PROPORCIONES DE CONCRETO SIMPLE

1
55
36.67
9.167
275
24.44

Equivalencias
m3
Balde Concretero
Lata de Aceite
Buguies
Palanadas
Bolsa Cemento

1.5
Insertar los valores de las
celdas con letras de color rojo

Poste
Block Ret
Solado

Item
1

2
3

lado
lado

8 m
0.4 alto
0.4 alto

Descripcin
cimentacin Poste
cimentacin Poste
cimentacin Poste
cimentacin Poste
cimentacin Poste
Block Ret
Solado

Unid
8
9
11
12
13
0.4
0.4

m
m
m
m
m
m
m

Unid
Unid
Unid
Unid
Unid
Unid
Unid

0.15
0.1

Cantid
10
5
9
9
15
3
4

metros
metros

Volum
Unitario
(m3)
0.37
0.55
0.66
0.71
1.34
0.024
0.016

Volum
Parcial
(m3)
3.700
2.750
5.940
6.390
20.100
0.072
0.064

39.016

Tipo
Cemento
Piedra
Hormigon
Agua Volum
Cocreto
Volum
Volum
Volum
Parcial (m3)
(Kg/cm2)
Parcial (m3) Parcial (m3) Parcial (m3)
175
175
175
175
175
175
110

MOVIMIENTO DE TIERRAS

Hoyos para Postes


Poste (m)
Diam
Prof
Volumen
Lado_Solado
Altura_Solado
Volum_Solado

8
0.65
1.1
0.37
0.4
0.1
0.016

9
0.8
1.1
0.55

11
0.75
1.5
0.66

m
m
m3

12
0.75
1.6
0.71

13
1
1.7
1.34

Insertar los valores de las


celdas con letras de color
rojo

Retenidas
Simple_MT

Cont_MT

Simple_BT

Cont_BT

v1
v2
vt

1.22
0.13
1.35

1.78

0.98
0.14
1.12

1.78

Lado_Block
Altura_Block
Volum_Block

0.4
0.15
0.024

0.5
0.2
0.05

PAT-1
1
1.78
0.21
1.99
1.58
0.206

PAT-2
2
3.56
0.41
3.97
3.31
0.166

1.78
m
m
m3

Insertar los valores de las


celdas con letras de color
rojo

MEDIA TENSION
Puestas a tierra
v1
v2
vt
Relleno
Factor

BAJA TENSION
Puestas a tierra
v1
v2
vt
Relleno
Factor

PAT
1
1.72
0.14
1.86
1.58
0.151

1.78

PAT-3
3
5.34
0.62
5.96
5.56
0.067

tar los valores de las


con letras de color

Unid
m
m
m3

12
1.4
10.6
1.5
1.72

3.44

0.1125
0.1125

1.02

1.8325
1.6075
1.76825

MORTEROS Y CONCRETOS
Especificacin
Arena
Gruesa
Fina

Cemento
1:
1:
1:
1:
1:
1:
1:
1:

Cemento
Bolsas

1
2
3
4
5
6
7
8

21.00
15.00
12.00
10.00
8.00
7.00
6.00
5.00

Cemento
Bolsas

Cemento Hormign
1:
1:
1:
1:
1:

6
8
10
12
14

Cemento Hormign
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:
1:

6
6
6
8
8
8
10
10
10
12
12
12
14
14
14

23.00
17.00
13.00
11.00
9.00
8.00
7.00
6.00

5.00
4.50
3.50
3.00
2.70

25%
30%
40%
25%
30%
40%
25%
30%
40%
25%
30%
40%
25%
30%
40%

4.50
4.20
3.60
3.40
3.15
2.70
2.65
2.45
2.10
2.25
2.10
1.80
2.20
1.65
1.60

0.50
0.70
0.90
1.00
1.05
1.10
1.13
1.15

Arena
m3

5.30
4.75
3.70
3.15
2.75

Cemento
Bolsas

% Piedra

Arena
m3

4.70
4.40
3.80
3.50
3.30
2.80
2.80
2.60
2.20
2.30
2.15
1.85
2.05
1.90
1.65

Arena
m3

Cemento

Piedra
Triturada

Cemento
Bolsas

Arena

Arena
m3

fc= 100 kg/cm2

6.50

0.45

fc= 140 kg/cm2

7.40

0.47

fc= 175 kg/cm2

9.00

0.48

fc= 210 kg/cm2

10.00

0.55

Mezcla de concreto : Equivalencias


MATERIAL
1 Bolsa de Cemento
1 m3 de Arena
1 m3 de Piedra
1 Lt de Agua

Kg
Volum (p3) Volum (m3)
42.50
1.00
0.0283
1220.00
1500.00
1.00

Dosificacin de Mezcla de concreto : Ejemplo


En peso:

0.076165

Descripcin de Material
Cemento
Arena
Piedra
Agua

Kg
290.29
615.42
1196.01
173.28

Proporcin
1.00
2.12
4.12
0.60

0.076087

CONCRETO

2275.00

7.84

2.12

4.12

Descripcin de Material
Cemento
Arena
Piedra
Agua

m3
0.1934
0.5044
0.7973
0.1733

Proporcin
1.00
2.61
4.12
0.90

CONCRETO

1.6685

8.63

2.61

4.12

m3
0.10

Proporcin
1.00

(Kg)

Proporcion

En Volumen:

