You are on page 1of 108

Schedule of Technical Data

(Rev.0)
Page-1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De3c2i6tion &-01 ,-01 ,-02 ,-03
1.0 MECHANICAL/CONVEYOR EQUIPMENT
1.1Belt Conveo!/Fee"e! D#t#
i. 'ength along 9et+ c/c end 6ulle13+ 44 702295 90336 277796
ii. 'ift+ 44 18000 7113 10943
iii. -idth+ 44 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 10 05 10
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading+ ; of "!M&
1.$ Po%e!
i. Moto2 2ating+ 5- 250 90 132
ii. "alc. < de3ign ca6acit1+ 5- 247.54 81.75 125.04
iii. Sta2ting to28ue+ ; full load to28ue
iv. ,2ea5-do7n to28ue+ ; full load to28.
1.& Belt Ten'(on) N
i. T1 82048 27096 41446
ii. T2 24181 7986 12215
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
vii. Ma:. 2un
viii. Ma: 3ta2t 106700 35200 53900
1.* Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1./ Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1.1 Belt D#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3
v. RM& g2ade of 2u99e2 EP 1000 EP 500 EP 500
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on A-01 B-01 B-0$ B-0&
Schedule of Technical Data
(Rev.0)
Page-2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.3P4lle D#t#
i. Manufactu2e2
ii. (ace 7idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+ 44 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+ 44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.5 He#" P4lle
i. Pulle1 dia4ete2+ 44 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 125
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 P!(.#! D!(ve P4lle 8(9 not #t :e#"
"('0:#!,e;
i. Pulle1 dia4ete2+ 44 1000 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 160 125
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1$ Se0on"#! D!(ve P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on A-01 B-01 B-0$ B-0&
1.1& Ben" P4lle
Schedule of Technical Data
(Rev.0)
Page-3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.13 I"le! D#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing+ 44 1>00 1>00 1>00
vii. Retu2n idle2 36acing+ 44 2?00 2?00 2?00
1.15 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee t2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e idle2 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
De'0!(2t(on A-01 B-01 B-0$ B-0&
1.16 T#+e-42
Schedule of Technical Data
(Rev.0)
Page->
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16eE ho2iF+ ve2tical+ 7inch+ h1d2 define Horizontal Vertical Vertical
iv. 'ocation
1.$0 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$1 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$$ Belt Plo%
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
1.$& S+(!t 7o#!"
i. 'ength of 35i2t 9oa2d 2u99e2+ 44 7000 5000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t 9oa2d 2u99e2 du2o4ete2
1.$* Moto!8';
i. $u49e2 of 4oto23 01 01 01
ii. Manufactu2e2 ABB ABB ABB
iii. Rating+ 5- 250 90 132
iv. S6eed+ 264 1500 1500 1500
v. !nclo3u2e+ i.e. %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e. %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e. ca3t i2on
viii. Dut1 cla33ification+ i.e. S1
i:. %!" de3ign to28ue+ i.e. $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficienc1 de3ign+ i.e. %!2
::i. Moto2 cla33 in3ulation+ i.e. (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
De'0!(2t(on A-01 B-01 B-0$ B-0&
1.$/ Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat Fluidoat Fluidoat
ii. Model nu49e2 HF !"#10 HE !"#8 HF !"#9
iii. Rating+ 5- 275 90 172
Schedule of Technical Data
(Rev.0)
Page-A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
1.$1 Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2+ 5-
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$3 S2ee" Re"40e!
i. Manufactu2e2 $uitoo $uitoo $uitoo
ii. Model nu49e2 PH!#9080 PH!#9045 PH!#9055
iii. Reduction 2atio 22.4 14 14
iv. Mechanical 2ating+ 5- 401 136 197
v. The24al h6 2ating+ 5- 391 205 248
vi. (an o2 othe2 cooling device 01 %Fan& 01 %Fan& 01 %Fan&
vii. Mechanical 3e2vice facto2 1.5 1.5 1.5
1.$5 HS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 LS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.&0 B#0+'to2
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
De'0!(2t(on A-01 B-01 B-0$ B-0&
1.&1 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&$ Belt S2ee" S%(t0:e'
Schedule of Technical Data
(Rev.0)
Page-G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model nu49e2
1.&& Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
1.&* Belt S0#le'
BS-A1 BS-B1
i. Manufactu2e2
ii. Model nu49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 on 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe (l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
1.&/ Lo0#l !#te o9 9lo% #n" tot#l(=e (n"(0#t(n,
i. Manufactu2e2
ii. Model nu49e2
iii. SiFe (l : 7 : h)
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&1 Belt >#':(n, S'te.
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lit2e3/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al5a7a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al5a7a13+ 42
v. -al5a7a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al5a7a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
De'0!(2t(on A-01 B-01 B-0$ B-0&
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
Schedule of Technical Data
(Rev.0)
Page-I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
&.$ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.& ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on B-0* C-01 C-0$ C-0&
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9et+ c/c end 6ulle13+ 44 330980 1112008 90336 277796
ii. 'ift+ 44 12618 18000 7113 10943
iii. -idth+ 44 1200 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 10 10 05 10
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading+ ; of "!M&
Schedule of Technical Data
(Rev.0)
Page-?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.$ Po%e!
i. Moto2 2ating+ 5- 180 350 90 132
ii. "alc. < de3ign ca6acit1+ 5- 158 329 82 125
iii. Sta2ting to28ue+ ; full load to28ue
iv. ,2ea5-do7n to28ue+ ; full load to28.
1.& Belt Ten'(on) N
i. T1 51096 106425 27096 41446
ii. T2 14167 29507 7986 12215
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
vii. Ma:. 2un
viii. Ma: 3ta2t 66400 138400 35200 53900
1.* Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1./ Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1.1 Belt D#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3 3
v. RM& g2ade of 2u99e2 EP 630 EP 1250 EP 500 EP 500
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on B-0*
C-01 C-0$
C-0&
1.3P4lle D#t#
i. Manufactu2e2
ii. (ace 7idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+ 44 14 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+ 44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.5 He#" P4lle
i. Pulle1 dia4ete2+ 44 630 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 150 125
iv. ,ea2ing cente23+ 44
Schedule of Technical Data
(Rev.0)
Page-J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 125
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 P!(.#! D!(ve P4lle 8(9 not #t :e#"
"('0:#!,e;
i. Pulle1 dia4ete2+ 44 1000
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 160
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1$ Se0on"#! D!(ve P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on B-0* C-01 C-0$ C-0&
1.1& Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ Ben" P4lle
Schedule of Technical Data
(Rev.0)
Page-10
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.13 I"le! D#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing+ 44 1>00 1>00 1>00 1>00
vii. Retu2n idle2 36acing+ 44 2?00 2?00 2?00 2?00
1.15 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee t2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e idle2 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
De'0!(2t(on B-0* C-01 C-0$ C-0&
1.16 T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16eE ho2iF+ ve2tical+ 7inch+ h1d2 define Vertical Horizontal Vertical Vertical
iv. 'ocation
1.$0 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$1 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$$ Belt Plo%
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
1.$& S+(!t 7o#!"
Schedule of Technical Data
(Rev.0)
Page-11
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. 'ength of 35i2t 9oa2d 2u99e2+ 44 15000 5000 5000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t 9oa2d 2u99e2 du2o4ete2
1.$* Moto!8';
i. $u49e2 of 4oto23 01 01 01 01
ii. Manufactu2e2 ABB ABB ABB ABB
iii. Rating+ 5- 180 350 90 132
iv. S6eed+ 264 1500 1500 1500 1500
v. !nclo3u2e+ i.e. %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e. %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e. ca3t i2on
viii. Dut1 cla33ification+ i.e. S1
i:. %!" de3ign to28ue+ i.e. $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficienc1 de3ign+ i.e. %!2
::i. Moto2 cla33 in3ulation+ i.e. (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
1.$/ Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat Fluidoat Fluidoat Fuidoat
ii. Model nu49e2
HF !" '
9B
HF !" '
10B
HE !"#8 HF !" ' 9
iii. Rating+ 5- 228 373 90 172
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
De'0!(2t(on B-0* C-01 C-0$ C-0&
1.$1 Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2+ 5-
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$3 S2ee" Re"40e!
i. Manufactu2e2 $uitoo $uitoo $uitoo $uitoo
ii. Model nu49e2 PH!#9060 PH!#9085 PH!#9045 PH!#9055
iii. Reduction 2atio 14 22.4 14 14
iv. Mechanical 2ating+ 5- 215 455 136 197
v. The24al h6 2ating+ 5- 197 668 205 248
vi. (an o2 othe2 cooling device 01 %Fan& 01 %Fan& 01 %Fan& 01 %Fan&
Schedule of Technical Data
(Rev.0)
Page-12
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. Mechanical 3e2vice facto2 1.5 1.5 1.5 1.5
1.$5 HS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
iv. Manufactu2e2
v. Model nu49e2
vi. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 B#0+'to2
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
v.
vi.
vii.
viii. Manufactu2e2
i:. Model nu49e2
:. $u49e2 of 37itche3
:i. Total length of 6ull co2d+ 44
1.&0 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
1.&1 Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
De'0!(2t(on B-0* C-01 C-0$ C-0&
1.&$ Belt S0#le'
BS-C1
i. Manufactu2e2
ii. Model nu49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 on 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe (l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
1.&& Lo0#l !#te o9 9lo% #n" tot#l(=e (n"(0#t(n,
i. Manufactu2e2
ii. Model nu49e2
iii. SiFe (l : 7 : h)
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lit2e3/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
Schedule of Technical Data
(Rev.0)
Page-13
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al5a7a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al5a7a13+ 42
v. -al5a7a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al5a7a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
&.$ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.& ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on C-0* D-01 D-0$ D-0&
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9et+ c/c end 6ulle13+ 44 330980 902295 90336 277796
ii. 'ift+ 44 12618 18000 7113 10943
iii. -idth+ 44 1200 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 10 10 05 10
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading+ ; of "!M&
1.1 Po%e!
i. Moto2 2ating+ 5- 180 315 90 132
ii. "alc. < de3ign ca6acit1+ 5- 158 288.358 81.75 125.04
iii. Sta2ting to28ue+ ; of full load to28ue
iv. ,2ea5-do7n to28ue+ ; full load to28.
1.$ Belt Ten'(on) N
i. T1 51096 934444 27096 41446
ii. T2 14167 25908 7986 12215
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
Schedule of Technical Data
(Rev.0)
Page-1>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. Ma:. 2un
viii. Ma: 3ta2t 66400 121500 35200 53900
1.& Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1.* Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1./ Belt D#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3 3
v. RM& g2ade of 2u99e2 EP 630 EP 1250 EP 500 EP 500
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on C-0* D-01 D-0$ D-0&
1.1P4lle D#t#
i. Manufactu2e2
ii. (ace 7idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+ 44 14 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+ 44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
i. Pulle1 dia4ete2+ 44 630 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 150 125
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.3 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.5 P!(.#! D!(ve P4lle 8(9 not #t :e#"
"('0:#!,e;
i. Pulle1 dia4ete2+ 44 1000 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 160 125
iv. ,ea2ing cente23+ 44
Schedule of Technical Data
(Rev.0)
Page-1A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 Se0on"#! D!(ve P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on C-0* D-01 D-0$ D-0&
1.1$ T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1& Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ I"le! D#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing+ 44 1>00 1400 1>00 1400
Schedule of Technical Data
(Rev.0)
Page-1G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. Retu2n idle2 36acing+ 44 2?00 2800 2?00 2800
1.11 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee t2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e idle2 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
1.13T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16eE ho2iF+ ve2tical+ 7inch+ h1d2 define Vertical (orizontal Vertical Vertical
iv. 'ocation
1.15 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
De'0!(2t(on
C-0*
D-01 D-0$ D-0&
1.16 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$0 Belt Plo%
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
1.$1 S+(!t 7o#!"
i. 'ength of 35i2t 9oa2d 2u99e2+ 44 15000 5000 5000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t 9oa2d 2u99e2 du2o4ete2
1.$$ Moto!8';
i. $u49e2 of 4oto23 1 01 01 01
ii. Manufactu2e2 ABB ABB ABB ABB
iii. Rating+ 5- 180 315 90 132
iv. S6eed+ 264 1500 1500 1500 1500
v. !nclo3u2e+ i.e. %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e. %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e. ca3t i2on
viii. Dut1 cla33ification+ i.e. S1
i:. %!" de3ign to28ue+ i.e. $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficienc1 de3ign+ i.e. %!2
::i. Moto2 cla33 in3ulation+ i.e. (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
Schedule of Technical Data
(Rev.0)
Page-1I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.$& Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat Fluidoat Fluidoat Fluidoat
ii. Model nu49e2 HF !" ' 9B HF !" 10B HF !" ' 8 HF !" # 9
iii. Rating+ 5- 228 373 90 172
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
1.$/ Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2+ 5-
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
De'0!(2t(on C-0* D-01 D-0$ D-0&
1.$1 S2ee" Re"40e!
i. Manufactu2e2 $uitoo $uitoo $uitoo $uitoo
ii. Model nu49e2 PH!#9060 PH!#9080 PH!#9045
PH! '
9055
iii. Reduction 2atio 14 22.4 14 14
iv. Mechanical 2ating+ 5- 215 401 136 197
v. The24al h6 2ating+ 5- 197 391 205 248
vi. (an o2 othe2 cooling device 01 %Fan& 01 %Fan& 01 %Fan& 01 %Fan&
vii. Mechanical 3e2vice facto2 1.5 1.5 1.5 1.5
1.$3 HS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$5 LS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 B#0+'to2
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
1.&0 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&1 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
Schedule of Technical Data
(Rev.0)
Page-1?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.&$ Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
1.&& Belt S0#le'
i. Manufactu2e2
ii. Model nu49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 on 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe (l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
De'0!(2t(on C-0* D-01 D-0$ D-0&
1.&* Lo0#l !#te o9 9lo% #n" tot#l(=e (n"(0#t(n,
i. Manufactu2e2
ii. Model nu49e2
iii. SiFe (l : 7 : h)
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&/ Belt >#':(n, S'te.
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lit2e3/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al5a7a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al5a7a13+ 42
v. -al5a7a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al5a7a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
&.$ S:#llo% Fo4n"#t(on'
Schedule of Technical Data
(Rev.0)
Page-1J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.& ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9et+ c/c end 6ulle13+ 44 330980 121640 577224
ii. 'ift+ 44 12618 8725 15440
iii. -idth+ 44 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 10 10 10
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading+ ; of "!M&
1.1 Po%e!
i. Moto2 2ating+ 5- 180 110 250
ii. "alc. < de3ign ca6acit1+ 5- 158 101 213
iii. Sta2ting to28ue+ ; full load to28ue
iv. ,2ea5-do7n to28ue+ ; full load to28.
1.$ Belt Ten'(on) N
i. T1 51096 32983 67457
ii. T2 14167 9145 18703
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
vii. Ma:. 2un
viii. Ma: 3ta2t 66400 42900 87700
1.& Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1.* Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1./ Belt D#t#
Schedule of Technical Data
(Rev.0)
Page-20
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3
v. RM& g2ade of 2u99e2 EP 630 EP 500 EP 800
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.1P4lle D#t#
i. Manufactu2e2
ii. (ace 7idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+ 44 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+ 44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.3 He#" P4lle
i. Pulle1 dia4ete2+ 44 630 630 800
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 150 110 150
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.5 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 P!(.#! D!(ve P4lle 8(9 not #t :e#"
"('0:#!,e;
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 Se0on"#! D!(ve P4lle 8(9 !e<4(!e";
Schedule of Technical Data
(Rev.0)
Page-21
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.1$ Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1& T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 I"le! D#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing+ 44 1400 1400 1400
vii. Retu2n idle2 36acing+ 44 2800 2800 2800
1.13 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee t2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e idle2 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
Schedule of Technical Data
(Rev.0)
Page-22
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.15 T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16eE ho2iF+ ve2tical+ 7inch+ h1d2 define Vertical Vertical )ertical
iv. 'ocation
1.16 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$0 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
1.$1 Belt Plo%
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
1.$$ S+(!t 7o#!"
i. 'ength of 35i2t 9oa2d 2u99e2+ 44 15000 16000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t 9oa2d 2u99e2 du2o4ete2
1.$& Moto!8';
i. $u49e2 of 4oto23 1 1 01
ii. Manufactu2e2 ABB ABB ABB
iii. Rating+ 5- 180 110 250
iv. S6eed+ 264 1500 1500 1500
v. !nclo3u2e+ i.e. %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e. %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e. ca3t i2on
viii. Dut1 cla33ification+ i.e. S1
i:. %!" de3ign to28ue+ i.e. $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficienc1 de3ign+ i.e. %!2
::i. Moto2 cla33 in3ulation+ i.e. (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
1.$* Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat
Fluidoat
HF !" #8 B
125
Fluidoat
HF !" #10
273
ii. Model nu49e2
HF !" #9
B
iii. Rating+ 5- 228
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
Schedule of Technical Data
(Rev.0)
Page-23
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.$/ Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2+ 5-
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$1 S2ee" Re"40e!
i. Manufactu2e2 $uitoo $uitoo $uitoo
ii. Model nu49e2 PH!#9060 PH!#9050 PH!#9070
iii. Reduction 2atio 14 14 18
iv. Mechanical 2ating+ 5- 215 139 308
v. The24al h6 2ating+ 5- 197 127 387
vi. (an o2 othe2 cooling device 01 %Fan& 01 %Fan& 01 %Fan&
vii. Mechanical 3e2vice facto2 1.5 1.5 1.5
1.$3 HS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$5 LS Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 B#0+'to2
i. Manufactu2e2
ii. Model nu49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
1.&0 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&1 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
1.&$ Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
Schedule of Technical Data
(Rev.0)
Page-2>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on D-0* E-01 E-0$ E-0&
1.&& Belt S0#le'
i. Manufactu2e2
ii. Model nu49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 on 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe (l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
1.&* Lo0#l !#te o9 9lo% #n" tot#l(=e (n"(0#t(n,
i. Manufactu2e2
ii. Model nu49e2
iii. SiFe (l : 7 : h)
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&/ Belt >#':(n, S'te.
