Introduction
C & F Engineering is a private company established under the law of Negara Brunei Darussalam since 2000.
We are the Negara Brunei Darussalam formed the contractor with JKR (Jabatan Kerja Raya) standard trenchless
technologies including the provision of auger boring, horizontal directional drilling, underground utility installations,
electricity equipments installation and low voltage and high voltage power cable installation.
Our primary aim is to reduce the environmental impact of its clients infrastructure. Trenchless technology provide as
solution that reduces the environmental risks associated with open excavation. C & F Engineering does however
recognize that its activities still have the potential to cause harm.
C & F Engineering will act at all time to prevent pollution, use resource efficiently, and to limit the impact of our
operations upon other. C & F Engineering shall comply with legal requirements and other requirements applicable to its
activities. C & F Engineering are committed to continual improvement and aim to exceed its own and its clients
expectations.
For more detail, clients should contact C & F Engineering to determine if their requirements can be meet.
Capabilities
With the purchase of Vermeers D33X44 directional drill machine, C & F Engineering capable of installing conduits,
ducts and piping by horizontal directional drill raging 50 mm to 600 mm in diameter with distances typical up to 200
meters in one pull. Longer distances and large diameters can be achieved but need to be considered on a case by case
basis. The purpose of this document is to provide guidance on how the HDD is likely to be undertaken until such time as
a specialist contractor is contacted, the contents of this report should be treated as Provisional because there are
several options that could be employed depending on the type and size of the drilling machine used and the preference
of the contractor for other issues.

VERMEER D33x44 NAVIGATOR


Technical Detail
Engine type
Weight
Height
Wide
Length
Pullback
Drill Rot
Torque

: Cummins 125/93KW
: 9299Kg
: 2,11M
: 2,08M
: 6,91M
: 14969Kg
Torque
: 10Ft
: 5957Nm

1 C & F ENGINEERING SDN BHD

: 189Lpm

METHODE AND STATEMENT

2 C & F ENGINEERING SDN BHD

Method and Statement for Horizontal Directional Drilling


Each horizontal directional drilling, job site has its own unique characteristics, depending on the soil/the surface
condition to be drill. The following method statement is intended to indicate the typical activities at a job site. For a
particular job or crossing, prospective clients should contact C & F Engineering and required method statement for
their requirements.
The schedule of horizontal directional drilling activities can normally be broken down into the following parts:
1.
2.
3.
4.

Site survey and bore planning


Preparation of the site
Drilling
Site cleanup

1. Site Survey and Bore Planning


A survey team will map out the bore patches. Their function is to provide an accurate plan and elevation of the area
that the pipeline will go through. The survey team will also locate, identify and mark any buried services that run
close to the part of the bore. With
the data provide by the surveyors, the
locator operator or drilling manager
will make a bore plan and profile
using Atlas bore planning computer
software.
The bore plan will establish the
entrance and exit angles and the
radius of the pipe curvature, to
achieve the deep and length of the
drill. The bore plan also will show
any utilities that were found by the
survey team and will allow for the
necessary deviation of the pipeline
to avoid contact with the utility.
When the bore plan is completed it
will be presented to the client or his representative for approval. Upon approval of the bore plan the HDD operations
proceed.
Identification of Any Buried Services
In the trenchless world, taking a step onto any jobsite comes with certain risks. With so many active and abandoned
utilities, there are potential disasters on any jobsite. Avoiding these utilities is often a difficult and frustrating task.
But how can you make sense of it all?
Use of GPR (Ground Penetrating Radar) for utility locating has been growing in popularity in recent years as the
technology improves and becomes easier to use, and more people become aware of its benefits and capabilities is
special for Horizontal Directional drilling contractor before executes of job. Granted, GPR is not the solution to every
locators problem and it does have limitations depending on certain soil conditions. However, it does help where
other technologies dont suffice, so it is best to do some research and find out what it can do for you.
Typically, three components make up a GPR system: the control unit, the GPR antenna and the survey wheel to
measure distance. GPR is looking for any point where the electromagnetic properties of the materials change. As
the operator walks over an area, the GPR system sends low-power radar waves into the subsurface from the
antenna. The control unit then records the strength and time required for the return of reflected signals. Subsurface
variations like pipes (metallic and non-metallic), wire, tanks and voids will cause significant reflections. These
reflections appear on the screen in real-time, allowing the operator to identify both horizontal and depth positioning
of buried utilities.

