SUBCONTRACT

STANDARD FORM OF AGREEMENT BETWEEN


THE CONTRACTOR

Stasica Construction (Thorndale Construct ion Co. dba)


465 Spring Road, Unit 2
Elmhu rst, IL 60126

THE SUBCONTRACTOR

Inter Construction

TCC JOB NUMBER

1209 Frederick St.

CMG2000
DATE OF OWNER/CONTRACTOR

j oliet, IL 60435

CONTRACT

2/8/2013

DATE OF CONTRACTOR/
THE PROJECT

Chipot le - Plainfield

SUBCONTRACTOR CONTRACT

12720 S. IL Route 59, # 100

CONTRACT AMOUNT

2/8/ 2013
S42 ,000 .00

Plainfield, IL 60544
THE OWNER

Chipotle Mexican Grill

Includes all carpentry and drywall work- including, but

140 1 Wynkoop Street , Suite 200

not limited to: Acous t ical, tectum , Carpent ry, Metal Studs&Drywall,

Denver, CO 80202

FRP Panels , Install of fixt ures and trim package, Install of furni t ure ,
Install of doors,frames , and hardware ; partitions, ...

THE ARCHITECT

Wilkus Archi t ects

All work to be per plans and specs ..

(THE TERMS AND CONDITIONS OF THE AlA DOCUMENT A401 , STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR
- 1997 EDITION SHALL GOVERN THIS AGREEMENT) .
ARTICLE 1 - THE CONTRACT DOCUMENTS
1. The Contract documents for this subcontract consist of this Agreement and any Exhibits attached hereto, the Agreement Between the ONner and Contractor dated as of

February 8, 2013

the Conditions of the contract between the Owner and Contractor (General, Suppfementary and other conditjons), the drawings the Specifications,

all Addenda issued prior to and all Modifications issued after execution of the Agreement Between the Owner and Contractor and agreed upon by the parties to this

Subcontract as if attached to this Agreement or repeated herein. 2. Copies of the above documents that are applicable to the Work under the Subcontract shall be
furnished to the Subcontractor upon his

request An enumeration of the applicable Contract Documents appears in Article 16 of the AlA DOCUMENT A401 , STANDARD

FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR - 1997 EDITION.


ARTICL E 2 - THE WORK
The Subcontractor shall perform all Work required by the Contract Documents for
Shee1s

A000,001 ,002 ,010,011 ,012 .013.100,110,115,117,118,120,

dated

Garpentry&Drywall

material and labor in accordance with Architectural Drawings

125,126,130,140,141 ,150,200,210.220.225,230,400 ;

S100,200;F100;MP010;M100,200,300;P100,110.200,300;E010,100,110,200.

12/12/12
ARTICLE 3- TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION

1. The WorX to be performed under this Subcontract shall be commenced no later than
shall be substantially completed no later than

02/11 /13 and , subject to authorized adjustments,


04/19/13 2. Time is of the essence of this Subcontract. 3. No extension of time will be valid

wi1hout the Con1racto(s written consen1 after claim is made by the Subcon1ractor in accordance wi1h Paragraph 5 .2 of the AlA DOCUMENT A401 , STANDARD FORM OF
AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR- 1997 EDITION.
ARTICLE 4 - THE CONTRACT SUM
The Contractor shall pay the Subcontractor in current funds for the performance of the Work, subject to additions and deductions authorized and accepted by the
Contractor, Architect , and Owner, the Contract sum of

cF_:o.cr~
ty T-'w
-'-o'-T
-'-h'-o-'u-'s-"n
a "-d"-"
an"-d"-0
'-0"-/'100
:..:__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

ARTICLE 5 - PROGRESS PAYM ENT S


1. The Contractor shall pay lhe Subcon1ractor monlhly progress paymen1s in accordance with Paragraph 11 .1 of the AlA DOCUMENT A401 , STANDARD FORM OF
AGREMEENT BETWEEN CONTRACTOR AND SUBCONTRACTOR - 1997 EDITION. 2. Applicalions for monlhly progress paymen1s shall be in wri1ing and. in
accordance wi1h Paragraphs 11 .11hru 11 .7 .4 of lhe AlA DOCUMENT A401 , STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR 1997 EDITION, shall state the estimated percentage of the work in this Subcontract that has been satisfactorily completed and shall be submitted to the Contractor on or
before lhe 251h day of each mon1h. 3. ALL BILLING TO BE COMPLETED ON "AlA" FORM OR EQUIVALENT AND TO BE ACCOMPANIED BY A LIEN WAIVER IN THE
AMOUNT OF THE PAYMENT. 4. In Accordance wi1h 1he AlA DOCUMENT A401 , STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND
SUBCONTRACTOR- 1997 EDITION, when the Subcontractor's work or a destgnated portion thereof is substantially complete and in accordance with the Contract
Documents, the Contract shall , upon application by the Subcontractor, make prompt applications for payment of such Work. Wrthin thirty days following issuance by the
Architect of the Certrticate for Payment covering such substantially completed WorX, less any portions of the funds for the Subcontractor's Work withheld in accordance
with the Certificate to cover costs of items to be completed or corrected by the Subcontractor. 5. Progress payments or final payment due and unpaid under this
Subcontract shall bear interest from the date payment is due at the rate entered below or, in the absence thereof, at the legal rate prevailing at the place of the projects .
6 . Prior to commencement of work or any payment, a current Certificate of Insurance naming Stasica Construction as "Certificate Holder" as well as
"Additionally Insured" is required . Insurance certificate must include the following clause: "Stasica Construction is additional insured on a primary/non-contributory basis
on the general liability."
ARTICL E 6 - FINAL PAY MENT
1. Final payment , constituting the entire unpaid balance of the Contract Sum , shall be due when the Work described in this Subcontract is fully completed and performed in
accordance with the Contract Documents and is satisfactory to the Architect, and shall be payable, in accordance with Article 12 of the AlA DOCUMENT A401 , STANDARD
FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR - 1997 EDITION. 2. Before issuance of 1he final payments , the Subcon1rac1or. ~required .
shall submit evidence satisfactory to the Contractor that all payrolls, bills for materials and equipment, and all known indebtedness connected with the Subcontractor's Work
have been satisfied.

Thomdale~nstru
on Co. = = = = =

Inter Construction

By:

Da1e:

~~
_.;.F_:ec::c
bru
= al)'
:.<.-:1..:.
1c.:2:.:0..:.
13
: ;:__ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Date:

Jose Hernandez

($42,000.001