01.03.02
DIMENSIONES
ANCHO
ALTO
N DE
VECES
REVOQUES ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5, E=1.5Cm
Muro interno
Long.
7.00
7.00
1.65
1.75
Total(ml) Parcial(Kg)
49.00
27.44
56.00
31.36
11.55
6.47
14.00
7.84
1.20
18.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
Muro externo
Camara de Recoleccion
02.01.05
02.01.05.01
2.00
2.00
1.00
2.00
1.00
1.00
DESCRIPCION
BOCATOMA DE FONDO, GARGANTA 4.5m
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUALMENTE
DESVIO DE RIACHUELO
TRAZO Y REPLANTEO PRELIMINAR
TRAZO, NIVELACION EN EL PROCESO CONSTRUCTIVO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN ROCA SUELTA
Zapata
Uas
Solado
Camara de recoleccion
02.02.02.03
02.02.03
02.02.03.01
solado inferior
Garganta
Solado Superior
02.02.03.04
1.00
Largo de pared
Ancho de pared
Losa
techo
ENCOFRADO Y DESENCOFRADO DE BOCATOMA
Muro interno
Muro externo
Camara de Recoleccion
02.02.04
02.02.04.01
REVOQUES ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5, E=1.5Cm
Muro interno
Muro externo
Camara de Recoleccion
10.50
ml
1
1
1
1
1
1
1
1
1
und
und
und
CANTIDAD
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
45.58
16.00
45.58
45.58
45.58
16.00
45.58
45.58
45.58
16.00
45.58
45.58
m2
m2
m2
m2
7.35
2.46
18.23
3.88
31.92
31.92
m3
10.36
2.85
2.55
15.76
15.76
m2
25.75
25.75
m3
6.34
6.34
m3
3.62
3.62
m3
66.06
66.06
m2
73.11
73.11
Kg
66.06
66.06
m2
10.50
10.50
ml
10.50
10.50
ml
10.50
1.00
1.00
DIMENSIONES
ANCHO
ALTO
N DE
VECES
LARGO
1.00
1.00
1.00
1.00
7.40
8.00
7.40
7.40
6.16
2.00
6.16
6.16
2.00
1.00
1.00
1.00
7.50
6.16
7.40
1.90
0.70
0..4
6.16
1.70
2.00
1.00
1.00
7.40
1.90
1.70
0.70
1.50
1.50
2.00
2.00
1.00
1.00
1.00
1.00
7.50
7.50
7.50
4.50
2.50
4.50
0.70
0.30
0.20
2.50
0.55
2.40
0.25
1.45
1.45
0.80
0.80
0.40
2.63
6.53
2.18
9.00
1.10
4.32
1.00
0.50
1.00
1.00
6.20
6.20
4.50
2.50
0.40
0.20
2.50
0.60
0.40
0.40
0.40
0.40
0.99
0.25
4.50
0.60
2.00
1.00
1.00
1.00
1.70
1.50
1.90
1.50
0.20
0.20
1.90
1.50
2.50
2.50
0.20
0.20
1.70
0.75
0.72
0.45
2.00
2.00
2.00
1.00
2.00
1.00
1.00
7.50
7.50
1.70
1.90
1.50
1.70
1.50
1.20
1.46
2.50
2.50
2.30
2.30
1.40
18.00
21.90
8.50
4.75
6.90
3.91
2.10
Diamet.
3/8"
3/8"
3/8"
3/8"
Veces
7.00
8.00
7.00
8.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
7.50
7.50
1.70
1.90
1.50
1.70
1.50
0.70
0.40
0.40
1.20
Long.
7.00
7.00
1.65
1.75
Total(ml) Parcial(Kg)
49.00
27.44
56.00
31.36
11.55
6.47
14.00
7.84
1.20
1.46
2.50
2.50
2.30
2.30
1.40
18.00
21.90
8.50
4.75
6.90
3.91
2.10
JUNTA DE DILATACION
JUNTA CON ASFALTO E=1"
Juntas Asfaltica en pantalla
02.02.05.02
10.50
10.50
CONCRETO FC=175KG/CM2
02.02.03.05
02.02.05
02.02.05.01
ml
02.02.03.03
10.50
10.50
CONCRETO SIMPLE
CONCRETO FC=175KG/CM2 + 30%PM
Talon
Muro
02.02.03.02
10.50
10.50
02.01.06
INSTALACION DE ACCESORIOS EN BOCATOMA
02.01.06.01
INSTALACION DE TAPA METALICA METALICA (0.7 X 0.7), PLANCHA ESTRELLADA
02.01.06.02
COLOCACION DE REGILLA METALICA (2.5 x 0.35)
1.00
02.01.06.03
COLOCACION DE VALVULA DE CONTROL DE BRONCE 6"
1.00
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.02
02.02.02.01
21.90
8.50
4.75
6.90
3.91
2.10
CODIGO
1.46
2.50
2.50
2.30
2.30
1.40
JUNTA DE DILATACION
JUNTA CON ASFALTO E=1"
Juntas Asfaltica en pantalla
02.01.05.02
7.50
1.70
1.90
1.50
1.70
1.50
10.50
10.50
10.50
10.50
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
02.02.06
INSTALACION DE ACCESORIOS EN BOCATOMA
02.02.06.01
INSTALACION DE TAPA METALICA METALICA (0.7 X 0.7), PLANCHA ESTRELLADA
02.02.06.02
COLOCACION DE REGILLA METALICA (1.3 x 0.30)
1.00
02.02.06.03
COLOCACION DE VALVULA DE CONTROL DE BRONCE 6"
1.00
CODIGO
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.02
02.03.02.01
N DE
VECES
DESCRIPCION
BOCATOMA DE FONDO, GARGANTA 3m
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUALMENTE
DESVIO DE RIACHUELO
TRAZO Y REPLANTEO PRELIMINAR
TRAZO, NIVELACION EN EL PROCESO CONSTRUCTIVO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN ROCA SUELTA
Zapata
Uas
Solado
Camara de recoleccion
02.03.02.03
02.03.03
02.03.03.01
solado inferior
Garganta
Solado Superior
02.03.03.05
02.03.04
02.03.04.01
REVOQUES ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5, E=1.5Cm
Muro interno
Muro externo
Camara de Recoleccion
TOTAL
UNIDAD
TOTAL
UNIDAD
29.60
10.50
29.60
29.60
29.60
10.50
29.60
29.60
29.60
10.50
29.60
29.60
m2
m
m2
m2
7.35
2.46
11.84
3.88
25.53
25.53
m3
10.36
2.85
2.55
15.76
15.76
m2
21.55
21.55
m3
6.02
6.02
m3
3.57
3.57
m3
66.06
66.06
m2
73.11
73.11
Kg
66.06
66.06
m2
10.50
10.50
ml
10.50
10.50
ml
1.00
1.00
1.00
1
1
1
und
und
und
1.00
1.00
1.00
1.00
7.40
7.00
7.40
7.40
4.00
1.50
4.00
4.00
2.00
1.00
1.00
1.00
7.50
6.16
7.40
1.90
0.70
0..4
4.00
1.70
2.00
1.00
1.00
7.40
1.90
1.70
0.70
1.50
1.50
2.00
2.00
1.00
1.00
1.00
1.00
7.40
7.50
7.50
3.00
2.60
3.00
0.70
0.30
0.20
2.60
0.55
2.40
0.25
1.45
1.45
0.80
0.80
0.40
2.59
6.53
2.18
6.24
1.14
2.88
1.00
0.50
1.00
1.00
4.60
4.60
4.50
2.50
0.40
0.20
2.50
0.60
0.40
0.40
0.40
0.40
0.74
0.18
4.50
0.60
2.00
1.00
1.00
1.00
1.65
1.50
1.90
1.50
0.20
0.20
1.90
1.50
2.50
2.50
0.20
0.20
1.65
0.75
0.72
0.45
2.00
2.00
2.00
1.00
2.00
1.00
1.00
7.50
7.50
1.70
1.90
1.50
1.70
1.50
1.20
1.46
2.50
2.50
2.30
2.30
1.40
18.00
21.90
8.50
4.75
6.90
3.91
2.10
Diamet.
3/8"
3/8"
3/8"
3/8"
Veces
7.00
8.00
7.00
8.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
7.50
7.50
1.70
1.90
1.50
1.70
1.50
0.70
0.40
0.40
1.20
Long.
7.00
7.00
1.65
1.75
Total(ml) Parcial(Kg)
49.00
27.44
56.00
31.36
11.55
6.47
14.00
7.84
1.20
1.46
2.50
2.50
2.30
2.30
1.40
10.50
10.50
10.50
10.50
1.00
02.03.06
INSTALACION DE ACCESORIOS EN BOCATOMA
02.03.06.01
INSTALACION DE TAPA METALICA METALICA (0.7 X 0.7), PLANCHA ESTRELLADA
02.03.06.02
COLOCACION DE REGILLA METALICA (1.0 x 0.30)
1.00
02.03.06.03
COLOCACION DE VALVULA DE CONTROL DE BRONCE 6"
1.00
1.00
1.00
1.00
1.00
1.00
und
und
und
18.00
21.90
8.50
4.75
6.90
3.91
2.10
JUNTA DE DILATACION
JUNTA CON ASFALTO E=1"
Juntas Asfaltica en pantalla
02.03.05.02
CANTIDAD
PARCIAL
02.03.05
02.03.05.01
ALTO
CONCRETO FC=175KG/CM2
Largo de pared
Ancho de pared
Losa
techo
02.03.03.04
DIMENSIONES
LARGO
ANCHO
1.00
1.00
1.00
02.03.03.03
1.00
1.00
1.00
1.00
CONCRETO SIMPLE
CONCRETO FC=175KG/CM2 + 30%PM
Talon
Muro
02.03.03.02
1.00
1.00
1.00
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
CODIGO
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.01.04
02.04.02
02.04.02.01
DESCRIPCION
BOCATOMA DE FONDO, GARGANTA 2m
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUALMENTE
DESVIO DE RIACHUELO
TRAZO Y REPLANTEO PRELIMINAR
TRAZO, NIVELACION EN EL PROCESO CONSTRUCTIVO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN ROCA SUELTA
Zapata
Uas
Solado
Camara recoleccion
02.04.02.03
02.04.03
02.04.03.01
solado inferior
Garganta
Solado Superior
02.04.03.05
02.04.04
02.04.04.01
REVOQUES ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:5, E=1.5Cm
Muro interno
Muro externo
Camara de Recoleccion
21.00
7.00
21.00
21.00
21.00
7.00
21.00
21.00
42.00
14.00
42.00
42.00
m2
m
m2
m2
5.59
0.94
3.16
3.71
1.34
14.74
29.48
m3
7.98
5.85
5.25
19.08
38.16
m2
13.10
26.19
m3
3.50
7.00
m3
3.62
7.24
m3
55.95
111.90
m2
73.11
365.54
Kg
55.95
111.90
m2
10.50
21.00
ml
10.50
21.00
ml
2.00
2.00
2.00
2.00
2.00
2.00
und
und
und
CANTIDAD
19.50
m2
1.00
1.00
1.00
1.00
6.00
7.00
6.00
6.00
3.50
2.00
1.00
1.00
1.00
2.00
5.70
3.90
3.95
2.90
0.80
0.70
0.60
2.00
1.60
1.20
2.00
1.00
1.00
5.70
3.90
3.50
0.70
1.50
1.50
2.00
2.00
1.00
1.00
1.00
1.00
5.60
5.60
5.60
2.00
1.60
2.00
0.70
0.30
0.20
1.60
0.50
1.80
0.25
1.45
1.45
0.80
0.80
0.40
1.96
4.87
1.62
2.56
0.64
1.44
1.00
0.50
1.00
1.00
4.00
4.00
2.00
2.25
0.40
0.20
2.25
1.00
0.40
0.40
0.40
0.40
0.64
0.16
1.80
0.90
2.00
1.00
1.00
1.00
1.70
1.50
1.90
1.50
0.20
0.20
1.90
1.50
2.50
2.50
0.20
0.20
1.70
0.75
0.72
0.45
2.00
2.00
2.00
1.00
2.00
1.00
1.00
5.60
5.60
1.70
1.90
1.50
1.70
1.50
1.20
1.46
2.50
2.50
2.30
2.30
1.40
13.44
16.35
8.50
4.75
6.90
3.91
2.10
Diamet.