3 C & F ENGINEERING SDN BHD

Before Cutting Coring or Drilling


GPR (Ground Penetrating Radar) is a quick, easy and safe way to locate buried obstructions in
concrete structures before they become hazards.
Learn how we can find potential obstacles and dangers of all kinds for increased accuracy,
safety and peace of mind.
2

7m

Roadway

Water Surface
Starting
Point

Utility

Surface

Pilot Hole

4 C & F ENGINEERING SDN BHD

Receiving
Point

5 C & F ENGINEERING SDN BHD

1. Preparation of Site
An all-weather access to the entrance and exit sites for the HDD operation must be constructed and a level hard
standing area for the drill equipment prepared at each of these sites as follow:

2.1. Exit or rig side.


A rectangular area has to be prepared that is approximately 10 meters long by approximately 5 meters wide.
Access to the entrance should be an all-weather road capable of withstanding heavy loaded transporters. The
hard stand should be either clay filling with a cover of late rite, wooden mats or steel plates.
The clean water (salt water is not allow) requirements should be met by either a reliable pumped supply or by
water trucks. If it is determined that the water supply is not sufficient to meet the need of a crossing, water
storage tank will be use store enough water to meet the requirement.
Pits will be excavated at the pipeline exit and entry points. The pits are to contain the borehole slurry. The must
be of sufficient capacity to accommodate the use slurry/cuttings mixture. Further disposal of the use Bentonite
during the operation must be possible using other means and should be arranged for together with the client.

6 C & F ENGINEERING SDN BHD

2.2. Entrance side.


The hard stand should be constructed in a similar manner to the exit. A similar access, as constructed for the
exit should be provided. A Slurry pit will be constructed to collect any Bentonite/slurry discharged from the drill
hole.

7 C & F ENGINEERING SDN BHD

2. HDD Drilling Operation


The survey team will place stake at the pipeline exit and entry points. The directional drilling unite is placed at the
exit where the drill will enter at exactly the correct location. The drill unit is then elevated at the rear so that the
entrance angle conforms to the drill profile drawing. The rig is the anchored in position. If necessary a 20 tons
excavator will also be used as an anchor for the drill rig. The drill operation begins by drilling a pilot hole using drill
bit, the drill head and the pressure injection of drill fluid. The drilling is carried out continuously in interval of 3.5
meters, equivalent to one length of drill pipe. Location of drill bit is monitored using the DCI locating system. An
electronic Transmitter in the drill head will sends information to the locator operators receiver. As each drill rod is
drilled in to the ground the locator operator take a reading from his equipment and inform the drill operator of the

location, pitch and roll the drill head. From this information the operator know the location of the drill head at all
times. The operator uses the information to maintain the preplanned path of the bore. The accuracy of the drilling is
verified by comparing the coordinates of the actual location of the drill bit against the plane drill profile. If these a
major difference between the actual and planned location of the drill bit, the operator is able to correct the actual
profile by pulling back to a correct position of the planned profile and begin re-drilling. Once the drill bit exits the
other end of the drill hole, the drill head is removed and a Reamer is attached to the drill string.
8 C & F ENGINEERING SDN BHD

Depending of the diameter of the pipe to be installed, several reaming with progressively large diameter reamers
may be necessary (i.e. with a 24 inch diameter pipe, the firs reaming could be with an 16 inch reamer, the second
reaming with a 24 inch reamer and the third reaming with a 32 inch reamer). During the reamer process, drilling fluid
is pumped under pressure thought the drill string to the reamer.
As the drill rig pulls the reamer back, drill pipe is attached continuously behind the reamer for the subsequent
reaming and pipe pulling operations.
When the bore hole has been reamed out to the correct diameter the back reamer is sent back down the bore one
and two more times to ensure that the hole is clear of any large object and that the slurry in the hole is well mixed.
This prepares the hole for the pipe to be pulled in. Once the driller is satisfied that the hole is clear and ready for the

pipe, the pull head is connected to the drill string via Swivel. The swivel prevents the clients pipe from rotation
during the pullback.

Prior the pullback, the clients pipe, which has had a pull head welded on to it, has be prepared and hydrostatically
tested by the client in a single length. The length being equivalent to or greater that the length of the drilled hole.
The clients pipe is the pulled back toward the exit area by the drill rig.

3. Leaving the Site


The site will be left clean and tidy and basically in a similar condition as it was prior to drilling commencing.
For additional information, comments, or questions, please contact C & F Engineering Sdn Bhd.

