DATACENTER MIGRATION

I. PRE SHIFTING:
1. Complete full backup.
2. Confirm with vendor for timing.
3. Shutdown Server.
4. PDU Mounting
5. Switch Mounting
II. SHIFTING
1. Switch Mounting.
2. Disconnect Parsons Router.
3. Disconnect Parsons Firewall.
4. Disconnect Egis Firewall.
5. Disconnect Systra Firewall.
6. Move ITC Switch.
7. Move Server & Rail.
a. NIC1.
b. NIC2.
c. ID Rack.
8. Move Autoloader & Rail.
a. LAN Port.
9. Check WAP Connections.
III. POST SHIFTING
1. Check WAP.
2. Check EGIS Network.
3. Check SYSTRA Network.
4. Check Parsons Intranet.
5. Check Internet.
6. Check Printing from all networks.
7. Check Scan to Email
8. Check PWEB.
9. Check IP Phones.
10. Check Printer installed at Managers offices.
IV. TOOLS REQUIRED
1. Star Screw driver
2. Flat Screw driver
3. Hex keys
4. Cable tie
5. cage nuts
6. Mounting Rails
7. Power cables for PDU and other equipment.