You are on page 1of 7

1/6 (Pesona

Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Labour
1 General Labourers Manday 70.00 68.00 65.00 40.00 - -
2 Pneumatic Driller Manday 90.00 100.00 130.00 120.00 - -
3
Concretor and concrete
vibrator operator
Manday 90.00 90.00 130.00 80.00 - -
4 Concrete screeder Manday 90.00 90.00 130.00 80.00 - -
5 Steelbar bender / steel fixer Manday 90.00 90.00 130.00 80.00 - -
6 Steel erector Manday 200.00 N/A 130.00 100.00 - -
7 Pump operator / attendant Manday 70.00 N/A 100.00 60.00 - -
8 Ganger (or Charge Hand) Manday 100.00 N/A 100.00 70.00 - -
9
Compressor operator /
attendant
Manday 90.00 N/A 100.00 60.00 - -
10 Electrician / Wireman Manday 150.00 N/A 130.00 80.00 - -
11 Welder Manday 175.00 N/A 200.00 100.00 - -
12 Welder Assistant Manday 90.00 N/A 130.00 60.00 - -
13 Drainlayer (or jointer) Manday 90.00 90.00 130.00 70.00 - -
14 Pipelayer (or jointer) Manday 90.00 90.00 130.00 70.00 - -
15 Filter / Mechanic Manday 175.00 N/A 180.00 100.00 - -
16
Filter's / Mechanic's
Assistant
Manday 100.00 N/A 150.00 70.00 - -
17
"Frog" type mechanical
rammer operator
Manday 90.00 N/A 100.00 60.00 - -
18 Truck / Lorry driver Manday 150.00 90.00 100.00 80.00 - -
19 Dumper driver Manday 150.00 90.00 100.00 100.00 - -
20 Crane driver (or all classes) Manday 200.00 N/A 130.00 100.00 - -
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
21
Cranes driver's Assistant /
signaller
Manday 90.00 N/A 120.00 60.00 - -
22
Heavy plant Driver (of all
classes)
Manday 200.00 N/A 130.00 120.00 - -
Materials
23 Bricks No 0.39 - 0.23 - - -
24 Cement ordinary Portland 50 kg 19.25 - 15.50 - - -
25 Coarse graded aggregate cu.m 46.00 - 46.00 - - -
For concrete: 38mm
26 Coarse graded aggregate cu.m 46.00 - 46.00 - - -
For concrete: 19mm
27 Sand for pipe Surround cu.m 73.50 - 68.00 - - -
28 Fine graded aggregate for cu.m 46.00 - 68.00 - - -
Concrete
29 Class "X" material cu.m N/A - - - - -
30 Class "Y" material cu.m N/A - - - - -
31 Crush stone for road cu.m 35.00 - 51.00 - - -
32 Rip-rap class "R" material cu.m 77.00 - 55.00 - - -
33 High tensile steel Tonnes 2380.00 - 2300.00 - - -
Reinforcing bar straight and
Cut to length (All sizes)
34 M.S. reinforcing bars Tonnes 2380.00 - 2250.00 - - -
Straight and cut to length
(All sizes)
35(a). Welding rods (Electrodes): kg 8.80 - - - - -
5 gauge
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
35(b). Welding rods (Electrodes): kg 9.90 - - - - -
36 Timber (Soft wood) cu.m 680.00 - 1800.00 - - -
37 Timber (Hard wood) cu.m 780.00 - 3600.00 - - -
38 Cement sulphate resisting cu.m N/A - - - - -
Portland
39 Cement high alumina cu.m N/A - - - - -
40 Bitumen cu.m N/A - 353.00 - - -
Plant
Compressor, portable with
breaker, rock drills,
spades, air lines,
41 6 cu.m/min up to and Hour 49.50 N/A 100.00 150.00 - -
including 9 cu.m/min
42 Over 6 cu.m/min up to and Hour 70.00 N/A 100.00 200.00 - -
Including 9 cu.m/min
Cranes, mobile:
43 3 tonnes Hour 70.00 N/A 100.00 40.00 - -
44 5 tonnes Hour 80.00 N/A 120.00 50.00 - -
45 10 tonnes Hour 120.00 N/A 130.00 60.00 - -
Derrick crane, all electric,
Up to 80 ft. jib:
46 20 tonnes Hour 200.00 N/A 180.00 - - -
47 40 tonnes Hour 300.00 N/A 200.00 - - -
Dumper, petrol or Diesel
48 Up to and including 2 cu.m Hour 60.00 N/A 150.00 50.00 - -
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
49 Over 2 cu.m up to and Hour 90.00 N/A 300.00 70.00 - -
including 5 cu.m
50 Over 5 cu.m up to and Hour 90.00 N/A 200.00 85.00 - -
including 8 cu.m Lorry,
tipper
51 Up to and including 3 tonnes Hour 70.00 N/A 100.00 50.00 - -
52 Over 3 tonnes up to and Hour 90.00 N/A 100.00 65.00 - -
including 6 tonnes
53 Over 6 tonnes up to and Hour 100.00 N/A 200.00 85.00 - -
including 10 tonnes
54 Over 10 tonnes up to and Hour 150.00 N/A 300.00 100.00 - -
including 15 tonnes
Mixer, concrete:
55 3/2 Hour 50.00 N/A 30.00 10.00 - -
56 7/5 Hour 60.00 N/A 35.00 15.00 - -
57 10/7 Hour 80.00 N/A 40.00 20.00 - -
58 14/10 Hour 100.00 N/A 50.00 30.00 - -
Pump, portable, including
hoses, strainers, etc.