9 C & F ENGINEERING SDN BHD

EXCECUTION

Of HORIZONTAL DIRECTIONAL WORK

10 C & F ENGINEERING SDN BHD

The Horizontal Directional Drilling Technology is a modern and innovative technology of pipe and cable lying, which
replaces the brutality of open cut trenches with gentle drilling through injection. It uses the principle of high pressure
injection of drilling suspensions, combined with the mechanical rotation of drilling tools.

The Steel pipe installing accuracy by HDD is provided by the permanent electromagnetic location of the drill head.
Trench less directional drilling with P.D.E. Technology is the ideal procedure for areas with certain specific features:
Areas where open cut trenches are difficult and expensive (railways, highways, roads, water courses, clay
sand, other existing installations, runways etc.).
Heavily urbanized areas (buildings and underground installations, crossings etc.).
Areas which impose the protection of environment (protected parks, reservations, archaeological sites etc.)

Execution of HDD Works:

PILOT DRILL

From the start pit, the remotely controlled drill head is advancing underground. The high pressure drilling
suspension from the rotating drill head does accomplish the pilot hole. This suspension (Water, Bentonite and
/or special additives) is dislocating the soil, larger spoils being pressed against the tunnel wall and finer particles
being transported along the tunnel with the drilling fluid to the start pit. (Pilot will maintain required depth from
the lowest invert of the last pipe).

11 C & F ENGINEERING SDN BHD

REAMING
After the drill head reaches accurate the target pit, the adequate reamer for the job will be attached. Rotating
the reamer through the pilot hole, it will widen it, to enable the simultaneous of the product.

1. Ripper Reamer
HDD back reamers designed for high mixing and pumping action in sticky clay ground
conditions. Carbide cutters are precisely placed to provide smooth even
cutting action.

Ballistic Carbide Cutters for superior cutting in


hard condition
Ideal for sticky & hard pack clay conditions
Angled blades for superior mixing.

2. Fluted Reamer
Vermeer fluted reamers include robotically applied carbide mesh grit hard
facing to add longevity. And theyre available with rotary or Shark Teeth to
create an aggressive cutting action. Ideal for rugged ground
conditions ranging from hard pan and soft rock to cobble.

3. Helical Plus Reamer


This Vermeer-original design helps you tame sandy loam and clay.
The secret to its success is a helical bar design with Shark Teeth
tooling and rear-facing paddle. It all adds up to efficient
cutting and mixing action.

REAME
RR

C&F

12 C & F ENGINEERING SDN BHD

LAYING THE PRODUCT


The product (Steel pipe or HDPE or others) is attached directly behind the reamer. The drilling suspension
enables the installation to be carried out smoothly and without damaging the product. This drilling suspension
acts as a lubricant and is reducing friction in the tunnel.

SENSOR TEHNIQUE
The three-dimensional localization of the drill head is based on electromagnetic wave emission from a
transmitter mounted in the drill tool. A data receiver (with a data screen) above the ground is receiving the
signals send by the transmitter. So the
precise position of the drill head can be
located.
PITCH Point

DRILL HEAD ROTATION


DEEP Point
Distance Point

13 C & F ENGINEERING SDN BHD

C&F

LOCATOR

14 C & F ENGINEERING SDN BHD

F2 DigiTrak HDD Locator.


The DigiTrak F2 delivers the most popular features of the Eclipse locator with enhanced sensitivity and greater
ease of operation. Discover the next generation ball-in-box locator. The revolution continues.
The DigiTrak F2 incorporates DCIs patented 3-D antenna and target-in-the-box locating with a new depth screen
display for exceptional accuracy and clarity. The 2 dimensional birds eye perspective is viewed on the same screen as
the depth view. This means for the first time with a HDD locating device you can actually view the drill head location in 3
dimensions in real-time.

The data di splay screen is streamlined to provide transmitter roll, pitch, signal strength and temperature in a single
column view. The locating display is free from clutter.

TRANSMITTER

Its picture-driven menu structure removes language as a barrier to using the system anywhere in the world. The menu
and screen views are easily navigated with a single switch/trigger interface.
The real-time, birds-eye view provides operators with critical on-the-fly steering ability and directly contributes to on-thejob productivity and moneysaving opportunities.

The complete system includes a handheld receiver, F Series display, and battery charger rechargeable lithium-ion
batteries to power the receiver and remote display, DC power cable as an option to power the remote display from the
drill rig, and carry case.