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lit2e3/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al5a7a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al5a7a13+ 42
v. -al5a7a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al5a7a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
i. "onc2ete 8ualit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.$ ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
Schedule of Technical Data
(Rev.0)
Page-2A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9elt+c/c and 6ulle1+ 44 534066
ii. 'ift+ 44 6500
iii. -idth+ 44 1200
iv. De3ign "a6acit1+ 4t6h 1380
v. S6eed+ 4/3 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint3+
deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 7
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading+ ; of "!M&
1.1 Po%e!
i. Moto2 2ating+ 5- 180
ii. "alc. < de3ign ca6acit1+ 5- 165
iii. Sta2ting to28ue+ ; of full to28ue
iv. ,2ea5 do7n to28ue+ ;full load to28
v.
vi.
vii.
viii. T1 52859
i:. T2 14656
:. T at concave cu2ve
:i. T at conve: cu2ve
:ii. T-U
:iii. Tail
:iv. Ma: 3ta2t 68720
:v. Ma: 3ta2t
1.$ Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1.& Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1.* Belt "#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5
iv. ,otto4 cove2 thic5ne33+ 44 3
v. RM& g2ade of 2u99e2 EP 630
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
Schedule of Technical Data
(Rev.0)
Page-2G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1./ P4lle D#t#
i. Manufactu2e2
ii. (ace -idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+44 14
v. $on-d2ive 6ulle1 lag+
t16e/thic5ne33+44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.1 He#" P4lle
i. Pulle1 dia4ete2+ 44 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 160
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.3 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.5 P!(.#! D!(ve P4lle 8(9 not #t :e#"
"('0:#!,e;
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 Se0on"#! D!(ve P4lle 8 (9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
1.11 Ben" P4lle
i. Pulle1 dia4ete2+ 44
Schedule of Technical Data
(Rev.0)
Page-2I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1$ T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1& Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ I"le! "#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing 1400
vii. Retu2n idle2 36acing+44 2800
1.11 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee th2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
1.13 T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16e E ho2iF+ ve2tical+ 7inch+ h1d2
define
Horizontal
iv. 'ocation
v.
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
1.15 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1.16 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
Schedule of Technical Data
(Rev.0)
Page-2?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. Model $u49e2
1.$0 Belt Plo%
i. Manufactu2e2
ii. Model $u49e2
iii. Duantit1
1.$1 S+(!t7o#!"
i. 'ength of 35i2t9oa2d 2u99e2+ 44 10000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t9oa2d 2u99e2 du2o4ete2
1.$$ Moto!8';
i. $u49e2 of 4oto23 01
ii. Manufactu2e2 ABB
iii. Rating+ 5- 180
iv. S6eed+ 264 1500
v. !nclo3u2e+ i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e ca3t i2on
vii. Moto2 f2a4e 4ate2ial+ i.e. ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42+
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull 'oad cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh effiecienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
1.$& Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat
ii. Model nu49e2 HF !"#9B
iii. Rating+ 5- 228
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
1.$* Fl4(" D!(ve
%*F +$E!& %*F +$E!& %*F +$E!&
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$/ S2ee" Re"40e!
i. Manufactu2e2
ii. Model nu49e2 14
iii. Reduction 2atio
Schedule of Technical Data
(Rev.0)
Page-2J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. Mechanical 2ating+ 5-
v. The24al h6 2ating+ 5-
vi. (an o2 othe2 cooling device
vii. Mechanical 3e2vice facto2
1.$1 HS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$3 LS Co42l(n,
vii. Manufactu2e2
viii. Model $u49e2
i:. Ma:i4u4 allo7a9le 9o2e+ 44
1.$5 B#0+'to2
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
1.$6 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&0 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
1.&1 Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
1.&$ Belt S0#le'
BS-R1
i. Manufactu2e2
ii. Model $u49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 of 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe(l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
De'0!(2t(on SB-BF1 SB-BF1 SB-BF1 R-01
1.&& Lo0#l !#te o9 9lo% #n" tot#l(=e! (n"(0#t(n,
i. Manufactu2e2
ii. Model $u49e2
iii. SiFe (l : 7 : h)+ 44
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&* Belt >#':(n, S'te.
Schedule of Technical Data
(Rev.0)
Page-30
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lite23/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al57a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al57a13+ 4
v. -al57a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al57a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
&.$ ':#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
iii.
iv.
v.
vi. "onc2ete 8uantit1+ cu9ic 4ete23
vii. "onc2ete 3t2ength+ MPa
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9elt+ c/c end 6ulle13+ 44 62391 160182 22762 570000
ii. 'ift+ 44 7650 6200 0
4700,10
414
iii. -idth+ 44 1200 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 12.5 3.4 0 15
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading of ; "!M&
Schedule of Technical Data
(Rev.0)
Page-31
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.1. Po%e!
i. Moto2 2ating+ 5- 90 110 37 250
ii. "alc < de3ign ca6acit1+ 5- 76 88 33 205
iii. Sta2ting to28ue+ ; of full load to28ue
iv. ,2ea5 do7n to28ue+ ; full load to28.
1.$ Belt Ten'(on) N
i. T1 25398 28713 10916 66253
ii. T2 7485 7691 3217 18369
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
vii. Ma: 2un
viii. Ma: 3ta2t 33000 37300 14200 86130
1.& Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1.* Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1./ Belt "#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3 3
v. RM& g2ade of 2u99e2 EP 500 EP 500 EP 500 EP 800
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.1 P4lle D#t#
i. Manufactu2e2
ii. (ace -idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+44 14 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.3 He#" P4lle
i. Pulle1 dia4ete2+ 44 630 630 630 800
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 125 110 100 150
Schedule of Technical Data
(Rev.0)
Page-32
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.5 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 P!(.#! D!(ve P4lle 8(9 not #t :e#" "('0:#!,e;
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11Se0on"#! D!(ve P4lle 8 (9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.1$ Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1& T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* Ben" P4lle
Schedule of Technical Data
(Rev.0)
Page-33
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 I"le! "#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing 1400 1400 1400 1400
vii. Retu2n idle2 36acing+44 2800 2800 2800 2800
1.13 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee th2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Duantit1 Total
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.15 T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16e E ho2iF+ ve2tical+ 7inch+ h1d2 define )ertical )ertical - Horizontal
iv. 'ocation
1.16 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1.$0 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1.$1 Belt Plo%
i. Manufactu2e2
ii. Model $u49e2
iii. Duantit1
1.$$ S+(!t7o#!"
Schedule of Technical Data
(Rev.0)
Page-3>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. 'ength of 35i2t9oa2d 2u99e2+ 44 5000 5000 5000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t9oa2d 2u99e2 du2o4ete2
1.$& Moto!8';
i. $u49e2 of 4oto23 01 01 01 01
ii. Manufactu2e2 ABB ABB ABB ABB
iii. Rating+ 5- 90 90 37 250
iv. S6eed+ 264 1500 1500 1500 1500
v. !nclo3u2e+ i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e %PAA
vii. Moto2 f2a4e 4ate2ial i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42+
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull 'oad cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh effiecienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
1.$* Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat Fluidoat Fluidoat Fluidoat
ii. Model nu49e2 HF !" ' 8 HF !" ' 8 HF !" ' 6
HF !" '
10
iii. Rating+ 5- 90 90 40 275
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.$/ Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$1 S2ee" Re"40e!
i. Manufactu2e2 $uitoo $uitoo $uitoo
ii. Model nu49e2 PH!#9045 PH! 9045 PH!#9030
iii. Reduction 2atio 14 14 14 18
iv. Mechanical 2ating+ 5- 136 136 67
v. The24al h6 2ating+ 5- 205 205 113
vi. (an o2 othe2 cooling device 01 %Fan& 01 %Fan& 01 %Fan&
vii. Mechanical 3e2vice facto2 1.5 1.5 1.5
1.$3 HS Co42l(n,
Schedule of Technical Data
(Rev.0)
Page-3A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$5 LS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 B#0+'to2
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
1.&0 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&1 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
1.&$ Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
De'0!(2t(on R-10 S-01 S-0$ S-0&/S-1&
1.&& Belt S0#le'
i. Manufactu2e2
ii. Model $u49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of idle23 7eigh 92idge
v. $u49e2 of 36ecial a662oach/2et2eat idle23
vi. T2an3duce2 ca9inet 3iFe(l : 7 : h)+ 44
vii. T2an3duce2 out6ut 3ignal
1.&* Lo0#l !#te o9 9lo% #n" tot#l(=e! (n"(0#t(n,
i. Manufactu2e2
ii. Model $u49e2
iii. SiFe (l : 7 : h)+ 44
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&/ Belt >#':(n, S'te.
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lite23/4in
v. -ate2 flo7 62e33u2e+ 9a2
vi. -ate2 flo7 62e33u2e+ 9a2
Schedule of Technical Data
(Rev.0)
Page-3G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al57a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al57a13+ 4
v. -al57a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al57a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
&.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
&.$ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.& ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on S-1$ T-01 T-10 T-0$/T-1$
1.0 MECHANICAL/CONVEYOR EQUIPMENT
i. 'ength along 9elt+ c/c end 6ulle13+ 44 125500 165277 153780 220000
ii. 'ift 0 22550 22550
18490,4
830
iii. -idth+ 44 1200 1200 1200 1200
iv. De3ign "a6acit1+ 4t6h 1380 1380 1380 1380
v. S6eed+ 4/3 3.5 3.5 3.5 3.5
vi. "oncave cu2ve 2adiu3+ 44
vii. &ngle of incline at loading 6oint+ deg2ee3
viii. Ma:i4u4 conve1ing angle+ deg2ee3 0 12.5 12.5 11.5
i:. "onve: cu2ve 2adiu3+ 44
:. 'oading of ; "!M&
1.1 Po%e!
i. Moto2 2ating+ 5- 55 180 180 180
ii. "alc < de3ign ca6acit1+ 5- 53 165 163 175
iii. Sta2ting to28ue+ ; of full load to28ue
iv. ,2ea5 do7n to28ue+ ; full load to28
1.$ Belt Ten'(on) N
i. T1 17511 53203 53514 56483
ii. T2 5161 14751 14560 15660
iii. T at concave cu2ve
iv. T at conve: cu2ve
v. T-U
vi. Tail
Schedule of Technical Data
(Rev.0)
Page-3I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. Ma: 2un
viii. Ma: 3ta2t 22800 69200 68300
73400
1.& Conveo! Ine!t(#) +,-.$
i. ,elt d2iven co46onent3
ii. D2ive co46onent3
iii. Total 313te4
1.* Conveo! A00ele!#t(on/De0ele!#t(on
i. &ccele2ation ti4e+ loaded+ 3econd3
ii. Decele2ation ti4e+ loaded+ 3econd3
iii. Decele2ation ti4e+ e46t1+ 3econd3
iv. "oa3t di3tance loaded+ feet
1./ Belt "#t#
i. Manufactu2e2
ii. P2oduct na4e = nu49e2
iii. To6 cove2 thic5ne33+ 44 5 5 5 5
iv. ,otto4 cove2 thic5ne33+ 44 3 3 3 3
v. RM& g2ade of 2u99e2 EP 500 EP 630 EP 630 EP 630
vi. Rating+ 5$/4
vii. $u49e2 of 6lie3 4 4 4 4
viii. Run 3afet1 facto2
i:. Sta2ting 3afet1 facto2
De'0!(2t(on S-1$ T-01 T-10 T-0$/T-1$
1.1 P4lle D#t#
i. Manufactu2e2
ii. (ace -idth+ inch
iii. T16e of hu9
iv. D2ive 6ulle1 lag+ t16e/thic5ne33+ 44 14 14 14 14
v. $on-d2ive 6ulle1 lag+ t16e/thic5ne33+ 44
vi. 'agging du2o4ete2
vii. ,ea2ing 4anufactu2e2
1.3 He#" P4lle
i. Pulle1 dia4ete2+ 44 630 630 630 630
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44 100 150 150 150
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.5 Sn47/Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.6 P!(.#! D!(ve P4lle 8(9 not #t :e#" "('0:#!,e;
Schedule of Technical Data
(Rev.0)
Page-3?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.10 Sn47 P4lle 8(9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11Se0on"#! D!(ve P4lle 8 (9 !e<4(!e";
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
vii. Pulle1 = 3haft 7eight+ 5g
viii. ,ea2ing catalog nu49e2
De'0!(2t(on S-1$ T-01 T-10 T-0$/T-1$
1.1$ Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1& T#+e-U2 P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1* Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.1/ T#(l P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.11 I"le! "#t#
Schedule of Technical Data
(Rev.0)
Page-3J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing 1400 1400 1400 1400
vii. Retu2n idle2 36acing+44 2800 2800 2800 2800
1.13 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee th2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. To6 3t2and 6i6e 7ith 3i: 2oll3
iv. Retu2n 3t2and 6i6e idle2 7ith 3i: 2oll3
v. %46act ta9le
vi. T2oughing aligning idle2
vii. Retu2n B*C idle2
viii. Retu2n aligning idle2
i:. %dle2 Dualit1 Total
1.15 T#+e-42
i. "ounte27eight+ 5g
ii. T2avel+ 44
iii. T16e E ho2iF+ ve2tical+ 7inch+ h1d2 define Vertical Vertical Vertical Vertical
iv. 'ocation
De'0!(2t(on S-1$ T-01 T-10 T-0$/T-1$
1.16 P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1.$0 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1.$1 Belt Plo%
i. Manufactu2e2
ii. Model $u49e2
iii. Duantit1
1.$$ S+(!t7o#!"
i. 'ength of 35i2t9oa2d 2u99e2+ 44 5000 5000 5000 5000
ii. Ru99e2 3iFe+ 44 : 44
iii. S5i2t9oa2d 2u99e2 du2o4ete2
1.$& Moto!8';
i. Manufactu2e2
ii. Rating+ 5- 55 180 180 180
iii. S6eed+ 264 1500 1500 1500 1500
iv. !nclo3u2e+ i.e %">11+ fan cooled
v. !nclo3u2e cla33ification+ i.e %PAA
vi. Moto2 f2a4e 4ate2ial i.e ca3t i2on
vii. Dut1 cla33ification+ i.e S1
viii. %!" de3ign to28ue+ i.e $
i:. Sta2ting to28ue+ ;
:. Pull-u6 to28ue+ ;
:i. ,2ea5do7n to28ue+ ;
:ii. $u49e2 of 9ea2ing3
:iii. -.2 at out6ut 3haft+ 5g-42+
:iv. "old 3ta2t ti4e+ 3econd3
:v. ot 3ta2t ti4e+ 3econd3
:vi. (ull 'oad cu22ent+ a463
:vii. %!" f2a4e 3iFe
:viii.-eight+ 5g
Schedule of Technical Data
(Rev.0)
Page->0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:i:. igh efficienc1 de3ign+ i.e. %!2
::. Moto2 cla33 in3ulation+ i.e. (
::i. Te46. 2i3e < >0"+ 100; na4e6late
1.$* Fl4(" Co42l(n,
i. Manufactu2e2 Fluidoat Fluidoat Fluidoat Fluidoat
ii. Model nu49e2 HF !"#7 HF !"#9B HF !"#9B HF !"#9B
iii. Rating+ 5- 62 228 228 228
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
1.$/ Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2+ 5-
De'0!(2t(on S-1$ T-01 T-10 T-0$/T-1$
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
1.$1 S2ee" Re"40e!
i. Manufactu2e2 $uitoo
ii. Model nu49e2 PH!#9035
iii. Reduction 2atio 14 14 14 14
iv. Mechanical 2ating+ 5- 91
v. The24al h6 2ating+ 5- 148
vi. (an o2 othe2 cooling device 01 %Fan&
vii. Mechanical 3e2vice facto2 1.5
1.$3 HS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$5LS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
1.$6 B#0+'to2
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 2ating+ $-4
iv. Duantit1
1.&0 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.&1 Belt S2ee" S%(t0:e'
Schedule of Technical Data
(Rev.0)
Page->1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model $u49e2
1.&$ Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
1.&& Belt S0#le'
i. Manufactu2e2
ii. Model $u49e2
iii. Hua2anteed accu2ac1+ 2A to 100; load+ ;
iv. $u49e2 of 36ecial a662oach/2et2eat idle23
v. T2an3duce2 ca9inet 3iFe(l : 7 : h)+ 44
vi. T2an3duce2 out6ut 3ignal
De'0!(2t(on TH-A1
TH-
B1/C1/D1
TH-
B$/C$/D$
TH-
B&/C&/D&/E&
1.&* Lo0#l !#te o9 9lo% #n" tot#l(=e! (n"(0#t(n,
i. Manufactu2e2
ii. Model $u49e2
iii. SiFe (l : 7 : h)+ 44
iv. Di36la1 ca6acit1 (define)
v. Re3et (4ech. o2 elect.)