59 50mm delivery 2" Hour 40.00 N/A 50.00 10.00 - -
60 100mm delivery 4" Hour 70.00 N/A 70.00 15.00 - -
61 150mm delivery 6" Hour 80.00 N/A 90.00 30.00 - -
62 200mm delivery 8" Hour 100.00 N/A 110.00 40.00 - -
63 250mm delivery 10" Hour 140.00 N/A 130.00 55.00 - -
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
64 Rammer, Mechanical Hour 60.00 N/A 180.00 40.00 - -
roller, road
65 Up to and including 5 tonnes Hour 90.00 N/A 200.00 45.00 - -
66 Over 5 tonnes up to Hour 130.00 N/A 300.00 60.00 - -
and including 10 tonnes
Excavator for shovels
Skimmers, draglines or
Back-acters
67 Up to and including 1/2 cu.m Hour 100.00 150.00 200.00 55.00 - -
68 Over 1/2 cu.m and up to Hour 150.00 200.00 250.00 65.00 - -
and including 1 cu.m
69 Over 1 cu.m and up to and Hour 180.00 N/A 300.00 85.00 - -
Including 2 cu.m
70 Over 2 cu.m and up to and Hour 200.00 N/A 350.00 160.00 - -
including 5 cu.m
Genarating set:
71 Up to including 10 KW Hour 50.00 N/A 20.00 50.00 - -
72 Over 10 KW and up to and Hour 80.00 N/A 35.00 80.00 - -
including 60 KW
Pneumatic Tyred Rollers:
73 10 tonnes Hour 130.00 N/A 150.00 55.00 - -
74 20 tonnes Hour 190.00 N/A 200.00 65.00 - -
Lorry, ordinary:
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
75 Up to and including 3 tonnes Hour 50.00 N/A 80.00 20.00 - -
76 Over 3 tonnes up to and Hour 60.00 N/A 100.00 30.00 - -
including 4 tonnes
77 Over 4 tonnes up to and Hour 70.00 N/A 120.00 40.00 - -
including 6 tonnes
78 Over 6 tonnes up to and Hour 100.00 82.00 160.00 55.00 - -
including 10 tonnes
Vibrating roller:
79 2 tonnes up to and Hour 80.00 N/A 175.00 50.00 - -
including 5 tonnes static
weight
80 Over 5 tonnes up to and Hour 140.00 N/A 200.00 65.00 - -
including 10 tonnes static
weight
Tractor, caterpillar,
including bull or angle
dozer
81 Up to and including 37 KW Hour 120.00 N/A 250.00 50.00 - -
(Drawbar)
82 Over 37KW up to and Hour 140.00 N/A 280.00 65.00 - -
including 67KW
83 Over 67KW up to and Hour 160.00 N/A 300.00 85.00 - -
including 100KW
84 Over 100KW Hour 180.00 N/A 400.00 125.00 - -
Welding and cutting set:
1/6 (Pesona
Metro)
2/6
(Advancecon)
3/6 ( Menta ) 4/6 (CNY)
5/6 ( United
Earthwork)
6/6 (Nagano)
Rate (RM)
Item Description Unit
COMPARISON OF SCHEDULE OF RATES
85 Oxy-acetylene Hour 80.00 N/A 100.00 30.00 - -
86 Electric 300 Amp Hour 80.00 N/A 180.00 70.00 - -
Vibrator, concrete,
Immersion type:
87 Light (40mm and below) Hour 30.00 N/A 100.00 20.00 - -
88 Heavy (50mm and above) Hour 45.00 N/A 150.00 25.00 - -