You are on page 1of 5

Mechanical Engineering and Design

June 2014, Volume 3, Issue 2, PP.19-23

Research on Workflow Management Model in


PDM System of Tunnel Drilling Rigs in Coal
Mine
Guiqin Liu
CCTEG Xian Research Institute, Xian 710077, China
#Email: liuguiqin@cctegxian.com

Abstract
To improve the operation efficiency of workflow of tunnel drilling rig design, it introduce the workflow management model and
the definition of workflow, and according to the characteristics of the workflow in the design of tunnel drilling rigs, built the
design process and the drawing change process of tunnel drilling rig in the PDM system, realize the workflow management in the
development of tunnel drilling rig.
Keywords: Tunnel Drilling Rig; PDM; Workflow Management Model

PDM
*

710077

PDM

PDM

PDM

PDM

PDM

*(2011ZX05041-001)

- 19 www.ivypub.org/med

1 PDM

PDM

PDM

PDM
PDM

PDM

PDM
PDM

- 20 www.ivypub.org/med

4.1
PDM
2

4.2

PDM

- 21 www.ivypub.org/med

PDM
PDM

REFERENCES
[1]

Liu Mengqi, On the PDM system applications in manufacturing enterprises. AUTOMOBILE APPLIED TECHNOLOGY,
2013.7, pp.92-94

[2]

CUI Gui-dan, WANG De-quan. The design and application of PDM management information system in manufacturing
enterprise. MANUFACTURING AUTOMATION, 2013.1, pp.12-14

[3]

CHEN Han-ming. Design and development on ship document based on PDM. SHIP SCIENCE AND TECHNOLOGY.
2012.12, pp.131-135

[4]

LIU Guiqin. Construction of PDM system of drilling rig based on Teamcenter. COAL GEOLOGY & EXPLORATION,
2013.8, pp.90-92

[5]

LI Tao, ZHONG Shi-sheng. Building of workflow and process management model in PDM. JOURNAL OF HARBIN
INSTITUTE OF TECHNOLOGY, 2006.6, pp.852-855

[6]

MENG Li-li, LU Chun-guang, HAO Li-wen, GAO Jun-bin. Resear ch on Technology and Integrated Technology in Implement
of PDM. Microelectronics & Computer, 2006.12, pp.68-71
- 22 www.ivypub.org/med

[7]

ZHANG Jianming, LIU Guiqin, LIU Qingxiu, WANG Xiqian. Functional model and system for PDM of tunnel drilling rigs in
coal mine. COAL GEOLOGY & EXPLORATION, 2010.8, pp.72-76

[8]

Wu Xu. Implementation of Document Management and Process Management in the PDM System. Computer Development &
Applications, 2008.9, pp.19-21

[9]

Zeng Fengfang, Liu Zhufeng, Yan Xiaoguang. The model of product data management and its application in PDM system. J.
Huazhong Univ. of Sci. & Tech. ( Nature Science Edition), 2004.10, pp.94-96

[10] WANG Yang-jian,TIAN Xi-tian,GENG Jun-hao. Research on a Fine-grained Task Monitoring Method Oriented Workflow
Management. Manufacture Information Engineering of China. 2012.7, pp.14-17
[11] ZHUANG De-sheng, et.al. The Design of Practical Drawings Management of PDM Platform. JOURNAL of SICHUAN
ORDNANCE. 2013.2, pp.107-110
[12] Liao Jie. Research of Electronic Records Management Based on PDM. SCIENCE MOSAIC. 2013.4, pp.58-62
[13] SUN Xing. Analysis of the PDM System Project Workflow. SOFTWARE DEVELOPMENT AND DESIGN. 2013(12), pp.2526
[14] ZHU Yong-xiang,HUANG You-qun,DENG Chao. Implementation of project organization structure based on PDM. Journal of
Shenyang University of Technology. 2000.8, pp.310-312
[15] Luo Nianmeng, Xiao Zuan, and Zhu Lin. A system of engineering drawings and BOM management based on design
environment. JOURNAL OF GRAPHICS. 2012.5, pp.141-146

1979-2006
Email: liuguiqin@cctegxian.com

- 23 www.ivypub.org/med

You might also like