1.&/ Belt >#':(n, S'te.
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 362a1 noFFle3
iv. -ate2 flo7 2ate+ lite23/4in
v. -ate2 flo7 62e33u2e+ 9a2
$.0 STRUCTURAL
i. Steel 7eight+ tonne3
ii. Total length of hand2ail 0 all 7al57a13+ 4
iii. and2ail 4ate2ial+ identif1
iv. Total a2ea of all 7al57a13+ 4
v. -al57a1 4ate2ial 0 ho2iFontal a2ea3
vi. -al57a1 4ate2ial 0 3lo6ed a2ea3
vii. Roofing/3iding+ 38ua2e 4ete23
viii. Roofing/3iding 4anufactu2e2
i:. Roofing/3iding 92and de3ignation
&.0 CIVIL STRUCTURAL
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength
&.$ ':#llo% Fo4n"#t(on'
Schedule of Technical Data
(Rev.0)
Page->2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.& ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on TH-A1
TH-
B1/C1/D1
TH-
B$/C$/D$
TH-
B&/C&/D&/E&
$.0 TRANSFER AND DRIVE HOUSES
i. -idth < colu4n ".'.+ 44
ii. 'ength < colu4n ".'.+ 44
iii. eight f2o4 g2ade to 2oof+ 44
iv. $u49e2 of floo23
$.1 St!40t4!#l Steel) En0lo'4!e') An" A224!t.
i. Steel 7eight+ tone3
ii. 'ength of hand2ail+ 4
iii. (loo2 a2ea+ 38. 4ete23
iv. Maintenance doo2 8uantit1
v. Maintenance doo2 3iFe (7 : h)+ 44
vi. &cce33 doo2 8uantit1
vii. &cce33 doo2 3iFe (7 : h)+ 44
viii. $u49e2 of 3tai23 t2ead3 8uan
i:. Siding 3u2face a2ea+ 38. 4ete23
:. Roofing 3u2face a2ea+ 38. 4ete23
:i. Roofing/3iding 4anufactu2e2
:ii. Roofing/3iding 92and de3ignation
$.$ C:4te' #n" S+(!t 7o#!"'
i. DM 4odeling de3igne2 (identif1)
ii. Min. 6late thic5ne33+ 44
iii. 'ine2 4ate2ial
iv. Min. line2 thic5ne33+ 44
$.& Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
$.* Flo2 ?#te
F.#
B2/02/!2
F.#
B3/03/!3/E3
i. -idth+ 44
ii. eight+ 44
iii. Shaft dia. at 92g+ 44
iv. ,ea2ing 4anufactu2e2
v. ,ea2ing 4odel nu49e2
vi. &ctuato2 4anufactu2e2
vii. &ctuato2 4odel nu49e2
viii. Moto2 2ating+ 5-
i:. 'i4it 37itch 4anufactu2e2
:. 'i4it 37itch 4odel nu49e2
$./ D('0:#!,e C:4te S:4ttle Me0:#n('.
Schedule of Technical Data
(Rev.0)
Page->3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. -inch 4anufactu2e2
ii. -inch 4odel nu49e2
iii. $u49e2 of 7inche3
iv. -i2e 2o6e dia4ete2+ 44
v. -i2e 2o6e con3t2uction
vi. -i2e 2o6e 4ate2ial
vii. Moto2 2ating+ 5-
viii. Moto2 36eed+ 264
i:. D2u4 dia4ete2+ 44
:. D2u4 face 7idth+ 44
:i. T2avel di3tance+ 44
:ii. $u49e2 of li4it 37itche3
:iii. 'i4it 37itch 4anufactu2e2
:iv. 'i4it 37itch 4odel nu49e2
De'0!(2t(on TH-A1
TH-
B1/C1/D1
TH-
B$/C$/D$
TH-
B&/C&/D&/E&
$.1 M#,net(0 Se2#!#to!'
1$#B12
1$#012
1$#!1
i. Manufactu2e2
ii. Model nu49e2
iii. Magnet 7idth+ 44
iv. Magnet length+ 44
v. Hau33 at 300 44 3u36en3ion di3t
vi. Po7e2 con3u46tion+ 5-/volt3
vii. Rectifie2 t16e
viii. Ma: 9u2den of de6th+ 44
i:. ,elt d2ive 6o7e2+ 5-
:. D2ive t16e (di2ect+ v-9elt+ etc.)
:i. ,elt d2ive 36eed+ 4/3
:ii. 'ength of e:tended 4agnet+ 44
$.3 Ho('t'
i. Duantit1
ii. Manufactu2e2
iii. T16e
iv. Model $u49e2
v. 'ift height+ 44
vi. Rated ca6acit1+ tonne3
vii. D2ive+ 5-
$.5 DUST SUPPRESSION SYSTEM
i. Manufactu2e2
ii. Model nu49e2
iii. Pu46/cont2ol hou3e 3iFe (l : 7 : h)+ 44
iv. Pu46/cont2ol hou3e 62e-a33e49led (//$)
v. (lo7 cont2ol ca9inet 8uantit1
vi. (lo7 cont2ol ca9inet 3iFe (l : 7 : h)+ 44
vii. Mate2ial level 3en3o2 4anufactu2e2
viii. Mate2ial level 3en3o2 4odel nu49e2
$.6 D4't '422!e''(on %#te! 24.2'.
i. Duantit1 of 7ate2 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. Moto2 ho23e6o7e2
v. "a6acit1 2ating+ lite23 6e2 4inute
Schedule of Technical Data
(Rev.0)
Page->>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vi. P2e33u2e 2ating+ 9a2
$.10 S4!9#0t#nt 24.2' 8(9 !e<4(!e";
i. Duantit1 of 3u2factant 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. Moto2 ho23e6o7e2
v. "a6acit1 2ating+ lite23 6e2 4inute
vi. P2e33u2e 2ating+ 9a2
De'0!(2t(on TH-A1
TH-
B1/C1/D1
TH-
B$/C$/D$
TH-
B&/C&/D&/E&
$.11 S4!9#0t#nt t#n+ 8(9 !e<4(!e";
i. Manufactu2e2
ii. Model nu49e2
iii. Tan5 ca6acit1+ lite23
iv. Tan5 4ate2ial
v. Tan5 4ate2ial thic5ne33+ 44
vi. 'evel cont2ol 4anufactu2e2
vii. 'evel cont2ol 4ode nu49e2
viii. 'adde2 height+ 44
i:. Manhole dia4ete2+ 44
$.1$ D4't '422!e''(on %#te! '422l !e<4(!e"
i. Duantit1+ lite23/4inute
ii. P2e33u2e+ 9a2
iii. Su66l1 6i6e dia4ete2+ 44
$.1& Vent(l#t(on 8(9 !e<4(!e"/ en0lo'e";
i. Manufactu2e2
ii. Po7e2+ 5-
iii. "(M
iv. Duct 3iFe (38ua2e 44)
$.1* P(lle" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
$.1/ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
$.11 ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
Schedule of Technical Data
(Rev.0)
Page->A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on TH-B*/C*/D*/A1/E& DH-E1 TH-E$
$.0 TRANSFER AND DRIVE HOUSES
i. -idth < colu4n ".'+ 44
ii. 'ength < colu4n ".'+ 44
iii. eight f2o4 g2ade to 2oof+ 44
iv. $u49e2 of floo23
$.1 St!40t4!#l Steel) En0lo'4!e' #n" A224!t
i. Steel 7eight+ tonne3
ii. 'ength of hand2ail+ 4
iii. (loo2 a2ea+ 38. 4ete23
iv. Maintenance doo2 8uantit1
). Maintenance doo2 3iFe (7 : h)+ 44
vi. &cce33 doo2 8uantit1
vii. &cce33 doo2 3iFe (7 : h)+44
viii. $u49e2 of 3tai2 t2ead3 8uan
i:. Siding 3u2face a2ea+ 38+ 4ete23
:. Roofing 3u2face a2ea+ 38. 4ete23
3i. Roofing/3iding 4anufactu2e2
:ii. Roofing/3iding 92and de3ignation
$.$ C:4te #n" S+(!t 7o#!"'
i. DM 4odeling de3igne2 (identif1)
ii. Min 6late thic5ne33+ 44
iii. 'ine2 4ate2ial
iv. Min line2 thic5ne33+ 44
$.& Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
$.* Flo2 ?#te
F.#B4/04/!4/A1/E3
i. -idth+ 44
ii. eight+ 44
iii. Shaft dia. at 92g+ 44
iv. ,ea2ing 4anufactu2e2
v. ,ea2ing 4odel nu49e2
vi. &ctuato2 4anufactu2e2
Schedule of Technical Data
(Rev.0)
Page->G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. &ctuato2 4odel nu49e2
viii. Moto2 2ating+ 5-
i:. 'i4it 37itch 4anufactu2e2
:. 'i4it 37itch 4odel nu49e2
De'0!(2t(on TH-B*/C*/D*/A1/E& DH-E1 TH-E$
$./ D('0:#!,e C:4te S:4ttle Me0:#n('.
i. -inch 4anufactu2e2
ii. -inch 4odel nu49e2
iii. $u49e2 of 7inche3
iv. -i2e 2o6e dia4ete2+ 44
v. -i2e 2o6e con3t2uction
vi. -i2e 2o6e 4ate2ial
vii. Moto2 2ating+ 5-
viii. Moto2 36eed+ 264
i:. D2u4 dia4ete2+ 44
:. D2u4 face 7idth+ 44
:i. T2avel di3tance+ 44
:ii. $u49e2 of li4it 37itche3
:iii. 'i4it 37itch 4anufactu2e2
:iv. 'i4it 37itch nu49e2
$.1 M#,net(0 Se2#!#to!'
i. Manufactu2e2
ii. Model nu49e2
iii. Magnet 7idth+ 44
iv. Magnet length+ 44
v. Hau33 at 300 44 3u36en3ion di3t
vi. Po7e2 con3u46tion+ 5-/volt3
vii. Rectifie2 t16e
viii. Ma: 9u2den of de6th+ 44
i:. ,elt d2ive 6o7e2+ 5-
:. D2ive t16e (di2ect+ v-9elt+ etc.)
:i. ,elt d2ive 36eed+ 4/3
:ii. 'ength of e:tended 4agnet+ 44
$.3 Ho('t'
i. Duantit1
ii. Manufactu2e2
iii. T16e
iv. Model $u49e2
v. 'ift height+ 44
vi. Rated ca6acit1+ tonne3
vii. D2ive+ 5-
$.5 DUST SUPPRESSION SYSTEM
i. Manufactu2e2
ii. Model nu49e2
iii. Pu46/cont2ol hou3e 3iFe (l : 7 : h)+ 44
i). Pu46/cont2ol hou3e 62e-a33e49led
(//$)
Schedule of Technical Data
(Rev.0)
Page->I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
v. (lo7 cont2ol ca9inet 8uantit1
vi. (lo7 cont2ol ca9inet 3iFe (l : 7 : h)+ 44
vii. Mate2ial level 3en3o2 4anufactu2e2
viii. Mate2ial level 3en3o2 4odel nu49e2
De'0!(2t(on TH-B*/C*/D*/A1/E& DH-E1 TH-E$
$.6 D4't '422!e''(on %#te! 24.2'
i. Duantit1 of 7ate2 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. Moto2 ho23e6o7e2
v. "a6acit1 2ating+ lite23 6e2 4inute
vi. P2e33u2e 2ating+ 9a2
$.10 S4!9#0t#nt 24.2 8(9 !e<4(!e";
i. Duantit1 of 3u2factant 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. "a6acit1 2ating+ lite23 6e2 4inute
v. P2e33u2e 2ating+ 9a2
$.11 S4!9#0t#nt t#n+ 8(9 !e<4(!e";
i. Manufactu2e2
ii. Model nu49e2
iii. Tan5 ca6acit1+ lite23
iv. Tan5 4ate2ial
v. Tan5 4ate2ial thic5ne33+ 44
vi. 'evel cont2ol 4anufactu2e2
)ii. 'evel cont2ol 4odel nu49e2
viii. 'adde2 height+ 44
i:. Manhole dia4ete2+ 44
$.1$ D4't '422!e''(on %#te! '422l
!e<4(!e"
i. Duantit1+ lite23/4inute
ii. P2e33u2e+ 9a2
iii. Su66l1 6i6e dia4ete2+ 44
$.1& Vent(l#t(on 8(9 !e<4(!e"/ en0lo'e";
i. Manufactu2e2
ii. Po7e2+ 5-
iii. "(M
iv. Duct 3iFe (38ua2e 44)
$.1* P(lle" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
Schedule of Technical Data
(Rev.0)
Page->?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on TH-B*/C*/D*/A1/E& DH-E1 TH-E$
$.1/ S:#llo% Fo4n"#t(on'
i "onc2ete 8uantit1+ cu9ic 4ete23
ii "onc2ete 3t2ength+ MPa
$.11 ?!#"e Sl#7
i "onc2ete 8uantit1+ cu9ic 4ete23
ii "onc2ete 3t2ength+ MPa
Schedule of Technical Data
(Rev.0)
Page->J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on TH-T10 TH-T1/T11
$.0 TRANSFER AND DRIVE HOUSES
i. -idth < colu4n ".'.+ 44
ii. 'ength < colu4n ".'.+ 44
iii. eight f2o4 g2ade to 2oof+ 44
iv. $u49e2 of floo23
$.1 St!40t4!#l Steel) En0lo'4!e' #n" A224!t.
i. Steel 7eight+ tonne3
ii. 'ength of hand2ail+ 4
iii. (loo2 a2ea+ 38. 4ete23
iv. Maintenance doo2 8uantit1
v. Maintenance doo2 3i:e (7 : h)+ 44
vi. &cce33 doo2 8uantit1
vii. &cce33 doo2 3iFe (7 : h)+ 44
viii. $u49e2 of 3tai2 t2ead3 8uan
i:. Siding 3u2face a2ea+ 38+ 4ete23
:. Roofing 3u2face a2ea+ 38. 4ete23
:i. Roofing/3iding 4anufactu2e2
:ii. Roofing/3iding 92and de3ignation
$.$ C:4te #n" S+(!t 7o#!"'
i. DM 4odeling de3igne2 (identif1)
ii. Min 6late thic5ne33+ 44
iii. 'ine2 4ate2ial
iv. Min line2 thic5ne33+ 44
$.& Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
$.* Flo2 ?#te
i. -idth+ 44
ii. eight+ 44
iii. Shaft dia. at 92g+ 44
iv. ,ea2ing 4anufactu2e2
v. ,ea2ing 4odel nu49e2
vi. &ctuato2 4anufactu2e2
vii. &ctuato2 4odel nu49e2
viii. Moto2 2ating+ 5-
i:. 'i4it 37itch 4anufactu2e2
:. 'i4it 37itch 4odel nu49e2
$./ D('0:#!,e C:4te S:4ttle Me0:#n('.
i. -inch 4anufactu2e2
ii. -inch 4odel nu49e2
iii. $u49e2 of 7inche3
iv. -i2e 2o6e dia4ete2+ 44
v. -i2e 2o6e con3t2uction
vi. -i2e 2o6e 4ate2ial
vii. Moto2 2ating+ 5-
viii. Moto2 36eed+ 264
i:. D2u4 dia4ete2+ 44
:. D2u4 face 7idth+ 44
:i. T2avel di3tance+ 44
:ii. $u49e2 of li4it 37itche3
:iii. 'i4it 37itch 4anufactu2e2
:iv. 'i4it 37itch 4odel nu49e2
Schedule of Technical Data
(Rev.0)
Page-A0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on TH-T10 TH-T1/T11
$.1 M#,net(0 Se2#!#to!'
i. Manufactu2e2
ii. Model nu49e2
iii. Magnet 7idth+ 44
iv. Magnet length+ 44
v. Hau33 at 300 44 3u36en3ion di3t
vi. Po7e2 con3u46tion+ 5-/volt3
vii. Rectifie2 t16e
viii. Ma: 9u2den of de6th+ 44
i:. ,elt d2ive 6o7e2+ 5-
:. D2ive t16e (di2ect+ v-9elt+ etc.)