15 C & F ENGINEERING SDN BHD

Possibility of DigiTrak F2 Locator :


1. The new DigiTrak F2 is the worlds first 3-dimensional field view directional locating system with a
single button user interface and graphically driven menu.
1. Operates at depths up to 85 feet (25.9 meters) with 0.1% sensitive pitch.
2. An active display enables DCIs exclusive look-ahead capability with target-in-the-box locating for Intuitive
transmitter tracking.
3. An enhanced Target Steering function on the menu allows the operator to place the receiver in front of the
drill head, along the bore path, using a target on the remote display to steer.
4. A unique 3-D antenna configuration provides exceptional accuracy.
5. A 4-channel radio enables multiple F2 locators to be in the same vicinity and work up to distances of 1,800 feet
plus, making it suitable for maxi rigs.

16 C & F ENGINEERING SDN BHD

F5 DigiTrak HDD Locator.


Increasingly sophisticated technology to make the company C & F engineering decided to shift even more advanced
technology in the equip and facilitate in determining a point in every step of Horizontal Directional Drilling.

F5 LWD DataLog Mapping System

The DigiTrak LWD (Log-While-Drilling) DataLog System allows you to collect and store drill data electronically.
The data is recorded using an F5 receiver and then it is uploaded to a computer for analysis, printing, saving, and emailing. The following types of data can be measured and recorded with the LWD DataLog system:

Depth
Pitch
Elevation change (surface topography)
Fluid pressure, when using an F5 fluid pressure transmitter
Pullback force and mud pressure, when using a DigiTrak TensiTrak transmitter
Transmitter heading information, when using a DigiTrak SST (steering) transmitter
System Components include the following:

F5 Receiver A locater or receiver with DataLog menus used to display and record transmitter data; the data is then
uploaded from the receiver to a computer.
F5compatible Transmitter A battery- or cable-powered device located in the drill head with sensors that
continuously measure and transmit information about the below-ground drill head or product pull-force that the aboveground receiver detects and displays.
LWD Software The computer application used for uploading data from the receiver to a computer and for working
with the uploaded data in the computer.
Upload Adapter A USB device required for the computer to communicate with the F5 Receiver to upload data.
17 C & F ENGINEERING SDN BHD

F5 Fluid Pressure Transmitter (FPT)


The DigiTrak F5 Fluid Pressure Transmitter (FPT) is designed to provide instantaneous readings of the annular
drilling fluid pressure around the drill head during a pilot hole. The FPT incorporates all the functions of the F5 dualfrequency transmitters and in addition is fitted with fluid pressure sensors. Although the mechanical design of the
transmitter and its electronics is new, its dimensions are the same as the standard DigiTrak transmitters. The only
requirement for using the FPTs is that there must be a fluid path from the annulus around the housing to the four fluid
pressure sensor ports located at the front of the FPT.
Advantages of the FPT include the following:
Real-time downhole mud pressure is continuously displayed at the receiver and on the remote display at the
drill.
Knowledge of downhole drilling fluid pressure can assist in preventing inadvertent returns and or damage to
surrounding structures.
Changes in the fluid pressure can indicate formation changes that may require modifications to the drilling fluid.
Fluid pressure data can be monitored and saved on the F5 receiver and uploaded via Bluetooth to a PC for
later analysis and reporting.

Part Numbers

F5Dp 19/12 and F5Dp 12/1.3

Depth Range

65 ft (19.8 m)

Frequencies

F5Dp 19/12: 19.2 or 12 kHz and F5Dp 12/1.3: 12 or 1.3 kHz

Battery Type

2 C-cell alkaline (20 hr awake; 200 hr sleep) or 1 SuperCell (70 hr awake; 400 hr sleep) or
2 SAFT LSH14 (40 hr awake; 400 hr sleep)

Maximum Temperature

220F (104C)

Length x Diameter

15 in. x 1.25 in. (38.1 cm x 3.175 cm)

Weight

1.65 lb (748 g)

Pressure Range

0250 psi (01725 kPa)

Pitch Sensitivity

0.1%

Roll Data

24-position clock

18 C & F ENGINEERING SDN BHD

F5 SST Advanced HDD Guidance System


The DigiTrak F5 SST advanced HDD wire line guidance system is easy to use, delivering quick and accurate
steering data. The system eliminates the need for a DC wire grid and its lengthy setup time. Due to the small size of the

SST transmitter, tight turning radii can be achieved.


