You are on page 1of 2

s

Qty Unit Rate Amount Qty Unit Rate Amount Qty Unit Rate Amount
1 6.7
Earthworkinexcavationinfoundation,trenches,of
undergroundstructures,sullagedrainsetc.and
othersimilerworksinordinarysoilincluding
dressingofbotomandsides,tocorrectlevelsand
templets,cuttingoftreesandbushes,dewateringof
rainwater,diversionoftraffic,fixingand
mainantencesofcautionboards,andnight
siganals,crossingovertrenchesforaccessto
houses,watching,stakingofexcavatedsoil,clearfrom
theedgeofexcavation,andsubsequentfilling(For
SluiceValveChambers,AirreleasevalveChambers
andScourValveChambers)
8
cumper
Valve
44 350 14
cumper
Valve
44 15350 14
cumper
Valve
44 631
2
ProvidingandFixingCIDoubleFlangedSluiceValve
PN1.6MarkedwithIS:14846includingnuts&bolts
markedwithIS:1363.RubberSheetmarkedwith
IS:638etc.Carriageloading,unloading,stacking,
handling,Rehandlingetc.completeinallrespectto
thesatisfactionofEngineerinCharge(Makes
AARKO,Venus,Leaderetc.)
1 Nos. 267644 267644
4 SupplyofSluiceValve 1 Nos. 551680 551680 935190 935190
5 Storage,LocalHandling,Transit&Insuranceat3% 16550 16550 28056 28056
6 Add10%Contractorprofit 55168 55168 93519 93519
7 VATAT12.5%&CSTat2% 79994 79994 135603 135603
8 28.1 LabourchargesforfixingofSluiceValves 188 188 235 235
8
AddcostofNuts&Boltsformakingconnectionof
theSluiceValveswiththemainpipeline.
1 5517 5517 9352 9352
9 Add300%CeilingPremiumon8 564 564 705 705
10 TotalCost 709661 709661 1202659 1202659
11
Constructionof(ValveChamber)masonrychambers
of1mx1mx2mforsluicevalves,withCIsurface
cover
1 Nos. 20929 20929 0 0 0 0 0 0 0 0
12
Constructionof(ValveChamber)masonrychambers
of1.6mx1.6mx2.2mforsluicevalves,withCI
surfacecover
0 Nos. 0 0 1 0 38649 38649 0 0 0 0
S.No.
Constructionof(ValveChamber)masonrychambers
of1.6mx1.6mx2.7mforsluicevalves,withCI
surfacecover
0 Nos. 0 0 0 0 0 0 1 0 44342 44342
Total 288923 748310 1247001
Qty Unit Rate Amount Qty Unit Rate Amount Qty Unit Rate Amount
ProvidingandfixingkineticairreleaseValvesincludingChamberwithCover
S.No. HSR Description
i/d150mm i/d200 i/d250mm
Design,Construction&Commissioningof12MGDWaterSupplySchemeConsistingofMainBoostingStation,Providing&StringingofDIRaisingMainsFromKubulpurKhadarWorksToSectors7589,FaridabadonEPCBasis(Withoperation
andMaintenanceFor5Yearsfromthedateofcommissioningaftercompletionofdefectliabilityperiodof1yearandallotherworkscontingentthereto)
ContractScheduleofRates
ProvidingandfixingD/FSluiceValvesincludingChamberwithCover
i/d800mm i/d1000mm
S.No. HSR Description
i/d500mm
1
Earthworkinexcavationinfoundation,trenches,of
undergroundstructures,sullagedrainsetc.and
othersimilerworksinordinarysoilincluding
dressingofbotomandsides,tocorrectlevelsand
templets,cuttingoftreesandbushes,dewateringof
rainwater,diversionoftraffic,fixingand
mainantencesofcautionboards,andnight
siganals,crossingovertrenchesforaccessto
houses,watching,stakingofexcavatedsoil,clearfrom
theedgeofexcavation,andsubsequentfilling(For
SluiceValveChambers,AirreleasevalveChambers
andScourValveChambers)
3.92
cumper
Valve
43.804 171.71168 10
cumper
Valve
43.804 438.04 10
cumper
Valve
43.804 438.04
2 28.13(A)
ProvidingandfixingofCIkineticairvalvesratingas
perrelevantISspecificationtotheentiresatisfaction
oftheEngineerInChargeincludingcarriage,
loading,unloading,stacking,handling,rehandling
etc.drilling,tapping,screwinginvalveconnections
completeinallrespects
1 Nos. 8265.4 8265.4 1 Nos. 14593.7 14593.7 1 Nos. 22802.6563 22802.6563
3 NS
Constructionof(ValveChamber)masonrychambers
of1mx1mx2mforsluicevalves,withCIsurface
cover
1 Nos. 20928.91885 20928.9189 1 Nos. 20928.91885 20928.91885 1 Nos. 20928.9189 20928.9189
Total 29366.03053 35960.65885 44169.6
Description
Qty Unit Rate Amount Qty Unit Rate Amount
1
Earthworkinexcavationinfoundation,trenches,of
undergroundstructures,sullagedrainsetc.and
othersimilerworksinordinarysoilincluding
dressingofbotomandsides,tocorrectlevelsand
templets,cuttingoftreesandbushes,dewateringof
rainwater,diversionoftraffic,fixingand
mainantencesofcautionboards,andnight
siganals,crossingovertrenchesforaccessto
houses,watching,stakingofexcavatedsoil,clearfrom
theedgeofexcavation,andsubsequentfilling(For
SluiceValveChambers,AirreleasevalveChambers
andScourValveChambers)
8
cumper
Valve
43.804 350.432 10
cumper
Valve
43.804 438
2
ProvidingandfixingofCIkineticairvalvesratingas
perrelevantISspecificationtotheentiresatisfaction
oftheEngineerInChargeincludingcarriage,
loading,unloading,stacking,handling,rehandling
etc.drilling,tapping,screwinginvalveconnections
completeinallrespects
1 Nos. 39780 39780 1 Nos. 164480 164480
3
Constructionof(ValveChamber)masonrychambers
of1mx1mx2mforsluicevalves,withCIsurface
cover
1 Nos. 20928.91885 20928.9189 1 Nos. 20928.91885 20928.91885
ProvidingandfixingScourValvesincludingChamberwithCover
Total 61059 185847
S.No. HSR
i/d200mm i/d400

You might also like