:i. ,elt d2ive 36eed+ 4/3
:ii. 'ength of e:tended 4agnet+ 44
$.3 Ho('t'
i. Duantit1
ii. Manufactu2e2
iii. T16e
iv. Model $u49e2
v. 'ift height+ 44
vi. Rated ca6acit1+ tonne3
vii. D2ive+ 5-
$.5 DUST SUPPRESSION SYSTEM
i. Manufactu2e2
ii. Model nu49e2
iii. Pu46/cont2ol hou3e 3iFe (l : 7 : h)
iv. Pu46/cont2ol hou3e 62e-a33e49led (//$)
v. (lo7 cont2ol ca9inet 8uantit1
vi. (lo7 cont2ol ca9inet 3iFe (l : 7 : h)+ 44
vii. Mate2ial level 3en3o2 4anufactu2e2
viii. Mate2ial level 3en3o2 4odel nu49e2
$.6 D4't '422!e''(on %#te! 24.2'.
i. Duantit1 of 7ate2 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. Moto2 ho23e6o7e2
v. "a6acit1 2ating+ lite23 6e2 4inute
vi. P2e33u2e 2ating+ 9a2
$.10 S4!9#0t#nt 24.2' 8(9 !e<4(!e";
i. Duantit1 of 3u2factant 6u463
ii. Manufactu2e2
iii. Model nu49e2
iv. "a6acit1 2ating+ lite23 6e2 4inute
v. P2e33u2e 2ating+ 9a2
$.& S4!9#0t#nt t#n+ 8(9 !e<4(!e";
i. Manufactu2e2
ii. Model nu49e2
iii. Tan5 ca6acit1+ lit2e3
iv. Tan5 4ate2ial
v. Tan5 4ate2ial thic5ne33+ 44
vi. 'evel cont2ol 4anufactu2e2
vii. 'evel cont2ol 4odel nu49e2
viii. 'adde2 height+ 44
i:. Manhole dia4ete2+ 44
De'0!(2t(on TH-T10 TH-T1/T11
Schedule of Technical Data
(Rev.0)
Page-A1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
$.* D4't S422!e''(on %#te! '422l
!e<4(!e"
i. Duantit1+ lite23/4inute
ii. P2e33u2e+ 9a2
iii. Su66l1 6i6e dia4ete2+ 44
$./ Vent(l#t(on 8(9 !e<4(!e"/en0lo'e";
i. Manufactu2e2
ii. Po7e2+ 5-
iii. "(M
iv. Duct 3iFe (38ua2e 44)
$.1 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength+ MPa
$.3 S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
$.5 ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on
&.0 TRUC@ LOADIN? TERMINAL
i. Manufactu2e2
Schedule of Technical Data
(Rev.0)
Page-A2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. P2o@ected a2ea fo2 3t2uctu2e+ 44 : 44
iii. H2ade elevation+ 4
iv. !levation fo2 t2i66e2 floo2+ 4
v. Ma33 flo7 te3ting la9o2ato21 (identif1)
&.1 S4!,e B(n'
i. $u49e2 of 3u2ge 9in3
ii. !ffective 3u2ge 9in volu4e 0 each+43
iii. "a6acit1 each 0 7ate2 level+ tonne3
iv. "a6acit1 each 0 effective+ tonene3
v. Plate 4ate2ial+ &STM nu49e2
vi. Plate thic5ne33+ 44
vii. 'ine2 4ate2ial+ &STM nu49e2 o2 othe2
viii. 'ine2 thic5ne33+ 44
i3. (lange outlet o6ening 3iFe+ 44 : 44
&.$ >e(,: B(n C:#!,(n, ?#te
i. Manufactu2e2
ii. Model nu49e2
iii. Plate 4ate2ial+ &STM nu49e2
iv. Plate thic5ne33+ 44
v. 'ine2 4ate2ial+ &STM nu49e2 o2 othe2
vi. 'ine2 thic5ne33+ 44
vii. #utlet flange o6ening 3iFe+ 44 : 44
viii. $u49e2 of h1d2aulic c1linde23 6e2 gate
i:. 1d2aulic c1linde2 4anufactu2e2
:. 1d2aulic c1linde2 3t2o5e+ 44
3i. 1d2aulic c1linde2 62e33u2e 2ating+ 9a2
&.& >e(,: B(n'
i. $u49e2 of 7eigh 9in3
ii. !ffective 7eigh 9in volu4e 0 each+43
iii. "a6acit1 each 0 7ate2 level+ tonne3
iv. "a6acit1 each 0 effective+ tonene3
v. Plate 4ate2ial+ &STM nu49e2
vi. Plate thic5ne33+ 44
vii. 'ine2 4ate2ial+ &STM nu49e2 o2 othe2
viii. 'ine2 thic5ne33+ 44
i:. #utlet flange o6ening 3iFe+ 44 : 44
De'0!(2t(on
&.* >e(,: B(n D('0:#!,e ?#te
i. Manufactu2e2
ii. Model nu49e2
iii. Plate 4ate2ial+ &STM nu49e2
iv. Plate thic5ne33+ 44
v. 'ine2 4ate2ial+ &STM nu49e2 o2 othe2
vi. 'ine2 thic5ne33+ 44
Schedule of Technical Data
(Rev.0)
Page-A3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. #utlet flange o6ening 3iFe+ 44 : 44
viii. $u49e2 of h1d2aulic c1linde23 6e2 gate
i:. 1d2aulic c1linde2 4anufactu2e2
:. 1d2aulic c1linde2 3t2o5e+ 44
:i. 1d2aulic c1linde2 62e33u2e 2ating+ 9a2
&./ >e(,: B(n C#l(7!#t(on S'te.
i. $u49e2 of 313te43
ii. Total 4a33 of cali92ation3 7eight3 0
each
iii. Ma33 of each 7eight+ 5g
iv. $u49e2 of h1d2 3u36en3ion c1linde2+
each
v. $u49e2 of li4it 37itch+ each 313te4
vi. 'i4it 37itch 4anufactu2e2
vii. 'i4it 37itch 4odel nu49e2
&.1 H"!#4l(0 Po%e! Un(t
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of h1d2aulic 6o7e2 unit3
iv. Re3e2voi2 tan5 ca6acit1 0 each+ lite23
v. &ccu4ulato2 3iFe 0each+ lite23
vi. Pu46 4anufactu2e2
vii. Pu46 4odel nu49e2
viii. Pu46 62e33u2e 2ating+ 9a2
i:. &i2 fan/2adiato2 4anufactu2e2
:. &i2 fan/2adiato2 4odel nu49e2
:i. (an 4oto2 6o7e2+ 5-
v. (an 4oto2 36eed+ 264
De'0!(2t(on
&.3 H"!#4l(0 Po%e! Un(t Moto!
i. Manufactu2e2
ii. Rating+ 5-
iii. S6eed+ 264
iv. !nclo3u2e i.e %">11+ fan cooled
v. !nclo3u2e cla33ification i.e %PAA
vi. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
vii. Dut1 cla33ification+ i.e S1
viii. %!" de3ign to28ue+ i.e $
i:. Sta2ting to28ue+ ;
:. Pull-u6 to28ue+ ;
Schedule of Technical Data
(Rev.0)
Page-A>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:i. ,2ea5do7n to28ue+ ;
:ii. $u49e2 of 9ea2ing3
:iii. -.2 at out6ut 3haft+ 5g-42
:iv. "old 3ta2t ti4e+ 3econd3
:v. ot 3ta2t ti4e+ 3econd3
:vi. (ull load cu22ent+ a463
:vii. %!" f2a4e 3iFe
:viii.-eight+ 5g
3i3. igh efficienc1 de3ign+ i.e %!2
::. Moto2 cla33 in3ulation+ i.e (
::i. Te46. 2i3e < >0"+ 100; na4e6late
&.5 Tele'0o2(n, Lo#" o4t C:4te'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of load out chute3
iv. SiFe of o6ening+ 44 : 44
v. 'ength of t2avel+ 44
vi. Plate 4ate2ial+ &STM nu49e2
vii. Plate thic5ne33+ 44
viii. 'ine2 4ate2ial+ &STM nu49e2 o2 othe2
i:. 'ine2 thic5ne33+ 44
:. $u49e2 of h1d2aulic c1linde23 6e2 chute
:i. 1d2aulic c1linde2 4anufactu2e2
:ii. 1d2aulic c1linde2 3t2o5e+ 44
3iii. 1d2aulic c1linde2 62e33u2e 2ating+ 9a2
&.6 Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
De'0!(2t(on
&.10 H(,: #n" H(,:-H(,: Level Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
&.11 Lo% #n" Lo%-Lo% Level Sen'o!
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
Schedule of Technical Data
(Rev.0)
Page-AA
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
&.1& Lo#" Cell'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
&.1* T!#99(0 L(,:t S(,n#l'
i. $u49e2 of t2affic light3
ii. T16e i.e+ '.!.D. 7/3un vi3o23
iii. T2affic light 4anufactu2e2
iv. T2affic light 4odel nu49e2
&.1/ T!#99(0 D('2l# S(,n
i. $u49e2 of t2affic light di36la13
ii. Panel 3iFe+ 44 : 44
iii. T16e
iv. Di36la1 4anufactu2e2
v. Di36la1 4odel nu49e2
De'0!(2t(on
&.11 H"!#4l(0 Roo. Vent(l#t(on
i. $u49e2 of fan3
ii. (an 4anufactu2e2
iii. (an 4odel nu49e2
iv. (an 4oto2 6o7e2+ 5-
v. (an 4oto2 36eed+ 264
)i. (an 4oto2 enclo3u2e cla33if1+ i.e %PAA
&.13 St!40t4!#l Steel) En0lo'4!e' #n"
A224!t
i. !3ti4ated 3teel 7eight+ tonne3
ii. 'ength of hand2ail+ 4
iii. (loo2 a2ea+ 38 4ete23
iv. Maintenance doo2 8uantit1
v. Maintenance doo2 3iFe (7 : h)+ 44
vi. &cce33 doo2 8uantit1 (7 : h)+ 44
Schedule of Technical Data
(Rev.0)
Page-AG
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. &cce33 doo2 3iFe(7 : h)+ 44
viii. $u49e2 of 3tai2 t2ead3 8uan
i:. Siding 3u2face a2ea+ 38+ 4ete23
:. Roofing 3u2face a2ea+ 38. 4ete23
:i. Roofing/3iding 4an?ufactu2e2
:ii. Roofing/3iding 92and de3ignation
&.15 P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength
&.16 S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
&.$0 ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on ST@-A ST@-B
*.0 STAC@ERS
*.1 STAC@ER EQUIPMENTS/STRUCTURE
i. Manufactu2e2
ii. Stac5ing ca6acit1+ tonne3 6e2 hou2
iii. Ma:i4u4 3toc56ile height+ 4
iv. Ma:i4u4 3toc56ile ca6acit1+ 43/4
v. ,oo4 angle 7hile 3tac5ing 4a: 6ile+ deg2ee3
vi. ,oo4 angle 7hile 6a33ing 2eclai4e2+ deg2ee3
vii. ,oo4 conve1o2 9elt 36eed+ 4/3
viii. Ma: 4ate2ial den3it1 handled+ 5g/43
i:. 'oading facto2 7/4a: den3it1+ ; of "!M&
:. T2ave23e 36eed 7/4a: 4ate2ial den3it1+ 4/3
:i. Min 4ate2ial den3it1 at 3tac5ing 2ate+ 5g/43
:ii. 'oading facto2 7/4in den3it1+ ; of "!M&
:iii. T2ave23e 36eed 7/4in+ 4ate2ial den3it1+ 4/3
:iv. Total t2ave23e length+ 4
*.1.1 M#0:(ne >e(,:t
Schedule of Technical Data
(Rev.0)
Page-AI
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Hant21+ 5g
ii. &-(2a4e ,oo4 Su66o2t+ 5g
iii. ,oo4 7/4a3t+ 3u36en3ion+ etc+ 5g
iv. T2aile2+ 5g
v. "ounte27eight+ 5g
vi. Total 4achine+ 5g
>.1.1. counte2 7eight 4ate2ial+ identif1
*.1.$ L47!(0#t(on S'te.
i. Manufactu2e2
ii. Model nu49e2
*.1.& Boo. L499(n, Cl(n"e!'
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
iv. Dia4ete2+ 44
v. St2o5e+ 44
vi. Ti4e fo2 total 3t2o5e+ 3econd3
)ii. 62e33u2e 2ating+ 9a2
De3c2i6tion $45#A $45#B
*.1.* H"!#4l(0 Po%e! Un(t
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of h1d2aulic 6o7e2 unit3
iv. Re3e2voi2 tan5 ca6acit1 0 each+ lite23
v. &ccu4ulato2 3iFe 0 each+ lite23
vi. Pu46 4anufactu2e
vii. Pu46 4odel nu49e2
viii. Pu46 62e33u2e 2ating+ 9a2
i:. &i2 fan/2adiato2 4anufactu2e2
:. &i2 fan/ 2adiato2 4odel nu49e2
:i. (an 4oto2 6o7e2+ 5-
:ii. (an 4oto2 36eed+ 264
:iii. P2e33u2e 37itch 4anufactu2e2
:iv. $u49e2 of 62e33u2e 37itche3
:v. P2e33u2e 37itch 4odel nu49e2
:vi. P2e33u2e 37itch 2ating+ 9a2
:vii. *alve 4anufactu2e2
:viii.$u49e2 of valve3
:v. *alve 4odel nu49e2
*.1./ H"!#4l(0 Po%e! Un(t Moto!
i. $u49e2 of 4oto2
Schedule of Technical Data
(Rev.0)
Page-A?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
De'0!(2t(on STK-A STK-B
*.1.1 Boo. Conveo! E<4(2.ent
*.1.3 Sto!. T(e "o%n
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
iv. &ctuato2 4anufactu2e2
v. &ctuato2 4odel nu49e2
vi. De3ign 7ind condition+ 54/h2
*.1.5 Po%e! C#7le Reel
i. Manufactu2e2
ii. "atalogue nu49e2
iii. Reel dia4ete2+ 44
iv. Duantit1
v. Po7e2 ca9le length+ 4ete23
vi. Po7e2 ca9le t16e
vii. Po7e2 ca9le 4anufactu2e2
viii. $u49e2 of conducto23 and 2ating
i:. Po7e2 ca9le voltage+ volt3
*.1.6 Cont!ol C#7le Reel
i. Manufactu2e2
ii. "atalogue nu49e2
iii. Reel dia4ete2+ 44
Schedule of Technical Data
(Rev.0)
Page-AJ
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. Duantit1
v. "ont2ol ca9le length+ 4ete23
vi. "ont2ol ca9le t16e
vii. "ont2ol ca9le 4anufactu2e2
viii. $u49e2 of conducto23 and 2ating
i:. "ont2ol ca9le voltage+ volt3
*.1.10 Ele0t!(0#l Roo.
i. SiFe (' : - : )+ 44
ii. %ndoo2 de3ign te46e2atu2e+ deg2ee "
iii. *&" 2ating+ -
De'0!(2t(on STK-A STK-B
*.1.11 Cont!ol Roo.
i. SiFe (' : - : )+ 44
ii. %ndoo2 de3ign te46e2atu2e+ deg2ee "
iii. *&" 2ating+ -
iv. #6e2ating chai2 4anufactu2e2
v. #6e2ating chai2 4odel nu49e2
*.$ TRAVERSE DRIVE
*.$.1 De'(,n P#!#.ete!'