The SST system monitors the tools compass heading (azimuth) in degrees and provides the operator with a lateral
deviation (in degrees) from the intended path for quick steering corrections.
With the F5 receiver and remote display, the operator can view real-time position and depth data. A laptop computer
also graphically displays the tools progress in real time. It shows both a profile view of the bore and a birds-eye view of
the lateral deviation.

19 C & F ENGINEERING SDN BHD

CROSS COMPLETED

20 C & F ENGINEERING SDN BHD

VERMEER
No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

D33x44

NAVIGATOR

Client

Location

Berakas Power Management Company

Hospital RIPAS-Bandar Seribegawan


Komplek Sukan Hassanal Bolkiah, Berakas
Islamic Centre, Jl. Stadium Berakas
Traffic light Jl. Mabuhai
Sungai Liang Industry Spark.
Jl. Tutong New Istana
Temburong, ULU-ULU
Temburong. Kg. Batang Duri
Suangai Akar Highway
Kesenian 11Kv S/S, Kg. Burung Pingai
Jl. Bunga gadong, Kg. Burung Pingai
Jl. Bunga Kuning, Kg. Burung Pingai
Jl. Seri Gading, Kg. Burung Pingai
Jl. Bunga Gadong2, Kg. Burung Pingai
Kementrian Pembangunan Driveway1
Kementrian Pembangunan Driveway2
Dewan Bahasa Dan Pustaka Old Airport
Roundabout VSL Old Airport
JKR Old Airport
Tungku Link Highway
Jl. Muara, Kg. Sungai Buluh
Jl. Muara Mile 12, JKR Driveway
Muara-Tutong Highway, Kg. Meragang
Rimba School
Rimba School
Jl. Pulaie
JKR Old Airport1
JKR Old Airport2
Jl. Muara, Kg. Sungai Hanching
Jl. Berakas, Kg. Serusop
Jl. Telisai, Kg. Sungai Liang1
Jl. Telisai, Kg. Sungai Liang2
SLI-Sungai Liang Industry Spark
Sungai Tujuh
Yayasan School
Yayasan School
Pusat Kesehatan Kg. Lamunin

HSE
DHJ - SWEE
LSL
Department Electrical Services Brunei
Primetek

SPAD
Department Electrical Services Brunei
DHJ
Galfar Pembinaan/Bina Mega
Department Electrical Services Brunei

DHJ
Wee Ta
HSE
Wee Ta
Department Electrical Services Brunei

21 C & F ENGINEERING SDN BHD

Date Completed
29 October 2009
03 November 2009
7 November 2009
13 November 2009
16 November 2009
25 November 2009
10 January 2010
17 February 2010
7 April 2010
6 July 2010
8 July 2010
9 July 2010
10 July 2010
11 July 2010
17 July 2010
19 July 2010
21 July 2010
22 July 2010
26 July 2010
29 July 2010
26 August 2010
31 August 2010
25 October 2010
7 November 2010
8 November 2010
9 December 2010
6 January 2011
7 January 2011
12 January 2011
1 March 2011
30 March 2011
25 March 2011
30 March 2011
2 May 2011
7 May 2011
12 May 2011
20 May 2011

Services

Bundle

Electrical

4160..mm. HDPE pipe


4160..mm. HDPE pipe
4160..mm. HDPE pipe
4160..mm. HDPE pipe
2160..mm. HDPE pipe
4160..mm. HDPE pipe
3180..mm. HDPE pipe
3180..mm. HDPE pipe
1160..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
3180..mm. HDPE pipe
3180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe

Electrical
Electrical
Electrical
Electrical
Electrical

Electrical
Electrical
Telecom
Electrical
Water Line
Electrical

Electrical
Water line
Electrical
Water Line
Electrical

Length (M)
65
45
45
86
33
46
150
50
35
24
21
30
29
26
60
32
24
50
38
36
22
15
32
22
22
30
30
37
24
34
37
46
38
16
12
28
24

38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.

