GOVERNMENT OF THE REPUBLIC OF THE UNION OF MYANMAR

MINISTRY OF CONSTRUCTION
PUBLIC WORKS
ANALYSIS OF RATES
FOR
AIRFIELD WORKS
SECOND EDITION
JUNE 2013
-
Sr.
\lo.
-
1
2
3
-
I Standard Data for Working Out Rates
Particulars of Materials and Labour
Earth work
See to Road Work
Construction of subgrade for l m
(compacted) thickness using selected
soil, adjusting moisture content to obtain
OMC +I- 1% and specified density for
1000 sqm.
Compaction shall be done in layers.
Material
Transported soil
Labour
Head worker
Worker
Operator
Driver
Operator helper & Driver helper
Machine
Grader GD-500
Compactor Cat 8 15
Water bowzer(5400 litre) (within lkm)
Water pump
Three wheels roller
P.0.L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Site cleaning before construction of
concrete sub-base course for 1000 sqm.
Labour
Head worker
Worker
T Unit Quc
Unit
cum
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
$9 of Items of Work . . .
Quantity
:ontd
Remarks
-
Sr.
\lo.
-
4
5
Standard Data for Working Out Rates
Particular of Materials and Labours
Laying of 50mm thick sand filling before
construction of concrete sub-base course
including watering and compacting with
roller for 1000 sqm.
Material
Sand
Labour
Head worker
Worker
Operator
Driver
Operator helper & Driver helper
Machine
Three wheels roller
Water bowzer (5400 litre) (within lkrn)
Water pump
P.0.L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Concrete mixing by batching plant,
operating works all machines and
materials (cement, sand, crushed rock
and water)according to the mix design
and batching plant cleaning,operating
work completed for 100 cum.
Concrete mixed
2
r Unit Qut
Unit
cum
vlan-Day
Man-Day
vlan-Day
uian-Day
Man-Day
cum
!ity of Items of Work . .
Quantity
lontd
Remarks
Material
Cement
Fine aggregate (sand)
Coarse aggregate (crushed rock or crushed
stone)
Water
Standard Data for Working Out Rates Per Unit Quantity of I t em of Work ..,
Labour
Head worker
Worker
Operator
Driver
Operator helper & Driver helper
Particular of Materials and Labours
Machine
Concrete batching plant (80 cumlhr)
Generator (3 50 KVA)
Loader (medium)
Air compressor (390 CFM )
Cement pump
Agitator truck(6 cum) (within 1 km)
Water pump
Water bowzer (5400 litre) (within lkm)
P.0.L for o~eration
Diesel
Engine oil
Gear oil
Hydraulic oil
Unit
Grease
Quantity
Concrete paving work < 300 mm
-
thick layer. By machine including
cleaning, alignment and level checking
each station, fixing temporary timber
formworks, concrete leveling work for
sag portion,surface dressing with cotton
clothes and vibrating where necessary
for 1000 sqm.
kg
cum
cum
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Remarks
!
According to mix
design
Standard Data for work in^ Out Rates
sr' I
Particular of Materials and Labours
Concrete
Jungle wood (scant) (three times used)
Jungle wood (plank) (three times used)
Wire nail
Cotton clothes
No.
Labour
Mason
Carpenter
Head worker
Worker
Driver
Operator helper & Driver helper
Material
Machine
Concrete paver (GP 2600)
Texturing machine
Loader (medium)
Water bowzer (5400 litre) (within lkrn)
Water pump
P.0.L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Concrete paving work 2 300 mm thick
1ayer.B~ machine including cleaning,
alignment and level checking each
station, fixing temporary timber
formworks, concrete leveling work for
sag portion, surface dressing with cotton
clothes and vibrating where necessary
for 1000 sqm.
w
Material
Jungle wood (scant)(three times used)
Jungle wood @lank)(three times used)
Wire nail
Cotton clothes
-
Sr.
No.
-
8
Standard Data for Working Out Rates
Particular of Materials and Labours
Labour
Mason
Carpenter
Head worker
Worker
Operator
Driver
Operator helper & Driver helper
Machine
Concrete paver (GP 2600)
Texturing machine
Loader (medium)
Water bowzer (5400 litre) (within lkm)
Water pump
P.0.L for o~eration
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Texturing work and curing compound
spraying work by texturing machine for
1000 sqm.
Material
Curing compound
Labour
Worker
Operator
Helper
Machine
Texturing machine
5
er Unit QUI
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
fity of Items of Work ..
Quantity
:ontd
Remarks
Sr.
No.
9
10
Standard Data for Working Out Rates
Particular of Materials and Labours
P.0.L for operation
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Cutting work for cement concrete by
machine. Painting the line and cleaning
for 100 m.
Material
Cutter disc
Paint
Brush
Labour
Worker
Operator
Driver
Operator helper & Driver helper
Machine
Concrete cutter
Water bowzer (5400 litre) (within lkm)
Water pump
P.0.L for operation
M.S
Diesel
Laying of plastic sheet between sub-base
layer and base layer for 1000 sqm.'
Material
Plastic sheet
Per Unit Quantity
Unit
litre
litre
litre
litre
kg
disc
L. S
L.S
Man-Day
Man-Day
Man-Day
Man-Day
hr
hr
hr
litre
litre
sqm
of I t em of Work ....
Quantity
9.7
0.1
0.1
0.1
0.1
contd
Remarks
Sr.
No.
11
12
Standard Data for Working Out Rates
Particular of Materials and Labours
Labour
Head worker
Worker
15 mm groove, 20 mm depth groove
cutting by milling machine, cleaning by
air and water jet, caulking and filling
joint sealant thoroughly for 100 m.
Material
Joint sealant
Propane gas
String
Milling disc
Labour
Worker
Operator
Helper
Machine
Milling machine
Air compressor
P.0.L for operation
M.S
Diesel
Engine oil
Gear oil
Hydraulic oil
Grease
Construction of flexible Pavement
Construction of sub-base course
See to Road Work
Per Unit Quantity
Unit
Man-Day
Man-Day
kg
L.S
m
disc
Man-Day
Man-Day
Man-Day
hr
hr
litre
litre
litre
litre
litre
kg
of I t e m of Work ....
Quantity
contd
Remarks