i. Ma:i4u4 2e6o3itioning 36eed+ 4/3
ii. Ma:i4u4 36eed 7hile 3tac5ing+ 4/3
iii. Ma:i4u4 36eed 7hile 3tac5ing+ 4/3
iv. Ma:i4u4 7ind 7hile 2e6o3itioning+ 54/h2
v. Ma:i4u4 7ind 7hile 3tac5ing+ 54/h2
*.$.$ T!#ve!'e T!40+'
i. $u49e2 of gant21 t2uc53
ii. $u49e2 of gant21 7heel3
iii. $u49e2 of gant21 d2iven 7heel3
iv. $u49e2 of t2aile2 7heel3
v. $u49e2 of t2aile2 d2iven 7heel3
vi. Ma:i4u4 7heel loading o6e2ating
vii. Ma:i4u4 7heel loading 3to24 tie-do7n
viii. -heel dia4ete2+ 44
i:. -heel 4ate2ial
:. -heel 4anufactu2e2
:i. -heel 3haft dia4ete2 at hu9+ 44
Schedule of Technical Data
(Rev.0)
Page-G0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:ii. -heel 3haft dia4ete2 at 9ea2ing+ 44
:iii. ,ea2ing 4anufactu2e2
:iv. ,ea2ing 4odel nu49e2
:v. $u49e2 of 2ail 37ee63
:vi. Rail 37ee6 4ate2ial
*.$.& T!#ve!'e D!(ve H"!#4l(0 S:o0+ A7'o!7e!'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of h1d2aulic 3hoc5 a93o29e23
iv. St2o5e+ 44
v. Ma: ene2g1 2ating each 6e2 c1cle+ $4
vi. !ffective 7eight+ 5g
vii. Ma: 2ated d2iven 36eed of 3tac5e2+ 4/3
De'0!(2t(on STK-A STK-B
*.$.* T!#ve!'e D!(ve S2ee" Re"40e!
i. Manufactu2e2
ii. Model nu49e2
iii. Reduction 2atio
iv. Mechanical 2ating+ 5-
v. The24al h6 2ating+ 5-
vi. (an o2 othe2 cooling device
vii. Mechanical 3e2vice facto2
*.$./ T!#ve!' D!(ve HS Co42l(n, 8(9 4'e";
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
*.$.1 T!#ve!'e D!(ve .oto!'
i. $u49e2 of d2ive 4oto2
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
Schedule of Technical Data
(Rev.0)
Page-G1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
*.$.3 VFD
i. Manufactu2e2
ii. Model nu49e2
De'0!(2t(on STK-A STK-B
*.$.5 T!#ve!'e D!(ve B!e#+'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 92ea53
iv. To28ue 2ating each+ $-4
v. &ctuato2+ identif1
vi. *oltage
vii. Ma:i4u4 2ated 7ind 36eed+ 54/h2
*.$.6 R#(l Cl#.2'
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
iv. "la46ing 2ating+ $
*.& TRAILER CONVEYOR EQUIPMENT
*.&.1 Hol""o%n P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
*.&.$ D('0:#!,e P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
Schedule of Technical Data
(Rev.0)
Page-G2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
*.&.& D('0:#!,e Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
De'0!(2t(on STK-A STK-B
*.&.* Ret4!n Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
*.&./ P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
*.&.1 Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model nu49e2
*.&.3 I"le! "#t#
i. Manufactu2e2
ii. Se2ie3
iii. "!M& de3ignation
iv. Mounting di4. "ente23+ 44
v. Roll 3hell thic5ne33+ 44
vi. T2oughing idle2 36acing
vii. Retu2n idle2 36acing+ 44
*.&.5 I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee th2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. T2oughing aligning idle2
iv. Retu2n B*C idle2
v. Retu2n aligning idle2
vi. %dle2 Duantit1 Total
*.&.6 P4ll Co!" S%(t0:e'
Schedule of Technical Data
(Rev.0)
Page-G3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
De'0!(2t(on STK-A STK-B
*.&.10 Belt S2ee" S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
*.&.11 Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
*.&.1$ Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
*.$.1& Boo. An,le L(.(t S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
*.$.1* Coll('(on P!event(on P!oA(.(t Sen'o!
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 3en3o2
*.&.1/ T!#ve!'e L(.(t S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
*.&.11 C:4te #n" S+(!t7o#!"'
i. DM 4odeling de3igne2 (identif1)
ii. Min 6late thic5ne33+ 44
iii. 'ine2 4ate2ial
iv. Min line2 thic5ne33+ 44
Schedule of Technical Data
(Rev.0)
Page-G>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on STK-A STK-B
*.*. CIVIL STRUCTURES
*.*.1 R#(l
i. Manufactu2e2
ii. SiFe
iii. Hauge+ 44
iv. Total length 0each+ 4
*.*.$ R#(l T(e'
i. Manufactu2e2
ii. SiFe (' : - : )+ 44
iii. Tie 36acing+ 44
iv. Tie 4ate2ial+ identif1
*.*.& B#ll#'t
i. Su9-9alla3t 4ate2ial 8uantit1+ tonne3
ii. Su9-9alla3t 4ate2ial 8ualit1/t16e
iii. Su9-9alla3t 4ate2ial thic5ne33+ 44
iv. Su9-9alla3t 4ate2ial 7idth+ 44
v. ,alla3t 4ate2ial 8uantit1+ tonne3
vi. ,alla3t 4ate2ial 8ualit1/t16e
vii. ,alla3t 4ate2ial thic5ne33+ 44
viii. ,alla3t 4ate2ial 7idth+ 44
*.*.* P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength
*.*/ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
*.*1 ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
Schedule of Technical Data
(Rev.0)
Page-GA
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on SR--01 SR-02
/.0 PORTAL SCRAPER RECLAIMERS
/.1 RECLAIMER EQUPMENTS STRUCTURE
i. Manufactu2e2
ii. Reclai4ing 2ate+ tonne3 6e2 hou2
iii. Ma: 4ate2ial den3it1 at thi3 2ate+ 5g/43
iv. T2ave23e 36eed 7/4a: 4ate2ial den3it1+ 4/3
v. Min 4ate2ial den3it1 at thi3 2ate+ 5g/43
vi. T2ave23e 36eed 7/4in+ 4ate2ial den3it1+ 4/3
vii. Ma:i4u4 3toc56ile height+ 4
viii. Ma:i4u4 3toc56ile ca6acit1+ 43/4
i:. ,oo4 angle 7hile 2eclai4ing 4a: 6ile+ deg2ee3
:. U66e2 9oo4 angle 6a33ing 3tac5e2+ deg2ee3
:i. 'o7e2 9oo4 angle 6a33ing 3tac5e2+ deg2ee
3ii. Total t2ave23e length+ 4
/.1.1 M#0:(ne >e(,:t
i. Po2tal+ 5g
ii. Sc2a6e2 conve1o2 9oo4+ 5g
iii. #the2+ 5g
iv. Total 4achine+ 5g
/.$ CONVEYIN? EQUIPMENT
v. "alculated 6o7e2 at de3ign ca6acit1+ 5-
vi. "hain 36eed+ 4/3
/.$.1 Conve(n, C:#(n Ten'(on 87ot: 't!#n"';) N
i. T1
ii. T2
iii. T at to6 3t2and of inflection cu2ve
iv. T at 9otto4 3t2and of inflection cu2ve
v. T-U+ 9oo4 u6
vi. T-U 9oo4 do7n
vii. Ma: 2un
viii. Ma: 3ta2t
Schedule of Technical Data
(Rev.0)
Page-GG
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on SR--01 SR-02
/.$.$ S0!#2e! C:#(n
i. Manufactu2e2
ii. T16e
iii. Model nu49e2
iv. Pitch+ 44
v. 'ength+ 44
vi. Ten3ion 2ating+ $
vii. Mate2ial of con3t2uction
viii. 'ength+ 44
i:. Rolle2 dia4ete2
:. Rolle2 4anufactu2e2
:i. Rolle2 4odel nu49e2
:ii. S6acing of 2olle23+ 6itch+ 44
:iii. Rolle2 9ea2ing dia4ete2+ 44
:iv. o2iFontal guide 2olle2 dia4ete2+ 44
:v. o2iFontal guide 2olle2 4anufactu2e2
:vi. o2iFontal guide 2olle2 4odel nu49e2
:vii. o2iFontal guide 2olle2 36acing+ 44
:viii.o2iFontal guide 2olle2 9ea2ing dia+ 44
:i:. Ra5e 7idth+ 44
::. Ra5e height+ 44
::i. Ra5e 6itch+ 44
::ii. Ra5e 4ate2ial
::iii.$u49e2 of teeth on each 2a5e
::iv.Su2face ha2dne33 of 2a5e 9lade+ ,$
::v. $u49e2 of teeth on each 2a5e
33)i.Su2face ha2dne33 of teeth+ ,$
::vii. Ta5e-u6 ten3ion+ 9oo4 u6 +$
::viii. Ta5e-u6 ten3ion+ 9oo4 do7n+ $
::i:.Ta5e-u6 di3tance+ 44
/.$.& D!(ve S2!o0+et
i. S62oc5et 6itch dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
Schedule of Technical Data
(Rev.0)
Page-GI
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on SR--01 SR-02
/.$.* Boo. H(n,e/In9le0t(on >:eel
i. -heel dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
/.$./ T#+e-U2 >:eel
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
/.$.1 Moto!8';
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e+ i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e %PAA
vii. Moto2 f2a4e 4ate2ial i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42+
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull 'oad cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
Schedule of Technical Data
(Rev.0)
Page-G?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on SR--01 SR-02
/.$.3 Fl4(" Co42l(n,
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
/.$.5 Fl4(" D!(ve
i. Manufactu2e2
ii. Model nu49e2
iii. Rating+ 5-
iv. Sli6 6e2cent
v. Sta2ting To28ue Ratio - (acto2
vi. $u49e2 of cooling fan3
vii. "ooling fan 4oto2 6o7e2
viii. "ooling fan 4oto2 36eed+ 264
i:. Ma:i4u4 hot 3ta2t3 6e2 hou2
:. &ctuato2 t16e
:i. &ctuato2 voltage+ volt3
:ii. Mini4u4 continuou3 out6ut 36eed+ 264
/.$.6 S2ee" Re"40e!
i. Manufactu2e2
ii. Model nu49e2
iii. Reduction 2atio
iv. Mechanical 2ating+ 5-
v. The24al h6 2ating+ 5-
vi. (an o2 othe2 cooling device
vii. Mechanical 3e2vice facto2
/.$.10 HS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
/.$.11 LS Co42l(n,
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
Schedule of Technical Data
(Rev.0)
Page-GJ
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on SR-01 SR-11
/.$.1$ I.2#0t T#7le I"le! D#t#
v. Manufactu2e2
vi. Se2ie3
)ii. "!M& de3ignation
)iii. Mounting di4. "ente23+ 44
i:. Roll 3hell thic5ne33+ 44
:. T2oughing i46act idle2 36acing+ 44
:i. $u49e2 of t2oughing i46act idle23
/.$.1& Boo. C:#(n S2ee" S%(t0:
i. Manufactu2e2
ii. Model $u49e2
/.$.1* Y#!" Conveo! Belt S2ee" S%(t0:
i. Manufactu2e2
ii. Model $u49e2
/.$.1/ P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
/.$.11 Belt Al(,n.ent S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
/.$.13 Pl4,,e" C:4te Sen'o!'
i. $u49e2
ii. 'ocation
iii. Manufactu2e2
iv. Model nu49e2
/.$.15 C:4te #n" S+(!t 7o#!"'
i. Min 6late thic5ne33+ 44
ii. 'ine2 4ate2ial
iii. Min line2 thic5ne33+ 44
De'0!(2t(on SR-01 SR-11
Schedule of Technical Data
(Rev.0)
Page-I0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
/.& PORTAL EQUIPMENT
/.&.1 Boo. Ho('t
i. Manufactu2e2
ii. T16e
iii. Model nu49e2
iv. 'ifting height+ 44
v. Rated ca6acit1+ tonne3
vi. #ut6ut to28ue+ $4
vii. D2u4 36eed+ 264
viii. Ro6e 36eed+ 4/3
i:. -i2e 2o6e dia4ete2+ 44
3. -i2e 2o6e con3t2uction
:i. -i2e 2o6e 4ate2ial
:ii. D2u4 6itch dia4ete2+ 44
3iii. D2u4 face 7idth+ 44
:iv. D2u4 4ate2ial
:v. $u49e2 of 2o6e la1e23
:vi. Hea2 2educe2 4anufactu2e
:vii. Hea2 2educe2 4odel nu49e2
:viii.Hea2 2educe2 2atio
:i:. ,ea2ing 4anufactu2e
::. ,ea2ing 4odel nu49e2
33i. ,ea2ing dia4ete2+ 44
33ii. D2u4 92a5e 4anufactu2e2
33iii. D2u4 92a5e 4odel nu49e2
::iv.D2u4 92a5e 3ta2ting to28ue+ $4
::v. $u49e2 of 7i2e 2o6e 3heave3
::vi. Ro6e 3heave 4anufactu2e
::vii. Ro6e 3heave nu49e2
::vii. $u49e2 of 6a2t3 of line 7i2e 2o6e 313.
De'0!(2t(on SR-01 SR-11
Schedule of Technical Data
(Rev.0)
Page-I1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
/.&.$ Boo. Ho('t Moto!
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e+ i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification+ i.e %PAA
vii. Moto2 f2a4e 4ate2ial i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42+
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull 'oad cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
/.&.& Boo. An,le L(.(t S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 37itche3
/.&.* H"!#4l(0 Po%e! Un(t
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of h1d2aulic 6o7e2 unit3
iv. Re3e2voi2 tan5 ca6acit1 0 each+ lite23
v. &ccu4ulato2 3iFe 0each+ lite23
vi. Pu46 4anufactu2e2
vii. Pu46 4odel nu49e2
viii. Pu46 62e33u2e 2ating+ 9a2
i:. &i2 fan/2adiato2 4anufactu2e2
:. &i2 fan/2adiato2 4odel nu49e2
:i. (an 4oto2 6o7e2+ 5-
:ii. (an 4oto2 36eed+ 264
De'0!(2t(on SR-01 SR-11
Schedule of Technical Data
(Rev.0)
Page-I2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
/.&./ H"!#4l(0 Po%e! Un(t Moto!