Berakas Power Management Company

Department Electrical Services Brunei


Sunlit Advertising
PTD-DES 66Kv
HSE
Department Electrical Services Brunei
HSE
Department Electrical Service Brunei
HSE
Department Electrical Services Brunei
HSE
Pan-El
Department Electrical Services Brunei
Berakas Power Management Company
Department Electrical Services Brunei
Department Electrical Services Brunei

Department Electrical Services Brunei


DHJ
Department Electrical Services Brunei
Berakas Power Management Company
Sakila
Department Electrical Services Brunei
DHJ
Berakas Power Management Company

22 C & F ENGINEERING SDN BHD

Jl. Kumbang Pasang


Jl. Stadium SS #1
Orchid Garden Hotel
Jl. Anggrek Desa, Spg.32-3
Jl. Anggrek Desa, Spg.32-15
Anggrek Desa Cross River
Traffic Light Kg. Perpindahan Lambak Kanan
Jl. Kota Batu, Kg. Sungai Besar
Muara
Muara-Tutong Highway, Kg. Meragang
JL. Berkas, Kg. Lambak
Perumahan Nasional Kg. Meragang
Kg. Lumapas
Old Airport, Kementrian Pendidikan
Jl. Tanjung Batu, Kg. Sabun-Muara
Center Point 1, Gadong
Centre Point 2, Gadong
The Mall Gadong
Bina Mega site, Project Perumahan Kg. Meragang
Alimbena site, Project Perumahan Kg. Meragang
Muara Port
Jl. Subok, Kg. Subok, BSB
INTERNATION Airport Brunei, BSB
Jl. Telanai 1, Spg. 53, BSB
Jl. Telanai 2, BSB
Jl. Telanai 3, BSB
Komplek Bangunan Kerajaan Old Airport Berakas, BSB-1
Komplek Bangunan Kerajaan Old Airport Berakas, BSB-2
Komplek Bangunan Kerajaan Old Airport Berakas, BSB-3
Komplek Bangunan Kerajaan Old Airport Berakas, BSB-4
Jln. Industry Serasa, Muara Town
Jl. Kubah Diraja, Maktab Ugama BSB
Jl. Mulaut, New Masjid Mulaut
Kementrian Pendiddikan, Old Airport
Jl. Gadong, behin JPD Beribi, Sekolah Rendah Mata-Mata
Jl. Tutong, Mile 8, Kg. Kilanas
Proposed Perumahan Kg. Lugu
Serasa JKR water treatment
Bengkurong Masin MIS
Perpindahan Kg. Katok B
Road Crossing No.6 Jl Menteri Besar
Road Crossing No.5

25 July 2011
28 July 2011
4 August 2011
12 August 2011
13 August 2011
15 August 2011
6 November 2011
25 December 2011
30 December 2011
26 January 2012
3 February 2012
10 February 2012
18 February 2012
5 March 2012
8 March 2012
4 April 2012
5 April 2012
8 April 2012
14 April 2012
17 April 2012
22 April 2012
26 April 2012
9 May 2012
16 May 2012
18 May 2012
20 May 2012
27 May 2012
6 June 2012
4 June 2012
6 June 2012
11 June 2012
16 June 2012
7 July 2012
1 August 2012
8 August 2012
6 August 2012
20 August 2012
8 October 2012
14 October 2012
17 October 2012
25 November 2012
30 November 2012

Electrical

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

1180..mm. HDPE pipe


4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
8180..mm. HDPE pipe
4180..mm. HDPE pipe
2180..mm. HDPE pipe
6180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
8180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe

33
28
66
24
24
110
95
15
102
60
24
36
12
24
80
50
85
33
28
22
29
30
50
25
51
20
48
45
27
27
64
54
35
24
54
53
136
24
36
33
58
54

80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.

Wee Ta
DHJ

C&F Engineering
Department Electrical Services Brunei
Berakas Power Management Company

C&F Engineering/DES
Berakas Power Management Company

BHFT

23 C & F ENGINEERING SDN BHD

Road Crossing No.1


Road Crossing No.2
Road Crossing No.3
Road Crossing No.4
Road Crossing No.7
Road Crossing No.8
Road Crossing No.9
Road Crossing No.11
Road Crossing No.10
Pusat Kesehatan Gadong
NHS Kg. Katok-B1
NHS Kg. Katok-B2
NHS Kg. Katok-B3
NHS Kg. Katok-B4
NHS Kg. Katok-B5
Industry Kg. Salar
Jl. Telanai
Military Academy Road crossing no.1
Military Academy Road crossing no.2
Military Academy Road crossing no.3
Military Academy Road crossing no.4
Military Academy Road crossing no.5
Military Academy Road crossing no.6
Military Academy Road crossing no.7
Military Academy Road crossing no.8
Military Academy Road crossing no.9
Military Academy Road crossing no.10
JL. Kasat Putat
Additional Crossing at Span No.22
Additional Crossing at Span No.24
Additional Crossing at Span No.25
Additional Crossing at Span No.10
Additional Crossing at Span No.11A
Additional Crossing at Span No.11B
Additional Crossing at Span No.16
Additional Crossing at Span No.12A
Additional Crossing at Span No.12B (Storm drain)
Additional Crossing at Span No.15
Additional Crossing at Span No.13A
Additional Crossing at Span No.13B
MOH
JL. Muara-Mentiri