3/8"
3/8"
3/8"
3/8"
Veces
7.00
8.00
7.00
8.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
5.60
5.60
1.70
1.90
1.50
1.70
1.50
3.50
3.50
0.70
0.40
0.40
0.80
0.70
Long.
7.00
7.00
1.65
1.75
Total(ml) Parcial(Kg)
49.00
27.44
56.00
31.36
11.55
6.47
14.00
7.84
1.20
1.46
2.50
2.50
2.30
2.30
1.40
13.44
16.35
8.50
4.75
6.90
3.91
2.10
JUNTA DE DILATACION
JUNTA CON ASFALTO E=1"
Juntas Asfaltica en pantalla
02.04.05.02
UNIDAD
02.04.05
02.04.05.01
TOTAL
CONCRETO FC=175KG/CM2
Largo de pared
Ancho de pared
Losa
techo
02.04.03.04
TOTAL
UNIDAD
02.04.03.03
CANTIDAD
PARCIAL
LARGO
CONCRETO SIMPLE
CONCRETO FC=175KG/CM2 + 30%PM
Talon
Muro
02.04.03.02
DIMENSIONES
ANCHO
ALTO
N DE
VECES
10.50
10.50
10.50
10.50
1.00
02.04.06
INSTALACION DE ACCESORIOS EN BOCATOMA
02.04.06.01
INSTALACION DE TAPA METALICA (0.7 X 0.7), PLANCHA ESTRELLADA
02.04.06.02
COLOCACION DE REGILLA METALICA (1.4 x 0.30)
2.00
02.04.06.03
COLOCACION DE VALVULA COMPUERTA 6"
2.00
2.00
2.00
2.00
2.00
2.00
03.01.00
03.01.01 OBRAS PRELIMINARES
01.01.01.01 Limpieza manual de terreno normal
6.50
Desarenador
Canal de Limpia
1.00
1.00
4.00
1.00
1.50
0.50
6.00
0.50
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.00
1.00
3.70
2.00
1.25
0.46
Desarenador
2.00
1.00
1.00
1.07
1.00
2.24
1.24
1.24
0.46
4.00
1.00
2.00
1.07
1.00
2.24
1.24
1.24
1.00
1.20
2.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
Canal de Limpia
0.57
0.60
0.60
1.03
0.74
0.62
0.60
3.62
1.24
2.69
0.80
0.20
0.19
1.24
1.00
2.24
1.10
0.20
0.20
0.45
0.50
0.45
0.10
0.10
0.30
0.10
0.10
0.45
0.15
0.10
0.15
0.60
0.45
0.10
0.20
0.30
0.30
0.40
0.40
0.40
0.15
0.09
0.07
0.02
0.006
0.027
0.027
0.040
0.027
2.00
1.00
1.00
2.00
1.00
1.00
1.00
1.02
1.00
1.00
1.00
1.00
1.00
2.30
0.12
0.12
0.15
0.12
0.60
0.60
0.84
0.57
0.60
0.60
0.57
0.10
0.10
0.08
0.14
0.07
0.09
0.14
0.38
0.06
0.15
2.00
2.00
2.00
2.00
4.00
4.00
4.00
2.00
2.00
4.00
2.00
2.00
2.00
1.24
1.00
1.10
0.20
1.02
1.00
1.00
0.20
0.45
0.50
0.45
2.20
0.84
0.60
0.45
0.20
0.30
0.57
0.60
0.57
0.30
1.49
0.90
0.44
0.12
2.33
2.40
2.28
0.12
0.14
0.60
0.14
0.44
0.17
Diamet.
3/8"
3/8"
3/8"
3/8"
N veces
6.00
10.00
6
6
2.00
4.00
4.00
4.00
2.00
2.00
4.00
2.00
1.24
1.02
1.00
1.00
0.20
0.45
0.50
0.45
2.00
2.00
4.00
1.10
0.20
1.00
0.15
0.30
0.15
0.10
0.10
Long.
1.80
0.34
3.50
4.00
0.60
0.57
0.60
0.57
0.30
Canal de limpia
16.64
m2
2.39
7.18
m3
7.54
22.63
m2
0.20
0.60
m3
0.48
1.43
m3
1.08
3.24
m3
12.13
36.39
m2
36.74
110.22
Kg.
9.48
28.45
m2
0.15
0.30
0.15
2.36
7.08
m2
1.00
3.00
Und
1.49
2.33
2.40
2.28
0.12
0.14
0.60
0.14
5.55
4.63
0.92
0.20
0.30
0.45
0.44
0.12
1.80
1.00
1.00
1.00
1.00
4.50
4.00
1.00
1.00
0.50
4.00
0.50
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
CANTIDAD
9.00
m2
1.00
1.00
3.70
1.00
1.00
0.46
Desarenador
2.00
1.00
1.00
0.60
1.00
1.85
0.85
0.85
0.46
4.00
1.00
2.00
0.60
1.00
1.85
0.85
0.85
1.00
1.20
2.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
Canal de Limpia
0.57
0.60
0.60
0.44
0.51
0.51
0.60
1.56
0.85
2.22
0.80
0.15
0.14
0.85
1.00
1.85
1.10
0.20
0.20
0.45
0.50
0.45
0.10
0.10
0.30
0.10
0.10
0.45
0.15
0.10
0.15
0.60
0.45
0.10
0.20
0.30
0.30
0.40
0.40
0.40
0.10
0.09
0.06
0.02
0.006
0.027
0.027
0.040
0.027
2.00
1.00
1.00
2.00
1.00
1.00
1.00
1.02
1.00
1.00
1.00
1.00
1.00
2.30
0.12
0.12
0.15
0.12
0.60
0.60
0.84
0.57
0.60
0.60
0.57
0.10
0.10
0.08
0.14
0.07
0.09
0.14
0.38
0.06
0.15
2.00
2.00
2.00
2.00
4.00
4.00
4.00
2.00
2.00
4.00
2.00
2.00
2.00
0.85
1.00
1.10
0.20
1.02
1.00
1.00
0.20
0.45
0.50
0.45
2.20
0.84
0.60
0.45
0.20
0.30
0.57
0.60
0.57
0.30
1.02
0.90
0.44
0.12
2.33
2.40
2.28
0.12
0.14
0.60
0.14
0.44
0.17
Diamet.
3/8"
3/8"
3/8"
3/8"
N veces
6.00
10.00
6
6
2.00
4.00
4.00
4.00
2.00
2.00
4.00
2.00
0.85
1.02
1.00
1.00
0.20
0.45
0.50
0.45
2.00
2.00
4.00
1.10
0.20
1.00
0.15
0.30
0.15
0.10
0.10
Long.
1.80
0.34
3.50
4.00
0.20
0.57
0.60
0.57
0.30
Canal de limpia
8.32
m2
1.47
2.93
m3
4.63
9.26
m2
0.15
0.30
m3
0.42
0.83
m3
1.08
2.16
m3
11.64
23.28
m2
36.74
73.48
Kg.
8.34
16.67
m2
0.15
0.30
0.15
2.36
4.72
m2
1.00
1.00
2.00
2.00
Und
Und
0.34
2.33
2.40
2.28
0.12
0.14
0.60
0.14
4.16
3.70
0.46
0.20
0.30
0.45
0.44
0.12
1.80
1.00
1.00
1.00
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
CODIGO
N DE
VECES
DESCRIPCION
DIMENSIONES
LARGO
ANCHO
ALTO
48.50
0.50
PARCIAL
TOTAL
UNIDAD
24.25
121.25
m2
48.50
242.50
24.25
121.25
72.75
363.75
m3
11.64
58.20
m3
2.91
14.55
m3
48.50
242.50
48.50
242.50
48.50
242.50
48.50
242.50
24.25
48.50
48.50
1.00
48.50
0.50
1.00
48.50
2.00
1.50
72.75
1.00
38.80
0.50
0.60
11.64
1.00
9.70
0.50
0.60
2.91
1.00
48.50
48.50
04.02.02.04 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
48.50
48.50
1.00
48.50
1.00
48.50
1.00
48.50
48.50
CANTIDAD
TOTAL
UNIDAD
CODIGO
DESCRIPCION
N DE
VECES
LARGO
1.00
4980.00
1.00
4980.00
4980.00
1.00
4980.00
4980.00
1.00
4980.00
2.00
1.50
7470.00
1.00
3486.00
0.60
0.80
1673.28
1.00
1245.00
0.60
0.80
597.60
1.00
249.00
0.60
0.80
119.52
DIMENSIONES
ANCHO
ALTO
PARCIAL
CANTIDAD
TOTAL
UNIDAD
TOTAL
UNIDAD
9960.00
9960.00
m2
4980.00
4980.00
4980.00
4980.00
7470.00
7470.00
m3
1673.28
1673.28
m3
597.60
597.60
m3
9960.00
119.52
119.52
m3
4980.00
4980.00
4980.00
4980.00
m
UNIDAD
m
UNIDAD
m
UNIDAD
m
UNIDAD
1.00
4980.00
4980.00
05.01.02.06 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
4980.00
4980.00
180.00
1.00
546.00
1.00
2996.00
1.00
1258.00
1.00
4980.00
180.00
180.00
180.00
546.00
546.00
546.00
2996.00
2996.00
2996.00
1258.00
1258.00
1258.00
4980.00
4980.00
4980.00
4980.00
1.00
1.00
1.00
1.00
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
CODIGO
N DE
VECES
DESCRIPCION
06.01.00
CAMARA DE REUNION (4.0 UNIDADES)
06.01.01 OBRAS PRELIMINARES
06.01.01.01 Limpieza manual de terreno normal
Caja de Reunion
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
1.00
2.00
2.00
4.00
Caja de Reunion
1.00
1.70
1.50
2.55
Caja de Reunion
1.00
1.70
1.50
0.80
2.04
Caja de Reunion
2.00
2.00
1.70
1.50
0.80
0.80
2.72
2.40
Solado
1.00
1.70
1.50
0.15
0.38
Muros deA-A
Muros de B-B
2.00
2.00
1.50
1.30
0.15
0.15
0.85
0.85
0.38
0.33
1.00
1.50
1.30
0.10
0.20
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.50
1.20
1.30
1.00
1.50
1.50
0.85
0.85
0.85
0.85
2.55
2.04
2.21
1.70
1.95
0.30
0.26
Diamet.