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
/.&.1 Sto!. T(e"o%n
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
iv. &ctuato2 4anufactu2e2
v. &ctuato2 4odel nu49e2
vi. De3ign 7ind condition+ 54/h2
/.&.3 Po%e! C#7le Reel
i. Manufactu2e2
ii. "atalogue nu49e2
iii. Reel dia4ete2+ 44
iv. Duantit1
v. Po7e2 ca9le length+ 4ete23
vi. Po7e2 ca9le t16e
vii. Po7e2 ca9le 4anufactu2e2
viii. $u49e2 of conducto23 and 2ating
i:. Po7e2 ca9le voltage+ volt3
De'0!(2t(on SR-01 SR-11
/.&.5 Cont!ol C#7le Reel
Schedule of Technical Data
(Rev.0)
Page-I3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. "atalogue nu49e2
iii. Reel dia4ete2+ 44
iv. Duantit1
v. "ont2ol ca9le length+ 4ete23
vi. "ont2ol ca9le t16e
vii. "ont2ol ca9le 4anufactu2e2
viii. $u49e2 of conducto23 and 2ating
i:. "ont2ol ca9le voltage+ volt3
/.&.6 Ele0t!(0#l Roo.
i. SiFe (' : - : )+ 44
ii. %ndoo2 de3ign te46e2atu2e+ deg2ee "
iii. *&" 2ating+ -
/.&.10 Cont!ol Roo.
i. SiFe (' : - : )+ 44
ii. %ndoo2 de3ign te46e2atu2e+ deg2ee "
iii. *&" 2ating+ -
iv. #6e2ating chai2 4anufactu2e2
v. #6e2ating chai2 4odel nu49e2
/.&.11 >#':"o%n ''te.
i. $u49e2 of 7a3hdo7n 3tation3
ii. Dia4ete2 7ate2 6i6e+ 44
iii. ,all valve 4anufactu2e2
iv. ,all valve 4odel nu49e2
v. S13te4 62e33u2e 2ating+ 9a2
De'0!(2t(on SR-01 SR-11
/.* TRAVERSE DRIVE
/.*.1 De'(,n P#!#.ete!'
i. Ma:i4u4 2e6o3itioning 36eed+ 4/3
Schedule of Technical Data
(Rev.0)
Page-I>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. Ma:i4u4 36eed 7hile 3tac5ing+ 4/3
iii. Ma:i4u4 36eed 7hile 3tac5ing+ 4/3
iv. Ma:i4u4 7ind 7hile 2e6o3itioning+ 54/h2
v. Ma:i4u4 7ind 7hile 3tac5ing+ 54/h2
/.*.$ T!#ve!'e T!40+'
i. $u49e2 of gant21 t2uc53
ii. $u49e2 of gant21 7heel3
iii. $u49e2 of gant21 d2iven 7heel3
iv. $u49e2 of t2aile2 7heel3
v. $u49e2 of t2aile2 d2iven 7heel3
vi. Ma:i4u4 7heel loading o6e2ating
vii. Ma:i4u4 7heel loading 3to24 tie-do7n
viii. -heel dia4ete2+ 44
i:. -heel 4ate2ial
:. -heel 4anufactu2e2
:i. -heel 3haft dia4ete2 at hu9+ 44
:ii. -heel 3haft dia4ete2 at 9ea2ing+ 44
:iii. ,ea2ing 4anufactu2e2
:iv. ,ea2ing 4odel nu49e2
:v. $u49e2 of 2ail 37ee63
:vi. Rail 37ee6 4ate2ial
/.*.& T!#ve!'e D!(ve H"!#4l(0 S:o0+ A7'o!7e!'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of h1d2aulic 3hoc5 a93o29e23
iv. St2o5e+ 44
v. Ma: ene2g1 2ating each 6e2 c1cle+ $4
vi. !ffective 7eight+ 5g
vii. Ma: 2ated d2iven 36eed of 3tac5e2+ 4/3
/.*.* T!#ve!'e D!(ve S2ee" Re"40e!
i. Manufactu2e2
ii. Model nu49e2
iii. Reduction 2atio
iv. Mechanical 2ating+ 5-
v. The24al h6 2ating+ 5-
vi. (an o2 othe2 cooling device
vii. Mechanical 3e2vice facto2
De'0!(2t(on SR-01 SR-11
/././ T!#ve!'e D!(ve HS Co42l(n, 8(9 4'e";
i. Manufactu2e2
ii. Model $u49e2
iii. Ma:i4u4 allo7a9le 9o2e+ 44
/./.1 T!#ve!'e D!(ve Moto!
Schedule of Technical Data
(Rev.0)
Page-IA
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. $u49e2 of d2ive 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
/./.3 VFD
i. Manufactu2e2
ii. Model nu49e2
/./.5 T!#ve!'e D!(ve B!e#+'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 92ea53
iv. To28ue 2ating each+ $-4
v. &ctuato2+ identif1
vi. *oltage
vii. Ma:i4u4 2ated 7ind 36eed+ 54/h2
De'0!(2t(on SR-01 SR-11
/./.6 Coll('(on P!event(on P!oA(.(t Sen'o!
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 3en3o2
/./.10 T!#vel L(.(t S%(t0:e'
i. Manufactu2e2
ii. Model $u49e2
iii. $u49e2 of 3en3o2
Schedule of Technical Data
(Rev.0)
Page-IG
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
/./.11 R#(l Cl#.2'
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1
iv. "la46ing 2ating+ $
/./.1$ L47!(0#t(on S'te.
i. Manufactu2e2
ii. Model nu49e2
/.1 CIVIL STRUCTURES
/.1.1 R#(l
i. Manufactu2e2
ii. SiFe
iii. Hauge+ 44
i). Total length 0each+ 4
/.1.$ R#(l T(e'
i. Manufactu2e2
ii. SiFe (' : - : )+ 44
iii. Tie 36acing+ 44
iv. Tie 4ate2ial+ identif1
De'0!(2t(on SR-01 SR-11
/.1.& B#ll#'t
i. Su9-9alla3t 4ate2ial 8uantit1+ tonne3
ii. Su9-9alla3t 4ate2ial 8ualit1/t16e
iii. Su9-9alla3t 4ate2ial thic5ne33+ 44
iv. Su9-9alla3t 4ate2ial 7idth+ 44
v. ,alla3t 4ate2ial 8uantit1+ tonne3
vi. ,alla3t 4ate2ial 8ualit1/t16e
vii. ,alla3t 4ate2ial thic5ne33+ 44
viii. ,alla3t 4ate2ial 7idth+ 44
/.1.* P(le" Fo4n"#t(on'
i. $u49e2/Duantit1 of 6ile3
Schedule of Technical Data
(Rev.0)
Page-II
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. Pile length (no4inal/each)+ 4
iii. Pile ca3ing dia4ete2+ 44
iv. &llo7a9le co462e33ion ca6acit1+ 5$
v. &llo7a9le ten3ion ca6acit1+ 5$
vi. &llo7a9le late2al ca6acit1+ 5$
vii. "onc2ete 3t2ength
/.1./ S:#llo% Fo4n"#t(on'
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
/.1.1 ?!#"e Sl#7
i. "onc2ete 8uantit1+ cu9ic 4ete23
ii. "onc2ete 3t2ength+ MPa
De'0!(2t(on SR-01 SR-11
1.0 TRAVELLIN? TRIPPERS
i. Manufactu2e2
ii. Model nu49e2
iii. SiFe (' : - : )
iv. -eight+ 5g
v. T2ave23e 36eed+ 4/3
vi. T2ave23e di3tance+ 44
vii. #ve2t2avel di3tance+ 44
1.1 D('0:#!,e P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
Schedule of Technical Data
(Rev.0)
Page-I?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vi. ,ea2ing catalog nu49e2
1.$ Ben" P4lle
i. Pulle1 dia4ete2+ 44
ii. Shaft dia4ete2 at hu9+ 44
iii. Shaft dia4ete2 at 9ea2ing+ 44
iv. ,ea2ing cente23+ 44
v. Pulle1 = 3haft 7eight+ 5g
vi. ,ea2ing catalog nu49e2
1.& I"le! Q4#nt(t(e'
i. &d@u3ta9le deg2ee th2oughing idle2
ii. 3A deg2ee t2oughing idle2
iii. Ha2land t2oughing idle2
1.* P!(.#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
1./ Se0on"#! Belt S0!#2e!
i. Manufactu2e2
ii. Model $u49e2
De'0!(2t(on SR-01 SR-11
1.1 P4ll Co!" S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
iv. Total length of 6ull co2d+ 44
1.3 T!#vel L(.(t S%(t0:e'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
1.5 Pl4,,e" C:4te Sen'o!'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 37itche3
1.6 T!#ve!'e "!(ve
Schedule of Technical Data
(Rev.0)
Page-IJ
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Reduce2 4anufactu2e2
ii. Reduce2 4odel nu49e2
iii. Reduce2 2atio
iv. Reduce2 2ating+ 4echanical 5-
v. Reduce2 2ating+ the24al 5-
vi. $u49e2 of d2ive a:el3
)ii. T2ave23e 7heel 4anufactu2e2
viii. T2ave23e 7heel dia4ete2+ 44
i:. T2ave23e 7heel 4ate2ial+ &STM
:. Dualit1 of t2ave23e 7heel3
:i. Rail t16e+ 5g/4
3ii. Rail3+ cli63+ etc. 62ovided+ (1e3/no)
1.10 T!#ve!'e D!(ve Moto!
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
De'0!(2t(on SR-01 SR-11
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
1.11 R#(l Cl#.2
i. Moto2 6o7e2+ 5-
ii. Moto2 voltage+ 5-
iii. Moto2+ 264
iv. Mechani34+ t16e
1.1$ H"!#4l(0 Un(t 8(9 #22l(0#7le;
Schedule of Technical Data
(Rev.0)
Page-?0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Moto2 + 5-
ii. Moto2+ 264
iii. 1d2aulic 6u46 4anufactu2e2
i). 1d2aulic 6u46 4odel nu49e2
v. 1d2aulic 4oto2 4anufactu2e2
vi. 1d2aulic 4oto2 4odel nu49e2
vii. #6e2ating 62e33u2e+ 9a2
viii. #il filt2ation+ 4ic2on3
i:. #il heat e:change2 4anufactu2e2
:. #il heat e:change2 4odel nu49e2
:i. #il heat e:change2 fan 6o7e2+ 5-
:ii. #il heat e:change2 fan voltage+ volt3
:iii. 1d2aulic tan5 3iFe+ lite23
:iv. Sight gage = 4agnetic t2a6 (1e3/no)
1.1& T!#vel S:o0+ A7'o!7e!
i. Manufactu2e2
ii. Model nu49e2
iii. St2o5e+ 44
iv. Ma: ene2g1 6e2 c1cle+ @oule
De'0!(2t(on TT-02 TT-12
1.1* D4't Se#l Belt S'te.
i. ,elt 4anufactu2e2
ii. ,elt 2ating+ 5$/4
iii. ,elt cove2 thic5ne33+ 44
iv. $u49e2 of 3eal 9elt 6ulle13
v. Pulle1 dia4ete2+ 44
vi. Pulle1 3haft dia4ete2+ 44
1.1/ Fe'toon S'te.
i. Manufactu2e2
ii. "atalogue nu49e2
iii. Po7e2 ca9le length+ 4ete23
iv. Po7e2 ca9le t16e
v. Po7e2 ca9le 4anufactu2e2
vi. $u49e2 of conducto23 and 2ating
vii. Po7e2 ca9le voltage+ volt3
viii. "ont2ol ca9le length+ 4ete23
i3. "ont2ol ca9le t16e
:. "ont2ol ca9le 4anufactu2e2
:i. $u49e2 of conducto23 and 2ating
:ii. "ont2ol ca9le voltage+ volt3
:iii. Mounting t2ave23e 9ea4 3iFe
Schedule of Technical Data
(Rev.0)
Page-?1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.11 Ho('t 8#t no!t: en" o9 t!(22e! 0onveo! #!e#;
i. Duantit1 0oon to 44#02
ii. Manufactu2e2 0oon to 44#02
iii. T16e 0oon to 44#02
iv. 4odel nu49e2 0oon to 44#02
v. 'ift height+ 4ete23 0oon to 44#02
vi. Rated ca6acit1+ tonne3 0oon to 44#02
vii. D2ive+ 5- 0oon to 44#02
viii. 'ift 9ea4 3iFe 0oon to 44#02
De'0!(2t(on DC-A1(At TH-A1) DC-B1(At TH-B1)
DC-TL (At Truck
Loading Bins)
3.0 DUST COLLECTORS
i. Manufactu2e2
ii. Model nu49e2
iii. &i2 volu4e+ cu9ic
4ete23 6e2 hou2
iv. (2e8uenc1 of 9ag
cleaning
v. D2aft lo33 th2ough
collecto2
1.1 Colle0t(on 7#,'
i. Mate2ial
ii. 'ength+ 44
iii. Dia4ete2+ 44
iv. Su2face a2ea+ 38ua2e
4ete23
1.$ D4't Colle0to! 9#n
i. Manufactu2e2
ii. Model nu49e2
iii. "a6acit1+ cu9ic 4ete23
6e2 hou2
Schedule of Technical Data
(Rev.0)
Page-?2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. Static 62e33u2e+ 6a3cal3
v. S6eed+ 264
vi. Re8ui2e 4oto2+ 5-
vii. #6e2ating 6o7e2+ 5-
viii. D2ive t16e
i:. %46elle2 4ate2ial+ &STM
nu49e2
1 .& B#, Cle#n(n, F#n
i. Manufactu2e2
ii. Model nu49e2
iii. "a6acit1+ cu9ic 4ete23
6e2 hou2
iv. Static 62e33u2e+ 6a3cal3
v. S6eed+ 264
vi. Re8ui2e 4oto2+ 5-
vii. #6e2ating 6o7e2+ 5-
viii. D2ive t16e
i:. %46elle2 4ate2ial+ &STM
nu49e2
1.* Fee"e! V#lve
i. Manufactu2e2
ii. %nlet and di3cha2ge 3iFe
iii. Mate2ial of con3t2uction
iv. "a6acit1
v. #6e2ating 36eed+ 264
vi. Re8ui2ed 4oto2+ 5-
vii. T16e of d2ive
De'0!(2t(on DC-A1(At TH-A1)
DC-B1(At TH-B1) DC-TL (At Truck
Loading Bins)
1./ D4't Ret4!n Pne4.#t(0
S'te. Blo%e!
%i6 u7ed& %i6 u7ed&
i. Manufactu2e2
ii. "a6acit1+ cu9ic 4ete23
6e2 hou2
iii. Static 62e33u2e+ 6a3cal3
iv. S6eed+ 264
v. Re8ui2e 4oto2+ 5-
vi. #6e2ating 6o7e2+ 5-
vii. D2ive t16e
viii. %46elle2 4ate2ial+ &STM
nu49e2
1.1 D4't Ret4!n D(ve!te!
V#lve
%i6 u7ed&
%i6 u7ed&
i. Manufactu2e2
ii. %nlet and di3cha2ge 3iFe
iii. Mate2ial of con3t2uction
iv. "a6acit1
1.3 D4't Ret4!n C0lone %i6 u7ed& %i6 u7ed&
i. Dualit1
ii. Manufactu2e2
iii. %nlet and di3cha2ge 3iFe
iv. Mate2ial of con3t2uction
v. "a6acit1
Schedule of Technical Data
(Rev.0)
Page-?3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
1.5 Moto! Lo0#t(on
E3(au7
t Fan
E3(au
7t Fan
E3(au7t
Fan
E3(au7
t Fan
E3(au
7t Fan
E3(au7t
Fan
E3(au7
t Fan
E3(au
7t Fan
E3(au7t
Fan
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan
cooled
vi. !nclo3u2e cla33ification i.e
%PAA
vii. Moto2 f2a4e 4ate2ial+ i.e
ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-
42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii. %!" f2a4e 3iFe
:i:. -eight+ 5g
::. igh efficeienc1 de3ign+ i.e
%!2
::i. Moto2 cla33 in3ulation+ i.e
(
::ii. Te46. 2i3e < >0"+ 100;
na4e6late
De'0!(2t(on DC-A1 (At TH-A1) DC-B1 (At TH-B1)
DC-TL (At Truck
Loading Bins)
1.6 Moto! Lo0#t(on
Blo8
er
!i)e
rt
Val)
e
09clo
ne
Val)e
Blo8
er
!i)e
rt
Val)
e
09clo
ne
Val)e
Blo8
er
!i)e
rt
Val)
e
09clo
ne
Val)e
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan
cooled
vi. !nclo3u2e cla33ification
i.e %PAA
vii. Moto2 f2a4e 4ate2ial+
i.e ca3t i2on
viii. Dut1 cla33ification+ i.e
S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-
42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+
i.e %!2
::i. Moto2 cla33 in3ulation+
Schedule of Technical Data
(Rev.0)
Page-?>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i.e (
::ii. Te46. 2i3e < >0"+
100; na4e6late
i. (i2e 62otection
(de3c2i9e)
i. !:6lo3ion vent3+ 38ua2e
4ete23
De'0!(2t(on CUB1
CUB3 CUB
CRA! 1
CUB CRA!
3
5.0 ELECTRICAL EQUIPMENT
5.1 Me"(4. Volt#,e T!#n'9o!.e!' %i6 :e;uired&
%i6 :e;uired& %i6
:e;uired&
%i6 :e;uired&
i. Total "onnected 'oad+ 5-
ii. Duantit1
iii. Manufactu2e2
iv. 'ocation E %ndoo2/#utdoo2
v. T16e+ D/n11 #$&(
vi. .*& 2ating
a. AA deg2ee3 " 2i3e
9. GA deg2ee3 " 2i3e
c. AA deg2ee3 " 2i3e+ 7ith fan3
d. GA deg2ee3 " 2i3e+ 7ith fan3
i. P2i4a21 voltage/,%'+ 5*
ii. P2i4a21 no-load la63
iii. Seconda21 voltage/,%'+ 5*
iv. %46edance+ gua2anteed 4ini4u4+ ;
v. -inding 4ate2ial
vi. T2an3fo24e2 &T"/th2oat connection
a. *
9. '*
vii. Sound level < 1.A 4ete23 f2o4
Schedule of Technical Data
(Rev.0)
Page-?A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
t2an3fo24e2+ d9&
viii. "ooling li8uid
a. T16e
9. "a6acit1+ lite23
i:. (an3 62ovided 0 1e3/no
:. 'ightning a22e3to2+ t16e
:i. 'o33e3
5.1.1 Pe!0ent Lo#" B Co!e/Co22e!
Lo''e'/t!#n'9o!.e!