15 December 2012
20 December 2012
5 February 2013
8 February 2013
2 February 2013
25 January 2013
23 January 2013
19 January 2013
14 March 2013
30 December 2012
18 February 2013
18 February 2013
20 February 2013
22 February 2013
25 February 2013
1 March 2013
3 March 2013
8 April 2013
11 April 2013
16 April 2013
25 April 2013
29 April 2013
6 May 2013
21 May 2013
23 July 2013
31 May 2013
24 July 2013
6 June 2013
16 June 2013
21 June 2013
23 June 2013
26 July 2013
27 July 2013
28 July 2013
2 August 2013
10 September 2013
25 October 2013
12 September 2013
14 September 2013
16 September 2013
20 July 2013
6 September 2013

Water pipe
Electric

Electric
Electric
Electric

Electric
Electric

Electric/Telephone

4180..mm. HDPE pipe


4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
4180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
2180..mm. HDPE pipe

36
36
58
58
150
30
30
36
230
17
24
26
30
32
36
13
20
86
70
84
54
43
38
110
46
41
204
18
30
36
36
30
36
48
48
36
108
36
36
36
57
42

122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.

Syarikat Pembekalan Air Pipe Akmal


Department Electrical Services Brunei

Department Electrical Services Brunei


Syarikat Hajahmas Sdn Bhd
Department Electrical Services Brunei

Syarikat Hajahmas Sdn Bhd


Berakas Power Management Company
Department Electrical Services Brunei
Syarikat Hajahmas Sdn Bhd
Department Electrical Services Brunei
Department Electrical Services Brunei

AmberHigh
Department Electrical Services Brunei
Berakas Power Management Company
Syarikat Hajahmas Sdn Bhd
Berakas Power Management Company
Department Electrical Services Brunei
ASTAL Engineering
I-WATER Contactor
Department Electrical Services Brunei

24 C & F ENGINEERING SDN BHD

Perumahan Katok-B
Kg. Perpindahan Rimba Spg.177
Kg. Mata-Mata Spg. 74-59
Jalan Muara Kg. Sungai Tilong
Jalan Lailai Wijaya Kg. Mata-Mata
Kg. Jerudong Spg.396-53
Berakas Garison Jalan Pemancha
JL. Stadion, Kg. Anggrek Desa
JL. Sungai Tilong, Kg. Sungai Tilong
JL. Muara, Kg. Sungai Hanching
JL. Lubok Sigurun
Sekolah Menengah Sayyidina Hassan, Kg. Kilanas
Masjid Muhammad Bolkiah, Kg. Serusop
JL. Sungai Akar Spg.40, Kg. Sungai Akar
JL. Bengkurong-Masin, Kg. Masin
JL. Mulaut, Kg. Masin
Jerudong Park Medical Centre1
Jerudong Park Medical Centre2
JL. Muara, Kg. Sabun
JL. Junjongan, Kg. Junjongan
JL. Kulapis Bebatik
JL. Mulaut, Kg. Agau
JL. Mulaut-Limau Manis Spg.125, Kg. Sungai Tampoi
Perumahan Kg. Rimba Spg. 177
JL. Tunku 1
JL. Tungku 2
JL. Dato Ratna, Kg. Bribi
JL. Pangiran Babu Raja, Kg. Beribi
JL. Mabuhai, Kementerian Belian dan Sukan
Indonesian Embassy
Malaysian Highs commissioner
JL. Muara, Kg. Delima
JL. Kuala Belait
JL. Tungku Spg.162
Roundabout JL. Gadong Estate
JL. Subok, Sungai Akar
Airbase Military of Brunei
JL. Bebatik-Kilanas
JL. Muara, Kg. Manggis
Under Bridge RIPAS flyover
Muara-Tutong Highway
JL. Pasir Berakas, Kg. Lambak Kiri