3/8"
3/8"
N veces
8.00
7.00
Muros de A-A
Muros de B-B
Solado
2.00
2.00
1.00
1.20
1.00
1.20
Muros de A-A
Muros de B-B
Techo de caja de inspeccion
2.00
2.00
1.00
2.00
2.00
1.50
1.30
1.50
1.50
CANTIDAD
TOTAL
UNIDAD
TOTAL
UNIDAD
4.00
16.00
m2
2.55
10.20
m2
2.04
8.16
m3
5.12
20.48
m2
0.40
1.61
m3
0.75
3.00
m3
0.20
0.82
m3
11.56
46.24
m2
12.97
51.88
Kg.
10.76
43.05
m2
5.58
22.30
m2
1.00
4.00
Und
1.30
1.30
Long.
1.30
1.50
0.10
0.10
2.04
1.70
1.20
0.50
0.50
1.50
1.30
1.95
0.30
0.26
1.00
1.30
1.30
0.10
0.10
1 Und
1.00
CODIGO
07.01.00
07.01.01
07.01.01.01
07.01.01.02
N DE
VECES
DESCRIPCION
07.01.02
07.01.02.01
07.01.02.02
07.01.03
07.01.03.01
07.01.03.02
PARCIAL
12.69
1.20
1.50
1.00
1.20
2.40
3.60
1.20
1.50
1.00
1.20
2.40
3.60
1.20
1.50
1.00
1.20
4.00
4.00
4.00
4.00
1.20
1.00
1.50
1.20
1.20
1.20
0.80
0.80
2.00
2.00
1.20
1.50
1.00
1.20
0.10
0.10
0.24
0.36
2.00
1.20
1.00
1.20
2.88
2.00
2.00
TOTAL
UNIDAD
PROGRESIVA
1
07.01.01.03
DIMENSIONES
LARGO
ANCHO
ALTO
1.20
0.80
CANTIDAD
TOTAL
UNIDAD
0+168.8- 0+189.8
12.69
12.69
m2
6.00
6.00
m2
6.00
6.00
m2
5.76
5.76
m3
19.20
19.20
m2
0.60
0.60
m3
2.88
2.88
m3
2.88
2.88
5.76
4.80
4.80
3.84
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.01.04
07.01.04.01
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columnas
07.01.04.02
07.01.04.03
07.01.05
07.01.05.01
07.01.06
07.01.06.01
07.01.06.02
07.01.06.03
07.02.00
07.02.01
07.02.01.01
07.02.01.02
07.02.02
07.02.02.01
07.02.02.02
07.02.03
07.02.03.01
07.02.03.02
07.02.04
07.02.04.01
07.02.04.03
7.37
m2
59.35
59.35
Kg.
4.21
3.16
7.37
7.37
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
0.40
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
32
15.00
23.00
11.50
11.50
22.05
0.30
2.6
0.63
0.30
2.6
2.6
4.21
3.16
Long.
1.50
1.20
3.43
1.46
1.50
0.30
PROGRESIVA
1
13.19
1.40
1.60
1.00
1.20
2.80
3.84
1.40
1.60
1.00
1.20
2.80
3.84
1.40
1.60
1.00
1.20
4.00
4.00
4.00
4.00
1.40
1.00
1.60
1.20
1.20
1.20
0.80
0.80
2.00
2.00
1.40
1.60
1.00
1.20
0.10
0.10
0.28
0.38
2.00
1.40
1.00
1.20
3.36
2.00
0.40
0.30
2.7
0.65
4.00
4.00
0.40
0.30
2.7
2.7
4.34
3.25
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
33
2.00
2.00
1.20
0.80
Estribo
Long.
1.60
1.20
3.51
1.48
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=22m
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.80
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
32.89
Numero de guardacabos en cable 1/2"
2.00
0.30
0+479.8- 0+501.8
13.19
m2
6.64
6.64
m2
6.64
6.64
m2
6.43
6.43
m3
20.48
20.48
m2
0.66
0.66
m3
3.36
3.36
m3
0.65
0.65
m3
7.59
7.59
m2
61.09
61.09
Kg.
4.34
3.25
7.59
7.59
m2
1.00
1.00
1.00
Und
3.36
3.07
6.72
4.80
5.12
3.84
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
13.19
Columna
07.02.06
07.02.06.01
7.37
4.00
4.00
Zapata
07.02.05
07.02.05.01
m3
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=21m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
31.68
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
Columnas
07.02.04.02
0.63
0.40
REVOQUES Y ENLUCIDOS
TARRAJEO COLUMNAS, MEZCLA 1:5, E = 1.5 Cm
cmaras de anclaje
zapatas
07.02.01.03
0.63
2.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.02.06.02
07.02.06.03
07.03.00
07.03.01
07.03.01.01
07.03.01.02
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
15.00
24.00
12.00
12.00
23.10
07.03.02
07.03.02.01
07.03.02.02
07.03.03
07.03.03.01
07.03.03.02
07.03.04
07.03.04.01
07.03.04.03
Estribo
07.03.06.02
07.03.06.03
07.04.00
07.04.01
07.04.01.01
07.04.01.02
1.00
1.00
1.00
1.00
PROGRESIVA
8.71
0+507.8- 0+522.8
1+012.6 - 1+027.6
17.41
m2
5.40
10.80
m2
5.40
10.80
m2
4.68
9.36
m3
16.56
33.12
m2
0.54
1.08
m3
2.88
5.76
m3
0.52
1.04
m3
6.07
12.13
m2
51.09
102.18
Kg.
3.47
2.60
6.07
12.13
m2
1.00
1.00
2.00
Und
1.00
1.00
2.00
8.71
2.00
2.00
1.20
1.50
1.00
1.00
2.40
3.00
1.20
1.50
1.00
1.00
2.40
3.00
1.20
1.50
1.00
1.00
4.00
4.00
4.00
4.00
1.20
1.00
1.50
1.00
1.20
1.20
0.60
0.60
2.00
2.00
1.20
1.50
1.00
1.00
0.10
0.10
0.24
0.30
2.00
1.20
1.00
1.20
2.88
2.00
0.40
0.30
2.2
0.52
4.00
4.00
0.40
0.30
2.2
2.2
3.47
2.60
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
27
4.00
4.00
0.40
1.20
0.60
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
Long.
1.50
1.00
2.77
1.14
1.50
0.30
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=22m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
23.20
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
8.00
17.00
51.00
8.50
22.00
1.00
5.76
4.80
3.60
2.40
PROGRESIVA
1
13.56
2.00
2.00
1.40
1.60
1.00
1.20
2.88
1.80
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columna
07.03.06
07.03.06.01
1.00
2.00
Zapata
07.03.05
07.03.05.01
1.00
Columnas
07.03.04.02
1.00
LINEA DE CONDUCCION
cmaras de anclaje
zapatas
07.03.01.03
1.00
0+699.3- 0+722.3
13.56
13.56
m2
6.64
6.64
m2
2.80
3.84
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.04.01.03
07.04.02
07.04.02.01
07.04.02.02
07.04.03
07.04.03.01
07.04.03.02
07.04.04
07.04.04.01
07.04.04.03
07.04.05
07.04.05.01
07.04.06
07.04.06.01
07.04.06.02
07.04.06.03
07.05.00
07.05.01
07.05.01.01
07.05.01.02
07.05.02
07.05.02.01
07.05.02.02
07.05.03
07.05.03.01
07.05.03.02
07.05.04
07.05.04.01
6.43
6.43
m3
20.48
20.48
m2
0.66
0.66
m3
3.36
3.36
m3
0.67
0.67
m3
7.81
7.81
m2
61.95
61.95
Kg.
4.46
3.35
7.81
7.81
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.40
1.60
1.00
1.20
4.00
4.00
4.00
4.00
1.40
1.00
1.60
1.20
1.20
1.20
0.80
0.80
2.00
2.00
1.40
1.60
1.00
1.20
0.10
0.10
0.28
0.38
2.00
1.40
1.00
1.20
3.36
2.00
0.40
0.30
2.8
0.67
4.00
4.00
0.40
0.30
2.8
2.8
4.46
3.35
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
34
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=23m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
34.30
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
20.00
25.00
75.00
12.50
24.15
2.80
3.84
1.20
0.80
3.36
3.07
6.72
4.80
5.12
3.84
Long.
1.60
1.20
3.59
1.50
1.50
0.30
LINEA DE CONDUCCION
PROGRESIVA
2.00
11.57
2.00
2.00
1.20
1.50
1.00
1.20
2.40
3.60
1.20
1.50
1.00
1.20
2.40
3.60
1.20
1.50
1.00
1.20
4.00
4.00
4.00
4.00
1.20
1.00
1.50
1.20
1.20
1.20
0.80
0.80
2.00
2.00
1.20
1.50
1.00
1.20
0.10
0.10
0.24
0.36
2.00
1.20
1.00
1.20
2.88
2.00
0.40
0.30
2.4
0.58
4.00
4.00
0.40
0.30
2.4
2.4
3.84
2.88
1.20
0.80
0+815.4- 0+833.4
11.57
11.57
m2
6.00
6.00
m2
6.00
6.00
m2
5.76
5.76
m3
19.20
19.20
m2
0.60
0.60
m3
2.88
2.88
m3
0.58
0.58
m3
6.72
6.72
m2
2.88
2.88
5.76
4.80
4.80
3.84
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columnas
07.05.04.02
m2
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
cmaras de anclaje
zapatas
07.05.01.03
6.64
1.00
1.20
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columnas
07.04.04.02
6.64
1.40
1.60
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.05.04.03
07.05.05
07.05.05.01
07.05.06
07.05.06.01
07.05.06.02
07.05.06.03
07.06.00
07.06.01
07.06.01.01
07.06.01.02
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
07.06.02
07.06.02.01
07.06.02.02
07.06.03
07.06.03.01
07.06.03.02
07.06.04
07.06.04.01
07.06.04.03
18.90
07.06.06.03
0.30
1.00
LINEA DE CONDUCCION
56.76
56.76
Kg.