Cor"#Co$$
"r
Cor"#Co$$
"r
Cor"#Co$$
"r
Cor"#Co$$"
r
a. Ke2o
9. 0.A
c. 0.IA
d. 1
e. 1.12
5.1$ P!(.#! lo#" 7!e#+ "('0onne0t/94'e
#''e.7l
i. Manufactu2e2
ii. *oltage/,%'+ 5*
iii. "ontinuou3 cu22ent inte22u6ting+ a46
iv. Mo4enta21 cu22ent+ 10c1 a314 a46
). (ault clo3e cu22ent+ a314 a46
vi. !lect2ical o6e2ated 1e3/no
De'0!(2t(on CUB1
CUB& CUB
CRANE 1
CUB CRANE
&
vii. (u3e
a. Ma:i4u4+ a46
9. %nte22u6ting+ a46
c. 5*
viii. enclo3u2e t16e
i:. 4ain 9u3 4ate2ial/cu22ent 2ating+ a46
:. ea2th 9u3 4ate2ial/cu22ent 2ating+ a46
:i. t2an3fo24e2 t2an3ition/th2oat connection
:ii. di4en3ion+ ':-:
5.1.& Ne4t!#l E#!t:(n, Re'('to!
i. 4anufactu2e2
ii. 313te4 voltage+ volt3
iii. "u22ent 2ating+ a46 fo2 10 3econd3
iv. T16e of con3t2uction
v. Potential t2an3fo24e2 2ating+ 5*
5.1.* C4!!ent T!#n'9o!.e!
i. Ratio
ii. *oltage
iii. T16e+ accu2ac1
5.1./ &.& +V B4' D40t %*6 :e;uired&
%*6 :e;uired& %*6
:e;uired&
%*6 :e;uired&
i. Manufactu2e2
ii. De3ign voltage+ 5*
iii. Rated cu22ent+ a46e2e3
Schedule of Technical Data
(Rev.0)
Page-?G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iv. Sho2t-ci2cuit 2ating+ 5& fo2 10 c1cle3
). Sho2t-ci2cuit 2ating+ 5& fo2 2 3econd3
vi. ,a3ic %46ul3e 'evel 5*
vii. !a2th 9u3 3iFe+ 44 9olted to 9u3
enclo3u2e
viii. ,u3 enclo3u2e thic5ne33+ 44
i:. T2an3fo24e2 th2oat connection+ t16e
:. 35* "ont2olle2 &33e49l1 connection+
t16e
:i. S6ace heate23 7ith the24o3tat
62ovided+ 1e3/no
5.$ Se0on"#! Un(t S47't#t(on
T!#n'9o!.e!'
5.$.1 Lo% Volt#,e T!#n'9o!.e!'
i. Total "onnected 'oad+ 5-
ii. Manufactu2e2
iii. Duantit1
iv. 'ocation E %ndoo2/#utdoo2
v. T16e+ D/n11 #$&(
vi. .*& 2ating
a. AA deg2ee3 " 2i3e
9. GA deg2ee3 " 2i3e
c. AA deg2ee3 " 2i3e+ 7ith fan3
d. GA deg2ee3 " 2i3e+ 7ith fan3
De'0!(2t(on CUB 1 CUB &
CUB
CRANE 1
CUB CRANE
&
vii. P2i4a21 voltage/,%'+ 5*
viii. P2i4a21 no-load la63
i3. Seconda21 voltage/,%'+ 5*
:. %46edance+ gua2anteed 4ini4u4+ ;
:i. -inding 4ate2ial
:ii. T2an3fo24e2 &T"/th2oat connection
a. *
9. '*
:iii. Sound level < 1.A 4ete23 f2o4
t2an3fo24e2+ d9&
:iv. "ooling li8uid
a. T16e
9. "a6acit1+ lite23
:v. (an3 62ovided 0 1e3/no
:vi. 'ightning a22e3to2+ t16e
:vii. 'o33e3
Pe!0ent Lo#" B Co!e/Co22e!
Lo''e'/t!#n'9o!.e!
Cor"#Co$$
"r
Cor"#Co$$
"r
Cor"#Co$$
"r
Cor"#Co$$"
r
a. Ke2o
<. A0;
c. IA;
d. 100;
Schedule of Technical Data
(Rev.0)
Page-?I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
e. 112;
5.& P!(.#! lo#" 7!e#+ "('0onne0t/4'e
#''e.7l
i. Manufactu2e2
ii. *oltage/,%'+ 5*
iii. "ontinuou3 cu22ent inte22u6ting+ a46
iv. Mo4enta21 cu22ent+ 10c1 a314 a46
v. (ault clo3e cu22ent+a314 a46
vi. !lect2ical o6e2ated 1e3/no
vii. (u3e
a. Ma:i4u4+ a46
9. %nte22u6ting+ a46
c. 5*
viii. !nclo3u2e t16e
i3. Main 9u3 4ate2ial/cu22ent 2ating+ a46
:. !a2th 9u3 4ate2ial/cu22ent 2ating+ a46
:i. T2an3fo24e2 t2an3ition/th2oat
connection
3ii. Di4en3ion+ l:7:h
De'0!(2t(on CUB 1 CUB &
CUB C!#ne
1
CUB C!#ne $
5.* &.& +V Moto! Cont!olle! A''e.7l(e' %*6 :e;uired&
%*6 :e;uired& %*6
:e;uired&
%*6 :e;uired&
5.*.1 &.& +V Moto! Cont!olle! St!40t4!e'
i. Manufactu2e2
ii. !nclo3u2e con3t2uction+ i.e %P>2
iii. (ault 7ith3tand 2ating+ M*&
iv. ,u3 3ho2t ci2cuit 2ating+ 3144et2ical +
5&
v. Main o2iFontal ,u3
a. Rating+ a46
9. Mate2ial
vi. *e2tical ,u3
a. Rating+ a46
9. Mate2ial
)ii. H2ound 9u3
a. Rating+ a46
9. Mate2ial
viii. &2c (ault 62otection+ de3c2i9e
i:. Di4en3ion3+ ':-:+ f2ont
elevation vie7
5.*.$ &.& +V In"40t(on Moto! Cont!olle!'
Schedule of Technical Data
(Rev.0)
Page-??
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. $u49e2 of D#' cont2olle23
ii. "u22ent 2ating+ a46
iii. %nte22u6ting 2ating at 3.3 5*+ M*&
iv. (u3e t16e
v. P2otective 2ela1+ t16e/4odel $o.
5.*.& &.& +V T!#n'9o!.e! Cont!olle!'
i. "u22ent 2ating+ a46
ii. %nte22u6ting 2ating at 3.3 5*+ M*&
iii. (u3e t16e
iv. P2otective 2ela1+ t16e/4odel $o.
5.*.* &.& +V Lo#" B!e#+ T(e S%(t0:
i. "u22ent 2ating+ a46
ii. ,%' 2ating+ 5*
iii. Mo4enta21 cu22ent+ a46
iv. (ault clo3e cu22ent+ a46
De'0!(2t(on CUB 1
CUB 3 CUB
Cran" 1
CUB Cran"
2
5.*./ &.& +V M#(n B!e#+e!'
i. *oltage+ 5*
ii. "u22ent 2ating+ a46
iii. ,%' 2ating+ 5*
iv. "lo3e and latch+ at 2eted 5*+ a46
v. Th2ee 3econd 2ating+ a46
vi. $o4inal 3-6ha3e M*& cla33
vii. Rated inte22u6ting ti4e+ c1cle3
viii. P2otective 2ela1+ t16e/4odel $o.
5./ *1/V Moto! Cont!ol St!40t4!e'
5./.1 *1/ V Moto! Cont!ol St!40t4!e'
i. Manufactu2e2
ii. !nclo3u2e con3t2uction+ i.e. %P>2
iii. %nte2nal 3e6a2ation t16e+ i.e 39
iv. ,u3 3ho2t ci2cuit 2ating+ 3144et2ical+ A
3econd3+ a463
v. Main o2iFontal 9u3
a. Rating+ a46
9. 4ate2ial
c. %3olated/%n3ulated
vi. Main o2iFontal 9u3
d. Rating+ a46
e. 4ate2ial
6. %3olated/%n3ulated
Schedule of Technical Data
(Rev.0)
Page-?J
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
vii. H2ound 9u3
a. o2iFontal 2ating+ a46
9. 4ate2ial
c. %3olated/%n3ulated
d. Mate2ial
viii. &2c (ault P2otection+ de3c2i9e
g. *ented f2ont+ 1e3/no
h. P2e33u2e 2elief 313te4+ de3c2i9e
i. %nte2nal e:hau3t ga3 ventilation+
de3c2i9e
v. Di4en3ion3+ ':-:+ f2ont elevation
vie7
5./.$ *1/V M#(n/T(e B!e#+e!'
i. (2a4e 3iFe/t2i6 2ating+ a463
ii. Sho2t ci2cuit+ 3144et2ical+ a463
De'0!(2t(on CUB 1
CUB 3 CUB
Cran" 1
CUB Cran"
2
iii. Solid 3tate t2i6
a. %n3tantaneou3
9. 'ong ti4e dela1
0. S:o!t t(.e "el#
d. H2ound fault dela1
iv. Mete2ing t16e/4odel $o.
v. Shunt t2i6
5./.& *1/V St#!te!'
i. "o49ination 3ta2te2 3ho2t ci2cuit 2ating+
a46
ii. Du2ing 2ating+ i.e &"3+ t16e 1 62otection
iii. "u22ent t2an3fo24e23+ 3I 5- and la2ge2
5./.& *1/V Fee"e! 7!e#+e!'
i. (eede2 92ea5e2 3ho2t ci2cuit 2ating+
a46
Schedule of Technical Data
(Rev.0)
Page-J0
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on CUB1 CUB& CUB CRANE 1
6.0 CONTROL SYSTEM
6.1 I/O P#nel' C#7(net'
i. %P A2 con3t2uction+ 1e3/no
ii. Model/catalogue nu49e2 o2 t16e
iii. SiFe+ : - : D+ 44
iv. S6a2e 36ace availa9le
v. "a9inet+ 8uantit1
vi. &2chitectu2e 35etch included in 62o6o3alL
/e3/no
6.1 I/O P#nel' H#!"%#!e
i. P2oce33o2 4odel and catalogue nu49e2
a. %n3talled 4e4o21
9. !3ti4ated 36a2e 4e4o21
c. Module 2e6lace4ent unde2 6o7e2+
1e3/no
d. P2oce33o2 c1cle ti4e
e. Mean ti4e 9et7een failu2e
ii. Redundanc1 4odule 4odel and
catalogue no fo2 E
a. P2oce33o2-9u46le33
9. Po7e2 3u66lie3
c. "o44unication3
iii. S6a2e %/# 4odule 36ace availa9le+
nu49e2 of 3lot3
iv. &nalog in6ut >-20 4& 8uantit1+
total/36a2e
v. &nalog in6ut the24ocou6le/RTD+
8uantit1+ total/36a2e
vi. &nalog out6ut 8uantit1+ total/36a2e
vii. Digital in6ut 230*&" 8uantit1+ total/36a2e
viii. Digital out6ut 230*&" 8uantit1+
total/36a2e
i:. &2e D% = D# d21 contact3+ 1e3/no
Schedule of Technical Data
(Rev.0)
Page-J1
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:. %f not+ a2e inte26o3ing 2ela13 3u66liedL
/e3/no
3i. %/# co44unication ca9le to fi9e2
inte2face 4odule
a. Duantit1
9. Model nu49e2
6.& HMI #n" So9t%#!e %*6 A==lica<le& %*6 A==lica<le& %*6 A==lica<le&
i. P2oce33o2 3oft7a2e
a. Manufactu2e2
9. Soft7a2e 6ac5age de3tination
ii. M% g2a6hic3 3oft7a2e
a. Manufactu2e2
9. Soft7a2e 6ac5age de3tination
De'0!(2t(on CUB1 CUB& CUB CRANE 1
iii. M% di36la1
a. Manufactu2e2
9. Model nu49e2
i). M% di36la1+ 8uantit1
). %/# co44unication ca9le to fi9e2
inte2face 4odule
a. Duantit1
9. "atalogue nu49e2
Schedule of Technical Data
(Rev.0)
Page-J2
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on CUB C!#ne $ T!(22e! T!40+ Lo#"o4t
6.0 CONTROL SYSTEM
6.1 I/O P#nel' C#7(net'
i. %P A2 con3t2uction+ 1e3/no
ii. Model/catalogue nu49e2 o2 t16e
iii. SiFe+ : - : D+ 44
iv. S6a2e 36ace availa9le
v. "a9inet+ 8uantit1
vi. &2chitectu2e 35etch included in
62o6o3alL /e3/no
6.1 I/O P#nel' H#!"%#!e
i. P2oce33o2 4odel and catalogue
nu49e2
a. %n3talled 4e4o21
9. !3ti4ated 36a2e 4e4o21
c. Module 2e6lace4ent unde2 6o7e2+
1e3/no
d. P2oce33o2 c1cle ti4e
e. Mean ti4e 9et7een failu2e
ii. Redundanc1 4odule 4odel and
catalogue no fo2 E
a. P2oce33o2-9u46le33
9. Po7e2 3u66lie3
c. "o44unication3
iii. S6a2e %/# 4odule 36ace availa9le+
nu49e2 of 3lot3
iv. &nalog in6ut >-20 4& 8uantit1+
total/36a2e
v. &nalog in6ut the24ocou6le/RTD+
8uantit1+ total/36a2e
vi. &nalog out6ut 8uantit1+ total/36a2e
vii. Digital in6ut 230*&" 8uantit1+
total/36a2e
viii. Digital out6ut 230*&" 8uantit1+
total/36a2e
i:. &2e D% = D# d21 contact3+ 1e3/no
:. %f not+ a2e inte26o3ing 2ela13 3u66liedL
/e3/no
Schedule of Technical Data
(Rev.0)
Page-J3
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
3i. %/# co44unication ca9le to fi9e2
inte2face 4odule
a. Duantit1
9. Model nu49e2
6.& HMI #n" So9t%#!e %*6 A==lica<le& %*6 A==lica<le& %*6 A==lica<le&
i. P2oce33o2 3oft7a2e
a. Manufactu2e2
9. Soft7a2e 6ac5age de3tination
De'0!(2t(on CUB C!#ne $ T!(22e! T!40+ Lo#"o4t
vi. M% di36la1
c. Manufactu2e2
d. Model nu49e2
)ii. M% di36la1+ 8uantit1
)iii. %/# co44unication ca9le to fi9e2
inte2face 4odule
c. Duantit1
d. "atalogue nu49e2
Schedule of Technical Data
(Rev.0)
Page-J>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on
Contro% Roo&
(TH-B3#C3#D3)
Contro%
Roo&
(Ad&in
B%dg-L')
(ndustria%
)ark
Con*"+or
B"%t S+st"&
ii. M% di36la1
a. Manufactu2e2
9. Model nu49e2
iii. M% di36la1+ 8uantit1
i). %/# co44unication ca9le to fi9e2
inte2face 4odule
a. Duantit1
9. "atalogue nu49e2
Schedule of Technical Data
(Rev.0)
Page-JA
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on
1.0 DATA MANA?EMENT C COMISSIONIN?
1.1 D#t# M#n#,e.ent S'te. C A".(n('t!#t(on
B4(l"(n,
i. P2oce33o2
a. Manufactu2e2
9. Soft7a2e 6ac5age de3ignation
c. Me4o21+ H, R&M
d. a2d d2ive3+ 8uantit1/ca6acit1 H,
ii. Data Soft7a2e
a. Manufactu2e2
9. Soft7a2e 6ac5age de3ignation
iii. Data di36la13
a. Manufactu2e2
9. Model nu49e2
c. Data di36la1+ 8uantit1
iv. 'a3e2 di36la1
a. Manufactu2e2
9. Model nu49e2
v. %/# co44unication ca9le to fi9e2 inte2face
4odule
a. Duantit1
9. "atalogue nu49e2
1.$ St#!t-42 #n" Co..(''(on(n, 9o! PLC/HMI/D#t#
''te.'
i. Total hou23
ii. Pe2 die4 2ate 3heet included+ 1e3/no
Schedule of Technical Data
(Rev.0)
Page-JG
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De3c2i6tion
11.0 >ATER SYSTEMS
11.1 FIRE PROTECTION
11.1.1 S422l 2(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.1.$ P4.2 P#0+#,e
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 6u46 6ac5age3
iv. Pu46 2ating+ 43/h2
v. Pu46 2ating+ 9a2
vi. Suction lift+4
vii. Rated ca6acit1 at 3uction lift+ ;
viii. %46elle2 4ate2ial+ &STM nu49e2
i:. "a3ing 4ate2ial+ &STM nu49e2
:. Pu46 36eed+ 264
:i. (lo7 4ete2 4anufactu2e2
:ii. (lo7 4ete2 4odel nu49e2
:iii. Suction 62e33u2e gage 4anufactu2e2
:iv. Suction 62e33u2e gage 4odel nu49e2
:v. Di3cha2ge 62e33u2e gage 4anuf.
