Professional Documents
Culture Documents
REFERENCES
DOCUMENT N
DESCRIPTION
DOCUMENTATION APPROVAL
APPROVED WITH OBSERVATIONS,
CORRECT & ISSUE.
APPROVED.
APPROVED FOR CONSTRUCTION
EXCEPT OBSERVATIONS
CORRECT & ISSUE.
APPROVED FOR CONSTRUCTION.
REJECTED
CORRECT & ISSUE.
NAME
SIGN
DATE
MECHANIC.
PIPING
ELECTRICAL
INSTRUM.
CIVIL
PROCESS
ENG.
COORD.
ENG. MGR.
RECEIVED:
REMITTED:
APPROVAL BY TOTAL AUSTRAL DOES NOT DIMINISH ANY CONTRACTOR/VENDOR RESPONSABILITY ON ITS CONTENT.
B FOR APPROVAL
A FOR APPROVAL
RE
DESCRIPTION
V
GZ
GZ
BY
OS
PR
OS
PR
CHECK APPR.
23/01/04
04/11/03
DATE
Scale :
s/e
Contract / P.O.N : GP/SR/21562/03
Call Out N
File : 247854327.doc
DOC N
MP COMPRESSION
LV CAPACITOR BANKS
SP-SRC-21562-03-E-033
Rev.: B
Page 2 of 11
TECHNICAL SPECIFICATION
Date: 01/03/04
SP-SRC-21562-03-E-
of
10
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 3 of 11
Date: 01/03/04
Contents
1.
2.
3.
4.
5.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
Scope...............................................................................................................................3
Reference documents....................................................................................................3
Standards and specifications.......................................................................................3
Site conditions................................................................................................................3
Design characteristics...................................................................................................4
General.................................................................................................................................... 4
Protection system.................................................................................................................... 4
Control devices........................................................................................................................ 4
Control and signalling system..................................................................................................5
Capacitor banks....................................................................................................................... 5
Harmonic filter......................................................................................................................... 6
Electrical Panel Characteristics...............................................................................................6
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 4 of 11
Date: 01/03/04
1. Scope
The scope of this document is to establish minimum requirements to be fulfilled by LV Capacitors
Bank (52-LVCB-20A and 52-LVCB-20B) to be supplied for the MP Compression Project at San
Roque Plant, Neuqun, Argentina.
2. Reference documents
Reference
Title
DR-SRC-21562-03-E-002
BD-SRC-21562-03-E-015
Title
IEC 60289
Reactors
IEC 60439
IEC 60664
IEC 60831
IEC 61000
IEC 61010
GS ELE 001
GS ELE 135
4. Site conditions
Temperature:
Normal: +25C
Minimum: -15C
Maximum: +45C
Relative humidity: 60%
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 5 of 11
Date: 01/03/04
5. Design characteristics
5.1 General
This equipment shall monitor the power system status and acts on the connection or
disconnection of capacitors in order to reach the preset target power factor (cos ).
The equipment will consist of two (2) 400V, 50Hz automatic power correction banks, each one
with 12 steps. Reactive power will be defined in detail engineering. One bank will be connected to
bus bar A and the other one will be connected to bus bar B in 52-LVS-20, at MP Compression
Technical Room (see Appendix 1)
Basically, the equipment shall be composed of:
Protection system
Operation devices
Control and signalization system
Capacitor banks
Harmonic filters
5.2 Protection system
A disconnection switch shall be installed in the incoming feeder.
The equipment shall incorporate short circuit protection, that shall consist of individual highrupturing-capacity fuses (NH type). Fuse rating shall be chosen according to reactive power and
service voltage, and shall not be less than 120% of capacitor nominal current.
Protection equipment shall be capable of support in-rush current generated by capacitors during
its connection. However, this peak current shall be limited to allowable values using a limiting
ferromagnetic inductance, which presents a high impedance at high frequencies.
5.3 Control devices
To control the automatic connection and disconnection of capacitors, power contactors shall be
used. Capacitor rating shall be chosen according to reactive power and service voltage, and shall
not be less than 120% of capacitor nominal current.
Control equipment shall be capable of resist limited in-rush current. Pre-insertion resistors shall
be installed in contactors in order to limit in-rush current during the connection of capacitors.
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 6 of 11
Date: 01/03/04
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 7 of 11
Date: 01/03/04
In case capacitors cannot be connected directly to the distribution network due to presence of
harmonic currents or the possibility of resonance between them and certain inductive loads, it
should be necessary to add reactances, either to match with capacitors and filter the disturbances
or to obtain an adequate rejection for the harmonic currents.
A detailed harmonic study shall be carried out for MP & LP compression plants in order to
determine the necessity of an harmonic filter system. This detailed harmonic study shall include
variable frequency drivers supplied by turbocompressors vendor, power control devices for
heaters, etc.
This study shall determine the type of filter to be used and the arrangement of capacitors and
inductors needed to reduce harmonic contents. Filter shall be of the active or passive type,
depending on the kind and magnitude of harmonic currents to be reduced.
5.7 Electrical Panel Characteristics
Low Voltage Capacitor Bank (LVCB) shall be constructed according to GS ELE 135: Low Voltage
Switchgear. It shall not be of the withdrawable type.
LVCB should be indoors type and will include the whole supply of capacitor banks, power
equipment, control panel, automatic control devices, power protection components, electric
protection, relays and devices, command, signalling, alarming, measurement and all other control
elements.
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 8 of 11
Date: 01/03/04
Functional schemes
Fabrication schedule
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 9 of 11
Date: 01/03/04
8. Warranty
SUPPLIER shall warrant goods of its manufacture as being free of defective material and faulty
workmanship. Warranted goods will be returned to SUPPLIER's during the period of coverage.
Manufacturer shall repair or replace without charge those items it finds defective.
DOC N
SP-SRC-21562-03-E-033
Rev.: B
Page 10 of 11
Date: 01/03/04
UNIT
REQUIRED
kVAr
V
Hz
325
400
50
12
kVAr
Automatic
and manual
Qty.
Qty.
Qty.
CAPACITORS
IEC 60831-1
IEC 60831-2
steel case
Standards
Tank material
metallized,
self-healing
polypropylene
V
V
kVAr
Hz
A
C
W/kVAr
F
+/-%
%
%
yes
yes
440
50
40
0.7
0/+10
30
50
Standards
Rated current
Rated voltage
Rated frequency
Auxiliary power supply voltage
Working temperature
Precision
A
V
Hz
V
C
%
50
0-50
2.5
OFFERE
D
OBSERV.
DOC N
UNIT
REQUIRED
Qty
12
0.8/1.0
yes
yes
yes
yes
yes
yes
yes
yes
V
kVAr
kVAr
REACTORS
Standards
Rated voltage
Rated power
Rated current
Losses
Insulation voltage
Internal insulation class
Maximum ambient temperature
V
kVAr
A
W
C
IEC 076
400
F
45
SP-SRC-21562-03-E-033
Rev.: B
Page 11 of 11
Date: 01/03/04
OFFERE
D
OBSERV.