18 September 2013
29 July 2013
20 September 2013
22 September 2013
27 September 2013
29 September 2013
30 October 2013
24 December 2013
23 January 2014
28 January 2014
12 February 2014
14 February 2014
15 February 2014
21 February 2014
27 February 2014
01 March 2014
07 March 2014
13 March 2014
18 March 2014
22 March 2014
26 March 2014
29 March 2014
01 April 2014
04 April 2014
01 June 2014
03 June 2014
06 June 2014
08 June 2014
10 June 2014
11 June 2014
12 June 2014
14 June 2014
17 June 2014
28 June 2014
7 July 2014
8 July 2014
12 July 2014
12 August 2014
16 August 2014
24 August 2014
28 August 2014
1 September 2014

Water pipe
Electric

Electric
Water pipe
Electric

Water pipe
Electric
Electric
Water
Electric
Electric

Sewerage
Electric
Electric
Electric
Electric
Electric
Water pipe
Water pipe
Electric

1200..mm. HDPE pipe


2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
1355..mm. HDPE pipe
1355..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
3180..mm. HDPE pipe
1355..mm. HDPE pipe
1355..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1355..mm. HDPE pipe
1355..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
2180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1160..mm. HDPE pipe
1180..mm. HDPE pipe
1180..mm. HDPE pipe
1110..mm. HDPE pipe
8180..mm. HDPE pipe
1110..mm. HDPE pipe
1110..mm. HDPE pipe
1355..mm. HDPE pipe
1355..mm. HDPE pipe
1185..mm. HDPE pipe

18
12
38
38
20
34
30
84
21
21
24
18
24
33
33
18
30
42
53
36
16
18
12
53
30
84
54
60
36
48
36
42
62
36
80
48
72
24
65
32
33
30

164.
165.
166.
167.
168.
169.
170.

Department Electrical Services Brunei


Berakas Power Management Company
Department Electrical Services Brunei
FALAH-TEK

*Up-date August 2014*

25 C & F ENGINEERING SDN BHD

JL. Tutong, Kg. Tanjung Bunut


Muara Port
JL. Kasat-Putat, Mukim Lumapas
JL. Kasat, Mukim Lumapas
Roundabout Bangunan Baru Mahkamah Tutong
JL. Lorong 8, Kg. Panaga-Seria

29 September 2014
03 October 2014
22 October 2014
26 October 2014
29 October 2014
01 November 2014

Electric
Electric
Electric
Telephone Line

2180..mm. HDPE pipe


2180..mm. HDPE pipe
4180..mm. HDPE pipe
4180..mm. HDPE pipe
1185..mm. HDPE pipe
1180..mm. HDPE pipe

54
72
36
36
36
30

Job Completed

47
41
35

20

20

2009

2010

26 C & F ENGINEERING SDN BHD

2011

2012

2013

2014

CERTIFICATED

27 C & F ENGINEERING SDN BHD

28 C & F ENGINEERING SDN BHD

SITE PHOTO

29 C & F ENGINEERING SDN BHD

Client
: BERAKAS POWER MANAGEMENT COMPANY (BPMC)
Project : Proposed HV/CD (Cable Duct)
Product Bundle
: 8 X 180mm.DIA.HDPE X 72m
Location
: Rimba
Year
: 2014

30 C & F ENGINEERING SDN BHD

Client
: BERAKAS POWER MANAGEMENT COMPANY (BPMC)
Project : Proposed HV/CD (Cable Duct)
Product Bundle
: 4 X 180mm.DIA.HDPE X 250m
Location
: Jalan Berakas
Year
: 2014

31 C & F ENGINEERING SDN BHD

SAFETY MESSAGES

32 C & F ENGINEERING SDN BHD

SAFETY MESSAGES
General safety messages appear in the safety section. Specification safety messages are in appropriate section of the manual
where potential hazard may occur if the instruction or procedures are not followed.

!
!
!
!

UNDERSTAND SAFETY ALERT


This symbol place on our machine or in the
manual is used to alert you to the potential for
bodily injury or death.

DANGER
CAUTION
WARNING

UNDERSTAND SIGNAL WORDS

DANGER Imminent hazard which, if not avoided, will result in in serious personal injury or death.
CAUTION Potential hazard or unsafe practices which, if not avoided, will result in in serious personal injury or death.
WARNING Potential hazard or unsafe practices which, if not avoided, will result in in serious personal injury or death.

33 C & F ENGINEERING SDN BHD

INDEX

INTRODUCTION..... 1

METHODE AND STATEMENT2

EXCECUTION OF HORIZONTAL DIRECTIONAL DRILLING10

LOCATOR.. 14

CROSS COMPLETED. 19

CERTIFICATE COMPETENCY.. 24

SITE PHOTO.... 28

SAFETY MESSAGES.. 32