Proporcion

(m3)
1

Otro ejemplo
En Volumen:

Descripcin de Material
Cemento

1m3
1500.87
1220.00
1500.00
1000.00
Kg

0.175258

Arena
Piedra
Agua

0.31
0.41
0.18

3.00
4.00
1.70

0.076087

CONCRETO

1.00

9.70

3.00

4.00

Descripcin de Material
Cemento
Arena
Piedra
Agua

Kg
154.7292
377.3196
618.5567
175.2577

Proporcin
1.00
2.44
4.00
1.13

CONCRETO

1325.8632

8.57

2.44

4.00

(m3)

Proporcion

En Peso:

Proporcion

(Kg)
1

Arena
m3

Piedra
m3

Hormigon
m3

Piedra
m3

Hormigon
m3

0.60
0.80
0.95
1.05
1.10
1.15
1.20
1.25

Arena
m3

1.25
1.25
1.25
1.25
1.25

Arena
m3

Piedra
m3

Hormigon
m3

0.30
0.40
0.50
0.30
0.40
0.50
0.30
0.40
0.50
0.30
0.40
0.50
0.30
0.40
0.50

0.95
0.90
0.75
0.95
0.90
0.75
0.95
0.90
0.75
0.95
0.90
0.75
0.95
0.90
0.75

0.13
0.12
0.10
0.10
0.09
0.08
0.08
0.07
0.06
0.06
0.06
0.05
0.06
0.05
0.05

1.38

1.35

1.33

1.31

1.31

0.13
0.12
0.11
0.10
0.09
0.08
0.08
0.07
0.06
0.07
0.06
0.05
0.06
0.05
0.05

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Arena
m3

Piedra
m3

Hormigon
m3

0.42
0.83
0.72
0.55

1 Kg
0.000666
0.000820
0.000667
0.001000
m3

0.1934
0.5044
0.7973
0.1733

1.00000
0.81286
0.99942
0.66628

m3
m3
m3
m3

154.7292 Kg

1.00000
1.23022
1.00058
1.50087

6.83 Bolsas

3.64 Bolsas

377.3196 Kg
618.5567 Kg
175.2577 Kg

Piedra
2.35
3.36
4.90
3.03
4.48
6.54
4.00
5.77
8.41
4.71
6.73
9.81
4.82
8.56
11.04

Hormigon
7.46
7.57
7.36
9.59
10.09
9.81
12.66
12.97
12.61
14.91
15.13
14.71
15.25
19.26
16.55

MORTEROS Y CONCRETOS
Especificacin
Mezcla de concreto : Equivalencias
Kg
Volum (p3) Volum (m3)
42.50
1.00
0.0283
1220.00
1500.00
1.00

MATERIAL
1 Bolsa de Cemento
1 m3 de Arena
1 m3 de Piedra
1 Lt de Agua

1m3
1500.87
1220.00
1500.00
1000.00
Kg

1 Kg
0.000666
0.000820
0.000667
0.001000
m3

1.00000
0.81286
0.99942
0.66628

35.31467
43.44495
35.33523
53.00284

Dosificacin de Mezcla de concreto : Ejemplo


Descripcin de Material
Cemento
Hormign
Piedra
Agua

En Volumen:
Poste
8m
9m

En Volumen:
Poste
11m

CONCRETO

(m3)
Cemento
Proporcion
1

0.37
Hormig
10.00

Descripcin de Material
Cemento
Hormign
Piedra
Agua

m3
0.03
0.24
0.20
0.05
0.52
0.66
Hormig
8.00

CONCRETO

(m3)
Cemento
Proporcion
1

Descripcin de Material
Cemento
Hormign
Piedra
Agua

En Volumen:
Poste
12m

CONCRETO

(m3)
Cemento
Proporcion
1

0.016

0.48

m3
0.035
0.141
0.074
0.060

m3
0.07
0.56
0.34
0.12
1.09
1.34
Hormig
8.00

Proporcin
1.00
4.00
1.68
1.70

Kg
Baldes C
Latas
Buguies
53.0458
1.94
1.30
0.32
172.4752
7.78
5.18
1.30
111.0000
4.07
2.71
0.68
60.0836
3.30
2.20
0.55

8.38
Piedra
20%

Proporcin
1.00
8.00
4.59
1.70

Kg
Baldes C
Latas
Buguies
45.3628
1.66
1.11
0.28
294.9892
13.30
8.87
2.22
297.0000
10.89
7.26
1.82
51.3813
2.83
1.88
0.47

15.29
Piedra
30%

Proporcin
1.00
8.00
3.57
1.70
14.27
Piedra
25%

Kg
Baldes C
Latas
Buguies
105.7274
3.87
2.58
0.65
687.5327
31.00
20.66
5.17
502.5000
18.43
12.28
3.07
119.7547
6.59
4.39
1.10

Bolsas
1.25

174.00

174.00

174.00

24.43
16.18
8.31

25.95
16.18
7.35

24.60
12.88
10.45

1800
0.5025
6.50
Bolsas
1.07

Bolsas
2.49

20.00
11.27
6.70
2.40

720

0.20
0.20

Baja Tensin
8m

37

6.60

0.60

X= 6 x Tang 37

0.40

4.97
Cable

10.9668249

0.20
0.20

Media Tensin
12 m

37

10.10

0.8

X= 6 x Tang 37

0.7

7.61
Cable

16.7825654

You might also like