3.84
2.88
6.72
6.72
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
PROGRESIVA
2.00
6.78
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
4.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
1.20
1.20
0.60
0.60
2.00
2.00
1.00
1.00
1.00
1.00
0.10
0.10
0.20
0.20
2.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
1.8
0.43
4.00
4.00
0.40
0.30
1.8
1.8
2.84
2.13
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
22
1.20
0.60
Long.
1.00
1.00
2.38
1.04
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=10m
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.80
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
16.57
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
1.00
0.30
1+172.7 - 1+182.7
6.78
6.78
m2
4.00
4.00
m2
4.00
4.00
m2
3.60
3.60
m3
14.40
14.40
m2
0.40
0.40
m3
2.40
2.40
m3
0.43
0.43
m3
4.98
4.98
m2
42.37
42.37
Kg.
2.84
2.13
4.98
4.98
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
2.40
1.20
4.80
4.80
2.40
2.40
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Estribo
07.06.06.02
Long.
1.50
1.20
3.20
1.40
1.50
Columna
07.06.06
07.06.06.01
0.40
12.00
18.00
18.00
18.00
Zapata
07.06.05
07.06.05.01
4.00
4.00
Columnas
07.06.04.02
N veces
16.00
16.00
8.00
4.00
29
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=22m
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.80
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
27.44
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
cmaras de anclaje
zapatas
07.06.01.03
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
7.00
12.00
36.00
6.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.00
07.07.02
07.07.02.01
07.07.02.02
07.07.03
07.07.03.01
07.07.03.02
07.07.04
07.07.04.01
07.07.04.03
Columna
Estribo
07.07.06
07.07.06.01
07.07.06.02
07.07.06.03
07.08.00
07.08.01
07.08.01.01
07.08.01.02
07.08.02
07.08.02.01
07.08.02.02
1.00
7.09
2.00
2.00
7.09
m2
4.00
m2
4.00
4.00
m2
4.00
4.00
m3
16.00
16.00
m2
0.40
0.40
m3
2.40
2.40
m3
0.45
0.45
m3
5.20
5.20
m2
44.56
44.56
Kg.
2.97
2.23
5.20
5.20
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
4.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
1.20
1.20
0.80
0.80
2.00
2.00
1.00
1.00
1.00
1.00
0.10
0.10
0.20
0.20
2.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
1.9
0.45
4.00
4.00
0.40
0.30
1.9
1.9
2.97
2.23
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
23
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=11m
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.80
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
17.98
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
7.00
13.00
39.00
6.50
11.55
1.20
0.80
2.40
1.60
4.80
4.80
3.20
3.20
Long.
1.00
1.00
2.66
1.26
1.50
0.30
PROGRESIVA
1
8.16
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
1.00
1.00
1.20
1.00
1.20
1.20
0.80
0.80
4.00
4.00
4.00
4.00
1+262.4 - 1+273.4
4.00
1.00
1.00
:
7.09
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
cmaras de anclaje
zapatas
07.08.01.03
2.00
PROGRESIVA
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Zapata
07.07.05
07.07.05.01
LINEA DE CONDUCCION
Columnas
07.07.04.02
1.00
07.07.01.03
1.00
10.50
1.20
0.80
1+362.8 -1+376.8
8.16
8.16
m2
4.40
4.40
m2
4.40
4.40
m2
4.32
4.32
m3
16.64
16.64
m2
2.40
1.92
4.80
4.80
3.84
3.20
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.08.03
07.08.03.01
07.08.03.02
07.08.04
07.08.04.01
CONCRETO SIMPLE
SOLADO E = 2" , MEZCLA 1:10 C:H, S/M
07.08.04.03
07.08.06.03
07.09.00
07.09.01
07.09.01.01
07.09.01.02
07.09.02
07.09.02.01
07.09.02.02
07.09.03
07.09.03.01
07.09.03.02
07.09.04
07.09.04.01
07.09.04.03
m3
5.85
5.85
m2
48.91
48.91
Kg.
3.34
2.51
5.85
5.85
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
2.1
0.50
4.00
4.00
0.40
0.30
2.1
2.1
3.34
2.51
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
26
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Long.
1.20
1.00
2.89
1.32
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=14m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
22.10
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
10.00
16.00
48.00
8.00
14.70
0.30
PROGRESIVA
1
7.53
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
4.00
4.00
4.00
4.00
1.00
1.00
1.20
1.00
1.20
1.20
0.80
0.80
2.00
2.00
1.00
1.20
1.00
1.00
0.10
0.10
0.20
0.24
2.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
1.9
0.46
4.00
4.00
0.40
0.30
1.9
1.9
3.09
2.32
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
24
4.00
4.00
0.40
1.20
0.80
Estribo
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
Long.
1.20
1.00
2.73
1.28
1.50
0.30
1+785.8 - 1+797.8
7.53
7.53
m2
4.40
4.40
m2
4.40
4.40
m2
4.32
4.32
m3
16.64
16.64
m2
0.44
0.44
m3
2.40
2.40
m3
0.46
0.46
m3
5.41
5.41
m2
47.18
47.18
Kg.
5.41
5.41
m2
2.40
1.92
4.80
4.80
3.84
3.20
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columna
07.09.06
0.50
2.00
Zapata
07.09.05
07.09.05.01
0.50
Columnas
07.09.04.02
m3
0.20
0.24
cmaras de anclaje
zapatas
07.09.01.03
2.40
0.10
0.10
Estribo
07.08.06.02
2.40
1.00
1.00
Columna
07.08.06
07.08.06.01
m3
1.00
1.20
Zapata
07.08.05
07.08.05.01
0.44
2.00
2.00
Columnas
07.08.04.02
0.44
cmaras de anclaje
zapatas
3.09
2.32
ESTRUCTURA DE ACERO
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.09.06.01
07.09.06.02
07.09.06.03
07.10.00
07.10.01
07.10.01.01
07.10.01.02
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=12m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
19.28
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
11.00
14.00
42.00
7.00
12.60
07.10.02
07.10.02.01
07.10.02.03
07.10.03
07.10.03.01
07.10.03.02
07.10.04
07.10.04.01
07.10.04.03
Estribo
07.10.06.02
07.10.07
07.11.00
07.11.01
07.11.01.01
07.11.01.02
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PROGRESIVA
1+917.8 - 1+930.8
2+673.1 - 2+686.1
15.69
m2
4.40
8.80
m2
4.40
8.80
m2
4.32
8.64
m3
16.64
33.28
m2
0.44
0.88
m3
2.40
4.80
m3
0.48
0.97
m3
5.63
11.26
m2
48.04
96.09
Kg.
3.22
2.41
5.63
11.26
m2
1.00
1.00
2.00
Und
1.00
1.00
1.00
2.00
1.00
1.00
1.00
2.00
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
2.00
2.40
1.00
1.20
1.00
1.00
4.00
4.00
4.00
4.00
1.00
1.00
1.20
1.00
1.20
1.20
0.80
0.80
2.00
2.00
1.00
1.20
1.00
1.00
0.10
0.10
0.20
0.24
2.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
2.0
0.48
4.00
4.00
0.40
0.30
2.0
2.0
3.22
2.41
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
25
2.00
2.00
1.20
0.80
Long.
1.20
1.00
2.81
1.30
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=13m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
20.69
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
Numero de Grapas con 5 pernos en cable de 1/2"
10.00
10.00
15.00
45.00
7.50
13.65
0.30
LINEA DE CONDUCCION
2.40
1.92
4.80
4.80
3.84
3.20
PROGRESIVA
2.00
4.92
2.00
2.00
1.00
1.00
1.00
0.80
2.00
1.60
Und
7.84
7.84
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columna
07.10.06
07.10.06.01
1.00
Zapata
07.10.05
07.10.05.01
1.00
Columnas
07.10.04.02
1.00
cmaras de anclaje
zapatas
07.10.01.03
1.00
2+185.6 - 2+191.6
4.92
4.92
m2
3.60
3.60
m2
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.11.01.03
07.11.02
07.11.02.01
07.11.02.03
07.11.03
07.11.03.01
01.11.03.02
07.11.04
07.11.04.01
07.11.04.03
01.11.05
07.11.05.01
07.11.06
01.11.06.01
07.11.06.02
07.11.07
07.12.00
07.12.01
07.12.01.01
07.12.01.02
07.12.02
07.12.02.01
07.12.02.03
07.12.03
07.12.03.01
07.12.03.02
07.12.04
07.12.04.01
m2
3.36
3.36
m3
13.92
13.92
m2
0.36
0.36
m3
2.40
2.40
m3
0.39
0.39
m3
4.54
4.54
m2
38.89
38.89
Kg.
2.60
1.95
4.54
4.54
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.80
4.00
4.00
4.00
4.00
1.00
1.00
1.00
0.80
1.20
1.20
0.60
0.60
2.00
2.00
1.00
1.00
1.00
0.80
0.10
0.10
0.20
0.16
2.00
1.00
1.00
1.20
2.40
2.00
0.40
0.30
1.6
0.39
4.00
4.00
0.40
0.30
1.6
1.6
2.60
1.95
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
20
Long.
1.00
0.80
2.22
1.01
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=8m
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
13.75
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 3/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
10.00
30.00
5.00
5.00
8.40
2.00
1.60
1.20
0.60
2.40
0.96
4.80
4.80
2.40
1.92
0.30
LINEA DE CONDUCCION
PROGRESIVA
2.00
10.26
2.00
2.00
1.20
1.50
1.00
1.00
2.40
3.00
1.20
1.50
1.00
1.00
2.40
3.00
1.20
1.50
1.00
1.00
4.00
4.00
4.00
4.00
1.20
1.00
1.50
1.00
1.20
1.20
0.80
0.80
2.00
2.00
1.20
1.50
1.00
1.00
0.10
0.10
0.24
0.30
2.00
1.20
1.00
1.20
2.88
2.00
0.40
0.30
2.6
0.61
07.12.01.03
3.60
1.00
0.80
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columnas
07.11.04.02
3.60
1.00
1.00
1.20
0.80
2+828.6 - 2+848.6
10.26
m2
5.40
5.40
m2
5.40
5.40
m2
5.28
5.28
m3
18.56
18.56
m2
0.54
0.54
m3
2.88
2.88
m3
0.61
0.61
m3
2.88
2.40
5.76
4.80
4.80
3.20
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Columnas
10.26
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
07.12.04.02
07.12.04.03
07.12.05
07.12.05.01
07.12.06
07.12.06.01
07.12.06.02
07.12.07
4.00
4.00
0.40
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
31
2.6
2.6
7.16
7.16
m2
56.72
56.72
Kg.