:vi. Di3cha2ge 62e33u2e gage 4odel $o.
:vii. Relief valve gage 4anufactu2e2
:viii.Relief valve gage 4odel nu49e2
:i:. "ou6ling 4anufactu2e2
::. "ou6ling 4odel nu49e2
::i. "ou6ling 4a: allo7a9le 9o2e+ 44
Schedule of Technical Data
(Rev.0)
Page-JI
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De3c2i6tion
11.1.& Moto!
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
11.1.* D('0:#!,e P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.1./ P4.2 Roo.
i. -idth < colu4n ".'+ 44
ii. 'ength < colu4n ".'+ 44
iii. eight f2o4 g2ade to 2oof+ 44
iv. (loo2 a2ea+ 38. 4ete23
v. Maintenance doo2 8uantit1
vi. Maintenance doo2 3iFe (7 : h)+ 44
vii. &cce33 doo2 8uantit1
viii. &cce33 doo2 3iFe (7 : h)+ 44
Schedule of Technical Data
(Rev.0)
Page-J?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on
11.1.1 ?!#"e Mo4nte" F(!e H"!#nt'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of fi2e h1d2ant3
i). Mate2ial of con3t2uction+ &STM
v. $u49e2 of outlet connection3 each fi2e h1d2ant
11.1.3 F(!e S2!(n+le!'
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of fi2e 362in5le2
iv. P2e33u2e 2ating+ 9a2
v. (lo7 2ating+ '/4in
vi. $o4inal 36acing+ 44
11.1.5 Ho'e St#t(on
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1 of ho3e 3tation3 62ovided
iv. Reel dia4ete2+ 44
v. o3e length+ 4ete23
vi. o3e dia4ete2+ 44
vii. o3e 2ating+ 9a2
viii. o3e 2ating+ lite23/4inute
i:. Shut off valve 4anufactu2e2
:. Shut off valve 4odel nu49e2
:i. Shut off valve 3iFe+ 44
:ii. Shut off valve 4ate2ial+ &STM
11.1.6 D!#(n v#lve'
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1 of d2ain valve3 62ovided
i). D2ain valve 4ate2ial+ &STM
). D2ain valve 3iFe+ 44
11.$ >ASHDO>N
11.$.1 S422l P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
Schedule of Technical Data
(Rev.0)
Page-JJ
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.$.$ P4.2 P#0+#,e
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 6u46 6ac5age3
iv. Pu46 2ating+ 43/h2
v. Pu46 2ating+ 9a2
vi. Suction lift+4
vii. Rated ca6acit1 at 3uction lift+ ;
viii. %46elle2 4ate2ial+ &STM nu49e2
i:. "a3ing 4ate2ial+ &STM nu49e2
:. Pu46 36eed+ 264
:i. (lo7 4ete2 4anufactu2e2
:ii. (lo7 4ete2 4odel nu49e2
:iii. Suction 62e33u2e gage 4anufactu2e2
:iv. Suction 62e33u2e gage 4odel nu49e2
:v. Di3cha2ge 62e33u2e gage 4anuf.
:vi. Di3cha2ge 62e33u2e gage 4odel nu49e2
:vii. Relief valve gage 4anufactu2e2
:viii.Relief valve gage 4odel nu49e2
:i:. "ou6ling 4anufactu2e2
::. "ou6ling 4odel nu49e2
::i. "ou6ling 4a: allo7a9le 9o2e+ 44
11.$.& Moto!8';
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
De'0!(2t(on
Schedule of Technical Data
(Rev.0)
Page-100
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
11.$.* D('0:#!,e P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.$./ D('t!(74t(on P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
De'0!(2t(on
11.$.1 Ho'e St#t(on
Schedule of Technical Data
(Rev.0)
Page-101
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1 of ho3e 3tation3 62ovided
iv. Reel dia4ete2+ 44
v. o3e length+ 4ete23
vi. o3e dia4ete2+ 44
vii. o3e 2ating+ 9a2
viii. o3e 2ating+ lite23/4inute
i:. Shut off valve 4anufactu2e2
:iv. Shut off valve 4odel nu49e2
:v. Shut off valve 3iFe+ 44
:vi. Shut off valve 4ate2ial+ &STM
11.$.3 D!#(n v#lve'
i. Manufactu2e2
ii. Model nu49e2
iii. Duantit1 of d2ain valve3 62ovided
iv. D2ain valve 4ate2ial+ &STM
:vii. D2ain valve 3iFe+ 44
11.& STOC@PILE SPRAY SYSTEM
11.&.1 S422l 2(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.&.$ P4.2 P#0+#,e
i. Manufactu2e2
ii. Model nu49e2
iii. $u49e2 of 6u46 6ac5age3
iv. Pu46 2ating+ 43/h2
v. Pu46 2ating+ 9a2
vi. Suction lift+ 4
vii. Rated ca6acit1 at 3uction lift+ ;
viii. %46elle2 4ate2ial+ &STM nu49e2
De'0!(2t(on
i:. "a3ing 4ate2ial+ &STM nu49e2
:. Pu46 36eed+ 264
:i. (lo7 4ete2 4anufactu2e2
:ii. (lo7 4ete2 4odel nu49e2
:iii. Suction 62e33u2e gage 4anufactu2e2
Schedule of Technical Data
(Rev.0)
Page-102
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
:iv. Suction 62e33u2e gage 4odel nu49e2
:v. Di3cha2ge 62e33u2e gage 4anuf.
:vi. Di3cha2ge 62e33u2e gage 4odel $o.
:vii. Relief valve gage 4anufactu2e2
:viii.Relief valve gage 4odel nu49e2
:i:. "ou6ling 4anufactu2e2
::. "ou6ling 4odel nu49e2
::i. "ou6ling 4a: allo7a9le 9o2e+ 44
11.&.& Moto!8';
i. $u49e2 of 4oto23
ii. Manufactu2e2
iii. Rating+ 5-
iv. S6eed+ 264
v. !nclo3u2e i.e %">11+ fan cooled
vi. !nclo3u2e cla33ification i.e %PAA
vii. Moto2 f2a4e 4ate2ial+ i.e ca3t i2on
viii. Dut1 cla33ification+ i.e S1
i:. %!" de3ign to28ue+ i.e $
:. Sta2ting to28ue+ ;
:i. Pull-u6 to28ue+ ;
:ii. ,2ea5do7n to28ue+ ;
:iii. $u49e2 of 9ea2ing3
:iv. -.2 at out6ut 3haft+ 5g-42
:v. "old 3ta2t ti4e+ 3econd3
:vi. ot 3ta2t ti4e+ 3econd3
:vii. (ull load cu22ent+ a463
:viii.%!" f2a4e 3iFe
:i:. -eight+ 5g
33. igh efficienc1 de3ign+ i.e %!2
::i. Moto2 cla33 in3ulation+ i.e (
::ii. Te46. 2i3e < >0"+ 100; na4e6late
11.&.* D('0:#!,e P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
:. D2ain valve 4anufactu2e2
De'0!(2t(on
:i. D2ain valve 4odel nu49e2
:ii. D2ain valve 3iFe+ 44
:iii. D2ain valve 4ate2ial+ &STM
11.&./ I!!(,#t(on S2!# ?4n
i. Manufactu2e2
ii. Model nu49e2
Schedule of Technical Data
(Rev.0)
Page-103
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
iii. $u49e2 of i22igation 362a1 gun3
iv. $o4inal 36acing+ 4
v. (lo7 2ating+ 43/h2
vi. P2e33u2e 2ating+ 9a2
vii. S62a1 angle+ deg2ee3
viii. S62a1 di3tance3 7/di3cha2ge 34 a9ove g2ade+
4
i:. (lo7 cont2ol valve 4anufactu2e2
:. (lo7 cont2ol valve 4odel nu49e2
11.* >ATER COLLECTION SUMPS
11.*.1 S4.2 P4.2
i. Manufactu2e2
ii. Model nu49e2
iii. Pu46 2ating+ 43/h2
iv. Pu46 2ating+ 9a2
v. %46elle2 4ate2ial+ &STM nu49e2
vi. Moto2 ho23e6o7e2
vii. Moto2 264
11.*.$ D('0:#!,e P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 63i
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
De'0!(2t(on
11.*.& Det St!e#./#,(t#to! 2(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 63i
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
Schedule of Technical Data
(Rev.0)
Page-10>
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
De'0!(2t(on
1$.0 SERVICE AIR SYSTEM
1$.1 Co.2!e''o!/T#n+
i. Duantit1
ii. 'ocation3
iii. Manufactu2e2
iv. Model nu49e2
). Moto2 ho23e6o7e2
vi. Rated ca6acit1+ 43/h2
vii. P2e33u2e 2ating+ 9a2
viii. Tan5 3iFe+ lite23
Schedule of Technical Data
(Rev.0)
Page-10A
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i:. Ma:i4u4 de3ign dut1 c1cle+ ;
1$.1 V#lve'
i. Duantit1
ii. 'ocation3
iii. Manufactu2e2
iv. Model nu49e2
v. Rating+ 9a2
vi. Mate2ial+ &STM
1$.& S'te. A(! S422l P(2e
i. Pi6e dia4ete2+ 44
ii. Pi6e 3chedule nu49e2
iii. Total length of 6i6e+ 4ete23
iv. Pi6e 4ate2ial+ &STM nu49e2
v. Pi6e coating+ 36ecif1
vi. P2e33u2e 2ating+ 9a2
vii. ange2/3u66o2t3 62ovided (1e3/no)
viii. ange2 3u66o2t 4ate2ial+ &STM
i:. ange2 3u66o2t coating+ 36ecif1
De'0!(2t(on
1&.0 SITE >OR@
1&.1 SITE ?RADIN?
1&.1.1 Sto0+2(le A!e#' 8E#'t #n" >e't;
i. (ini3hed g2ade elevation+ 4
ii. &662o:i4ate 4a: cut height+ 4
iii. &662o:i4ate 4a: fill height+ 4
iv. Pe2centage of 2oc5+ ;
v. $u49e2 of ne7 9o2ing3 that 7ill 9e thi3 a2ea
vi. &ve2age de6th of ne7 9o2ing3 that 7ill 9e thi3
a2ea
vii. "lea2ing and g2u99ing+ 38ua2e 4ete23
viii. To63oil 3t2i66ing and 3toc56iling+ 43
Schedule of Technical Data
(Rev.0)
Page-10G
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
i:. "ut/fill/"o46act 3oil+ 43
:. "ut and 3toc56ile e:ce33+ 43
1&.1.$ No!t: Settl(n, Pon"
i. (ini3hed 9a3e elevation+ 4
ii. Pe2i4ete2 elevation+ 4
iii. %nlet elevation+ 4
iv. #utlet elevation+ 4
v. &662o:i4ate 4a: cut height+ 4
vi. &662o:i4ate 4a: fill height+ 4
vii. Pe2centage of 2oc5+ ;
viii. "lea2ing and g2u99ing+ 38ua2e 4ete23
i:. To63oil 3t2i66ing and 3toc56iling+ 43
:. "ut/fill/"o46act 3oil+ 43
:i. "ut and 3toc56ile e:ce33+ 43
:ii. Stoc56ile d2ainage ditch+ ' : - : + 4
1&.1.& So4t: Settl(n, Pon"
i. (ini3hed 9a3e elevation+ 4
ii. Pe2i4ete2 elevation+ 4
iii. %nlet elevation+ 4
iv. #utlet elevation+ 4
v. &662o:i4ate 4a: cut height+ 4
vi. &662o:i4ate 4a: fill height+ 4
vii. Pe2centage of 2oc5+ ;
viii. "lea2ing and g2u99ing+ 38ua2e 4ete23
i:. To63oil 3t2i66ing and 3toc56iling+ 43
:. "ut/fill/"o46act 3oil+ 43
:i. "ut and 3toc56ile e:ce33+ 43
:ii. Stoc56ile d2ainage ditch+ ' : - : + 4
De'0!(2t(on
1&.1.* Conveo! Co!!("o!
i. (ini3hed 9a3e elevation+ 4
ii. &662o:i4ate 4a: cut height+ 4
iii. &662o:i4ate 4a: fill height+ 4
iv. Pe2centage of 2oc5+ ;
v. $u49e2 of ne7 9o2ing3 that 7ill 9e thi3 a2ea
vi. &ve2age de6th of ne7 9o2ing3 that 7ill 9e thi3
a2ea
vii. "lea2ing and g2u99ing+ 38ua2e 4ete23
viii. To63oil 3t2i66ing and 3toc56iling+ 43
i:. "ut/fill/"o46act 3oil+ 43
:. "ut and 3toc56ile e:ce33+ 43
:i. Stoc56ile d2ainage ditch+ ' : - : + 4
1&.1./ T!40+ Lo#"(n, Te!.(n#l
i. (ini3hed 9a3e elevation+ 4
Schedule of Technical Data
(Rev.0)
Page-10I
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
ii. (ini3hed g2ade a2ea+ 38ua2e 4ete23
iii. &662o:i4ate 4a: cut height+ 4
iv. &662o:i4ate 4a: fill height+ 4
v. Pe2centage of 2oc5+ ;
vi. $u49e2 of ne7 9o2ing3 that 7ill 9e thi3 a2ea
vii. &ve2age de6th of ne7 9o2ing3 that 7ill 9e thi3
a2ea
viii. "lea2ing and g2u99ing+ 38ua2e 4ete23
i:. To63oil 3t2i66ing and 3toc56iling+ 43
:. "ut/fill/"o46act 3oil+ 43
:i. "ut and 3toc56ile e:ce33+ 43
:ii. Pe2i4ete2 d2ainage ditch+ ' : - : + 4
1&.$ SURFACE FINISHES
1&.$.1 Sto0+2(le P#"
i. Mate2ial 0 identif1 t16e/8ualit1
ii. Thic5ne33 of 6ad+ 44
iii. *olu4e of 4ate2ial+ cu9ic 4ete23
iv. "o46act den3it1+ 5g/43
v. (ini3hed elevation of 6ad+ 4
1&.$.$ Settl(n, Pon" L(ne!'
i. Mate2ial 0 identif1 t16e/8ualit1
ii. Thic5ne33 of 6ad+ 44
iii. *olu4e of 4ate2ial+ cu9ic 4ete23
i). "o46acted den3it1+ 5g/43
v. (ini3hed elevation of 6ad+ 4
)i. -idth of cleanout acce33 lane+ 4
vii. Slo6e of cleanout acce33 lane+ deg2ee3
De'0!(2t(on
1&.$.& Conveo! Co!!("o!
i. Su9-9a3e 4ate2ial 8uantit1+ tonne3
ii. Su9-9a3e 4ate2ial 8ualit1+ t16e
iii. ,a3e 4ate2ial 8uantit1+ tonne3
iv. ,a3e 4ate2ial 8ualit1+ t16e
v. Su9-9a3e 4ate2ial 8uantit1+ tonne3
vi. Su9-9a3e 4ate2ial 8ualit1+ t16e
vii. ,a3e 4ate2ial 8uantit1+ tonne3
viii. ,a3e 4ate2ial 8ualit1+ t16e
Schedule of Technical Data
(Rev.0)
Page-10?
SPMU/10/2013
T! "#$STRU"T%#$ &$D "#MP'!T%#$ #( T! PR#P#S!D S&M&'&)U P#RT D!*!'#PM!$T PR#)!"T &T
S&M&'&)U+ ,%$TU'U+ S&R&-&.+ M&'&/S%& 0 "onve1o2 S13te4 (acilitie3 Pac5age (o2 Pha3e 1 -o253
SCHEDULEOFTECHNICALDATA
Tende2e2 4u3t full1 co46lete thi3 3chedule and 3u66l1 3u66le4enta21 catalogue3+ d2a7ing3 and othe2 detailed info24ation a3 2e8ue3ted 91 the
%n3t2uction to Tende2e23.
CONVEYOR BELT FACILITIES
1*.0 TESTIN? C COMMISSIONIN? FORMAT
EA' "e'0!(7e" (n Se0t(on 1) Ite. 1.*/F

You might also like