Forepoling with tunneling jumbo

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo

Forepoling is normally done with standard


tunneling jumbos. The work anyhow
requires certain changes to be done in
the jumbo.
Drill rig features

Drill rods, casings and casing advancing


tools

The work procedure requires especially


thoroughness in certain aspects like
Spile parallelism (straightness)

Grouting according to the prevailing


conditions

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drill rig
The drill rigs technical condition will
affect the results. Loose joints and
neglected maintenance will worsen
the overall results.
Well maintained, good condition
drilling jumbo will get the best
results.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drill rig
The drill rig feed needs to be
specially fitted for the job.
The front centralizer and the traveling
centralizer have to be made according
to the casing outside diameter. Both
centralizers must be of openable
type for easier operation.
Feed front support is needed for reliable
wall support in order to keep feed alignment.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drill rig

The front support and the travelling centralizer

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drill rig
Feeds have to be equipped with
reasonable guiding system for reliable
alignment
Laser assisted guiding and automatic
electronic controls are modern features
in forepoling
Anyhow even water scale will do, if used
often enough and keeping in mind the two
different axels out of which one changes
from spile to spile

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drilling tools
The drill rods can be either speed rods or hexaconal rods. Easiest ones
to use would be hexaconal speed rods when available
Centralizers (wing couplings) should be used for sizes (of casings) of
89 mm and up. One centralizer should be immediately behind drill bit
and at least one at first drill rod joint. Centralizer will help reconnecting
the drill bit if disconnected earlier.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drilling tools
Please also note that the smaller the ring bit OD / Casing OD difference
is the straighter is the hole. The larger the void the more possibilities
there are for deviation.

Casing OD

Ring bit OD

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drilling tools

T78 has integrated casing shoe, recommended


T76 J has threaded casing shoe

SX82 has wire retainer (casing shoe can be produced locally)


T69 has small pilot OD (esp. for thick wall plastic casings)

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The drilling tools

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The Casings

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The Casings

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
The Casings / Thread

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
Feed alignment
Drilling starts with feed alignment. Right spotting and right start angle of
drilling (in both planes) will very much decide the end result.
Alignment is done by using laser devices, electronic feed alignment
controls or measuring direction planes and angles manually
Please note there are two different things: alignment, which is the
original intended direction from feed set up and deviation, which is
caused by the ground (fissures, material changes etc), feed movements
and casing /drill rod bending during the drilling.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
Feed alignment
Please note that while look out angle is one thing there is also another
plane according which the feed needs to be set formed by the center
point of the tunnel. This is demonstrated in the photo of a long feed
tunneling machine located at tunnel center point.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo

Casing and drill rod handling


Casing and rod handling requires normally manual work. There has
been attempts to develop a manipulator to ease the work but they are
still too heavy to be attached to modern jumbo booms.
A separate scissor lift or other
on ground moving basket is
required. To do all work from
loading basket alone is not
recommended.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo

Casing and drill rod handling


If a manipulator will be used, all cumulated weights have to be taken in
consideration when checking the load carrying capacities of booms and
loading basket.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo

Casing and drill rod handling

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
Hole collaring
Collaring is done when drilling is started. Collaring means
drilling with half feed and half drilling energy and with slow
or with no rotation at all.
Collaring ensures that hole is started to aligned direction.
Please note that when drilling from soft material to hard,
sloping rock, collaring is done also when already inside the
ground

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo
Drilling
Stiff rods, use of stabilizers and avoiding of the use of excess feed
forces will give best results. When drilling to hard formations from soft
material, use of collaring drilling features should be considered.

Atlas Copco Overburden Drilling Tools


Forepoling with tunneling jumbo

Adding of new rods and casings


Please note that feed is often moved to get threading of casings done.
Feed should be set back to the direction of the already drilled casing,
which should be the desired spile direction if collaring was done
correctly.