4.09
3.07
7.16
7.16
m2
1.00
1.00
1.00
Und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
CANTIDAD
80
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
3.00
240.00
m2
1.80
144.00
m2
1.80
144.00
m3
5.40
432.00
m2
0.28
22.68
m3
0.50
40.32
m3
0.14
10.92
m3
8.84
707.28
m2
8.38
670.25
Kg.
3.59
287.28
m2
3.62
289.80
m2
1.00
80.00
Und
0.30
Long.
1.50
1.00
3.36
1.44
1.50
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
4.00
0.40
4.00
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1/2"; RESIST. ROTURA.= 10.4 Tn; LUZ 1.00
=20m
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.80
CABLES DE 1/2" TIPO BOA (6x19) , R. ROTURA 10.4 Tn
30.26
Numero de guardacabos en cable 1/2"
2.00
Grapas Doble via tipo traccion I/5 pernos para cable de 1/2"
2.00
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 1/4"
Pendola 1/4" (ml)
Grapas con 3 pernos I/p para cable de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Pernos C/tuerca - arandela 2/4"x3"
20.00
22.00
66.00
11.00
21.00
4.09
3.07
2.56
2.56
0.30
CODIGO
N DE
VECES
DESCRIPCION
08.01.00
CAMARA DE INSPECCION (80.0 UNIDADES)
08.01.01 OBRAS PRELIMINARES
08.01.01.01 Limpieza manual de terreno normal
Caja de inspeccion
DIMENSIONES
LARGO
ANCHO
ALTO
1.00
2.00
1.50
3.00
Caja de inspeccion
1.00
1.50
1.20
1.80
Caja de inspeccion
1.00
1.50
1.20
1.00
1.80
Caja de inspeccion
2.00
2.00
1.50
1.20
1.00
1.00
3.00
2.40
Solado
1.00
1.50
1.20
0.15
0.27
Muros deA-A
Muros de B-B
2.00
2.00
1.30
0.70
0.15
0.15
0.80
0.80
0.31
0.17
1.00
1.30
1.00
0.10
0.13
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.30
1.00
1.00
0.70
1.30
1.30
0.80
0.80
0.80
0.80
2.08
1.60
1.60
1.12
1.56
0.26
0.20
Diamet.
3/8"
3/8"
N veces
7.00
5.00
Muros de A-A
Muros de B-B
Solado
2.00
2.00
1.00
1.00
0.70
1.00
Muros de A-A
Muros de B-B
Techo de caja de inspeccion
2.00
2.00
1.00
2.00
2.00
1.30
1.20
1.00
1.30
1.20
1.00
Long.
1.00
1.30
0.10
0.10
1.60
1.12
0.70
0.50
0.50
0.70
0.10
0.10
1.30
1.20
0.49
0.26
0.20
0.70
0.70
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1 Und
1 Und
1.00
CODIGO
N DE
VECES
CAMARA DE ENTRADA A LA RAPIDA (2.0 UNIDADES)
DESCRIPCION
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
09.01.00
09.01.01 OBRAS PRELIMINARES
09.01.01.01 Limpieza manual de terreno normal
Camara de entrada
1.00
2.00
1.50
3.00
Camara de entrada
1.00
1.90
1.30
2.47
Camara de entrada
1.00
1.90
1.30
0.80
1.98
Camara de entrada
2.00
2.00
1.90
1.30
0.80
0.80
3.04
2.08
1.00
2.00
1.00
1.00
1.00
1.90
1.90
1.00
1.00
1.90
1.30
0.15
0.15
0.25
1.30
0.15
0.90
0.90
0.90
0.10
0.37
0.51
0.14
0.23
0.25
2.00
2.00
2.00
2.00
1.00
2.00
2.00
1.90
1.50
1.30
1.00
1.30
1.30
0.90
0.90
0.90
0.90
3.42
2.70
2.34
1.80
1.95
0.26
0.30
Diamet.
3/8"
3/8"
N veces
10.00
7.00
Muros de A-A
Muros de B-B
Solado
2.00
2.00
1.00
1.50
1.00
1.50
Muros de A-A
Muros de B-B
Techo de caja de inspeccion
2.00
2.00
1.00
2.00
2.00
1.90
1.50
1.50
1.90
1.50
0.10
0.10
1.50
Long.
1.20
1.80
2.70
1.80
1.50
0.50
0.50
1.90
1.50
1.50
0.38
0.26
1.00
1.00
1.30
0.10
0.10
1 Und
1 Und
1 Und
CANTIDAD
TOTAL
UNIDAD
TOTAL
UNIDAD
3.00
6.00
m2
2.47
4.94
m2
1.98
3.95
m3
5.12
10.24
m2
1.57
3.13
m3
13.41
26.82
m2
15.27
30.53
Kg.
6.30
12.60
m2
5.82
11.63
m2
1.00
2.00
Und
1.00
1.00
1.00
CODIGO
N DE
DESCRIPCION
VECES
POZA DISIPADORA DE ENERGIA (2.0 UNIDADES)
10.01.00
10.01.01 OBRAS PRELIMINARES
10.01.01.01 Limpieza manual de terreno normal
Poza de Disipacion
1.00
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
2.50
2.00
5.00
3.45
1.00
2.30
1.50
Poza de Disipacion
1.00
2.30
1.50
0.80
2.76
Poza de Disipacion
2.00
2.00
2.30
1.50
1.00
1.00
4.60
3.00
1.00
2.00
2.00
2.30
2.30
1.20
1.50
0.15
0.15
0.15
1.10
1.10
0.52
0.76
0.40
CANTIDAD
TOTAL
UNIDAD
5.00
10.00
m2
3.45
6.90
m2
2.76
5.52
m3
7.60
15.20
m2
1.84
3.67
m3
TOTAL
UNIDAD
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.00
1.00
1.00
2.30
1.50
0.80
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00
2.00
2.00
2.00
2.30
2.00
Diamet.
3/8"
3/8"
3/8"
1/2"
N veces
8.00
7.00
7.00
6.00
2.00
2.00
1.00
1.00
2.00
2.00
1.20
2.00
1.50
1.50
2.00
2.00
1.00
2.00
2.00
2.30
1.50
2.30
2.30
1.50
0.25
0.60
0.10
0.60
0.05
0.35
0.23
0.02
1.10
1.10
0.85
0.85
5.06
4.40
2.55
2.04
0.75
1.80
3.45
0.46
0.30
0.08
0.06
Pantalla de desipacion
Techo de la Camara de Desipacion
Tapa de Camara
1.50
1.50
2.30
2.30
1.50
1.20
0.25
0.60
1.50
0.10
0.10
0.05
0.05
1.50
0.80
0.60
Long.
1.30
1.50
0.60
1.50
1.10
1.10
1.20
0.25
0.60
0.50
0.50
m2
24.57
49.15
Kg.
12.20
24.39
m2
8.41
16.82
m2
2.30
1.50
3.45
0.46
0.30
1.50
0.10
0.10
1.50
44.00
4.40
2.64
2.40
0.38
1.80
22.00
CODIGO
N DE
VECES
DADOS DE ANCLAJE EN RAPIDAS (44.0 UNIDADES)
DESCRIPCION
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
11.01.00
11.01.01 OBRAS PRELIMINARES
11.01.01.01 Limpieza manual de terreno normal
Dados de Anclaje
1.00
1.00
1.00
1.00
Dados de Anclaje
1.00
0.80
0.80
0.64
Dados de Anclaje
1.00
0.80
0.80
0.70
0.45
Dados de Anclaje
2.00
2.00
0.80
0.80
0.70
0.70
1.12
1.12
Dado de anclaje
1.00
4.00
0.60
0.80
0.60
0.10
0.80
0.80
0.29
0.13
Dado de Anclaje
4.00
0.80
0.60
0.80
2.24
Dado de Anclaje
Diamet.
3/8"
3/8"
N veces
12.00
6.00
Long.
0.50
0.70
4.00
0.80
0.60
0.80
CANTIDAD
44
TOTAL
UNIDAD
TOTAL
UNIDAD
1.00
44.00
m2
0.64
28.16
m2
0.45
19.71
m3
2.24
98.56
m2
0.44
19.22
m3
2.24
98.56
m2
6.11
268.92
Kg.
2.35
103.49
m2
2.24
CODIGO
DESCRIPCION
N DE
VECES
CANT.
TOTAL
UNIDAD
2.25
4.50
m2
1.96
3.92
m2
TOTAL
DIMENSIONES
PARCIAL
UNIDAD
LARGO
ANCHO
ALTO
PROGRESIVAS (2+040 - 2+140)
1.00
1.50
1.50
2.25
1.00
1.40
1.40
1.96
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.40
1.40
4.00
1.40
1.00
1.40
1.40
Base
Muro
Muro
1.00
2.00
2.00
1.40
1.30
1.30
1.40
0.15
0.15
Muros Interno
Muros externo
4.00
4.00
1.30
1.00
Fondo
Muros
Diamet.
3/8"
3/8"
Veces
6.00
10.00
Long.
1.00
1.00
Pared
base
4.00
1.00
1.00
1.00
1.00
Pared
4.00
1.00
1.50
2.94
1.50
8.40
0.15
1.35
1.35
0.29
0.53
0.53
1.35
1.35
7.02
5.40
Total(ml) Parcial(Kg)
6.00
1.50
10.00
2.50
5.40
1.00
1.00
4.00
2.00
1.8 m
3 Und
1Und
1 Und
1 Und
2 Und
1 Und
1 Und
2.00
m3
8.40
16.80
m2
1.96
3.92
m2
1.35
2.69
m3
12.42
24.84
m2
4.00
8.00
Kg
6.40
12.80
m2
4.00
8.00
m2
2.00
2.00
Und
CANT.
2.25
9.00
m2
1.96
7.84
m2
2.94
11.76
m3
8.40
33.60
m2
1.96
7.84
m2
1.35
5.39
m3
12.42
49.68
m2
4.00
16.00
Kg
6.40
25.60
m2
1.00
1.50
1.50
2.25
1.00
1.40
1.40
1.96
1.00
1.40
1.40
4.00
1.40
1.00
1.40
1.40
Base
Muro
Muro
1.00
2.00
2.00
1.40
1.30
1.30
1.40
0.15
0.15
Muros Interno
Muros externo
4.00
4.00
1.30
1.00
Fondo
Muros
Diamet.
3/8"
3/8"
Veces
6.00
10.00
Pared
base
4.00
1.00
1.00
1.00
2.94
1.50
8.40
0.29
0.53
0.53
1.35
1.35
7.02
5.40
5.88
1.96
2.94
Long.
