DOCUMENT PROCEDURE
CONTENTS
INTRODUCTION
GENERAL FAT SCHEDULE
1.0
1.1
1.2
1.3
1.4
2.0
2.1
I.INTRODUCTION
The Factory Acceptance Test (FAT) is provided in accordance with the . There
will be a Pre FAT where ** will check all the items are in order and record the
same. After finding everything in order during Pre FAT ** shall give FAT call
with signed Pre FAT document.
GENERAL:
1. The Factory Acceptance Test is carried out in order to demonstrate that
the system and its components function properly, that manufacturing,
assembly, configuration and software generation are done correctly
and that system performance is in compliance with the approved
functional specifications and relevant documents.
2. Daily progress meeting will be held to check progress problems etc.
3. The documentation for F.A.T. will consist of relevant functional
specifications and other approved documents.
F.A.T. SCHEDULE
The Electrical Engineer is responsible for the overall execution of the F.A.T.
and will be the prime interface between the client inspectors and
------------------------- Engineers from the beginning to the completion of the
F.A.T.
1
2
3
4
5
Date of F.A.T.
Place
Test Conductor
Schedule of F.A.T.
Test Witnessed by
1.0
1.1
OBJECTIV
E
REFERENC
E
PROCEDU
RE
CRIETERIA
Test Certificates for all above components are available
FOR
and the components confirm to Rockwell Automation's
COMPLIA
Quality Standards.
NCE
COMMENT
S
1.2
OBJECTIV
E
REFERENC
E
PROCEDU
RE
CRIETERIA
FOR
The quantity and location of the I/O Modules, I/O Racks
COMPLIA
are in accordance with the system configuration.
NCE
COMMENT
S
1.3
OBJECTIV
E
PROCEDU
RE
1.4
COMMUNICATION
OUTLINE
OBJECTIV
E
PROCEDU
RE
CRIETERIA
COMMENT
S
2.0
2.1
PROCEDU
RE
CRIETERIA
COMMENT
S
3.0
3.1
OUTLINE
OBJECTIV
E
REFERENC
Approved panel drawings
E
PROCEDU
RE
CRIETERIA
FOR
Panel should confirm to that defined in panel drawings.
COMPLIA
NCE
COMMENT
S
3.2
OBJECTIV
E
REFERENC
Panel drawings
E
PROCEDU
RE
3.3
PANEL WIRING
OUTLINE
OBJECTIV
E
REFERENC
E
PROCEDU
RE
CRIETERIA
COMMENT
S
3.4
OBJECTIV
E
REFERENC
E
1. Panel GA Drawing
2. Panel Wiring Drawing
PROCEDU
RE
CRIETERIA
COMMENT
S
3.5
OBJECTIV
E
PROCEDU
RE