1.00
1.00
Total(ml) Parcial(Kg)
6.00
1.50
10.00
2.50
5.40
1.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
4.00
4.00
1.8 m
3 Und
1Und
1 Und
1 Und
2 Und
1 Und
1 Und
1.00
1.00
4.00
16.00
m2
4.00
4.00
4.00
Und
CANTIDAD
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
4.00
CODIGO
13.01.00
13.01.01
13.01.01.01
N DE
VECES
DESCRIPCION
24.50
24.50
600.25
600.25
600.25
m2
24.50
24.50
600.25
600.25
600.25
m2
24.50
24.50
600.25
600.25
600.25
m2
26.40
26.40
1777.25
1777.25
1777.25
m3
269.28
269.28
m3
529
529.00
m2
1267.20
1267.20
m3
246.61
246.61
m3
16.80
16.80
m3
86.40
86.40
m3
112.14
112.14
m3
115.20
115.20
m3
505.12
505.12
m2
12547.97 Kg
358.26 varilla
Kg
13.01.01.03
13.01.02.02
MOVIMIENTO DE TIERRA
EXCAVACION DE ZANJA EN ROCA SUELTA
2
2
26.40
26.40
23.00
23.00
24.00
24.00
2.20
1267.20
2
2
26.40
24.50
0.95
0.95
2.55
2.55
127.91
118.70
2
2
26.40
23.00
1.70
1.70
0.10
0.10
8.98
7.82
24.00
24.00
0.15
86.40
Largo de pantalla
Largo de zapata
Ancho de pantalla
Ancho de zapata
2
2
2
2
24.50
26.40
24.00
23.00
0.25
1.70
0.25
1.70
2.20
0.35
2.20
0.35
26.95
31.42
26.40
27.37
Losa de reservorio
24.00
24.00
0.20
115.20
13.01.02.04
13.01.03
13.01.03.01
13.01.03.02
13.01.04
13.01.04.01
CONCRETO SIMPLE
CONCRETO FC = 100 Kg/Cm2 PARA SOLADO C/M
Largo de reservorio
Ancho de reservorio
CONCRETO FC = 140 Kg/Cm2 + 70% PG
Cama de reservorio
2.55
2.55
134.64
134.64
CONCRETO ARMADO
CONCRETO FC = 210 Kg/Cm2, C/M
13.01.04.02
13.01.04.03
4
4
4
4
4
4
4
4
24.50
Diamet.
5/8"
5/8"
Veces
344.00
344.00
Long.
5.11
3.65
1/2"
1/2"
13.00
13.00
101.99
103.43
1325.81
1344.59
1317.85 4839.21 Kg
1336.52
1/2"
2.00
105.12
210.24
208.98
1/2"
1/2"
1/2"
2.00
2.00
2.00
106.81
108.50
110.20
213.63
217.00
220.40
212.35
215.70
219.08
Talon-1
Pantalla-2
Talon-2
13.01.04.04
2.55
13.01.02.03
13.01.02.05
DIMENSIONES
ANCHO
ALTO
13.01.01.02
13.01.02
13.01.02.01
LARGO
0.25
26.40
1.70
24.00
0.25
23.00
1.70
2.20
2.20
0.35
0.35
2.20
2.20
0.35
0.35
215.60
2.20
36.96
2.38
211.20
2.20
32.20
2.38
Total(ml) Parcial(Kg)
1757.84 2728.17 5004.24 Kg
1255.60 1948.69
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
540.69 varilla
e=0,3m)
13.01.05
13.01.05.01
13.01.06
13.01.06.01
13.01.07
13.01.07.01
13.01.07.02
1/2"
2.00
111.80
223.60
222.26
1/2"
1/2"
1/2"
2.00
2.00
2.00
100.92
99.86
98.80
201.84
199.72
197.60
200.63
198.52
196.41
1/2"
2.00
97.75
195.50
194.33
3/8"
174.00
25.94
4513.56
2527.59
1
1
1
1
24.00
24.00
24.50
24.00
2.20
2.20
0.25
0.25
52.80
52.80
6.13
6.00
1
1
1
1
24.00
24.00
24.50
24.00
2.20
2.20
0.25
0.25
52.80
52.80
6.13
6.00
14
29.60
414.40
14
29.60
414.40
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 ; E=1.5 Cm
CURADO
CURADO DE CONCRETO
JUNTAS DE DILATACION
JUNTA CON ASFALTO E=1"
13.01.08
COLOCACION DE ACCESERIO EN RESERVORIO
13.01.08.01 ACCESORIOS EN RESERVORIO
2704.53 Kg
536.61 varilla
117.73
117.73
m2
117.73
117.73
m2
414.40
414.40
ml
414.40
414.40
ml
1.00
und
##########################################################
COLOCACION DE ESCALINES
1.00
1.00
1
1.00
1.00
1.00
1.00
13.01.09
13.01.09.01
PRUEBAS DE LABORATORIO
ROTURA DE TESTIGO - RESISTENCIA A LA COMPRESION
1.00
1.00
8.00
und
CODIGO
DESCRIPCION
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
N DE
VECES
LARGO
DIMENSIONES
ANCHO
ALTO
1.21
1.20
1.45
1.45
1.45
m2
13.02.01.02
1.00
1.21
1.20
1.45
1.45
1.45
m2
1.00
TRAZO, NIVELACION REPLANTEO EN EL PROCESO CONSTRUCTIVO
MOVIMIENTO DE TIERRA
EXCAVACION DE ZANJA EN ROCA SUELTA
1.00
1.21
1.20
1.45
1.45
1.45
m2
1.45
1.45
m3
4.84
4.84
m2
0.56
0.56
m3
0.71
0.71
m3
8.26
8.26
m2
3.42
3.42
m2
1.00
und
13.02.01.03
13.02.02
13.02.02.01
13.02.02.01
13.02.03
13.02.03.01
13.02.03.01
1.21
1.20
1.00
1.45
1.00
4.84
1.21
2
2
1.21
0.95
1
1
0.13
0.13
0.31
0.25
2
2
1
1.21
0.95
1.21
1
1
1.21
0.13
0.13
0.1
0.31
0.25
0.15
0.95
1.21
0.9
1
3.42
4.84
0.95
0.9
3.42
CONCRETO SIMPLE
CONCRETO FC = 100 Kg/Cm2 PARA SOLADO C/M
CODIGO
1
1
1
DESCRIPCION
N DE
VECES
13.03.00
CANAL DE REBOSE
13.03.01 OBRAS PRELIMINARES
13.03.01.01
LIMPIEZA MANUAL DE TERRENO CON PRESENCIA VEGETACION 1.00
2.5
1
1
DIMENSIONES
LARGO
ANCHO
ALTO
20.00
0.40
2.50
1.00
1.00
2.50
1.00
1.00
CANT.
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
8.00
8.00
8.00
m2
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
13.03.01.02
1.00
20.00
0.40
1.00
20.00
0.40
0.30
2.40
Solera
Muros
1
2
20.00
20.00
0.40
0.10
0.10
0.20
0.80
0.80
Pared Interior
Pared exterior
2
2
20.00
20.00
0.30
0.30
12.00
12.00
2
1
2
20.00
20.00
20.00
0.20
0.20
8.00
4.00
4.00
8.00
13.03.03.02
ENCOFRADO Y DESENCOFRADO
0.1
8.00
8.00
Ml
2.40
2.40
m3
1.60
1.68
m3
24.00
24.00
m2
16.00
16.80
m2
CODIGO
N DE
VECES
DESCRIPCION
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
14.01.00
MUROS DE TIPO GAVION (80ml)
14.01.01 TRABAJOS PRELIMINARES
14.01.01.01 Limpieza de terreno Manual
CANTIDAD
TOTAL
UNIDAD
TOTAL
UNIDAD
480.00
480.00
m2
320.00
320.00
m2
320.00
320.00
m2
480.00
480.00
m3
168.00
168.00
m2
1.00
80.00
6.00
480.00
1.00
80.00
4.00
320.00
1.00
80.00
4.00
320.00
1.00
80.00
4.00
1.50
480.00
2.00
2.00
80.00
4.00
1.00
1.00
160.00
8.00
2.00
80.00
4.00
1.50
960.00
960.00
960.00
m3
2.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
80.00
80.00
4.00
60.00
60.00
3.00
40.00
40.00
4.00
20.00
20.00
1.00
4.00
640.00
240.00
12.00
180.00
180.00
9.00
80.00
120.00
12.00
20.00
60.00
3.00
1556.00
1556.00
m2
1253.60
1253.60
1253.60
Kg
14.01.03.02
14.01.03.03
Alambre galvanizado para Atirantado
14.01.04 RELLENO DE GAVION
14.01.04.01 Relleno con Material de canto rodado
1.00
1.00
1.00
1.00
1.00
75.00
50.00
30.00
10.00
4.00
3.00
2.00
1.00
1.50
1.50
1.50
1.50
450.00
225.00
90.00
15.00
780.00
780.00
m3
1.00
80.00
1.50
4.00
240.00
240.00
240.00
m3
CODIGO
N DE
DESCRIPCION
VECES
15.01.00
FILTRO DE GRAVA Y MALLA (1 MODULO)
15.01.01 TRABAJOS PRELIMINARES
15.01.01.01 Limpieza de terreno Manual
Area de filtro
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
1.00
10.00
5.00
50.00
1.00
10.00
5.00
50.00
CANTIDAD
TOTAL
UNIDAD
50.00
50.00
m2
50.00
50.00
m2
TOTAL
UNIDAD
MOVIMIENTO DE TIERRA
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
10.00
5.00
4.00
4.00
10.00
2.00
2.00
9.60
9.60
m3
42.00
42.00
m2
6.40
3.20
16.00
16.00
m3
0.40
0.40
0.80
0.80
6.40
3.20
5.00
0.80
0.50
32.00
10.00
10.00
5.00
0.40
0.40
0.80
0.80
15.01.03.02
2.00
2.00
10.00
5.00
0.20
0.20
0.25
0.25
1.00
0.50
1.50
1.50
m3
15.01.03.03
15.01.03.04
1.00
9.40
4.40
0.10
4.14
4.14
4.14
m3
2.00
2.00
10.00
5.00
0.25
0.25
5.00
2.50
7.50
7.50
m2
3.00
3.00
3.00
2.40
2.00
5.20
7.20
6.00
15.60
13.20
13.20
ml
2.00
2.00
10.00
5.00
40.00
20.00
60.00
60.00
m2
5.50
16.50
16.50
16.50
ml
36.00
36.00
36.00
m2
1.00
1.00
1.00
1.00
Und
Sobrecimiento
15.01.04 ESTRUCTURA DE PERIMETRO DE LA CASETA
15.01.04.01 Tuberia de de FG de D=4" para marco
2.00
2.00
3.00
15.01.05.03
Techo de Calamina
36.00
Unid.
Unid.
ml
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
Unid.
1.00
6.00
8.00
6.00
2.00
20.00
6.00
3.00
5.00
2.00
36
2
12
2
CODIGO
DESCRIPCION
N DE
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
1.00
11104.72
11104.72
1.00
11104.72
11104.72
1.00
11104.72
11104.72
1.00
7773.30
0.40
0.40
1243.73
1.00
3331.42
0.40
0.40
533.03
VECES
CANTIDAD
TOTAL
UNIDAD
11104.72
11104.72
m2
11104.72
11104.72
11104.72
11104.72
1243.73
1243.73
m3
TOTAL
UNIDAD
533.03
533.03
m3
11104.72
11104.72
1.00
11104.72
11104.72
16.01.02.05 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
11104.72
11104.72
11104.72
11104.72
1.00
1.00
2911.77
2779.43
2911.77
2779.43
2911.77
2779.43
11104.72
5782.00
m
m3
1.00
1.00
1.00
1.00
1.00
1.00
65.84
1504.97
4171.86
3009.93
1146.92
1065.46
65.84
1504.97
4171.86
3009.93
1146.92
1065.46
65.84
1504.97
4171.86
3009.93
1146.92
1065.46
66
1505
4172
3010
1147
1065
m
m
m
m
m
m
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
16.01.03.07
16.01.03.08
1.00
1.00
51.98
87.78
11104.72
51.98
87.78
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
5.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
44.00
12.00
5.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
44.00
12.00
1.00
18401.46
1.00
18401.46
18401.46
1.00
18401.46
18401.46
1.00
12881.02
0.40
0.40
2060.96
1.00
5520.44
0.40
0.40
883.27
1.00
18401.46
18401.46
16.02.02.05 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
16.02.02.06 Relleno con material propio Seleccionado
1.00
16.02.02.07 Relleno con material propio
1.00
18401.46
2911.77
2779.43
1.00
51.98
87.78
52
88
m
m
1.00
Und
18401.46
18401.46
m2
18401.46
18401.46
18401.46
18401.46
2060.96
2060.96
m3
883.27
883.27
m3
18401.46
18401.46
18401.46
2911.77
2779.43
18401.46
2911.77
2779.43
18401.46
18401.46
7658.00
m
m
m3
18401.46
1.00
229.85
229.85
229.85
230
16.02.03.02
1.00
392.70
392.70
392.70
393
16.02.03.03
16.02.03.04
16.02.03.05
16.02.03.06
16.02.03.07
16.02.03.08
16.02.03.09
16.02.03.10
16.02.03.11
16.02.03.12
16.02.03.13
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
110.88
65.84
1103.03
686.07
1183.88
256.41
1032.57
6610.07
4900.67
1330.56
498.96
18401.46
110.88
65.84
1103.03
686.07
1183.88
256.41
1032.57
6610.07
4900.67
1330.56
498.96
110.88
65.84
1103.03
686.07
1183.88
256.41
1032.57
6610.07
4900.67
1330.56
498.96
111
66
1103
686
1184
256
1033
6610
4901
1331
499
m
m
m
m
m
m
m
m
m
m
m
1.00
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
5.00
6.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
44.00
12.00
5.00
6.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
44.00
12.00
15484.37
m2
1.00
15484.37
15484.37
1.00
15484.37
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
15484.37
15484.37
1.00
15484.37
15484.37
1.00
10839.06
0.40
0.40
1734.25
1.00
4645.31
0.40
0.40
743.25
15484.37
15484.37
15484.37
15484.37
1734.25
1734.25
m3
743.25
743.25
m3
15484.37
15484.37
1.00
15484.37
15484.37
16.03.02.05 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
16.03.02.06 Relleno con material propio Seleccionado
1.00
16.03.02.07 Relleno con material propio
1.00
15484.37
2911.77
2779.43
15484.37
2911.77
2779.43
15484.37
2911.77
2779.43
15484.37
15484.37
8956.00
m
m3
m3
1.00
170.61
170.61
170.61
171
16.03.03.03
16.03.03.05
16.03.03.06
16.03.03.04
16.03.03.05
16.03.03.07
16.03.03.08
1.00
1.00
1.00
1.00
1.00
1.00
1.00
186.34
433.18
185.13
899.03
11464.75
1223.31
922.02
15484.37
186.34
433.18
185.13
899.03
11464.75
1223.31
922.02
186.34
433.18
185.13
899.03
11464.75
1223.31
922.02
186
433
185
899
11465
1223
922
m
m
m
m
m
m
m
1.00
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
6.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
6.00
16.00
47.00
29.00
22.00
7.00
27.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
9708.93
9708.93
m2
1.00
9708.93
9708.93
9708.93
1.00
9708.93
9708.93
9708.93
9708.93
1.00
9708.93
9708.93
1087.40
1087.40
m3
1.00
6796.25
0.40
0.40
1087.40
466.03
466.03
m3
1.00
2912.68
0.40
0.40
466.03
9708.93
9708.93
1.00
9708.93
9708.93
16.04.02.05 Cama de apoyo para tuberia hastata 10" con material propio incluye sarandeo
1.00
16.04.02.06 Relleno con material propio Seleccionado
1.00
16.04.02.07 Relleno con material propio
1.00
9708.93
2911.77
2779.43
9708.93
2911.77
2779.43
9708.93
2911.77
2779.43
9708.93
9708.93
5286.00
m
m3
m3
3004.76
4689.96
1175.68
838.53
3005
4690
1176
839
m
m
m
m
1.00
Und
1.00
9708.93
1.00
1.00
1.00
1.00
3004.76
4689.96
1175.68
838.53
9708.93
3004.76
4689.96
1175.68
838.53
Und
Und
Und
Und
Und
Und
16.00
47.00
29.00
22.00
7.00
27.00
16.00
47.00
29.00
22.00
7.00
27.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
4" 45
3" 90
3" 45
2" 90
2" 45
4" a 3"
3" a 2"
Und
Und
Und
Und
Und
Und
Und
19.00
15.00
13.00
21.00
11.00
21.00
51.00
19.00
15.00
13.00
21.00
11.00
21.00
51.00
CODIGO
17.01.00
17.01.01
17.01.01.01
17.01.01.02
N DE
VECES
DESCRIPCION
17.01.02
17.01.02.01
17.01.02.02
17.01.03
17.01.03.01
17.01.03.02
17.01.04
17.01.04.01
17.01.04.03
Columna
Estribo
17.01.06
17.01.06.01
17.01.06.02
07.05.06.03
UNIDAD
49.75
49.75
m2
19.76
19.76
m2
19.76
19.76+K2399
m2
35.57
35.57
m3
64.08
64.08
m2
1.98
1.98
m3
14.40
14.40
m3
1.36
1.36
m3
15.84
15.84
m2
118.84
118.84
Kg.
9.05
6.79
15.84
15.84
m2
Und
CANT.
151
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
2.25
339.75
m2
1.96
295.96
m2
12
49.75
2.00
2.00
2.00
2.80
2.00
2.10
8.00
11.76
2.00
2.80
2.00
2.10
8.00
11.76
2.00
2.80
2.00
2.10
4.00
4.00
4.00
4.00
2.00
2.00
2.80
2.10
1.80
1.80
1.80
1.80
2.00
2.00
2.00
2.80
2.00
2.10
0.10
0.10
0.80
1.18
2.00
2.00
2.00
1.80
14.40
2.00
0.40
0.30
5.7
1.36
4.00
4.00
0.40
0.30
5.7
5.7
9.05
6.79
Diamet.
1/2"
1/2"
1/2"
1/2"
1/4"
N veces
16.00
16.00
8.00
4.00
66
4.00
4.00
0.40
1.80
1.80
14.40
21.17
14.40
14.40
20.16
15.12
CONCRETO ARMADO
CONCRETO FC = 175 Kg/Cm2 S/M
Zapata
17.01.05
17.01.05.01
TOTAL
2.00
Columnas
17.01.04.02
TOTAL
UNIDAD
17.01.01.03
CANTIDAD
PARCIAL
DIMENSIONES
LARGO
ANCHO
ALTO
REVOQUES Y ENLUCIDOS
TARRAJEO DE EXTERIORES, MEZCLA 1:5, E = 1.5 Cm
Long.
2.80
2.10
7.46
3.21
1.50
0.30
ESTRUCTURA DE ACERO
TENDIDO DE CABLE TIPO BOA (6x19) 1"; RESIST. ROTURA.= 40.7 Tn; LUZ =65m
1
Acero corrugado fy =4200 kg/cm2 (0.7 m; D=1/2 ")
1.8
CABLES DE 1" TIPO BOA (6x19) , R. ROTURA 40.7 Tn
91
Numero de guardacabos en cable 1"
2
Numero de Grapas con 5 pernos en cable de 1"
2
Pernos para grapas (3/8"; 2 1/2")
10
COLOCACION DE PENDOLAS DE CABLE TIPO BOA 1/4"
Pendola 1/4" (ml)
Grapas con 3 pernos Incluido pernos para cables de 1/4"
Abrazadera de platina(3/16"; 2 1/2") A=3.02Cm2
Perno/ tuerca - arandela 2/4"x3"
INSTALACION DE TUBERIAS Y ACCESORIOS
TUBERIA DE PE 110mm (LUZ=65m)
Tuberia de PE D = 110mm
73
67
34
34
68.25
CODIGO
DESCRIPCION
N DE
VECES
DIMENSIONES
LARGO
ANCHO
ALTO
1.50
1.50
2.25
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.00
1.40
1.40
1.96
1.00
1.40
1.40
1.96
1.00
1.40
1.40
4.00
1.40
1.00
1.40
1.40
Base
Muro
Muro
1.00
2.00
2.00
1.40
1.30
1.30
1.40
0.15
0.15
Muros Interno
Muros externo
4.00
4.00
1.30
1.00
Fondo
Muros
Diamet.
3/8"
3/8"
Veces
6.00
10.00
Pared
base
4.00
1.00
1.00
1.00
Pared
4.00
1.00
2.94
1.50
8.40
0.15
1.35
1.35
0.29
0.53
0.53
1.35
1.35
7.02
5.40
Long.
1.00
1.00
Total(ml) Parcial(Kg)
6.00
1.50
10.00
2.50
5.40
1.00
1.00
4.00
1.00
CODIGO
N DE
VECES
DESCRIPCION
295.96
m2
2.94
443.94
m3
8.40
1268.40
m2
1.96
295.96
m2
1.41
213.57
m3
12.42
1875.42
m2
4.00
604.00
Kg
6.72
1014.72
m2
4.20
634.20
m2
145.00
21895.00
Und
8.00
8.00
52.00
52.00
35.00
35.00
37.00
37.00
13.00
13.00
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
1.96
1.96
145.00
DIMENSIONES
LARGO
ANCHO
ALTO
CANTIDAD
193
PARCIAL
TOTAL
UNIDAD
TOTAL
UNIDAD
m3
19.01.00
VALV. DE CONTROL (193.0 UNIDADES)
19.01.01 TRABAJOS PRELIMINARES
19.01.01.01
Limpieza de terreno Manual
1.00
0.70
0.70
0.49
0.49
94.57
19.01.01.02
1.00
0.70
0.70
0.49
0.49
94.57
Trazo y replanteo
m2
19.01.02
MOVIMIENTO DE TIERRAS
19.01.02.01
1.00
1.00
0.70
0.50
4.00
0.70
2.00
2.00
0.70
0.50
19.01.03.02
1.00
0.50
19.01.03.03
4.00
4.00
0.70
0.50
19.01.04
0.70
0.50
0.60
0.15
0.33
63.98
1.68
324.24
0.29
0.04
m3
0.60
1.68
m2
0.10
0.10
0.60
0.60
0.08
0.06
0.14
27.79
m2
0.50
0.10
0.03
0.03
4.83
m2
2.88
555.84
m2
0.60
0.60
1.68
1.20
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
19.01.04.01
19.01.04.02
1.20
4.00
0.50
1.00
Unid.
pza
Unid.
Unid.
2.00
2.00
2.00
1.00
Unid.
pza
Unid.
Unid.
2.00
2.00
2.00
1.00
Unid.
pza
Unid.
Unid.
2.00
2.00
2.00
1.00
Unid.
pza
Unid.
Unid.
2.00
2.00
2.00
1.00
Unid.
pza
Unid.
Unid.
2.00
2.00
2.00
1.00
1.20
231.60
m2
1.00
17.00
193.00
17.00
Und
Und
54.00
54.00
Und
63.00
63.00
Und
27.00
27.00
Und
3.00
3.00
Und
0.60
CODIGO
N DE
VECES
DESCRIPCION
20.01.00
VALV. DE AIRE (62.0 UNIDADES)
20.01.01 OBRAS PRELIMINARES
20.01.01.01 Limpieza manual de terreno normal
Caja de Valv de Aire
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
CANTIDAD
62
TOTAL
UNIDAD
TOTAL
UNIDAD
1.00
62.00
m2
0.64
39.68
m2
0.61
37.70
m3
3.04
188.48
m2
1.00
1.00
1.00
1.00
1.00
0.80
0.80
0.64
1.00
0.80
0.80
0.95
0.61
2.00
2.00
0.80
0.80
0.95
0.95
1.52
1.52
1.00
0.80
0.80
0.15
0.10
0.10
6.25
m3
2.00
2.00
0.80
0.50
0.15
0.15
0.80
0.80
0.19
0.12
0.33
20.31
m3
m3
m3
4.00
4.00
0.80
0.50
0.80
0.80
2.56
1.60
4.16
257.92
m2
m2
2.00
1.00
0.50
0.50
0.80
0.80
0.25
1.05
65.10
m2
1.00
1.00
62.00
Und
Unid.
Unid.
PZA
0.50
1
1
2
CODIGO
DESCRIPCION
N DE
VECES
DIMENSIONES
LARGO
ANCHO
ALTO
Und
PARCIAL
21.01.00
HIDRANTES (240.0 UNIDADES)
21.01.01
TRABAJOS PRELIMINARES
21.01.01.01
Limpieza y deforestacin manual
1.00
0.95
0.95
CANTIDAD
240
TOTAL
UNIDAD
TOTAL
UNIDAD
0.90
216.60
m2
0.90
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
21.01.01.02
Trazo y replanteo
1
0.95
0.95
1.00
0.95
0.95
4.00
0.95
1.00
2.00
2.00
0.95
0.95
0.75
4.00
4.00
4.00
21.01.02
MOVIMIENTO DE TIERRAS
21.01.02.01
Encofrado y Desencofrado
Muros exteriores
Muros interiores
1.00
0.90
1.00
3.80
0.10
0.90
0.90
0.09
0.17
0.14
0.95
0.75
1.00
0.90
3.80
2.70
0.75
0.90
2.70
1.00
1.00
0.95
0.10
0.10
21.01.04
REVOQUES Y ENLUCIDOS
21.01.04.01
CODIGO
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
N DE
DESCRIPCION
VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
21.02.00
HIDRANTES (120.0 UNIDADES)
21.02.01
TRABAJOS PRELIMINARES
21.02.01.01
Limpieza y deforestacin manual
21.02.01.02
1.00
0.80
0.80
0.64
1.00
0.80
0.80
0.64
1.00
0.80
0.80
4.00
0.80
1.00
2.00
2.00
0.80
0.80
0.50
4.00
4.00
0.80
0.50
Trazo y replanteo
21.02.02
MOVIMIENTO DE TIERRAS
21.02.02.01
Encofrado y Desencofrado
Muros exteriores
Muros interiores
0.80
0.15
0.15
0.95
0.61
0.95
3.04
0.15
0.80
0.80
0.10
0.19
0.12
0.95
0.80
3.04
1.60
0.80
1.60
21.02.04
REVOQUES Y ENLUCIDOS
21.01.04.01
CODIGO
N DE
DESCRIPCION
VECES
22.01.00
VALV. DE PURGA (148.0 UNIDADES)
22.01.01 OBRAS PRELIMINARES
22.01.01.01 Limpieza manual de terreno normal
Caja de inspeccion
0.90
216.60
m2
0.90
216.60
m3
3.80
912.00
m2
0.40
95.10
m3
6.50
1560.00
m2
2.70
648.00
m2
1.00
1.00
Und
0.90
1.00
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
1.00
0.70
0.70
0.49
Caja de inspeccion
1.00
0.70
0.70
0.49
Caja de inspeccion
1.00
0.70
0.70
0.70
0.34
Caja de inspeccion
2.00
2.00
0.70
0.70
0.70
0.70
0.98
0.98
2.00
2.00
0.70
0.50
0.10
0.10
0.70
0.70
0.10
0.07
TOTAL
TOTAL
UNIDAD
CANTIDAD
120
0.64
76.80
m2
0.64
76.80
m2
0.61
72.96
m3
3.04
364.80
m2
0.41
48.96
m3
4.64
556.80
m2
1.60
192.00
m2
1.00
120.00
Und
UNIDAD
CANTIDAD
148
TOTAL
UNIDAD
0.49
72.52
m2
0.49
72.52
m2
0.34
50.76
m3
1.96
290.08
m2
0.18
26.11
m3
TOTAL
UNIDAD
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
1.00
0.50
4.00
4.00
0.70
0.50
4.00
0.50
0.50
0.25
0.26
38.85
0.70
0.70
1.96
1.40
3.36
497.28
m2
0.70
1.40
1.40
207.20
m2
148.00
Und
1.00
1.00
Unid.
1.00
Unid.
1.00
Unid.
2.00
Unid.
2.00
Unid.
2.00
m
1.80
23.00 VALV. DE REDUCCION DE PRESIONES (CANTIDAD = 15.0 UNIDAD)
CODIGO
DESCRIPCION
VALV. DE REDUCCION DE PRESIONES
23.01.00
N DE
VECES
(15.0 UNIDADES)
DIMENSIONES
LARGO
ANCHO
ALTO
1.00
1.00
2.00
2.00
2.00
1.80
PARCIAL
CANTIDAD
15
TOTAL
UNIDAD
TOTAL
UNIDAD
2.55
38.25
m2
2.55
38.25
m2
3.06
45.90
m3
6.40
96.00
m2
0.13
1.91
m3
0.01
0.14
m3
0.30
4.50
m2
1.18
17.76
m3
10.50
157.50
m2
48.78
731.64
kg
4.40
66.00
m2
1.00
15.00
Und
1.00
15.00
Und
1.70
1.50
2.55
1.00
1.70
1.50
2.55
Caja
1.00
1.70
1.50
Paredes laterales
2.00
3.06
1.70
1.00
3.40
2.00
1.50
1.00
3.00
Solado
1.00
1.70
1.50
0.05
0.13
Dados de apoyo
2.00
0.15
0.10
0.30
0.01
Dados de apoyo
4.00
0.15
0.30
0.18
4.00
0.10
0.30
0.12
1.00
1.70
1.50
0.15
0.38
1.00
0.25
0.25
0.15
0.01
2.00
1.50
0.15
1.00
0.45
2.00
1.00
0.15
1.00
0.30
2.00
0.35
0.10
0.35
0.02
2.00
0.25
0.10
0.35
0.02
2.00
1.50
1.00
3.00
2.00
1.30
1.00
2.60
2.00
1.20
1.00
2.40
2.00
1.00
1.00
2.00
4.00
0.25
0.50
0.50
1.00
2.00
1.20
1.00
2.40
2.00
1.00
1.00
2.00
1.00
1.00
1.00
23.01.07.00 VARIOS
23.01.07.01 Tapa metlica 1.20x1.00m e=1/8"
CODIGO
DESCRIPCION
25.01.00
VECES
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
TOTAL
UNIDAD
CANTIDAD
12
TOTAL
UNIDAD
12.00
Und
1.00
Und
10.00
10.00
Und
10.00
10.00
Und
10.00
10.00
Und
9.00
9.00
Und
9.00
9.00
Und
30.00
30.00
6.00
Und
6.00
4.60
4.60
Tuberia de PE de 63mm C -4
92.00
92.00
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc
und
3.00
3.00
CODIGO
DESCRIPCION
26.01.00
FLETE
N DE
VECES
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
TOTAL
UNIDAD
CANTIDAD
TOTAL
UNIDAD
25.00
25.00
25.00
25.00
VJE
1.00
1.00
1.00
1.00
GBL
FLETE RURAL
CODIGO
DESCRIPCION
27.01.00
MITIGACION AMBIENTAL
VECES
LARGO
DIMENSIONES
ANCHO
ALTO
PARCIAL
TOTAL
UNIDAD
CANTIDAD
TOTAL
UNIDAD
1.00
1.00
1.00
1.00
GLB
27.01.01.02
Traslado de Plantones
5.00
5.00
5.00
5.00
VJE
27.01.01.03
Plantaciones de Plantones
1.00
2.00
2.00
2.00
HA
1.00
5.00
5.00
5.00
Ton
9.00
9.00
9.00
9.00
UND
1.00
1.00
1.00
GLB
CODIGO
DESCRIPCION
28.01.00
N DE
VECES
DIMENSIONES
LARGO
ANCHO
ALTO
PARCIAL
TOTAL
UNIDAD
CANTIDAD
TOTAL
UNIDAD
2.00
2.00
2.00
2.00
GLB
28.01.01.02
2.00
2.00
2.00
2.00
GLB
2.00
2.00
2.00
2.00
GLB
mes
1.50
1.50
1.50
1.50
28.01.02.02
1.50
1.50
1.50
1.50
mes
1.00
1.00
1.00
1.00
GBL
28.01.02.03
EXPEDIENTE TECNICO: Sistema De Riego Tecnificado En Los Sectores De Sambaray Alto, Centro, Margaritayocc E Isilluyocc